Rascona

City of Chandler — Regular Meeting (2022-04-19)

View PDF Meeting page

Extracted text (via pymupdf) 3185 characters
CHANDLER FIRE DEPT.
In Memory of Mark “Bo” Boulanger
1

•
Maltese sculpture on concrete plinth
•
Pays Homage to firefighter's commitment to protect and save lives
•
Ladder, Fire Hat, axe, and hose reference some of the tools firefighters rely on to fight
fires
•
Engraved Badge on front of plinth reads: "in memory of Mark Boulanger"
Site-view
2
_____________________________________________
_________
______________________________________________

side-view
•
variety of views 360 degrees around
3

4
Back-side

•
Powder-coat
•
+Automotive Enamel
Material: steel
5
FINISH:

Description
6
"Fire and Fight" was designed to draw eyes from passers by like a bright red fire 
engine. When viewed from the front the sculpture takes the shape of the maltese 
cross- referencing the history of firefighters as protectors- and their willingness 
to lay down their own lives to save others. As viewers move around the work the 
shape changes from maltese to flame as seen from the sides; creating a tension 
between ideas (chaos and control) or more specifically: fire and fighter. Centered 
focally in the piece, the ladder, the hat, the axe, and the hose remind viewers that 
firefighters place themselves in the centers of fires whenever necessary and these 
tools specifically are some of the most iconic and enduring firefighters use to 
do their job. Inside the walls of the work itself are blue silhouettes- on one side a 
mountain, on the other a couple of buildings- these painted additions make 
reference to chandler, AZ and the surrounding area in which the Chandler FD 
serve as first responders. Last but not least is a bronze badge on the 
foundation of which the piece stands- this badge will remember Mark “Bo” 
Boulanger and his commitment to save lives. I thank you for the opportunity to put 
forth this proposal and for your service to fighting fires and protecting our 
communities.

Nicolas Rascona 
5335 E. Shea Blvd Scottsdale AZ, 85254 
ph:602-525-4599 
Email:nicolasrascona@gmail.com
Budget 
Date:
 4/2/2022
Description:
The budget for the artwork is as follows. Production will begin after final design approvals and upon receipt of deposit. If you have any 
questions or comments feel free to email me at nicolasrascona@gmail.com or call me @ 602-525-4599. 
-Nick
Cost
Totals
Totals: 
        $65,040
Services
Chandler FD Outdoor Sculpture
Item
Steel
      8000
      7000
  10000
Machining/ Pipe bending
 Welding/ Fabricating
Design
  5000 
5000
3D drawings and Designs
Structural Designs
Surface Finishing
25000
 10000
 9000
10000
 3000 
   19000  
  3000 
 3000 
 3000 
Final design approvals/ deposit rec'd 
 Work Installed 
6 months from deposit
Production begins 
Timeline
7
Grinding/ sanding
Powder-coat/ Automotive enamel
5040 
 Overhead  Shop Fee 
Transport/ Install
Tax
2,960 dollars of available funds remain in the budget to be 
allocated towards plinth and lighting- further discussions will be 
necessary to determine if these line items can be worked into 
the overall build project budget- cost for pouring the concrete, 
running power and installing uplighting may exceed the available 
funds/ services within this budget
Plinth
Lighting
*Pending*