Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
1
Project No.: WA2107.401
Rev. 4/19/2022
CITY OF CHANDLER
JOB ORDER PROJECT AGREEMENT
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND
SUBSIDENCE MITIGATION
Project No. WA2107.401
This JOB ORDER PROJECT AGREEMENT (”Job Order”) is made this ________ day of _________ 2022 (“Effective
Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”) and Felix
Construction Company, an Arizona corporation, (“JOC Contractor”) and is entered into pursuant to Job
Order Master Agreement No. JOC1913.401 (“JOC Master Agreement”). City and JOC Contractor may be
referred to individually as “Party” or collectively as “Parties”).
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as follows:
RECITALS
A. On or about January 17, 2020, the Parties entered into the JOC Master Agreement, which terms and
conditions are made a part of and incorporated into this Job Order Project Agreement by this reference.
B. City proposes to engage JOC Contractor to provide construction services for Hunt Highway Water
Production Facility Ground Subsidence Mitigation as more fully described in Exhibit "A", which is attached
to and made a part of this Job Order by this reference.
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for the
compensation and fees set forth and as described in Exhibit ”B”, which is attached to and made a part of
this Agreement by this reference.
ARTICLE 1. DESCRIPTION OF WORK
The Parties enter into this Job Order Project Agreement for the HUNT HIGHWAY WATER PRODUCTION
FACILITY GROUND SUBSIDENCE MITIGATION, Project Number WA2107.401. The scope of work consists
of providing construction services for Hunt Highway Water Production Facility Ground Subsidence
Mitigation, all as more particularly set forth in Exhibit “A” attached hereto and incorporated herein by
reference.
The JOC Contractor will not accept any change of scope, or change in contract provisions, unless issued in
writing, as a contract amendment or change order and signed by the authorized signatories for each party.
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached hereto
and incorporated herein by reference, will be due prior to execution of each Job Order Project Agreement
in the full amount of each Job Order.
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
2
Project No.: WA2107.401
Rev. 4/19/2022
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement of Claims
and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively attached hereto and
incorporated herein by reference.
ARTICLE 2. PROJECT PRICE
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master Agreement a fee
not to exceed the Guaranteed Maximum Price of $466,622 determined and payable as set forth in JOC
Master Agreement and Exhibit “B” attached hereto and made a part hereof by reference.
ARTICLE 3. CONTRACT TIME & SCHEDULE
JOC Contractor agrees to complete all Construction within 120 calendar days from the Notice to Proceed
(NTP) Date.
ARTICLE 4. PARTICIPANTS
CITY:
Construction Project Manager: Russ Slotnick
Phone:
480-782-3411
Email:
Russ.slotnick@chandleraz.gov
JOC CONTRACTOR:
Felix Construction Company
2530 S. 52nd Ave.
Phoenix, AZ 85043
JOC Contractor Representative: Archie Lopez
Phone:
602-469-5208
Email:
archiel@felixconstruction.com
SIGNATURE PAGE TO FOLLOW
6/06/2022
Archie Lopez
President
Kevin Felix
City of Chandler Job Order Project Agreement
A-1
Public Works & Utilities Department, Capital Projects Division
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.: WA2107.401
Rev. 3/4//22
EXHIBIT A
SCOPE OF WORK
EXHIBIT B
FEE SCHEDULE
City of Chandler Job Order Project Agreement
B-1
Public Works & Utilities Department, Capital Projects Division
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.: WA2107.401
Rev. 3/4//22
EXHIBIT E
City of Chandler Job Order Project Agreement
E-1
Public Works & Utilities Department, Capital Projects Division
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.: WA2107.401
Rev. 3/4//22
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS
________________________, Arizona
Date ____________________________
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.:
WA2107.401
To the City of Chandler, Arizona
Gentlemen:
This is to certify that all lawful claims for materials, rental of equipment and labor used in connection with
the construction of the above project, whether by subcontractor or claimant in person, have been duly
discharged.
The undersigned, for the consideration of $________________________, as set out in the final pay estimate, as
full and complete payment under the terms of the contract, hereby waives and relinquishes any and all
further claims or right of lien under, in connection with, or as a result of the above described project. The
undersigned further agrees to indemnify and save harmless the City of Chandler against any and all liens,
claims or liens, suits, actions, damages, charges and expenses whatsoever, which said City may suffer arising
out of the failure of the undersigned to pay for all labor performances and materials furnished for the
performance of said installation.
Signed and dated at ________________, this _________ day of _______________ 20_____.
__________________________________
CONTRACTOR
By _______________________________
STATE OF ARIZONA
)
) SS
COUNTY OF MARICOPA
)
The foregoing instrument was subscribed and sworn to before me this __________ day of __________________
20 _________.
___________________________________
Notary Public
___________________________________
My Commission Expires
EXHIBIT F
City of Chandler Job Order Project Agreement
F-1
Public Works & Utilities Department, Capital Projects Division
Project Name: HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.: WA2107.401
Rev. 3/4//22
CERTIFICATE OF COMPLETION
Project:
HUNT HIGHWAY WATER PRODUCTION FACILITY GROUND SUBSIDENCE MITIGATION
Project No.:
WA2107.401
(TO BE COMPLETED BY CONTRACTOR)
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER PROJECT NO.
WA2107.401 HAVE BEEN DELIVERED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BID
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE CONTRACT HAVE BEEN
COMPLETED AS OF ____________________________.
(Date)
FIRM NAME:
________________________________
PRINCIPAL:
________________________________
(Name)
________________________________
(Signature)
________________________________ DATE: ___________________
(Title)
CERTIFIED BY ENGINEER/CONSULTANT (IF APPLICABLE):
_________________________________
DATE: ____________________
(Signature)
_________________________________
(Firm Name)
PROJECT ACCEPTED BY USER DEPARTMENT
_________________________________
DATE: ____________________
(Signature)
_________________________________
(Dept. /Div.)
_______________ Date of Final Walk-Through
_______________ Date As-Built Received