TC Project Status Update May 2022
Extracted text (via pymupdf)
5001 characters
Projects Designer Contractor Status Comments PROJECT COST ESTIMATE ($MILLIONS) ROADWAY AND TRAFFIC PROJECTS ST1503, Cooper Road Imprv. [Alamosa Drive (aprx. 3,500 ft. north of Chandler Heights Road) to Riggs Road for two through lanes each direction] Entellus Pulice Construction Construction underway. Completion scheduled for mid 2022. Federal funds $19.3 ST1614, Chandler Heights Road Imprv. [McQueen Road to Gilbert Road for two through lanes each direction] Kimley-Horn tbd Construction contract award in February 2022. Long lead procurement NTP Spring 2022. Start construction Summer 2022. Federal funds $20.9 ST1616, Ocotillo Road Imprv. [Gilbert Road to 148th Street for two through lanes each direction] Ritoch-Powell tbd Open bids late January 2022. Construction contract award April 2022. Long lead NTP late Spring 2022. Start construction late Summer 2022. Federal funds $6.4 ST1804, Chandler Heights Road Imprv. [Gilbert Road to Val Vista Drive for two through lanes each direction] Kimley-Horn tbd Design in progress. Bid scheduled for Spring 2023. Federal funds $20.9 ST1908, Bicycle Detection System [40 intersections] n/a n/a Purchase of bicycle detection cameras Federal funds $1.3 ST1909, Alleyway Rehab PM10 Dust Emission Reduction n/a Cactus Asphalt Construction underway. Federal funds $2.1 ST2001, Lindsay Road Imprv. [Ocotillo Road to Hunt Highway for two through lanes in each direction] Kimley-Horn tbd Design in progress. Bid scheduled for summer 2023. Federal funds $27.2 ST2002, Traffic Study of Kyrene Road [Chandler Boulevard to Loop 202] AZTEC n/a Study complete. $0.2 ST2003, Gilbert Road Imprv. [Ocotillo Road to Chandler Heights Road for new traffic signals and three through lanes in each direction] Sunrise Engineering Sunland Asphalt Construction complete. $8.5 ST2004, Alma School Road Imprv. [Pecos Road to Germann Road for three through lanes in each direction to match development imprv.] Wood Sunland Asphalt Construction complete. $3.7 ST2006, Traffic Signal at Warner Road and Nevada Street Stanley Consultants tbd Design complete. Construction in 2022 $0.8 ST2007, Hamilton Street Imprv. [Appleby Road to Carob Drive] Nfra Consultants tbd Design in progress. Construction in 2022 $3.4 ST2009, Dobson Road Imprv. at Intel Driveways #1 and #4 [Price Rd / Market Pl to Chaparral Way] Premier DCS Contracting Design in progress. Funded by 20% from Intel and 80% from State TPT per ARS 42-5032.02 $0 City Cost (Intel Funded) ST2012, Arterial Congestion Monitoring [Install data collection devices at major intersections, and use data to map traffic congestion and mobility.] Y.S. Mantri & Assoc. tbd Design complete. Installation in 2022 Grant funds $0.8 ST2103, Intersection Imprv. at Ray Road and Dobson Road tbd tbd Study to begin in Feb 2022. Study only. Future phases tbd. $0.1 ST2104, Traffic Signal at Ocotillo Road and Pinelake Way Y2K Engineering tbd Design in progress. $0.8 ST2113, Alley Rehab PM10 Dust Emissions Reduction 2 (FMA Areas 16, 25, 39, and 40) Premier / Olsson tbd Design in progress. Federal funds $2.4 (tbc) PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS ST1612, Chandler Boulevard Bike Lanes [I-10 to 56th Street] Kimley-Horn Combs Construction Construction complete. Federally funded $1.3 ST1613, Downtown ADA Improvements [Downtown Chandler on Chicago Street, Washington Street, and Boston Street] J2 DNG Phase I construction complete. Phase II construction complete. Locally funded. $1.5 ST1701, McClintock Drive Bike Lanes [Loop 202 to north of Ray Road] & Kyrene Road Bike Lanes - [Chandler Boulevard to north of Ray Road] Aztec AJP Electric Construction complete. Federally funded $5.6 ST2011, Study of Price Road, Ocotillo Road, and Chandler Heights Road Separated Bike Lanes TY Lin n/a Study complete. Federally funded $0.1 ST2016, Park & Ride Shade Canopies, Phase 2 [two parking canopies covering 40 parking spaces & electric vehicle charging station] LEA-Architects TSG Constructors Construction complete. Funded with State Lottery Proceeds $0.3 ST2106, Frye Road Protected Bike Lanes [Paseo Trail to San Marcos Elementary School] TY Lin tbd Study completed by Y2K. Design underway. Construction in fall 2023. $3.2 Million grant awarded for construction and $650,000 for design. $6.0 Kyrene Branch and Highline Canal Shared Use Paths Kimley-Horn tbd Study underway. Design in FY 2022-23. Construction in 2024-25. Federal grants have been awarded to fund study, design and construction. $4.0 Ashley and Paseo Trails Connection Y2K Engineering tbd Study underway. Design in FY 2022-23. Construction in 2024-25. Study is federally funded. Construction and design grant funding will be pursued. $1.0 Price Road Flexible Transit NA Via Study completed in collaboration with Valley Metro. Contract awarded to Via. Operations scheduled to begin in July 2022. Awarded $2 Million grant for project startup and two years of operations. $2.1 Transportation Project Status - May 18, 2022