Project Name: Fire Station 282 Reconstruction CO1
Page 1
Project No.: FI2001.401
Rev. 7/20/22
CITY OF CHANDLER
CHANGE ORDER NO.
1
DATE
07/28/2022
Change Order not valid until signed by both the City and the Contractor. Contractor’s signature indicates
Agreement herewith, including any adjustments in the Agreement Price or Agreement Time.
Project Name:
Fire Station 282 Reconstruction
Project No.:
FI2001.401
User Dept.:
Fire
NTP Date:
07/28/2022
TO:
CORE Construction, Inc.
3036 East Greenway Rd. Phoenix, AZ 85032
(CONTRACTOR)
(Address)
The following contract change order for GMP No.2 in the amount of $4,311,031.00 represents the
GMP#2; Remaining portion of Work per the attached GMP#2 Exhibits D.2.0-D.2.8, dated 07/21/22
to complete the construction of the new fire station and demolition of the existing fire station
facility. An additional 13 calendar days will be added to the contract for a final completion time
of 463 calendar days. See Exh. D.2.6
OWNER NAME & DATE APPROVAL:
K.Hargis 07/28/2022
Changes result in the following revised Agreement amount and time:
Original Agreement amount:
$5,801,958.00
Current Agreement amount, prior to this Change Order: (incl. previous
Change Orders)
$5,801,958.00
Net change resulting from this Change Order: (if over $50,000 from Agreement
amount previously approved by Council, Council approval is required)
$4,311,031.00
Revised Agreement amount, including this Change Order:
$10,112,989.00
Last Agreement amount approved by Council:
$5,801,58.00
Change Order % of last Agreement amount approved by Council: (if over
10% of previous Agreement amount approved by Council, Council approval is required)
74%
Agreement time or completion date prior to this Change Order:
(incl. previous Change Orders)
450
or
Days
Date
Net change resulting from this Change Order:
13
Days
Revised Agreement time OR completion date:
463
or
Days
Date
SIGNATURE PAGE TO FOLLOW
Exhibit D.2.0 – Table of Contents
GMP Proposal Table of Contents
Attached you will find the GMP#2 Exhibits for the Phase 2; Remaining portion of Work
of the City of Chandler – Fire Station 282 Reconstruction (CoC Project No. FI2001.401) as
follows:
• Exhibit D.2.0 – GMP Proposal Table of Contents, 1 page.
• City of Chandler’s Exhibit D.2 - CM@Risk GMP Summary, dated 7/21/22, 1 page.
• Exhibit D.2.1 – Project Description, dated 7/21/22, 1 page.
• Exhibit D.2.2 – GMP Assumptions, Clarifications & Exclusions (“Basis of GMP#2”),
dated 07/21/22, 14 pages.
• Exhibit D.2.3 – List of Potential Subcontractors, dated 7/21/22, 1 page.
• Exhibit D.2.4 – Schedule of Manufacturers and Suppliers, dated 07/21/22, 1 page.
• Exhibit D.2.5 – Schedule of Values (“SOV”), dated 7/21/22 1 page.
• Exhibit D.2.6 – Baseline Project Schedule, dated 07/21/22, 1 page.
• Exhibit D.2.7 – Site Logistics Plan, 1 page.
• Exhibit D.2.8 – List of GMP Plans and Specifications, dated 7/21/22, 5 pages.
Exhibit D.2
CM @ Risk GMP Summary
Project Name
City of Chandler Fire Station #282 Reconstruction
Date:
7/21/2022
(Phase 2; Remaining portion of Work)
Project Location
1911 N Alma School Road, Chandler, AZ 85225
City of Chandler Project No.
FI2001.401
GMP #2
A. Cost of Work
A1 Cost of Work (self perform, no mark up)
-
$
A2. Cost of Work (subcontractors, suppliers, materialmen)
2,712,164
$
TOTAL COST OF WORK:
2,712,164
$
B. General Conditions
247,876
$
SUBTOTAL 1 (Cost of Work) (A + B):
2,960,040
$
C. CM@Risk's Fee
162,802
$
SUBTOTAL 2 (A+B+C):
3,122,843
$
D. Bonds and Insurance (on Subtotal 1)
D1 Bonds
38,109
$
D2 Insurance
76,221
$
TOTAL BONDS & INSURANCE:
114,330
$
SUBTOTAL 3 (SUBTOTAL 2 + BONDS & INS):
3,237,173
$
E. Sales Tax
E1 Sales Tax
183,896
$
E2 Tax Credits
-
$
TOTAL SALES TAX:
183,896
$
F. Approved Allowances
F1 Owner's Allowance
749,962
$
F2 Owners Allowance for Alerting System Allowance
125,000
$
F3 Art Allowance
15,000
$
TOTAL ALLOWANCES:
889,962
$
TOTAL GMP #2 PROPOSAL:
4,311,031
$
CoC – Fire Station 282 Reconstruction
(City of Chandler Project No. FI2001.401)
Chandler, AZ
07/21/22
Page 1 of 1
Exhibit D.2.1 – Project Description
Project Description and Narrative:
The City of Chandler Fire Station #282 Reconstruction Project comprises the complete construction of a new 12,980
square foot fire station with four apparatus bays and living quarters. The Project requires construction of the new
building to occur while keeping the existing fire station fully operational, with building demolition of the existing
buildings to occur once the new building is complete. Additionally, the retention basin located to the south of the
new building will be completely regraded for additional storm drain water volume. Traffic signal rework will
comprise the off-site portion of the Project work.
Page 1 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
The Basis of GMP is a written explanation clarifying the scope, assumptions and exclusions used in establishing the
GMP#2 dated July 21, 2022, for the Phase 2; Remaining portion of Work.
All costs are based on CORE’s incorporation of the scope shown on the 6/6/22 95% Construction Document Set of
construction documents (as per Exhibit D.2.8 – Enumeration of Documents) and the scope clarifications below.
ASSUMPTIONS, CLARIFICATIONS, & EXCLUSIONS
Schedule:
•
As per Exhibit D.2.6 – Baseline Project Schedule.
Contingency:
•
Construction Contingency – NO Construction Contingency is included in this GMP#2.
•
Design Contingency – NO Design Contingency is included in this GMP#2.
•
Escalation Contingency – NO Escalation Contingency is included in this GMP#2. CORE assumes all escalation of
materials will be covered by the Owner’s allowance with proper documentation of cost increases from the
subcontractor and approval from the Owner.
Allowances:
•
“Allowances” are considered to be an allotted sum of money included for a particular system or scope of work
for which sufficient detail is not available to determine a definitive cost. A reasonable estimate for an assumed
Owner’s Allowance – An Owner’s Allowance of $749,962 – is included in this GMP#2 below the line for use by
the Owner at the Owner’s discretion. This allowance is “below the line” and not marked up with General
Conditions Costs, CMAR Fee, bonds, insurance, or taxes.
•
An Alerting System Allowance of $125,000 is included in this GMP#2 below the line for use by the Owner at the
Owner’s discretion to purchase the Fire Station Alerting System from the City of Phoenix. This allowance is
“below the line” and not marked up with General Conditions Costs, CMAR Fee, bonds, insurance, or taxes.
•
An Art Allowance of $15,000 is included in this GMP#2 below the line for use by the Owner at the Owner’s
discretion for the purchase and installation of the foundation for the art piece to be located in front of the fire
station. This allowance is “below the line” and not marked up with General Conditions Costs, CMAR Fee, bonds,
insurance, or taxes.
General Assumptions:
•
The Notice-To-Proceed with the construction phase Work shall not require CMAR to commence prior to fifteen
(15) days from CMAR’s receipt of the fully executed Construction Contract, and Issuance of Site Permit, Building
Permit, and any other permits required to commence the Work.
•
This GMP#2 is valid through August 18, 2022.
Page 2 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
•
Any cost savings from approved value engineering after executed GMP#2 will be added to the CMAR’s
Construction Contingency.
•
CORE has not included any costs for a building permit, mechanical/electrical/plumbing permits. We have
included a Dust permit and NESHAP for the demo.
•
We assume normal working hours.
•
This GMP#2 includes all costs related to warranty as required in the contract.
•
This GMP#2 is considered a Lump Sum, not line-item GMP#2.
•
We acknowledge the following Geotechnical Report issued by RAMM:
o
Geotechnical Report G27743 dated November 18, 2021
•
There are no Addenda issued for this project.
•
Normal shrinkage cracking of the slab is expected and shall not be exceed tolerances as established by the
American Concrete Institute (ACI). If concrete is within ACI’s published tolerances, then preplacement of
structurally sound slabs is not required.
•
CORE does not recommend or endorse any specific topical vapor moisture barrier as they have proven to
promote Alkaline Silica Reaction (ASR). In addition, CORE does not recommend installation of an under-slab
vapor barrier at areas where polished or sealed concrete will be the finished product. It is our experience that
using an under-slab vapor barrier will contribute to slab curling which will affect the final appearance on
concrete grinding, especially for “salt-and-pepper” light aggregate exposure finish.
•
CORE has included slab-on-grade concrete with a higher Water/Cement (W/C) ratio and omitted vapor barrier
wherever floor coverings are not included. All W/C ratios for non-structural slab-on-grades will be reviewed,
evaluated, and subject to modification by CORE, and reviewed and approved by Engineer of Record. This would
include all polished and sealed concrete areas.
•
The following agreed to hourly rates will be used to determine and define “Actual Costs”. The Actual Costs for
each of the agreed to rates includes all normal and customary payroll paid by the Contractor plus all fringe
benefits, taxes and insurances.
Standard Rate
Overtime
Rate
PreConstruction:
Director of PreConstruction
$145
-
PreConstruction Manager
$110
-
Asst. PreConstruction Manager
$95
PreConstruction Coordinator
$72
-
Project Management:
Project Director
$133
-
Sr. Project Manager
$124
-
Project Manager
$110
-
Asst. Project Manager
$95
-
Scheduler
$107
-
Page 3 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
Specific Exclusions to GMP#2:
a.
Background checks and badging
b. MAG Specification $108.2 (E) is not applicable to this Project.
c.
FF&E - Furniture, Fixtures, and Equipment
d. The following are excluded and assumed to be by Owner or Owner’s vendor:
o
Trenching for the SW Gas line from off-site source to the property line. None shown on plans.
o
Salvage and Relocation of any existing equipment or furnishings
o
Intercom, Paging, and Clock Systems
o
Audio and Video Equipment of any kind including Monitors, Smart Boards, Projectors and
Televisions
o
HVAC DDC Controls Systems other than overhead door interlock at apparatus bay
o
Commissioning
o
Fitness equipment
o
Commercial Washers/Dryers
o
Structured cabling from off-site. We assume existing structured cabling on site sufficient to support
systems at new station
o
Delivery and Installation of all above
o
Fireproofing
o
Providing O2 racks
o
Electric operated roller shade window coverings
o
Re-placing existing Rip Rap in the south retention
o
Gas for the new fuel tank first fill
o
Trash enclosure gates
Virtual Construction Director
$110
Virtual Construction Manager
$95
Construction Coordinator
$72
-
Project Accountant
$72
-
Contracts Administrator
$72
-
Information Systems Technician
$75
-
Intern
$30
$45
Field Operations:
Director of Field Operations
$145
-
General Superintendent
$133
-
Sr. Superintendent
$124
Project Superintendent
$110
-
Asst. Superintendent
$95
-
Safety Director
$97
-
Carpenter
$72
$108
Water Truck Driver
$72
$108
Painter
$72
$108
Laborer
$64
$96
Page 4 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
o
Stabilizer at decomposed granite
o
Extractor
o
Special Inspections
Other Scope Specific Assumptions and Clarifications:
LINE ITEM MT | Material Testing
1. We have included:
o
Earthwork
o
Concrete
o
Masonry
o
Trench Backfill
o
Asphalt Pavement
LINE ITEM FC | Final Clean
2. We have included:
o
Final clean interior of building
o
Power wash hardscape
LINE ITEM 1 | Demolition
1. We have included:
o
Make safe of electrical, mechanical, and plumbing systems for demo.
o
Demolition of existing CMU site wall at south side of building at retention area.
o
Phased demolition to include selective site demo in first phase and existing building demo and
remaining site demo in second phase
o
Demolition of existing fuel pump and tank
o
Demolition of existing generator
o
NESHAP permit for demolition
o
Removal of temporary drive at retention area
o
Removal and disposal of four (4) fire-rated doors in existing building assumed to contain asbestos.
2. We have NOT included:
o
Phase 1 removal of the existing roof overhand during construction. Entirety of structure will be removed
in Phase 2.
Page 5 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 6 | Survey & Staking
1. We have included:
o
Survey and staking at site and including the retention area
o
Construction staking
LINE ITEM 7 | Earthwork & Paving
1. We have included:
o
Construction of a temporary road comprising 2” compacted millings on 8” ABC
o
Import soil for temporary road
o
SWPP Plan
o
Construction Water and Hydrant Meter
o
Clearing, regrading, and recompacting retention area
o
Removing trees
o
Importing (867 CY) of non-expansive fills
o
Mass grading
o
Traffic control
o
Asphalt paving scope consists of 2' patch back at new curb along Alma School Road
LINE ITEM 8 | Site Utilities
1. We have included:
o
Domestic Water
o
Fire Water
o
Irrigation
o
Sanitary Sewer
o
Storm Water System
o
Trenching for gas
o
Removal of exisitng utilities as needed
o
Temporary re-routing of utilities during construction
2. We have NOT included:
o
Gas piping, connections, & meters
o
Demolition of gas piping
Page 6 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 9 | Drywells
1. We have included:
o
(5) Type IV Maxwell Drywells
LINE ITEM 11 | Soil Treatment
1. We have included:
o
Termite treatment at new building slab-on-grade locations
LINE ITEM 14 | Site Signage & Striping
1. We have included:
o
ADA hash marks, parking symbols and signage
o
Parking stall striping
o
Red paint at fire lane curbing
o
Danger zone yellow striping inside apparatus bays
o
($9,000) Off-site striping at crosswalk and traffic signal
LINE ITEM 15 | Landscaping & Irrigation
1. We have included:
o
Building Area
Ground Covering
Irrigation
o
Retention Area
Decomposed granite
(87) 5-gallon shrubs
(36) 24” box trees
Irrigation to shrubs and trees
2. We have NOT included:
o
Put back existing rip rap or new rip rap at the retention area
o
Plantings and irrigation at the bottom area of the retention
LINE ITEM 18 | Fencing & Gates
1. We have included:
o
2"X6"X16GA Tube Steel Frame Rolling Gate
o
Loop detectors
Page 7 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
o
Temporary fencing
o
Re-arranging temporary fencing
o
20ga Perforated metal wall infill panels
2. We have NOT included:
o
Trash enclosure gate. None shown on plans.
LINE ITEM 21 | Flagpole
1. We have included:
o
30’ alluminum flagpole with .156” wall
Steel cable, flag clips, flash collar, gold ball
5’ x 8’ USA Flag
Top mounted solar light fixture
o
We have NOT included relocation of the existing flag pole
LINE ITEM 24 | Site Furnishings
1. We have included:
o
Bicycle rack, 3 spaces
LINE ITEM 25 | Traffic Signals
1. We have included:
o
Traffic Signal per 60% Traffic Signal drawing dated 6/16/22
LINE ITEM 26 | Fuel Island
1. We have included:
o
2000 Gallon UL2085 tank
o
Fill Rite 702 Pump/Meter
o
System startup
o
Existing propane tank - make safe, removal of exisitng tank, and loading onto City of Chandler flatbed
truck
o
Exisitng Diesel Fuel Pump and Tank – Remove and relocation to COC
LINE ITEM 31 | Miscellaneous Metals
1. We have included:
o
Stainless Steel Handrail at Day Room
Page 8 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 33 | Rough Carpentry
1. We have included:
o
Plywood backerboard at IT room
o
Wood framing and decking at standing seam roof
o
Wood nailer at parapet caps
o
Backing and blocking
LINE ITEM 38 | Insulation
1. We have included:
o
R-11 unfaced fiberglass batts at exterior furred walls, interior sound walls, and interior sound ceilings
o
R-19 unfaced fiberglass batts at interior sound walls
LINE ITEM 39 | Aluminum Frames / Entrances
1. We have included:
o
Aluminum storefront in dark bronze anodized finish
o
Arcadia ULT500 Windows with 1” IGU
o
Storefront doors
o
Gym mirror
LINE ITEM 43 | Exterior Wall Systems (Stucco/EIFS)
1. We have included:
o
EIFS exterior soffit at front entry
LINE ITEM 44 | Fire Stopping & Joint Sealants
1. We have included:
o
Firestopping at rated walls
o
Building and Site joint sealants
2. We have NOT included:
o
Fireproofing
LINE ITEM 55 | Finished Carpentry & Millwork
1. We have included:
o
Dorm Rooms
P-lam 8’ tall locking closets
Page 9 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
P-lam faced bed platform with built-in locking drawers
P-lam countertop desk
P-lam upper shelf above desk
o
Transition North
P-lam base cabinets
o
Transition South
P-lam tall storage cabinets
o
Captain Office 107
P-lam countertop with supports
o
Office 111
P-lam counter with supports
o
Kitchen
Wood faced base cabinets at island
Wood faced base cabinets at lower and upper millwork
Woof faced tall storage cabinets
Wood
o
HC Restroom 134
Wood ADA base cabinet solid surface countertop
o
Public Restroom
Wood faced base cabinet and solid surface countertop
o
(5) Typical Restroom
Wood faced base cabinet and solid surface countertop
Wood lockers in restroom
LINE ITEM 59 | Metal Studs & Drywall Package
1. We have included:
o
Exterior soffit framing with Densglass
o
Interior framing and drywall walls, soffits, and hardlid ceilings
o
Level four drywall finish
o
FRP
LINE ITEM 61 | Painting
1. We have included:
o
Epoxy up to 10’ at Apparatus Bay, Prep and Decon
Page 10 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
o
Epoxy walls at Turnout and Laundry
o
Open-to-structure ceilings
o
Interior framed walls and ceilings
o
Steel bollards
o
HM Frames/Doors
o
Sealer at exterior CMU walls
2. We have NOT included:
o
Parapet cap; assume prefinished
o
Metal roof panels and fascia; assume prefinished
o
Wood doors; assume factory finished
LINE ITEM 62 | Acoustical Ceiling & Wall Panels
1. We have included:
o
9/16” white steel heavy duty grid with 2x2 tegular edge Ultima high NRC tiles
o
4’ high acoustical wall panels on 3 walls in gym
LINE ITEM 64 | Tile Package
1. We have included:
o
Daltile / Wall Tile / 12” x 24” / Invoke / Color: Evening Veil
o
Schluter / Cove Base / Dilex EHK / Brushed Stainless Steel
LINE ITEM 65 | Flooring Package
1. We have included:
o
Resilient Athletic Flooring
o
Rubber Base
o
Floor Protection
LINE ITEM 66 | Concrete Sealing, Grinding & Polishing
1. We have included:
o
CONC-1 Sealed Concrete
o
CONC-2 Medium Grind (Level 3)- Salt and Pepper
o
CONC-4 Burnished Concrete
Page 11 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 67 | Terrazzo
1. We have included:
o
8’ High terrazzo shower walls
o
Terrazzo shower pan
LINE ITEM 72 | Window Shades & Curtains
1. We have included:
o
Blackout shades
Locations: (12) dorm room windows
Type: Manual Mecho Urban roller shades
Fabric: Classic 0700 series blackout in one standard color
Operation: Stainless steel chain
Options: Includes fascia with blackout side and sill channels in one standard color
o
Sheer shades
Locations: Office 107, Office 111, Laundry 118, Office 120, and Kitchen 117
Type: Manual Mecho Urban roller shades
Fabric: SoHo series in one standard color and openness
Operation: Stainless steel chain
Options: Includes fascia in one standard color
2. We have NOT included:
o
Any motorized operation
LINE ITEM 73 | Signage Package
1. We have included:
o
Building room signs
o
Exterior building lettering
o
72” x 72” Front entrance Chandler logo – aluminum pan with digital print logo
o
24” x 24” Cast bronze dedication plaque
LINE ITEM 75 | Toilet Partitions & Accessories
1. We have included:
o
(7) Toilet Paper Holder
o
(1) Mirror - 18"x30" Glass
o
(2) 36"Grab Bar
Page 12 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
o
(2) 42" Grab Bar
o
(7) Paper Towel Dispenser/Disposal
o
(2) 18" Vertical Grab Bar
o
(7) Feminine Napkin Disposal
o
(1) Mop Rack
o
(7) Toiler Seat Cover Dispenser
o
(1) Baby Changing Station
o
(6) Towel Hook
o
(1) ADA Fold Down Seat
o
(6) Glass Shower Door
2. We have NOT included:
o
(1) Shower Rods and Curtain
LINE ITEM 75 | Wall Protection & Corner Guards
1. We have included:
o
Stainless steel corner guards
LINE ITEM 78 | Fire Extinguishers & Cabinets
1. We have included:
o
Type 2A-10BC Fire Extinguisher
o
Type K Fire Extinguisher
LINE ITEM 86 | Residential Appliances
1. We have included:
o
(2) GE ADA Compliant Stainless Steel Interior Dishwasher (Model: GDT225SSLSS)
o
(3) GE ENERGY STAR 27.7 Cu. Ft. Fingerprint Resistant French-Door Refrigerator (Model: GFE28GYNFS)
o
GE 21.9 Cu. Ft. Top-Freezer Refrigerator (Model: GTS22KYNRFS)
o
48" Gas Range - 6 Burners and Infrared Griddle (Model: GR486G)
o
48” Professional Hood (Model: UVW9484SPSS)
o
2.0 Cu. Ft. Capacity Countertop Microwave Oven (Model: IDT0500A)
o
Manitowoc Ice Cube Machine (Model: IDT0500A) with Ice Bin (Model: D570BIN)
Page 13 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 87 | Kitchen (Cafe) Equipment & Stainless Steel
1. We have included:
o
Stainless Steel Turnout Racks
o
Prep – Stainless Steel Open Shelving/Cabinets
o
Prep – Stainless Steel Doors
o
Prep – Stainless Steel Top and Backsplash
o
Transition – Stainless Steel Top and Backsplash
o
Kitchen – Stainless Steel Top and Backsplash
o
Range backsplash
o
Kitchen Island 12" hole
LINE ITEM 97 | Fire Sprinkler System
1. We have included:
o
Wet pipe fire sprinkler system
o
Covered patio fire sprinkler system
LINE ITEM 100 | HVAC Controls
1. We have included:
o
Apparatus Bay Controls for Overhead Door Interlock
DDC Controller and Network Communication Wiring
(2) Evaporative Coolers
Fan Start/Stop/Status
Pump Start/Stop/Status
Control Switch (Off/Auto/Fan/Cool)
(2) Exhaust Fans
Fan Start/Stop/Status
(8) Garage Door Open/Closed Contact Switch
CO/NO2 Combination Gas Detection Sensor
Space Temperature Sensor
2. We have NOT included:
o
HVAC/DDC Controls in any of the building
Page 14 of 14
Exhibit D.2.2 – Basis of GMP#2
Chandler Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
July 21, 2022
LINE ITEM 101 | Test & Balance
1. We have included:
o
Test & Balance of new HVAC system
LINE ITEM 102 | Electrical Systems
1. We have included:
o
Trenching, empty conduit, and pull strings for future use ran from IT room to East property line.
LINE ITEM 103 | Fire Alarm Systems
1. We have included:
o
Fire Alarm monitors fire riser
o
Smoke detectors w/ low frequency sounder bases & strobes in Dorms
o
CO detectors located outside of Dorm Rooms & in Transition Room
o
Smoke Detectors in Living Areas
o
Heat Detectors in Apparatus Bays
o
Notification throughout building
o
Notifier Fire Alarm system
LINE ITEM 109 | Structured Cabling Systems
1. We have included:
o
IT Room Buildout
o
CAT 6 cabling
o
Data cabling
o
Access control cabling
o
Dispatch cabling
o
Cable tray in accessible ceiling space
o
Data for (10) Wifi locations
LINE ITEM 110 | Security/Access Control Systems
1. We have included:
o
(4) Interior door card readers
o
(2) Exterior gate card readers
o
Door contacts
o
Access control system panels
o
Pedestal and housing for the vehicle gate entrance
CoC – Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
Chandler, AZ
07/21/22
Page 1 of 1
Exhibit D.2.3– List of Subcontractors
GMP #2 List of Potential Subcontractors:
1. Material Testing / Special Inspection
RAMM
2. Final Clean
J-S Construction Cleanup
3. Demolition
Dickens Quality Demolition
4. Surveying/Staking
Benchmark Surveying
5. Earthwork & Paving
Mark’s Valley Grading
6. Site Utilities
Midwest Contracting
7. Drywells
Torrent Resources
8. Soil Treatment
Bio-Chem Exterminating
9. Site Signage & Striping
TSS Enterprises
10. Landscaping & Irrigation
Carter Landscaping
11. Fencing & Gates
Diamond Iron
12. Flagpole
Ken’s Sign Service
13. Site Furnishings
Norcon
14. Traffic Signals
CS Construction
15. Fuel Island
Acton Contracting
16. Misc. Metals
Modern Metal Masters
17. Rough Carpentry
CMR Construction
18. Insulation
BPS
19. Alluminum Frames / Entrances
Mirror Works
20. Exterior Wall Systems (Stucco / EIFS)
Division 9
21. Fire Stopping & Joint Sealants
Johnson Statewide Caulking
22. Finished Carpentry & Millwork
Sierra Woodworks
23. Metal Studs & Drywall / Paining
Pete King
24. Acoustical Ceilings & Wall Panels
Barrett Homes
25. Tile Package
Sun Country Floors
26. Flooring Package/Concrete Sealing
Wholesale Flooring
27. Terrazzo
Stone Finish
28. Window Shades & Curtains
Blinds & Beyond
29. Signage Package
Grand Canyon Suppliers
30. Toilet Partitions & Accessories
IISI
31. Residential Appliances
Spencer’s Appliances
32. Kitchen (Café) Equipment & Stainless Steel AZ Restaurant Supply
33. Fire Sprinkler Systems
A-1 Fire Sprinklers
34. HVAC Controls
Climatec
35. Test & Balance
Technical Air Balance
36. Fire Alarm Systems
Copperstate Fire
37. Structured Cabling Systems
Cable Solutions
38. Security/Access Control Systems
APL
CoC – Fire Station 282 Reconstruction
(Phase 2; Remaining portion of Work)
Chandler, AZ
07/21/22
Page 1 of 1
Exhibit D.2.4– Schedule of Manufacturers & Suppliers
Schedule of Manufacturers and Suppliers:
Concrete
Site Signage & Striping
Roadsafe, Aexcel
Carter Landscaping
Horizon, Desert Forrest, Pioneer Material
Flagpole
Bolander Co., King Concrete, G Mack
Traffic Signal
Cemtec, Phillips, McCain, Econolite
Fuel Island
Petroleum Marketing Equipment, Solvent Recy-Clean, Smiley
Cranes, Kohlhaas Tank Corp., Fill rite, OPW, Husky, VST
Misc. Metals
Coast Aluminum
Joint Sealants
DOW, Hilti, SikaFlex
Aluminum Frames / Entrances
Clarus, Oldcastle, Arcadia, Trulite
Acoustical Ceilings & Wall Panels
Armstrong World Industries
Flooring
Big D, Daltile
Window Shades & Curtains
Mechoshade
Wall Protection & Corner Guards
INPRO
Fire Extinguishers & Cabinets
JL
Residential Appliances
GE, SpeedQueen, Wolf
Kitchen (Café) Equipment & Stainless Steel
Everpure, StainCon
Fire Sprinkler
Fire Sprinkler Fitter Supply
HVAC Controls
Tridium N4 Software
Structured Cabling
CommScope, Panduit, Times Microwave, CPI, Burndy, STI, Lynn,
WBT, Graybar
LOCATION: 1911 N. Alma School Rd., Chandler AZ
ARCHITECT: HDA Architects
GMP#2 - Remaining Scope
GENERAL REQUIREMENTS
$43,776
GR1
General Requirements
$24,435
MT
Material Testing
RAMM
$13,716
FC
Final Clean
J-S Construction Cleanup
$5,625
DEMOLITION/ OFF-SITE INFRASTRUCTURE
$105,723
1
Demolition
Dickens Quality Demo
$105,723
SITE WORK (ROUGH)
$838,727
6
Surveying/Staking
Benchmark Surveying
$12,620
7
Earthwork & Paving
Mark's Valley Grading
$450,009
8
Site Utilities
Midwest Contracting
$276,093
9
Drywells
Torrent Resources
$99,050
11
Soil Treatment
Bio-Chem Exterminating
$955
SITE WORK (FINISH)
$416,348
14
Site Signage & Striping
TSS Enterprises
$16,909
15
Landscaping & Irrigation
Carter Landscaping
$133,516
18
Fencing & Gates
Diamond Iron
$54,896
21
Flagpole
Kens Sign Service
$8,438
24
Site Furnishings
Norcon
$2,450
25
Traffic Signals
CS Construction
$146,000
26
Fuel Island
Acton Contracting
$54,139
STRUCTURE
$34,675
30
Steel Package
Castle Steel
-$224
31
Miscellaneous Metals
Modern Metal Masters
$6,371
33
Rough Carpentry
CMR Construction
$28,528
ENCLOSURE
$190,644
38
Insulation
BPS
$9,550
39
Aluminum Frames / Entrances
Mirror Works
$88,968
43
Exterior Wall Systems (Stucco / EIFS)
Division 9
$5,040
44
Fire Stopping & Joint Sealants
Johnson Statewide Caulking
$28,745
47
Membrane Roofing
Progressive Roofing
$29,350
49
Metal Roofing
Progressive Roofing
$20,141
50
Roof Specialties & Accessories
Progressive Roofing
$3,000
51
Sheet Metal Flashing & Trim
Progressive Roofing
$5,850
INTERIOR FINISHES
$672,106
55
Finished Carpentry & Millwork
Sierra Woodworks
$184,376
57
Overhead Coiling Doors
DH Pace
$3,600
59
Metal Studs & Drywall Package
Pete King
$187,647
61
Painting
Pete King
$85,136
62
Acoustical Ceilings & Wall Panels
Barrett Homes
$42,213
64
Tile Package
Sun Country Floors
$44,572
65
Flooring Package
Wholesale Flooring
$14,327
66
Concrete Sealing, Grinding & Polishing
Wholesale Flooring
$69,816
67
Terrazzo
Stone Finish
$40,420
SPECIALTIES
$57,660
72
Window Shades & Curtains
Blinds & Beyond
$6,620
73
Signage Package
Grand Canyon
$22,070
75
Toilet Partitions & Accessories
IISI
$25,250
77
Wall Protection & Corner Guards
IISI
$1,731
78
Fire Extinguishers & Cabinets
IISI
$1,989
EQUIPMENT
$90,064
86
Residential Appliances
Spencer's Appliances
$34,520
87
Kitchen (Cafe) Equipment & Stainless Steel
AZ Restaurant Supply
$55,544
92
FF&E
(BY OWNER)
$0
MEP SYSTEMS
$176,964
97
Fire Sprinkler Systems
A-1 Fire Sprinklers
$44,150
98
Plumbing Systems
Universal Plumbing
$5,700
99
HVAC Systems
Pueblo Mechanical
$51,980
100
HVAC Controls
Climatec
$27,500
101
Test & Balance
Technical Air Balance
$3,285
102
Electrical Systems
Armstrong Service Electric
$5,711
103
Fire Alarm Systems
Copperstate Fire
$38,638
SPECIAL SYSTEMS
$85,478
109
Structured Cabling Systems
Cable Solutions
$54,948
110
Security/Access Control Systems
APL
$30,530
CONTINGENCIES & ALLOWANCES
$0
GENERAL CONDITIONS
BASED ON
SUB TOTAL
REQUIRED
General Conditions
Carried from 'GC's' Tab
$247,876
RATE
CONTRACTOR'S FEE
BASED ON
SUB TOTAL
5.50%
Construction Manager At Risk Fee
$7,799,828
$162,802
RATE
ALLOWANCES
BASED ON
SUB TOTAL
7.00%
Owner's Allowance
$749,962
LS
Alerting System Allowance
$125,000
LS
Art Allowance
$15,000
Exhibit D.2.5 - GMP#2 SOV
$4,311,031
GMP#2 Total
$3,258,267
Subtotal (with GC's)
$4,311,031
Subtotal
Subtotal (with GC's & Insurance)
$2,712,164
$3,074,371
$2,960,040
Subtotal (GC's, Insurance, Tax, & Fee)
Subtotal (with GC's, Insurance, & Tax)
Description
#
GMP Breakouts
SUBCONTRACTOR
CoC - Fire Station #282 Reconstruction
Phase 2; Remaining portion of Work)
GMP#2 07.21.22
Page 1 of 1
ID
Task Name
Finish
3
SD Pricing Submitted
Thu 12/16/21
5
DD Pricing Submitted
Thu 2/24/22
10
GMP #1 Long Lead Procurement Approved
Fri 7/8/22
12
Anticipated NTP
Tue 7/26/22
21
GMP #2 - All Remaining Scope Approved
Thu 8/18/22
22
Preconstruction Complete
Thu 8/18/22
33
Long Lead Submittals Received
Fri 8/19/22
44
Long Lead Submittals Complete
Fri 9/2/22
59
Building Permit Issued
Fri 8/19/22
65
Construction Start
Mon 8/22/22
67
Mobilization Complete
Fri 8/26/22
78
Foundations Complete
Thu 10/27/22
80
Steel & Decking On Site
Mon 11/14/22
81
Colored CMU Onsite
Tue 11/15/22
83
HM Frames On Site
Wed 11/30/22
84
SOG Complete
Mon 12/5/22
86
Roofing Materials On Site
Wed 2/8/23
87
HVAC Equipment On Site
Wed 2/8/23
88
Building Structure Complete
Mon 2/13/23
91
Building Dry-in Complete
Mon 3/13/23
92
Electrical Gear On Site
Wed 4/19/23
94
Generator Onsite
Thu 6/1/23
95
Interior Finishes Complete
Wed 7/5/23
97
Temporary CofO - FF Move Into New Station
Wed 7/26/23
100
Demo of Existing Station Complete
Thu 8/10/23
102
Substantial Completion
Fri 10/13/23
103
Site Work Complete
Fri 10/13/23
104
Final CofO
Fri 10/13/23
106
Construction Final Completion
Tue 10/31/23
12/16
2/24
7/8
7/26
8/18
8/18
8/19
9/2
8/19
8/22
8/26
10/27
11/14
11/15
11/30
12/5
2/8
2/8
2/13
3/13
4/19
6/1
7/5
7/26
8/10
10/13
10/13
10/13
10/31
Qtr 4
Qtr 1
Qtr 2
Qtr 3
Qtr 4
Qtr 1
Qtr 2
Qtr 3
Qtr 4
Qtr 1
2022
2023
2024
Chandler FS No. 282 Reconstruction
VIEW 04 - Milestone
1 of 1
Exhibit D.2.6 - Baseline Project Schedule
Date 07/21/22
+- 40'-3"
+- 45'-8"
NEW FIRE STATION 282
PUBLIC PARKING
2 + HC
ROLLING GATE
NEW
GENERATOR
EXISTING
FLAGPOLE
EXISTING
TOWER
STAFF
PARKING
EXISTING RETENTION AREA
NEW RETENTION
TEMPORARY APPARATUS VEHICLE RETURN
NEW RETENTION
RETENTION
PUBLIC
ENTRY
EXISTING ALLEY
ALMA SCHOOL ROAD
EXISTING DRIVE
PATIO
W. HIGHLAND ST.
GYM
EXISTING
TRAFFIC
LIGHT
RELOCATE
EXISTING
CROSSING
LIGHT
TURNOUT
OUTDOOR
existing
station
existing
gym
TEMPORARY
APPARATUS
EXITING
REVERSED
+- 14'-0"
+- 5'-0"
HDA ARCHITECTS, LLC.
HDA Architects, LLC.
459 N. Gilbert Road, Suite C-200, Gilbert, AZ 85234
TEL: (480) 539-8800
FAX: (480) 539-8608
Sheet No.
Job No.
Drawn
Checked
Date
HDA: #00-2107
HDA PROJECT NO. 2107
City of Chandler Project FI2001.201
NOT FOR
CONSTRUCTION
4/4/2022 7:52:47 AM
BIM 360://Chandler Fire Station #2/2107-Chandler Fire Station
2-Demo New.rvt
EXISTING SITE-NEW PLANS
A116
60%
SUBMITTAL
2107
Author
Checker
04/01/2022
CITY OF CHANDLER
FIRE STATION 2
1911 NORTH ALMA SCHOOL ROAD
CHANDLER, AZ 85225
1 OVERALL SITE PLAN
SCALE: 1" = 20'-0"
NORTH
Sound Partitions
to underside of
structure
Construction
Fence
Bus Stop
to remain
open
Sidewalk to
remain open
to public
Construction
Trailer
Exhibit D.2.7 - Site Logistics Plan
Exhibit D.2.8 -
Enumeration of Documents
CoC - Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
95% CD's
21 July 2022 GMP#2
Specification/
Drawing
Description
Spec / Drawing
Date
Stamp Date
CORE Received Date
Revision
Color
Division 00
General Requirements
00 01 07 Seals Page
9-Jun-22
15-Jun-22
17-Jun-22
None
White
00 26 00 Procurement Substitution Procedures
9-Jun-22
15-Jun-22
17-Jun-22
None
White
00 31 32 Geotechnical Data
9-Jun-22
15-Jun-22
17-Jun-22
None
White
00 63 25 Substitution Form
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 01
General Requirements
01 10 00 Summary of Work
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 25 00 Substitution Procedures
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 26 13 Requests for Information
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 31 00 Project Management and Coordination
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 33 00 Submittal Procedures
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 40 00 Quality Requirements
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 42 00 References
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 50 00 Temporary Facilities and Controls
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 60 00 Product Requirements
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 73 00 Execution Requirements
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 73 29 Cutting and Patching
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 77 00 Closeout Procedures
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 78 23 Operation and Maintenance Manuals
9-Jun-22
15-Jun-22
17-Jun-22
None
White
01 78 39 Project Record Documents
9-Jun-22
15-Jun-22
17-Jun-22
Division 02
Existing Conditions/Site
02 41 00 Selective Demolition
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 03
Concrete
17-Jun-22
03 24 00 Fibrous Reinforcement
9-Jun-22
15-Jun-22
17-Jun-22
None
White
03 30 00 Cast-In-Place Concrete
9-Jun-22
15-Jun-22
17-Jun-22
None
White
03 30 13 Concrete Hardener Sealer
9-Jun-22
15-Jun-22
17-Jun-22
None
White
03 35 43 Polished Concrete Finishing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 04
Masonry
17-Jun-22
04 20 00 Unit Masonry
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 05
Metals
05 12 00 Structural Steel Framing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
05 12 13 Architecturally Exposed Structural Steel
9-Jun-22
15-Jun-22
17-Jun-22
None
White
05 31 23 Steel Decking
9-Jun-22
15-Jun-22
17-Jun-22
None
White
05 40 00 Cold-Formed Metal Framing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
05 50 00 Metal Fabrications
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 06
Wood, Plastics, and Composites
06 10 53 Miscellaneous Rough Carpentry
9-Jun-22
15-Jun-22
17-Jun-22
None
White
06 41 13
Plastic-Laminate-Faced Architectural Wood
Cabinets
9-Jun-22
15-Jun-22
17-Jun-22
None
White
06 61 16 Solid Surface Fabrications
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 07
Thermal and Moisture Protection
07 21 00 Thermal Insulation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 54 23 Thermoplastic-Polyolefin Roofing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 61 00 Sheet Metal Roofing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 62 00 Sheet Metal Flashing and Trim
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 71 16 Roof Specialties
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 72 00 Roof Accessories
9-Jun-22
15-Jun-22
17-Jun-22
None
White
07 92 00 Joint Sealants
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 08
Openings
9-Jun-22
15-Jun-22
17-Jun-22
08 11 13 Hollow Metal Doors and Frames
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 14 16 Flush Wood Doors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 31 13 Access Doors and Frames
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 33 23 Overhead Coiling Doors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 33 25 High-Speed Overhead Coiling Doors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 35 13 Folding Doors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 41 13 Aluminum Frames Entrances and Storefronts
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 51 13 Aluminum Windows
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 71 00 Door Hardware
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 80 00 Glazing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
08 83 00 Mirrors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 09
Finishes
PROJECT MANUAL
Page 1 of 5
Exhibit D.2.8 -
Enumeration of Documents
CoC - Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
95% CD's
21 July 2022 GMP#2
Specification/
Drawing
Description
Spec / Drawing
Date
Stamp Date
CORE Received Date
Revision
Color
09 22 16 Non-Structural Metal Framing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 29 00 Gypsum Board
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 30 00 Tiling
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 51 14 Acoustical Panel Ceilings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 65 13 Resilient Base
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 65 66 Resilient Athletic Flooring
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 81 00 Acoustical Insulation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 91 00 Painting
9-Jun-22
15-Jun-22
17-Jun-22
None
White
09 96 00 High Performance Coatings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 10
Specialties
10 26 13 Corner Guards
9-Jun-22
15-Jun-22
17-Jun-22
None
White
10 28 00 Toilet Accessories
9-Jun-22
15-Jun-22
17-Jun-22
None
White
10 44 13 Fire Protection Specialties
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 12
Furnishings
12 24 13 Roller Shades
9-Jun-22
15-Jun-22
17-Jun-22
None
White
12 35 31 Residential Casework
9-Jun-22
15-Jun-22
17-Jun-22
None
White
12 36 16 Stainless Steel Countertops
9-Jun-22
15-Jun-22
17-Jun-22
None
White
12 93 13 Bicycle Racks
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 21
Fire Suppression
21 10 00 Water-Based Fire-Suppression Systems
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 22
Plumbing
22 01 00 General Plumbing Requirements
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 01 20 Trenching & Backfill
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 05 23 Valves
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 07 00 Plumbing Insulation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 11 00 Building Water Supply System
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 11 23 Building Natural Gas
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 13 00 Building Soil and Waste System
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 14 00 Building Roof & Area Drainage
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 20 00 Pipe and Pipe Fittings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
22 61 00 Compressed Air
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 23
Heating, Ventilating, and Air Conditioning
23 01 00 General Mechanical Requirements
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 05 48 Vibration Isolation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 05 93
Testing, Adjusting and Balancing of
Mechanical Systems
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 07 00 Mechanical Systems Insulation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 20 00 Pipe and Pipe Fittings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 23 00 Refrigerant Piping System
9-Jun-22
15-Jun-22
17-Jun-22
None
White
23 30 00 Air Tempering System and Equipment
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 25
Integrated Automation
25 00 00 Direct Digital Control System for HVAC
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 26
Electrical
26 05 00 General Electrical Provisions
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 19 Conductors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 26 Grounding and Bonding of Electrical Systems
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 29 Hangers and Supports for Electrical Systems
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 33 Raceways, Boxes and Fittings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 43 Underground Electrical System
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 05 53 Identification for Electrical Systems
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 09 23 Relays and Contactors
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 24 13 Switchboards
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 24 16 Panelboards
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 27 26 Wiring Devices and Plates
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 28 13 Fuses
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 28 16 Enclosed Switches and Circuit Breakers
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 51 19 LED Interior Lighting
9-Jun-22
15-Jun-22
17-Jun-22
None
White
26 56 00 Exterior Lighting
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 31
Earthwork
Page 2 of 5
Exhibit D.2.8 -
Enumeration of Documents
CoC - Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
95% CD's
21 July 2022 GMP#2
Specification/
Drawing
Description
Spec / Drawing
Date
Stamp Date
CORE Received Date
Revision
Color
31 10 00 Site Clearing
9-Jun-22
15-Jun-22
17-Jun-22
None
White
31 20 00 Earth Moving
9-Jun-22
15-Jun-22
17-Jun-22
None
White
31 31 16 Termite Control
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Division 32
Exterior Improvements
32 12 16 Asphalt Paving
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 13 13 Concrete Paving
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 17 23 Pavement Markings
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 31 00 Ornamental Fences and Gates
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 84 00 Planting Irrigation
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 90 00 Planting
9-Jun-22
15-Jun-22
17-Jun-22
None
White
32 92 13 Inert Groundcovers
9-Jun-22
15-Jun-22
17-Jun-22
None
White
Specification/
Drawing
Description
Drawing Date
Stamp Date
CORE Received Date
Revision
Color
Architectural
A001
Cover Sheet
6-Jun-22
23-May-22
9-Jun-22
None
White
A002
Building Codes and Sheet Index
6-Jun-22
23-May-22
9-Jun-22
None
White
A003
First Floor Exiting Plan & Code Info
6-Jun-22
23-May-22
9-Jun-22
None
White
A004
Signage Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A101
Site Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A102
Saw Cut Site Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A112
Site Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A113
Gate Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A114
Demo Plan/Site Building
6-Jun-22
23-May-22
9-Jun-22
None
White
A116
Existing Site - New Plans
6-Jun-22
23-May-22
9-Jun-22
None
White
A201
First Floor Plans
6-Jun-22
23-May-22
9-Jun-22
None
White
A202
Dimensioned Floor Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A203
First Floor Sawcut Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A205
Wall Types
6-Jun-22
23-May-22
9-Jun-22
None
White
A211
First Floor RCP
6-Jun-22
23-May-22
9-Jun-22
None
White
A221
Roof Plan
6-Jun-22
23-May-22
9-Jun-22
None
White
A301
West and North Exterior Elevations
6-Jun-22
23-May-22
9-Jun-22
None
White
A302
East and South Exterior Elevations
6-Jun-22
23-May-22
9-Jun-22
None
White
A311
Building Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A312
Building Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A401
Wall Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A402
Wall Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A403
Wall Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A404
Wall Sections
6-Jun-22
23-May-22
9-Jun-22
None
White
A500
Typical Mounting Heights
6-Jun-22
23-May-22
9-Jun-22
None
White
A501
Interior Elevations
6-Jun-22
23-May-22
9-Jun-22
None
White
A502
Interior Elevations
6-Jun-22
23-May-22
9-Jun-22
None
White
A601
Enlarged Floor Plans
6-Jun-22
23-May-22
9-Jun-22
None
White
A801
Room Finish Schedule
6-Jun-22
23-May-22
9-Jun-22
None
White
A802
Door Hardware
6-Jun-22
23-May-22
9-Jun-22
None
White
A811
Door, Window Schedule, Types & Frames
6-Jun-22
23-May-22
9-Jun-22
None
White
A813
Door Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A814
Window Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A901
Interior Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A902
Roof Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A903
Fire Rated Details & Wall Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A904
Wall Details
6-Jun-22
23-May-22
9-Jun-22
None
White
A905
Roof Details
6-Jun-22
23-May-22
9-Jun-22
None
White
Civils
None
Cover Sheet
18-May-22
18-May-22
9-Jun-22
None
White
GD1
Grading & Drainage Plan
18-May-22
18-May-22
9-Jun-22
None
White
GD2
Grading & Drainage Plan
18-May-22
18-May-22
9-Jun-22
None
White
GN1
General Notes
18-May-22
18-May-22
9-Jun-22
None
White
DRAWINGS
Page 3 of 5
Exhibit D.2.8 -
Enumeration of Documents
CoC - Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
95% CD's
21 July 2022 GMP#2
Specification/
Drawing
Description
Spec / Drawing
Date
Stamp Date
CORE Received Date
Revision
Color
GN2
General Notes & Abbreviations
18-May-22
18-May-22
9-Jun-22
None
White
GN3
Construction Quantities & Legend
18-May-22
18-May-22
9-Jun-22
None
White
P1
Paving Plan
18-May-22
18-May-22
9-Jun-22
None
White
SD1
Storm Drain Plan
18-May-22
18-May-22
9-Jun-22
None
White
SD2
Storm Drain Plan
18-May-22
18-May-22
9-Jun-22
None
White
UT1
Utility Plan
18-May-22
18-May-22
9-Jun-22
None
White
Landscaping
L--1.1
Planting Plan
12-May-22
12-May-22
9-Jun-22
None
White
L--2.1
Irrigation Plan
12-May-22
12-May-22
9-Jun-22
None
White
L--1.1
Landscape Details
12-May-22
12-May-22
9-Jun-22
None
White
Structural
S001
Legend Sheet
12-May-22
12-May-22
9-Jun-22
None
White
S002
General Structural Notes
12-May-22
12-May-22
9-Jun-22
None
White
S003
Special Inspection Schedules
12-May-22
12-May-22
9-Jun-22
None
White
S201
Foundation Plan
12-May-22
12-May-22
9-Jun-22
None
White
S202
Roof Framing Plan
12-May-22
12-May-22
9-Jun-22
None
White
S401
Schedules and Typical Details
12-May-22
12-May-22
9-Jun-22
None
White
S402
Masonry Schedules and Typical Details
12-May-22
12-May-22
9-Jun-22
None
White
S403
Masonry Schedules and Typical Details
12-May-22
12-May-22
9-Jun-22
None
White
S404
Steel Schedules and Typical Details
12-May-22
12-May-22
9-Jun-22
None
White
S501
Foundation Details
12-May-22
12-May-22
9-Jun-22
None
White
S502
Foundation Details
12-May-22
12-May-22
9-Jun-22
None
White
S701
Steel Framing Details
12-May-22
12-May-22
9-Jun-22
None
White
S702
Steel Framing Details
12-May-22
12-May-22
9-Jun-22
None
White
Mechanical
M001
Mechanical Symbols, Legend and Notes
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M002
Mechanical Schedules
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M003
Mechanical Schedules
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M101
Mechanical First Floor Plan
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M201
Mechanical Details
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M202
Mechanical Details
6-Jun-22
6-Jun-22
9-Jun-22
None
White
M203
Mechanical Details
6-Jun-22
6-Jun-22
9-Jun-22
None
White
Plumbing
P001
Plumbing Cover Sheet
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P002
Plumbing Specification & Piping Material List
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P101
Plumbing Waste Floor Plan
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P102
Plumbing Water, Gas & Compressed Air
Floor Plan
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P201
Plumbing Gas Diagram
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P202
Plumbing Waste & Vent Diagram
6-Jun-22
6-Jun-22
9-Jun-22
None
White
P301
Plumbing Details
6-Jun-22
6-Jun-22
9-Jun-22
None
White
Electrical
E001
Electrical Legends
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E002
Electrical Legends
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E101
Electrical New Site Plan
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E201
Electrical Lighting Plan
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E301
Electrical Power Plan
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E401
Special Systems Plan
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E501
Electrical HVAC Power Plan
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E601
One-Line Diagram and Load Calculations
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E602
Electrical Panel Schedules
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E701
Lighting Fixture Schedule and Calcs
6-Jun-22
3-Jun-22
9-Jun-22
None
White
E801
Electrical Details
6-Jun-22
3-Jun-22
9-Jun-22
None
White
Page 4 of 5
Exhibit D.2.8 -
Enumeration of Documents
CoC - Fire Station 282 Reconstruction
(Phase 1; Long Lead portion of Work)
95% CD's
21 July 2022 GMP#2
Specification/
Drawing
Description
Spec / Drawing
Date
Stamp Date
CORE Received Date
Revision
Color
Addendums
Description
Date
Stamp Date
CORE Received Date
Revision
Color
None
None
None
None
None
None
None
Supplemental Documents
Page 5 of 5