2901_Ashley_Trail_-_220912_Transportation_Commission_-_Update
Extracted text (via pymupdf)
12948 characters
Ashley and Paseo Trails Connection MAG Pedestrian and Bicycle Facilities Design Assistance Program MAG Project No. 0600-0145-22-E001-1137A-0C.000003 Transportation Commission City of Chandler September 21, 2022 Project Overview 2 A. COOPER ROAD AND ASHLEY TRAIL Recommendation: Pedestrian Hybrid Beacon Cooper Road and Ashley Trail 4 Existing Conditions 5 A Existing Conditions/ Proposed Improvements 6 View of the Ashley Trail alignment from the Westbank Estates HOA property, looking west. Ashley Trail is proposed to have a signalized crossing of Cooper Road then connect to Paseo Trail with a 10-foot-wide concrete multi-use path. Open channel to remain. A Cooper Road Lane Configuration at Ashley Trail Crossing 7 85 feet Curb to Curb A East of Cooper Rd Westbank HOA ROW 62 feet from centerline West of Cooper Rd SRP ROW 62 feet from centerline Median Traffic Data 8 85th % (percentile) speed: 85% of vehicles in that direction were at the speed category indicated, or slower. Note: No crashes were reported within 150 feet of the Ashley Trail crossing on Cooper Road from 2016 to 2020. A Daily volume (vehicles per day) 85th % speed COOPER RD CHANDLER BLVD RAY RD ASHLEY TRAIL CHANDLER PASEO TRAIL 10,322 vpd 56-60 mph 10,729 vpd 51-55 mph Motor Vehicles Pedestrians and Bicyclists COOPER RD CHANDLER BLVD RAY RD ASHLEY TRAIL CHANDLER PASEO TRAIL 4 10 6 1 12 5 7 11 2 1 10 5 2 22 3 42 4 21 2 16 4 Bicyclists Pedestrians Southbound Northbound 5am to 9pm volume 5am to 9pm volume Pedestrians Peak hour 7:45-8:45am 5 EB, 3 WB Bicyclists Peak hour 9:10-10:10am 3 EB, 0 WB • Cooper Road is a multilane arterial crossing with high vehicular travel speeds (>50 mph) • A pedestrian hybrid beacon (PHB) will stop vehicles to allow pedestrians and bicyclists to cross Cooper Road • The location is ½ mile from the nearest traffic signal and could be operated as a hot button (upon request) • Current crossing volumes are low, however, the PHB will create an important connection to the Paseo Trail 9 A Reasoning for Improvements Pedestrian Hybrid Beacon Public Outreach 10 A meeting was held with the Westbank HOA. A two-page project information sheet and letter was sent to the homes south of the canal. A Proposed Crossing Improvements – Cooper Road and Ashley Trail 11 2 1 2 3 3 4 4 5 5 6 6 7 7 9 11 8 10 10 11 8 Install high-visibility crosswalk 1 Install pedestrian hybrid beacon with luminaires 2 Install ADA curb ramps 3 Install truncated dome tactile strips 4 Install stop bars 5 Remove existing lane lines between the stop lines and crosswalk 6 Install pedestrian push button 7 Install new sidewalk and connect to existing sidewalk 8 Install sign “STOP HERE ON RED” (R10-6) 11 Remove existing median 9 Install bicycle and pedestrian trail crossing sign (W11-15P) 10 Pedestrian Hybrid Beacon A 4 4 12 13 13 12 14 14 Install pedestrian and bicyclist sign indications (BIKE WAIT) 12 Install sign “CROSSWALK, STOP ON RED” (R10-23AZ) 13 Install sign “CROSSWALK, STOP ON RED, PROCEED ON FLASHING RED WHEN CLEAR” (custom) on traffic pole 14 10 11 12 13 14 B. CHANDLER BOULEVARD AND PASEO TRAIL Alternatives: • Midblock Pedestrian Traffic Signal • Pedestrian Hybrid Beacon • Maintain Existing Conditions – Pedestrian Refuge Island 13 B Paseo Trail/Chandler Boulevard & Cooper Road/Paseo Trail B Paseo Trail/Chandler Boulevard & Cooper Road/Paseo Trail 14 Trail alignment Existing diversion route CHANDLER BLVD COOPER RD Residential B Existing Conditions 15 View of the Paseo Trail alignment from the north side of Chandler Boulevard, looking south. B Traffic Data 16 85th % (percentile) speed: 85% of vehicles in that direction were at the speed category indicated, or slower. B Pedestrians Peak hour 7:35-8:35am 20 NB, 7 SB Bicyclists Peak hour 11:20am-12:20pm 27 NB, 14 SB 5am to 9pm volume 5am to 9pm volume Crash Data 17 2 single vehicle crashes and 1 sideswipe crash within 150 feet of the Paseo Trail crossing on Chandler Boulevard from 2016 to 2020. These crashes may have occurred due to drivers avoiding other motor vehicles or people in the roadway. No crashes involved pedestrians or bicyclists. B CHANDLER BLVD COOPER RD Proposed Improvements 18 Alternatives Include: • Midblock Pedestrian Traffic Signal • Pedestrian Hybrid Beacon • Maintain Existing Conditions – Pedestrian Refuge Island B • The current route diversion is not being used • High volume of pedestrians and bicyclists making U-turns or crossing through instead of turning. The presence of a pedestrian refuge island makes the crossing feel safer. • Current pedestrian/bicycle volumes meets MUTCD volume warrants for PHB. • The crossing location is only 400 feet away from an existing traffic signal. Typical signal spacing is 660 feet or more. • Challenges anticipated with signalization: • Pedestrian signal might have higher vehicle delays compared to other alternatives (e.g. PHB). • Potential queueing on Chandler Blvd that could extend to the Cooper Rd/Chandler Blvd intersection. • Pedestrians will have to wait longer because of the signal coordination, which may increase frequency of pedestrians violating signal. 19 B Consideration for Alternative Selection C. COOPER ROAD AND PASEO TRAIL Alternatives: • Pedestrian Hybrid Beacon (North) • Pedestrian Hybrid Beacon (South) • Installation of Traffic Signal 21 C Paseo Trail/Chandler Boulevard & Cooper Road/Paseo Trail C B Paseo Trail/Chandler Boulevard & Cooper Road/Paseo Trail 22 Trail alignment Existing diversion route CHANDLER BLVD COOPER RD Residential C Existing Conditions 23 View of the Paseo Trail alignment from the west side of Cooper Road, looking east. C Traffic Data 24 85th % (percentile) speed: 85% of vehicles in that direction were at the speed category indicated, or slower. Note: No crashes were reported within 150 feet of the Paseo Trail crossing on Cooper Road from 2016 to 2020. C Pedestrians Peak hour 6:25-7:25am 17 EB, 13 WB Bicyclists Peak hour 7:55-8:55am 12 EB, 13 WB 5am to 9pm volume Proposed Improvements 25 Paseo Trail is proposed to have a signalized crossing of Cooper Road that will be situated at the trail approach on the west side of the roadway. The crossing will be positioned perpendicular with Cooper Road. Alternatives Include: • Pedestrian Hybrid Beacon (North) • Pedestrian Hybrid Beacon (South) • Installation of a Traffic Signal C Proposed Crossing Improvements – Cooper Road and Paseo Trail 26 Pedestrian Hybrid Beacon (North) C Install high-visibility crosswalk 1 Install pedestrian hybrid beacon with luminaires 2 Install ADA curb ramps 3 Install truncated dome tactile strips 4 Install stop bars 5 Remove existing pavement markings between the stop bars and crosswalk 6 Install pedestrian push button 7 Install detectable pavement marking message “Use Traffic Signal” 8 Install overhead pedestrian/ path lighting near trail approach 9 Install STOP sign (R1-1) with street name sign panels 10 Install route wayfinding sign” “You Are Here” 11 Install wayfinding sign guiding trail users to cross at the signal 12 Install back-to-back wayfinding sign with the trail name and directional arrow 13 Install sign “STOP HERE ON RED” (R10-6) 14 Install sign “CROSSWALK, STOP ON RED” (R10-23AZ) 15 Install sign “FLASHING RED, STOP, PROCEED WHEN SAFE” (custom) 16 Install pedestrian and bicyclist signal indications (BIKES WAIT) 17 8 12 11 13 14 15 16 17 Proposed Crossing Improvements – Cooper Road and Paseo Trail 27 Pedestrian Hybrid Beacon (South) C Install high-visibility crosswalk 1 Install pedestrian hybrid beacon with luminaires 2 Install ADA curb ramps 3 Install truncated dome tactile strips 4 Install stop bars 5 Remove existing pavement markings between the stop bars and crosswalk 6 Install pedestrian push button 7 Install detectable pavement marking message “Use Traffic Signal” 8 Install overhead pedestrian/ path lighting near trail approach 9 Install STOP sign (R1-1) with street name sign panels 10 Install route wayfinding sign” “You Are Here” 11 Install wayfinding sign guiding trail users to cross at the signal 12 Install back-to-back wayfinding sign with the trail name and directional arrow 13 Install sign “STOP HERE ON RED” (R10-6) 14 Install sign “CROSSWALK, STOP ON RED” (R10-23AZ) 15 Install sign “FLASHING RED, STOP, PROCEED WHEN SAFE” (custom) 16 Install pedestrian and bicyclist signal indications (BIKES WAIT) 17 8 12 11 13 14 15 16 17 D. QUEEN CREEK ROAD AND PASEO TRAIL Recommendation: Direct Users to Nearby Signalized Crossing 29 D Paseo Trail/Queen Creek Road & McQueen Road/Paseo Trail D E Existing Conditions/ Proposed Improvements 30 View of the Paseo Trail alignment from the north side of Queen Creek Road, looking south. Paseo Trail is proposed to have a redirection of trail users attempting to cross Queen Creek Road to the nearby signalized crossing on the west leg of the Airport Boulevard/Queen Creek Road intersection. D MCQUEEN RD QUEEN CREEK RD ADAMS AVE MCQUEEN RD QUEEN CREEK RD ADAMS AVE Pedestrians and Bicyclists 5am to 9pm volume 59 23 2 27 22 4 7 55 1 14 52 66 Bicyclists 13 21 2 43 4 4 5 12 8 Pedestrians 8,139 vpd 51-55 mph 8,732 vpd 46-50 mph 1 23 16 Westbound Eastbound Daily volume (vehicles per day) 85th % speed Motor Vehicles Traffic Data 31 85th % (percentile) speed: 85% of vehicles in that direction were at the speed category indicated, or slower. Note: No crashes were reported within 150 feet of the Paseo Trail crossing on Queen Creek Road from 2016 to 2020. D Pedestrians Peak hour 7:50-8:50am 4 NB, 8 SB Bicyclists Peak hour 11:20am-12:20pm 27 NB, 14 SB 5am to 9pm volume Proposed Crossing Improvements – Queen Creek Rd and Paseo Trail 32 Direct Users to Nearby Signalized Crossing D Install overhead pedestrian/ path lighting near trail approach 3 Install high-visibility crosswalk 1 Install STOP sign (R1-1) with street name sign panels 2 Install pedestrian pole with push button 4 Install pedestrian push button on existing traffic pole 5 Install detectable pavement marking message “Use Traffic Signal” 6 Install route wayfinding sign” “You Are Here” 7 Install wayfinding sign guiding trail users to cross at the signal 8 Widen existing sidewalk 9 Install new sidewalk and connect to existing sidewalk 10 Install stop bars 11 Install ADA curb ramps 12 Install truncated dome tactile strips 13 Existing traffic signal 14 6 7 8 E. MCQUEEN ROAD AND PASEO TRAIL Recommendation: Direct Users to Nearby Signalized Crossing 34 E Paseo Trail/Queen Creek Road & McQueen Road/Paseo Trail E Existing Conditions/ Proposed Improvements 35 View of the Paseo Trail alignment from the east side of McQueen Road, looking west. Paseo Trail is proposed to have a redirection of trail users attempting to cross McQueen Road to the nearby signalized crossing on the north leg of the existing intersection south of the trail. E Trail Continuation MCQUEEN RD QUEEN CREEK RD Pedestrians and Bicyclists MCQUEEN RD QUEEN CREEK RD 26 52 48 2 27 Pedestrians 89 31 12 2 40 16 1 10 12 2 73 Bicyclists 8,806 vpd 46-50 mph 7,466 vpd 46-50 mph 17 5 1 Southbound Northbound Daily volume (vehicles per day) 85th % speed Motor Vehicles Traffic Data 36 85th % (percentile) speed: 85% of vehicles in that direction were at the speed category indicated, or slower. E Pedestrians Peak hour 8:00-9:00am 2 EB, 5 WB Bicyclists Peak hour 8:25-9:25am 6 EB, 9 WB 5am to 9pm volume 5am to 9pm volume Paseo Trail/Queen Creek Road & McQueen Road/Paseo Trail 37 E Existing diversion route Queen Creek Rd McQueen Rd Amazon Trail alignment Proposed diversion Proposed diversion Airport Blvd Proposed Crossing Improvements – McQueen Road and Paseo Trail 38 Direct Users to Nearby Signalized Crossing E Install high-visibility crosswalk 1 Install ADA curb ramps 2 Install truncated dome tactile strips 3 Install pedestrian pole with push button 4 Install pedestrian guardrail 5 Install overhead pedestrian/ path lighting near trail approach 6 Install detectable pavement marking message “Use Traffic Signal” 7 Install route wayfinding sign” “You Are Here” 8 Install STOP sign (R1-1) with street name sign panels 9 Install back-to-back wayfinding sign with the trail name and directional arrow 10 Install wayfinding sign guiding trail users to cross at the signal 11 Remove existing sidewalk 13 Install new widened sidewalk 14 Install back-to-back signs: No Pedestrians (R9-3) and Use Crosswalk (R9-3bP) plaque 12 Install raised median 15 Install pathfinding blue stripe along sidewalk 16 Existing traffic signal 17 7 8 10 11 12 • Ashley/ Paseo Trail Crossing and Trail Connection • Design in 2023 • Construction in 2024-25 • Chandler/ Cooper and McQueen/ Queen Creek Crossings • Separate CIP Project • Currently Programmed in 2030 39 E Schedule 40 E Questions/ Discussion