Extracted text (via pymupdf) 346316 characters
Legal approved 9/6/18 Rev. 3/4/2022 
       Project # WW2111.401 
Page 1 of 2 
  Project Name: Chandler Heights Road Utility Relocations CO 1 
CITY OF CHANDLER 
CHANGE ORDER NO. 
1 
DATE 
3/23/22 
Change Order not valid until signed by both the City and the Contractor.  Contractor’s signature indicates agreement 
herewith, including any adjustments in the Contract Price or Contract Time.   
Project Name: 
Chandler Heights Road Utility Relocations – GMP 2 
Project No.: 
WW2111.401 
User Dept.: 
PW&U 
NTP Date: 
3/28/2022 
TO: 
Achen-Gardner Construction, LLC 
550 S. 79th St. Chandler, AZ 85226 
(CONTRACTOR) 
(Address) 
Contractor must make the following changes to this contract: (Detail scope change (Exh. A) / 
Technical Specifications (Exh. B), if needed) 
The following contract Change Order represents the GMP for the Phase II of the Chandler Heights 
Road Utility Relocations as presented in Exhibit A for the proposed work along Lake Drive from 
Chaparral Way to Alma School Road. The contract time will also be extended an additional 50 
calendar days to allow the contractor to perform this portion of the work.   
OWNER NAME & DATE APPROVAL: 
Kim Moon 03/22/2022 
Changes result in the following revised contract amount and time: 
Original contract amount: 
$1,371,579.28 
Current contract amount, prior to this Change Order: (incl. previous Change 
Orders) 
$1,371,579.28 
Net change resulting from this Change Order: (if over $50,000 from contract 
amount previously approved by Council, Council approval is required)  
$3,396,940.40 
Revised contract amount, including this Change Order: 
$4,768,519.68 
Last contract amount approved by Council: 
$1,371,579.28 
Change Order  % of last contract amount approved by Council: (if over 10% 
of previous contract amount approved by Council, Council approval is required)  
247% 
Contract time or completion date prior to this Change Order: (incl. 
previous Change Orders) 
90 
or 
Days 
Date 
Net change resulting from this Change Order: 
50 
Days 
Revised contract time OR completion date: 
140 
or 
Days 
Date 
SIGNATURE PAGE TO FOLLOW

THE ABOVE IS AGREED TO BY: 
Achen-Gardner Construction, LLC 
CONTRACTOR 
MAYOR 
Approved as to Form 
(initials): 
E-copy: 
Owner I Project Mgr. / Orig.- City Clerk 
Legal approved 9/6/18 Rev. 3/4/2022 
~~ 
knunez@achen.com 
Signer Email Address 
Date 
Recommended By: 
Date 
Project# WJ\/2111 .401 
Approved by 
Council on: 
Project Name: Chandler Heights Road Utility Relocations CO 1 
3/29/2022 
Date 
----
Date 
Date 
Page 2 of 2

GMP PROPOSAL FOR CITY OF CHANDLER ‐ CHANDLER HEIGHTS ROAD UTILITY 
RELOCATIONS.  LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD CMAR PROJECT 
March 18, 2022 
City of Chandler 
Mr. Paul Ahlas 
215 E. Buffalo Street 
Chandler, Arizona 85224 
City of Chandler Project No.:  WW2111.401 
Achen‐Gardner Construction, LLC Project No.: 3938102 
Dear Mr. Ahlas: 
Attached please find Achen‐Gardner Construction, LLC’s (“Achen‐Gardner”) GMP Proposal (“Proposal”) 
including Schedule of Values (SOV) for installation of 2”,8”, & 16” water lines and 10” sewer.   
This GMP Proposal total for the Direct Cost and markups is $2,953,861.22 (excluding Owner Allowance 
(Item 10700) or $443,079.18). Achen‐Gardner does not guarantee the Owner Allowance amount. 
Should you have any questions and/or comments, please feel free to contact me Lat (480) 403‐9399 or 
e‐mail dbroderick@achen.com.   
Sincerely, 
ACHEN‐GARDNER CONSTRUCTION, LLC  
Dan Broderick, Sr. Project Manager 
Attachments 
Exhibit A

INDEX OF EXHIBITS 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD 
PROJECT NO:  WW2111.401 
Exhibit D1: 
Scope of Work 
Exhibit D2: 
Cost Model Form 
Exhibit D3: 
Schedule of Values 
Exhibit D4: 
List of GMP Documents 
Exhibit D5 
Clarifications and Assumptions 
Exhibit D6: 
Subcontractor and Supplier Solicitation Documentation, Award 
Recommendations and Quotes 
Exhibit D7: 
Baseline Project Schedule

EXHIBIT D1:  SCOPE OF WORK 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
The overall project scope includes the relocation of existing City‐ owned wastewater, reclaimed water 
and potable water pipes to clear an alignment for a proposed SRP undergrounding of a 230‐Kilowatt 
transmission system.  These relocations will occur on Chaparral Way (Dobson Road to Lake Drive) ‐
Package no. 1, on Lake Drive (Chaparral to Alma School) ‐ Package no. 2, on Alma School Road (Lake 
Drive to Chandler Heights Road) and Chandler Heights (Alma School Road to the Union Pacific Railroad) ‐ 
Package 3, then work on Chandler Heights east of the Union Pacific Railroad ‐ Package 4.   
The Package 2 GMP project scope on Lake Drive includes the installations of approximately: 250 LF of 8” 
waterline with valves and fittings, 30 LF of 16” waterline with valves and fittings, one 2” service, 30 LF of 
3” reclaimed water and 1130 LF of 10” sewer with ten new Polymer manholes.  The replacement of 
existing concrete and asphalt surfaces due to the construction are included.

EXHIBIT D2:  COST MODEL FORM  
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
Page 1 of 2 
Date: 18‐Mar‐22
Chandler Heights Road Utility Relocations
Amount
A. Cost of Work
 A1 Cost of Work (self‐performed, subcontractors, suppliers no mark‐up)
$2,361,622.79
 A2 Cost of Work (subcontractors, suppliers, materialmen)
TOTAL COST OF WORK:
$2,361,622.79
B. General Conditions
$156,321.70
$2,517,944.49
C. CM@Risk's Fee
$226,615.00
SUBTOTAL 2 (A + B + C):
$2,744,559.49
D. Bonds and Insurance (on Subtotal 1)
  D1 Bonds (Payment and Performance)
$20,143.56
 D2 Insurance
$49,099.92
$69,243.48
SUBTOTAL 3 (SUBTOTAL 2 + BONDS & INS):
$2,813,802.97
E. Sales Tax
 E1 Sales Tax
$142,659.81
 E2 Tax Exempt Material Adjustment
‐$2,601.56
$140,058.25
EXHIBIT D2
TOTAL BONDS & INSURANCE:
TOTAL SALES TAX:
CM@RISK GMP SUMMARY
Project Name:
Project Location:
City of Chandler Project No.:
Lake ‐ Chaparral to Alma
WW2111.401
SUBTOTAL 1 (Cost of Work) (A + B):

EXHIBIT D2:  COST MODEL FORM  
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD 
PROJECT NO:  WW2111.401 
Page 2 of 2 
F. Approved Allowances
 F1 Allowances with F2
$0.00
 F2 Owner Allowance
$443,079.18
$443,079.18
G. Contingencies
  G1 
Construction Contingency
$0.00
  G2
$0.00
$0.00
$3,396,940.40
Establishment of Values:
a. Cost of Work (A) and Allowances (F) to be submitted with GMP Proposal.
b. General Conditions Cost (B) to be established in Baseline Cost Model.
c. CM@Risk Fee as set forth in Section 3.7.3 of this Contract
TOTAL GMP PROPOSAL:
TOTAL ALLOWANCES:
TOTAL CONTINGENCIES:

EXHIBIT D3:  SCHEDULE OF VALUES  
 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
 
 
 
 
 
 
 
 
 
 
Page 1 of 3 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
3‐18‐22
PROJECT NO.:  WW2111.401
90% GMP FOR LAKE DR: CHAPARRAL TO ALMA SCHOOL
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938102
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY 
ITEM
DESCRIPTION
UM
QUANTITY
 UNIT PRICE 
TOTAL
1
MOBILIZATION/DEMOBILIZATION
LS
1
$41,563.96
41,563.96
$ 
2
SURVEY
LS
1
$3,660.00
3,660.00
$ 
3
INSTALL 8" DIP CL 350 WATERLINE & FITTINGS
LF
250
$1,025.79
256,447.50
$ 
4
INSTALL 24" STEEL CASING
LF
120
$764.94
91,792.80
$ 
5
INSTALL 8" GATE VALVE
EA
6
$3,288.53
19,731.18
$ 
6
INSTALL 16" DIP CL 350 WATERLINE & FITTINGS
LF
30
$881.48
26,444.40
$ 
7
INSTALL 16" GATE VALVE
EA
2
$8,237.88
16,475.76
$ 
8
INSTALL 1" COMBO AIR VAC VALVE
EA
3
$9,191.08
27,573.24
$ 
9
INSTALL 2" WATER SERVICE
EA
1
$8,893.51
8,893.51
$ 
10
INSTALL 3" RECLAIMED WATERLINE
LF
30
$133.30
3,999.00
$ 
11
ABANDON EXISTING 8" WATERLINE GROUT FILL
LF
299
$61.26
18,316.74
$ 
12
ABANDON EXISTING 12" WATERLINE GROUT FILL
LF
70
$62.67
4,386.90
$ 
13
REMOVE 10" SEWER LINE
LF
70
$446.35
31,244.50
$ 
14
REMOVE EXISTING MANHOLE
EA
4
$11,621.45
46,485.80
$ 
15
INSTALL 10" VCP SEWER LINE
LF
1130
$652.58
737,415.40
$ 
16
INSTALL 60"  POLYMER MANHOLE
EA
10
$38,558.08
385,580.80
$ 
17
ABANDON EXISTING 10" SEWER LINE/GROUT FILL
LF
1085
$41.65
45,190.25
$ 
18
CONCRETE ENCASEMENT MAG 404
LF
70
$206.21
14,434.70
$ 
20
ASPHALT REMOVAL & REPLACEMENT
SY
2600
$85.57
222,482.00
$ 
21
SIDEWALK REMOVAL & REPLACEMENT
SF
1700
$13.28
22,576.00
$ 
22
SIDEWALK RAMP REMOVAL & REPLACEMENT
SF
300
$22.77
6,831.00
$ 
23
CURB & GUTTER REMOVAL & REPLACEMENT
LF
747
$29.34
21,916.98
$ 
24
VALLEY GUTTER REMOVAL & REPLACMENT
SF
720
$28.46
20,491.20
$ 
25
TRAFFIC CONTROL
LS
1
$10,640.00
10,640.00
$ 
26
PROJECT DUST CONTROL
LS
1
$15,082.77
15,082.77
$ 
27
SWPPP
LS
1
$12,562.50
12,562.50
$ 
28
SEWER BYPASS
LS
1
$249,403.90
249,403.90
$ 
SUBTOTAL ‐ DIRECT COST OF THE WORK (A1)
2,361,622.79
$ 
DESIGN DOCUMENT STAGE:   90% WILSON
EXHIBIT D3 ‐ SCHEDULE OF VALUES 90% GMP

EXHIBIT D3 
Page 2 of 3 
 
 
37
GENERAL CONDITIONS EXHIBIT D2, (B)
MO
2.0 $          78,160.85 
156,321.70
$ 
2,517,944.49
$ 
10100
OVERHEAD AND FEE (7.5% OH, 1.5% FEE) EXHIBIT D2, (C)
9.00%
226,615.00
$ 
SUBTOTAL ‐ OVERHEAD AND FEE 
226,615.00
$ 
2,744,559.49
$ 
10200
INSURANCE (INCL. BUILDERS RISK & POLLUTION LIABILITY)
EX D2,(D2)
1.95% (Calc on RT #1) 
49,099.92
$ 
10300
BONDS (PAYMENT & PERFORMANCE)
EX D2,(D1)
0.80% (Calc on RT #1) 
20,143.56
$ 
SUBTOTAL ‐ INSURANCE AND BONDS
69,243.48
$ 
2,813,802.97
$ 
10400
SALES TAXES (5.07% or 7.8% of 65% of Running Total No. 3  EX, D2(E1)
5.070%
142,659.81
$ 
10450
ESTIMATED TAX EXEMPT MATERIAL ADJ. (ALLOWANCE) EX, D2 (E2)
5.070% $          86,654.00 
(2,601.56)
$ 
SUBTOTAL ‐ SALES TAXES
140,058.25
$ 
2,953,861.22
$ 
29‐35
ALLOWANCES EXHIBIT D2, (F1) Included in (F2)
AL
0.0
$                         ‐   
‐
$ 
10700
OWNER'S ALLOWANCE(AMOUNT INLC. MARK‐UPS (F2)
15.0%
443,079.18
$ 
SUBTOTAL ‐ ALLOWANCES AND CONTINGENCY (INCL MUs)
443,079.18
$ 
3,396,940.40
$ 
TOTAL GMP PROPOSAL
RUNNING TOTAL NO. 4 ‐ DIRECT COST OF THE WORK, + OH & FEE + INS & BOND + SALES TAXES)
RUNNING TOTAL NO. 3  ‐ DIRECT COST OF THE WORK + OH & FEE + INS & BOND 
RUNNING TOTAL NO. 1 ‐ DIRECT COST OF THE WORK INCLUDING GCs
RUNNING TOTAL NO. 2  ‐ DIRECT COST OF THE WORK + OH & FEE
 
 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
3‐18‐22
PROJECT NO.:  WW2111.401
90% GMP FOR LAKE DR: CHAPARRAL TO ALMA SCHOOL
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938102
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY ITEM DESCRIPTION
QUANTITY
UM UNIT PRICE
TOTAL
37.1
PROJECT SUPERINTENDENT 
352.00
HR
109.41
 
38,511.40
37.2
SPECIALTY SUPERINTENDENT
352.00
HR
104.01
 
36,612.00
37.3
PROJECT MANAGER 
176.00
HR
109.41
 
19,255.70
37.4
PROJECT ENGINEER 
352.00
HR
93.81
 
33,020.58
37.5
ICE AND WATER
2.00
MO
220.00
 
440.00
37.6
BUY CONSTRUCTION WATER
2.00
MO
2,150.00
 
4,300.00
37.7
TEMPORARY FACILITIES
2.00
MO
12,091.01
 
24,182.02
GENERAL CONDITIONS (DIRECT COSTS)
156,321.70
37
MONTHLY GENERAL CONDITIONS
2
MO
78,160.85
 
NOTE
See Main Schedule of Values Pay Item 37 for GCs 
DESIGN DOCUMENT STAGE:   90% 
WILSON
 ITEM 27 ‐ GENERAL CONDITIONS DETAIL

Exhibit D3 
Page 3 of 3 
 
CITY OF CHANDLER CHANDLER HEIGHTS ROAD UTILITY RELOCATONS CMAR PROJECT
3/18/22
PROJECT NO.:  WW2111.401
90% GMP FOR LAKE DR: CHAPARRAL TO ALMA SCHOOL
ACHEN‐GARDNER CONSTRUCTION PROJECT NO. 3938102
ACHEN‐GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PAY 
ITEM
DESCRIPTION
UM
QUANTITY
 UNIT PRICE 
TOTAL
29
OFF‐DUTY OFFICER (ALLOWANCE)
LS
1.0
29,920.00
$          
29,920.00
$ 
30
LANDSCAPING RESTORATION (ALLOWANCE)
LS
1.0
20,000.00
$          
20,000.00
$ 
31
HOA WALL REPAIR (ALLOWANCE)
LS
1.0
30,000.00
$          
30,000.00
$ 
32
3" IRRIGATION BYPASS (ALLOWANCE)
LS
1.0
10,000.00
$          
10,000.00
$ 
33
MATERIAL TESTING (ALLOWANCE)
LS
1.0
15,000.00
$          
15,000.00
$ 
34
SWEEPING (ALLOWANCE)
LS
1.0
13,000.00
$          
13,000.00
$ 
35
PLANT OPENING FEES (ALLOWANCE)
LS
1.0
12,000.00
$          
12,000.00
$ 
129,920.00
 
10100
OVERHEAD AND FEE (7.5% OH, 1.5% FEE)
9.00%
11,692.80
$ 
SUBTOTAL ‐ OVERHEAD AND FEE ©
11,692.80
$ 
141,612.80
$ 
10200
INSURANCE (INCL. BUILDERS RISK & POLLUTION LIABILITY)
1.95% (Calc on RT #1) 
2,533.44
$ 
10300
BONDS (PAYMENT & PERFORMANCE)
0.80% (Calc on RT #1) 
1,039.36
$ 
SUBTOTAL ‐ INSURANCE AND BONDS
3,572.80
$ 
145,185.60
$ 
10400
SALES TAXES (5.07% or 7.8% of 65% of Running Total No. 3
5.070%
7,360.91
$ 
10450
ESTIMATED TAX EXEMPT MATERIAL ADJUSTMENT (ALLOWANCE)
SUBTOTAL ‐ SALES TAXES
7,360.91
$ 
152,546.51
$ 
NOTE
ALLOWANCES ARE ESTIMATES  F1 Allowance to be included in F2 Owner Allowance
TOTAL ALLOWANCES  (SEE MAIN SCHEDULE OF VALUES PAY ITEM 28)
SUBTOTAL ‐ DIRECT COST OF THE ALLOWANCES 
.
DESIGN DOCUMENT STAGE:   90% WILSON
RUNNING TOTAL NO. 1  ‐ DIRECT COST  + OH & FEE 
RUNNING TOTAL NO. 2  ‐ DIRECT COST  + OH & FEE + INS & BOND

EXHIBIT D4:  LIST OF GMP DOCUMENTS 
 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
 
 
 
Wilson Engineers City of Chandler ‐ Chandler Heights Road Utility Relocations, Lake Drive: 
Chaparral Way to Alma School Road 90% plan set (pages 1 to 14), Project No. WW2111.401 
dated January 2022 with comments dated February 8th, 2022. 
 
Wilson Engineers Technical Specifications Submittal for City of Chandler – Chandler Heights 
Road Utility Relocations, Lake Drive: Chaparral Way to Alma School Road, City Project No. 
WW2111.401, dated February 2022 (Agency Review set, pages 1 to 99). 
 
Executed (12‐16‐21) Pre‐construction Services Contract with Achen‐Gardner Construction, LLC 
and the City of Chandler for the Chandler Heights Road Utility Relocations CMAR Project; City of 
Chandler Project No. WW2111.251. 
 
Project WW2111.401 GMP 1 ‐Package 1 (Chaparral Way – Dobson Road to Lake Dr.) proposal 
dated 1‐26‐22 and contract documents scheduled for council approval on 2‐24‐22.

EXHIBIT D5:  CLARIFICATIONS AND ASSUMPTIONS  
 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
 
 
 
NOTE: This GMP is based on the following clarifications and assumptions.  
 
1. Fee Exclusions:  GMP excludes all costs associated with City permit and plan review fees, Quality 
Assurance (QA) (i.e., City inspection and testing) costs, impact fees, and utility company fees, water 
meters/meter installations except for construction water, and/or any other fees not specifically 
identified herein. 
2. Unit Price Contract Administration:  This GMP will be administered as a Measured Quantity/Unit 
Price, Guaranteed Not‐to‐Exceed Contract. The Schedules of Values (Re:  Exhibit D3) is defined by the 
individual work/pay items plus fee structure, and markups (re: Exhibit D3, Items 10100 through 
10450). Final contract price/payout will be based on field measured, final completed quantities at the 
approved unit prices, approved allowance and/or contingency utilization, and approved change 
orders. It is understood that these City approved prices including mark‐ups are the “Cost of the 
Work”.  The mark‐up structure on the Schedule of Values (Exhibit D3) will apply to Change Orders 
and/or Extra Work, allowances, and contingencies.  The mark‐ups for MAG section 109.5 do not apply 
for this contract.  Pay Item under‐runs and/or unused items shall fall to Owner’s Allowance for the 
duration of the project. Quantity over‐runs shall be paid at the unit price established in the Schedule 
of Values for the pay item and shall be paid from Owner’s Allowance or Change Orders. 
3. Aerial Construction Photography:  Achen‐Gardner shall provide a pre‐construction video/photographs 
and progress photographs/videos periodically. Aerial videos shall only be provided if FAA and local 
approval is provided to fly a drone camera. Drone videos if allowed, shall be standard drone footage. 
4. Mobilization/Demobilization – includes the following monthly items as defined in the Specifications: 
the field office fencing, work area fencing for three work sites, field offices, temporary utilities, 
material testing, and toilets for the two‐month project duration. Therefore, the 
Mobilization/Demobilization Pay Item shall be invoiced monthly based on the two (2) month project 
duration.  
5. Utility Relocations / Unknown Buried Conflicts:  This GMP excludes all costs associated with removing, 
replacing and/or relocating any existing buried or overhead dry utilities and/or unknown buried 
conflicts. 
6. Final, For‐construction Plans and Technical Provisions:  Funds required for revisions made between 
the 90% and final design documents shall come from Owners Allowance.

FEE SCHEDULE ITEM CLARIFICATIONS 
ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
DIRECT COSTS 
1 
Mobilization 
 
Mobilization & Demobilization 
 
Pre-Construction Video & Progress Photos 
 
Project Clean-Up 
 
Known utility potholing 
 
Small Tools & Consumables 
 
Dust Permit 
 
Project Sign 
 
Quality Control based on MAG testing requirements for frequency and type. 
 
Nighttime/weekend plant opening fees. 
 
Measured and paid on lump sum basis.
2 
Survey 
 
Survey, Staking, Registered Land Surveyor Certified As-Builts 
 
Construction Redlines 
 
GIS point collection and submission per City’s GIS Mapping specifications 
 
Registered Land Surveyor Certification of as-builts 
 
Measured and paid on lump sum basis
3-9,12 
Potable Water 
 
Includes all installation work associated; dig/lay/bedding/shading/backfill per 
MAG specs and as noted on drawings, spoil/debris haul off, slurry backfill to 
full depth in asphalt per detail 101 on page M-1, connections to existing 
waterlines/service connections (tees), installation of valves, and testing (bac 
tee & chlorination) 
 
Includes 2”, 8”, and 16” waterline as noted on the plans. 
 
Includes 24” steel casings where laterals are noted on plans; all lateral 
crossings to be placed under SRP duct banks. Each casing installation is based 
on all 35’ at one time.  
 
Work excludes cathodic protection for all DIP related components. 
 
Work includes grout fill of 174 LF of 8” and 70 LF of 12” abandoned 
waterlines per the plans. 
 
Material pricing good for 30 days. 
 
Measured and paid for as noted on Exhibit D3 unit rates summary.
10 
Reclaimed Water 
 
Includes all installation work associated; dig/lay/bedding/shading/backfill per 
MAG specs and as noted on drawings, spoil/debris haul off, slurry backfill to 
full depth in asphalt per detail 101page M-1, connections to existing 
reclaimed waterlines/service connections (tees), installation of valves, and 
pressure testing as required. 
 
Includes 3”” reclaimed waterline as noted on the plans. 
 
Material pricing good for 30 days. 
 
Measured and paid for as noted on Exhibit D3 unit rates summary.
13-18 
Sewer 
 
Includes all installation work associated; dig/lay/bedding/shading/backfill, 
spoil/debris haul off, slurry backfill to full depth in asphalt per detail 101 on 
page M-1, manhole connections, manhole installation/rehab as noted on plans, 
applicable sewer encasements, testing, and CCTV.  
 
Includes 10” sewer as noted on the plans. 
 
Includes new polymer manholes 60” diameter as noted on the plans. 
 
Includes removal of existing manholes and existing 10” sewer line as noted 
on the plans. 
 
Includes grouting 1085 LF of 10” abandoned sewer line. 
 
Includes MAG 404 encasement as noted on the plans. 
 
Material pricing good for 30 days. 
 
Measured and paid for as noted on Exhibit D3 unit rates summary.

ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
20 
Asphalt Removal & 
Replacement 
 
Includes all work associated with the construction including saw cutting, 
spoil/debris haul off, subgrade preparation, and installation of ABC, AC and 
tack coat.. 
 
Slurry seal is excluded.  
 
Asphalt thickness to be replaced on Lake Drive at 3” Asphalt Concrete on 6” 
ABC and on Alma School Road at 5” Asphaltic Concrete on 12” of ABC as 
noted on the plans. 
 
Includes thermoplastic striping. 
 
Material pricing good for 30 days. 
 
Measured and paid for by the Square Yard.
21-24 
Concrete 
 
Includes all work associated; concrete removal, saw cutting, haul off, 
disposal, subgrade preparation, and replacement of concrete with like kind to 
match existing color and textured surfaces. Curb & Gutter replacements per 
mag 220, Sidewalk replacements per MAG 230 and valley gutter/apron 
replacements per MAG 240. 
 
Material pricing good for 30 days. 
 
Measured and paid for as noted on Exhibit D3 unit rates summary.
25 
Traffic Control 
 
Traffic Control assumed to have hard closure all directions on Lake Dr from 
approximately station 100+80 to approximately station 117+00 (west asphalt 
edge of Alma School Road). Excludes any use of jersey barriers. 
 
Message Boards - Variable Message Boards will set up 2 weeks prior to 
construction and then removed after 2 weeks after the start of construction. 
Includes 4 variable message boards. 
 
Traffic Control Plans - Includes preparation, submission, and updates of 
Traffic Control Plans (TCP). 
 
Setup & Takedown - Includes installation, maintenance, and removal of 
barricades and signage in accordance with approved TCP. 
 
Includes daily maintenance of barricades in accordance with approved TCP. 
 
Barricades and no plating. 
 
Measured and paid on lump sum basis.
26 
Dust Control 
 
Includes one month of 2000 gallon water truck and teamster for dust control. 
 
Measured and paid on lump sum basis.
27 
SWPPP – Design, 
Implementation, & 
Maintenance 
 
Includes SWPPP plan, implementation of plan, inspections, and removal at 
the completion of the project.  
 
Track Out Pad 
 
Measured and paid on lump sum basis.
28 
Bypass Pumping 
 
Includes installation with 5week operation of bypass for 10” sewer line. The 
suction manhole is located at approximately 101+00 and the discharge 
manhole is located at approximately 117+00 (west edge of Alma School 
Road).   Lateral flows are picked up at MH #4 (from the south), MH #7 (from 
the north), and MH #10 (from the north and south).  Assumes that lateral 
bypass line will need to be buried at 2 locations Wildflower and Apartment 
lateral at MH #10 to connect to main bypass line. No asphalt replacement 
included in this item.   
 
Measured and paid on lump sum basis.
37 
General Conditions 
 
Includes cost of Project Management – Project Supt., Specialty Supt. 
Project Manager, Project Engineer and vehicles.   
 
Ice/drinking water and construction water. 
 
Temporary Facilities (2.0 months) – trailer, fencing, electrical service, 
yard rental, toilets, and trailer furnishings. 
 
Assumption is that GMP 1 timeframe for 2 months (April/May) gives 
GMP 2 a sequenced start directly after GMP 1 for 2.0 months (June/July) 
with no gap.  Should a nonconsecutive work time gap exist the additional 
time would be funded out of Owner Contingency. 

Measured and paid on a monthly basis.

ITEM NO. 
DESCRIPTION 
CLARIFICATION / ASSUMPTION 
ALLOWANCES 
29 
Off Duty Police Officer w/ 
vehicle (Allowance) 
 
Chandler Off-Duty Police Office and Vehicle. 
 
Hourly rate may be adjusted to match actual costs incurred (City rates could 
be subject to change during the duration of the project). 
 
Measured and paid on an hourly basis out of owner contingency F2.
30 
 
Landscape Restoration 
(Allowance) 
 
Includes all work associated including granite removal, spoil/debris haul off, 
subgrade preparation, replacement of decomposed granite and restoration of 
existing irrigation system. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
31 
 
HOA Wall Repair 
(Allowance) 
 
Includes all HOA repair work associated with the construction of north tie in 
on 8” waterline at station 14+80. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
32 
3” Irrigation Bypass 
(Allowance) 
 
Includes all work associated with bypassing the 3” reclaimed waterline. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
33 
Material Testing (Allowance) 
 
Includes all work associated with Quality Control based on MAG testing 
requirements for frequency and type. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
34 
Sweeping (Allowance) 
 
Includes all work associated with sweeping for dust control to and from the 
site. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
35 
 
Plant Opening (Allowance) 
 
Includes all work associated with additional plant opening fees. 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable out of owner contingency F2. 
10700 
Owner’s Allowance 
 
For City requested upgrades and changes per Construction Contract Article 
15.4.2 Owner’s Contingency. 
 
Includes $140,000 for the preconstruction services for GMP 3 (Package 3) 
and GMP 4 (Package 4). 
 
Measured and paid for on a cost-plus markups basis unless unit prices can be 
utilized where applicable.
CMAR FEE 
10100 
CMAR Construction Fee 
 
Measured and paid on calculation of 9.0% of subtotal direct costs, 
contingencies, allowances, and job overhead. 
BONDS AND INSURANCE 
10200 
Insurance 
 
Measured and paid on calculation of 1.95% of subtotal for direct costs. 
10300 
Performance and Payment 
Bonds 
 
Measured and paid on calculation of .8% of subtotal for direct costs. 
 
 
SALES TAX 
10400 
Gross Receipts Tax 
 
Calculated based on 65% of 7.8% City of Chandler Sales Tax rate. 
 
Calculation may be adjusted to match actual sales tax incurred (City rates 
could be subject to change during the duration of the project). 
 
Measured and paid on calculation of 5.07% of subtotal direct costs, 
contingencies, allowances, job overhead, CMAR fee, bonds and insurance.

10450 
 
Tax Exempt Material 
Adjustment 
 
Tax Exempt material adjustment for water line materials per Title 42 of the 
Arizona Revised Statutes (also reference AZDOR code 535 Pipes or Valves, 
4” diameter or large used to transport oil, natural/artificial gas, water, coal 
slurry). 
 
Measured and paid on lump sum basis.
 
** Allowance options with values are referenced above; allowance items can be reallocated to the base 
bid as requested.

EXHIBIT D6:  SUBCONTRACTOR AND SUPPLIER SOLICITATION DOCUMENTATION, 
AWARD RECOMMENDATIONS, AND QUOTES 
 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
 
 
See following subcontractor and supplier award recommendations spreadsheet with quotes. 
 
1) This Proposal is based on recommended awarded subcontractor and supplier resource values and 
related proposals/quote clarifications, inclusions, exclusions, escalation clauses, and qualifications.  
These proposals/quotes follow this summary sheet. 
2) This summary reflects competitive bids with a specific scope/Schedule of Values provided to all 
subcontractors and suppliers at the time of solicitation.  Actual quantities and extended totals 
reflected in the SOV may be different based on final quantity and cost adjustments due to ongoing 
revisions. 
 
3/18/2022
SCOPE OF WORK/MATERIAL SUBCONTRACTOR/SUPPLIER
BID/NO BID BID AMOUNT
RECOMMENDATIONS
AGGREGATES
Buesing Corp
B
337,138.00
$      
AGGREGATES
Cemex Inc
B
309,592.00
$      
Lowest Qualified Bidder
AGGREGATES
Vulcan Materials
B
569,926.00
$      
ASPHALT
Fisher Sand and Gravel
B
72,735.00
$        
ASPHALT
Vulcan Materials
B
54,375.00
$        
Lowest Qualified Bidder
BYPASS
Capital Pump & Equipment
B
216,005.07
$      
Lowest Qualified Bidder
BYPASS
Rain For Rent
B
249,938.00
$      
CASING
Trinity Products
B
21,822.00
$        
Selection Continuation Pck 1
GROUT
Action Pumping
B
7,695.00
$           
Lowest Qualified Bidder
GROUT
Cell‐Crete Corporation
B
27,030.00
$        
GROUT
Pacific International Grout Company
N
PIPEPK
Core&Main
B
92,686.00
$        
Selection Continuation Pck 1
POLYMH
Armorock
B
143,581.00
$      
Lowest Qualified Bidder
POLYMH
Olson Precast
B
122,089.00
$      
Not approved supplier
QC
Alta Arizona (Survey,Engineering, GeotecN
QC
Ninyo & Moore
N
QC
Quality Testing LLC.
B
14,957.00
$        
Lowest Qualified Bidder
REDIMIX
Arizona Materials LLC
B
158,770.00
$      
Lowest Qualified Bidder
REDIMIX
Calportland
B
164,135.00
$      
REDIMIX
Desert Redi Mix
B
144,808.00
$      
NO PRICE/DELIVERY GUARANTEE 
SURVEY
Atwell, LLC
N
SURVEY
Benchmark Surveying & Consulting
N
SURVEY
Survey Innovations Group Inc.
B
3,660.00
$           
Lowest Qualified Bidder
SUBCONTRACTOR SOLICITATION SUMMARY AND RECOMMENDATIONS

Quote Analysis Report
Page 1 of 2
Achen-Gardner Construction, LLC 71
Mark McLafferty
3/18/2022 12:52 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2 FINAL
39381002-1
AGGREGATES
AGGREGATES
Vendor Phone
Vendor Name
Vendor Code
Unit Price
7606377179
Cemex Inc
CEMEXINC
Unit Price
6022333339
Buesing Corp
BUESINGCORP
Unit Price
6025288961
Vulcan Materials
VULCANMATERI
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
25.0000
TN
1.50
57 ROCK
2AG57ROCK
P
25.0000
0.0000
25.0000
15.0000
TN
19,949.00
ABC MAG
2AGABC
15.5000
16.9000
28.5500
23.0000
TN
15.00
BEDDING SAND
2AGBEDSAND
P
23.0000
0.0000
P
23.0000
Plugged Amount
Quoted Amount
383
309,210
0
337,138
345
569,581
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
299,618
Totals
309,592
337,138
569,926
Diff From Plug
9,975
37,521
270,309
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

GENERAL INFORMATION
MATERIAL PRICING:
 ADDITIONAL CLAUSES 
Category
Item
Value
UoM
Comments
Pricing Escalation
ADD $0.50/TON 7/1/22 - 9/30/22
The prices are subject to an escalation of
x.xx
USD/ton
Effective , and each  months thereafter
Surcharges and Fees
Variable Fuel surcharge
xx.xx
USD/Load
Environmental compliance fee
$5.00
USD/Load
Charged on all loads
Full freight recovery
xx.xx
USD/ton
Based on full freight for a load of 22 Tons
Plant Operning fee for non business hours on 
weekdays, weekends
$1,000.00
USD per Each
Subject to notification
Saturday haul premium
Bid upon request
USD/ton
Aggregates account manager for pricing
Standby charge
xx.xx
USD/min
Subject to notification
Re-handling fee
$40.00
USD/Load
Unsuitable material dumped at landfill, to be reloaded
Pricing Conditions
All Sales are subject to CEMEX Standard terms and conditions. Pricing quoted is per short ton and does not include sales tax.  Applicable Sales Tax will apply unless Sales Tax exemption 
certificate is on file at CEMEX prior to pick up or delivery.
Delivered Pricing: Pricing is based on delivery during regular aggregate plant hours.
FOB Pricing:  Material prices are FOB CEMEX facility at the designated location loaded onto buyer’s trucks. Ownership of materials transfers from CEMEX to customer at gate.
Payment terms
Payment Terms are standard as follows: Net 10th Prox. (10th of the month following delivery or pick up)
Delayed portion of payment will attract a Finance charge of the lessor of 1.5% per month, 18% per annum or maximum permitted under applicable laws
Material Availability
All Materials are subject to availability by plant inventory, production schedules, shipping schedules, plant failure and / or equipment breakdown. CEMEX is not liable for lack of 
material, equipment, drivers, disruptions in transportation, and any other shortage.
Delivery Availability
All shipments are subject to truck availability.
Product Performance
All material is per engineer approval and is considered acceptable when tested and sampled per acceptable sampling standards at our plant.
Respectfully,
CEMEX Con Mat South,LLC
Accepted by:
Donald Peters
ACHEN-GARDNER CONSTRUCTION LLC
Phone: 0
Email:  donald.peters@cemex.com
BID-0608432
2/16/2022 2:40 PM
Account:
ACHEN-GARDNER CONSTRUCTION LLC
Project:
D - CHANDLER HTS RD CMAR P2
Account number:
3033003
Project Address:
4500  South Alma School Road
Contact:
Mark McLafferty
Chandler, Arizona 85248
E-mail:
mmclafferty@achen.com
Phone:
480-940-1300
Doc. Expiration Date:
3/18/2022
Price Valid from:
2/16/2022
Customer Service:
602-416-2658
Price Valid to:
3/31/2022
Sales Office Address:
5555 E. Van Buren Street, Suite 155, Phoenix, AZ 
85008
Material Number
Description
Plant
Quantity
UoM
Delivered Price
Truck Type
Notes
 1307799
SPEC BASE COARSE
2108-8985-Agg Trading - 
Sacaton (SO-3233)
30,000.00
TON
$15.25
16 WHEELER
DELIVERED IN SUPERS

Standard Terms and Condition
1.Terms and Conditions. These Standard Terms and Conditions of CEMEX Con Mat South,LLC and its affiliates (“Seller”), Buyer’s Credit Application, and Seller’s Quotation, if any, (collectively, “Agreement”) govern any and all 
purchases made by Buyer from Seller and are incorporated herein by reference. This Agreement, and any other documents prepared by Seller for Buyer in connection with Buyer’s purchase of materials contain the entire 
understanding between the parties concerning the subject matter hereof, and there are no other agreements or understandings except as set forth herein. Any different or additional terms or conditions contained in any writing or 
instrument of Buyer, whether by purchase order or otherwise, are hereby objected to by Seller and shall have no effect on, and not become part of, this Agreement.
2.Technical Assistance. In no event shall Seller bear any responsibility for claims arising from technical advice or assistance provided to Buyer. Advice by Seller is for Buyers guidance only and Buyer agrees to rely solely on its 
own architects, engineers or other technical experts.
3.Prices and Price Increases. Prices for the materials are (i) subject to material availability at the time of delivery; (ii) shall remain firm until the date set forth on the Seller’s Quotation, if any, or if no such date is given, for a period 
of thirty (30) days after the date the order was accepted by Seller, the price was quoted by Seller or such shorter period as set forth in the Seller’s quote; thereafter prices are subject to change by Seller; and (iii) do not include 
Saturday, Sunday holiday, off-hour or overtime shipments, all of which are subject to additional charges.  Prices are applicable only to the job quoted or orders accepted by Seller and are available only to the specific Buyer 
referred to therein, are for a standard mix design, if applicable, and are only for the quantities requested by Buyer at the time the prices were quoted.  Seller reserves the right to (i) increase prices on any quote or accepted orders 
without notice to reflect any raw material cost increases or surcharges incurred by Seller and (ii) defer or cancel any quote or accepted orders in the event Seller becomes delayed or prevented from performing due to shortages 
or allocation of raw materials.  In the event of a delay or cancellation resulting from shortages or allocations of raw materials, Seller shall not be liable to Buyer for any damages incurred by Buyer as a result of any such delay or 
cancellation.
4.Surcharges and Fees. Prices quoted may not include additional charges Buyer may be responsible for.  Such additional charges include, but are not limited to, charges for additives, accelerators, winterizers/summerset, water 
(hot or chilled), ice and stand-by, waiting time and delivery charges due to loads in amounts less than a full truckload.  Such prices shall be charged at the rate of Seller’s then-current price list for additional charges, which is 
incorporated into these Terms and Conditions by reference as if fully set forth herein and which is available to Buyer upon request.  Buyer acknowledges that surcharges and fees are to recoup Seller’s costs and achieve a return 
on investment.
5.Tests. Seller reserves the right to levy an additional charge on Buyer for any nonstandard tests that Buyer may require to be performed on the materials sold to Buyer.  Failure of Buyer to witness any tests shall be deemed a 
waiver by Buyer of its right to do so and of any right to require repetition of such tests, and Buyer shall be deemed to have accepted any such test results as sufficient to meet its specifications.
6.Payment and Interest.  Buyer shall make all payments due hereunder in accordance with the terms of this Agreement and as stated on Seller’s invoices or other notices of terms, without any right of setoff or retention and without 
regard to any agreement Buyer may have with other parties. If Buyer fails to pay in full the invoice amount when due, Buyer agrees to pay interest on the unpaid balance from the date when due until paid in full at the rate selected 
by Seller, not to exceed the lesser of 18% per annum or the highest lawful rate, specifically including post judgment.  Buyer agrees to pay any and all costs and expenses incurred by Seller in collecting from Buyer any past due 
amounts, including but not limited to reasonable attorney fees, court costs and collection agency fees. Seller may suspend pending deliveries during any period when Buyer has overdue balances or evidence of a changed 
financial condition.
7.Liens. Buyer agrees to timely provide in writing to Seller information regarding bonding companies, general contractors or owners for the purpose of filing preliminary notices and claims on payment bonds or mechanic’s and 
material supplier’s liens.
8.Delivery. Seller’s responsibility for delivery shall cease FOB shipping point or, if Seller agrees to deliver FOB delivery site, at the curbside or frontage of the address for delivery. Where delivery of products is to an unattended 
site, Seller will not be liable for any loss or damage to products, property or for unsigned delivery tickets.  In absence of a specific delivery date on the Quotation, Seller will commence delivery of the materials on a date and at a 
rate mutually agreed upon by both Seller and Buyer.
9.Default.  If Buyer is in default under this Agreement or any of its contracts or obligations with Seller, Seller may at its option and without notice: (i) declare the entire unpaid balance owed by Buyer due and payable; (ii) postpone 
further deliveries until such default is remedied; (iii) terminate any and all obligations under any contract; and (iv) refuse further performance without any liability to Buyer.
10.Limited Warranty and Liability Disclaimer. Seller warrants that the materials sold under this Agreement meet solely the description and specifications for the same set forth in the applicable Quotation, if any, and shall be free 
from defects in material and workmanship for a period of one (1) year from the date of delivery thereof. No other express warranties are made with respect to said materials. Acceptance by Buyer of the materials shall constitute 
confirmation by Buyer that the materials meet the description and specifications, if any, set forth in such applicable Quotation. The foregoing warranty is subject to standard manufacturing and color variations, efflorescence, 
tolerances and classifications or naturally occurring substances.  Seller is not responsible for installation or defective conditions caused by installation. Buyer’s exclusive remedy for breach of this warranty shall be to require Seller, 
at Seller’s option, to refund the purchase price for the materials failing to comply, to repair or to provide Buyer with conforming replacements for any nonconforming materials. Seller shall not be responsible for any removal or 
installation costs. THE FOREGOING WARRANTY IS IN LIEU OF AND EXCLUDES ALL OTHER WRITTEN OR ORAL WARRANTIES OR CONTRACTUAL AGREEMENTS, WHETHER EXPRESS OR IMPLIED BY LAW OR 
OTHERWISE, INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY OR HABITABILITY. Buyer agrees that in specific consideration for receiving this warranty, it will 
indemnify and hold harmless Seller from any and all damages in connection with any statutory, contractual or warranty breach, negligence, strict liability, or other tortuous conduct by Seller. This Agreement may not be modified 
or amended except by a writing signed by both parties.
11.Delays.  If Seller is unable to complete delivery of any part of an order, Buyer shall accept such part of the order as Seller is able to deliver and Buyer shall pay for the part delivered pro rata at the same rate as the whole of the 
order agreed to be sold and on the same terms of payment. In the event Seller shall be delayed in or prevented from the performance of any act required under this Agreement, or it shall become commercially unreasonable to 
perform by reason of governmental allocations, priorities, restrictions or regulations now or hereafter in effect, storm, flood, fire, earthquake or other Acts of God, war, terrorism, riot, insurrection or other civil disturbance, strikes, 
lockouts, shortages of materials, labor, raw materials, fuel, power or production facilities, breakdown of equipment, transportation shortages, changes in market conditions or other contingencies beyond Seller’s reasonable control 
whether of a similar or dissimilar nature to the foregoing, Seller shall not be liable to Buyer for any damages incurred by Buyer as a result of any such delay or failure. 
12.Claims. Buyer agrees that all claims against Seller are waived unless presented to Seller in writing within one week from the date of delivery of the materials. Seller shall have thirty days from receipt to inspect and correct a 
defect if such claim is allowed. Buyer further agrees that in the event that Buyer disagrees with Seller’s decision about whether to allow the claim that the Buyer’s remedy is to formally adjudicate the claim, but the Buyer further 
agrees that Seller’s invoices for all materials supplied shall be paid in the interim. No claim shall be allowed after the materials purchased hereunder are incorporated, modified or processed by Buyer in any manner. SELLER’S 
LIABILITY ON ANY CLAIM FOR LOSS OR DAMAGE SHALL NOT EXCEED THE PRICE OF THE MATERIALS ACTUALLY RECEIVED FROM BUYER BY SELLER WITH REGARD TO WHICH SUCH CLAIM FOR LOSS OR 
DAMAGE IS MADE. 
13.Waiver. Seller may, at its option, permit Buyer to remedy any default under this Agreement without waiving the default so remedied or any other default by Buyer. Buyer waives notice of default of this Agreement and waives 
presentment, demand, protest, and notice of dishonor as to any instrument issued or delivered to Seller.
14.Venue.  This Agreement will be governed by the applicable state and federal laws without giving effect to conflict of laws principles. The Buyer agrees that any legal actions and proceedings brought for the breach or the 
enforcement of this Agreement will lie in the state and county in this state of delivery.  Buyer consents and submits to the jurisdiction and venue of any state, county or federal court located within that county. As a material 
inducement to Seller to enter into this Agreement, Buyer waives the right to trial by jury in any proceeding arising out of poror related to this Agreement.
15.Notice.  Any notice sent to Seller shall be in writing and sent by Certified Mail, postage prepaid, to the 10100 Katy Freeway, Suite 300, Houston, TX 77043, Attn: CEMEX Customer Care.
16.Severability. If any term, provision, covenant or condition of this Agreement is held by a court of competent jurisdiction to be invalid, void, or unenforceable, the remainder of the provisions shall remain in full force and effect and 
shall in no way be affected, impaired or invalidated. The parties agree that each term and provision of this Agreement shall be construed according to its fair meaning and not strictly for or against any Party.
17.Offset and/or Setoff. Seller may exercise the right of set-off under this Agreement as to any sums owed by Buyer and/or its affiliates under any other contract or agreement with Seller and/or its affiliates.
18.Remedies Cumulative. The duties and obligations imposed by this Agreement and the rights and remedies available under this Agreement are to be in addition to, and not a limitation of rights and remedies at law or in equity.
19.Miscellaneous. Time is of the essence. Buyer consents to Seller sending information to Buyer regarding Seller’s products and prices at any time by fax to any fax number provided by Buyer, other electronic means or otherwise. 
A facsimile copy or electronic transmission will be treated as an original. Buyer shall not assign the Agreement or any interest herein without the prior written consent of Seller, and any attempted assignment, whether by operation 
of law or otherwise, shall be void without such prior written consent.
20.Authorization for Credit Review.  Buyer consents to Seller’s use of a non-business consumer credit report on the Buyer in order to further evaluate the credit worthiness of the Buyer in connection with the extension of business 
credit as contemplated hereby.  Buyer authorizes Seller to utilize a consumer credit report from time to time in connection with the extension or continuation of business credit. Buyer hereby knowingly consents to the use of such 
credit report consistent with the Federal Fair Credit Reporting Act as contained in 15 USC @ 1681 et seq.
21.Representations. Buyer represents to Seller that it is solvent and that any financial information provided reflects the present financial condition of the Buyer. If Buyer is not a corporation or limited liability entity, Buyer acknowledges 
that Seller is relying on the credit worthiness and financial ability of the owner(s) of Buyer.  Each owner shall be joint and severally liable for all indebtedness of Buyer to Seller under the Agreement. Buyer warrants that all 
information supplied to Seller is accurate and complete.  Each representation and the information contained in a Credit Application, if any, is material and given to induce Seller to provide credit. Buyer will notify Seller by certified 
mail, within forty-eight (48) hours after any material change in Buyer’s financial or ownership status.

BUESING CORP.
  Highway / Heavy Construction
    AZ Lic. # A-ROC200645
 
Date: 2/16/2022
 
To:       Achen Gardner Construction
Attn:        Mark McLafferty
Phone:
Fax:
  
Bid Date:
February 16, 2021
Project No:
 
Project:   Chandler Heights Utility Package #2
Location:
Alma School Road & Lake Drive
City:
Chandler, Az
We are pleased to submit the following cost estimate:
Pricing Good Through 09/30/2022            (See Standard Provisions)
QUANTITY
UNIT
DESCRIPTION
PRICE / UNIT
TOTAL
24,645
TON
NON LIMED MAG ABC DELIVERED IN BELLY DUMPS
15.45
$            
380,765.25
$        
24,645
TON
NON LIMED MAG ABC DELIVERED IN SUPERS
16.90
$            
416,500.50
$        
$
$
Standard Provisions
SUFFICIENT QUANTIIES PER DELIVERY TO INSURE 4 HOUR MINIMUM PER TRUCK
Prices do not include weekend, holiday, off hour, or overtime shipments.  Additional charges may apply if any of
these conditions occur. Unless otherwise stated, dirt haul prices exclude permits, loading, dust control & sweeping.
ALL PRICES ASSUME THAT BUESING CORP'S STANDARD INSURANCE IS ACCEPTABLE
ALL PRICING WILL BE HONORED THROUGH THE DATE SPECIFIED ABOVE
PROVIDED THAT WE RECEIVE A P.O., P.A., OR LETTER OF INTENT WITHIN 30 DAYS .  If 
JOB AWARD IS LONGER THAN 30 DAYS PLEASE NOTIFY US WITHIN THE 30 DAYS ,
AND WE WILL NEGOTIATE WITH MATERIAL SUPPLIERS TO ALLOW THE PRICE TO BE HONORED
Special Provisions
AGGREGATE PRICING INCLUDES AN ALLOWANCE OF 5 MINUTES PER LOAD FOR BELLY DUMPS OR 7 MINUTES PER LOAD FOR
SUPERS TO GET FROM THE PROJECT ENTRANCE TO THE DUMPSITE, UNLOAD & GET BACK TO THE PROJECT ENTRANCE.
BUESING WILL MAKE EVERY REASONABLE EFFORT TO HONOR THIS QUOTE & MEET CUSTOMER PRODUCTION EXPECTIONS.
HOWEVER, MATERIAL & TRUCK AVAILABILITY ARE BEYOND OUR CONTROL.  ACCEPTANCE OF THIS QUOTE SHALL NOT
SERVE AS A GUARANTEE THAT MATERIALS AND/OR TRUCKS WILL BE AVAILABLE WHEN REQUESTED.
Company Name:
   Date:                   .
and GOOD LUCK !!!
Respectfully Submitted:   Cecil  Wallace
3045 S 7th Street
Phoenix, Arizona  85040
(602) 845-3133
Cell:  (602) 799-5702
Payment due on or before the 25th day of the month for work completed or materials delivered in the month prior.  No retention withheld.
 
"Simply the Best"
-
      Achen Gardner Construction
 Authorized Person's Signature:_________________________________________________
If These Terms And Conditions Are Acceptable Please Sign This Form And Fax It Back To The Number Below
     ACCEPTANCE OF PROPOSAL
   The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified, provided there is an understanding between
parties that the prime and / or subcontractor must receive an official award. If an official award, contract or subcontract is not consummated this proposal shall become null and void.

Attn:
Acct#:
Mark McLafferty
550 SOUTH 79TH STREET
ACHEN-GARDNER CONSTRUCTION LLC
CHANDLER, AZ  85226
CHANDLER, AZ 85248
Quote Name:
Quote #:
 Quotation
CHANDLER HEIGHTS UTILITY / ALMA SCHOO
513348
ALMA SCHOOL RD & LAKE DR /CHANDLER
AZ049141
213235
Quote Created:
Date:
Quote Expiration:
Price Expiration:
Effective From:
Wednesday, February 16, 2022
Sales Rep :
PHOENIX, AZ 85034
Phone:
Fax :
Email:
Special Instructions:
Wednesday, February 16, 2022
Wednesday, February 16, 2022
Friday, March 18, 2022
Sunday, July 31, 2022
Brian Kochert
2526 E University Drive
480-536-0576
kochertb@vmcmail.com
There is a minimum for short loads.
This Hot-Mix Asphalt quote is based on a published average selling price from Poten & Partners for liquid binder of 
$515/per ton. Any increase in price of $25.00 or greater will be billed to the customer at $1.50 per ton for every $25.00 
increase.
In the above example, if the published rack rate for liquid binder hits $540/ton during the lifecycle of the project, an 
increase of $1.50/ton will be added to each invoice for that month.   If the rack rate climbs to $565/ton, a second $1.50 
Binder Surcharge will go into effect.  If pricing drops back down to the initial published rate, we’ll adjust the price back to 
the original quoted per ton price.
Material quoted based on no specs reviewed. If any changes or different material is required, material is subject to price 
adjustment
Prices quoted are for delivery during normal business hours - Monday thru Friday 6AM to 5PM. Plant Premium for Monday 
- Friday night production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Friday night into 
Saturday morning production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Saturday 
production (per 8 hour shifts) will be charged $1,000.00  per shift.  Plant Premium for Sunday production (per 8 hour 
shifts)  will be charged $2,000.00 per shift. Any overtime will be charged at $350.00 per hour.  Truck stand by will be 
charged on site after the first 20 minutes at the rate of $93 per hour or $1.55 per minute. All night work will be subject 
to an 8 hour minimum hourly haul charge. All weekend work will be subject to a 4 hour minimum hourly haul charge. 
All FOB asphalt will be $79.00 per ton.
Product #
Product Name
Plant
SAND & GRAVEL
Delivered 
Price Per Unit
U/M
Qty
WEST BROADWAY SAND & GRAVEL MAG SPEC ABC
16272
Tons
 24,645
$28.55
STD FRT RATE
Truck Type
WEST BROADWAY SAND & GRAVEL MAG SPEC ABC
16272
Tons
 24,645
$28.25
BOTTOM DUMP
Truck Type
VAL VISTA SAND & GRAVEL
#57 ROCK
25112
Tons
 2
$26.50
STD FRT RATE
Truck Type
Product #
Product Name
Plant
ASPHALT
Delivered 
Price Per Unit
U/M
Qty
SAN TAN HMA
3/4" EVAC PG70-10
231512T
Tons
 750
$72.10
Page 1 of 3

STD FRT RATE
Truck Type
Other Charges
Environmental Fee -Agg & Asphalt at $4.00 / Load
Prices quoted above do not include any state or local sales and use tax, if any applies for this project.
Prices quoted are for shipments during normal daytime working hours unless other shipping hours are mutually agreed upon 
in writing by both parties.
This quote is limited to acceptance within 30 days from the date of this quotation after which time quotation is subject to 
review/revision.  Please contact Sales prior to placing the order.
Accepted by:
Sales Representative:
Date:
Date:
We appreciate the opportunity to provide you this quote and trust that Vulcan will have the pleasure of serving your needs for this and future 
projects.
Prices are FOB your jobsite as stated above.  Terms are Net 15 prox.  Please note standard terms and conditions apply.  (Subject to 
credit approval)
Page 2 of 3

GENERAL TERMS AND CONDITIONS
PRICES AND TERMS
Prices are based on the terms and conditions set forth on page 1 of this Quotation, of which these General Terms and Conditions form a part, the terms and conditions stated in 
Customer’s Application for Business Credit, and, if applicable, any terms and conditions relating to the delivery or shipment of materials by truck, barge, vessel, rail or other means 
which are provided by Vulcan to Customer in addition to this Quotation (each, a “Vulcan Sales Document”, and collectively, the “Vulcan Sales Documents”).  Prices are available only 
to the customer specifically named therein, and are only for the quantities mentioned in such Quotation or Sales Order plus or minus 10% of such quantities. A charge of 1.5% per month, 
(18% annum), will accrue on a daily basis from the date of invoice and will continue to accrue on a daily basis on any unpaid balance, both before and after judgment, until the date the 
balance is paid in full, or at the maximum amount permitted by law in which the sale occurred, whichever is less.  However, the assessment of a finance charge on invoices paid in full 
by the payment due date will be waived.  Quotation is offered for furnishing the total aggregate requirements for the project only.  Customer’s contract with Vulcan regarding the sale by 
Vulcan to Customer of the materials listed in this Quotation is subject to the terms and conditions set forth in the Vulcan Sales Documents.  Prices reflect Customer 's acceptance of 
materials at the quoted plant based upon gradation analysis performed and reported by Vulcan 's certified plant quality control personnel. Any penalties that result from in place 
sampling shall be the full responsibility of Customer.
THE TERMS AND CONDITIONS OF THE VULCAN SALES DOCUMENTS GOVERN THE RIGHTS AND OBLIGATIONS OF THE PARTIES
If Customer has issued a purchase order for the materials quoted by Vulcan in this Quotation, this Quotation is not an acceptance of said purchase order, or any of its terms or conditions , 
which are hereby rejected.  Any sale by Vulcan to Customer of the materials listed in this Quotation shall be subject to the terms and conditions set forth in the Vulcan Sales Documents , 
and Customer’s receipt or acceptance of said materials shall constitute acceptance of the offer that this Quotation constitutes.  Any terms or conditions of a subsequent purchase order 
issued by Customer that are inconsistent with the terms and conditions of the Vulcan Sales Documents shall be null and void .
SHIPMENT AND DELIVERY
Unless a "delivered" price is quoted by Vulcan in the Vulcan Sales Documents, all prices are F.O.B. point of shipment from the locations designated. All taxes applicable to the sale or 
delivery of materials that are not paid directly by Customer will be added to the sales price, invoiced to and paid by Customer, unless Customer provides Vulcan with satisfactory 
evidence of exemption from same. Shipment will be in accordance with Customer’s reasonable instructions or, if none, then by whatever means Vulcan shall deem practicable.  
The 
quantities of material delivered to Customer shall be conclusively presumed to be the quantities shown on the tickets produced from a certified weigh scale at Vulcan’s quarry or sales 
yard.
CREDIT AND DEFAULT
Vulcan shall have no obligation to ship or deliver except upon its determination prior to each shipment or delivery that Customer is worthy of the credit to be extended and is not in 
default upon any obligation to Vulcan. Upon default, Customer agrees to pay all of Vulcan’s collection expenses, including attorneys’ fees.  
INSURANCE
A Memorandum of Insurance containing current information regarding Vulcan’s insurance program is available at 
<https://marshdigital.marsh.com/marshconnect/viewMOI.action?clientId=632529479>.
EXCULPATORY PROVISIONS
Vulcan shall have no liability for delay or failure to make shipments, or delivery, as a result of strikes, labor problems, severe weather conditions, casualty, mechanical breakdown or 
other conditions beyond Vulcan’s reasonable control.  In no event shall Vulcan be liable for any incidental or consequential damages. Vulcan’s liability and Customer’s exclusive 
remedy for any cause of action arising out of the provision of material quoted herein shall be the replacement of, or payment of the purchase price for, the materials which are the subject of 
this Quotation.
CHANGE OF TERMS
Vulcan may change the price and/or quantity upon 30 days’ notice to Customer.  Vulcan shall also have right to change, modify or amend any other terms and conditions upon written 
notice of such change to customer.  The effect of the change shall be as stated in the written notice and accepted by Customer upon placing of orders with seller following receipt of such 
notice.  .
APPLICABLE LAW
All orders are subject to acceptance by Vulcan at the headquarters of its Mountain West Division in Phoenix, Arizona, and the laws of the state in which the materials was shipped from 
shall apply to the sale of all materials subject hereto.  In the event material is imported into the U .S., the law in the state in which the material was sold to the customer will prevail.  All
disputes regarding finance charges shall be governed by Alabama law .
LIMITED WARRANTY AND WARRANTY DISCLAIMER
Vulcan warrants for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with Vulcan’s specifications for said material or the 
specifications set forth in Vulcan’s quotation.  VULCAN HEREBY EXCLUDES ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PURPOSE, AND ALL 
OTHER WARRANTIES, EXPRESS OR IMPLIED, OF THE MATERIAL SOLD HEREUNDER, OTHER THAN THE EXPRESS WARRANTY STATED ABOVE.  In addition, 
except to the extent otherwise set forth in the specifications described above, Vulcan makes no warranty whatsoever with respect to specific gravity, absorption, whether the material is 
innocuous, non-deleterious, or non-reactive, or whether the material is in conformance with any plans, other specifications, 
regulations, ordinances, statutes, or other standards 
applicable to Customer’s job or to said material as used by Customer.  VULCAN SHALL IN NO EVENT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL 
DAMAGE CAUSED BY NON-COMPLIANCE OF THE MATERIAL WITH SPECIFICATIONS, OR FOR ANY DEFECTS IN THE MATERIAL SOLD HEREUNDER.
Page 3 of 3

Page 2 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
2/24/2022 2:14 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2
39381002
ASPHALT
ASPHALT
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6025288961
Vulcan Material
VULCANMATERI
Unit Price
4807301033
Fisher Sand and 
FISHERSANDAN
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
TN
750.00
REPLACE ASPHALT
2AC12EVAC
72.5000
96.5000
Plugged Amount
Quoted Amount
0
54,375
0
72,375
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
54,375
72,375
Diff From Plug
54,375
72,375
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Attn:
Acct#:
Mark McLafferty
550 SOUTH 79TH STREET
ACHEN-GARDNER CONSTRUCTION LLC
CHANDLER, AZ  85226
CHANDLER, AZ 85248
Quote Name:
Quote #:
 Quotation
CHANDLER HEIGHTS UTILITY / ALMA SCHOO
513348
ALMA SCHOOL RD & LAKE DR /CHANDLER
AZ049141
213235
Quote Created:
Date:
Quote Expiration:
Price Expiration:
Effective From:
Wednesday, February 16, 2022
Sales Rep :
PHOENIX, AZ 85034
Phone:
Fax :
Email:
Special Instructions:
Wednesday, February 16, 2022
Wednesday, February 16, 2022
Friday, March 18, 2022
Sunday, July 31, 2022
Brian Kochert
2526 E University Drive
480-536-0576
kochertb@vmcmail.com
There is a minimum for short loads.
This Hot-Mix Asphalt quote is based on a published average selling price from Poten & Partners for liquid binder of 
$515/per ton. Any increase in price of $25.00 or greater will be billed to the customer at $1.50 per ton for every $25.00 
increase.
In the above example, if the published rack rate for liquid binder hits $540/ton during the lifecycle of the project, an 
increase of $1.50/ton will be added to each invoice for that month.   If the rack rate climbs to $565/ton, a second $1.50 
Binder Surcharge will go into effect.  If pricing drops back down to the initial published rate, we’ll adjust the price back to 
the original quoted per ton price.
Material quoted based on no specs reviewed. If any changes or different material is required, material is subject to price 
adjustment
Prices quoted are for delivery during normal business hours - Monday thru Friday 6AM to 5PM. Plant Premium for Monday 
- Friday night production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Friday night into 
Saturday morning production (per 8 hour shifts) will be charged $2,000.00 per shift. Plant Premium for Saturday 
production (per 8 hour shifts) will be charged $1,000.00  per shift.  Plant Premium for Sunday production (per 8 hour 
shifts)  will be charged $2,000.00 per shift. Any overtime will be charged at $350.00 per hour.  Truck stand by will be 
charged on site after the first 20 minutes at the rate of $93 per hour or $1.55 per minute. All night work will be subject 
to an 8 hour minimum hourly haul charge. All weekend work will be subject to a 4 hour minimum hourly haul charge. 
All FOB asphalt will be $79.00 per ton.
Product #
Product Name
Plant
SAND & GRAVEL
Delivered 
Price Per Unit
U/M
Qty
WEST BROADWAY SAND & GRAVEL MAG SPEC ABC
16272
Tons
 24,645
$28.55
STD FRT RATE
Truck Type
WEST BROADWAY SAND & GRAVEL MAG SPEC ABC
16272
Tons
 24,645
$28.25
BOTTOM DUMP
Truck Type
VAL VISTA SAND & GRAVEL
#57 ROCK
25112
Tons
 2
$26.50
STD FRT RATE
Truck Type
Product #
Product Name
Plant
ASPHALT
Delivered 
Price Per Unit
U/M
Qty
SAN TAN HMA
3/4" EVAC PG70-10
231512T
Tons
 750
$72.10
Page 1 of 3

STD FRT RATE
Truck Type
Other Charges
Environmental Fee -Agg & Asphalt at $4.00 / Load
Prices quoted above do not include any state or local sales and use tax, if any applies for this project.
Prices quoted are for shipments during normal daytime working hours unless other shipping hours are mutually agreed upon 
in writing by both parties.
This quote is limited to acceptance within 30 days from the date of this quotation after which time quotation is subject to 
review/revision.  Please contact Sales prior to placing the order.
Accepted by:
Sales Representative:
Date:
Date:
We appreciate the opportunity to provide you this quote and trust that Vulcan will have the pleasure of serving your needs for this and future 
projects.
Prices are FOB your jobsite as stated above.  Terms are Net 15 prox.  Please note standard terms and conditions apply.  (Subject to 
credit approval)
Page 2 of 3

GENERAL TERMS AND CONDITIONS
PRICES AND TERMS
Prices are based on the terms and conditions set forth on page 1 of this Quotation, of which these General Terms and Conditions form a part, the terms and conditions stated in 
Customer’s Application for Business Credit, and, if applicable, any terms and conditions relating to the delivery or shipment of materials by truck, barge, vessel, rail or other means 
which are provided by Vulcan to Customer in addition to this Quotation (each, a “Vulcan Sales Document”, and collectively, the “Vulcan Sales Documents”).  Prices are available only 
to the customer specifically named therein, and are only for the quantities mentioned in such Quotation or Sales Order plus or minus 10% of such quantities. A charge of 1.5% per month, 
(18% annum), will accrue on a daily basis from the date of invoice and will continue to accrue on a daily basis on any unpaid balance, both before and after judgment, until the date the 
balance is paid in full, or at the maximum amount permitted by law in which the sale occurred, whichever is less.  However, the assessment of a finance charge on invoices paid in full 
by the payment due date will be waived.  Quotation is offered for furnishing the total aggregate requirements for the project only.  Customer’s contract with Vulcan regarding the sale by 
Vulcan to Customer of the materials listed in this Quotation is subject to the terms and conditions set forth in the Vulcan Sales Documents.  Prices reflect Customer 's acceptance of 
materials at the quoted plant based upon gradation analysis performed and reported by Vulcan 's certified plant quality control personnel. Any penalties that result from in place 
sampling shall be the full responsibility of Customer.
THE TERMS AND CONDITIONS OF THE VULCAN SALES DOCUMENTS GOVERN THE RIGHTS AND OBLIGATIONS OF THE PARTIES
If Customer has issued a purchase order for the materials quoted by Vulcan in this Quotation, this Quotation is not an acceptance of said purchase order, or any of its terms or conditions , 
which are hereby rejected.  Any sale by Vulcan to Customer of the materials listed in this Quotation shall be subject to the terms and conditions set forth in the Vulcan Sales Documents , 
and Customer’s receipt or acceptance of said materials shall constitute acceptance of the offer that this Quotation constitutes.  Any terms or conditions of a subsequent purchase order 
issued by Customer that are inconsistent with the terms and conditions of the Vulcan Sales Documents shall be null and void .
SHIPMENT AND DELIVERY
Unless a "delivered" price is quoted by Vulcan in the Vulcan Sales Documents, all prices are F.O.B. point of shipment from the locations designated. All taxes applicable to the sale or 
delivery of materials that are not paid directly by Customer will be added to the sales price, invoiced to and paid by Customer, unless Customer provides Vulcan with satisfactory 
evidence of exemption from same. Shipment will be in accordance with Customer’s reasonable instructions or, if none, then by whatever means Vulcan shall deem practicable.  
The 
quantities of material delivered to Customer shall be conclusively presumed to be the quantities shown on the tickets produced from a certified weigh scale at Vulcan’s quarry or sales 
yard.
CREDIT AND DEFAULT
Vulcan shall have no obligation to ship or deliver except upon its determination prior to each shipment or delivery that Customer is worthy of the credit to be extended and is not in 
default upon any obligation to Vulcan. Upon default, Customer agrees to pay all of Vulcan’s collection expenses, including attorneys’ fees.  
INSURANCE
A Memorandum of Insurance containing current information regarding Vulcan’s insurance program is available at 
<https://marshdigital.marsh.com/marshconnect/viewMOI.action?clientId=632529479>.
EXCULPATORY PROVISIONS
Vulcan shall have no liability for delay or failure to make shipments, or delivery, as a result of strikes, labor problems, severe weather conditions, casualty, mechanical breakdown or 
other conditions beyond Vulcan’s reasonable control.  In no event shall Vulcan be liable for any incidental or consequential damages. Vulcan’s liability and Customer’s exclusive 
remedy for any cause of action arising out of the provision of material quoted herein shall be the replacement of, or payment of the purchase price for, the materials which are the subject of 
this Quotation.
CHANGE OF TERMS
Vulcan may change the price and/or quantity upon 30 days’ notice to Customer.  Vulcan shall also have right to change, modify or amend any other terms and conditions upon written 
notice of such change to customer.  The effect of the change shall be as stated in the written notice and accepted by Customer upon placing of orders with seller following receipt of such 
notice.  .
APPLICABLE LAW
All orders are subject to acceptance by Vulcan at the headquarters of its Mountain West Division in Phoenix, Arizona, and the laws of the state in which the materials was shipped from 
shall apply to the sale of all materials subject hereto.  In the event material is imported into the U .S., the law in the state in which the material was sold to the customer will prevail.  All
disputes regarding finance charges shall be governed by Alabama law .
LIMITED WARRANTY AND WARRANTY DISCLAIMER
Vulcan warrants for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with Vulcan’s specifications for said material or the 
specifications set forth in Vulcan’s quotation.  VULCAN HEREBY EXCLUDES ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PURPOSE, AND ALL 
OTHER WARRANTIES, EXPRESS OR IMPLIED, OF THE MATERIAL SOLD HEREUNDER, OTHER THAN THE EXPRESS WARRANTY STATED ABOVE.  In addition, 
except to the extent otherwise set forth in the specifications described above, Vulcan makes no warranty whatsoever with respect to specific gravity, absorption, whether the material is 
innocuous, non-deleterious, or non-reactive, or whether the material is in conformance with any plans, other specifications, 
regulations, ordinances, statutes, or other standards 
applicable to Customer’s job or to said material as used by Customer.  VULCAN SHALL IN NO EVENT BE RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL 
DAMAGE CAUSED BY NON-COMPLIANCE OF THE MATERIAL WITH SPECIFICATIONS, OR FOR ANY DEFECTS IN THE MATERIAL SOLD HEREUNDER.
Page 3 of 3

Page 3 of 9
Achen-Gardner Construction, LLC 71
Mark McLafferty
3/17/2022 2:26 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2 FINAL
39381002-1
BYPASS
BYPASS
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4806265257
Capital Pump & 
CAPITALPUMPE
Unit Price
4808959225
Rain For Rent
RAINFORRENT
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
LS
1.00
BYPASS PUMPING
4BYPASSPUMP
2051090
281
216,005.0700
243,938.7200
Plugged Amount
Quoted Amount
0
216,005
0
243,939
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
216,005
243,939
Diff From Plug
216,005
243,939
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

9229 S Hardy Drive  Tempe, AZ 85284
Phone: 480-626-5257   Email: Sales@cpepumps.com
Quote #:
CP22-275
Job Name:
Customer:
Achen Gardner
Location:
550 S 79th Street
Chandler, AZ
Chandler AZ
Contact: 
Mark McLafferty
Phone:
602-877-9392
Email:
MMcLaffertyt@achen.com  
 
Rental Equipment
RATES
Qty
Unit
Rental Period
Description
Day
Week
4 Week
6 Week Total
10
ea.
Week
884.00
$      
2,652.00
$     
44,200.00
$      
5
ea.
Week
50.00
$        
150.00
$        
1,250.00
$        
5
ea.
Week
66.00
$        
198.00
$        
1,650.00
$        
10
ea.
Week
75.00
$        
225.00
$        
3,750.00
$        
1500
ft
Week
0.25
$          
0.75
$            
1,875.00
$        
600
ft
Week
0.24
$          
0.72
$            
720.00
$           
1
ea.
Week
500.00
$      
1,500.00
$     
2,500.00
$        
42
Day
3,120.00
$        
131,040.00
$    
42
Day
230.00
$           
9,660.00
$        
1
 
Sale
$950.00
 
 
950.00
$             
QUANTITIES ARE ESTIMATES
6 Week Rental Total
197,595.00
$    
QUANTITIES USED WILL BE BILLED
 
Delivery
375.00
$           
** This bypass is designed to pump 450gpm @ 20' TDH with
Pick-up
375.00
$           
     100% Pump redundancy **
Estimated Install Labor
8,900.00
$        
** Certified confined space crew **
5 Plug Install Labor 
1,500.00
$        
Estimated Removal Labor
6,250.00
$        
Estimated Sale Tax
1,010.07
$        
ESTIMATE TOTAL - 
$216,005.07
 
Prepared by:
Jerry Sheatz
Accepted by:
 
Date:
Date:
Subject to Terms and Conditions on Page 2
Estimate valid for 30 days from issuance date
10' x 12' x 12" Spill Berms
6" to 10" Multi size Plug
6" X 13' Suction Stingers
24/7 Pump Watch 
8" DR17 HDPE Pipe
Misc. Elbows Pipe & Fittings
6" DR17 HDPE Pipe
Wednesday, February 16, 2022
Est. Fuel Burn 40 Gal Per day@$5.75Gal
PE Stamped Bypass Plan
10" Sewer Bypass
Lake Dr & Wildflower
4" Silenced Pumps
2 person days  24/7 @ $130.00 per Hr.

9229 S Hardy Drive  Tempe, AZ 85284
Phone: 480-626-5257   Email: Sales@cpepumps.com
Terms, Conditions & Specifications
1. Customer agrees to abide by the terms and conditions on the purchase or rental contract.
2. Quantities are estimates and system is designed with information supplied by the customer. Any additional
requirements will incur additional charges.
3. Customer responsible for all permits, traffic control, road crossings, etc.
4. Customer responsible for all FUEL & PM SERVICE during pump rentals.
5. Pump rate is based on 8 hour day, 48 hour week, 192 hour 4 week.
N/A
6. Overtime Charges, if applicable, are Computed: (Monthly Rate / 192) X .5 = O/T Charge Per Hour
N/A
7. Labor rate is for normal working hours. Weekend or nighttime will incur additional charges.
8.  Rental begins when equipment leaves CPE branch.  Pumping systems are on rent during installation.
JOB SPECIFIC TERMS, CONDITIONS & SPECIFICATIONS
 
9.  If Water Bridges are rented, they are placed under customer’s direction.  Customer accepts sole responsibility for placement, ongoing 
maintenance, and suitability for use in each specific traffic location.

Achen-Gardner Construction, LLC
Account: 120490
550 S 79TH ST
CHANDLER, AZ, 85226
Mark McLafferty
480-940-1300
mmclafferty@achen.com
26001 S Arizona Ave
Chandler, AZ, 85248
480-895-9225
rainforrent.com
JWILSON@rainforrent.com
Rain For Rent
Dear Mark McLafferty,
Thank you for your inquiry. As requested, please find attached our proposal 1092-IND-2008807 for Lake Rd Bypass (4-5 stations). We
value this opportunity to provide a solution for your liquid handling need and we are committed to partnering with you to ensure
your project's safe execution and completion.
To convert this proposal into a confirmed order WITHOUT ANY CHANGES, please click the "Start Signing" button to begin the
electronic signature process.
If you would like to CHANGE anything in this proposal or discuss anything further, please call Jon Wilson at 480-895-9225.
Thank you, and I look forward to working with you.
Regards,
Jon Wilson
JWILSON@rainforrent.com
Mobile: 602-725-7839
Branch: 480-895-9225
26001 S Arizona Ave
Chandler, AZ, 85248

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2008807
Sales Rep: Jon Wilson
Rain For Rent
Proposal #
1092-IND-2008807
Project Name
Lake Rd Bypass (4-5 stations)
Date Prepared
2/15/2022
Est. Delivery Date
5/2/2022
Prevailing Wage
No
Est. Completion Date
5/31/2022
Project Location
Alma School/Lake St. west
Chandler, AZ, 85226
Project Summary
Project requires multiple pump stations with redundancy, 24/7 pump watch (2 men)
STATEMENT OF WORK
RFR Responsibilities & Scope of Work
Rain for Rent (RFR) will provide the following:  
Delivery, installation, 24/7 operation, removal, pickup of all quoted materials/equipment.
Reference Materials
Project is quoted based on applicable/customer provided reference materials noted below: 
Plans, Job Walks, Customer Meetings, and email/phone communications. 
Operating Parameters
System is designed to convey up to 500GPM sewage. Lateral flows shall be managed according to details listed below.
4 separate pump stations shall be operated by RFR.
Customer Responsibilities
It is the customer’s responsibility to inform RFR about prevailing wage at time of proposal. If RFR is informed after the quote is issued that 
certified payroll is required, quote will be subject to additional charges.  
 
Jobsite: 
Customer is responsible for: 
1. Informing RFR of any jobsite or general requirement(s) to perform work on location. 
2. Securing permits, fees, bonding, right of ways, vehicular/pedestrian traffic control, and security.  
3. Providing safe, secure access and egress to an adequate staging area throughout the job which could include brush clearing, grading, and 
removal or replacement of any landscape or hardscape in the temporary right of way for the equipment. 
4. Any damage to the environment including trees, vegetation, stream banks, or any other part of the site caused by the installation, removal, 
construction, pulling or dragging of equipment, or operation of the equipment that would require site restoration or environmental 
countermeasures. 
5. Any excavation, saw cutting, trench plating for the purpose of road crossings, installing sewer diversion lines, backfilling, restoration, 
modification, or alteration of any permanent structure or site element including changes to pump pad preparation, suction, or discharge 
chambers during duration of job (including installation and removal). 
 
System:  
1. RFR will provide dedicated equipment with operator and fuel to perform all needed unloading, testing, operations, maintenance, relocating, 
cleaning, and reloading of provided equipment/system.
2. If installation provided by RFR and Customer is operating system, this Transfer of Operation form will need to be reviewed and signed by both 
parties upon completion of setup. (sample form only): https://rainforrentcorp.box.com/v/systemtransferoperation  
3. Customer will provide fueling.  
4. 
Customer 
will 
provide 
preventative 
maintenance 
as 
recommended 
by 
manufacturer 
or 
per 
the 
Rental 
Agreement.  https://rainforrentcorp.box.com/v/pumpmaintenance 
5. Customer will supply all needed water for the commissioning, startup, and system testing. Project specific criteria for hydrotesting can be 
provided at an additional charge.  
Proposal Number 1092-IND-2008807 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 2 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2008807
Sales Rep: Jon Wilson
Rain For Rent
6. By accepting this quotation, the customer has acknowledged that the equipment proposed herein is suitable for its intended application and 
accepts all liabilities associated with its use. Customer is responsible for compliance with appropriate liquid/material quality standards, 
regulations, and testing protocols to meet all federal, state, local and job location specific requirements. Customer is responsible for all 
waste materials associated with this equipment/system. 
Customer is responsible for: 
1. Any work in confined spaces. 
2. Equipment, operator and fuel to excavate sump/installing temporary structure as needed to permit lateral pump stations to convey sewage 
away from suction structure. Sumps/temporary structures needed on Wildflower Rd and in front of school.
3. Protecting system from damage including any freeze protection necessary to safeguard equipment from damage. Should equipment become 
frozen and damaged, customer is responsible for repair of equipment. RFR can provide necessary freeze protection at an additional charge 
per executed change order. Equipment stays on rent until it can be returned. 
4. Using equipment in a safe and proper manner in accordance with manufacturers' recommendations, regulatory standards, and industry best 
practices. Improper usage may cause equipment/system failure, damage, possible incidents, injuries, and spills. 
5. Customer is responsible for identifying at-risk service laterals to evaluate and mitigate the potential for sewage backups. Customer must 
communicate the risk of flooding and other potential issues to affected property owners. This may require customer to install additional 
sewer plugs or backflow preventers.
6.  Customer will provide sewer plugs and any associated installation, monitoring, and removal of sewer plugs.
7. Customer is required to periodically start diesel back-up pumps and ensure batteries are fully charged, ready for operation.
8. Customer to identify high points for air vents.
9. Customer is responsible for any residual fluids in system once project is concluded to remove and properly dispose of.
Upon Pickup: 
Contact the RFR office at 480.895.9225 to schedule pickup when equipment/system is cleaned and ready to be released.  
Flushing and cleaning of equipment must be performed to RFR’s standards prior to being called off rent. RFR personnel will perform a visual 
inspection. It is recommended to have a customer representative on-site during inspection. Equipment found not to be in “delivered 
condition” will not be picked up. 
Project Scheduling & Billing
This quote is valid for 30 days. For the quoted items, RFR requires a signed quote and Purchase Order prior to scheduling equipment and crew, 
subject to availability ARO. Scheduling shall not be sooner than 1 week before start of work.
 
Customer acknowledges that availability of equipment/system and/or media will be confirmed at time of order. Additional freight charges may 
apply subject to mutually agreed upon change order.  
 
Billing  
Delivery and first week’s labor will be billed at the end of the first week of installation, supported by signed daily work tickets. Any additional 
labor will be billed weekly supported by signed day tickets.  
Inbound freight shall be invoiced at cost plus 15%.
 
Safety
Each employee is expected to adhere to the RFR Environmental, Health and Safety programs, which will protect the environment, the health and 
safety of the customer, employees, and others. RFR asks for your full cooperation to succeed in this expected outcome. 
Proposal Number 1092-IND-2008807 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 3 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2008807
Sales Rep: Jon Wilson
Rain For Rent
Achen-Gardner requests sewer bypass system to support work on Lake Drive utility relocation project.
1 week equipment rental = $7,488.48
1 week, 2-man 24/7 pump operation = $15,288.00.
Details in Statement of Work
Proposal Number 1092-IND-2008807 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 4 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2008807
Sales Rep: Jon Wilson
Rain For Rent
PROJECT COSTS
Estimated Rental Total
$7,488.48
Estimated Environmental Recovery Fees
$243.38
Total Estimated Recurring Charges
$7,731.86
MOBILIZATION & DE-MOB COSTS
Estimated Delivery
$746.46
Estimated Installation
$7,554.88
Estimated Removal
$5,048.92
Estimated Pickup
$746.46
Estimated Services
$31,536.10
GRAND TOTAL
$53,364.68
-Estimated costs do not include taxes
-Recurring rental project costs will be on a cycle/week/day basis+ tax
PO Number:
By signing this proposal, customer represents that he/she has read and agreed to both the Statement of Work and Quote Agreement sections, and
is also agreeing to the grand total amount listed above, plus any recommended optional items if accepted and initialed. If customer requires a
Purchase Order number to process and submit payment, it must be supplied to Rain for Rent at the time of acceptance of this proposal.
Proposal Acknowledgement
Date
Customer Signature
Customer Name
{{Fullname*}}
{{Signature*}} 
{{Signdate}}
RPP
$1,048.38
I have received and reviewed the Rental Protection Plan Agreement incorporated as the last page of this estimate. By initialing this paragraph, I
understand that I am agreeing to enter into and be bound by the terms of the Rental Protection Plan Program Agreement and that I am authorized
to enter into this Agreement on behalf of Customer. FOR ALL RENTALS OF EQUIPMENT, EXCEPT THOSE SPECIFICALLY EXCLUDED, YOU MAY EITHER
SHOW PROOF OF PROPERTY INSURANCE IN ACCORDANCE WITH INSURANCE REQUIREMENTS AND RENTAL AGREEMENT OR PURCHASE THE
RENTAL PROTECTION. THE PURCHASE OF THE RENTAL PROTECTION PLAN FOR RENTALS OF EQUIPMENT IS NOT MANDATORY AND MAY BE
DECLINED IF YOU HAVE PROOF OF ALL RISK PROPERTY INSURANCE AS REQUIRED BY CONTRACT.
Rental Protection Plan
{{Initial}}
Created Date: 2/10/2022
Proposal Number 1092-IND-2008807 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 5 of 6

Achen-Gardner Construction, LLC
Account: 120490
Proposal: 1092-IND-2008807
Sales Rep: Jon Wilson
Rain For Rent
Quote Agreement
If Customer has entered into a Master Service Agreement with Rain for Rent and there is a conflict between these terms and conditions of this Quotation Agreement and the Customer's Master Service
Agreement, then the terms and conditions in the Customer's Master Service Agreement signed by Rain for Rent will prevail. Availability of products and services is subject to change without notice.
Payment terms are net 30 days from invoice date. Interest at the rate of 18% per year shall be charged on any past due invoice. A Fuel Surcharge will be calculated and invoiced based on the diesel fuel
price as published by the Department of Energy on https://www.eia.gov/petroleum/gasdiesel An Environmental Recovery Fee shall apply to all rental charges invoiced for the duration of the rental
pursuant to this quote/Estimate to help offset direct and indirect costs associated with regulatory compliance, obtaining permits, and obtaining licenses. California Air Quality Fee will be added to the cost
of diesel pumps used in California only. This is a State mandated fee. Customer is prohibited from deducting retention from Rain for Rent invoices and charging Rain for Rent liquidated damages. Customer
is responsible for flushing and cleaning tanks, roll off boxes, pipelines, pumps, filters and other Rain for Rent equipment prior to return unless specifically agreed to by both parties in writing. The Terms
and Conditions of the Rain For Rent Rental and Hazardous Material and/or Non-Hazardous Waste Agreement, Credit Application/Master Rental & Sales Agreement, Invoice and this Quotation (also known
as the Rain for Rent Rental/Sale Estimate as may be referenced in any Master Service Agreement, Blanket Purchase Order, or any other contractual document executed between the parties) contain the
complete and final agreement between Rain for Rent and Customer and no other agreement in any way modifying or adding to any of said Terms and Conditions will be binding upon Rain for Rent unless
made in writing and signed by a Rain for Rent Corporate Officer or Rain for Rent authorized representative. The Customer cannot alter the equipment without Rain for Rent's prior written approval.
Customer is responsible for equipment, repairs, maintenance and damage, excluding normal wear and tear or damage caused by Rain for Rent. All returned equipment is subject to inspection by Rain for
Rent personnel. Damages and accrued rent will be invoiced to Customer while equipment is out of service for repairs. The Customer is responsible for damage caused by reactive, corrosive or abrasive
material; including, but not limited to sand, sodium hydroxide, chlorine, and acids. Customer must notify Rain for Rent immediately of any spill so that any necessary repairs to the system can be made and
to minimize service interruption. The Customer assumes all risks of loss due to operation and use of the equipment. Customer will provide "all risk" property insurance for rented equipment. Customer
shall pay Rain for Rent additional expenses caused by unforeseen or changing conditions, including, but not limited to, soil, underground conditions, rock formations, environmental conditions, weather
events, regulations or restrictions, hard pan, boulders, cesspools, gas lines, waterlines, drain pipes, underground electrical conduits or other above ground or underground obstructions. All equipment
rented or used products sold are provided "AS IS, WHERE IS" in their present condition. Rain for Rent makes no warranties, expressed or implied of any kind whatsoever with respect to the equipment or
products. Sold equipment is not to be rented. Customer agrees that customer is renting equipment or purchasing used products based on their judgment and evaluation, without reliance upon any
statements of representations by Rain for Rent, and that Rain for Rent is not responsible for any defects in their operation or for any repairs, parts or services, unless otherwise noted. All new products
sold are provided without warranty beyond the terms of such warranty offered by the manufacturer, if any. Customer must comply with all original manufacturer's terms and conditions for any warranty
claims that may arise. Neither Rain for Rent nor the manufacturer warranties the product if it has failed due to corrosion, misuse or damage; (2) it has been altered, repaired or modified in any way that
would adversely affect its operation; or (3) it was installed or operated other than in accordance with manufacturer's operating instructions. Products supplied by Rain for Rent are warranted to be free
from any defect in workmanship and material under conditions of normal use and service. Rain for Rent's obligation under this warranty is limited to replacing or repairing at the designated
manufacturer's or Rain for Rent facility any part or parts returned to it with transportation charges prepaid, which Rain for Rent determines in its sole discretion to be defective. This Quotation excludes
any additional costs to Rain for Rent associated with Owner Controlled Insurance (OCIP) or WRAP insurance programs that will be added to Rain for Rent's prices. De-watering, Roll-off, Vacuum boxes and
similar equipment are not liquid tight. Rentee accepts full responsibility for all losses, damages and costs caused by or arising out of spills, leakage or discharge from this equipment. Rain for Rent will not
be held liable for any structural or soils subsidence. This Quotation is valid for 30 days and is subject to credit approval. Rain for Rent will take every effort to protect our customers and employees. Due to
the current pandemic, all quoted equipment and services are subject to delay, change, or unilateral cancelation by Rain for Rent. Please be assured every effort will be made to execute the quote as
written. The customer is responsible to inform Rain for Rent of any jobsite hazards, precautions, or entry requirements relating to the Corona Virus prior to Rain for Rent personnel going onsite to perform
work or deliver equipment. This includes informing Rain for Rent if anyone at the jobsite has tested positive and provide a list of actions taken to protect Rain for Rent personnel.
If you elect to maintain All Risk Property Insurance coverage, and the certificate of insurance You provide to Rain for Rent to evidence Your insurance coverage expires or is cancelled for any reason, You
agree Rain for Rent may charge RPP for Your rentals until such time as You provide an acceptable and valid certificate of insurance to Rain for Rent. This Rental Protection Plan Program Agreement (this
"RPP Agreement") is entered into between the undersigned Rentor and Rentee in relation to the Master Rental and Sales Agreement (MRSA) between Rentor and Rentee. If Rentee has checked or
initialed, as applicable, the Rental Protection Plan Program (the "RPP Program") box on the quote, then Rentee has opted-in to the RPP Program and this RPPP Agreement shall supplement the MSRA
whether or not executed by Rentee. Rentee understands and agrees that the RPP Program is not insurance and that the RPP Program provides only limited coverage, as described below.1.Cost;
Deductible; Maximum Coverage; Rentee shall pay a fee equal to 14 percent (14%) of the rental charge for each covered item, which fee shall be listed on each invoice during which period Rentee has
opted to participate in the RPP Program. In the event of a Covered Occurrence, as defined below, Rentee shall further be responsible for the lesser of $500 or 10 percent (10%) of the total loss, as a
deductible. The maximum coverage available under the RPP Program is $150,000 per Covered Occurrence, whether or not there is more than one piece of equipment involved in the
occurrence.2.Coverage; The RPP Program provides coverage only for losses involving Covered Equipment, as defined below, in the following instances: fire that was not caused by Rentee's gross negligence
or willful misconduct; theft for which a police report was filed, and that occurred despite Rentee's reasonable precautions to protect and secure the covered equipment; and vandalism for which a police
report was filed (individually, "Covered Occurrence," and collectively, "Covered Occurrence"). The RPP Program provides coverage only for the following types of equipment: pumps, electric submersible
pumps, tanks, generators, light towers, filtration, boxes, heaters, spillguards, safety products, sprinklers, hoses, pipe, valves and fittings ("Covered Equipment"). Coverage does not extend to any
equipment not owned by Rentor such as re-rented equipment.3.Exclusions; The RPP program does not cover any equipment or event of loss that is not specifically described in Section 2.Without limiting
the foregoing, the RPP Program does not provide coverage for the following: misuse of equipment; willful abuse of equipment; failure to maintain equipment; failure to secure items from theft (including
but not limited to failing to store items in a fenced, locked area or failing to maintain personnel on site); damage or theft while in transit to or from a jobsite; corrosion from any source; any damage caused
by named storm events; any instance that occurs while the account is not in good standing, such as a default as defined in the MRSA or upon written notice of non-payment; and any occurrence not
reported to Rentor within 24 hours after the occurrence. The RPP program does not provide coverage for: electronic equipment (controls, instrumentation, and wiring), flow meters, water meters, wheel
wash systems & accessories, Freezesentry items, or tires.4.Claims; All claims must be submitted within 24 hours of the Covered Occurrence. Rentor's mechanic will inspect the equipment following any
claim. The mechanic's findings as to the cause of the damage and cost of repair will be final. In the event of a theft or vandalism, Rentee must also provide supporting evidence that the site was secured at
the time of loss.
Rental Protection Plan Program Agreement
Proposal Number 1092-IND-2008807 Confidentiality Notice: This proposal and any associated document(s) are privileged and confidential and are intended for the sole use of the
addressee(s). They cannot be used, circulated, duplicated, quoted, or otherwise referred to or disclosed to third parties for any reason without the written consent of an Officer of
Western Oilfields Supply Company dba/Rain for Rent. If you have received this information in error, please immediately contact us at info@rainforrent.com.
Page 6 of 6

Page 4 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
2/24/2022 2:14 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2
39381002
STEEL CASING
CASING
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6368879683
Trinity Product
TRIINITY
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
LF
120.00
24" STEEL CASING
2CAS24
181.8500
Plugged Amount
Quoted Amount
0
21,822
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
Total Adjustment
0
0
Totals
21,822
Diff From Plug
21,822
Total Minority
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Trinity Products, LLC
1969 W. TERRA LN. O’ FALLON MO, 63366
Tel: (800) 456-7473
Fax: (636) 639-6258
Feb 09, 2022
Quote #: TPIQ55776
Project: Chandler Heights (Pa...
QUOTE
Sales Rep:
Adam Manz
amanz@trinityproducts.com
636-887-9683 
REMIT TO:
Trinity Products LLC
PO Box 84103
Chicago, IL, 60689-4003
FOB:
Approx. Ship
Date:
Terms of Sale:
JOBSITE
TBD
NET 30
QUOTE TO:
Achen-Gardner Construction
SHIP TO:
Mark McLafferty
550 South 79th St.
Chandler , Arizona 85226
Tel: 480-940-1300
Job Site
Chandler , Arizona 85224
DESCRIPTION
QTY
UOM
UNIT PRICE
TOTAL
24" x .375" Nominal, New Trinity Lo-profile Spiral Weld Steel
Pipe, A252 Gr. 3, Domestic w/ MTR's, 3pcs @ 40'
120
FT
$99.35
$11,922.00
Freight to Chandler, Arizona - Steel Pipe
1
T/L
$6,300.00
$6,300.00
8" x 24", Stainless Steel Spacer with EPDM Liner, Center
Restrained
12
EA
$185.00
$2,220.00
8" x 24", EPDM Wrap-Around End Seal
6
EA
$170.00
$1,020.00
Freight to Chandler, Arizona - Spacers/End Seals
1
LOT
$360.00
$360.00
Accepted by:
 
 
 
Mark McLafferty
Date
SUBTOTAL:
$21,822.00
ESTIMATED TAX:
$0.00
GRAND TOTAL:
$21,822.00
Comments:
All materials are subject to prior sale, mill rolling schedule and price fluctuations upon receipt of order.
Thank you,
Adam Manz
For more information please visit our website @ www.trinityproducts.com
Any claim(s) for damaged or incorrect must be made in writing within five (5) days of receipt of material to be considered valid. Due to the volatility of the steel and fuel markets, all quotations will be su
surcharges at time of order and/or shipment. These surcharges will be monitored monthly and adjusted accordingly. Any recommendations are for educational purposes only, not for commercial work
are subject to prior sale. Trinity Products, LLC is not responsible for delivery problems, delays or costs incurred due to shipping or trucking problems. IMPORTANT: Regarding All Coated Materials: Dama
coating from shipping and handling should be expected. Customer is responsible for all coating repairs. Also included in this agreement is the final pages, titled "Terms and Conditions of Sale of Goods"
part of this order.

TERMS & CONDITIONS OF THE SALE OF GOODS
1. Buyer shall indemnify, defend and hold Seller harmless from and against any and all claims whatsoever, demands, liabilities, causes of action, losses, damages,
costs and expenses, including, without limitation, attorneys' fees and claims for breach of contract, bodily injury (including death) or property damage, arising out
of or relating to Seller furnishing goods hereunder in accordance with shop drawings that were approved, approved as noted, or with respect to which no
exceptions were taken, or in accordance with plans, specifications or other design documents furnished by Buyer to Seller. A shop drawing shall be deemed
approved for all purposes and deemed consistent with plans, specifications and other design documents unless Buyer notifies Seller in writing of a specific
objection having merit within 14 days of receipt of the shop drawing
2. All materials and their attachments remain the property of Trinity Products, Inc. until all payments have been made in full.
3. Trinity Products LLC's sales price is exclusive of any applicable sales tax, use tax, and any other transaction taxes that may be imposed by any governmental entity or agent
thereof whether state, county, municipal, city or otherwise ("Governmental Entity"). The Customer shall be exclusively responsible for the complete payment of any sales, use
or other transaction taxes and shall pay all invoiced sales, use or other transaction taxes upon its receipt of materials from Trinity Products, LLC unless it provides Trinity
Products, LLC with a valid sales tax exemption certificate. In the event that any Governmental Entity at any time deems the Customer's sales tax exemption certificate to be
invalid or inapplicable or otherwise determines that the transaction is subject to a sales tax, use tax, or other transaction taxes the Customer shall immediately upon demand
provide Trinity Products, LLC and/or any of its successors and/or affiliates with monetary funds to cover all applicable sales tax, use tax, and any other transaction taxes that
may have been assessed, including any applicable interest and penalties as well as any costs whatsoever incurred by Trinity Products, LLC, including, but not limited to, any
attorney's fees and accountant's fees.
4. Seller accepts Buyer's order only upon the terms and conditions on the face side hereof and as set forth herein (collectively the "TERMS"), The TERMS form the entire
agreement between the parties. All other terms, proposals, negotiations, representations, recommendations, statements or agreements, whether made or issued
contemporaneously or previously, are excluded from and are not a part of this agreement, and have no binding or enforceable effect. This agreement shall be binding on the
parties and their respective successors and assigns. An e-mail or facsimile transmission by Seller to Buyer at Buyer's last known e-mail address or to Buyer's last known
facsimile number shall be deemed delivered to Buyer upon Seller's transmission thereof, regardless of whether Buyer later claims non-receipt.
5. Buyer's failure to object to any terms as proposed by Seller within ten (10) days after receipt of this Agreement shall be deemed to be Buyer's acceptance of those terms. In
order for any change or amendment to this order to be binding upon Seller it must be accepted in writing by Seller.
6. Unless Seller and Buyer otherwise agree in writing, Buyer shall pay Seller's invoice within thirty (30) days of the invoice date. Interest shall accrue on each late payment at
the lesser of: (a) the highest rate permitted by law, and (b) one and one-half percent per month compounded monthly. Should Seller choose to hire an attorney to collect
monies claimed due hereunder from Buyer to Seller, Buyer shall pay to Seller, in addition to all other sums due to Seller, the reasonable attorneys' fees, expert fees, costs and
other expenses Seller incurs to pursue collection from the Buyer.
7. Should Seller learn of any information that causes Seller concern about Buyer's ability to perform any of its obligations owing to Seller under this sale, Seller has the right to
request Buyer to provide Seller adequate assurance of due performance on such terms as are deemed reasonable by Seller when acting in good faith, including the right to
await full or partial payment from Buyer as demanded by Seller. In such an instance, Seller may suspend its performance pending Buyer's receipt of adequate assurance of
due performance in a manner found acceptable by Seller.
8. Acceptance of contracts is at all times subject to the Seller’s credit approval and the Seller reserves the right to require full or partial payment in advance if, in the Seller’s
opinion, the financial condition of the Buyer does not justify shipment of material. If at any time, in the Seller’s judgment, reasonable doubt exists as to the Buyer’s financial
responsibility, or if Buyer is past due in payment of any amount owing to Seller under this or any other contract, Seller reserves the right, without liability and without
prejudice to any other remedies to suspend performance, decline to ship, or stop any material in transit, until Seller receives payment of all amounts owing to Seller whether
or not due, or adequate assurance of such payment.
9. Although title to the materials does not transfer from the Buyer to the Seller until the materials have been received at the subject construction site, and payments have
been made by the Buyer to the Seller, all prices are F.O.B. Seller's warehouse in Missouri. Buyer shall arrange for all insurance. Risk of loss to each item sold hereunder passes
to Buyer immediately before that item is shipped from Seller's warehouse. Title, ownership, and risk of loss of products and materials provided by Trinity Products, LLC to the
Customer is transferred from Trinity Products, LLC to the Customer (1) at the site of the construction project after fabrication is complete and where the materials supplied by
Trinity Products, LLC will actually be used and/or installed upon final written acceptance by the Customer if payment in full has been made by the Customer to Trinity
Products, LLC, or (2) five (5) days after the aforementioned materials are delivered to the project site where they will be used and/or installed and payment in full has been
made by the Customer to Trinity Products, LLC, whichever occurs first. Actual and constructive possession is not transferred at any other time with the SOLE EXCEPTION of the
event of "Customer pickup" at any of the business locations of Trinity Products, LLC and/or its affiliate locations in the State of Missouri, in which case title, ownership, and risk
of loss are transferred from Trinity Products, LLC to the Customer in the State of Missouri once payment in full has been made by the Customer to Trinity Products, LLC and
the Customer will be invoiced and will pay all applicable Missouri sales/use taxes (including local tax). The Customer shall at all times remain exclusively responsible for
payment to Trinity Products, LLC of any and all sales tax, use tax and any other transaction taxes that may be determined to be applicable by any Governmental Entity that
emanate from this transaction(s) and shall also be responsible for any other costs incurred by Trinity Products, LLC as set forth in term #3 above.

10. It is agreed that no retainage is allowed on this sale for labor or materials and invoices will be paid in full within the thirty day period specified. Any legal fees or other
collection costs shall be borne by Buyer.
11. Seller shall not be responsible for any inability to perform under the TERMS or for any loss or damage due to delays or disruptions resulting directly or indirectly from, or
contributed to by, any act of God, action or omission of Buyer, act of civil or military authorities, fire, strike or other labor dispute, accident, flood, war, riot, terrorism,
transportation delay, inability to obtain material or fuel supplies, or any other circumstances beyond Seller's reasonable control, whether similar or dissimilar to any of the
foregoing.
12. Even if Seller has shop drawings prepared or Seller performs, or directs the performance, of other services in connection with this sale, this sale and the interpretation of
the TERMS are nevertheless governed by Missouri law, including Article 2 of Missouri's Uniform Commercial Code.
13. Except for items sold "AS IS", Buyer shall inspect the goods sold hereunder upon their delivery and shall, to preserve a claim against Seller, notify Seller in writing within
five (5) days thereafter of any defect or deficiency believed to be Seller's responsibility. Should any such item contain a defect, deficiency or non-conformity for which Seller is
responsible, Seller shall repair or replace the item, at Seller's option, or Seller shall instruct Buyer in writing to return that item with shipping instructions in which case Seller's
sole responsibility will be to return to Buyer the price paid therefor plus the cost for the return shipping if paid by the Buyer. Buyer's failure to furnish Seller timely notice of a
defect, deficiency or non-conformity shall constitute unequivocal acceptance of the item(s). Except for the express warranties forming a part of the TERMS, Seller disclaims all
express and implied warranties, including implied warranties of merchantability and fitness for a particular purpose. Seller’s liability to Buyer, whether in
contract, warranty, tort or otherwise, is limited to that permitted under the "terms", and shall in no event exceed the purchase price hereunder. Notwithstanding
anything seemingly to the contrary, Seller shall not be liable to Buyer for any special, incidental, indirect, liquidated or consequential damages, including without
limitation damages for loss of use, lost time, delay, disruption, interference, loss of productivity, inconvenience, lost income, or lost profits. Seller shall have no
obligation to repair, replace, or accept the return of any item sold "AS IS". If Buyer inspects any of the goods prior to the delivery contemplated hereunder, the five (5) day
notice period for those goods shall run from that pre-delivery inspection date.
14. Seller warrants that the material sold hereunder will conform to the description stated herein (subject to tolerances and variations consistent with current trade practices
and practical testing and inspection methods); that Seller will convey good title thereto (except for any liens or encumbrances that may be caused by Buyer); and that Seller
will repair or replace any defective or nonconforming material or repay the purchase price, as Seller may elect, if notified thereof in writing within one (1) year from the date of
delivery. This is Seller’s sole warranty with respect to the material. Seller makes no other warranty of any kind whatever express or implied and all implied warranties of
merchantability and fitness for a particular purpose which exceed the aforesaid obligation are hereby disclaimed by Seller and excluded from this transaction.
15. Should Buyer wish to cancel this order, Buyer may do so only if Seller agrees in writing and material falls under standard material. In the event of any such cancellation of
standard material, the purchase price shall become the sum of: (a) all costs and expenses, direct and indirect, incurred by Seller in producing the order up to the date Seller
agreed in writing to the cancellation, plus (b) Seller's reasonable cancellation costs, which shall include a restocking charge of thirty-five percent (35) percent of the items not
delivered to Buyer or returned by Buyer, plus (c) a reasonable markup for Seller's home office overhead and profit. Non-standard material is non-returnable and order may
not be canceled. Materials deemed non-standard are available from Seller upon request.
16. Any offer made by Seller as part of this Part of this Agreement may be revoked by Seller prior to the acceptance of this Agreement in its entirety by Buyer. In any event,
this offer shall only remain valid for thirty (30) days.
17. Buyer acknowledges that the "terms" form the contract and are deemed made in Missouri, and that Buyer, in relation to this sale, is deemed to be transacting business in
Missouri. any legal action concerning a claim or dispute involving Buyer and Seller, whether in contract, tort or otherwise, shall be brought in a state or federal court for the
county or district in which Seller's office is located, and Buyer consents to the jurisdiction of that court in Missouri. notwithstanding the foregoing, any claim or dispute arising
out of or relating to this contract, or to the goods or services supplied by Seller to Buyer, or to monies claimed due from Buyer to Seller, whether in contract, in tort, or
otherwise, shall be decided by binding arbitration before a single arbitrator. If Buyer's address on this order is located in the United States, the arbitration shall be conducted
under the construction industry arbitration rules of the American Arbitration Association. If Buyer's address on this order is located outside the United States, the arbitration
shall be conducted under the international arbitration rules of the International Centre for dispute resolution. The arbitration award shall be enforceable in the state or
federal court mentioned above. The arbitration locale shall be St. Louis, Missouri. Nothing herein shall be construed as preventing Seller from enforcing any claim or right to a
mechanic's lien or any claim or right against a bond regardless of where such a claim must be filed or enforced.
18. Pricing is based on a continuous manufacturing schedule. Should this process be interrupted through no fault of the Seller. Seller shall be entitled to additional
compensation. Any cost associated with such delays shall be identified by Seller and agreed to by Buyer prior to continuation with manufacturing.
19. Buyer will proceed with changes in the work herein specified only upon receipt of a written order from Buyer specifying the requested change and containing an agreed
price and schedule adjustment.
20. Buyer’s exclusive remedy against Seller for any damages suffered by Buyer in connection with the material and arising out of this transaction shall be for breach of
contract, and Sellers’ liability in this regard shall be limited to repair or replacement of defective or nonconforming material or repayment of the purchase price paid therefore
by Buyer, as Seller may in its sole discretion elect. Because the sales price herein makes no provision for such risk, Seller shall in no event be liable to Buyer for any special or
consequential damages including, but not limited to, erection costs, lost profits, good will, loss of time, unabsorbed overhead, inconvenience or commercial loss. Any action
for breach of this contract must be commenced within one (1) year after the cause of action shall occur, and no such action may be maintained which is not commenced with
in such period.

21. If any provision of this Purchase Order, or portion of any provision, is declared or found to be unenforceable, the balance of this Purchase Order or such provision shall be
interpreted and enforced to the greatest extent possible as if the unenforceable provision or portion had never been a part hereof. In particular, if any interest rate provided
for herein is higher than that permitted by applicable law, it shall automatically be amended to the highest legal rate.

Page 5 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
2/24/2022 2:14 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2
39381002
GROUT
GROUT
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6192868193
Pacific Internati
PACIFICINTER
Unit Price
4804307106
Action Pumping
ACTIONPUMP
Unit Price
6269409251
Cell-Crete Corp
CELLCRETECOR
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
LF
299.00
ABANDON EXISTING 8" WATE
4GROUT
2051110
65
0.0000
5.5600
19.5300
0.0000
LF
1,085.00
ABANDON EXISTING 10" SEW
4GROUT
2051110
93
0.0000
5.5600
19.5300
Plugged Amount
Quoted Amount
0
0
0
7,695
0
27,030
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
0
Totals
0
7,695
27,030
Diff From Plug
0
7,695
27,030
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

SOUND-CRETE CONTRACTORS, INC. 
ARIZONA REGIONAL OFFICE 
2615 S 40th Street 
Phoenix, AZ 85034 
602-438-4510- Office 
602-438-9726 – Fax 
Page 1 of 2 
SPECIALTY CONCRETE CONTRACTORS 
CORPORATE OFFICE 135 E. Railroad Avenue • Monrovia, CA 91016-4652 (626) 357-3500 (800) 660-8062 ∙ FAX (626)357-2537 
NORTHERN CALIFORNIA 995 Zephyr Avenue ∙ Hayward, CA 94544 ∙ (510) 471-7257 (800) 696-0433 ∙ FAX (510) 471-6426 
SAN DIEGO 530 Opper Street, Suite A ∙ Escondido, CA 92029 ∙ (760) 291-1240 (877) 291-1240 ∙ FAX (760) 291-1242 
ARIZONA 2615 S 40th Street ∙ Phoenix, AZ 85034 ∙ (602) 438-4510 ∙ FAX (602) 438-9726 
NEVADA 3475 John Peter Lee Avenue ∙ North Las Vegas, NV 89032 ∙ (702) 366-1954 ∙ FAX (702) 366-9474 
CALIFORNIA 
#243404 
ARIZONA 
#104888 
NEVADA 
#10689 
UTAH 
#4835096-5501 
IDAHO 
#15868-a-$(9) 
ALASKA 
#29473 
 
 
February 16, 2022 
Bid Number: 220116-1-AV01 
 
Attn: 
Estimating Dept. 
 
Project: 
CHANDLER HEIGHTS RD UTILITY RELOCATIONS (CMAR) PACKAGE 2 
                            Chandler, AZ. 
 
Re: 
Low Density Cellular Concrete Abandonment (Alternative) 
 
Scope: Provide labor, equipment and materials for annular grouting with 30 PCF 80 psi min Cellular Concrete to pipeline 
described below. General Contractor to provide traffic control, water, and setup area (24’X80’ or 12’X120’). Price 
includes all applicable taxes. Price good through the end of 2022. 
Pipe Abandonment 
Description 
Quantity 
Units 
Unit Price 
Total 
Low Density Cellular Concrete 30 
PCF 80 PSI min, 8” & 10” 
Pipe Abandonment 
24 
CY 
$ 
66.00 $          1,584.00 
Work-Day (Labor and Equip) 
2 
Each 
$ 5,500.00 $ 
11,000.00 
Mobilization 
2 
Each 
$ 6,000.00 $ 
  12,000.00 
TOTAL 
$ 
24,584.00 
General Conditions: 
1. Price includes Material, 2 mobilizations and 2 workdays, all items shown on tables shall be awarded 
collectively in order to hold pricing. Add $5500 for additional workday, $6000 for full mobilization 
(equipment off-site) and $5000 for partial mobilization (equipment on-site). 
2. Contractor to provide lines free of standing water and blow air prior to our arrival to ensure the lines are free of 
blockages. If foreign liquids or hydrocarbons are encountered in the line it will result in a yield loss of our 
material; contractor will be responsible for all overages as a result of yield loss caused by foreign liquids or 
hydrocarbons in the line. 
3. Bulkheads are excluded, will be installed by contractor shall be watertight and able to withstand the pumping 
pressure applied by the grouting process. 
4. Cell-Crete accepts no responsibility for the placing of concrete product into lines, vessels or any areas not properly 
insolated. Materials when used for pipe fills must be contained during the placement process. 
5. Contractor to install concrete bulkheads with 3” threaded inlet pipes at or above street level at each inlet location 
with valves on the inlet side. No hard 90’s only sweeps are to be used in the injection ports. We must pressurize 
to move material down the line. 2” or larger vent pipe or catch basin at end of run with threaded cap. 
6. Bid Cell-Crete works a typical 7-3:30, 40 hour work week unless specifically contracted otherwise. All prices 
based upon normal working hours excluding weekend and night work. 
7. GC to provide 24 hour advanced notice of any unavailable work onsite for non-concurrent working days. If no notice 
is given and Cell Crete Corporation shows up to the site, and no work is available a $2,800 show up fee will be 
charged (4hour charge @ $700/hour).

SOUND-CRETE CONTRACTORS, INC. 
ARIZONA REGIONAL OFFICE 
2615 S 40th Street 
Phoenix, AZ 85034 
602-438-4510- Office 
602-438-9726 – Fax 
Page 2 of 3 
SPECIALTY CONCRETE CONTRACTORS 
CORPORATE OFFICE 135 E. Railroad Avenue • Monrovia, CA 91016-4652 (626) 357-3500 (800) 660-8062 ∙ FAX (626)357-2537 
NORTHERN CALIFORNIA 995 Zephyr Avenue ∙ Hayward, CA 94544 ∙ (510) 471-7257 (800) 696-0433 ∙ FAX (510) 471-6426 
SAN DIEGO 530 Opper Street, Suite A ∙ Escondido, CA 92029 ∙ (760) 291-1240 (877) 291-1240 ∙ FAX (760) 291-1242 
ARIZONA 2615 S 40th Street ∙ Phoenix, AZ 85034 ∙ (602) 438-4510 ∙ FAX (602) 438-9726 
NEVADA 3475 John Peter Lee Avenue ∙ North Las Vegas, NV 89032 ∙ (702) 366-1954 ∙ FAX (702) 366-9474 
CALIFORNIA 
#243404 
ARIZONA 
#104888 
NEVADA 
#10689 
UTAH 
#4835096-5501 
IDAHO 
#15868-a-$(9) 
ALASKA 
#29473 
 
 
8. Contractor to provide a minimum of 2 weeks’ notice for each mobilization. 
9. Bid subject to approval by the Project Engineer 
10. Bid bond amount is excluded from base bid added cost of bond is 1%. 
11. Contractor agrees this is a per unit contract, not a lump sum contract. Excludes Bonds and Textura fees or other 
fee based platforms, the costs associated with this will be passed on as an added cost to the GC in addition to 
contract amount. 
12. Cement prices good for 120 days from the date of the bid opening. Annual increases equal to the increase in 
Cement price from the supplier and/or increased labor costs to be expected if the job runs longer than 1 year. 
13. Contractor to provide washout and washout disposal adjacent to our batch plant. Add $500/day if Cell-Crete 
provides washouts. 
14. Production rate is based on consistent supply of bulk cement. Freight delays due to site logistics and unforeseen 
conditions /traffic delays will impact production rate. Contractor to provide traffic controls that includes all lane 
closure permits and flagmen for such closures. 
15. Maximum retention shall be 5%. Payable within 120 days of completion of scope. Payment terms are net 30 
unless otherwise specified. 
16. Bid does not include local hire labor or DBE requirements if any are required. Our crews are usually 3-5 people, 
and we cannot obtain useful labor from the hall for short duration jobs. If a local hire is required, please include 
the direct cost to our contract. 
17. Cell-Crete cannot be responsible for liquidated damages without an agreed upon schedule, or negotiated LD costs. 
Contractor to create a schedule that is acceptable by Cell-Crete. 
18. Contractor to provide a continuous water supply with an appropriate 2” water connection with minimum of 70-psi 
pressure and a minimum of 200 gallons/minute. Delays caused by the lack of continuous water or other delays will 
be charged at a rate of $700 per hour and $1,000 per hour for over time. 
19. Quantity to be determined by readings from Cell-Crete’s mixing equipment. If alternate method of measurement 
requested, it is to be agreed upon prior to the first day of placement and to be verified accurate and acceptable to 
Cell-Crete Corporation. Cell-Crete requires opportunity to attend all measurements that determine our material 
quantity including surveyor-shooting grade before placement of initial lift of material. 
20. Cell-Crete will present a “Daily Report” for each working day to your onsite superintendent to verify quantities 
21. installed. Your onsite superintendent is authorized to sign the “Daily Report” on Contractor’s behalf unless Cell- 
Crete is notified in writing. 
22. Contractor to provide safe access and a set up area of a minimum of 24’x80’ adjacent to fill with good access for 
up to 6 trucks at one time. 
23. Contractor to provide OSHA requirements i.e. Safety rails, lighting, protection of openings, access ladders-etc. 
Cell-Crete to provide safety equipment for standards for our crews and equipment. Excludes third party testing, 
de-watering, bulkheads and formwork, feed and vent pipes, cleaning, shoring, excavation, traffic control, gas 
testing, backfill and access. Snow plow access/clearing roads responsibility of contractor. 
24. Contractor to provide traffic controls that includes all lane closure permits and flagmen for such closures. 
25. There shall be no clauses requiring Cell-Crete Corp. to assume liability for any act of others. 
26. Purchase orders, contracts and change orders must be executed before the start of associated work. 
27. This quotation shall be attached and all terms herein are to be part of the final contract. Additional terms will not 
be part of this Contract unless agreed to by Cell-Crete Corporation in writing. If there are any contradictions / 
28. conflicts between this quotation’s terms and the final contract’s terms, this quotation’s terms shall be deemed 
controlling and the contradictions / conflicts in the final contract’s terms shall be disregarded. 
29. 2 hour safety training is included in bid. If more than 2 hour training is needed due to site specific compliance 
please add cost at $700/hour. 
30. Warranty period included in bid shall not exceed 1 year from date of LCC scope completion. 
31. Standard insurance included in bid is $2 million general liability and $1 million workers comp.

SOUND-CRETE CONTRACTORS, INC. 
ARIZONA REGIONAL OFFICE 
2615 S 40th Street 
Phoenix, AZ 85034 
602-438-4510- Office 
602-438-9726 – Fax 
Page 3 of 3 
SPECIALTY CONCRETE CONTRACTORS 
CORPORATE OFFICE 135 E. Railroad Avenue • Monrovia, CA 91016-4652 (626) 357-3500 (800) 660-8062 ∙ FAX (626)357-2537 
NORTHERN CALIFORNIA 995 Zephyr Avenue ∙ Hayward, CA 94544 ∙ (510) 471-7257 (800) 696-0433 ∙ FAX (510) 471-6426 
SAN DIEGO 530 Opper Street, Suite A ∙ Escondido, CA 92029 ∙ (760) 291-1240 (877) 291-1240 ∙ FAX (760) 291-1242 
ARIZONA 2615 S 40th Street ∙ Phoenix, AZ 85034 ∙ (602) 438-4510 ∙ FAX (602) 438-9726 
NEVADA 3475 John Peter Lee Avenue ∙ North Las Vegas, NV 89032 ∙ (702) 366-1954 ∙ FAX (702) 366-9474 
CALIFORNIA 
#243404 
ARIZONA 
#104888 
NEVADA 
#10689 
UTAH 
#4835096-5501 
IDAHO 
#15868-a-$(9) 
ALASKA 
#29473 
 
 
 
Estimated by: 
 
 Vishvesh Mehta  
(626) 483-8898 
vmehta@cell-crete.com

Page 6 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
2/24/2022 2:14 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2
39381002
PIPE PACAKGE
PIPEPK
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4809267003
Core&Main
COREMAIN
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
EA
3.00
1" COMBO AIR VAC
2CAV1
1,155.0000
0.0000
LF
30.00
16" DIP WATERLINE
2DIP16
315.5600
0.0000
LF
250.00
8" DIP WATERLINE
2DIP8
88.8900
0.0000
EA
2.00
16" GATE VALVE
2GV16
6,514.0000
0.0000
EA
6.00
8" GATE VALVE
2GV8
1,598.0100
4.5000
LF
30.00
3" PVC MATERIALS
2PVC3IN
0.0000
28.0000
LF
1,130.00
10" VCP
2VCP10
27.3500
0.0000
LS
1.00
2" WATER SERVICE MATERIA
2WSM
4,010.1800
Plugged Amount
Quoted Amount
0
92,686
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
Total Adjustment
0
31,775
Totals
92,686
Diff From Plug
60,911
Total Minority
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

ACHEN GARDNER CONSTRUCTION LLC
550 S 79TH STREET
CHANDLER, AZ 85226

Job
Chandler Heights Relocates Package 2
Chandler, AZ
Bid Date: 02/16/2022
Bid #: 2201262
Sales Representative
Justin Paule
(M) 480-688-0977
(T) 480-688-0977
Justin.Paule@coreandmain.com

Core & Main
1410 W Harvard Ave
Gilbert, AZ 85233
(T) 480-926-7003
02/16/2022 - 1:09 PM
Actual taxes may vary
Page 1 of 4
Bid Proposal for Chandler Heights Relocates Package
2
CUSTOMER
CONTACT
NOTES

Seq# Qty
Description
Units
Price
Ext Price
DUE TO CURRENT SUPPLY CHAIN DISRUPTIONS, MATERIALS
ARE SUBJECT TO PRICING AT TIME OF SHIPMENT. MATERIAL
AVAILABILITY AND TIMELINESS OF SHIPMENTS CANNOT BE
GUARANTEED. THIS TERM SUPERSEDES ALL OTHER
CONTRACTUAL PROVISIONS.
10
8" DIP WATERLINE
20 336 8 TJ PR350 DI PIPE
FT
29.66
9,965.76
30
13 8 TJ FIELD LOK 350 GASKET SBR
EA
123.52
1,605.76
 
 
50
3
8 SURE STOP LOCKING GASKET
EA
160.15
480.45
 
EPDM HEAT RATED
 
 
80
2
8 MJXFLG ADPT C153 IMP
EA
145.12
290.24
90
12 8 MJ 90 C153 IMP
EA
174.14
2,089.68
100 30 8 TUFGRIP DI TLD-8 L/ACC (I)
EA
49.82
1,494.60
110 30 8 MJ REGULAR ACC SET L/GLAND
EA
25.80
774.00
120
3
8 MJ L/P SLV C153 IMP
EA
175.81
527.43
130
1
16X8 MJ TEE C153 IMP
EA
780.28
780.28
140
2
8 MJ CAP C153 IMP
EA
80.37
160.74
150
2
16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
273.74
160
2
16 MJ REGULAR ACC SET L/GLAND
EA
56.19
112.38
170
2
16X8 FLG TEE C110 IMP
EA
1,563.35
3,126.70
 
 
190 340 20"X340' POLYWRAP BLK F/6"-8" BS (W/20'PERF)
FT
0.59
200.60
200
2
T-10-2 UPC 10 MIL TAPE 2"X100'
EA
8.00
16.00
210 500 WIRE 14/1 X 500 UF BLUE SOLID FEED 500' ROLL
FT
0.13
65.00
220
1
3X1000' DET TAPE WATER BLUE
RL
52.03
52.03
SUBTOTAL 22,015.39
 
 
240
8" GATE VALVE
250
6
8 F6100 MJ RW GV OL ON L/ACC CLOW GATE VALVE EPOXY COATED W/STAINLESS STEEL BOLTS &
NUTS
EA
1,118.23
6,709.38
260 12 8 TUFGRIP DI TLD-8 L/ACC (I)
EA
49.82
597.84
270 12 8 MJ REGULAR ACC SET L/GLAND
EA
25.80
309.60
280 12 36 564-A BOTTOM ONLY IMP
EA
66.88
802.56
290
6
24 562-A BOTTOM ONLY IMP
EA
47.75
286.50
300
6
16 562-A TOP ONLY IMP
EA
47.03
282.18
310
6
SWSERVICE NPR600-WA 562A POLYM
EA
42.31
253.86
320
6
DC457 DEBRIS CAP-BLUE
EA
57.69
346.14
SUBTOTAL
9,588.06
 
 
 
 
350
16" DIP WATERLINE
02/16/2022 - 1:09 PM
Actual taxes may vary
Page 2 of 4
ACHEN GARDNER CONSTRUCTION LLC
Job Location: Chandler, AZ
Bid Date: 02/16/2022
Core & Main
2201262
Core & Main
1410 W Harvard Ave
Gilbert, AZ 85233
Phone: 480-926-7003
Fax: 480-926-7050
Bid Proposal for Chandler Heights Relocates Package 2

Seq# Qty
Description
Units
Price
Ext Price
360 36 16 TJ CL50 PR350 DI PIPE
FT
73.55
2,647.80
370 10 16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
1,368.70
380 10 16 MJ REGULAR ACC SET L/GLAND
EA
56.19
561.90
390
6
16 MJ L/P SLV C153 IMP
EA
540.84
3,245.04
400
2
16 MJXFLG ADPT C153 IMP
EA
583.81
1,167.62
410
6
16 MAG HDG BOLT&NUT KIT L/GSKT A307A HOT DIP GALV
EA
57.81
346.86
420
6
16X1/8 FF CLOTH IN RUBBER GSKT
EA
21.48
128.88
SUBTOTAL
9,466.80
 
 
440
16" GATE VALVE
450
2
16 F6106 MJXFLG RW GV OL L/ACC ON CLOW GATE VALVE EPOXY COATED W/STAINLESS STEEL
BOLTS & NUTS
EA
6,000.00
12,000.00
460
2
16 TUFGRIP DI TLD-16 L/ACC (I)
EA
136.87
273.74
470
2
16 MJ REGULAR ACC SET L/GLAND
EA
56.19
112.38
480
2
16 MAG HDG BOLT&NUT KIT L/GSKT A307A HOT DIP GALV
EA
57.81
115.62
490
2
16X1/8 FF CLOTH IN RUBBER GSKT
EA
21.48
42.96
500
2
36 564-A BOTTOM ONLY IMP
EA
66.88
133.76
510
2
24 562-A BOTTOM ONLY IMP
EA
47.75
95.50
520
2
16 562-A TOP ONLY IMP
EA
47.03
94.06
530
2
SWSERVICE NPR600-WA 562A POLYM
EA
42.31
84.62
540
2
DC457 DEBRIS CAP-BLUE
EA
57.69
115.38
SUBTOTAL 13,068.02
 
 
560
1" COMBO AIR VAC VALVE
570
PER DTL 106 / COC DTL C-319
580
3
BR2B0899IP100 SAD 8X1IP 8.99-9.67 DBL STRAP BRNZ SAD
EA
167.27
501.81
590
3
B25025N 1 BALL CORP MIPXCF AWWA IP X COP FLARE NO LEAD
EA
75.32
225.96
600 120 1 HARD K COPPER TUBE 20'
FT
8.17
980.40
610 12 1 WROT COPPER 90 BEND CXC
EA
2.73
32.76
620
3
P25172N 1 BALL CURB PJCTSXFIP PACK JT CTS X FIP NO LEAD
EA
115.43
346.29
630
3
1X6 BRASS NIPPLE NO LEAD (I)
EA
11.73
35.19
640
3
1 BRASS 90 NO LEAD (I)
EA
7.48
22.44
650
3
1" ARI D040 AIR RELEASE VALVE
EA
257.56
772.68
660
3
#4 CONC MB EXT/STACK BOX PHOE- NIX
EA
66.73
200.19
670
3
#4 CONC METER BOX BODY PHOENIX
EA
66.73
200.19
680
3
#4 MAG POLY LID W/AMR WATER A6001852-H9
EA
109.62
328.86
SUBTOTAL
3,646.77
 
 
700
16X2 WATER SERVICE
710
1
BR2B1732IP200 SAD 16X2IP 17.32-19.19 DBL STRAP BRNZ SAD
EA
721.24
721.24
720
1
B20046N 2 BALL CORP MIPXFIP NO LEAD
EA
280.86
280.86
730
2
2 WROT COPPER MALE ADAPTER
EA
12.71
25.42
740
1
2 WROT COPPER 45 BEND CXC
EA
10.67
10.67
750 120 2 HARD K COPPER TUBE 20'
FT
20.07
2,408.40
760
5
2 WROT COPPER CXC COUPLING
EA
5.78
28.90
770
1
2 WROT COPPER 90 BEND CXC
EA
11.51
11.51
780
1
B24286N 2 ANG BMV FIPXFLG W/LW NO LEAD
EA
346.83
346.83
790
1
#4 CONC METER BOX BODY PHOENIX
EA
66.73
66.73
800
1
#4 MAG POLY LID W/AMR WATER A6001852-H9
EA
109.62
109.62
SUBTOTAL
4,010.18
 
 
02/16/2022 - 1:09 PM
Actual taxes may vary
Page 3 of 4
Bid Proposal for Chandler Heights Relocates Package 2
Bid #: 2201262

Seq#
Qty
Description
Units
Price
Ext Price
820
10" VCP SEWER
830
1168
10 CLAY PIPE BEXPE
FT
23.83
27,833.44
840
4
GALLON CLAY PIPE LUBE
EA
25.00
100.00
850
2
FREIGHT
EA
600.00
1,200.00
860
23
0410720 10 MISSION ADJ CPLG SHEAR RING
EA
65.09
1,497.07
870
5
0408781 8 CLAYXCLAY CPLG MISSION STANDARD SHEAR RING
EA
50.45
252.25
SUBTOTAL
30,882.76
Sub Total
92,677.98
Tax
0.00
Total
92,677.98
UNLESS OTHERWISE SPECIFIED HEREIN, PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY
CUSTOMER FOR MANUFACTURE WITHIN THIRTY (30) CALENDAR DAYS FROM THE DATE OF THIS QUOTATION. CORE & MAIN LP
RESERVES THE RIGHT TO INCREASE PRICES TO ADDRESS FACTORS, INCLUDING BUT NOT LIMITED TO, GOVERNMENT REGULATIONS,
TARIFFS, TRANSPORTATION, FUEL AND RAW MATERIAL COSTS. DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD
TIMES. ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR
APPLICABLE STORAGE FEES. THIS BID PROPOSAL IS CONTINGENT UPON BUYER’S ACCEPTANCE OF SELLER’S TERMS AND
CONDITIONS OF SALE, AS MODIFIED FROM TIME TO TIME, WHICH CAN BE FOUND AT: https://coreandmain.com/TandC/
02/16/2022 - 1:09 PM
Actual taxes may vary
Page 4 of 4
Bid Proposal for Chandler Heights Relocates Package 2
Bid #: 2201262

Page 7 of 9
Achen-Gardner Construction, LLC 71
Mark McLafferty
3/17/2022 2:26 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2 FINAL
39381002-1
POLYMER MANHOLE
POLYMH
Vendor Phone
Vendor Name
Vendor Code
Unit Price
6022696219
Olson Precast
OLSONPRECAST
Unit Price
7028249702
Armorock
ARMOROCK
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
0.0000
EA
10.00
5' POLYMER MANHOLE
2POLYMH
12,208.9800
14,358.1000
Plugged Amount
Quoted Amount
0
122,090
0
143,581
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
Totals
122,090
143,581
Diff From Plug
122,090
143,581
Total Minority
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

Q  U  O  T  A  T  I  O  N
Page
 1
of
3
2/2/2022
Notes: 
1. Quote is subject to our standard terms, conditions, and shipping policies. 
2. Payment is due at Net 30. Late Payment service charge for over 30 days will be charged at 18% APR 
3. Quote is valid for 60 days from issue date to receipt of PO after 60 days quote is subject to change based off 
market value of materials.  
4. All applicable taxes are to be paid by purchaser 
5. If owner requires items to be grouted in field contractor is responsible for materials and labor costs incurred.  
6. All loads will be billed at $1500 for each truck. Total of four(4) needed for job. Customer will only be billed for 
trucks used. Additional trucks will be billed at market rate.  
7. Freight requested under 3 days notice may be subject to increased freight rates 
8. Products will be billed at unit pricing per quotation 
9. Rush orders will be priced accordingly. 
10. Contractor shall be responsible for joint sealing and performance.  
11. Miscellaneous items such as grout, epoxy, and hardware are not included with the structures unless a specific 
line item is shown on this quote. Additional charges will apply for any extra items that are not shown on this quote. 
12. Final lead time is determined at date of approved submittal.  
From:
Quote Date: 2/2/2022
To:
Ref: Chandler Heights Chapparral Way to Alma School RD
Chandler, AZ

MH 01
60"-30" Polymer Manhole
14.27'
6,684
$10,674
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50524-S
60 IN X 2 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 02
60"-30" Polymer Manhole
13.98'
6,543
$10,518
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X4FL
30 IN X 4 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50524-S
60 IN X 2 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 03
60"-30" Polymer Manhole
14.18'
6,684
$10,674
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50524-S
60 IN X 2 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 04
60"-30" Polymer Manhole
14.25'
6,684
$10,674
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50524-S
60 IN X 2 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 05
60"-30" Polymer Manhole
14.84'
6,875
$10,919
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X2FL
30 IN X 2 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50536-S
60 IN X 3 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 06
60"-30" Polymer Manhole
15.94'
7,302
$11,208
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X4FL
30 IN X 4 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50548-S
60 IN X 4 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 07
60"-30" Polymer Manhole
16.18'
7,443
$11,364
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50548-S
60 IN X 4 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
Structure
Description
Height
Weight
Price
For:
Ref: Chandler Heights Chapparral Way to Alma School RD
Chandler, AZ
Quote Date: 2/2/2022
Page
2
of
3
2/2/2022
Quotation 7.2.14

1
30" CITY OF CHANDLER SEWER A-1700
R&C
MH 08
60"-30" Polymer Manhole
17.24'
7,822
$12,027
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50560-S
60 IN X 5 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 09
60"-30" Polymer Manhole
17.51'
8,011
$12,254
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X1FL
30 IN X 1 IN FLAT PRO-RING
1
PR30X4FL
30 IN X 4 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50560-S
60 IN X 5 FT POLYMER MH SECTION
1
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
6
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
MH 10
60"-30" Polymer Manhole
19.32'
9,078
$13,826
1
30" CITY OF CHANDLER SEWER A-1700
R&C
1
PR30X2FL
30 IN X 2 IN FLAT PRO-RING
1
PR30X6FL
30 IN X 6 IN FLAT PRO-RING
1
50530-C
60 IN X 3 FT ECC POLYMER CONE 30 IN
1
50512-S
60 IN X 1 FT POLYMER MH SECTION
2
50572-S
60 IN X 6 FT POLYMER MH SECTION
1
50512-SNB
60 IN X 1 FT POLYMER MH SECTION NO
BELL
8
JM1.25
1.25 IN X 14 FT JOINT MASTIC ROLL
1
PEPOXY
EPOXY KIT FOR CIP BASE
Spreader Bar 
0.00'
0
$1,943
1
SPREADER BAR AND RIGGING FOR
LIFTING
Sub-Total
$116,081
Freight/Delivery
$6,000
$122,081
Total Price for
Chandler Heights Chapparral Way to Alma School RD
Structure
Description
Height
Weight
Price
For:
Ref: Chandler Heights Chapparral Way to Alma School RD
Chandler, AZ
Quote Date: 2/2/2022
Page
3
of
3
2/2/2022
Quotation 7.2.14
    Manhole Bases (Preach)                                                                                  $21,500
$143,581

Office: (602) 242-2007     Fax: (602) 997-9644 
ROC # 82366 & 118937 
 Preach Incorporated 
 1601 W. Hatcher Road 
  Phoenix, AZ 85021-2169 
 
                                       RFI 0736 
                                      PROPOSAL 
Contractor: Achen Gardner 
                Attention: Mark Mclafferty 
Job Name: Chandler Heights Rd Utility Relocation 
Address: Lake Dr.– Chaparral Way to Alma School                   Date: 2-14-22 
 
Preach Incorporated proposes to supply and install precast manholes on the following: 
 
Bid Item 
 Description 
 
Quantity 
 
Per Each  
 
 Cast in Place 5’ID SS MH Bases    
 
      10 
 
$1,500.00 
 
 Apply Epoxy Coating To Bases 
 
      10 
 
$550.00 
 
  
 
       
 
 
 
 Insecta Coating Of MH’s 
 
      10     
 
$100.0 
 
  
 
       
 
 
 
  
 
       
 
 
 
  
 
       
 
 
 
  
 
       
 
 
 
  
 
         
 
 
 
  
 
     
 
 
 
     
 
       
 
 
 
 
 
 
       
 
 
 
 
   
 
       
 
 
 
 
          Based On 2 Manholes Per Trip      
 
 
 
 
 
       QUOTE EXPIRES: 7/1/22  
 
 
 
 
 
INCLUDES:  Labor, Concrete, Spray Sauereisen 210-X HB, Spark Test & Insecta Coating.  
Installation Per City Of Chandler Standard Spec’s.  
 
EXCLUDES:  Excavation, Backfilling, Shoring, Barricades, Final Adjustments, Concrete Collar 
Around Frame & Cover, Drop Connections, Pouring of Drop Encasements, Cutting Holes In 
Side Of Shaft To Accept High Pipes, Breaking Out Pipes, Setting Of Pipes & Or Stub Outs, Pipe 
Supports, Compaction Testing, Concrete Testing, 3rd Party Inspection, Dewatering, Weekend, 
Night Work, Davis Bacon Wages, Taxes, Bonds & Permit. Concrete Pump, Setting Of 
Polymer MH’s & Vacuum Testing.

Page 2 of 2
Achen-Gardner Construction, LLC 71
Mark McLafferty
3/18/2022 12:52 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2 FINAL
39381002-1
REDI MIX
REDIMIX
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4804282280
Desert Redi Mix
DESERETREDIM
Unit Price
6022787777
Arizona Materia
ARIZONAMATER
Unit Price
6028176945
Calportland
CALPORTLAND
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
60.0000
CY
1,190.00
1/2 SACK CLSM
2CRMAG1/2SK
96.2500
108.0000
111.5000
0.0000
CY
110.00
MAG B CONCRETE
2CRMAGB
131.2500
131.0000
141.0000
78.0000
CY
10.00
MAG C CONCRETE
2CRMAGC
127.2500
128.0000
138.0000
160.0000
CY
41.00
GROUT
2CRMAGGROUT
P
160.0000
P
160.0000
P
160.0000
200.0000
EA
8.00
SHORT LOAD CHARGE 2<4 C
2CRSL2-4
P
200.0000
200.0000
200.0000
150.0000
CY
40.00
SRP THERMAL CLSM
2CRTHCLSM
160.0000
160.0000
160.0000
Plugged Amount
Quoted Amount
8,160
136,648
6,560
152,210
6,560
157,575
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
86,340
Totals
144,808
158,770
164,135
Diff From Plug
58,468
72,430
77,795
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

CONCRETE
Est Quantity 9,036.00 CYDS
Qty
Description
Mix ID
Price
8891
1/2 Sack ABC Slurry (COP)65.68
PHCLSM
$105.00/CYD
135
MAG-B 2500 PSI 1" Rock
12504
$127.00/CYD
10
2000 PSI MAG C
12004
$124.00/CYD
Chilled Water
$1.00/Per Yard
Environmental
$25.00/Each
Fuel Surcharges
$15.00/Each
Hot Water
$1.00/Per Yard
SHORTLOAD CHARGES
$200.00/Each
Concrete Terms & Conditions
Arizona Materials accepts no responsibility for any damage to curb and beyond curb line. It will be Buyers responsibility to contact Arizona Materials Quality
Control Department with any concrete issue/concerns within 48 hours after placement. Buyer is responsible to provide safe access to point of delivery. All
materials are produced in conformance with ACI / ASTM standards. Mixes quoted below, unless otherwise stated, conform to no specific water cement
ratio, minimum sack content, shrinkage, temperature requirement, or the plans and specifications of this project.
All colored concrete loads have a 3 yard minimum.
Arizona Materials cannot guarantee compressive strengths of 5000 PSI or below for loads less than 3 yards. 
5000 PSI or above must be 5 yards or more to guarantee compressive strength.
Payment is due and payable on or before the 15th day of the month following to receive 2% discount. Account must be current in full to be eligible to apply
discount. A service charge not to exceed the maximum allowed by law applies on unpaid invoice amounts beginning the 1st day of the month following due
date and daily thereafter until paid in full. Should litigation be commenced to enforce payment, the prevailing party is entitled to reimbursement of reasonable
attorney fees and court costs.
Buyer has 30 days to validate quote with P.O. , signing issued quote, or written verification.
Prepared & Submitted By:
ACCEPTANCE (void if not accepted before 03/17/2022)
Charity Medlock
6026200364
CMEDLOCK@AZMATL.COM
Prepared On 02/15/2022
All prices expire on quoted expiration date: 09/30/2022
Signature: __________________________________ Date: ______________________________
Print Name/ Title: ________________________________________________________________
Page 1 of 1
 
Customer Service : 602-278-7777
Fax : 602-278-3077
3636 S 43rd Ave
Phoenix, AZ 85009
PROJECT QUOTATION
Customer: Achen Gardner Construction, LLC
Mark McLafferty -
602-877-9329
mmclafferty@achen.com
Project Chandler Heights Rd Utility Relocations
Location Alma School & Lake Dr , Chandler , AZ
Quote # 3416 (21)
Quote Date 02/15/2022

Corporate Offices:
3636 S. 43rd Avenue
Phoenix, AZ  85009
Phone: 602-278-7777
Fax: 602-442-6905
Terms and Conditions of Sale
Additives
Hot / Chilled Water - $1.00 per cubic yard
Nitrogen Cooling -  $9.50 per cubic yard
Non-Chloride Accelerator - $1.50 per unit
Recover - $2.00 per 1/2 Hour
Fiber
Micro Fiber  -  $7.50 per pound
Macro Fiber (Structural) - Priced as Quoted
Color  
Standard Liquid Color - See mix detail for per yard pricing
Color Washout - $25.00 per load
Delivery
Fuel Surcharge - $15.00 per load
Wash Out System Buckets - $25.00 per load (requested at time of order)
Standby Charges - $1.50 per minute beyond 6 minutes per cubic yard
Short Load Charges - 6 yards or less $200.00 per load
Environmental Fee - $25.00 per load
Weekend Delivery - $50.00 per load
Plant Opening Charge - $500.00/hr, 4 hour minimum
Sunday / Holiday Opening - $750.00/hr, 4 hour minimum
All order backs/split loads under 11 yds on one order are subject to Short Load Charges.
Concrete Pricing subject to change in the event of cement / fly ash allocations and/or 
unanticipated cement / fly ash price increases.
All materials are produced in conformance with ACI / ASTM Standards.
Contractor is responsible to provide safe access to the point of delivery.
Arizona Materials accepts no responsibility for damages to any curb and beyond the curb line.
concrete issues/concerns no later than 48 Hours after placement.
www.arizonamaterials.net
It is Contractors responsibility to contact Arizona Materials Quality Control Department with any 
Page 1 of 1

Customer Name 
ACHEN GARDNER CONSTRUCTION LLC 
Attention 
Project Name 
CHANDLER HEIGHTS RD UTILITY RELOCATIONS (CMAR) PACKAGE 2 
City 
CHANDLER 
Project Address 
ALMA SCHOOL RD & LAKE DR 
C/St 
 
Office Phone 
Fax 
Email 
 
Date 
02/15/2022 
Sales 
MARK REINER 
Cell # 
(480) 620-4673 
Email 
mreiner@calportland.com 
Quote # 
125782 
Customer # 
1016934 
Job Start 
02/15/2022 
Job End 
04/01/2022 
 
 
Volume 
Product Number 
Description 
Unit Price 
UOM 
Comments                                  
8891.00 PHCLSM 
0.5 SK ABC SLURRY (PHCLSM 1/2) 
$97.00 
CY 
10.00 
P2025C01 
2000PSI #57 MAG C 
$124.00 
CY 
135.00 P2525B01 
MAG B 2500PSI #57 ASH 
$127.00 
CY 
9036 
Total Volume 
$20.00 
LOAD 
Environmental Fee – Effective 04/01/22 Environmental Fee 
Increase to $25.00 per load. 
 
$25.00 
LOAD 
Fuel Surcharge 
Fly ash and lightweight mixes subject to daily availability / All aggregates meet ASTM C 33. 
Comments : PRICE INCREASE 4-1-22 $10.00 CYD EXPIRING 10-1-22 
 
Subject to availability. CalPortland warrants that the concrete as delivered to this project will meet or exceed the design strength specified on the delivery ticket when evaluated 
in accordance with applicable ACI and ASTM standards. CalPortland does not provide Contractor Quality Control. CalPortland guarantees ticketed mix designs of less than 
5,000psi for load of three yards or more. Mix strength for loads less than three yards is not guaranteed. Ticketed mix designs of 5,000psi or greater require a four-yard minimum. 
Three-yard minimum for all colored concrete. Concrete is a natural product. Seller cannot be responsible for variations in color, surface discoloration, popouts or variations in 
the finished product caused by finishing techniques or job site conditions. Due to potential reactive aggregates in Arizona, CalPortland recommends the use of a Class F Fly 
Ash to mitigate Alkali Silica Reactivity (ASR). Purchaser shall assume the liability for the use of a cement-only mix. 
CalPortland reserves the right to postpone or cancel any quotes, current jobs or accepted deliveries if unable to perform due to raw material shortages, allocations or government 
regulations. Prices subject to change due to drastic cost changes of the major components of concrete or surcharges.  
Concrete is batched and delivered at current ambient temperatures. Buyer is responsible for temperature controlled concrete (Ice/Tempered Water). Prices for temperature 
controlled concrete are available upon request. 
Contractor is responsible for providing safe access to the point of delivery.  CalPortland accepts no responsibility for damages to the premises beyond the curb line.   
Customer shall provide and assume responsibility for an area or container for clean out of the concrete truck chutes.  Additional color added by Buyer on-site subject to wash 
out fees. 
All products quoted per Buyers request. Additional products or services ordered are subject to applicable charges.  
 
 
 
 
 
Standard Operating 
hours 
Loads batched outside Standard Operating Hours subject to applicable charges. 
Summer: 3:00AM – 2:00PM 
Winter: 5:00AM – 3:00PM 
Saturday: 5:00AM – 12:00PM 
Standing Time: 
$2.00 per minute beyond 5 minutes per CY. 
Minimum Load Charges: 
 
Excessive Trucking Fee: 
Fuel Surcharge: 
One Minimum Load Charge waived on orders of 1 full load or more. 
Under 6 CY = $200.00 
Split Loads or multiple Order Backs subject to Excessive Trucking Fees. 
Variable Fuel Surcharge based on U.S. Energy Information Administration On-Highway Diesel Fuel Price Index and is adjusted weekly. 
https://www.eia.gov/petroleum/gasdiesel/ 
Terms: 
All pricing is net 30 days with a valid credit application on file.   All applicable sales taxes will be added to price. 
Financing: 
All invoices are due and payable within 30 days of the original billing date.  A Finance Charge of 1.5% per month on a pro-
rated portion thereof (12% Annual Percentage Rate) will be charged upon all balances not paid within 30 days or first 
appearance on a Statement. 
We impose a surcharge of 2.25% on the transaction amount on all credit card products, which is not greater than our cost of 
processing.  We do not surcharge debit cards. 
General Terms & 
Conditions of Sale: 
Acceptance: 
CalPortland Co. Terms and Conditions are applicable and included as page two of this quote.  If you did not receive a copy, 
please contact CalPortland Sales Department at (602) 817-6950. 
For this job quotation to be effective, written acceptance must be received no later than 30 days after quote date. 
 
 
 
 
 
 
 
 
 
Price Expiration: 
04/01/2022 
See acceptance clause below 
Buyer Acceptance: 
 
Name / Title: 
 
Date:

Ready Mix Terms and Conditions 
 
Customer # 
1016934 
Customer Name 
ACHEN GARDNER CONSTRUCTION LLC 
Quote # 
125782 
Project Title 
CHANDLER HEIGHTS RD UTILITY 
RELOCATIONS (CMAR) PACKAGE 2 
 
  
Tempered Water: 
Heated Water $2.00 per cubic yard. 
Ice: 
$0.50 per pound (Requires 3 – 5 business days notice). 
Non-Chloride Accelerator: 
 
$0.09 per ounce. 
Recover Set Delay Admixture: 
$0.20 per ounce. 
Micro Fiber: 
$6.50 per pound. 
Macro Fiber: 
 
(Structural) Priced individually 
 
Please see manufacturer recommendation / specifications for suggested dosage 
rate. 
Standard Liquid Color: 
See mix detail for per yard pricing. Actual color of concrete may vary due to 
differences in cement, aggregates, job site conditions and finishing methods. 
Three-yard minimum load required. 
Color Washouts: 
 
$25.00 per load 
Standby Charges: 
 
$2.00 per minute beyond 5 minutes per cubic yard. 
Minimum Load: 
Under 6 CY = $200.00  
Excessive Trucking: 
One Excessive Trucking Fee of $200 will be assessed for each additional load 
required due to load sizes or multiple Order Backs. 
Saturday Service: 
$5.00 per cubic yard 
Saturday operating hours 5:00am – 12:00pm 
Loads delivered outside of operating hours subject to additional charges 
Split Load Charges: 
 
$250.00 per load. 
Cancellation Charges: 
$10.00 per cubic yard 
- 
All orders greater than 80 cubic yards cancelled within 24 hours of scheduled 
delivery  
$10.00 per cubic yard (with a minimum of $250.00) 
- 
All orders with scheduled delivery between the hours of 6:00pm – 4:00am 
cancelled within 24 hours of scheduled delivery 
 
 
 
Special Provisions:

DESERT READY MIX 
                                                                                                           READY MIX CONCRETE SALES AND SERVICE 
 
                                                                                                       4011 PRESIDO STREET 
 
                                                                                                    MESA, AZ  85215 
                                                                                                            OFFICE: 480-428-2280  FAX: 480-985-4248 
* E – Environmental | S – Saturday Fee | F – Fuel Surcharge  
 
Begin Date: 
February 15, 2022 
Quote # : 
15186 
Expiration Date: 
December 31, 2022 
MAP/GRID 
184-20   
                                 “This quote does not guarantee product or service availability” 
 
 
 
Item Code 
Item Description 
Est. Qty 
Price 
S500501      
PHCLSM.5 (1/2 SACK SLURRY COP)           
8891 Yards 
$93.00 
SRP104       
1/2 SACK MAG CLSM (SRP MIX)                           
Per Yard 
$93.00 
A202001      
MAG C 2000 PSI                    
10 Yards 
$124.00 
A202501      
MAG B 2500 PSI                           
135 Yards 
$128.00 
TC           
TEMPERATURE CONTROL                      
Per Yard 
$1.00 
              Additional Fees                                                                                 Minimum Load Fee 
Quoted By:
BRUCE A. TABET                             
 
Customer: 
ACHEN GARDNER CONSTRUCTION, LLC          
Customer Code: 
ACHE001    
Address: 
 
 
CHANDLER, AZ  85226 
Contact: 
MARK MCLAFFERTY (ESTIMATOR)                          
Phone: 
480-940-1300   
Fax: 
 
Project: 
CHANDLER HEIGHTS-RD UTILITY RELOC (CMAR) 
Job Address: 
ALMA SCHOOL ROAD & LAKE DRIVE            
Terms Description: 
2% 10TH NET 30                            
Fee ID * 
UOM 
Price 
E01 
Per Yard 
$3.25 
Less than or equal to 
UOM 
Price 
2 Yards 
Load 
$0.00 
3.5 Yards 
Load 
$0.00 
5.5 Yards 
Load 
$0.00 
 
Normal operating hours are Mon-Fri, Sat, Sun or Holidays are subject to surcharges. 
 
Color added at no expressed guarantee. 
 
Drivers do not except cash or make change. 
 
Desert Ready Mix reserves the right to increase prices due to RAW Material cost increases 
such as Cement, Fly Ash, Aggregates or unexpected Fuel increases. 
 
All specialized aggregates are based on availability. 
 
Deliveries less than 6 Cubic yards are subject to our minimum load charges. 
 
This quote does not guarantee product or service availability 
 
**Won't guarantee price or
availability*** Can't Use for GMP

Page 10 of 10
Achen-Gardner Construction, LLC 71
Mark McLafferty
2/24/2022 2:14 PM
CHANDLER HEIGHTS LAKE DR PACKAGE 2
39381002
SURVEY
SURVEY
Vendor Phone
Vendor Name
Vendor Code
Unit Price
4805862104
Atwell, LLC
ATWELLLLC
Unit Price
4803136788
Benchmark Surv
BENCHMARKSUR
Unit Price
4809220780
Survey Innovatio
SURVEYINNOVA
Plug Price
Unit
Quan
Desc
Resource
Activity
Bid
10,000.0000
LS
1.00
SURVEY
4SURVEY
3021490
20
0.0000
0.0000
3,660.0000
Plugged Amount
Quoted Amount
0
0
0
0
0
3,660
$ Adjustment
% Adjustment
Mobilization
Bond
0
0
0
0
0
0
0
0
0
0
0
0
Total Adjustment
0
0
0
10,000
Totals
0
0
3,660
Diff From Plug
-10,000
-10,000
-6,340
Total Minority
0
0
0
A 'P' beside a price indicates a plug price.
Green background indicates that the vendor is selected.

February 17th, 2022 
 
Mark McLafferty 
Achen-Gardner Construction 
550 South 79th Street 
Chandler, AZ 85226 
480-403-9426 
 
SUBJECT:  
Chandler Heights Rd Utility Relocations – Package 2 
 
Dear Mark: 
 
Rick Engineering Company is pleased to submit this proposal to provide professional survey services on 
the above referenced project. We look forward to working with you on this project. 
 
SCOPE OF WORK: 
 
Control 
• Verify existing horizontal and vertical control and establish new control for site staking. 
 
Subtotal: $510.00 
 
Domestic/Fireline Water Services 
• 
Provide one stake at requested offset on 50-foot intervals for line only. 
• 
Provide two stakes at requested offset including grades to adjacent top of curb elevation for 
fire hydrants, water meter vaults and back flow preventers. 
 
Subtotal: $510.00 
 
Sanitary Sewer 
• 
Provide one stake at requested offset on 25-foot intervals for line including grade to invert. 
• 
Provide one offset stake at requested offset for cleanout locations. 
• 
Provide two offset stakes per manhole at requested offset with grades to rim and invert 
elevation. 
 
Subtotal: $1,020.00 
Asbuilts 
• 
Collect field data for use in preparing final asbuilts. 
1. 
Water  
• 
Provide centerline stations on fire hydrants, valves, fittings, meters and taps. 
• 
Contractor to notify surveyor if vertical dip locations are required to be 
located. 
2. 
Sewer  
• 
Provide centerline stations for manholes, cleanouts and fittings. 
• 
Provide rim and invert elevations for manholes

Page 2 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
Note:  The contractor will note any changes made during the construction phase and provide 
dimensions to the surveyor before completion of final asbuilts are submitted.  Should the 
following be required by the governing municipality, the contractor shall notify the project 
surveyor before back-filling water, fire line, sewer, storm drain facilities or other underground 
pipelines and utilities in order that the surveyor may verify the asbuilt location and elevation of 
said utilities. 
 
Subtotal: $850.00 
 
Calculations, Coordination and Project Management 
• 
Onsite preconstruction meetings to coordinate field staking for synergistic operation with 
construction subcontractors (not to exceed one meeting).  Additional meetings will be 
conducted on a time and materials basis per Fee Schedule. 
• 
Point staking calculation for items contained in this proposal. 
• 
Drafting services to complete contract asbuilts per governing agency. 
• 
Correspondence to client and subcontractors (i.e. cutsheets, staking progress 
memorandums, etc). 
 
Subtotal: $770.00 
 
FEE: 
 
Rick Engineering will provide the above services for a TOTAL FEE of $3,660.00. The attached 
Provisions of Agreement between Achen-Gardner Construction (CLIENT) and RICK are incorporated 
hereunto and made a part of this proposal. Any printing is extra and not a part of this agreement. 
 
 
EXCLUSIONS: 
 
The following items are specifically excluded from the Scope of Work and budget and, if required, 
will either be prepared by others or will be covered by separate agreement between Rick Engineering 
Company and CLIENT. 
 
a) Boundary Discrepancies 
b) Soils Reports 
c) Staking for Finish Landscaping or Hardscape 
d) Any items not listed in the “Scope of Work” 
 
If the above meets with your approval, please execute where indicated below, and return to our 
office for our files.  If there are any questions or concerns, please feel free to contact our office. 
 
Sincerely, 
RICK ENGINEERING COMPANY

Page 3 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
                                                                                                                                  
Randall R. Hager, RLS 
Associate – Construction Survey Manager 
 
 
 
 
 
 
ACCEPTED THIS                                             DAY OF                                          , 2022 
 
BY: ________________________________________________________________  
                                                  CLIENT 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Invoices for this project to be mailed to: 
 
Company:  _______________________________________________________________________ 
 
Address:  ________________________________________________________________________ 
 
City/State/Zip:  __________________________________________________________________ 
 
Telephone:  ___________________________________  Email:  ________________ ____________ 
 
Contact person:  __________________________________________________________________ 
 
Please complete, sign and return a copy to RICK ENGINEERING COMPANY

Page 4 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
STANDARD PROVISIONS: ARIZONA 2022 
The Client and Consultant agree that the following provisions shall be a part of their Agreement: 
 1.  This Agreement shall be binding upon the heirs, partners, successors, executors, administrators and assigns of the Client and Consultant. 
 2.  In the event of any increase of costs due to the granting of wage increases and/or other employee benefits to field or office employees due to 
the terms of any labor agreement, rise in the cost of living, or increase in any applicable prevailing wage during the lifetime of this Agreement, 
such increase shall be applied to all remaining compensation.  For services provided on a time and materials or hourly rate basis, increases in the 
applicable rates will be reflected in the billing statement or invoice for the month following the increase. 
 3.  Should litigation at law or equity arising out of this Agreement, including but not limited to an action for declaratory relief, be brought to 
enforce or interpret any term or provision of this Agreement, or to collect any portion of the amount payable under this Agreement or litigation 
commenced either directly or by way of a cross-complaint whether arising out of contract or tort, including a cross-complaint for indemnity, for 
failure or alleged failure to perform or for errors, omissions, or negligence, the prevailing party shall be entitled, in addition to any other award, to 
all litigation and collection expenses, any and all costs of defense, including attorney's fees, expert witness fees, witness fees and court costs and 
any and all other expenses incurred.  
 4.  Neither the Client nor Consultant shall assign his interest in this Agreement without the written consent of the other.  
 5.  This Agreement shall be governed by and construed in accordance with the laws of the State of Arizona.  This Agreement contains the entire 
agreement between Client and Consultant relating to the project and the provision of services by Consultant to the project.  Any agreements, 
promises, negotiations or representations not expressly set forth herein, are of no force or effect.  Subsequent modifications to this Agreement 
shall be in writing and signed by both Client and Consultant. 
 6.  Conditions or representations, alterations, detractions from or to the terms hereof, including delineations hereon, shall not be valid unless they 
are in writing and signed by both Client and Consultant. 
 7.  Client agrees that the Consultant is not responsible for damages arising directly or indirectly from any delays for causes beyond the 
Consultant's control. For purposes of this Agreement, such causes include, but are not limited to, strikes or other labor disputes; severe weather 
disruptions or other natural disasters; fires, riots, war or other emergencies or acts of God; failure of any government agency to act in timely 
manner; failure of performance by the Client or the Client's contractors or consultants; issuance of regulations, orders or other governmental 
actions that limit, restrict or delay the ability of Consultant or Consultant’s workforce to perform; or discovery of any hazardous substances or 
differing site conditions. In addition, if the delays resulting from any such causes increase the cost or time required by the Consultant to perform 
its services in an orderly and efficient manner, the Consultant shall be entitled to an equitable adjustment in schedule and/or compensation. 
 8.  In the event litigation is instituted under the terms and conditions of this Agreement, such litigation is to be brought and tried in the 
appropriate court in the state and county in which the project is located and the parties waive the right to have brought, tried in, or removed to any 
other county or judicial jurisdiction. 
 9.  Client acknowledges that Consultant is not responsible for the performance of work by third parties, including, but not limited to, the 
construction contractor(s), subcontractors, governmental agencies, construction managers, architects, or other consultants.  
10.  Consultant shall only act as an advisor in all governmental relations. Consultant shall not be liable for damages resulting from the actions or 
inactions of governmental agencies including, but not limited to, permit processing, environmental impact reports, dedications, general plans and 
amendments thereto, zoning matters, annexations or consolidations, use or conditional use permits, project or plan approvals and building 
permits. 
11.  Consultant makes no warranty, either express or implied, as to the findings, recommendations, plans, specifications, or professional advice.  
Consultant shall perform in accordance with generally accepted engineering and/or surveying practices or standards in effect at the time of 
performance in the locale where the services are rendered. 
12.  Consultant makes no representation, guarantee, warranty, express or implied concerning estimated cost figures made in connection with 
maps, plans, specifications, or drawings, other than that all such figures are estimates only.  Consultant shall not be responsible for fluctuations in 
cost factors. 
13.  Consultant makes no representations concerning estimates of areas.  Estimates of areas are estimates only and are not to be considered 
precise unless Consultant specifically agrees to provide the precise determination of such areas. 
14.  Client and Consultant agree to cooperate in any and every way or manner on project.   
15.  Consultant makes no representation, either express or implied, concerning soils or geological surveys or subsurface soil tests or general soils 
testing and reporting. 
16.  Upon written request, each of the parties hereto shall execute and deliver, or cause to be executed and delivered, such additional instruments 
and documents which may be necessary and proper to carry out the terms of this Agreement. 
17.  The terms and provisions of this Agreement shall not be construed to alter, waive, or affect any lien or stop notice rights which the 
Consultant may have for the performance of services under this Agreement.

Page 5 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
18.  One or more waivers of any term, condition or covenant by a party shall not be construed as a waiver of subsequent breach of the same or 
any other term, condition, or covenant. 
19.  In the event Client fails to pay Consultant promptly or within sixty (60) days after invoices are rendered, then Client agrees that Consultant 
shall have the right to consider said default a total breach of this Agreement and, upon written notice, the duties, obligations and responsibilities 
of the Consultant under this Agreement are terminated.  In such event, Client shall then promptly pay the Consultant for all the fees, charges, and 
services performed to date by Consultant. 
20.  In the event any term, condition, covenant or provision of this Agreement shall be held to be invalid, void or unenforceable, the remaining 
terms, conditions, covenants and provisions of this Agreement shall be valid and binding on the parties hereto. 
21.  The Client agrees it will require that the Contractor hold harmless, indemnify and defend the Client, the Architect, the Consultant and its 
subconsultants, and each of their officers, directors, principals, employees and agents, from any and all liability claims, losses or damages arising 
or alleged to arise from the performance of the work described herein, but not including the sole negligence or willful misconduct of the Client, 
the Architect or the Consultant or their respective subconsultants, officers directors, principals, employees and agents. 
22.  The Client shall indemnify and hold Consultant harmless with regard to all liability or claims of any kind, including all investigation and 
defense costs, connected directly or indirectly with this project, which liabilities or claims do not result from the sole negligence or willful 
misconduct of the Consultant. 
23.  Consultant has a right to complete all services agreed to be rendered pursuant to this Agreement. In the event this Agreement is terminated 
before the completion of all services, unless Consultant is responsible for such early termination, Client agrees to release Consultant from all 
liability for services performed. 
24.  In the event work prepared or partially prepared by the Consultant be suspended, abandoned, or terminated, the Client shall pay the 
Consultant for all work, fees, deposits, charges and services provided, not to exceed any maximum amount specified herein.  Client 
acknowledges if project work is suspended and restarts, there may be additional charges due to suspension which shall be paid by Client as extra 
work. 
25.  Client agrees that if Client requests services not specified pursuant to the scope of services described within this Agreement, Client agrees to 
pay all such additional services as extra work if authorized in writing. 
26.  Consultant shall be entitled to immediately, and without notice, suspend the performance of any and all of its obligations pursuant to this 
Agreement if Client files a voluntary petition seeking relief under the United States Bankruptcy Code or if there is an involuntary bankruptcy 
petition filed against Client in the United States Bankruptcy Court, and that petition is not dismissed fifteen (15) days after its filing.  Any 
suspension of services made pursuant to the provisions of this Paragraph shall continue until such time as this Agreement has been fully and 
properly assumed or adequate assurance provided in accordance with the applicable provisions of the United States Bankruptcy Court and in 
compliance with the final order or judgments issued by the Bankruptcy Court. 
27.  If payment for Consultant's services is to be made on behalf of Client by a third party, Client agrees that Consultant shall not be required to 
indemnify the third party, in the form of an endorsement or otherwise, as a condition of receiving payment for services. 
28.  Client agrees to purchase and maintain, during construction, builder's liability special peril or other similar insurance which will name 
Consultant as an additional insured.  Client also agrees to require the contractor or contractors to purchase and maintain liability insurance, 
including broad form general liability coverage, comprehensive bodily injury, broad form property damage, independent contractors insurance, 
completed operations and contractual liability coverage, and the exclusions for explosion, collapse or underground coverage shall be deleted; 
automobile including bodily injury, property damage, owned, non-owned and hired vehicles; and worker's compensation insurance including 
employers liability coverage, all of which shall name the Client and Consultant as additional insureds. Certificates of such insurance shall be 
provided to Consultant and the certificate(s) shall include provisions that the above policies are primary and non-contributory with Consultant's 
insurance and that coverage will not be canceled unless at least thirty days prior written notice has been given to Consultant. 
29.  In the event that the plans, specifications, and/or field work covered by this Agreement are those required by various governmental agencies 
and one or more such governmental agency changes its policies, ordinances, procedures or requirements after the date of this Agreement, any 
additional office or field work required, shall be paid by Client as extra work.  
30.  Services provided within the Agreement are for the exclusive use of the Client.  Nothing contained in this Agreement shall be construed to be 
for the benefit of any person not a party to this Agreement and no third-party beneficiary rights are created. 
31.  All original papers, drawings, notes, documents and other work product of Consultant, and copies thereof, produced as a result of the 
Agreement represent professional services, shall remain the property of the Consultant, and Consultant shall retain all copyright and other 
ownership interests.  Client shall have a nonexclusive license to use Consultant’s work product and any items in which Consultant maintains 
ownership and/or copyright interest so long as all fees to be paid under this Agreement have been paid.  Any nonexclusive license Client obtains 
under this Agreement terminates upon the termination of this Agreement.  Consultants work product may be used by Consultant without consent 
of the Client.  
32.  In the event that any changes are made in the plans and/or specifications by the Client or persons other than the Consultant, and such changes 
are not consented to in writing by Consultant, Client acknowledges that the changes and their effects are not the responsibility of Consultant and

Page 6 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
Client agrees to release Consultant from all liability arising from the use of such changes and agrees to defend, indemnify and hold Consultant, its 
officers, directors, principals, agents and employees harmless from and against all claims, demands, damages or costs arising from the changes. 
33.  Client agrees not to use or permit any other person to use plans, drawings or other work product prepared by Consultant, which plans, 
drawings or other work product are not signed and stamped or sealed by Consultant and/or are not final.  Client agrees to be liable and 
responsible for any use of non-final plans, drawings or work product or plans, drawings or work product not signed, and stamped or sealed by 
Consultant and waives liability against Consultant for their use.  Client further agrees that final plans, drawings, and other work products are for 
the exclusive use of Client and may be used by Client only for the project described in this Agreement. 
34.  In the event that any staking is destroyed, damaged, or disturbed by an act of God or parties other than Consultant, the cost of re-staking shall 
be paid for by the Client as extra work.  If the scope of services provided for pursuant to this Agreement does not include construction staking by 
Consultant, Client acknowledges that changes, clarifications, adjustments, and modifications may be necessary because of changed field or other 
conditions.  Client will indemnify and defend Consultant for construction staking by others and from claims arising from changes, clarifications, 
adjustments and modifications which may be necessary to reflect changed field or other conditions, except claims caused by the sole negligence 
or willful misconduct of Consultant. 
35.  Questions concerning location or changes in construction stakes or questions concerning information on plans and specifications must be 
called to the attention of the Consultant upon discovery and before corrective remedy. 
36.  The Consultant shall be notified 24 hours in advance, so that he may check forms, for grade and alignment only, prior to the pouring of 
concrete for cast-in-place concrete structures, thrust blocks, electrical boxes, bridge abutments or piers, or any similar structures staked by 
Consultant.  Consultant can assure compliance to proper grade and alignment only when it has been advised to check in advance. 
37.(a)  If the scope of services to be provided by Consultant pursuant to the terms of this Agreement include the preparation of engineering 
drawings but exclude construction staking services, Client acknowledges that such services normally include coordinating civil engineering 
services and the preparation of as-built drawings pursuant to Uniform Building Code Chapter 70 and/or other statutes, ordinances or laws, and 
Client will be required to retain such services from another consultant or pay Consultant  pursuant to this Agreement for such services as extra 
work. 
   (b) If the scope of services to be provided by Consultant pursuant to the terms of the Agreement, include construction staking services, but 
exclude the preparation of the engineering drawings to be used for construction and construction staking, Client acknowledges the coordination of 
civil engineering services and the preparation of as-built drawings as required by statute, ordinance or law may require the retention by Client of 
another consultant or the original consultant responsible for the design, or pay Consultant pursuant to this Agreement for such services as extra 
work.  Client acknowledges that if Consultant is retained to prepare as-built drawings of plans prepared by others, Client will indemnify, defend 
and hold Consultant harmless from any and all liability in connection with the plans and specifications prepared by others, and the performance 
of work by Consultant on this project as set forth in Paragraph 44. 
38.  In the event Client discovers or becomes aware of apparent errors or omissions, field conditions or discrepancies during the construction 
phase of the project, which apparent errors or omissions, field conditions or discrepancies are resolvable by Consultant, Client agrees to notify 
Consultant and engage Consultant to resolve the problem before construction activities commence or further construction activity proceeds.  
Further, Client agrees to have a provision in its construction contracts for the project which require the contractor to notify Client of any such 
apparent errors or omissions, field conditions or discrepancies so that Client may, in turn, notify Consultant pursuant to the provisions of this 
Paragraph. 
39.  Client shall pay the costs of checking and inspection fees, zoning and annexation application fees, assessment fees, soils engineering fees, 
soil testing fees, aerial topography fees, and other fees and deposits, permits, bond premiums, title company charges, blueprints and 
reproductions, and all other charges not specifically covered by the terms of this Agreement.  
40.  All fees and other charges will be billed monthly as the work progresses and the net amount shall be due at the time of billing. 
41.  A late payment CHARGE will be computed by the Consultant at the periodic rate of 1.5% per month, not to exceed the maximum legal rate, 
which will be applied to any unpaid balance commencing thirty (30) days after the date of the original billing. 
42.  Client agrees that the balance as stated on the billings from Consultant to Client are correct, conclusive and binding on the Client unless 
Client within forty-five (45) days from the date of receipt of such billing, notifies Consultant in writing of the particular items that are alleged to 
be incorrect. 
43. In consideration of the Consultant's fee for services, the Client agrees that the Consultant will perform no onsite construction review, 
construction management, supervision of construction of engineering structures or other construction supervision for this project unless 
specifically contracted for; that such services will be provided by others; and that the Client shall defend, indemnify and hold the Consultant, its 
officers, directors, principals, agents and employees harmless from any and all liability, real or alleged, arising or resulting from the performance 
of construction review, construction management, supervision of construction of engineering structures or supervision by others.  Further, Client 
acknowledges that Consultant will be unable to correct errors or omissions in the plans which customarily become apparent and resolvable during 
construction review.    
44.  Client agrees that, in accordance with generally accepted construction practices, the construction contractor will be required to assume sole 
and complete responsibility for job site conditions during the course of construction of the project, including safety of all persons and property; 
that this requirement shall be made to apply continuously and not be limited to normal working hours.  The Client further agrees to defend,

Page 7 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
indemnify, and hold the Consultant harmless from any and all liability in connection with the performance of work on this project, excepting 
liability arising from the sole negligence or willful misconduct of the Consultant. 
45.  Client agrees to limit the liability of Consultant, its principals and employees to the Client, all contractors and subcontractors on the project, 
due to professional  negligent  acts, errors  or  omissions  of  the  Consultant, breach of contract or any other cause of action however pled to the 
sum of $50,000 or the Consultant's fee, whichever is greater; except that if the contract amount, including any addenda or other contracts 
pertaining to or covering services related to the project, exceeds $150,000, the liability of Consultant shall not exceed $150,000.  Client further 
agrees to notify any contractor and subcontractor who may perform work in connection with any design, report or study prepared by Consultant 
of such limitation of liability, and to require as a condition precedent to their performing their work, a like indemnity of liability on their part as 
against the Consultant. 
46.  The Client hereby agrees to bring no claim for negligence, breach of contract, indemnity or otherwise against the Consultant, its principals, 
employees and agents if such claim, in any way, would involve the Consultant's services for the investigation, detection, abatement, replacement, 
use or specification, or removal of products, materials or processes containing asbestos, asbestos cement pipe, and/or hazardous materials (as 
defined by state, federal and/or local laws or ordinances).  Client further agrees to defend, indemnify and hold harmless Consultant, its officers, 
directors, principals, employees and agents from any asbestos, asbestos cement pipe, and/or hazardous waste material related claims that may be 
brought by third parties as a result of the services provided by the Consultant pursuant to this Agreement except claims caused by the sole 
negligence or willful misconduct of the Consultant. 
47.  Client acknowledges that Consultant's scope of services for this project does not include any services related, in any way, to asbestos and/or 
hazardous waste.  Should Consultant or any other party encounter such materials on the job site, or should it in any way become known that such 
materials are present or may be present on the job site or any adjacent or nearby areas which may affect Consultant's services, Consultant may, at 
its option, terminate work on the project until such time as Client retains a specialist contractor to abate and/or remove the asbestos and/or 
hazardous waste materials and warrant that the job site is free from any hazard which may result from the existence of such materials. 
48.  Digital data files shall be provided to Client only if such delivery has been specified in the scope of services set forth in this Agreement.  If 
the scope of services does not specify that digital data files shall be delivered, all costs associated with delivery of digital data files shall be paid 
by Client.   Client agrees that all digital data files delivered by Consultant are to be used exclusively to fulfill the scope of this Agreement.  Client 
agrees to hold Consultant harmless for any use by client of this data outside or beyond the scope of this Agreement. 
49.  Consultant makes the following representations as to the compatibility of digital data files: 
   (a) All data files are to be used with compatible hardware and software versions as used by Consultant at the time file copies were created. 
   (b) Consultant makes no representation as to the compatibility of any data files other than for the hardware and software versions used by 
Consultant to create the data files. 
   (c) Client agrees to hold Consultant harmless for any use of data files on any hardware or software versions other than those which were used 
by Consultant to create them. 
   (d) If Client requires or requests any special or specific file structure, format or software that is different from those used by Consultant at the 
time Consultant is performing the services set forth in this Agreement, unless otherwise specified in this Agreement, all costs associated with 
creating the file structure or format, and/or acquiring necessary software and/or hardware, shall be the responsibility of Client. 
50.  After the time final data files have been delivered per terms of this Agreement, Consultant will not be held responsible for maintaining copies 
of any digital data related to this Agreement. 
51.  Client agrees that if formats for deliverables of digital files are not specified in this Agreement, they will be delivered using the standards and 
versions of Consultant at the time of creation. 
52.  Client agrees not to use any digital files (drawing or data file), in whole or in part, for any purpose or project other than the project which is 
the subject of this Agreement.  Client waives any and all claims against Consultant resulting in any way from any changes not authorized and/or 
authored by Consultant and/or reuse of the drawings or data for any other project without the express written consent by Consultant.  The transfer 
of drawings or data in electronic media or format shall not be deemed a sale, and Consultant makes no warranties, either express or implied, of 
merchantability or fitness for a particular purpose. 
53.  Because data stored on electronic media can deteriorate undetected or be modified without the Consultant’s knowledge, the Client agrees that 
it will accept responsibility for the completeness, correctness, or readability of the electronic media after an acceptance period of 30 days after 
delivery of the electronic files, and that upon the expiration of this acceptance period, client will indemnify and save harmless the Consultant for 
any and all claims, losses, costs, damages, awards or judgments arising from use of the electronic media files or output generated from them.  The 
Consultant agrees that it is responsible for the accuracy of the sealed drawings that accompany the submittal, and that such accuracy is defined as 
the care and skill ordinarily used by members of the Consultants profession practicing under similar conditions at the same time and in the same 
locality.  Consultant makes no warranties, express or implied, under this Agreement or otherwise, in connection with the Consultant’s services. 
54.  Prior to the commencement of any legal action, in an effort to resolve any conflicts that arise during the design or construction of the project 
which is the subject of this Agreement, or following completion of the project, Client and Consultant agree that all disputes between them arising 
out of or relating to this Agreement, the services performed pursuant to this Agreement, or relating in any way to the project, shall be submitted to 
nonbinding mediation unless the parties mutually agree otherwise.  Each party shall be represented at the mediation by a person or persons with

Page 8 of  8 
 
 
 
22425 N 16TH Street, Suite 1, Phoenix, AZ   85024 
C:\RICK\Departments\Survey\PHX\_Pursuits\PROPOSALS\Achen - Chandler Heights Road Utility Relocations - Package 2.doc 
the authority to bind the party to any agreement, obligation or resolution resulting from the mediation.  Each of the parties agrees to include a 
similar mediation provision in all agreements with any other contractors and consultants retained for the project and to require such contractors 
and consultants to include a similar provision in all agreements with subcontractors, sub-consultants, suppliers or fabricators, thereby providing 
mediation as the primary method for dispute resolution between the parties to those agreements.

EXHIBIT D7:  BASELINE PROJECT SCHEDULE 
 
MARCH 18, 2022 
CITY OF CHANDLER – CHANDLER HEIGHTS ROAD UTILITY RELOCATI0NS 
 GMP PROPOSAL FOR LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD  
PROJECT NO:  WW2111.401 
 
 
See Following Baseline Project Schedule

ID
Task 
Mode
Task Name
Duration
Start
Finish
1
GMP 1 ‐ CHAPARRAL WAY
62 days
Fri 4/1/22
Wed 6/1/22
2
GMP 2 ‐Lake Drive
47 days
Thu 6/2/22
Mon 7/18/22
3
LAKE DR ‐ SEWER (1130 LF)
47 days
Thu 6/2/22
Mon 7/18/22
4
INSTALL BYPASS
4 days
Thu 6/2/22
Sun 6/5/22
5
INSTALL SEWER MH#1 TO MH#5
14 days
Mon 6/6/22 Sun 6/19/22
6
INSTALL SEWER MH#5 TO MH#10
14 days
Mon 6/6/22 Sun 6/19/22
7
 FINAL PRESSURE TEST SEWER
2 days
Mon 6/20/22Tue 6/21/22
8
INSTALL MH'S & BACKFILL ‐ 10EA
17 days
Thu 6/9/22
Sat 6/25/22
9
FINAL MH COATING BASE
4 days
Sun 6/26/22 Wed 6/29/22
10
FINAL MH TESTING
2 days
Thu 6/30/22 Fri 7/1/22
11
FINAL SEWER CAMERA
1 day
Sat 7/2/22
Sat 7/2/22
12
REMOVE BYPASS
4 days
Sun 7/3/22
Wed 7/6/22
13
CONCRETE REPLACEMENT
12 days
Fri 7/1/22
Tue 7/12/22
14
PAVING
3 days
Wed 7/13/22Fri 7/15/22
15
ADJUSTMENTS
2 days
Sat 7/16/22 Sun 7/17/22
16
STRIPING
1 day
Mon 7/18/22Mon 7/18/22
17
LAKE DR ‐ WATER (2 EA)
23 days
Mon 6/20/22Tue 7/12/22
18
INSTALL 8" 
12 days
Mon 6/20/22Fri 7/1/22
19
TESTING
7 days
Sat 7/2/22
Fri 7/8/22
20
TIE OVER NEW/OLD WL
4 days
Sat 7/9/22
Tue 7/12/22
21
LAKE DR ‐ WATER (1EA)
15 days
Mon 6/20/22Mon 7/4/22
22
INSTALL 8" 
6 days
Mon 6/20/22Sat 6/25/22
23
TESTING
7 days
Sun 6/26/22 Sat 7/2/22
24
TIE OVER NEW/OLD WL
2 days
Sun 7/3/22
Mon 7/4/22
25
ALMA ‐ WATER SERVICE (1 EA)
5 days
Tue 7/5/22
Sat 7/9/22
26
INSTALL 2" SERVICE
3 days
Tue 7/5/22
Thu 7/7/22
27
TIE OVER NEW/OLD WL
1 day
Fri 7/8/22
Fri 7/8/22
28
PAVING
1 day
Sat 7/9/22
Sat 7/9/22
29
GMP 3 ‐ ALMA SCHOOL/CHANDLER HTS
126 days
Tue 7/19/22 Mon 11/21/2
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
'22 Mar 27, '2 Apr 17, '22May 8, '22May 29, '2Jun 19, '22Jul 10, '22 Jul 31, '22 Aug 21, '2 Sep 11, '2 Oct 2, '22 Oct 23, '22Nov 13, '2
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Project: GMP 2 - Lake Dr 2-24-
Date: Thu 2/24/22

CITY OF CHANDLER 
PUBLIC WORKS AND UTILITIES DEPARTMENT
CHANDLER HEIGHTS ROAD UTILITY RELOCATIONS     
LAKE DRIVE: CHAPARRAL WAY TO ALMA SCHOOL RD 
PROJECT NO. WW2111.401 
FOR CONSTRUCTION 
TECHNICAL SPECIFICATIONS 
MARCH 2022 
Exhibit B
Technical Specifications

March 2022 
 
City of Chandler  
21-047 
TOC-2 
Chandler Heights Road Utility Relocations  
DIVISION 15 MECHANICAL 
 
15050 
 
PIPING SYSTEMS 
15051 
 
BURIED PIPING INSTALLATION 
15061 
 
DUCTILE IRON PIPE 
15064 
 
COPPER PIPE 
15067 
 
VCP PIPE 
15120 
 
PIPING SPECIALTIES AND ACCESSORIES 
 
 
++  END OF TABLE OF CONTENTS  ++

March 2022 
  
City of Chandler 
21-047 
01010-1 
Chandler Heights Road Utility Relocations 
SECTION 01010 
SUMMARY OF WORK 
PART 1 - GENERAL 
1.1       SUMMARY 
A. The work covered under this Contract will be performed within the City of 
Chandler in the following general locations: 
1. 
Lake Drive: Chaparral Way to Alma School Road 
1.2       DESCRIPTION OF OWNER'S PROJECT 
A. The overall scope project will consist of the following installation: 
1. 
Relocation of approximately 250 linear feet of 8-inch potable water line. 
2. 
Relocation of approximately 100 linear feet of 6-inch potable water line. 
3. 
Installation of approximately 100 liner feet of 2-inch potable water line.  
4. 
Installation of approximately 1,500 linear feet of 10-inch VCP sanitary 
sewer.  
5. 
Abandoning of approximately 1,400 linear feet of 10-inch sanitary sewer by 
filling with grout. 
6. 
Addition of six (6) new sanitary sewer manhole. 
7. 
Removal and replacement of four (4) existing sanitary sewer manhole.  
8. 
Complete all testing and disinfection on new and relocated waterlines prior to 
connecting to existing water distribution system. Contractor to coordinate 
and plan construction activities with existing operational needs of the City. 
9. 
Complete all testing on new sewer lines and manholes prior to connecting to 
existing sewer system. Contractor to coordinate and plan construction 
activities with existing operational needs of the City. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
01050-1 
Chandler Heights Road Utility Relocations 
SECTION 01050 
FIELD ENGINEERING/SURVEYING 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. The CONTRACTOR shall hire a surveyor licensed in the State of Arizona to 
perform all surveying responsibilities.  It is also the CONTRACTOR'S 
responsibility to notify the ENGINEER, in writing, of any discrepancy found 
between the topographic survey provided and the baseline conditions provided in 
the Contract Documents within 14 days of the Notice to Proceed.  The 
CONTRACTOR further takes the responsibility to correct any discrepancies not 
reported to the ENGINEER within the specified construction schedule as part of 
the finished grading required as part of this Project at no cost to the OWNER. 
B. The CONTRACTOR shall provide competent, qualified personnel and materials 
required to perform all construction layout staking and re-staking (as necessary) 
of the Work and will protect and preserve the established reference points and 
will make no change or relocations without the prior written approval of the 
OWNER. 
C. The CONTRACTOR will report to the OWNER whenever any reference point is 
lost or destroyed or requires relocation because of necessary changes in grades or 
locations.  The CONTRACTOR will replace and accurately relocate all reference 
points so lost, destroyed, or moved at no additional cost to the OWNER. 
D. Field surveying shall include GIS location and data of all new construction and 
abandoned utilities as required by the City of Chandler. The CONTRACTOR 
shall provide the GIS location and data at each application of payment to verify 
content. If data is missing or does not meet City of Chandler requirements, 
portions of the new construction shall be exposed to obtain the data at no 
additional cost to the OWNER. The City of Chandler requirements are identified 
below: 
1. 
Contractor shall provide survey grade GPS / GIS data, meeting the following 
requirements for all facilities to be owned and/or operated by the City of 
Chandler. 
a. 
ESRI File Geodatabase format: 
1) All GPS point data, along with corresponding GIS Attribute data, 
must be submitted in ESRI File Geodatabase format.  
2) The City of Chandler will provide a copy of the File Geodatabase in 
ESRI ArcGIS format, upon submitting a data request form attached

March 2022 
  
City of Chandler 
21-047 
01050-2 
Chandler Heights Road Utility Relocations 
herewith. 
Please 
submit 
the 
data 
request 
form 
to 
Kristy.Noelson@Chandleraz.gov 
b. 
Data dictionary and Attribute data: 
1) Attribute data should be provided for each of the GPS’d Utility 
Feature listed in section ‘d’ below. All Attribute data should 
conform to the ESRI File Geodatabase format, provided by the 
City. A copy of the data dictionary will be made available to the 
CONTRACTOR. 
c. 
Coordinate System: 
1) Horizontal  Datum:  Arizona  State  Plane  Coordinates,  Central  
Zone  NAD83  (HARN) Vertical Datum: NAVD88 
d. 
Point Data for GPS: 
1) Water System Features: 
a) 
Water main location (top of pipe), size and material (one (1) 
coordinate provided every 100 feet minimum) and at fittings. 
b) Water fitting location (top of feature), size, material and type 
including:  Bend (22.5, 45, or 90), Tee, Tapping Sleeve, Cross, 
Coupling, End Cap, Line Stop, Reducer, Saddle, Other. 
c) 
Water valve location (center of valve box cover), size and type. 
d) Fire hydrant location (top of hydrant), manufacturer and year. 
e) 
Water service line location (at connection to main, any bends, 
and termination at meter box or meter vault or at the edge of 
easement or ROW), size and material. 
f) 
Water blow-off and air release valve location (center of cover), 
size, type and manufacturer. 
g) Water manhole or vault location (center of cover), size and 
type. 
2) Waste Water System features:  
a) 
Sewer manhole and cleanout location (center of cover), size, 
material, and cover type. 
b) Sewer gravity main location (invert of pipe), size, material and 
flow direction (from) at all manholes, cleanouts and structures. 
c) 
Sewer service line location, size and material (at connection to 
main, and termination at cleanout, or stub out at edge of the 
easement or ROW). 
d) Sewer force main location (top of pipe), size, and material (one 
(1) coordinate provided every 100 feet minimum) and at 
fittings. 
e) 
Sewer force main (and gravity) fitting location (top of feature), 
size, material and type including: Bend (22.5, 45, or 90), Tee, 
Tapping Sleeve, Cross, Coupling, End Cap, Linestop, Reducer, 
Saddle, Wye, Other 
f) 
Sewer force main valve location (center of valve box cover), 
size and type.

March 2022 
  
City of Chandler 
21-047 
01050-3 
Chandler Heights Road Utility Relocations 
g) Sewer  force  main  air  release  valve  location  (center  of  
cover),  size,  type  and manufacturer. 
h) Sewer force main manhole or vault location (center of cover), 
size and material. 
i) 
Sewer structure (center of structure), type (diversion, junction 
box) 
3) Standard GPS Metadata on all points collected: Date, Time, 
Height, 
Horiz_Precision, 
Vert_Precision, Northing, 
Easting, 
Surveyor, Datafile, and Comments 
2. 
Refer to the included information, following this specification, from the City 
of Chandler. Contractor shall meet all requirements.  
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
++  END OF SECTION  ++

DATA DICTIONARY 
 
 
FOR 
 
 
WATER, SEWER, RECLAIM & STORM

DATA DICTIONARY: 
 
 
WATER

Water Fitting 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WS_SPATIALSOURCE_STD 
MATERIAL 
 MATERIAL 
 String 
20 
  
DIAMETER1 
 DIAMETER1 
 String 
8 
 RWS_FITTING_DIAMETER 
DIAMETER2 
 DIAMETER2 
 String 
8 
  
ROTATION 
 ROTATION 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
TYPE 
 TYPE 
 String 
30 
 WS_FITTING_TYPE 
BEND 
 BEND 
 String 
20 
 WS_FITTING_BEND

Water Hydrant 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 Feature Owner 
 String 
25 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 Lifecycle Status 
 String 
25 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 Spatial Source 
 String 
25 
 WS_SPATIALSOURCE_STD 
BARRELDIAMETER 
 Barrel Diameter 
 Double 
8 
  
LARGENOZZLEDIAMETER 
 Large Nozzle Diameter 
 Double 
8 
  
SMALLNOZZLEDIAMETER 
 Small Nozzle Diameter 
 Double 
8 
  
OUTLETCONFIGURATION 
 Outlet Configuration 
 Double 
8 
  
SEATDIAMETER 
 Seat Diameter 
 Double 
8 
  
MANUFACTURER 
 Manufacturer 
 String 
25 
 WS_HYD_MANUFACTURER 
YEARMANUFACTURED 
 Manufacture Year 
 String 
25 
  
HASLOCK 
 Has Lock ? 
 String 
25 
 GIS_BOOLEAN_YES_NO 
COLOR 
 Color 
 String 
25 
  
ROTATION 
 Symbol Rotation 
 Double 
8 
  
GPSOID 
 GPS ObjectID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
25 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 String 
25 
  
VERT_PREC 
 VERT_PREC 
 String 
25 
  
NORTHING 
 NORTHING 
 String 
25 
  
EASTING 
 EASTING 
 String 
25 
  
DATAFILE 
 DATAFILE 
 String 
25 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50

WATER VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATURE OWNER 
 String 
20 
 RWS_SYSVAL_FUNCTION 
LIFECYCLESTATUS 
 LIFECYCLE STATUS 
 String 
20 
 
WS_SYSVAL_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIAL SOURCE 
 String 
20 
 WS_SYSVAL_SPATIALSOURCE 
TYPE 
 TYPE 
 String 
25 
 RWS_SYSVAL_TYPE 
VALVETYPE 
 VALVE TYPE 
 String 
10 
 RWS_SYSVAL_VALVETYPE 
GROUNDTYPE 
 GROUNDTYPE 
 String 
25 
 WS_SYSVAL_GROUNDTYPE 
DIAMETER 
 Diameter 
 String 
8 
 WS_SYSVAL_DIAM 
GPSOID 
 GPS OBJECTID 
 Integer 
4 
  
GPS_DATE 
 GPS DATE 
 Date 
8 
  
GPS_TIME 
 GPS TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ PREC 
 Double 
8 
  
VERT_PREC 
 VERT PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS COMMENT 
 String 
30 
  
WO_CAT_CODE 
 WO CAT CODE 
 String 
10 
  
WO_CAT 
 WO CAT 
 String 
25

WATER MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WS_SPATIALSOURCE_STD 
ACCESSDIAMETER 
 ACCESSDIAMETER 
 String 
8 
  
ACCESSTYPE 
 ACCESSTYPE 
 String 
20 
  
GROUNDTYPE 
 GROUNDTYPE 
 String 
20 
 WS_SYSVAL_GROUNDTYPE 
COVERMATERIAL 
 COVERMATERIAL 
 String 
10 
  
COVERTYPE 
 COVERTYPE 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

WATER MISC PNT 
  
This feature is used for any miscellaneous information  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50 
  
NOTES 
 NOTES 
 String 
150 
  
SIZE 
 SIZE 
 Double 
8

Water Domains: 
Domain name 
 WS_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
FUTURE  
 FUTURE 
INACTIVE  
 INACTIVE 
REMOVED  
 REMOVED 
UNKNOWN  
 UNKNOWN 
  
  
  
  
Domain name 
 
WS_SYSVAL_SPATIALSOURCE 
APPROVED PLANS  
 APPROVED PLANS 
ASBUILT  
 ASBUILT 
DESIGN  
 DESIGN 
GPS  
 GPS 
HYDRMAINT  
 HYDRMAINT 
ORTHOPHOTO  
 ORTHOPHOTO 
TM7  
 TM7 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WS_HYD_MANUFACTURER 
AMERICANDARLING   AMERICANDARLING 
AVK  
 AVK 
CLOW  
 CLOW 
DRESSER  
 DRESSER 
GREENBERG  
 GREENBERG 
KENNEDY  
 KENNEDY 
MUELLER  
 MUELLER 
PACIFIC  
 PACIFIC 
UNKNOWN  
 UNKNOWN 
WATEROUS  
 WATEROUS 
  
 
 
  
Domain name 
 WS_FEATUREOWNER 
COC  
 Chandler 
COG  
 Gilbert 
COM  
 Mesa 
COP  
 Phoenix 
COT  
 Tempe 
COUNTY  
 Maricopa County 
GOULD  
 Gould 
GRIC  
 GRIC 
INTEL  
 Intel 
MICROCHIP  
 Microchip 
MOTOROLA  
 Motorola 
PRIVATE  
 Private 
SRP  
 SRP 
SRVWUA  
 SRVWUA 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 
WS_SYSVAL_LIFECYCLESTATUS 
FUTURE  
 FUTURE 
UNKNOWN  
 UNKNOWN 
INACTIVE  
 INACTIVE 
ACTIVE  
 ACTIVE 
REMOVED  
 REMOVED 
ABANDONED  
 ABANDONED

Domain name 
 WS_FITTING_BEND 
HORIZONTAL  
 HORIZONTAL 
VERTICAL  
 VERTICAL 
  
  
Domain name 
 WS_SYSVAL_DIAM 
2 
2 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
16 
16 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48 
54 
54 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Domain name 
 WS_FITTING_TYPE 
11B  
 11B 
22B  
 22B 
45B  
 45B 
90B  
 90B 
COUPLING  
 COUPLING 
CROSS  
 CROSS 
ENDCAP  
 ENDCAP 
LINESTOP  
 LINESTOP 
OTHER  
 OTHER 
REDUCER  
 REDUCER 
SADDLE  
 SADDLE 
TAPPING SLEEVE  
 TAPPING SLEEVE 
TEE  
 TEE 
UNKNOWN  
 UNKNOWN 
WYE  
 WYE 
  
  
Domain name 
 
WS_SYSVAL_GROUNDTYPE 
CONCRETE  
 CONCRETE 
ASPHALT  
 ASPHALT 
LANDSCAPE  
 LANDSCAPE 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WS_SPATIALSOURCE_STD 
ASBUILT  
 ASBUILT 
DESIGN  
 DESIGN 
FIELD  
 FIELD 
GPS  
 GPS 
ORTHOPHOTO  
 ORTHOPHOTO 
UNKNOWN  
 UNKNOWN

DATA DICTIONARY: 
 
 
SEWER

SEWER CLEANOUT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
RIM_ELEV 
 RIM_ELEV 
 Double 
8 
  
INV_ELEV 
 INV_ELEV 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

SEWER CONTROL VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
TYPE 
 TYPE 
 String 
25 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
DIAMETER 
 DIAMETER 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

SEWER_FITTING 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
MATERIAL 
 MATERIAL TYPE 
 String 
20 
  
TYPE 
 TYPE 
 String 
30 
  
BEND 
 BEND 
 String 
20 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
SIZE_ 
 SIZE OF FITTING 
 String 
20

SEWER_MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
25 
 WW_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
25 
 WW_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 WW_SPATIALSOURCE 
LID 
 LID TYPE 
 String 
20 
  
TYPE 
 TYPE 
 String 
20 
 WW_MH_TYPE 
COVER_MATERIAL 
 COVER_MATERIAL 
 String 
25 
 
WW_MH_COVER_MATERIAL 
COVER_HOLE 
 COVER_HOLE 
 String 
25 
 WW_MH_COVER_HOLE 
COVER_SIZE 
 COVER_SIZE 
 String 
20 
 WW_MH_COVER_SIZE 
RIM_ELEV 
 RIM_ELEV 
 Double 
8 
  
INV_ELEV 
 INV_ELEV 
 Double 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
LINER 
 LINER 
 String 
50 
 WW_MH_LINER 
WALL_MATERIAL 
 WALL_MATERIAL 
 String 
50 
 WW_MH_WALL_MATERIAL

SEWER_MISC 
  
For any Miscellaneous features 
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
  
MATERIAL 
 MATERIAL 
 String 
20 
  
TYPE 
 TYPE 
 String 
30 
  
BEND 
 BEND 
 String 
20 
  
NOTES 
 NOTES 
 String 
255 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
DATAFILE 
 DATAFILE 
 String 
20 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30 
  
SIZE_ 
 SIZE_ 
 String 
20

Sewer Domains: 
Domain name 
 WW_FEATUREOWNER 
COC  
 COC 
PRIVATE  
 PRIVATE 
TOG  
 TOG 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_SPATIALSOURCE 
GPS  
 GPS 
ASBUILT  
 ASBUILT 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_MH_COVER_HOLE 
UNKNOWN  
 UNKNOWN 
SEALED  
 SEALED 
  
  
Domain name 
 WW_MH_LINER 
CAST-IN-PLACE  
 CAST-IN-PLACE 
CEMENTITIOUS  
 CEMENTITIOUS 
COMPOSITE  
 COMPOSITE 
CURED-IN-PLACE  
 CURED-IN-PLACE 
EPOXY  
 EPOXY 
FR PLASTIC INSERT  
 FR PLASTIC INSERT 
FR POLYMER INSERT  
 FR POLYMER INSERT 
INSERT  
 INSERT 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
INACTIVE  
 INACTIVE 
PULLED  
 PULLED 
UNKNOWN  
 UNKNOWN 
 
 
 
Domain name 
 
WW_MH_COVER_MATERIAL 
ALUMINUM  
 ALUMINUM 
CASTIRON  
 CASTIRON 
HDPE COMPOSITE - CAP   HDPE COMPOSITE - CAP 
HDPE COMPOSITE - EJ  
 HDPE COMPOSITE - EJ 
HDPE COMPOSITE - 
HD20  
 HDPE COMPOSITE - HD20 
STEEL  
 STEEL 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 WW_MH_COVER_SIZE 
0 
 Unknown 
4 
4 
6 
6 
8 
8 
22 
22 
24 
24 
26 
26 
28 
28 
30 
30 
32 
32 
38 
38 
48 
48 
60 
60 
  
  
Domain name 
 WW_MH_WALL_MATERIAL 
NONE  
 NONE 
COMPOSITE  
 COMPOSITE 
UNKNOWN  
 UNKNOWN 
CONCRETE  
 CONCRETE 
POURED  
 POURED 
TLOCK  
 TLOCK 
PRECAST  
 PRECAST 
BRICK  
 BRICK

Domain name 
 WW_MH_TYPE 
0 
 UNKNOWN 
1 
 SANITARY SEWER 
2 
 ARV

DATA DICTIONARY: 
 
 
RECLAIM

RECLAIM_FITTING 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
MATERIAL 
 MATERIAL 
 String 
20 
 RWS_MAIN_OR_SERVICE_MATERIAL 
DIAMETER1 
 DIAMETER1 
 String 
8 
 RWS_FITTING_DIAMETER 
DIAMETER2 
 DIAMETER2 
 String 
8 
 RWS_FITTING_DIAMETER 
TYPE 
 TYPE 
 String 
30 
 RWS_FITTING_TYPE 
BEND 
 BEND 
 String 
20 
 RWS_FITTING_BEND 
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

RECLAIM_MISC_STRUCT 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
TYPE 
 SUBTYPE 
 String 
20 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
50 
  
NOTES 
 Notes 
 String 
150

RECLAIM_MANHOLE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATUREOWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLESTATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIALSOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
ACCESSDIAMETER 
 ACCESSDIAMETER 
 String 
8 
 RWS_GROUNDTYPE 
GROUNDTYPE 
 GROUNDTYPE 
 String 
20 
  
COVERMATERIAL 
 COVERMATERIAL 
 String 
10 
  
COVERTYPE 
 COVERTYPE 
 String 
8 
  
GPSOID 
 GPSOID 
 Integer 
4 
  
GPS_DATE 
 GPS_DATE 
 Date 
8 
  
GPS_TIME 
 GPS_TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS_HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ_PREC 
 Double 
8 
  
VERT_PREC 
 VERT_PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS_COMMENT 
 String 
30

RECLAIM SYSTEM VALVE 
  
  
  
  
  
  
  
  
  
Field Name 
Alias Name 
Type 
Length 
Domain 
OBJECTID 
 OBJECTID 
 OID 
4 
  
SHAPE 
 SHAPE 
 Geometry 
0 
  
FEATUREOWNER 
 FEATURE OWNER 
 String 
20 
 RWS_FEATUREOWNER 
LIFECYCLESTATUS 
 LIFECYCLE STATUS 
 String 
20 
 RWS_LIFECYCLESTATUS 
SPATIALSOURCE 
 SPATIAL SOURCE 
 String 
20 
 RWS_SPATIALSOURCE 
TYPE 
 TYPE 
 String 
25 
 RWS_SYSVAL_TYPE 
VALVETYPE 
 VALVE TYPE 
 String 
10 
 RWS_SYSVAL_VALVETYPE 
FUNCTION 
 FUNCTION 
 String 
25 
 RWS_SYSVAL_FUNCTION 
GROUNDTYPE 
 GROUNDTYPE 
 String 
25 
 RWS_SYSVAL_GROUNDTYPE 
GPSOID 
 GPS OBJECTID 
 Integer 
4 
  
GPS_DATE 
 GPS DATE 
 Date 
8 
  
GPS_TIME 
 GPS TIME 
 String 
10 
  
GPS_HEIGHT 
 GPS HEIGHT 
 Double 
8 
  
HORZ_PREC 
 HORZ PREC 
 Double 
8 
  
VERT_PREC 
 VERT PREC 
 Double 
8 
  
NORTHING 
 NORTHING 
 Double 
8 
  
EASTING 
 EASTING 
 Double 
8 
  
GPS_COMMENT 
 GPS COMMENT 
 String 
30 
  
WO_ZONE 
 WO ZONE 
 Double 
8 
  
DIAMETER 
 DIAMETER 
 Double 
8 
 RWS_SYSVAL_DIAM 
WO_CAT_CODE 
 WO_CAT_CODE 
 String 
10

Reclaim Domains: 
 
Domain name 
 RWS_SYSVAL_VALVETYPE 
BALL  
 BALL 
BUTTERFLY  
 BUTTERFLY 
GATE  
 GATE 
INSERTA  
 INSERTA 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_SYSVAL_FUNCTION 
ARV  
 ARV 
INLINE  
 INLINE 
PUMPOUT  
 PUMPOUT 
PUMPSTATION  
 PUMPSTATION 
SERVICE  
 SERVICE 
STUBOUT  
 STUBOUT 
UNKNOWN  
 UNKNOWN 
VAULT  
 VAULT 
  
  
Domain name 
 RWS_SYSVAL_TYPE 
ARV  
 ARV 
BLOWOFF  
 BLOWOFF 
STANDARD  
 STANDARD 
  
  
Domain name 
 RWS_FEATUREOWNER 
COC  
 CHANDLER 
COM  
 MESA 
INTEL  
 INTEL 
OCA  
 OCA 
OMG  
 OMG 
PRIVATE  
 PRIVATE 
SRP  
 SRP 
TOG  
 GILBERT 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 RWS_FITTING_BEND 
HORIZONTAL  
 HORIZONTAL 
VERTICAL  
 VERTICAL 
  
  
Domain name 
 RWS_MAIN_OR_SERVICE_MATERIAL 
AC  
 AC 
CC  
 CC 
CI  
 CI 
CU  
 COPPER 
DI  
 DI 
PVC  
 PVC 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_FITTING_TYPE 
11B  
 11B 
22B  
 22B 
45B  
 45B 
90B  
 90B 
COUPLING  
 COUPLING 
CROSS  
 CROSS 
ENDCAP  
 ENDCAP 
LINESTOP  
 LINESTOP 
MECHANICAL 
JOINT  
 MECHANICAL JOINT 
OTHER  
 OTHER 
RECHARGE WELL  
 RECHARGE WELL 
REDUCER  
 REDUCER 
SADDLE  
 SADDLE 
TAPPING SLEEVE  
 TAPPING SLEEVE 
TEE  
 TEE 
UNKNOWN  
 UNKNOWN 
WYE  
 WYE

Domain name 
 RWS_SPATIALSOURCE 
ASBUILT  
 ASBUILT 
FIELD  
 FIELD 
GPS  
 GPS 
ORTHOPHOTO  
 ORTHOPHOTO 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_LIFECYCLESTATUS 
ABANDONED  
 ABANDONED 
ACTIVE  
 ACTIVE 
INACTIVE  
 INACTIVE 
REMOVED  
 REMOVED 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_SYSVAL_DIAM 
1.5 
1.5 
2 
2 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
16 
16 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48 
9999 
 UNKNOWN 
 
 
 
 
Domain name 
 RWS_GROUNDTYPE 
ASPHALT  
 ASPHALT 
CONCRETE  
 CONCRETE 
DIRT  
 DIRT 
UNKNOWN  
 UNKNOWN 
 
Domain name 
 RWS_SYSVAL_GROUNDTYPE 
ASPHALT  
 ASPHALT 
CONCRETE  
 CONCRETE 
LANDSCAPE  
 LANDSCAPE 
UNKNOWN  
 UNKNOWN 
  
  
Domain name 
 RWS_FITTING_DIAMETER 
0.63 
0.63 
0.75 
0.75 
1 
1 
1.25 
1.25 
1.5 
1.5 
2 
2 
2.5 
2.5 
3 
3 
4 
4 
6 
6 
8 
8 
10 
10 
12 
12 
15 
15 
16 
16 
18 
18 
20 
20 
24 
24 
30 
30 
36 
36 
42 
42 
48 
48

March 2022 
  
City of Chandler 
21-047 
01090-1 
Chandler Heights Road Utility Relocations 
SECTION 01090 
REFERENCE STANDARDS/ABBREVIATIONS 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. This Section lists many of the construction industry organizations, professional 
and technical associations, societies and institutes, and government agencies 
issuing, promoting, or enforcing standards to which references may be made in 
the Contract Document, along with the abbreviations commonly used for those 
references.  Also included are certain general requirements for the use of industry 
standards specified and for application of the standards in quality control. 
1.2       USE OF REFERENCE STANDARDS 
A. Work specified by reference to the published standard or specification of a 
government agency, technical association, trade association, professional society 
or institute, testing agency, or other organization shall conform to, or surpass the 
minimum standards of quality for materials and workmanship established by the 
designated standard or specification. 
B. Where so specified, products or workmanship shall also conform to the additional 
prescriptive or performance requirements included within the Contract 
Documents to establish a higher or more stringent standard of quality than that 
required by the referenced standard. 
C. Where the specific date or issue of the standard is not included with the reference 
to the standard, the edition, including all amendments published and available on 
the first published date of the Invitation to Bid, shall apply. 
D. Where two or more standards are specified to establish quality, the product, and 
workmanship shall conform to or surpass the requirements of both. 
E. In case of conflict between referenced standards, the more stringent shall apply. 
F. Where both a standard and a brand name are specified for a product in the 
Contract Document, the proprietary product named shall conform to or surpass 
the requirements of the specified reference standard.  The listing of a trade name 
in a Contract Document shall not be construed a warranting that such product 
conforms to the respective reference standard. 
G. Copies of Standards: 
1. 
Copies of applicable referenced standards have not been bound in this 
Contract Document.

March 2022 
  
City of Chandler 
21-047 
01090-2 
Chandler Heights Road Utility Relocations 
2. 
Where copies of standards are needed by the CONTRACTOR for 
superintendence and quality control of the Work, obtain a copy or copies 
directly from the publication source and maintain in an orderly manner at the 
job site, available to the CONTRACTOR'S personnel, subcontractors, 
OWNER, and ENGINEER. 
3. 
Submittals:  Submit for approval the requests to use products conforming to 
printed standards or publications with a different publication date from that 
effective under the Contract.  Clearly indicate the changes in product or 
workmanship quality involved in the proposed change, if any, and reasons for 
the request. 
1.3       ABBREVIATIONS 
A. Abbreviations for trade organizations and government agencies.  The following is 
a list of construction industry organizations and government agencies to which 
references may be made in the Contract Document, with abbreviations used. 
 
 
 
AA 
Aluminum Association 
 
 
AAMA 
American Architectural Manufacturers Association 
 
 
AAMA 
Architectural Aluminum Manufacturers' Association 
 
 
AASHTO 
American Association of State Highway and Transportation Officials 
 
 
ABPA 
Acoustical and Board Products Association 
 
 
ACI 
American Concrete Institute 
 
 
ADA 
Americans With Disabilities Act 
 
 
ADEQ 
Arizona Department of Environmental Quality 
 
 
ADHS 
Arizona Department of Health Services 
  
 
AFBMA 
Anti-Friction Bearing Manufacturers' Association 
 
 
AGA 
American Gas Association 
 
 
AGC 
Associated General Contractors 
 
 
AGMA 
American Gear Manufacturers' Association 
 
 
AHC 
Architectural Hardware Consultant 
 
 
AI 
Asphalt Institute 
 
 
AIA 
American Institute of Architects 
 
 
AIA 
American Insurance Association 
 
 
AIEE 
American Institute of Electrical Engineers 
 
 
AISC 
American Institute of Steel Construction 
 
 
AISI 
American Iron and Steel Institute 
 
 
AITC 
American Institute of Timber Construction 
 
 
ALS 
American Lumber Standards 
 
 
AMCA 
Air Moving and Conditioning Association 
 
 
AMG 
Arizona Masonry Guild 
 
 
ANSI 
American National Standards Institute 
 
 
APA 
American Plywood Association 
 
 
API 
American Petroleum Institute 
 
 
AREA 
American Railway Engineering Association 
 
 
ARI 
Air Conditioning and Refrigeration Institute

March 2022 
  
City of Chandler 
21-047 
01090-3 
Chandler Heights Road Utility Relocations 
 
 
ARMA 
Asphalt Roofing Manufacturers Association 
 
 
ASAE 
American Society of Agricultural Engineers 
 
 
ASCE 
American Society of Civil Engineers 
 
 
ASHRAE 
American Society of Heating, Refrigerating, and Air Conditioning 
Engineers, Inc. 
 
 
ASME 
American Society of Mechanical Engineers 
 
 
ASTM 
American Society for Testing and Materials 
 
 
AWI 
Architectural Woodwork Institute 
 
 
AWPA 
American Wood Preservers' Association 
 
 
AWPB 
American Wood Preservers Bureau 
 
 
AWPI 
American Wood Preservers' Institute 
 
 
AWS 
American Welding Society 
 
 
AWSC 
American Welding Society Code 
 
 
AWI 
Architectural Woodwork Institute 
 
 
AWWA 
American Water Works Association 
 
 
 
BHMA 
Builders Hardware Manufacturers' Association 
 
 
BIA 
Brick Institute of America 
 
 
 
CBMA 
Certified Ballast Manufacturers' Association 
 
 
CDA 
Copper Development Association 
 
 
CGA 
Compressed Gas Association 
 
 
CISPI 
Cast Iron Soil Pipe Institute 
 
 
CLFMI 
Chain Link Fence Manufacturer's Institute 
 
 
CMAA 
Crane Manufacturers' Association of America 
 
 
CRA 
California Redwood Association 
 
 
CRSI 
Concrete Reinforcing Steel Institute 
 
 
CS 
Commercial Standards 
 
 
CSI 
Construction Specifications Institute 
 
 
CTI 
Cooling Tower Institute 
 
 
 
FGMA 
Flat Glass Manufacturer's Association 
 
 
FIA 
Factory Insurance Association 
 
 
FM 
Factory Mutual 
 
 
FS 
Federal Specification 
 
 
FTI 
Facing Tile Institute 
 
 
 
GA 
Gypsum Association 
 
 
 
HI 
Hydraulic Institute 
 
 
HMI 
Hoist Manufacturers' Institute 
 
 
 
ICBO 
International Conference of Building Officials 
 
 
ICEA 
Insulated Cable Engineers' Association 
 
 
IEEE  
Institute of Electrical and Electronics Engineers, Inc. 
 
 
IES 
Illuminating Engineering Society

March 2022 
  
City of Chandler 
21-047 
01090-4 
Chandler Heights Road Utility Relocations 
 
 
ISA 
Instrument Society of America 
 
 
 
JIC 
Joint Industry Conferences of Hydraulic Manufacturers 
 
 
 
LIA 
Lead Industries Association 
 
 
 
MAG 
Maricopa Association of Governments 
 
 
MIA 
Marble Institute of America 
 
 
MIA 
Masonry Institute of America 
 
 
MLMA 
Metal Lath Manufacturers Association 
 
 
MS 
Military Specifications 
 
 
MMA 
Monorail Manufacturers' Association 
 
 
 
NAAMM 
National Association of Architectural Metal Manufacturers 
 
 
NBFU 
National Board of Fire Underwriters 
 
 
NBHA 
National Builders' Hardware Association 
 
 
NBS 
National Bureau of Standards 
 
 
NCMA 
National Concrete Masonry Association 
 
 
NEC 
National Electrical Code 
 
 
NEMA 
National Electrical Manufacturers' Association 
 
 
NESC 
National Electric Safety Code 
 
 
NFPA 
National Fire Protection Association 
 
 
NFPA 
National Forest Products Association 
 
 
NGA 
National Glass Association 
 
 
NHLA 
National Hardwood Lumber Association 
 
 
NKCA 
National Kitchen Cabinet Association 
 
 
NLMA 
National Lumber Manufacturers' Association 
 
 
NMWIA 
National Mineral Wool Insulation Association 
 
 
NSF 
National Sanitation Foundation 
 
 
NTMA 
National Terrazzo and Mosaic Association 
 
 
NWMA 
National Woodwork Manufacturers' Association 
 
 
 
OECI 
Overhead Electrical Crane Institute 
 
 
OSHA 
Occupational Safety and Health Administration (both Federal and 
State) 
 
 
 
PCA 
Portland Cement Association 
 
 
PCI 
Pre-cast Concrete Institute 
 
 
PDI 
Plumbing Drainage Institute 
 
 
PEI 
Porcelain Enamel Institute 
 
 
PS 
Product Standards Section - U.S. Department of Commerce 
 
 
 
RLM 
RLM Standards Institute, Inc. 
 
 
RMA 
Rubber Manufacturers' Association 
 
 
 
SAE 
Society of Automotive Engineers

March 2022 
  
City of Chandler 
21-047 
01090-5 
Chandler Heights Road Utility Relocations 
 
 
SDI 
Steel Deck Institute 
 
 
SDI 
Steel Door Institute 
 
 
SIGMA 
Sealed Insulating Glass Manufacturing Association 
 
 
SJI 
Steel Joist Institute 
 
 
SMACNA Sheet Metal and Air Conditioning Contractors National Association 
 
 
SSPC 
Steel Structures Painting Council 
 
 
SWI 
Steel Window Institute 
 
 
 
TEMA 
Tubular Exchanger Manufacturers' Association 
 
 
TCA 
Tile Council of America 
 
 
TIMA 
Thermal Insulation Manufacturers Association 
 
 
TPI 
Truss Plate Institute 
 
 
 
UBC 
Uniform Building Code 
 
 
UFC 
Uniform Fire Code 
 
 
UL 
Underwriters' Laboratories, Inc. 
 
 
USDA 
United States Department of Agriculture 
 
 
USPS 
United States Postal Service 
 
 
 
VI 
Vermiculite Institute 
 
 
 
WCLA 
West Coast Lumberman's Association 
 
 
WCLB 
West Coast Lumber Bureau 
 
 
WCLIB 
West Coast Lumber Inspection Bureau 
 
 
WIA 
Woodwork Institute of Arizona 
 
 
WPOA 
Western Plumbing Officials Association 
 
 
WWPA 
Western Wood Products Association 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
01143-1 
Chandler Heights Road Utility Relocations 
SECTION 01143 
COORDINATION WITH OWNER'S OPERATIONS 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. The intent of this Section is to provide CONTRACTOR a sequence to perform the 
Work in such a manner that continuous, uninterrupted access to the businesses 
and property owners is maintained operational throughout the construction period. 
B. Except for the construction hours specified in this Section, CONTRACTOR'S 
means and methods shall be implemented such that the traffic lanes shall remain 
in continuous satisfactory operation during the entire construction period.  Work 
shall be so scheduled and conducted by CONTRACTOR such that it shall not 
impede any hindrances to the public and businesses.  In performing the Work 
shown and specified, CONTRACTOR shall plan and schedule the Work to meet 
both the constraints outlined in this Section and the latest City of Chandler Traffic 
Barricade Design Technical Design Manual. 
C. Work not specifically covered in Section 01010, Summary of Work, or in the 
following paragraphs may, in general, subject to the operating requirements 
outlined in this Section.   
1.2       OVERTIME 
A. All overtime work by CONTRACTOR necessary to conform to the requirements 
of this Section shall be performed by CONTRACTOR at no additional cost to the 
OWNER and shall be performed in accordance with the General Conditions.  
CONTRACTOR shall make no claims for extra compensation as a result thereof. 
B. PRODUCTS (NOT USED) 
PART 2 - EXECUTION 
2.1       COORDINATION DESCRIPTION 
A. All traffic control plans shall be in accordance with the latest City of Chandler 
Traffic Barricade Design Technical Manual and shall be approved by the City 
Traffic Inspector prior to any construction. 
B. Potable Piping Tie-In: 
1. 
The CONTRACTOR shall prepare a plan with scheduling, means and 
methods, disinfection, and the proposed connections at each tie-in.  The tie-in

March 2022 
  
City of Chandler 
21-047 
01143-2 
Chandler Heights Road Utility Relocations 
plans shall be approved by the OWNER 30 days prior to starting the first 
water lateral tie-in.  
2. 
Prior to any tie-in, CONTRACTOR shall coordinate with OWNER or 
ENGINEER to schedule valve closure.  
   
3. 
Work may occur at night or during the weekend to ensure minimal disruption 
to businesses. 
C. Sewer Piping Tie-In: 
1. 
CONTRACTOR shall coordinate all sewer bypass pumping operations with 
the City of Chandler per Section 02145, Diversion of Sewage Flow and 
Dewatering. The CONTRACTOR shall notify the OWNER 72 hours prior to 
bypassing the pipeline. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
01300-1 
Chandler Heights Road Utility Relocations 
SECTION 01300 
SUBMITTALS 
PART 1 - GENERAL 
1.1       SUMMARY 
A. The CONTRACTOR shall include a completed transmittal form for all submittals.  
Transmittal forms will be furnished to CONTRACTOR by CONSTRUCTION 
MANAGER.  Submittals shall be sent to the CONSTRUCTION MANAGER. 
1.2       SECTION INCLUDES 
A. Shop Drawings. 
B. Testing results. 
C. Construction photographs. 
D. Record Drawings. 
 
 
1.3       SHOP DRAWINGS 
A. The CONTRACTOR shall submit Shop Drawings for the equipment and materials 
specified herein to CONSTRUCTION MANAGER.  
B. CONSTRUCTION MANAGER shall return electronic Shop Drawings to 
CONTRACTOR within three (3) weeks of receipt by CONSTRUCTION 
MANAGER per General Conditions Section 4.7.3.10. 
C. The CONTRACTOR may request submittals be reviewed up to two times for each 
equipment or construction material item, regardless of manufacturer or supplier, by 
the CONSTRUCTION MANAGER. 
D. Each Shop Drawing submittal shall include an electronic copy of the relevant 
Specification Section.  Each and every paragraph of the Specification Section shall 
be clearly marked to indicate whether the requirements for equipment and/or services 
in the Specification Section are met.  If clarifications are needed to any of the 
paragraphs in the Specification Section, they shall be addressed next to the paragraph 
or in an attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The

March 2022 
  
City of Chandler 
21-047 
01300-2 
Chandler Heights Road Utility Relocations 
CONTRACTOR shall furnish equipment and/or services as specified if an exception 
and/or deviation is rejected. 
E. The CONTRACTOR will be held responsible for any delay in progress of the Work 
due to resubmittal of Shop Drawings.  Time for completion of the Contract will not 
be extended due to CONTRACTOR’s failure to promptly submit complete and 
acceptable Shop Drawings, product data and samples. 
F. Do not execute Work required by Shop Drawings until accepted Shop Drawings are 
received from CONSTRUCTION MANAGER. 
G. Before submitting Shop Drawings for review, CONTRACTOR shall check Shop 
Drawings for accuracy, ascertain that all Work contiguous with and having bearing 
on other Work shown on Shop Drawings is accurately drawn, and that Work shown 
is in conformity with Contract requirements.  The CONTRACTOR is responsible for 
all submittals from subcontractors and suppliers. 
H. All such Drawings and details, when submitted, must bear the stamp of approval of 
CONTRACTOR, bearing checked data, as evidence that such Drawings and details 
have been checked by the CONTRACTOR.  Said "stamp" shall clearly state that the 
CONTRACTOR has checked the Drawings by providing signature certification. Any 
Drawings submitted without such executed stamp of approval, or whenever it is 
evident (despite the stamp) that the Drawings have not been checked, they will be 
returned to the CONTRACTOR for resubmission and will not be considered.  In such 
event, it will be deemed that CONTRACTOR has not complied with this provision 
and the CONTRACTOR shall bear risk of all delays to the same extent as if no 
Drawings or details had been submitted. 
I. 
The CONTRACTOR shall prepare composite Drawings and installation layouts, 
when required to solve tight field conditions.  Such Drawings shall consist of 
dimensioned plans and elevations, and must give complete information particularly 
as to size and location of sleeves, inserts, attachments, openings, conduits, ducts, 
boxes, structural interferences, etc.  These composite drawings and installation 
layouts shall be coordinated in the field by the CONTRACTOR and his 
subcontractors for proper relationship to the Work of other trades, based on field 
conditions, and shall be checked and approved by them before submission to the 
CONSTRUCTION MANAGER  for his final review.  The CONTRACTOR shall 
have competent technical personnel readily available for such coordinating and 
checking, as well as for supervision of field installation of Work as per the Drawings 
and installation layouts, which have been previously determined by him to be correct 
and carry the CONSTRUCTION MANAGER’s review stamp. 
J. 
Submission of Shop Drawings (in either original submission or when resubmitted 
with corrections) constitute evidence that the CONTRACTOR has checked all 
information thereon, and that he accepts and is willing to perform the Work as shown 
in a workmanlike manner and in accordance with best standard practice.

March 2022 
  
City of Chandler 
21-047 
01300-3 
Chandler Heights Road Utility Relocations 
K. Cost of any changes in construction due to improper checking and coordination by 
the CONTRACTOR shall be paid for by the CONTRACTOR, and the 
CONTRACTOR shall be responsible for all additional costs, including coordination. 
L. Each Drawing or page must include all information as required by General Condition 
Section 4.7.3.4.  
M. The CONSTRUCTION MANAGER shall provide the CONTRACTOR with a form 
to accompany the Shop Drawings. 
N. If Shop Drawings show variations from Contract Documents because of standard 
shop practice or other reasons, make specific mention of such variations in the 
transmittal form. 
O. Shop Drawings review will be general.  It shall not relieve the CONTRACTOR of 
responsibility for accuracy of such Shop Drawings, nor proper fitting, construction of 
Work, furnishing of materials, or Work required by Contract Documents and not 
indicated on Shop Drawings. Shop Drawings review shall not be construed as 
approving departures from Contract Documents. 
P. Review of Shop Drawings and schedules shall not relieve the CONTRACTOR from 
responsibility for any violation indicated on such Drawings or schedules of local, 
County, State, or Federal laws, rules, ordinances, or rules and regulations of 
commissions, boards or other authorities or utilities having jurisdiction. 
Q. When product data, consisting of manufacturer's printed literature, is required to be 
submitted to CONSTRUCTION MANAGER, it shall be submitted in original form.  
Any fading type of reproduction will not be accepted. 
1.4       CONSTRUCTION PHOTOGRAPHS 
A. Per City of Chandler Contract Requirements. 
1.5       TESTING RESULTS 
A. CONTRACTOR shall furnish to CONSTRUCTION MANAGER copies of all 
testing results for all tests as required in the General Condition Section 4.7. 
1.6       RECORD DRAWINGS 
A. CONTRACTOR shall update Record Drawings as required by General Conditions 
Section 4.8.

March 2022 
  
City of Chandler 
21-047 
01300-4 
Chandler Heights Road Utility Relocations 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION (NOT USED) 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
01710-1 
Chandler Heights Road Utility Relocations 
SECTION 01710 
CLEANING 
PART 1 - GENERAL 
1.1       SUMMARY 
A. This Section outlines requirements for cleaning of the Project Work.  This Section 
is complementary to the General Conditions and nothing herein shall be 
considered to waive any requirements of the General Conditions. 
1.2       REQUIREMENTS OF REGULATORY AGENCIES 
A. Safety and Insurance Standards:  Maintain Project in accordance with the 
following safety and insurance standards: 
1. 
State Industrial Commission of Arizona (OSHA). 
B. Fire Protection:  Store volatile waste in covered metal containers and remove 
from premises daily. 
C. Pollution Control:  Conduct cleanup and disposal operations to comply with local 
ordinances and anti-pollution laws.  Burning or burying of rubbish and waste 
material on the Project site is not permitted.  Disposal of volatile fluid waste (such 
as mineral spirits, oil, or paint thinner) in storm or sanitary sewer systems or into 
streams or waterways is not permitted. 
PART 2 - PRODUCTS (NOT USED) 
PART 3 - EXECUTION 
3.1       DURING CONSTRUCTION 
A. During the construction period, the material to be used in the Work shall be kept 
in an orderly manner, neatly stacked or piled. 
B. Clean up frequently (at least weekly) all refuse, rubbish, scrap materials, and 
debris caused by operations, to the end that at all times the site of the Work shall 
present a neat, orderly, and workmanlike appearance.  Sprinkle dusty debris with 
water. 
C. Provide for the disposal of all waste products, trash, debris, etc., and make 
necessary arrangement for legal disposal of same off the site.  Never throw

March 2022 
  
City of Chandler 
21-047 
01710-2 
Chandler Heights Road Utility Relocations 
rubbish from windows or other parts of building.  Lower waste materials in a 
controlled manner with as few handling as possible. 
D. Remove all surplus material, false-work, temporary structures, including 
foundations thereof, plant of any description and debris of every nature resulting 
from operations and put the site in a neat, orderly condition. 
E. Remove carpentry nails, pieces of rebar, pieces of cut metal, metal strapping, and 
pieces of wood. Wire (bare or insulated), shall also be recovered from the ground 
at the end of each day. 
F. General contractor shall provide trash gondolas or containers for use by all trades.  
3.2       FINAL CLEANING 
A. Use experienced workmen or professional cleaners for final cleaning.  Provide 
adequate ventilation during use of volatile or noxious substances. 
B. All existing improvements, inside or outside the property that are disturbed, 
damaged, or destroyed by the Work under the Contract, shall be restored to the 
condition in which they originally were, or to the satisfaction of the OWNER. 
C. CONTRACTOR shall clean all sidewalks by power washing to remove tire trend 
marks. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
02100-1 
Chandler Heights Road Utility Relocations 
SECTION 02100 
SITE PREPARATION 
PART 1 - GENERAL 
1.1       SUMMARY 
 
A. Prepare the construction site for new construction. 
1.2       SECTION INCLUDES 
A. Protection of certain existing trees and vegetation. 
B. Clearing and grubbing. 
C. Removing below grade improvements (including stumps). 
D. Installing and maintaining barricades and warning signs. 
E. All other miscellaneous items of Work required to complete the site preparation.  
1.3       PROJECT CONDITIONS 
A. Traffic:  Conduct site-clearing operations to ensure minimum interference with 
roads, streets, walks, and other adjacent occupied or used facilities.  Do not close 
or obstruct streets, walks, or other occupied or used facilities without permission 
from authorities having jurisdiction. 
B. Protection of Existing Improvements:  Provide protection as necessary to prevent 
damage to existing improvements indicated to remain in place. 
1. 
Protect improvements on adjoining properties and OWNER'S property. 
2. 
Restore damaged improvements to their original or better condition, as 
acceptable to OWNER. 
C. Protection of Existing Trees and Vegetation: 
1. 
Existing vegetation in the field not scheduled for removal shall be 
undisturbed by the CONTRACTOR.  The CONTRACTOR shall NOT 
remove from the site any plants unless specifically approved by the 
CONSTRUCTION MANAGER. 
2. 
Protect existing trees and vegetation indicated to remain against unnecessary 
cutting, breaking or skinning of roots, skinning or bruising of bark, 
smothering of trees by stockpiling construction materials or excavated 
materials within drip line, excess foot or vehicular traffic or parking of 
vehicles within the drip line.  Prior to initiating site clearing activities, the

March 2022 
  
City of Chandler 
21-047 
02100-2 
Chandler Heights Road Utility Relocations 
CONTRACTOR shall mark the limits of the disturbance areas either by 
placing lime, flags, or survey stakes at the limits shown on the Plans. 
3. 
Do not destroy vegetation which may be naturally located in the periphery of 
proposed disturbed areas (within a zone ± 5 feet from the limits of 
construction).  The CONSTRUCTION MANAGER shall be notified if 
existing plants are located within the fringes of the construction limits.  The 
CONSTRUCTION MANAGER shall issue instructions at that time. 
4. 
Adjustments may be made in the limits of construction to protect the affected 
plants based on a field review of the staked limits.  The adjusted construction 
limits shall be considered the permanent construction limits for the duration 
of the Project.  If the CONSTRUCTION MANAGER recommends that 
construction 
limits 
be 
adjusted 
to 
preserve 
existing 
plants, 
the 
CONTRACTOR, at his own option, may elect to clear the subject vegetation 
and revegetate with like-kind size and species as required herein and by 
Landscape Drawings at no additional cost to the OWNER.  The 
CONTRACTOR shall be entirely responsible for removal, storage, and 
replanting of such vegetation in accordance with City’s Landscape Design of 
Right-of-Way, medians, and retention basin Technical Design Manual no. 8. 
5. 
During the course of the Work the CONTRACTOR shall: 
a. 
Water trees, shrubs, and other vegetation to remain within limits of 
Contract Work as required to maintain their health during the course of 
construction operations at no additional cost to the OWNER.   
b. 
Provide protection for roots over 1-1/2-inches in diameter that are cut 
during construction operations.  Temporarily cover exposed roots with 
wet burlap to prevent the roots from drying out; cover with earth as soon 
as possible. 
c. 
Repair or replace trees and vegetation indicated to remain that are 
damaged by construction operations in a manner acceptable to the 
CONSTRUCTION MANAGER. 
d. 
Trees to be protected in place shall not be pruned unless limbs are 
damaged, or at the direction of the CONSTRUCTION MANAGER.  
Employ a licensed arborist to repair damaged trees and shrubs.  Replace 
trees that cannot be repaired and restored to full growth status, as 
determined by the arborist. 
e. 
Trees may be pruned for routing maintenance during construction with 
CONSTRUCTION MANAGER’S approval at no additional cost to the 
OWNER. 
D. Provide a temporary construction fence/barrier to protect trees and vegetation at 
the limits reviewed and approved by the CONSTRUCTION MANAGER.  The 
barrier shall be installed and remain in place for the duration of the Project or as 
directed by the CONSTRUCTION MANAGER. 
PART 2 - PRODUCTS

March 2022 
  
City of Chandler 
21-047 
02100-3 
Chandler Heights Road Utility Relocations 
2.1       MATERIALS 
A. Fencing:  Any fencing removed as obstructions shall be restored to match existing 
with property OWNER’s approval/acceptance. 
B. Barricades, warning signs, and related equipment shall be placed as required. 
C. Tree Protection Fence/Barrier:  Shall be a commercially available product 
acceptable to the CONSTRUCTION MANAGER for its intended purpose.  The 
barrier shall be similar to a nylon woven material or woven wire fence such as 
TENAX Nordic Snow Fence, or approved equal, with approved stakes 
approximately 36-inches in height.  Submit material sample and Shop Drawings 
for barrier installation to the CONSTRUCTION MANAGER for approval prior to 
use. 
PART 3 - EXECUTION 
3.1       PREPARATION 
A. Site Clearing 
1. 
General:  Remove trees, shrubs, grass and other vegetation, improvements or 
obstructions, as required, to permit installation of new construction.  Remove 
similar items elsewhere on site or premises as specifically indicated.  
Removal includes digging out and off-site disposal of stumps and roots. 
a. 
Cut minor roots and branches of trees indicated to remain in a clean and 
careful manner where such roots and branches obstruct installation of 
new construction. 
2. 
Clearing and Grubbing:  Within the limits of Work, clear site of trees, shrubs 
and other material, except for those indicated to be left standing. 
a. 
Completely remove stumps, roots, and other debris protruding through 
the ground surface.  Stump removal and backfilling of holes is required 
for trees indicated on the Plans to be removed. 
b. 
Use only hand methods for grubbing inside drip line of trees indicated to 
remain. 
c. 
Fill depressions caused by clearing and grubbing operations with 
satisfactory soil material, unless further excavation or earthwork is 
indicated. 
d. 
Place fill material in horizontal layers not exceeding 6-inches loose 
depth, and thoroughly compact each layer to a density equal to adjacent 
original ground. 
3. 
Disposal of Waste Material: 
a. 
Burning on OWNER'S Property:  Burning is not permitted on 
OWNER'S property. 
b. 
Removal from OWNER'S Property:  Remove waste materials from 
OWNER'S property at no additional cost to the Project.

March 2022 
  
City of Chandler 
21-047 
02100-4 
Chandler Heights Road Utility Relocations 
4. 
All miscellaneous items not specifically mentioned or designated on the 
Drawings as removal items, but required for the completion of the Work, 
shall be removed.  All such items removed shall be hauled from the site. 
B. Barricades and Warning Signs: 
1. 
Construction sites shall be properly barricaded with appropriate warning 
signs affixed to prevent unauthorized access to the construction site. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
02145-1 
Chandler Heights Road Utility Relocations 
 SECTION 02145 
DIVERSION OF SEWAGE FLOW AND DEWATERING 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
This Section provides minimum requirements for temporary bypass pump 
station and dewatering of sewers as required to completing work and prior to 
acceptance.  
B. Requirements: 
1. 
CONTRACTOR shall provide all labor, materials, equipment, and 
supervision to temporarily bypass pump sewage flow around the 
CONTRACTOR'S Work and to dewater the pipeline for removal. The bypass 
strategy shall maintain flow to prevent wastewater backup into the City’s 
sewage collection system or discharge to the environment. 
2. 
The actual design of the bypass arrangement shall be prepared by the 
CONTRACTOR, 
and 
shall 
be 
submitted 
to 
the 
OWNER 
and 
CONSTRUCTION MANAGER for review.  Means and methods of 
accomplishing 
the 
bypassing 
shall 
be 
the 
responsibility 
of 
the 
CONTRACTOR. 
3. 
The CONTRACTOR shall have the entire bypassing system in place and 
tested before bypassing any sewage. 
4. 
The CONTRACTOR shall notify the OWNER 72 hours prior to bypassing 
the pipeline. The wastewater levels shall be continuously monitored by the 
CONTRACTOR.  
5. 
CONTRACTOR is responsible for immediate and proper cleanup should any 
spill occur, regardless of amount. 
6. 
CONTRACTOR shall connect bypass piping to the existing collection 
system and utilize temporary pumps and control equipment. 
7. 
CONTRACTOR shall utilize a pumping system with 100% back-up 
capability. In the event a pump shall fail, an alternate equally sized pump 
shall be ready to be utilized immediately. This requires the alternate pump(s) 
to be connected to the forcemain system. 
8. 
CONTRACTOR shall have enough pipe material and fittings on site to 
provide redundancy to the forcemain system for use should the primary 
forcemain fail during operation. Forcemain shall be fusible HDPE. The 
forcemain shall be sized with a velocity of less than 5 feet per second. 
9. 
CONTRACTOR shall coordinate operation of temporary bypass pump 
station with authorized City of Chandler personnel. CONTRACTOR shall 
not operate any equipment in or about temporary bypass pump station

March 2022 
  
City of Chandler 
21-047 
02145-2 
Chandler Heights Road Utility Relocations 
without 
prior 
written 
consent 
from 
OWNER 
and 
copied 
to 
CONSTRUCTION MANAGER. 
10. Bypass pump operation shall include a lighting system at the bypass pump 
operation and the forcemain discharge. The lighting system shall be gas 
operated.  
11. CONTRACTOR shall provide qualified personnel, at a minimum two (2), 
on-site 24 hours per day to maintain the bypass pumps and pipeline. 
12. CONTRACTOR shall continuously monitor hydrogen sulfide concentrations 
at the suction side of the bypass pump operation and the forcemain discharge. 
CONTRACTOR shall provide temporary covering at each location to 
minimize hydrogen sulfide releases. This may include providing and 
installing a temporary odor control system as determined by the OWNER.  
13. CONTRACTOR shall provide, install, and maintain safety signs as 
determined by the OWNER. CONTRACTOR shall plan for at least 20 signs 
measuring 14-inches by 10-inches. Signs shall be installed prior to testing the 
bypass pumping system. 
C. Experience: 
1. 
CONTRACTOR shall utilize staff and/or a subcontractor that has been 
directly responsible for the bypass pumping of sewage flows during the 
completion of a similar pipeline project. 
1.2       SUBMITTALS 
A. Provide a detailed plan for the bypass pump operation. The plan shall include the 
following items: 
1. 
Detailed layout of the temporary pumping system. Include layouts of the 
pump station and forcemain. The layout shall include all redundant pumps 
and forcemains. 
2. 
Pump suction piping size and layout. 
3. 
Pump equipment data sheets. Data sheets shall include a system head curve 
along with a pump curve to verify its operating point. The system head curve 
calculations shall be developed by the CONTRACTOR and be included 
within the submittal for review.  
4. 
Forcemain diameter and material data sheets. 
5. 
Forcemain sizing calculations. 
6. 
Detailed list of personnel to be utilized for the bypass pump operation. The 
list shall also include the local supplier of the by-pass pumps and forcemains. 
7. 
Detailed list of additional parts and equipment to be placed at the site should 
the system not operate as intended.  
8. 
Additional temporary measures that are planned to be supplied to ensure safe 
and reliable bypass pump operation.  
9. 
Detailed list of items and methods utilized to repair or replace items damaged 
or modified due to the by-pass pump operation.

March 2022 
  
City of Chandler 
21-047 
02145-3 
Chandler Heights Road Utility Relocations 
B. The plan shall include a detailed daily schedule and a list of daily activities that 
will be completed before, during, and after the bypass operation. Include all 
personnel that are planned to work on the pipeline and the bypass pump operation.  
C. Provide an emergency contact list for all of the personnel to be at the site. Include 
all of the OWNER’s and CONSTRUCTION MANAGER’s personnel. Once the 
emergency contact list is finalized, three (3) copies shall be printed, laminated, 
and placed at locations along the bypass pump operation as determined by the 
OWNER.  
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. CONTRACTOR shall provide temporary piping, fittings, conduits, and all other 
equipment to bypass sewer flow around the CONTRACTOR'S Work as required.  
CONTRACTOR shall furnish all necessary labor supervision to set up and 
operate the pumping system.  Equipment shall be equipped with sound attenuation 
devices to keep noise level within limits specified in the City of Chandler Codes 
or stated in the Contract Documents.  Bypass shall be of adequate capacity and 
size to handle the required flows.  
B. Bypass piping shall be polyethylene pipe with Standard PE Code Designation 
PE3408 as defined in AWWA C906, have a minimum Cell Classification of PE 
334434C as defined in ASTM D3350, and designed using Hydrostatic Design 
Basis of 1,600 psi as specified in ASTM D2837.  The physical properties of the 
polyethylene pipe shall have minimum test values as specified in ASTM D3350.  
Properties shall be substantiated with test data. 
C. The polyethylene shall be designed by CONTRACTOR in accordance with the 
procedures of AWWA Design Manual M55, applicable MAG standards and these 
Specifications.  All material properties used in design calculations shall be long-
term (time-corrected) values.  CONTRACTOR shall be familiarized with site 
conditions when preparing the pipe design. 
D. CONTRACTOR shall calculate the required minimum wall thickness using the 
following parameters: 
1. 
Modulus of Soil Reaction:  E's = 500 psi (fully deteriorated). 
2. 
Unit Weight of Soil:  w = 140 pcf. 
3. 
Vacuum Pressure:  PV = 14.7 psi. 
4. 
Ground Water Depth Above Invert:  h = 4 feet. 
5. 
Live Loads:  AASHTO H-20. 
6. 
Safety Factor:  N = 2.0. 
7. 
Internal Operating Temperature (Design):  Tn = 24° C to 33° C. 
8. 
Minimum Depth of Cover:  d = 2 feet.

March 2022 
  
City of Chandler 
21-047 
02145-4 
Chandler Heights Road Utility Relocations 
9. 
Maximum Depth of Cover:  d =10 feet. 
10. Poisson's Ratio for Long Term Loading:  m = 0.45. 
11. Bedding Constant:  K = 0.1. 
12. Time Lag Factor:  TL = 1.5. 
13. Long Term Apparent Modulus of Elasticity:  E = 23,000 psi. 
14. Working Pressure:  P = 110 psi. 
15. Test Pressure:  P = 150 psi. 
16. Ovality Compensation Factor:  f0 = 0.5. 
17. Recurrent Surge Velocity:  DVRS = 2.9 ft./sec. 
18. Occasional Surge Velocity:  DVOS = 6.2 ft./sec. 
19. Bulk Modulus of Water:  K = 300,000 psi. 
20. Effective Modulus of Pipe Material:  Ed = 150,000 psi. 
21. Design Factor for use in AWWA M55 eq 4-1:  DF = 0.5. 
22. Allowable Deflection:  As described in AWWA M55, Table 5-11. 
E. CONTRACTOR shall maintain on-site sufficient equipment and materials to 
ensure continuous and successful operation of the bypass and dewatering systems.  
The CONTRACTOR shall maintain on-site a sufficient number of valves, tees, 
elbows, connections, tools, sewer plugs, piping, and other parts or system 
hardware to ensure immediate repair or modification of any part of the system as 
necessary. 
F. All equipment shall be placed on a new plastic tarp, adequately sized, and bermed 
to protect against gasoline, oil, and hydraulic fluid spills. 
PART 3 - EXECUTION 
3.1       PROTECTION 
A. In areas where flows are bypassed, all bypass flow shall be discharged to a 
downstream sanitary sewer manhole following a bypass plan approved by the 
OWNER and CONSTRUCTION MANAGER.  No bypassing to ground surface 
receiving waters, canals, storm drains, or bypassing which results in groundwater 
contamination or potential health hazards shall be permitted in accordance with 
the General Conditions. 
3.2       DAMAGES 
A. The CONTRACTOR shall repair, without cost to OWNER, any damage that may 
result from his negligence, inadequate or improper mechanical or electrical 
failures. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
11295-1 
Chandler Heights Road Utility Relocations 
SECTION 11295 
HYDRAULIC VALVES 
PART 1 - GENERAL 
1.1       SUMMARY 
A. Furnish and install all valves and valve accessories for water as indicated on the 
Plans and as specified herein, including all appurtenances required for a complete 
and operational installation. 
1.2       RELATED SECTIONS 
A. Section 01300, Submittals. 
1.3       REFERENCES 
A. ANSI/AWWA C500 - Gate Valves. 
B. ANSI/AWWA C509 - Resilient-Seated Gate Valves. 
C. ANSI B16.1. 
D. ANSI B46.1. 
E. ASTM A126. 
F. ASTM A269. 
G. ASTM A48. 
H. ASTM A536. 
I. 
ASTM A582. 
J. 
ASTM B271. 
K. ASTM D429. 
L. ASTM D1784. 
M. ASTM D2000. 
N. ASTM F439. 
O. All other applicable ASTM and ANSI Standards.

March 2022 
  
City of Chandler 
21-047 
11295-2 
Chandler Heights Road Utility Relocations 
1.4       SUBMITTALS 
A. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 2 - PRODUCTS 
2.1       GENERAL 
A. All buried valves shall be provided with a valve box and cover. 
2.2       VALVES 
A. Gate Valves, Insertion Valves, Combination Air Release Valves: 
1. 
All Water Valves shall be in accordance with City of Chandler Supplement to 
MAG Standard Specification Sections 610 and 630 and as listed in the latest 
City of Chandler Approved Product List. 
2. 
All buried valve box installation shall be per City of Chandler Standard Detail 
C-307.  
2.3       SHOP PAINTING 
A. The manufacturer shall paint all valves, floor boxes, and valve boxes as follows: 
1. 
Clean and remove oil, grease, dirt, loose mill scale, and other foreign 
substances from un-galvanized ferrous-metal surfaces. 
2. 
Solvent scrub with stiff bristle brush followed by brush-off abrasive blast 
cleaning to a minimum surface profile depth of 1.5 mils. 
3. 
Valves, floor boxes, and valve boxes to be installed in exterior or buried 
conditions shall have prime coat Series 69-1255 (beige) H.B. Epoxoline II; one 
coat, 3-5 mils dry film thickness (DFT). 
4. 
Valves and floor boxes to be installed in interior exposure conditions shall have 
prime coat Series 135 Chembuild; one coat, 3-5 mils DFT.

March 2022 
  
City of Chandler 
21-047 
11295-3 
Chandler Heights Road Utility Relocations 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Valves of the various types and pattern shall be installed at the respective locations 
as shown on the Drawings and specified herein.  All appurtenances required for 
operation and control of the valves shall be included.  Joints and connections shall 
be made in accordance with applicable requirements for pipeline or pipe joints.  
Valve stems shall be plumb and vertical unless otherwise specifically shown.  Each 
valve shall be adjusted for smooth and easy operation and shall be watertight when 
placed in operation under maximum working pressure. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15050-1 
Chandler Heights Road Utility Relocations 
SECTION 15050 
PIPING SYSTEMS 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope:  This Section specifies systems of process piping and general requirements 
for piping systems.  Detailed Specifications for the components listed on the Piping 
System Specification Sheets are found in other Sections of Division 15, 
Mechanical.  This Section shall be used in conjunction with those Sections. 
B. Related Sections: 
1. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. This Section contains references to the following documents.  They are a part of 
this Section as specified and modified.  In case of conflict between the requirements 
of this Section and those of the listed documents, the requirements of this Section 
shall prevail. 
B. Unless otherwise specified, references to documents shall mean the documents in 
effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective 
date of the Agreement if there were no Bids).  If referenced documents have been 
discontinued by the issuing organization, references to those documents shall mean 
the replacement documents issued or otherwise identified by that organization or, 
if there are no replacement documents, the last version of the document before it 
was discontinued.  Where document dates are given in the following listing, 
references to those documents shall mean the specific document version associated 
with that date, whether or not the document has been superseded by a version with 
a later date, discontinued, or replaced. 
1. 
AASHTO M36/M36M - Metallic (Zinc or Aluminum) Coated Corrugated 
Steel Culverts and Underdrains. 
2. 
ANSI A13.1 - Scheme for the Identification of Piping Systems. 
3. 
ANSI B1.20.1 - Pipe Threads, General Purpose (Inch). 
4. 
ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250, 
and 800. 
5. 
ANSI B16.3 - Malleable Iron Threaded Fittings Class 150 and 300. 
6. 
ANSI B16.5 - Pipe Flanges and Flanged Fittings. 
7. 
ANSI B16. - Factory Made Wrought Steel Buttwelding Fittings. 
8. 
ANSI B16.11 - Forged Steel Fittings, Socket Welding and Threaded. 
9. 
ANSI B16.12 - Cast Iron Threaded Drainage Fittings. 
10. ANSI B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure 
Fittings.

March 2022 
  
City of Chandler 
21-047 
15050-2 
Chandler Heights Road Utility Relocations 
11. ANSI B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes. 
12. ANSI B31.1 - Power Piping. 
13. ANSI B31.3 - Chemical Plant and Petroleum Refinery Piping. 
14. ASME Section IX - Boiler and Pressure Vessel Code; Welding and Brazing 
Qualifications. 
15. ASTM A47 - Malleable Iron Castings. 
16. ASTM A74 - Cast Iron Soil Pipe and Fittings. 
17. ASTM A105/A105M - Forgings, Carbon Steel, for Piping Components. 
18. ASTM A106 - Seamless Carbon Steel Pipe for High Temperature Service. 
19. ASTM A126 - Standard Specification for Gray Iron Castings for Valves, 
Flanges, and Pipe Fittings. 
20. ASTM A197 - Cupola Malleable Iron. 
21. ASTM A234/A234M - Pipe Fittings of Wrought Carbon Steel and Alloy Steel 
for Moderate and Elevated Temperatures. 
22. ASTM A312/A312M - Seamless and Welded Austenitic Stainless Steel Pipe. 
23. ASTM A403/A403M - Wrought Austenitic Stainless Steel Piping Fittings. 
24. ASTM A536 - Ductile Iron Castings. 
25. ASTM A570/A570M - Hot Rolled Carbon Steel Sheet and Strip, Structural 
Quality. 
26. ASTM B88 - Seamless Copper Water Tube. 
27. ASTM C76 - Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. 
28. ASTM C443-REV A - Standard Specification for Joints for Circular Concrete 
Sewer and Culvert Pipe, Using Rubber Gaskets. 
29. ASTM C564 - Rubber Gaskets for Cast Iron Soil Pipe and Fittings. 
30. ASTM D1248 - Polyethylene Plastics Molding and Extrusion Materials. 
31. ASTM D1784 - Rigid Poly (Vinyl Chloride) (PVC) Compounds and 
Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds. 
32. ASTM D1785 - Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, 
and 120.  
33. ASTM D2241 - Poly (Vinyl Chloride) (PVC) Plastic Pipe (SDR-PR). 
34. ASTM D2513 - Thermoplastic Gas Pressure Pipe, Tubing, and Fittings. 
35. ASTM D2665 - Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent 
Pipe and Fittings. 
36. ASTM D2996 - Filament Wound Reinforced Thermosetting Resin Pipe. 
37. ASTM D3034 - Standard Specification for Type PSM Poly (Vinyl Chloride) 
(PVC) Sewer Pipe and Fittings. 
38. ASTM D3261 - Butt Fusion Polyethylene (PE) Plastic Fittings for 
Polyethylene (PE) Plastic Pipe and Tubing. 
39. ASTM D4174 - Cleaning, Flushing, and Purification of Petroleum Fluid 
Hydraulic Systems. 
40. ASTM D4101 - Propylene Plastic Injection and Extrusion Materials. 
41. ASTM F441 - Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, 
Schedules 40 and 80. 
42. AWWA C105 - Polyethylene Encasement for Ductile-Iron Piping for Water 
and Other Liquids.

March 2022 
  
City of Chandler 
21-047 
15050-3 
Chandler Heights Road Utility Relocations 
43. AWWA C110 - Ductile Iron and Gray Iron Fittings, 3" Through 48", for Water 
and Other Liquids. 
44. AWWA C111 - Rubber Gasket Joints for Ductile Iron and Gray Iron Pressure 
Pipe and Fittings. 
45. AWWA C115 - Flanged Ductile Iron and Gray Iron Pipe with Threaded 
Flanges. 
46. AWWA C151 - Ductile Iron Pipe, Centrifugally Cast in Metal Molds or Sand-
Lined Molds, for Water or Other Liquids. 
47. AWWA C200 - Steel Water Pipe 6" and Larger. 
48. AWWA C205 - Cement Mortar Protective Lining and Coating for Steel Water 
Pipe - 4" and Larger - Shop Applied. 
49. AWWA C206 - Field Welding of Steel Water Pipe. 
50. AWWA C207 - Steel Pipe Flanges for Waterworks Services - Sizes 4" 
Through 144". 
51. AWWA C208 - Dimensions for Fabricated Steel Water Pipe Fittings. 
52. AWWA C209 - Cold Applied Tape Coating for Special Sections, Connections, 
and Fittings for Steel Water Pipelines. 
53. AWWA C210 - Liquid Epoxy Coating Systems for the Interior and Exterior 
of Steel Water Pipe. 
54. AWWA C214 - Tape Coating Systems for the Exterior of Steel Water 
Pipelines. 
55. AWWA 301 - Pre-stressed Concrete Pressure Pipe, Steel Cylinder Type, for 
Water and Other Liquids. 
56. AWWA C303 - Reinforced Concrete Pressure Pipe, Steel Cylinder Type, Pre-
tensioned, for Water and Other Liquids. 
57. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
58. AWWA C651 - Disinfecting Water Mains. 
59. AWWA C900 - Polyvinyl Chloride (PVC) Pressure Pipe, 4" Through 12", for 
Water. 
60. AWWA M11 - Steel Pipe - A Guide for Design and Installation. 
61. CISPI 301 - Specification Data for Hubless Cast Iron Sanitary System with 
No-Hub Pipe and Fittings. 
62. FEDSPEC L-C-530B(1) - Coating, Pipe, Thermoplastic Resin, or 
Thermosetting Epoxy. 
63. MIL-H-13528B - Hydrochloric Acid, Inhibited, Rust Removing. 
64. MIL-STD-810C - Environmental Test Methods. 
65. SAE J1227 - Assessing Cleanliness of Hydraulic Fluid Power Components and 
Systems. 
66. UPC - Uniform Plumbing Code. 
C. Fittings and Coupling Compatibility: 
1. 
To assure uniformity and compatibility of piping components, fittings and 
couplings for grooved end piping systems shall be furnished by the same 
manufacturers.

March 2022 
  
City of Chandler 
21-047 
15050-4 
Chandler Heights Road Utility Relocations 
D. All Pipes, fittings, valves, fire hydrants, and other appurtenances shall conform to 
current AAWA, ASTM, and NSF standards.  
E. All material that comes in contact with water shall conform to ANSI/NSF Standard 
61.  
PART 2 - PRODUCTS 
2.1       PIPING MATERIALS 
A. Unless otherwise specified, piping materials including pipe, gaskets, fittings, 
connection and joint assemblies, linings, and coatings shall be selected from those 
listed on the Piping System Specification Sheets.   
B. Piping materials shall conform to detailed specifications for each type of pipe and 
piping appurtenance specified in other Sections of Division 15, Mechanical.   
C. All piping shall be compatible with the fluid to which it is exposed. 
D. All piping and valves to be used for the air release valve connections shall be copper 
or brass material.  
E. All piping which comes in contact with potable water shall have ASNI/NSF 61 
certification.  
2.2       VALVES 
A. Valves of the same size and service shall be provided by a single valve 
manufacturer.  Packing shall be non-asbestos material.  Actual length of valves 
shall be within 1/16-inch () of the manufacturer's specified length.  Flanges shall 
meet the requirement of ANSI B16.5.  Push-on and mechanical joints shall meet 
the requirements of AWWA C111.   
B. All Valves shall be manufactured as listed in the latest City of Chandler Approved 
Product List. No other manufacturer shall be acceptable.   
2.3       SUBMITTALS 
A. All additional submittal information shall be included with this submittal 
information as noted in the Division 15, Mechanical, Pipe Material Specifications. 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information

March 2022 
  
City of Chandler 
21-047 
15050-5 
Chandler Heights Road Utility Relocations 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Location: 
1. 
Piping shall be provided as specified, except for adjustments, to avoid 
architectural and structural features. 
B. Piping Sizes: 
1. 
Where the size of piping is not specified, the CONTRACTOR shall provide 
piping of the sizes required by UPC.  Unless specified otherwise, small piping 
(less than 1-inch in diameter) required for services not described by UPC shall 
be 1/2-inch. 
3.2       TESTING 
A. General: 
1. 
Upon completion of piping, but prior to application of insulation on exposed 
piping, the CONTRACTOR shall test the piping systems in accordance with 
the appropriate MAG and City of Chandler Specifications.  Pressures, media, 
and test durations shall be as specified in the PIPESPEC.  Equipment which 
may be damaged by the specified test conditions shall be isolated.  Testing 
shall be performed using calibrated test gages and calibrated volumetric 
measuring equipment to determine leakage rates.  Each test gage shall be 
selected so that the specified test pressure falls within the upper half of the 
gage's range.  Unless otherwise specified, the CONTRACTOR shall notify the 
CONSTRUCTION MANAGER 24 hours prior to each test. 
2. 
Unless otherwise specified, testing, as specified herein, shall include existing 
piping systems that connect with new pipe systems.  Existing pipe shall be 
tested to the nearest existing valve.  Any piping that fails the test shall be 
repaired.  Repair of existing piping will be considered and paid for as extra 
Work. 
3. 
All blow off assemblies shall be removed after successful testing of the new 
pipes as specified in the Drawings.  
B. Liquid Systems: 
1. 
Pressure and leakage testing for water systems shall be in accordance with 
MAG Section 610.  Unless otherwise specified, leakage from other buried 
liquid piping systems shall be less than 0.02 gallons per hour per inch diameter 
per 100 feet of buried piping.

March 2022 
  
City of Chandler 
21-047 
15050-6 
Chandler Heights Road Utility Relocations 
2. 
Potable Water Systems Additional Requirements: 
a. 
The CONTRACTOR shall provide all vents, piping, plugs, bulkheads, 
valves, bracing, blocking, pump, including measuring device and all other 
equipment necessary for making the tests, except pressure gages. 
b. 
The pipe shall be tested between each valve or between a valve and the 
closed end of the pipe. 
c. 
Pipe test section shall be limited to 1/2 linear mile, or less, unless 
otherwise approved in writing by the Engineer. Testing cannot be done 
against an existing valve. The new pipeline must be separated from any 
potable system in such a way to prevent any potential for cross-
contamination between the existing potable water system and the new 
pipeline. 
d. 
The test shall be made after the backfilling is completed or compacted, 
regardless of the compaction method. 
e. 
All connections, blow-offs, hydrants and valves shall be tested with the 
main, where practical. 
f. 
The test section shall be slowly filled with potable water and all air shall 
be vented from the line.  The rate of filling shall be as approved by the 
ENGINEER, with at least 24-hour notice required before filling is 
scheduled. 
C. Drains: 
1. 
Drain systems, other than pumped drain systems, shall be tested in accordance 
with UPC. 
3.3       CLEANING AND FLUSHING 
A. General: 
1. 
Piping systems shall be cleaned following completion of testing and prior to 
connection to operating, control, regulating, or instrumentation equipment. 
2. 
The CONTRACTOR may, at his option, clean and test sections of buried 
piping systems.  Use of this procedure, however, will not waive the 
requirement for a full pressure test of the completed system. 
3. 
Unless specified otherwise, piping 24-inches in diameter and smaller shall first 
be cleaned by pulling a tightly fitting cleaning ball or swab through the system. 
4. 
Piping larger than 24-inches in diameter may be cleaned manually or with a 
cleaning ball or swab. 
B. Liquid Systems: 
1. 
After completion of cleaning, liquid systems, unless otherwise specified, shall 
be flushed with clean water. 
C. Water Systems: 
1. 
For non-potable water systems, final flushing and microbiological testing, as 
specified in MAG Section 611.15, is not required.

March 2022 
  
City of Chandler 
21-047 
15050-7 
Chandler Heights Road Utility Relocations 
3.4       PIPING SPECIFICATION SHEETS (PIPESPEC) 
A. Piping and valves for groupings of similar plant processes or types of service lines 
are specified on individual piping specification sheets (PIPESPECS).  Piping 
services are grouped according to the chemical and physical properties of the fluid 
conveyed and/or by the temperature or pressure requirements.  Piping services 
specified in the PIPESPECS and on the Drawings are alphabetically arranged by 
designated service symbols. 
 
 
TABLE A - PIPING SERVICES 
Symbol 
         Service 
Fluid Category 
Pipe Marker 
Background Color 
W 
    Potable Water 
          Liquid 
  Blue 
SS 
   Sanitary Sewer 
          Liquid 
 Green 
 
(The remainder of this page has been intentionally left blank)

March 2022 
  
City of Chandler 
21-047 
15050-8 
Chandler Heights Road Utility Relocations 
 
PIPING SYMBOL/SERVICE 
SS / SANITARY SEWER 
 
 
 
 
 
Refer to section 15067, Vitrified Clay Pipe. 
 
 
 
 
 
 
 
 
 
 
 
PIPING SYMBOL/SERVICE 
POT / POTABLE WATER 
 
 
Medium: 
Water. 
  
Pressure: 
As shown on buried and exposed 
piping schedules.  All requirements 
of COC. 
  
  
Duration: 
2 hours. 
  
  
Gasket Requirements: 
  
Flange: 
Red Rubber Gasket Material (SBR) 
conforming to ASTM D1330. 
  
  
Push-on/Mech. Cpl: 
Nitrile, Neoprene, or EPDM. Areas 
within 35 foot SRP easement shall 
be fitted with Fluoroelastomer 
Fluorel Viton suitable for water 
service of up to 212oF. 
  
  
  
  
Buried and Encased Pipes: 
  
(See Drawings for pipe sizes and materials.) 
  
2” and Smaller 
Copper Tube; ASTM B88, Type K, drawn.   
Ref. Spec. Section 15064, Copper Pipe. 
 
Copper Conn; Solder type with 
threaded adapters. 
 
 
 
Copper Ftgs; Wrought copper 
or bronze, ANSI 
B16.22. 
 
 
 
Copper Interior Lining; None. 
Copper Exterior Coating; None.

March 2022 
  
City of Chandler 
21-047 
15050-9 
Chandler Heights Road Utility Relocations 
4” and Larger 
 
Ductile Iron; AWWA C151  
with cement mortar lining. Ref.  
Spec. Section 15061 
 
 
 
Ductile Iron Conn; Restrained 
push-on rubber gasket 
joint.  Flanged adapters 
for valves and ends. 
 
 
 
Ductile Iron Ftgs; Ductile iron 
per Spec. Section 
15061. 
 
 
 
Ductile Iron Exterior Coating;  
Bituminous Coated,  
Polyethylene Wrap 
  
 
 
  
Remarks: 
 
  
1.  Potable water lines shall be disinfected in 
accordance with AWWA C651-92. 
 
  
2.  All piping, fittings, valves, and any other 
material that comes in contact with 
drinking water shall comply with 
NSF Standards 60 and 61.

March 2022 
  
 
 
 
 
City of Chandler 
21-047 
 
15050-10 
Chandler Heights Road Utility Relocations 
PIPING SCHEDULE TABLES 
 
1. Potable water lines shall be disinfected in accordance with AWWA C651-92. 
2. All piping, fittings, valves, and any other material that comes in contact with drinking water shall comply with NSF Standards 60 
and 61. 
 
 
BURIED PIPE 
SERVICE 
DESCRIPTION 
PIPE 
SYMBOL 
PIPE 
MATERIAL SPECIFICATION CLASS/ 
TYPE 
INTERIOR 
LINING 
EXTERIOR 
COATING JOINT TYPE 
TEST 
PRESSURE 
POTABLE WATER 4-
INCHES AND LARGER 
W 
DIP 
15061 
350 
CM 
BC/PE 
MJ 
PER 15051 
POTABLE WATER 3-
INCHES AND SMALLER 
W 
COP 
15064 
K 
NONE 
P 
BZ 
PER 15051 
SANITARY SEWER 
SS 
VCP 
15067 
Extra 
Strength 
N/A 
N/A 
CJ 
PER 15051 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15051-1 
Chandler Heights Road Utility Relocations 
SECTION 15051 
BURIED PIPING INSTALLATION 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
CONTRACTOR shall provide all labor, materials, equipment, and incidentals 
as shown, specified, and required to install and test all buried piping, fittings, 
and specials.  The Work includes, but is not limited to, the following: 
a. 
All types and sizes of buried piping, except those specified under other 
Sections. 
b. 
Supports, restraints, and thrust blocks. 
c. 
Pipe encasements. 
d. 
Work on or affecting existing piping. 
e. 
Testing. 
f. 
Cleaning. 
g. 
Installation of all jointing and gasketing materials, specials, flexible 
couplings, mechanical couplings, harnessed and flanged adapters, 
sleeves, tie rods, and all other Work required to completing the buried 
piping installation. 
h. 
Incorporation of valves, meters and special items shown or specified into 
the piping systems as required and as specified in the appropriate Division 
15, Mechanical Sections. 
i. 
Unless otherwise specifically shown, specified, or included under other 
Sections, all buried piping work required begins at the outside face of 
structures or structure foundations and extending away from structure. 
B. Coordination: 
1. 
Review installation procedures under other Sections and coordinate with the 
Work that is related to this Section. 
2. 
Section 15051, Buried Pipe Installation, specifies the installation of all buried 
piping materials specified in Sections of Division 15, Mechanical.  Coordinate 
with these Sections. 
C. Related Work Specified Elsewhere: 
1. 
Section 11295, Hydraulic Valves. 
2. 
Section 15050, Piping Systems. 
3. 
Section 15061, Ductile Iron Pipe. 
4. 
Section 15064, Copper Pipe. 
5. 
Section 15067, VCP Pipe. 
6. 
Section 15020, Piping Specialties and Accessories.

March 2022 
  
City of Chandler 
21-047 
15051-2 
Chandler Heights Road Utility Relocations 
1.2       QUALITY ASSURANCE 
A. CONTRACTOR shall conform to all applicable requirements of Parts 600 and 700 
of the Uniform Standard Specifications for Public Work Construction by the 
Maricopa Association of Governments (MAG).  If there is a conflict between MAG 
Standard Specifications and these Specifications, the provisions of these 
Specifications shall govern. 
B. Requirements of Regulatory Agencies: 
1. 
Comply with requirements of UL, FM, and other jurisdictional authorities, 
where applicable. 
2. 
Refer to the General and Supplementary Conditions regarding permit 
requirements for this Work. 
C. Reference Standards:  Comply with applicable provisions and recommendations of 
the following, except as otherwise shown or specified. 
1. 
ASTM D2321 - Practice for Underground Installation of Flexible Thermoplas-
tic Pipe. 
2. 
ASTM D2774 - Practice for Underground Installation of Thermoplastic 
Pressure Piping. 
3. 
AWWA C105 - Polyethylene Encasement for Ductile Iron Piping for Water 
and Other Liquids. 
4. 
AWWA C111 - Rubber Gasket Joints for Ductile Iron Pressure Pipe and 
Fittings. 
5. 
AWWA C200 - Steel Water Pipe. 
6. 
AWWA C205 - Cement Mortar Protective Lining and Coating for Steel Water 
Pipe. 
7. 
AWWA C206 - Field Welding of Steel Water Pipe. 
8. 
AWWA C207 - Steel Pipe Flanges for Waterworks Service. 
9. 
AWWA C208 - Dimensions for Fabricated Steel Water Pipe Fittings. 
10. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
11. AWWA C606 - Grooved and Shouldered Joints. 
12. AWWA C651 - Disinfecting Water Mains. 
13. AWWA M11 - Steel Pipe - A Guide for Design and Installation. 
14. AWWA M23 - PVC - Design and Installation. 
15. AWWA M41 - Ductile Iron Pipe and Fittings. 
16. ASCE MOP No. 37 - Design and Construction of Sanitary and Storm Sewers 
17. Concrete Pipe Handbook - American Concrete Pipe Association. 
1.3       SUBMITTALS 
A. Shall be in accordance with Section 15050, Piping Systems, submittal information. 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the

March 2022 
  
City of Chandler 
21-047 
15051-3 
Chandler Heights Road Utility Relocations 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Deliver materials to the site to ensure uninterrupted progress of the Work. 
B. Handle all pipe, fittings, specials, and accessories carefully with approved handling 
devices.  Do not drop or roll material off trucks.  Do not otherwise drop, roll, or 
skid piping. 
C. Store pipes and fittings on heavy wood blocking or platforms so they are not in 
contact with the ground. 
D. Unload pipe, fittings, and specials opposite to or as close to the place where they 
are to be installed as is practical to avoid unnecessary handling.  Keep pipe interiors 
completely free from dirt and foreign matter. 
E. Inspect delivered pipe for cracked, gouged, chipped, dented, or other damaged 
material and immediately remove defective pipe from site. 
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. Required pipe materials are listed in the Piping Schedule.  Refer to applicable 
Sections for Material Specifications. 
B. General: 
1. 
Marking Piping: 
a. 
Clearly mark each piece of pipe or fitting with a designation conforming 
to those shown on the laying schedule and/or Shop Drawings. 
b. 
Cast or paint material, type, and pressure designation on each piece of 
pipe or fitting 4-inches in diameter and larger.   
c. 
Pipe and fittings smaller than 4-inches in diameter shall be clearly marked 
by manufacturer as to material, type, and rating.

March 2022 
  
City of Chandler 
21-047 
15051-4 
Chandler Heights Road Utility Relocations 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. General: 
1. 
Installation of all pipe, fittings, valves, specials, and appurtenances shall be 
subject to the review and/or approval of the CONSTRUCTION MANAGER. 
2. 
Install piping as shown, specified, and as recommended by the manufacturer 
and in conformance with referenced standards, and approved Shop Drawings. 
3. 
Request instructions from CONSTRUCTION MANAGER before proceeding 
if there is a conflict between the manufacturer's recommendations and the 
Contract Documents. 
4. 
All piping shall be inspected by the CONSTRUCTION MANAGER prior to 
installation.  CONSTRUCTION MANAGER’S inspection will not relieve 
CONTRACTOR or manufacturer from responsibility for damaged products. 
5. 
All piping shall be carefully examined for cracks, damage, or other defects 
before installation.  Any piping that is defective, including but not limited to, 
cracked, damaged, in poor condition, or with damaged linings or improper 
markings shall be rejected unless the product can be repaired in a manner 
acceptable to the manufacturer and CONSTRUCTION MANAGER.  Any 
piping found to be broken or defective after it has been installed shall be 
removed, replaced, or repaired at the CONTRACTOR'S expense. 
6. 
Minimum earth cover over the piping shall be as shown on the Drawings, 
specified or directed by the CONSTRUCTION MANAGER, but in no case 
shall the earth cover be less than 4 feet for all piping larger than 6-inches in 
diameter.  
7. 
Present all conflicts between piping systems and equipment, structures or 
facilities to CONSTRUCTION MANAGER for determination of corrective 
measures before proceeding. 
8. 
Take field measurements, where required, prior to installation to ensure proper 
fitting of Work.  The CONTRACTOR shall uncover the existing pipelines 
sufficiently in advance of the proposed Work in order that the type and location 
of the existing pipes and joints and other information required to fabricate the 
proposed piping can be determined.  It shall be the responsibility of the 
CONTRACTOR to obtain whatever information is required to complete the 
connections of the proposed pipelines to the existing pipelines. Refer to 
Paragraph 3.3 of this Section, as applicable. 
9. 
Interior of all piping and mating surfaces shall be inspected and all dirt, gravel, 
sand, debris or other foreign material shall be completely removed from the 
interior and mating surfaces before installation.  Measures shall be taken to 
maintain the interior of all piping clean until acceptance of the completed 
Work.  Care shall be taken to prevent foreign matter from entering joint space.  
Bell and spigot mating surfaces shall be wiped clean immediately before 
piping is laid.  For ductile iron pipe, the bell and spigot mating surfaces shall 
be thoroughly cleaned with a wire brush.

March 2022 
  
City of Chandler 
21-047 
15051-5 
Chandler Heights Road Utility Relocations 
10. Install piping accurately to line and grade shown, specified or directed, unless 
otherwise approved by the CONSTRUCTION MANAGER.  Accurate means 
of determining and checking the alignment and grade shall be used, which shall 
be subject to the approval of the CONSTRUCTION MANAGER.  Any 
modifications to the Contract Documents to suit the pipe manufacturer's 
standard shall be approved by the CONSTRUCTION MANAGER. Remove 
and relay piping that is incorrectly installed, at CONTRACTOR'S expense. 
11. Do not lay piping in water, unless otherwise specified in these Specifications 
or approved by the CONSTRUCTION MANAGER.  Ensure that the water 
level in the trench is at least 6-inches below the bottom of piping.  Maintain a 
dry trench until jointing and backfilling are complete, unless otherwise 
specified in these Specifications or approved by the CONSTRUCTION 
MANAGER. 
12. Where unforeseen conditions will not permit the installation of piping as 
shown or specified, no piping shall be installed without approval of the 
CONSTRUCTION MANAGER.  Do not modify structures or facilities 
without approval of the CONSTRUCTION MANAGER. 
13. Start laying piping at lowest point and proceed toward the higher elevations, 
unless otherwise approved by the CONSTRUCTION MANAGER.  Slope 
piping uniformly between elevations shown on the Drawings or as otherwise 
directed by the CONSTRUCTION MANAGER. 
14. Place bell and spigot piping so that the bells face the direction of laying, unless 
otherwise approved by the CONSTRUCTION MANAGER. 
15. Piping shall be installed so that the barrel of the piping, and not the joints, 
receives the bearing pressure from the trench bottom or other bedding 
condition. 
16. No piping shall be brought into position until the preceding length, valve, 
fitting, or special has been bedded and secured in place. 
17. Whenever pipe laying is not actively in progress, the open ends of the piping 
shall be closed by a temporary plug or cap to prevent soil, water, and other 
foreign matter from entering the piping. 
18. Field cutting of metallic piping, where required for inserting valves, fitting, 
specials, and closures, shall be made with a machine specially designed for 
cutting piping and in accordance with the manufacturer's instructions.  Cuts 
shall be carefully done, without damage to piping, so as to leave a smooth end 
at right angles to the axis of the piping.  Cut end shall be tapered and sharp 
edges filed off smooth.  Flame cutting shall not be permitted.  Piping damaged 
by the CONTRACTOR by improper or careless methods of cutting shall be 
replaced or repaired at his expense. 
19. Blocking under piping shall not be permitted, unless specifically approved by 
CONSTRUCTION MANAGER for special conditions. 
20. Protective linings and coatings shall be touched up prior to installation, where 
required. 
21. Except where bends, wyes or similar fittings are used, changes in alignment 
and grade of the piping shall be made by deflecting joints or with beveled pipe.

March 2022 
  
City of Chandler 
21-047 
15051-6 
Chandler Heights Road Utility Relocations 
Permissible joint deflection shall not exceed 75% of the amount allowed by 
the manufacturer. 
22. All joints shall be made in the presence of the CONSTRUCTION MANAGER, 
or his duly authorized representative, except as otherwise approved. 
23. Special care shall be taken to ensure that each section of piping abuts against 
the next in such a manner that there will be not shoulder or unevenness of any 
kind along the piping invert. 
24. Piping shall be rotated as required to place outlets in proper position. 
25. Blind flanges and cleanouts shall be provided at locations shown on the 
Drawings, specified, or required.  Cleanouts on buried piping shall include all 
pipes, fittings, and appurtenances required to bring cleanout to finished grade 
and terminate in a flange and blind flange or suitably capped piping as shown.  
Cleanout piping shall be same as that specified for the main run. 
26. All gravity lines shall pitch uniformly at the grade shown or as specified or 
approved. 
27. Short pipe stubs, maximum 4 feet in length, shall be used at all manholes and 
other wall faces, except as otherwise specified. 
28. Field painting shall be accomplished after joints are made. 
29. All piping shall be plugged watertight with a suitable cap or plug securely 
fastened to the end of the piping at all contact interfaces. 
30. CONTRACTOR shall notify CONSTRUCTION MANAGER in advance of 
backfilling operations. 
31. On steep slopes, take measures acceptable to CONSTRUCTION MANAGER 
to prevent movement of the pipe during installation. 
32. Thrust Restraint:  During the installation of the pipe, thrust blocks, tied joints, 
or proprietary restrained joint systems shall be provided wherever required for 
thrust restraint.  Thrust restraint shall conform to the applicable requirements 
of Paragraph 3.2 of this Section. 
33. Exercise care to avoid flotation when installing pipe in cast-in-place concrete. 
B. Manufacturer's Installation Specialist: 
1. 
Provide the services of a competent installation specialist of the pipe 
manufacturer when pipe laying begins if the CONTRACTOR is not 
experienced in laying and jointing a particular type of pipe. 
2. 
Retain installation specialist at the site for a minimum of two days or until 
competency of the pipe laying crew has been satisfactorily demonstrated. 
C. Separation of Sewers and Potable Water Pipe Lines: 
1. 
Conform to the requirements of all applicable requirements of the Uniform 
Standard Specifications for Public Work Construction by the Maricopa 
Association of Governments (MAG).   
D. Plugs: 
1. 
Temporarily plug installed pipe at the end of each day's Work or other 
interruption to the installation of any pipe line.  Plugging shall prevent the entry 
of animals, liquids, or persons into the pipe or the entrance or insertion of 
deleterious materials.

March 2022 
  
City of Chandler 
21-047 
15051-7 
Chandler Heights Road Utility Relocations 
2. 
Install standard plugs into all bells at dead ends, tees or crosses.  Cap all spigot 
ends. 
3. 
Fully secure and block all plugs and caps installed for pressure testing to 
withstand the specified test pressure. 
4. 
Where plugging is required for phasing of the Work or for subsequent 
connection of piping, install watertight, permanent type plugs. 
E. Bedding Pipe:  Bed pipe as specified below and in accordance with the details 
shown. 
1. 
Trench excavation and backfill and bedding materials shall conform to the 
Contract Documents. 
2. 
Excavate trenches below the pipe bottom by an amount specified.  Remove all 
loose and unsuitable material from the trench bottom. 
3. 
Carefully and thoroughly compact all pipe bedding with hand held pneumatic 
compactors. 
4. 
Do not lay pipe until the CONSTRUCTION MANAGER approves the 
bedding condition.  If a conflict exists, obtain clarification from 
CONSTRUCTION MANAGER before proceeding. 
5. 
No pipe shall be brought into position until the preceding length has been 
bedded and secured in its final position. 
F. Laying Pipe: 
1. 
Conform to manufacturer's instructions and requirements of the standards 
listed below, where applicable: 
a. 
Ductile Iron Pipe:  AWWA C600, AWWA C105. 
b. 
ASCE Manual of Practice No. 37. 
G. Polyethylene Encasement: 
1. 
Provide polyethylene encasement for ductile iron piping to prevent contact 
between the pipe and surrounding bedding material and backfill. 
2. 
Polyethylene may be supplied in tubes or in sheet material. 
3. 
Polyethylene encasement materials and installation shall be in accordance with 
the requirements of MAG Section 610.6. 
H. Jointing Pipe: 
1. 
Ductile Iron Mechanical Joint Pipe: 
a. 
Wipe clean the socket, plain end and adjacent areas immediately before 
making joint.  Make certain that cut ends are tapered and sharp edges are 
filed off smooth. 
b. 
Lubricate the plain ends and gasket with soapy water or an approved pipe 
lubricant, in accordance with AWWA C111, just prior to slipping the 
gasket onto the plain end of the joint assembly. 
c. 
Place the gland on the plain end with the lip extension toward the plain 
end, followed by the gasket with the narrow edge of the gasket toward the 
plain end. 
d. 
Insert the pipe into the socket and press the gasket firmly and evenly into 
the gasket recess.  Keep the joint straight during assembly.

March 2022 
  
City of Chandler 
21-047 
15051-8 
Chandler Heights Road Utility Relocations 
e. 
Push gland toward socket and center it around pipe with the gland lip 
against the gasket. 
f. 
Insert bolts and hand tighten nuts. 
g. 
Make deflection after joint assembly, if required, but prior to tightening 
bolts.  Alternately tighten bolts 180 degrees apart to seat the gasket 
evenly.  The bolt torque shall be as follows: 
 
Pipe Size 
(inches) 
Bolt Size 
(inches) 
Range of Torque 
(ft-lbs) 
3 
5/8 
45-60 
4-24 
3/4 
75-90 
30-36 
1 
100-120 
42-48 
1-1/4 
120-150 
 
h. 
All bolts and nuts shall be heavily coated with two 10 mil minimum coats 
of coal-tar epoxy coating as manufactured by Koppers, Tnemec, or equal. 
i. 
Restrained mechanical joints shall be in accordance with Section 15061, 
Ductile Iron Pipe. 
2. 
Ductile Iron Push-On Joint Pipe: 
a. 
Prior to assembling the joints, the last 8-inches of the exterior surface of 
the spigot and the interior surface of the bell shall be thoroughly cleaned 
with a wire brush, except where joints are lined or coated with a special 
protective lining or coating. 
b. 
Rubber gaskets shall be wiped clean and flexed until resilient.  Refer to 
manufacturer's instructions for procedures to ensure gasket resiliency 
when assembling joints in cold weather.  
c. 
Insert gasket into joint recess and smooth out the entire circumference of 
the gasket to remove bulges and to prevent interference with the proper 
entry of the spigot of the entering pipe. 
d. 
Immediately prior to joint assembly, apply a thin film of approved 
lubricant to the surface of the gasket which will come in contact with the 
entering spigot end of pipe.  CONTRACTOR may, at his option, apply a 
thin film of lubricant to the outside of the spigot of the entering pipe. 
e. 
For assembly, center spigot in the pipe bell and push pipe forward until it 
just makes contact with the rubber gasket.  After gasket is compressed and 
before pipe is pushed or pulled all the way home, carefully check the 
gasket for proper position around the full circumference of the joint.  Final 
assembly shall be made by forcing the spigot end of the entering pipe past 
the rubber gasket until it makes contact with the base of the bell.  When 
more than a reasonable amount of force is required to assemble the joint, 
the spigot end of the pipe shall be removed to verify the proper positioning 
of the rubber gasket.  Gaskets which have been scoured, or otherwise 
damaged, shall not be used. 
f. 
Maintain an adequate supply of gaskets and joint lubricant at the site at 
all times when pipe jointing operations are in progress. 
3. 
Proprietary Joints:

March 2022 
  
City of Chandler 
21-047 
15051-9 
Chandler Heights Road Utility Relocations 
a. 
Pipe which utilizes proprietary joints such as Fastite, by American Cast 
Iron Pipe Company, Tyton by U.S. Pipe Incorporated, restrained joints 
described under Paragraph 3.2 of this Section, or other such joints shall 
be installed in strict accordance with the manufacturer's instructions. 
4. 
Mechanical Coupling Joints: 
a. 
Prior to the installation and assembly of mechanical couplings, the joint 
ends shall be cleaned thoroughly with a wire brush to remove foreign 
matter.  Following this cleaning, lubricant shall be applied to the rubber 
gasket or inside of the coupling housing and to the joint ends.  After 
lubrication, the gasket shall be installed around the joint end of the 
previously installed piece and the joint end of the subsequent piece shall 
be mated to the installed piece.  The gasket shall be positioned and the 
coupling housing placed around the gasket and over the grooved or 
shouldered joint ends.  The bolts shall be inserted and the nuts screwed up 
tightly by hand.  The bolts shall then be tightened uniformly in order to 
produce an equal pressure on all parts of the housing.  When the housing 
clamps meet metal to metal, the joint is complete and further tightening is 
not required. 
I. 
Backfilling: 
1. 
Place backfill as construction progresses.  Backfill by hand and use power 
tampers until pipe is covered by at least 1 foot of fill. 
J. 
Connections to Valves: 
1. 
Install valves as shown. 
2. 
Provide suitable adapters when valves and piping have different joint types. 
3. 
Provide thrust restraint at all valves at pipeline terminations. 
K. Transitions from One Type of Pipe to Another: 
1. 
Provide all necessary adapters, specials and connection pieces required when 
connecting different types and sizes of pipe or connecting pipe made by 
different manufacturers. 
L. Closures: 
1. 
Provide all closure pieces shown or required to complete the Work. 
3.2       THRUST RESTRAINT 
A. Provide thrust restraint on all pressure piping systems and where otherwise shown 
and specified.  Pipe joints shall be restrained as specified in Paragraph 3.2.C of this 
Section. 
B. Thrust restraint shall be accomplished by means of restrained pipe joints.  Concrete 
thrust blocks shall be used only when specifically shown on the Drawings or as 
directed by the CONSTRUCTION MANAGER.  Thrust restraints shall be 
designed for the axial thrust exerted by the test pressure given in the Buried Piping 
Schedule.

March 2022 
  
City of Chandler 
21-047 
15051-10 
Chandler Heights Road Utility Relocations 
C. Restrained Pipe Joints: 
1. 
Pipe joints shall be restrained by means suitable to the type of pipe being 
installed. 
a. 
Ductile iron push-on joints and mechanical joints shall be restrained 
utilizing a proprietary restrained joint system such as American Fast-Grip 
and American Flex-Ring Joint, MEGALUG Ductile Iron Pipe Restraints 
as manufactured by EBAA Iron Inc., TR Flex Gripper Ring and TR Flex 
Joints, and tie rods, or other system approved by CONSTRUCTION 
MANAGER.   
b. 
Pipe thrust restraint shall be in accordance with the Schedule of 
Restrained Pipe Lengths and as noted on the Project Drawings. 
2. 
Schedule of Restrained Pipe Lengths:  Restrained pipe lengths shall conform 
to the requirements of AWWA M41 for ductile iron pipe.  Restrained pipe 
lengths shall be as shown on the Construction Plans.  For pipe not specifically 
illustrated on the Plans, CONTRACTOR shall submit a lay schedule 
identifying restrained lengths complying with AWWA M41. 
D. Concrete Thrust Blocks: 
1. 
Thrust blocks shall be constructed of Class “B” concrete, conforming to the 
requirements of MAG. 
2. 
Blocks shall be placed against undisturbed soil as shown on Drawings or as 
directed by the CONSTRUCTION MANAGER. Concrete shall be placed so 
that pipe joints and fitting joints will be accessible for repair. 
3. 
Size of the concrete thrust blocks shall be per MAG details or as directed by 
the CONSTRUCTION MANAGER. 
4. 
Concrete thrust blocks shall not be used for pipe restraint except where 
specifically shown on the Drawings, or as approved by the CONSTRUCTION 
MANAGER. 
3.3       WORK AFFECTING EXISTING PIPING 
A. Location of Existing Piping: 
1. 
Locations of existing piping shown should be considered approximate. 
2. 
CONTRACTOR shall determine the true locations of existing piping to which 
Work is to be performed, and locations of other facilities which could be 
disturbed during earthwork operations, or which may be affected by 
CONTRACTOR'S Work already installed. 
B. Taking Existing Pipelines Out of Service: 
1. 
Do not take pipelines out of services, unless specifically provided for under 
this Project or approved by CONSTRUCTION MANAGER. 
2. 
Notify CONSTRUCTION MANAGER at least 48 hours prior to taking 
pipeline out of service. 
C. Work on Existing Pipelines: 
1. 
Cut or tap pipes as shown or required with machines specifically designed for 
this Work.

March 2022 
  
City of Chandler 
21-047 
15051-11 
Chandler Heights Road Utility Relocations 
2. 
Install temporary plugs to prevent entry of mud, dirt, water, and debris. 
3. 
Provide all necessary adapters, fittings, pipe, and appurtenances required to 
complete the Work. 
4. 
Existing pipelines that are cut and abandoned shall be adequately capped or 
filled with grout. 
3.4       TESTING OF PIPING 
A. General: 
1. 
All testing shall conform to the MAG Standard Specifications 611.  In case of 
contradiction with these Specifications the CONTRACTOR shall notify the 
CONSTRUCTION MANAGER before proceeding with the testing. 
2. 
Test all piping except as otherwise authorized by CONSTRUCTION 
MANAGER. 
3. 
Notify CONSTRUCTION MANAGER 72 hours in advance of testing. 
4. 
Provide all testing apparatus, including pumps, hoses, gauges, and fittings. 
5. 
Unless otherwise noted, pipelines shall hold specified test pressure for two 
hours. 
6. 
Repair and retest pipelines that fail to hold specified test pressure or which 
exceed the allowable leakage rate. 
7. 
Unless otherwise specified, test pressures required are at the lowest elevation 
of the pipeline section being tested. 
8. 
Conduct all tests in the presence of CONSTRUCTION MANAGER. 
9. 
Advise local authorities having jurisdiction if their presence is required during 
testing. 
10. All testing shall conform to the MAG Standard Specifications.  In case of 
contradiction with these Specifications the CONTRACTOR shall notify the 
CONSTRUCTION MANAGER before proceeding with the testing. 
B. Schedule of Pipeline Tests: 
1. 
Test piping at the test pressures listed in the Buried Piping Schedule and 
respective pipe material specification. 
2. 
All piping shall be water tested after installation, except as otherwise specified 
or directed by CONSTRUCTION MANAGER. 
3. 
For piping not included in the Schedule, the CONSTRUCTION MANAGER 
will notify CONTRACTOR in writing of the test pressure to be used. 
C. Pressure Test Procedure: 
1. 
Per MAG Standard Specification 611, all restrained pipelines shall be 
backfilled and compacted to 100% before testing, unless otherwise required or 
approved by CONSTRUCTION MANAGER.  
2. 
Allow concrete for thrust blocks to reach design strength before testing. 
3. 
Fill section to be tested slowly with water and expel all air.  Install corporation 
cocks, if necessary, to remove all air. 
4. 
Test only one section of pipe at a time. 
5. 
Apply specified test pressure for two hours and observe pressure gage.  Check 
carefully for leaks while test pressure is being maintained.

March 2022 
  
City of Chandler 
21-047 
15051-12 
Chandler Heights Road Utility Relocations 
D. Leakage Testing: 
1. 
Conduct leakage test for all liquid piping after satisfactory completion of 
pressure test. 
2. 
Allow all pipes to stand full of water at least 24 hours prior to starting leakage 
test. 
3. 
Maintain test pressure constantly for the minimum test period and accurately 
measure the amount of water which must be added to maintain the test 
pressure. 
4. 
Allowable Leakage in piping system shall be per MAG Standard Specification 
611.2.2 
5. 
Leakage Test Procedure: 
a. 
Examine exposed pipe, joints, fittings, and valves.  Repair visible leakage 
or replace the defective pipe, fitting, or valve. 
b. 
Refill the line under test to reach the required test pressure. 
c. 
Provide a test container filled with a known quantity of water at the start 
of the test.  Attach the test pump suction to the test container. 
d. 
Pump water from the test container into the line with the test pump to hold 
the specified test pressure for the test period.  Water remaining in the 
container shall be measured and the amount used during the test shall be 
recorded on the test report. 
e. 
Perform all repair, replacement, and retesting required because of failure 
to meet testing requirements. 
f. 
Leakage shall be less than rate specified above. 
3.5       DISPOSAL OF WATER 
A. CONTRACTOR shall provide suitable means for disposal of test and flushing 
water so that no damage results to facilities or waterways. 
B. Means of disposal of test and flushing water shall be subject to the approval of 
CONSTRUCTION MANAGER, local governing authorities, and regulatory 
agencies. 
C. CONTRACTOR shall be responsible for any damage caused by his water disposal 
operations. 
3.6       CLEANING 
A. Cleaning: 
1. 
Thoroughly clean all piping and flush prior to placing in service in a manner 
approved by CONSTRUCTION MANAGER. 
2. 
Piping 24-inches in diameter and larger shall be inspected from inside and all 
debris, dirt and foreign matter removed. 
3. 
If piping that requires disinfection has not been kept clean during storage or 
installation, CONTRACTOR shall swab each section individually before 
installation with a 5% hypochlorite solution, to ensure clean piping.

March 2022 
  
City of Chandler 
21-047 
15051-13 
Chandler Heights Road Utility Relocations 
3.7       PIPING SCHEDULE 
A. The following abbreviations are used in the Buried Piping Schedule: 
1. 
Service Abbreviations: 
a. 
Potable Water: W. 
b. 
Reclaimed Water:  RW. 
2. 
Material Abbreviations: 
a. 
Asbestos Concrete Pipe:  ACP 
b. 
Chlorinated Polyvinyl Chloride:  CPVC 
c. 
Copper Pipe:  COP 
d. 
Ductile Iron Pipe:  DIP 
e. 
Glass-Lined Ductile Iron Pipe:  GDIP 
f. 
Galvanized Steel:  GST 
g. 
Polyethylene:  PE 
h. 
Polyvinyl Chloride:  PVC 
i. 
Stainless Steel Pipe:  SST 
j. 
Vitrified Clay Pipe:  VCP 
3. 
Lining/Coating Abbreviations: 
a. 
Bituminous Coated:  BC 
b. 
Cement Mortar Lined:  CML 
c. 
Galvanized:  GALV 
d. 
Glass Lined:  GL 
e. 
Polyethylene Wrap:  PE 
f. 
Protecto 401 Ceramic Epoxy:  CE 
g. 
T-Lock:  TL 
h. 
Painting:  P (Painted per Section 09900) 
4. 
Joint Abbreviations: 
a. 
Bell and Spigot:  BS 
b. 
Butt Wrapped:  BW 
c. 
Flanged:  FL 
d. 
Mechanical Joint:  MJ 
e. 
Soldered:  SD  
f. 
Solvent Welded:  SW 
g. 
Welded:  W

March 2022 
  
City of Chandler 
21-047 
15051-14 
Chandler Heights Road Utility Relocations 
BURIED PIPING SCHEDULE 
 
Service 
Material Interior 
Lining 
Exterior 
Coating 
Pressure Class 
Joint 
Test Pressure 
(psig) 
Potable Water (Up to 
12-inch Diameter) 
DIP 
CML 
BC,PE 
350 
MJ/BS 
200 
Potable Water 
(Larger than 12-inch 
Diameter)  
DIP 
CML 
BC,PE 
250 
MJ/BS 
188 
Potable Water (Less 
than 2-inch 
Diameter) 
COP 
N/A 
PE 
350 
SD 
200 
Sanitary Sewer 
ASTM 
C700 
VCP 
N/A 
N/A 
Extra Strength 
BS 
3.5 
 
 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15061-1 
Chandler Height Road Utility Relocations 
SECTION 15061 
DUCTILE IRON PIPE 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope:  
1. 
CONTRACTOR shall provide all labor, materials, equipment, and incidentals 
as shown, specified, and required to furnish and install ductile iron pipe and 
fittings.   
2. 
The extent of ductile iron pipe to be furnished is shown on the Drawings and 
in the schedules included in Section 15051, Buried Piping Installation. 
B. Definition:  Where cast iron pipe is specified, the term and symbol shall mean 
ductile iron pipe. 
C. Related Work Specified Elsewhere: 
1. 
Section 11295, Hydraulic Valves. 
2. 
Section 15050, Piping Systems. 
3. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. Manufacturer Qualifications:  Manufacturer shall have a minimum of five years of 
experience in the production of ductile iron pipe and fittings and shall show 
evidence of satisfactory service in at least five installations. 
B. Unless otherwise specified, references to documents shall mean the documents in 
effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective 
date of the Agreement if there were no Bids).  If referenced documents have been 
discontinued by the issuing organization, references to those documents shall mean 
the replacement documents issued or otherwise identified by that organization or, 
if there are no replacement documents, the last version of the document before it 
was discontinued.  Where document dates are given in the following listing, 
references to those documents shall mean the specific document version associated 
with that date, whether or not the document has been superseded by a version with 
a later date, discontinued, or replaced. 
1. 
ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250, 
and 800. 
2. 
ANSI B16.5 - Pipe Flanges and Flanged Fittings. 
3. 
ASTM C150 - Portland Cement. 
4. 
AWWA C104 (ANSI A21.4) - Cement Mortar Lining for Ductile Iron and 
Gray Iron Pipe and Fittings for Water.

March 2022 
  
City of Chandler 
21-047 
15061-2 
Chandler Height Road Utility Relocations 
5. 
AWWA C105 (ANSI A21.5) - Polyethylene Encasement for Ductile Iron 
Piping for Water and Other Liquids. 
6. 
AWWA C110 (ANSI A21.10) - Ductile Iron and Gray Iron Fittings, 3" 
Through 48", for Water and Other Liquids. 
7. 
AWWA C111 (ANSI A21.11) - Rubber Gasket Joints for Ductile Iron and 
Gray Iron Pressure Pipe and Fittings. 
8. 
AWWA C115 (ANSI A21.15) - Flanged Ductile Iron and Gray Iron Pipe with 
Threaded Flanges. 
9. 
AWWA C150 (ANSI A21.50) - Thickness Design of Ductile Iron Pipe. 
10. AWWA C151 (ANSI A21.51) - Ductile Iron Pipe, Centrifugally Cast, in Metal 
Molds or Sand-Lined Molds, for Water or Other Liquids. 
11. AWWA C153 (ANSI A21.53) - Ductile Iron Compact Fittings, 3" Through 
12" for Water and Other Liquids. 
12. AWWA C600 - Installation of Ductile Iron Water Mains and Their 
Appurtenances. 
13. AWWA C606 - Grooved and Shouldered Type Joints. 
14. MAG - Uniform Standard Specifications and Details for Public Work 
Construction. 
15. City of Chandler Unified Standard Specifications. 
1.3       SUBMITTALS 
A. Shall be in accordance with Section 15050, Piping Systems, submittal information. 
B. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the paragraphs 
in the Specification Section, they shall be addressed next to the paragraph or in an 
attached letter as such and explained further with any additional information 
necessary.  If any exceptions and/or deviations are proposed to any of the 
Specifications, they shall be clearly noted as such in the submittal, and an 
explanation of any deviation and/or exception shall be provided. The 
CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
PART 2 - PRODUCTS 
2.1       GENERAL 
A. Pipe design, materials, and manufacturer shall comply with the following 
documents:

March 2022 
  
City of Chandler 
21-047 
15061-3 
Chandler Height Road Utility Relocations 
ITEM 
DOCUMENT 
Thickness Design 
AWWA C150 
Manufacturing Requirements: 
Water or Other Liquid 
 
AWWA C151 
Gravity Service Pipe 
ASTM A716 
Joints: 
Rubber Gasket 
Threaded Flange 
 
AWWA C111 
AWWA C115 
Fittings: 
Water or Other Liquid 
 
AWWA C110/AWWA C153 
Cement Mortar Lining 
AWWA C104 
Polyethylene Encasement 
AWWA C105 
 
2.2       PIPE 
A. Unless otherwise specified, ductile iron pipe shall be Pressure Class 350 for below 
ground installations and Special Thickness Class 53 for above ground. 
B. For grooved end pipe or flanged end, wall thickness shall be minimum Class 53, 
except where the specified pressure requires heavier pipe. 
C. All ductile iron pipes shall conform to the requirements of MAG Standard 
Specification Section 750 "Iron Water Pipe and Fittings." 
D. All ductile iron pipes shall be manufacturers as listed within the City of Chandler 
Approved Product List.  
2.3       GASKETS 
A. Unless otherwise specified, gasket stock shall be a synthetic rubber compound in 
which the elastomer is nitrile or neoprene. 
B. The compound shall contain not less than 50% by volume nitrile or neoprene and 
shall be free from factice, reclaimed rubber, and other deleterious substances. 
C. Gaskets shall comply with AWWA C111 for push-on and mechanical joints, and 
with AWWA C606 for grooved end joints. 
D. For high temperature gaskets refer to section 15050, Piping Systems. 
2.4       FITTINGS 
A. Parent pipe and branch outlets shall be centrifugally cast ductile iron pipe designed 
in accordance with ANSI/AWWA C150/A21.50 and manufactured in accordance 
with ANSI/AWWA C151/A21.51.  Minimum class shall be Thickness Class 53.

March 2022 
  
City of Chandler 
21-047 
15061-4 
Chandler Height Road Utility Relocations 
B. Ends shall be flanged, restrained mechanical joint, or restrained push-on to suit the 
condition specified, except for transmission mains where indicated otherwise on 
the Drawings. 
C. The AWWA C153 compact ductile iron fittings in sizes 3-inches through 12-inches 
are an acceptable substitute for standard fittings, unless otherwise specified. 
D. Long radius elbows shall be provided where specified. 
E. Welded-on outlets shall be limited to branch outlets having a nominal diameter less 
than 70% of the nominal diameter of the main line pipe (maximum size of 30-
inches). Welded-on outlets may be provided for tees, tangential outlets, or lateral 
outlets fabricated at a specific angle to the main line pipe as shown on the Drawings.  
Welded-on outlets shall be fabricated by the pipe manufacturer at the same facility 
where the pipe is produced.  The pipe cement mortar lining shall only be applied or 
repaired after the outlet has been welded on at the manufacturing facilities where 
the pipe is produced.  The pipe manufacturer shall have a minimum of five years 
experience in the fabrication and testing of outlets of similar size and configuration 
as shown on the Drawings or specified herein. 
F. Weldment for welded-on outlets shall be based on the method described in Section 
VII of the ASME Unified Pressure Vessel Code.  Reinforcing welds shall be placed 
using Ni-Rod FC 55 cored wire or Ni-Rod 55 electrodes manufactured by INCO 
Alloys (or an electrode with equivalent performance properties).  Carbon steel 
electrodes are not acceptable.   
G. All ductile iron pipe fittings shall be as manufactured by the same manufacturer as 
the ductile iron pipe. 
2.5       JOINTS 
A. Push-On Joints:  
1. 
Push-on joints shall be the rubber ring compression type suitable for buried 
service.  Unrestrained push-on joints shall be Fastite Joint as manufactured by 
American Cast Iron Pipe Company, the Tyton Joint as manufactured by U.S. 
Pipe, or equal.  This joint is not permitted on fittings or specials, unless 
otherwise specified.  Push-on joints shall have an allowable deflection of up to 
5 degrees at specified pressures.  Joint assembly and field cuts shall be made 
in strict conformance with AWWA C600 and pipe manufacturer's 
recommendations. 
B. Flange Assemblies: 
1. 
Unless otherwise specified, flanges shall be ductile iron and shall be threaded-
on flanges conforming to ANSI/AWWA A21.15/C115 or cast-on flanges 
conforming ANSI/AWWA A21.10/C110. 
2. 
Flanges shall be adequate for 250 psi working pressure. 
3. 
Bolt circle and bolt holes shall match those of ANSI B16.1, Class 125 flanges 
and ANSI B16.5, Class 150 flanges.

March 2022 
  
City of Chandler 
21-047 
15061-5 
Chandler Height Road Utility Relocations 
4. 
Where specified, flanges shall be threaded-on or cast-on flanges conforming 
to ANSI B16.1, Class 250. 
5. 
Unless otherwise specified, bolts and nuts for flange assemblies shall conform 
with the requirements of Section 15120, Piping Specialties and Accessories.  
Gaskets shall be as specified with the requirements of Section 15120, Piping 
Specialties and Accessories. 
C. Mechanical Joints: 
1. 
Where specified, restrained mechanical joints shall be the positive restraint 
type.  Mechanical joints with retainer glands are not acceptable. 
2. 
Locked mechanical hydrant tees, bends, and adapters are an acceptable 
substitute for anchoring fire hydrants and valves to the pipe main. 
D. Restrained Joints: 
1. 
Unless otherwise specified, restrained joints shall be flanged or grooved end 
for exposed service and push-on or grooved end for buried service.  Restrained 
pipe shall be applied the entire length of pipe as shown on the Construction 
Drawings. 
2. 
Restrained joints for pipe and fittings shall be as listed within City of Chandler 
Approved Product List.  
3. 
Restrained joints shall be capable of being deflected after full assembly.   
4. 
Joint assembly shall be in strict conformance with AWWA C600 and 
manufacturer's recommendations.   
5. 
No field cuts of restrained pipe are permitted without prior approval of the 
Construction Manager.   
E. Bolts and Nuts: 
1. 
Corrosion-resistant bolts and nuts for use with ductile iron joints shall be high-
strength, low-alloy steel as specified in ANSI/AWWA C111/A21.11. 
2. 
Below grade installations require type 316 stainless steel. 
2.6       PIPE COATING 
A. Unless otherwise specified, pipe and fittings shall be coated with asphaltic material 
as specified in AWWA C151. 
B. Polyethylene Encasement: 
1. 
All buried ductile iron pipe and fittings shall be wrapped with polyethylene 
film in tube form as specified in AWWA C105 and MAG Section 610. 
2.7       PIPE LINING 
A. Cement mortar lining. 
B. Unless otherwise specified, interior surfaces of pipe and fittings shall be cement 
mortar lined in accordance with AWWA C104.

March 2022 
  
City of Chandler 
21-047 
15061-6 
Chandler Height Road Utility Relocations 
C. Cement shall be ASTM C150, Type II or V, low alkali, containing less than 0.60% 
alkalies. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. General: 
1. 
Piping runs specified on the Drawings shall be followed as closely as possible.  
Proposed deviations shall be submitted in accordance with Section 01300, 
Submittals. 
2. 
Pipe shall be installed in accordance with AWWA C600 and MAG Section 
610. 
B. Insulating Sections: 
1. 
Where a metallic non-ferrous pipe or appurtenance is connected to ferrous pipe 
or appurtenance, an insulating section shall be provide. 
C. Anchorage: 
1. 
Anchorage shall be provided as specified.  Calculations and Drawings for 
proposed alternative anchorage shall be submitted in accordance with Section 
01300, Submittals. 
3.2       ACCEPTANCE TESTING 
A. Hydrostatic pressure tests shall be conducted in accordance with Section 4 of 
AWWA C600, except that test pressures and allowable leakage shall be as listed in 
Section 15050, Piping Systems. 
B. The CONTRACTOR shall conduct the tests in the presence of the 
CONSTRUCTION MANAGER and/or OWNER. 
C. All welded-on outlets shall be rated for a working pressure of 250 psi and must 
have a minimum safety factor of 2.0 based on proof of design hydrostatic test 
results.  
D. Prior to the application of any coating or lining in the outlet area all weldments for 
branch outlets to be supplied on this project shall be subject to an air pressure test 
of at least 15 psi.  Air leakage is not acceptable.  Any leakage shall be detected by 
applying an appropriate soapy water solution to the entire exterior surface of the 
weldment and adjoining pipe edges or by immersing the entire area in a vessel of 
water and visually inspecting the weld surface for the presence of air bubbles.  Any 
weldment that shows signs of visible leakage shall be repaired and retested in 
accordance with the manufacturer's written procedures.

March 2022 
  
City of Chandler 
21-047 
15061-7 
Chandler Height Road Utility Relocations 
3.3       POLYETHYLENE TUBE 
A. Polyethylene encasement shall be used on all buried ductile iron pipe, unless 
otherwise specified.  Installation of polyethylene shall be as specified in MAG 
Section 610 and these Specifications.  Pipe, fittings, valves, and couplings shall be 
wrapped.  Fittings that require concrete backing shall be wrapped prior to placing 
the concrete. 
B. The polyethylene tube seams and overlaps shall be wrapped and held in place by 
means of a 2-inch wide plastic backed adhesive tape.  The tape shall be Polyken 
No. 900 (polyethylene), Scotchwrap No. 50 (polyvinyl), or equal.  The tape shall 
be such that the adhesive shall bond securely to both metal surfaces and 
polyethylene film.  Bedding and initial backfill for polyethylene wrapped pipe shall 
be a well-graded granular material which will not cut or damage the polyethylene 
tube during placement and backfilling.  Sharp angular material over 0.5-inches shall 
not be used with polyethylene encasement. 
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15064-1 
Chandler Heights Road Utility Relocations 
SECTION 15064 
COPPER PIPE 
PART 1 - GENERAL 
1.1       DESCRIPTION 
A. Scope: 
1. 
CONTRACTOR shall provide all labor, materials, equipment and 
incidentals, as shown, specified, and required to furnish and install copper 
pipe and fittings. 
2. 
The extent of copper pipe is shown and specified in the schedules included in 
Sections 15051, Buried Piping Installation. 
3. 
All jointing materials, end caps, and other appurtenances and accessories 
shall be provided. 
4. 
It is the intent of the Contract Documents to provide complete and workable 
piping systems.  Any supplementary fittings and appurtenances required for 
proper completion of the Work shall be considered as having been included 
under this Section. 
B. Related Sections: 
1. 
Section 15051, Buried Piping Installation. 
1.2       QUALITY ASSURANCE 
A. Manufacturer's Qualifications: 
1. 
Manufacturer shall have a minimum of five years of experience in the 
production of copper pipe and fittings, and shall show evidence of 
satisfactory service in at least five installations. 
2. 
Each type of pipe and fitting shall be obtained from no more than one 
manufacturer. 
B. Requirements of Regulatory Agencies:  Comply with the applicable provisions of 
the following regulatory agencies, where applicable: 
1. 
Underwriters' Laboratories, Inc. 
2. 
National Fire Protection Association. 
3. 
ASME, Boiler and Pressure Vessel Code. 
4. 
State and Local Building Codes and Ordinances. 
5. 
Uniform Plumbing Code. 
C. Reference Standards:  Comply with applicable provisions and recommendations 
of the following, except as otherwise shown or specified. 
1. 
ANSI B16.22, Wrought Copper and Copper Alloy Solder Joint Pressure 
Fittings. 
2. 
ANSI B16.26, Cast Copper Alloy Fittings for Flared Copper Tubes.

March 2022 
  
City of Chandler 
21-047 
15064-2 
Chandler Heights Road Utility Relocations 
3. 
ASTM B32, Specification for Solder Metal. 
4. 
ASTM B42, Specification for Standard Size Seamless Copper Pipe. 
5. 
ASTM B68, Specification for Bright Annealed Seamless Copper Tube. 
6. 
ASTM B75, Specification for Seamless Copper Tube. 
7. 
ASTM B88, Specification for Seamless Copper Water Tube. 
8. 
ASTM B280, Specification for Seamless Copper Tube for Air-Conditioning 
and Refrigeration Field Service. 
9. 
ASTM B302, Specification for Threadless Copper Pipe. 
10. ASTM B306, Specification for Copper Drainage Tube (DWV). 
D. Inspection:  The quality of all materials provided and adequacy of installation 
shall be subject to the review and approval of the CONSTRUCTION 
MANAGER. 
1.3       SUBMITTALS  
A. Shop Drawings:  Submit for approval the following: 
1. 
Detailed drawings and data on pipe fittings and appurtenances.  Submit these 
with Shop Drawings required under Section 15051, Buried Piping 
Installation. 
B. Certificates:  Where specified or otherwise required by the CONSTRUCTION 
MANAGER, submit test certificates.  Submit Certificates of Compliance with 
referenced standards. 
C. Each Shop Drawing submittal shall include a hard copy of the relevant 
Specification Section.  Each and every paragraph of the Specification Section 
shall be clearly marked to indicate whether the requirements for equipment and/or 
services in the Specification Section are met.  If clarifications are needed to any of 
the paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected. 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Refer to Section 15051, Buried Piping Installation.

March 2022 
  
City of Chandler 
21-047 
15064-3 
Chandler Heights Road Utility Relocations 
PART 2 - PRODUCTS 
2.1       MATERIALS 
A. Threadless Copper Pipe:  Pipe shall be assembled with brazing-joint pipe fittings. 
Material shall conform to ASTM B302. 
B. Couplings and Fittings for Copper Tubing: 
1. 
Unless otherwise specified, couplings for copper tubing 2-inch and smaller 
nominal diameter shall be compression type, bronze or brass, capable of 
holding the full bursting strength of the tubing and shall meet the 
requirements of ANSI B16.26. 
2. 
Product and Manufacturer:  Provide fittings and couplings for copper tubing 
by one of the following: 
a. 
Swagelok. 
b. 
Gyrolok. 
c. 
Or equal. 
C. No galvanized pipe or fittings shall be used for this installation. 
2.2       JOINTING 
A. Reclaimed water piping shall be assembled with soldered type joints.  Fittings 
shall conform to ANSI B 16.22, Wrought Copper and Copper Alloy Solder Joint 
Pressure Fittings. 
B. Soldered joints shall be 95-5 tin-antimony solder, conforming to ASTM B32. 
C. All joints shall conform to manufacturer's recommendations and shall be made by 
skilled workmen. 
D. Joints shall develop full strength and shall be greater than the pipe joined. 
2.3       MARKING 
A. All items shall be marked or labeled with the following information: 
1. 
Metal or alloy designation. 
2. 
Temper. 
3. 
Size and schedule. 
4. 
ASTM specification number. 
5. 
Name and location of supplier.

March 2022 
  
City of Chandler 
21-047 
15064-4 
Chandler Heights Road Utility Relocations 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Refer to Section 15051, Buried Piping Installation, for installation, testing and 
cleaning. 
B. Dielectric Protection:  Copper tubing or fittings shall not be permitted to come in 
contact with steel piping, reinforcing steel, or other steel at any location.  
Electrical checks shall be made to ensure no contact is made between copper 
tubing and steel elements.  Wherever electrical contact is demonstrated by such 
test, CONTRACTOR shall provide dielectric protection as specified in Section 
15120, Piping Specialties and Accessories. 
C. All copper piping being buried shall be provided with a protective covering or 
wrapping such as polyethylene wrap as specified in MAG Section 610.6 – 
Polyethylene Corrosion Protection.  
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15067-1 
Chandler Heights Road Utility Relocations 
SECTION 15067 
VITRIFIED CLAY PIPE 
PART 1 - GENERAL 
1.1       SUMMARY 
A. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as 
shown on the plans, specified and required to furnish and install vitrified clay pipe, 
fittings and appurtenances. 
B. Any pipe, which does not meet specifications or has been rejected, shall be removed 
from the job site at no cost to the owner. 
C. The extent of vitrified clay pipe is shown within the Drawings and in the schedules 
included in Section 15051, Buried Piping Installation. 
1.2       SECTION INCLUDES 
A. Vitrified Clay Pipe (VCP). 
1.3       RELATED SECTIONS 
A. Section 15050, Piping Systems.  
B. Section 15051, Buried Piping Installation. 
1.4       REFERENCES 
A. National Clay Pipe Institute (NCPI) Engineering Manual 
B. ASTM C12 – Standard Practice for Installing Vitrified Clay Pipe 
C. ASTM C301 – Test Methods for Vitrified Clay Pipe 
D. ASTM C425 – Compression Joints for Vitrified Clay Pipe and Fittings 
E. ASTM C700 – Vitrified Clay Pipe, Extra Strength, Standard Strength, and Perforated 
F. ASTM C828 – Test Method for Low-Pressure Air Test of Vitrified Clay Pipe Lines 
G. ASTM C896 – Terminology Relating to Clay Products 
H. ASTM C1091 – Test Method for Hydrostatic Infiltration Testing of Vitrified Clay 
Pipe Lines

March 2022 
  
City of Chandler 
21-047 
15067-2 
Chandler Heights Road Utility Relocations 
1.5       SUBMITTAL 
A. Shop Drawings:  Submit for approval the following: 
1. 
Detailed drawings and data on pipe, fittings, gaskets, and appurtenances.  
Submit these with Shop Drawings required under Section 15051, Buried Piping 
Installation.  
B. The manufacturer shall submit design calculations to the ENGINEER.  The design 
calculations shall be signed and sealed by a Registered Professional Engineer 
licensed in the State of Arizona.  The design calculations shall indicate that the pipe 
wall thickness will be satisfactory for all conditions of external pressure and earth 
loadings, special physical loadings, and internal pressure. 
C. Certificates:  Submit certificates of compliance with referenced standards. 
D. Also shall be in accordance with Section 15050, Piping Systems submittal 
information. 
1.6       PRODUCT DELIVERY, STORAGE AND HANDLING 
A. Refer to Section 15051, Buried Piping Installation. 
B. Refer to Manufacturer’s recommendations. 
PART 2 - PRODUCTS 
2.1       SERVICE CONDITIONS 
A. General: 
1. 
Pipe shall be designed for an external live loading, including impact, equal to 
AASHTO, H-20 truck loading with earth cover as shown on the Drawings.  The 
external loading shall be calculated in accordance with the National Clay Pipe 
Institute (NCPI) Engineering Manual and as modified in accordance with the 
City of Chandler Standard Specifications. 
B. Service Conditions: 
1. 
Liquid Service:  (Refer to Section 15051, Buried Piping). 
2. 
Pipe overburden and trench bedding condition:  Refer to Drawings. 
3. 
Pipe should be able to attain the full design life of the pipe when surrounding 
earth is at a continuous temperature of up to 90oC. 
2.2       MATERIALS 
A. All materials used in the manufacturing of the piping and its components shall be 
new and of the best quality used for the purpose of commercial practice.

March 2022 
  
City of Chandler 
21-047 
15067-3 
Chandler Heights Road Utility Relocations 
2.3       VITRIFIED CLAY PIPE (VCP) AND FITTINGS 
A. General: 
1. 
All VCP and fittings shall be suitable for use as a gravity sewer conduit. VCP 
shall be Extra Strength Vitrified Clay Pipe conforming to all the requirements of 
ASTM C700 and MAG Specifications Section 743. 
2. 
Fittings shall be made to such dimensions as will accommodate the joint system 
specified. Wye and Tee branch fittings shall be furnished with spurs securely 
fastened by the manufacturer to the barrel of the fitting. There shall be no 
projection on the inner surface of the barrel. 
3. 
Joints for vitrified clay pipe and fittings shall be factory applied, mechanical, 
flexible-compression type and shall conform to ASTM C425 – Compression 
Joints for Vitrified Clay Pipe and Fittings. Clay pipe joint material must be 
polyurethane. The polyurethane joint must be a standard joint for the pipe 
manufacturer furnishing pipe on this project for a minimum of five years for all 
pipe sizes specified. The polyurethane joint must meet all requirements of 
ASTM C425. 
a. 
Rubber couplings used for mainline connections or reconnecting services 
shall be a stainless steel shielded rubber coupling. Gasket to meet ASTM 
C-425-91 Table 2. Shear ring to be Series 300 stainless steel with a 
minimum thickness of .012". Tightening bands shall be Series 316 stainless 
steel with stainless steel nut and bolt tightening clamps. Shear ring and 
clamps to meet all requirements of ASTM A-240-94A. 
4. 
All pipe load tested shall be loaded to the ultimate limit.  The load test is 
destructive and any pipe section tested shall be rejected from installation. 
PART 3 - EXECUTION 
3.1       TRENCHING, BACKFILLING, AND SUBGRADE PREPARATION 
A. Trenching, backfilling, and sub-grade preparation shall conform to MAG 
Specifications Section 601 and 615, and the City of Chandler Wastewater Technical 
Design Manual.  Bury depth shall be as shown in the Plans. 
B. Sheet, shore, and brace trenches, as necessary, to prevent caving or sliding of trench 
walls, to provide protection for workmen and the pipe, and to protect adjacent 
structures and facilities. 
C. Where solid timber sheeting is driven to a level below the top of pipe, it should not 
be removed after the pipe has been installed. The sheeting may be cut off at the level 
of the top of the pipe. 
D. If a movable shield is used, it is imperative that pipe already laid be securely blocked 
or braced to prevent opening of pipe joints when the shield is advanced in the trench.

March 2022 
  
City of Chandler 
21-047 
15067-4 
Chandler Heights Road Utility Relocations 
E. The bedding shall be placed on a flat undisturbed or restored trench bottom with a 
minimum thickness beneath the pipe barrel of 6 inches or one eighth of the outside 
diameter of the pipe, whichever is greater. "Carefully placed material" shall be sliced 
in the haunches of the pipe with a flattened shovel or other suitable tool. 
F. Pipe barrel shall be placed so that it is true to line and grade and to provide uniform 
and continuous support. 
G. A foundation may be required if soft, spongy, unstable, or other similar material is 
encountered upon which bedding material or pipe is to be placed. Unstable material 
shall be removed to a depth ordered by the Engineer and replaced with foundation 
material suitably densified. 
3.2       TESTING 
A. The CONTRACTOR shall be responsible for testing all pipelines.  All testing shall 
be performed in the presence of the CONSTRUCTION MANAGER and conform to 
the following paragraphs. 
B. After installation, backfilling, compaction, cleaning and before paving, acceptance 
testing shall be performed by low pressure air testing. 
C. Air Testing 
a. 
Testing shall be performed by the low pressure air test method conforming 
to ASTM C828 - Standard Test Method for Low Pressure Air Test of 
Vitrified Clay Pipe or per MAG Standard Specification 611.4.

March 2022 
  
City of Chandler 
21-047 
15067-5 
Chandler Heights Road Utility Relocations 
 
Table 1 
Minimum Test Time for Various Pipe Sizes 
 
Nominal  
Pipe Size, in. 
T (time) 
min/100 ft 
Nominal  
Pipe Size, in. 
T (time) 
min/100 ft 
 
 
 
 
4 
0.3 
24 
3.6 
6 
0.7 
27 
4.2 
8 
1.2 
30 
4.8 
10 
1.5 
33 
5.4 
12 
1.8 
36 
6.0 
15 
2.1 
39 
6.6 
18 
2.4 
42 
7.3 
21 
3.0 
 
 
 
Lines which fail any testing will be evaluated, repaired/replaced and retested for compliance 
with these specifications and the cost of any re-testing shall be borne by the contractor. 
D. Pressure testing for Gravity Pipe: 
1. 
Shall be in accordance with Section 15050, Piping Systems.  
++  END OF SECTION  ++

March 2022 
  
City of Chandler 
21-047 
15120-1 
Chandler Heights Road Utility Relocations 
SECTION 15120 
PIPING SPECIALTIES AND ACCESSORIES 
PART 1 - GENERAL  
1.1       DESCRIPTION  
A. Scope:  
1. 
CONTRACTOR shall provide all labor, materials, equipment, and 
incidentals as shown, specified, and required to furnish and install all piping 
specialties and accessories.  Included, but not limited to, are flexible 
couplings, mechanical couplings, flanged adapters, expansion joints, saddle 
taps. 
B. Related Work Specified Elsewhere: 
1. 
Division 15, Mechanical, Sections on piping and piping systems. 
1.2       QUALITY ASSURANCE  
A. Manufacturer's Qualifications: 
1. 
Manufacturer shall have a minimum of five years of experience in the 
production of substantially similar types of piping specialties specified and 
shall show evidence of satisfactory service in at least five installations. 
2. 
Each type of piping specialty and accessory shall be the product of one 
manufacturer. 
1.3       SUBMITTALS  
A. Descriptive submittals shall be made in accordance with Section 01300, 
Submittals. 
B. Coordinate these with Shop Drawings required for the piping systems. 
C. Each Shop Drawing submittal shall include a copy of the relevant Specification 
Section.  Each and every paragraph of the Specification Section shall be clearly 
marked to indicate whether the requirements for equipment and/or services in the 
Specification Section are met.  If clarifications are needed to any of the 
paragraphs in the Specification Section, they shall be addressed next to the 
paragraph or in an attached letter as such and explained further with any 
additional information necessary.  If any exceptions and/or deviations are 
proposed to any of the Specifications, they shall be clearly noted as such in the 
submittal, and an explanation of any deviation and/or exception shall be provided. 
The CONTRACTOR shall furnish equipment and/or services as specified if an 
exception and/or deviation is rejected.

March 2022 
  
City of Chandler 
21-047 
15120-2 
Chandler Heights Road Utility Relocations 
1.4       PRODUCT DELIVERY, STORAGE, AND HANDLING 
A. Refer to Division 15, Mechanical, Sections on piping and piping systems. 
PART 2 - PRODUCTS  
2.1       MATERIALS  
A. Couplings:  Unless otherwise specified, piping 2-inches in diameter and larger 
passing from concrete to earth shall be provided with two pipe couplings or 
flexible joints as specified within 2 feet or one pipe diameter of the structure, 
whichever is greater. 
1. 
Below-Grade Restrained Type Coupling: 
a. 
Pressure and Service:  Same as connected piping. 
b. 
Material:  ASTM A536 Ductile Iron. 
c. 
Gasket:  Suitable for water service and specification 15050.  
d. 
Bolts and Nuts:  Type 316 stainless steel bolts and nuts. 
e. 
Product and Manufacturer:   
1) Per City of Chandler Approved Product List 
2) No approved equal. 
2. 
Sleeve Type, Couplings:  
a. 
Pressure and Service:  Same as connected piping. 
b. 
Material: Carbon steel for carbon steel and exposed ductile iron piping 
systems, or stainless steel for stainless steel and buried or submerged 
ductile iron piping systems. 
c. 
Gasket:  Suitable for water service – NSF 61 Certified and specification 
15050.  
d. 
Bolts and Nuts:  Alloy steel, corrosion-resistant, prime coated.  Buried 
couplings shall have Type 316 stainless steel bolts and nuts. 
e. 
Harnessing:  
1) Harness couplings to restrain pressure piping.  Test pressures for 
pressure pipelines shall conform to the requirements of Section 
15050, Piping Systems. 
2) Adjacent flanges shall be tied with bolts of corrosion resistant alloy 
steel.  Provide flange mounted stretcher bolt plates as shown on the 
Drawings and to be designed by manufacturer, unless otherwise 
approved by the ENGINEER.  
3) Conform to dimensions, size, spacing and materials for lugs, bolts, 
washers and nuts as recommended by manufacturer and approved 
by ENGINEER for the pipe size, wall thickness and test pressure 
required.  However, the following minimum bolting shall be 
provided, unless otherwise approved by the ENGINEER.

March 2022 
  
City of Chandler 
21-047 
15120-3 
Chandler Heights Road Utility Relocations 
 
  Pipe  
 
 
 
   
 Bolt 
Diameter 
      Number 
      Diameter                 At 
 
(Inches)           of Bolts 
       (Inches)       
  (Degrees) 
   4 
 
 
  2 
 
 
  5/8  
 
   
180 
  6-8 
 
 
  2 
 
 
  3/4  
 
   
180 
 10-12  
 
  2 
 
 
  7/8  
    
   180 or 250 
 14-20  
 
  4 
 
 
   1  
 
 
190 
 24-48  
 
  4 
 
 
   1  
 
    
90 
   54 
 
 
  4 
 
 
   1  
 
   
250 
   60 
 
 
  4 
 
 
 1-1/4 
 
     
90 
f. 
Remove pipe stop, unless otherwise shown on the Drawings or 
specified. 
g. 
Product and Manufacturer:  Provide one of the following: 
1) Type 501, Romac Industries. 
2) Or equal. 
3. 
Flanged Adapters:  
a. 
Description:  One end of adapter shall be flanged and the other end shall 
have a sleeve type flexible coupling. 
b. 
Pressure and Service:  Same as connected piping. 
c. 
Material:  Cast iron or steel.  
d. 
Gasket:  Suitable for water service, and specification 15050. 
e. 
Bolts and Nuts:  Type 316 stainless steel. 
f. 
Harnessing:  
1) Harness adapters to restrain pressure piping.  Test pressures for 
pressure pipe lines are included in the piping schedules in Section 
15051, Buried Piping Installation. 
2) For adapters 12-inch diameter and less, provide 1/2-inch minimum 
stainless steel anchor studs installed in a pressure tight anchor boss. 
Provide number of studs required to restrain test pressure and 
service conditions.  Harness shall be as designed and recommended 
by manufacturer; however, the following minimum anchor studs 
shall be provided, unless otherwise approved by ENGINEER.  
a) 
6-inch Diameter and Less:  Two. 
b) 8-inch Diameter and Less:  Four. 
c) 
10-inch Diameter and Less:  Six. 
d) 12-inch Diameter and Less:  Eight. 
3) For adapters larger than 12-inch diameter, provide split-ring harness 
clamps with a minimum of four Type 316 stainless steel bolts.  
Harness assembly shall be as designed and recommended by 
manufacturer.  Dimensions, sizes, spacing, and materials shall be 
suitable for service and conditions encountered and shall be 
approved by ENGINEER. 
4) Harness couplings to restrain pressure piping. 
5) Test pressures for pressure pipe lines are included in Section 15051, 
Buried Piping Installation.

March 2022 
  
City of Chandler 
21-047 
15120-4 
Chandler Heights Road Utility Relocations 
6) Harnessing shall conform to the details shown on the Drawings. 
g. 
Product and Manufacturer:  Provide one of the following:  
1) Style FCA501, as manufactured by Romac Industries. 
2) Style 128, as manufactured by Dresser. 
3) Or approved equal. 
PART 3 - EXECUTION 
3.1       INSTALLATION 
A. Install piping specialties and accessories in accordance with manufacturer's 
instructions. 
B. Make adjustments to expansion joints as required to ensure that they will be fully 
extended when the ambient temperature is at minimum operating temperature and 
fully compressed at maximum operating temperature for the system in which they 
are installed. 
++  END OF SECTION  ++