EXECUTIVE SUMMARY 
 
Across the United States, natural and human-caused disasters have led to increasing levels of death, injury, 
property damage, and interruption of business and government services. The toll on families and individuals can 
be immense and damaged businesses cannot contribute to the economy. The time, money and effort to respond 
to and recover from these emergencies or disasters divert public resources and attention from other important 
programs and problems. With 54 federal or state declarations and a total of 524 other recorded events, the 28 
jurisdictions contained within Maricopa County, Arizona and participating in this planning effort recognize the 
consequences of disasters and the need to reduce the impacts of natural and human-caused hazards.  The County 
and jurisdictions also know that with careful selection, mitigation actions in the form of projects and programs 
can become long-term, cost effective means for reducing the impact of natural and human-caused hazards. 
The elected and appointed officials of Maricopa County and the 27 other participating jurisdictions 
demonstrated their commitment to hazard mitigation in 2014-2015 by preparing the second update of the 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan (2015 Plan).  The 2015 Plan covered all 28 
participating jurisdictions and was approved by FEMA on December 22, 2015.  To remain compliant with the 
congressional regulations, the county and jurisdictions must perform a full plan update and obtain state and 
FEMA approval. 
In response, the Maricopa County Department of Emergency Management (MCDEM) secured a federal 
planning grant and hired JE Fuller/ Hydrology and Geomorphology, Inc. to assist the County and participating 
jurisdictions with the update process.  MCDEM reconvened a multi-jurisdictional planning team (MJPT) 
comprised of veteran and first-time representatives from each participating jurisdiction, and other various 
county, state, and federal departments and organizations such as the National Weather Service and Arizona 
Public Service.  The MJPT met approximately every six-weeks beginning in July 2020 and finishing December 
2020.  Subsequent “catch up” meetings were conducted through February 2021 to assist several communities 
with finalizing assignments and the first draft of the updated 2021 Plan was issued in March 2021.  The 
meetings and MJPT worked in a collaborative effort to review, evaluate, and update the 2015 Plan keeping the 
single, consolidated multi-jurisdictional plan format and approach. Tribal Plan elements for each of the two 
participating Indian Tribes, were also updated to address Tribal specific planning requirements.  The 2021 Plan 
will continue to guide the County and participating jurisdictions toward greater disaster resistance in full 
harmony with the character and needs of the community and region.  
The Plan has been prepared in compliance with Section 322 of the Robert T. Stafford Disaster Relief and 
Emergency Assistance Act (Stafford Act or the Act), 42 U.S. C. 5165, enacted under Sec. 104 the Disaster 
Mitigation Act of 2000, (DMA 2000) Public Law 106-390 of October 30, 2000, as implemented at 44 CFR 
§201.6 and §201.7 dated October, 2007.  The Plan includes risk assessments for multiple natural hazards, a 
public outreach effort at two phases of the planning process, and development of a mitigation strategy that 
incorporates measures intended to eliminate or reduce the effects of future disasters throughout the County.  
The development of the various 2021 Plan elements was accomplished through a joint and cooperative venture 
by members of the Maricopa County MJPT, with MCDEM serving as the lead agency and primary point of 
contact for the planning effort.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page i 
TABLE OF CONTENTS 
 
SECTION 1:  JURISDICTIONAL ADOPTION AND FEMA APPROVAL ......................................... 1 
1.1 
DMA 2000 Requirements ................................................................................................. 1 
1.1.1 
General Requirements ...................................................................................... 1 
1.1.2 
Update Requirements ........................................................................................ 2 
1.2 
Official Record of Adoption ............................................................................................. 2 
1.3 
Tribal Assurances ............................................................................................................. 3 
1.4 
FEMA Approval Letter .................................................................................................... 3 
SECTION 2:  INTRODUCTION .................................................................................................... 5 
2.1 
Plan History ....................................................................................................................... 5 
2.2 
Plan Purpose and Authority ............................................................................................ 6 
2.3 
General Plan Description ................................................................................................. 6 
SECTION 3:  PLANNING PROCESS ............................................................................................. 9 
3.1 
Update Process Description ............................................................................................. 9 
3.2 
Previous Planning Process Assessment ........................................................................... 9 
3.3 
Planning Team ................................................................................................................ 10 
3.3.1 
General ........................................................................................................... 10 
3.3.2 
Primary Point of Contact ................................................................................ 10 
3.3.3 
Planning Team Assembly ................................................................................ 10 
3.3.4 
Planning Team Activities ................................................................................ 13 
3.3.5 
Agency/Organization Participation ................................................................ 18 
3.4 
Public Involvement ......................................................................................................... 20 
3.4.1 
Previous Plan Assessment............................................................................... 20 
3.4.2 
Plan Update .................................................................................................... 21 
3.4.3 
Tribal Definitions of “Public” ........................................................................ 22 
3.5 
Reference Documents and Technical Resources .......................................................... 22 
3.6 
Plan Integration into Other Planning Mechanisms ..................................................... 25 
3.6.1 
Past Plan Incorporation/Integration Assessment ........................................... 25 
3.6.2 
Five Year Plan Integration/Incorporation Strategy ....................................... 25 
3.6.3 
Plan Incorporation Process ............................................................................ 50 
SECTION 4:  COMMUNITY DESCRIPTIONS ............................................................................. 59 
4.1 
General ............................................................................................................................. 59 
4.2 
County Overview ............................................................................................................ 59 
4.2.1 
Geography....................................................................................................... 59 
4.2.2 
Climate ............................................................................................................ 60 
4.2.3 
Population ....................................................................................................... 64 
4.2.4 
Economy .......................................................................................................... 67 
4.2.5 
Development Trends for Unincorporated Maricopa County.......................... 68 
4.3 
Jurisdictional Overviews ................................................................................................ 68 
4.3.1 
Avondale ......................................................................................................... 70 
4.3.2 
Buckeye ........................................................................................................... 77 
4.3.3 
Carefree .......................................................................................................... 82 
4.3.4 
Cave Creek ...................................................................................................... 86 
4.3.5 
Chandler ......................................................................................................... 90 
4.3.6 
El Mirage ........................................................................................................ 94

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page ii 
4.3.7 
Fountain Hills ................................................................................................. 97 
4.3.8 
Fort McDowell Yavapai Nation .................................................................... 101 
4.3.9 
Gila Bend ...................................................................................................... 105 
4.3.10 
Gilbert ........................................................................................................... 108 
4.3.11 
Glendale ........................................................................................................ 113 
4.3.12 
Goodyear....................................................................................................... 117 
4.3.13 
Guadalupe ..................................................................................................... 121 
4.3.14 
Litchfield Park .............................................................................................. 124 
4.3.15 
Mesa .............................................................................................................. 127 
4.3.16 
Paradise Valley ............................................................................................. 132 
4.3.17 
Peoria ............................................................................................................ 134 
4.3.18 
Phoenix ......................................................................................................... 137 
4.3.19 
Queen Creek.................................................................................................. 143 
4.3.20 
Salt River Pima-Maricopa Indian Community ............................................. 147 
4.3.21 
Salt River Project .......................................................................................... 151 
4.3.22 
Scottsdale ...................................................................................................... 151 
4.3.23 
Surprise ......................................................................................................... 155 
4.3.24 
Tempe ............................................................................................................ 159 
4.3.25 
Tolleson ......................................................................................................... 165 
4.3.26 
Wickenburg ................................................................................................... 168 
4.3.27 
Youngtown..................................................................................................... 172 
SECTION 5: RISK ASSESSMENT ............................................................................................ 175 
5.1 
Hazard Identification and Screening .......................................................................... 175 
5.2 
Vulnerability Analysis Methodology .......................................................................... 180 
5.2.1 
General ......................................................................................................... 180 
5.2.2 
Climate Change ............................................................................................ 180 
5.2.3 
Calculated Priority Risk Index (CPRI) Evaluation ...................................... 182 
5.2.4 
Asset Inventory .............................................................................................. 182 
5.2.5 
Loss/Exposure Estimations ........................................................................... 185 
5.2.6 
Development Trend Analysis ........................................................................ 187 
5.3 
Hazard Risk Profiles .................................................................................................... 187 
5.3.1 
Dam Inundation ............................................................................................ 188 
5.3.2 
Drought ......................................................................................................... 205 
5.3.3 
Extreme Heat ................................................................................................ 216 
5.3.4 
Fissure........................................................................................................... 230 
5.3.5 
Flood / Flash Flood ...................................................................................... 239 
5.3.6 
Levee Failure ................................................................................................ 253 
5.3.7 
Severe Wind .................................................................................................. 262 
5.3.8 
Subsidence..................................................................................................... 271 
5.3.9 
Wildfire ......................................................................................................... 282 
5.4 
Risk Assessment Summary .......................................................................................... 296 
SECTION 6: MITIGATION STRATEGY ................................................................................... 297 
6.1 
Hazard Mitigation Goals and Objectives ................................................................... 297 
6.2 
Capability Assessment ................................................................................................. 298 
6.2.1 
Jurisdictional Capabilities ............................................................................ 298

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page iii 
6.2.2 
Fort McDowell Yavapai Nation Pre- and Post-Disaster Hazard 
Management ................................................................................................ 383 
6.2.3 
Salt River Pima Maricopa Indian Community Pre- and Post-Disaster 
Hazard Management ................................................................................... 384 
6.2.4 
National Flood Insurance Program Participation ....................................... 386 
6.3 
Mitigation Actions/Projects and Implementation Strategy ...................................... 413 
6.3.1 
Previous Mitigation Actions/Projects Assessment ........................................ 413 
6.3.2 
New Mitigation Actions / Projects and Implementation Strategy ................. 413 
SECTION 7:  PLAN MAINTENANCE PROCEDURES ................................................................ 497 
7.1 
Monitoring and Evaluation .......................................................................................... 497 
7.1.1 
Past Plan Cycle ............................................................................................. 497 
7.1.2 
Proposed Schedule and Scope ...................................................................... 498 
7.2 
Plan Update ................................................................................................................... 498 
7.3 
Continued Public Involvement .................................................................................... 499 
7.4 
Monitoring of Tribal Mitigation Activities ................................................................. 520 
7.4.1 
Goals Achievement........................................................................................ 520 
7.4.2 
Actions/Projects Progress ............................................................................. 520 
7.4.3 
Project Closeouts .......................................................................................... 520 
SECTION 8: PLAN TOOLS ..................................................................................................... 523 
8.1 
Acronyms ....................................................................................................................... 523 
8.2 
Definitions ...................................................................................................................... 524 
 
 
LIST OF FIGURES 
 
Figure 4-1:  Map of general features for Maricopa County ..............................................61 
Figure 4-2:  Daily Temperatures and Extremes for Carefree Station, 
Arizona ......................................................................................................62 
Figure 4-3:  Daily Temperatures and Extremes for Gila Bend Station, 
Arizona ......................................................................................................62 
Figure 4-4:  Daily Temperatures and Extremes for Phoenix WSFO AP 
Station, Arizona........................................................................................63 
Figure 4-5:  Monthly climate summary for the Carefree Station, Arizona ......................63 
Figure 4-6:  Monthly climate summary for the Gila Bend Station, Arizona ...................64 
Figure 4-7:  Monthly climate summary for the Phoenix WSFO AP 
Station, Arizona........................................................................................64 
Figure 4-8:  2010 population density for Maricopa County ..............................................66 
Figure 4-9:  2010 employment concentration projections for Maricopa 
County .......................................................................................................69 
Figure 4-10:  Avondale location map ...................................................................................76 
Figure 4-11:  Buckeye location map .....................................................................................79

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page iv 
Figure 4-12:  Buckeye SFR Activity – Past 5 Years ............................................................80 
Figure 4-13:  Buckeye master planned communities map .................................................81 
Figure 4-14:  Carefree location map ....................................................................................84 
Figure 4-15:  Carefree land use planning map ....................................................................85 
Figure 4-16:  Cave Creek location map ...............................................................................88 
Figure 4-17:  Cave Creek land use planning map ...............................................................89 
Figure 4-18:  Chandler location map ...................................................................................92 
Figure 4-19:  Chandler land use planning map ..................................................................93 
Figure 4-20:  El Mirage location map ..................................................................................95 
Figure 4-21:  El Mirage land use planning map..................................................................96 
Figure 4-22:  Fountain Hills location map ...........................................................................99 
Figure 4-23:  Fountain Hills land use planning map ........................................................100 
Figure 4-24:  Fort McDowell Yavapai Nation location map ............................................103 
Figure 4-25:  Fort McDowell Yavapai Nation land use map ...........................................104 
Figure 4-26:  Gila Bend location map ................................................................................106 
Figure 4-27:  Gila Bend land use planning map ...............................................................107 
Figure 4-28:  Gilbert location map .....................................................................................111 
Figure 4-29:  Gilbert growth area map ..............................................................................112 
Figure 4-30:  Glendale location map ..................................................................................115 
Figure 4-31:  Glendale land use planning map .................................................................116 
Figure 4-32:  Goodyear location map.................................................................................119 
Figure 4-33:  Goodyear land use planning map ................................................................120 
Figure 4-34:  Guadalupe location map...............................................................................122 
Figure 4-35:  Guadalupe land use map ..............................................................................123 
Figure 4-36:  Litchfield Park location map .......................................................................125 
Figure 4-37:  Litchfield Park land use map .......................................................................126 
Figure 4-38:  Mesa location map ........................................................................................130 
Figure 4-39:  Mesa growth area map .................................................................................131 
Figure 4-40:  Paradise Valley location map .......................................................................133 
Figure 4-41:  Peoria location map ......................................................................................135 
Figure 4-42:  Peoria land use map ......................................................................................136 
Figure 4-43:  Phoenix location map ....................................................................................141

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page v 
Figure 4-44:  Phoenix land use map ...................................................................................142 
Figure 4-45:  Queen Creek location map ...........................................................................146 
Figure 4-46:  Queen Creek land use map ..........................................................................146 
Figure 4-47:  Salt River Pima-Maricopa Indian Community location map...................149 
Figure 4-48:  Salt River Pima-Maricopa Indian Community land use map ..................150 
Figure 4-49:  Scottsdale location map ................................................................................153 
Figure 4-50:  Scottsdale growth area map .........................................................................154 
Figure 4-51:  Surprise location map ...................................................................................157 
Figure 4-52:  Surprise growth area maps ..........................................................................158 
Figure 4-53:  Tempe location map ......................................................................................163 
Figure 4-54:  Tempe projected land use map ....................................................................164 
Figure 4-55:  Tolleson location map ...................................................................................166 
Figure 4-56:  Tolleson growth area map ............................................................................167 
Figure 4-57:  Wickenburg location map ............................................................................170 
Figure 4-58:  Wickenburg growth area map .....................................................................171 
Figure 4-59:  Youngtown location map ..............................................................................173 
Figure 4-60:  Youngtown future land use map .................................................................174 
Figure 5-1:  Average annual precipitation variance from a normal based 
on 1895-2018 period for Maricopa County .........................................206 
Figure 5-2:  Annual historic precipitation for Maricopa County from 
1896 to 2017 ............................................................................................207 
Figure 5-3:  Drought in Maricopa County from 2000 to 2020 .........................................208 
Figure 5-4:  U.S. Drought Monitor Map for November 10, 2020 ....................................209 
Figure 5-5:  U.S. Seasonal Drought Outlook, October 2020 to January 
2021..........................................................................................................210 
Figure 5-6:  Arizona long term drought status map for July September 
2020..........................................................................................................211 
Figure 5-7:  Progression of days with maximum temperature over 100°F 
and minimum temperature over 85°F for Phoenix Sky 
Harbor from 1950 to 2020 .....................................................................217 
Figure 5-8a:  Total heat-associated deaths recorded by the Maricopa 
County Department of Public Health heat surveillance 
system, 2006–2020 ..................................................................................218 
Figure 5-8b:  Daily emergency room visits as a percent of all visits by day 
during the 2020 heat season for Maricopa County .............................218

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page vi 
Figure 5-8c:  Average percent of emergency room visits in Maricopa 
County (April-September 2020) due to heat-related 
illness by HeatRisk category .................................................................219 
Figure 5-9a:  Projected temperature changes for Arizona based on varied 
future greenhouse gas emission assumptions ......................................221 
Figure 5-9b:  Past and projected number of days in a year with high 
temperatures in Phoenix, AZ at-or-above 100 °F ...............................221 
Figure 5-9c:  Past and projected number of days in a year with high 
temperatures in Phoenix, AZ at-or-above 110 °F ...............................222 
Figure 5-10a:  High or very high heat vulnerability index exposure by 
percent population .................................................................................224 
Figure 5-10b:  High or very high heat vulnerability index exposure by 
percent population .................................................................................224 
Figure 5-11:  Heat associated deaths versus daily mean temperature ............................226 
Figure 5-12:  Illustration of FEMA Wind Zones ..............................................................266 
Figure 5-13:  Map of Maximum Subsidence Depths for Arizona ...................................273 
 
 
LIST OF TABLES 
 
Table 3-1:  List of jurisdictional primary points of contact ...............................................11 
Table 3-2:  Summary of multi-jurisdictional planning team participants .......................13 
Table 3-3:  Summary of planning meetings convened as part of the plan 
update process ..........................................................................................16 
Table 3-4:  List of agencies and organizations invited or participating in 
the planning process ................................................................................19 
Table 3-5:  List of resource documents and references reviewed and 
incorporated in the Plan update process ...............................................22 
Table 3-6:  Plan integration history and future strategy for Avondale ............................26 
Table 3-7:  Plan integration history and future strategy for Buckeye ..............................27 
Table 3-8:  Plan integration history and future strategy for Carefree .............................28 
Table 3-9:  Plan integration history and future strategy for Cave Creek ........................29 
Table 3-10:  Plan integration history and future strategy for Chandler ..........................29 
Table 3-11:  Plan integration history and future strategy for El Mirage .........................30 
Table 3-12:  Plan integration history and future strategy for Fort 
McDowell Yavapai Nation ......................................................................31

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page vii 
Table 3-13:  Plan integration history and future strategy for Fountain 
Hills............................................................................................................32 
Table 3-14:  Plan integration history and future strategy for Gila Bend .........................32 
Table 3-15:  Plan integration history and future strategy for Gilbert ..............................33 
Table 3-16:  Plan integration history and future strategy for Glendale ...........................34 
Table 3-17:  Plan integration history and future strategy for Goodyear..........................36 
Table 3-18:  Plan integration history and future strategy for Guadalupe........................37 
Table 3-19:  Plan integration history and future strategy for Litchfield 
Park ...........................................................................................................38 
Table 3-20:  Plan integration history and future strategy for Maricopa 
County (Unincorporated) ........................................................................39 
Table 3-21:  Plan integration history and future strategy for Mesa .................................40 
Table 3-22:  Plan integration history and future strategy for Paradise 
Valley .........................................................................................................40 
Table 3-23:  Plan integration history and future strategy for Peoria ...............................40 
Table 3-24:  Plan integration history and future strategy for Phoenix .............................41 
Table 3-25:  Plan integration history and future strategy for Queen Creek ....................42 
Table 3-26:  Plan integration history and future strategy for Salt River 
Pima Maricopa Indian Community .......................................................42 
Table 3-27:  Plan integration history and future strategy for Scottsdale .........................43 
Table 3-28:  Plan integration history and future strategy for Surprise ............................45 
Table 3-29:  Plan integration history and future strategy for Tempe ...............................47 
Table 3-30:  Plan integration history and future strategy for Tolleson ............................48 
Table 3-31:  Plan integration history and future strategy for Wickenburg .....................48 
Table 3-32:  Plan integration history and future strategy for Youngtown .......................49 
Table 3-33:  Jurisdictional standard operating procedures for integration 
of planning mechanisms ..........................................................................51 
Table 4-1:  Summary of jurisdictional population estimates for Maricopa 
County .......................................................................................................65 
Table 4-2:  Population, housing and employment statistics for Avondale .......................70 
Table 4-3:  Population, housing and employment statistics for Buckeye .........................77 
Table 4-4:  Population, housing and employment statistics for Carefree .........................82 
Table 4-5:  Population, housing and employment statistics for Cave Creek ....................86 
Table 4-6:  Population, housing and employment statistics for Chandler .......................90

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page viii 
Table 4-7:  Population, housing and employment statistics for El Mirage.......................94 
Table 4-8:  Population, housing and employment statistics for Fountain 
Hills............................................................................................................97 
Table 4-9:  Population, housing and employment statistics for Fort 
McDowell Yavapai Nation ....................................................................101 
Table 4-10:  Population, housing and employment statistics for Gila Bend...................105 
Table 4-11:  Population, housing and employment statistics for Gilbert .......................108 
Table 4-12:  Population, housing and employment statistics for Glendale ....................113 
Table 4-13:  Population, housing and employment statistics for Goodyear ...................117 
Table 4-14:  Population, housing and employment statistics for 
Guadalupe ...............................................................................................121 
Table 4-15:  Population, housing and employment statistics for Litchfield 
Park .........................................................................................................124 
Table 4-16:  Population, housing and employment statistics for Mesa ...........................128 
Table 4-17:  Population, housing and employment statistics for Paradise 
Valley .......................................................................................................132 
Table 4-18:  Population, housing and employment statistics for Peoria .........................134 
Table 4-19:  Population, housing and employment statistics for Phoenix ......................137 
Table 4-20:  Population, housing and employment statistics for Queen 
Creek .......................................................................................................143 
Table 4-21:  Population, housing and employment statistics for Salt River 
Pima-Maricopa Indian Community .....................................................147 
Table 4-22:  Population, housing and employment statistics for Scottsdale ..................151 
Table 4-23:  Population, housing and employment statistics for Surprise .....................155 
Table 4-24:  Population, housing and employment statistics for Tempe ........................159 
Table 4-25:  Population, housing and employment statistics for Tolleson .....................165 
Table 4-26:  Population, housing and employment statistics for 
Wickenburg ............................................................................................168 
Table 4-27:  Population, housing and employment statistics for 
Youngtown ..............................................................................................172 
Table 5-1:  Summary of Initial Hazard Identification Lists ............................................176 
Table 5-2:  State and Federally Declared Natural Hazard Events That 
Included Maricopa County – January 1966 to 
December 2014 .......................................................................................177 
Table 5-3:  Maricopa County Historic Hazard Events – June 1955 to 
December 2012 .......................................................................................178

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page ix 
Table 5-4:  Summary of Calculated Priority Risk Index (CPRI) categories 
and risk levels .........................................................................................183 
Table 5-5:  Summary of Critical and Non-Critical Facility counts by 
category and jurisdiction .......................................................................185 
Table 5-6:  Summary of ADWR safety categories ............................................................190 
Table 5-7:  Summary of NID downstream hazard classifications ...................................190 
Table 5-8:  Summary count of NID and ADWR hazard classification 
dams ........................................................................................................191 
Table 5-9:  Summary of CPRI results by jurisdiction for dam inundation 
(emergency spillway flow and dam failure) .........................................192 
Table 5-10:  Asset inventory exposure due to emergency spillway 
inundation ...............................................................................................194 
Table 5-11:  Asset inventory exposure due to dam failure inundation ...........................195 
Table 5-12:  Residential structures exposed to emergency spillway 
inundation ...............................................................................................197 
Table 5-13:  Residential structures exposed to dam failure inundation .........................198 
Table 5-14:  Population sectors exposed to emergency spillway inundation ..................200 
Table 5-15:  Population sectors exposed to dam failure inundation ...............................201 
Table 5-16:  CPRI results by jurisdiction for drought .....................................................212 
Table 5-17:  CPRI results by jurisdiction for extreme heat .............................................222 
Table 5-18:  CPRI results by jurisdiction for fissure hazard...........................................232 
Table 5-19:  Asset inventory exposure to high hazard fissure zones ...............................236 
Table 5-20:  Population sectors exposed to high hazard fissure zones ...........................237 
Table 5-21:  Residential structures exposed to fissure high hazard zones .....................238 
Table 5-22:  CPRI results by jurisdiction for flooding hazard ........................................244 
Table 5-23:  Asset inventory exposure to high hazard flood zones .................................245 
Table 5-24:  Population sectors exposed to high hazard flood zones ..............................246 
Table 5-25:  Residential structures exposed to high hazard flood zones ........................247 
Table 5-26:  Repetitive loss property statistics for Maricopa County 
jurisdictions ............................................................................................248 
Table 5-27:  CPRI results by jurisdiction for levee failure ..............................................255 
Table 5-28:  Asset inventory exposure to high hazard levee failure areas .....................256 
Table 5-29:  Population sectors exposed to high hazard levee failure areas ..................257 
Table 5-30:  Residential structures exposed to high hazard levee failure 
areas ........................................................................................................258

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page x 
Table 5-31:  Beaufort Wind Scale.......................................................................................267 
Table 5-32:  Enhanced Fujita Tornado Scale ....................................................................267 
Table 5-33:  CPRI results by jurisdiction for severe wind ...............................................269 
Table 5-34:  CPRI results by jurisdiction for subsidence ................................................273 
Table 5-35:  Asset inventory exposure to high hazard subsidence areas ........................278 
Table 5-36:  Population sectors exposed to high hazard subsidence areas .....................279 
Table 5-37:  Residential structures exposed to high hazard subsidence 
areas ........................................................................................................280 
Table 5-38:  CPRI results by jurisdiction for wildfire......................................................285 
Table 5-39:  Asset inventory exposure to high hazard wildfire areas .............................287 
Table 5-40:  Population sectors exposed to high hazard wildfire areas ..........................288 
Table 5-41:  Residential structures exposed to high hazard wildfire areas ....................289 
Table 5-42:  Summary of hazards to be mitigated by each participating 
jurisdiction ..............................................................................................296 
Table 6-1-1:  Legal and regulatory capabilities for Avondale .........................................299 
Table 6-2-1:  Technical staff and personnel capabilities for Avondale ...........................300 
Table 6-3-1:  Fiscal capabilities for Avondale ...................................................................300 
Table 6-1-2:  Legal and regulatory capabilities for Buckeye ...........................................301 
Table 6-2-2:  Technical staff and personnel capabilities for Buckeye.............................302 
Table 6-3-2:  Fiscal capabilities for Buckeye .....................................................................303 
Table 6-1-3:  Legal and regulatory capabilities for Carefree ..........................................304 
Table 6-2-3:  Technical staff and personnel capabilities for Carefree ............................306 
Table 6-3-3:  Fiscal capabilities for Carefree ....................................................................307 
Table 6-1-4:  Legal and regulatory capabilities for Cave Creek .....................................308 
Table 6-2-4:  Technical staff and personnel capabilities for Cave Creek .......................309 
Table 6-3-4:  Fiscal capabilities for Cave Creek ...............................................................310 
Table 6-1-5:  Legal and regulatory capabilities for Chandler .........................................311 
Table 6-2-5:  Technical staff and personnel capabilities for Chandler ...........................312 
Table 6-3-5:  Fiscal capabilities for Chandler ...................................................................312 
Table 6-1-6:  Legal and regulatory capabilities for El Mirage ........................................313 
Table 6-2-6:  Technical staff and personnel capabilities for El Mirage ..........................315 
Table 6-3-6:  Fiscal capabilities for El Mirage ..................................................................316

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page xi 
Table 6-1-7:  Legal and regulatory capabilities for Fort McDowell 
Yavapai Nation .......................................................................................317 
Table 6-2-7:  Technical staff and personnel capabilities for Fort 
McDowell Yavapai Nation ....................................................................317 
Table 6-3-7:  Fiscal capabilities for Fort McDowell Yavapai Nation ..............................318 
Table 6-3-7b:  Funding source assessment for Fort McDowell Yavapai 
Nation ......................................................................................................319 
Table 6-1-8:  Legal and regulatory capabilities for Fountain Hills .................................320 
Table 6-2-8:  Technical staff and personnel capabilities for Fountain Hills ..................321 
Table 6-3-8:  Fiscal capabilities for Fountain Hills ...........................................................321 
Table 6-1-9:  Legal and regulatory capabilities for Gila Bend ........................................322 
Table 6-2-9:  Technical staff and personnel capabilities for Gila Bend ..........................322 
Table 6-3-9:  Fiscal capabilities for Gila Bend ..................................................................323 
Table 6-1-10:  Legal and regulatory capabilities for Gilbert ...........................................324 
Table 6-2-10:  Technical staff and personnel capabilities for Gilbert.............................327 
Table 6-3-10:  Fiscal capabilities for Gilbert .....................................................................328 
Table 6-1-11:  Legal and regulatory capabilities for Glendale ........................................329 
Table 6-2-11:  Technical staff and personnel capabilities for Glendale ..........................331 
Table 6-3-11:  Fiscal capabilities for Glendale ..................................................................331 
Table 6-1-12:  Legal and regulatory capabilities for Goodyear ......................................333 
Table 6-2-12:  Technical staff and personnel capabilities for Goodyear ........................334 
Table 6-3-12:  Fiscal capabilities for Goodyear ................................................................334 
Table 6-1-13:  Legal and regulatory capabilities for Guadalupe ....................................336 
Table 6-2-13:  Technical staff and personnel capabilities for Guadalupe ......................337 
Table 6-3-13:  Fiscal capabilities for Guadalupe ..............................................................337 
Table 6-1-14:  Legal and regulatory capabilities for Litchfield Park .............................339 
Table 6-2-14:  Technical staff and personnel capabilities for Litchfield 
Park .........................................................................................................340 
Table 6-3-14:  Fiscal capabilities for Litchfield Park .......................................................340 
Table 6-1-15:  Legal and regulatory capabilities for Mesa ..............................................342 
Table 6-2-15:  Technical staff and personnel capabilities for Mesa ................................343 
Table 6-3-15:  Fiscal capabilities for Mesa ........................................................................343 
Table 6-1-16:  Legal and regulatory capabilities for Paradise Valley.............................345

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page xii 
Table 6-2-16:  Technical staff and personnel capabilities for Paradise 
Valley .......................................................................................................345 
Table 6-3-16:  Fiscal capabilities for Paradise Valley.......................................................345 
Table 6-1-17:  Legal and regulatory capabilities for Peoria ............................................347 
Table 6-2-17:  Technical staff and personnel capabilities for Peoria ..............................349 
Table 6-3-17:  Fiscal capabilities for Peoria ......................................................................350 
Table 6-1-18:  Legal and regulatory capabilities for Phoenix..........................................351 
Table 6-2-18:  Technical staff and personnel capabilities for Phoenix ...........................353 
Table 6-3-18:  Fiscal capabilities for Phoenix....................................................................355 
Table 6-1-19:  Legal and regulatory capabilities for Queen Creek .................................356 
Table 6-2-19:  Technical staff and personnel capabilities for Queen Creek ..................357 
Table 6-3-19:  Fiscal capabilities for Queen Creek ...........................................................358 
Table 6-1-20:  Legal and regulatory capabilities for Salt River Pima-
Maricopa Indian Community ...............................................................359 
Table 6-2-20:  Technical staff and personnel capabilities for Salt River 
Pima-Maricopa Indian Community .....................................................359 
Table 6-3-20a:  Fiscal capabilities for Salt River Pima-Maricopa Indian 
Community .............................................................................................360 
Table 6-3-20b:  Funding source assessment for Salt River Pima-Maricopa 
Indian Community .................................................................................361 
Table 6-1-22:  Legal and regulatory capabilities for Scottsdale ......................................362 
Table 6-2-22:  Technical staff and personnel capabilities for Scottsdale ........................364 
Table 6-3-22:  Fiscal capabilities for Scottsdale ................................................................365 
Table 6-1-23:  Legal and regulatory capabilities for Surprise .........................................366 
Table 6-2-23:  Technical staff and personnel capabilities for Surprise ..........................368 
Table 6-3-23:  Fiscal capabilities for Surprise ...................................................................369 
Table 6-1-24:  Legal and regulatory capabilities for Tempe............................................370 
Table 6-2-24:  Technical staff and personnel capabilities for Tempe .............................370 
Table 6-3-24:  Fiscal capabilities for Tempe......................................................................371 
Table 6-1-25:  Legal and regulatory capabilities for Tolleson .........................................372 
Table 6-2-25:  Technical staff and personnel capabilities for Tolleson...........................373 
Table 6-3-25:  Fiscal capabilities for Tolleson ...................................................................373 
Table 6-1-26:  Legal and regulatory capabilities for Unincorporated 
Maricopa County ...................................................................................374

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page xiii 
Table 6-2-26:  Technical staff and personnel capabilities for 
Unincorporated Maricopa County .......................................................375 
Table 6-3-26:  Fiscal capabilities for Unincorporated Maricopa County .......................376 
Table 6-1-27:  Legal and regulatory capabilities for Wickenburg ..................................377 
Table 6-2-27:  Technical staff and personnel capabilities for Wickenburg ....................378 
Table 6-3-27:  Fiscal capabilities for Wickenburg ............................................................379 
Table 6-1-28:  Legal and regulatory capabilities for Youngtown....................................380 
Table 6-2-28:  Technical staff and personnel capabilities for Youngtown .....................381 
Table 6-3-28:  Fiscal capabilities for Youngtown .............................................................382 
Table 6-4-1:  Fort McDowell Yavapai Nation departments or entities with 
hazard mitigation responsibilities ........................................................383 
Table 6-4-2:  Salt River Pima Maricopa Indian Community departments 
or entities with hazard mitigation responsibilities ..............................384 
Table 6-5:  NFIP status and statistics for Maricopa County and 
participating jurisdictions .....................................................................386 
Table 6-6:  NFIP program assessment for Maricopa County and 
participating NFIP jurisdictions ...........................................................389 
Table 6-8-1:  Mitigation actions and projects and implementation 
strategy for Avondale ............................................................................419 
Table 6-8-2:  Mitigation actions and projects and implementation 
strategy for Buckeye ..............................................................................421 
Table 6-8-3:  Mitigation actions and projects and implementation 
strategy for Carefree ..............................................................................424 
Table 6-8-4:  Mitigation actions and projects and implementation 
strategy for Cave Creek.........................................................................426 
Table 6-8-5:  Mitigation actions and projects and implementation 
strategy for Chandler ............................................................................428 
Table 6-8-6:  Mitigation actions and projects and implementation 
strategy for El Mirage ...........................................................................429 
Table 6-8-7:  Mitigation actions and projects and implementation 
strategy for Fort McDowell Yavapai Nation .......................................433 
Table 6-8-8:  Mitigation actions and projects and implementation 
strategy for Fountain Hills ....................................................................436 
Table 6-8-9:  Mitigation actions and projects and implementation 
strategy for Gila Bend ...........................................................................438 
Table 6-8-10:  Mitigation actions and projects and implementation 
strategy for Gilbert ................................................................................440

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page xiv 
Table 6-8-11:  Mitigation actions and projects and implementation 
strategy for Glendale .............................................................................443 
Table 6-8-12:  Mitigation actions and projects and implementation 
strategy for Goodyear ............................................................................446 
Table 6-8-13:  Mitigation actions and projects and implementation 
strategy for Guadalupe ..........................................................................449 
Table 6-8-14:  Mitigation actions and projects and implementation 
strategy for Litchfield Park...................................................................450 
Table 6-8-15:  Mitigation actions and projects and implementation 
strategy for Mesa....................................................................................452 
Table 6-8-16:  Mitigation actions and projects and implementation 
strategy for Paradise Valley ..................................................................454 
Table 6-8-17:  Mitigation actions and projects and implementation 
strategy for Peoria..................................................................................454 
Table 6-8-18:  Mitigation actions and projects and implementation 
strategy for Phoenix ...............................................................................460 
Table 6-8-20:  Summary of mitigation actions and projects and 
implementation strategy for Queen Creek ..........................................463 
Table 6-8-20:  Mitigation actions and projects and implementation 
strategy for Salt River Pima-Maricopa Indian 
Community .............................................................................................465 
Table 6-8-21:  Mitigation actions and projects and implementation 
strategy for Scottsdale ...........................................................................468 
Table 6-8-22:  Mitigation actions and projects and implementation 
strategy for Surprise ..............................................................................472 
Table 6-8-23: Mitigation actions and projects and implementation 
strategy for Tempe .................................................................................478 
Table 6-8-24:  Mitigation actions and projects and implementation 
strategy for Tolleson ..............................................................................485 
Table 6-8-25:  Mitigation actions and projects and implementation 
strategy for Unincorporated Maricopa County ..................................487 
Table 6-8-26:  Mitigation actions and projects and implementation 
strategy for Wickenburg .......................................................................491 
Table 6-8-27:  Mitigation actions and projects and implementation 
strategy for Youngtown .........................................................................493 
Table 7-1:  Continued public involvement activities performed by 
jurisdictions during the 2009 Plan cycle ..............................................499

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page xv 
Table 7-2:  Continued public involvement activities or opportunities 
identified by each participating jurisdiction .......................................509 
 
 
LIST OF MAPS 
 
Maps 1A, 1B, and 1C – Dam Spillway Flood Hazard Map(s) 
Maps 2A, 2B, and 2C – Potential Dam Failure Flood Hazard Map(s) 
Maps 3A, 3B, and 3C – Earth Fissure Hazard Map(s) 
Maps 4A, 4B, and 4C – Flood Hazard Map(s) 
Maps 5A, 5B, and 5C – Potential Levee Failure Flood Hazard Map(s) 
Maps 6A, 6B, and 6C – Subsidence Hazard Map(s) 
Maps 7A, 7B, and 7C – Wildfire Hazard Map(s) 
Maps 7A-2, 7B-2, and 7C-2 – Fire Threat Index Map(s) 
 
 
LIST OF APPENDICES 
 
Appendix A:  Official Resolution of Adoption 
Appendix B:  Planning Process Documentation 
Appendix C:  Public Involvement Records (Digital Only) 
Appendix D:  Detailed Historic Hazard Records (Digital Only) 
Appendix E:  Plan Maintenance Review Memorandums 
 
 
SUPPLEMENTAL DOCUMENTS (under separate cover) 
 
Jurisdiction-Specific Executive Summaries

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 1 
SECTION 1:  JURISDICTIONAL ADOPTION AND FEMA APPROVAL 
 
1.1 
DMA 2000 Requirements 
1.1.1 General Requirements 
This 2021 update of the Maricopa County Multi-Jurisdictional Hazard 
Mitigation Plan (Plan) has been prepared in compliance with Section 322 of the Robert 
T. Stafford Disaster Relief and Emergency Assistance Act of 1988 (Stafford Act), 42 
U.S.C. 5165, as amended by Section 104 of the Disaster Mitigation Act of 2000 (DMA 
2000) Public Law 106-390 enacted October 30, 2000.  The regulations governing the 
mitigation planning requirements for local mitigation plans are published under the 
Code of Federal Regulations (CFR) Title 44, Section 201.6 (44 CFR §201.6).  
Minimum requirements for tribal mitigation plans are published under CFR Title 44, 
Section 201.7 (44 CFR §201.7).  Additionally, a DMA 2000 compliant plan that 
addresses flooding will also meet the minimum planning requirements for the Flood 
Mitigation Assistance program as provided for under 44 CFR §78. 
DMA 2000 provides requirements for States, Tribes, and local governments to 
undertake a risk-based approach to reducing risks to natural hazards through mitigation 
planning1. The local mitigation plan is the representation of the jurisdiction's 
commitment to reduce risks from natural hazards, serving as a guide for decision 
makers as they commit resources to reducing the effects of natural hazards.  Local plans 
will also serve as the basis for the State to provide technical assistance and to prioritize 
project funding. 
Under 44 CFR §201.6 and §201.7, local and tribal governments must have a 
Federal Emergency Management Agency (FEMA)-approved local mitigation plan in 
order to apply for and/or receive project grants as a sub-grantee under the following 
Hazard Mitigation Assistance (HMA) programs: 
• Hazard Mitigation Grant Program (HMGP) 
 
1 FEMA, 2008, Local Multi-Hazard Mitigation Planning Guidance 
Requirement §201.6(c)(5): [The local hazard mitigation plan shall include…] Documentation that the plan has been 
formally adopted by the governing body of the jurisdiction requesting approval of the plan (e.g., City Council, County 
Commissioner, Tribal Council). For multi-jurisdictional plans, each jurisdiction requesting approval of the plan must 
document that it has been formally adopted. 
 
Requirement §201.6(d)(3): A local jurisdiction must review and revise its plan to reflect changes in development, 
progress in local mitigation efforts, and changes in priorities, and resubmit it for approval within five (5) years in order to 
continue to be eligible for mitigation project grant funding. 
 
Requirement §201.7(a)(1): Indian tribal governments applying to FEMA as a grantee must have an approved Tribal 
Mitigation Plan meeting the requirements of this section as a condition of receiving non-emergency Stafford Act 
assistance and FEMA mitigation grants. 
 
Requirement §201.7(a)(4): Multi-jurisdictional plans (e.g. county-wide or watershed plans) may be accepted, as 
appropriate, as long as the Indian tribal government has participated in the process and has officially adopted the plan. 
Indian tribal governments must address all the elements identified in this section to ensure eligibility as a grantee or as a 
sub-grantee.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 2 
• Building Resilient Infrastructure and Communities (BRIC) [formerly Pre-
Disaster Mitigation (PDM)] 
• Flood Mitigation Assistance (FMA) 
In addition, Indian Tribal governments applying to FEMA as a grantee must 
have an approved tribal mitigation plan meeting the requirements of 44 CFR §201.7 as 
a condition of receiving non-emergency Stafford Act assistance through Public 
Assistance Categories C through G and the above mentioned HMA program funds. 
1.1.2 Update Requirements 
DMA 2000 requires that existing plans be updated every five years, with each 
plan cycle requiring a complete review, revision, and re-approval of the plan at both 
the state and FEMA level.  Maricopa County, the incorporated communities of 
Avondale, Buckeye, Carefree, Cave Creek, Chandler, El Mirage, Fountain Hills, Gila 
Bend, Gilbert, Glendale, Goodyear, Guadalupe, Litchfield Park, Mesa, Paradise 
Valley, Peoria, Phoenix, Queen Creek, Scottsdale, Surprise, Tempe, Tolleson, 
Wickenburg, and Youngtown, the Fort McDowell Yavapai Nation and Salt River Pima-
Maricopa Indian Community, and the Salt River Project are participating jurisdictions 
in the FEMA approved 2015 Maricopa County Multi-Jurisdictional Hazard Mitigation 
Plan (2015 Plan).  The current Plan is the result of an update process performed by the 
participating jurisdictions to update the 2015 Plan.  The Plan continues to include all 
tribal required planning elements. 
1.2 
Official Record of Adoption 
Promulgation of the Plan is accomplished through formal adoption of official 
resolutions by the governing body for each participating jurisdiction in accordance with the 
authority and powers granted to those jurisdictions by the State of Arizona and/or the federal 
government.  Participating jurisdictions in the Plan include: 
Counties 
Tribes 
Cities 
Towns 
Maricopa 
Fort McDowell 
Yavapai Nation 
 
Salt River 
Pima-Maricopa 
Indian Community 
Avondale 
Buckeye 
Chandler 
El Mirage 
Glendale 
Goodyear 
Litchfield Park 
Mesa 
Peoria 
Phoenix 
Scottsdale 
Surprise 
Tempe 
Tolleson 
Carefree 
Cave Creek 
Fountain Hills 
Gila Bend 
Gilbert 
Guadalupe 
Queen Creek 
Wickenburg 
Youngtown

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 3 
It is noted that the Town of Paradise Valley and Salt River Project will not be included 
in the Plan for this update.  For those participating, each jurisdiction will keep a copy of their 
official resolution of adoption located in Appendix A of their copy of the Plan. 
1.3 
Tribal Assurances 
The Fort McDowell Yavapai Nation (FMYN) and Salt River Pima-Maricopa Indian 
Community (SRPMIC) will continue to comply with applicable Federal statutes and grant 
regulations in effect for those periods when one or both tribes receive grant funding per the 
DMA 2000 requirement §201.7(c)(6).  Both FMYN and SRPMIC will amend its Plan 
whenever necessary to reflect changes in tribal or Federal laws and statutes as required in 
44CFR 13.11(d). 
1.4 
FEMA Approval Letter 
The Plan was submitted to the Arizona Division of Emergency Management (ADEM), 
the authorized state agency, and FEMA, for review and approval.  FEMA’s approval letter is 
provided on the following page.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 4 
 
 
 
 
[Insert FEMA Approval Letter Here]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 5 
SECTION 2:  INTRODUCTION 
2.1 
Plan History 
In 2003 and 2004, Maricopa County, two Indian Tribes, and all incorporated cities and 
towns in Maricopa County, participated in a multi-jurisdictional mitigation planning effort that 
resulted in the development of a multi-jurisdictional hazard mitigation plan with separate 
stand-alone annexes that covered each participating jurisdiction.  The following is a list of 
those annexes: 
• Maricopa County Unincorporated Area Hazard Mitigation Plan 
• City of Avondale Hazard Mitigation Plan 
• Town of Buckeye Hazard Mitigation Plan 
• Town of Carefree Hazard Mitigation Plan 
• Town of Cave Creek Hazard Mitigation Plan 
• City of Chandler Hazard Mitigation Plan 
• City of El Mirage Hazard Mitigation Plan 
• Fort McDowell Yavapai Nation Hazard Mitigation Plan 
• Town of Fountain Hills Hazard Mitigation Plan 
• Town of Gila Bend Hazard Mitigation Plan 
• Town of Gilbert Hazard Mitigation Plan 
• City of Glendale Hazard Mitigation Plan 
• City of Goodyear Hazard Mitigation Plan 
• Town of Guadalupe Hazard Mitigation Plan 
• City of Litchfield Park Hazard Mitigation Plan 
• City of Mesa Hazard Mitigation Plan 
• Town of Paradise Valley Hazard Mitigation Plan 
• City of Peoria Hazard Mitigation Plan 
• City of Phoenix Hazard Mitigation Plan 
• Town of Queen Creek Hazard Mitigation Plan 
• Salt River Pima-Maricopa Indian Community Hazard Mitigation Plan 
• City of Scottsdale Hazard Mitigation Plan 
• City of Surprise Hazard Mitigation Plan 
• City of Tempe Hazard Mitigation Plan 
• City of Tolleson Hazard Mitigation Plan 
• Town of Wickenburg Hazard Mitigation Plan 
• Town of Youngtown Hazard Mitigation Plan 
Collectively and individually, these plans will be referred to herein as the 2004 Plan(s).  
The 2004 Plans received official FEMA approval on November 29, 2004.  Additional planning 
was performed with the Fort McDowell Yavapai Nation to upgrade their 2004 Plan to a “state 
level” plan, which was approved by FEMA and retains the November 29, 2004 approval date.   
In October of 2008, Maricopa County Department of Emergency Management 
(MCDEM) initiated a planning process with local and tribal jurisdictions to consolidate and 
update the 2004 Plans into a true multi-jurisdictional plan with annexes for the tribal elements

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 6 
corresponding to the Fort McDowell Yavapai Nation and the Salt River Pima-Maricopa Indian 
Community.  The resulting 2009 Maricopa County Multi-Jurisdictional Hazard Mitigation 
Plan, complete with tribal annexes and herein referred to as the 2009 Plan, was submitted to 
FEMA and received official approval on April 30, 2010.   
In early 2014, MCDEM worked to successfully secure grant funding to update the 2009 
Plan.  The planning process was officially kicked off in August 2014 and culminated with 
receipt of official FEMA approval on December 22, 2015.  The 2015 Plan update merged the 
information provided in the 2009 Tribal Annexes into one complete plan. 
In early 2020, MCDEM was again able to secure FEMA grant funding to perform the 
5-year update of the 2015 Plan and retained professional consulting and planning services to 
guide the update planning process and 2021 Plan development.  That effort was kicked off in 
July 2020 and is detailed further below.  It is noted that the Salt River Project and the Town of 
Paradise Valley are no longer participants in the updated Plan. 
2.2 
Plan Purpose and Authority 
The purpose of the Plan is to identify natural hazards that impact the various 
jurisdictions located within Maricopa County, assess the vulnerability and risk posed by those 
hazards to community-wide human and structural assets, develop strategies for mitigation of 
those identified hazards, present future maintenance procedures for the plan, and document the 
planning process.  The Plan is prepared in compliance with DMA 2000 requirements and 
represents a multi-jurisdictional update of the 2015 Plan. 
Maricopa County and all the cities and towns are political subdivisions of the State of 
Arizona and are organized under Title 9 (cities/towns) and Title 11 of the Arizona Revised 
Statutes (ARS).  The Fort McDowell Yavapai Nation is a federally recognized sovereign nation 
that was created by Executive Order on September 15, 1903 and is governed by a Tribal 
Council that is elected by tribal members pursuant to the Tribe's Constitution.  The Salt River 
Pima-Maricopa Indian Community was established by Executive Order on June 14, 1879 and 
is governed by a community council comprised of a president, vice president and tribal council.  
As such, each of these entities are empowered to formally plan and adopt the Plan on behalf 
of their respective jurisdictions. 
Funding for the development of the Plan was provided through a PDM planning grant 
obtained by MCDEM through the State of Arizona from FEMA, with MCDEM providing the 
matching funds.  JE Fuller/ Hydrology and Geomorphology, Inc. (JE Fuller) was retained by 
MCDEM to provide consulting services in guiding the update process and developing technical 
risk assessment data. 
2.3 
General Plan Description 
The Plan is generally arranged and formatted to be consistent with the 2018 State of 
Arizona Multi-Hazard Mitigation Plan (State Plan) and is comprised of the following major 
sections: 
Planning Process – this section summarizes the planning process used to update the Plan, 
describes the assembly of the planning team and meetings conducted, and summarizes the 
public involvement efforts.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 7 
Community Description – this section provides an overall description of the participating 
jurisdictions and the County as a whole. 
Risk Assessment – this section summarizes the identification and profiling of natural hazards 
that impact the County and the vulnerability assessment for each hazard that considers 
exposure/loss estimations and development trend analyses. 
Mitigation Strategy – this section presents a capability assessment for each participating 
jurisdiction and summarizes the Plan mitigation goals, objectives, actions/projects, and 
strategy for implementation of those actions/projects. 
Plan Maintenance Strategy – this section outlines the proposed strategy for evaluating and 
monitoring the Plan, updating the Plan in the next 5 years, incorporating plan elements into 
existing planning mechanisms, and continued public involvement. 
Plan Tools – this section includes a list of Plan acronyms and a glossary of definitions.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 8 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
[This page is purposely blank]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 9 
SECTION 3:  PLANNING PROCESS 
 
This section includes the delineation of various DMA 2000 regulatory requirements, as well 
as the identification of key stakeholders and planning team members within Maricopa County. 
In addition, the necessary public involvement meetings and actions that were applied to this 
process are also detailed. 
3.1 
Update Process Description 
MCDEM applied for and received a PDM planning grant to fund a multi-jurisdictional 
effort to review and update the 2015 Plan.  MCDEM solicited letters of support from all 2015 
Plan towns, cities, and Tribes to aid in the preparation of the PDM planning grant application.  
Once the grant was received, the County then selected JE Fuller to work with the participating 
jurisdictions and guide the Plan update process.  An initial project kick-off meeting between 
JEF and MCDEM was convened May 29, 2020 to line up the meeting dates and agendas for 
the coming planning efforts, discuss the plan format and potential changes to the Plan outline 
and content to address recent FEMA guidelines, request initial data, and other administrative 
tasks.  Four planning team meetings, one tribal only planning meeting, and numerous other 
individual community outreach meetings were conducted over the period of July 2020 to 
February 2021, along with all the work required to collect, process, document updated data, 
and make changes to the Plan.  Details regarding updated key contact information and 
promulgation authorities, the planning team selection, participation, and activities, and public 
involvement are discussed in the following sections. 
3.2 
Previous Planning Process Assessment 
The first task of preparation for the Plan update, was to evaluate the process used to 
develop the 2015 Plan.  This was initially discussed by MCDEM and JEF in the May 29, 2020 
kick-off meeting with the goal of establishing the framework for the planning effort ahead.  
The 2015 Plan process employed a multi-jurisdictional approach with representation from each 
participating jurisdiction in larger multi-jurisdictional planning team meetings wherein 
concepts would be presented and discussed, and work assignments would be made for 
completion by each jurisdiction.  Supplemental follow-up sessions with one or more 
jurisdictions by both MCDEM and JEF were also employed on an as-needed basis to assist 
jurisdictions with completing assignments on schedule.  MCDEM and JEF agreed to continue 
with the same approach due to the success of the 2014-2015 planning effort in getting to an 
approved plan both in time and budget.   
§201.6 (b):  Planning process. An open public involvement process is essential to the development of an effective 
plan. In order to develop a more comprehensive approach to reducing the effects of natural disasters, the planning 
process shall include: 
(1) An opportunity for the public to comment on the plan during the drafting stage and prior to plan approval. 
(2) An opportunity for neighboring communities, local and regional agencies involved in hazard mitigation activities, 
and agencies that have the authority to regulate development, as well as businesses, academia, and other private 
and non-profit interests to be involved in the planning process; and  
(3) Review and incorporation, if appropriate, of existing plans, studies, reports, and technical information. 
 
§201.6(c)(1): [The plan shall include…] (1) Documentation of the planning process used to develop the plan, 
including how it was prepared, who was involved in the process, and how the public was involved.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 10 
The Plan update process was presented and discussed at the first multi-jurisdictional 
planning team meeting for comment and concurrence of the Plan jurisdictions.  Most of the 
planning team members were new to the hazard mitigation planning process altogether, so 
there was very little institutional knowledge of the prior process.  Those that were returning 
team members felt the process worked well and were in favor of using it again. 
3.3 
Planning Team 
3.3.1 General 
Continuing the format used for the 2015 Plan, two levels of planning teams were 
organized for this Plan update.  The first was a Multi-Jurisdictional Planning Team (MJPT) 
that was comprised of one or more representatives from each participating jurisdiction, and 
predominantly the primary points of contact (PPOC). The second level planning team was the 
Local Planning Team (LPT).  
The role of the MJPT was to work with the planning consultant to perform the 
coordination, research, and planning element activities required to update the 2015 Plan. 
Attendance by each participating jurisdiction was required for every MJPT meeting as the 
meetings were structured to progress through the plan update process.  Steps and procedures 
for updating the 2015 Plan were presented and discussed at each MJPT meeting, and worksheet 
assignments were normally given. Each meeting built on information discussed and 
assignments made at the previous meeting.  The MJPT representatives also had the 
responsibility of being the liaison to the LPT, and were tasked with: 
• Conveying information and assignments received at the MJPT meetings to the LPT 
• Ensuring that all requested worksheets were completed fully and returned on a 
timely basis 
• Arranging for review and official adoption of the Plan 
The function and role of the LPT was to: 
• Provide support and data 
• Assist the MJPT representative in completing each assignment 
• Make planning decisions regarding plan update components 
• Review the Plan draft documents 
3.3.2 Primary Point of Contact 
Table 3-1 summarizes the PPOC identified for each participating local jurisdiction and 
tribe. 
3.3.3 Planning Team Assembly 
At the beginning of the update planning process, MCDEM organized and 
identified members for the MJPT by initiating contact with the PPOCs identified in the 
2015 Plan, their equivalent, or the emergency manager, for all 24 incorporated towns, 
cities, the two tribes and the county.  It is noted that Salt River Project was invited to

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 11 
 
Table 3-1:  List of jurisdictional primary points of contact 
Jurisdiction 
Name 
Department / Position 
Address 
Avondale 
Larry Rooney 
Fire & Medical Department – Assistant Fire 
Chief & Emergency Manager 
1825 N. 107th Ave. 
Avondale, AZ  85323 
Buckeye 
Travis Rand 
Fire Department – Deputy Chief 
21699 W. Yuma Rd., Ste. 101 
Buckeye, AZ 85326 
Carefree 
John Kraetz 
Fire District –  
Fire Chief 
37401 N. Tom Darlington Dr.  
P.O. Box 753  
Carefree, AZ 85377 
Cave Creek 
Adam Stein 
Marshal’s Office – Town Marshal / Emergency 
Services Coordinator 
37622 N. Cave Creek Rd. 
Cave Creek, AZ  85331 
Chandler 
Suzy Vargo 
Fire Department –  
Battalion Chief 
151 E. Boston St. 
Chandler, AZ  85225 
El Mirage 
Joe Fusco 
Fire Department –  
Fire Chief 
13601 N. El Mirage Rd.  
El Mirage, AZ  85335 
Fountain Hills 
Mike Winters 
Fire Department –  
Assistant Chief/Fire Marshal 
16426 E. Palisades Blvd. 
Fountain Hills, AZ  85268 
Fort McDowell 
Yavapai Nation 
Mark Barnhart 
Fire Department –  
Administrative Captain 
10755 N. Fort McDowell Rd., Ste. 4 
Fort McDowell, AZ  85264 
Gila Bend 
Kathy Valenzuela 
Administration – Town Manager 
644 W. Pima St. 
P.O. Box A 
Gila Bend, AZ  85337 
Gilbert 
Pete Weaver 
Town Manager’s Office – Emergency 
Management Coordinator 
85 E. Civic Center Dr. 
Gilbert, AZ  85296 
Glendale 
Nicole Munson 
Fire Department – Emergency Management 
Coordinator 
11550 W. Glendale Ave. 
Glendale, AZ  85301 
Goodyear 
Julie Syrmopoulos 
Fire Department – Emergency Manager 
14455 W. Van Buren St., Ste. E-102 
Goodyear, AZ  85338 
Guadalupe 
Wayne Clement 
Fire Department – Fire Chief / Emergency 
Manager 
8413 S. Avenida del Yaqui 
Guadalupe, AZ  85283 
Litchfield Park 
Matthew Williams 
Community Services & Recreation Department 
- Assistant City Manager/Director 
214 W. Wigwam Blvd. 
Litchfield Park, AZ 85340 
Maricopa County 
Rudy Perez 
Department of Emergency Management – 
Emergency Services Planner 
5636 E. McDowell Rd. 
Phoenix, AZ  85008

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 12 
Table 3-1:  List of jurisdictional primary points of contact 
Jurisdiction 
Name 
Department / Position 
Address 
Mesa 
Therese Derivan 
Fire/Medical Department – Emergency 
Manager 
13 W. 1st Street 
Mesa, AZ  85201 
Peoria 
Glenn Jones 
Emergency Management – Emergency 
Management Coordinator 
8401 W. Monroe Street 
Peoria, AZ  85345 
Phoenix 
Kim Gathers 
Office of Homeland Security & Emergency 
Management – Interim Deputy Director 
200 W. Washington Street 
Phoenix, AZ 85003 
Queen Creek 
Joe LaFortune 
Fire and Medical Department – Emergency 
Management Coordinator 
22358 S. Ellsworth Rd. 
Queen Creek, AZ  85142 
Salt River Pima-
Maricopa Indian 
Community 
Terry Nelson 
Fire Department-Office of Emergency 
Management – Emergency Management 
Coordinator 
10005 E. Osborn Rd. 
Scottsdale, AZ  85256 
Scottsdale 
Troy Lutrick 
City Manager’s Office -Emergency 
Management Division – Emergency 
Management Coordinator 
8401 E. Indian School Rd. 
Scottsdale, AZ  85251 
Surprise 
Tracy Montgomery 
City Manager’s Office – Emergency Manager 
16000 W Civic Center Plaza 
Surprise AZ 85374 
Tempe 
Michelle Seitz 
Fire Medical Rescue Departments – 
Emergency Manager 
P.O. Box 5002 
Tempe, AZ  85280 
or 
1400 E. Apache Blvd. 
Tempe, AZ  85281 
Tolleson 
George Good 
Fire Department – Fire Chief 
203 N. 92nd Ave. 
Tolleson, AZ   85353 
Wickenburg 
Amy Sloane 
Police Department – Support Services 
Lieutenant 
155 N. Tegner, Ste. C 
Wickenburg, AZ  85390 
Youngtown 
Gregory Arrington 
Community Development Department – 
Manager 
12030 Clubhouse Sq. 
Youngtown, AZ  85363

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 13 
participate as a jurisdiction for this update but chose not to.  In June 2020, MCDEM 
distributed a kick-off email with a date for the first MJPT meeting to PPOCs 
announcing the official start of the planning effort.   
3.3.4 Planning Team Activities 
The MJPT met for the first time on July 16, 2020 to begin the plan update 
process.  Three more MJPT meetings and one extra tribal-only meeting were convened 
on about a monthly basis to step through the plan review and update process.  Due to 
the COVID 19 pandemic, all meetings were conducted virtually using the Zoom 
platform, which encouraged greater attendance by more participants than just the 
PPOCs.  At the first meeting, each MJPT member was directed to a digital copy of the 
2015 Plan and was requested to have it available for review and reference at every 
meeting. A full agenda for all the planning team meetings was provided and reviewed 
so all participants could prepare in advance of each meeting. Following each MJPT 
meeting, the PPOC for each jurisdiction would coordinate with their LPT to work 
through the assigned worksheets as needed.  There were also several other outreach 
meetings conducted with individual communities by MCDEM staff and JE Fuller to 
assist in the development of the plan elements.  Table 3-2 provides a list of all MJPT 
meeting participants and the dates of participation.  Individuals in bold text are the 
identified PPOC for each community.  The light-green shaded names are returning 
individuals from the 2015 Plan team. Table 3-3 summarizes the MJPT and tribal 
meetings convened, along with a brief list of the agenda items discussed.  Detailed 
meeting notes for the MJPT meetings are provided in Appendix B.  There are no details 
for the LPT meetings. 
 
Table 3-2: Summary of multi-jurisdictional planning team participants  
 
Name 
Jurisdiction/Agency/Organization 
Planning Team Meeting Nos. and Dates 
1 
07/16/20 
2 
08/20/20 
3 
10/08/20 
4 
11/19/20 
Tom Abbott 
City of Surprise 
x 
x 
x 
x 
Mark Ahlstrom 
City of Mesa 
  
  
  
x 
Hector Andrade 
Maricopa County 
  
x 
x 
x 
John Bailey 
Maricopa County 
x 
  
  
  
Mark Barnhart 
Fort McDowell Yavapai Nation 
x 
x 
x 
x 
Michael Boule 
City of Surprise 
  
x 
x 
  
Kevin Burke 
City of Peoria 
  
x 
x 
  
Mark Christian 
Coconino County 
  
x 
x 
  
Tony Christofferson 
Town of Wickenburg 
  
  
  
x 
Wayne Clement 
Town of Guadalupe 
x 
x 
x 
x 
Lisa Collins 
City of Glendale 
  
x 
x 
  
Mike Conlin 
City of Glendale 
x  
x 
x 
  
Kelly Corsette 
City of Scottsdale 
  
x 
x 
  
C. Ashley Couch 
City of Scottsdale 
  
x 
x

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 14 
Table 3-2: Summary of multi-jurisdictional planning team participants  
 
Name 
Jurisdiction/Agency/Organization 
Planning Team Meeting Nos. and Dates 
1 
07/16/20 
2 
08/20/20 
3 
10/08/20 
4 
11/19/20 
Marty Crossland 
City of Goodyear 
x 
  
  
  
Travis Cutright 
City of Mesa 
x 
x 
x 
x 
Mike Davis 
City of Mesa 
x 
  
  
  
James Delaittre 
City of Glendale 
  
  
  
x 
Therese Derivan 
City of Mesa 
x 
x 
x 
x 
Darrell Duty 
City of Tempe 
x 
  
  
  
Alan English 
City of Peoria 
  
  
x 
  
Mary Evans 
JE Fuller 
x 
  
x 
x 
Josh Friedman 
Town of Gilbert 
x 
x 
x 
x 
Joe Fusco 
City of El Mirage 
x 
  
x 
  
Melanie Gall 
Arizona State University 
x 
x 
x 
x 
Kim Gathers 
City of Phoenix 
  
x 
x 
x 
Brian Gerber 
Arizona State University 
x 
x 
x 
x 
Sheri Gibbons 
Arizona State University 
x 
  
  
  
Brett Gilliland 
City of Buckeye 
  
  
x 
x 
George Good 
City of Tolleson 
x 
  
  
  
Bob Goodhue 
City of Peoria 
x 
x 
x 
x 
Mary Goodman 
Town of Gilbert 
x 
  
  
  
Ken Goucher 
City of Scottsdale 
  
x 
  
  
Randy Grant 
City of Scottsdale 
  
x 
  
  
Brad Hartig 
City of Scottsdale 
  
x 
  
  
Elliot Harwood 
Maricopa County 
  
  
x 
x 
John Hatler 
Maricopa County 
x 
  
  
  
David Hondula 
Arizona State University 
  
  
  
x 
Rhonda Humbles 
City of Peoria 
  
x 
x 
  
Laura Hyneman 
City of Mesa 
  
  
x 
x 
Glenn Jones 
City of Peoria 
x 
x 
x 
x 
Harry Jones 
City of Mesa 
  
x 
x 
x 
Braden Kay 
City of Tempe 
  
  
x 
x 
Michael Kennedy 
City of Mesa 
x 
  
  
  
Rob Kidder 
City of Mesa 
  
x 
x 
x 
John Kraetz 
Town of Carefree 
x 
x 
x 
x 
Joe LaFortune 
Town of Queen Creek 
x 
x 
x 
x 
Lee Lambert 
City of Surprise 
  
x 
x 
  
Sara Latin 
Maricopa County 
x 
  
  
  
Bob Lee 
Town of Paradise Valley 
x 
x 
x 
x 
Daylynn Little 
City of Scottsdale 
  
  
x 
x

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 15 
Table 3-2: Summary of multi-jurisdictional planning team participants  
 
Name 
Jurisdiction/Agency/Organization 
Planning Team Meeting Nos. and Dates 
1 
07/16/20 
2 
08/20/20 
3 
10/08/20 
4 
11/19/20 
Grace Logan 
Arizona State University 
x 
  
  
  
David Luhan 
City of Goodyear 
  
  
  
x 
Troy Lutrick 
City of Scottsdale 
x 
x 
x 
  
Richard Manzo 
City of Mesa 
  
  
x 
x 
Charlie McDermott 
Arizona State University 
  
  
  
x 
Dee McKenzie 
City of Mesa 
  
  
x 
  
Jeff McMenemy 
City of Glendale 
x 
  
  
  
Art Miller 
City of Peoria 
  
x 
  
  
Tracy Montgomery 
City of Surprise 
x 
x 
x 
x 
Nicole Munson 
City of Glendale 
x 
x 
x  
x 
Tim Murphy 
Flood Control District of Maricopa County 
x 
x 
x 
x 
Scott Myers 
Maricopa County 
x 
  
  
  
Terry Nelson 
Salt River-Pima Maricopa Indian Community 
x 
x 
x 
x 
Dan Nissen 
City of Peoria 
x 
x 
x 
  
Scott Ogden 
JE Fuller 
x 
x 
x 
x 
Brent Olson 
City of Phoenix 
  
x 
  
  
Patrick O'Toole 
Salt River Project 
x 
  
  
  
John Padilla 
APS 
x 
  
x 
x 
Jared Palacios 
City of Avondale 
  
x 
x 
x 
Rich Peel 
Maricopa County 
  
x 
  
  
Rudy Perez 
Maricopa County 
x 
x 
x 
x 
Cape Powers 
City of Peoria 
  
x 
  
  
Arif Rahman 
City of Mesa 
  
  
x 
x 
Travis Rand 
City of Buckeye 
x 
  
x 
x 
Anne Reichman  
Arizona State University 
x 
x 
  
  
Jaret Rogers 
National Weather Service 
  
  
x 
  
Larry Rooney 
City of Avondale 
x 
x 
x 
x 
Fred Rustam 
City of Mesa 
  
  
x 
  
Craig Sears 
City of Mesa 
  
  
x 
  
Michelle Seitz 
City of Tempe 
x 
x 
x 
x 
Nancy Selover 
Arizona State Climate Office 
  
x 
  
  
Megan Sheldon 
City of Glendale 
x 
  
  
  
Antonio Shin 
City of Phoenix 
  
x 
x 
x 
Amy Sloane 
Town of Wickenburg 
  
  
x 
  
Jana Smith 
Maricopa County 
  
x 
x 
x 
Kevin Spirlong 
City of Surprise 
  
  
  
x 
Warren Sprecher 
City of Mesa 
x 
x 
  
x

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 16 
Table 3-2: Summary of multi-jurisdictional planning team participants  
 
Name 
Jurisdiction/Agency/Organization 
Planning Team Meeting Nos. and Dates 
1 
07/16/20 
2 
08/20/20 
3 
10/08/20 
4 
11/19/20 
Adam Stein 
Town of Cave Creek 
x 
x 
  
x 
Daren Sweet 
Arizona Dept of Emergency & Military Affairs 
  
  
x 
  
Julie Syrmopoulos 
City of Goodyear 
x 
x 
x 
x 
Kristin Tytler 
City of Surprise 
  
x 
x 
x 
Kathy Valenzuela 
Town of Gila Bend 
  
x 
x 
x 
Suzy Vargo 
City of Chandler 
x 
x 
x 
x 
Pete Weaver 
Town of Gilbert 
x 
x 
x 
x 
Nicole Wiley 
City of Surprise 
  
x 
x 
x 
Matthew Williams 
City of Litchfield Park 
  
x 
x 
x 
Mike Winters 
Town of Fountain Hills 
x 
x 
x 
x 
 
 
Table 3-3:  Summary of planning meetings convened as part of the plan update 
process  
Meeting Type, 
Date, and 
Location 
Meeting Agenda 
Pre-Planning Kick-
Off Meeting 
 
May 29, 2020 
 
Web conference via 
Zoom 
 
• Discuss schedule of MJPT meetings 
• Discuss Plan outline and changes required 
• Strategize the MJPT list 
• Discuss roles of MCDEM and JEF in the overall planning process

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 17 
Table 3-3:  Summary of planning meetings convened as part of the plan update 
process  
Meeting Type, 
Date, and 
Location 
Meeting Agenda 
MJPT Meeting  
No. 1 
 
July 16, 2020 
 
Web conference via 
Zoom 
• 
INITIAL INTRODUCTIONS  
• 
DMA2K OVERVIEW AND UPDATE REQUIREMENTS 
o General DMA2K Overview 
o Update Requirements  
• 
DISCUSSION OF SCOPE AND SCHEDULE  
• 
PLANNING PROCESS 
o Discussion of Last Planning Process 
o Planning Team Roles and Responsibilities 
 
*** 15-Minute Break *** 
 
• 
PUBLIC INVOLVEMENT 
o Discuss Past Strategy 
o Formulate New Strategy  
o Additional Agency / Organization Invitations 
• 
RISK ASSESSMENT 
o Hazard List Identification 
o Existing Plans, Studies, Reports and Technical Information 
• 
EMAP DISCUSSION 
o Purpose 
o Supplemental Requirements to Regular DMA2000 Plan 
o Current EMAP Annex for Unincorporated Maricopa County 
o Go or No-Go Discussion 
MJPT Meeting  
No. 2 
 
August 20, 2020 
 
Web conference via 
Zoom 
• 
GENERAL – Community Description Review 
• 
PLAN MAINTENANCE STRATEGY 
o Review/Discuss Maintenance and Monitoring Over Last Plan 
Cycle  
o Develop New Monitoring Schedule 
o Develop Plan Update Schedule 
• 
RISK ASSESSMENT 
o Critical Facility Review/Update  (worksheet) 
o Review hazard profile mapping and data for each hazard 
o CPRI Update (worksheet) 
o Discuss and Profile Development Trends (worksheet) 
 
Past Plan Cycle 
 
Future Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 18 
Table 3-3:  Summary of planning meetings convened as part of the plan update 
process  
Meeting Type, 
Date, and 
Location 
Meeting Agenda 
MJPT Meeting  
No. 3 
 
October 8, 2020 
 
Web conference via 
Zoom 
• 
MITIGATION STRATEGY 
o Existing Mitigation Action/Project Assessment (worksheet) 
o Capability Assessment (worksheet) 
 
Legal and Regulatory (Codes / Ordinances) 
 
Administrative and Technical Staff Resources 
 
Fiscal Capabilities  
o Plans / Manuals / Guidelines / Studies Integration and 
Incorporation (worksheet) 
 
Past Plan Cycle 
 
Future Strategy  
o NFIP Statistics and Compliance (worksheet) 
MJPT Meeting  
No. 4 
 
November 19, 2020 
 
Web conference via 
Zoom 
• 
RISK ASSESSMENT 
o Repetitive Loss Properties 
o Vulnerability Analysis Results Review 
• 
MITIGATION STRATEGY 
o Develop/Update Goals 
o Action/Project Identification (worksheet) 
o Implementation Strategy (worksheet) 
• 
PLAN MAINTENANCE STRATEGY  
o Continued Public Involvement (worksheet) 
• 
PROMULGATION PROCESS 
Tribal Planning 
Meeting 
 
December 15, 2020 
 
Web conference via 
Zoom 
• 
Tribal Assurances 
• 
Definition Of “Public” 
• 
Plan Integration 
• 
Pre- and Post-Disaster Capabilities 
• 
Funding Sources 
• 
Progress Review and Project Closeout 
 
3.3.5 Agency/Organization Participation 
The planning process used to develop the 2015 Plan included participation from 
several agencies and organizations which operate within or have jurisdiction over small 
and large areas of Maricopa County.  For this update, a list of known and/or potential 
stakeholders not already involved in the MJPT was brainstormed and compiled at both 
the internal kickoff meeting and MJPT Meeting No. 1.  Invitations were sent to the 
identified list via emails with an attached document that explained the DMA 2000 
planning process and the request for involvement.  A copy of the letter attachment is 
provided in Appendix C.  Personal invitations by MCDEM staff were also extended to 
the Gila, Pinal, and Yavapai County emergency managers to participate in the planning 
meetings.  The La Paz County emergency manager had recently passed away and the 
position was not filled as of this planning effort, so no invitation was extended to La

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 19 
Paz County. In addition to the personal invitations, a broader invitation to all citizens 
within and near Maricopa County was indirectly extended via website postings, social 
media (Facebook, Twitter, and NextDoor), and various newsletters/utility bill inserts, 
which are discussed more thoroughly in Section 3.5.2.  This approach was considered 
the best way to reach interested non-profits and businesses within the County and 
provide them an opportunity for participation in the planning process. Table 3-4 
represents the list of all entities (except the participating jurisdictions) that were either 
directly invited or that responded to the public invitations: 
 
Table 3-4:  List of agencies and organizations invited or participating in the 
planning process  
Agency / Organization 
Contact Position 
Inter-Tribal Council of 
Arizona 
Nathan Nixon - Emergency Preparedness Program 
Coordinator 
Bureau of Indian Affairs - Salt 
River Agency 
Alan Sinclair - Fire Management Officer 
Arizona Department of Water 
Resources 
Brian Cosson – NFIP Coordinator 
Arizona Department of 
Environmental Quality 
Chris Nutter – Emergency Response Coordinator 
Arizona State Land - Forestry 
Division 
Dan Colgan - Central District A4S District 
Manager 
Arizona Department of 
Transportation – Phoenix 
District 
David Egliskis – Emergency Manager 
Bureau of Land Management - 
Phoenix District 
Ken Shaver - Fire Prevention Specialist 
Bureau of Land Management - 
Phoenix District 
Fritz Mueller - Fire Operations Specialist 
National Weather Service - 
Phoenix Forecast Office 
Jaret Rogers - Warning Coordination 
Meteorologist 
USFS - Tonto National Forest 
Dave Ramirez - South Zone Fire Management 
Officer 
Arizona State University 
Sheri Gibbons - Emergency Manager 
ASU State Climatologist 
Office 
Nancy Selover - State Climatologist 
Arizona Game and Fish 
Department 
Fred Bloom - Engineering Supervisor 
Arizona Geological Survey 
Ann Youberg - Research Geologist 
Southwest Gas 
Carrie Heglund - Engineer 
U.S Army Corps of Engineers 
– LA District – 
Arizona/Nevada Planning 
Office 
Kim Gavigan – Regional Engineer/Planner

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 20 
Table 3-4:  List of agencies and organizations invited or participating in the 
planning process  
Agency / Organization 
Contact Position 
Central Arizona Project 
Patrick Kernan - Civil Engineering Division 
Supervisor 
Yavapai County Emergency 
Management 
Ron Sauntman - Emergency Management 
Coordinator 
Pinal County Emergency 
Management 
Chuck Kmet - Emergency Management Officer 
Gila County Emergency 
Management 
Carl Melford - Emergency Manager 
 
An integral part of the planning process included coordination with agencies 
and organizations outside of the participating jurisdiction’s governance to obtain 
information and data for inclusion into the Plan or to provide more public exposure to 
the planning process.  Much of the information and data that is used in the risk 
assessment is developed by agencies or organizations other than the participating 
jurisdictions.  In some cases, the jurisdictions may be members of a larger organization 
that has jointly conducted a study or planning effort like the development of a 
community wildfire protection plan, participation in an area association of 
governments, or participation in a FEMA RiskMAP Discovery study.  Examples of 
those data sets include the FEMA floodplain mapping, community wildfire protection 
plans, severe weather statistics, hazard incident reports, and regional comprehensive 
plans.  The resources obtained, reviewed and compiled into the risk assessment are 
summarized in Section 3.6 and at the end of each subsection of Section 5.3 of this Plan.  
Jurisdictions needing these data sets obtained them by requesting them directly from 
the host agency or organization, downloading information posted to website locations, 
or engaging consultants. 
3.4 
Public Involvement 
3.4.1 Previous Plan Assessment 
The public involvement strategy for the 2015 Plan development included the 
publishing of public notices in the major newspapers that cover the greater Phoenix 
area, posting of similar public notices to jurisdiction websites with an included link to 
the full-time website maintained on the Maricopa County servers.  Additional notices 
inviting public participation were published in local and regional newspapers, 
jurisdictional newsletters, and flyer inserts to utility bills.  
The second opportunity for public input was provided through the normal 
city/town/tribal council and/or county board of supervisors public meeting process 
associated with each jurisdiction’s formal adoption of the 2015 Plan.  The details of the 
meeting process varied from jurisdiction to jurisdiction, but typically included some 
form of advertisement of the meeting agenda two to four weeks in advance of the 
council/board meeting.  In most cases, an informal, pre-adoption presentation of the 
2015 Plan was made during a working session of the council/board.  The final adoption

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 21 
of the resolutions was almost unanimously done as part of a consent agenda at a formal 
council/board meeting.  There are no records of any public comment on the 2015 Plan 
adoption process.  Because the process is required for any formal council/board action 
and has a built-in public notification and comment opportunity, the MJPT chose to 
continue using this process as one of the post-draft mechanisms for getting the Plan 
update before the public. 
3.4.2 Plan Update 
The opportunity for public involvement and input to the plan update process 
was accommodated using the same general strategy as the 2015 Plan, with several 
notable additions that included comprehensive English and Spanish language media 
blasts to social media platforms and the preparation of an on-line survey/questionnaire 
that was accessible by a link to the base Maricopa County hazard mitigation website 
hosted on Maricopa County servers. Participating jurisdictions posted public notices to 
their respective websites that included a link to the base website.  A copy of the 2015 
Plan was made available on the County website along with contact information for the 
MJPT PPOC. There were also additional notices published in local newspapers, 
jurisdictional newsletters, and utility bill inserts. 
The community survey/questionnaire was comprised of 10 questions that were 
constructed to better facilitate an understanding of the level of hazard and mitigation 
concept awareness on the part of the public. The survey responses were logged for a 
period of August to December 2020.  During that time, the English survey site was 
accessed a total of 1,188 times.  The Spanish version was accessed 8 times.  Of those, 
524 occurrences fully completed the survey.  The following highlight some of the 
response statistics: 
• Severe Wind events top the list of hazards that caused negative impacts to 
respondents.  The second was Extreme Heat, closely followed by Drought 
and Flooding 
• The reported zip codes for the respondents were reasonably distributed 
across the populated areas of the county. 
• Approximately 45% of the respondents were aware of the 2015 Plan. 
• Less than 8% of the respondents had a home or business located within a 
FEMA delineated Special Flood Hazard Area (SFHA). 
• Preferences for typical structural/infrastructure type improvements and 
protection of natural buffers was slightly favored over the other types of 
mitigation actions/projects. 
• On average, approximately 13% of the respondents carry some type of flood 
insurance on their homes.  Rental coverage was less than 4% and business 
coverage was less than 1%. 
• The four top-ranked choices for receiving hazard related information and 
notifications were in order: email, websites, television and social media.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 22 
A second wave of post-draft public notices was posted to jurisdiction websites 
and a copy of the draft Plan was posted to the County website for review and comment.  
Interested citizens were also encouraged to participate in the local community adoption 
process which, depending upon the jurisdiction, included a formal public hearing and 
in some cases, a prior informal presentation. 
Copies of the public outreach materials (notices, web page snips, newspaper 
notices, survey/questionnaire, etc.) are provided in Appendix C. 
3.4.3 Tribal Definitions of “Public” 
Pursuant to 44 CFR §201.7(c)(1)(i), each of FMYN and SRPMIC must include 
“…a description of how the Indian tribal government defined ‘‘public;’’”.  Both 
participating tribes reviewed the definitions provided in the 2015 Plan and had no 
changes to make. Accordingly, the following statements to define “public” for the 
purposes of this Plan are defined for each of the participating tribes as: 
• FMYN: “All FMYN tribal members, community members, and employees.” 
• SRPMIC: “All enrolled Community members, employees and enterprises.” 
3.5 
Reference Documents and Technical Resources 
Over the course of the update planning process, numerous other plans, studies, reports, 
and technical information were obtained and reviewed for incorporation or reference purposes.  
Most sources referenced and researched pertain to the risk assessment and the capabilities 
assessment.  To a lesser extent, the community descriptions and mitigation strategy also 
included some document or technical information research.  Table 3-5 provides a reference 
listing of the primary documents and technical resources reviewed and used in the Plan.  
Detailed bibliographic references for the risk assessment are provided at the end of each hazard 
risk profile in Section 5.3.  Other bibliographic references are provided as footnotes throughout 
the Plan. 
 
Table 3-5:  List of resource documents and references reviewed and incorporated in 
the Plan update process  
Referenced 
Document or 
Technical Source 
Resource 
Type 
Description of Reference and Its Use 
Arizona 
Department of 
Water Resources 
Hazard 
Data 
Source for dam failure, drought, levee and subsidence 
data 
American Society 
of Civil Engineers 
Technical 
Reference 
Source for design wind speed data. 
Arizona State 
University 
Hazard 
Data 
Technical 
Reference 
Source and co-author for extreme heat data and hazard 
profile.  Host for the SHELDUS database.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 23 
Table 3-5:  List of resource documents and references reviewed and incorporated in 
the Plan update process  
Referenced 
Document or 
Technical Source 
Resource 
Type 
Description of Reference and Its Use 
State of Arizona 
Hazard Mitigation 
Plan (2018) 
Hazard 
Data 
Mitigation 
Data 
Some of the hazard data and mitigation information 
published in the State Plan are used and incorporated 
into the Plan update. 
Arizona Geological 
Survey 
Hazard 
Data 
Source for fissure, landslide and subsidence data 
Arizona State Land 
Department – 
Forestry Division 
Hazard 
Data 
Source for wildfire data associated with State Lands 
and host for the Arizona Wildfire Risk Assessment 
Portal (AZWRAP) 
Bureau Net (2020) 
Website 
Database 
Source for NFIP statistics. 
Comprehensive 
Floodplain 
Management Plan 
and Program Report 
(FCDMC – 2020) 
Technical 
and 
Planning 
Resource 
The FCDMC’s Comprehensive Floodplain 
Management Plan is a source for flooding data and 
mitigation strategies envisioned for the areas served 
by the District.  
Discovery Report 
for Phoenix Metro 
Valley Watersheds 
(2013) 
Technical 
and Data 
Resource 
Flood related hazard data, areas of mitigation interest, 
and mitigation strategies are identified in the 
Discovery Report and are incorporated as appropriate 
into the Plan. 
InciWeb – Incident 
Information System 
(2020) 
Wildfire 
Data 
Source wildfire incident information for historical 
hazard and profile information, specifically for 
Horseshoe 2 and Monument Fire. 
Environmental 
Working Group’s 
Farm Subsidy 
Database  (2020) 
Website 
Database 
Source of disaster related agricultural subsidies.  Used 
in the risk assessment. 
Federal Emergency 
Management 
Agency 
Technical 
and 
Planning 
Resource 
Resource for HMP guidance (How-To series), 
floodplain and flooding related NFIP data (mapping, 
repetitive loss, NFIP statistics), and historic hazard 
incidents.  Used in the risk assessment and mitigation 
strategy. 
U.S. Global Change 
Research Program 
Technical 
and Data 
Resource 
Source for National Climate Assessment reports and 
documentation with discussions on climate change. 
HAZUS-MH 
Technical 
Resource 
Based data sets within the program were used in the 
vulnerability analysis. 
Maricopa 
Association of 
Governments 
Technical 
and Data 
Resource 
Source for current demographic and economic data for 
the county.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 24 
Table 3-5:  List of resource documents and references reviewed and incorporated in 
the Plan update process  
Referenced 
Document or 
Technical Source 
Resource 
Type 
Description of Reference and Its Use 
Maricopa County 
Multi-Jurisdictional 
Hazard Mitigation 
Plan (2015) 
Hazard 
Mitigation 
Plan 
FEMA approved hazard mitigation plan that formed 
the starting point for the update process. 
Maricopa County 
Community 
Wildfire Protection 
Plan (2010) 
CWPP 
Source for wildfire history and risk data. 
Maricopa County 
Community 
Wildfire Protection 
Plan – 5 Year 
Update (2020) 
CWPP 
Source for wildfire history and risk data, as well as 
updated mitigation strategies 
National Climatic 
Data Center 
Technical 
Resource 
Online resource for weather related data and historic 
hazard event data.  Used in the risk assessment. 
National Integrated 
Drought 
Information System 
(2020) 
Technical 
Resource 
Source for drought related projections and conditions.  
Used in the risk assessment. 
National Response 
Center 
Technical 
Resource 
Source of traffic related HAZMAT incidents and rail 
accidents.  Used in the risk assessment. 
National Weather 
Service 
Technical 
Resource 
Source for hazard information, data sets, and historic 
event records.  Used in the risk assessment. 
National Wildfire 
Coordination Group 
(2020) 
Technical 
Resource 
Source for historic wildfire hazard information.  Used 
in the risk assessment. 
Standard on 
Disaster/Emergency 
Management and 
Business Continuity 
Programs (2000) 
Standards 
Document 
Used to establish the classification and definitions for 
the asset inventory.  Used in the risk assessment. 
U.S. Army Corps of 
Engineers 
Dam 
Inventory 
Source for dam locations and characteristics 
U.S. Bureau of 
Land Management 
GIS Data 
Source for land ownership data 
U.S. Census Bureau Technical 
Data 
TIGER/Line shape file for county census block data 
was used to obtain block boundaries, population, and 
housing units 
U.S. Forest Service 
Technical 
Data 
Source for local wildfire data.  Used in the risk 
assessment.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 25 
Table 3-5:  List of resource documents and references reviewed and incorporated in 
the Plan update process  
Referenced 
Document or 
Technical Source 
Resource 
Type 
Description of Reference and Its Use 
U.S. Geological 
Survey 
Technical 
Data 
Source for geological hazard data and incident data.  
Used in the risk assessment. 
Jurisdictional 
General Plans 
Planning 
and Hazard 
Data 
General Plans prepared by each of the various 
jurisdictions summarizes the long-term growth 
strategies and can provided data regarding 
development trends. 
Western Regional 
Climate Center 
Website 
Data 
Online resource for climate data used in climate 
discussion of Section 5 
Zillow Real Estate 
Values 
Website 
Reference 
Obtained home value indexes for incorporated and 
unincorporated areas of Maricopa County to use for 
residential values in vulnerability assessment. 
  
3.6 
Plan Integration into Other Planning Mechanisms 
Incorporation and/or integration of the Plan into other planning mechanisms, either by 
content or reference, enhances a community’s ability to perform hazard mitigation by 
expanding the scope of the Plan’s influence.  It also helps a community to capitalize on all 
available mechanisms at their disposal to accomplish hazard mitigation and reduce risk.  
3.6.1 Past Plan Incorporation/Integration Assessment 
A poll of the participating jurisdictions revealed that success of incorporating 
the 2015 Plan elements into other planning programs has varied over the past planning 
cycle.  Ways in which the 2015 Plan has been successfully incorporated or referenced 
into other planning mechanisms by each jurisdiction are summarized in Tables 3-6 
through 3-32. 
3.6.2 Five Year Plan Integration/Incorporation Strategy 
With the efficacy of integrating the 2015 Plan during the last cycle in view, the 
MJPT identified typical ways to use and incorporate the Plan over the next five-year 
planning cycle, as follows: 
• Use of, or reference to, Plan elements in updates/revisions to codes, 
ordinances, general and/or comprehensive planning documents, and other 
long-term strategic plans. 
• Integration of defined mitigation A/Ps into capital improvement plans and 
programming. 
• Reference to Plan risk assessments during updates or revisions to land use 
planning and zoning maps. 
• Resource for developing and/or updating emergency operations plans, 
community wildfire protection plans, emergency response plans, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 26 
• Reference during grant application processes. 
• Use of the Plan as a resource during LEPC meetings. 
 
Specific opportunities for integrating and/or referencing the Plan into other 
planning mechanisms over the next five years are summarized by jurisdiction in Tables 
3-6 to 3-32.  In all cases, the jurisdiction’s PPOC will take responsibility to ensure that 
the Plan, risk assessment, goals and mitigation strategies are integrated and/or 
incorporated into the listed planning mechanism by participating in those efforts as they 
occur. 
 
Table 3-6:  Plan integration history and future strategy for Avondale  
Plan Integration Over the Past Plan Cycle: 
City of Avondale’s existing General Plan 2030, which approved in August 2012, includes a 
Safety Element that references the County’s hazard mitigation plan and specific items related 
to Avondale. The General Plan is being updated as part of a 10-year update, requiring 
approval in 2022. The Planning Division is working with various departments to update 
information in the plan, which would include the Safety Element. There is no other update to 
the existing information at this time. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
General Plan 2030 being 
updated for approval in 2022  
This will include any new information from City departments 
related to the Safety Element. As of current, no information is 
available regarding the update.  
City Code  
Chapter 8, Article I Division 3; Provisions for Flood Hazard 
Reduction; addresses Flood Plain Management. 
“Pursuant to ARIZ. REV. STAT. § 48-3610, the City of 
Avondale (the "City") is authorized to adopt floodplain 
management regulations in conformance with ARIZ. REV. 
STAT. §§ 48-3603 and 48-3609 designed to promote the 
public health, safety and general welfare of its citizenry.”

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 27 
Table 3-7:  Plan integration history and future strategy for Buckeye  
Plan Integration Over the Past Plan Cycle: 
The current Maricopa County Multi-Jurisdictional Hazard Mitigation Plan (MCMJHMP) was 
reviewed on an annual basis.  Staff from the Fire and Medical Department, Public Works 
Department, and the Development Services Department consulted to update the current list of 
mitigation actions and projects.  The updated document was submitted to the Maricopa 
County Department of Emergency Management (MCDEM). 
 
Fire and Medical Department staff also would review the list of mitigation actions and 
projects when the Hazard Mitigation Grant Program (HMGP) guidance was issued annually.  
This was done to determine if any of the projects would be a viable candidate for submittal to 
the HMGP. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Emergency Response Plan 
(EOP) 
The City’s Emergency Response Plan (EOP) provides a guide 
to how the community will respond to a disaster incident.  The 
risk data may be utilized as one of the appendices to the EOP. 
Community Wildfire 
Protection Plan (CWPP) 
The risk data from the community wildfire protection plan 
serves as the basis of the hazard mitigation plan and for 
identifying candidate wildfire mitigation actions and projects. 
Capital Improvement 
Program (CIP) 
The hazard mitigation plan will be utilized to inform and 
guide the submittal and funding of projects on an annual 
basis. This can occur both in the City’s CIP and outside 
partners such as the Flood Control District of Maricopa 
County. 
Community Risk Assessment The Fire and Medical Department has developed a 
Community Risk Assessment to identify all the hazards that 
may impact the community. The hazards may include train 
derailments, airplane crashes and natural hazards. The Hazard 
Mitigation Plan data can be incorporated into this document 
when it is updated.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 28 
Table 3-8:  Plan integration history and future strategy for Carefree  
Plan Integration Over the Past Plan Cycle: 
The town continues to look for integration opportunities when evaluating updates or 
amendments to the 2012, the Town of Carefree’s General Plan.  Within the General Plan: 
• The Environmental Element focuses on limiting encroachment within 
delineated floodplains and ensuring desert sensitive design solutions for 
drainage mitigation. 
• The Streets Element outlines that the town should maintain a circulation plan 
which services the needs of the local residents by implementing measures to 
improve the safety and efficiency of the network. 
• The Open Space Element focuses on preserving floodplains and washes in 
their natural state. 
• The Public Facilities Element focuses on supporting ongoing efforts internally 
and with external agencies to maintain a reliable, efficient and quality level of 
public services which includes but is not limited to public safety and 
emergency services. 
The town updated the Emergency Operations Plan in December 2014 to which the 2015 Plan 
was referred to in its update. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Transportation Planning 
Over the next five (5) years, depending upon available 
funding, the town could explore improvements to numerous 
washes crossing public streets.  If funding becomes available 
the planning, design and priority will integrate and reference 
the Plan. 
The Emergency Operation 
Plan 
The EOP was recently updated. Any future changes or 
updates will integrate and/or reference the Plan. 
Flood Control District 
Drainage Area Master Plan 
The FCDMC is currently working on a drainage area master 
plan which bisects the southwestern corner of the town.  Such 
Master Plan should reference the Plan. 
Town of Carefree General 
Plan (2012) 
The town’s General Plan is intended to guide growth and 
development within the town and its planning areas.  
Integration of the Plan with future updates of the General Plan 
will provide additional input into the identification of 
problematic growth areas and possible areas of mitigation 
interest.  The Plan will also serve as a reference source during 
annual amendments to the General Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 29 
Table 3-9:  Plan integration history and future strategy for Cave Creek  
Plan Integration Over the Past Plan Cycle: 
The Town of Cave Creek staff incorporates the 2015 Hazard Mitigation plan into our daily 
activities. During plan reviews staff would typically review the Hazard Mitigation plan to 
ensure that items identified as hazards within the Hazard Mitigation Plan are addressed within 
the submitted plans.  
 
Staff would also utilize the 2015 Hazard Mitigation plan as other documents are worked upon 
and drafted, for example during the updates to the Community Wildfire Protection Plan as 
well as the 2018 Updates to The Cave Creek Flood Response Plan, the Multi Hazard 
Mitigation Plan is referenced for pertinent cross reference materials. 
 
The Updates to the Town of Cave Creek Emergency Operations Plan also frequently referred 
to the Multi Hazard Mitigation Plan during the planning and update process. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Town of Cave Creek General 
Plan 
The Town’s General Plan provides the framework for guiding 
Cave Creek into the next decade. During the development and 
updates to the 2021 General Plan, staff will refer to the Multi 
Hazard Mitigation Plan for reference purposes. The 2021 
Multi Hazard Mitigation Plan will be incorporated into 
projects and actions projected for the next ten years. 
Storm Water Area Master 
Plan 
The Storm Water Master Plan will refer to the 2021 Multi 
Hazard Mitigation Plan as it specifically refers to flooding and 
flood mitigation. 
 Cave Creek Emergency 
Operations Plan 
The Cave Creek Emergency Operations Plan will refer to the 
2021 Multi Hazard Mitigation Plan during the updates 
process. The Emergency Operations Plan incorporates the 
hazards identified within the 2021 Multi Hazard Mitigation 
Plan. 
Town of Cave Creek Zoning 
Ordinance 
Cave Creek Planners will utilize the 2021 Multi Hazard 
Mitigation Plan as they look to update the Zoning Ordinance. 
The 2021 Multi Hazard Mitigation Plan will be utilized as a 
reference manual as it pertains to new ordinances that will 
help address and effect defined hazards. 
 
 
Table 3-10:  Plan integration history and future strategy for Chandler  
Plan Integration Over the Past Plan Cycle: 
The City of Chandler utilized the prior 2015 Plan as a reference for the development of the 
Community Wildfire Protection Plan.   Additionally, the 2015 Plan was referenced by the Fire 
Department when completing the Emergency Operations Plan for the City of Chandler, 
specifically the risk assessment components.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 30 
Table 3-10:  Plan integration history and future strategy for Chandler  
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Emergency Operations Plan 
The purpose of this plan is to provide effective emergency 
operations within the City of Chandler using the existing 
governmental organization and resources to the maximum 
extent possible. This includes a comprehensive risk analysis 
and threat assessment. The EOP is due to be revised in 2021 
and should reference the Plan. 
Capital Improvement 
Program 
The CIP serves as a multi-year planning instrument used to 
identify needs and financing sources for public infrastructure 
improvements. The CIP is revised annually and will continue 
to reference the Plan. 
General Plan 
The City of Chandler General Plan serves as an expression of 
development policies used to guide development decisions. Its 
purpose is to establish clear direction that spells out public 
expectations and preferences to sustain a desirable 
community. 
 
 
Table 3-11:  Plan integration history and future strategy for El Mirage  
Plan Integration Over the Past Plan Cycle: 
El Mirage has a COOP plan that is currently under revision as well as the 2015 Plan. Capital 
Improvement Plans (CIP) have been established for mid- to long-range planning for public 
safety and were developed with reference to the 2015 Plan.  
 
Cooperation within the organization has continued to be strong with incorporation of the 2015 
Plan into communications between Public Safety and Public Works, on how services can be 
improved based on the CIP, the COOP plan, and public safety. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
City of El Mirage General 
Plan, CIP programs, and 
Council Goals 
The El Mirage general plan provides long-term guidance to 
the Cities growth. Development of the general plan and 
council goals setting are elements that are informed by either 
reference or incorporation of the risks, goals and mitigation of 
the actions within the projects of the hazard mitigation plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 31 
Table 3-11:  Plan integration history and future strategy for El Mirage  
City of El Mirage General 
Plan, CIP programs, and 
Council Goals 
The City of El Mirage is consciously aware of the future 
needs that are not limited to the items below. The City of El 
Mirage has either updated each of these items or are 
concurrently working towards an update.  
• Comprehensive or General Plans 
• Stormwater Master Plans  
• Capital Improvement Programs 
• Regional Plans (Transportation, Land Use, etc.) 
• Emergency Operations/Response Plans 
• Community Wildfire Protection Plans 
• Development Plans 
• Development Guidelines and/or Regulations 
• Ordinance Updates or Revisions 
 
 
Table 3-12:  Plan integration history and future strategy for Fort McDowell Yavapai 
Nation  
Plan Integration Over the Past Plan Cycle: 
The Wildland Fire Management Plan, 2012, was commissioned by the Bureau of Indian 
Affairs, Salt River Agency on behalf of three tribal Nations, one of which is the Fort 
McDowell Yavapai Nation. The wildland fire management plan incorporated some of the 
existing Hazard Mitigation Plan components in the development of the wildfire management 
plan. The current mitigation plan has also aided in the annual Threat and Hazard Identification 
and Risk Assessment process. Finally, it has aided the Nation in the development and renewal 
of our emergency operations plan. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Capital Projects Five Year 
plan 
The Nation’s Capital Projects Five Year Plan elements are 
potentially affected by the risks, goals, and mitigation actions 
of the hazard mitigation plan. 
Emergency Operations Plan 
Update 
The Nation’s Emergency Operations Plan is required to be 
updated at least every three years. The elements of the 
Emergency Operations Plan are directly correlated to the 
risks, hazards, goals, and mitigation actions of the hazard 
mitigation plan.  
Threat and Hazard 
Identification and Risk 
Assessment  (THIRA) 
The THIRA is updated annually and incorporates several 
elements of the Hazard Mitigation Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 32 
Table 3-13:  Plan integration history and future strategy for Fountain Hills  
Plan Integration Over the Past Plan Cycle: 
The 2015 Plan was referenced in the development and implementation of several plans and 
Capital Improvement Projects including: 
• The 2020 Maricopa County Community Wildfire Protection Plan. 
• Flood Control Emergency Plans. 
• 2020 Town of Fountain Hills Subdivision Ordinance. 
• 2020 Fountain Hills Storm Ready Certification. 
• Fuels mitigation projects in the Ashbrook and Legend Washes. 
• Drainage improvements to the Civic Center and Eagle Mountain Parkway areas. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Capital Improvement Plan 
The town’s Capital Improvement Program provides project 
development for drainage improvement projects.  As before, 
the Plan will serve as a reference for the identification of 
future CIP projects. 
Town of Fountain Hills 
General Plan 
The Fountain Hills General Plan – 2020 provides long-term 
direction for the town’s growth.  Most of the town’s drainage 
is through preserved natural or re-graded wash areas.  The 
Plan will be referenced with any amendments or updates to 
the General Plan. 
Town of Fountain Hills 
Emergency Operations Plan 
The Town’s Emergency Operations Plan specifically 
addresses flooding in washes and roadways throughout the 
community.  The Hazard Mitigation Plan works in concert 
with the risk analysis and threat assessment.  
 
 
Table 3-14:  Plan integration history and future strategy for Gila Bend  
Plan Integration Over the Past Plan Cycle: 
Over the past 5 years the Town of Gila Bend has incorporated the Plan into Capital 
Improvement Programs and Regional Plans (Transportation, Land Use, etc.), in the update or 
revision of Economic Development Plans, Guidelines, Regulations, Ordinances and the 
Town’s Emergency Operations and Response Plans.   Elements of these planning mechanisms 
were informed by either reference or incorporation of the risks, goals, and mitigation 
actions/projects of the Plan. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Capital Improvement 
Programs  
 
Regional Plans 
(Transportation, Land Use, 
etc.) 
The town’s CIP and Regional plans serve as guidance 
documents for the town’s growth and resources. Development 
of these plan elements are informed by either reference or 
incorporation of the risks, goals, and mitigation 
actions/projects of the Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 33 
Table 3-14:  Plan integration history and future strategy for Gila Bend  
Economic Development 
Plans 
 
Development Guidelines 
and/or Regulations 
 
Ordinance Updates or 
Revisions 
The town’s Economic, Development plans, and Ordinances 
provide long-term guidance to the town’s growth and 
development.  Development of these plans and guideline 
elements are informed by either reference or incorporation of 
the risks, goals and mitigation actions/projects of the Plan. 
Flood Mitigation Master Plan  
The Flood Mitigation Master Plan was a multi-jurisdictional 
effort across various agencies. The town’s Flood Mitigation 
Master Plan provides long-term guidance to the town’s 
growth patterns.  Development of the master plan elements 
are informed by either reference or incorporation of the risks, 
goals and mitigation actions/projects of the Plan. 
Emergency 
Operations/Response Plans 
These plans are being developed/revised and plan elements 
are informed by either reference or incorporation of the risks, 
goals and mitigation actions/projects of the Plan. 
 
 
Table 3-15:  Plan integration history and future strategy for Gilbert  
Plan Integration Over the Past Plan Cycle: 
The 2015 Mitigation plan was referenced with updating the Gilbert Emergency Operations 
Plan, concentrating specific responses to areas identified within the mitigation plan.  The 
mitigation plan was also taken into consideration during the development of the Gilbert Flood 
Response Plan adopted by council in 2019.  The Mitigation plan was also referenced during 
our Community Rating System (CRS) reviews, audits and updates. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Town of Gilbert Emergency 
Operation Plan update 
The Town of Gilbert’s Emergency Operation Plan slated for 
update in 2021, provides direction and guidance to the town’s 
response and recovery efforts in the event of a natural or 
manmade disaster. The planning process could potentially 
reference and/or incorporate risks, goals and mitigation 
actions of the Plan. 
Town of Gilbert Flood 
Response Plan update 
The Town of Gilbert’s Flood Response Plan slated for review 
and potential update in 2022, provides direction and guidance 
to the town’s flood response.  The planning process could 
potentially reference and/or incorporate risks, goals and 
mitigation actions of the Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 34 
Table 3-15:  Plan integration history and future strategy for Gilbert  
Town of Gilbert Storm 
Water Management Plan 
The Town of Gilbert Storm Water Management Plan slated 
for update soon.  The planning process could potentially 
reference and/or incorporate risks, goals and mitigation 
actions of the Plan. 
 
Table 3-16:  Plan integration history and future strategy for Glendale  
Plan Integration Over the Past Plan Cycle: 
The 2015 Maricopa County Multi-Jurisdictional Hazard Mitigation Plan was adopted by the 
Glendale City Council, demonstrating their continued commitment to hazard mitigation. The 
plan has been a guide for the City of Glendale as it pursues reducing risks to life and property, 
limiting the risks to critical infrastructure, and implementing and integrating hazard mitigation 
planning to other planning efforts. 
 
The Glendale Division of Emergency Management initiated a comprehensive revision of the 
City’s Emergency Operations Plan in 2019. The revision process included a review of the 
natural hazards that could impact the City and ensuring the related appendices were in place. 
The revision has not yet been completed due to the shifting of staff responsibilities due to the 
COVID-19 pandemic. 
 
In 2019-2020, the Water Services Department was required to conduct a Risk and Resilience 
Assessment and complete an Emergency Response Plan for the drinking water system in 
accordance with Section 1433 of the Safe Drinking Water Act as amended by Section 2013 of 
the American Water Infrastructure Act (AWIA). This assessment included natural hazards as 
listed in the 2015 Hazard Mitigation Plan: extreme heat; flooding; severe wind. 
 
Glendale Water Services Department also maintains various emergency response plans for the 
drinking water and wastewater system as well as site-specific plans for treatment plants, well 
sites, reservoirs, etc. For example, Water Services maintains an Emergency Action Plan for 
the Thunderbird Park Reservoir Dam. These plans provide more specific information and 
procedures than the Hazard Mitigation Plan. 
 
The City also maintains a Drought Management Plan to comply with the Arizona Department 
of Water Resources’ requirements. The most recent update to this plan was completed in 
2016. 
 
Glendale Water Services is currently working on an Integrated Water Master Plan which will 
consider impacts from drought to water supplies. 
 
Information in the Hazard Mitigation Plan was leveraged during the development of the 2018 
City of Glendale Transportation Plan. The hazards that could affect the transportation system 
were considered during the planning process. 
Plan Integration Strategy for Next Five Years:

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 35 
Table 3-16:  Plan integration history and future strategy for Glendale  
Planning Mechanism 
Description of Planning Mechanism Opportunity 
City of Glendale Emergency 
Operations Plan 
The City of Glendale Emergency Operations Plan is currently 
under revision. Planning efforts will include a review of the 
Multi-Jurisdictional Hazard Mitigation Plan to ensure that the 
risks, goals, and objectives of the plan are adequately 
addressed. 
City of Glendale Capital 
Improvement Program 
The City of Glendale CIP plan addresses various projects over 
a ten-year span. The plan is an outline for creating, 
maintaining present and future infrastructure needs. 
 
Glendale Water Services contributes projects to the City’s 
CIP.  Projects include the rehabilitation or replacement of 
assets to improve redundancy and maintain resiliency. One 
such project involves the design and installation of additional 
groundwater wells to improve water supplies when drought 
impacts surface water supplies. 
Integrated Water Master Plan 
Glendale Water Services’ Integrated Water Master Plan 
(IWMP) looks at development/population growth, water 
demand, and water supplies through 2055. The IWMP 
complements the Hazard Mitigation Plan specific to available 
water resources, including plans to improve redundancy and 
resiliency of the City’s water system. 
 
One component of the IWMP is a stormwater maintenance 
plan to prevent flooding of the City’s storm sewer system. 
Drought Management Plan 
The City is currently updating our Drought Management Plan 
(DMP) to reflect recent developments on the Colorado River 
and the latest data available through SRP. The DMP 
complements the Hazard Mitigation Plan related to drought 
response. 
Emergency Action Plan for 
Thunderbird Park Reservoir 
Dam 
Glendale Water Services maintains an emergency action plan 
in case of a breach of the reservoir/dam. This plan is reviewed 
each year and updated as needed. 
2018 City of Glendale 
Transportation Plan 
The City of Glendale’s Transportation Plan outlines the City’s 
involvement in transportation planning at the regional and 
sub-regional levels to assist in planning and addressing the 
City’s transportation system needs. The Hazard Mitigation 
Plan will be used as a reference of possible hazards for 
consideration in the transportation planning process.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 36 
Table 3-17:  Plan integration history and future strategy for Goodyear  
Plan Integration Over the Past Plan Cycle: 
Over the past 5 years the Plan has been referenced or integrated into the following planning 
mechanisms: 
THREAT VULNERABILITY ASSESSMENTS:  Threat Vulnerability Assessments:  
Goodyear’s Hazard Mitigation Plan has informed and promoted the process of both Water and 
Wastewater Threat Vulnerability Study, which in turn informed the priority values and 
potential CIP funding for both security improvements, as well as the location of additional 
continuity features, such as generators.   
WATER CURTAILMENT PLANNING: While not directly involved, the City is working 
to update the Water Curtailment plan, which is a parallel planning document which 
specifically addresses critical items within the Hazard Mitigation Plan in relation to drought. 
TRAINING/EXERCISING:  Several training and a full-scale exercise with the Flood 
Control District of Maricopa have occurred in the last five year, ensuring that key staff were 
aware of the Emergency Response Plan for Bullard Wash (flooding), understood actions to be 
taken, practiced evacuation route planning in coordination with Street closures, public 
information and mass communication through the CENS system.  Real storm activity 
reinforced the ability to activate WEA during a high wind event. 
WILDLAND URBAN INTERFACE: The Community Wildfire Protection Plan identified 
the Estrella community in the southern portion of the city, as being within the Wildland Urban 
Interface (WUI).  Mitigation efforts resulted in a debris clean-up day and the community’s 
qualification for Firewise for one year.  Program requirement changed, as did HOA 
leadership, but Goodyear plans to continue to work with the HOA in relation to reducing 
wildland fire hazards in Corgett Wash.   
EXTERNAL COMMUNICATIONS:  Goodyear routinely, either through citywide 
communications and social media platforms, informs the public of preparedness, weather 
events, safety information on a variety of hazards within the city.    
INTERNAL COMMMUNICATIONS:  Goodyear Emergency Manager is responsible for 
monitoring forecasts and promoting messages to over 70 key staff regarding incoming 
weather, implications, and potential actions to mitigate damage (as possible).  This 
communication distribution list (DL) is also used to collect and report storm damage.  This 
can then be used to identify repetitive damage and proactive measures in which to mitigate 
when and where possible.   It is also often used to prompt external communications as noted 
above.   
ORDINANCES:   The City of Goodyear has a weed abatement program which includes an 
enforcement component.   
DEVELOPMENT REVIEW PROCESSES:    Goodyear planning processes include 
DFIRM maps and the identification of floodway and floodplain for development, as well as 
the most current building codes.      
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 37 
Table 3-17:  Plan integration history and future strategy for Goodyear  
City of Goodyear General 
Plan 
The City’s general plan provides long-term guidance to the 
City’s growth.  The Hazard Mitigation will be but one 
document which will inform the update of the General Plan in 
terms all types of growth planning, from land use designations 
to additional CIP projects if appropriate.  
Curtailment and 
Conservation Plan 
Currently in the process of update, the Hazard Mitigation plan 
will also be considered (and ideally referenced) within the 
plan. 
Emergency Operations Plan 
A comprehensive Emergency Operations Plan update is due in 
2021.  The Hazard Mitigation will be featured in the Specific 
Annex to identify which hazard specific entries are 
appropriate as well as help identify any which require the 
development of Emergency Response Plans for development 
and exercise.    
Ordinance and Code updates 
The Plan will inform the update of any new land use 
development and/or building codes being updated 
contemplated during the next five years.   Ideally, 
consideration of mitigation plans will have a direct impact 
upon any updates if and as warranted. 
 
 
Table 3-18:  Plan integration history and future strategy for Guadalupe 
Plan Integration Over the Past Plan Cycle: 
The hazard mitigation plan is referenced and is considered in any ongoing construction for 
both residential and commercial. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Town of Guadalupe 
Emergency Operation Plan 
The Town of Guadalupe’s EOP is planning for response to 
and mitigation to potential disasters. 
Building Plan Review 
Building plans are reviewed to be compliant with location, 
elevation, and drainage codes. 
Building codes 
Building codes are to be review and updated.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 38 
Table 3-19:  Plan integration history and future strategy for Litchfield Park 
The City of Litchfield Park has incorporated references to hazard mitigation into the General 
Plan that was reviewed and amended in 2020. The Wildfire protection plan was reviewed and 
updated to reflect protection to buildings and other properties both municipal and private. The 
City Emergency Operations Plan was reviewed and the Hazardous Material and mitigation 
plans were brought into line with the NIMS format.  Ground water protection plan was 
reviewed and is monitored on a monthly basis by an independent engineering firm to make 
sure our City’s groundwater is not being contaminated by a potential source of hazardous 
waste from a nearby property. This monitoring companies report its findings to the City 
monthly. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
City of Litchfield Park 
General Plan 
The LP General Plan was reviewed and adopted in 2010 and 
then  Amended in 2020. 
 
The plan addressed the need to protect our residents from 
hazards that would affect the City’s environment and 
community wellbeing. 
 
Environmental impacts do not respect municipal boundaries.  
Nevertheless, local policy should support efforts to improve 
and achieve a wholesome, healthful environment.  
Maintaining efforts to protect the City’s water supply is 
paramount to keeping a safe living environment. 
 
Clean water, air and land are high priorities for maintaining 
the community’s healthful, outdoor lifestyle. Citizens 
appreciate serenity, and expect protection from negative 
impacts on well-being caused by non-compatible land uses, 
nuisances, hazardous activity, overly bright unshielded 
lighting, and vehicular noise and congestion. 
OBJECTIVES 
• Continue local efforts to maximize opportunities for 
recycling, hazardous materials disposal, community 
cleanup events, enhanced property maintenance and 
dust control.  Consider and initiate partnerships with 
neighboring communities as opportunities are 
presented. 
• Monitor external environmental impacts on the 
community, such as water table contamination and air 
quality. 
City Ordinance Updates 
City ordinances are reviewed and amended as needed. Spend 
time reviewing all ordinances that address Hazardous 
materials or safety to the community.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 39 
Table 3-19:  Plan integration history and future strategy for Litchfield Park 
Community Wildfire 
Protection Plans 
Review the Regional Community Wildfire Protection Plans as 
it pertains to the City of Litchfield Park. Review City 
ordinances that require grass and weed abatement to reduce 
fuel sources for fire. This was recently reviewed and revised. 
Schedule a review every year and amend as needed. 
Annual review of Emergency 
Operations Plan , EOP 
Review plan and amend as needed for sections that address all 
Hazard Mitigation Procedures. 
 
 
Table 3-20:  Plan integration history and future strategy for Maricopa County 
(Unincorporated) 
Plan Integration Over the Past Plan Cycle: 
Integration or reference to the 2015 Plan were accomplished with the following efforts. 
• Update and review of the Flood Control Comprehensive Plan. Completed in 2020. 
Integration of mitigation projects between the two plans. 
• Maricopa County has incorporated references to the Hazard Mitigation Plan into its 
Emergency Operations Plan, which is updated and approved by the Board of 
Supervisors annually.  
• The Community Wildfire Protection Plan was reviewed and updated in 2020 with 
integration of mitigation projects between both plans. 
• Update and review of the MCDOT Transportation Improvement Plan. Completed in 
2017. Plan is updated every 5 years. Integration of mitigation projects between the two 
plans. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Community Wildfire 
Protection Plan 
The CWPP identifies actions that will reduce the risk of 
wildfires to communities within the wild land urban interface 
zones. The plan was updated in 2020 and the Plan will be 
referenced with any future updates. 
Emergency Operation Plan 
The EOP identifies response and recovery actions in Maricopa 
County.  The EOP is reviewed and updated annually and will 
include integration of risk assessment data from the Plan. 
Transportation Improvement 
Plan 
The TIP identifies transportation related projects within a 5 
year plan.  The TIP is updated annually and reference to the 
Plan will be made with each update. 
Capital Improvement Plan 
(Flood, MCDOT, County) 
The CIPs for each of the various agencies within the county 
are typically reviewed and updated annually.  Integration of 
mitigation actions and projects between the CIPs and the Plan 
will be part of the process.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 40 
Table 3-21:  Plan integration history and future strategy for Mesa 
Plan Integration Over the Past Plan Cycle: 
The timing of the Emergency Operations Plan and the general plan do not align optimally. 
The previous EOP was adopted following the last general plan update, therefore integration 
and updating of policies and strategies is constrained. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
General Plan 
Per Arizona State Statue, municipalities are required to update 
their general plans every 10 years. Mesa’s 2040 General Plan 
was adopted in 2014 and is required to be updated by 2024. 
The plan will include policy and strategies for hazard 
mitigation, resiliency planning, and public safety. Items 
identified in the Emergency Operation Plan will be 
incorporated into these sections and possibly other appropriate 
places within the general plan.  
 
 
Table 3-22:  Plan integration history and future strategy for Paradise Valley 
Paradise Valley is no longer participating in this Plan 
 
 
Table 3-23:  Plan integration history and future strategy for Peoria 
Plan Integration Over the Past Plan Cycle: 
In the past five years, the City of Peoria has worked with Maricopa County Department of 
Emergency Management to ensure that the hazard mitigation plan is maintained and updated 
as necessary. 
 
In addition, when possible, the City has worked whenever possible to incorporate the hazard 
mitigation plan components into our normal business process. These include the review and 
updating of Codes and Regulations within the City. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Flood Response Plan 
The City will work with Maricopa County Flood Control to 
update the Flood response plan 
Emergency Operation Plan 
(EOP) 
The Emergency Operation Plan was been updated and will be 
taken to Council for their approval pending the removal of 
proclamation number 1 for COVID response. 
Departmental Plans 
City departments will continue to update any internal plans 
and/or Public plans as necessary.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 41 
Table 3-24:  Plan integration history and future strategy for Phoenix 
Plan Integration Over the Past Plan Cycle: 
The City of Phoenix Emergency Operations Plan (EOP) addresses the City’s hazard and threat 
environment, including natural, technological, and human-caused emergencies or disasters. 
 
The Continuity of Operations Plan establishes policy and guidance to ensure the execution of 
the essential functions for the City of Phoenix in the event that an emergency threatens or 
incapacitates operations; and the relocation of selected personnel and functions of any 
essential facilities are required. Specifically, this plan is designed to ensure that the City of 
Phoenix is prepared to respond to emergencies, recover from them, and mitigate against their 
impacts.   
 
The Floodplain Management Plan is an overall strategy of programs, projects and measures 
aimed at reducing the adverse impacts of flood hazards on the community. This plan identifies 
flood risks, their impact on the community, and a prioritized action plan for reducing flood 
risks. The National Flood Insurance Program requires the city to review this plan annually. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
City of Phoenix Emergency 
Operations Plan 
The City of Phoenix Emergency Operations Plan (EOP) 
addresses the City’s hazard and threat environment, including 
natural, technological, and human-caused emergencies or 
disasters. 
Continuity of Operations 
Plans 
The Continuity of Operations Plan establishes policy and 
guidance to ensure the execution of the essential functions for 
the City of Phoenix in the event that an emergency threatens 
or incapacitates operations; and the relocation of selected 
personnel and functions of any essential facilities are required. 
Specifically, this plan is designed to ensure that the City of 
Phoenix is prepared to respond to emergencies, recover from 
them, and mitigate against their impacts.   
Floodplain Management Plan 
The Floodplain Management Plan is an overall strategy of 
programs, projects and measures aimed at reducing the 
adverse impacts of flood hazards on the community. This plan 
identifies flood risks, their impact on the community, and a 
prioritized action plan for reducing flood risks. The National 
Flood Insurance Program requires the city to review this plan 
annually. 
Capital Improvement 
Program 
The City’s capital improvement Program details projects and 
funding for identified risks, goals, and mitigation efforts 
referenced in the hazard mitigation plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 42 
Table 3-25:  Plan integration history and future strategy for Queen Creek 
Plan Integration Over the Past Plan Cycle: 
The current Maricopa County Multi-Jurisdictional Hazard Mitigation Plan (MCMJHMP) was 
reviewed on an annual basis.  Staff from the Fire and Medical Department, Public Works 
Department, and the Development Services Department consulted to update the current list of 
mitigation actions and projects.  The updated document was submitted to the Maricopa 
County Department of Emergency Management (MCDEM). 
 
Fire and Medical Department staff also would review the list of mitigation actions and 
projects when the Hazard Mitigation Grant Program (HMGP) guidance was issued annually.  
This was done to determine if any of the projects would be a viable candidate for submittal to 
the HMGP. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Emergency Response Plan 
(EOP) 
The Town’s Emergency Response Plan (EOP) provides a 
guide to how the community will respond to a disaster 
incident.  The risk data may be utilized as one of the 
appendices to the EOP. 
Community Wildfire  
Protection Plan (CWPP) 
The risk data from the community wildfire protection plan 
serves as the basis of the hazard mitigation plan. 
Capital Improvement 
Program (CIP) 
The hazard mitigation plan can be utilized to inform and guide 
the submittal and funding of projects on an annual basis. This 
can occur both in the Town’s CIP and outside partners such as 
Salt River Project (SRP) and the Flood Control District of 
Maricopa County. 
Community Risk Assessment 
The Fire and Medical Department has developed a 
Community Risk Assessment to identify all of the hazards 
that may impact the community. The hazards may include 
train derailments, airplane crashes and natural hazards. The 
Hazard Mitigation Plan data can be incorporated into this 
document when it is updated. 
 
 
Table 3-26:  Plan integration history and future strategy for Salt River Pima Maricopa 
Indian Community 
Plan Integration Over the Past Plan Cycle: 
The Salt River Indian Community incorporated the Emergency Operations Plan and the Tribal 
Emergency Response Commission planning process to further support hazard mitigation in an 
All Hazards environment. In addition, other supporting documents such as the Tribal 
Communities Threat Hazard Identification Risk Assessment (THIRA) and Office of 
Emergency Communications (OEC) Tribal Communications Profile were utilized to support 
on-going efforts to further incorporate into the Hazard Mitigation Plan. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 43 
Table 3-26:  Plan integration history and future strategy for Salt River Pima Maricopa 
Indian Community 
Storm Water Study 
Elements of this plan will be integrated into the SRPMIC 
Storm Water Study and the development of Master Plans for 
storm water management. 
Transportation Plan 
The Public Works Department has plans to develop a Tribal 
Transportation Plan. The Plan components will be a 
consideration in that plan development. 
SRPMIC Tribal Emergency 
Response Commission 
(TERC) 
The overall governing body for the Emergency Management 
Program is the SRPMIC TERC. This plan once completed 
will be reviewed by that Commission so that their planning 
efforts consider elements of the Plan. 
Community Wildfire 
Protection Plan 
Elements of the current plan will be integrated into operations 
within identified community stakeholder departments to 
further mitigate wildfire hazards within the Tribal community. 
Emergency Operations Plan 
Elements of the plan to manage projects in an All-hazard 
environment will further test capabilities through planning; 
equipment purchases; and training & exercises. Components 
of the plan include but are not limited to Mass Care, 
Volunteer Management, Logistics and Supply Chain 
Management, Operational Communications, and Public 
Health. 
 
 
Table 3-27:  Plan integration history and future strategy for Scottsdale 
Plan Integration Over the Past Plan Cycle: 
The city of Scottsdale continues to strive for all integration of all emergency plans. This 
integration will allow a multidisciplinary approach to preparing for, responding to, recovery 
and mitigation efforts from emergency and disaster events. The intent is to create structured 
effort that minimizes impact and increase efficiency. Coinciding with the update of the 2016 
plan is the update of the city’s Emergency Operation Plan, Community Wildfire Protection 
Plan, Continuity of Operations Plan, Local Emergency Planning Committee, and the Storm 
Water Working group. The goal has been to integrate hazard mitigations strategies into city 
and functional plans and demonstrate value added into zoning laws and codes. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Scottsdale Emergency 
Operations Plan (EOP) 
Scottsdale’s “all hazard” approach to dealing with a range of 
emergencies. Provides the structure and processes that the city 
utilizes to respond to and initially recover from an event. The 
Plan identifies for planning purposes key threats known to the 
City of Scottsdale.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 44 
Table 3-27:  Plan integration history and future strategy for Scottsdale 
Local Emergency Planning 
Committee (LEPC) 
Under the Emergency Planning and Community Right to 
Know Act this committee must develop an emergency 
response plan and provide information about chemicals in the 
community to citizens. The Plan ties into this planning by 
identifying Tier 1 and Tier 2 storage of chemicals. 
Continuity of Operations 
Plan (COOP) 
The Plan establishes priorities and procedures to sustain vital 
operations and services during a disaster event. The Plan 
provides the historical and potential emergencies to be 
prepared for. 
Community Wildfire 
Protection Plan (CWPP) 
The Plan identifies at risk communities within or near the 
wildland/urban interface. The Plan provides historical 
evidence for mitigation of fires within the wildland/urban 
interface.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 45 
Table 3-28:  Plan integration history and future strategy for Surprise 
Plan Integration Over the Past Plan Cycle: 
Public Works Department - 
The Public Works Department has incorporated the current hazard mitigation plan into the 
Municipal Code and the Engineering Development Standards (EDS). Engineering staff uses 
both the code and the EDS to identify potential hazards and provided comments to 
development applicants to mitigate potential issues/threats. 
 
Water Resource Management Department- 
The recommendations associated with the 2015 Hazard Mitigation Plan were incorporated 
into the following Council approved documents and policies: 
1. Water Resource Capital Improvement Plan  
2. Utility Rate Study 
3. Water & Wastewater Utility Guidelines and Standards 
4. SCADA Guidelines & Standards  
Water & Wastewater Site Security Enhancements 
 
Fire Medical Department -  
The Surprise Fire-Medical Department (SFMD) utilized information within the 2015 Hazard 
Mitigation Plan to assist with the creation of the following documents: 2015 Certificate of 
Necessity (CON), 2019 Standards of Cover / Community Risk Assessment (SOC/CRA), and 
the 2020 SFMD Strategic Plan.   
 
Each of these documents was presented and approved by the City of Surprise (COS) City 
Council.  Additionally, the 2015 CON was responsible for the newly created ambulance 
division with the SFMD.  Lastly, the 2019 SOC/CRA and the 2020 Strategic Plan were vital 
to the SFMD becoming an Internationally Accredited Fire Department from the Center for 
Public Safety Excellence (CPSE).  The SFMD became Accredited in early March of 2020. 
 
Community Development Department- 
None. While the City’s General Plan 2035 incorporates general planning mechanisms and 
language throughout which is intended to guide the City’s safe development, the General Plan 
2035 was developed prior to the City’s comprehensive hazard mitigation plan and so the 
hazard mitigation plan is not specifically incorporated into the General Plan, or mentioned by 
reference. The City’s General Plan 2035 is located online at 
https://www.surpriseaz.gov/DocumentCenter/View/18530/General-Plan-2035?bidId=. 
 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
City of Surprise Capital 
Improvement Plan (PW) 
City staff will research and identify available funding sources 
for hazard mitigation projects.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 46 
Table 3-28:  Plan integration history and future strategy for Surprise 
City of Surprise Engineering 
Development Standards 
(PW) 
The city continually reviews the Engineering Development 
Standards (EDS) for update opportunities. The EDS provides 
guidelines to the development community that help mitigate 
hazard risks. 
City of Surprise Municipal 
Code (PW) 
The Public Works Department continually coordinates with 
the Community Development Department to update the Land 
Development portion of the Municipal Code. This section of 
the code specifies regulations that help mitigate hazard risks, 
such as flooding. 
Integrated Water Master Plan 
Update (WRM) 
The Integrated Master Plan Update will include elements 
identified in the 2021 plan related to the Utility’s critical 
infrastructure. 
America’s Water 
Infrastructure Act of 2018 
Analysis (WRM) 
The City is required to comply with the AWIA Risk 
Assessments by December 31, 2021. The recommendations 
identified in the Hazard Mitigation Plan will be implemented 
into this plan if not previously identified. 
Water, Stormwater, Sewer 
Utility Rate Study (WRM) 
If the recommendations of the 2021 identify capital 
improvements, our 2024 utility rate study would incorporate 
these projects. 
City of Surprise General Plan 
(CD) 
The City’s General Plan is the guiding document for the short 
and long-term development of the City and incorporates 
planning mechanisms and language throughout which is 
intended to guide the City’s safe development. The plan, 
which was last revised in 2019, undergoes a major update 
every 10 years. Future editions will incorporate or contain 
specific reference to the City’s hazard mitigation plan.  
General Plan 2035- City of 
Surprise 
The General Plan 2035 provides long term guidance as it 
relates to the City’s expected growth. The general plan 
references risks unique to the City of Surprise described in the 
2021 Hazard Mitigation Plan including wildfire risks, and the 
high potential for flash flooding in Northern portions of 
Surprise. 
Capital Improvement Plans  
Future Capital Improvement Plans created by the SFMD 
reference will utilized the 2021 Hazard Mitigation Plan as it 
relates to future growth, fire station placement, needs 
assessments & managing risk with the COS. 
Wildfire Protection Plans 
The 2021 Hazard Mitigation Plan (HMP) will assist the 
SFMD with the creation of Wildfire Protection Plans by 
identifying areas in Surprise that have experienced rapid 
residential growth that are located in the urban interface.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 47 
Table 3-29:  Plan integration history and future strategy for Tempe 
Plan Integration Over the Past Plan Cycle: 
The City of Tempe Public Works-Engineering/Principal Civil Engineer has completed a 
Storm Drain Management Study in the past plan cycle. This plan outlines projects based on 
flood protection. The highest rank projects have been worked on and projects will continue to 
be programmed into Tempe’s 5-year and will be built and constructed as funding is available.  
 
The current Emergency Operations Plan updated September 2019 references the MCMJHMP 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Long-Term Asset 
Management Plan 
The City of Tempe’s Long-Term Asset Management Plan 
addresses the risks, goals and mitigation projects referenced in 
the hazard mitigation plan. The Well Asset Maintenance and 
New Production will add new groundwater production and 
recovery well capacity to the Tempe municipal system for 
back-up water production, supplemental drought supply water 
quality blending, and emergency preparedness. 
Tempe’s Climate Action 
Plan 
The Climate Action Plan recommends that Tempe invest in 
neighborhood facilities that can act as community hubs as a 
hazard mitigation measure during emergencies. The EnVision 
hub will provide Human Services programs 365 days a year 
and will have the capacity and infrastructure to serve residents 
with limited incomes as a neighborhood resource during a 
disaster as part of a whole community-based approach to 
emergency management. 
Urban Forest Master Plan 
The Urban Forest Master Plan includes a tree and shade 
canopy coverage performance measure to mitigate the effects 
of extreme heat in the City of Tempe. It is the City of 
Tempe’s goal to achieve a citywide 25% tree and shade 
canopy by 2040. 
Tempe’s Multi-Year 
Training and Exercise Plan 
The City of Tempe is in the process of completing a 
comprehensive Hazard Vulnerability Analysis (HVA) to 
include hazardous materials, human hazards, technological 
and natural hazards. We will complete the analysis on an 
annual basis. The top three hazards identified will become the 
priority focus of our Multi-Year Training and Exercise Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 48 
Table 3-30:  Plan integration history and future strategy for Tolleson 
Plan Integration Over the Past Plan Cycle: 
The 2015 Plan was used in the development of plans for the new City Hall building and 
Aquatic Center, with construction to begin this year.  Additionally, the Plan was referenced in 
the update and revision of City Ordinances, including the recently adopted Fireworks 
Ordinance. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Emergency Operation Plan 
Plan to identify response and recovery actions in Tolleson. 
Annual updates.  
Annual Capital Improvement 
Programs 
Plan to fund and implement construction projects to mitigate 
identified deficiencies in local flood protection, transportation 
corridors, and emergency operations. 
Ordinance Updates or 
Revisions 
Revisions to City Codes, as needed, to mitigate or improve 
shortcomings in current codes regarding public health, safety, 
and welfare. 
 
 
Table 3-31:  Plan integration history and future strategy for Wickenburg 
Plan Integration Over the Past Plan Cycle: 
Over the past 5 years, the plan has been referenced and considered in development activities 
and in response emergencies throughout the jurisdiction.  The Town of Wickenburg also used 
the 2015 Plan as a reference in updates and amendments to the Emergency Operation Plan, 
the Town General Plan, Town Codes and Ordinances, and in prioritizing projects within the 
ICIP. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Capital Improvement Project 
Plans 
Provide the information needed from the hazard mitigation 
standpoint to identify areas where CIP funds may be utilized 
in projects, i.e. infrastructure repair, transportation issues. 
Emergency Operations Plan, 
Town of Wickenburg 
Provide template to larger scale planning, and contacts for 
other municipalities that may provide assistance in the event 
the Plan is activated. 
Town of Wickenburg 
General Plan 
With updates to the General plan, having the mitigation plan 
in place as a reference for overall impact of growth to the 
community 
Ordinance Updates or 
Revisions 
As the Town reviews and updates Ordinances, the mitigation 
plan is used as a reference to inform decisions related to 
hazard risk and risk mitigation.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 49 
Table 3-32:  Plan integration history and future strategy for Youngtown 
Plan Integration Over the Past Plan Cycle: 
The 2015 Plan was either reviewed, referenced and/or integrated with the following planning 
activities for the Town of Youngtown: 
• In 2014, the Youngtown General Plan 2025 was updated and approved by the voters 
by an overwhelming 70%.  The General Plan addressed the following: 
o Circulation & Transportation – This element includes the goals, objectives, and 
policies for vehicular and non-vehicular mobility throughout Youngtown and 
between Youngtown and adjacent communities per the Small Area 
Transportation Study that the town worked with in collaboration with the 
MAG (Maricopa Association of Governments). 
o Water Resources – Youngtown’s location on the east bank of the Agua Fria 
River provides it with an opportunity to implement the recommendations of the 
Agua Fria Watercourse Master Plan.   The town continues to work with 
Maricopa County on areas that have potential for flooding within the town. 
o Open Space & Recreation – Town will continue to work with the City of El 
Mirage, the Flood Control District of Maricopa County and the U.S. Army 
Corps of Engineers to implement the Agua Fria River Watercourse Master 
Plan. 
o Environmental Planning – The town has implemented the MAG 1997 PM-10 
& Carbon Monoxide Plan and in 1998, added additional measures to reduce 
PM-10 particulates to continue to meet air quality standards. 
• The town has also worked with the Flood Control District of Maricopa County to 
determine appropriate actions to prevent flooding and development within the Agua 
Fria 100-year floodplain. 
Plan Integration Strategy for Next Five Years: 
Planning Mechanism 
Description of Planning Mechanism Opportunity 
Commercial Development 
Checklist 
Each new development is required to complete a 
comprehensive review outlining the possible effect on the 
town’s mitigation plan in conjunction with the growth to the 
community. 
Flooding Resilience Planning 
The town has identified streets that are prone to flooding and 
has applied for flood control assistance with Maricopa County 
in order to prevent street flooding and potential residential 
flooding.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 50 
Table 3-32:  Plan integration history and future strategy for Youngtown 
Transportation Planning 
The town has developed a transportation policy.  The plan 
includes integration of pedestrian/bicycle non-motorized 
transportation into existing corridors in a safe manner; 
determined improvements and developed a plan to address 
residents’ needs, address local and regional mobility, and 
consider access-management issues, while understanding the 
values and future transportation needs of our community.  
Developed a comprehensive transportation master plan, 
identified a prioritized project list for short-term and long-
term investments.  Public input meetings, dialogue and 
involvement in the plan, was received to ensure the policy 
reflects the vision of the town residents and businesses.  
Bike/Pedestrian Path was another key component of the study 
for Youngtown to become a more walkable community. 
Ordinances – Updates or 
Revisions 
Ongoing collaboration between town council, town 
management and staff and the town clerk’s office 
Design Review Board 
The Town of Youngtown provides information on potential 
development from the hazard mitigation standpoint to identify 
areas where development may impact infrastructure, 
transportation issues, etc. 
 
3.6.3 Plan Incorporation Process 
Each jurisdiction has particular processes that are followed for officially 
incorporating and adopting planning documents and tools.  Many of the processes and 
procedures are similar for jurisdictions with comparable government structures. 
In general, planning documents prepared by the various departments or 
divisions of a particular jurisdiction are developed using an appropriate planning 
process that is overseen and carried out by staff, with the occasional aid of consultants.  
Each planning process is unique to the plan being developed, but all usually involve 
the formation of a planning or steering committee, and have some level of 
interagency/stakeholder coordination within the plan’s effective area.  Public 
involvement may also be incorporated when appropriate and depending on the type of 
plan. New or updated plans are usually developed to a draft stage wherein they are 
presented to the respective governing body for initial review and comment.  Upon 
resolution and address of all comments, which may take several iterations, the plans 
are then presented to the governing body for final approval and official adoption.  
Integration or reference to the Plan into these various processes will be 
accomplished by the active participation of the MJPT PPOC representative(s) from 
each jurisdiction, in the other planning teams or committees to ensure that the Plan risk 
assessment, goals, and mitigation A/Ps are integrated and/or incorporated into the 
planning mechanism as appropriate.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 51 
Table 3-33 provides a summary of standard operating procedures that each of 
the participating jurisdictions follow when considering and incorporating official 
planning mechanisms, and how they apply to integration of the Plan. 
 
Table 3-33:  Jurisdictional standard operating procedures for integration of planning 
mechanisms  
Jurisdiction 
Description of Plan Integration Standard Operating Procedures 
Avondale 
The General Plan follows Arizona Revised Statute for public processes, legal 
notifications, public hearings, and public vote steps to approve a General Plan. The 
Development & Engineering Services Department’s Planning Division manages the 
General Plan process, update, written documentation, etc. collaborating with various 
City departments and staff. The proposed updates typically are presented to the City 
Council in a Work Session and Planning Commission in a Work Session followed by 
a formal approval process and public ballot vote. The General Plan was adopted in 
August 2012 and includes a Safety Element with the following information. This 
information will be updated for the 2022 General Plan update along with the goals 
and policies related to it.  
In general, planning documents are prepared by a particular department in the City by 
staff to a final draft stage and presented to the city council in a study work session for 
review and comment. Final approval and official adoption of any planning document 
or mechanism is normally done using a formal resolution process through the City 
Council. 
Buckeye 
The Maricopa County Multi-Jurisdictional Hazard Mitigation Plan (MCMJHMP) was 
developed by City staff through a consultant hired by the Maricopa County 
Department of Emergency Management (MCDEM).  The final draft of the 
MCMJHMP will be reviewed by the City staff with input from the City Attorney and 
then placed on a City Council Agenda for their review and discussion.  This will 
occur either during their Work Study Session or Regular Session.  The MCMJHMP 
can be accepted by the City Council through their adoption of a resolution. 
 
The MCMJHMP will be distributed to the Public Works and Development Services 
Departments and utilized in future planning documents where appropriate. 
Carefree 
The town’s General Plan is vetted through a series of public open houses to outline 
and gain acceptance of all facets of the Plan prior to consideration and deliberation of 
the Planning and Zoning Commission and town council.  The Planning and Zoning 
Commission typically holds numerous public meetings to further discuss and vet the 
plan prior to forwarding their recommendation to the town council.  Upon 
recommendation from the commission, the town council considers the General Plan 
or any proposed update/change to the plan.  Throughout this extensive review 
process, if relevant, additional items related to the Hazard Mitigation Plan can be 
added. 
Cave Creek 
The Town of Cave Creek Planners, as well as Department Directors, frequently 
prepare planning documents that are reviewed at a Department Director level and 
then are further reviewed by the Town Manager. Many of those documents are 
further vetted through committees comprised of elected officials and commissioners 
as well as by town residents. The Final Drafts are then frequently presented to the 
Town Council for review and adoption often times via resolution. The Maricopa 
County Multi-Jurisdictional, Hazard Mitigation Plan shall be reviewed and as 
appropriate it shall be incorporated into future planning documents as it pertains to 
the Town of Cave Creek. The Town of Cave Creek staff will actively participate in 
the drafting and updating of planning documents for The Town of Cave Creek.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 52 
Chandler 
Planning documents are created through a variety of means, including consultant and 
internal/ regional committee. The City of Chandler utilizes a process for planning 
document approval. All documents will have an official council memo and resolution 
assigned. These documents along with the resolution will be presented to mayor and 
council during a designated session. Resolution will be adopted or denied based on 
council vote. Adopted resolutions are then signed by the clerk’s office, city attorney, 
and mayor.  
 
The Plan, when completed, will follow the process described above. This will lead to 
formal city adoption of the plan and ensure the plans’ usefulness over the next 
planning period. 
El Mirage 
General planning documents prepared by all departments for the City of El Mirage 
are developed by staff to a final draft stage and presented to the city council in a 
study work session for review and comment. Final approval and official adoption of 
any planning document or mechanism is normally done using a formal resolution 
process through the City Council.  The Maricopa County Multi-Jurisdictional Hazard 
Mitigation Plan will be reviewed and as appropriate, incorporated into future 
planning documents and mechanism by the active participation of members of the 
City of El Mirage Mitigation Planning Team members in the development or update 
of those plans and mechanisms. 
Fort McDowell 
Yavapai Nation 
General planning documents in the Nation are prepared by departments and staff 
members of these departments specific to their area of responsibility and combined 
into a final document. The planning document is presented to the Tribal Council for 
discussion and approval. Included in the presentation of the planning document as an 
Action Item on the council agenda is a formal resolution.  
  
The multi-jurisdictional hazard mitigation plan will be reviewed, and as appropriate, 
incorporated into future planning documents for the Fort McDowell Yavapai Nation 
by the members of the Nation’s Hazard Mitigation Planning team. 
Fountain Hills 
The Town of Fountain Hills staff researches, develops, and presents its planning 
documents to the Town Council for discussion, comment, and approval.  The 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan will be reviewed, and 
brought before the Town Council, and upon approval, will be incorporated into the 
Town Planning documents as they are revised. 
Gila Bend 
General Plans, Capital Improvement Programs and Regional Plans (Transportation, 
Land Use, etc.), Emergency Operations/Response Plans (utilities, fire, and facilities), 
and Flood Mitigation Master Plans are developed by staff and outside agencies to a 
final draft stage and presented to the town council in a study work session for review 
and comment.  Final approval and official adoption of any planning document or 
mechanism is normally done using a formal ordinance/resolution process through the 
public hearing and then town council.   
 
The Plan will be reviewed and as appropriate, incorporated into future planning 
documents and mechanism by the active participation of the MJPT PPOC for the 
town, in the development or update of those plans and mechanisms. 
Gilbert 
General planning documents prepared by several departments for the Town of Gilbert 
are developed by staff to a final draft stage and presented to the city council in a 
study work session for review and comment. Final approval and official adoption of 
any planning document or mechanism is normally done using a formal resolution 
process through the Town Council.  The Maricopa County Multi-Jurisdictional 
Hazard Mitigation Plan will be reviewed and as appropriate, incorporated into future 
planning documents and mechanism by the active participation of members of the 
Maricopa County Mitigation Planning Team members in the development or update 
of those plans and mechanisms.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 53 
Glendale 
General planning documents are developed by staff and/or consultants to a final draft 
stage. For both new and updated CIP projects, a CIP Priority Matrix is used which 
includes questions regarding whether a project is designed to protect life/health/safety 
and if it is included in a master plan. Projects that meet these conditions are assessed 
a higher score which helps City management prioritize projects for presentation to 
City Council and public workshops for consideration. For Water Services projects, in 
some cases, the information is presented to the Citizen Utility Advisory Commission, 
then presented to City Council in a study work session for review and comment. Final 
approval and official adoption of certain planning documents or mechanisms are done 
using a formal resolution process through the City Council, as appropriate.   
 
The transportation planning process includes identifying all potential hazards and 
creating mitigation measures. The hazard mitigation plan will be used as a guide in 
this planning process. This process applies to capital transportation projects and 
operational activities. For capital projects, this is addressed as part of the 
environmental planning process. For operations, this is part of the ongoing risk 
mitigation process. Transportation projects and plans are made public for citizen 
review and input. The approval process involves staff review, Citizen Transportation 
Oversight Commission review and recommendation that are approved through City 
Council action. 
 
The Multi-Jurisdictional Hazard Mitigation Plan will be reviewed and, as appropriate, 
incorporated into future planning documents. 
Goodyear 
General planning documents prepared by all departments for the City of Goodyear 
are developed by staff to a final draft stage and presented to the city council for 
review and approval through a formal resolution. Once the FEMA update is 
completed, this plan will go before the City Council for signatory approval and 
formal resolution.  Once approved locally, copies of the plan will be made available 
to all Department directors and key staff for incorporation into plans, policies, 
processes and protocols as appropriate.   Additionally, this document will be used to 
annual for consideration of any Capital Improvement Projects (CIP) or as 
portions/considerations within other CIP projects as appropriate.  This plan will also 
be used to inform, as appropriate, the update of other large-scale plans within the city, 
including, but not limited to:  General Plan, Community Wildfire Protection Plan, 
Capital Improvement Plan, Conservation and Curtailment plan, etc.  Finally, annual 
review of the Hazard Mitigation Plan will provide an opportunity to reach out to 
various departments for reporting and will act, if nothing more, as a reminder of the 
Hazard Mitigation Plan projects.    
Guadalupe 
Planning documents are prepared by staff and presented to Town Council as a final 
draft for review. The Planning documents are approved through resolution by the 
Town council. Hazard Mitigation plans are then reviewed and updated as directed by 
program manager from the Maricopa County Department Emergency Management. 
Litchfield Park 
Planning documents are prepared by the appropriate staff in the department that is 
proposing the planning document.  A review by the City Manager or his designee is 
made of each document in question. The document is sent to the City Attorney for 
review and formatting. The document is placed on a City Council Agenda for 
discussion, public hearing if required, and possible introduction.  If the document is 
introduced by the city council, then it will appear on the next city council agenda for 
public hearing and adoption.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 54 
Maricopa County 
(Unincorporated) 
General planning documents prepared by all departments within Maricopa County are 
developed by staff to a final draft stage and presented to the Maricopa County Board 
of Supervisors for review and final approval.  Final approval and official adoption of 
any planning document is done using a formal resolution process. The Maricopa 
County Multi-Jurisdictional Hazard Mitigation Plan will be reviewed and as 
appropriate, incorporated into future planning documents as determined by Maricopa 
County Leadership, or members of the Maricopa County Mitigation Plan Committee. 
Mesa 
In general, the “big picture” concepts to be incorporated into planning documents are 
prepared by staff and shared with the public and city officials during a preliminary 
planning stage. Through public engagement events and Board and City Council study 
sessions, staff receives feedback and direction that informs the creation of the official 
planning document. Once a final draft of planning documents are complete, staff 
returns to Boards and City Council, via study sessions, to receive confirmation on 
policy direction.  Once final documents are prepared, they are presented to the 
Planning & Zoning Board for their recommendation to City Council. City Council 
then takes action on the proposed documents, through the adoption of Resolutions or 
Ordinance. 
Paradise Valley 
Paradise Valley is no longer participating in the Plan 
Peoria 
The City of Peoria plan adoption process includes the following steps. (1) The 
development and/or updating of the hazard mitigation plan. (2) The plan is reviewed 
by both the City Attorney Office. (3) The plan is submitted to the City Manager’s 
Office. (4) The plan is then submitted to our City Council for approval and adoption. 
 
The Maricopa County (City of Peoria) Multi-jurisdictional hazard mitigation plan 
will be reviewed by the City of Peoria on an annual basis and more frequently as 
required. 
 
Whereas appropriate the hazard mitigation plan will be used to provide guidance for 
the development of city-based codes and regulations to reduce the potential damage 
caused by a disaster such as a flooding event, wild land fire or other incident that 
hampers the city ability to provide essentials services. 
Phoenix 
1. Planning documents prepared by various departments for the City of 
Phoenix are developed by internal staff to a final draft stage and presented to 
the Mayor and Council in a formal session for review and comment. Final 
approval and official adoption of any planning document is normally done 
using a formal resolution process through the City Council.   
2. The City of Phoenix Multi-Jurisdictional Hazard Mitigation Plan will be 
reviewed annually by the local planning team and updated, maintained 
and/or incorporated into future planning documents by the active 
participation of this local planning team. 
Queen Creek 
The Maricopa County Multi-Jurisdictional Hazard Mitigation Plan (MCMJHMP) was 
developed by Town staff through a consultant hired by the Maricopa County 
Department of Emergency Management (MCDEM).  The final draft of the 
MCMJHMP will be reviewed by the Town staff with input from the Town Attorney 
and then placed on a Town Council Agenda for their review and discussion.  This 
will occur either during their Work Study Session or Regular Session.  The 
MCMJHMP can be accepted by the Town Council through their adoption of a 
resolution. 
 
The MCMJHMP will be distributed to the Public Works and Development Services 
Departments and utilized in future planning documents where appropriate.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 55 
Salt River Pima-
Maricopa Indian 
Community 
General planning documents prepared by all departments for the Salt River Indian 
Community are developed by staff to a final draft stage and presented to the Tribal 
Council in a study work session for review and comment. Final approval and official 
adoption of any planning document or mechanism is normally done using a formal 
resolution process through the Tribal Council. The Plan will be reviewed and as 
appropriate, incorporated into future planning documents and mechanism by the 
active participation of members of the SRPMIC Mitigation Planning Team. Team 
members will be involved in the formal adoption processes described above, as well 
as the implementation of the plan into their respective department’s planning efforts. 
Scottsdale 
Planning documents and studies are usually initiated at the staff level. New plans are 
typically studied and developed within the department responsible for the plan. 
Existing plans are reviewed and updated based on the particular plan’s life cycle. 
Once plans have been developed and edited, they are presented to council for official 
approval. Wherever appropriate, the plan will be reviewed and incorporated into 
future planning documents and mechanisms.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 56 
Surprise 
Public Works 
General planning documents are typically generated by the relevant department staff 
and reviewed by multiple departments and department heads in the city. Depending 
on the plan type, it may be provided to the general public for input prior to formal 
adoption by Council. The City of Surprise management and City Council participate 
in the general planning and development process. The Plan is placed on the council 
agenda for formal review and approval. The plan is reviewed, and as appropriate, 
incorporated into future planning processes and documents. (PW) 
 
Water Resource Management 
1. The preparation of planning documents that will ultimately need the 
approval of City Council are presented over the duration of the development 
at work sessions for input and review. The final draft is presented and 
approved by council via resolution.  
The 2021 Hazard Mitigation Plan will receive a similar process, keeping Council in 
the loop at work sessions or other informal meetings. Once the plan is complete, it 
will be adopted via resolution. 
 
Fire Medical Department 
General planning documents are prepared by city staff in each of the departments 
within the City of Surprise (COS).  Draft documents are reviewed internally by 
multiple stakeholders.  Draft plans are forwarded to the department director for 
approval and subsequent presentation to the COS City Council.  Some 
documents/plans may also need to be reviewed by the legal department before 
moving on to the City Council.  The general public may have the ability to review 
and provide input prior to formal adoption by COS City Council, depending on the 
sensitivity of said plan. 
 
The 2021 Hazard Mitigation Plan will follow a similar route and will be formally 
presented before the COS City Council for formal review and approval.   
 
Community Development Department 
Planning documents are prepared by Community Development’s Planning Division 
staff and/or in close coordination with expert consultants hired to assist with the 
generation of such documents (ex. City of Surprise General Plan). Planning 
documents are developed by staff and/or consultants to a final draft and then 
presented to the City’s Planning and Zoning Commission, City Council, or a 
combination thereof for comments. Final adoption of any final planning documents 
occurs through a formal resolution of the City Council. The City of Surprise Multi-
Jurisdictional Hazard Mitigation Plan will be reviewed and incorporated into future 
planning documents, as appropriate. 
Tempe 
General planning documents prepared by all departments for the City of Tempe are 
developed by staff and outside consultants to a final draft stage and presented to the 
city council in a study work session for review and comment.  Depending on the 
document, the action of the city council may include: 
• 
Council review only,  
• 
Council review and formal adoption via a resolution process, or 
• 
Council review with a recommendation to promulgate via a general 
public ballot measure/approval. 
All planning processes typically require a review of available reference material and 
plans, which will include but not be limited to the MCMJHMP.  Staff serving on the 
Local Planning Team are often involved in other planning processes and will provide 
context and a nexus to the MCMJHMP.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 57 
Tolleson 
General planning documents developed by city staff are presented to the city council 
for review and approval.  Depending upon the complexity and/or breadth of the 
document or the plan, work study meetings or public hearings may be incorporated 
into the process.  Final approval and official adoption of any document, policy, or 
mechanism is normally completed through a formal resolution process of the City 
council.   
Wickenburg 
Plans are developed by the department heads with help from other departments, 
depending on what details are needed within the document.  The plan will be 
reviewed by the Town Manager’s office and Town Clerk’s office, prior to going to 
legal department for review.  The legal department will provide further guidance and 
editing, then send plan back to department head for final review and move forward to 
council.  The town council will then adopt the plan as a resolution during a regular 
council meeting.  The plan will then stay on file with the town clerk and appropriate 
departments. 
Youngtown 
Each development project is required to go through a formal pre-application process 
at which time the applicant will receive comments from various departments within 
the town.  The comments generated by staff will include all aspects of development 
including the Plan as it relates to their perspective project.  Comments generated by 
staff must be included in the design of the project prior to the formal approval. 
 
The town’s General Plan was formulated with the input of key community 
stakeholders, which included APS, Southwest Gas, EPCOR Water, Sun City Fire 
District, El Mirage, Surprise, Phoenix, Peoria, Sun City and Sun City West, the 
Arizona Commerce Authority and many others.  Public meetings were held to 
provide input from our residents and business community.  Planning and Zoning 
hearing was held and consideration by council, before going to vote in the General 
Election in November 2014.  Voters approved the plan by a vote of 70%.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 58 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
[This page is purposely blank]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 59 
SECTION 4:  COMMUNITY DESCRIPTIONS 
4.1 
General 
The purpose of this section is to provide updated basic background information on 
Maricopa County as a whole and includes information on geography, climate, population and 
economy.  Abbreviated details and descriptions are also provided for each participating 
jurisdiction. 
4.2 
County Overview 
4.2.1 Geography 
Maricopa County is located in central Arizona and encompasses 9,224 square 
miles. Situated in the upper Sonoran Desert and varying in elevation from 436 feet 
above sea level in the southwest to 7,645 feet at the northeast, the county contains 
several plant communities. At the lower elevations, desert scrub, punctuated with 
saguaro cactus, predominate. The higher elevations contain woodlands and sparse 
forests.  Along the rivers, streams, and washes, riparian communities flourish and 
sustain the majority of the diverse plant and animal life found in the county.  The Salt 
and Verde Rivers enter the county at the northeast quadrant, combine, and continue on 
a bisecting path at the Salt River until confluencing with the Gila River in the central 
portion of the county near Avondale.  The Gila River then continues bisecting the 
county as it journeys southwesterly towards the confluence with the Colorado River in 
Yuma, Arizona.  The life-sustaining water this extensive river system brings to the 
region has defined life in Maricopa County from the earliest Native American 
settlements to the present day.  Maricopa County has one of the most ample water 
supplies of any desert region in the west. The watershed of the Salt and Verde Rivers 
is impounded behind the dams of the Salt River Project. The Central Arizona Project 
canal which brings water from the Colorado River can supply more than a fifth of the 
total water for the county. In addition to this supply, the metropolitan area is situated 
over a prolific aquifer. To assure an adequate water supply for future generations, the 
state legislature adopted the Groundwater Management Act in 1980. This act requires 
careful water management and conservation measures to ensure water will be available 
for the influx of people expected in the next 20 years and beyond 2.   
Several major roadways support both local and regional transportation needs in 
Maricopa County.  Interstates 10, 17, and 8 all intersect in or near Phoenix, and provide 
access to surrounding states.  Several other state and US highways provide local and 
regional access throughout Arizona.  Sky Harbor International Airport, located in 
central Phoenix, is one of the busiest air travel facilities in the United States. 
Federal and state government entities own 50 percent of Maricopa County land, 
including the U.S. Bureau of Land Management (28 percent), the U.S. Forest Service 
 
2 Maricopa County Planning and Development Services, 2002, Maricopa County Comprehensive Plan, 2020 Eye to the 
Future, adopted October 20, 1997, revised August 7, 2002.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 60 
(11 percent), and the State of Arizona (11 percent). An additional 16 percent is publicly 
owned, and 5 percent is Indian reservation land.  
General County features are depicted in Figure 4-1. 
4.2.2 Climate 
The climate in Maricopa County is characterized by the mild winters and hot summers 
typical of the upper Sonoran Desert regions.  Temperatures and precipitation across the 
county vary somewhat due to the changes in elevation and orographic influences of 
local mountains and valleys.  Climate statistics for weather stations within the county 
are produced by the Western Region Climate Center3 (WRCC) and span records dating 
back to the early 1900’s.  Locations for WRCC stations within Maricopa County are 
shown on Figure 4-1. 
Average temperatures within the county range from near freezing during the 
winter months to over 110 degrees Fahrenheit during the hot summer months.  The 
severity of temperatures in either extreme is highly dependent upon the location, and 
more importantly the altitude, within the county.  For instance, temperature extremes 
in the northeastern portion of the county are notably different from those for the lower 
Gila River valley. 
Figures 4-2, 4-3, and 4-4 present a graphical depiction of temperature variability 
and extremes throughout the year for the Carefree (elevation = 2,530 ft), Gila Bend 
(elevation = 730 ft), and Phoenix Airport Weather Service Forecast Office (WSFO AP) 
(elevation = 1,110 ft).  In general, there is a ten degree reduction in temperatures 
between the lower and upper elevation stations. 
Precipitation throughout the county is governed to a great extent by elevation 
and season of the year.  From November through March, storm systems from the 
Pacific Ocean cross the state as broad winter storms producing longer duration 
precipitation events with low intensity rainfall and snowstorms at the higher elevations.  
Summer rainfall begins early in July and usually lasts until mid-September.  Moisture-
bearing winds move into Arizona at the surface from the southwest (Gulf of California) 
and aloft from the southeast (Gulf of Mexico).  The shift in wind direction, termed the 
North American Monsoon, produces summer rains in the form of thunderstorms that 
result largely from excessive heating of the land surface and the subsequent lifting of 
moisture-laden air, especially along the primary mountain ranges.  Thus, the strongest 
thunderstorms are usually found in the mountainous regions of the central southeastern 
portions of Arizona.  These thunderstorms are often accompanied by strong winds, 
blowing dust, and infrequent hail storms4. 
  
 
3 http://www.wrcc.dri.edu/CLIMATEDATA.html  
4 Office of the State Climatologist for Arizona, 2004.  https://azclimate.asu.edu/

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 61 
 
Figure 4-1:  Map of general features for Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 62 
 
 
Figure 4-2:  Daily Temperatures and Extremes for Carefree Station, Arizona 
 
 
 
Figure 4-3:  Daily Temperatures and Extremes for Gila Bend Station, Arizona

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 63 
 
Figure 4-4:  Daily Temperatures and Extremes for Phoenix WSFO AP Station, Arizona 
 
 
Figures 4-5, 4-6, and 4-7 present tabular temperature and precipitation statistics 
for the Carefree, Gila Bend, and WSFO AP Stations.  It is noteworthy that average 
annual precipitation more than doubles from the lower elevation of the county to the 
upper regions. 
 
 
Figure 4-5:  Monthly climate summary for the Carefree Station, Arizona

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 64 
 
Figure 4-6:  Monthly climate summary for the Gila Bend Station, Arizona 
 
 
Figure 4-7:  Monthly climate summary for the Phoenix WSFO AP Station, Arizona 
4.2.3 Population 
Maricopa County is home to more than half of Arizona’s overall population, 
with the 2019 count estimated at 4.5 million people.  In the 1990’s, the county was the 
fastest growing county in the United States, gaining nearly 1 million new residents with 
a growth rate of 44.8 percent during that decade.  Since the economic crash of 2008, 
growth within the county, in general, slowed significantly, with a moderate 5.0 percent 
growth over the 2010 to 2014 period. More recently Maricopa County has become the 
fastest-growing county in the United States, with more than 81,000 people added 
between July 2017 – 2018. Table 4-1 summarizes 2010 and 2019 jurisdictional 
population statistics for Maricopa County communities and the county as a whole.  The 
county population is projected to exceed 4.5 million by the year 2020.  Figure 4-8 is a 
map prepared by the Maricopa Association of Governments (MAG) that illustrates 
2010 population densities for the county.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 65 
Table 4-1:  Summary of jurisdictional population estimates for Maricopa County  
 
Jurisdiction 
Total Population 
Percent Change 
Share 
April 1, 
2010 
(Census 
2010) 
July 1, 
2019 
Change Overall Annual 
Share of 
Growth 
Share of 
County 
Apache Junction* 
294
322
28
9.52%
0.99%
0.01%
0.01%
Avondale 
76,238
84,595
8,357
10.96%
1.13%
1.52%
1.94%
Buckeye 
50,876
81,624
30,748
60.44%
5.40%
5.58%
1.87%
Carefree 
3,363
3,771
   408
12.13%
1.25%
0.07%
0.09%
Cave Creek 
5,015
5,834
819
16.33%
1.65%
0.15%
0.13%
Chandler^ 
236,326
266,804
30,478
12.90%
1.32%
5.53%
6.11%
El Mirage 
31,797
34,359
2,562
8.06%
0.84%
0.46%
0.79%
Fort McDowell Yavapai Nation 
971
1,043
72
7.42%
0.78%
0.01%
0.02%
Fountain Hills 
22,489
24,225
1,736
7.72%
0.81%
0.32%
0.55%
Gila Bend 
1,922
2,019
97
5.05%
0.53%
0.02%
0.05%
Gila River* 
2,994
3,148
154
5.14%
0.54%
0.03%
0.07%
Gilbert^ 
208,352
259,386
51,034
24.49%
2.40%
9.26%
5.94%
Glendale 
226,721
243,262
16,541
7.30%
0.76%
3.00%
5.57%
Goodyear 
65,275
88,870
23,595
36.15%
3.39%
4.28%
2.03%
Guadalupe 
5,523
6,373
850
15.39%
1.56%
0.15%
0.15%
Litchfield Park 
5,476
6,811
1,335
24.38%
2.39%
0.24%
0.16%
Mesa 
439,041
497,439
58,398
13.30%
3.60%
10.60%
11.39%
Paradise Valley 
12,820
14,134
1,314
10.25%
1.06%
0.24%
0.32%
Peoria* 
154,058
180,161
26,103
16.94%
1.71%
4.74%
4.12%
Phoenix^ 
1,447,128
1,617,344
170,216
11.76%
1.21%
30.89%
37.02%
Queen Creek* 
25,912
46,271
20,359
78.57%
6.47%
3.69%
1.06%
Salt River Pima Maricopa Indian 
6,289
6,808
519
8.25%
0.86%
0.09%
0.16%
Scottsdale 
217,385
247,944
30,559
14.06%
1.43%
5.55%
5.68%
Surprise 
117,517
136,194
18,677
15.89%
1.61%
3.39%
3.12%
Tempe 
161,719
188,616
26,897
16.63%
1.68%
4.88%
4.32%
Tolleson 
6,545
7,085
540
8.25%
0.86%
0.10%
0.16%
Wickenburg 
6,363
7,797
625
9.82%
1.02%
0.11%
0.18%
Youngtown 
6,156
6,599
443
7.20%
0.75%
0.08%
0.15%
Balance of County^ 
272,552
299,806
27,524
10.10%
1.04%
5.00%
6.86%
Totals 
3,817,117
4,368,644
550,988
14.43%
1.46% 100.00%
100.00%
NOTES: 
-  Totals may not add due to rounding 
-  * Maricopa County portion only 
-  ^ Census 2010 counts adjusted to reflect Census Count Question Resolutions 
-  Approved by the Maricopa Association of Governments Regional Council, December 4, 2019 
Sources:

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 66 
 
 
Source:  MAG, 2013, Municipal Planning Area Socioeconomic Profiles Maricopa County, Arizona. 
Figure 4-8:  2010 population density for Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 67 
4.2.4 Economy 
Maricopa County was originally inhabited by Native Americans, who 
abandoned the area during the 1300's for unexplained reasons.  Agriculture was the 
prominent activity in the region and was reestablished during the 1860's as the first 
European settlers migrated to the Salt River Valley.  Rapid growth and robust 
development have been the hallmark of Maricopa County ever since.  In 1870, the town 
site of Phoenix was established, and on February 14, 1871, the Territorial Legislature 
created Maricopa County.  By 1872, there were over 700 people in the county with 
5,000 acres under cultivation.  The arrival of the railroad in 1877 caused a surge in 
economic activity.  In the early 1900s, the larger farm parcels scattered throughout the 
region were divided into small farm communities such as Chandler, Gilbert, and 
Tolleson.  In 1902—at the request of President Theodore Roosevelt—after a series of 
devastating floods, Congress passed the Reclamation Act of 1902.  Shortly thereafter, 
the U.S. Bureau of Reclamation started construction on Theodore Roosevelt Dam east 
of Phoenix.  Irrigated agricultural production and population exploded after the 
completion of Roosevelt Dam in 1912, providing the region with a reliable water 
supply.  Maricopa County quickly became one of the leading agricultural producing 
counties in the United States.  During this period, the County also became a winter 
haven for tourists.  
Growth in the area continued as tourism, automobile travel, military, and 
industrial activities came to the county.  Construction continued on residential 
developments, highways, and commercial districts, making Maricopa County an 
increasingly popular place to live.  Until the end of World War II, the traditional 
economic engines of both the State of Arizona and Maricopa County were known as 
the five “Cs”:  Cotton, Copper, Cattle, Climate, and Citrus.  Newly established wartime 
industries fueled the monumental growth of the county in the post-war era.  By 1960, 
the population was over 660,000 people, and reached one million residents in the early 
1970s.  Combined with the general economic expansion of the 1980s and the rush to 
the Sun Belt, Maricopa County claimed over 2.2 million residents by 1990.  Even with 
economic sluggishness in the early 1990s, the region continued to grow through 2007 
at a rate of about four times the national average.  U.S. Census (American Community 
Survey) data indicate median household income for the period of 2015 to 2019 to be 
$64,468 and per capita income for the same period of $33,279. 
As of January, 20215, the unemployment rate stands at 6.8 percent with a total 
non-farm employed labor force of over 2.05 million.  Total revenue from sales exceeds 
$4.67 billion.  For 2020, a total of 39,693 residential building permits were issued.  
Figure 4-9 is a map prepared by MAG that shows employment densities across the 
county for the year 2010. 
 
5 University of Arizona – Eller Economic & Business Research Center, 2015, URL at:  http://azeconomy.org/data/economic-
indicators/maricopa-county/

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 68 
4.2.5 Development Trends for Unincorporated Maricopa County 
Over the past five years residential development in unincorporated Maricopa 
County has been very low. The largest development in unincorporated Maricopa 
County has occurred along the I-17 in the Anthem area, and in western Maricopa 
County along the recently completed SR303. 
Over the next five years development will continue in areas near the SR303 and 
in northern Maricopa County specifically, the Anthem area. 
4.3 
Jurisdictional Overviews 
The following are brief overviews for each of the participating jurisdictions in the Plan.  
With this update, the socioeconomic details for each jurisdiction have been modified to include 
projections into 2030 and clarify the population estimates for the current jurisdictional 
boundary and the municipal planning area (MPA) which is the geographical limit that the 
Maricopa Association of Governments (MAG) uses for the housing and employment statistics.  
Population and employment statistics are obtained from the latest MAG socioeconomic 
projections report6.  Housing projections are obtained from comprehensive socioeconomic 
profiles developed by MAG in 20137.  For further socioeconomic details for each jurisdiction, 
the reader is referred to the MAG website at https://www.azmag.gov/Programs/Maps-and-
Data/Community-Profiles. Excerpts from the MAG documents are provided as appropriate.  
Additionally, updated development trend information provided by each jurisdiction is included 
in this section. 
 
 
 
6 MAG, 2019, Socioeconomic Projections, Population and Employment by Municipal Planning Area, Jurisdiction and 
Regional Analysis Zone. Web access at:  https://www.azmag.gov/Portals/0/Documents/MagContent/municipality-
population-housing-estimates-2019.pdf  
7 MAG, 2013, Municipal Planning Area Socioeconomic Profiles Maricopa County, Arizona.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 69 
 
 
Source:  MAG, 2013, Municipal Planning Area Socioeconomic Profiles Maricopa County, Arizona. 
   
Figure 4-9:  2010 employment concentration projections for Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 70 
4.3.1 Avondale 
Situated along Interstate 10 approximately 15 miles west of downtown Phoenix, 
the City of Avondale lies immediately east of Goodyear and west of Tolleson in the 
west valley region of Maricopa County, as shown in Figure 4-10. 
 The Gila River Native American Community is located southeast of the City. 
Estrella Mountain Park is located in the southern portion of Avondale, and the Agua 
Fria River bisects the City running north to south before merging with the Salt and Gila 
Rivers to form the Tres Rios Nature Area.  
Avondale was founded in 1900 and was incorporated in 1946. Avondale is 
governed by a council-manager form of government with a seven-member city council 
consisting of a mayor and six council members elected at-large for a term of four years. 
The City Council appoints the City Manager and other officers necessary to produce 
an orderly administration of the City’s affairs.  
Like most communities located in the greater metropolitan area, Avondale has 
experienced rapid growth in both population and land area over the past 30 years. The 
City of Avondale’s population grew from 16,169 in 1990 to an estimated 88,750 in 
2020. Population, housing and employment statistics and projections are summarized 
in Table 4-2. Currently, the City of Avondale Planning Area is 94.4 square miles, 
whereas in 1990, the Planning Area was 40 square miles. The primary manmade 
features that influence Avondale’s land uses include: Interstate 10, which runs east to 
west across the City; a Salt River Power transmission line which runs north to south 
through Avondale and turns east to west in the south-central portion of the city; and the 
Roosevelt and St. Johns-Sunland Irrigation District Canals which transverse the city’s 
north and south sides, respectively. The City has a well-developed Arterial Road 
system north of the Estrella Mountains creating a 1-mile intersecting grid of streets. 
In 2019, the 
population 
of 
Avondale was 84,595. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-2. 
 
Development Trends: 
The City has experienced significant land use activity over the preceding five 
(5) years. During this period, key growth corridors included: 
• 99th Avenue from I-10 to Van Buren Street 
• McDowell Road from Avondale Blvd to 99th Avenue 
Table 4-2:  Population, housing and employment 
statistics for Avondale   
Year 
Population 
(Current 
Limits) 
Population 
(MPA) 
Housing 
(MPA) 
Employment 
(MPA) 
2010 
76,238 
77,900 
27,600 
14,064 
2020 85,000 
86,700 
31,400 
23,200 
2030 98,600 
101,800 
40,000 
30,400

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 71 
• Van Buren Street from the new Fairway Drive freeway exit (near 127th Ave) to 
99th Avenue 
• Historic Avondale area – approx. Dysart and Buckeye Road 
• North Avondale area – north of I-10 
• South Avondale area – south of Lower Buckeye Road to the Gila River and Estrella 
Mountains 
• The BLVD live/work/play destination area – The west and east sides of Avondale 
Blvd from I-10 to Van Buren Street 
Citywide, land use development over the past five (5) years has included twelve (12) 
Single-Family Residential Projects either in review, under construction or approved to 
develop totaling approximately 8,431 units (platted subdivisions and townhomes); 
approximately 1,274,635 square feet of Commercial Project (Retail, Restaurant, 
Entertainment, Office, & Hotel) building area that is built, in review, under 
construction or approved; approximately 2,844,666 square feet of Employment 
Projects (Industrial, Business Parks) building area that is built, in review, under 
construction, or approved; and Seven (7) Multi-Family Residential Projects 
(apartments, condos) in review, under construction or approved to develop totaling 
approximately 1,953 units. 
Anticipated development over the next five (5) years in Avondale includes the 
following: 
1. Developing “The BLVD” mixed-use area off of I-10 and Avondale Blvd. to be a 
major destination for Avondale; live, work, play concept. This area is planned for 
urban residential multi-family densities, office, commercial retail, restaurant, and 
entertainment uses.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 72 
 
2. Continued development of vacant parcels along the McDowell Road Corridor from 
Avondale Blvd. to 99th Avenue with healthcare related businesses, office, retail, 
and restaurant.  
 
 
3. Developing commercial corners at arterial street intersections with commercial or 
other land use pending the economic needs of the area for additional commercial. 
4. Development opportunities along the planned State Route 30, Gila River, and Rio 
Reimagined in southern Avondale.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 73 
• Focus on economic development and land use goals for new development. 
• Finding the right balance of commercial retail, restaurant, and office uses at the 
proposed interchanges that will transition appropriately to low density 
residential and recreation areas envisioned for the area. 
• Creating linkages between SR-30, recreational areas, and our core community 
to the north. 
• Focus on recreational opportunities along the Gila River as part of the Rio 
Reimagined project.  
  
 
5. Developing the land use vision and promote development in the City’s planning 
area south of the Estrella Mountains.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 74 
 
 
6. Employment/industrial infill development in Old Town along Elise C. Felix Jr. 
Way, along Van Buren Street from 107th Avenue to 99th Avenue. 
 
All new development will be required to connect to City water and sewer lines, 
upgrade or install new lines as well as improve rights-of-ways as needed. Development 
south of the Estrella Mountains will need access to water and sewer infrastructure as 
none exist in the Avondale planning boundary. The adjacent City of Goodyear and 
County properties have utilities and rights-of-ways that Avondale may be able to access 
through a partnership/agreement. City of Goodyear has the nearby Province at Estrella 
Mountain Ranch Parcel 7 (already built with stubs to utilities and streets) and two to 
three master planned residential communities in the planning process to the west off 
Rainbow Valley Road.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 75

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 76 
 
Figure 4-10:  Avondale location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 77 
4.3.2 Buckeye 
The City of Buckeye is positioned as the Western-most community in the 
greater metropolitan area, giving the community the unique title of "Western Gateway" 
for the Salt River Valley.  Situated along Interstate 10 approximately 30 miles west of 
downtown Phoenix, the City of Buckeye lies immediately west of the communities of 
Goodyear and Surprise, as shown in Figure 4-11.  Now encompassing all or portions 
of the west, south, and east sides of the White Tank Regional Park, Buckeye’s historical 
town center—located four miles south of Interstate 10 near State Route 85—lies many 
miles away from what is expected to become the city’s new growth area to the west of 
the White Tank Mountains.  Like most of the communities located in the greater 
metropolitan area, Buckeye has been growing steadily for the past several decades. 
While it was once one of the smallest communities in Maricopa County, recent 
annexations and growth initiatives have resulted in significant expansion of Buckeye’s 
planning area. 
The primary features that influence Buckeye’s land uses include:  Interstate 10, 
which bisects the community’s south side; the White Tank Mountains, which 
effectively separate Buckeye from its eastern neighbors, and the Hassayampa River and 
its tributaries, which influence the north and west sides of Buckeye.  Various overhead 
power lines transect the community’s southern half, as does a traditional network of 
arterial streets. The Sun Valley Parkway, a multi-lane, limited access roadway proceeds 
north from Interstate 10 through Buckeye and connects with the City of Surprise on the 
northeast section of the White Tank Regional Park.  
Although prominent new growth in Buckeye will contribute steadily to the 
demographic, economic, and land use climate of the west valley, Buckeye is one of the 
older “outer ring” suburbs in Maricopa County.  Founded in 1888 and incorporated in 
1929, Buckeye’s rural-residential character is reinforced by its agricultural economic 
base—Buckeye is still among the largest producers of Pima Cotton in Maricopa 
County.  Buckeye’s residents are governed under a council-city manager form of 
government, which includes a seven-member city council consisting of a mayor and 
six council members elected at-large for a term of four years. The council appoints the 
city manager and other officers necessary to produce an administration of the 
community’s affairs. 
In 2019, the 
population of Buckeye 
was 
81,624. 
Population projections 
for 2020 and 2030 
current 
corporate 
limits and population, 
housing, 
and 
employment statistics 
for MPAs for 2010, 2020 and 2030 are summarized in Table 4-3. 
 
Development Trends: 
Table 4-3:  Population, housing and employment 
statistics for Buckeye 
Year 
Population 
(Current 
Limits) 
Population 
(MPA) 
Housing 
(MPA) 
Employment 
(MPA) 
2010 
50,876 
62,800 
22,500 
12,800 
2020 
84,100 
97,700 
35,800 
26,900 
2030 
15,200 
186,600 
65,300 
42,900

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 78 
Development trends over the last five (5) years have included 12,366 Single Family 
Residential (SFR) permits issued in the City of Buckeye between January 2015 and 
October 2020.  Figure 4-12 portrays the SFR activity for the past five years in the City 
of Buckeye. The majority of the SFRs were in the following Communities:  
• Verrado, Tartesso, Festival Ranch, Blue Horizons, Sienna Hills, Watson Estates, 
Sundance,  
• Vista de Montana, Crystal Vista, Sonoran Vista, Sonoran Vista, Canyon Views, 
Arroyo Seco, 
• Parkplace at Buckeye, Terra Vista, Encantada Estates, Westpark, Blue Hills, Miller 
Manor, 
• Miller Park and Buckeye Park. 
New commercial development in the City of Buckeye was concentrated on Miller 
Road and Watson Road immediately south of Interstate 10 (I-10).  This has included 
new retail stores, restaurants, car washes and several new hotels. Additional new 
commercial development occurred along Verrado Way immediately north of Interstate 
10 (I-10). This retail development has been primarily restaurants and professional 
complexes, as well as a storage facility.  Commercial development in the City of 
Buckeye has significantly lagged new residential development due to the lack of 
rooftops, which drives new commercial development. 
The forecast for residential growth in the City of Buckeye is expected to 
continue in Verrado, Tartesso, Festival Ranch and Westpark as well as development 
starting in Spurlock Ranch, Douglas Ranch, and in subdivisions along the Apache Road 
corridor and throughout Central Buckeye. 
In the next five (5) years (2021-2026), 2000 Single Family Residential (SFR) 
permits per year are projected, totaling 10,000 new homes and a population growth of 
approximately 20,000 to 25,000 new residents. Figure 4-13 portrays the anticipated 
SFR activity in the next five years in the City of Buckeye. 
New commercial, retail and significant industrial development will occur on the 
Miller Road and Watson Road corridors south of Interstate 10, (I-10) as well as the 
Verrado Way corridor and the area east and west of Verrado Way and just south of 
Interstate 10, (I-10). The industrial development will include regional distribution 
facilities along with logistic centers and manufacturing opportunities.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 79 
 
Figure 4-11:  Buckeye location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 80 
 
Figure 4-12:  Buckeye SFR Activity – Past 5 Years

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 81 
 
 
Figure 4-13:  Buckeye master planned communities map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 82 
4.3.3 Carefree 
The Town of Carefree is located in the far northeast portion of the Phoenix 
Metropolitan Area, approximately 25 miles from downtown Phoenix.  To the west, 
Carefree is bordered for its full length by the Town of Cave Creek.  On the south and 
east, it is bordered by Scottsdale and on the north by unincorporated Maricopa County. 
The City of Phoenix approaches within a mile from the southwest. Developed as a 
planned community in the 1950s and incorporated in 1984, the Town of Carefree has 
become known as a residential town with resort-style living. Historically, the Town of 
Carefree was master planned to be entirely distinct from the surrounding communities 
by allowing its small population to preserve a lifestyle that integrates with the 
surrounding desert environment. On December 4, 1984, the Maricopa County Board of 
Supervisors declared Carefree a legally incorporated town in the State of Arizona.  
Illustrated in Figure 4-14, the primary east-west roadway into the area—the 
Carefree Highway—has been constructed as a four-lane arterial from Interstate 17 to 
Cave Creek Road. Other major roadway and infrastructure improvements to the south 
have been completed or are in the planning stages by the Cities of Scottsdale and 
Phoenix. Most of the vacant desert that once surrounded the Town of Carefree on the 
south, east, and west in the 1980’s is now developed with semi-rural urban uses. Recent 
development opportunities to the north of Carefree suggest that growth of the 
metropolitan area may continue with the potential to surround the town at some point 
in the future.  
Today, Carefree’s residents are governed under a council-administrator form of 
government, which includes a seven-member town council consisting of a mayor and 
six council members elected at-large for a term of two years. The town council appoints 
the town administrator and other officers necessary to manage the daily affairs of the 
town. 
In 
2019, 
the population of 
Carefree 
was 
3,771. Population 
projections 
for 
2020 
and 
2030 
current 
corporate 
limits 
and 
population, 
housing, and employment statistics for MPAs for 2010, 2020 and 2030 are summarized 
in Table 4-4. 
 
Development Trends: 
Over the past five years there have been a couple of new/approved residential 
developments in Carefree, one near the northwest corner of Cave Creek and Pima 
Roads and a second townhome development within the Town Center core.  The 
subdivision at the northwest corner contains 39 single-family homes and is complete.  
The townhome development in the Town Center is under construction and will contain 
Table 4-4:  Population, housing and employment statistics 
for Carefree   
Year 
Population Population Housing 
Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
3,363 
3,400 
2,200 
1,400 
2020 
3,800 
3,800 
2,600 
1,600 
2030 
4,100 
4,100 
2,900 
2,100

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 83 
20 units when completed.   Much of the other residential development within the past 
five years consists of custom home development on large lots within existing 
subdivided undeveloped lots.  Nonresidential projects included an indoor storage 
facility which was constructed at the northwest corner of Carefree Highway and Cave 
Creek Road.  Much of the other nonresidential development over the last five years 
consisted of tenant improvements to existing commercial buildings located within the 
Town Center. 
Over the next five years, Carefree will experience more infill development.  
Much of the land mass in Carefree has been platted for single-family homes.  There 
remain numerous undeveloped lots within these platted areas that will develop 
overtime.  Additionally, there is a growing trend to redevelop/remodel existing homes 
to address today’s lifestyles and standards.  There will also be an emergence in new 
and redeveloped commercial buildings within the Town Center and on the edges of the 
community to take advantage of eco-tourism which is becoming a more prominent part 
of the local economy.  To this point, on the northern edges of Carefree, north of 
Ranchitos del Rey subdivision, remain undeveloped. The Town will continue to work 
with our land preservation partners, the Desert Foothills Land Trust to secure and build 
the Town’s own desert preserve.  It is envisioned that this preserve will be expanded 
over time to include sections of unincorporated land that will expand up to and around 
Continental Mountain.  If successful, this land preservation will enhance the Town’s 
eco-tourism opportunities and mitigate the introduction of residential areas to areas 
subject to wildfires and flash floods. 
Within the next five years, there are several properties located on the periphery 
of the community that are well positioned for commercial development.  These 
properties are located at major intersections and across the street from a private airport, 
SkyRanch.  Within the Town Center, there are numerous undeveloped properties 
fronting Cave Creek Road that are prime to develop as well as the redevelopment of 
economically obsolete properties within the interior.  Any new development will come 
with enhancement to public infrastructure which would include but not be limited water 
resources, streets and storm water management.  
 Figure 4-15 shows a future land use map that is currently published in the 
town’s General Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 84 
 
Figure 4-14:  Carefree location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 85 
 
Figure 4-15:  Carefree land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 86 
4.3.4 Cave Creek 
One of the few communities in Maricopa County that has not experienced a 
rapid rate of growth, the Town of Cave Creek is located in the far northeast portion of 
the Greater Metropolitan Area, approximately 25 miles from downtown Phoenix.  To 
the east, the Town of Carefree borders Cave Creek for its full length.  On the south, it 
is bounded by Phoenix and on the north and west by unincorporated Maricopa County.  
A community more closely associated with a frontier and cowboy image than its “sister 
community” to the east, Carefree, the Town of Cave Creek exists in and near some of 
the most scenic country in Maricopa County.  The area that now includes the Town of 
Cave Creek was originally settled in the late 1870s, and quickly became an active 
mining area during the 1880s.  Incorporated in 1986, Cave Creek today is struggling to 
maintain its rural appearance while existing in a rapidly growing region of Maricopa 
County. 
Illustrated in Figure 4-16, the primary east-west roadway into the area—the 
Carefree Highway—has been constructed as a four-lane arterial east from Interstate 17.  
This roadway intersects with the primary north-south access to the area, Cave Creek 
Road, on the south side of the town and runs north, bisecting the town.  Sharing a 
development pattern that roughly parallels that of Carefree, most of the vacant desert 
that once surrounded the Town of Cave Creek in the 1980’s is now developed with 
semi-rural urban uses.  Complementing the rugged landscape of the area has been a 
recent effort to preserve these natural amenities.  Today the Spur Cross Ranch 
Conservation Area, Cave Creek Park, and Black Mountain Summit Preserve reflect this 
movement, and are located on the north, west, and southeast portions of Cave Creek, 
respectively.  Recent development opportunities to the south of Cave Creek, especially 
in north Phoenix and Scottsdale, suggest that growth of the metropolitan area may 
continue with the potential to surround the town at some point in the future.  
Cave Creek’s residents are governed under a council/manager form of 
government, which includes a seven-member town council consisting of a mayor and 
six council members elected at-large for a term of two years. The town council appoints 
the 
town 
administrator 
and 
other 
officers 
necessary to manage 
the daily affairs of 
Cave 
Creeks’ 
residents. 
In 2019, the 
population of Cave 
Creek was 5,834. Population projections for 2020 and 2030 current corporate limits 
and population, housing, and employment statistics for MPAs for 2010, 2020 and 2030 
are summarized in Table 4-5. 
 
Development Trends: 
Table 4-5:  Population, housing and employment 
statistics for Cave Creek  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
5,015 
4,900 
2,600 
1,800 
2020 
5,900 
6,000 
3,000 
2,400 
2030 
6,400 
6,500 
3,900 
2,700

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 87 
During the previous five (5) years, the Town of Cave Creek has expanded with 
commercial development such as retail, drive-up franchise establishments, automobile 
services, and emergency service.  Some examples of recent commercial development 
include Sprouts Grocery Store, Auto Zone, Tractor Supply Company, Dutch Bros, Sun 
Devil Auto, Jiffy Lube, Chipotle, Mod Pizza, and a Micro Hospital.  Most of the recent 
commercial development has occurred along Carefree Highway. Additional 
development over the past five (5) years has included the Windmill Village Multi-
Family development approved in 2016.  This project included the rezoning of a Desert 
Rural 89 property to Multi-Family for the development of 24 multi-family residential 
units and is currently in the planning stages.  Development over the last cycle has also 
included two (2) developments in 2018: the Galloway Ridge Commercial and Single-
Family Residential Community located at the NW corner of Cave Creek Road and 
School House Road which includes a residential community consisting of 70 
residential units and 3.5 acres intended for commercial use and the 31 lot Venture at 
Black Mountain Single-Family Residential Subdivision located at the NE corner of 
Carefree Highway and 52rd Street on 12.2 acres in a Multi-Family Residential Zone.  
Cave Creek anticipates commercial development to occur within the next 5 
years. The area where future development will likely occur is along Carefree Highway. 
Cave Creek will also be working on the possibility of adding an interconnect for fresh 
water with another jurisdiction over the next five years allowing for the increased 
availability of potable water. 
Figure 4-17 shows a current land use map that is published in the town’s 
General Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 88 
 
Figure 4-16:  Cave Creek location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 89 
 
Figure 4-17:  Cave Creek land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 90 
4.3.5 Chandler 
Located approximately 19 miles east of downtown Phoenix, Chandler is located 
in the southeast Maricopa County.  The City of Chandler was one of the fastest growing 
cities in Arizona and the United States, having grown 116 percent from 1990 to 2002.  
Chandler, known as the "Oasis of the Silicon Desert" was once a quiet tree-lined 
farming community.  It has since blossomed into a city that is home to a dynamic high-
tech industry.  Its incorporated area is 63.6 square miles, and the city’s planning area 
is 71.4 square miles.  
Chandler is characterized by a generally flat landscape framed by views of the 
Santan Mountains to the southeast and the Superstition Mountains to the east as shown 
in Figure 4-18.  The Loop 101 Freeway passes through the west-central portion of the 
city, the 202 (Santan) Freeway passes through the south-central portion of the city, and 
the existing State Route 60 provides access just north of the city’s northern border. The 
Town of Gilbert borders the city to the east; Tempe and Mesa border Chandler to the 
north; Phoenix forms the western border; and the Gila River Indian Community lies to 
the south.  
Incorporated in 1920, today Chandler’s residents are governed under a council-
manager form of government, which includes a seven-member city council consisting 
of a mayor and six council members elected at-large for a term of four years.  The city 
council appoints the city manager and other officers necessary to produce an orderly 
administration of the city’s affairs. 
In 2019, the 
population 
of 
Chandler 
was 
266,804. Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-6. 
 
Development Trends: 
In the last five years, the city has experienced a steady growth of multi-family 
projects averaging over 1,000 new units developed per year.  The development of 
single-family homes has declined from 1,200 units built in 2016 to less than 500 units 
built in 2019.  During this time, single family homes were developed at an average rate 
of 64 homes per month.  This is largely attributed to the fact that the city is at a point 
of its maturity where all of the bigger parcels of land that are attractive to home builders 
have been developed and most of the remaining undeveloped parcels available for 
single family development are smaller infill pieces that are more desirable for medium 
to high density residential projects. 
 
Table 4-6:  Population, housing and employment 
statistics for Chandler  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
236,123 
244,600 
98,600 
112,900 
2020 
271,300 
279,500 
108,200 
154,700 
2030 
298,800 
309,100 
118,900 
182,300

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 91 
During the next five years, the city anticipates continued growth of multi-family 
development in downtown and North Chandler based on recently received zoning 
entitlements.  These include multi-story, urban style apartments as well as single story 
for rent units.  Single family development is expected to continue at a lower growth 
rate and will be in South Chandler. 
In the Retail, Office and Industrial real estate market, Chandler has produced 
over 1 million square feet in retail, over 2 million square feet in office and over 3 
million square feet in industrial real estate over the last five years.  Projected deliveries 
over the next five years in these sectors are viewed has healthy and a repeat of the past 
five years.  Intel had a sizeable delivery with the 900,000 square feet Fab 42 opening 
in the last year. 
Figure 4-19 shows the land use planning map from Chandler’s current General 
Plan8. 
 
8 City of Chandler, http://www.chandleraz.gov/content/GP_FutureLandUsePlan.pdf

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 92 
 
Figure 4-18:  Chandler location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 93 
 
Figure 4-19:  Chandler land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 94 
4.3.6 El Mirage 
The City of El Mirage is located approximately 15 miles northwest of 
downtown Phoenix in the western portion of the Phoenix Metropolitan area. South of 
Peoria Avenue, El Mirage is bordered to the west and south by the City of Glendale.  It 
is enclosed on the west and north by the City of Surprise.  On the east, the city is 
bordered by the Town of Youngtown and unincorporated areas of Maricopa County.  
El Mirage sits on the west bank of the Agua Fria River, which runs the length of the 
city’s eastern border.  
United States Highway 60, Grand Avenue, is a divided four to six lane road that 
extends from the Town of Wickenburg southeast to Van Buren Street in the City of 
Phoenix.  As shown in Figure 4-20, Highway 60 diagonally traverses the north portion 
of El Mirage. The Burlington Northern Santa Fe (BNSF) Railroad runs along Grand 
Avenue’s east side through the City of El Mirage. The centerpiece of El Mirage’s 
recreation facilities is Gateway Park, located at the northwest corner of Thunderbird 
and El Mirage Roads. The Agua Fria River represents the city’s largest open space 
area, entailing 1,120 acres.  
Originally a farming community, migrant farm workers founded El Mirage in 
1937, and the city was incorporated in 1951.  El Mirage’s residents are governed under 
a council-manager form of government, which includes a seven-member city council 
consisting of a mayor and six council members elected at-large for a term of four years.  
The city council appoints the city manager and other officers necessary to produce an 
orderly administration of the city’s affairs.  
In 2019, the 
population 
of 
El 
Mirage was 34,359. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-7. 
 
Development Trends: 
In the last 5 years, El Mirage has had industrial growth to the southern areas of 
the city. There has been minor growth with residential homes in the north east section, 
but most of the growth has been the southern industrial zone. Most growth has come in 
the form of manufacturing. A data storage facility has also been constructed in the 
industrial zone. 
The current plans for the next 5 years are the continuation of seeking industrial 
and commercial growth, in the southern parts of El Mirage.  There are plans for 3 story 
residential, multifamily dwellings are being constructed in the north west section of the 
city. Land was annexed south of the industrial zone for more industrial developments.  
Table 4-7:  Population, housing and employment 
statistics for El Mirage  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
31,797 
31,900 
11,300 
4,300 
2020 
35,100 
35,100 
11,800 
5,100 
2030 
36,500 
36,500 
13,600 
6,500

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 95 
 
Figure 4-20:  El Mirage location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 96 
Figure 4-21 shows the current land use planning map for El Mirage with an 
overlay of the Luke Air Force Base airport related zoning. 
 
 
Figure 4-21:  El Mirage land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 97 
4.3.7 Fountain Hills 
The Town of Fountain Hills lies in the northeast quadrant of Maricopa County 
approximately 30 miles northeast of central Phoenix. The town’s hillside topography 
in the upper Sonoran Desert on the eastern slope of the McDowell Mountains provides 
the community with a rugged terrain and rich natural desert vegetation. Separated from 
much of greater Phoenix, the Town of Fountain Hills lies atop the McDowell 
Mountains, which create elevations in the Town between 1,510 and 3,170 feet—
averaging about 400-500 feet higher than other Phoenix-area communities.  
As shown in Figure 4-22, the town is bordered by City of Scottsdale on the 
west, the Salt River Pima-Maricopa Indian Community on the south, the Fort 
McDowell Yavapai Nation on the east, the McDowell Mountain Regional Park on the 
northwest, and State-owned land on the northeast.  Major access to Fountain Hills is 
provided via Shea Boulevard, which is the town’s primary connection to the greater 
metropolitan area to the west.  To the east, adjacent to the town boundary, Shea 
Boulevard intersects State Highway 87 connecting the town to the south and east 
valley, including the cities of Mesa, Chandler, Gilbert, and north toward the Verde 
River, the Salt River, and further north to Payson and the Mogollon Rim country. 
The proximity of both the Verde River and Fort McDowell, established in the 
late 1800’s, brought attention to a region that rapidly became known for ranching 
opportunities in the area.  In 1968, still a ranching community, a large land holding in 
the area came into the possession of the McCulloch Oil Corporation.  In 1970 this firm 
directed the development of a 12,000-acre model town, which would become the 
community of Fountain Hills.  Among the many amenities these developers included 
with this planned development would be the world’s tallest fountain, which is still the 
community’s most prominent feature. 
In December of 1989, the town was incorporated, and now operates under a 
council-mayor form of government, including a mayor and six council members 
elected at-large. Development of Fountain Hills continued steadily throughout the 
1990’s, with land annexed to the south. 
In 2019, the 
population 
of 
Fountain Hills was 
24,225. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-8. 
 
Development Trends: 
Within the Town of Fountain Hills, there is a trend towards increased housing 
density, particularly multifamily developments in the Town Center.  Mixed use 
development with ground level retail and multifamily above has recently been added 
Table 4-8:  Population, housing and employment 
statistics for Fountain Hills  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
22,849 
22,400 
13,200 
5,500 
2020 
24,700 
24,700 
14,600 
7,700 
2030 
26,200 
26,200 
15,900 
9,100

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 98 
in Town.  A multi-story, mixed use development was recently completed at Avenue of 
the Fountains and Verde River Dr.  A 147-apartment development is underway at 
Avenue of the Fountains and La Montana.  The development of a hospital at Saguaro 
and Trevino is currently underway.  There is an expansion of a major resort property 
along Eagle Ridge Drive west of Palisades that is currently underway.  The majority of 
development continues to be single family homes.  While infills occur in all areas of 
town, the development of the Adero Canyon area along Eagle Ridge Drive has been 
the largest single area of development. 
Over the next five years, the town expects to continue with significant single 
family development, primarily in the western and northwestern parts of the Town in 
Adero Canyon and Eagles Nest.  This is likely to include additional multifamily/higher 
density housing development, particularly in the Town Center and Shea Boulevard 
corridor.  There is a potential for redevelopment or partial redevelopment of 
commercial properties to include a mix of uses, including high density residential, 
particularly along the Shea Boulevard corridor.  With development of the hospital, the 
trend could include further medical offices/uses. There is also potential for additional 
hospitality uses as occupancy rates had been strong Pre-COVID.  There is a continued 
infill and redevelopment in the industrial/heavy commercial areas around Saguaro and 
Panorama and Saguaro and Technology.  The Town has recently processed requests 
for mini-storage and RV storage in both areas.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 99 
 
Figure 4-22:  Fountain Hills location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 100 
For an overall development picture, Figure 4-239 shows that low to mid-density single-family homes predominate 
throughout the community and tend to follow the ridgelines.  A large share of the undeveloped areas of Fountain Hills is devoted 
to open space, much of which includes the necessary gulches and valleys that facilitate runoff.  Following its heritage as a 
planned community, Fountain Hills includes a concentrated core area that includes residential, commercial, multi-family and 
some industrial uses.  Highway commercial uses are scattered along Shea Boulevard to the south of Fountain Hills’ core. 
 
Figure 4-23:  Fountain Hills land use planning map 
 
9 Town of Fountain Hills, 2010, http://www.fh.az.gov/224/Fountain-Hills-General-Plan

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 101 
4.3.8 Fort McDowell Yavapai Nation 
The Fort McDowell Yavapai Nation (FMYN) is located in the east portion of 
Maricopa County approximately 23 miles northeast of downtown Phoenix.  The FMYN 
lies adjacent to the east side of the Town of Fountain Hills and the McDowell Mountain 
Park and is linked to the north end of the Salt River Pima-Maricopa Indian Community, 
as shown in Figure 4-24.  
With an average elevation of 1,350 feet, the area’s diverse landscape ranges 
from tree-lined bottomlands to cactus studded rolling hills. This desert landscape is 
contrasted by the riparian areas of the Verde River and Sycamore Creek. The 40-square 
mile area is now home to over 600 tribal members, while another 300 live off the 
reservation.  
The FMYN was created by Executive Order on September 15, 1903. The 
community is governed by a tribal council that is elected by tribal members pursuant 
to the tribe's constitution.   
In 2019, the 
population of Fort 
McDowell 
was 
1,043. 
Population 
projections for 2020 
and 2030 current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-9. 
 
Development Trends: 
Development in the nation over the last five years has been relatively active. 
Over the last three years, the major development project has been the new casino. The 
new casino, scheduled to open in mid to late October 2020, was built immediately west 
of the existing casino and is attached to the existing hotel.  Some existing structures, 
both residential and governmental have also been involved in remodeling and tenant 
improvement projects. 
There have been seven new housing units built in the last three years. These 
projects have been constructed in compliance with the development processes. The 
projects have gone through a planning and review process to ensure the sites being 
developed are not in a floodplain, have been assessed for any environmental impacts, 
and cleared for any archeological significance or artifacts. Each of the projects has been 
inspected and monitored during construction for quality assurance and code 
compliance. All of these projects have been developed within the approximately 30% 
area of the southwest portion of the nation which contains existing infrastructure such 
as water, sewer, and electric services.  
 Planned development in the next 5 years includes 6 to 7 individual housing 
units per year until all tribal member residential housing needs are met. These 
Table 4-9:  Population, housing and employment 
statistics for Fort McDowell Yavapai Nation  
Year 
Population 
Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
971 
1,000 
300 
1,500 
2020 
1,100 
1,100 
300 
2,400 
2030 
1,100 
1,100 
400 
2,400

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 102 
development projects will occur in pre-designated areas with existing infrastructure, 
areas that are not located in a floodplain or other hazard zones and will not affect the 
vulnerability of the nation. One exception to development within the existing 
infrastructure would be the extension of water, sewer, and electric services to the rodeo 
grounds in the south end of the nation on the east side of the Verde River. 
Open space dominates most of the reservation land mass, with agricultural and 
very low-density residential uses comprising the next two largest elements. 
Existing land use elements for FMYN are indicated on Figure 4-2510.   
 
10 MAG, 2013, Municipal Planning Area Socioeconomic Profiles Maricopa County, Arizona

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 103 
 
Figure 4-24:  Fort McDowell Yavapai Nation location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 104 
 
Figure 4-25:  Fort McDowell Yavapai Nation land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 105 
4.3.9 Gila Bend 
One of the few Maricopa County communities not adjacent to another 
municipality, the Town of Gila Bend is located at the intersection of State Highway 85 
and Interstate 8 approximately 65 miles southwest of downtown Phoenix, as illustrated 
through Figure 4-26.  Prominent land features that influence Gila Bend include the 
Woolsey Peak Wilderness approximately ten miles to the northwest, the North 
Maricopa Mountains Wilderness to the northeast, the South Maricopa Mountains 
Wilderness to the east, and the Barry M. Goldwater Gunnery Range to the immediate 
south of the community. The Tohono O’odham Nation’s San Lucy District sits adjacent 
to the town’s northern border.  Incorporated in 1962, the town is appropriately named 
for a dramatic bend of the Gila River, which approaches the community from the north 
before heading west to join the Colorado River.  Gila Bend sits at an elevation of 735 
feet and includes approximately nine square miles, making the town one of the 
geographically smallest communities in Maricopa County. 
In 2019, the 
population of Gila 
Bend 
was 
2,019. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-10. 
 
Development Trends: 
Over the past 5 years, Gila Bend has experienced limited growth in the form of 
industrial, commercial, and institutional developments.  Examples include a new 
industrial development in the proposed industrial complex located along Butterfield 
Trail near the Gila Bend Municipal Airport and a new $20 million-dollar school 
constructed by the Gila Bend Unified School District servicing grades K-12, located at 
777 Logan Avenue. Commercial developments included a new Pilot Flying-J Fuel 
Center constructed along Butterfield Trail and a Circle K on Pima Street. No significant 
residential development occurred over the past 5 years. 
Over the next five (5) years, the Town will be actively seeking industrial 
partners and working to bring light manufacturing facilities to the town. Gila Bend has 
had several inquiries regarding medical marijuana sites, agricultural industries 
(specifically shrimp farming), and solar sites.  Residential development continues at a 
modest rate on a single-lot basis.  The Town is working to ensure that the necessary 
water and wastewater infrastructure is in place to attract industry.  Gila Bend is also 
focused on increasing the number of hospitality facilities, specifically hotels, within 
their community to meet existing demand in addition to rehabilitating the existing 
historic Scouts Hotel in downtown Gila Bend. 
The current land use plan for Gila Bend is shown on Figure 4-27.   
Table 4-10:  Population, housing and employment 
statistics for Gila Bend  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
1,922 
2,500 
1,100 
800 
2020 
2,200 
2,700 
1,200 
900 
2030 
3,200 
3,700 
2,900 
1,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 106 
 
Figure 4-26:  Gila Bend location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 107 
 
Figure 4-27:  Gila Bend land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 108 
4.3.10 Gilbert 
The Town of Gilbert, located in the southeast valley, was incorporated in 1920.  
The original town site of just less than one square mile has grown rapidly today into a 
74 square mile planning area in southeast Maricopa County.  As shown in Figure 4-28, 
the town shares boundaries with the City of Mesa, City of Chandler, Town of Queen 
Creek, the Gila River Indian Community, and Pinal County.  A region that is defined 
more by roadways than natural features, the town's northern boundary is Baseline 
Road; the eastern boundary is generally along Power Road; the southern boundary is 
Hunt Highway; and the western boundary is along several roads as it jogs between 
Arizona Avenue and Val Vista Road. Numerous pockets of unincorporated land dot the 
planning area, some of which are surrounded by the town.  
Like many communities in Maricopa County, Gilbert’s origins lie in 
agriculture.  In 1902, the Arizona Eastern Railway established a rail line between the 
towns of Phoenix and Florence.  A rail siding was established on property owned by 
William "Bobby" Gilbert. The siding, and the town that sprung up around it, eventually 
became known as Gilbert. The town became an active farming community, fueled by 
the construction of the Roosevelt Dam and the Eastern and Consolidated Canals.  It 
remained an agricultural town for many years and was known as the "Hay Capital of 
the World" until the late 1920s.  Gilbert began to take its current shape during the 1970s 
when the town council approved a strip annexation that encompassed 53 square miles 
of county land.  
Today Gilbert’s residents are governed under a council-manager form of 
government, which includes a seven-member town council consisting of a mayor and 
six council members elected at-large for a term of four years. The council appoints the 
town manager and other officers necessary to produce an orderly administration of the 
town’s affairs.  
In 2019, the 
population of Gilbert 
was 
259,386. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-11. 
 
Development Trends:  
Since 2015 Q2, the Town of Gilbert has added just over 4 million square-feet 
of new office, retail, and industrial/flex space to the market. Nearly 94% of that growth 
occurred in one of Gilbert’s four employment areas which are shown in Exhibit 1A, 
with the Central Business District seeing to most growth at just over 2.6 million square 
feet followed by the Gateway corridor with nearly 500,000 square feet.  
Table 4-11:  Population, housing and employment 
statistics for Gilbert  
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
208,453 
212,400 
76,400 
74,600 
2020 
262,300 
265,900 
90,100 
98,600 
2030 
289,200 
293,500 
103,800 
120,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 109 
 
In 2000 there were 
a total of 37,007 housing 
units in Gilbert, and by 
2010, the housing stock 
nearly doubled to 74,907. 
As of 2017, the total 
number of housing units 
increased to 87,145. From 
2015 to 2019, there have 
been a total of 9,691 
residential 
building 
permits issued. Gilbert is a 
primarily 
residential 
community and of the 
existing 
housing 
stock 
approximately 86.5% of 
housing in Gilbert is low 
density, single family, and 
primarily larger homes. 
Only 13.5% of Gilbert’s 
existing housing stock is 
allocated to multi-family 
development (3 or more 
units per structure). As 
shown in Figure 1B, the 
housing growth patterns 
have shifted from north to 
south Gilbert overtime.  
Since 2015, most of 
the residential growth 
has been concentrated 
in the southern portion 
of Gilbert, below the 
202.   
 
 
Exhibit 1B. Gilbert Intensity of Household Construction by Zip Code   
Source: U.S. Census Bureau    
Exhibit 1A. Gilbert Employment Areas  
Source: U.S. Census Bureau

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 110 
Over the next 5 years, Gilbert anticipates the 
largest 
areas 
for 
non-residential 
development will continue to be the Central 
Business 
District 
and 
the 
Gateway 
employment area. The Central Business 
District is home to Rivulon, a Nationwide 
Realty Investors mixed-use development, 
that covers 250 acres and anticipates over 4 
million square feet of office and retail 
development at full build-out. This corridor 
will also be the recipient of a new full 
diamond traffic interchange on the 
Loop 202 freeway in Fall/Winter 
2021. South of the Loop 202, 
Germann Road serves as a major 
corridor for several flex and light 
industrial business parks and will see 
the widening of Germann Road all 
the way through to Val Vista Road in 
2021. The Gateway employment 
area is located adjacent to the 
Phoenix Mesa Gateway Airport and 
is the location of a 300-acre parcel 
zoned for employment uses and 
growth. This area is a target of 
business development and attraction 
efforts 
for 
the 
economic 
development team.  
Residential development is projected 
to steadily increase within the next 5 
years. As shown in Figure 1D, the 
majority of housing stock built between 2000 and 2018 was concentrated below the Loop 202. 
This trend is expected to continue in the next 5 years.  Gilbert’s 2012 General Plan includes a 
growth area map which shows some of these areas and is shown in Figure 4-2911. 
 
 
11 Town of Gilbert, http://www.gilbertaz.gov/departments/development-services/planning-development/general-
plan/general-plan-2012   
Exhibit 1D. Gilbert Existing Housing Stock   
Exhibit 1C. Gilbert Land Use

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 111 
 
Figure 4-28:  Gilbert location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 112 
 
Figure 4-29:  Gilbert growth area map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 113 
4.3.11 Glendale 
Located on the western portion of the greater metropolitan area, Glendale is 
located approximately 13 miles from downtown Phoenix.  Bordered on the east, north, 
and south by the City of Phoenix, and on the west by the City of Peoria, Glendale is 
one of the most rapidly growing and diverse cities in Maricopa County.  Between 1990 
and 2000, Glendale was the 19th fastest-growing large city in the country and stands 
today as the seventh most populous community in Arizona. Growth projections for this 
region show that by 2045, over 3 million Arizonans will call the West Valley home; 
that’s nearly one-third of the state’s population. Glendale’s Sports and Entertainment 
District is home to major economic drivers including: the Arizona Cardinals (NFL), the 
Arizona Coyotes (NHL), the Los Angeles Dodgers (MLB), and the Chicago White Sox 
(MLB) and plays host to numerous mega events such as the Super Bowl and major 
concerts featuring top recording artists. Glendale is also the location of choice for major 
employers including Bechtel, Banner Health, Red Bull, White Claw, Honeywell and 
Lockheed Martin, to name a few. Established in 1892 and incorporated in 1910, the 
city’s planning area now stretches west into unincorporated Maricopa County to an 
area immediately south of the communities El Mirage and Surprise.  As shown in 
Figure 4-30, major access to Glendale is provided via the Loop 101 Freeway, which 
enters the city from the north and meets Interstate 10 on the south. Interstate 17 and US 
Highway 60 (Grand Avenue) provide alternate routes to other communities in the 
metropolitan area.  
Today Glendale’s residents are governed under a council-manager form of 
government, which includes a seven-member city council consisting of a mayor and 
six council members from various districts within the community who serve four-year 
terms.  The city council appoints the city manager and other officers necessary to 
produce an orderly administration of the city’s affairs. 
In 2019, the 
population 
of 
Glendale 
was 
243,262. Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-12. 
 
Development Trends:  
Development trends over the last five years in the City of Glendale have 
concentrated heavily on smart growth within our targeted industries and strategic 
districts as defined below.  
Targeted Industries: 
- 
Healthcare 
- 
Advanced Business Services (Office/HQs) 
Table 4-12:  Population, housing and employment 
statistics for Glendale 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
226,721 
252,800 
98,700 
78,600 
2020 
247,800 
279,100 
106,000 
111,400 
2030 
265,300 
306,400 
122,600 
134,000

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 114 
- 
Aerospace, Aviation and Defense 
- 
Advanced Manufacturing 
- 
Technology/Innovation 
Strategic Districts 
- 
Sports and Entertainment District 
- 
New Frontier (Loop 303) District 
- 
Downtown District 
Growth in these areas/industries has been accomplished through both 
significant annexation of land into the city jurisdiction and through infill development 
in the mostly built out portion of the city.  
In the last five years, the annexation of thousands of acres of land 
predominantly in the New Frontier District, has resulted in a high volume of 
industrial/manufacturing development. 
Additionally, with the continued growth in the Sports and Entertainment 
District, as well as prime infill opportunities citywide and consistent with market 
trends, the city has experienced significant residential development activity, both in 
multifamily projects and new single-family homes.  
Recent locates to Glendale include North American manufacturing 
headquarters for Red Bull, West Coast Manufacturing for White Claw, as well as 
signature retail in the form of luxury auto dealerships including BMW. Major hospital 
systems continue to expand citywide, and the city is experiencing its lowest office 
vacancy rates in the single digits after welcoming large corporations including Alaska 
USA Federal Credit Union.  
The City of Glendale anticipates in the next five years, further development 
within the city’s “New Frontier” will continue at a rapid pace, to include a large 
increase predominantly in industrial/manufacturing square footage in this area. 
Important to note that this area of the city is not served by city water/sewer but does 
have an obligation to ensure the annexed areas are served adequately by public safety. 
The City’s Sports and Entertainment District contains significant green fields 
that are anticipated to continue developing over the next five years as well. 
Development type in this area is expected to be predominantly office, entertainment, 
experiential retail and multifamily. Infill development is expected to continue citywide 
with both commercial and residential developments. In the northern portion of the city, 
Arrowhead, additional luxury auto dealerships will develop and open in the next five 
years, along with expansions in the healthcare industry. The city is also strategically 
focused on the development of technology both as an asset/infrastructure and as an 
industry. These efforts are currently focused in the Sports and Entertainment District 
with intentions to leverage the strategy citywide. The 2016 General Plan land use map 
is shown in Figure 4-3112,  
 
12 City of Glendale, http://www.glendaleaz.com/planning/documents/GlendaleLandUseMap.pdf

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 115 
 
Figure 4-30:  Glendale location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 116 
 
Figure 4-31:  Glendale land use planning map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 117 
4.3.12 Goodyear 
The City of Goodyear, located on the west side of the metropolitan area, was 
founded in 1916 by the Goodyear Tire and Rubber Company, which grew cotton in the 
area for use in its tire manufacturing. Later, a naval air station was established in 
Goodyear and a subsidiary, Goodyear Aircraft, began manufacturing flight decks for 
Navy seaplanes.  Aerospace and food processing industries, and its proximity to 
California markets, have provided Goodyear with a strong economic base and have 
contributed to its rapid growth.  
As illustrated through Figure 4-32, two major roadways contribute to the 
economic and residential growth in the city:  Interstate 10, which bisects the city’s 
northern region, and Maricopa County Highway 85, which runs through central 
Goodyear and connects to Interstate 8.  The Union Pacific Rail Line also runs through 
Goodyear, providing industrial sites with rail access. The two primary natural features 
that affect the City of Goodyear include the Estrella Mountains, which border a portion 
of Goodyear’s east side, and the Gila River watershed, which runs east to west bisecting 
the community. The incorporated area of Goodyear exhibits an elongated rectangular 
shape, ranging between 6 and 7 miles from east to west, and 22 miles from north to 
south. Currently Goodyear’s incorporated area contains approximately 117 square 
miles of land. The majority of its land area exhibits slopes less than 3 percent, draining 
to the middle of the planning area where the Gila River flows from east to west.  The 
city incorporated on November 19, 1946. 
Today Goodyear’s residents are governed under a council-manager form of 
government, which includes a seven-member city council consisting of a mayor who 
serves a two-year term and six council members elected at-large for a term of four 
years. The city council appoints the city manager and other officers necessary to 
produce an orderly administration of the city’s affairs. 
In 2019, the 
population 
of 
Goodyear 
was 
88,870. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-13. 
 
Development Trends:  
Over the past 5 years, the City of Goodyear has seen a significant increase in 
development, at an average rate of approximately 20% more permits per year.  All 
geographic areas of Goodyear north of the Pecos Road alignment have seen significant 
development over this time.  More specifically, from Pecos Road Alignment to the Gila 
River, significant amount of residential development and minor commercial 
Table 4-13:  Population, housing and employment 
statistics for Goodyear 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
65,275 
68,000 
26,000 
24,200 
2020 
89,400 
92,100 
41,700 
37,200 
2030 
133,700 
140,300 
64,700 
50,600

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 118 
development has occurred; from the Gila River to I-10, Goodyear has had a significant 
amount of Residential, Multifamily and Industrial Development, with a moderate 
amount of Commercial Development occur; and from I-10 to Camelback Road, we 
have had a significant amount of Industrial Development, with a moderate amount of 
Residential, Multifamily and Industrial Development realized. 
Over the next 5 years, it is anticipated that the current level of new development 
will occur across the same spectrums and in the same geographical areas included 
above.  If the current trend of development is sustained, it is possible that we will see a 
small to moderate increase in residential growth south of the Pecos Road alignment, as 
well.   The City population is anticipated to continue increasing in the next five years. 
Future planned growth areas for the City are shown in Figure 4-33.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 119 
 
Figure 4-32:  Goodyear location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 120 
 
Figure 4-33:  Goodyear Growth Areas Map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 121 
4.3.13 Guadalupe 
One of the smallest towns in Maricopa County, Guadalupe is a Native American 
and Hispanic community of about 6,000 residents sitting between Phoenix and Tempe 
at the base of South Mountain.  Yaqui Indians founded Guadalupe around the turn of 
the century and the town proudly maintains a strong cultural and ethnic identity.  The 
Town of Guadalupe was incorporated in 1975 and is approximately one square mile in 
area.  Guadalupe is expected to retain its current shape because it is surrounded by man-
made boundaries:  Interstate 10 and the City of Phoenix on the west; Baseline Road 
and the City of Tempe on the North; the City of Tempe on the South; and the Highline 
Canal on the East.  These features are illustrated through Figure 4-34. 
The Town was founded in 1914 and today has a council-manager form of 
government. Municipal services are provided by the town or on a contractual basis, and 
the Maricopa County Sheriff’s Department provides public safety services.  
In 2019, the 
population 
of 
Guadalupe 
was 
6,373. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-14. 
 
Development Trends:  
Guadalupe is a land locked community. Development trends continue slowly 
with infill projects. No major development or geographical changes are forecasted for 
the next 5 years. 
Figure 4-3513 clearly illustrates the two most prominent land features of 
Guadalupe, namely, the preponderance of residential land uses and the town’s inability 
to expand beyond its current borders.  While residential land uses dominate the built 
environment of Guadalupe, other commercial and industrial areas along the border with 
Interstate 10 and in the town’s eastern and southern regions also take advantage of the 
town’s proximity to active regional features such as the Arizona Mills Mall and the 
dynamic retail core areas in Chandler. 
 
13 MAG, 2013, Municipal Planning Area Socioeconomic Profiles Maricopa County, Arizona 
Table 4-14:  Population, housing and employment 
statistics for Guadalupe 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
5,523 
5,500 
1,400 
1,000 
2020 
6,400 
6,400 
1,500 
1,300 
2030 
6,700 
6,700 
1,700 
1,500

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 122 
 
Figure 4-34:  Guadalupe location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 123 
 
Figure 4-35:  Guadalupe land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 124 
4.3.14 Litchfield Park 
Situated north of Interstate 10 approximately 16 miles west of downtown 
Phoenix, the City of Litchfield Park lies immediately east of Goodyear and north of 
Avondale in the west valley region of Maricopa County, as shown in Figure 4-36.  
Litchfield Park is a planned residential community which incorporated in 1987.  
Litchfield Park began in 1917 when the Goodyear Tire and Rubber Company bought 
farmland to grow Egyptian long-staple cotton to use in tire cords.  Litchfield Park 
eventually became the headquarters for Goodyear Farms, which had thousands of acres 
under cultivation.  From 1931 to 1944, it was also the test site for Goodyear auto, truck 
and tractor tires. In the 1960's, Litchfield Park designed a master plan for development 
including several self-sufficient villages.  
In 2019, the 
population 
of 
Litchfield Park was 
6,811. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-15. 
 
Development Trends:  
Over the past 5 years, the City has seen two residential developments start. One 
development to the north boundary of LP is completed and contains 121 single family 
dwellings. The second development, centrally located, contains single family, 
townhouses and condos (163 total units) and is 98% completed. These two areas are 
indicated in yellow on Figure 4-37. 
Development of our remaining commercial sites are in progress. This includes 
areas along Camelback at Litchfield (NEC), Dysart (SEC) and El Mirage (SWC) 
Roads.  These areas are indicated in pink on Figure 4-37. 
The areas along Camelback at Dysart and El Mirage Roads will continue to 
develop. These are Commercial and Light Industrial zoned. These are shown in pink 
on Figure 4-37. 
The City has plans for developing the City Center to create a larger more vital 
‘downtown’. The plans include a large central park surrounded by commercial (office, 
retail, and restaurants) along with the potential inclusion of mixed use and residential 
units. This area is depicted in green on Figure 4-37. 
The final developable land surrounds the existing Sun Health Assisted Living 
facility. There has been discussion of developing their land which surrounds City 
owned, historical property.  The Sun Health development proposes additional housing, 
both single and multi-family, additional Assisted and Independent living facilities. This 
area is shown in cross-hatched green on Figure 4-37. 
Table 4-15:  Population, housing and employment 
statistics for Litchfield Park 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
5,476 
10,500 
4,600 
2,000 
2020 
7,300 
14,000 
4,900 
4,400 
2030 
8,400 
15,400 
5,700 
5,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 125 
 
Figure 4-36:  Litchfield Park location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 126 
 
Figure 4-37:  Litchfield Park land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 127 
4.3.15 Mesa 
The City of Mesa, located in the southeast Phoenix valley, was incorporated in 
1883.  As shown in Figure 4-38, the city shares boundaries with the communities of 
Tempe, Chandler, Gilbert, Queen Creek, and Apache Junction, and with the Salt River 
Pima-Maricopa Indian Community to the north.  A region that is generally defined 
more by a roadway network than by natural features, the environment of north Mesa is 
enhanced by the presence of both the Salt River watershed and Red Mountain.  
Numerous notable pockets of unincorporated land dot the planning area, some of which 
are entirely surrounded by the city.  As part of the greater metropolitan area, Mesa is 
the third-largest city in Arizona and the nation’s 35th-largest city.  Just 15 miles east 
of downtown Phoenix, incorporated Mesa currently includes 129.7 square miles, with 
a future land area that will include more than 170 square miles. 
Since its incorporation over 100 years ago, the City of Mesa has experienced 
tremendous growth.  Mesa’s modern history began in 1877 when a group of Mormon 
colonists arrived in Lehi and built Fort Utah in the north-central portion of Mesa near 
the Salt River.  In 1883, the City of Mesa was officially incorporated and had an 
estimated 200 residents. By 1980, boundaries had expanded significantly, increasing 
the city’s area to over 66 square miles. 
Mesa’s early development was triggered partly by the influence of military 
training in the region.  In 1941 two bases were constructed to provide training for World 
War II pilots.  Falcon Field, now Falcon Field Airport, was built for the British Royal 
Air Force.  Williams Field, later Williams Air Force Base, and now Williams Gateway 
Airport, was built for U.S. pilots.  After the war, many military families decided to 
settle in Mesa. The decade of the 1950's brought more commerce and industry to Mesa, 
including early aerospace companies.  However, until 1960 more than 50 percent of the 
residents earned their living directly or indirectly from farming, mainly citrus and 
cotton. The 1960's through 1990's saw more high-technology companies, now over 100 
firms. Health facilities grew especially during the 1980's and 1990's to service the larger 
population.  
The City of Mesa has an elected mayor and six city council members that are 
limited to two consecutive terms. The city operates under a charter form of government, 
with the mayor and city council setting policy.  In 1998, a voter initiative changed the 
election of the council members from an at-large system to a system of six districts.  
Council members serve a term of four years, with three members elected every two 
years.  The mayor is elected at-large every four years. The council appoints the city 
manager and other officers necessary to produce an orderly administration of the city’s 
affairs.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 128 
In 2019, the 
population of Mesa 
was 
497,439. 
Population 
projections for 2020 
and 2030 current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-16. 
 
Development Trends:  
Over the past five years the City of Mesa has seen an increase in residential 
development, particularly in the southeast area of Mesa. The Eastmark and Cadence 
master planned communities have consistently platted hundreds of new lots on the old 
GM Proving Grounds site. The northeast area of Mesa has also seen an increase in 
single-family residential development with the Mountain Bridge Master Planned 
Community at Ellsworth Road and McKellips Road and the Lehi Crossing Community 
at Lindsay Road and McDowell Road. There has been significant multi-residential 
development both in the Downtown area and the Superstition Freeway Corridor. 
The City also has four “Economic Activity Areas” and several “Economic 
Activity Districts” identified within the General Plan (see Exhibit 2A). New 
commercial, retail, and employment development has focused around the Falcon Field 
Area, the Phoenix-Mesa Gateway Airport Area (specifically in the Elliot Road Tech 
Corridor and the Pecos Road Economic Opportunity Zone), and the Superstition 
Freeway Corridor, while a significant amount of redevelopment has occurred in 
Downtown and the Broadway corridor.  
 
 
Table 4-16:  Population, housing and employment 
statistics for Mesa 
Year 
Population 
Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
439,041 
482,500 
227,000 
160,800 
2020 
506,600 
552,800 
241,300 
205,900 
2030 
556,600 
607,500 
266,600 
249,000 
Exhibit 2A 
City of Mesa Economic Activity Areas

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 129 
The City identified four “Growth Areas” within the Mesa 2040 General Plan. 
These areas include the Falcon Field Area, the Phoenix-Mesa Gateway Area, the Light 
Rail Corridor along Main Street, and the East Superstition Springs Freeway Corridor 
as shown in Figure 4-39. The City anticipates continued growth to occur within the 
specified Growth Areas and Economic Activity Areas in the next five years. 
Particularly, there is an ample supply of undeveloped land surrounding the Phoenix-
Mesa Gateway Airport that is prime for employment and residential growth (see 
Exhibit 2B). It is anticipated that there will be development activity within the Inner 
Loop District north of Phoenix-Mesa Gateway Airport. It is also anticipated that 
significant amounts of redevelopment will occur along Main Street and the Fiesta 
District. 
 
Exhibit 2A.  Mesa Gateway Strategic Plan Districts (Figure 9)

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 130 
 
Figure 4-38:  Mesa location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
 
Page 131 
 
Figure 4-39:  Mesa growth area map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 132 
4.3.16 Paradise Valley 
***NOTE – Paradise Valley is no longer a Plan participant, but the following 
information is retained to provide context for adjacent communities. 
Located approximately 10 miles northeast of downtown Phoenix, the Town of 
Paradise Valley lies in the central region of the metropolitan area between the cities of 
Phoenix and Scottsdale, as shown in Figure 4-40. Incorporated as a community in May 
of 1961, the town’s founders initiated the integration in response to concerns that the 
relaxed, sparsely populated desert lifestyle of their community was in danger of eroding 
due to threatened annexation by and the changing density and commercialization of 
neighboring Phoenix and Scottsdale. The area originally incorporated as the Town 
included 2.7 square miles.  By 1970, Paradise Valley had grown to 13.3 square miles, 
and the population had reached 6,637 residents.  By 1980, the town had a population 
of approximately 11,000 residents and included roughly 14 square miles.  While 
Paradise Valley reflects a unique focus on low-density, resort style living, the town also 
has a rugged terrain that compliments the beautiful homes.  
Today Paradise Valley’s residents are governed under a council-manager form 
of government, which includes a seven-member town council consisting of a mayor 
and six council members elected at-large for a term of four years. The town council 
appoints the mayor and town manager and other officers necessary to produce an 
orderly administration of the town’s affairs. 
In 2019, the 
population 
of 
Paradise Valley was 
14,143. Population 
projections for 2020 
and 2030 current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-17. 
 
Development Trends:  
There is no development trend analysis for Paradise Valley in this Plan. 
Table 4-17:  Population, housing and employment 
statistics for Paradise Valley 
Year 
Population 
Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
12,820 
12,800 
5,600 
4,300 
2020 
14,100 
14,100 
5,800 
6,300 
2030 
14,700 
14,700 
6,100 
6,800

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 133 
 
Figure 4-40:  Paradise Valley location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 134 
4.3.17 Peoria 
The City of Peoria was established in the 1880’s when local leader William J. 
Murphy’s vision for the Arizona Canal was completed in 1885. The city was 
incorporated in 1954, with boundaries covering only one square mile of land.  The 
incorporated area of Peoria covers nearly 176 square miles. Northern Peoria’s planning 
area includes a landscape dominated by the Lake Pleasant Recreational Area. This park 
is complimented by both the Agua Fria River and New River watersheds, which enter 
the city from the north and depart to the south. As shown in Figure 4-41, Peoria is 
provided access through various arterial roadways and major throughways.  Most 
notably, State Route 74 provides access to the city’s north end, the Loop 101 Freeway 
bisects the city’s southern region, and the Loop 303 Freeway alignment affords access 
to the central and northern portion of the city. 
Today, Peoria’s residents are governed under a council-manager form of 
government, which includes a seven-member city council consisting of a mayor and 
six council members elected from six districts within the city for four-year terms. The 
city council appoints the city manager and other officers necessary to produce an 
orderly administration of the city’s affairs. 
In 2019, the 
population 
of 
Peoria 
was 
180,161. 
Population 
projections 
for 
2020 
and 
2030 
current 
corporate 
limits 
and 
population, housing, and employment statistics for MPAs for 2010, 2020 and 2030 are 
summarized in Table 4-18. 
 
Development Trends:  
Over the last five years, development has been focused in the northern and 
northwestern areas of the City, such as Vistancia and the Lake Pleasant Parkway 
corridor.  Construction codes have been consistently updated to the most recent national 
codes and standards, to protect health and life safety of the citizens of Peoria. 
Over the next five years, building codes and Flood Plain Management will 
continue to evolve to address natural hazards posing threats to occupied structures and 
developments.  Development activity will continue to migrate to the north, which will 
increase population densities north of Happy Valley Road and Hwy 303.  New 
development and structures will conform to the most recent national building and 
construction regulations, minimizing potential property damage and threats to health 
and life safety. The city’s current Land Use Plan is shown on Figure 4-4214. 
 
14 City of Peoria, http://www.peoriaaz.gov/NewSecondary.aspx?id=25810  
Table 4-18:  Population, housing and employment 
statistics for Peoria 
Year 
Population 
Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
154,065 
162,500 
68,000 
40,900 
2020 
183,700 
196,600 
84,400 
62,400 
2030 
214,700 
232,400 
110,700 
73,100

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 135 
 
Figure 4-41:  Peoria location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 136 
 
Figure 4-42:  Peoria land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 137 
4.3.18 Phoenix 
The City of Phoenix, located in the heart of the greater metropolitan area, 
dominates the political, economic, and cultural landscape not only of Maricopa County, 
but also much of Arizona.  In 1867, Phoenix founder Jack Swilling formed a canal 
company and diverted water from the Salt River, helping to capitalize on the region’s 
agricultural value.  In 1911, the Roosevelt Dam was completed and water supplies—
vital to growth in the region—were stabilized.  Strong growth in the region began 
during World War II when several military airfields were constructed in Maricopa 
County, and various defense industries followed.  Formally incorporated in 1881, today 
the City of Phoenix includes over 500 square miles and is the nation’s fifth most 
populous city. Phoenix is Arizona’s capitol and is located in the County Seat:  Maricopa 
County.  
As suggested through Figure 4-43, Phoenix has grown more north-south than east-west 
since its inception.  To the south, Phoenix is bounded by the Gila River Indian 
Community, and on the north by unincorporated Maricopa County.  Many smaller 
communities, including Tempe, Paradise Valley, and Scottsdale define the city to the 
east, and Peoria and Glendale form the city’s western border.  The natural environment 
of Phoenix is typical of the Sonoran Desert climate.  Rugged urban mountain parks, 
including South Mountain—one of the nation’s largest urban parks—and the Phoenix 
Mountain Preserve create a memorable skyline.  The region’s catalyst, the Salt River, 
now runs dry through the center of the city, and is complemented by various smaller 
watersheds.  A massive arterial roadway network and, more recently, the development 
of a large freeway system, now serve Phoenix.  The primary roadway network includes 
Interstates 17 and 10, with State Highway 51 and the Loop 101 and 202 Freeways also 
providing transportation service throughout the region.  Phoenix and the region are 
served by Sky Harbor International Airport, located only two miles east of the city’s 
central business district.  
The City of Phoenix has an elected mayor and eight city council members that 
represent various districts within the city. The city operates under a charter form of 
government, with the mayor and city council setting policy. The mayor and eight 
council members serve terms of four years. The mayor is elected at-large every four 
years. The council appoints the city manager and other officers necessary to produce 
an orderly administration of the city’s affairs.  
In 2019, the 
population 
of 
Phoenix 
was 
1,617,344. 
Population 
projections 
for 
2020 
and 
2030 
current 
corporate 
limits 
and 
population, housing, and employment statistics for MPAs for 2010, 2020 and 2030 are 
summarized in Table 4-19. 
Table 4-19:  Population, housing and employment 
statistics for Phoenix 
Year 
Population 
Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
1,445,632 
1,501,300 
611,500 
747,700 
2020 
1,641,100 
1,697,700 
653,300 
937,600 
2030 
1,816,200 
1,881,900 
735,100 
1,084,000

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 138 
 
 
Development Trends:  
The City of Phoenix Planning and Development Department has tracked 
development trends over the past five years and reported these trends to city 
management, the Development Advisory Board and the public. The most prominent 
development trends include: 
Strong growth within the Infill Development District: The City of Phoenix's 
Infill Development District was created on January 1, 2014. The Infill Development 
District and associated policies remove some of the barriers to infill development. The 
goal is to promote growth and development in areas served by light rail and existing 
public infrastructure. In the last decade, high-rise and luxury apartment projects have 
fueled a construction boom in central Phoenix. Since 2000 there have been 7,743 
housing units built in Downtown Phoenix, thirty percent of those in the past three years. 
Over 4,000 more are currently under construction or in advanced planning stages. 
An increasing population in the central core has led to increased investment in 
the service and entertainment business environment. Downtown’s Roosevelt Row 
planning district was named one of the nation’s best planning concept neighborhoods 
in 2015 by the American Planning Association. An abundance of nightlife, restaurants 
and trendy apartment complexes turned this relatively quiet neighborhood into an 
entertainment destination. Similarly, the Central Ave core in Midtown and Uptown 
Phoenix have seen significant capital investments in retail, service establishments and 
housing. The Park Central mall and Uptown Plaza have undergone major renovations, 
greatly increasing patronage, interest and investment. 
Bio-medical and academic expansion: The Arizona State University downtown 
campus has grown significantly since its creation in 2006. The downtown campus has 
over 11,000 students with emphasis on Journalism & Mass Communications and 
Medical, Nursing & Health Innovations. As part of that medical initiative, the 
University of Arizona has partnered with Arizona State University for the Phoenix 
Biomedical Campus, taking advantage of the Phoenix Downtown Code Biomedical 
district zoning entitlements. A few miles away at Midtowns Park Central Mall, 
Creighton University School of Medicine is nearing completion. The new nine-story, 
180,000-square-foot campus will educate nearly 1000 students annually. Located just 
a few hundred yards away from the Creighton campus, the Barrow Neurological 
Institute is currently in the process of a major neurology and brain study facility 
expansion at Dignity Health St Joseph’s hospital. The new 130,050-square-foot, five-
story building will bring cutting edge technology research and medical innovation for 
the study of brain injury, stroke and dementia. 
In northeast Phoenix, Mayo clinic is in the middle of a major campus expansion. 
The $650 million expansion will double the size of the facilities and add 1.4 million 
square feet of building space. The HonorHealth Sonoran Crossing Medical Center is 
currently under construction in northwest Phoenix on Dove Valley Rd and interstate 
17. This 210,00-square-foot medical center will accommodate growing health and 
wellness needs of north Phoenix and Anthem residents.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 139 
 
In west Phoenix, Grand Canyon University is experiencing unprecedented 
growth in student body, land acquisition and infrastructure construction. Due to 
increased student enrollments, the on-campus student population is currently 19,000. 
Student population projections at campus buildout are estimated to be 30,000 students. 
Over $1.2 billion in infrastructure projects and new programs are planned and being 
implemented. 
Traditional Growth Areas: There has been moderate residential construction 
growth in the southwest growth region. Single family and, increasingly multifamily 
residential units are reacting to the opening of the Loop 202 South Mountain Freeway 
and this region is seeing the highest level of single-family development. Southeast 
Phoenix is nearing build out and has only seen modest growth activity. Northern 
Phoenix contains the most developable land and will likely take many decades to build 
out. Most of the property in that area is owned by the State Land Trust and development 
of land for residential and commercial purposes tends to take place at slower pace due 
to a complex disposition process. Those areas are also affected by several constraints 
associated with topography, infrastructure requirements, and the regulatory 
environment that have made development more challenging. However, the City is 
working with the State Land Department to address many of these issues, and it is 
possible that a significant amount of urban growth will take place in remaining vacant 
lands in the north in the coming decade. 
Development trends anticipated by the city over the next five years include: 
The current trend of urban infill is expected to continue for the foreseeable 
future. A decreasing availability of vacant properties has led to the repurposing of 
existing, under-utilized properties. City staff continues to work with developers, 
investment groups, the historic preservation community and concerned citizens to 
strike the most appropriate balance between growth, livability and our history. The 
continued growth of high-rise residential units is anticipated to slow down, at least in 
the immediate future. The majority of previous multifamily projects in the infill district 
in recent years have been rental units. It is anticipated that more owner-occupied units 
will be planned as inventory has dwindled under recent market conditions. 
 Light rail expansion will continue to drive growth in the Infill incentive district 
and beyond. Current light rail construction for the south-central corridor is underway. 
Anticipated service, retail and multi-family projects are expected as the line moves 
closer to completion. Further light rail extensions to the north and west are planned to 
begin within this five-year time horizon. Major redevelopment and renovations are 
planned to revitalize the Metro center mall district. A major transportation hub has been 
planned and will be implemented as the rail line is constructed. 
Residential growth will continue in the traditional growth areas. Southwest 
Phoenix will continue to see the most residential development in the next five years. 
The South Mountain 202 freeway has made thousands of acres of vacant farmland more 
readily accessible. An increase in multi-family homes is anticipated. The northern 
growth areas will likely see modest growth because of the limited supply of land being

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 140 
brought to market. However, there are a number of projects being proposed or 
contemplated by the State Land Department and interest on the part of the development 
community is strong, so there may be significantly more activity towards the end of the 
five-year period. For example, the Rawhide wash channelization project in northeast 
Phoenix should be completed in this five-year time horizon. Over 2,000 acres of land 
will be taken out of the 100-year flood plain. Growth is anticipated as the project nears 
completion. The State Land Department is working with the City of Phoenix to release 
3,500 acres in northwest Phoenix as part of a major technology and industrial hub. 
There are significant infrastructure requirements to bring this project forward however 
all parties are focused on streamlining the critical path. Initial project and infrastructure 
improvements could start within the next two years. Figure 4-4415 shows the latest 
version of the city’s land use plan. 
 
 
15 City of Phoenix, https://www.phoenix.gov/econdev/Reports-Maps

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 141 
 
Figure 4-43:  Phoenix location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 142 
 
Figure 4-44:  Phoenix land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 143 
4.3.19 Queen Creek 
Like most of the communities located in the greater metropolitan area, Queen 
Creek has experienced rapid growth in both population and land area yet is still known 
as a very rural community that is rich in agricultural and rustic lifestyles.  The Town of 
Queen Creek is situated in the southeastern corner of Maricopa County and a portion 
of western Pinal County, as shown in Figure 4-45.  The Gila River Indian Community 
borders the southwest boundary of Queen Creek, the Town of Gilbert lies to the 
immediate west, and Mesa forms the northern boundary of the town. The San Tan 
Mountains Regional Park boundary comprises the southern boundary of the planning 
area.  Downtown Mesa is approximately 20 miles north, yet the southernmost border 
of Mesa is Germann Road, which forms the northern boundary of the Queen Creek 
planning area.  Phoenix-Mesa Gateway Airport, a growing regional facility in Mesa, is 
only one mile north of the northern boundary of Queen Creek.  
The Queen Creek planning area is 64.7 square miles while the current 
incorporated town area is approximately 26 square miles.  Before it became a 
community, Queen Creek was a home for early Indian communities and the 
homesteaders who farmed and ranched along Queen Creek.  By the time Arizona 
became a state in 1912, an organized farming town had been formed in the area.  The 
Town of Queen Creek formally incorporated in 1989. 
Large farms throughout the area grow a variety of crops including citrus, 
pecans, cotton, corn, soybeans, wheat, potatoes, and alfalfa. The Union Pacific Railroad 
runs northwest to southeast through the town. Queen Creek and Sonoqui Wash also 
traverse the planning area, and periodically convey water flows generally due to flash 
floods.  The San Tan Mountains and Goldmine Mountains are the most dramatic 
landform in the area and lie immediately to the south. The Superstition Mountains, to 
Queen Creek’s northeast, can be seen from virtually anywhere within the planning area.  
Major arterials in the town are based on a grid system, with Rittenhouse Road crossing 
diagonally through the region. The southern section of the Loop 202 Freeway passes 
through Mesa and Gilbert several miles to the north and will provide primary access to 
the metropolitan area.  
In 2019, the 
population of Queen 
Creek was 46,271. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-20. 
 
Development Trends:  
The Town has seen exponential development growth in the last 5 years.   The 
graphic below provides the number of historic single-family permit issuances as of 
Table 4-20:  Population, housing and employment 
statistics for Queen Creek 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
26,361 
32,200 
10,500 
5,900 
2020 
54,000 
65,000 
15,800 
16,400 
2030 
72,200 
90,900 
21,700 
19,900

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 144 
September 2021.  Below is a list of new residential subdivisions that have begun 
residential construction in the last five years.  
• 
Gateway Quarter 
• 
Terravella 
• 
Queen Creek Station 
• 
Dorada Estates 
• 
Bellero 
• 
Pecan Lakes 
• 
Whitewing at Whisper Ranch 
• 
Hastings Farms 
• 
Nauvoo Station 
• 
Church Farm (aka Meridian) 
• 
Ovation at Meridian 
• 
Crismon Heights 
• 
Spur Cross 
• 
Ironwood Crossing 
• 
Harvest at Queen Creek 
• 
Encanterra 
 
 
Figure 4-46 identifies the total 
number of residential lots within 
the 
Town** 
(this 
includes 
developed and zoned lots), the 
total number of lots within 
subdivisions that are actively 
constructing (both completed 
lots and lots available for 
development), and properties 
zoned 
for 
single-family 
residential development.  
**This 
excludes 
the 
future residential lots within the 
ASLD boundaries. 
Over the next five (5) years, residential developments that are anticipated to 
begin construction include:
• 
Jorde Farms North 
• 
Barney Farms 
• 
North Creek 
• 
Madera West 
• 
Madera 
• 
Malone Place Parke 
• 
Jorde Farms South 
• 
Ellsworth Ranch 
• 
ASLD 
 
Additionally, the Town will likely see multi-family develop along Combs Road 
in between Gantzel and Rittenhouse.  The residential developments noted above are 
generally located on the East side of Town.  
Known commercial development within the next 5 years includes: 
• 
Commercial center at the NEC of Ellsworth and Riggs 
• 
Commercial center at the NWC of Ellsworth and Riggs 
• 
Commercial Center at the SWC of Riggs and Gary 
• 
Commercial infill in existing centers 
• 
ASLD

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 145 
Figure 4-45:  Queen Creek location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 146 
 
Figure 4-46:  Queen Creek growth areas map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 147 
4.3.20 Salt River Pima-Maricopa Indian Community 
The Salt River Pima-Maricopa Indian Community (SRPMIC) is located 
approximately 17 miles northeast of Phoenix, Arizona, and is bounded by Scottsdale 
to the north and west, Mesa and Tempe to the south, and Fountain Hills to the northeast.  
As a result of the community’s location in the Phoenix metropolitan area, it has 
experienced steady population and economic growth.  Primary access to the community 
is offered through both the Loop 101 and 202 Freeways, and by State Highway 87, 
which runs north from Mesa to Payson through SRPMIC land. As shown through 
Figure 4-47, the most visible natural features of the region include the Salt River, which 
runs along the southern reservation border, and Red Mountain, a feature that exists on 
the community’s east side.  
The SRPMIC was established in 1879 by an Executive Order signed by 
President Rutherford B. Hayes. The Executive Order enabled the Pima and Maricopa 
people to occupy the same 54,000 acres of fertile agricultural land as their ancestors.  
The SRPMIC is governed by the Community Council, which is comprised of 
the Community President, Community Vice-President, and the Tribal Council. The 
President and vice-president are elected at large and serve a four-year term. The council 
members serve a staggered term of four (4) years. The Community President and vice 
president oversee the management of the comprehensive government development, 
operations and services including: administration, general counsel, treasury, budgets 
and records, gaming regulatory office, self-governance, community development, 
economic development, construction and engineering, education, human resources, 
community relations, congressional and legislative affairs, cultural and environment, 
finance, fire, police, health and human services, judicial center, public works, 
transportation, recreation, museum, purchasing, and learning center. 
In 2020, the population of the Salt River Pima Maricopa Indian Community 
was 6,500. Population housing and employment statistics and projections for Oct 1st, 
2020 through Oct 1st, 2025 and 2030 are summarized in Table 4-21. 
Table 4-21: Population, housing and employment statistics for Salt River Pima-
Maricopa Indian Community     
Year 
Population of CM’s 
within Community 
Boundaries 
Non-
Enrolled 
Population 
Housing 
Enrolled 
Membership 
Employment to include 
Govt, Enterprises and 
Corridor 
2020 
6,500 
3,500 
2,129 
10,831 
21,000 
2025 
7,500 
3,700 
2,691* 
11,425 
25,000 
2030 
8,500 
2,350** 
2,468** 12,150*** 
28,000 
CM – Community Member 
* Includes all new rental housing in the queue plus 15 new homeownership homes built annually 
** SM Trailer park lease closes in 2026. 573 homes will be removed from count 
*** Notes no changes in Constitutional enrollment criteria 
Source:  SRPMIC

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 148 
 
Development Trends:  
The Salt River Pima-Maricopa Indian Community (SRPMIC or Community) 
has experienced a fast paced development effort within the Community’s boundaries.  
In 2010, when the Community opened Talking Stick Resort and Salt River Fields at 
Talking Stick, a new level of interest in development has been experienced by SRPMIC 
landowners.  Development has included numerous hotels (Great Wolf Lodge, 
Residence Inn, Staybridge, Home2Suites/Tru) and new entertainment venues to 
include:  iFly, Mavrix, Odysea in the Desert/The Boardwalk and Medieval Times have 
anchored this intensive development trend.  Beyond these hotel and entertainment 
developments, SRPMIC has opened an auto mall, large headquarters (McKesson and 
Harkins) and invested in new water, sewer and roadway infrastructure projects.   
Residential development within SRPMIC is designated for Community Member 
households only and is based upon scattered site homes throughout the central/non-
commercial portion of the lands.   
SRPMIC anticipates continued interest and development in commercial aspects 
of the Community.  These could include:  restaurants, additional entertainment, urban 
distribution centers, medical offices/services.  There will also be additional housing 
development specifically built for Community Members.  Development will occur in 
the current Talking Stick Entertainment District and possibly along the Southern 
Boundary area.  It is anticipated that development will bring additional infrastructure 
efforts to support Community Member and general public needs for public safety. A 
future land use planning map for the SRPMIC is shown in Figure 4-4816. 
 
16 Salt River Pima Maricopa Indian Community,  http://www.srpmic-nsn.gov/economic/

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 149 
 
Figure 4-47:  Salt River Pima-Maricopa Indian Community location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 150 
 
 
Figure 4-48:  Salt River Pima-Maricopa Indian Community land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 151 
4.3.21 Salt River Project 
The Salt River Project is no longer a participating jurisdiction in this Plan. 
4.3.22 Scottsdale 
Situated in the northeast portion of Maricopa County approximately 15 miles 
west of downtown Phoenix, the City of Scottsdale is bordered by several communities 
including Phoenix and Paradise Valley on the west, Tempe on the south, the Salt River 
Pima-Maricopa Indian Community on the east, and the Tonto National Forest to the 
north and east, as shown in Figure 4-49.  Founded in 1888, Scottsdale has long been 
known as the “West’s Most Western Town”.  Today the city is an example of a 
community that combines a rich western heritage with civic culture and a resort 
lifestyle.  Contributing to these influences are several natural features that affect 
community lifestyle including the McDowell Mountain Park, the McDowell Sonoran 
Preserve, and the Salt River to the south.  
The primary man-made features that influence Scottsdale’s land uses include:  
the Loop 101 Freeway, which runs along the east and north portions of Scottsdale, 
provides transportation to the rest of the valley, and offers opportunities for commercial 
growth; and the Scottsdale Road corridor, which runs north-south for the length of the 
community, and bisects Scottsdale into east and west halves.  This roadway intersects 
the spectrum of Scottsdale land uses, including the Old Town shopping district in the 
south, the upscale shops and office areas near the Scottsdale Airpark, and the preserved 
open lands on the city’s far north area. These facilities compliment a wide array of 
resort and golf communities that have strengthened Scottsdale’s image as a destination 
community.  
Scottsdale has evolved and grown since its founding in the late 1800's and 
incorporation in 1951, and currently includes over 185 square miles within its corporate 
boundary. Starting as a small residential community sprinkled with farms and citrus 
groves, Scottsdale has become a community that features a variety of land uses.  Today, 
Scottsdale is governed by a council-manager form of government, which includes a 
mayor and six council members elected at-large for a period of four years. 
In 2019, the 
population 
of 
Scottsdale 
was 
247,944. Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-22. 
 
Development Trends:  
Over the past five years Scottsdale has seen new development and 
redevelopment of single-family, multi-family, and mixed-use projects. Although new 
Table 4-22:  Population, housing and employment 
statistics for Scottsdale 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
217,385 
217,400 
124,000 
165,800 
2020 
253,700 
253,800 
133,300 
207,400 
2030 
281,800 
281,900 
147,100 
235,500

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 152 
single-family development primarily occurred throughout the North Sub-Area (all 
areas of the city located north of Deer Valley Road), new clusters of such also 
occurred within the east-Shea area of the Central Sub-Area (all areas of the city 
located between Indian Bend and Deer Valley Roads). This includes Sienna Hills 
(124th Street and Shea Boulevard), Sunrise Trail (124th Street and Shea Boulevard), 
and Whisper Ridge (136th Street and Shea Boulevard) – all of which are located 
within the X Flood Zone (see the FEMA Flood Zones Map). Multi-family residential 
development occurred predominantly in the Central and South (all areas of the city 
south of Indian Bend Road) Sub-Areas. In the Central Sub-Area, new multi-family 
development such as the View at Cascade (Scottsdale Road and Mayo Boulevard), 
Chauncy Marketplace (Scottsdale Road and Chauncey Lane), and SOHO Scottsdale 
(92nd Street and Bahia Drive) occur within the AO Flood Zone, while developments 
such as Villas Altozano (Bell Road and Thompson Peak Parkway), District at the 
Quarter (73rdStreet and Greenway-Hayden Loop), and Vitri Apartments (73rd Street 
and Greenway-Hayden Loop) occur within the X Flood Zone. Commercial and 
mixed-use development occurred relatively evenly across the Central and South Sub-
Areas of the city – typically within the Greater Airpark area (AO and X Flood Zones), 
Old Town Scottsdale (X Flood Zone), and the Scottsdale Road and McDowell Road 
corridors, south of Old Town (X Flood Zone).  
 
According to the 2020 City of Scottsdale Development Forecast Update, 
drafted by Applied Economics, over the next five years (2020-2025) most new 
development is anticipated to occur in the North and Central Sub-Areas of the 
community. The North Sub-Area is anticipated to absorb 1,229 +/- acres of 
development, with most of that acreage composed of Rural Neighborhood development 
(typically 1 unit per acre, or more, of land area). The majority of the North Sub-Area 
aligns with the X flood zone. The Central Sub-Area is anticipated to absorb 515 +/- 
acres of development, composed primarily of a mixture of 242 +/- acres of residential, 
103 +/- acres of office, and 73 +/- acres of retail. The Central Sub-Area is primarily 
composed of the X and AO flood zones. The South Sub-Area, which is the oldest and 
most developed area of the community, is anticipated to see approximately 143 +/- 
acres of development of varying land uses. There will continue to be a focus on 
redevelopment and new infill development within the McDowell Road Corridor, 
consisting of mixed-use commercial, office, and multi-family. The South Sub-Area is 
primarily composed of the X flood zone. The city is currently updating its General Plan 
and has developed a draft map showing anticipated growth areas which is shown in 
Figure 4-5017. 
 
 
17 City of Scottsdale, http://www.scottsdaleaz.gov/Assets/Public+Website/generalplan/_SGP2035TFRecommended.pdf

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 153 
 
Figure 4-49:  Scottsdale location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 154 
 
Figure 4-50:  Scottsdale growth area map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 155 
4.3.23 Surprise 
Surprise is located 25 minutes northwest of downtown Phoenix along US Route 
60/State Highway 93 in the northwest valley of the metropolitan area.  It is positioned 
about 13 miles west of Interstate 17, and 18 miles north of Interstate 10.  Luke Air 
Force Base is 2.5 miles south of the Surprise planning area, located in the City of 
Glendale. As shown in Figure 4-51, the City of Surprise is bordered on the east by the 
cities of Peoria and El Mirage and on the west by the City of Buckeye. The 
unincorporated retirement communities of Sun City West and Sun City lie to the east 
of the City of Surprise, and Glendale lies immediately to the south of Surprise.  The 
White Tank Mountain Regional Park is in the southwest portion of the planning area 
and Lake Pleasant Regional Park is located approximately ten miles to the northeast.  
Surprise became an incorporated town on December 12, 1960 and boasted a 
population of nearly 1,600 people located on a one square mile site. Today Surprise’s 
residents are governed by a council-manager form of government, which includes a 
mayor and six council members who are elected from six council districts for four-year 
terms.  
In 2019, the 
population 
of 
Surprise 
was 
136,194. Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-23. 
 
 
Development Trends:  
Over the last five years the city has experienced residential growth above the 
state average. A city population of 130,336 in 2015 grew to 141,664 in 2019, or 8.7% 
compared to 6.6% by the state. Housing units increased from 54,592 in 2015 to 
58,036 in 2019 for a 6.3% rise. 
 
Source: CoStar 
2015 
2019 
% Increase 
Office  
1,599,062 SF 
1,670,598 SF 
4.5% 
Retail 
5,250,531 SF 
5,542,021 SF 
5.6% 
Industrial  
2,017,125 SF 
2,988,861 SF 
48.2% 
 
The decade of the 2020s is projecting a 53% increase in population with a 
63% expansion of jobs related to office, retail, and industrial development.  
Source: MAG 
2019 
2030 
% Increase 
Population  
141,664  
216,700 
53% 
Jobs  
36,400 
59,500 
63% 
 
Table 4-23:  Population, housing and employment 
statistics for Surprise 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
117,517 
127,600 
56,900 
19,500 
2020 
138,700 
150,300 
68,000 
36,400 
2030 
189,200 
216,700 
99,300 
59,500

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 156 
The four development areas the ED department promotes will see the mix of 
residential and commercial development associated with the growth. 
• Loop 303, Bell Road to Peoria Avenue 
• City Center, Bell Road and Bullard Avenue 
• Surprise Railplex, Cactus Road and Litchfield Road 
• North Surprise, US 60 north of Loop 303

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 157 
 
Figure 4-51:  Surprise location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 158 
 
 
Figure 4-52:  Surprise growth area maps

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 159 
4.3.24 Tempe 
The City of Tempe consists of 40 square miles in the heart of the metropolitan 
area.  It straddles the Salt River and is generally bounded on the east and west by 
freeways, with two additional freeways bisecting the city and running across its 
northern section.  As illustrated through Figure 4-53, the City of Tempe is landlocked 
on all sides by adjacent communities, Scottsdale to the north, the Salt River Pima-
Maricopa Indian Community and Mesa to the east, Chandler to the south, and 
Guadalupe and Phoenix to the west. Tempe’s central location is augmented by its 
proximity to an intricate freeway network that provides access to and from these 
surrounding communities. Arizona State University, with a main campus of over 
44,000 students, is located in Tempe.  Tempe also includes several prominent natural 
land features including Hayden Butte, Papago Butte and the Tempe Town Lake, which 
is the only length of the Salt River in the Phoenix area that has a continuous supply of 
water.  
Founded in 1894, Tempe is one of the oldest communities in the valley and 
historically has been one of the most densely populated. Its position in the region is 
both advantageous and challenging. Land-locked Tempe falls in the middle of a large 
transportation commute zone, significantly impacting land use planning, environmental 
issues and public health and safety.  Tempe’s planning area is five miles wide by eight 
miles long, or about forty square miles.  Within this area are approximately 24.2 linear 
miles of freeway, 23 miles of canal, 30 miles of power lines, 14 miles of active railroad 
lines, and five miles of departure/landing air flight corridor. In spite of these 
tremendous right-of-way impacts, Tempe has some of the most desirable residential 
and commercial areas in the valley. Today Tempe is administered by a council-manager 
form of government that includes a mayor and six council members elected at-large for 
a period of four years. 
In 2019, the 
population of Tempe 
was 
188,616. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-24. 
 
Development Trends:  
Over the past 5 years, Tempe has seen a rapid growth of high density residential, 
new corporate office headquarters and many new retail developments are currently 
under construction. Due to the limited land available for new development, Tempe has 
experienced infill redevelopment and the majority of high density residential in small 
lots. That is of greater interest to the emergency responders as it requires careful design 
review to ensure that these developments are meeting the requirements of the Fire and 
Police department. The highest growth is primarily in the north Tempe area, and 
Table 4-24:  Population, housing and employment 
statistics for Tempe 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
161,719 
162,100 
73,200 
169,100 
2020 
190,000 
190,000 
77,300 
200,500 
2030 
217,000 
217,100 
90,000 
231,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 160 
specifically in the downtown area, Tempe Town Lake, the new Novus Innovation 
Corridor of a master-planned for private development on Arizona State University 
owned land. Redevelopment also continues to occur along the Valley Metro Light Rail 
line in and around Apache Boulevard. Location such as new the Loop 101 and Loop 
202 interchange, just north of Rio Salado Parkway, and a project on the south side of 
Broadway Road are also experiencing high growth. Reinvestment and sporadic 
redevelopment projects still occur throughout the Tempe limits, but it is the Urban Core 
area, an approximate 6 square mile area that has seen most of the growth for the past 
decade. The most significant development consists of residential development projects 
with 45-100 dwelling units per acre. Tempe’s infrastructure is also greatly impacted by 
the new constructions of the Arizona State University campus including the 
construction such as the new Greek Village, the ISTB7 research and bioresearch 
building, all of them in very close proximity to downtown Tempe area.  
Additionally, some preliminary analysis conducted by Maricopa Association of 
Governments (MAG) in 2017 also indicated that Tempe’s daytime population doubles 
as compared to actual population of Tempe due to the expansive employment base. 
This is an important issue as it relates to emergency preparedness. 
 
The anticipated areas of development or redevelopment in the next 5 years will 
continue in the same areas as previous development activity. Locations such as along 
Apache Boulevard and connecting areas where the Valley Metro Light Rail is located, 
as well as Downtown Tempe with existing Light Rail and the new Modern Streetcar 
that is under construction, set to be in operation by late 2021. Vacant land and growth 
for urban development opportunities are still available along the Tempe Town Lake 
perimeters.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 161 
Novus Planning Area: 
Significant amount of high density residential and commercial development, 
along with new roadway system and a new fire station, is projected to occur in the next 
20 years within the Arizona State University’s Novus Master Plan area, which includes 
approximately 330 acres of redevelopment area, including the Karsten Golf Club which 
by itself, is approximately 156 acres. Novus Master Plan area is shown below (outlined 
in red) in Exhibit 3A: 
 
Other redevelopment potential for the future: 
Tempe will also see opportunities for redevelopment and new business trends 
in two of the cities industrial-based hubs located south on Broadway Road from 
Southern, Priest Drive to the Union Pacific Railroad tracks, known as Broadway Maker 
District. The Smith Industrial Innovation Hub is another up-and-coming area with 
potential expansion of rapid transit extending on the Rio Salado Parkway area. There 
are growth opportunities in this corridor and south of Rio Salado, extending to 
University Drive, and McClintock to Loop 101 freeway. 
Proposed annexation: 
There are two areas of Tempe where additional residential development may 
occur if annexation of these properties is approved by City Council.  These include: 
• Banyan Tempe (yellow highlighted area in Exhibit 3B) 
• Priest and Caroline (highlighted in blue in Exhibit 3C) 
 
Finally, projected land use from the current city general plan is shown in Figure 
4-54.  
 
: 
Exhibit 3A 
City of Tempe Novus Master Plan area

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 162 
 
 
Exhibit 3B 
Banyan Tempe area   
Exhibit 3C 
Priest and Caroline area

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 163 
 
Figure 4-53:  Tempe location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 164 
 
Figure 4-54:  Tempe projected land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 165 
4.3.25 Tolleson 
Situated along Interstate 10 approximately 14 miles west of downtown Phoenix, 
the small community of Tolleson lies in the west valley region of Maricopa County, 
and is surrounded by the City of Avondale on the west and Phoenix on the north, east, 
and south, as shown in Figure 4-55.  Founded in 1912 and incorporated in 1929, the 
incorporated boundary of Tolleson measures only about six square miles in area.  
Once dependent on agriculture, Tolleson today has a sound commercial and 
industrial base.  Tolleson is served by the Papago Freeway, which is a segment of 
Interstate 10.  Tolleson is also served by the Loop 101, which allows traffic headed 
toward Flagstaff to bypass downtown Phoenix and connects the city to northeast 
Phoenix.  To the west of Tolleson, Highway 85 intersects Interstate 10 and then runs 
south to Interstate 8 in Gila Bend.  The Union Pacific rail line runs through Tolleson, 
providing several industrial sites with rail access.  Today, Tolleson is administered by 
a council-manager form of government that includes a mayor and six council members 
elected at-large to four-year terms.  
In 2019, the 
population 
of 
Tolleson was 7,085. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-25. 
 
 
Development Trends:  
Over the past 5 years there have been several developments of small areas 
previously identified as infill areas, primarily as commercial or residential projects.  
Growth areas within Tolleson for the next several years are specifically addressed in 
the 2014 General Plan.  Four specific growth areas have been identified: 1) 83rd 
Avenue Corridor 2) 91st Avenue Gateway 3) CORE District and 4) Industrial Area.  
The identified growth areas are shown in Figure 4-56, which is taken from the City of 
Tolleson General Plan 2024. 
 
 
 
 
Table 4-25:  Population, housing and employment 
statistics for Tolleson 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
6,545 
6,600 
2,200 
10,600 
2020 
7,100 
7,100 
2,300 
18,300 
2030 
8,600 
8,600 
2,700 
21,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 166 
 
Figure 4-55:  Tolleson location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 167 
 
Figure 4-56:  Tolleson growth area map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 168 
4.3.26 Wickenburg 
One of Maricopa County’s most historic and scenic communities, the Town of 
Wickenburg lies in north central Maricopa County on the border with Yavapai County, 
approximately 60 miles from downtown Phoenix. The Town of Wickenburg is distinct 
from most of the communities in Maricopa County for its isolation from the greater 
Phoenix metropolitan area. Illustrated in Figure 4-57, Wickenburg is highlighted by the 
Hassayampa River and its tributaries, which are protected through the Hassayampa 
River Canyon Wilderness to the north of Wickenburg in Yavapai County.  Wickenburg 
also serves as a crossroads of various highways in northwest Maricopa County, with 
US Highway 60 and Arizona Highways 93 and 89 providing access to Los Angeles, 
Las Vegas, and Prescott, respectively. 
Along the town's main historic district, early businesses-built structures that still 
exist in Wickenburg's downtown area. In the 1900’s Wickenburg’s clean air and wide-
open spaces attracted guest ranches and resorts to the Wickenburg neighborhood.  
Later, the construction of Highway 60 from Phoenix to California brought even more 
tourists, making Wickenburg the unofficial dude ranch capital of the world. Today, 
some of these ranches still offer their unique brand of western hospitality.  
Founded in 1863, Wickenburg operates under a council-manager form of 
government, which includes a seven-member town council consisting of a mayor and 
six council members elected at-large for a term of four years. In Wickenburg, the town 
council functions as the legislature, and the town manager administers community 
policies.  
In 2019, the 
population 
of 
Wickenburg 
was 
6,988. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-26. 
 
Development Trends:  
The development over the past five years in the Town of Wickenburg includes 
the projects listed below: 
• Town wide linked trailhead system beginning at Kerkes Trailhead (off Hwy 
60) 
• The continued development of the Wickenburg Ranch housing subdivisions 
(currently have 700 residences, 3,100 residences at full capacity) 
• Cottonwood housing development 
• Jefferson St & Mohave St waterline replacement project 
• Continued Public Safety radio issues involving Century Link and Motorola 
Communications – projected partnership with Regional Wireless 
Cooperative (RWC) / (additional radio tower sites TBD) 
Table 4-26:  Population, housing and employment 
statistics for Wickenburg 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
6,363 
8,000 
4,400 
3,500 
2020 
8,200 
8,500 
5,500 
4,600 
2030 
15,100 
9,400 
8,400 
5,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 169 
The town anticipates the continued growth of Wickenburg Ranch home 
development, projected to grow at a rate of 200 homes per year with 25% growth 
expected each year.  Other developments include Saddle Ridge (144 homes), 
Wickenburg Vistas (61 homes), Arroya Vistas (37 homes), West Park (42 homes), and 
Hermosa Ranch (325 homes).    Additional development includes an ADOT multi-year 
project to construct additional roundabouts within Wickenburg police/fire jurisdiction 
including Hwy 93 & Rincon Rd, Cope Rd, Vulture Mine Rd, Scenic Loop, Hwy 89 
junction and Hwy 89 and Wickenburg Ranch (currently the construction entrance). 
Wickenburg’s General Plan 2025 includes a map of future growth nodes with 
land use estimates and is shown on Figure 4-5818.  
 
18 Town of Wickenburg, http://www.ci.wickenburg.az.us/41/General-Plan

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
FOR OFFICIAL USE ONLY 
Page 170 
 
Figure 4-57:  Wickenburg location map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 171 
 
Figure 4-58:  Wickenburg growth area map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 172 
4.3.27 Youngtown 
Situated in the west central portion of the greater metropolitan area 
approximately 15 miles west of downtown Phoenix, the Town of Youngtown lies on 
the east bank of the Agua Fria River.  Located just south of United States Highway 60, 
the Town of Youngtown is bordered on the west by El Mirage and on the east by the 
much larger retirement community of Sun City (Unincorporated Maricopa County), as 
shown in Figure 4-59.  In 1954, real estate broker Ben Schleifer and banker Clarence 
Suggs bought 320 acres of farmland and built the first master-planned, adult 
community dedicated exclusively to retirees.  It was the first town occupied solely by 
senior citizens and has the distinction of being designated as Chapter 1 by AARP.  It is 
known for its more mature landscaping and lower housing costs.  In 1998, age 
restrictions were removed allowing all ages to enjoy community life in Youngtown. 
Youngtown’s residents are governed under a council-manager form of 
government, which includes a seven-member town council consisting of a mayor and 
six council members elected at-large for a term of four years. The town council appoints 
the town manager who oversees all town departments and manages the town’s business.  
In 2019, the 
population 
of 
Youngtown 
was 
6,599. 
Population 
projections for 2020 
and 
2030 
current 
corporate limits and 
population, housing, 
and 
employment 
statistics for MPAs for 2010, 2020 and 2030 are summarized in Table 4-27. 
 
Development Trends:  
Over the past 5 years, most development within Youngtown has taken the form 
of redevelopment of storefronts and new start-ups.  There is one new residential 
development under construction with 129 units south of Peoria Avenue. The town has 
also created a neighborhood-commercial live-work corridor on N. 111th Avenue.  
Over the next 5 years, Youngtown has identified several areas for new 
development and redevelopment within the Town limits.  One redevelopment area 
exists in the northern portion of the Town, bounded roughly by 111th on the east, 113th 
avenue on the west, Wisconsin Avenue on the South and Hwy. 60 to the north. The 
Council has approved a 100+ acre regional park in the Agua Fria river bottom and a 
$50 million battery storage facility in its commerce park south of Peoria Avenue.  
Additional development areas have been identified north of Alabama Avenue and 
South of Peoria Avenue. The Town is also continuing with the Youngtown sidewalk 
Table 4-27:  Population, housing and employment 
statistics for Youngtown 
Year 
Population Population Housing Employment 
(Current 
Limits) 
(MPA) 
(MPA) 
(MPA) 
2010 
6,156 
6,100 
2,800 
1,300 
2020 
6,800 
6,800 
2,900 
1,800 
2030 
7,300 
7,300 
3,100 
2,200

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 173 
improvement programs for the northern portion of the community. Figure 4-6019 shows 
the two future development areas on a future land use map.  
 
Figure 4-59:  Youngtown location map 
 
19 Town of Youngtown, http://www.youngtownaz.org/vertical/Sites/%7B464715DD-87E9-4AA9-9EEF-
3CDF5B7D33D6%7D/uploads/%7BFFC342FE-B7D1-415F-B73F-18097DF4B2E6%7D.PDF

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 174 
 
Figure 4-60:  Youngtown future land use map

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 175 
SECTION 5: RISK ASSESSMENT 
 
One of the key elements to the hazard mitigation planning process is the risk assessment. In 
performing a risk assessment, a community determines “what” can occur, “when” (how often) 
it is likely to occur, and “how bad” the effects could be20.  According to DMA 2000, the 
primary components of a risk assessment that answer these questions are generally categorized 
into the following measures: 
 Hazard Identification and Screening 
 Hazard Profiling 
 Assessing Vulnerability to Hazards 
The risk assessment for Maricopa County and participating jurisdictions was performed 
using a county-wide, multi-jurisdictional perspective, with much of the information gathering 
and development being accomplished by the MJPT.  This integrated approach was employed 
because many hazard events are likely to affect numerous jurisdictions within a consolidated 
urban area like Maricopa County, and are rarely relegated to a single jurisdictional boundary.  
The vulnerability analysis was performed in a way such that the results reflect vulnerability at 
an individual jurisdictional level, and at a countywide level. 
5.1 
Hazard Identification and Screening 
Hazard identification is the process of answering the question; “What hazards can and 
do occur in my community or jurisdiction?”  For this update, the list of hazards identified in 
the 2015 Plan was reviewed by the MJPT, who chose to continue a focus on natural hazards.  
The MJPT also compared and contrasted the 2015 Plan list to the comprehensive hazard list 
summarized in the 2018 State Plan21 to ensure compatibility with the State Plan.  Table 5-1 
summarizes the 2015 Plan and 2018 State Plan hazard lists. 
 
20 National Fire Protection Association, 2000, Standard on Disaster/Emergency Management and Business Continuity 
Programs, NFPA 1600. 
21 ADEM, 2018, State of Arizona Multi-Hazard Mitigation Plan 
§201.6(c)(2):  [The plan shall include…] (2) A risk assessment that provides the factual basis for activities 
proposed in the strategy to reduce losses from identified hazards. Local risk assessments must provide sufficient 
information to enable the jurisdiction to identify and prioritize appropriate mitigation actions to reduce losses from 
identified hazards. The risk assessment shall include: 
(i) A description of the type, location, and extent of all natural hazards that can affect the jurisdiction. The plan shall 
include information on previous occurrences of hazard events and on the probability of future hazard events.  
(ii) A description of the jurisdiction’s vulnerability to the hazards described in paragraph (c)(2)(i) of this section. This 
description shall include an overall summary of each hazard and its impact on the community. The plan 
should describe vulnerability in terms of: 
(A) The types and numbers of existing and future buildings, infrastructure, and critical facilities located in the 
identified hazard areas; 
(B) An estimate of the potential dollar losses to vulnerable structures identified in paragraph (c)(2)(i)(A) of this 
section and a description of the methodology used to prepare the estimate; 
(C) Providing a general description of land uses and development trends within the community so that 
mitigation options can be considered in future land use decisions. 
(iii) For multi-jurisdictional plans, the risk assessment section must assess each jurisdiction’s risks where they vary 
from the risks facing the entire planning area.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 176 
 
Table 5-1:  Summary of Initial Hazard Identification Lists 
2015 Plan Hazard List 
2018 State Plan Hazard List 
• 
Dam Inundation 
• 
Drought 
• 
Extreme Heat 
• 
Fissures 
• 
Flood 
• 
Levee Failure 
• 
Severe Winds 
• 
Subsidence 
• 
Wildfire 
• 
Dam Failure 
• 
Drought 
• 
Earthquake 
• 
Extreme Heat 
• 
Fissure 
• 
Flooding/Flash Flooding 
• 
Hazardous Materials Incidents 
• 
Landslides/Mudslides 
• 
Levee Failure 
• 
Severe Wind 
• 
Subsidence 
• 
Terrorism 
• 
Wildfires 
• 
Winter Storm 
 
The review included an initial screening process to evaluate each of the listed hazards 
based on the following considerations: 
• Experiential knowledge represented by the MJPT with regard to the relative risk 
associated with the hazard 
• Documented historic context for damages and losses associated with past events 
(especially events that have occurred during the last plan cycle) 
• The ability/desire of MJPT to develop effective mitigation for the hazard under 
current DMA 2000 criteria 
• Compatibility with the state hazard mitigation plan hazards 
• Duplication of effects attributed to each hazard 
 
One tool used in the initial screening process was the historic hazard database 
referenced in the 2015 Plan.  With this update, the 2015 Plan database was reviewed and 
updated to include declared disaster events and significant non-declared events that have 
occurred during the last plan cycle.  Declared event sources included Maricopa County 
Department of Emergency Management (MCDEM), Arizona Division of Emergency 
Management (ADEM), Federal Emergency Management Agency (FEMA), and United States 
Department of Agriculture (USDA).  Non-declared sources included Arizona State Land 
Department (ASLD), National Weather Service (NWS), National Oceanic and Atmospheric 
Administration (NOAA), National Climatic Data Center (NCDC), United States Geological 
Survey (USGS), United States Forest Service (USFS), and the Spatial Hazard Events and 
Losses Database for the United States (SHELDUS) database.  The historic hazard database 
presented in this Plan primarily represent the period of June 1955 to June 2020.  Two tables 
are used in this update to summarize the historic hazard events.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 177 
Table 5-2 summarizes the federal and state disaster declarations that included Maricopa 
County.  Table 5-3 summarizes all non-declared hazard events that meet the following 
selection criteria: 
• 1 or more fatalities 
• 1 or more injuries 
• Any dollar amount in property or crop damages 
• Significant event, as expressed in historical records or according to defined criteria 
above 
 
Table 5-2:  State and Federally Declared Natural Hazard Events That Included 
Maricopa County – January 1966 to June 2020 
  
Hazard 
No. of 
Recorded Losses 
Declarations Fatalities 
Injuries Damage Costs ($) 
Drought 
20 
0 
0 
$303,000,000 
Dam Failure 
0 
0 
0 
$0 
Earthquake 
0 
0 
0 
$0 
Extreme Heat/Cold 
0 
0 
0 
$0 
Fissure 
0 
0 
0 
$0 
Flooding / Flash Flooding 
18 
54 
115 
$623,550,000 
Hail 
0 
0 
0 
$0 
Lightning 
0 
0 
0 
$0 
Levee Failure 
0 
0 
0 
$0 
Pandemic 
1 
3,797 A 
0 
$0 
Subsidence 
0 
0 
0 
$0 
Thunderstorm / High Wind 
4 
0 
0 
$0 
Tornado / Dust Devil 
0 
0 
0 
$0 
Tropical Storm / Hurricane 
1 
0 
0 
$375,000,000 
Wildfire 
18 
0 
0 
$0 
Notes: 
Damage Costs are reported as is and no attempt has been made to adjust costs to current 
dollar values 
A – Total deaths in Maricopa County as of November 14, 2020 (Source: ADHS, 2020)

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 178 
Table 5-3:  Maricopa County Historic Hazard Events – June 1955 to June 2020 
Hazard 
No. of 
Recorded Losses 
Records 
Fatalities Injuries 
Damage Costs ($) 
Drought 
0 
0 
0 
$0 
Dam Failure 
1 
0 
0 
$0 
Earthquake 
0 
0 
0 
$0 
Extreme Heat/Cold 
102 
199 
9 
$122,200,000 
Fissure 
2 
0 
0 
$2,500 
Flooding / Flash Flooding 
200 
18 
8 
$129,198,500 
Hail 
10 
1 
0 
$2,810,048,500 
Lightning 
15 
1 
2 
$1,334,000 
Levee Failure 
0 
0 
0 
$0 
Subsidence 
2 
0 
0 
$4,170,000 
Thunderstorm / High Wind 
573 
11 
194 
$436,217,500 
Tornado / Dust Devil 
51 
0 
58 
$37,407,900 
Wildfire (2004-2019; over 500 
acres)) 
24 
0 
6 
$5,000,000 
Notes:  Damage Costs are reported as is and no attempt has been made to adjust costs to 
current dollar values 
 
Detailed historic hazard records are provided in Appendix D. 
The culmination of the review and screening process by the MJPT resulted in a decision 
to retain the 2015 Plan hazards for profiling and updating.  Accordingly, the 2021 Plan hazard 
list is: 
• Dam Inundation 
• Drought  
• Extreme Heat  
• Fissure 
• Flood 
• Levee Failure 
• Severe Wind 
• Subsidence 
• Wildfire 
 
Definitions for each hazard are provided in Section 5.3 and in Section 8.2 
During the MJPT discussions and evaluation of the Plan hazard list, two recent and 
significant past events related to the hazard categories of HAZMAT and Infectious Disease / 
Pandemic were discussed and are briefly summarized below.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 179 
HAZMAT:  On July 29, 2020, a Union Pacific train with several cars loaded with hazardous 
cargo derailed on the bridge spanning the Tempe Town Lake, in Tempe, Arizona, igniting a 
fire that consumed the bridge and melted the southern abutment.  According to the National 
Transportation Safety Board22 there were no fatalities and one injury due to smoke inhalation 
by a first responder.  The damages were estimated to be between $8 and $10 million. Of the 
12 derailed cars (in positions 49 through 60), three tank cars were loaded with the hazardous 
material cyclohexanone. Two of these tank cars fell from the trestle and one released 2,201 
gallons of cyclohexanone. A third tank car partially derailed but was not breached. A small 
area near the bridge was evacuated as a precautionary measure. 
INFECTIOUS DISEASE / PANDEMIC:  
Coronavirus Disease 2019 (COVID-19) was 
confirmed to have reached Arizona in January 
2020. The first confirmed case of COVID-19 
in Arizona was reported on January 26, 2020 
in Tempe, Arizona.  Arizona Governor Doug 
Ducey declared a public health emergency on 
March 12, 2020. On March 20th, ADHS and 
Maricopa County health officials announced 
the first death in the state from COVID-19: a 
Maricopa County man in his 50s with 
underlying health conditions. On March 30th, Gov. Ducey issued a statewide stay at home 
order to stop the spread of new coronavirus, barring Arizonans from leaving their residences 
except for food, medicine, and other essentials. The order took effect at the close of business 
March 31st.  The order expired on May 15th and on June 17th, Governor Ducey announced 
that local governments would be able to set mask-wearing regulations after previously having 
blocked local mask wearing requirements. Soon after, many city and county officials began 
implementing face covering mandates or announcing plans to discuss possible regulations. As 
 
22 NTSB Preliminary Report:  https://www.ntsb.gov/investigations/AccidentReports/Pages/RRD20LR005-preliminary-
report.aspx  
Source: azfamily.com

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 180 
of November 14, 2020, the Maricopa County death toll stood at 3,797 with 174,957 confirmed 
cases 23. 
The MJPT chose not to add these hazards to the formal list since they are either human-
caused or are more formally addressed by other plans.  The MJPT, however, wanted to 
document the occurrences and acknowledge that the hazards do exist and are of concern to the 
overall health and safety of the county. 
5.2 
Vulnerability Analysis Methodology 
5.2.1 General 
The following sections summarize the methodologies used to perform the 
vulnerability analysis portion of the risk assessment.  For this update, the entire 
vulnerability analysis was either revised or updated to reflect the availability of new 
hazard and census data.  Specific changes are noted below and/or in Section 5.3 
For the purposes of this vulnerability analysis, updated hazard profile maps 
were developed for Dam Inundation, Fissure, Flood, Levee Failure, Subsidence and 
Wildfire to map the geographic variability of the probability and magnitude risk of the 
hazards as estimated by the planning team.  Hazard profile categories of HIGH, 
MEDIUM, and/or LOW were used and were subjectively assigned based on the factors 
discussed in Probability and Magnitude sections below.  Within the context of the 
county limits, the other hazards do not exhibit significant geographic variability and 
will not be categorized as such. 
Unless otherwise specified in this Plan, the general cutoff date for new historic 
or hazard profile data is October 2020. 
5.2.2 Climate Change 
In recent years, FEMA and others have taken a harder look at the impacts of 
climate change on natural hazards and the mitigation planning process.  In March 2015, 
FEMA released state mitigation planning guidance that requires all state hazard 
mitigation plans to address climate change beginning with all updates submitted after 
March 2016 24.  FEMA’s National Advisory Council noted that the effects of climate 
change could manifest as a “threat multiplier”.  When considering probabilities of 
hazard events, it is typical to make the implicit assumption that the past is a prologue 
for the future; however, trending changes to climate related variables may require 
broader thinking and projections to develop mitigation actions and projects that account 
for those changes. 
The scope and severity of cause and impacts relating to climate change are still 
difficult to predict and highly debated.  There is, however, a growing body of science 
and research that indicates a few noticeable trends that should be considered when 
 
23 Arizona Department of Health Services COVID 19 Data Dashboard:  https://www.azdhs.gov/preparedness/epidemiology-
disease-control/infectious-disease-epidemiology/covid-19/dashboards/index.php  
24 FEMA, 2015, State Mitigation Plan Review Guide, released March 2015, effective March 2016, FP 302-094-2

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 181 
evaluating natural hazard vulnerability and risk.  In 1989, the U.S. Global Change 
Research Program (USGCRP) was established by Presidential Initiative and later 
mandated by Congress in the Global Change Research Act of 1990 with the stated 
purpose of assisting “the Nation and the world to understand, assess, predict, and 
respond to human-induced and natural processes of global change.”  In May 2014, the 
USGCRP released the 3rd National Climate Assessment (NCA), which is a 
comprehensive compilation of the latest body of work and science on the topic of 
climate change.  The NCA results and discussion are divided into regions to focus the 
discussions and conclusions to a regional perspective.  The Southwest region includes 
the states of Arizona, California, Colorado, Nevada, New Mexico, and Utah.  
According to Chapter 20 of the NCA25, the Southwest regional climate change impacts 
noted in the recent research include increased  heat, drought, and insect outbreaks that 
result in more wildfires, declining water supplies, reduced agricultural yields, health 
impacts in cities due to heat, and flooding and erosion in coastal areas.  In its 2014 
report, the NCA released the following “Key Messages” for the Southwest Region: 
1. Snowpack and streamflow amounts are projected to decline in parts of the 
Southwest, decreasing surface water supply reliability for cities, agriculture, 
and ecosystems.  The Southwest produces more than half of the nation’s 
high-value specialty crops, which are irrigation-dependent and particularly 
vulnerable to extremes of moisture, cold, and heat.  Reduced yields from 
increasing temperatures and increasing competition for scarce water 
supplies will displace jobs in some rural communities. 
2. Increased warming, drought, and insect outbreaks, all caused by or linked 
to climate change, have increased wildfires and impacts to people and 
ecosystems in the Southwest.  Fire models project more wildfire and 
increased risks to communities across extensive areas. 
3. Flooding and erosion in coastal areas are already occurring even at existing 
sea levels and damaging some California coastal areas during storms and 
extreme high tides.  Sea level rise is projected to increase as Earth continues 
to warm, resulting in major damage as wind-driven waves ride upon higher 
seas and reach farther inland. 
4. Projected regional temperature increases, combined with the way cities 
amplify heat, will pose increased threats and costs to public health in 
southwestern cities, which are home to more than 90% of the region’s 
population.  Disruptions to urban electricity and water supplies will 
exacerbate these health problems.  
FEMA has established that future changes in probabilities and severity of 
hazard events influenced by climate change should be addressed during mitigation 
planning.  Accordingly, a brief assessment of the potential effects that current climate 
 
25 Garfin, G., G. Franco, H. Blanco, A. Comrie, P. Gonzalez, T. Piechota, R. Smyth, and R. Waskom, 2014, Ch. 20: 
Southwest. Climate Change Impacts in the United States: The Third National Climate Assessment, J. M. Melillo, Terese 
(T.C.) Richmond, and G. W. Yohe, Eds., U.S. Global Change Research Program, 462-486. doi:10.7930/J08G8HMN

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 182 
change understanding may have on the Plan hazards is provided where appropriate in 
Section 5.3. 
5.2.3 Calculated Priority Risk Index (CPRI) Evaluation 
The first step in the vulnerability analysis (VA) is to assess the perceived overall 
risk for each of the plan hazards using a tool developed by the State of Arizona called 
the Calculated Priority Risk Index26 (CPRI).  The CPRI value is obtained by assigning 
varying degrees of risk to four (4) categories for each hazard, and then calculating an 
index value based on a weighting scheme.  Table 5-4 summarizes the CPRI risk 
categories and provides guidance regarding the assignment of values and weighting 
factors for each category. 
Application of the CPRI is illustrated by the following example.  Assume that 
the project team is assessing the hazard of flooding, and has decided that the following 
assignments best describe the flooding hazard for their community: 
• Probability = Likely 
• Magnitude/Severity = Critical 
• Warning Time = 12 to 24 hours 
• Duration = Less than 6 hours 
The CPRI for the flooding hazard would then be: 
CPRI = [ (3*0.45) + (3*0.30) + (2*0.15) + (1*0.10)] = 2.65 
5.2.4 Asset Inventory 
With this update, the 2015 Plan detailed asset inventory was reviewed and 
updated to reflect the current status and replacement cost information.  In some cases, 
jurisdictions expanded or modified their inventory. 
The 2018 State Plan defines assets as: 
Any natural or human-caused feature that has value, including, but not limited 
to people; buildings; infrastructure like bridges, roads, and sewer and water 
systems; lifelines like electricity and communication resources; or 
environmental, cultural, or recreational features like parks, dunes, wetlands, 
or landmarks.  
The asset inventory is generally tabularized into critical and non-critical 
categories.  Critical facilities and infrastructure are systems, structures, and 
infrastructure within a community whose incapacity or destruction would: 
• Have a debilitating impact on the defense or economic security of that 
community. 
• Significantly hinder a community’s ability to recover following a disaster. 
 
 
 
26 ADEM, 2003, Arizona Model Local Hazard Mitigation Plan, prepared by JE Fuller/ Hydrology & Geomorphology, Inc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 183 
Table 5-4: Summary of Calculated Priority Risk Index (CPRI) categories and risk levels 
CPRI 
Category 
Degree of Risk 
Assigned 
Weighting 
Factor 
Level ID 
Description 
Index 
Value 
Probability  
Unlikely  
 
Extremely rare with no documented history of 
occurrences or events.  
 
Annual probability of less than 0.001.  
1 
45% 
Possibly  
 
Rare occurrences with at least one documented or 
anecdotal historic event.  
 
Annual probability that is between 0.01 and 0.001.  
2 
Likely  
 
Occasional occurrences with at least two or more 
documented historic events.  
 
Annual probability that is between 0.1 and 0.01.  
3 
Highly Likely  
 
Frequent events with a well-documented history of 
occurrence.  
 
Annual probability that is greater than 0.1.  
4 
Magnitude/ 
Severity  
Negligible  
 
Negligible property damages (less than 5% of 
critical 
and 
non-critical 
facilities 
and 
infrastructure).  
 
Injuries or illnesses are treatable with first aid and 
there are no deaths.  
 
Negligible quality of life lost.  
 
Shut down of critical facilities for less than 24 
hours.  
1 
30% 
Limited  
 
Slight property damages (greater than 5% and less 
than 25% of critical and non-critical facilities and 
infrastructure).  
 
Injuries or illnesses do not result in permanent 
disability and there are no deaths.  
 
Moderate quality of life lost.  
 
Shut down of critical facilities for more than 1 day 
and less than 1 week.  
2 
Critical  
 
Moderate property damages (greater than 25% and 
less than 50% of critical and non-critical facilities 
and infrastructure).  
 
Injuries or illnesses result in permanent disability 
and at least one death.  
 
Shut down of critical facilities for more than 1 
week and less than 1 month.  
3 
Catastrophic  
 
Severe property damages (greater than 50% of 
critical 
and 
non-critical 
facilities 
and 
infrastructure).  
 
Injuries or illnesses result in permanent disability 
and multiple deaths.  
 
Shut down of critical facilities for more than 1 
month.  
4 
Warning 
Time  
Less than 6 hours  
Self-explanatory.  
4 
15% 
6 to 12 hours  
Self-explanatory.  
3 
12 to 24 hours  
Self-explanatory.  
2 
More than 24 hours  
Self-explanatory.  
1 
Duration  
Less than 6 hours  
Self-explanatory.  
1 
10% 
Less than 24 hours  
Self-explanatory.  
2 
Less than one week  
Self-explanatory.  
3 
More than one week  
Self-explanatory.  
4

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 184 
Following the criteria set forth by the Critical Infrastructure Assurance Office 
(CIAO), the State of Arizona has adopted eight general categories27 that define critical 
facilities and infrastructure: 
1. Communications Infrastructure:  Telephone, data services, and internet 
communications, cell and radio towers, which have become essential to 
continuity of business, industry, government, and military operations.  
2. Electrical Power Systems:  Generation stations and transmission and 
distribution networks that create and supply electricity to end-users.  
3. Gas and Oil Facilities:  Production and holding facilities for natural gas, crude 
and refined petroleum, and petroleum-derived fuels, as well as the refining and 
processing facilities for these fuels.  
4. Banking and Finance Institutions:  Banks, financial service companies, 
payment systems, investment companies, and securities/commodities 
exchanges.  
5. Transportation Networks:  Highways, railroads, ports and inland waterways, 
pipelines, and airports and airways that facilitate the efficient movement of 
goods and people.  
6. Water Supply Systems:  Sources of water; reservoirs and holding facilities; 
aqueducts and other transport systems; filtration, cleaning, and treatment 
systems; pipelines; cooling systems; and other delivery mechanisms that 
provide for domestic and industrial applications, including systems for dealing 
with water runoff, wastewater, and firefighting.  
7. Government Services:  Capabilities at the federal, state, and local levels of 
government required to meet the needs for essential services to the public.  
8. Emergency Services:  Medical, police, fire, and rescue systems. 
Other assets such as public libraries, schools, museums, parks, recreational 
facilities, historic buildings or sites, churches, residential and/or commercial 
subdivisions, apartment complexes, and so forth, are classified as non-critical facilities 
and infrastructure, as they are not necessarily “critical” per the definition set forth in 
Executive Order 13010.  They are, however, still considered by the MJPT to be 
important facilities and critical and non-critical should not be construed to equate to 
important and non-important.  For each asset, attributes such as name, description, 
physical address, geospatial position, and estimated replacement cost were identified 
to the greatest extent possible and entered into a GIS geodatabase. 
The updated asset inventory data was developed for each community using 
existing GIS data sets, on-line mapping utilities, and manual data acquisition by 
members of the local planning teams.  Table 5-5 summarizes the updated facility counts 
by category for each of the participating jurisdictions in this plan. 
 
 
27 Instituted via Executive Order 13010, which was signed by President Clinton in 1996.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 185 
Table 5-5: Summary of Critical and Non-Critical Facility counts by category and 
jurisdiction  
Participating 
Jurisdiction 
Critical Facilities and Infrastructure 
Non-Critical Facilities 
and Infrastructure 
Communications  
Infrastructure 
Electrical Power 
Systems 
Gas and Oil Facilities 
Banking and  
Finance Institutions 
Transportation 
Networks 
Water Supply Systems 
Government Services 
Emergency Services 
Educational 
Cultural 
Business 
Residential 
Recreational 
Avondale 
0 
0 
0 
0 
0 
46 
7 
11 
28 
0 
27 
0 
12 
Buckeye 
0 
8 
0 
3 
24 
46 
16 
7 
12 
1 
2 
0 
6 
Carefree 
0 
0 
0 
0 
0 
1 
4 
1 
0 
0 
0 
0 
0 
Cave Creek 
0 
0 
0 
0 
0 
4 
0 
0 
0 
0 
0 
0 
0 
Chandler 
16 
24 
0 
0 
1 
86 
24 
17 
78 
3 
0 
25 
3 
El Mirage 
0 
0 
0 
0 
3 
13 
3 
3 
6 
0 
6 
0 
0 
Fountain Hills 
0 
0 
0 
0 
0 
1 
3 
2 
6 
0 
0 
1 
2 
Fort McDowell 
Yavapai Nation 
0 
0 
0 
0 
0 
1 
7 
2 
3 
1 
9 
0 
3 
Gila Bend 
0 
0 
0 
0 
0 
2 
3 
1 
1 
0 
0 
0 
0 
Gilbert 
103 
0 
0 
88 
0 
137 
54 
230 
165 
0 
4284 
227 
0 
Glendale 
3 
19 
1 
37 
51 
69 
42 
90 
185 
108 
162 
360 
97 
Goodyear 
0 
0 
0 
0 
0 
0 
0 
0 
0 
0 
0 
0 
0 
Guadalupe 
0 
0 
0 
0 
0 
0 
3 
1 
2 
0 
0 
0 
1 
Litchfield Park 
0 
0 
0 
0 
0 
0 
1 
0 
2 
0 
1 
0 
1 
Mesa 
44 
12 
75 
0 
6 
145 
38 
48 
138 
8 
1 
24 
11 
Paradise Valley 
8 
2 
0 
0 
0 
38 
3 
7 
6 
14 
13 
4 
0 
Peoria 
0 
0 
0 
0 
5 
155 
17 
12 
37 
10 
1 
33 
29 
Phoenix 
0 
6 
5 
0 
22 
16 
270 
113 
422 
20 
0 
66 
7 
Queen Creek 
16 
0 
0 
8 
11 
21 
3 
6 
22 
15 
10 
8 
9 
Salt River Pima-
Maricopa Indian 
Community 
15 
3 
6 
0 
3 
12 
8 
10 
6 
1 
11 
0 
3 
Scottsdale 
14 
1 
0 
0 
0 
156 
15 
33 
4 
0 
0 
4 
10 
Surprise 
6 
5 
0 
0 
2 
67 
5 
9 
0 
0 
0 
0 
0 
Tempe 
0 
0 
1 
0 
0 
3 
17 
5 
73 
2 
1 
7 
2 
Tolleson 
0 
0 
0 
0 
0 
2 
2 
2 
4 
0 
0 
0 
0 
Unincorporated 
Maricopa County 
53 
2 
5 
0 
459 
1 
324 
28 
46 
2 
0 
0 
150 
Wickenburg 
0 
2 
1 
0 
0 
0 
4 
2 
5 
0 
0 
0 
0 
Youngtown 
0 
0 
0 
0 
0 
1 
3 
0 
2 
0 
1 
5 
0 
Notes: 
A – The City of Mesa reports that 32 of the 145 facilities are wastewater related. 
. 
5.2.5 Loss/Exposure Estimations 
In the 2015 Plan, economic loss and human exposure estimates for each of the 
final hazards identified began with an assessment of the potential exposure of critical 
and non-critical assets and human populations to those hazards.  Estimates of exposure 
to critical and non-critical assets identified by each jurisdiction were accomplished by 
intersecting the asset inventory with the hazard profiles.  Human or population

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 186 
exposures were estimated by intersecting the same hazards with Census 2010 block 
level data for estimating the human (population) and residential structure impacts 
wherever possible.   
For this Plan, a similar census block level database compiled by the Arizona 
Department of Health Services using 2015 population projections and the same 2010 
census residential structure statistics was used. As with the 2015 Plan, no industrial or 
commercial unit estimates are made for this update due to the lack of reliable data at 
the time of this analysis.  It is noted that the next plan update will likely have the 2020 
Census data available. The procedures for developing loss estimates for this Plan are 
discussed below. 
Economic and human exposure estimates for each of the final hazards identified 
in Section 5.1 begins with an assessment of the potential exposure of assets, human 
populations, and residential structures to those hazards.  Asset exposure estimates are 
accomplished by intersecting the asset inventory with the hazard profiles in Section 5.3 
and compiling the exposed facility count and replacement values by jurisdiction.  
Similarly, human population and residential unit exposures are estimated by 
intersecting the same hazards with the census block population and residential unit 
count data sets.  Structure and content replacement costs for assets were assigned to 
each facility by the corresponding jurisdiction.  Structure and content replacement costs 
for the residential housing counts were geographically assigned based on zip code and 
average housing cost unit values data from the Zillow home value database 28.  Content 
value for these buildings was assumed to equal 50% of the replacement cost. 
Combining the exposure results from the asset inventory and census database 
provides a comprehensive depiction of the overall exposure of critical facilities, human 
population, and residential building stock and the two datasets are considered 
complimentary and not redundant. 
Economic loss projections to structures and facilities are not estimated in this 
Plan unless specifically noted otherwise. It is important to note the following when 
reviewing the exposure estimate results: 
• Potential exposures reported in this Plan represent an inherent assumption 
that the hazard occurs county-wide to the magnitude shown on the hazard 
profile map.  The results are intended to present a county-wide value and 
number of exposures.  Any single hazard event will likely only impact a 
portion of the county and the event specific exposure and losses would be 
some fraction of those estimated herein. 
• No attempt has been made at developing annualized loss estimates, unless 
otherwise noted in Section 5.3.  
Several of the hazards profiled in this Plan will not include quantitative 
exposure and loss estimates. The vulnerability of people and assets associated with 
some hazards are nearly impossible to evaluate given the uncertainty associated with 
 
28 Zillow at: https://www.zillow.com/research/data/

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 187 
attempting to specify a geospatial correlation of the hazard event and loss potential 
without sufficient data to justify the estimation of geographically varied damages.  
Instead, a qualitative review of vulnerability will be discussed to provide insight to the 
nature of losses that are associated with the hazard.  For subsequent updates of this 
Plan, the data needed to evaluate these unpredictable hazards may become refined such 
that comprehensive vulnerability statements and thorough loss estimates can be made. 
5.2.6 Development Trend Analysis 
The 2015 Plan development trend analysis will require updating to reflect 
growth and changes in Maricopa County over the last planning cycle.  The updated 
analysis will focus on the potential risk associated with projected growth patterns and 
their intersection with the Plan identified hazards. 
5.3 
Hazard Risk Profiles 
The following sections summarize the risk profiles for each of the Plan hazards 
identified in Section 5.1.  For each hazard, the following elements are addressed to present the 
overall risk profile: 
• Description 
• History 
• Probability and Magnitude 
• Climate Change Impacts 
• Vulnerability 
o CPRI Results 
o Loss/Exposure Estimations  
o Development Trend Analysis 
• Sources 
• Profile Maps (if applicable) 
 
County-wide profile maps are provided at the end of the section (if applicable) and 
jurisdiction specific maps are included in the Executive Plan Summary for that jurisdiction.  
Also, the maps are not included in the pagination count.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 188 
5.3.1 Dam Inundation 
Description 
There are two primary scenarios of downstream inundation risk associated with 
dams in Maricopa County: (1) Emergency Spillway Discharges, and (2) Dam Failure, 
and these were both addressed in the 2015 Plan.  For this update, the MJPT chose to 
continue with the distinction between the downstream inundation risk (emergency 
spillway discharges versus a dam failure).  Accordingly, vulnerability for each scenario 
will be assessed separately, except for the CPRI evaluation, which will consider the 
two scenarios blended to one CPRI value.  
Dams within or impacting Maricopa County can generally be divided into two 
groups: (1) storage reservoirs designed to permanently impound water and possibly 
generate power, and (2) single purpose flood retarding structures (FRS) designed to 
attenuate or reduce flooding by impounding stormwater for relatively short durations 
of time during flood events. Most dams within, or upstream of, Maricopa County are 
FRS and are typically earthen structures equipped with emergency spillways.  The 
purpose of an emergency spillway is to provide a designed and protected outlet to 
convey runoff volumes exceeding the dam’s storage capacity during extreme or back-
to-back storm events. Dam failures may be caused by a variety of reasons including: 
seismic events, extreme wave action, leakage and piping, overtopping, material fatigue 
and spillway erosion.  The risk associated with an emergency spillway discharge is 
different from a dam failure for several reasons: 
• First, dams that are properly designed and maintained are considerably less likely 
to fail and assets located downstream of them are more likely to be impacted by an 
emergency spillway discharge than by a dam failure.   
• Second, the emergency spillway is at a fixed location(s), and therefore, the 
downstream inundation limits can be more readily predicted as compared to a dam 
failure, which could occur anywhere along the structure. 
• Lastly, the dynamics of the flood wave associated with an emergency spillway 
discharge are different than that of a dam failure.  A dam failure is an uncontrolled 
release of water impounded behind a dam through a breach in the dam itself and is 
usually catastrophically destructive.  An emergency spillway discharge usually 
increases in magnitude gradually, and then decreases gradually as the structure 
drains. 
History 
Maricopa County has a limited history of dam failures and emergency spillway 
discharges that caused damaging inundation of downstream properties, and there have 
been no events of occurrence during the last plan cycle. The following are historic 
examples from the records available: 
• In January-February 1993, a major statewide precipitation event caused major 
spillway releases from the Salt and Verde River system of dams, with a peak 
discharge of nearly 124,000 cfs from Granite Reef Diversion Dam.  The 
unavoidable releases caused major flooding along the Salt and Gila River all

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 189 
the way to the county line, with over $38 million in public and private damages 
reported and the evacuation of over 200 families.  The flooding also caused the 
failure of Gillespie Dam29 and forced peak spillway discharges of 25,600 cfs at 
Painted Rock Dam in the southwestern part of the county (USACE, 1994). 
• In September 1997, Tropical Storm Nora moved through the western portion of 
Maricopa County dumping record breaking precipitation along the way.  The 
Narrows Dam located just north of Maricopa County on Centennial Wash, 
began filling in the early part of the storm with flows reaching a depth of over 
two feet in the emergency spillway before the dam itself failed by breach in two 
locations.  The peak discharge estimated from the dam spillway was 2,610 cfs 
(FCDMC, 1997). 
 
Probability and Magnitude 
The probability and magnitude of emergency spillway and dam failure 
discharges vary greatly with each dam.  Most of the dams located within Maricopa 
County function as flood retarding structures (FRS) with a normally dry impoundment 
area.  These FRS are typically designed to store, at a minimum, runoff from the one 
percent probability storm (100-year) in the flood-pool below the crest of the emergency 
spillway.  Many of the FRS have sufficient capacity to store the 0.2 percent probability 
storm (500-year) or greater, without emergency spillway operation.  Depending on the 
dam hazard classification, the emergency spillways will usually have capacity to pass 
the entire Inflow Design Flood (IDF) without any overtopping of the dam itself.  The 
IDF is based on the hazard classification of the dam and is usually the probable 
maximum flood (PMF) or some fraction thereof.  Other dams impacting Maricopa 
County that impound water on a continuous basis (Salt and Verde River systems for 
example) are typically equipped with primary and secondary spillways that are closely 
monitored and operated to provide an optimized level of flood protection, freeboard 
and reservoir storage for power generation, irrigation, and drinking water supplies.  
Probabilities and magnitudes of spillway discharge from these systems are dependent 
on several variables such as available reservoir capacity, time of year, and magnitude 
of storm causing the spillway discharge. 
There are two sources of data that publish hazard ratings for dams impacting 
Maricopa County that are based on either an assessment of the consequence of failure 
and/or dam safety considerations.  The hazard ratings are not tied to probability of 
occurrence.  The first is the Arizona Department of Water Resources (ADWR) and the 
second is the National Inventory of Dams (NID).   
ADWR has regulatory jurisdiction over the non-federal dams impacting the 
county and is responsible for regulating the safety of these dams, conducting field 
investigations, and participating in flood mitigation programs with the goal of 
minimizing the risk for loss of life and property to the citizens of Arizona.  ADWR 
jurisdictional dams are inspected regularly according to downstream hazard potential 
 
29 Gillespie Dam was an irrigation diversion structure that was not regulated as a jurisdictional dam by ADWR.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 190 
classification.  High hazard dams are inspected annually, significant hazard dams every 
three years, and low hazard dams every five years. Via these inspections, ADWR 
identifies safety deficiencies requiring correction and assigns each dam one of five 
safety ratings (listed in increasing severity): no deficiency, safety deficiency, unsafe 
non-emergency, unsafe non-emergency elevated risk, or unsafe emergency. Examples 
of safety deficiencies include: lack of an adequate emergency action plan, inability to 
safely pass the required IDF, embankment erosion, dam stability, etc.  Further 
descriptions of each safety classification are summarized in Table 5-6. 
Table 5-6: Summary of ADWR safety categories 
ADWR Safety Rating 
Definition 
No Deficiency 
No safety deficiencies found 
Safety Deficiency 
One or more conditions at the dam that impair or 
adversely affects the safe operation of the dam 
Unsafe Non-emergency 
Safety deficiencies in a dam or spillway could result in 
failure of the dam with subsequent loss of human life 
or significant property damage.  Failure is not 
considered imminent. 
Unsafe Non-emergency 
Elevated Risk 
Safety deficiencies in a dam or spillway could result in 
failure of the dam with subsequent loss of human life 
or significant property damage.  Concern the dam 
could fail during a 100-yr or smaller flood. 
Unsafe Emergency 
The dam is in imminent risk of failure. 
Source:  ADWR, 2009. 
 
The NID database contains information on approximately 77,000 dams in the 
50 states and Puerto Rico, with approximately 30 characteristics reported for each dam, 
such as:  name, owner, river, nearest community, length, height, average storage, max 
storage, hazard rating, Emergency Action Plan (EAP), latitude, and longitude.  Dams 
within the NID database are classified by hazard potential that is based on an 
assessment of the consequences of failure.  Table 5-7 summarizes those classifications 
and their criteria.  
Table 5-7:  Summary of NID downstream hazard classifications 
Hazard Potential 
Loss of Human Life 
Economic, Environmental, 
Lifeline Losses 
Low 
None expected 
Low and generally limited to owner 
Significant 
None expected 
Yes 
High 
Probable. One or more 
expected. 
Yes (but not necessary for this 
classification) 
Note: 
The hazard potential classification is an assessment of the consequences of failure, but not an evaluation of the probability 
of failure. 
Source:  NID  
 
The NID database includes dams that are either:

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 191 
• High or Significant hazard potential class dams, or, 
• Low hazard potential class dams that exceed 25 feet in height and 15 
acre-feet storage, or 
• Low hazard potential class dams that exceed 50 acre-feet storage and 6 
feet height.   
There are 52 dams in the NID database that are in Maricopa County, and 46 of 
those dams are under ADWR jurisdiction.  There are also four more dams located in 
Pinal County that are owned and operated by the Flood Control District of Maricopa 
County and have a direct impact on Maricopa County communities.  Table 5-8 provides 
a summary of the hazard and safety classifications by count for both the ADWR and 
NID databases.  The location and hazard classifications for each dam are shown on 
Maps 1A, 1B, 1C and 2A, 2B, and 2C. 
 
Table 5-8:  Summary count of NID and ADWR hazard classification dams 
Database 
Source 
High 
Significant 
Low or 
Very Low 
Safety 
Deficiency 
Unsafe 
(any sub-
category) 
NID 
39 
8 
5 
N/A 
N/A 
ADWR 
39 
2 
5 
4 
1 
NOTES: 
• 
The unsafe dam is currently in a rehabilitation process. 
• 
Four of the High hazard dams are located just east of Maricopa County in Pinal County. 
• 
One of the Safety Deficient dams is currently deemed as “out of service” 
Source:  FCDMC, ADWR (2020) and NID (2014) 
 
The magnitude of impacts due to emergency spillway flows and/or dam failure 
are usually depicted by mapping the estimated inundation limits based on an 
assessment of a combination of flow depth and velocity.  These limits are typically a 
critical part of the emergency action plan.  Of the 46 dams considered, 42 have 
emergency action plans. 
The MJPT chose to assign profile categories separately for emergency spillway 
inundation and dam failure inundation, since the perceived probability and magnitude 
for each is distinctly different.  For inundation resulting from emergency spillway 
flows, two classes of hazard risk are depicted as follows: 
HIGH Hazard = Inundation limits due to full emergency spillway flow 
LOW Hazard = All other areas outside the inundation limits 
For inundation resulting from a dam failure, three classes of hazard are 
depicted as follows: 
HIGH Hazard = Dam failure inundation limits downstream of any dam 
classified as “Unsafe” by ADWR. 
MEDIUM Hazard = Dam failure inundation limits downstream of any 
dam classified as “Safety Deficient” by ADWR.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 192 
LOW Hazard = All other areas. 
Extents of the emergency spillway and dam failure inundation hazard areas are 
shown on Maps 1A-C and 2A-C, respectively.  It is duly noted that these hazard areas 
and maps depicting them continue to be a work in progress and may not reflect every 
dam spillway inundation or failure limit. 
Climate Change Impacts 
Climate change impacts to emergency spillway and dam failure inundation 
hazard are anticipated to occur in relation to the assumed increase in wildfire 
occurrences.  Wildfires typically change a watershed’s hydrology with regard to 
rainfall-runoff processes, causing significant increases in peak discharge and runoff 
volumes during precipitation events.  Dams and FRSs located in the county are 
typically not designed for post wildfire flooding volumes and flow rates and could pose 
significant increased risks of emergency spillway operation or failure should a large 
wildfire occur in the watershed.  Other indirect impacts could be linked to increased 
presence of fissure and subsidence due to increased groundwater withdrawal due to 
reduced surface water supplies.  
Vulnerability – CPRI Results 
Dam inundation CPRI results for each community are summarized in Table 5-9. 
 
Table 5-9:  Summary of CPRI results by jurisdiction for dam inundation (emergency 
spillway flow and dam failure) 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Buckeye 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Carefree 
Unlikely 
Negligible 
> 24 hours 
< 6 hours 
1.00 
Cave Creek 
Unlikely 
Negligible 
> 24 hours 
< 6 hours 
1.00 
Chandler 
Unlikely 
Limited 
6 - 12 hours 
< 24 hours 
1.70 
El Mirage 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Fort McDowell Yavapai Nation 
Unlikely 
Critical 
> 24 hours 
< 1 week 
1.80 
Fountain Hills 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Gila Bend 
Unlikely 
Critical 
> 24 hours 
< 1 week 
1.80 
Gilbert 
Unlikely 
Limited 
< 6 hours 
< 24 hours 
1.85 
Glendale 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Goodyear 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Guadalupe 
Unlikely 
Limited 
< 6 hours 
< 24 hours 
1.85 
Litchfield Park 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Unincorporated Maricopa County 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Mesa 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Paradise Valley 
Unlikely 
Negligible 
> 24 hours 
< 6 hours 
1.00 
Peoria 
Unlikely 
Catastrophic 
< 6 hours 
< 1 week 
2.55 
Phoenix 
Unlikely 
Critical 
< 6 hours 
< 1 week 
2.25 
Queen Creek 
Unlikely 
Catastrophic 
< 6 hours 
< 24 hours 
2.45 
Salt River Pima-Maricopa Indian 
Community 
Unlikely 
Catastrophic 
> 24 hours 
< 1 week 
2.10 
Scottsdale 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
Surprise 
Unlikely 
Catastrophic 
< 6 hours 
< 24 hours 
2.45 
Tempe 
Unlikely 
Catastrophic 
< 6 hours 
< 1 week 
2.55 
Tolleson 
Unlikely 
Limited 
< 6 hours 
< 24 hours 
1.85 
Wickenburg 
Unlikely 
Catastrophic 
< 6 hours 
< 24 hours 
2.45 
Youngtown 
Unlikely 
Critical 
< 6 hours 
< 24 hours 
2.15 
County-wide average CPRI = 
2.01

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 193 
 
Vulnerability – Loss/Exposure Estimations 
The estimation of potential exposures due to inundation from either an 
emergency spillway flow or a dam failure was accomplished by intersecting the human 
and facility assets with the inundation limits depicted on Maps 1A, 1B, and 1C. Since 
no common methodology is available for obtaining losses from the exposure values for 
these types of extreme events, no estimates of economic losses were made for this 
update.  Any storm event, or series of storm events of sufficient magnitude to cause an 
emergency spillway to operate or cause a dam failure scenario, would have potentially 
catastrophic consequences in the inundation area.  Flood waves from these types of 
events travel very fast and possess tremendous destructive energy.   
It should be noted that the MJPT recognizes that probability of an emergency 
spillway flow or dam failure occurring on multiple (or all) structures at the same time 
is essentially zero.  Accordingly, the exposure estimates presented below are intended 
to serve as a collective evaluation of the potential exposure to high and medium hazard 
emergency spillway and dam failure inundation events. 
Tables 5-10 and 5-11 summarize estimations of exposure to MJPT identified 
assets for emergency spillway and dam failure inundation hazards.  Tables 5-12 and 5-
13 summarize census block residential building stock exposure estimates for the 
emergency spillway and dam failure inundation hazards.  Table 5-14 and 5-15 
summarize the estimated census block population exposed to emergency spillway and 
dam failure inundation hazards. 
In summary, 1,197, 21 and 3,800 critical and non-critical MJPT identified assets 
with a cumulative reported replacement cost of $2.84 billion, $23.3 million and $820.6 
million are exposed to emergency spillway high hazard and dam failure high and 
medium hazard inundations, respectively, for the planning area.  An additional $72.7 
billion, $88.4 million and $38.9 billion of census block residential structures are 
exposed to emergency spillway high hazard and dam failure high and medium hazard 
inundations, respectively, for the planning areas.  Regarding human vulnerability, a 
total population of 553,274 people, or 13.37% of the total census planning area 
population, is potentially exposed to an emergency spillway inundation event.  
Similarly, total populations of 854 and 331,796 people, or 0.02% and 8.0% of the total 
census planning area population, are potentially exposed to a high or medium hazard 
dam failure inundation event.  The potential for deaths and injuries are directly related 
to the warning time and type of event.  Given the magnitude of such events, it is realistic 
to anticipate at least one death and several injuries. There is also a high probability of 
population displacement for most of the inhabitants within the inundation limits 
downstream of the dam(s).

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 194 
Table 5-10:  Asset inventory exposure due to emergency spillway inundation 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
1197 
10.96% 
$26,024,918 
$2,839,188 
Avondale 
131 
0 
0.00% 
$179,460 
$0 
Buckeye 
125 
6 
4.80% 
$268,667 
$10,300 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
0 
0.00% 
$1,361,072 
$0 
El Mirage 
34 
27 
79.41% 
$285,542 
$206,293 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
0 
0.00% 
$36,000 
$0 
Gilbert 
5287 
398 
7.53% 
$0 
$0 
Glendale 
1224 
309 
25.25% 
$4,085,807 
$1,381,994 
Goodyear 
159 
30 
18.87% 
$148,573 
$7,800 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
76 
7.16% 
$3,624,310 
$68,220 
Mesa 
528 
38 
7.20% 
$2,850,466 
$118,570 
Paradise Valley 
95 
0 
0.00% 
$469,300 
$0 
Peoria 
299 
56 
18.73% 
$282,333 
$19,247 
Phoenix 
947 
96 
10.14% 
$7,843,312 
$455,408 
Queen Creek (Maricopa County Only) 
124 
112 
90.32% 
$301,446 
$269,511 
Salt River Pima-Maricopa Indian Community 
78 
0 
0.00% 
$502,493 
$0 
Scottsdale 
237 
0 
0.00% 
$1,094,610 
$0 
Surprise 
94 
47 
50.00% 
$498,810 
$289,844 
Tempe 
111 
2 
1.80% 
$1,373,300 
$12,000 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
1 
100.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
7 
31.82% 
$7,380 
$1,730 
Queen Creek (Pinal County Only) 
5 
3 
60.00% 
$4,697 
$1,600 
Maricopa County (Pinal County Only) 
3 
1 
33.33% 
$707 
$37 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 195 
Table 5-11:  Asset inventory exposure due to dam failure inundation 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
HIGH HAZARD 
County-Wide Totals (Maricopa Only) 
10917 
21 
0.19% 
$26,024,918 
$23,335 
Avondale 
131 
0 
0.00% 
$179,460 
$0 
Buckeye 
125 
16 
12.80% 
$268,667 
$23,335 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
0 
0.00% 
$1,361,072 
$0 
El Mirage 
34 
0 
0.00% 
$285,542 
$0 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
0 
0.00% 
$36,000 
$0 
Gilbert 
5287 
0 
0.00% 
$0 
$0 
Glendale 
1224 
0 
0.00% 
$4,085,807 
$0 
Goodyear 
159 
0 
0.00% 
$148,573 
$0 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
5 
0.47% 
$3,624,310 
$0 
Mesa 
528 
0 
0.00% 
$2,850,466 
$0 
Paradise Valley 
95 
0 
0.00% 
$469,300 
$0 
Peoria 
299 
0 
0.00% 
$282,333 
$0 
Phoenix 
947 
0 
0.00% 
$7,843,312 
$0 
Queen Creek (Maricopa County Only) 
124 
0 
0.00% 
$301,446 
$0 
Salt River Pima-Maricopa Indian Community 
78 
0 
0.00% 
$502,493 
$0 
Scottsdale 
237 
0 
0.00% 
$1,094,610 
$0 
Surprise 
94 
0 
0.00% 
$498,810 
$0 
Tempe 
111 
0 
0.00% 
$1,373,300 
$0 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
0 
0.00% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 196 
Table 5-11:  Asset inventory exposure due to dam failure inundation 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
MEDIUM HAZARD 
County-Wide Totals (Maricopa Only) 
10,917 
3,800 
34.81% 
$26,024,918 
$820,612 
Avondale 
131 
10 
7.63% 
$179,460 
$3,851 
Buckeye 
125 
0 
0.00% 
$268,667 
$0 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
5 
1.81% 
$1,361,072 
$7,658 
El Mirage 
34 
19 
55.88% 
$285,542 
$123,370 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
0 
0.00% 
$36,000 
$0 
Gilbert 
5,287 
3,582 
67.75% 
$0 
$0 
Glendale 
,1224 
14 
1.14% 
$4,085,807 
$0 
Goodyear 
159 
40 
25.16% 
$148,573 
$32,110 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1,061 
46 
4.34% 
$3,624,310 
$253,980 
Mesa 
528 
39 
7.39% 
$2,850,466 
$143,920 
Paradise Valley 
95 
0 
0.00% 
$469,300 
$0 
Peoria 
299 
0 
0.00% 
$282,333 
$0 
Phoenix 
947 
0 
0.00% 
$7,843,312 
$0 
Queen Creek (Maricopa County Only) 
124 
7 
5.65% 
$301,446 
$15,915 
Salt River Pima-Maricopa Indian Community 
78 
0 
0.00% 
$502,493 
$0 
Scottsdale 
237 
0 
0.00% 
$1,094,610 
$0 
Surprise 
94 
38 
40.43% 
$498,810 
$239,809 
Tempe 
111 
0 
0.00% 
$1,373,300 
$0 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
0 
0.00% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 197 
 
Table 5-12:  Residential structures exposed to emergency spillway inundation  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,265 
218,715 
13.34% 
$542,436,633 
$72,664,531 
13.40% 
Apache Junction (Maricopa County Portion) 
295 
291 
98.64% 
$76,791 
$75,619 
98.47% 
Avondale 
26,802 
0 
0.00% 
$7,272,041 
$0 
0.00% 
Buckeye 
18,206 
1,353 
7.43% 
$4,946,783 
$367,732 
7.43% 
Carefree 
2,242 
0 
0.00% 
$1,922,010 
$0 
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751 
$0 
0.00% 
Chandler 
94,257 
0 
0.00% 
$34,713,265 
$0 
0.00% 
El Mirage 
11,307 
9,889 
87.46% 
$2,655,346 
$2,322,499 
87.47% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045 
$0 
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909 
$0 
0.00% 
Gila Bend 
944 
0 
0.00% 
$118,937 
$0 
0.00% 
Gilbert 
74,821 
8,966 
11.98% 
$29,339,526 
$3,515,983 
11.98% 
Glendale 
90,415 
19,942 
22.06% 
$24,665,480 
$13,008,089 
52.74% 
Goodyear 
25,023 
6,875 
27.47% 
$8,326,438 
$2,287,555 
27.47% 
Guadalupe 
1,397 
0 
0.00% 
$269,202 
$0 
0.00% 
Litchfield Park 
2,616 
0 
0.00% 
$996,356 
$0 
0.00% 
Unincorporated Maricopa County 
142,777 
16,808 
11.77% 
$45,530,720 
$5,359,869 
11.77% 
Mesa 
201,507 
9,191 
4.56% 
$59,328,380 
$2,705,947 
4.56% 
Paradise Valley 
5,621 
0 
0.00% 
$11,738,020 
$0 
0.00% 
Peoria 
64,806 
17,865 
27.57% 
$21,410,130 
$5,902,113 
27.57% 
Phoenix 
590,476 
90,618 
15.35% 
$167,455,500 
$25,698,678 
15.35% 
Queen Creek 
8,422 
8,118 
96.39% 
$2,890,493 
$2,786,003 
96.39% 
Salt River Pima-Maricopa Indian Community 
2,680 
0 
0.00% 
$919,777 
$0 
0.00% 
Scottsdale 
123,959 
0 
0.00% 
$67,660,310 
$0 
0.00% 
Surprise 
52,607 
27,050 
51.42% 
$15,652,750 
$8,048,600 
51.42% 
Tempe 
73,603 
1,491 
2.03% 
$24,383,780 
$493,819 
2.03% 
Tolleson 
2,165 
0 
0.00% 
$505,455 
$0 
0.00% 
Wickenburg 
3,610 
258 
7.15% 
$1,285,212 
$92,025 
7.16% 
Youngtown 
2,796 
0 
0.00% 
$540,226 
$0 
0.00% 
Queen Creek (Pinal County Portion) 
606 
404 
66.67% 
$207,814 
$138,592 
66.69% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321 
$0 
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703 
$0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 198 
Table 5-13:  Residential structures exposed to dam failure inundation  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
HIGH HAZARD 
County-Wide Totals (Maricopa Only) 
1,639,265 
279 
0.02% 
$542,436,633  
$88,444  
0.02% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
0 
0.00% 
$7,272,041  
$0  
0.00% 
Buckeye 
18,206 
9 
0.05% 
$4,946,783  
$2,377  
0.05% 
Carefree 
2,242 
0 
0.00% 
$1,922,010  
$0  
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751  
$0  
0.00% 
Chandler 
94,257 
0 
0.00% 
$34,713,265  
$0  
0.00% 
El Mirage 
11,307 
0 
0.00% 
$2,655,346  
$0  
0.00% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045  
$0  
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$0  
0.00% 
Gila Bend 
944 
0 
0.00% 
$118,937  
$0  
0.00% 
Gilbert 
74,821 
0 
0.00% 
$29,339,526  
$0  
0.00% 
Glendale 
90,415 
0 
0.00% 
$24,665,480  
$0  
0.00% 
Goodyear 
25,023 
0 
0.00% 
$8,326,438  
$0  
0.00% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
0 
0.00% 
$996,356  
$0  
0.00% 
Unincorporated Maricopa County 
142,777 
270 
0.19% 
$45,530,720  
$86,068  
0.19% 
Mesa 
201,507 
0 
0.00% 
$59,328,380  
$0  
0.00% 
Paradise Valley 
5,621 
0 
0.00% 
$11,738,020  
$0  
0.00% 
Peoria 
64,806 
0 
0.00% 
$21,410,130  
$0  
0.00% 
Phoenix 
590,476 
0 
0.00% 
$167,455,500  
$0  
0.00% 
Queen Creek 
8,422 
0 
0.00% 
$2,890,493  
$0  
0.00% 
Salt River Pima-Maricopa Indian Community 
2,680 
0 
0.00% 
$919,777  
$0  
0.00% 
Scottsdale 
123,959 
0 
0.00% 
$67,660,310  
$0  
0.00% 
Surprise 
52,607 
0 
0.00% 
$15,652,750  
$0  
0.00% 
Tempe 
73,603 
0 
0.00% 
$24,383,780  
$0  
0.00% 
Tolleson 
2,165 
0 
0.00% 
$505,455  
$0  
0.00% 
Wickenburg 
3,610 
0 
0.00% 
$1,285,212  
$0  
0.00% 
Youngtown 
2,796 
0 
0.00% 
$540,226  
$0  
0.00% 
Queen Creek (Pinal County Portion) 
606 
0 
0.00% 
$207,814  
$0  
0.00% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 199 
Table 5-13:  Residential structures exposed to dam failure inundation  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
MEDIUM HAZARD 
County-Wide Totals (Maricopa Only) 
1,639,265 
115,046 
7.02% 
$542,436,633  
$38,886,441  
7.17% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
823 
3.07% 
$7,272,041  
$223,241  
3.07% 
Buckeye 
18,206 
0 
0.00% 
$4,946,783  
$0  
0.00% 
Carefree 
2,242 
0 
0.00% 
$1,922,010  
$0  
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751  
$0  
0.00% 
Chandler 
94,257 
4,483 
4.76% 
$34,713,265  
$1,650,962  
4.76% 
El Mirage 
11,307 
9,863 
87.22% 
$2,655,346  
$2,316,165  
87.23% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045  
$0  
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$0  
0.00% 
Gila Bend 
944 
0 
0.00% 
$118,937  
$0  
0.00% 
Gilbert 
74,821 
52,126 
69.67% 
$29,339,526  
$20,439,864  
69.67% 
Glendale 
90,415 
1,812 
2.00% 
$24,665,480  
$494,443  
2.00% 
Goodyear 
25,023 
4,750 
18.98% 
$8,326,438  
$1,580,691  
18.98% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
206 
7.86% 
$996,356  
$78,307  
7.86% 
Unincorporated Maricopa County 
142,777 
1,660 
1.16% 
$45,530,720  
$529,474  
1.16% 
Mesa 
201,507 
10,284 
5.10% 
$59,328,380  
$3,027,751  
5.10% 
Paradise Valley 
5,621 
0 
0.00% 
$11,738,020  
$0  
0.00% 
Peoria 
64,806 
0 
0.00% 
$21,410,130  
$0  
0.00% 
Phoenix 
590,476 
0 
0.00% 
$167,455,500  
$0  
0.00% 
Queen Creek 
8,422 
297 
3.53% 
$2,890,493  
$101,942  
3.53% 
Salt River Pima-Maricopa Indian Community 
2,680 
0 
0.00% 
$919,777  
$0  
0.00% 
Scottsdale 
123,959 
0 
0.00% 
$67,660,310  
$0  
0.00% 
Surprise 
52,607 
27,702 
52.66% 
$15,652,750  
$8,242,504  
52.66% 
Tempe 
73,603 
0 
0.00% 
$24,383,780  
$0  
0.00% 
Tolleson 
2,165 
0 
0.00% 
$505,455  
$0  
0.00% 
Wickenburg 
3,610 
0 
0.00% 
$1,285,212  
$0  
0.00% 
Youngtown 
2,796 
1,041 
37.22% 
$540,226  
$201,096  
37.22% 
Queen Creek (Pinal County Portion) 
606 
0 
0.00% 
$207,814  
$0  
0.00% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 200 
 
Table 5-14:  Population sectors exposed to emergency spillway inundation  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,787 
553,274 
13.37% 
538,166 
84,203 
15.93% 
Apache Junction (Maricopa County Portion) 
314 
307 
97.77% 
149 
146 
100.00% 
Avondale 
79,485 
0 
0.00% 
5,313 
0 
0.03% 
Buckeye 
65,452 
4,521 
6.91% 
5,141 
286 
26.16% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
0 
0.00% 
23,435 
0 
0.00% 
El Mirage 
33,728 
29,633 
87.86% 
2,700 
2,319 
85.49% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
6.94% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
27,549 
11.50% 
17,960 
3,494 
19.35% 
Glendale 
237,327 
50,181 
21.14% 
23,675 
6,466 
25.06% 
Goodyear 
78,118 
20,317 
26.01% 
10,094 
4,802 
47.37% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
1 
0.02% 
1,065 
0 
0.00% 
Unincorporated Maricopa County 
290,179 
29,122 
10.04% 
95,187 
13,269 
15.02% 
Mesa 
467,657 
24,403 
5.22% 
71,995 
3,380 
4.05% 
Paradise Valley 
13,834 
0 
0.00% 
3,365 
0 
0.00% 
Peoria 
166,339 
41,810 
25.14% 
25,308 
8,367 
34.71% 
Phoenix 
1,561,296 
224,541 
14.38% 
143,448 
24,137 
17.06% 
Queen Creek 
35,720 
34,408 
96.33% 
2,094 
2,014 
94.94% 
Salt River Pima-Maricopa Indian Community 
6,706 
0 
0.00% 
1,004 
0 
0.00% 
Scottsdale 
237,929 
0 
0.00% 
49,963 
0 
0.00% 
Surprise 
128,211 
62,695 
48.90% 
26,025 
14,761 
58.09% 
Tempe 
176,809 
3,191 
1.80% 
15,264 
611 
5.20% 
Tolleson 
6,904 
0 
0.00% 
809 
0 
0.00% 
Wickenburg 
6,803 
595 
8.75% 
2,058 
151 
4.62% 
Youngtown 
6,454 
0 
0.00% 
1,177 
0 
0.00% 
Queen Creek (Pinal County Portion) 
1421 
878 
61.79% 
128 
73 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 201 
Table 5-15:  Population sectors exposed to dam failure inundation  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
HIGH HAZARD 
County-Wide Totals (Maricopa Only) 
4,136,787 
854 
0.02% 
538,166 
60 
0.01% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
0 
0.00% 
5,313 
0 
0.00% 
Buckeye 
65,452 
30 
0.05% 
5,141 
2 
0.04% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
0 
0.00% 
23,435 
0 
0.00% 
El Mirage 
33,728 
0 
0.00% 
2,700 
0 
0.00% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
0 
0.00% 
17,960 
0 
0.00% 
Glendale 
237,327 
0 
0.00% 
23,675 
0 
0.00% 
Goodyear 
78,118 
0 
0.00% 
10,094 
0 
0.00% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
0 
0.00% 
1,065 
0 
0.00% 
Unincorporated Maricopa County 
290,179 
824 
0.28% 
95,187 
58 
0.06% 
Mesa 
467,657 
0 
0.00% 
71,995 
0 
0.00% 
Paradise Valley 
13,834 
0 
0.00% 
3,365 
0 
0.00% 
Peoria 
166,339 
0 
0.00% 
25,308 
0 
0.00% 
Phoenix 
1,561,296 
0 
0.00% 
143,448 
0 
0.00% 
Queen Creek 
35,720 
0 
0.00% 
2,094 
0 
0.00% 
Salt River Pima-Maricopa Indian Community 
6,706 
0 
0.00% 
1,004 
0 
0.00% 
Scottsdale 
237,929 
0 
0.00% 
49,963 
0 
0.00% 
Surprise 
128,211 
0 
0.00% 
26,025 
0 
0.00% 
Tempe 
176,809 
0 
0.00% 
15,264 
0 
0.00% 
Tolleson 
6,904 
0 
0.00% 
809 
0 
0.00% 
Wickenburg 
6,803 
0 
0.00% 
2,058 
0 
0.00% 
Youngtown 
6,454 
0 
0.00% 
1,177 
0 
0.00% 
Queen Creek (Pinal County Portion) 
1421 
0 
0.00% 
128 
0 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 202 
Table 5-15:  Population sectors exposed to dam failure inundation  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
MEDIUM HAZARD 
County-Wide Totals (Maricopa Only) 
4,136,787 
331,796 
8.02% 
538,166 
36,287 
6.74% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
2,470 
3.11% 
5,313 
166 
3.13% 
Buckeye 
65,452 
0 
0.00% 
5,141 
0 
0.00% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
12,193 
4.87% 
23,435 
1,093 
4.66% 
El Mirage 
33,728 
29,422 
87.23% 
2,700 
2,376 
87.98% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
166,477 
69.50% 
17,960 
11,531 
64.20% 
Glendale 
237,327 
1,614 
0.68% 
23,675 
9 
0.04% 
Goodyear 
78,118 
13,272 
16.99% 
10,094 
2,342 
23.20% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
516 
8.63% 
1,065 
76 
7.17% 
Unincorporated Maricopa County 
290,179 
4,804 
1.66% 
95,187 
481 
0.51% 
Mesa 
467,657 
30,101 
6.44% 
71,995 
3,620 
5.03% 
Paradise Valley 
13,834 
0 
0.00% 
3,365 
0 
0.00% 
Peoria 
166,339 
0 
0.00% 
25,308 
0 
0.00% 
Phoenix 
1,561,296 
0 
0.00% 
143,448 
0 
0.00% 
Queen Creek 
35,720 
1,280 
3.58% 
2,094 
53 
2.51% 
Salt River Pima-Maricopa Indian Community 
6,706 
0 
0.00% 
1,004 
0 
0.00% 
Scottsdale 
237,929 
0 
0.00% 
49,963 
0 
0.00% 
Surprise 
128,211 
66,853 
52.14% 
26,025 
14,161 
54.41% 
Tempe 
176,809 
0 
0.00% 
15,264 
0 
0.00% 
Tolleson 
6,904 
0 
0.00% 
809 
0 
0.00% 
Wickenburg 
6,803 
0 
0.00% 
2,058 
0 
0.00% 
Youngtown 
6,454 
2,795 
43.31% 
1,177 
380 
32.27% 
Queen Creek (Pinal County Portion) 
1421 
0 
0.00% 
128 
0 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 203 
Vulnerability – Development Trend Analysis 
Most of the dams within Maricopa County serve as flood retarding structures 
(FRS) and typically sit empty for most of their design life.  The flood protection 
afforded by these structures has encouraged development of lands immediately 
downstream of the structures.  In some cases, the FRSs are long linear structures that 
intercept runoff from multiple washes and have emergency spillways that are not 
always directed to a regional watercourse.  All the larger dams with some level of 
permanent reservoir storage direct emergency spillway flows to the regional 
watercourse they are constructed on.  Emergency spillway flows from these structures 
typically coincide with FEMA regulated 100-year floodplains in the downstream 
watercourse, and are, therefore, not as potentially destructive as an emergency spillway 
flow from some of the FRS structures.  A dam failure in any case, would be 
catastrophic. 
 
Changes in Development in the Hazard Prone Area 
The vulnerability analysis indicates that five to 14% of the county population is situated 
within the potential downstream inundation limits of an emergency spillway or elevated 
hazard dam failure. Recent and anticipated changes in development will expand the 
exposed footprint, with over half of the county population expected to be situated 
within dam failure inundation limits of some dam.  Prohibition of development within 
those limits is not feasible.  Instead, public awareness measures such as notices on final 
plats and public education on the need for vigilant dam safety measures are mitigation 
efforts employed by local county and city/town officials.  Also, Emergency Action 
Plans (EAPs) that establish notification procedures and thresholds are also prepared for 
response to potential dam related disaster events. 
Sources 
Arizona Department of Water Resources, 2020, 
http://www.azwater.gov/AzDWR/SurfaceWater/DamSafety/default.htm 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
City of Phoenix, 2020, Street Transportation Department.  
Flood Control District of Maricopa County, 1997, Storm Report, Tropical Storm Nora 
– September 1997, prepared by S. D. Waters. 
Flood Control District of Maricopa County, 2020, personal contact with Dam Safety 
Group. 
US Army Corps of Engineers, 1994, Flood Damage Report, State of Arizona, Floods 
of 1993. 
US Army Corps of Engineers, National Inventory of Dams, 2009, 
https://nid.usace.army.mil/ 
 
Profile Maps

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 204 
Maps 1A, 1B, and 1C – Dam Spillway Flood Hazard Map 
Maps 2A, 2B, and 2C – Potential Dam Failure Flood Hazard Map

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
85
rx
101
rx
303
rx
303
rx
303
rx
202
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
Potential Dam Failure Flooding Hazard Rating
High
Medium
Low
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 2A
Maricopa County
Potential Dam Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High
!(
Significant
!(
Low
![
High, Unsafe**
!.
High, Safety Deficiency**
!.
Significant, Safety Deficiency**
!.
Low, Safety Deficiency**
*Federal Rating     **ADWR Dam Safety Rating

§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
§¨¦
10
rx
88
rx
303
rx
202
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
202
rx
303
rx
202
rx
51
rx
101
rx
303
£
¤
60
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 2B
Maricopa County
Potential Dam Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High
!(
Significant
!(
Low
![
High, Unsafe**
!.
High, Safety Deficiency**
!.
Significant, Safety Deficiency**
!.
Low, Safety Deficiency**
Potential Dam Failure Flooding Hazard Rating
High
Medium
Low
*Federal Rating          **ADWR Dam Safety Rating

§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 2C
Maricopa County
Potential Dam Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
*Federal Rating     **ADWR Dam Safety Rating
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High
!(
Significant
!(
Low
![
High, Unsafe**
!.
High, Safety Deficiency**
!.
Significant, Safety Deficiency**
!.
Low, Safety Deficiency**
Potential Dam Failure Flooding Hazard Rating
High
Medium
Low

!.
!(
!(
!(!(
![
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!.
!(
#*
§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
85
rx
101
rx
303
rx
303
rx
303
rx
202
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
Emergency Spillway
Inundation
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 1A
Maricopa County
Emergency Spillway
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
NOTE: Emergency spillway inundation mapping has not been
produced for the all dams impacting the county and the hazard 
zones depicted are not comprehensive
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High*
!(
Significant*
!(
Low*
!.
High*, Safety Deficiency**
![
High*, Unsafe**
!.
Significant*, Safety Deficiency**
!.
Low*, Safety Deficiency**
*Federal Rating     **ADWR Dam Safety Rating

!.
!(
!(
!(
!( !(
!(!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!.
!(
!(
!(
!(
!(
!(
!(
#*
#*
#*
#*
#*
#*
#*
#*#*#*
#*
#*
§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
88
rx
303
rx
74
rx
202
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
303
rx
101
rx
303
rx
202
rx
303
rx
202
rx
51
£
¤
60
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 1B
Maricopa County
Emergency Spillway
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
NOTE: Emergency spillway inundation mapping has not been
produced for the all dams impacting the county and the hazard 
zones depicted are not comprehensive
Emergency Spillway
Inundation
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High*
!(
Significant*
!(
Low*
!.
High*, Safety Deficiency**
![
High*, Unsafe**
!.
Significant*, Safety Deficiency**
!.
Low*, Safety Deficiency**
*Federal Rating     **ADWR Dam Safety Rating

!(
!(
#*
§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 1C
Maricopa County
Emergency Spillway
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Sources: JE Fuller 2020; NID 2020; 
FCDMC 2020; ADWR 2020; TIGER 2020
NOTE: Emergency spillway inundation mapping has not been
produced for the all dams impacting the county and the hazard 
zones depicted are not comprehensive
Emergency Spillway
Inundation
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Federal Dams
#*
High*
#*
Significant*
#*
Low*
Arizona Jurisdictional Dams
!(
High*
!(
Significant*
!(
Low*
!.
High*, Safety Deficiency**
![
High*, Unsafe**; 
!.
Significant*, Safety Deficiency**
!.
Low*, Safety Deficiency**
*Federal Rating     **ADWR Dam Safety Rating

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 205 
5.3.2 Drought 
Description 
Drought is a normal part of virtually every climate on the planet, including areas 
of high and low rainfall. It is different from normal aridity, which is a permanent 
characteristic of the climate in areas of low rainfall.  Drought is the result of a natural 
decline in the expected precipitation over an extended period of time, typically one or 
more seasons in length. The severity of drought can be aggravated by other climatic 
factors, such as prolonged high winds and low relative humidity (FEMA, 1997). 
Drought is a complex natural hazard which is reflected in the following four 
definitions commonly used to describe it:  
• Meteorological – drought is defined solely on the degree of dryness, expressed as 
a departure of actual precipitation from an expected average or normal amount 
based on monthly, seasonal, or annual time scales. 
• Hydrological – drought is related to the effects of precipitation shortfalls on stream 
flows and reservoir, lake, and groundwater levels. 
• Agricultural – drought is defined principally in terms of naturally occurring soil 
moisture deficiencies relative to water demands of plant life, usually arid crops. 
• Socioeconomic – drought associates the supply and demand of economic goods or 
services with elements of meteorological, hydrologic, and agricultural drought. 
Socioeconomic drought occurs when the demand for water exceeds the supply as a 
result of weather-related supply shortfall.  It may also be called a water 
management drought. 
A drought’s severity depends on numerous factors, including duration, 
intensity, and geographic extent as well as regional water supply demands by humans 
and vegetation. Due to its multi-dimensional nature, drought is difficult to define in 
exact terms and also poses difficulties in terms of comprehensive risk assessments. 
Drought differs from other natural hazards in three ways.  First, the onset and 
end of a drought are difficult to determine due to the slow accumulation and lingering 
effects of an event after its apparent end.  Second, the lack of an exact and universally 
accepted definition adds to the confusion of its existence and severity.  Third, in 
contrast with other natural hazards, the impact of drought is less obvious and may be 
spread over a larger geographic area and longer timeframes. These characteristics have 
hindered the preparation of drought contingency or mitigation plans by many 
governments.  
Droughts may cause a shortage of water for human and industrial consumption, 
hydroelectric power, recreation, and navigation.  Water quality may also decline and 
the number and severity of wildfires may increase.  Severe droughts may result in the 
loss of agricultural crops and forest products, undernourished wildlife and livestock, 
lower land values, and higher unemployment.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 206 
History 
Beginning in June 199930, Arizona has been under a continuous Gubernatorial 
declared drought emergency for 31 years.  Over the past plan cycle (2015-2020), 
Maricopa County has been included as a primary county in USDA Secretarial drought 
disaster declarations for crop years 2015, 2018, 2019 and 2020.  Figures 5-1 and 5-2 
depict the most recent precipitation data from NCDC regarding average statewide 
precipitation variances from normal.  Between 1849 and 1905, the most prolonged 
period of drought conditions in 300 years occurred in Arizona (NOAA, 2003).  Another 
prolonged drought occurred during the period of 1941 to 1965, during which time there 
were no spill releases into the Salt River (ADEM, 2001). The period from 1979-1983 
appears to have been anomalously wet, while the rest of the historical records shows 
that dry conditions are most likely the normal condition for Arizona.  Between 1998 
and 2018, there have been significantly more months with below normal precipitation 
than months with above normal precipitation, and definite indications of a deficit trend 
in precipitation. 
 
Source:  http://cefa.dri.edu/Westmap/Westmap_home.php 
 
Figure 5-1:  Average annual precipitation variance from a normal based on 1895-2018 
period for Maricopa County 
 
 
30 Via the current declaration, PCA 99006, issued by the Governor in June 1999 and continued by Executive Order 2007-10. 
-6
-4
-2
0
2
4
6
8
10
12
14
1896
1900
1904
1908
1912
1916
1920
1924
1928
1932
1936
1940
1944
1948
1952
1956
1960
1964
1968
1972
1976
1980
1984
1988
1992
1996
2000
2004
2008
2012
2016
PRECIPITATION, INCHES
YEAR
Maricopa County Precipitation Departure from Normal - 1895 to 2018

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 207 
 
Source:  http://cefa.dri.edu/Westmap/Westmap_home.php 
 
Figure 5-2:  Annual historic precipitation for Maricopa County from 1896 to 2017 
 
Maricopa County remains in a drought cycle that began in 1995.  Drought 
conditions gradually worsened until 2003, with a brief period of relief occurring during 
the period of winter 2004 to spring 2005.  After that there have been only 3-years of 
above average precipitation; 2007, 2010, and 2015.  Other noteworthy dates include 
1951 and 1991, which are the only two times in the Salt River Project's 100-year history 
that it has rationed water. 
 Compared to some areas of the state, Maricopa County and its surrounding 
communities are less affected by drought due to the availability of water supplies from 
the Central Arizona Project (CAP), the Salt River Project (SRP), significant 
investments in recharge systems, and ground water sources (Jacobs and Morehouse, 
June 11-13, 2003).  However, according to the Arizona Department of Water 
Resources’ Drought Dashboard illustrated in Figure 5-3, Maricopa County has 
experienced varying degrees of drought, with recent conditions worsening due to a lack 
of summer monsoon activity.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 208 
 
Source: https://new.azwater.gov/drought/drought-dashboard  
Figure 5-3:  Drought in Maricopa County from 2000 to 2020 
 
Probability and Magnitude 
There are no commonly accepted return period or non-exceedance probability 
for defining the risk from drought (such as the 100-year or 1 percent annual chance of 
flood).  The magnitude of drought is usually measured in time and the severity of the 
hydrologic deficit. There are several resources available to evaluate drought status and 
project very near future expected conditions. 
The National Integrated Drought Information System (NIDIS) Act of 2006 
(Public Law 109-430) prescribes an interagency approach for drought monitoring, 
forecasting, and early warning (NIDIS, 2007). The NIDIS maintains the U.S. Drought 
Portal31 which is a centralized, web-based access point to several drought related 
resources including the U.S. Drought Monitor (USDM) and the U.S. Seasonal Drought 
Outlook (USSDO). The USDM, shown in Figure 5-4, is a weekly map depicting the 
current status of drought and is developed and maintained by the National Drought 
Mitigation Center. The USSDO, shown in Figure 5-5, is a six month projection of 
potential drought conditions developed by the National Weather Service’s Climate 
Prediction Center. The primary indicators for these maps for the Western U.S. are the 
Palmer Hydrologic Drought Index and the 60-month Palmer Z-index.  The Palmer 
Drought Severity Index (PSDI) is a commonly used index that measures the severity 
of drought for agriculture and water resource management.  It is calculated from 
observed temperature and precipitation values and estimates soil moisture.  However, 
the Palmer Index is not considered to be consistent enough to characterize the risk of 
 
31 NIDIS U.S. Drought Portal website is located at:  http://www.drought.gov/portal/server.pt/community/drought.gov/202

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 209 
drought on a nationwide basis (FEMA, 1997) and neither of the Palmer indices is well 
suited to the dry, mountainous western United States. 
In 2003, Governor Janet Napolitano created the Arizona Drought Task Force 
(ADTF), led by ADWR, which developed a statewide drought plan. The plan includes 
criteria for determining both short and long-term drought status for each of the 15 major 
watersheds in the state using assessments that are based on precipitation and stream 
flow. The plan also provides the framework for an interagency group which reports to 
the governor on drought status, in addition to local drought impact groups in each 
county and the State Drought Monitoring Technical Committee. Twice a year this 
interagency group reports to the governor on the drought status and the potential need 
for drought declarations.  The counties use the monthly drought status reports to 
implement drought actions within their drought plans. The State Drought Monitoring 
Technical Committee uses a combination of the Standardized Precipitation Index (SPI) 
and streamflow records for the long-term drought status.  Figure 5-6 presents the most 
current long term maps available as of the writing of this plan. 
Each of the three maps show general agreement and indicate that the majority 
of Maricopa County currently remains in a drought condition with abnormally dry 
conditions and expected worsening over the next six months. 
 
 
 
Source:  http://droughtmonitor.unl.edu/data/pngs/current/current_az_trd.png 
 
Figure 5-4:  U.S. Drought Monitor Map for November 10, 2020

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 210 
 
 
         Source:  http://www.cpc.ncep.noaa.gov/products/expert_assessment/sdo_summary.html 
 
Figure 5-5:  U.S. Seasonal Drought Outlook, October 2020 to January 2021 
 
When attempting to evaluate the probability and magnitude of drought in 
Maricopa County, it is helpful to remember that potable water in Maricopa County is 
derived from both surface water and groundwater.  Surface water to Maricopa County 
users comes from two sources, the Colorado River, (through the Central Arizona 
Project (CAP) Canal), and in-state rivers (including streams and lakes). This surface 
water is a major renewable resource for the county, but can vary dramatically between 
years, seasons, and locations due to the state’s desert climate.  In order to lessen the 
impact of such variations, water storage reservoirs and delivery systems have been 
constructed throughout the county, the largest of which are located on the Salt River, 
Verde River, Gila River, and Agua Fria River. 
The other major source of water for Maricopa County is groundwater. This 
water has been pumped out of large subsurface natural reservoirs known as aquifers.  
While a significant supply of water remains stored in the aquifers, groundwater has 
historically been pumped out much more rapidly than it can be replenished through 
natural recharge, and has led to a condition known as overdraft.  In 1980, Arizona 
implemented the Groundwater Management Code in order to promote conservation and 
long-range planning of water resources, including reducing reliance on groundwater 
supplies.  Active Management Areas (AMAs) were formed based on groundwater basin 
areas and Maricopa County is mostly covered under the Phoenix AMA.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 211 
 
Source:  https://new.azwater.gov/drought/drought-status 
 
Figure 5-6:  Arizona long term drought status map for July September 2020

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 212 
Reclaimed water, or effluent, is the only increasing source of water in the 
county, although it constitutes only a small amount of the overall water used.  As the 
regional population grows; increasing amounts of reclaimed water will be available for 
agricultural, golf course, and landscape irrigation, as well as industrial cooling, and 
maintenance of wildlife areas.  
Climate Change Impacts 
Increased severity and duration of drought due to climate change is one of the 
“Key Messages” of the NCA report (Garfin, et.al., 2014).  If current predictions are 
valid, the increase in drought will only magnify the current drought related challenges 
faced by the county.  Accordingly, drought planning and contingencies for mitigating 
the impacts of drought should factor in longer than expected durations and possibly 
more frequent drought cycles. 
Vulnerability – CPRI Results 
Drought CPRI results for each community are summarized in Table 5-16 below. 
Table 5-16:  CPRI results by jurisdiction for drought 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Buckeye 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Carefree 
Highly Likely 
Limited 
12-24 hours 
>1 week 
2.95 
Cave Creek 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Chandler 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
El Mirage 
Highly Likely 
Critical 
>24 hours 
>1 week 
3.25 
Fort McDowell Yavapai Nation 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Fountain Hills 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Gila Bend 
Unlikely 
Negligible 
<6 hours 
>1 week 
1.75 
Gilbert 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Glendale 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Goodyear 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Guadalupe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Litchfield Park 
Possibly 
Negligible 
>24 hours 
>1 week 
1.75 
Unincorporated Maricopa County 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Mesa 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Paradise Valley 
Likely 
Limited 
>24 hours 
<1 week 
2.40 
Peoria 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Phoenix 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Queen Creek 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Salt River Pima-Maricopa Indian 
Community 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Scottsdale 
Likely 
Negligible 
>24 hours 
>1 week 
2.20 
Surprise 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Tempe 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Tolleson 
Likely 
Critical 
>24 hours 
>1 week 
2.80 
Wickenburg 
Highly Likely 
Critical 
>24 hours 
>1 week 
3.25 
Youngtown 
Likely 
Critical 
>24 hours 
>1 week 
2.80 
County-wide average CPRI = 
2.54 
 
Vulnerability – Loss/Exposure Estimations 
No standardized methodology exists for estimating losses due to drought and 
drought does not generally have a direct impact on critical and non-critical facilities 
and building stock.  A direct correlation to loss of human life due to drought is

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 213 
improbable for Maricopa County.  Instead, drought vulnerability is primarily measured 
by its potential impact to certain sectors of the county economy and natural resources 
include the following:  
• Crop and livestock agriculture  
• Municipal and industrial water supply 
• Recreation/tourism 
• Wildlife and wildlife habitat 
Sustained drought conditions will also have secondary impacts to other hazards 
such as fissures, flooding, subsidence and wildfire.  Extended drought may weaken and 
dry the grasses, shrubs, and trees of wildfire areas, making them more susceptible to 
ignition.  Drought also tends to reduce the vegetative cover in watersheds, and hence 
decrease the interception of rainfall and increase the flooding hazard.  Subsidence and 
fissure conditions are aggravated when lean surface water supplies force the pumping 
of more groundwater to supply the demand without the benefit of recharge from normal 
rainfall. 
From 1995 to 2020, Maricopa County farmers and ranchers received over $20.8 
million in disaster related assistance funding from the U.S Department of Agriculture 
(USDA) for crop and livestock damages32. Over $8.7 million of those funds were 
received from 1999 to 2003, which corresponds to the most severe period of the current 
drought cycle.  According to the USDA, 35 to 55 percent of the disaster assistance 
money (USDA, 2004) in the last 10 years (1994-2004) can be attributed to drought 
related losses.  Accordingly, at least $5 to $8 million of these losses are likely drought 
related and $4 to $5 million occurred in the span of 4 years.  It is therefore realistic to 
expect at least $1 to $2 million in agriculture related drought losses in a given year of 
severe drought conditions.  Other direct costs such as increased pumping costs due to 
lowering of groundwater levels, and costs to expand water infrastructure to compensate 
for reduced yields or to develop alternative water sources, are a significant factor but 
very difficult estimate due to a lack of documentation.  There are also the intangible 
costs associated with lost tourism revenues and impacts to wildlife habitat and animals.  
Typically, these impacts are translated into the general economy in the form of higher 
food and agricultural goods prices and increase utility costs. 
Vulnerability – Development Trends 
Population growth in Maricopa County will also require additional water to 
meet the thirsty demands of potable, landscape, and industrial uses.  All new residential, 
commercial, and/or industrial developments within the county that are comprised of six 
or more parcels and at least one parcel less than 36 acres in size, are required to 
demonstrate an Assured and Adequate Water Supply, as administered by ADWR.  All 
water service providers operating within the Phoenix AMA are required to comply with 
 
32 EWG Farm Subsidy Database, 2020, http://farm.ewg.org/progdetail.php?fips=04013&progcode=total_dis

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 214 
this requirement.  The ADTF is also working cooperatively with water providers within 
the state to develop System Water Plans that are comprised of three components:  
• Water Supply Plan – describes the service area, transmission facilities, 
monthly system production data, historic demand for the past five years, 
and projected demands for the next five, 10 and 20 years.  
• Drought Preparedness Plan – includes drought and emergency response 
strategies, a plan of action to respond to water shortage conditions, and 
provisions to educate and inform the public.  
• Water Conservation Plan – addresses measures to control lost and 
unaccounted for water, considers water rate structures that encourage 
efficient use of water, and plans for public information and education 
programs on water conservation. 
The combination of these requirements will work to ensure that future 
development in Maricopa County will address and/or recognize drought. 
 
Changes in Development in the Hazard Prone Area 
Maricopa County and most incorporated jurisdictions within the planning area 
have experienced moderate to high growth rates over the past 5 years with annual 
growth rates ranging from 0.75% to 6.47%. It is anticipated that growth will continue 
over the next 5 years.  Some development is converting agricultural land uses to 
residential/commercial/industrial uses and in some cases, the water rights are 
transferred to the water provider serving that development. Growth in non-agricultural 
areas will likely require additional surface and ground water supplies. The anticipated 
development and conversion of agricultural lands versus non-agricultural lands is about 
60% and 40% countywide. As growth occurs, drought vulnerability would likely be 
impacted as potable water demand faces dwindling supply sources exacerbated by 
drought.   
Sources 
Arizona Department of Water Resources, 2020, https://new.azwater.gov/drought 
Arizona Department of Water Resources, 2019, 2019 Arizona Drought Preparedness 
Annual Report 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
Environmental Working Group, 2020 Farm Subsidy Database accessed at:  
http://farm.ewg.org/progdetail.php?fips=04013&progcode=total_dis 
Federal Emergency Management Agency,1997, Multi-Hazard Identification and Risk 
Assessment – A Cornerstone of the National Mitigation Strategy. 
Jacobs, Katharine and Morehouse, Barbara. June 11-13, 2003. “Improved Drought 
Planning for Arizona,” from Conference on Water, Climate, and Uncertainty: 
Implications for Western Water Law, Policy and Management

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 215 
http://www.water.az.gov/gdtf/content/files/06262003/Improved_Drought_Plannin
g_for_AZ_6-17.pdf 
National Integrated Drought Information System, 2015, National Integrated Drought 
Information System Implementation Plan, NOAA. 
U.S. Department of Agriculture, 2020, http://www.fsa.usda.gov/programs-and-
services/disaster-assistance-program/index 
 
Profile Maps 
No profile maps are provided.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 216 
5.3.3 Extreme Heat 
Description 
Extreme Heat refers to environmental conditions with high air temperatures, 
often in combination with high shortwave or longwave radiation (sunlight, or heat 
radiated from buildings and other surfaces) and/or high humidity. Under certain 
conditions, low or high wind speeds can also increase the risks associated with high 
heat (Kuras, et.al., 2017; Parsons, 2014). Extreme heat poses threats to the health and 
well-being of humans, other animals, and plants, as well as critical infrastructure 
systems including food, water, energy, and transportation. The major human health 
risks associated with extreme heat are as follows: 
• Heat Cramps: May occur in people unaccustomed to exercising in the heat 
and generally ceases to be a problem after acclimatization.  
• Heat Syncope: This refers to sudden loss of consciousness and is typically 
associated with people exercising who are not acclimated to warm 
temperatures.  Causes little or no harm to the individual. 
• Heat Exhaustion: While much less serious than heatstroke, heat exhaustion 
victims may complain of dizziness, weakness, or fatigue. Body 
temperatures may be normal or slightly to moderately elevated. The 
prognosis is usually good with fluid treatment. 
• Heatstroke: Considered a medical emergency, heatstroke is often fatal.  It 
occurs when the body’s responses to heat stress are insufficient to prevent 
a substantial rise in the body’s core temperature. While no standard 
diagnosis exists, a medical heatstroke condition is usually diagnosed when 
the body’s temperature exceeds 105°F due to environmental temperatures.  
Rapid cooling is necessary to prevent death, with an average fatality rate of 
15 percent even with treatment. 
History 
Maricopa County faces the highest summer temperatures of any major 
urbanized area in the United States. The average daily high temperature in the months 
of June, July, and August exceeds 100°F at Phoenix Sky Harbor Airport, based on 
official U.S. Climate Normals for the period 1981–2010. Both daytime and nighttime 
temperatures have steadily increased in urbanized portions Maricopa County since the 
1950s. Days with temperatures of 100°F or above have increased at a rate of 5.2 days 
per decade; nights with temperatures of 85°F or above have increased at a rate of 7.3 
days per decade (Figure 5-7) (Hondula, 2020).  
Heat exerts a considerable public health burden in Maricopa County. For the 
period of 2006–2020, there were more than 1,700 confirmed deaths attributed to 
excessive natural heat in Maricopa County (MCDPH, 2020) (Figure 5-8a). The number 
of heat-associated deaths reported by the Maricopa County Department of Public 
Health (MCDPH) has increased each year since 2014. The more than 250 deaths 
reported in 2020 marked the highest annual total since the county began its heat 
surveillance program in 2006. The vast majority of heat-associated deaths (85%) occur

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 217 
during the hot summer months of June, July and August, with another 13% of cases in 
the months of May, September, and October. Extreme heat also leads to increases in 
illnesses that require hospitalizations, emergency department visits, and other medical 
treatment. Figure 5-8b illustrates the contribution of heat-related emergency room 
visits to the total emergency room case load in summer 2020; during extreme heat 
events, heat-related cases can account for more than 1% of total visits. 
Probability/Magnitude 
During Arizona's hottest months, the NOAA/National Weather Service (NWS) 
issues weather alerts to notify the public when unusually hot weather is expected. These 
alerts are intended to raise awareness and prevent heat illness and death from occurring 
and mitigate financial impacts. When the NWS issues an alert, it should serve as a 
signal that on that day it is not "business as usual."  
 
 
Figure 5-7:  Progression of days with maximum temperature over 100°F and minimum 
temperature over 85°F for Phoenix Sky Harbor from 1950 to 2020

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 218 
 
Figure 5-8a:  Total heat-associated deaths recorded by the Maricopa County 
Department of Public Health heat surveillance system, 2006–2020 
 
 
 
 
Figure 5-8b:  Daily emergency room visits as a percent of all visits by day during the 
2020 heat season for Maricopa County 
 
Research from the Centers for Disease Control and Prevention (CDC) and 
academic institutions shows that heat-associated deaths in Arizona can occur with 
temperatures in the mid-80s and hotter, with heat-related illnesses beginning to occur 
at even lower temperatures (Petitti et al. 2016; Vaidyanathan et al. 2019). Research also 
Note: Bars are shaded by NWS HeatRisk category (determined from the official station at Phoenix Sky Harbor Airport, see description 
in next session). Stars indicate days when NWS issued an Excessive Heat Warning. 
Note: 2020 data are preliminary as of 
the time of this publication with 
expected cases expected to be added 
upon final medical examiner review.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 219 
shows that our bodies have a greater ability to tolerate heat as the summer wears on. 
For example, a temperature of 105°F in May, may seem hot and lead to elevated cases 
of illness and death, whereas the same temperature in June or July will not seem as hot 
and may not have the same public health consequences, because our bodies have 
acclimated to the heat. Hence, local forecasters do not use one single, constant 
temperature used to determine when an alert will be issued. Instead, the NWS HeatRisk 
product (https://www.wrh.noaa.gov/wrh/heatrisk/) is leveraged to identify unusually 
hot days for a given time of year. It is noted that other metrics are available and may 
be commonly used by the public or in specific sectors (e.g. heat index, wet bulb globe 
temperature) though they are not used in the alerting process for Maricopa County by 
NWS. 
When "High" or "Very High" HeatRisk conditions are forecast, an Excessive 
Heat Watch (EHA) or Excessive Heat Warning (EHW) will be issued. Both alerts are 
a way to give public and emergency officials a "heads up" that extreme temperatures 
are expected. An EHA conveys a moderate (50%) confidence that excessive heat will 
occur. If confidence increases to a high (80%+) level, an EHW is issued (or an existing 
EHA is upgraded to an EHW). Alerts are issued by "forecast zones," geographical areas 
of which 20 cover some portion of Maricopa County. A map is available at 
https://www.weather.gov/psr/Phoenix_CWA_Zones. (Note that the nine zones that 
cover most of the Phoenix metro area are generally treated as one for issuing heat 
watches and warnings.) The typical "lead time" (number of days prior to the weather 
event) for heat alerts is three to five days. Once an alert is issued, it will continue until 
conditions abate. Figure 5-8b (above) and Figure 5-8c (below) show that the 
“HeatRisk” product and EHWs were both strongly correlated with emergency room 
visits during the historic record-breaking 2020 heat season, with Extreme HeatRisk 
days having about 10 times greater visits than Low HeatRisk days. In addition, heat 
impacts occurred on nearly every day from April to September in 2020, including for 
Low and Medium HeatRisk conditions that fall below EHW criteria. Additional 
information is available from the NWS at https://www.weather.gov/psr/HeatSafety. 
 
Figure 5-8c:  Average percent of emergency room visits in Maricopa County (April-
September 2020) due to heat-related illness by HeatRisk category

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 220 
Over the period 2008–2020, Excessive Heat Warnings (EHW) were in effect 
for a total of 263 days (average of 20.2 days per year). The probability of an Excessive 
Heat Warning being in effect on any given day over that time period varied by month 
as follows: 
• April: 1.3% (5 EHW days) 
• May: 3.2% (13 EHW days) 
• June: 19.0% (74 EHW days) 
• July: 17.1% (69 EHW days) 
• August: 22.3% (90 EHW days) 
• September: 3.1% (12 EHW days) 
No Excessive Heat Warnings have been issued outside of the months April–
September in the previous 13 years in Maricopa County.  
It is noted that Carefree, Cave Creek, Fountain Hills, and Wickenburg, and the 
northern extents of Phoenix, Peoria, and Scottsdale, are all located at higher elevations 
than the rest of the Plan jurisdictions.  Accordingly, average maximum temperatures 
for these jurisdictions tend to be 2-5 °F less than their neighboring communities, with 
average maximum summertime temperatures that range from 100 to 105 °F.  Extreme 
maximums for these communities occasionally push higher into the 110 to 115 °F 
range, but with less frequency than the other Plan jurisdictions. Overnight low 
temperatures outside of the urban area can be significantly cooler (5-15 °F), even 
during heat events. 
Climate Change Impacts 
Increased temperatures and durations associated with extreme heat events due 
to climate change is one of the “Key Messages” of the NCA report (Garfin, et al., 2014). 
More severe heat is projected for hot summer days in Arizona in climate model 
simulations that account for lower and higher amounts of future greenhouse gas 
emissions (Figure 5-9a). Additional warming is expected because of continued 
urbanization (Georgescu et al., 2014).  Figures 5-9b and 5-9c show respective plots of 
the number days the Phoenix temperatures have exceeded 100°F and 110°F, in contrast 
to the projected temperatures from climate change models (NWS, 2020).  Red dots 
represent the number of days by year as observed at the NWS official climate station 
for Phoenix (Sky Harbor Airport), whereas pink bars represent the given decadal 
average. The gray (black) bars represent the decadal average number of days with high 
temperatures at-or-above 100 °F in Phoenix, AZ from nineteen CMIP5 climate model 
projections for the intermediate emission scenario RCP4.5 (high emission scenario 
RCP8.5). Vertical orange lines represent the 10th to 90th percentile range of values.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 221 
 
Figure 5-9a:  Projected temperature changes for Arizona based on varied future 
greenhouse gas emission assumptions  
 
 
Figure 5-9b:  Past and projected number of days in a year with high temperatures in 
Phoenix, AZ at-or-above 100 °F

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 222 
 
Figure 5-9c:  Past and projected number of days in a year with high temperatures in 
Phoenix, AZ at-or-above 110 °F  
 
If current projections are realized, the increase in both temperature and 
durations of extreme heat days within the urbanized areas of the county will magnify 
the current extreme heat related challenges faced by the county and participating 
jurisdictions.  Extreme heat mitigation measures should probably consider that 
durations of events will be longer, and the overall duration of hot summer temperatures 
is anticipated to lengthen as well. 
 
Vulnerability – CPRI Results 
Extreme Heat CPRI results for each community are summarized in Table 5-17 
below. 
Table 5-17:  CPRI results by jurisdiction for extreme heat 
Participating 
Jurisdiction 
Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Likely 
Critical 
> 24 hours 
> 1 week 
2.80 
Buckeye 
Highly Likely 
Limited 
> 24 hours 
> 1 week 
2.95 
Carefree 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15 
Cave Creek 
Highly Likely 
Limited 
> 24 hours 
< 1 week 
2.85 
Chandler 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15 
El Mirage 
Highly Likely 
Critical 
> 24 hours 
> 1 week 
3.25 
Fort McDowell Yavapai Nation 
Likely 
Limited 
> 24 hours 
> 1 week 
2.50 
Fountain Hills 
Likely 
Limited 
> 24 hours 
< 1 week 
2.40 
Gila Bend 
Likely 
Limited 
> 24 hours 
> 1 week 
2.50 
Gilbert 
Highly Likely 
Limited 
> 24 hours 
< 1 week 
2.85 
Glendale 
Highly Likely 
Critical 
> 24 hours 
> 1 week 
3.25 
Goodyear 
Highly Likely 
Limited 
> 24 hours 
< 1 week 
2.85 
Guadalupe 
Highly Likely 
Limited 
> 24 hours 
> 1 week 
2.95 
Litchfield Park 
Highly Likely 
Limited 
> 24 hours 
> 1 week 
2.95 
Unincorporated Maricopa County 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 223 
Table 5-17:  CPRI results by jurisdiction for extreme heat 
Participating 
Jurisdiction 
Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Mesa 
Likely 
Critical 
> 24 hours 
< 1 week 
2.70 
Paradise Valley 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15 
Peoria 
Highly Likely 
Critical 
> 24 hours 
> 1 week 
3.25 
Phoenix 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15 
Queen Creek 
Likely 
Limited 
> 24 hours 
< 1 week 
2.40 
Salt River Pima-Maricopa Indian 
Community 
Highly Likely 
Limited 
> 24 hours 
> 1 week 
2.95 
Scottsdale 
Likely 
Limited 
> 24 hours 
< 1 week 
2.40 
Surprise 
Likely 
Critical 
> 24 hours 
< 1 week 
2.70 
Tempe 
Highly Likely 
Limited 
> 24 hours 
> 1 week 
2.95 
Tolleson 
Highly Likely 
Critical 
> 24 hours 
> 1 week 
3.25 
Wickenburg 
Highly Likely 
Critical 
> 24 hours 
< 1 week 
3.15 
Youngtown 
Highly Likely 
Critical 
> 24 hours 
> 1 week 
3.25 
County-wide average CPRI = 
2.92 
 
 
Vulnerability – Heat Vulnerability Index Assessment 
Risk assessment for extreme heat for each jurisdiction requires attention to the 
social and environmental variables that interactively lead to higher vulnerability for 
certain populations. Researchers often quantitatively represent vulnerability using 
indices derived from large-scale data sets. A heat vulnerability index (HVI) used by 
academic researchers (Reid, et.al., 2009; Harlan, et.al., 2013) has been calculated for 
all census tracts in Maricopa County (Figures 5-10a and 5-10b). Based on the HVI, 
approximately 25% of Maricopa County residents (nearly 1,200,000 people) live in 
census tracts classified as highly or very highly heat vulnerable. The percentage of 
residents living in vulnerable areas varies highly from jurisdiction to jurisdiction. Based 
on the most recently available social and environmental data, 100% of the residents of 
Guadalupe, the Salt River Pima-Maricopa Indian Community, and Wickenburg, all live 
in census tracts classified as highly or very highly heat vulnerable. Cave Creek, 
Phoenix, Youngtown, and Unincorporated portions of Maricopa County also have 
disproportionately higher percentages of residents living in heat vulnerable areas. 
Twenty-one (21) jurisdictions included in this plan have at least some residents living 
in census tracts classified as highly heat vulnerable. Importantly, measures of heat 
vulnerability are only estimates of where impacts are most likely to occur; residents to 
live outside of the most vulnerable areas are still subject to risk and adverse outcomes 
if exposed to heat without effective protective measures. Vulnerability indices also do 
not adequately represent risks facing transient, unsheltered, and undocumented 
individuals.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 224 
 
Figure 5-10a:  High or very high heat vulnerability index exposure by community and 
percent population  
 
Figure 5-10b:  High or very high heat vulnerability index exposure by community and 
total population

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 225 
Vulnerability – Loss/Exposure Estimations 
Losses due to extreme heat primarily occur in the form of death and illness. The 
risk of heat-associated deaths and illnesses increases non-linearly as a function of 
temperature (Figure 5-11). Mean temperatures explain approximately 33% of the 
variability in the time series of daily heat-associated deaths; mean temperatures are 
more closely associated with heat-associated deaths than either daily maximum or daily 
minimum temperatures. On average, one heat-associated death is expected in Maricopa 
County on days with a mean temperature of 95°F, two deaths are expected on days with 
a mean temperature of 100°F, and more than four deaths are expected on days with a 
mean temperature of 105°F.  
Although the expected number of heat-associated deaths each day increases as 
a function of temperature, the total number of heat-associated deaths that occur in the 
county is higher for more modest temperatures than the highest temperatures, because 
days with more modest temperatures occur more frequently. A total of 374 heat-
associated deaths (20.5% of the total for 2006-2019) occurred on days with mean 
temperatures of 101°F or above. Higher totals were observed in the five-degree 
temperature intervals of 91-95°F (387, 26.0%) and 96-100°F (557, 37.4%). Thus, while 
days with the highest temperatures pose the highest risk, there is a considerable public 
health burden that accumulates across less severely hot summer days that occur more 
regularly. 
There were 1,491 heat-associated deaths recorded in Maricopa County over the 
period 2006–2019. The MCDPH operates a rigorous heat-health surveillance program 
and publishes publicly accessible annual reports identifying a wide range of risk factors 
and circumstances associated with heat-associated deaths. Over the 14-year period for 
which data are available: 
• Men have accounted for nearly 75% of all cases, dying from heat at a rate 
nearly three times higher than women 
• Almost two-thirds of heat-related deaths have an outdoor place of injury, 
and slightly more than one-third have an indoor place of injury. The vast 
majority of cases associated with an indoor place of injury are linked to air 
conditioning units that were not present, functioning, and/or operational at 
the time of death.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 226 
 
Figure 5-11:  Heat associated deaths versus daily mean temperature  
 
• At least 270 unsheltered individuals were among the heat-associated 
decedents, representing at least 18% of all cases and a significantly 
disproportionately higher risk than the sheltered population of the county   
• 86% of heat-associated decedents were residents of Maricopa County; out-
of-state visitors represent less than 10% of all cases 
• Substance abuse (drugs or alcohol) was noted in the records for at least 552 
decedents, representing at least 37% of all cases 
• The heat-associated death rate is highest for those aged 75 and above 
compared to other age groups, although the total number of heat-associated 
deaths is highest for the 50-64-year-old age group. In 2019, cases were 
approximately evenly distributed between the population aged 49 and 
younger, age 50-64, and age 65 and above.  
• African Americans and Native Americans have had the highest heat-
associated death rates. Whites, Asian/Pacific Islanders, and Hispanics have 
had the lowest heat-associated death rates; the rate for those identifying as 
Hispanic is typically the lowest of any group.  
• Compared to other jurisdictions in Maricopa County, relatively high rates 
of place-of-injury for heat-associated deaths are evident in Gila Bend, 
Tolleson, Guadalupe, Phoenix, Buckeye, and Wickenburg. Relatively high 
rates of heat-associated deaths based on decedent residence are evident in 
Tolleson, Guadalupe, Cave Creek, Glendale, and Phoenix. It is important to 
note that jurisdictional information about place of injury and/or residence

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 227 
of heat-associated decedents is not consistently available from heat 
surveillance records and calculation of heat-associated death rates is 
impractical for many jurisdictions with smaller populations and/or case 
counts. Every jurisdiction in Maricopa County except for Carefree, Salt 
River Pima-Maricopa Indian Community, and the Unincorporated portions 
of Maricopa County, is represented with at least one heat-associated death 
in the MCDPH heat surveillance records for the period 2006–2019.  
The total economic valuation of the heat-associated deaths that have occurred 
in Maricopa County since 2006 is approximately $14,000,000,000 (an average of $1 
billion per year), based on the EPA Value of Statistical Life estimate of $7.4 million in 
2006, adjusted for inflation to 2020.  
The MCDPH and Arizona Department of Health Services (ADHS) also track 
cases of heat-related illnesses that require emergency department visits and 
hospitalization. The most recent statistics from the MCDPH cover the period 2006–
2017, in which a total of 21,447 hospitalizations (emergency department and in-patient 
visits) related to heat were recorded. These hospitalizations were associated with an 
estimated $115,000,000 (nearly $10 million per year) in healthcare costs, applying 
nationally adjusted mean costs per heat-related illness hospitalization from Schmeltz et 
al. (2016). Additional healthcare costs are likely borne by residents of Maricopa County 
for medical treatment related to heat that does not result in in patient or emergency 
department visits.  
There are currently no statistical analyses for projecting heat related deaths in 
Maricopa County; however, MCDPH continues to track data and monitor the above-
mentioned trends and other factors to determine if a statistical significance exists.  
Recent history would indicate that the County may experience more than 200 heat-
related deaths annually in the coming years without enhanced risk mitigation strategies. 
Vulnerability – Development Trends 
In a metropolitan area, paved surfaces typically absorb and retain the heat of 
the day and then slowly release that heat back into the atmosphere through the night.  
When large areas are paved, the metropolitan area will develop an "urban heat island" 
effect, wherein temperatures in the center of the metropolitan area become much 
warmer than those on the outskirts of the valley due to the storage of heat during the 
day. 
The metropolitan area of Maricopa County has grown dramatically in size over 
the last several decades, transforming a significant portion of the once natural desert 
and/or agricultural farmlands, into concrete and asphalt paved streets, roofs, driveways, 
sidewalks, parking lots, and other hardscapes.  The result has been an intensification of 
the urban heat island effect and a steady increase in the nighttime low temperature (see 
Figure 5-7b above).  The impacts of this expansion include increased cooling costs for 
residential, commercial, and industrial sectors, increased evaporation from surface 
water resources, and greater demand on power resources and strains on electrical 
infrastructure.  According to a 1998 article in the Arizona Republic, the Salt River 
Project estimated that for every degree increase in temperature, the utility's then 
610,000 residential customers paid $3.2 million to $3.8 million extra per month in

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 228 
cooling costs, or about $5 to $7 per customer per month (Az Republic, 1998).  Given 
inflation since that time, the average cost increase is likely to exceed $15 today. 
Changes in Development in the Hazard Prone Area 
All of the urbanized areas within Maricopa County and participating 
jurisdictions have vulnerability to extreme heat. As development and population 
continue to grow in nearly all jurisdictions, the vulnerability of each community 
increases to this hazard.   Future development in urban areas could affect the frequency 
of extreme heat events due to the potential for increasing the urban heat island effects.  
Buildings are not usually directly impacted by extreme heat; therefore, new 
development will not necessarily increase extreme heat risk.  However, population 
growth associated with new development would raise the overall population exposure 
and potentially increase the strain on existing utility infrastructure unless sufficient 
concurrent utility expansions are made.   
The use of green design and construction methods and materials can 
significantly reduce the heat island effects. Examples may include green buildings that  
require less energy to cool, use of good insulation on pipes and electric wirings, use of 
reflective roofing materials to avoid the creation of heat sinks, and smart design of 
walkways, parking structures, pedestrian zones, and landscaping to minimize exposure 
to extreme heat may help reduce vulnerability of the built environment and the 
individuals who use it.  
Sources 
Arizona Department of Health Services, 2004, Prevention Bulletin, Volume 18, No. 
4, http://www.azdhs.gov/diro/pio/preventionbulletin/july04.pdf  
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
Federal Emergency Management Agency,1997, Multi-Hazard Identification and Risk 
Assessment – A Cornerstone of the National Mitigation Strategy. 
Georgescu, M., Morefield, P. E., Bierwagen, B. G., & Weaver, C. P. (2014). Urban 
adaptation can roll back warming of emerging megapolitan regions. Proceedings 
of the National Academy of Sciences, 111(8), 2909-2914. 
Harlan, S. L., Declet-Barreto, J. H., Stefanov, W. L., & Petitti, D. B. (2013). 
Neighborhood effects on heat deaths: social and environmental predictors of 
vulnerability in Maricopa County, Arizona. Environmental health perspectives, 
121(2), 197-204. 
Hondula, D.M., (2020).  Extreme Heat section statistics and edits. ASU Urban 
Climate Research Center with underlying data are from NOAA/NWS. 
Kuras, E. R., Richardson, M. B., Calkins, M. M., Ebi, K. L., Hess, J. J., Kintziger, K. 
W., ... & Uejio, C. K. (2017). Opportunities and challenges for personal heat 
exposure research. Environmental Health Perspectives, 125(8), 085001.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 229 
Maricopa County Department of Public Health, Division of Disease Control, Office 
of Epidemiology and Data Services, 2019, Heat-Associated Deaths In Maricopa 
County, AZ Final Report for 2019  
National Weather Service, Warning and Forecast Office – Phoenix, AZ, 2020.  NWS 
Phoenix (weather.gov)  
Parsons, K. (2014). Human thermal environments: the effects of hot, moderate, and 
cold environments on human health, comfort, and performance. CRC press. 
Petitti, D. B., Hondula, D. M., Yang, S., Harlan, S. L., & Chowell, G. (2016). 
Multiple trigger points for quantifying heat-health impacts: new evidence from a 
hot climate. Environmental health perspectives, 124(2), 176-183. 
Reid, C. E., O’neill, M. S., Gronlund, C. J., Brines, S. J., Brown, D. G., Diez-Roux, 
A. V., & Schwartz, J. (2009). Mapping community determinants of heat 
vulnerability. Environmental health perspectives, 117(11), 1730-1736. 
Schmeltz, M. T., Petkova, E. P., & Gamble, J. L. (2016). Economic Burden of 
Hospitalizations for Heat-Related Illnesses in the United States, 2001-2010. 
International journal of environmental research and public health, 13(9), 894. 
https://doi.org/10.3390/ijerph13090894  
Vaidyanathan, A., Saha, S., Vicedo-Cabrera, A. M., Gasparrini, A., Abdurehman, N., 
Jordan, R., ... & Elixhauser, A. (2019). Assessment of extreme heat and 
hospitalizations to inform early warning systems. Proceedings of the National 
Academy of Sciences, 116(12), 5420-5427. 
 
Profile Maps 
No profile maps are provided.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 230 
5.3.4 Fissure 
Description 
Earth fissures are linear cracks, seams, or separations in the ground that extend 
from the groundwater table and are caused by tensional forces related to differential 
land subsidence.  In many cases, fissures form as a direct result of subsidence caused 
by groundwater depletion. The surface expression of fissures ranges from less than a 
yard to several miles long and from less than an inch to tens of feet wide.  The longest 
fissure is in Pinal County, near Picacho, and is over 10 miles long.  Earth fissures occur 
at the edges of basins, usually parallel to mountain fronts, or above local bedrock highs 
in the subsurface, and typically cut across natural drainage patterns.  Fissures can alter 
flood patterns, break buried pipes and lines, cause infrastructure to collapse, provide a 
direct conduit to the groundwater table for contaminants, and even pose a life safety 
hazard for both humans and animals.  
History 
In Arizona, fissures were first noted near Picacho in 1927. The number of 
fissures has increased dramatically since the 1950s because of groundwater depletion, 
first because of agriculture, and later because of exponential population growth.  The 
risk posed by fissures is also increasing as the population expands into the outlying 
basin edges and mountain fronts.  Several fissure case histories for the Maricopa 
County area are summarized below. 
• San Tan Mountains, Maricopa and Pinal Counties 
o Foothills—undermining at least one home, and crossing several roads; 
dogs trapped in flash flood flowing through the fissure in 2007 
o Y-crack—crosses the Hunt Highway and San Tan Boulevard east of 
Sossaman Road; present at least by 1969; catastrophically re-opened 
from 195th Street and Happy Road to San Tan in 2005 and again in 
2007, damaging roads, corrals, fences, driveways, stranding and 
trapping vehicles, and killing a horse 
• Apache Junction/East Mesa, Maricopa County 
o Baseline and Meridian—fissure crosses diagonally under the 
intersection, fissure zone over one mile long 
o Ironwood and Guadalupe—industrial facilities built on top of several 
fissures in the area; fissures stop immediately east of subdivision; 
fissures crossing powerlines 
• Mesa, Maricopa County 
o Loop 202 (Red Mountain Freeway)—fissure present at least since 
1970s; attempted mitigation during construction cost $200,000 
o Sossaman Road and University Drive—fissure runs diagonally through 
a subdivision along the entrance; fissure known in 1973 and 
subsequently backfilled

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 231 
• Wintersburg, Maricopa County 
o Fissure runs perpendicular to power transmission lines near Palo Verde 
Nuclear Generating Station; made one road impassable 
• Scottsdale, Maricopa County 
o CAP Canal—fissure paralleling the canal opened within a few feet of 
the lining on the east side in 2003 
o 40th St and Cholla—discovered in 1980s 
• Flood retarding structures, Maricopa and Pinal Counties 
o McMicken Dam, White Tank Mountains—dam had to be removed and 
replaced; cost several million dollars 
o Powerline FRS, Apache Junction—fissure just discovered within 1200 
feet of the FRS; Flood Control District examining mitigation options 
Probability/Magnitude 
There are no methods of quantifiably predicting the probability and magnitude 
of earth fissures.  The locations of potential fissures or extension of existing fissures 
may be predictable in specific areas if enough information about the subsurface 
material properties and groundwater levels are available.  It is a fair assurance that 
continued groundwater depletion will result in more fissures.  The magnitude of 
existing and new fissures is dependent upon several variables including the depth to 
groundwater, type and depth of surficial material present, amount and rate of 
groundwater depletion, groundwater basin depth, depth to bedrock, volume and rate of 
runoff due to precipitation entering the fissure, and human intervention. 
The Arizona Geological Survey has mapped known and suspected fissure 
lineaments for certain areas of the county and compiled the data into a GIS database. 
The latest update of GIS data published 33 has a version date of June 2019.  In order to 
estimate the areas of immediate risk, the MJPT chose to create polygons that represent 
a 500-foot buffer along the mapped fissures and assign a HIGH hazard risk to areas 
within the buffered zone.  These areas are indicated on Maps 3A, 3B, and 3C. 
Climate Change Impacts 
As previously stated, fissure development for most of the county is correlated 
to overdrafting of local and regional groundwater tables.  The NCA report (Garfin, 
et.al., 2014) notes that one of the anticipated impacts of climate change for the 
Southwest is a reduction in precipitation and streamflow volumes.  This impact could 
translate into a greater demand for groundwater which could further reduce 
groundwater levels and increase the formation of subsidence areas and fissure risk. The 
current management of groundwater withdrawals by the ADWR regulated active 
management areas (AMA) will likely serve to keep these impacts in check, but 
consideration for future expansion of fissures and subsidence zones could be warranted. 
 
33 AZGS Document Repository at:  http://repository.azgs.az.gov/uri_gin/azgs/dlio/997

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 232 
Vulnerability – CPRI Results 
Fissure CPRI results for each community are summarized in Table 5-18 below. 
Table 5-18:  CPRI results by jurisdiction for fissure hazard 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Possibly 
Negligible 
<6 hours 
>1 week 
2.20 
Buckeye 
Unlikely 
Negligible 
>24 hours 
<24 hours 
1.10 
Carefree 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Cave Creek 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Chandler 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
El Mirage 
Unlikely 
Negligible 
>24 hours 
<24 hours 
1.10 
Fort McDowell Yavapai Nation 
Unlikely 
Negligible 
6-12 hours 
<24 hours 
1.40 
Fountain Hills 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Gila Bend 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Gilbert 
Highly Likely 
Negligible 
<6 hours 
>1 week 
3.10 
Glendale 
Likely 
Negligible 
12-24 hours 
>1 week 
2.35 
Goodyear 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Guadalupe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Litchfield Park 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Unincorporated Maricopa County 
Possibly 
Limited 
12-24 hours 
>1 week 
2.20 
Mesa 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Paradise Valley 
Unlikely 
Negligible 
<6 hours 
<1 week 
1.65 
Peoria 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Phoenix 
Unlikely 
Negligible 
<6 hours 
>1 week 
1.75 
Queen Creek 
Possibly 
Negligible 
<6 hours 
<6 hours 
1.90 
Salt River Pima-Maricopa Indian 
Community 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Scottsdale 
Possibly 
Negligible 
<6 hours 
<6 hours 
1.90 
Surprise 
Possibly 
Limited 
<6 hours 
<6 hours 
2.20 
Tempe 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Tolleson 
Unlikely 
Negligible 
>24 hours 
>1 week 
1.30 
Wickenburg 
Likely 
Limited 
>24 hours 
>1 week 
2.50 
Youngtown 
Unlikely 
Limited 
>24 hours 
>1 week 
1.60 
County-wide average CPRI = 
1.80 
 
Vulnerability – Loss/Exposure Estimations 
The Arizona Land Subsidence Group (ALSG) prepared a white paper in 2007 
(ASLG, 2007) that summarizes fissure risk and various case studies.  The following 
table is an excerpt from that report listing various types of damages that either have or 
could occur as a result of fissures: 
 
Historic losses in Maricopa County due to fissures are mostly minor and 
associated with damaged utilities, fences and dirt/gravel roads and driveways.  The 
exception was the death of a horse in the Town of Queen Creek’s Planning Area when

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 233 
a fissure opened up and engulfed the animal during a July 2007 storm.  It is therefore 
very difficult to estimate economic losses due to a lack of an established methodology.  
Potential exposure of human and facility assets to high hazard fissure zones was 
estimated instead, and no estimation of economic losses was made.  Table 5-19 
summarizes the MJPT defined critical and non-critical facilities potentially exposed to 
a high hazard fissure zone.  Table 5-20 summarizes population sectors exposed to the 
high hazard fissure zones.  Residential structures exposed to high hazard fissure zones 
are summarized in Table 5-21. 
In summary, 9 critical and non-critical MJPT identified assets with a cumulative 
reported replacement cost of $5 million (note: only one facility had a reported 
replacement cost) are exposed to high hazard fissure zones for the planning area, with 
a combined exposed value of.  An additional $776.3 million of census block residential 
structures are exposed to a high hazard fissure zone for the planning area.  Regarding 
human vulnerability, a total population of 4,341 people, or 0.10% of the total 2015 
census block population is potentially exposed to a high hazard fissure zone for the 
planning area.  The potential for human death and/or injury is possible, although no 
occurrences have been documented to-date.  Short and long-term displacement are also 
likely should structures become damaged. 
Vulnerability – Development Trends 
Earth fissures have been part of the landscape of southern and south-central 
Arizona for at least the past seventy years (ALSG, 2007).  As the communities of 
Maricopa County grow, it is inevitable that expansion into agricultural and 
undeveloped desert lands will occur, bringing the urban interface into more and more 
proximity to the geologic hazards related to fissures.  In particular, growth areas for 
Chandler, El Mirage, Goodyear, Litchfield Park, Mesa, and Queen Creek have the most 
vulnerability. The AZGS and state continue working to provide better reporting and 
disclosure of fissure hazards, and county and local officials are becoming more aware 
of the dangers of not addressing them with development. 
 
Changes in Development in the Hazard Prone Area 
Within the unincorporated areas of Maricopa County, residential development 
has been minimal but has mostly been concentrated along I-17 in the Anthem area and 
in the western portion of the County along SR303.  It is anticipated that new 
development will largely occur in these areas over the next five years.  These areas do 
not lie within identified high hazard fissure areas.   
The table below summarizes the changes in development for jurisdictions that 
are impacted by known fissure hazard areas.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 234 
Jurisdiction 
Development Changes 
El Mirage 
El Mirage is impacted by areas identified to have high hazard of earth fissure on 
the south end of the community from approximately Olive Rd to Northern 
Avenue.  Limited residential development is being constructed and planned 
within the northeast and northwest areas of the City.  Industrial and commercial 
development efforts have been focused within the southern portion of El Mirage 
in the industrial zone. Changes in development within the southern Industrial 
Zone will impact the City’s vulnerability to earth fissure. 
Gilbert 
Areas identified to have existing hazards associated with fissure exist within the 
most southern portion of the Town of Gilbert between Riggs Rd. and Hund Rd.  
Most existing and proposed commercial and industrial developments are 
focused in the central and northern portions of the Town.  The most recent and 
expected residential developments in Gilbert are located within the central and 
southern portions of the community.  Changes in residential developments 
within the southernmost area of the Town may increase the vulnerability to 
fissure within Gilbert. 
Glendale 
Identified fissure hazard areas within or near Glendale represent the highest 
concentration of mapped fissures in the west valley.  In particular, hazard areas 
west of SR303 are near or within proximity to the City’s “New Frontier” 
Development District. Development within this district is growing at a rapid 
pace predominantly in industrial and manufacturing sectors.  The area of 
development is bounded to the north by Peoria Ave, to the south by Camelback 
Rd, to the east by Dysart Rd, and to the west by 171st Ave.   
Goodyear 
Small areas with identified fissure hazards are in northernmost and southern 
portions of the City of Goodyear.  There have been no changes in development 
within the southern portion of Goodyear, but there have been several 
developments within the northern area of the City, from I-10 to Camelback Rd, 
including industrial, moderate residential and multi-family projects. 
Mesa 
Several identified fissure hazard areas exist within the City of Mesa within the 
eastern area of the City.  Changes in development identified by the City are 
outside of these areas and will not be impacted by the fissure hazard areas.  
Phoenix 
There is only a small area identified to have a high hazard due to earth fissure 
with the City of Phoenix.  This area is located along East Shaw Butte Dr. 
between Cactus Rd and Cholla St. Changes in development identified by the 
City are outside of this area and will not be impacted by the fissure hazard area.  
Queen Creek 
There are no areas of high hazard due to Fissure located within the Town of 
Queen Creek. It should be noted that there are several identified fissure areas 
immediately south of the jurisdictional boundary. Although not currently 
impacted, the changes in development within the Town boundary should be 
conducted with an acknowledgment of the nearby hazard. 
Scottsdale 
There is only a small area identified to have a high hazard due to earth fissure 
with the City of Scottsdale.  This area is located east of the intersection of Cactus 
Rd. and Frank Lloyd Wright Blvd.  Changes in development identified by the 
City are proposed to occur mostly within the northern and central areas of 
Scottsdale and are outside of this area and will not be impacted by the fissure 
hazard area. 
Surprise 
The City of Surprise contains a small area of identified hazard areas associated 
with fissure along the southern border near the Hwy 303 alignment.  While 
changes in development have occurred outside of this area, they have no impact 
on this hazard.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2020 
 
 
FOR OFFICIAL USE ONLY 
Page 235 
Sources 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
AZ Geological Survey in partnership with the AZ Dept of Emergency and Military 
Affairs, Hazards Viewer, http://data.azgs.az.gov/hazard-viewer/  
AZ Geologic Survey, Arizona’s Earth Fissure Center, 
http://www.azgs.az.gov/EFC.shtml  
Arizona Land Subsidence Group, http://azlandsubsidence.org/  
AZ Land Subsidence Group, 2017, Land Subsidence and Earth Fissures in Arizona, 
Research and Information Needs for Effective Risk Management., AZGS Contributed 
Report CR-07-C. 
Profile Maps 
Map 3A, 3B, and 3C – Earth Fissure Hazard Map(s)

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 236 
Table 5-19:  Asset inventory exposure to high hazard fissure zones 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
9 
0.08% 
$26,024,918 
$5,000 
Avondale 
131 
0 
0.00% 
$179,460 
$0 
Buckeye 
125 
0 
0.00% 
$268,667 
$0 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
0 
0.00% 
$1,361,072 
$0 
El Mirage 
34 
0 
0.00% 
$285,542 
$0 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
0 
0.00% 
$36,000 
$0 
Gilbert 
5287 
2 
0.04% 
$0 
$0 
Glendale 
1224 
2 
0.16% 
$4,085,807 
$0 
Goodyear 
159 
1 
0.63% 
$148,573 
$0 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
2 
0.19% 
$3,624,310 
$0 
Mesa 
528 
1 
0.19% 
$2,850,466 
$5,000 
Paradise Valley 
95 
0 
0.00% 
$469,300 
$0 
Peoria 
299 
0 
0.00% 
$282,333 
$0 
Phoenix 
947 
0 
0.00% 
$7,843,312 
$0 
Queen Creek (Maricopa County Only) 
124 
1 
0.81% 
$301,446 
$0 
Salt River Pima-Maricopa Indian Community 
78 
0 
0.00% 
$502,493 
$0 
Scottsdale 
237 
0 
0.00% 
$1,094,610 
$0 
Surprise 
94 
0 
0.00% 
$498,810 
$0 
Tempe 
111 
0 
0.00% 
$1,373,300 
$0 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
0 
0.00% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 237 
Table 5-20:  Population sectors exposed to high hazard fissure zones  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,787 
4,341 
0.10% 
538,166 
1,002 
0.19% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
0 
0.00% 
5,313 
0 
0.00% 
Buckeye 
65,452 
0 
0.00% 
5,141 
0 
0.00% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
0 
0.00% 
23,435 
0 
0.00% 
El Mirage 
33,728 
0 
0.00% 
2,700 
0 
0.00% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
470 
0.20% 
17,960 
33 
0.18% 
Glendale 
237,327 
2 
0.00% 
23,675 
0 
0.00% 
Goodyear 
78,118 
0 
0.00% 
10,094 
0 
0.00% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
0 
0.00% 
1,065 
0 
0.00% 
Unincorporated Maricopa County 
290,179 
917 
0.32% 
95,187 
138 
0.14% 
Mesa 
467,657 
2,020 
0.43% 
71,995 
891 
1.24% 
Paradise Valley 
13,834 
0 
0.00% 
3,365 
0 
0.00% 
Peoria 
166,339 
0 
0.00% 
25,308 
0 
0.00% 
Phoenix 
1,561,296 
214 
0.01% 
143,448 
83 
0.06% 
Queen Creek 
35,720 
6 
0.02% 
2,094 
1 
0.05% 
Salt River Pima-Maricopa Indian Community 
6,706 
0 
0.00% 
1,004 
0 
0.00% 
Scottsdale 
237,929 
65 
0.03% 
49,963 
21 
0.04% 
Surprise 
128,211 
464 
0.36% 
26,025 
25 
0.10% 
Tempe 
176,809 
0 
0.00% 
15,264 
0 
0.00% 
Tolleson 
6,904 
0 
0.00% 
809 
0 
0.00% 
Wickenburg 
6,803 
0 
0.00% 
2,058 
0 
0.00% 
Youngtown 
6,454 
0 
0.00% 
1,177 
0 
0.00% 
Queen Creek (Pinal County Portion) 
1421 
73 
5.14% 
128 
8 
6.25% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 238 
Table 5-21:  Residential structures exposed to fissure high hazard zones  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,265 
2,521 
0.15% 
$542,436,633  
$776,318  
0.14% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
0 
0.00% 
$7,272,041  
$0  
0.00% 
Buckeye 
18,206 
0 
0.00% 
$4,946,783  
$0  
0.00% 
Carefree 
2,242 
0 
0.00% 
$1,922,010  
$0  
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751  
$0  
0.00% 
Chandler 
94,257 
0 
0.00% 
$34,713,265  
$0  
0.00% 
El Mirage 
11,307 
0 
0.00% 
$2,655,346  
$6  
0.00% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045  
$0  
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$0  
0.00% 
Gila Bend 
944 
0 
0.00% 
$118,937  
$0  
0.00% 
Gilbert 
74,821 
143 
0.19% 
$29,339,526  
$56,012  
0.19% 
Glendale 
90,415 
1 
0.00% 
$24,665,480  
$185  
0.00% 
Goodyear 
25,023 
0 
0.00% 
$8,326,438  
$95  
0.00% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
0 
0.00% 
$996,356  
$0  
0.00% 
Unincorporated Maricopa County 
142,777 
418 
0.29% 
$45,530,720  
$133,279  
0.29% 
Mesa 
201,507 
1,646 
0.82% 
$59,328,380  
$484,646  
0.82% 
Paradise Valley 
5,621 
0 
0.00% 
$11,738,020  
$0  
0.00% 
Peoria 
64,806 
0 
0.00% 
$21,410,130  
$0  
0.00% 
Phoenix 
590,476 
116 
0.02% 
$167,455,500  
$32,842  
0.02% 
Queen Creek 
8,422 
2 
0.02% 
$2,890,493  
$724  
0.03% 
Salt River Pima-Maricopa Indian Community 
2,680 
0 
0.00% 
$919,777  
$0  
0.00% 
Scottsdale 
123,959 
43 
0.03% 
$67,660,310  
$23,267  
0.03% 
Surprise 
52,607 
152 
0.29% 
$15,652,750  
$45,262  
0.29% 
Tempe 
73,603 
0 
0.00% 
$24,383,780  
$0  
0.00% 
Tolleson 
2,165 
0 
0.00% 
$505,455  
$0  
0.00% 
Wickenburg 
3,610 
0 
0.00% 
$1,285,212  
$0  
0.00% 
Youngtown 
2,796 
0 
0.00% 
$540,226  
$0  
0.00% 
Queen Creek (Pinal County Portion) 
606 
27 
4.46% 
$207,814  
$9,394  
4.52% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
143
rx
202
rx
51
rx
101
rx
303
rx
202
rx
85
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
£
¤
60
£
¤
60
Earth Fissure
Hazard Rating
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 3A
Maricopa County
Earth Fissure
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ALRIS 2006; 
AZGS 2020; TIGER 2020; MAG 2020
rx
303
rx
303
OLIVE
PEORIA
COTTON
CITRUS
SARIVAL
DYSART
EL MIRAGE
REEMS
CAMELBACK
INDIAN SCHOOL
LITCHFIELD
CACTUS
GLENDALE
BULLARD
PERRYVILLE
JACKRABBIT
NORTHERN
CACTUS

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
17
rx
88
rx
303
rx
202
rx
87
rx
51
rx
101
rx
24
rx
143
rx
202
rx
202
rx
51
rx
101
£
¤
60
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 3B
Maricopa County
Earth Fissure
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ALRIS 2006; 
AZGS 2020; TIGER 2020; MAG 2020
rx
101
rx
101
SHEA
TATUM
CACTUS
40TH
56TH
HAYDEN
BELL
LINCOLN
SCOTTSDALE
GREENWAY
64TH
PIMA
THUNDERBIRD
FRANK LLOYD WRIGHT
92ND
94TH
DOBSON
64TH
BELL
BELL
rx
202
rx
24
rx
87
rx
202
£
¤
60
Earth Fissure
Hazard Rating
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams

§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 3C
Maricopa County
Earth Fissure
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ALRIS 2006; 
AZGS 2020; TIGER 2020; MAG 2020
rx
238
Earth Fissure
Hazard Rating
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 239 
5.3.5 Flood / Flash Flood 
Description 
For the purpose of this Plan, the hazard of flooding addressed in this section 
will pertain to floods that result from precipitation/runoff related events.  Other 
flooding due to dam and levee failures are addressed separately.  The three seasonal 
atmospheric events that tend to trigger floods in Maricopa County are: 
• Tropical Storm Remnants: Some of the worst flooding tends to occur when 
the remnants of a hurricane that has been downgraded to a tropical storm or 
tropical depression enter the state. These events occur infrequently and 
mostly in the early autumn, and usually bring heavy and intense 
precipitation over large regions causing severe flooding. 
• Winter Rains: Winter brings the threat of low intensity; but long duration 
rains covering large areas can cause extensive flooding and erosion, 
particularly when combined with snowmelt. 
• Summer Monsoons: A third atmospheric condition that brings flooding to 
Arizona is the annual summer monsoon. In mid to late summer the monsoon 
winds bring humid subtropical air into the state.  Solar heating triggers 
afternoon and evening thunderstorms that can produce extremely intense, 
short duration bursts of rainfall.  The thunderstorm rains are mostly 
translated into runoff and, in some instances, the accumulation of runoff 
occurs very quickly resulting in a rapidly moving flood wave referred to as 
a flash flood.  Flash floods tend to be very localized and cause significant 
flooding of local watercourses. 
Damaging floods in the county can be primarily categorized as either riverine, 
sheet flow, or local area flows.  Riverine flooding occurs along established 
watercourses when the bank full capacity of a wash is exceeded by storm runoff and 
the overbank areas become inundated.  There are also areas within the county where 
the watercourse is broad and generally shallow with ill-defined low flow paths and 
broad sheet flooding.  Local area flooding is often the result of poorly designed or 
planned development wherein natural flow paths are altered, blocked or obliterated, 
and localized ponding and conveyance problems result.  Erosion is also often associated 
with damages due to flooding. 
History 
Flooding is clearly a major hazard in Maricopa County as shown in Tables 5-2 
and 5-3.  Maricopa County has been part of 18 presidential disaster declarations for 
flooding and there have been at least 200 other reported flooding incidents that met the 
thresholds outlined in Section 5.1.   
Over the past plan cycle, flooding was mostly limited to smaller, localized 
events and no major flooding events occurred.  Two of the localized flood events are 
discussed below.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 240 
• In July 2017, Scattered monsoon thunderstorms developed across much of the 
greater Phoenix area spanning a week’s time and causing significant flooding 
across several areas in Maricopa County.  There were no injuries of fatalities and 
damages were less than $100,000.  Flooding did require one swift water rescue 
(NCDC, 2020). 
• In March 2020, a powerful Pacific low pressure system spread deep moisture into 
the central deserts causing scattered to numerous showers and thunderstorms to 
develop during the afternoon and evening hours. Moderate to heavy rain fell with 
many of the storms, affecting areas to the southwest of central Phoenix. There were 
no injuries of fatalities and damages were less than $100,000.  Flooding did require 
one swift water rescue (NCDC, 2020). 
The following incidents represent older examples of major flooding that has impacted 
the county: 
• In March 1978, a general winter storm centered over the mountains north and east 
of Phoenix, 35 miles north at Rock Springs.  Extrapolation of intensity-probability 
data for one measurement of 5.73 inches of precipitation in a 24 hour period equates 
to a 400 year storm.  The main source of flooding was due to Verde River runoff 
volume exceeding reservoir storage capacity above Bartlett Dam.  Flooding also 
occurred along irrigation canals on the north side of the Phoenix metro area, and 
along tributaries of the Gila River and Queen Creek.  There was one death 
countywide and $37 million in total damages (USACE, 1978).  Presidential 
Disaster Declaration 550-DR. 
• In December 1978, a second major storm for the year hit hard with total 
precipitation that ranged from less than 1 inch in the northeastern and far 
southwestern portions of Arizona to nearly 10 inches in the Mazatzal Mountains 
northeast of Phoenix.  A large area of the central mountains received over 5 inches. 
The main stems of the Gila, Salt, Verde, Agua Fria, Bill Williams, and Little 
Colorado Rivers, as well as a number of major tributaries, experienced especially 
large discharges.  There were 4 deaths, $16.3 million-public and $5 million-
agriculture losses estimated for Maricopa County (USACE, 1979). Presidential 
Disaster Declaration 570-DR. 
• In February 1980, severe flooding in central Arizona set record discharges (later 
broken in 1993) in the Phoenix metro area on the Salt, Verde, Agua Fria and Gila 
Rivers, as well as on Oak Creek in north central Arizona. The Phoenix metro area 
was nearly cut in half with only two bridges remaining open over the Salt River.  It 
took hours for people to move between Phoenix and the east valley using either the 
Mill Avenue or Central Avenue bridges.  Even the Interstate 10 bridge was closed 
for fear that it had been damaged.  Precipitation during this period at Crown King 
in the Bradshaw Mountains was 16.63 inches. Three people died statewide and 
damages were estimated at $63,700,000 for Phoenix Metro Area (USACE, 1980). 
Presidential Disaster Declaration 614-DR. 
• In January and February 1993, flooding damage occurred from winter storms 
associated with the El Nino phenomenon.  These storms flooded watersheds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 241 
throughout Arizona by dumping excessive rainfall amounts that saturated soils and 
increased runoff.  Warm temperature snowmelt exacerbated the situation over large 
areas. Erosion caused tremendous damage and some communities along normally 
dry washes were devastated. Stream flow velocities and runoff volumes exceeded 
historic highs.  Many flood prevention channels and retention reservoirs were filled 
to capacity and water was either diverted to the emergency spillways or the 
reservoirs were breached, causing extensive damage in some cases (e.g., Painted 
Rock Reservoir spillway).  The new Mill Avenue Bridge and a large landfill in 
Mesa were washed away by the raging Salt River.  The Gillespie Dam west of 
Phoenix was damaged as high water spread throughout low-lying areas.  Many 
roads were closed and motorists were stranded by flooded dips and washes.  
Phoenix alone sustained at least $4.2 million in damages from this prolonged period 
of heavy rains.  County-wide, $38 million in property and agricultural losses were 
estimated (USACE, 1993). Presidential Disaster Declaration 977-DR. 
• In 1997, flooding from the remnants of Hurricane Nora resulted in the breaching of 
Narrows Dam.  The calculated 24-hour, 100-year rainfall amount in NW Maricopa 
County exceeded at six ALERT measuring sites led to flash flooding in portions of 
NW Maricopa County.  Two earthen dams gave way in Aguila and caused 
widespread flooding.  One dike was located seven miles east of Aguila and the 
second in the center of the Martori Farms complex.  Half of the cotton crop was 
lost at Martori Farms, as well as 300 to 500 acres of melons.  Up to five feet of 
water filled Aguila.  About 40 people were evacuated from the hardest hit area of 
the town.  Water flowing down the Sols Wash was so high that the Sols Wash 
Bridge in Wickenburg was closed for more than two hours.  There was some 
flooding below Sols Wash in the streets around Coffinger Park.  Several houses in 
the area were also flooded.  Highway 71 west of Wickenburg and Highway 95 north 
were closed due to high water from the storm. 
• In October 2000, a large low pressure area dumped four to six inches of rain over 
parts of eastern LaPaz and western Maricopa County. This caused flash flooding in 
the upper part of the Centennial Wash between the Harcuvar and Harquahala 
mountain ranges. The heavy runoff flowed into the town of Wenden where water 
ran over the highway 60 bridge. At its peak, the wash was about 3/8ths of a mile 
wide and 12 feet deep.  The resulting high water surged through the town of 
Wenden, with at least 400 residents evacuated. There was extensive damage to the 
town and for many miles downstream. The reported flow was in excess of 20,000 
cfs. When the flood hit Wenden, it inundated some mobile homes, causing them to 
lift off their foundations and float down the wash. An estimated 125 mobile homes 
were affected.  One migrant worker was killed when flood waters swept through 
the town during the early morning hours.  Additional heavy rainfall hit this area 
several days later and complicated relief efforts for many of the homeless.  A spotter 
in Wickenburg reported that route 93 was closed north of Wickenburg due to high 
water.  Sols Wash was out of its banks and flooded Coffinger Park as well as nearby 
homes.  The Vulture Mine road was closed and motorists had to be rescued.  Flood 
water produced considerable damage to melon and cotton crops in northwest 
Maricopa County.  The roads around Aguila were closed for several hours.  A total

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 242 
of $10.2 million in structure and crop damages was estimated (NCDC, 2008). 
Presidential Disaster Declaration 1347-DR. 
• In late July – early August 2005, one of the heaviest rainfall events of the 2005 
season struck the greater Phoenix metropolitan.  Almost three inches of rain fell at 
many locations in the metro, causing roofs to collapse and streets to flood quickly.  
Up to 120 residents at the Crystal Creek Apartments in Phoenix were evacuated 
after 83 apartment units were damaged by flood waters.  Additional roof damage 
was reported at the Scottsdale Community College, and Osco Drug store in Mesa, 
and a Fry’s grocery store in Tempe.  In the Wickenburg area, very heavy rainfall 
caused flooding of low spots and washes.  The peak flow in Hartman Wash was 
reported as 1,200 cfs. Major damage occurred at Bear Cat Manufacturing where a 
large robotic welding building was destroyed by the flood.  Losses were estimated 
at over $4 million (NCDC, 2009). 
• In September 2014, heavy rainfall caused by the remnants of Hurricane Norbert 
resulted in extensive flooding throughout the state and especially in LaPaz, 
Maricopa and Pinal Counties.  The Phoenix area experienced its wettest day in 
history, surpassing a record set in 1939. Preliminary damages assessments 
exceeded $18 million.  Among other impacts, major sections of freeways were 
closed, canals and flood control systems were overwhelmed, and two individuals 
perished in separate flash flood incidents.  Several valley locations received rainfall 
that exceeded 500-year storm estimates.  State search and rescue teams spent 
considerable resources performing numerous rescues of stranded drivers and 
residents, in addition to services provided during flooding from two other hurricane 
remnants (Hurricane Lowell and Hurricane Odile), all of which impacted Arizona 
within a two-month period.  The state received a presidential disaster declaration 
(DR-4203) for Maricopa and La Paz Counties in November 2014. 
Numerous other flood related incidents are summarized in the historic hazard 
database provided in Appendix D. 
Probability and Magnitude 
For the purposes of this Plan, the probability and magnitude of flood hazard for 
Maricopa County jurisdictions are based on the one percent probability floodplains 
delineated on FEMA Flood Insurance Rate Maps (FIRMs), plus any provisional 
floodplain delineations used for in-house purposes by participating jurisdictions.  
FEMA and participating agencies and departments of Maricopa County jurisdictions 
have recently completed a map modernization program to update the FIRMs for the 
county into a digital FIRM (DFIRM) format and re-delineate a few select areas.  The 
latest maps became effective in October 2013 and are the basis for flood hazard 
depictions in this Plan.  Floodplain limits and GIS base files were provided by the 
FCDMC and National Flood Hazard Layer (NFHL) data from FEMA. 
Two designations of flood hazard are used, with HIGH hazard areas being any 
“A” zone and MEDIUM flood hazard being all “Shaded X” zones.  All “A” zones (e.g. 
– A, A1-99, AE, AH, AO, etc.) represent areas with a one percent (1%) probability of 
being flooded at a depth of one-foot or greater in any given year.  All “Shaded X” zones

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 243 
represent areas with a 0.2 percent (0.2%) probability of being flooded at a depth of one-
foot or greater in any given year.  These two storms are often referred to as the 100-
year and 500-year storm, respectively. 
Maps 4A, 4B, and 4C present the high flood hazard areas for Maricopa County.  
When viewing the maps, the following should be noted: 
• Neither the Fort McDowell Yavapai Nation or Salt River Pima-Maricopa 
Indian Community participate in the National Flood Insurance Program 
(NFIP).  Consequently, neither of the tribes has FEMA mapped floodplains 
for their reservation boundaries except for Sycamore Creek and the Verde 
and Salt Rivers.  The Local Planning Team for each tribe met and discussed 
identifying supplemental delineations of on reservation floodplains, and the 
results are indicated on the hazard profile maps. 
• With the 2013 DFIRM update, a decision was made county-wide to map 
most of the non- Zone A areas as Shaded Zone X without the benefit of 
supporting hydrologic and hydraulic analysis.  Obvious mountain and steep 
hillslope areas were excluded.  For the sake of map clarity, only the high 
flood hazard areas are shown. 
Climate Change Impacts 
The NCA report (Garfin, et.al., 2014) notes that one of the anticipated impacts 
of climate change for the Southwest is a reduction in average annual precipitation and 
streamflow volumes.  The report and supporting documents also indicate that winter 
storm intensities are anticipated to increase, which may lead to increased event-based 
flooding.  This could be exacerbated by watersheds with reduced vegetation due to 
climate change induced drought or wildfire.  Collectively these impacts could result in 
more severe winter season flooding and warrant mitigation efforts that design to less 
frequent storm events such as the 250- or 500-year (0.4 or 0.2% probability) recurrence 
intervals in anticipation of the impacts.  Executive Order 1369034, titled “Federal Flood 
Risk Management Standard”, is a first step by the federal government in implementing 
requirements to look at less frequent storm events when establishing finished floor and 
flood elevation design standards for certain federally identified or funded facilities that 
are located with special flood hazard areas.  Expansion of these policies to all floodplain 
development and flood mitigation may be warranted under the current climate change 
thinking. 
Vulnerability – CPRI Results 
Flooding CPRI results for each community are summarized in Table 5-22 
below. 
 
 
 
34 FEMA website access at:  https://www.fema.gov/federal-flood-risk-management-standard-ffrms

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 244 
Table 5-22:  CPRI results by jurisdiction for flooding hazard 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Likely 
Limited 
12-24 hours 
<24 hours 
2.45 
Buckeye 
Possibly 
Critical 
<6 hours 
<24 hours 
2.60 
Carefree 
Highly Likely 
Limited 
12-24 hours 
<24 hours 
2.90 
Cave Creek 
Highly Likely 
Limited 
6-12 hours 
<6 hours 
2.95 
Chandler 
Likely 
Negligible 
>24 hours 
<24 hours 
2.00 
El Mirage 
Highly Likely 
Critical 
12-24 hours 
<24 hours 
3.20 
Fort McDowell Yavapai Nation 
Possibly 
Limited 
6-12 hours 
<24 hours 
2.15 
Fountain Hills 
Possibly 
Critical 
6-12 hours 
<1 week 
2.55 
Gila Bend 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Gilbert 
Highly Likely 
Limited 
>24 hours 
<1 week 
2.85 
Glendale 
Likely 
Limited 
12-24 hours 
>1 week 
2.65 
Goodyear 
Highly Likely 
Limited 
6-12 hours 
<24 hours 
3.05 
Guadalupe 
Possibly 
Limited 
<6 hours 
<6 hours 
2.20 
Litchfield Park 
Likely 
Limited 
12-24 hours 
<24 hours 
2.45 
Unincorporated Maricopa County 
Highly Likely 
Critical 
<6 hours 
<24 hours 
3.50 
Mesa 
Highly Likely 
Limited 
6-12 hours 
<1 week 
3.15 
Paradise Valley 
Possibly 
Critical 
12-24 hours 
<24 hours 
2.30 
Peoria 
Highly Likely 
Critical 
<6 hours 
<24 hours 
3.50 
Phoenix 
Likely 
Critical 
12-24 hours 
<24 hours 
2.75 
Queen Creek 
Highly Likely 
Limited 
12-24 hours 
<24 hours 
2.90 
Salt River Pima-Maricopa Indian 
Community 
Highly Likely 
Critical 
<6 hours 
<1 week 
3.60 
Scottsdale 
Likely 
Limited 
<6 hours 
<6 hours 
2.65 
Surprise 
Highly Likely 
Limited 
<6 hours 
<6 hours 
3.10 
Tempe 
Highly Likely 
Critical 
6-12 hours 
<1 week 
3.45 
Tolleson 
Likely 
Limited 
12-24 hours 
<24 hours 
2.45 
Wickenburg 
Highly Likely 
Catastrophic 
<6 hours 
<24 hours 
3.80 
Youngtown 
Highly Likely 
Catastrophic 
<6 hours 
<24 hours 
3.80 
County-wide average CPRI = 
2.86 
 
Vulnerability – Loss/Exposure Estimations 
The estimation of potential exposure to high and medium flood hazards was 
accomplished by intersecting the human, residential and asset facilities with the flood 
hazard limits depicted on Maps 4A, 4B, and 4C.  No loss estimations were made for 
this update.  Only exposure of the human, residential and asset facilities are reported.  
Table 5-23 summarizes the MJPT identified critical and non-critical facilities 
potentially exposed to high hazard floods.  Table 5-24 summarizes population sectors 
exposed to the high hazard flood areas.  Residential structure exposures to high hazard 
flood areas are summarized in Table 5-25. 
In summary, 500 critical and non-critical MJPT identified assets with a 
cumulative reported replacement cost of $1.6 billion are exposed to high hazard flood 
areas for the planning area.  An additional $19.0 billion of census block residential 
structures are located in high hazard flood areas for the planning area.  Regarding 
human vulnerability, a total population of 104,120 people, or 2.73% of the total census 
block population, is potentially exposed to a high hazard flood area for the planning 
area.  Based on the historic record, multiple deaths and injuries are plausible and a 
substantial portion of the exposed population is subject to displacement depending on 
the event magnitude.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 245 
Table 5-23:  Asset inventory exposure to high hazard flood zones 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
500 
4.58% 
$26,024,918 
$1,596,365 
Avondale 
131 
6 
4.58% 
$179,460 
$7,000 
Buckeye 
125 
11 
8.80% 
$268,667 
$24,838 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
5 
1.81% 
$1,361,072 
$20,434 
El Mirage 
34 
2 
5.88% 
$285,542 
$47,500 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
2 
28.57% 
$36,000 
$9,000 
Gilbert 
5287 
119 
2.25% 
$0 
$0 
Glendale 
1224 
35 
2.86% 
$4,085,807 
$4,011 
Goodyear 
159 
22 
13.84% 
$148,573 
$0 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
238 
22.43% 
$3,624,310 
$1,071,063 
Mesa 
528 
3 
0.57% 
$2,850,466 
$5,800 
Paradise Valley 
95 
1 
1.05% 
$469,300 
$1,000 
Peoria 
299 
5 
1.67% 
$282,333 
$1,395 
Phoenix 
947 
15 
1.58% 
$7,843,312 
$111,523 
Queen Creek (Maricopa County Only) 
124 
7 
5.65% 
$301,446 
$24,500 
Salt River Pima-Maricopa Indian Community 
78 
1 
1.28% 
$502,493 
$13,366 
Scottsdale 
237 
24 
10.13% 
$1,094,610 
$224,035 
Surprise 
94 
3 
3.19% 
$498,810 
$30,000 
Tempe 
111 
0 
0.00% 
$1,373,300 
$0 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
1 
7.14% 
$32,589 
$900 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
0 
0.00% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 246 
Table 5-24:  Population sectors exposed to high hazard flood zones  
Community 
Total Population 
Population Exposed 
Total 
Population Over 
65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,787 
104,120 
2.52% 
538,166 
11,003 
2.04% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
1,327 
1.67% 
5,313 
98 
1.84% 
Buckeye 
65,452 
1104 
1.69% 
5,141 
96 
1.87% 
Carefree 
3,580 
237 
6.62% 
1,591 
100 
6.29% 
Cave Creek 
5,287 
436 
8.25% 
1169 
109 
9.32% 
Chandler 
250,334 
3,793 
1.52% 
23,435 
197 
0.84% 
El Mirage 
33,728 
2044 
6.06% 
2,700 
617 
22.85% 
Fort McDowell Yavapai Nation 
1017 
54 
5.31% 
85 
5 
5.88% 
Fountain Hills 
23,536 
740 
3.14% 
7,318 
204 
2.79% 
Gila Bend 
2,012 
447 
22.22% 
193 
44 
22.80% 
Gilbert 
239,546 
4,780 
2.00% 
17,960 
391 
2.18% 
Glendale 
237,327 
3,567 
1.50% 
23,675 
308 
1.30% 
Goodyear 
78,118 
1,618 
2.07% 
10,094 
232 
2.30% 
Guadalupe 
6,230 
145 
2.33% 
581 
11 
1.89% 
Litchfield Park 
5,980 
70 
1.17% 
1,065 
13 
1.22% 
Unincorporated Maricopa County 
290,179 
26,322 
9.07% 
95,187 
3,553 
3.73% 
Mesa 
467,657 
3,307 
0.71% 
71,995 
617 
0.86% 
Paradise Valley 
13,834 
774 
5.59% 
3,365 
162 
4.81% 
Peoria 
166,339 
2,906 
1.75% 
25,308 
455 
1.80% 
Phoenix 
1,561,296 
34,577 
2.21% 
143,448 
2,701 
1.88% 
Queen Creek 
35,720 
414 
1.16% 
2,094 
28 
1.34% 
Salt River Pima-Maricopa Indian Community 
6,706 
313 
4.67% 
1,004 
45 
4.48% 
Scottsdale 
237,929 
21,875 
9.19% 
49,963 
4,361 
8.73% 
Surprise 
128,211 
1,822 
1.42% 
26,025 
509 
1.96% 
Tempe 
176,809 
1110 
0.63% 
15,264 
57 
0.37% 
Tolleson 
6,904 
426 
6.17% 
809 
40 
4.94% 
Wickenburg 
6,803 
1,164 
17.11% 
2,058 
300 
14.58% 
Youngtown 
6,454 
643 
9.96% 
1,177 
94 
7.99% 
Queen Creek (Pinal County Portion) 
1421 
45 
3.17% 
128 
4 
3.13% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 247 
Table 5-25:  Residential structures exposed to high hazard flood zones  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,265 
49,562 
3.02% 
$542,436,633  
$18,990,906  
3.50% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
448 
1.67% 
$7,272,041  
$121,641  
1.67% 
Buckeye 
18,206 
360 
1.98% 
$4,946,783  
$97,749  
1.98% 
Carefree 
2,242 
165 
7.36% 
$1,922,010  
$141,641  
7.37% 
Cave Creek 
2,498 
215 
8.61% 
$1,628,751  
$140,434  
8.62% 
Chandler 
94,257 
1,269 
1.35% 
$34,713,265  
$467,257  
1.35% 
El Mirage 
11,307 
1275 
11.28% 
$2,655,346  
$299,436  
11.28% 
Fort McDowell Yavapai Nation 
308 
19 
6.17% 
$260,045  
$16,007  
6.16% 
Fountain Hills 
13,105 
439 
3.35% 
$5,944,909  
$199,003  
3.35% 
Gila Bend 
944 
268 
28.39% 
$118,937  
$33,709  
28.34% 
Gilbert 
74,821 
1,560 
2.08% 
$29,339,526  
$611,868  
2.09% 
Glendale 
90,415 
2,711 
3.00% 
$24,665,480  
$739,539  
3.00% 
Goodyear 
25,023 
562 
2.25% 
$8,326,438  
$186,928  
2.24% 
Guadalupe 
1,397 
32 
2.29% 
$269,202  
$6,149  
2.28% 
Litchfield Park 
2,616 
30 
1.15% 
$996,356  
$11,320  
1.14% 
Unincorporated Maricopa County 
142,777 
10,181 
7.13% 
$45,530,720  
$3,246,766  
7.13% 
Mesa 
201,507 
1,526 
0.76% 
$59,328,380  
$449,284  
0.76% 
Paradise Valley 
5,621 
488 
8.68% 
$11,738,020  
$1,019,575  
8.69% 
Peoria 
64,806 
1,341 
2.07% 
$21,410,130  
$443,113  
2.07% 
Phoenix 
590,476 
11,833 
2.00% 
$167,455,500  
$3,355,733  
2.00% 
Queen Creek 
8,422 
98 
1.16% 
$2,890,493  
$33,465  
1.16% 
Salt River Pima-Maricopa Indian Community 
2,680 
90 
3.36% 
$919,777  
$31,051  
3.38% 
Scottsdale 
123,959 
11,914 
9.61% 
$67,660,310  
$6,503,151  
9.61% 
Surprise 
52,607 
969 
1.84% 
$15,652,750  
$288,441  
1.84% 
Tempe 
73,603 
635 
0.86% 
$24,383,780  
$210,364  
0.86% 
Tolleson 
2,165 
127 
5.87% 
$505,455  
$29,567  
5.85% 
Wickenburg 
3,610 
695 
19.25% 
$1,285,212  
$247,462  
19.25% 
Youngtown 
2,796 
312 
11.16% 
$540,226  
$60,253  
11.15% 
Queen Creek (Pinal County Portion) 
606 
18 
2.97% 
$207,814  
$6,345  
3.05% 
Peoria (Yavapai County Portion) 
5 
1 
20.00% 
$1,321  
$306  
23.16% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 248 
It is duly noted that the exposure numbers presented above represent a 
comprehensive evaluation of the county as a whole.  It is unlikely that a storm event 
would occur that would flood all of the delineated high flood hazard areas at the same 
time.  Accordingly, actual event based losses and exposure are likely to be only a 
fraction of those summarized above. 
Vulnerability – Repetitive Loss Properties 
Repetitive Loss (RL) properties are NFIP-insured properties that, since 1978, 
have experienced multiple flood losses.  FEMA tracks RL properties with a particular 
interest in identifying Severe RL (SRL) properties.  RL properties demonstrate a track 
record of repeated flooding for a certain location and are one element of the 
vulnerability analysis.  RL properties are also important to the NFIP, since structures 
that flood frequently put a strain on the National Flood Insurance Fund.  FEMA records 
dated March 3, 2021 indicate that there are 223 identified RL properties in Maricopa 
County, 119 of which have been mitigated.  The total payments made for building and 
contents for the record period is over $8.6 million.  Table 5-26 summarizes the RL 
property characteristics by jurisdiction.  If a jurisdiction is not listed, then there are no 
RL properties for that jurisdiction. 
Table 5-26:  Repetitive loss property statistics for Maricopa County jurisdictions  
Jurisdiction 
No. of 
Properties 
No. of Properties 
Mitigated 
Total 
Payments 
Avondale 
1 
0 
$9,865 
Buckeye 
6 
0 
$156,463 
Glendale 
5 
4 
$118,108 
Goodyear 
1 
0 
$210,035 
Unincorporated Maricopa County 
68 
50 
$2,368,122 
Mesa 
5 
1 
$153,614 
Paradise Valley 
5 
0 
$651,563 
Phoenix 
102 
43 
$3,990,687 
Scottsdale 
6 
4 
$264,427 
Tempe 
4 
2 
$194,648 
Tolleson 
12 
11 
$291,388 
Wickenburg 
5 
1 
$165,375 
 
Vulnerability – Development Trends 
For most Maricopa County jurisdictions, adequate planning and regulatory 
tools are in place to regulate future development.  The FCDMC is very proactive in 
delineating floodplains ahead of development in the less populated areas of the county 
and works cooperatively with all incorporated jurisdictions to update and refine 
existing floodplain mapping as needed. As such, it is anticipated that any new 
development or growth in the unincorporated county will be required to adhere to the 
county’s drainage and flood control requirements.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 249 
  
 
Changes in Development in the Hazard Prone Area 
Within the unincorporated areas of Maricopa County, residential development 
has been minimal but has been concentrated along I-17 in the Anthem area and in the 
western portion of the County along SR303.  It is anticipated that new development 
will largely occur in these areas over the next five years.  Portions of these areas do lie 
within identified high hazard flooding areas and can potentially impact the flooding 
hazard if development is located within the designated floodplains.   Development in 
1% flood hazard areas is regulated through compliance with the NFIP by the County 
and municipalities. 
The table below summarizes the changes in development within all other 
participating jurisdictions in relation to known flood hazard areas within the County. 
Jurisdiction 
Development Changes 
All Jurisdictions 
Changes in development are regulated through each community’s Floodplain 
Management Ordinance or similar, and individual drainage review processes 
will minimize the exposure to high flood hazards.   
Avondale 
A portion of the areas identified for development along the planned State 
Route 30, Gila River, and Rio Reimagined in southern Avondale will have the 
greatest exposure to flood risk.   
Buckeye 
Development of areas generally north of I-10 and bordering the Gila River 
have greatest exposure to high hazard flood zones. Over half of the 12,366 
permits issued in Buckeye are in subdivisions north of I-10.  All these areas 
have master drainage plans with well-defined flood conveyance facilities. 
Continued development within these areas will follow the same standards. 
Carefree 
Changes in development are anticipated to occur on a parcel-by-parcel basis 
with a focus on the Town center, SkyRanch area, and Cave Creek Road. Most 
of these areas are outside of a designated high hazard area. Any new 
development will come with enhancement to public infrastructure which 
would include storm water management.  
Cave Creek 
All the identified high hazard flood areas are located within well-defined 
watercourses and anticipated development changes will be required to avoid 
and preserve those conveyances through adherence to local drainage 
regulations and flood control measures.   
Chandler 
Small areas mostly in the eastern portion of Chandler, along the upstream side 
of irrigation canals, are designated as high hazard flood zones.  Changes in 
development of these areas is not anticipated and many are preserved as 
permanent open space.   
El Mirage 
Small areas mostly in the eastern portion of the El Mirage Community, east of 
El Mirage Rd, are designated as high hazard flood zones and are typically 
well-defined drainage corridors. Changes in development expected in the 
northeast and southern regions of the City are not within the high hazard flood 
zones.   
Fountain Hills 
All the identified high hazard flood areas are located within well-defined 
watercourses and anticipated development changes will be required to avoid 
and preserve those conveyances through adherence to local drainage 
regulations and flood control measures.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 250 
Jurisdiction 
Development Changes 
Fort McDowell 
Yavapai Nation 
Fort McDowell Yavapai Nation is bisected by a high hazard flood area running 
north to south along the Verde River with a tributary flood zone contributing 
from the east. Development changes on the nation are closely regulated and 
controlled to be outside of flood hazard areas and existing watercourses are 
preserved for conveyance. 
Gila Bend 
Flood hazard areas in Gila Bend are primarily located along watercourses 
entering the Town from the south and draining to the Gila River. Development 
changes within or near these zones are anticipated to be minimal. Any new 
development will be required to enhance public infrastructure to provide 
effective storm water management. 
Gilbert 
Small areas of flood zones along the upstream side of irrigation canals or along 
developed flood control channels are designated as high hazard flood zones in 
the Town.  Anticipated development changes are located outside of these 
areas. 
Glendale 
High hazard flood zones in Glendale are primarily contained within defined 
flood control corridors such as the New River, Agua Fria River, ACDC, and 
Skunk Creek.  Projected development changes are not expected to occur within 
the areas being targeted by the City.  
Goodyear 
High hazard flood zones in Goodyear, north of the Gila River are primarily 
limited to the Bullard Wash alignment.  Anticipated areas of development 
change are all located outside of currently identified high flood hazard areas.  
Guadalupe 
High flood hazard areas within the Town are solely contained within improved 
drainage facilities and the Town does not anticipate any meaningful 
development changes near these areas. 
Litchfield Park 
High hazard flood areas within Litchfield Park are primarily located in 
ponding zones upstream of an irrigation canal and are contained within golf 
course, park, and lake areas. None of the development changes are located in 
the high hazard flood zones.  
Mesa 
High hazard flood zones within the City are primarily located along the 
upstream side of irrigation canals or along developed flood control facilities. 
Anticipated areas of development change are located outside of these areas. 
Peoria 
High hazard flood zones throughout Peoria are primarily located along 
established watercourses, conveyance corridors and flood control facilities. 
Development changes in the northern portion of the City will likely increase 
population densities north of Happy Valley Road and Hwy 303. Portions of 
these areas contain high flood hazard areas that will be regulated per the City’s 
floodplain management ordinance and drainage design policies.  
Phoenix 
High hazard flood zones throughout Phoenix are primarily located along 
established watercourses, conveyance corridors, canals, and flood control 
facilities. Development changes anticipated for the northwest part of the City 
include a new industrial development at the northwest corner of Loop 303 and 
I-17. Continued active commercial and residential development in the 
northeast areas of the City are currently located within an alluvial fan flood 
zone that is planned for mitigation in the next planning cycle. Other new 
development throughout the City will be regulated per the City’s floodplain 
management ordinance and drainage design policies.  
Queen Creek 
High flood hazard areas within Queen Creek are primarily located along the 
Sonoqui Wash, Queen Creek, and the Rittenhouse corridors. The recently 
annexed lands in Pinal County have just received a LOMR removing the relic 
flood hazard zones from those areas. Development changes are generally 
located outside of the designated high hazard areas.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 251 
Jurisdiction 
Development Changes 
Salt River Pima-
Maricopa Indian 
Community 
The area along the southern border of the Salt River Pima-Maricopa Indian 
Community that follows the Salt River is designated as a high hazard flood 
zone. The corridor along the Verde River is similarly delineated.  Development 
changes are anticipated for areas outside of these zones.  
Scottsdale 
High hazard flood zones within Scottsdale primarily follow established 
watercourses and flood control facilities. Two alluvial fan zones exist in north 
of the CAP Canal and account for most of the City’s hazard exposure.  Both 
areas are in past and anticipated development change areas and will continue 
to be regulated per the City’s floodplain management ordinance and drainage 
design guidelines. The City is also working to provide mitigation infrastructure 
that will greatly reduce the flood hazard footprint. 
Surprise 
High hazard flood zones within Surprise are primarily located north (upstream) 
of the McMicken Dam and Outlet Channel. Anticipated development 
(primarily residential) changes are anticipated in some of these areas and 
particularly the areas north of Loop 303 and east of U.S. 60.  Hazard areas 
generally follow established watercourses will be regulated per the City’s 
floodplain management ordinance and drainage design guidelines. 
Tempe 
High hazard flood zones in Tempe are generally limited the Salt River, Indian 
Bend Wash, and minor ponding along an irrigation canal. Most of the 
development change for Tempe is through re-development and those areas are 
outside of the delineated high hazard areas.  
Tolleson 
The majority of high hazard flood areas in Tolleson are located along the 
upstream side of a regional railroad and within flood control facilities along 
the north side of I-10.  Development changes are anticipated to continue in the 
same areas for several industrial areas are anticipated along the rail line and 
will be impacted by the flood hazard area.  The City will regulate these 
developments per the City’s floodplain management ordinance and drainage 
design guidelines. 
Wickenburg 
High flood hazard zones within Wickenburg follow major watercourses 
draining through the Town.  Development changes along these corridors will 
likely be a continuation of recent development.  In all cases, watercourse 
corridors are preserved to contain the flood hazard, and the Town will continue 
to regulate the areas per the Town’s floodplain management ordinance and 
drainage design guidelines. 
Youngtown 
High flood hazard areas in Youngtown follow the Agua Fria River. 
Anticipated development changes within the hazard zone include improvement 
of a 100+ acre park in the river bottom. All other development changes are 
located outside of the flood hazard areas. 
 
Sources 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
FEMA, 2001, Understanding Your Risks; Identifying Hazards and Estimating Losses, 
FEMA Document No. 386-2. 
U.S. Army Corps of Engineers, Los Angeles District, 1978, Flood Damage Report, 28 
February-6 March 1978 on the storm and floods in Maricopa County, Arizona, 
FCDMC Library #802.024. 
U.S. Army Corps of Engineers, Los Angeles District, 1979, Flood Damage Report, 
Phoenix Metropolitan Area, December 1978 Flood, FCDMC Library #802.027.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 252 
U.S. Army Corps of Engineers, Los Angeles District, 1980, Phoenix Flood Damage 
Survey, FCDMC Library #802.029. 
U.S. Army Corps of Engineers, Los Angeles District, 1994, Flood Damage Report, 
State of Arizona, Floods of 1993. 
Profile Maps 
Maps 4A, 4B, and 4C – Flood Hazard Maps

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
85
rx
101
rx
303
rx
303
rx
303
rx
202
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 4A
Maricopa County
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020, MAG 2020; TIGER 2020
Flood Hazard Rating
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams

§¨¦
17
§¨¦
10
§¨¦
17
§¨¦
10
rx
88
rx
303
rx
202
rx
74
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
101
rx
202
rx
202
rx
51
rx
303
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 4B
Maricopa County
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020, MAG 2020; TIGER 2020
Flood Hazard Rating
High
Legend
NAME
Maricopa County
Mitigation Plan Extent
Major Streams

§¨¦
8
§¨¦
8
rx
238
rx
85
Flood Hazard Rating
High
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 4C
Maricopa County
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020, MAG 2020; TIGER 2020

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 253 
5.3.6 Levee Failure 
Description 
Levees are man-made structures that impound water above the natural 
prevailing grade or natural conveyance of a watercourse, creating an artificially 
constrained floodway. Areas protected by a levee, referred to as leveed areas, become 
the areas at-risk during a levee failure event.  Levees are usually artificial structures 
comprised of earthen, cement stabilized aggregate (CSA) or roller compacted concrete 
(RCC) embankments, or structural concrete or steel walls. A levee is typically 
constructed parallel and adjacent to an existing watercourse and serves to augment or 
contain flood flows to a specified corridor. In some cases, the levee will function as a 
diversion structure that will re-direct flood-waters along an alignment that allows for 
positive flow along the levee to the intended outlet. All the levees within Maricopa 
County are designed for flood control. 
FEMA defines levees as man-made structures, usually earthen embankments, 
that are designed and constructed in accordance with sound engineering practices to 
contain, control or divert the flow of water so as to provide protection from temporary 
flooding (FEMA, 2009).  National flood policy now recognizes the term “levee” to 
mean only those structures which were designed and constructed according to sound 
engineering practices, have up to date inspection records and current maintenance 
plans, and have been certified as to their technical soundness by a professional 
engineer.  FEMA has classified all other structures that impound, divert, and/or 
otherwise impede the flow of runoff as “non-levee embankments”.  In Maricopa 
County, these might be comprised of features such as elevated roadway and railway 
embankments, canals, irrigation ditches and drains, and agricultural dikes. 
In November 2017, Governor Ducey received a letter from the notifying the 
Governor of the Congressional authorization of USACE to work with interested states 
and levee owners/operators to conduct and inventory and review of levees across the 
nation. The purpose of the action is to work with Arizona agencies to inventory, review 
and assess critical information for levees within Arizona, with a particular focus on 
levees not currently identified to be within USACE authority. The collected 
information will be included in the USACE’s National Levee Database (NLD), which 
is publicly available and used to promote awareness of the benefits and flood risks 
associated with levees. 
In recent years, the United States Army Corps of Engineers (USACE) has been 
working with Arizona to assess and update the USACE’s National Levee Database 
(NLD), which is publicly available and used to promote awareness of the benefits and 
flood risks associated with levees. The Arizona Department of Water Resources 
(ADWR) will serve as the state’s lead agency for levee safety. By participating in the 
USACE project and coordinating with FEMA through the Cooperating Technical 
Partnership (CTP) program, ADWR will work with FEMA, USACE and local officials 
to better inspect, maintain, and track levees within their communities. 
Levee failures result in an uncontrolled release of water to the leveed areas, with 
potentially catastrophic impacts. Failures may be attributed to a variety of modes and

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 254 
causes. The three most common are: 1) foundation leakage and piping, 2) overtopping, 
and 3) embankment erosion. Deep rooted vegetation growth and animal boroughs along 
levees can also initiate piping failure pathways and compromise the structural integrity 
of walls and footings. 
History 
Levees (certified or not) have been used in Maricopa County for over a hundred 
years to protect communities and agricultural assets, as well as to facilitate the delivery 
and removal of irrigation water.  These levees range from simple earthen embankments 
pushed up by small equipment to large cement stabilized aggregate embankments 
lining both sides of a river.  The structural integrity of levees with regard to flood 
protection and policy has been discussed at a national level since the early 1980s but 
was elevated to a high priority after the collapse and breach of New Orleans’ levees 
after Hurricane Katrina in 2005. 
There are no documented failures of certified levees within Maricopa County, 
nor are there any documented records of non-levee embankment failures. 
Probability and Magnitude 
There are no established probability or magnitude criteria regarding levee 
failure due to variability in levee design and maintenance.  For flood protection credit 
under the NFIP, FEMA has established certain design criteria that are based on the 1 
percent (100-year) storm event.  Federally constructed levees are usually designed for 
larger, more infrequent events that equate to 250 to 500 year events.  All FEMA 
certified levees within Maricopa County are designed to safely convey the 100-year 
event, with a factor of safety provided by a minimum additional freeboard of three (3)  
or more feet. 
The Flood Control District of Maricopa County (FCDMC) has been active over 
the last planning cycle in delineating levee failure zones for levees managed by 
FCDMC. In addition, FEMA’s National Flood Hazard Layer (NFHL) data for 
Maricopa County has been updated to include several more Shaded Zone X - Areas 
Protected by Levee areas.  Both data sets have been compiled and a HIGH hazard 
rating.  All other areas are defined as LOW.  
Climate Change Impacts 
The climate change impacts to levee failure are nearly identical to those 
discussed in the Flooding section (see Section 5.3.5).  Increases in winter flood 
intensities, combined with the effects of reduced watershed vegetation due to drought 
and/or wildfire, could elevate the probability of levee failures in the county, and 
especially for levees that were not designed to convey/contain flows greater than the 
100-year (1% probability) standard.  Most federally sponsored levee design and 
construction will use, or have used, discharges that exceed the 100-year standard, but 
not all.  Mitigation activities should consider using the 500-year event as the minimum 
design standard to anticipate the impacts of climate change. 
Vulnerability – CPRI Results

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 255 
Levee Failure CPRI results for each community are summarized in Table 5-27 
below. 
Table 5-27:  CPRI results by jurisdiction for levee failure 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Possibly 
Negligible 
<6 hours 
<24 hours 
2.00 
Buckeye 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Carefree 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Cave Creek 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Chandler 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
El Mirage 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Fort McDowell Yavapai Nation 
Unlikely 
Negligible 
<6 hours 
<24 hours 
1.55 
Fountain Hills 
Unlikely 
Negligible 
<6 hours 
<24 hours 
1.55 
Gila Bend 
Unlikely 
Negligible 
<6 hours 
<24 hours 
1.55 
Gilbert 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Glendale 
Unlikely 
Limited 
<6 hours 
<24 hours 
1.85 
Goodyear 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Guadalupe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Litchfield Park 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Unincorporated Maricopa County 
Unlikely 
Critical 
<6 hours 
<1 week 
2.25 
Mesa 
Unlikely 
Limited 
<6 hours 
<1 week 
1.95 
Paradise Valley 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Peoria 
Possibly 
Limited 
<6 hours 
<24 hours 
2.15 
Phoenix 
Unlikely 
Critical 
6-12 hours 
<6 hours 
1.90 
Queen Creek 
Possibly 
Negligible 
<6 hours 
<24 hours 
1.85 
Salt River Pima-Maricopa Indian 
Community 
Possibly 
Critical 
<6 hours 
<24 hours 
2.60 
Scottsdale 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Surprise 
Unlikely 
Negligible 
<6 hours 
<24 hours 
1.55 
Tempe 
Possibly 
Limited 
<6 hours 
<1 week 
2.40 
Tolleson 
Unlikely 
Negligible 
>24 hours 
<1 week 
1.20 
Wickenburg 
Possibly 
Limited 
<6 hours 
<6 hours 
2.20 
Youngtown 
Unlikely 
Critical 
<6 hours 
<6 hours 
2.45 
County-wide average CPRI = 
1.75 
 
Vulnerability – Loss/Exposure Estimations  
The estimation of potential exposure to high hazard levee failure areas was 
accomplished by intersecting the human and facility assets with the levee failure hazard 
limits depicted on Maps 5A, 5B, and 5C.  Table 5-28 summarizes the MJPT identified 
critical and non-critical facilities potentially exposed to high hazard levee failure areas.  
Table 5-29 summarizes population sectors exposed to the high hazard levee failure 
areas.  Residential structure exposures to high hazard levee failure areas are 
summarized in Table 5-30.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 256 
Table 5-28:  Asset inventory exposure to high hazard levee failure areas 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
104 
0.95% 
$26,024,918 
$367,826 
Avondale 
131 
18 
13.74% 
$179,460 
$75,000 
Buckeye 
125 
0 
0.00% 
$268,667 
$0 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
0 
0.00% 
$1,361,072 
$0 
El Mirage 
34 
0 
0.00% 
$285,542 
$0 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
0 
0.00% 
$36,000 
$0 
Gilbert 
5287 
36 
0.68% 
$0 
$0 
Glendale 
1224 
2 
0.16% 
$4,085,807 
$24,950 
Goodyear 
159 
0 
0.00% 
$148,573 
$0 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
14 
1.32% 
$3,624,310 
$7,843 
Mesa 
528 
1 
0.19% 
$2,850,466 
$2,000 
Paradise Valley 
95 
0 
0.00% 
$469,300 
$0 
Peoria 
299 
10 
3.34% 
$282,333 
$11,001 
Phoenix 
947 
6 
0.63% 
$7,843,312 
$37,463 
Queen Creek (Maricopa County Only) 
124 
0 
0.00% 
$301,446 
$0 
Salt River Pima-Maricopa Indian Community 
78 
4 
5.13% 
$502,493 
$54 
Scottsdale 
237 
8 
3.38% 
$1,094,610 
$155,515 
Surprise 
94 
0 
0.00% 
$498,810 
$0 
Tempe 
111 
5 
4.50% 
$1,373,300 
$54,000 
Tolleson 
10 
0 
0.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
0 
0.00% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 257 
Table 5-29:  Population sectors exposed to high hazard levee failure areas  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,787 
25,425 
0.61% 
538,166 
4,417 
0.82% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
18,563 
23.35% 
5,313 
1003 
18.88% 
Buckeye 
65,452 
0 
0.00% 
5,141 
0 
0.00% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
0 
0.00% 
23,435 
0 
0.00% 
El Mirage 
33,728 
0 
0.00% 
2,700 
0 
0.00% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
1520 
0.63% 
17,960 
86 
0.48% 
Glendale 
237,327 
2 
0.00% 
23,675 
0 
0.00% 
Goodyear 
78,118 
0 
0.00% 
10,094 
0 
0.00% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
0 
0.00% 
1,065 
0 
0.00% 
Unincorporated Maricopa County 
290,179 
6,603 
2.28% 
95,187 
2,654 
2.79% 
Mesa 
467,657 
69 
0.01% 
71,995 
42 
0.06% 
Paradise Valley 
13,834 
0 
0.00% 
3,365 
0 
0.00% 
Peoria 
166,339 
19,258 
11.58% 
25,308 
2,852 
11.27% 
Phoenix 
1,561,296 
12,915 
0.83% 
143,448 
299 
0.21% 
Queen Creek 
35,720 
0 
0.00% 
2,094 
0 
0.00% 
Salt River Pima-Maricopa Indian Community 
6,706 
0 
0.00% 
1,004 
0 
0.00% 
Scottsdale 
237,929 
28268 
11.88% 
49,963 
5248 
10.50% 
Surprise 
128,211 
0 
0.00% 
26,025 
0 
0.00% 
Tempe 
176,809 
3897 
2.20% 
15,264 
180 
1.18% 
Tolleson 
6,904 
0 
0.00% 
809 
0 
0.00% 
Wickenburg 
6,803 
32 
0.47% 
2,058 
1 
0.05% 
Youngtown 
6,454 
0 
0.00% 
1,177 
0 
0.00% 
Queen Creek (Pinal County Portion) 
1421 
0 
0.00% 
128 
0 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 258 
Table 5-30:  Residential structures exposed to high hazard levee failure areas  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,265 
42,588 
2.60% 
$542,436,633  
$16,533,182  
3.05% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
6,634 
24.75% 
$7,272,041  
$1,800,089  
24.75% 
Buckeye 
18,206 
0 
0.00% 
$4,946,783  
$0  
0.00% 
Carefree 
2,242 
0 
0.00% 
$1,922,010  
$0  
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751  
$0  
0.00% 
Chandler 
94,257 
0 
0.00% 
$34,713,265  
$0  
0.00% 
El Mirage 
11,307 
0 
0.00% 
$2,655,346  
$0  
0.00% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045  
$0  
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$0  
0.00% 
Gila Bend 
944 
0 
0.00% 
$118,937  
$0  
0.00% 
Gilbert 
74,821 
384 
0.51% 
$29,339,526  
$150,602  
0.51% 
Glendale 
90,415 
1 
0.00% 
$24,665,480  
$182  
0.00% 
Goodyear 
25,023 
0 
0.00% 
$8,326,438  
$0  
0.00% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
0 
0.00% 
$996,356  
$0  
0.00% 
Unincorporated Maricopa County 
142,777 
3,663 
2.57% 
$45,530,720  
$1,168,204  
2.57% 
Mesa 
201,507 
30 
0.01% 
$59,328,380  
$8,850  
0.01% 
Paradise Valley 
5,621 
0 
0.00% 
$11,738,020  
$0  
0.00% 
Peoria 
64,806 
9,422 
14.54% 
$21,410,130  
$3,112,648  
14.54% 
Phoenix 
590,476 
6,050 
1.02% 
$167,455,500  
$1,715,769  
1.02% 
Queen Creek 
8,422 
0 
0.00% 
$2,890,493  
$0  
0.00% 
Salt River Pima-Maricopa Indian Community 
2,680 
0 
0.00% 
$919,777  
$48,581  
5.28% 
Scottsdale 
123,959 
14419 
11.63% 
$67,660,310  
$7,870,090  
11.63% 
Surprise 
52,607 
0 
0.00% 
$15,652,750  
$0  
0.00% 
Tempe 
73,603 
1966 
2.67% 
$24,383,780  
$651,398  
2.67% 
Tolleson 
2,165 
0 
0.00% 
$505,455  
$0  
0.00% 
Wickenburg 
3,610 
19 
0.53% 
$1,285,212  
$6,769  
0.53% 
Youngtown 
2,796 
0 
0.00% 
$540,226  
$0  
0.00% 
Queen Creek (Pinal County Portion) 
606 
0 
0.00% 
$207,814  
$0  
0.00% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 259 
In summary, 104 critical and non-critical MJPT identified assets with a 
cumulative reported replacement cost of $367.8 million are exposed to high hazard 
levee failure areas, for the planning area.  An additional $16.5 billion of census block 
residential structures are exposed to high hazard levee failure areas for the planning 
area.  Regarding human vulnerability, a total population of 24,525 people, or 0.67% of 
the total census block population for the planning area, is potentially exposed to a high 
hazard levee failure.  Should a levee structure fail suddenly, it is plausible that death 
and injury might occur.  It can also be expected that a substantial portion of the exposed 
population is subject to displacement, depending on the event magnitude. 
It is duly noted that the loss and exposure numbers presented above represent a 
comprehensive evaluation of the county as a whole.  It is unlikely that a storm event 
would occur that would fail all of the levees at the same time.  Accordingly, actual 
event based losses and exposure are likely to be only a fraction of those summarized 
above. 
Vulnerability – Development Trend Analysis 
With the new focus on residual downstream risk for the land-side of levees and 
a general refocusing of national levee regulation and policy, it is likely that new and 
old developments in these areas will need to be revisited to determine if additional 
measures are necessary for adequate flood protection.  The expansion of defined levee 
failure risk zones by FEMA and FCDMC will continue to raise the exposure for 
previously unstudied areas. New developments located in or around these areas should 
be evaluated to determine if mitigation actions are necessary.  The most effective 
mitigation is regular maintenance and inspections of levee structures. 
Changes in Development in the Hazard Prone Area 
Within the unincorporated areas of Maricopa County, residential development 
has been minimal but has been concentrated along I-17 in the Anthem area and in the 
western portion of the County along SR303.  It is anticipated that new development 
will largely occur in these areas over the next five years.  These areas do not lie within 
identified high hazard areas associated with levee failure.   
The table below summarizes the changes in development for jurisdictions with 
known levee failure hazard areas. 
Jurisdiction 
Development Changes 
Avondale 
The City contains levee failure hazard areas associated with the Agua Fria 
River with bisects the community from north to south.  Development changes 
within Avondale Key Growth Corridors, identified as Van Buren Street from 
the new Fairway Drive freeway exit (near 127th Ave) to 99th Avenue, Historic 
Avondale Area (approx. Dysart and Buckeye Road), North Avondale Area 
(North of I-10) and the south Avondale Area (South of Lower Buckeye Road 
to the Gila River) will potentially impact areas of levee failure hazard.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 260 
Jurisdiction 
Development Changes 
Gilbert 
The southern portion of the Town of Gilbert is impacted with a Levee Failure 
Hazard area associated with the Roosevelt Canal, roughly bounded by Val 
Vista on the west, Higley on the east and Ocotillo on the north.  The bulk of 
new and expected commercial and industrial development within Gilbert is 
anticipated to occur in the northern portion of the Town. The majority of new 
residential projects are anticipated to occur within the southern portion, 
however none of the projected areas are located within the levee failure hazard 
area.   
Glendale 
Levee failure hazard areas within Glendale are concentrated around the 
confluence of the Agua Fria River and New River.  The only area of new and 
proposed development potentially impacted by the identified Levee Failure 
Hazard is located west of Hwy 101 between Northern Avenue and Camelback 
Road.  However, given the limited extent of the levee failure hazard in this 
area, no impacts due to changes in development are anticipated.  
Goodyear 
There are no areas of high hazard due to levee failure located within the City 
of Goodyear.  While changes in development have occurred, they have no 
impact on this hazard. 
Guadalupe 
The Community of Guadalupe does not anticipate significant changes in 
development and is not impacted by areas of increased levee failure hazard. 
Litchfield Park 
There are no areas of high hazard due to levee failure located within the City 
of Litchfield.  While changes in development have occurred, they have no 
impact on this hazard. 
Mesa 
There are only minimal areas of high hazard due to levee failure located within 
the City of Mesa.  While changes in development have occurred, they have no 
impact on this hazard. 
Peoria 
Peoria is impacted by areas of levee failure hazard associated with New River 
from the intersection of Hwy 101 and 60 to the southern City limits. Recent 
development has occurred in the northern and northwestern areas of the City 
and is anticipated to continue to migrate northward.  Changes in development 
are not anticipated to impact areas of levee failure hazard.  
Phoenix 
The City contains levee failure hazard areas associated with Skunk Creek to 
the north, New River to the west and the Salt River to the east. The majority of 
new development within the City of Phoenix is associated with infill 
development and residential development within the southwest area of the 
City.  As the development efforts do not lie within areas of levee failure 
hazard, development changes will not impact this hazard.  
Queen Creek 
There are no areas of high hazard due to levee failure located within the Town 
of Queen Creek.  While changes in development have occurred, they have no 
impact on this hazard. 
Salt River Pima-
Maricopa Indian 
Community 
The SRPMIC is impacted with a levee failure hazard area associated with the 
Salt River on the westernmost portion of the Community, west of Hwy 101.  
No development changes are currently proposed within this area. 
Scottsdale 
The City of Scottsdale is impacted by the levee failure hazard area associated 
with Indian Bend Wash on the southernmost portion of the community from 
Indian Bend Rd to the southern boundary. The majority of new residential and 
commercial development is anticipated to occur within the northern and 
central sub-areas of the City and will not be impacted by the levee failure 
hazard area.  Limited development has occurred within the southern sub-area, 
however the area impacted by the levee is fully developed and will not 
experience substantial changes in development.   
Surprise 
There are no areas of high hazard due to levee failure located within the City 
of Surprise.  While changes in development have occurred, they have no 
impact on this hazard.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 261 
Jurisdiction 
Development Changes 
Tempe 
Levee failure hazard areas are present within the City of Tempe along the Hwy 
202 alignment in association with the Salt River.  The highest rates of growth 
within the City are located in the northern portions of the City, specifically in 
the downtown area, Tempe Town Lake, and the new Novus Innovation 
Corridor.  These areas of development will be impacted by the identified levee 
failure hazard areas.  
Tolleson 
There are no areas of high hazard due to levee failure located within the City 
of Tolleson.  While changes in development have occurred, they have no 
impact on this hazard. 
Wickenburg 
A small portion of levee failure hazard area associated with Hassayampa River 
is located within the Town of Wickenburg along Hwy 93. However, no 
changes in development exist or have been proposed within this area.   
Youngtown 
There are no areas of high hazard due to levee failure located within the Town 
of Youngtown.  While changes in development have occurred, they have no 
impact on this hazard. 
 
 
Sources 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
FEMA, 2001, Understanding Your Risks; Identifying Hazards and Estimating Losses, 
FEMA Document No. 386-2. 
FEMA, 2009, Web page at URL:  
http://www.fema.gov/plan/prevent/fhm/lv_intro.shtm#3  
FCDMC, 2020, Dam and Levee Safety group 
USACE National Levee Database, 2020, website access at:  
https://levees.sec.usace.army.mil/#/  
Profile Maps 
Maps 5A, 5B, and 5C – Potential Levee Failure Flood Hazard Map(s)

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
202
rx
85
rx
101
rx
303
rx
202
rx
303
rx
85
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
Legend
Maricopa County
Mitigation Plan Extent
FCDMC Levees
FEMA NFHL Levees
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 5A
Maricopa County
Potential Levee Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020; MAG 2020; TIGER 2020
Potential Levee
Failure Flood 
Hazard Rating
Levee Failure

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
17
rx
88
rx
303
rx
202
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
202
rx
303
rx
202
rx
51
rx
101
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 5B
Maricopa County
Potential Levee Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020; MAG 2020; TIGER 2020
Legend
Maricopa County
Mitigation Plan Extent
FCDMC Levees
FEMA NFHL Levees
Potential Levee
Failure Flood 
Hazard Rating
Levee Failure

§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 5C
Maricopa County
Potential Levee Failure
Flood Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; FEMA 2020; 
FCDMC 2020; MAG 2020; TIGER 2020
Legend
Maricopa County
Mitigation Plan Extent
FCDMC Levees
FEMA NFHL Levees
Potential Levee
Failure Flood 
Hazard Rating
Levee Failure

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 262 
5.3.7 Severe Wind 
Description 
For this Plan, the hazard of Severe Wind encompasses all climatic events that 
produce damaging winds.  For Maricopa County, severe winds usually result from 
either extreme pressure gradients that usually occur in the spring and early summer 
months, or from thunderstorms.  Occasionally, tropical storm activity (remnant 
hurricanes) can be accompanied by severe winds, but the wind speeds usually dissipate 
by the time the tropical storm front approaches the county.  Thunderstorms can occur 
year-round and are usually associated with cold fronts in the winter, monsoon activity 
in the summer, and tropical storms in the late summer or early fall. 
Three types of damaging wind related features typically accompany a 
thunderstorm; 1) downbursts, 2) straight line winds, and infrequently, 3) tornadoes. 
Downbursts are columns of air moving rapidly downward through a 
thunderstorm.  When the air reaches the ground, it spreads out in all directions, creating 
horizontal wind gusts of 80 mph or higher.  Downburst winds have been measured as 
high as 140 mph.  Some of the air curls back upward with the potential to generate a 
new thunderstorm cell.  Downbursts are called macrobursts when the diameter is 
greater than 2.5 miles, and microbursts when the diameter is 2.5 miles or less.  They 
can be either dry or wet downbursts, where the wet downburst contains precipitation 
that continues all the way down to the ground, while the precipitation in a dry 
downburst evaporates on the way to the ground, decreasing the air temperature and 
increasing the air speed.  In a microburst the wind speeds are highest near the location 
where the downdraft reached the surface, and are reduced as they move outward due to 
the friction of objects at the surface.  Typical damage from downbursts includes 
uprooted trees, downed power lines, mobile homes knocked off their foundations, 
block walls and fences blown down, and porches and awnings blown off homes. 
Straight line winds are developed similarly to downbursts, but are usually 
sustained for greater periods as a thunderstorm reaches the mature stage, traveling 
parallel to the ground surface at speeds of 75 mph or higher.  These winds are frequently 
responsible for generating dust storms and sand storms, reducing visibility and creating 
hazardous driving conditions. 
A tornado is a rapidly rotating funnel (or vortex) of air that extends toward the 
ground from a cumulonimbus cloud.  Most funnel clouds do not touch the ground, but 
when the lower tip of the funnel cloud touches the earth, it becomes a tornado and can 
cause extensive damage.  For Maricopa County, tornadoes are the least common severe 
wind to accompany a thunderstorm. 
History 
According to Tables 5-2 and 5-3, Maricopa County has been included in four 
state and/or federal disaster declarations involving thunderstorms.  There are also an 
additional 573 thunderstorm/high wind events, and 51 tornadoes, with a combined loss 
of approximately $470 million to structures and agriculture, 11 deaths, and over 252

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 263 
injuries.  The following are examples of documented events that have occurred during 
the last Plan cycle. 
• In January 1993, a category F2 tornado moved through Scottsdale damaging 18 
homes, four with major damage, and damaging many trees and signs.  The most 
damage occurred when the tornado moved east from 59th and Clinton to 72nd and 
Cholla.  Controllers from the nearby Scottsdale Airport watched the tornado move 
through this north Scottsdale residential area.  Damages were estimated to exceed 
$5 million (NCDC, 2009). 
• In August 1993, strong winds from nearby thunderstorms exceeded 50 mph in many 
areas of the valley.  Homes and businesses sustained damage, trees were uprooted 
and power lines were downed.  Arizona Public Service reported 10,000 customers 
without power.  An 8-year-old boy in Avondale was severely injured just after 1800 
MST when a window burst and glass cut his jugular vein.  The roof of a 
convenience store was blown off, and damage occurred to a church and an 
elementary school.  A 1-mile section of a 69,000-volt power line near Perryville 
was knocked down.  High winds blew tree limbs onto power poles and took shingles 
off several homes.  Damages were estimated to exceed $5 million (NCDC, 2009). 
• In September 1994, a microburst struck a school building at the Littleton 
Elementary School in the community of Cashion, two miles SW of Tolleson.  The 
roof was torn from about eight classrooms with one teacher and eight children being 
injured.  A National Weather Service Storm Survey Team estimated winds of 100 
mph.  A teacher reported the ground covered with hail, some golf ball-size.  A 
weather spotter at 75th Avenue and Camelback Road reported 1.25 inch hail.  A 
mile long stretch of power poles were downed near 107th Avenue and Interstate 
10.  Damage to the school was estimated in excess of $500,000 and storm wide 
estimates exceeded $5 million (NCDC, 2009). 
• In September 1996, a massive thunderstorm moved through the western half of the 
Phoenix Metropolitan Area, with nearly every west valley community reporting 
some damage.  The hardest hit areas were in northwest Phoenix, Glendale, and 
Peoria.  Other towns that sustained damage were Sun City, Surprise, El Mirage, 
Tolleson, Avondale, Goodyear, and Buckeye.  Approximately 400 power poles 
were knocked down throughout these towns, 100 owned by SRP and 300 owned 
by APS.  There were from 70,000 to 75,000 homeowner claims for about $100 
million in damage (NCDC, 2009). 
• In August 2001, a large thunderstorm complex developed over northwest Maricopa 
County and moved to the south and southwest. The thunderstorm induced gust 
front, at times over 60 miles long, west to east, caused widespread electric power 
outages in the Gila Bend area south to Ajo in west Pima County. In the immediate 
Gila Bend area, thirty-eight 230kv poles downed, and thirty-nine 69kv poles were 
downed. A substation was damaged as well as telephone lines. The reported wind 
gust of 66 knots was recorded at the Gila Bend municipal airport at 0245. As the 
gust front moved further to the south and southwest, a total of 140 power poles

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 264 
were blown over as reported by the Arizona Public Service. Electric power services 
were disrupted up to 5 days. State PCA No. 22001 (ADEM, 2009). 
• In July 2006, several cities throughout the central portion of Maricopa County had 
major wind damage as a series of thunderstorms and microbursts moved across the 
area.  According to SRP, an estimated 65 power poles were blown down in parts of 
Scottsdale, Tempe and Mesa. At one point, about 20,000 customers were without 
power.  APS reported about 8,000 customers were without power.  At Phoenix Sky 
Harbor Airport, the official peak wind gust was 59 mph.  However, winds at 
Williams Gateway Airport gusted to 86 mph and flipped a small twin-engine plane 
atop another aircraft.  In Mesa, 35 schools reported damages due to the storm. Storm 
wide losses were estimated to exceed $150 million. 
• In August 2008, several waves of severe thunderstorms moved westward across the 
central and eastern portions of Maricopa County with wind gusts estimated to 
exceed 85 mph.  In Tempe, an 18 year-old man was injured by a falling tree. Winds 
on the ASU campus were measured at 69 mph and severely damaged the indoor 
football practice facility.  At 16th St and Thomas, widespread damage occurred to 
homes and businesses, and windows were knocked out in at least one Phoenix high-
rise.  Numerous power poles were downed and many trees uprooted. Some damage 
also occurred at the Arizona State Capitol in Phoenix.  Trees were uprooted at 48th 
street and McDowell and nearby homes were damaged. Microburst winds hit 
Chandler Airport and flipped at least two planes.  Over $26 million in losses were 
reported Valley-wide (NCDC, 2009). 
• In January 2010, severe wind gusts in Scottsdale destroyed a large tent at the Russo 
Steele Auction near Mayo Blvd and Scottsdale Rd and blew it onto nearby State 
Highway Loop 101 when winds collapsed the tent onto many classic cars. There 
was also damage to facilities at the nearby Barrett Jackson Auction. Three minor 
injuries were reported and damages were in excess of $1.5 million. 
• In September 2014, a severe squall line moved across the greater Phoenix valley 
causing major damage to trees, power poles, roofs, cars, and small aircraft at several 
valley airports.  Gusts exceeding 70 mph were measured and reported damages 
exceeded $200,000 (NCDC, 2015). 
• In August 2015, numerous thunderstorms developed during the evening hours of 
August 31st across the greater Phoenix metropolitan producing gusty and damaging 
winds more than 60 mph. There were widespread reports of wind damage in the 
form of downed trees and power poles, and damaged structures and roofs.; No 
injuries were reported, and damages were estimated to exceed $836,000 (NCDC, 
2020). 
• In July 2018, a series of monsoon thunderstorms spanning a 5-day period produced 
gusty and damaging down burst winds across much of the greater Phoenix 
metropolitan area. A Safeway grocery store in Glendale suffered wind and water 
damage which contributed to a building fire that almost destroyed the store. No 
injuries were reported, and damages were estimated at $2.4 million over the five-
day period (NCDC, 2020).

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 265 
• In early September 2019, isolated monsoon thunderstorms developed across the 
central deserts to the west of Phoenix during the early evening hours on September 
4th. One of the more powerful storms produced a strong micro burst with wind 
speeds estimated to be as high as 70 mph. Local law enforcement reported that 
downburst winds blew over 6 semi-trailer trucks on Interstate 10 west of Tonopah 
and 11 miles east of Centennial. Damages were estimated at $75,000 and there was 
one person injured and one fatality (NCDC, 2020). 
• In November 2019, a strong cold front moved across the greater Phoenix 
metropolitan area during the early morning hours on November 29th. Due to high 
levels of wind shear and instability, the front generated several small EF0 and EF1 
tornadoes. According to the NWS, the tornados resulted in moderate damage, 
downing several trees and power poles and damaging roofs, small auxiliary 
structures, and vehicles. No fatalities or injuries were reported. Total damages were 
estimated at $320,000 valley wide (NCDC, 2020). 
Probability and Magnitude 
For thunderstorm winds, the probability of a severe thunderstorm occurring 
with high velocity winds increases as the average duration and number of thunderstorm 
events increases.  According to NCDC, 321 separate thunderstorm wind events 
reporting wind speeds exceeding 60 knots have been reported for Maricopa County 
over the past 30 year period ending in August 2020 (NCDC, 2020).  Of those events, 
228 were reported as damaging with a total of approximately $310 million in estimated 
losses, two deaths and 46 injuries. It is very likely that on average, over 10 severe wind 
events have occurred per year and approximately two-thirds of those events will cause 
damage. 
The NWS issues a severe thunderstorm watch when conditions are favorable 
for the development of severe thunderstorms. The local NWS office considers a 
thunderstorm severe if it produces hail at least 3/4-inch in diameter, wind of 58 mph or 
higher, or tornadoes. When a watch is issued for a region, residents are encouraged to 
continue normal activities but should remain alert for signs of approaching storms, and 
continue to listen for weather forecasts and statements from the local NWS office.  
When a severe thunderstorm has been detected by weather radar or one has been 
reported by trained storm spotters, the local NWS office will issue a severe 
thunderstorm warning.  A severe thunderstorm warning is an urgent message to the 
affected counties that a severe thunderstorm is imminent.  The warning time provided 
by a severe thunderstorm watch may be on the order of hours, while a severe 
thunderstorm warning typically provides an hour or less warning time.  All of the 290 
storms that were documented over the last 30 years would qualify as a severe 
thunderstorm. 
The American Society of Civil Engineers (ASCE) has identified a 3-second 
wind gust speed as the most accurate measure for identifying the potential for damage 
to structures.  The 3-second wind gust criteria is recommended as a normal wind 
loading design standard.  All of Maricopa County is designated with a standard design 
3-second gust wind speed of 90 mph, indicating relatively low levels of risk from severe 
winds when compared to other regions of the country (ASCE, 1999).  FEMA has taken

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 266 
the work from ASCE and further identified wind speed zones for use in designing 
community shelters and safe-rooms that can withstand tornado and hurricane winds.  
Maricopa County is entirely located in Zone I, as illustrated in Figure 5-12.  In these 
zones, a design wind speed of 130 mph is recommended for the design and construction 
of community shelters. 
  
Source:  FEMA Website at the following URL:  http://www.fema.gov/plan/prevent/saferoom/tsfs02_wind_zones.shtm 
 
Figure 5-12:  Illustration of FEMA Wind Zones 
 
The Beaufort Wind Scale, indicated by Table 5-31 shown below, provides a 
measure of wind magnitude versus expected damages.  The Beaufort scale is useful 
because it specifically addresses wind effects over land based on wind speed.  Wind 
speeds in the Beaufort Number 10-11 range annually impact the county.  On rare 
occasions, wind gusts in the county can creep into the low end of the Beaufort Number 
12 category. 
Tornado damage severity is measured by the Enhanced Fujita Tornado Scale, 
which assigns a numerical value of 0 to 5 based on wind speeds and damage potential, 
as shown in Table 5-32, with the letter EF preceding the number (e.g., EFO, EF1, EF2). 
Table 5-32 also provides reference to the older Fujita Scale. Most tornadoes last less 
than 30 minutes, but some last for over an hour. The path of a tornado can range from 
a few hundred feet to miles in length. The width of a tornado may range from tens of 
yards to more than a quarter of a mile.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 267 
Table 5-31:  Beaufort Wind Scale 
 
 
Source:  New Mexico Natural Hazard Mitigation Plan 
 
Table 5-32:  Enhanced Fujita Tornado Scale 
Fujita Scale 
Enhanced  
Fujita Scale 
Damage Description 
ID 
Wind 
Speed* 
ID 
Wind 
Speed* 
F0 
45-78 
EF0 
65-85 
Minor or no damage.  
Peels surface off some roofs; some damage to gutters or 
siding; branches broken off trees; shallow-rooted trees 
pushed over. Confirmed tornadoes with no reported damage 
(i.e., those that remain in open fields) are always rated F0 or 
EF0. 
F1 
79-117 
EF1 
86-110 
Moderate damage.  
Roofs severely stripped; mobile homes overturned or badly 
damaged; loss of exterior doors; windows and other glass 
broken. 
F2 
118-161 
EF2 
111-135 
Considerable damage.  
Roofs torn off well-constructed houses; foundations of frame 
homes shifted; mobile homes completely destroyed; large 
trees snapped or uprooted; light-object missiles generated; 
cars lifted off the ground.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 268 
Table 5-32:  Enhanced Fujita Tornado Scale 
Fujita Scale 
Enhanced  
Fujita Scale 
Damage Description 
ID 
Wind 
Speed* 
ID 
Wind 
Speed* 
F3 
162-209 
EF3 
136-165 
Severe damage.  
Entire stories of well-constructed houses destroyed; severe 
damage to large buildings such as shopping malls; trains 
overturned; trees debarked; heavy cars lifted off the ground 
and thrown; structures with weak foundations are badly 
damaged. 
F4 
210-261 
EF4 
166-200 
Extreme damage.  
Well-constructed and whole framed houses completely 
leveled; cars and other large objects thrown and small 
missiles generated. 
F5 
262-317 
EF5 
>200 
Total Destruction of Buildings  
Strong-framed, well-built houses leveled off foundations are 
swept away; steel-reinforced concrete structures are critically 
damaged; tall buildings collapse or have severe structural 
deformations; some cars, trucks, and train cars can be thrown 
approximately 1 mile. 
* - Wind speeds in mph, 3-second gust 
Source:  DEMA, 2018 and National Weather Service 
 
The probability of tornadoes occurring is much less frequent than thunderstorm 
winds.  For the 30-year period ending August 2020, there have been 29 tornado events 
with one injury and $5.7 million in reported damages. Four of the tornados were EF1 
(F1) and one is EF2 (F2).  According the NCDC, there has been only one EF3 (F3) 
tornado recorded in the history of Maricopa County on August 4, 1957. 
Climate Change Impacts 
The NCA report (Garfin, et.al., 2014) is silent regarding the impact of climate 
change on severe wind events in the Southwest. A study by Luong (Luong, et al., 2015) 
notes that monsoon thunderstorms in the Central and Southern Regions of Arizona have 
become more intense over a recent 20-year period (1991-2010) when compared to 
events recorded in the past (1950-1970). The study concludes that the trend will likely 
continue as the temperatures rise and provide more moisture storage capacity in the 
lower atmosphere. The increased thunderstorm intensities may correlate to increased 
wind intensities, and especially if the thunderstorm cells are stronger and larger.  There 
are no further references specific to Arizona tornados and climate change impacts. 
Vulnerability – CPRI Results 
Severe Wind CPRI results for each community are summarized in Table 5-33 
below.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 269 
Table 5-33:  CPRI results by jurisdiction for severe wind 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Likely 
Limited 
<6 hours 
<6 hours 
2.65 
Buckeye 
Highly Likely 
Critical 
<6 hours 
<6 hours 
3.40 
Carefree 
Highly Likely 
Limited 
12-24 hours 
<1 week 
3.00 
Cave Creek 
Highly Likely 
Limited 
12-24 hours 
<6 hours 
2.80 
Chandler 
Highly Likely 
Negligible 
6-12 hours 
<6 hours 
2.65 
El Mirage 
Highly Likely 
Critical 
>24 hours 
<1 week 
3.15 
Fort McDowell Yavapai Nation 
Highly Likely 
Limited 
12-24 hours 
<6 hours 
2.80 
Fountain Hills 
Likely 
Critical 
6-12 hours 
<1 week 
3.00 
Gila Bend 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Gilbert 
Highly Likely 
Limited 
<6 hours 
<24 hours 
3.20 
Glendale 
Highly Likely 
Limited 
<6 hours 
<6 hours 
3.10 
Goodyear 
Highly Likely 
Negligible 
12-24 hours 
<24 hours 
2.60 
Guadalupe 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Litchfield Park 
Highly Likely 
Limited 
<6 hours 
<24 hours 
3.20 
Unincorporated Maricopa County 
Highly Likely 
Critical 
<6 hours 
<6 hours 
3.40 
Mesa 
Highly Likely 
Limited 
<6 hours 
<1 week 
3.30 
Paradise Valley 
Highly Likely 
Limited 
6-12 hours 
<24 hours 
3.05 
Peoria 
Highly Likely 
Critical 
<6 hours 
<24 hours 
3.50 
Phoenix 
Highly Likely 
Negligible 
<6 hours 
<6 hours 
2.80 
Queen Creek 
Likely 
Limited 
<6 hours 
<6 hours 
2.65 
Salt River Pima-Maricopa Indian 
Community 
Highly Likely 
Critical 
6-12 hours 
<1 week 
3.45 
Scottsdale 
Likely 
Limited 
12-24 hours 
<6 hours 
2.35 
Surprise 
Highly Likely 
Limited 
<6 hours 
<6 hours 
3.10 
Tempe 
Highly Likely 
Critical 
<6 hours 
<24 hours 
3.50 
Tolleson 
Likely 
Limited 
12-24 hours 
<24 hours 
2.45 
Wickenburg 
Highly Likely 
Critical 
<6 hours 
<6 hours 
3.40 
Youngtown 
Highly Likely 
Critical 
<6 hours 
<24 hours 
3.50 
County-wide average CPRI = 
2.99 
 
Vulnerability – Loss/Exposure Estimations  
Exposure to severe wind events is generally the same across the county, 
although communities situated close to the mountains like Carefree, Cave Creek, and 
Fountain Hills, may not be as susceptible to tornadoes as other communities within the 
county.  Based on the historic record over the last 30 years, it is feasible to expect 
average annual losses of $11 million (county-wide).  It is difficult to estimate losses for 
individual jurisdictions within the county due to the lack of discrete data. 
Vulnerability – Development Trend Analysis 
Future development will expand the exposure of life and property to the 
damaging effects of severe wind events.  Enforcement and/or implementation of 
modern building codes to regulate new developments is probably the best way to 
mitigate against losses. 
Changes in Development in the Hazard Prone Area 
There have been no major changes since the last plan update regarding 
development impacted by severe wind within the planning area. All of the urbanized 
areas within Maricopa County and participating jurisdictions have vulnerability to 
severe wind. As development and population continue to grow in nearly all 
jurisdictions, changes to development will impact the vulnerability of each community 
to this hazard.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 270 
Sources 
American Society of Civil Engineers, 1999, ASCE 7-98: Minimum Design Loads for 
Buildings and Other Structures. 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
Federal Emergency Management Agency,1997, Multi-Hazard Identification and Risk 
Assessment – A Cornerstone of the National Mitigation Strategy. 
FEMA, 2001, Understanding Your Risks; Identifying Hazards and Estimating Losses, 
FEMA Document No. 386-2. 
Luong, T. M., Castro, C. L., Chang, H., Lahmers, T., Adams, D. K., & Ochoa-Moya, 
C. A. (2017). The More Extreme Nature of North American Monsoon 
Precipitation in the Southwestern United States as Revealed by a Historical 
Climatology of Simulated Severe Weather Events, Journal of Applied 
Meteorology and Climatology, 56(9), 2509-2529. Retrieved Dec 2, 2020, from 
https://journals.ametsoc.org/view/journals/apme/56/9/jamc-d-16-0358.1.xml 
New Mexico, 2010, New Mexico Natural Hazard Mitigation Plan. 
U.S. Dept of Commerce, National Climatic Data Center, 2015, Storm Events 
Database, accessed via the following URL:  
http://www.ncdc.noaa.gov/stormevents/ 
U.S. Dept of Commerce, NOAA National Weather Service, Storm Prediction Center, 
SVRGIS database, accessed at the following URL: 
http://www.spc.noaa.gov/gis/svrgis/  
U.S. Dept of Commerce, NOAA National Weather Service, Storm Prediction Center, 
Fujita Scale information at the following URL: 
http://www.spc.noaa.gov/faq/tornado/ef-scale.html  
Profile Maps 
No profile maps provided.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 271 
5.3.8 Subsidence 
Description 
Subsidence occurs when the original land surface elevation drops due to 
changes in the subsurface.  Causes of subsidence include, but are not limited to, 
removal of fluids (water, oil, gas, etc.), mine collapse, and hydro compaction.  Of these 
causes, hydro compaction and mine collapse tend to be localized events, while fluid 
removal may occur either locally or regionally.  The main cause for subsidence in 
Maricopa County is excessive groundwater withdrawal, wherein the volume of water 
withdrawn exceeds the natural recharge.  Once an area has subsided, it is likely the 
ground elevation will not rise again due to consolidation of the soils, even if the pumped 
groundwater is replaced. 
Subsidence can cause regional drainage patterns to change.  Impacts include 
unexpected flooding, storm drain backwater, reversal of channel drainage patterns, and 
damages to infrastructure both in the subsurface (water and electric lines, well casings, 
etc.) and surface (roads, canals, drainages, surveyed benchmarks, etc.).  Subsidence 
also can be accompanied by the development of fissures, which are discussed in Section 
5.3.4. 
History 
Over the past plan cycle, minor changes in subsidence activity have been noted 
in the way of expansions of active subsidence areas and five more years of data.  Active 
subsidence has been occurring in certain areas of Maricopa County for over 60 years 
and is primarily due to groundwater overdraft and reduced recharge due to drought.  By 
1980, ground-water levels had declined at least 100 feet county-wide and between 300 
and 500 feet in some areas (Carpenter, 1999).  These groundwater declines have 
resulted in areas of significant subsidence, as summarized in the following examples: 
• Luke Air Force Base – by 1992, ground-water level declines of more than 300 
feet generated land subsidence of as much as 18 feet about 20 miles west of 
Phoenix on and near Luke Air Force Base (Carpenter, 1999). 
• Queen Creek – by 1977, an area of almost 230 square miles had subsided more 
than 3 feet(Carpenter, 1999). 
• Harquahala Plain – subsidence of about 0.6 feet occurred in response to about 
300 feet of water-level decline (Carpenter, 1999). 
• East Mesa/Apache Junction – a total of 5.2 feet of subsidence was measured 
along the CAP near the Superstition Freeway, for the period of 1971 to 2001 
(AMEC, 2006). 
• Paradise Valley – between 1965 and 1982, over 5 feet subsidence occurred 
(Carpenter, 1999).  
• Scottsdale/CAP –  canal subsided about 1 foot since construction (Carpenter, 
1999).

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 272 
The following are two examples of documented damages that are directly 
attributable to subsidence: 
• Dysart Drain Flow Reversal – Subsidence near Luke Air Force Base led to flow 
reversal in a portion of the Dysart Drain, which is an engineered flood conveyance 
channel.  In 1992, surface runoff from four inches of precipitation caused the 
sluggish Dysart Drain to spill over flooding the base runways, damaging more than 
100 homes, and forcing the base to close for 3 days.  Total damage was on the order 
of $3 million (ALSG, 2007). 
• Central Arizona Project Canal Repair – sections of the CAP canal in Scottsdale 
traverse an area that has subsided up to 1.5 feet over a 20-year period, threatening 
the canal’s maximum flow capacity.  In response, CAP raised the canal lining 3 feet 
over a one-mile segment of affected area at a cost of $350,000.  A second and much 
larger subsidence area was later identified near the Scottsdale Airpark.  Plans for 
raising the canal lining will cost an estimated $820,000.  Recently, a third 
subsidence area has been identified east of the Scottsdale Airpark in the Scottsdale 
West World area which will likely require further repair (ALSG, 2007). 
Land subsidence has been detected over the years using surveying techniques 
such as differential leveling and high accuracy Global Positioning System (GPS) 
surveying.  In the early 1990’s, scientists began to use a satellite based technology 
called Synthetic Aperture Radar (SAR) and interferometric processing (InSAR) to 
detect land surface elevation changes.  InSAR has been developed into a highly reliable 
land subsidence monitoring technique that has been utilized by ADWR since 2002.  
ADWR has identified numerous subsidence features around the state and continues to 
monitor the extent and rates of these features on an annual basis (ADWR, 2009).   In 
Maricopa County, ADWR monitors 8 geographical areas using InSAR, the limits of 
which are shown on the hazard profile maps at the end of this section. 
Probability and Magnitude 
There are no statistical probability estimates for subsidence.  The magnitudes 
of severity depend on many factors including geography, geology, rates of groundwater 
withdrawals, and others.  ADWR (Conway, 2013) generally mapped the cumulative 
worst-case subsidence depths for several known areas of the state (Figure 5-13). The 
four most prominent areas within Maricopa County have exhibited between 6 and 20 
feet of lowering. The MJPT reviewed and chose to use the zones currently being 
monitored by ADWR to depict the subsidence hazard for the county.  Areas defined by 
ADWR as active subsidence areas were mapped as HIGH hazard zones and all other 
areas were assigned a LOW hazard.  The high hazard subsidence zones are presented 
on Maps 6A, 6B, and 6C. 
Climate Change Impacts 
As previously stated, active subsidence for most of the county is correlated to 
over drafting of local and regional groundwater tables.  The NCA report (Garfin, et.al., 
2014) notes that one of the anticipated impacts of climate change for the Southwest is 
a reduction in precipitation and streamflow volumes.  This impact could translate into 
a greater demand for groundwater which could further reduce groundwater levels and

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 273 
increase the formation of subsidence areas and fissure risk.  The current management 
of groundwater withdrawals by the ADWR regulated active management areas (AMA) 
will likely serve to keep these impacts in check, but consideration for future expansion 
of subsidence zones and fissures could be warranted. 
 
Figure 5-13:  Map of Maximum Subsidence Depths for Arizona  
 
Vulnerability – CPRI Results 
Subsidence CPRI results for each community are summarized in Table 5-34 
below. 
Table 5-34:  CPRI results by jurisdiction for subsidence 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Possibly 
Limited 
<6 hours 
<6 hours 
2.50 
Buckeye 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Carefree 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Cave Creek 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.0 
Chandler 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
El Mirage 
Possibly 
Limited 
>24 hours 
<6 hours 
1.75 
Fort McDowell Yavapai Nation 
Unlikely 
Negligible 
>24 hours 
>1 week 
1.30 
Fountain Hills 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Gila Bend 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 274 
Table 5-34:  CPRI results by jurisdiction for subsidence 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Gilbert 
Highly Likely 
Limited 
>24 hours 
<1 week 
2.85 
Glendale 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Goodyear 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Guadalupe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Litchfield Park 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Unincorporated Maricopa County 
Possibly 
Limited 
12-24 hours 
>1 week 
2.20 
Mesa 
Likely 
Limited 
< 6 hours 
>1 week 
2.95 
Paradise Valley 
Unlikely 
Negligible 
<6 hours 
<1 week 
1.65 
Peoria 
Unlikely 
Limited 
<6 hours 
<6 hours 
1.75 
Phoenix 
Unlikely 
Limited 
<6 hours 
<6 hours 
1.75 
Queen Creek 
Possibly 
Negligible 
<6 hours 
<6 hours 
1.90 
Salt River Pima-Maricopa Indian 
Community 
Possibly 
Critical 
<6 hours 
>1 week 
2.80 
Scottsdale 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Surprise 
Possibly 
Limited 
>24 hours 
>1 week 
2.05 
Tempe 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Tolleson 
Possibly 
Negligible 
>24 hours 
<1 week 
1.65 
Wickenburg 
Highly Likely 
Limited 
>24 hours 
>1 week 
2.95 
Youngtown 
Highly Likely 
Negligible 
<6 hours 
>1 week 
2.65 
County-wide average CPRI = 
1.87 
 
Vulnerability – Loss/Exposure Estimations  
The estimation of potential exposure to high hazard subsidence areas was 
accomplished by intersecting the human and facility assets with the subsidence high 
hazard limits depicted on Maps 6A, 6B, and 6C.  No losses are estimated for facilities 
located within the high hazard subsidence areas due to lack of appropriate loss-to-
exposure data.  Table 5-35 summarizes the MJPT identified critical and non-critical 
facilities potentially exposed to high hazard subsidence areas.  Table 5-36 summarizes 
population sectors exposed to the high hazard subsidence areas.  Residential structures 
exposed to high hazard subsidence areas are summarized in Table 5-37. 
In summary, 7,434 critical and non-critical MJPT identified assets with a 
reported $9.9 billion in replacement costs, are located within high hazard subsidence 
areas.  An additional $232.5 billion of census block residential structures are located 
within high hazard subsidence areas across the planning area.  Regarding human 
vulnerability, a total population of 1.72 million people, or 41.6% of the total census 
block population areas across the planning area, are located within a high hazard 
subsidence area.  It is unlikely that death and injury might be the direct result of 
subsidence.  Other likely negative impacts such as fissures, flooding due to slope 
reversal, and flow reversal in gravity sewer mains may occur. 
Vulnerability – Development Trend Analysis 
As ADWR continues its mapping and tracking programs, more data will 
become available for use in regulating future development.  Public awareness of the 
hazard is a key element to any effective mitigation measure, as well as the need to slow 
the depletion of groundwater sources.  New regional drainage features and gravity 
sewer mains should always refer to the maps in this plan to determine the need for 
special design considerations that address subsidence.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 275 
 
Changes in Development in the Hazard Prone Area 
Within the unincorporated areas of Maricopa County, residential development 
has been minimal but has been concentrated along I-17 in the Anthem area and in the 
western portion of the County along SR303.  It is anticipated that new development 
will largely occur in these areas over the next five years.  These areas do not lie within 
identified subsidence high hazard areas.   
The table below summarizes the jurisdictions with changes in development 
located in known subsidence hazard areas. 
Jurisdiction 
Development Changes 
Avondale 
The northern portion of Avondale lies within an area identified to have high 
risk of subsidence.  A significant portion of the areas identified for future 
development within the community lie within the area of subsidence hazard. 
Key growth corridors identified within this area include the North Avondale 
area (north of I-10), the Historic Avondale area and the BLVD live/work/play 
destination area.   
Buckeye 
The City of Buckeye has several designated high subsidence hazard areas 
along and south of the I-10 alignment. Over the next 5 years most anticipated 
growth will occur north of I-10 in the City of Buckeye outside of the 
subsidence hazard areas.  The proposed Vista De Montana, Mountain View 
South, Westpark, Copper Falls, Farallon, Terravista, and Encantada Estates 
Subdivisions are located within areas identified to have high subsidence 
hazard.  
Chandler 
The northeast portion of the City of Chandler lies within an area impacted by 
subsidence.  The City has experienced steady growth of multi-family projects 
over the past five years and anticipates growth in this area will continue though 
at a slower rate.  Residential development is expected to occur in downtown 
and north Chandler and could impact subsidence hazards in the northern 
portion of the City.  Commercial and industrial development is also projected 
continue at a steady rate.  Locating these types of development within the 
northeast portion of the City will likely increase hazards due to subsidence.  
El Mirage 
The City of El Mirage lies entirely within an area identified to have high 
subsidence hazard.  Most of the recent and anticipated development within the 
City has consisted of industrial developments within the southern industrial 
zone.  There has been minor growth with residential homes in the northeast 
section and there are plans for 3 additional residential projects to be 
constructed within the northwest portion of the City.  All development within 
the community will impact the hazard associated with land subsidence. 
Gila Bend 
The majority of the northern portion of the Town of Gila Bend is located 
within an area at increased risk of subsidence.  The Town has experienced 
limited growth in the form of industrial, commercial, and institutional 
developments and is actively seeking industrial partners in an effort to bring 
light manufacturing facilities to town.  Residential development continues at a 
modest rate on a single lot basis.  Most development has occurred along 
Butterfield Trail and does not lie within the designated hazard area for 
subsidence, with the exception of a new school located on Logan Avenue and 
a Circle K located on Pima Street. These developments are located adjacent to 
the I-8 corridor and fall within an identified hazard for subsidence.   
Gilbert 
Most of the Town of Gilbert falls within an area identified to have high hazard 
for subsidence.  The northern and central portions of the community are 
impacted by this designation, while the southern portion (South of Queen 
Creek Rd.) lies outside of the subsidence zone.  Based upon development 
trends over the past 5 years, it is anticipated that commercial and industrial

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 276 
development will continue to expand within the northern and central portions 
of the Town and will fall within areas designated to have high hazard 
associated with subsidence.  Most residential development is anticipated to 
occur within the southern portion of the community and falls outside of the 
defined hazard area for subsidence.   
Glendale 
Apart from small sections on the far east and north side of the City, Glendale 
lies within an identified subsidence hazard area. The City anticipates large 
increases in industrial and manufacturing development in the “New Frontier” 
District (located along SR303 near its intersection with Northern Ave), 
additional residential development within infill areas of the community and 
commercial and retail developments within the Sports and Entertainment 
(located along Hwy 101 at intersection with W. Glendale Ave) and Downtown 
(located along Glendale Ave. between Myrtle Ave and Lamar Rd.) Districts. 
All targeted areas for growth lie within the areas designated as subsidence 
hazard areas.  
Goodyear 
Approximately the northern third of the City of Goodyear lies within a 
designated subsidence hazard area.  The city has experienced significant 
increases in development over the past 5 years, at an average rate of 20% more 
permits per year, and anticipates new development to occur at the current rate 
over the next 5 years.  The majority of this development, including residential, 
commercial and industrial, has occurred north of the Pecos Rd alignment and 
south of the Camelback Road alignment.  This area is roughly defined as 
northern half of the City and portions of the development experienced within 
this region will lie within the subsidence hazard area. 
Litchfield Park 
The City of Litchfield lies entirely within an identified subsidence hazard area.  
As such, all development within the City will be impacted by subsidence 
hazard.  Currently, The City has experienced residential development of 2 
projects in the northern and central areas of the community of 121 and 163 
units, respectively.  This is in addition to commercial and light industrial 
developments along the Camelback Rd. alignment at Litchfield, Dysart, and El 
Mirage Roads, which is anticipated to continue over the next five years. 
Mesa 
Substantial portions of the City of Mesa on the west side are located within an 
identified subsidence hazard area, in addition to a smaller area along the easter 
boundary of the community.  These hazard areas will impact proposed 
development within the community within the Gateway, West Mesa, and 
Superstition Springs/Power Road Corridor Development Areas.  Proposed and 
existing development within these areas consists of residential and 
employment growth. 
Peoria 
The City of the Peoria is impacted by an identified subsidence hazard area in 
the southern portion of the community, mostly to the south of the Hwy 101 
alignment.  Most development within the City has occurred in the northern and 
northwestern areas of the incorporated limits, including the Vistancia and the 
Lake Pleasant Parkway Corridors.  It is anticipated that development will 
continue to migrate north over the next five years.  As a result, it is not 
anticipated the future development within Peoria will impact the hazard 
associated with subsidence.  T 
Phoenix 
A small portion of eastern Phoenix is located within an identified subsidence 
hazard area, roughly bounded by Interstate 17 on the east, Broadway Rd to the 
south, and Camelback Rd to the North. The majority of the properties within 
this area are fully developed with small pockets of agricultural lands.  The 
changes in development will occur outside of the subsidence hazard area.   
Queen Creek 
A small portion of the Town of Queen Creek is impacted by areas of increased 
subsidence hazard.  The area is located within the northwestern corner of the 
community boundary and is roughly bounded to the South by Queen Creek Rd 
and to the north by Rittenhouse Rd.  This area of the community is not

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 277 
anticipated to experience changes in development and will not impact the 
hazard due to subsidence.  
Salt River Pima-
Maricopa Indian 
Community 
The western half of the Salt River Pima-Maricopa Indian Community is 
located within an identified subsidence hazard area.   As the majority of 
existing and proposed development lies within the western portion of the 
community, along the Hwy 101 alignment, changes in development will 
continue to be impacted by the subsidence hazard area. 
Scottsdale 
Subsidence hazard areas exist within the City along the western portion of 
central Scottsdale and along the eastern portion of southern Scottsdale. The 
majority of development within Scottsdale is anticipated to occur within the 
Northern and Central Sub-Areas.  The Northern Sub-Area is located north of 
Deer Valley Road and is not impacted by identified subsidence hazard areas, 
while the Central Sub-Area is impacted by subsidence along the Hwy 101 
alignment.   
Surprise 
The southern portion of the City of Surprise lies within a subsidence hazard 
area and the four development areas identified and targeted by the City all lie 
within this hazard area.  Future development within these areas is anticipated 
to consist of residential and commercial applications and lie to the south of the 
Bell Road alignment.  
Tempe 
The City of Tempe is largely unimpacted by subsidence hazard areas, with 
only eastern portion along Hwy 101 lying within an identified hazard area.  
Over the past 5 years, Tempe has seen a rapid growth of high density 
residential, new corporate office headquarters and many new retail 
developments are currently under construction. The City anticipates that future 
development and redevelopment will continue to be focused in the areas 
currently being developed.  These areas are primarily located in the north 
Tempe area, and specifically in the downtown area, Tempe Town Lake, and 
the new Novus Innovation Corridor.   Of the areas targeted for future 
development, the Novus Innovation Corridor, developments around the Loop 
101 and Loop 202 interchange, and Tempe Town Lake are likely to impact the 
Community’s subsidence hazard in the future.   
Tolleson 
The entirety of the City of Tolleson lies within a subsidence hazard area and 
all changes in development will impact the subsidence hazard of the 
community.  Currently, the City has noted several small residential and 
commercial developments within identified infill areas and anticipates that 
development will continue along the same trajectory in the near future, though 
potentially slowing as available properties are limited. 
Youngtown 
The Town of Youngtown is entirely located within an area of increased 
subsidence hazard. The community added a 129-unit residential development 
south of Peoria Avenue and a new neighborhood-commercial live-work 
corridor on N. 111th Avenue over the past 5 years and has identified several 
areas for development/redevelopment within the town limits of the next 5 
years.  Anticipated development includes a redevelopment area in the northern 
portion of the Town, bounded roughly by 111th Avenue on the east, 113th 
Avenue on the west, Wisconsin Avenue to the South, and Hwy 60 to the north;  
a new 100+acre regional park in the Agua Fria river bottom; a new battery 
storage facility in the Town’s commerce park south of Peoria Avenue; and 
new development areas identified north of Alabama Avenue and South of 
Peoria Avenue.  All changes in development within the Town will impact the 
hazard associated with subsidence.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 278 
Table 5-35:  Asset inventory exposure to high hazard subsidence areas 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of Total 
Community 
Facilities Impacted 
Total Replacement 
Value of All Facilities 
Reported by 
Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed to 
Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
7434 
68.10% 
$26,024,918 
$9,864,465 
Avondale 
131 
124 
94.66% 
$179,460 
$123,010 
Buckeye 
125 
8 
6.40% 
$268,667 
$13,214 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
124 
44.77% 
$1,361,072 
$515,030 
El Mirage 
34 
34 
100.00% 
$285,542 
$285,542 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
7 
100.00% 
$36,000 
$36,000 
Gilbert 
5287 
4820 
91.17% 
$0 
$0 
Glendale 
1224 
969 
79.17% 
$4,085,807 
$3,360,191 
Goodyear 
159 
125 
78.62% 
$148,573 
$121,773 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
5 
100.00% 
$118,900 
$118,900 
Unincorporated Maricopa County 
1061 
284 
26.77% 
$3,624,310 
$488,280 
Mesa 
528 
350 
66.29% 
$2,850,466 
$2,229,168 
Paradise Valley 
95 
1 
1.05% 
$469,300 
$6,000 
Peoria 
299 
208 
69.57% 
$282,333 
$257,329 
Phoenix 
947 
113 
11.93% 
$7,843,312 
$552,191 
Queen Creek (Maricopa County Only) 
124 
5 
4.03% 
$301,446 
$11,650 
Salt River Pima-Maricopa Indian Community 
78 
71 
91.03% 
$502,493 
$482,480 
Scottsdale 
237 
63 
26.58% 
$1,094,610 
$634,679 
Surprise 
94 
81 
86.17% 
$498,810 
$424,130 
Tempe 
111 
18 
16.22% 
$1,373,300 
$182,300 
Tolleson 
10 
10 
100.00% 
$0 
$0 
Wickenburg 
14 
2 
14.29% 
$32,589 
$1,350 
Youngtown 
12 
12 
100.00% 
$21,247 
$21,247 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
1 
4.55% 
$7,380 
$470 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
0 
0.00% 
$1,760 
$0

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 279 
Table 5-36:  Population sectors exposed to high hazard subsidence areas  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,787 
1,722,580 
41.64% 
538,166 
202,165 
37.57% 
Apache Junction (Maricopa County Portion) 
314 
73 
23.25% 
149 
32 
21.48% 
Avondale 
79,485 
76,152 
95.81% 
5,313 
5,098 
95.95% 
Buckeye 
65,452 
2,692 
4.11% 
5,141 
159 
3.09% 
Carefree 
3,580 
0 
0.00% 
1,591 
0 
0.00% 
Cave Creek 
5,287 
0 
0.00% 
1169 
0 
0.00% 
Chandler 
250,334 
108,585 
43.38% 
23,435 
9,121 
38.92% 
El Mirage 
33,728 
33,728 
100.00% 
2,700 
2,700 
100.00% 
Fort McDowell Yavapai Nation 
1017 
0 
0.00% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
1,832 
91.05% 
193 
180 
93.26% 
Gilbert 
239,546 
212,513 
88.71% 
17,960 
14,492 
80.69% 
Glendale 
237,327 
188,227 
79.31% 
23,675 
18,563 
78.41% 
Goodyear 
78,118 
67,071 
85.86% 
10,094 
8,951 
88.68% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
5,980 
100.00% 
1,065 
1,065 
100.00% 
Unincorporated Maricopa County 
290,179 
116,769 
40.24% 
95,187 
46,340 
48.68% 
Mesa 
467,657 
350,244 
74.89% 
71,995 
44,785 
62.21% 
Paradise Valley 
13,834 
90 
0.65% 
3,365 
15 
0.45% 
Peoria 
166,339 
125,812 
75.64% 
25,308 
19,954 
78.84% 
Phoenix 
1,561,296 
314,904 
20.17% 
143,448 
19,862 
13.85% 
Queen Creek 
35,720 
2,112 
5.91% 
2,094 
75 
3.58% 
Salt River Pima-Maricopa Indian Community 
6,706 
6,567 
97.93% 
1,004 
969 
96.51% 
Scottsdale 
237,929 
91,598 
38.50% 
49,963 
18,377 
36.78% 
Surprise 
128,211 
114,640 
89.42% 
26,025 
18,794 
72.22% 
Tempe 
176,809 
30,936 
17.50% 
15,264 
3,199 
20.96% 
Tolleson 
6,904 
6,904 
100.00% 
809 
809 
100.00% 
Wickenburg 
6,803 
0 
0.00% 
2,058 
0 
0.00% 
Youngtown 
6,454 
6,454 
100.00% 
1,177 
1,177 
100.00% 
Queen Creek (Pinal County Portion) 
1421 
0 
0.00% 
128 
0 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 280 
Table 5-37:  Residential structures exposed to high hazard subsidence areas  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,187 
712,279 
43.45% 
$542,436,633  
$232,493,210  
42.86% 
Apache Junction (Maricopa County Portion) 
295 
56 
18.98% 
$76,791  
$14,566  
18.97% 
Avondale 
26,802 
25,854 
96.46% 
$7,272,041  
$7,014,883  
96.46% 
Buckeye 
18,206 
818 
4.49% 
$4,946,783  
$222,243  
4.49% 
Carefree 
2,242 
0 
0.00% 
$1,922,010  
$0  
0.00% 
Cave Creek 
2,498 
0 
0.00% 
$1,628,751  
$0  
0.00% 
Chandler 
94,257 
40,602 
43.08% 
$34,713,265  
$14,952,484  
43.07% 
El Mirage 
11,307 
11,307 
100.00% 
$2,655,346  
$2,655,345  
100.00% 
Fort McDowell Yavapai Nation 
308 
0 
0.00% 
$260,045  
$0  
0.00% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$0  
0.00% 
Gila Bend 
944 
871 
92.27% 
$118,937  
$109,679  
92.22% 
Gilbert 
74,821 
66,193 
88.47% 
$29,339,526  
$25,955,892  
88.47% 
Glendale 
90,415 
71,773 
79.38% 
$24,665,480  
$19,579,778  
79.38% 
Goodyear 
25,023 
21,298 
85.11% 
$8,326,438  
$7,086,794  
85.11% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
2,616 
100.00% 
$996,356  
$996,355  
100.00% 
Unincorporated Maricopa County 
142,777 
62,923 
44.07% 
$45,530,720  
$20,065,864  
44.07% 
Mesa 
201,507 
145,468 
72.19% 
$59,328,380  
$42,829,263  
72.19% 
Paradise Valley 
5,621 
37 
0.66% 
$11,738,020  
$78,156  
0.67% 
Peoria 
64,806 
50,138 
77.37% 
$21,410,130  
$16,564,087  
77.37% 
Phoenix 
590,476 
95,185 
16.12% 
$167,455,500  
$26,993,987  
16.12% 
Queen Creek 
8,422 
426 
5.06% 
$2,890,493  
$146,219  
5.06% 
Salt River Pima-Maricopa Indian Community 
2,602 
2,604 
100.08% 
$919,777  
$893,106  
97.10% 
Scottsdale 
123,959 
49,657 
40.06% 
$67,660,310  
$27,104,031  
40.06% 
Surprise 
52,607 
45,168 
85.86% 
$15,652,750  
$13,439,282  
85.86% 
Tempe 
73,603 
14,324 
19.46% 
$24,383,780  
$4,745,515  
19.46% 
Tolleson 
2,165 
2,165 
100.00% 
$505,455  
$505,455  
100.00% 
Wickenburg 
3,610 
0 
0.00% 
$1,285,212  
$0  
0.00% 
Youngtown 
2,796 
2,796 
100.00% 
$540,226  
$540,226  
100.00% 
Queen Creek (Pinal County Portion) 
606 
0 
0.00% 
$207,814  
$0  
0.00% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 281 
Sources 
AMEC Earth & Environmental, Inc., 2006, Earth Fissure Risk Zone Investigation 
Report, Powerline and Vineyard Flood Retarding Structures, Pinal County, AZ, 
prepared for FCDMC under Contract FCD 2004C503, Work Assignments 1&2. 
Arizona Department of Water Resources, 2020, land subsidence website at:  
https://new.azwater.gov/hydrology/field-services/land-subsidence-arizona  
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
Arizona Land Subsidence Group, 2007. Land subsidence and earth fissures in 
Arizona: Research and informational needs for effective risk management, white 
paper, Tempe, AZ, . http://www.azgs.az.gov/Earth%20Fissures/CR-07-C.pdf  
Arizona Land Subsidence Group, 2017, Land Subsidence and Earth Fissures in 
Arizona, Research and Information Needs for Effective Risk Management., AZGS 
Contributed Report CR-07-C. 
Carpenter, M.C., 1999, Land subsidence in the United States, South-Central Arizona: 
Earth fissures and subsidence complicate development of desert water resources, 
[Galloway, D., Jones, D.R., and Ingebritson, S.E., editors], USGS Circular 1182. 
Conway, Brian D., 2013, Land Subsidence Monitoring Report No. 1. Arizona 
Department of Water Resources. 
FEMA, 2001, Understanding Your Risks; Identifying Hazards and Estimating Losses, 
FEMA Document No. 386-2. 
Profile Maps 
Maps 6A, 6B, and 6C – Subsidence Hazard Map(s)

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
202
rx
85
rx
101
rx
303
rx
202
rx
303
rx
85
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
Gi
l
a
R
i
v
e
r
A
g
u
a
F
r
ia R
iv
e
r
Salt River
H
assa
ya
m
p
a River
Subsidence
Hazard Rating
Subsidence
Legend
Maricopa County
Mitigation Plan Extent
! !
! !
! ! Major Streams
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 6A
Maricopa County
Subsidence
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ADWR 2020; 
MAG 2020; TIGER 2020; AZGS 2020

§¨¦
17
§¨¦
10
§¨¦
17
§¨¦
10
rx
88
rx
303
rx
202
rx
74
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
202
rx
202
rx
51
rx
303
rx
101
£
¤
60
£
¤
60
S
a
l
t R
i
ve
r
Ve
r
d
e R
iv
e
r
G
i
l
a
R
iv
e
r
T
o
n
t
o Cr
e
ek
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 6B
Maricopa County
Subsidence
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ADWR 2020; 
MAG 2020; TIGER 2020; AZGS 2020
Subsidence
Hazard Rating
Subsidence
Legend
Maricopa County
Mitigation Plan Extent
! !
! !
! ! Major Streams

§¨¦
8
§¨¦
8
rx
238
rx
85
G
i
la
R
i
v
e
r
G
i
l
a
Ri
v
er
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 6C
Maricopa County
Subsidence
Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; ADWR 2020; 
MAG 2020; TIGER 2020; AZGS 2020
Subsidence
Hazard Rating
Subsidence
Legend
Maricopa County
Mitigation Plan Extent
! !
! !
! ! Major Streams

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 282 
5.3.9 Wildfire 
Description 
A wildfire is an uncontrolled fire spreading through wildland vegetative fuels 
and/or urban interface areas where fuels may include structures.  They often begin 
unnoticed, spread quickly, and are usually signaled by dense smoke that may fill the 
area for miles around.  Wildfires can be human-caused through acts such as arson or 
campfires, or can be caused by natural events such as lightning.  If not promptly 
controlled, wildfires may grow into an emergency or disaster.  Even small fires can 
threaten lives, resources, and destroy improved properties. 
The indirect effects of wildfires can also be catastrophic.  In addition to 
stripping the land of vegetation and destroying forest resources and personal property, 
large, intense fires can harm the soil, waterways and the land itself.  Soil exposed to 
intense heat may temporarily lose its capability to absorb moisture and support life.  
Exposed soils in denuded watersheds erode quickly and are easily transported to rivers 
and streams thereby enhancing flood potential, harming aquatic life and degrading 
water quality.  Lands stripped of vegetation are also subject to increased landslide 
hazards. 
History 
The Sonoran desert vegetation typically found in the majority of Maricopa 
County is less dense than other areas of the state.  That fact, combined with relative 
density of urban area, makes wildfire risk within the county relatively low when 
compared to the more densely forested areas of the state.  However, the risk of wildfire 
still exists within Maricopa County and can pose a real threat to those who live and/or 
work within the wildland urban interface.  Historic events that have occurred during 
the last Plan cycle included: 
• In March 2004, The Citris Fire located west of Gila Bend burned over 5,700 acres 
along the Gila River, which included state, private and federal lands. 
• In June 2005, lightning touched off the Cave Creek Complex Fire in the northern 
part of Maricopa County about 5 miles northeast of Carefree.  The fire threatened 
440 homes in the Tonto Hills and Camp Creek areas, as well as major power lines 
serving Phoenix.  There were damages reported to 11 residences and 3 out-
buildings in Camp Creek (USFS, 2009). 
• In June 2008, lightning touched off the Ethan Brush Fire in the heavily vegetated 
Gila River bed south of Laveen.  Approximately 50 residents of 18 homes were 
evacuated overnight and allowed to return their undamaged homes the next day.  
The fire ultimately consumed about 7,000 acres (AZ Republic, 2008). 
• In August 2008, the Robins Butte Fire burned about 500 acres of the Gila River 
bottom located four miles west of State Route 85, south of Palo Verde Road, and 
near Buckeye (AZ Republic, 2008). 
• In June 2010, the Sycamore Fire, located in northern Maricopa County near MP209 
on Highway 87, burned 187 acres and forced a temporary closure of the main

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 283 
thoroughfare between Phoenix and Payson while fire crews battled the blaze.  There 
were no reported damages, injuries or deaths and fire suppression costs were 
estimated to exceed $146K (NWCG, 2014). 
• In May 2012, the Sunflower Fire, located in northern Maricopa County 
approximately 30 miles north of Mesa, burned 17,446 acres.  There were 6 reported 
firefight related injuries and no reported deaths.  The fire threatened 2 residences, 
2 out-buildings, the Cross F Ranch, and an APS 345 KV power line, but firefighters 
were able to protect assets in the area.  Fire suppression costs were estimated to 
exceed $600K (NWCG, 2014). 
• In May 2020, two separate fires burned in the hillside areas of Cave Creek. The 
East Desert Fire started Sunday, May 17, off Desert Hills Drive in the Cave Creek-
area. Due to dry vegetation and wind gusts, the human caused fire spread rapidly 
over the course of a few hours consuming 1,492 acres.  Crews provided structure 
protection to roughly 120 homes and were able to protect all primary structures. 
Two weeks later on May 30th, the Ocotillo Fire started at near Ocotillo Road about 
1.3 miles NW of Cave Creek. The human caused fire consumed 980 acres and 
destroyed 20 buildings, eight of them homes. The fire also tore through an iconic 
business, Johnny Ringo’s Carefree Adventures.  Damages from the Ocotillo Fire 
exceeded $5 million. 
• In June 2020, the Bush Fire located in the northwest quadrant of Maricopa County 
and extending into Gila County, consumed 794,000 acres and caused a closure of 
the SR 87.  The human caused fire threatened several homes, a major electric 
transmission line, and caused significant damage to roadside guardrails along SR 
87.  Many of the steep burn areas will require close monitoring over the next several 
years during storm events that have very high debris flow potential. 
Probability and Magnitude 
The probability and magnitude of wildfire incidents for Maricopa County are 
influenced by numerous factors including vegetation densities, previous burn history, 
hydrologic conditions, climatic conditions such as temperature, humidity, and wind, 
ignition source (human or natural), topographic aspect and slope, and remoteness of 
area.  Two sources of wildfire hazard data were used by the MJPT to develop a 
composite hazard profile for the county.  The first and primary data source is the 
recently updated Maricopa County Community Wildfire Protection Plan (LSDI, 2010 
and MCDEM, 2020) and the second is a regional fire risk coverage provided by the 
Arizona State Forestry Office.  Each of these is discussed below. 
In 2009, Maricopa County communities, tribes, and state and federal officials 
tasked with managing wildfires within the county came together to develop the 
Maricopa County Community Wildfire Protection Plan (CWPP).  The  CWPP (LSDI, 
2010) was developed in response to the Healthy Forests Restoration Act of 2003 
(HFRA) for the at-risk communities and unincorporated areas in Maricopa County, 
Arizona, located in and around public lands administered by the US Department of the 
Interior Bureau of Land Management (USDI BLM) Phoenix District Office, the Tonto 
National Forest (TNF), and State Trust Lands (STL).  Two core teams were formed to

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 284 
implement the agency and public collaboration necessary to develop a CWPP 
compliant with HFRA:  the Eastern Core Team includes all identified at-risk 
communities in Maricopa County located east of Interstate 17 (I-17) and east of 
Interstate 10 (I-10), and the Western Core Team includes all identified at-risk 
communities west of I-17 and I-10.  The Core Teams identified 44 communities and 
analyzed 3,103,370 acres for potential risk from catastrophic wildland fire within 
Maricopa County.  The CWPP has been updated in both 2014 and in early 2020, 
however the base hazard data developed in the 2010 CWPP remained unchanged with 
both updates. 
The Maricopa County CWPP established the Wildland Urban Interface (WUI) 
areas for the county and mapped various wildfire risk elements such as vegetative fuels 
and densities, topographical slope and aspect, previous burn areas and ignition points, 
and prior treatment areas, etc.  One product of the CWPP work was the development 
of a county-wide wildland fuel hazard coverage for both a typical fire season and 
extraordinary rainfall years.  Components considered in the development of the 
wildland fuel hazard coverage included vegetation type and density, previously burned 
areas, and terrain slope and aspect.  The composite coverage resulted in a raster grid 
categorized as High, Medium, or Low hazard.  The procedures used by the CWPP 
planning team to develop the hazard designation are documented in the CWPP.  The 
MJPT chose to use the typical fire season data set to best represent the wildland fuel 
hazard for the county. 
Following the State of Arizona’s lead, the 2003/04 Arizona Wildland Urban 
Interface Assessment (AWUIA) project (Fisher, 2004) used in the 2015 Plan has been 
replaced with an updated regional dataset used to depict the threat of wildfire in 
Arizona as a part of the West Wide Wildfire Risk Assessment (WWWRA) (Sanborn 
Map Company, 2013) for the western U.S.  The data and assessment results are hosted 
by the Arizona State Forestry and Fire Management Department on its website35.  The 
wildfire hazards are derived from the Fire Threat Index (FTI) data distributed with the 
WWWRA.  The FTI reflects the likelihood of one acre burning if a fire started at a 
specific grid location. The calculation process integrates the probability of an acre 
igniting and the expected final fire size into a single measure of wildland fire 
susceptibility. The assessed fire size is based on the rate of spread in four weather 
percentile categories.  The key inputs used in the wildfire model to produce the FTI 
wildfire hazard layer are:  
 
 
35 Arizona Wildfire Risk Assessment Portal (AZWRAP), accessed at: https://arizonawildfirerisk.com/

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 285 
 Probability of fire occurrence, derived 
from: 
o Historic fire locations and fire 
occurrence areas 
o Weather influence zones (historic 
weather observations) 
 Fire behavior (rate of spread) derived from: 
o Surface fuels 
o Canopy closure 
o Canopy characteristics 
o Topography 
 Fire suppression effectiveness, derived from: 
o Historic fire sizes 
o Historic protection organization 
For the purposes of this Plan, the nine FTI categories were reclassified into three 
generalized categories, Low, Medium and High wildfire hazard and applied as 
appropriate to compliment or augment the CWWP coverages. 
One final adjustment to the wildfire hazard layers for this Plan update was to 
modify the hazards for areas that have recently burned in the past 6-years.  Wildfire 
perimeters were obtained from the National Interagency Fire Center (NIFC, 2020) and 
are illustrated on the wildfire hazard maps.  Hazard ratings within the burn perimeters 
were set to Low to account for the previous fire effects and reduced fuels.  These areas 
will need to be re-evaluated at the next 5-year update. 
The combination of these three data sets provides a complete geospatial hazard 
coverage for the planning area. 
Climate Change Impacts 
One of the “Key Messages” from the NCA report (Garfin, et.al., 2014) is the 
projection that wildfire risk and incidents within the Southwest region will likely 
increase due to climate change.  Reduced precipitation, increased temperatures and 
longer, more severe periods of drought all factor into the assessment.  Response to this 
amplification of current wildfire risk will likely include a greater need for vegetation 
management planning and greater enforcement of wildland urban interface best 
building practices.  Incorporation of climate change impacts into the CWPP is also 
something the county and participating jurisdictions should consider. 
Vulnerability – CPRI Results 
Wildfire CPRI results for each community are summarized in Table 5-38 
below. 
Table 5-38:  CPRI results by jurisdiction for wildfire 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Avondale 
Likely 
Limited 
<6 hours 
<1 week 
2.85 
Buckeye 
Likely 
Limited 
<6 hours 
<24 hours 
2.75 
Carefree 
Highly Likely 
Critical 
6-12 hours 
>1 week 
3.55 
Cave Creek 
Likely 
Critical 
<6 hours 
<1 week 
3.15

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 286 
Table 5-38:  CPRI results by jurisdiction for wildfire 
Participating Jurisdiction Probability 
Magnitude/ 
Severity 
Warning 
Time 
Duration 
CPRI 
Score 
Chandler 
Possibly 
Negligible 
<6 hours 
<6 hours 
1.90 
El Mirage 
Possibly 
Limited 
6-12 hours 
<6 hours 
2.05 
Fort McDowell Yavapai Nation 
Possibly 
Limited 
<6 hours 
<1 week 
2.40 
Fountain Hills 
Likely 
Critical 
<6 hours 
<1 week 
3.15 
Gila Bend 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Gilbert 
Possibly 
Limited 
<6 hours 
<6 hours 
2.20 
Glendale 
Possibly 
Negligible 
<6 hours 
<24 hours 
1.80 
Goodyear 
Likely 
Negligible 
<6 hours 
<24 hours 
2.45 
Guadalupe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Litchfield Park 
Possibly 
Limited 
<6 hours 
<24 hours 
3.20 
Unincorporated Maricopa County 
Highly Likely 
Critical 
<6 hours 
>1 week 
3.70 
Mesa 
Highly Likely 
Limited 
<6 hours 
<1 week 
3.30 
Paradise Valley 
Possibly 
Critical 
>24 hours 
<1 week 
2.25 
Peoria 
Likely 
Critical 
<6 hours 
<6 hours 
2.95 
Phoenix 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Queen Creek 
Possibly 
Limited 
<6 hours 
>1 week 
2.50 
Salt River Pima-Maricopa Indian 
Community 
Likely 
Critical 
<6 hours 
<1 week 
3.25 
Scottsdale 
Likely 
Limited 
<6 hours 
<24 hours 
2.75 
Surprise 
Possibly 
Limited 
<6 hours 
<24 hours 
2.30 
Tempe 
Unlikely 
Negligible 
<6 hours 
<6 hours 
1.45 
Tolleson 
Unlikely 
Negligible 
>24 hours 
<6 hours 
1.00 
Wickenburg 
Highly Likely 
Critical 
<6 hours 
<1 week 
3.60 
Youngtown 
Unlikely 
Critical 
<6 hours 
<1 week 
2.25 
County-wide average CPRI = 
2.49 
 
Vulnerability – Loss/Exposure Estimations  
The estimation of potential exposure to high and medium wildfire hazards was 
accomplished by intersecting the human and facility assets with the wildfire hazard 
limits depicted on Maps 7A, 7B, and 7C.  No loss estimations were made for this 
update.  Only exposure of the human, residential and asset facilities are reported.  Table 
5-39 summarizes the MJPT identified critical and non-critical facilities potentially 
exposed to high wildfire hazard areas.  Tables 5-40 and 5-41 summarize the population 
sectors and residential structures exposed to the high wildfire hazard areas. 
In summary, 368 critical and non-critical MJPT identified assets with a 
cumulative reported replacement cost of $1.6 billion are located within high hazard 
wildfire areas.  An additional $20.9 billion of census block residential structures are 
located within high hazard wildfire areas across the planning area.  Regarding human 
vulnerability, a total population of 47,856 people, or 1.16% of the total census block 
population areas across the planning area, are located within a high hazard wildfire 
area.  Typically, deaths and injuries not related to firefighting activities are rare.  
However, it is feasible to assume that at least one death and/or injury may be plausible.  
There is also a high probability of population displacement during a wildfire event, 
especially in the urban wildland interface areas.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 287 
Table 5-39:  Asset inventory exposure to high hazard wildfire areas 
Community 
Total Facilities 
Reported by 
Community 
Impacted 
Facilities 
Percentage of 
Total Community 
Facilities 
Impacted 
Total Replacement 
Value of All 
Facilities Reported 
by Community 
(x $1,000) 
Estimated 
Replacement 
Value Exposed 
to Hazard 
(x $1,000) 
County-Wide Totals (Maricopa Only) 
10917 
368 
3.37% 
$26,024,918 
$1,615,024 
Avondale 
131 
7 
5.34% 
$179,460 
$56,000 
Buckeye 
125 
1 
0.80% 
$268,667 
$0 
Carefree 
6 
0 
0.00% 
$9,000 
$0 
Cave Creek 
4 
0 
0.00% 
$13,258 
$0 
Chandler 
277 
1 
0.36% 
$1,361,072 
$1,037 
El Mirage 
34 
2 
5.88% 
$285,542 
$52,700 
Fort McDowell Yavapai Nation 
26 
0 
0.00% 
$202,624 
$0 
Fountain Hills 
15 
0 
0.00% 
$411,000 
$0 
Gila Bend 
7 
1 
14.29% 
$36,000 
$2,000 
Gilbert 
5287 
45 
0.85% 
$0 
$0 
Glendale 
1224 
22 
1.80% 
$4,085,807 
$195,508 
Goodyear 
159 
2 
1.26% 
$148,573 
$0 
Guadalupe 
7 
0 
0.00% 
$10,800 
$0 
Litchfield Park 
5 
0 
0.00% 
$118,900 
$0 
Unincorporated Maricopa County 
1061 
108 
10.18% 
$3,624,310 
$36,743 
Mesa 
528 
29 
5.49% 
$2,850,466 
$48,220 
Paradise Valley 
95 
42 
44.21% 
$469,300 
$94,300 
Peoria 
299 
31 
10.37% 
$282,333 
$2,697 
Phoenix 
947 
37 
3.91% 
$7,843,312 
$954,617 
Queen Creek (Maricopa County Only) 
124 
0 
0.00% 
$301,446 
$0 
Salt River Pima-Maricopa Indian Community 
78 
3 
3.85% 
$502,493 
$0 
Scottsdale 
237 
25 
10.55% 
$1,094,610 
$95,255 
Surprise 
94 
11 
11.70% 
$498,810 
$75,947 
Tempe 
111 
0 
0.00% 
$1,373,300 
$0 
Tolleson 
10 
1 
10.00% 
$0 
$0 
Wickenburg 
14 
0 
0.00% 
$32,589 
$0 
Youngtown 
12 
0 
0.00% 
$21,247 
$0 
Gilbert (Pinal County Only) 
1 
0 
0.00% 
$0 
$0 
Mesa (Pinal County Only) 
22 
1 
4.55% 
$7,380 
$0 
Queen Creek (Pinal County Only) 
5 
0 
0.00% 
$4,697 
$0 
Maricopa County (Pinal County Only) 
3 
0 
0.00% 
$707 
$0 
Maricopa County (Yavapai County Only) 
6 
1 
16.67% 
$1,760 
$155

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 288 
Table 5-40:  Population sectors exposed to high hazard wildfire areas  
Community 
Total 
Population 
Population Exposed 
Total 
Population 
Over 65 
Population Over 65 Exposed 
Total 
Percent 
Total 
Percent 
County-Wide Totals (Maricopa Only) 
4,136,790 
47,856 
1.16% 
538,166 
4,412 
0.82% 
Apache Junction (Maricopa County Portion) 
314 
0 
0.00% 
149 
0 
0.00% 
Avondale 
79,485 
2014 
2.53% 
5,313 
139 
2.62% 
Buckeye 
65,452 
3 
0.00% 
5,141 
0 
0.00% 
Carefree 
3,580 
319 
8.91% 
1,591 
122 
7.67% 
Cave Creek 
5,287 
724 
13.69% 
1169 
126 
10.78% 
Chandler 
250,334 
288 
0.12% 
23,435 
25 
0.11% 
El Mirage 
33,728 
593 
1.76% 
2,700 
144 
5.33% 
Fort McDowell Yavapai Nation 
1017 
2 
0.20% 
85 
0 
0.00% 
Fountain Hills 
23,536 
0 
0.00% 
7,318 
0 
0.00% 
Gila Bend 
2,012 
0 
0.00% 
193 
0 
0.00% 
Gilbert 
239,546 
1842 
0.77% 
17,960 
76 
0.42% 
Glendale 
237,327 
715 
0.30% 
23,675 
101 
0.43% 
Goodyear 
78,118 
319 
0.41% 
10,094 
45 
0.45% 
Guadalupe 
6,230 
0 
0.00% 
581 
0 
0.00% 
Litchfield Park 
5,980 
13 
0.22% 
1,065 
1 
0.09% 
Unincorporated Maricopa County 
290,179 
23,881 
8.23% 
95,187 
3116 
3.27% 
Mesa 
467,657 
6,203 
1.33% 
71,995 
1904 
2.64% 
Paradise Valley 
13,834 
5778 
41.77% 
3,365 
1465 
43.54% 
Peoria 
166,339 
7,984 
4.80% 
25,308 
533 
2.11% 
Phoenix 
1,561,296 
61,284 
3.93% 
143,448 
6,079 
4.24% 
Queen Creek 
35,720 
5 
0.01% 
2,094 
0 
0.00% 
Salt River Pima-Maricopa Indian Community 
6,709 
15 
0.22% 
1,004 
5 
0.50% 
Scottsdale 
237,929 
4,939 
2.08% 
49,963 
789 
1.58% 
Surprise 
128,211 
10077 
7.86% 
26,025 
3308 
12.71% 
Tempe 
176,809 
1377 
0.78% 
15,264 
49 
0.32% 
Tolleson 
6,904 
53 
0.77% 
809 
7 
0.87% 
Wickenburg 
6,803 
0 
0.00% 
2,058 
0 
0.00% 
Youngtown 
6,454 
38 
0.59% 
1,177 
5 
0.42% 
Queen Creek (Pinal County Portion) 
1421 
0 
0.00% 
128 
0 
0.00% 
Peoria (Yavapai County Portion) 
7 
0 
0.00% 
2 
0 
0.00% 
Wickenburg (Yavapai County Portion) 
206 
0 
0.00% 
32 
0 
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 289 
Table 5-41:  Residential structures exposed to high hazard wildfire areas  
Community 
Residential 
Building 
Count 
Residential Building Exposure 
Residential 
Building 
Replacement 
Value (x$1,000) 
Residential Building Value 
Exposed 
Total 
Percent 
Total (x$1,000) 
Percent 
County-Wide Totals (Maricopa Only) 
1,639,265 
52,732 
3.22% 
$542,436,633  
$20,904,932  
3.85% 
Apache Junction (Maricopa County Portion) 
295 
0 
0.00% 
$76,791  
$0  
0.00% 
Avondale 
26,802 
779 
2.91% 
$7,272,041  
$202,527  
2.79% 
Buckeye 
18,206 
1 
0.01% 
$4,946,783  
$318  
0.01% 
Carefree 
2,242 
157 
7.00% 
$1,922,010  
$134,254  
6.99% 
Cave Creek 
2,498 
292 
11.69% 
$1,628,751  
$190,410  
11.69% 
Chandler 
94,257 
118 
0.13% 
$34,713,265  
$43,297  
0.12% 
El Mirage 
11,307 
277 
2.45% 
$2,655,346  
$64,992  
2.45% 
Fort McDowell Yavapai Nation 
308 
1 
0.32% 
$260,045  
$435  
0.17% 
Fountain Hills 
13,105 
0 
0.00% 
$5,944,909  
$38  
0.00% 
Gila Bend 
944 
2 
0.21% 
$118,937  
$215  
0.18% 
Gilbert 
74,821 
528 
0.71% 
$29,339,526  
$207,205  
0.71% 
Glendale 
90,415 
245 
0.27% 
$24,665,480  
$66,776  
0.27% 
Goodyear 
25,023 
115 
0.46% 
$8,326,438  
$38,351  
0.46% 
Guadalupe 
1,397 
0 
0.00% 
$269,202  
$0  
0.00% 
Litchfield Park 
2,616 
3 
0.11% 
$996,356  
$1,202  
0.12% 
Unincorporated Maricopa County 
142,777 
9,064 
6.35% 
$45,530,720  
$2,890,566  
6.35% 
Mesa 
201,507 
2,996 
1.49% 
$59,328,380  
$882,029  
1.49% 
Paradise Valley 
5,621 
2485 
44.21% 
$11,738,020  
$5,190,276  
44.22% 
Peoria 
64,806 
2,730 
4.21% 
$21,410,130  
$901,847  
4.21% 
Phoenix 
590,476 
24,895 
4.22% 
$167,455,500  
$7,060,152  
4.22% 
Queen Creek 
8,422 
1 
0.01% 
$2,890,493  
$379  
0.01% 
Salt River Pima-Maricopa Indian Community 
2,680 
6 
0.22% 
$919,777  
$2,227  
0.24% 
Scottsdale 
123,959 
2,458 
1.98% 
$67,660,310  
$1,341,589  
1.98% 
Surprise 
52,607 
4704 
8.94% 
$15,652,750  
$1,399,528  
8.94% 
Tempe 
73,603 
846 
1.15% 
$24,383,780  
$280,194  
1.15% 
Tolleson 
2,165 
16 
0.74% 
$505,455  
$3,648  
0.72% 
Wickenburg 
3,610 
0 
0.00% 
$1,285,212  
$0  
0.00% 
Youngtown 
2,796 
13 
0.46% 
$540,226  
$2,477  
0.46% 
Queen Creek (Pinal County Portion) 
606 
0 
0.00% 
$207,814  
$0  
0.00% 
Peoria (Yavapai County Portion) 
5 
0 
0.00% 
$1,321  
$0  
0.00% 
Wickenburg (Yavapai County Portion) 
54 
0 
0.00% 
$19,703  
$0  
0.00%

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 290 
It is duly noted that the exposure numbers presented above represent a 
comprehensive evaluation of the county as a whole.  It is unlikely that wildfires would 
burn county-wide at the same time.  Accordingly, actual event based losses and 
exposure are likely to be only a fraction of those summarized above. 
Vulnerability – Development Trend Analysis 
By its very definition, the WUI represents the fringe of urban development as 
it intersects with the natural environment.  As communities push further out, more WUI 
is created.  The current CWPP provides a comprehensive approach to reducing wildfire 
risk through targeted activities and projects that are designed to establish a baseline for 
effective mitigation against wildfire damages in the WUI of Maricopa County.   
Changes in Development in the Hazard Prone Area 
Within the unincorporated areas of Maricopa County, residential development 
has been minimal but has been concentrated along I-17 in the Anthem area and in the 
western portion of the County along SR303.  It is anticipated that new development 
will largely occur in these areas over the next five years.  Some of these areas are near 
the County’s WUI boundary and are identified as having medium and high wildfire 
hazard ratings.  Future development in these areas should consult the CWPP and this 
Plan for guidance on sound development practices and wildfire risk reduction 
measures.  
The table below summarizes the changes in development within all other 
participating jurisdictions in relation to known wildfire hazard areas within the County. 
Jurisdiction 
Development Changes 
Avondale 
Avondale does not lie within proximity to the designated WUI but contains 
areas of medium and high wildfire hazard within the southern half of the City 
and to a lesser extent within the northern half, as well. Most of the key growth 
identified by the City lie adjacent to I-10 and no further south than Lower 
Buckeye Road and will not significantly impact the Community’s vulnerability 
to wildfire.  The South Avondale Growth Area, located between Lower 
Buckeye Road to the Estrella Mountains could impact the wildfire 
vulnerability of the City, due to the widespread medium and high wildfire 
hazard designation in that area.  
Buckeye 
The City of Buckeye is bounded to the south, north and west by the designated 
WUI and contains several areas of medium and high wildfire hazard. New and 
existing commercial development within the City is concentrated on Miller 
and Watson Road immediately south of I-10 outside of the significant areas of 
increased wildfire hazard.  The City’s forecasted residential developments are 
located along the south and north sides of I-10 and along the west and north 
boundaries of the community north of I-10.  Of the anticipated development 
changes, only the residential development identified as Douglas Ranch lies 
within an area of substantial wildfire hazard.  
Carefree 
The Town of Carefree is mostly located within areas of medium and high 
wildfire hazard but is not located along the designated WUI. Most residential 
and commercial development over the past five years and anticipated over the 
next 5 years occurs in designated infill areas of the Town in the northwest and 
central area. These areas are located with areas of elevated wildfire hazard.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 291 
Jurisdiction 
Development Changes 
Cave Creek 
The Town of Cave Creek is entirely composed of areas of medium and high 
wildfire hazard and is bounded to the north by the designated WUI. Changes in 
development include several single family and multi-family residential 
developments and commercial developments along the Carefree Highway.  
Commercial development along the Carefree Highway is anticipated to 
continue over the next five years.  The development described will change the 
community’s vulnerability to wildfire.  
Chandler 
The City of Chandler is bordered to the south by the designated WUI but does 
not contain substantial areas of medium and high wildfire hazard.  Most 
development is anticipated to occur in central and northern Chandler in the 
form of large lot residential, commercial, and industrial.  Given the location of 
these developments, they will not impact the community’s vulnerability to 
wildfire.  
El Mirage 
The City of El Mirage is not bordered by the defined WUI but is impacted by 
areas of medium and high wildfire hazard along the eastern community border. 
Most current and proposed development has taken the form of manufacturing 
projects located in the southern portions of the City.  Minor growth of 
residential projects has occurred in the northeast section and a 3-story 
residential, multifamily project is being constructed in the northwest section of 
the City. Most of the proposed and existing developments described could 
impact the community’s vulnerability to wildfire as the southern and 
northeastern sections of the City contain identified wildfire hazard areas. 
Fort McDowell 
Yavapai Nation 
The Fort McDowell Yavapai Nation contains areas of medium and high 
wildfire hazard, mostly following the alignments of the Verde River and 
Sycamore Creek and is bounded on the east by the defined WUI. Existing and 
planned developments are located approximately within the 30% of the 
southwest portion of the Nation and are not located within elevated wildfire 
hazard areas, nor will they affect the vulnerability of the Nation. 
Fountain Hills 
Most of the Town of Fountain Hills lies within areas identified to have 
medium wildfire hazard but is not proximal to the WUI boundary.  The Town 
expects to continue with significant single-family development, primarily on 
the western and northwestern parts of down in Adero Canyon and Eagles Nest. 
While the western portion of the community does not lie within an area of 
elevated wildfire hazard, development in the northwestern portion of the Town 
will impact the community’s vulnerability to wildfire.  
Gila Bend 
The Town of Gila Bend is bounded on all sides by the identified WUI for 
Maricopa County and contains several pockets of medium and high wildfire 
hazard areas.  The Town has seen limited growth over the past 5 years and 
anticipates that this trend will continue over the next 5 years.  This 
development has occurred largely along the Pima St. and Butterfield Trail in 
the form of commercial and industrial projects.  Developments within these 
may impact the community’s vulnerability to wildfire as identified pockets of 
medium wildfire hazard areas exist along those alignments.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 292 
Jurisdiction 
Development Changes 
Gilbert 
Gilbert does not lie within proximity to the WUI boundary and is minimally 
impacted by areas of medium and high wildfire hazard from State Highway 
202 to the southern boundary.  Development within Gilbert has been focused 
within the Northwest Employment area located in the northwest corner of the 
Town, in the Banner/MD Anderson Employment Area north of Baseline 
Roade, the Central Employment Area located along State Highway 202 on the 
west boundary of the Town, and the Gateway Employment Area along State 
Highway 202 on the east boundary of the Town.  The Town anticipates that the 
largest areas for development will continue to be the Central Business District 
and Gateway Employment Area in the future.  The areas identified for 
development are not significantly impacted by area of medium and high 
wildfire hazard. 
Glendale 
The City of Glendale is impacted by areas of medium and high wildfire hazard 
areas mostly between the alignments of El Mirage Rd. and Hwy 101 and in the 
northeast corner of the City.  Most areas targeted for development within the 
community lie outside of these areas of elevated wildfire risk, however 
development within the Sports & Entertainment District located around the 
intersection of Glendale Avenue and Hwy 101 will partially fall within areas 
of high wildfire hazard.  Development in this area is expected to be 
predominantly office, entertainment, experiential retail and multifamily. 
Goodyear 
The City of Goodyear is impacted by medium and high wildfire hazard areas, 
particularly in the central portion of the community, and is bounded by the 
WUI to the south and west. In relation to the areas of medium and high 
wildfire hazard increased residential and commercial development have 
occurred in the area bounded by Pecos Rd. to the South and the Gila River to 
the north.  Lesser amounts of development have occurred in the area bounded 
by the Gila River to the south and Camelback Rd. to the north.  It is anticipated 
that development will continue at a 20% year on year increase in these areas 
over the next 5 years.  Development located between Pecos Rd. and the Gila 
River may impact the community’s vulnerability to wildfire. 
Guadalupe 
The Community of Guadalupe does not anticipate significant changes in 
development, is not impacted by areas of increased wildfire hazard, and does 
not lie within proximity to the WUI boundary. 
Litchfield Park 
While Litchfield Park continues to develop, the City is not impacted by areas 
of increased wildfire hazard and does not lie within proximity to the WUI 
boundary. 
Mesa 
The City of Mesa is bounded by the WUI boundary on the northwest and has 
significant areas of medium and high wildfire hazard in the northern and 
southern portions of the City.  Over the past 5 years growth has occurred in the 
Falcon Field area to the north, along the Downtown and Main Street Transit 
District, along the Superstition Springs Freeway Corridor, and within the 
Phoenix Mesa Gateway Area. Development has included increased residential 
and commercial development.  This development is anticipated to continue 
within the growth areas identified with particular emphasis in the area 
surrounding the Phoenix-Mesa Gateway Airport.  Of these areas, the Falcon 
Field area to the north and Phoenix Mesa Gateway area to the south are located 
within areas at increased risk of wildfire.  
Peoria 
The City of Peoria is largely impacted by medium and high wildfire hazard 
areas and is bordered to the north by the WUI boundary.  Development has 
occurred and will continue to occur in the northern and central areas of the 
jurisdiction and will continue to migrate north over time.  Future development 
in these areas will potentially impact wildfire risk within Peoria as these areas 
lie within medium and high hazard area and within proximity to the WUI.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 293 
Jurisdiction 
Development Changes 
Phoenix 
The northern and southern portions of the City of Phoenix are significantly 
impacted by medium and high wildfire hazard areas and is bounded by the 
WUI boundary to the north. Changes in development within the City are 
largely contained within the Infill Development District and the Southwest 
Growth Region.  Anticipated commercial and residential growth within the 
Infill will be concentrated in the downtown area, which lies outside of the 
identified wildfire hazard areas. Residential development within the Southwest 
Growth Region, which contains significant areas of high wildfire hazard, will 
impact the City’s vulnerability to wildfire. 
Queen Creek 
Queen Creek has experienced residential and commercial development 
predominantly within the eastern portion of the Town and anticipates that 
development will continue over the next 5 years.  The Town is not located 
within proximity to the WUI boundary and has few areas of medium risk 
wildfire hazard within the incorporated area.  For this reason, there are no 
impacts to wildfire hazard anticipated. 
Salt River Pima-
Maricopa Indian 
Community 
The SRPMIC is bordered by the Maricopa County WUI boundary to the east 
and is designated to have medium and high wildfire hazard areas along the 
northern and southern boundary of the community.  Development has occurred 
in the community at a fast pace over the past five years and anticipates 
continued growth in the commercial sector over the next five years, while 
residential is limited as housing is only available to Community Members. 
Most recent existing and proposed development is located outside of areas 
with elevated wildfire risk; however, the Community is considering 
development along the Southern Boundary of the Community, which would 
potentially be at a higher risk to wildfire.  
Scottsdale 
A significant portion of the community of Scottsdale is in areas of medium to 
high wildfire hazard risk and is bounded by the WUI boundary to the 
northeast.  Development is continuing within the North Sub-Area of the City, 
north of Deer Valley Road, but is also occurring within the East-Shea area of 
the Central Sub-Area located between Deer Valley and Indian Bend Road.  
Residential, Commercial, and mixed-use development is expected to continue 
in these areas over the next 5 years.  Development occurring between 
Scottsdale Road and Pima Freeway will be outside areas of increased wildfire 
risk, while development east or west of their alignments would be at an 
increased risk of wildfire.  
Surprise 
Surprise is closely bordered by the WUI boundary to the northwest and 
contains several areas designated with medium to high wildfire hazard.  Over 
the past 5 years the City has experienced a residential growth rate above the 
state average and is anticipating continued growth of 53% in population and 
63% in jobs related to office, retail, and industrial development by 2030.  The 
city is targeting several areas for the growth, of which the Loop 303 
Development and Railplex Foreign Trade Zone are impacted by areas 
designated to have medium and high wildfire hazard. 
Tempe 
Tempe is not within proximity of the WUI boundary and contains limited areas 
of high and medium wildfire hazard risk, mostly along the Salt River running 
east to west within the northern portion of the City.  Tempe has seen rapid 
growth of high density residential, new corporate office headquarters and 
many new retail developments. A significant amount of this development has 
occurred in the downtown area, Tempe Town Lake, which lies with the 
designated high and medium fire hazard area. New developments within this 
area will increase the population and assets potentially impacted by wildfire.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 294 
Jurisdiction 
Development Changes 
Tolleson 
Tolleson has experienced a few small residential and commercial 
developments over the past 5 years and has designated specific areas to be 
targeted for development in the future.  These areas are infill areas within the 
jurisdictional boundary. The community has limited medium and high rated 
hazard areas for wildfire but is not located in an area impacted by the WUI.  
Future growth within the community is limited and will not impact the wildfire 
hazard. 
Wickenburg 
Wickenburg is in northern Maricopa County and is bordered to the north, west, 
and south by the defined WUI.  Pockets identified to have a medium wildfire 
hazard rating exist along Highway 93 which intersects the east side of the 
community from north to south.  Development over the past 5 years and 
anticipated over the next 5 years has been largely residential and outside of 
areas with known wildfire hazards, with the exception of the proposed Arroyo 
Vistas development (37 homes) which lies, at least in part within an area 
designated to have a medium hazard rating.  
Youngtown 
Youngtown is not located within proximity to the defined WUI boundary. 
Small pockets of high and medium wildfire hazard risk do exist within the 
incorporated limits of the community.  However, these areas are located along 
the Agua Fria River and further west.  Most development within the 
community over the past 5 years and anticipated in the next 5-year cycle is 
characterized by infill and redevelopment of areas east of the Agua Fria River 
alignment.  The Town’s Council has approved a 100+ acre regional park in the 
Agua Fria river bottom which will further limit development within areas at 
risk to wildfire. 
 
Sources 
Arizona Department of Emergency and Military Affairs, 2018, State of Arizona 
Multi-Hazard Mitigation Plan, 2018 Update. 
Arizona Wildfire Risk Assessment Portal (AZWRAP), accessed at: 
https://arizonawildfirerisk.com/  
FEMA, 2001, Understanding Your Risks; Identifying Hazards and Estimating Losses, 
FEMA Document No. 386-2. 
Fisher, M., 2004, Arizona Wildland Urban Interface Assessment, 2003, prepared for 
the Arizona Interagency Coordination Group. 
http://www.azsf.az.gov/UserFiles/PDF/Arizona%20Wildland%20Urban%20Interf
ace%20Assessment%2005MAR04.pdf  
Logan Simpson Design, Inc., 2010, Maricopa County Community Wildfire Protection 
Plan 
MCDEM, 2020, Maricopa County Community Wildfire Protection Plan Update 
National Interagency Fire Center, 2020, Wildland Fire Open Data Portal accessed at: 
https://data-nifc.opendata.arcgis.com/  
Sanborn Map Company, 2013, West Wide Wildfire Risk Assessment, Final Report, 
prepared for the Oregon Department of Forestry in cooperation with the Western 
Forestry Leadership Coalition and Council of Western State Foresters.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 295 
Profile Maps 
Maps 7A, 7B, and 7C – Wildfire Hazard Map(s) 
Maps 7A-2, 7B-2, and 7C-2 – Fire Threat Index Map(s)

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
202
rx
85
rx
101
rx
303
rx
202
rx
303
rx
85
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
NIFS Perimeters
WUI
Wildfire Hazard Rating
High
Medium
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Interagency Perimeters
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7A
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020

§¨¦
17
§¨¦
10
§¨¦
17
§¨¦
10
rx
88
rx
303
rx
202
rx
74
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
51
rx
303
rx
202
rx
202
rx
101
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7B
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020
NIFS Perimeters
WUI
Wildfire Hazard Rating
High
Medium
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Interagency Perimeters

§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7C
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020
NIFS Perimeters
WUI
Wildfire Hazard Rating
High
Medium
Legend
Interagency Perimeters
Major Streams
Maricopa County
Mitigation Plan Extent

§¨¦
10
§¨¦
17
§¨¦
10
§¨¦
10
§¨¦
17
rx
303
rx
74
rx
202
rx
85
rx
51
rx
101
rx
202
rx
85
rx
101
rx
303
rx
202
rx
303
rx
85
£
¤
60
£
¤
71
£
¤
93
£
¤
60
£
¤
60
NIFS Perimeters
WUI
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Interagency Perimeters
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7A-2
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020
Fire Threat Index
Very, Very Low
Very Low
Low
Low Moderate
Moderate
Moderate High
High
Very High
Extreme

§¨¦
17
§¨¦
10
§¨¦
17
§¨¦
10
rx
88
rx
303
rx
202
rx
74
rx
87
rx
51
rx
101
rx
24
rx
153rx
143
rx
51
rx
303
rx
202
rx
202
rx
101
£
¤
60
£
¤
60
£
¤
60
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7B-2
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020
NIFS Perimeters
WUI
Legend
Maricopa County
Mitigation Plan Extent
Major Streams
Interagency Perimeters
Fire Threat Index
Very, Very Low
Very Low
Low
Low Moderate
Moderate
Moderate High
High
Very High
Extreme

§¨¦
8
§¨¦
8
rx
238
rx
85
17
Maricopa County Multi-Jurisdictional
Hazard Mitigation Plan
Map 7C-2
Maricopa County
Wildfire Hazard Map
as of Sept 2020
0
75
150
37.5
MilesI
MARICOPA
COUNTY
Source: JE Fuller 2020; MAG 2020:
MCCWPP 2020; TIGER 2020; LSD 2020;
AWUIA 2004; USGS 2020
NIFS Perimeters
WUI
Legend
Interagency Perimeters
Major Streams
Maricopa County
Mitigation Plan Extent
Fire Threat Index
Very, Very Low
Very Low
Low
Low Moderate
Moderate
Moderate High
High
Very High
Extreme

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 296 
5.4 
Risk Assessment Summary 
The jurisdictional variability of risk associated with each hazard assessed in Section 
5.3 is demonstrated by the various CPRI and hazard exposure results.  Accordingly, each 
jurisdiction has varying levels of need regarding the hazards to be mitigated and may not 
consider all the hazards as posing a great risk to their individual communities.  Table 5-42 
summarizes the hazards selected for mitigation by each jurisdiction and will be the basis for 
each jurisdiction’s mitigation strategy. 
Table 5-42:  Summary of hazards to be mitigated by each participating jurisdiction  
Jurisdiction 
Dam Inundation 
Drought 
Extreme Heat 
Fissure 
Flood 
Levee Failure 
Severe Wind 
Subsidence 
Wildfire 
Avondale 
NV 
M 
M 
NV 
M 
M 
M 
M 
M 
Buckeye 
M 
M 
M 
NV 
M 
NV 
M 
M 
M 
Carefree 
NV 
M 
NH 
NV 
M 
NV 
M 
NV 
M 
Cave Creek 
NV 
M 
M 
NV 
M 
NV 
M 
NV 
M 
Chandler 
NV 
M 
M 
NV 
M 
NV 
M 
M 
NH 
El Mirage 
M 
M 
M 
NV 
M 
NV 
M 
M 
NH 
Fort McDowell Yavapai Nation 
NV 
M 
NH 
NV 
M 
NV 
M 
NV 
M 
Fountain Hills 
M (1) 
M 
NH 
NV 
M 
NV 
M 
NV 
M 
Gila Bend 
NV 
M 
M 
NV 
M 
NV 
M 
M 
M 
Gilbert 
M 
M 
M 
M 
M 
M 
M 
M 
NH 
Glendale 
M (1) 
M 
M 
M 
M 
M 
M 
M 
M 
Goodyear 
M 
M 
M 
NV 
M 
NV 
M 
M 
M 
Guadalupe 
NV 
M 
M 
NV 
M 
NV 
M 
NV 
NV 
Litchfield Park 
NV 
M 
M 
NV 
M 
NV 
M 
M 
NH 
Unincorporated Maricopa County 
M 
M 
M 
M 
M 
M 
M 
M 
M 
Mesa 
M 
M 
M 
M 
M 
M 
M 
M 
M 
Paradise Valley 
NV 
M 
M 
NV 
M 
NV 
M 
M 
M 
Peoria 
M 
M 
M 
NV 
M 
M 
M 
M 
M 
Phoenix 
M (1) 
M 
M 
M 
M 
M 
M 
M 
M 
Queen Creek 
M 
M 
M 
M 
M 
NV 
M 
NH 
M 
Salt River Pima-Maricopa Indian Community 
NV 
M 
M 
NV 
M 
NV 
M 
M 
M 
Scottsdale 
NV 
M 
M 
M 
M 
M 
M 
M 
M 
Surprise 
M 
M 
M 
M 
M 
NV 
M 
M 
M 
Tempe 
M 
M 
M 
NV 
M 
M 
M 
M 
NH 
Tolleson 
NV 
M 
M 
NV 
M 
NV 
M 
M 
NH 
Wickenburg 
M 
M 
M 
NV 
M 
M 
M 
NV 
M 
Youngtown 
M 
M 
M 
NV 
M 
NV 
M 
M 
M 
M – Mitigation A/Ps will be identified 
NH – Nuisance hazard - no mitigation is warranted 
NV – Jurisdiction is not vulnerable to hazard – no mitigation is warranted 
(1) – The Town of Fountain Hills and City of Phoenix own and maintain several dams and will continue 
to mitigate risk by maintaining the dams to ADWR dam safety standards.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 297 
SECTION 6: MITIGATION STRATEGY 
 
The mitigation strategy provides the “what, when, and how” of actions that will reduce or 
possibly remove the community’s exposure to hazard risks.  According to DMA 2000, the 
primary components of the mitigation strategy are generally categorized into the following: 
 Goals and Objectives 
 Capability Assessment 
 Mitigation Actions/Projects and Implementation Strategy 
The entire 2015 Plan mitigation strategy was reviewed and updated by the MJPT, including 
the section describing National Flood Insurance Program (NFIP) compliance.  Specifics of the 
changes and updates are discussed in the subsections below.   
6.1 
Hazard Mitigation Goals and Objectives 
The 2015 Plan goals and objectives were reviewed by the MJPT alongside the 2018 
State Plan goals, and were determined to be adequate and current with the overall mitigation 
planning goals of all the participating jurisdictions.  No changes were made. Accordingly, one 
goal and four clear objectives will be carried forward for the Plan as follows: 
 
 GOAL:  Reduce or eliminate the risk to people and property from natural 
hazards. 
 
 Objective 1:  Reduce or eliminate risks that threaten life and property in 
the incorporated, unincorporated, and tribal jurisdictions within Maricopa 
County. 
 Objective 2:  Reduce risk to critical facilities and infrastructure from 
natural hazards. 
 Objective 3:  Promote hazard mitigation throughout the incorporated, 
unincorporated, and tribal jurisdictions within Maricopa County. 
 Objective 4:  Increase public awareness of hazards and risks that threaten 
the incorporated, unincorporated, and tribal jurisdictions within Maricopa 
County. 
 
§201.6(c)(3):  [The plan shall include…] (3) A mitigation strategy that provides the jurisdiction’s blueprint for 
reducing the potential losses identified in the risk assessment, based on existing authorities, policies, programs and 
resources, and its ability to expand on and improve these existing tools. This section shall include:  
(i) A description of mitigation goals to reduce or avoid long-term vulnerabilities to the identified hazards. 
(ii) A section that identifies and analyzes a comprehensive range of specific mitigation actions and projects being 
considered to reduce the effects of each hazard, with particular emphasis on new and existing buildings and 
infrastructure. 
(iii) An action plan describing how the actions identified in paragraph (c)(3)(ii) of this section will be prioritized, 
implemented, and administered by the local jurisdiction. Prioritization shall include a special emphasis on the 
extent to which benefits are maximized according to a cost benefit review of the proposed projects and their 
associated costs.  
(iv) For multi-jurisdictional plans, there must be identifiable action items specific to the jurisdiction requesting FEMA 
approval or credit of the plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 298 
6.2 
Capability Assessment 
An important component of the Mitigation Strategy is a review of each participating 
jurisdiction’s resources in order to identify, evaluate, and enhance the capacity of local 
resources to mitigate the effects of hazards.  The capability assessment is comprised of several 
components: 
 Legal and Regulatory Review – a review of the legal and regulatory capabilities, 
including ordinances, codes, plans, manuals, guidelines, and technical reports that 
address hazard mitigation activities.  
 Technical Staff and Personnel – this assessment evaluates and describes the 
administrative and technical capacity of the jurisdiction’s staff and personnel 
resources. 
 Fiscal Capability – this element summarizes each jurisdiction’s fiscal capability to 
provide the financial resources to implement the mitigation strategy. 
 National Flood Insurance Program (NFIP) Participation – the NFIP contains 
specific regulatory measures that enable government officials to determine where 
and how growth occurs relative to flood hazards.  Participation in the NFIP is 
voluntary for local governments, but the program is promoted by FEMA as a basic 
first step for implementing and sustaining an effective flood hazard mitigation 
program and is a key indicator for measuring local capability as part of this 
assessment.   
For this update, the MJPT reviewed the information provided in Section 6.2 of the 2015 
Plan and updated data in the tables of Section 6.2.1 as appropriate. 
6.2.1 Jurisdictional Capabilities 
Tables 6-1-1 through 6-1-28 summarize the legal and regulatory mitigation 
capability for each jurisdiction.  Information provided includes a brief listing of current 
codes, mitigation relevant ordinances, plans, and studies/reports.  Tables 6-2-1 through 
6-2-28 summarize the staff and personnel resources employed by each jurisdiction that 
serve as a resource for hazard mitigation.  Tables 6-3-1 through 6-3-28 summarize the 
fiscal capability and budgetary tools available to each participating jurisdiction.  Each 
of these three tables are listed below by jurisdiction. 
Each jurisdiction performs regular evaluations and assessments of the policies 
and programs listed in the following tables and will adjust and revise as the need arises. 
Each jurisdiction will review their respective policies and programs as a part of the 
Plan maintenance listed in Section 7.1.2 and also as they related to integrating the Plan 
into other planning documents and activities as discussed in Section 3.6.2.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 299 
Table 6-1-1:  Legal and regulatory capabilities for Avondale 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2018 International Residential 
Code 
• 2018 International Mechanical 
Code 
• 2018 International Plumbing Code 
• 2018 International Energy 
Conservation Code 
• 2017 National Electrical Code 
• January 2012 International Fire 
Code 
• Building Official 
• Code Enforcement 
• Fire Marshal 
ORDINANCES 
• City of Avondale Ordinances (as 
Adopted) & Weed Abatement 
Ordinance/Planning 
• International Property Maintenance 
Code (IPMC) - 302.4 
• Subdivision/Zoning Ordinance  
• Zoning Ordinance and Subdivision 
Regulations 2006 – Chapter 5 
Planned Area Development District 
• Code Enforcement 
• Planning & Zoning 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• General Plan/City Ordinance 
• Capital Improvement Project Plan 
• Development Guidelines and Policies 
• City Emergency Operations Plan 
• Pandemic Preparedness and 
Response Plan 
• Flood Control and Response Plan 
(McMicken Dam) 
• Nation Response Framework 
• State and Local Mitigation Plan (as 
adopted) 
• Planning & Zoning 
• Building Official 
• Fire 
• Code Enforcement 
• Safety/Risk 
STUDIES 
• Maricopa County Mass Evacuation 
Planning Group 
• Fire

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 300 
 
Table 6-2-1:  Technical staff and personnel capabilities for Avondale 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Development & Engineering Services 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Development & Engineering Services 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Development & Engineering Services 
Floodplain Manager 
 Development & Engineering Services 
Surveyors 
 
 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Development & Engineering Services 
Personnel skilled in GIS and/or 
HAZUS 
 Information Technology / GIS 
Scientists familiar with the 
hazards of the community 
 
 
Emergency manager 
 Fire & Medical Department 
Grant writer(s) 
 Finance Department  
Others 
 
 
 
Table 6-3-1:  Fiscal capabilities for Avondale 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Fees for water and sewer 
services 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 301 
Table 6-1-2:  Legal and regulatory capabilities for Buckeye 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2018 International Residential Code 
• 2018 International Mechanical Code 
• 2018 International Plumbing Code 
• 2017 National Electrical Code 
• 2012 International Fuel Gas Code 
• 2018 International Energy 
Conservation Code 
• 2018 International Property 
Maintenance Code 
• 2018 International Existing Building 
Code 
• 2012 International Fire Code 
• Development Services 
• Fire Department 
ORDINANCES 
• Floodplain Management (Ord. No. 27-
11, § 2, 7-19-2011) 
• Airport (Ord. No. 5-11, § 2, 3-1-2011) 
• Procurement (Ord. No. 2-11, § 2, 2-
15-2011) 
• Health and Sanitation (Ord. No. 15-
13, § 3, 9-17-2013) 
• Public Works 
• Engineering 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2007 Airport Master Plan 
• Development Code Update 
• Site Plan Review Requirements 
• Capital Improvements Plan 
• Engineering Design Standards 
• Public Works 
• Engineering 
• Development Services 
• Construction and 
Contracting 
STUDIES 
• City of Buckeye Economic 
Development Action Agenda 
• Part 150 Noise Compatibility Study 
(Airport) 
• 2012 Downtown Storm Drain 
Improvement Plan 
• Transportation Master Plan 
• ITS Strategic Plan 
• Bike and Pedestrian Master Plan 
• Buckeye Area Drainage Master Plan 
• Sun Valley Area Drainage Master Plan 
• 2020 General Plan 
• Engineering 
• Development Services 
• Economic Development 
• Public Works

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 302 
Table 6-2-2:  Technical staff and personnel capabilities for Buckeye 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning – Planners 
Development Services – Planners 
Engineering - Engineers 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Engineering – Engineers 
Public Works - Engineers 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Engineering, Water Resources, Development 
Services, and Public Works Depts 
Floodplain Manager 
 Engineering - City Engineer 
Public Works - Engineers 
Surveyors 
 Water Resources and Engineering Depts. 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Human Services, Emergency Management, 
Development Services, Fire, Police, Public Works,  
Engineering, Water Resources Depts 
Personnel skilled in GIS and/or 
HAZUS 
 ITD, Fire Dept, Police Dept 
Scientists familiar with the 
hazards of the community 
 Police Dept, Water Resources Dept, Fire Dept 
Emergency manager 
 Fire Dept, Fire Chief 
Grant writer(s) 
 Police Dept for Police, Fire, and Public Works 
Depts. 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 303 
Table 6-3-2:  Fiscal capabilities for Buckeye 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water, Sewer, Solid Waste, 
Airport Services 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 304 
Table 6-1-3:  Legal and regulatory capabilities for Carefree 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2003 International Building Code 
• 2002 National Electrical Code 
• 2003 International Mechanical 
Code 
• 1994 International Plumbing Code 
• 2003 International Residential 
Code 
• Building Department 
(all) 
ORDINANCES 
• Abatement Ordinance Town Code 
6-1 2006 
• Adult Oriented Business Town 
Zoning Ordinance 2006 
• Dark Sky Ordinance Town 
Building Code 2003 
• Noise Ordinance Town Code 6-
2(P-23) 2006 
• Town Zoning Ordinance 2003 
• Zoning Administrator 
• Town Marshal 
• Town Engineer 
REGULATIONS 
• Zoning and Planning Addressing 
Regulations 
• Flood Control District 
• Dust Abatement Regulations 
• Town Subdivision Regulations  
• MS4 Regulations 
• Zoning Administrator 
• Town Engineer

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 305 
Table 6-1-3:  Legal and regulatory capabilities for Carefree 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Town Plan for Area Land Use In 
2002 General Plan 
• 2008 Town Transportation Plan  
• Comprehensive Planning 
Amendments  
• Guidelines included in 2002 
General Plan 
• Planning and Development 
included in 2002 General Plan and 
2006 Carefree Zoning Ordinances  
• Development Master Plan 
Guidelines included in Carefree 
2002  
General Plan 
• Area Drainage Master Plan 
completed via 2004 Flood Control 
District of Maricopa County 
• Watercourse Master Plan 
completed via 2004 Flood Control 
District of Maricopa County 
• Zoning Administrator 
• Town Engineer 
STUDIES 
• Dam Safety Studies / Emergency 
Action Plans 2006 
• Area Drainage Master Studies 
• Corridor Studies 2007 Traffic 
Study 
• Emergency Routes Evaluation 
2008 
• Zoning Administrator 
• Town Engineer

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 306 
Table 6-2-3:  Technical staff and personnel capabilities for Carefree 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning and Development - Planners 
Environmental Services – Inspectors 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Planning and Development - Planners 
Environmental Services – Inspectors 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Planning and Development - Planners 
Emergency Management - Planners 
Floodplain Manager 
 
None on Staff 
Surveyors 
 
Planning and Development - Planners 
Transportation – Engineer 
Emergency Management – Planners 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Planning and Development – GIS Staff 
Emergency Management – GIS Staff 
Sheriff’s Office – Marshal 
Elections – Town Clerk/GIS Staff 
Environmental Services – GIS Staff 
Air Quality – GIS Staff 
Personnel skilled in GIS and/or 
HAZUS 
 Contract On Staff – Hydrologist 
Scientists familiar with the 
hazards of the community 
 Emergency Management -  
Director/Marshal/Planners 
Emergency manager 
 
Emergency Management – Fire Chief 
Fire Department – Grant writer 
Water Department - Manager 
Grant writer(s) 
 Planning and Development - Planners 
Environmental Services – Inspectors 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 307 
Table 6-3-3:  Fiscal capabilities for Carefree 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 308 
Table 6-1-4:  Legal and regulatory capabilities for Cave Creek 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2018 International Residential Code 
• 2018 International Plumbing Code 
• 2018 International Mechanical Code 
• 2018 International Fire Code 
• 2017 National Electric Code 
• 2018 Energy Conservation Code 
• Chief Building Official 
& Cave Creek Fire 
Official 
ORDINANCES 
• 2012 Cave Creek Zoning Ordinance 
• 2011 Cave Creek Sub-Division 
Ordinance 
• 2005 Town of Cave Creek General 
Plan (updates to be voted on in 2021) 
• 2012 Town of Cave Creek Town 
Core and Implementation Plan 
• Planning and Zoning 
Administrator 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2008 Town of Cave Creek DMP 
Flood Response Plan 
• 2020 Storm Water Area Master Plan 
• 2008 Town of Cave Creek Master 
Drainage Plan 
• 2009 Town of Cave Creek Multi-
Hazard Mitigation Plan (currently 
being updated) 
• 2009 Town of Cave Creek 
Emergency Operations Plan 
• 2013 Town of Cave Creek Master 
Water Plan 
• 2008 Town of Cave Creek Water 
Emergency Operations Plan 
• Grading and Drainage Technical 
Design Guidelines 
• 2009 Trails Technical Design 
Guidelines 
• 2009 Transportation Technical 
Guidelines 
• Maricopa County Flood 
Control 
• Town of Cave Creek 
Engineer 
• Town Marshal 
• Town Utilities Manager

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 309 
Table 6-1-4:  Legal and regulatory capabilities for Cave Creek 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
STUDIES 
• 2020 Pedestrian Transportation Study 
• 2016 Development Fee Study 
• 2020 Water Rate Study 
• 2020 Sewage Rate Study 
• 2014 Carefree / Cave Creek 
Transportation Framework Study 
• Cave Creek Carefree Bike Lane 
Study 
• Development Fee and Capacity 
Study 
• Town Engineer 
• Town Manager 
• Town Council 
 
Table 6-2-4:  Technical staff and personnel capabilities for Cave Creek 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning and Zoning Staff, Town Engineer, Town 
Manager, Town of Cave Creek Building Official 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Town of Cave Creek Building Official, Town 
Engineer, Town Utilities Manager 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Planning and Zoning Staff, Town Engineer, Town 
Manager, Town of Cave Creek Building Official 
Floodplain Manager 
 Town of Cave Creek Engineer 
Surveyors 
 
Out Sourced 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Town Marshal 
Personnel skilled in GIS and/or 
HAZUS 
 Town Engineer 
Scientists familiar with the 
hazards of the community 
 Utilities Manager 
Emergency Manager 
 Town Building Official 
Grant writer(s) 
 Town Planning Staff 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 310 
Table 6-3-4:  Fiscal capabilities for Cave Creek 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 311 
Table 6-1-5:  Legal and regulatory capabilities for Chandler 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2017 National Electrical Code 
• 2018 International Plumbing Code 
• 2018 International Mechanical Code 
• 2018 International Residential Code 
• 2018 International Fuel Gas Code 
• 2018 International Energy 
Conservation Code 
• 2018 International Fire Code 
• 2018 International Existing Building 
Code  
• Chandler Code of Ordinances 
(Municode.com) 
• Development Services 
• Fire Department 
• City Clerk 
ORDINANCES 
• Chandler Code of Ordinances 
(Municode.com): 
Floodplain Administration Ord. No. 
3311 
Weed Abatement Ord No. 3879 
Land Use Zoning Ord. No. 3063 
• Development Services 
 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Engineering Standard Details and 
Specifications 
• Technical Design Manuals 
• Stormwater Prevention Plan 
• Flood Control District Floodplain 
Maps 
• Stormwater Master Plan 
• Development Services 
 
STUDIES 
• Chandler\Gilbert Floodplain 
Delineation Study -  
Ph 1 Eastern Canal 
• Chandler\Gilbert Floodplain 
Delineation Study -  
Ph 2 Consolidated Canal 
• Chandler\Gilbert Floodplain 
Delineation Study -  
Ph 3 Union Pacific RR and Arizona Av 
• Higley Area Drainage Master Plan 
• Development Services 
• Flood Control District 
of Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 312 
Table 6-2-5:  Technical staff and personnel capabilities for Chandler 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Development Services– Planners 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Development Services – Engineers 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Public Works - Municipal Utilities – planners and 
engineers 
Floodplain Manager 
 Development Services 
Surveyors 
 
 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Fire Department 
Personnel skilled in GIS and/or 
HAZUS 
 Information technology, Development Services, 
Police, Fire 
Scientists familiar with the 
hazards of the community 
 Public Works - Municipal Utilities  
Emergency manager 
 Fire Department 
Grant writer(s) 
 All Departments 
Others 
 
 
 
Table 6-3-5:  Fiscal capabilities for Chandler 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 313 
 
Table 6-1-6:  Legal and regulatory capabilities for El Mirage 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• El Mirage City Code 
• 2006 International Building Code 
• 2006 International Fire Code 
• 2005 National Electric Code 
• 1997 Dangerous Building Code 
• 2006 International Fuel Gas Code 
• 2006 International Energy 
Conservation Code 
• 1997 Uniform Administrative Code 
• City Clerk 
• Building Department 
• Fire Department 
• City Clerk

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 314 
Table 6-1-6:  Legal and regulatory capabilities for El Mirage 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
ORDINANCES 
• Chapter 19 
 - Off Site 
Construction 
• Chapter 30.28 - Emergency 
Purchases 
• Chapter 30.65-30.70 - Civil 
Preparedness and Disaster 
• Chapter 33 - City Court 
• Chapter 34 - Police and Fire 
Department 
• Chapter 50 - Water Supply System 
• Chapter 51 - Sewers 
• Chapter 52 - Sanitation 
• Chapter 53 - Storm Water Quality 
Protection 
• Chapter 90 - Nuisance and 
Neighborhood Preservation 
• Chapter 94 - Air Pollution 
Regulations; Dust Control 
• Chapter 96 - International Fire Code 
and Alarm Systems 
• Chapter 150 - Building Code – 2006; 
International Plumbing Code – 2006; 
National Electrical Code – 2005; 
International Mechanical Code – 
2006; Dangerous Building Code – 
1997; Mobile and Manufactured 
Housing Standards; International 
Energy Conservation Code – 2006; 
International Fuel Gas Code – 2006; 
Uniform Administrative Code- 1997. 
• Chapter 153 - Floodplain 
Management 
• Chapter 154 - Zoning Code 
• 
Section 21-5-13 Floodway 
overlay 
• 
Section 21-5-14 Floodplain 
overlay 
• 
Section 21-5-15 Airfield Impact 
overlay 
• Chapter 155 - Subdivisions 
• Engineering 
• Finance 
• City Manager 
• Municipal Judge 
• Police Department 
• Public Works 
• Code Compliance 
• Fire Department

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 315 
Table 6-1-6:  Legal and regulatory capabilities for El Mirage 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2003 General Plan 
• 2008 Emergency Action Plan for El 
Mirage Employees 
• El Mirage Emergency Operations 
Plan 
• Engineering General Notes & 
Guidelines 
• Maricopa Association of 
Governments (MAG) Standards 
• District Flood Control Standard 
• Planning Department 
• Human Resources 
• Fire Department 
• Engineering 
• Maricopa Association of 
Governments 
• Maricopa County Flood 
Control 
STUDIES 
• Flood Insurance Study by Flood 
Control District of Maricopa County 
• Floodplain Study by Flood Control 
District of Maricopa County 
• Dam Safety Study by Flood Control 
District of Maricopa County 
• Maricopa County 
 
 
Table 6-2-6:  Technical staff and personnel capabilities for El Mirage 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Community Development Director, City Engineer, 
City Planner 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 City Engineer, Engineering Technicians, Building 
Official 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 City Engineer, Building Official, Fire Chief 
Floodplain Manager 
 City Engineer 
Surveyors 
 City Engineering & Public Works staff 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 City Engineer, Building Official, Fire Chief,  
Personnel skilled in GIS and/or 
HAZUS 
 City GIS Technician, Information Technology 
Director 
Scientists familiar with the 
hazards of the community 
 
 
Emergency manager 
 Fire Chief, Police Chief

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 316 
Table 6-2-6:  Technical staff and personnel capabilities for El Mirage 
Staff/Personnel Resources 
 
Department/Agency - Position 
Grant writer(s) 
 City Grants Coordinator 
Others 
 
 
 
 
Table 6-3-6:  Fiscal capabilities for El Mirage 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 317 
Table 6-1-7:  Legal and regulatory capabilities for Fort McDowell Yavapai Nation 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
TRIBAL CODES 
• 2012 International Building Code 
• 2012 National Electrical Code 
• 2012 International Mechanical Code 
• 2012 International Plumbing Code 
• 2012 International Fire Code 
• Planning/Development 
Dept. 
• Fire Department 
TRIBAL 
ORDINANCES 
• Floodplain Management  
• Hazard Abatement   
• Subdivision 
•   Noise  
• Planning/Development 
Dept. 
• Emergency Manager 
• License & Property 
Use Dept. 
• Environmental 
Department 
TRIBAL 
REGULATIONS 
• Wildfire Prevention 
• Addressing 
• Drainage/Stormwater 
• Site Plan Reviews 
• Land Use Restrictions 
• Fire Department 
• Planning/Development 
Dept. 
• License & Property 
Use Dept 
PLANS, 
MANUALS, 
GUIDELINES, 
and/or STUDIES 
• Wildland Fire Management (2012) 
• Fuels Management Plan (2012) 
• Maricopa County Wildfire Protection 
Plan (2020) 
• All, as required by Tribal Council. 
(SEE TRIBAL ANNEX) 
• Bureau of Indian 
Affairs, Salt River 
Agency 
• Community and 
Economic 
Development Division. 
(SEE TRIBAL 
ANNEX) 
 
 
 
Table 6-2-7:  Technical staff and personnel capabilities for Fort McDowell Yavapai 
Nation 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning and Development - Planners/ 
Planning and Building - Committee 
Environmental Services - Inspectors/Analysts 
General Managers office – General Manager 
Land Use -  Manager 
Housing -  Manager

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 318 
Table 6-2-7:  Technical staff and personnel capabilities for Fort McDowell Yavapai 
Nation 
Staff/Personnel Resources 
 
Department/Agency - Position 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Planning and Development - Building Inspectors 
Flood Control - Engineers 
Transportation - Engineers/Consultants 
Environmental Services - Air/Water Quality Testers 
/Analysts 
Fire Department- Fire Inspectors 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Planning and Development - Planners 
Emergency Management - Fire Chief, Police Chief, 
Environmental Director, Public Works Director 
Floodplain Manager 
 Planning and Development – Director and 
Engineers 
Surveyors 
 
 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Planning and Development – Planners, Engineers 
Transportation – Engineers, Police Chief, Fire 
Chief, Emergency Manager 
Emergency Management – Police Chief, Fire Chief, 
Emergency Manager, Planners 
Personnel skilled in GIS and/or 
HAZUS 
 
Planning and Development –Staff 
Emergency Management –Staff 
Police Department–Staff 
Fire Department - Staff 
Environmental Services –Staff 
Scientists familiar with the 
hazards of the community 
 
 
Emergency manager 
 Emergency Management -  General Manager, Fire 
Chief, FD Administrative Captain 
Grant writer(s) 
 All Departments – Grants and Contracts 
Administrator 
Others 
 
 
 
 
Table 6-3-7a:  Fiscal capabilities for Fort McDowell Yavapai Nation 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Accessible but historically not 
obtained 
Capital Improvements Project 
funding 
Yes 
Tribal Capital Improvement 
Programs funded by tribal 
enterprise revenue

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 319 
Table 6-3-7a:  Fiscal capabilities for Fort McDowell Yavapai Nation 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Authority to levy taxes for specific 
purposes 
Yes 
Eligible to impose direct 
assessments for use of tribal 
lands 
Fees for water, sewer, gas, or electric 
service 
Yes 
Eligible to assess Water, 
Sewer, Solid Waste, and 
Transfer station fees. 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Limited Use 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other:  Grants, Inter-governmental 
Agreements and Specific Planning 
and Project Grants 
Yes 
 Eligible for federal, state, 
tribal directed grants and 
IGA’s 
 
 
Table 6-3-7b:  Funding source assessment for Fort McDowell Yavapai Nation 
Building on Table 6-3-7a, the following summarize existing and potential funding sources 
that have either been utilized by FMYN for implementing hazard mitigation actions and 
projects in the past 5-years, or are considered potential sources for future hazard mitigation 
actions and projects. 
 
Existing/Past Funding Sources Used: 
• Tribal Revenue 
• FEMA THSGP 
• BIA funding 
• Insurance funding 
Potential Funding Sources: 
• CDBG 
• FEMA HMGP grants 
• FEMA BRIC grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 320 
Table 6-1-8:  Legal and regulatory capabilities for Fountain Hills 
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 IBC, IRC, IPC, IMC, IECC, 
IFC.  2005 NEC.  97 UCADB 
• Building Safety 
• Fire Department 
ORDINANCES 
• Amendments to the IBC,IRC,IFC  
• Including fire sprinklers in all 
structures 
• Building Safety 
• Fire Department 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2020 General Plan 
• 2020 Stormwater Management 
Plan 
• 1996 – Fountain Hills Area 
Drainage Master Plan 
• 1997 - Fountain Hills Area 
Drainage Master Plan, Emergency 
Access Plan and Routes Evaluation 
• 2001 - Emergency Action Plan for 
Golden Eagle Park Dam 
Modifications 
• Check lists and minimum 
mandatory submittal documents 
and specifications, updated 2020 
with Erosion Control Guidance for 
construction. 
• Planning and Zoning 
• Development Services 
STUDIES 
• 1994 - Fountain Hills North 
Floodplain Delineation Study 
• 1994 - Fountain Hills South 
Floodplain Delineation Study 
• 1996 - Fountain Hills Retardation 
Structure Emergency Action Plan 
• 1997 - Town of Fountain Hills, 
Dam Break Analysis for Golden 
Eagle Park Dam, Hesperus Wash 
Dam, Aspen Dam, North Heights 
Dam, Sun Ridge Canyon Dam 
• ISO rating for building safety 
• Development Services 
• Building Safety

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 321 
Table 6-2-8:  Technical staff and personnel capabilities for Fountain Hills 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Public Works/Town Engineer 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Public Works/Town Engineer 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Public Works/Director 
Floodplain Manager 
 Public Works/Town Engineer 
Surveyors 
 
Public Works/Town Engineer 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 None 
Personnel skilled in GIS and/or 
HAZUS 
 Public Works/Director 
Scientists familiar with the 
hazards of the community 
 
CAD Services/GIS Tech 
Emergency manager 
 None 
Grant writer(s) 
 Fire Chief/Public Works/ Director 
Others 
 
Fire Chief/Public Works/Town Engineer 
 
 
Table 6-3-8:  Fiscal capabilities for Fountain Hills 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
No 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
Requires citizen vote 
Fees for water, sewer, gas, or electric 
service 
No 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
Requires citizen vote 
Incur debt through special tax bonds 
Yes 
Requires citizen vote

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 322 
Table 6-1-9:  Legal and regulatory capabilities for Gila Bend  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• International Building Code 
• Community 
Development Services 
• Public Works & 
Engineering 
ORDINANCES 
• Floodplain Management Ordinance 
• Subdivision/Zoning Ordinance 
• Community 
Development Services 
• Public Works & 
Engineering 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• General Plan 
• CIP Plan 
• Airport Master plan 
• Community 
Development Services 
• Public Works & 
Engineering 
STUDIES 
• Water, streets, sewer studies 
•  Maps (FEMA, Effective date of 
September 2005) 
• Gila Bend Aquifer Study 
• Community 
Development Services 
• Public Works & 
Engineering 
• Flood Control District of 
Maricopa County 
 
 
 
Table 6-2-9:  Technical staff and personnel capabilities for Gila Bend  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Town Engineer 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Contract personnel 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Contract personnel 
Floodplain Manager 
 
Managed by FCDMC 
Surveyors 
 
Contract personnel 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Public Works Director 
Fire Chief 
EMS 
Personnel skilled in GIS and/or 
HAZUS 
 
Contract personnel

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 323 
Table 6-2-9:  Technical staff and personnel capabilities for Gila Bend  
Staff/Personnel Resources 
 
Department/Agency - Position 
Scientists familiar with the 
hazards of the community 
 
Contract personnel 
Emergency manager 
 
Public Works Director 
Fire Chief 
EMS Chief 
Town Engineer 
Grant writer(s) 
 
Contract personnel 
Others 
 
 
 
 
Table 6-3-9:  Fiscal capabilities for Gila Bend  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Potable water related project 
Capital Improvements Project 
funding 
Yes 
WIFA, HURF, Rural 
Development 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water, trash and sewer fees 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other 
Yes 
WIFA, Rural Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 324 
Table 6-1-10:  Legal and regulatory capabilities for Gilbert  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 1996 Code Town of Gilbert, 
Arizona 
*There have been revisions and 
amendments since original adoption 
date   
• 2012 International Fire Code 
• 2012 International Building Code 
• 2012 International Residential 
Code 
• 2012 International Mechanical 
Code 
• 2012 International Plumbing Code 
• 2012 International Fuel Gas Code 
• 2012 International Energy 
Conservation Code 
• 2011 National Electrical Code 
*The Bldg & Fire codes adopted and 
amended through the Building and 
Construction Regulations Code of the 
Town of Gilbert, Arizona- 2013 
Edition. 
• The Arizonans with Disabilities 
Act & Implementing Rules 
• Developmental Services 
• Fire Department 
ORDINANCES 
• 2005 Town of Gilbert Land 
Development Code* 
* There have been revisions and 
amendments since original adoption 
date   
• 1987 The Flood Damage 
Prevention Ordinance of the Town 
of Gilbert, Arizona 
• 2013 Town of Gilbert Amendments 
to Chapter 34 Floodplain 
Management Ordinance 245 is 
Chapter 34 of Town Code 
• Development Services

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 325 
Table 6-1-10:  Legal and regulatory capabilities for Gilbert  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2003 Town of Gilbert Storm Water 
Management Program  
• 2003 Gilbert Water Supply 
Reduction Management Plan 
• 2015-2019 Capital Improvement 
Plan 
• 2016 Town of Gilbert Emergency 
Operation Plan (revision in 
progress) 
• 2019 Town of Gilbert Flood 
Response Plan 
• 2012 General Plan Town of Gilbert 
• 2015 Town of Gilbert Multi-
Hazard Mitigation Plan (currently 
being updated) 
• 200 Town of Gilbert Land 
Development Code Ordinance No. 
1625 
         Latest Revision: June 1, 2014 
• 2009 Town of Gilbert Public 
Works and Engineering Standards 
and Details 
 
• Public Works 
• Fire Department 
• Development Services 
• Management Office

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 326 
Table 6-1-10:  Legal and regulatory capabilities for Gilbert  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
STUDIES 
• 2005 Chandler/Gilbert Floodplain 
Delineation Study Phase 1 “Eastern 
Canal Watershed” Revised 2007. 
• 2008 Chandler/Gilbert Floodplain 
Delineation Study Phase 2 
“Consolidated Canal Watershed”. 
• 2009 Chandler/Gilbert Floodplain 
Delineation Study Phase 3 
“UPRR/Arizona Avenue Watershed”. 
• 2013 Flood Insurance Study for 
“Maricopa County, Arizona and 
Unincorporated Areas” Volumes 1 
thru 23. 
• FEMA Flood Insurance Rate Maps 
(FEMA, Effective date of October 
2013) 
• 2013 San Tan West Area Drainage 
Master Study (ADMS) 
• 2018 San Tan West Area Drainage 
Master Plan Update 
• 2020 San Tan West Area Drainage 
Master Study/Plan Update 
• East Mesa Area Drainage Master 
Plan 
• 2008 Earth Fissure Map of the 
Chandler Heights Study Area: Pinal 
and Maricopa Counties County   
(Includes Gilbert Area) Per Ariz. Rev. 
Stat. § 27-152.01(3) September 21, 2006 
• Public Works/Floodplain 
Administrator

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 327 
Table 6-2-10:  Technical staff and personnel capabilities for Gilbert 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Development Services Department - Planner, 
Business Development Manager, Business 
Development Specialists 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Development Services Department – Buildings – 
Plan Review & Inspection Manager, Building/Fire 
Inspection Administrator, Senior Building 
Inspectors, Building Inspector II’s, Building 
Inspector I’s, Fire Inspectors, Senior Building Plans 
Examiners, Building Plans Examiner.   
 
Development Services Department -Infrastructure –  
Engineering/Planning Inspection Administrator, 
Engineering Inspector II’s, Engineering/Planning 
Plan Review Administrator, Senior Engineering 
Plans Examiner, Engineering Plans Examiner. 
 
Public Works – Engineering Services Manager, 
Assistant Town Engineer, Town Engineer, Utility 
Field Supervisors, Water Manager, Senior Utility 
Workers, Utility Workers, Utility Electrician, 
Instrumentation Technician, Water Treatment Plant 
Mechanic, Well Technician, Lift Station 
Technicians, and Instrumentation Technicians 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Development Services - Associate Engineer  
 
Public Works Department - Public Works Director 
 
Fire Department - Emergency Management 
Coordinator 
Floodplain Manager 
 Public Works Department - Engineer 
Surveyors 
 
 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Gilbert Fire Department - Emergency Management 
Coordinator 
 
Gilbert Public Works Department - Public Works 
Director 
Personnel skilled in GIS and/or 
HAZUS 
 
Support Services Department - GIS Technician I 
and II 
GIS Database Analysis, GIS Administrator 
Scientists familiar with the 
hazards of the community 
 Public Works Department - Water Quality 
Supervisor/Chemist 
Emergency manager 
 Town Managers Office - Emergency Management 
Coordinator

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 328 
Table 6-2-10:  Technical staff and personnel capabilities for Gilbert 
Staff/Personnel Resources 
 
Department/Agency - Position 
Grant writer(s) 
 
Police Department - Police Plan and Research 
Coordinator 
  
Others 
 
 
 
 
Table 6-3-10:  Fiscal capabilities for Gilbert 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Gas and electric are 
private/public utilities 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 329 
Table 6-1-11:  Legal and regulatory capabilities for Glendale  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2018 International Residential Code 
• 2018 International Mechanical Code 
• 2018 International Existing Building 
Code 
• 2017 National Electrical Code 
• 2010 Americans with Disabilities Act 
Accessibility Guidelines and the City 
Code. 
• Fair Housing Accessibility 
Guidelines 
• 2018 International Fuel Gas Code 
• 2018 International Plumbing Code 
• 2018 International Energy 
Conservation Code 
• 2018 International Fire Code 
• 2018 International Property 
Maintenance Code 
• City of Glendale Sound Attenuation 
Standards 
• Maricopa Association of 
Governments Fireplace Standards 
• Building Safety  
• Engineering 
• Fire Marshalls Office 
ORDINANCES 
• City of Glendale Zoning Ordinance 
and associated PAD and PRD 
documents  
• Landscape Ordinance 
• Floodplain Ordinance 
• Grading and Drainage Ordinance 
• Sub-Division Ordinance 
• Building Safety  
• Engineering 
• Planning

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 330 
Table 6-1-11:  Legal and regulatory capabilities for Glendale  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• City Department SOP’s 
• City of Glendale Emergency 
Operations Plan 
• Multi-Jurisdictional Mitigation Plan 
• General Plan 2040 
• North Valley Specific Area Plan 
• Glendale Centerline 
• Western Area Plan  
• West Glendale Avenue Development 
Plan 
• Commercial and Industrial Design 
Guidelines 
• Residential Design & Development 
Manual 
• Adopted State Erosion Standard 
• Engineer Design and Construction 
Standards 
• Middle New River Master Plan 
• Glendale/Peoria Drainage Master 
Plan Update (2011) 
• Emergency Management 
• Engineering 
• Planning 
• Water Services 
STUDIES 
• 2020 MAF 2040 Regional 
Transportation Plan Update 
• 2016 Envision Glendale 2040 
General Plan 
• 2018 Glendale Transportation Plan 
• Transportation 
• Planning

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 331 
Table 6-2-11:  Technical staff and personnel capabilities for Glendale 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning, Planners 
Engineering, Engineers 
Community Services 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Engineering, Engineers 
Architecture, Architects 
Building Safety – Structural Engineers and 
Architects 
Community Services 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Planning, Engineering, Water Services, Building 
Safety 
Floodplain Manager 
 Engineering Dept. 
Surveyors 
 Engineering  
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Community Services, Emergency Management, 
Building Safety, Fire Dept, Police Dept, Public 
Works, Transportation, Engineering, Architecture, 
Water Services 
Personnel skilled in GIS and/or 
HAZUS 
 IT Department, Fire Dept, Police Dept 
Scientists familiar with the 
hazards of the community 
 Police Dept, Fire Dept, Water Services, 
Engineering 
Emergency manager 
 Fire Dept 
Grant writer(s) 
 All Depts 
Others 
 
 
 
 
Table 6-3-11:  Fiscal capabilities for Glendale 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Community Services 
Capital Improvements Project 
funding 
Yes 
Budget and Finance 
Authority to levy taxes for specific 
purposes 
Yes 
Function of Legislation (see 
COG website-Appendix 18 
FAQ under levy taxes) 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water Services Department. 
Budget and Finance 
Department

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 332 
Table 6-3-11:  Fiscal capabilities for Glendale 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Budget and Finance, 
Development Services 
Incur debt through general obligation 
bonds 
Yes 
Budget and Finance 
Incur debt through special tax bonds 
Yes 
Budget and Finance 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 333 
Table 6-1-12:  Legal and regulatory capabilities for Goodyear  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• International Building Code, 2006 
• International Residential Code, 2006 
• International Mechanical Code, 2006 
• International Property Maintenance 
Code, 2006 
• International Energy Conservation 
Code, 2006 
• NFPA 70, The National Electrical 
Code including Annex A – G, 2015 
• NFPA 99, Health Care Facilities, 
2015 
• ICC/ANSI A117.1 Accessible and 
Usable Buildings and Facilities, 2003 
• 2010 ADA Standards for Accessible 
Design 
• International Residential Code, 2006 
• International Fire Code Appendix 
B,D,E,F and G 2006 
• Fire Building and Life 
Safety 
ORDINANCES 
• Flood Damage Prevention Ordinance, 
2005 
• Zoning Ordinance, 2013 
• Subdivision Regulations, 2012 
• Engineering Design Standards and 
Policies Manual, 2012 
• Engineering 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• General Plan, 2014 
• General Plan Amendments, 2004 
through 2009 
• Design Guidelines, 2008 
• City Center Specific Plan, 2009 
• Storm Water Management Plan – 
Amended, 2014  
• Community 
Development 
STUDIES 
• Sonoran Valley Planning Area 
document, 2007 
• White Tank Area Drainage Master 
Plan, 2003 
• Waterman Wash Floodplain 
Delineation Study, 2006 
• Rainbow Valley Area Drainage 
Master Plan, in progress, 2010 
• Community 
Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 334 
 
Table 6-2-12:  Technical staff and personnel capabilities for Goodyear 
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Community Development – Director 
Engineering – City Engineer 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Community Development - Director 
Fire Department - Chief Building Official 
Engineering – City Engineer 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Fire Department - Chief 
Community Development - Director 
Fire Department – Chief Building Official 
Engineering – City Engineer 
Contract out as needed 
Floodplain Manager 
 Engineering – City Engineer 
Surveyors 
 
Contract out as needed 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Fire Department - Chief 
Community Development - Director 
Fire Department – Chief Building Official 
Engineering – City Engineer 
Contract out as needed 
Personnel skilled in GIS and/or 
HAZUS 
 
Engineering – City Engineer 
Engineering – GIS Coordinator 
Contract out as needed 
Scientists familiar with the 
hazards of the community 
 
Contract out as needed 
Emergency manager 
 Fire Department - Chief 
Grant writer(s) 
 City Administration – Grants Administrator 
Others 
 
 
 
 
Table 6-3-12:  Fiscal capabilities for Goodyear 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Water, sewer, and building 
rehabilitation projects 
Capital Improvements Project 
funding 
Yes 
Annual CIP Budget  
Five-year CIP 
IGAs with FCDMC, MCDOT 
Authority to levy taxes for specific 
purposes 
Yes 
Improvement Districts 
Community Facilities Districts

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 335 
Table 6-3-12:  Fiscal capabilities for Goodyear 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Fees for water, sewer, gas, or electric 
service 
Yes 
Adopted water and sewer 
connection fees and utility 
usage fees 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Adopted impact fees for water, 
sewer, reclaimed water, water 
resources, library, parks and 
recreation, fire, police, public 
works, general government, 
arterial streets, and regional 
transportation 
Incur debt through general obligation 
bonds 
Yes 
Sell G.O. Bonds 
Incur debt through special tax bonds 
Yes 
Sell Revenue Bonds, 
Improvement District Bonds, 
and Community Faculties 
Bonds 
Cooperative Agreement Grants and 
Specific Planning and Project Grants 
Yes 
FEMA, NRCS, State Land, 
etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 336 
Table 6-1-13:  Legal and regulatory capabilities for Guadalupe  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2012 Uniform Building Code 
• 2012 Plumbing Code 
• 2012 Mechanical Code 
• 2012 Fire Code 
• 2010 Town Code of Guadalupe  
• Town Council 
• Town Inspector 
• Town Fire Department 
• Legal Council 
ORDINANCES 
• 2010 Town of Guadalupe Planning & 
Zoning Ordinance 
• 2010 Town of Guadalupe 
Subdivision Regulations 
• Town Council 
• Town Manager 
• Legal Council 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2015 Town of Guadalupe Multi-
Hazard Mitigation Plan (in process) 
• 2010 Town of Guadalupe 5-year 
Consolidated Plan (in process) 
• 2018 Town of Guadalupe Emergency 
Operation Plan 
• 2018 Capital Improvement Program 
• 2010 Guadalupe Master Plan 
• Community 
Development Director 
• Town Manager 
• Fire Chief / EM 
• Legal Council 
STUDIES 
• 2015Town of Guadalupe 
Environmental Study 
• 2018 Town of Guadalupe Floodplain 
Housing Study 
• 2008 ADOT  Guadalupe Rd. 
Pedestrian Bridge & Pathway from 
South Mountain Park to Tempe City 
Line 
• Town Flood Control Management 
and Plan 
• Town Manager 
• Community 
Development Director 
• Town Engineer 
• Flood Control District of 
Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 337 
Table 6-2-13:  Technical staff and personnel capabilities for Guadalupe  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Town Manager  
Consultant (Dibble Engineering) 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Consultant (Dibble Engineering) 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Guadalupe Fire Department 
Consultant (Dibble Engineering) 
Floodplain Manager 
 
Consultant (Dibble Engineering) 
Surveyors 
 
Consultant (Dibble Engineering) 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Town Manager 
Fire Chief 
Personnel skilled in GIS and/or 
HAZUS 
 Guadalupe Fire Department 
Consultant (Dibble Engineering) 
Scientists familiar with the 
hazards of the community 
 
NA 
Emergency manager 
 Fire Chief 
Grant writer(s) 
 
Community Development 
Guadalupe Fire Department 
Consultant/ Contractor 
Others 
 
 
 
 
 
Table 6-3-13:  Fiscal capabilities for Guadalupe  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water 
Impact fees for homebuyers or new 
developments/homes 
No

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 338 
Table 6-3-13:  Fiscal capabilities for Guadalupe  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Incur debt through general obligation 
bonds 
No 
 
Incur debt through special tax bonds 
No 
 
Other 
No

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 339 
Table 6-1-14:  Legal and regulatory capabilities for Litchfield Park  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2006 International Building Code 
• 2006 International Residential Code 
• 2006 International Plumbing Code 
• 2006 International Mechanical Code 
• 2003 International Fire Code 
• 2005 National Electric Code 
• 2006 International Energy 
Conservation Code 
• 2006 International Fuel Gas Code 
• 2008 Litchfield Park City Code 
update as needed 
• Building Department 
• City Clerk/ City Council 
 
ORDINANCES 
• City of Litchfield Park Zoning Code 
Ordinances 
• Weed Abatement Ordinance 
• Public Nuisance Ordinance 
• Property Maintenance Ordinance 
• Hazardous Material Storage and 
Disposal Ordinance 
• Planning & Zoning  
• City Clerk/ City Council 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Handbook for Arizona Communities, 
Floodplain Management 
• Storm Water Management Plan 
• 2012 Emergency Management 
Response Guidebook 
• 2009 Litchfield Park General Plan 
• Planning & Zoning 
• City Manager’s Office, 
Emergency Management 
STUDIES 
• 2009 Flood Emergency Action Plan Exe • City Manager’s Office, 
Emergency Management

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 340 
Table 6-2-14:  Technical staff and personnel capabilities for Litchfield Park  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning, Planners 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Engineering, Engineers,  
Building, Building Inspectors 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Planning, Engineers  
Floodplain Manager 
 Engineering, Engineers 
Surveyors 
 
Contract Surveyors 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Contract Staff through MCSO and Rural Metro Fire 
Personnel skilled in GIS and/or 
HAZUS 
 
Contract Emergency Services 
Scientists familiar with the 
hazards of the community 
 
Contract Emergency Services 
Emergency manager 
 City Manager, Assistant City Manager 
Grant writer(s) 
 All Departments, Individuals within each Dept. 
Others 
 
 
 
 
 
Table 6-3-14:  Fiscal capabilities for Litchfield Park  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
No 
No area of the city meets the 
basic requirements due to 
income 
Capital Improvements Project 
funding 
Yes 
CIP City Budget 
Authority to levy taxes for specific 
purposes 
Yes 
Requires a vote of the people 
Fees for water, sewer, gas, or electric 
service 
No 
All of these services are 
privately owned 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Impact fees not currently 
required of

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 341 
Table 6-3-14:  Fiscal capabilities for Litchfield Park  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
developers/builders. Sales tax 
on developments are collected 
Incur debt through general obligation 
bonds 
Yes 
This would be hard for us at 
this time because we do not 
have a bond rating 
Incur debt through special tax bonds 
Yes 
 
Other 
No

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 342 
Table 6-1-15:  Legal and regulatory capabilities for Mesa  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building Code 
• 2018 International Fire Code 
• 2017 National Electric Safety Code 
• 2017 National Electric Code 
• Development Services  
• Fire/Medical Department 
ORDINANCES 
• City of Mesa Charter and 
Ordinances 2020 
• Maricopa County Flood Control 
Standards and Requirements 
• City Council 
• Engineering (Floodplain 
Mgr.)  
 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• American Public Power 
Association 
• American Gas Association 
• COM Operations, Maintenance, 
Construction Practice & 
Emergency Plan Manual 
• Code of Federal Regulations Title 
49 Part 192 
• City of Mesa Detailed Electrical 
Standards 
• 2019 City of Mesa Engineering & 
Design Standards 
• Uniform Standard Specifications & 
Details for Public Works 
Construction 2020 
• 2019 Mesa Standards, Details and 
Specifications 
• Energy Resources 
(Electric) 
• Engineering 
• Energy Resources (Gas) 
• Water Resources ( Water 
and Wastewater) 
STUDIES 
• City of Mesa Electrical Master Plan 
• City of Mesa Storm Drain Master 
Plan 2010 
• City of Mesa Water System Master 
Plan Update 2018 
• City of Mesa Wastewater Master 
Plan Update 2018 
• City of Mesa Gas Master Plan 
• Energy Resources 
(Electric) 
• Engineering 
• Water Resources (Water 
and Wastewater) 
• Energy Resources (Gas)

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 343 
Table 6-2-15:  Technical staff and personnel capabilities for Mesa  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Development Services 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Engineering 
Water Resources 
Transportation 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Assistant City Engineer 
Floodplain Manager 
 Engineering 
Surveyors 
 Engineering 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Police (Homeland Defense), Fire/Medical (Terrorism 
Liaison Officers), Energy Resources 
Personnel skilled in GIS and/or 
HAZUS 
 
GIS Supervisor 
GIS Manager 
GIS Specialist 
Scientists familiar with the 
hazards of the community 
 
N/A 
Emergency manager 
 Emergency Management Coordinator 
Assistant Chief Emergency Management 
Grant writer(s) 
 Grant Coordinators Office  
Others 
 
 
 
 
Table 6-3-16:  Fiscal capabilities for Mesa  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
May be done in conjunction with 
Floodplain Master Plans 
Capital Improvements Project 
funding 
Yes 
May include funding for new or 
existing city infrastructure 
Authority to levy taxes for specific 
purposes 
Yes 
Through city council approval 
Fees for water, sewer, gas, or electric 
service 
Yes 
As necessary , through city 
council approval 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Impact Fees provide revenue to 
cover added public services

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 344 
Table 6-3-16:  Fiscal capabilities for Mesa  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Incur debt through general obligation 
bonds 
Yes 
CIP Bonds, storm drains, parks, 
streets, fire, police 
Utility revenue bonds 
Yes 
CIP Bonds - utilities 
Incur debt through special tax bonds 
Yes 
Urban Area Security Initiative , 
Proposition 202 (Gaming) 
Other 
No

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 345 
 
Table 6-1-16:  Legal and regulatory capabilities for Paradise Valley  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
Paradise Valley is no longer participating in the Plan 
ORDINANCES 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
STUDIES 
 
 
Table 6-2-16:  Technical staff and personnel capabilities for Paradise Valley  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
Paradise Valley is no longer participating in the Plan 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
Floodplain Manager 
Surveyors 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
Personnel skilled in GIS and/or 
HAZUS 
Scientists familiar with the 
hazards of the community 
Emergency manager 
Grant writer(s) 
 
 
 
Table 6-3-16:  Fiscal capabilities for Paradise Valley

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 346 
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Paradise Valley is no longer participating in the Plan 
Capital Improvements Project 
funding 
Authority to levy taxes for specific 
purposes 
Fees for water, sewer, gas, or electric 
service 
Impact fees for homebuyers or new 
developments/homes 
Incur debt through general obligation 
bonds 
Incur debt through special tax bonds 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 347 
Table 6-1-17:  Legal and regulatory capabilities for Peoria  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2012 International Building Code 
• 2012 International Residential Code 
• 2012 International Fire Code 
• 2012 International Mechanical Code 
• 2012 International Property 
Maintenance Code 
• 2011 National Electrical Code 
• 2012 International Plumbing Code 
• 2012 International Fuel Gas Code 
• Planning & Zoning 
• Public Works 
• Utilities Division 
• Fire 
• Emergency Management 
ORDINANCES 
• Zoning Ordinance 
• Floodplain Ordinance 
• Grading & Drainage Ordinance 
• Planning & Zoning 
• Emergency Management 
• Development and 
Engineering Department 
• Economic Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 348 
Table 6-1-17:  Legal and regulatory capabilities for Peoria  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
 
 
Standard 
Operating 
Procedures (SOP) 
• Process Safety Management – Risk 
Management/Emergency Response 
Plan 
• Drought Protection Plan  
• Public Water System Emergency 
Operations Plan (ADEQ-04-07-520-
Revised 9/4/13) 
• New River Interconnection Operation 
(PW-UT PLT Ops-OP005) Revised 
Date 5/7/13 
• Pyramid Peak Emergency Shutdown 
(PW-UT Admin-PL022) Revised Date 
7/15/13 
• B204 Jomax-In-Line Booster Station  
Zone 4E  (PW-UT FLD Ops 054) 
Revised Date 2/5/13 
• Utilities Emergency Generators and 
Power Supply Transformers 
Maintenance Plan  (11-2012) 
• Capacity, Management, Operations 
and Maintenance Program (CMOM- 
6-2003) 
• Peoria Engineering Standards Manual 
• Maricopa County Drainage Design 
Manual 
• Maricopa Association of 
Governments (MAG) Standards 
and Specifications for Public Works 
Construction 
• FEMA DFIRMS 
• Manual on Uniform Traffic Control 
Devices (MUTCD)  
• AASHTO Green Book 
• City’s Circulation Plan  & Street 
Classification Map 
• Utilities Division  
• Development and 
Engineering Department 
• Economic Development  
STUDIES 
• Vulnerability Assessment 
• Storm Drain Master Plans  
• Water Course Master Plans 
• Utilities Division  
• Development and 
Engineering Department 
• Economic Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 349 
Table 6-2-17:  Technical staff and personnel capabilities for Peoria  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning – Planners; Development and Engineering – 
City Engineer, Staff Engineers, Engineering Inspector 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Development and Engineering – Engineers, 
Engineering Inspector; Architecture – Architects 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Planning – Planners; Development and Engineering – 
City Engineer, Staff Engineers, Engineering Inspector, 
Utilities Dept,  
Floodplain Manager 
 Development and Engineering – City Engineer, Staff 
Engineers 
Surveyors 
 Development and Engineering – City Engineer, Staff 
Engineers; Finance Dept using Contract Services 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Neighborhood Services Dept, Human Services, 
Emergency Management, Fire Dept, Police Dept, 
Public Works, Streets, Development and Engineering, 
Architecture, Utilities Dept; 
Personnel skilled in GIS and/or 
HAZUS 
 ITD, Fire Dept, Police Dept 
Scientists familiar with the 
hazards of the community 
 Police Dept, Utilities Dept, Fire Dept 
Emergency manager 
 City Manager’s Office, Emergency Manager 
Grant writer(s) 
 Every dept is responsible 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 350 
 
Table 6-3-17:  Fiscal capabilities for Peoria  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 351 
Table 6-1-18:  Legal and regulatory capabilities for Phoenix  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2016 ASME 
• 2017 National Electrical Code 
• 2018 International Building Code 
Administrative Provisions 
• 2018 International Building Code 
• 2018 International Energy 
Conservation Code 
• 2018 International Existing Building 
Code 
• 2018 International Fire Code 
• 2018 International Fuel Gas Code 
• 2012 International Green 
Construction Code 
• 2018 International Mechanical Code 
• 2018 International Residential Code 
• 2018 International and Uniform 
Plumbing Codes 
• Arizona Administrative Code, Title 
12, Chapter 15 (AAR-R12-15-
1206/1219) 
• Phoenix City Code, Chapter 32A 
(Grading & Drainage), 32B 
(Floodplains), and 32C (Stormwater 
Quality Protection) 
• Fire 
• Planning & Development 
• Public Works 
• Street Transportation 
• Water Services 
 
ORDINANCES 
• Phoenix City Codes & Ordinances 
• Law 
• Planning & Development

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 352 
Table 6-1-18:  Legal and regulatory capabilities for Phoenix  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2015 Phoenix General Plan 
(Scheduled for completion in Spring 
2015) 
• 2009 City of Phoenix Major 
Emergency Response and Recovery 
Plan 
• 2015 Maricopa County Regional 
Multi-Hazard Mitigation Plan  
• 2013 Water Services Department 
Design Standards Manual for Water 
and Wastewater Systems 
• 2013 Street Transportation 
Department Storm Water Policies and 
Standards (3rd Edition) 
• 2019 Aviation Department Multi-
Sector General Permit Stormwater 
Pollution Prevention Plan 
• Aviation Department Wildlife 
Management Plan 
• Aviation Department Rules and 
Regulations 
• Greater Phoenix Metro Area GSI/LID 
Handbook 
• Metro Phoenix Area Drainage Master 
Plan 
• Hohokam Area Drainage Master Plan 
• Water Services Facility Stormwater 
Management Plans 
• Water Services Facility Stormwater 
Pollution Prevention Plans 
• Aviation 
• Office of Homeland 
Security and Emergency 
Management 
• Office of Environmental 
Programs 
• Planning Development 
• Public Works 
• Water Services 
• Street Transportation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 353 
Table 6-1-18:  Legal and regulatory capabilities for Phoenix  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
STUDIES 
• 2015 City of Phoenix Threat and 
Hazard Identification and Risk 
Assessment 
• 7R/25L Runway Safety Area 
Environmental Assessment – 
Conditional Letter of Map Revision 
• Dam Safety Studies and Emergency 
Action Plans 
• FEMA DFIRM Maps 
• Flood Insurance Studies (FIS) 
• Levee Studies and Recertification 
• Recommendations for Integrating 
Green Infrastructure into the 
Maricopa County Multi-jurisdictional 
Hazard Mitigation Plan 
• Aviation 
• Office of Environmental 
Programs 
• Office of Homeland 
Security and Emergency 
Management 
• Public Works 
• Street Transportation 
 
 
 
 
Table 6-2-18:  Technical staff and personnel capabilities for Phoenix  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Street Transportation Dept. – Deputy Director, 
Special Projects Administrator, Principal Planner, 
Civil Engineers, Project Manager, Principal 
Engineering Technicians, Chief Engineering 
Technicians; Public Works Dept. – Assistant 
Director, Civil Engineer III 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Street Transportation Dept. – Deputy Director, 
Special Projects Administrator; Public Works Dept. 
– Assistant Director, Civil Engineer III; Planning & 
Development Department – Deputy Directors, 
Building Official, Plans Engineers 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Street Transportation – Deputy Director, Special 
Projects Administrator, Principal Planner, Civil 
Engineer II; Office of Emergency Management – 
Director, Deputy Director, Planner; Public Works 
Dept. – Assistant Director, Civil Engineer III 
Floodplain Manager 
 
Street Transportation Dept. – Principal Planner, 
Civil Engineer II, Senior Engineering Technician, 
Principal Engineering Technician; Public Works 
Dept. – Assistant Director, Civil Engineer III 
Surveyors 
 Street Transportation Dept. – Survey Teams

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 354 
Table 6-2-18:  Technical staff and personnel capabilities for Phoenix  
Staff/Personnel Resources 
 
Department/Agency - Position 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Office of Emergency Management – Director, 
Deputy Director, Planner; Planning and 
Development Dept. – Deputy, Planner III, Planner 
II, Planner I; Fire Dept. - Batalion Chief, Captain, 
Fire Fighter 
Personnel skilled in GIS and/or 
HAZUS 
 
Information Technology Services – Info Tech 
Analyst/Programmers and Info Tech Specialists 
Fire Dept. – Fire Protection Engineer 
Planning Development Dept. – Senior GIS 
Technician 
Police Dept. – Senior User Technology Specialist 
Street Transportation Dept. - Info Tech Analyst/ 
Programmer II and Senior GIS Technician 
Water Services Dept. – GIS and Senior GIS 
Technicians 
Scientists familiar with the 
hazards of the community 
 
City Manager’s Office, Office of Environmental 
Programs – Environmental Programs Coordinators 
and Environmental Quality Specialists 
Emergency manager 
 City Manager’s Office - Emergency Management 
Director 
Grant writer(s) 
 
Aviation Department – Planner II 
Fire Dept. – Volunteer Coordinator and Fire 
Captains 
Planning Development Dept. – Principal Planner, 
Planner III, Village Planner & Planner II 
Police Dept. – Police Research Analysts 
Public Transit Dept 
Office of Emergency Management – Management 
Assistant, 
Fire Dept. – Management Assistant II, 
Street Transportation Dept. – Management 
Services, 
Public Works Dept.  
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 355 
Table 6-3-18:  Fiscal capabilities for Phoenix  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Housing, Neighborhood 
Services, and Water Services 
projects 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water, Sewer, and Solid Waste 
Fees/Rates 
Impact fees for homebuyers or new 
developments/homes 
Yes 
For new developments inside 
impact fee areas-zones only.  
The Impact Fees are charged to 
new developments. 
Incur debt through general obligation 
bonds 
Yes 
This excludes the Water 
Services and Aviation 
Departments 
Incur debt through special tax bonds 
Yes 
Excise (sales) taxes 
Other 
Yes 
FAA and Arizona Dept of 
Transportation grants to the 
Aviation Department 
 
Water resources fees, 
Environmental fees, 
Improvement Districts

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 356 
Table 6-1-19:  Legal and regulatory capabilities for Queen Creek  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• Town Code of the Town of Queen 
Creek 
• 2012 International Building Code 
• 2012 International Residential 
Code 
• 2012 Uniform Plumbing Code 
• 2012 International Mechanical 
Code 
• 2012 International Fire Code 
• 2012 International Property 
Maintenance Code 
• 2012 International Existing 
Building Code 
• 2012 International Energy 
Conservation Code 
• 2012 International Urban-Wildland 
Interface Code 
• 2011 National Electrical Code 
• Development Services 
• Fire & Medical 
Department 
• Town Clerk 
ORDINANCES 
• Abatement Ordinance  
• Adult Oriented Business  
• Dark Sky Ordinance 
• Military Airport Zoning Ordinance 
• Noise Ordinance 
• Zoning Ordinance 
• Subdivision Ordinance 
• Floodplain Ordinance 
• Development Services 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Addressing Regulations 
• Drainage Regulations 
• Dust Abatement Regulations 
• Subdivision Regulations 
• HUD Consolidated Planning 
Regulations 
• Floodplain Regulations 
• Development Services 
• Public Works 
• Flood Control District

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 357 
Table 6-1-19:  Legal and regulatory capabilities for Queen Creek  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
STUDIES 
• Town of Queen Creek General Plan 
2018 
• Area Land Use Plan 
• Comprehensive Plans: Planning & 
Development 
• Transportation Plan 
• Desert Foothills Plan 
• Comprehensive Planning 
Amendments Guidelines 
• Development Master Plan 
Guidelines 
• Area Drainage Master Plan 
• Watercourse Master Plan 
• Development Services 
• Public Works 
• Flood Control District 
 
 
Table 6-2-19:  Technical staff and personnel capabilities for Queen Creek  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Development Services – Planners/Engineers 
Public Works – Engineers 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Development Services – 
Planners/Engineers/Inspectors 
Fire & Medical Department – Fire Marshal/Plans 
Examiner 
Public Works – Engineers 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Development Services – 
Planners/Engineers/Inspectors 
Fire & Medical Department – Emergency Mgmt 
Coordinator 
Public Works – Engineers 
Floodplain Manager 
 Development Services – Floodplain 
Administrator/Engineers/Inspectors 
Surveyors 
 
N/A 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Development Services – 
Planners/Engineers/Inspectors 
Fire & Medical Department – Emergency Mgmt 
Coordinator 
Public Works – Engineers 
Personnel skilled in GIS and/or 
HAZUS 
 Workforce & Technology – GIS Staff

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 358 
Table 6-2-19:  Technical staff and personnel capabilities for Queen Creek  
Staff/Personnel Resources 
 
Department/Agency - Position 
Scientists familiar with the 
hazards of the community 
 
N/A 
Emergency manager 
 
Town Manager – Director 
Fire & Medical Department – Emergency Mgmt 
Coordinator 
Grant writer(s) 
 
Communications & Marketing – Management 
Assistant 
Fire & Medical Department – Emergency Mgmt 
Coordinator 
Parks Division – Management Assistant 
Public Works – Engineers/Project Managers 
Others 
 
 
 
 
Table 6-3-19:  Fiscal capabilities for Queen Creek  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
No 
 
Capital Improvements Project 
funding 
Yes 
Town CIP 
Authority to levy taxes for specific 
purposes 
Yes 
• Fire/EMS/Law Enforcement 
Property Tax 
• Improvement Districts 
• Direct Assessment Special 
District 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water and sewer service 
Impact fees for homebuyers or new 
developments/homes 
Yes 
• Wastewater 
• Parks, Trails, & Open Space 
• Town Buildings and Vehicles 
• Transportation 
• Library 
• Public Safety 
• Fire 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
Yes 
 
Other - Cooperative Agreement 
Grants and Specific Planning and 
Project Grants 
Yes

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 359 
 
Table 6-1-20:  Legal and regulatory capabilities for Salt River Pima-Maricopa Indian 
Community  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
TRIBAL CODES 
• 2015 International Building Codes 
• 2015 International Fire Codes 
• Engineering Construction 
Services 
• Fire Department 
TRIBAL 
ORDINANCES 
• Salt River Pima-Maricopa Indian Comm
Ordinance 
• 1981 Zoning Ordinance  
• SRPMIC Administration 
• Tribal Council 
• Community 
Development 
TRIBAL 
REGULATIONS, 
PLANS, 
MANUALS, 
GUIDELINES, 
and/or STUDIES 
• Emergency Operations Plan 
• Tribal Emergency Response 
Commission Guidelines 
• 2006 General Use Plan 
• Maricopa County Multi-Jurisdictional 
Hazard Mitigation Plan 
• Fire Department 
• Tribal Emergency 
Response Commission 
• Community 
Development 
 
 
Table 6-2-20:  Technical staff and personnel capabilities for Salt River Pima-Maricopa 
Indian Community  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Engineering and Construction Services (ECS), 
Community Development Department (CDD) 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 ECS, Fire Department, Public Works 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
ECS, Environment Protection of Natural 
Resources(EPNR), CDD, Public Works, Fire 
Department/Emergency Manager  
Floodplain Manager 
 ECS, Public Works, CDD 
Surveyors 
 Public Works, ECS, 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Police, Fire, Emergency Management, ECS, CDD, 
Public Works  
Personnel skilled in GIS and/or 
HAZUS 
 ECS, CDD, EPNR 
Scientists familiar with the 
hazards of the community 
 Public Works, CDD, EPNR, ECS  
Emergency manager 
 Fire Department

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 360 
Table 6-2-20:  Technical staff and personnel capabilities for Salt River Pima-Maricopa 
Indian Community  
Staff/Personnel Resources 
 
Department/Agency - Position 
Grant writer(s) 
 Grants and Contracts 
Others 
 
 
 
Table 6-3-20a:  Fiscal capabilities for Salt River Pima-Maricopa Indian Community  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Unlikely, since water/sewer 
not owned by town.  Also, 
town does not have primary 
property tax. 
Incur debt through general obligation 
bonds 
Yes 
Unlikely, since water/sewer 
not owned by town.  Also, 
town does not have primary 
property tax.  
Incur debt through special tax bonds 
Yes 
 
Governance – Self Determination 
Yes 
Title 5 Construction 
Agreement 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 361 
Table 6-3-20b:  Funding source assessment for Salt River Pima-Maricopa Indian 
Community 
Building on Table 6-3-20, the following summarize existing and potential funding sources 
available to SRPMIC for implementing past and future hazard mitigation actions and projects. 
 
Existing/Past Funding Sources Used: 
• FEMA Emergency Management Program Grant 
• Governance Self Determination Funds 
• Tribal Capital Improvement Funds 
• Tribal Development Impact Fee Fund 
• Title V Construction Project Agreement between SRPMIC and Indian Health Services 
Potential Funding Sources: 
• CDBG Funds 
• FEMA HMGP grants 
• FEMA BRIC grants 
• BIA Fire Assistance grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 362 
Table 6-1-22:  Legal and regulatory capabilities for Scottsdale  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2015 International Fire Code 
• 2015 International Building Code 
• 2015 International Mechanical 
Code 
• 2015 International Plumbing Code 
• 2015 National Electric Code 
• 2015 International Energy 
Conservation Code 
• International Residential Code 
• Public Nuisance and Property 
Maintenance Code 
• Uniform Code for the Abatement 
of Dangerous Buildings 
• Uniform Housing Code 
• City Code 
• International Green Construction 
Code 
• Fire Department 
• Public Works 
• Water Resources 
• Planning and 
Development Services 
• Economic Vitality 
ORDINANCES 
• Stormwater and Floodplain 
Management 
• Zoning  
• Dust Control 
• Environmentally Sensitive Lands  
• Foothills Overlay Zoning District 
• Hillside Zoning District 
• Historic Preservation 
• Land Divisions 
• Native Plant 
• Protection of Archaeological 
Resources 
• McDowell Sonoran Preserve – 
2000 
• Noise Ordinance 
• Economic Vitality 
• Planning and 
Development Services 
• Public Works and Water 
Resources

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 363 
Table 6-1-22:  Legal and regulatory capabilities for Scottsdale  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Design Standards and Policies 
Manual 
• Scottsdale General Plan 2001 
• Green Building Program 
• Transportation/Mobility Plans 
• Streetscapes Guidelines 
• Scenic Corridor Policy/Design 
Guidelines 
• Old Town Scottsdale Urban Design 
and Architectural Guidelines 
• Adopted Character Area Plans 
• Neighborhood Plans 
• Neighborhood Assemblage Policy 
• Infill Incentive District 
• Citywide Design Guidelines 
• Greater Phoenix Metro Green 
Infrastructure Handbook 
• Desert Parks Design Guidelines 
• Parks Recreation Master Plan 
• Public Art Master Plan 
• Historic Preservation 
• Sensitive Design 
• 2015 SFD – Standard of Coverage 
Evaluation 
• Community Wildfire Protection 
Plan (CWPP) 2019  
• Airport Master Plan 
• Economic Development Strategic 
Plan 
• Housing and Human 5-Year 
Consolidated Plan 
• Integrated Water Master Plan 
• Stormwater Master Plan 
• Tourism Strategic Plan 
• WestWorld Master Plan 
• Planning and 
Development Services 
• Transportation and 
Streets 
• Community Services 
• Economic Vitality 
• Water Resources

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 364 
Table 6-2-22:  Technical staff and personnel capabilities for Scottsdale  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning & Development Services – Planners, 
Engineers 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Capitol Project Management-City Engineer; 
Planning and Development Services – Building 
Official, Development Engineering Manager, 
Stormwater Manager, Drainage and Flood Control 
Program Manager; Water Resources; Fire 
Department; Transportation/Traffic Engineer 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Capital Project Management-City Engineer; 
Planning and Development Services – Building 
Official, Development Engineering Manager, 
Stormwater Manager, Drainage and Flood Control 
Program Manager; Water Resources; Fire 
Department; Transportation/Traffic Engineer 
Floodplain Manager 
 Stormwater Management 
Surveyors 
 Water Resources, Planning and Development 
Services 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Neighborhood Services, Human Services, 
Emergency Management, Development Services, 
Fire Department, Police Department, Public Works, 
Streets, Engineering, Architecture, Water 
Resources, Stormwater Management 
Personnel skilled in GIS and/or 
HAZUS 
 
IT Department, Fire Department, Police 
Department, Stormwater Management; Planning 
GIS Staff 
Scientists familiar with the 
hazards of the community 
 Police Department, Water Resources, Fire 
Department, Stormwater Management 
Emergency Manager 
 City Manager's Office, Fire Department,  
Grant writer(s) 
 Office of Emergency Manager 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 365 
Table 6-3-22:  Fiscal capabilities for Scottsdale  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Community Assistance 
Programs 
Capital Improvements Project 
funding 
Yes 
May include funding for new 
or existing infrastructure 
Authority to levy taxes for specific 
purposes 
Yes 
Requires City Council 
approval and citizen vote 
Fees for water, sewer, gas, or electric 
service 
Yes 
Water, sewer and solid waste 
fees approved by City Council. 
Gas and electric are 
private/public utilities 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Water and sewer; one-time 
payments to fund construction 
of public facilities needed to 
accommodate new 
development 
Incur debt through general obligation 
bonds 
Yes 
Requires City Council 
approval and citizen vote 
Incur debt through special tax bonds 
Yes 
Can sell bonds issued by 
Municipal Property 
Corporation often supported by 
excise (sales) tax 
Other 
Yes 
Expenditures are subject to 
state-imposed expenditure 
limitation law

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 366 
Table 6-1-23:  Legal and regulatory capabilities for Surprise  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• International Series of Codes:  
• 2018 Building, Plumbing, Electrical 
• 2018 Fire  
• Community Development 
Department 
• Fire Medical Department 
ORDINANCES 
• COS Municipal Codes: Surprise 
Unified Development Code, 
Chapter 122 
• COS Municipal Codes: Buildings 
and Regulations, Chapter 105 
• COS Municipal Codes:  Storm 
Water Management, Chapter 117 
• Emergency Management and 
Emergency Services, Chapter 18 
• NFIP Reference Flood Insurance 
Study, Flood Insurance Rate Maps 
and Floodplain Management 
Regulations Ordinance 2016-15 
• Community Development 
Department 
• City Administration 
• Public Works Department 
• Police Department 
• Fire Medical Department 
• Water Resources 
Management Department 
REGULATIONS 
• Addressing Regulations 
• Drainage Regulations 
• Dust Control Regulations 
• Subdivision Regulations 
• Community Development 
Department 
• Public Works Department 
• City Administration

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 367 
Table 6-1-23:  Legal and regulatory capabilities for Surprise  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• General Plan 2035 
• Area Land Use Plan 
• Surprise Unified Development 
Code 
• Area Drainage Master Plan 
• Engineering Development 
Standards 
• Maricopa Association of 
Governments Standards 
• 2015 Hazard Mitigation Plan 
Update 
• 2017 City of Surprise Emergency 
Operations Plan (currently under 
revision for 2021) 
• 2020 Continuity of Operations 
Plans (COOP’s) for all City of 
Surprise Departments Including 
Water Resource Management and 
Public Works 
• 2020 City of Surprise Continuity of 
Government (COG) Plan 
• 2020 Maricopa County Department 
of Emergency Management 
Emergency Operations Plan 
(MCEOP) Annex C – “Severe 
Storms and Flood” 
• Community Development 
Department 
• Public Works Department 
• City Manager’s Office – 
Emergency Manager  
STUDIES 
• Flood Insurance Studies 
• Floodplain Delineation Studies 
• Area Drainage Master Studies 
• Transportation Studies 
• Integrated Water Master Plan 
• Community Development 
Department 
• Public Works Department

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 368 
Table 6-2-23:  Technical staff and personnel capabilities for Surprise  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning and Development – Planners, Long Range 
Planners, Planning Manager 
Public Works – Development Engineering Manager; 
Plan Reviewers 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning and Development – Planners, Long Range 
Planners, Planning Manager 
Public Works Department – Development Engineering 
Manager; Plan Reviewers 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Public Works Department– Development Engineering 
Manager, Traffic Engineer, Capital Program Manager, 
Construction Inspection Supervisor  
Community Development Dept. - Building Official 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Planning and Development Dept.  - Planners  
Public Works Department - Engineers 
 
Floodplain Manager 
 
Flood Control District of Maricopa County is 
Floodplain Administrator 
Public Works Department - City Engineer – Certified 
Floodplain Managers on staff 
Surveyors 
 Public Works – Registered Land Surveyor 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Planning and Development - Planners Public Works 
Department - Staff 
Police Department – Staff 
Fire Department – Staff 
City Manager’s Office – Emergency Manager 
Personnel skilled in GIS and/or 
HAZUS 
 
Community Development Department - GIS Staff 
Public Works Department - Survey Staff 
Information Technology Department -  GIS Division 
Scientists familiar with the 
hazards of the community 
 
None 
Emergency manager 
 City Manager’s Office – Emergency Manager 
Grant writer(s) 
 
Parks Department – Staff  
Police – Staff 
Public Works Department – Staff  
Fire Medical Department – Staff 
Finance Department – Senior Accountant 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 369 
 
Table 6-3-23:  Fiscal capabilities for Surprise  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes  
A Five-year Consolidated Plan is 
prepared with the public adoption 
of an Annual Action Plan. 
Capital Improvements Project 
funding 
Yes 
City  General Fund CIP,  
Regional Transportation Plan; 
HURF funding; Grant Funding  
Authority to levy taxes for specific 
purposes 
Yes 
City  council 
Fees for water, sewer, gas, or electric 
service 
Yes 
Solid Waste, Water, Sewer, and 
stormwater 
Impact fees for homebuyers or new 
developments/homes 
Yes  
Impact fees for the costs 
associated with the development 
of applicable infrastructure. 
Incur debt through general obligation 
bonds 
Yes 
Through bond elections regulated 
by the state 
Incur debt through special tax bonds 
Yes 
Through elections initiated by the 
city or developers. Subject to 
review and approval by council. 
Other 
Yes 
 FEMA, NRCS, State Land, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 370 
Table 6-1-24:  Legal and regulatory capabilities for Tempe  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Building code 
and International Fire Code 
• Fire Department 
ORDINANCES 
• Weed Abatement Ordinance 
• Public Works 
• Development Services 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Tempe Emergency Operations Plan 
Revised October 2019 
• Capital Improvement Plan, 2020-21 
• Economic Development Plan 
• Infrastructure Improvement Plan 
• Urban Forest Plan 
• Tempe Fire Medical Rescue 
Operational Guide 2020-21 
• Long-Term Asset Management 
Plan 
• Fire Department 
• Financial Services 
• Community 
Development 
• Public Works 
• Emergency Management 
STUDIES 
• Fire Medical Rescue Fire Station 
Location Study 
• Tempe Drainage Master Study 
• Floodplain Delineation Study 
• Fire Department 
• Public Works 
• Development Services 
• Community 
Development 
 
 
Table 6-2-24:  Technical staff and personnel capabilities for Tempe  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Public Works/Engineering, Planning 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Public Works/Engineering Community 
Development/Building Safety 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Public Works/Engineering 
Public Works/Water Utilities Division 
Floodplain Manager 
 Public Works/Engineering 
Surveyors 
 Public Works/Engineering 
Public Works/Water Utilities Division 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Fire Department, Police Department,  
Emergency Manager, Community Development,  
Public Works/Engineering, Streets  
Public Works/Water Utilities Division

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 371 
Table 6-2-24:  Technical staff and personnel capabilities for Tempe  
Staff/Personnel Resources 
 
Department/Agency - Position 
Personnel skilled in GIS and/or 
HAZUS 
 
Public Works/Engineering, Field Operations, 
Information Technology Department, Fire 
Department, Police Department, Emergency Manager, 
public Works/Water Utilities Division 
Scientists familiar with the 
hazards of the community 
 
Fire Department 
Public Works/Water Utilities Division 
Emergency manager 
 City of Tempe 
Grant writer(s) 
 All City Departments 
Others 
 
 
 
 
Table 6-3-24:  Fiscal capabilities for Tempe  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
Authorized through City Vote 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Yes 
 
Incur debt through general obligation 
bonds 
Yes 
Authorized through City Vote 
Incur debt through special tax bonds 
Yes 
 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 372 
Table 6-1-25:  Legal and regulatory capabilities for Tolleson  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2018 International Fire Code  
• 2018 National Fire Code & 
Standards  
• 2018 International Building Code  
• 2018 International Mechanical 
Code  
• 2018 International Electrical Code  
• 2018 National Electrical Code  
• Tolleson City Code  
• 2018 International Residential 
Code 
• 2018 International Plumbing Code 
• 2018 International Property 
Maintenance Code 
• 2018 International Fuel Gas Code 
• Fire Department 
• Building Department 
• City Clerk’s Office 
• Engineering Department 
ORDINANCES 
• 2211 N.S. Amending the Tolleson 
City Code Chapter 7 relating to fire 
codes  
• 2014 Tolleson City Ordinances 
• 2014 Dust and Airborne Particulate 
Control 
• 2014 Zoning Code 
• 2014 Storm Water Runoff 
Pollution/Prevention 
• Fire Department 
• Building Department 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Fire Protection Handbook, 18th 
edition  
• ANSI/IIAR 2-1999, Equipment 
Design, and Installation of 
Ammonia Mechanical 
Refrigerating Systems  
• Fire Department Plan Review 
Guidelines as adopted by 
Ordinance 463 N.S.  
• 2014 Tolleson General Plan 
• 2018 City of Tolleson Codes 
• Fire Department 
• Building Department 
• City Clerk’s Office 
• City Council / Staff 
 
STUDIES 
•  
• All City Departments

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 373 
Table 6-2-25:  Technical staff and personnel capabilities for Tolleson  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 City Engineering 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 Engineering, Building Departments 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Engineering, Fire Department, Police Department, 
Field Operations 
Floodplain Manager 
 City Engineering 
Surveyors 
 City Engineering 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 Street Department, Field Operations, City 
Engineering, Building Department, Fire Department 
Personnel skilled in GIS and/or 
HAZUS 
 I.T. Department 
Scientists familiar with the 
hazards of the community 
 
Police Department, Water Services, Fire 
Department 
Emergency manager 
 Fire Department 
Grant writer(s) 
 Each Individual City Department 
Others 
 
 
 
 
Table 6-3-25:  Fiscal capabilities for Tolleson  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
 
Capital Improvements Project 
funding 
Yes 
 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
Yes 
 
Impact fees for homebuyers or new 
developments/homes 
Don’t Know 
 
Incur debt through general obligation 
bonds 
Yes 
 
Incur debt through special tax bonds 
No

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 374 
Table 6-1-26:  Legal and regulatory capabilities for Unincorporated Maricopa County  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2012 International Building Code 
• 2012 National Electrical Code 
• 2012 International Mechanical 
Code 
• 2012 International Plumbing Code 
• 2012 International Residential 
Code 
• 2012 International Green 
Construction Code (optional) 
• 2012 International Energy 
Conservation Code (optional) 
• Planning and 
Development 
 
ORDINANCES 
• Abatement Ordinance (P-11) 
• Adult Oriented Business (P-10) 
• Dark Sky Ordinance 
• Military Airport Zoning Ordinance 
(P-16) 
• Noise Ordinance (P-23) 
• Zoning Ordinance (P-18) 
• Planning and 
Development 
REGULATIONS 
• Addressing Regulations 
• Drainage Regulations 
• Dust Abatement Regulations 
• Subdivision Regulations 
• HUD Consolidated Planning 
Regulations 
• Floodplain Regulations 
• Planning and 
Development 
• Air Quality 
• Transportation 
• Community 
Development 
• Flood Control District 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Area Land Use Plan 
• Comprehensive Plan 
• Transportation Plan 
• Scenic Corridors  
• Comprehensive Planning 
Amendments Guidelines 
• Development Master Plan 
Guidelines 
• Area Drainage Master Plan 
• Watercourse Master Plan 
• Flood Response Plan/Emergency 
Actions Plan 
• Comprehensive Report & Program 
2015 
• Planning and 
Development 
• Transportation 
• Environmental Services 
• Flood Control District

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 375 
STUDIES 
• Flood Insurance Studies 
• Floodplain Delineation Studies 
• Dam Safety Studies 
• Area Drainage Master Studies 
• Corridor Studies 
• Emergency Routes/Mass 
Evacuation 
• Fissure / Subsidence Risk Studies 
• Air Quality Planning Area Maps 
• Planning and 
Development 
• Environmental Services 
• Flood Control District 
• Transportation 
• Emergency 
Management 
• AZ Geological Survey 
• Air Quality 
 
Table 6-2-26:  Technical staff and personnel capabilities for Unincorporated Maricopa 
County  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 
Planning and Development – Planners 
Flood Control District – Engineers/Planners 
Transportation – Engineers/Planners 
Environmental Services – Inspectors 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Planning and Development – Planners 
Flood Control District – Engineers/Inspectors 
Transportation – Engineers/Surveyors 
Environmental Services – Inspectors 
Air Quality – Inspectors 
Facilities Management -Engineers/Inspectors 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 
Planning and Development – Planners 
Flood Control District - Engineers 
Transportation – Engineers/Planners 
Emergency Management - Planners 
Floodplain Manager 
 Flood Control District – Engineers 
Surveyors 
 Flood Control District – Surveyors 
Transportation – Surveyors 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Planning and Development – Planners 
Flood Control District - Engineers 
Transportation - Engineers 
Emergency Management – Planners 
Public Health - Planners 
Personnel skilled in GIS and/or 
HAZUS 
 
Planning and Development – GIS Staff 
Flood Control District – GIS Staff 
Transportation – GIS Staff 
Emergency Management – GIS Staff 
Assessor’s Office – GIS Staff 
Sheriff’s Office – GIS Staff 
Elections – GIS Staff 
Environmental Services – GIS Staff 
Air Quality – GIS Staff 
Office of Enterprise Technology – GIS Staff

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 376 
Table 6-2-26:  Technical staff and personnel capabilities for Unincorporated Maricopa 
County  
Staff/Personnel Resources 
 
Department/Agency - Position 
Scientists familiar with the 
hazards of the community 
 
Flood Control District – Hydrologist 
Flood Control District- Meteorologist  
Risk Management-Risk Control & Loss Prevention 
Specialist 
Emergency manager 
 Emergency Management -  Director/Planners 
Grant writer(s) 
 
Emergency Management – Administrative Manager 
Parks –Grant writer 
Sheriff’s Office – Grant writer 
Community Development – Grant writer 
Human Services – Grant writer 
Transportation - Grant writer/Fed. Aid Coordinator 
Flood Control District – CIP Manager 
Air Quality – Grants Program Coordinator 
 
Table 6-3-26:  Fiscal capabilities for Unincorporated Maricopa County  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
A Five-year Consolidated Plan 
is prepared with the public 
adoption of an Annual Action 
Plan 
Capital Improvements Project 
funding 
Yes 
• FCD’s CIP 
• County General Fund CIP 
• Transportation 
Improvement Program 
• Regional Transportation 
Plan 
Authority to levy taxes for specific 
purposes 
Yes 
Improvement District, Direct 
Assessment Special District 
Fees for water, sewer, gas, or electric 
service 
No 
Solid Waste only: Transfer 
station and waste tire 
collection fees 
Impact fees for homebuyers or new 
developments/homes 
Yes 
Limited Use 
Incur debt through general obligation 
bonds 
Yes 
Lease Revenue  Bonds 
Incur debt through special tax bonds 
Yes 
 
Other:  Cooperative Agreement 
Grants and Specific Planning and 
Project Grants 
Yes 
 FEMA, NRCS, USACE, State 
Land, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 377 
 
Table 6-1-27:  Legal and regulatory capabilities for Wickenburg  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2006 International Building Code 
• 2005 National Electrical Code 
• 2006 International Mechanical 
Code 
• 2006 International Plumbing Code 
• 2006 International Residential 
Code 
• Community 
Development 
• Public Works 
ORDINANCES 
• Dark Sky Ordinance 
• Noise Ordinance (P-23) 
• Zoning Ordinance (P-18) 
• Community 
Development 
• Public Works 
• Manager’s Office 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• Addressing Regulations 
• Drainage Regulations 
• Dust Abatement Regulations 
• Subdivision Regulations 
• Community 
Development 
• Public Works 
• Manager’s Office 
STUDIES 
• Area Land Use Plan 
• Flood Response Plan 
• Development Master Plan 
Guidelines 
• Area Drainage Master Plan 
• Watercourse Master Plan 
• Community 
Development 
• Public Works

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 378 
Table 6-2-27:  Technical staff and personnel capabilities for Wickenburg  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Planning and Development – Planners 
Public Works – Engineer 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Contract 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Planning and Development - Planners 
Emergency Management - Planners 
Floodplain Manager 
 
Contract with Flood Control District – Engineers 
Surveyors 
 
Contract  
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Planning and Development - Planners 
Public Works – Staff 
Police Dept – Staff 
Fire Dept - Staff 
Emergency Management – Coordinator 
Personnel skilled in GIS and/or 
HAZUS 
 Planning and Development – GIS Staff 
Scientists familiar with the 
hazards of the community 
 
None 
Emergency manager 
 Emergency Management -  Coordinator 
Grant writer(s) 
 
Emergency Management - Coordinator 
Parks –Grant writer 
Police – Grant writer 
Public Works  – Grant writer 
Fire Dept  – Grant writer 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 379 
Table 6-3-27:  Fiscal capabilities for Wickenburg  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
No 
A Five-year Consolidated Plan is 
prepared with the public adoption 
of an Annual Action Plan 
Capital Improvements Project 
funding 
Yes 
Town General Fund CIP 
Regional Transportation Plan 
Authority to levy taxes for specific 
purposes 
Yes 
Town council 
Fees for water, sewer, gas, or electric 
service 
Yes 
Solid Waste, Water, Sewer, 
Electric 
Impact fees for homebuyers or new 
developments/homes 
No 
 
Incur debt through general obligation 
bonds 
Yes 
Town council 
Incur debt through special tax bonds 
Yes 
Town council 
Other:  Cooperative Agreement 
Grants and Specific Planning and 
Project Grants 
Yes 
 FEMA, NRCS, State Land, BLM, 
ACF

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 380 
Table 6-1-28:  Legal and regulatory capabilities for Youngtown  
Regulatory Tools 
for Hazard 
Mitigation 
Description 
Responsible 
Department/Agency 
CODES 
• 2012 International Building Code 
• 2012 International Residential Code 
• 2012International Plumbing Code 
• 2012 International Mechanical Code 
• 2012 International Fire Code 
• 2012 International Existing 
Building Code 
• 2011 National Electric Code 
• Town Code of the Town of 
Youngtown 
• Adopted 2012 version of codes in 
January of 2014 
• Town adopted various local zoning 
and building codes 
• Building Safety Division 
• Code Compliance 
Division 
• Public Works 
Department 
ORDINANCES 
• 2008 Town of Youngtown Planning 
& Zoning Ordinance 
• Town of Youngtown Floodplain 
Ordinance 
• Various Town of Youngtown Weed 
& Debris Abatement ordinances 
• 2008 Town of Youngtown 
Subdivision Zoning Regulations  
• Debris Ordinances adopted 
• Building Safety 
Division 
• Public Works 
Department 
• Town Clerk’s Office 
PLANS, 
MANUALS, 
and/or 
GUIDELINES 
• 2025 General Plan and 
Comprehensive Plan adopted 
• 2014 Town of Youngtown 
Emergency Operations Plan 
(currently being updated) 
• Community Wildfire Protection Plan 
(Adopted by SCFD) 
• Public Works 
Department 
• Public Safety 
Department 
• Fire Department (Town 
is a member of Sun City 
Fire District) 
STUDIES 
• 2013 Flood Insurance Studies 
• 2012 Floodplain Delineation Studies 
• Public Works 
Department

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 381 
Table 6-2-28:  Technical staff and personnel capabilities for Youngtown  
Staff/Personnel Resources 
 
Department/Agency - Position 
Planner(s) or engineer(s) with 
knowledge of land development 
and land management practices 
 Community Development - Manager 
Engineer(s) or professional(s) 
trained in construction practices 
related to buildings and/or 
infrastructure 
 
Town Engineer and Building Inspector/Plans 
Reviewer, 
Community Development – Manager 
Public Works - Manage 
Planner(s) or engineer(s) with an 
understanding of natural and/or 
human-caused hazards 
 Community Development – Manager and Public 
Works – Manager 
Floodplain Manager 
  Town Engineer by Ordinance 
Surveyors 
 Town Engineer’s Staff 
Staff with education or expertise 
to assess the community’s 
vulnerability to hazards 
 
Town Engineer; Public Works/Emergency Services 
Manager; Public Safety Manager; various Staff 
Members 
Personnel skilled in GIS and/or 
HAZUS 
 
 
Scientists familiar with the 
hazards of the community 
 
 
Emergency Manager 
 Public Works Manager/Emergency Services 
Manager; Public Safety/Manager 
Grant writer(s) 
 
Town Engineer; Public Works Manager; Public 
Safety Manager, Town Manager; various Staff 
Members 
Others

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 382 
Table 6-3-28:  Fiscal capabilities for Youngtown  
Financial Resources 
Accessible or 
Eligible to Use 
(Yes, No, Don’t 
Know) 
Comments 
Community Development Block 
Grants 
Yes 
Member of MCCD/CDAC 
Small Cities 
Capital Improvements Project 
funding 
Yes 
Local Funds & MAG 
Authority to levy taxes for specific 
purposes 
Yes 
 
Fees for water, sewer, gas, or electric 
service 
No 
Utilities, including water/sewer 
owned by private providers 
Impact fees for homebuyers or new 
developments/homes 
No 
. 
Incur debt through general obligation 
bonds 
Yes 
Unlikely, since water/sewer 
not owned by town.  Also, 
town does not have primary 
property tax. 
Incur debt through special tax bonds 
Yes 
Unlikely, since water/sewer 
not owned by town.  Also, 
town does not have primary 
property tax. 
Other

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 383 
6.2.2 Fort McDowell Yavapai Nation Pre- and Post-Disaster Hazard Management 
In addition to Tables 6-1-7, 6-2-7 and 6-3-7, FMYN is required to summarize and 
evaluate pre- and post-disaster hazard management practices to satisfy the requirements at 44 
CFR §201.7(c)(3)(iv).  Accordingly, Table 6-4-1 summarizes hazard mitigation and pre- and 
post-disaster hazard management practices and roles that are currently accomplished through 
various FMYN departments and programs. 
Table 6-4-1:  Fort McDowell Yavapai Nation departments or entities with hazard 
mitigation responsibilities  
Department or Agency 
Hazard Mitigation Activities 
Fire Department 
Training first responders to Operational level. Review and update of emergency 
plans for facilities handling hazmat. Provided emergency response guidebooks to 
fire and law enforcement personnel. Follow MCDOT/ADOT guidelines. 
Responsible for wildfire mitigation other than weed abatement (e.g. – 
thinning/fuels reduction, creation of fire breaks, buffers, etc.) 
Economic Development 
Ensuring building codes are enforced. Performing assessments of infrastructure. 
Limiting development along river and in floodplains.  
Environmental Dept. 
Supervising abatement, prevention and investigations of public health nuisance 
conditions, illegal dumping activities and the storage and handling of potentially 
infections material. 
Emergency Management 
Coordinating involvement of industry, fire, law enforcement and other key 
players with the Tribal Emergency Response Committee (TERC). Providing 
WMD training for all employees. Supporting Urban Area Security Initiative. 
Promoting programs aimed at family preparedness.  Responsible for review and 
maintenance of hazard mitigation plan. 
Health Department 
Coordinating training, planning, and communications to provide the community 
with information to combat the effects of infestations and diseases. Developing 
capabilities to respond to and support a chemical, biological or radiological 
events. 
Public Works Dept. 
Creating access, and mapping access to high-risk areas. Providing weed 
abatement services in high risk areas.  Planning, design, construction and 
maintenance of drainage facilities.   
FMYN Tribal Council 
Ultimate authority for all FMYN hazard management and mitigation activities 
and funding. 
 
As is summarized in Tables 6-1-7, 6-2-7 and 6-3-7 and 6-4-1, FMYN has many good 
programs, policies and regulations in-place to provide for effective hazard mitigation.  An 
evaluation of the capabilities listed in these tables was performed by the FMYN LPT and the 
following mitigation related gaps and opportunities were identified: 
• A need for increased understanding of available mitigation grant programs. 
• Building and fire codes are slightly outdated and should be evaluated for the need 
to update to current consensus.  
• Identified a need for better floodplain and wildfire hazard mapping across the 
Nation, and especially in the upland areas that are not part of the Verde River 
floodplain. 
Upon receipt of a presidential disaster declaration, the Nation will work with FEMA to develop 
two post-disaster hazard management tools as follows:

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 384 
• Public Assistance Administration Plan  
• Hazard Mitigation Grant Program Administration Plan.  
Both plans will be used by the Nation to identify the roles and responsibilities 
of the Nation in administering the FEMA Public Assistance (PA) and Hazard 
Mitigation Grant Programs (HMGP), and to outline staffing requirements and the 
policies and procedures to be used.  A result of developing these plans will be to further 
focus Nation resources on the importance of hazard management and mitigation 
planning. 
6.2.3 Salt River Pima Maricopa Indian Community Pre- and Post-Disaster Hazard 
Management 
SRPMIC is also required to summarize and evaluate pre- and post-disaster hazard 
management practices to satisfy the requirements at 44 CFR §201.7(c)(3)(iv).  Tables 6-1-20, 
6-2-20, and 6-3-20 above, and Table 6-4-2 below summarize the SRPMIC hazard mitigation 
and pre- and post-disaster hazard management practices and roles that are currently 
accomplished through various SRPMIC departments and programs.  
Table 6-4-2:  Salt River Pima Maricopa Indian Community departments or entities with 
hazard mitigation responsibilities  
Department or Agency 
Hazard Mitigation Activities 
Community 
Development 
• Develop and maintain General Plan 
• Regulate land use 
• Responsibility for development or revisions to codes and ordinances 
Fire 
• Emergency management responsibility 
• Maintenance of the hazard mitigation plan 
• Ensuring the completion of mitigation projects 
• Mitigation grant liaison 
Engineering 
Construction Services 
• Responsible for construction of mitigation projects 
• Identification of future mitigation projects 
Administration, Legal, 
and Finance 
• Approve grant applications 
• Maintains CIP for mitigation projects 
• Identifies funding sources for mitigation projects 
• Process the approval of mitigation Plan through council 
• Manage mitigation grants once awarded. 
Tribal Council 
• Promulgation authority for mitigation plan 
• Approval of funding/budget for mitigation projects 
Environmental 
Protection and Natural 
Resources 
• Ensures protection of cultural, sacred and natural resources 
Transportation 
• Maintenance of transportation related critical facilities 
Public Works 
• Maintain and protect the critical infrastructure 
 
Since the 2015 Plan, SRPMIC has continued to support and fund a full time 
Emergency Manager position. The support of this position has allowed SRPMIC to 
significantly enhance its Emergency Management Program as a whole, including the

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 385 
area of mitigation.  Training of staff, plans updated and developed, improved internal 
and regional coordination in emergency management are just some of the examples of 
significant enhancements to the program.  Policies towards building within known 
hazard prone areas has adhered to strict guidelines that have been in place since before 
the 2015 Plan and have not changed for the Community.  The General Development 
Plan, codes and ordinances remain in place to prevent development in hazard prone 
areas. 
As is summarized in Tables 6-1-20, 6-2-20, 6-3-20, 6-4-2, SRPMIC has many 
good programs, policies, and regulations in-place to provide for effective hazard 
mitigation.  An evaluation of the capabilities listed in those tables was performed by 
the SRPMIC LPT and the following mitigation related gaps and opportunities were 
identified: 
• A need for increased understanding of available mitigation grant 
programs. 
• Building codes are slightly outdated and should be updated soon. 
• A distinct absence of flooding related considerations in the current 
general plan. 
• An identified need for better floodplain and wildfire hazard mapping 
across the Community, and especially in the upland areas that are not part 
of the Verde and Salt River floodplains. 
Upon receipt of a presidential disaster declaration, SRPMIC will work with 
FEMA to develop two post-disaster hazard management tools as follows:   
• Public Assistance Administration Plan  
• Hazard Mitigation Grant Program Administration Plan.  
 
Both plans will be used by SRPMIC to identify the roles and responsibilities 
of the SRPMIC in administering the FEMA Public Assistance (PA) and Hazard 
Mitigation Grant Programs (HMGP), and to outline staffing requirements and the 
policies and procedures to be used.  A result of developing these plans will be to 
further focus SRPMIC resources on the importance of hazard management and 
mitigation planning.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 386 
6.2.4 National Flood Insurance Program Participation 
Participation in the NFIP is a key element of any community’s local floodplain management and flood mitigation strategy.  
Maricopa County and all 24 incorporated jurisdictions participate in the NFIP at varying levels.  The Fort McDowell Yavapai 
Nation and Salt River Pima-Maricopa Indian Community do not currently participate in the NFIP.   
Joining the NFIP requires the adoption of a floodplain management ordinance that requires jurisdictions to follow 
established minimum standards set forth by FEMA and the State of Arizona when developing in the floodplain. These standards 
require that all new buildings and substantial improvements to existing buildings will be protected from damage by the 100-year 
flood, and that new floodplain development will not aggravate existing flood problems or increase damage to other properties.  
Maricopa County and some other communities, have adopted standards that are more stringent than the federal minimum to 
ensure better flood mitigation practices.  As a participant in the NFIP, communities also benefit from having Flood Insurance 
Rate Maps (FIRM) that map identified flood hazard areas and can be used to assess flood hazard risk, regulate construction 
practices and set flood insurance rates.  FIRMs are also an important source of information to educate residents, government 
officials and the private sector about the likelihood of flooding in their community.  Table 6-4 summarizes the NFIP status and 
statistics for each of the jurisdictions participating in this Plan. 
Table 6-5:  NFIP status and statistics for Maricopa County and participating jurisdictions  
Jurisdiction 
Community 
ID 
NFIP 
Entry 
Date 
Current 
Effective 
Map Date 
Number 
of 
Policies 
Amount of 
Coverage 
(x $1,000) 
Floodplain Management Role 
Maricopa 
County  
(via FCDMC) 
040037 
7/2/1979 
9/18/2020 
2,658 
$698,945 
Provides floodplain management for the 
Unincorporated County and the City/Towns 
noted below 
Avondale 
040038 
6/15/1979 
9/18/2020 
40 
$11,988 Provides in-house floodplain management 
Buckeye 
040039 
2/15/1980 
9/18/2020 
73 
$20,790 Floodplain management provided by the 
Flood Control District of Maricopa County 
Carefree 
040126 
7/2/1979 
10/16/2013 
34 
$11,050 Floodplain management provided by the 
Flood Control District of Maricopa County 
Cave Creek 
040129 
6/9/1988 
10/16/2013 
36 
$10,838 Floodplain management provided by the 
Flood Control District of Maricopa County

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 387 
Table 6-5:  NFIP status and statistics for Maricopa County and participating jurisdictions  
Jurisdiction 
Community 
ID 
NFIP 
Entry 
Date 
Current 
Effective 
Map Date 
Number 
of 
Policies 
Amount of 
Coverage 
(x $1,000) 
Floodplain Management Role 
Chandler 
040040 
7/16/1980 
11/4/2015 
290 
$90,236 Floodplain management provided by the 
Flood Control District of Maricopa County 
El Mirage 
040041 
12/1/1978 
9/18/2020 
10 
$2,915 Floodplain management provided by the 
Flood Control District of Maricopa County 
Fountain Hills 
040135 
2/10/1994 
10/16/2013 
34 
$8,620 Provides in-house floodplain management 
Gila Bend 
040043 
12/4/1979 
11/4/2015 
11 
$2,391 Floodplain management provided by the 
Flood Control District of Maricopa County 
Gilbert 
040044 
1/16/1980 
11/4/2015 
399 
$131,176 Provides in-house floodplain management 
Glendale 
040045 
4/16/1979 
9/18/2020 
185 
$58,036 Provides in-house floodplain management 
Goodyear 
040046 
7/16/1979 
9/18/2020 
179 
$51,443 Provides in-house floodplain management 
Guadalupe 
040111 
4/1/1994 
9/18/2020 
5 
$758 Floodplain management provided by the 
Flood Control District of Maricopa County 
Litchfield Park 
040128 
8/19/1988 
9/18/2020 
10 
$2,222 Floodplain management provided by the 
Flood Control District of Maricopa County 
Mesa 
040048 
5/15/1980 
9/18/2020 
381 
$111,625 Floodplain management provided by the 
Flood Control District of Maricopa County 
Paradise Valley 
040049 
5/1/1980 
9/18/2020 
174 
$58,901 Provides in-house floodplain management 
Peoria 
040050 
11/17/1978 
9/18/2020 
259 
$84,185 Provides in-house floodplain management 
Phoenix 
040051 
12/4/1979 
9/18/2020 
4,521 
$1,212,020 Provides in-house floodplain management 
Queen Creek 
040132 
7/22/1992 
10/16/2013 
44 
$14,050 Floodplain management provided by the 
Flood Control District of Maricopa County 
Scottsdale 
045012 
9/21/1973 
9/18/2020 
6,027 
$1,710,712 Provides in-house floodplain management

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 388 
Table 6-5:  NFIP status and statistics for Maricopa County and participating jurisdictions  
Jurisdiction 
Community 
ID 
NFIP 
Entry 
Date 
Current 
Effective 
Map Date 
Number 
of 
Policies 
Amount of 
Coverage 
(x $1,000) 
Floodplain Management Role 
Surprise 
040053 
12/15/1978 
11/04/2015 
211 
$62,728 Floodplain management provided by the 
Flood Control District of Maricopa County 
Tempe 
040054 
8/15/1980 
9/18/2020 
171 
$55,436 Provides in-house floodplain management 
Tolleson 
040055 
1/16/1980 
9/18/2020 
33 
$9,573 Floodplain management provided by the 
Flood Control District of Maricopa County 
Wickenburg 
040056 
1/5/1978 
9/18/2020 
41 
$9,047 Floodplain management provided by the 
Flood Control District of Maricopa County 
Youngtown 
040057 
11/15/1978 
9/18/2020 
3 
$658 Floodplain management provided by the 
Flood Control District of Maricopa County 
Fort McDowell Yavapai Nation 
Not a participant in the NFIP 
Salt River Pima-Maricopa Indian Community 
Not a participant in the NFIP 
Source:  Policy & NFIP Statistics - https://nfipservices.floodsmart.gov//reports-flood-insurance-data (Accessed:  10/11/2020)  
 
Each of the participating jurisdictions performed an overall assessment of their participation in the NFIP program by responding 
to the following questions: 
Question 1: Describe your jurisdiction’s current floodplain management / regulation process for construction of new or 
substantially improved development within your jurisdiction. 
Question 2: Describe the status and/or validity of the current floodplain hazard mapping for your jurisdiction. 
Question 3: Describe any community assistance activities (e.g. – help with obtaining Elevation Certificates, flood hazard 
identification assistance, flood insurance acquisition guidance, public involvement activities, etc.) 
Question 4: Describe identified needs in your floodplain management program.  This could include things like updating the 
floodplain management code/regulation, establishing written review procedures, modifying or adding flood hazard 
area mapping, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 389 
Responses were provided by all jurisdictions regardless of their participation status in the NFIP program.  Table 6-6 summarizes 
the responses provided by each of the currently participating jurisdictions. 
 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Avondale 
Q1 
Our City Engineer is a certified floodplain manager.  As the floodplain manager he works with floodplain 
zones, answers resident and business owner’s questions, assists realtors, and maintains documentation for 
future reference.  Any construction that takes place involving a permit is evaluated and tracked in regard to 
location of floodplains to proposed construction area.  This data is maintained electronically in the 
Engineering Department.  City Engineer/Floodplain Manager also participate in audits of the program as 
requested. 
Q2 Floodplain maps and DFIRMS for the city were recently updated as a part of the overall county update. 
Q3 
The Engineering department assists residents and businesses with questions they may have in regard to 
property contained within the floodplain.  In some instances when FIRM maps are not accurate, 
Engineering Department assists property owner with an appeal to have a re-determination done to re-
evaluate the property.  In some instances physical map revisions are made in coordination with Flood 
Control District of Maricopa County and FEMA. 
Q4 Having more floodplain information including mapping available on the website.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 390 
Buckeye 
Q1 
The following procedures are used in coordination with the Flood Control District of Maricopa County for 
structures that require Floodplain Use Permits as well as City of Buckeye (COB) Building Permits. 
 
1) The applicant applies for a building permit.  City’s Floodplain Administrator or his/her designee checks 
FIRM Map to determine if property is within a 100-year Floodplain. 
2) Property is in a 100-year Floodplain. 
a) Buckeye staff informs applicant property is in a floodplain and requires a Floodplain Use Permit 
from the Flood Control District of Maricopa County (FCDMC). 
b) (Buckeye staff will proceed with normal requirements to obtain a building permit.) 
c) Buckeye staff instructs Applicant to set up an appointment with the FCDMC.  Applicant is instructed 
to take Buckeye Building Permit to FCDMC and obtain a Floodplain Use Permit. 
d) Applicant returns to the COB with approved Floodplain Use Permit with stipulations for Building 
Permit.  Floodplain Use Permit shall be attached to the Building Permit and paper work for 
inspectors. 
Place in COB Project File: 
• Application Form 
• Stipulations – states floodplain requirements, e.g., lowest floor elevation, elevation certificate form 
completed by the Applicant’s Arizona Registered Professional Engineer (P.E.) or Surveyor (R.L.S.), 
etc. 
• Disclaimer Form 
• Copy of Elevation Certificate with owner’s name, property address, base flood elevation and FIRM 
map information for Engineer or Surveyor to complete. 
3) COB staff issues Building Permit and appoints an inspector to insure NFIP compliance. 
4) Applicant hires surveyor to place “temporary bench mark” for builder to know where to set lowest floor 
above grade. 
5) The applicant applies for a building permit.  City’s Floodplain Administrator or his/her designee checks 
FIRM Map to determine if property is within a 100-year Floodplain. 
6) Applicant’s Surveyor completes “Under Construction” FEMA Elevation Certification and faxes to the 
FCDMC.  The FCDMC will fax a copy of the Elevation Certificate to COB stating it is okay to pass 
stem.  Applicant calls COB for stem inspection.  Before the stem inspection can be given a pass, the

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 391 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
FCDMC must have a copy of the Elevation Certificate completed by the Applicant’s P.E. or R.L.S to 
determine that the elevation requirements are being met.  (COB inspector must fail the stem inspection 
if the certificate has not been completed.) 
7) Applicant calls COB for final inspection.  Before the final inspection can be given a pass, the Applicant’s 
P.E. or R.L.S. must complete FEMA Elevation Certificate for “Finished Construction”. 
8) COB Inspector assigned to assure NFIP compliance will: 
i) Prior to construction activity beginning, notify the FCDMC that construction will begin within 
the regulatory floodplain. 
ii) Complete the Floodplain Management Field Inspection Checklist to assure all work has been 
done in compliance with NFIP and county regulations. 
iii) Assure that the FEMA Elevation Certificate is completed and has been approved by the COB 
Inspector. 
iv) Assure that the permit file has copies of all appropriate forms required. 
(1) FEMA Elevation Certificate – fully completed. 
(2) Final Inspection/Compliance Checklist. 
(3) Variance information, if any. 
(4) Flood proofing, if any. 
(5) Substantial Improvement Calculations, if any. 
(6) Floodway Encroachment “No Rise” analysis, if any 
(7) NFIP Compliance Field Inspector’s Checklist. 
9) COB issues a Certificate of Occupancy to applicant and mails a copy of the Building Permit, finished  
construction Elevation Certificate and the Certificate of Occupancy to the FCDMC. 
 
NOTE:  FCDMC Inspectors will visit construction sites at their discretion per Arizona Senate Bill 1598. 
Q2 
The countywide update of FEMA mapped floodplains in 2013 encompasses the jurisdictional limits of the 
City of Buckeye.  An additional study has also been completed for the Gila River floodplain that has not 
yet been submitted to FEMA for consideration.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 392 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 The City of Buckeye is not currently providing additional formal community assistance activities, but 
rather relies on the FCDMC for these items. 
Q4 
With current staffing levels there are not additional items planned for the program.  Procedures were 
developed in 2014 for the following potential floodplain use permit related development scenarios: 
 
• Substantial Damage and substantial improvements 
• Commercial, Industrial and School development 
• Residential Structures 
• Residential Subdivisions 
• Other man-made development 
• Variance requests 
 
Carefree 
Q1 
The Town of Carefree is in full compliance and is in good standing with the National Flood Insurance 
Program (NFIP).  In accordance with this program, all new development and substantial improvement to 
existing structures are reviewed for compliance with federal, state, county, and town drainage and flood 
control regulations and guidelines.  This includes checking for a development’s encroachment into any 
Federal Emergency Management Agency (FEMA) designated Special Flood Hazard Area (SFHA).  In 
order to streamline this assessment, the town requires a Flood Insurance Rate Map (FIRM) Information 
Block on all plans.  This information block identifies critical flood zone information for the property, 
including the FIRM Panel number, FIRM Panel date, flood zone designation(s) that apply to the property, 
and base flood elevation (BFE), if applicable.  Any new development or substantial improvement to an 
existing structure that is identified as being fully or partially within a SFHA is routed to the Flood Control 
District of Maricopa County (FCDMC) for Floodplain Use Permit review.  The FCDMC provides 
floodplain management for the town and the town has adopted the county’s Floodplain Regulations by 
Ordinance.  The FCDMC’s Floodplain Use Permit review assures compliance with all applicable 
floodplain regulations within the Town of Carefree.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 393 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q2 
The FIRM’s for Maricopa County (county-wide maps) were recently updated and reissued on October 16, 
2013.  These revised maps have been adopted by the Town of Carefree via the town’s Floodplain 
Management Ordinance (Ordinance No. 2007-03).  The revised maps include the best available technical 
information for all SFHA’s and include newly identified SFHA’s within the eastern portion of the town. 
Q3 
The town responds to all drainage and flood control inquiries at the appropriate level.  The Town 
Administrator, Town Engineer, and Town Planner all provide assistance to citizens in obtaining this input 
and guidance.  Where needed, the Town Engineer and Town Planner perform site visits to assist citizens in 
flood hazard identification and drainage issue mitigation.  Citizens are also directed, as appropriate, to 
other resources, such as the FCDMC, for flood zone determinations, flood insurance assistance, and 
Elevation Certificate guidance. 
Q4 
All of the Town of Carefree’s floodplain management tools and regulations are working well.   Because of 
limited funding sources (the town has no property tax), resources are limited as far as identifying and 
implementing drainage and flood control projects.  The following are some investigations that would be 
helpful to the Town in identifying needs and unmet funding requirements: 
• Emergency access planning and improvement study. 
• Detailed local area master drainage plans. 
 
Cave Creek 
Q1 Currently, the Town of Cave Creek defers to the Flood Control District of Maricopa County as part of the 
review and approval of any permit which may impact an existing / recognized floodplain and or floodway. 
Q2 The Town of Cave Creek receives its mapping data from Maricopa County. 
Q3 
The Town of Cave Creek directs questions and concerns related to floodway / floodplain to the appropriate 
agency. The Town of Cave Creek actively communicates with the Flood Control District of Maricopa 
County Inspector. 
Q4 None

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 394 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Chandler 
Q1 
Our floodplain management is provided by the Flood Control District of Maricopa County.  They are 
responsible to identity areas susceptible to 100-year flooding, review permit applications for proposed uses 
within the floodplain, identify floodplain violations, and protect the natural and beneficial function of the 
floodplain.  The District is required by law to take all reasonable action to inform county residents and 
property owners of the location of flood hazard areas. 
 
The city participates in the National Flood Insurance Program (NFIP) and has adopted floodplain 
management regulations consistent with federal criteria.  City Code Section 43-5 states the statutory 
authority (vested in the Flood Control District) and duties and responsibilities of the Floodplain 
Administrator (City Engineer).  These duties include ensuring all construction permit requests within 
floodplains are promptly forwarded to the Flood Control District and that no permits are issued by any 
agent of the city until a valid floodplain use permit is obtained by the applicant 
Q2 
Updated Countywide Federal Insurance Rate Map (FIRM) Panels became effective on October 16, 2013.  
Currently, these maps, in addition to Letters of Map Change (LOMC) may be used to determine if a 
particular piece of property is located in a 100-year floodplain. 
 
A new FIRM update is underway and tentatively planned to be effective August 2016. The purpose of this 
map revision is to incorporate several large floodplain delineation studies onto the FIRMs that were too 
large to be incorporated under FEMA's traditional Letter of Map Revision (LOMR) process. In addition to 
incorporating these larger studies, the FIRM panels included in the revision will be updated for local 
LOMRs, updated community limits, and in certain locations, the FIRM panels will have new identification 
numbers and be printed at a closer scale. 
Q3 
Guidance is always provided to customer inquiries.  The Flood Control District of Maricopa County 
website is the primary resource for customer assistance including links and instructions pertaining to 
Elevations Certificates, when and how to obtain flood insurance, map applications to view current and 
pending 100-Year effective floodplains, general questions and answers and contact information. 
Q4 Currently our floodplain management code is up-to-date.  The city promptly adopts updates to FIRM's 
ensuring compliance with the NFIP.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 395 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
 
El Mirage 
Q1 
The City Engineer/Floodplain Administrator reviews development permits to ensure they are complete, 
accurate and all other necessary permits are in place. A floodplain use permit is required before 
construction or development begins within any area of special flood hazard. 
Q2 
The Floodplain Administrator ensures that any development that changes the water course within the 
floodplain is communicated to Flood Control District of Maricopa County, to ensure available information 
is accurate and current. The Administrator participates in the CLOMR/LOMR process is followed. 
Q3 The Floodplain administrator maintains records of flood proofing and elevation certificates for public 
review. Flood hazard identification is included in the development review process. 
Q4 The floodplain management program needs to establish public involvement activities. 
 
Fort McDowell 
Yavapai Nation 
Q1 
New development and construction as well as substantial improvement of existing structures and facilities 
within the exterior boundaries of the Fort McDowell Yavapai Nation are required to obtain a permit from 
the Community Economic Development Division. The permitting process includes a review of the 
location and proximity to the existing floodplain. 
Q2 
The Community Economic Development Division functions of the Land Use and License Manager and 
Planning Project Manager utilize GIS software applications to map floodplain areas with data acquired 
through Maricopa County. 
Q3 There is not currently any community assistance activities for flood insurance. 
Q4 The Nation needs to establish written procedures to review and update the floodplain management 
functions.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 396 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Fountain Hills 
Q1 
The town’s floodplain regulations are contained in Town Code Chapter 14 “Flood Damage Prevention”, 
which is from ADWR’s Model Ordinance. Nearly all of the town’s regulatory floodplain areas are 
contained within town-owned properties, and/or are within a platted (or granted) Drainage Easement on 
other properties. Town-owned washes are further restricted against development, transfer, or alienation by 
the “Watercourse Preservation and Habitat Ordinance” (Town Code Article 9-3). The town has an 
extensive vegetation maintenance/control program, and annually allocates funds to remove non-native, 
invasive, and channel-obstructing vegetation in its “Wash Management Program” from selected 
watercourses and other town-owned property. Regulatory floodplains are mapped on the town’s GIS 
system. Private development reviews verify that no infringement occurs within the floodplain (or that 
infringement is appropriately mitigated within that project). 
Q2 Floodplain/floodway areas have been mapped, with those areas shown on Maricopa County’s FIRM maps. 
The FIRM was approved by FEMA in 2011. 
Q3 The town provides community assistance on an as-needed basis. 
Q4 
Remapping of the Ashbrook Wash floodplain (East Town boundary to Golden Eagle Park Dam) was 
needed, due to past safety modifications to the Golden Eagle Park Dam, upstream development, and the 
upcoming enlarged culvert construction at Saguaro Blvd. and at Bayfield Drive. A joint project of the 
Flood Control District and the Town to remap this segment of the Ashbrook Wash floodplain was 
completed in 2018. 
 
Gila Bend 
Q1 
In the Town of Gila Bend a development permit shall be obtained before construction or development 
begins within any area of special flood hazard established in § 153.07 of the Town Code. Certification by 
a registered professional engineer or architect that the flood proofing methods, elevation of the lowest 
floor (relations to Mean Sea Level), and description as to what extent any watercourse will be altered or 
relocated as a result of the development and its impact to the adjacent areas.  The town engineer reviews 
all drainage, earth movement (larger than 1 acre), and construction of utilities and roadways for 
compliance with all town, state, county, and federal regulations.  The Town Manager has authority to 
approve or deny any permit.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 397 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q2 
The Town and Maricopa County have partnered to review the flood water impacts to the town residents. 
Flood Control District of Maricopa County has presented the town with alternatives for the current 
flooding issues.  It is believed that the study has been reviewed by staff and the costs associated with the 
plan have prevented implementation. 
Q3 The town received Assistance from Flood Control District of Maricopa County identifying floodplain 
limits and areas of significant impact. 
Q4 
The Town of Gila Bend needs assistance with the following: 
• Ground control so as to locate the limits of the floodplain in prone areas. Assistance with aerial 
mapping to correspond with GIS information for each affected parcel within the town. 
• Revision of the Town’s Code for floodplain management along with revised maps. 
• Finding sources to assist with financing any proposed projects within the scope provided by Flood 
Control District of Maricopa County. 
• Installation of recommended control devices to reduce flooding. 
 
Gilbert 
Q1 
The Town of Gilbert participates in the National Flood Insurance Program (NFIP) through the Department 
of Homeland Security's Federal Emergency Management Agency (FEMA).  As a participant of the NFIP, 
the town adopted Floodplain Management Ordinance 2454 and has established development requirements 
within the Land Development & Municipal Codes for projects within the Special Flood Hazard Areas 
(SFHA).  These requirements protect and regulate new or substantially improved development within 
flood prone areas in the town. 
Q2 
The current floodplain hazard maps (Flood Insurance Rate Maps) went into effect on October 16, 2013 – 
and will remain in effect until the latest “preliminary FIRM maps” are approved as the new effective maps 
by FEMA.  These preliminary maps, which were released for public comment in September 2014, are 
based on the results of the Chandler / Gilbert Floodplain Delineation Study.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 398 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 
We are presently working with the Flood Control District of Maricopa County to determine how we can 
partner to provide Elevation Certificates for properties that will be in the 100-year flood zone as a result of 
the latest preliminary FIRM mapping.  We are also developing a strategy and timeline to notify property 
owners affected by the latest preliminary FIRM mapping (i.e., properties that are being added to the 100-
year floodplain, and properties that will no longer be in the 100-year floodplain). 
Q4 
About 18 months ago, the town substantially improved our floodplain management program by 
developing web tools that can be used to quickly find Elevation Certificates and LOMR’s affecting 
properties within Gilbert.  Going forward, we would like to strengthen and improve our scores in the 
Community Rating System (presently we are rated “8” – and would like to bring this number down to “6” 
or perhaps “5”).  This is an on-going process, and we will continue to annually look at opportunities to 
improve this score. 
 
Glendale 
Q1 
We are currently a Class 7 NFIP CRS community. New and substantially improved developments within 
the City of Glendale are reviewed by Engineering and Building Safety for conformance with the 2015 
Engineering Design and Construction Standards, Chapter 17 Floodplain Management of the Glendale 
Code of Ordinances and the 2018 International Building, Residential, Mechanical, Plumbing and Fuel 
Codes. 
 
When a development is submitted through the Electronic Plan Review to Development Services staff, and 
all or some portion of the property is located in the SFHA, it is tagged in our tracking system (Hansen).  
Once a development is tagged, the application is sent to both Engineering and Building for review.  This 
lets staff know that the development must comply with Glendale’s ordinances as they relate to NFIP.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 399 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q2 
We currently use the September 18, 2020 FIS and FIRM's and DFIRM’s in the review process of 
applicable developments with all or some portion of the property that is in the SFHA and to make Flood 
Zone Determinations, when requested.  All CLOMR's / LOMR’s etc. are kept on file in Engineering for 
community use in addition to the availability of the current FIS, FIRM’s and access to DFIRM’s on 
FEMA’s website. 
 
We have ensured that when improvements are made that impact the floodplain that LOMR’s are processed 
with FEMA and the FIRM is updated to reflect the improvements. Accordingly, we feel the floodplains as 
they are mapped on the current FIRM are accurate and valid. 
Q3 
We require Elevation Certificate's on developments with all or some portion of the property in the SFHA. 
Staff provides Flood Hazard Determinations upon request. Information is provided to residents regarding 
flood determination articles in The Connection, information on flood insurance and residential drainage 
solutions as part of Glendale’s CRS program and public involvement activities as part of Glendale’s 
Hazard Mitigation Plan. 
Q4 
During the 2020 Community Assistance Contact (CAC) conference call, staff at Arizona Department of 
Water Resources (ADWR) discussed the City’s floodplain management program, including the City’s 
floodplain ordinance.  In conjunction with ADWR, the City’s ordinance will be revised and adopted. 
 
Goodyear 
Q1 
New or substantially improved development within the City of Goodyear is reviewed for conformance to 
the Engineering Design Standards and the Flood Damage Prevention Ordinance. While the City of 
Goodyear is responsible for floodplain administration within its jurisdiction, Engineering will obtain 
general floodplain information and guidance from the Flood Control District of Maricopa County 
whenever necessary in order to properly regulate construction within the city. 
Q2 
Floodplain hazard mapping is current through the most recent FIRMs that have been made available from 
FEMA. The maps are available on the city’s internal website for use by city staff for reviewing new 
proposed construction and providing floodplain determinations to the public upon request.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 400 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 
The city’s Engineering Department is responsible for maintaining documentation of elevation certificates, 
providing floodplain determinations, and providing assistance and answering questions from property 
owners who are impacted by proposed modifications to the special flood hazard zones. They also provide 
general information regarding flood insurance acquisition. 
Q4 The city will review and establish updated written review procedures for new construction and update the 
floodplain management code/regulations based on information that is received from ADEQ. 
 
Guadalupe 
Q1 
Floodplain management provided by the Flood Control District of Maricopa County.  New construction 
and redevelopment is managed through a building permit and plan review process by contracted 
engineering firm. All building permits follow currently adopted codes. 
Q2 Floodplain mapping is current and valid. 
Q3 No current community floodplain assistance activities. 
Q4 Continue annual review of floodplain management and mapping in conjunction with Flood Control 
District of Maricopa County. 
 
Litchfield Park 
Q1 
We follow the floodplain maps provided by the Flood Control District of Maricopa County. Our 
floodplain maps were updated in 2013.  All construction plans and property improvements, within our 
jurisdiction, are subjected to the city review and approval process which includes Engineering reviews and 
Building Plan Department review to ensure compliance with said floodplain and other ordinances as 
required by City of Litchfield Park municipal code. 
Q2 
The Flood Control District of Maricopa County provides updates:  as those are provided, City Engineers 
and other required personnel review updates and make revisions or addendums as necessary to city 
processes and procedures.  New dry wells and drainage plans have continued to alleviate ponding and 
street flooding issues and new plan reviews take such drainage into consideration. 
Q3 
The City Engineer provides input for plans review and existing property owners are referred to the Flood 
Control District of Maricopa County if assistance with flood insurance is required. If a proposed 
development falls within a floodplain the city will require the developer to apply for and receive a 
floodplain use permit from the Flood Control District of Maricopa County.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 401 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q4 
Only a small portion of the city falls into an identified flood hazard zone.  Our floodplain administrator is 
the Maricopa County Floodplain Administrators. We do not believe we need any more assistance than we 
are already receiving. 
 
Mesa 
Q1 
The City of Mesa is a participating community under the National Flood Insurance Program (NFIP) 
administered through FEMA. In accordance with the Arizona revised statutes 48-3610, the Flood Control 
District of Maricopa County is responsible for administration of the NFIP in the City of Mesa. A process 
is put in place for regulation/floodplain management of new construction of substantially improved 
development as follows: 
 
1.   The building process does not allow accepting a building permit within a Special Flood Hazard Area 
without an approved floodplain use permit from the FCDMC. Mesa has automated this process to flag 
any and all properties partially or fully located within an SFHA. 
2.   All new/proposed subdivisions, construction, and improved development are immediately directed to 
the Flood Control District of Maricopa County for review of the plans and improvements within the 
SFHA. City Planning Division sends all subdivision review cases to the FCDMC for Flood Zone 
determinations. Not until a floodplain use permit is allocated by the FCDMC will the building permit 
process move forward. 
3.   Plan Reviews include the City Floodplain Manager to review all subdivisions, commercial 
developments, land splits, rezoning and Design Review Board cases. 
4.   Mesa regularly trains staff that handle permits on flood zone requirements. 
5.   The City of Mesa utilizes the FCDMC “Floodplain Regulations for Maricopa County”, amended 
January 17, 2018, which defines the rules for usage, development restrictions and permitting 
requirements necessary to protect the environmental and flood control qualities of floodplains. 
Q2 
The City of Mesa holds all development to the Arizona revised statutes for mapping floodplains within 
new development. We also work regularly with the FCDMC to identify studies of areas within the City of 
Mesa that may require analysis and delineation of areas that aren’t otherwise mapped in the floodplain.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 402 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 
The City of Mesa is a “county dependent” municipality and defers to the FCDMC regarding floodplains, 
designation, and regulatory floodplain elevations and performance of any inspections relating to the 
Elevation Certificate or the Floodplain Use Permit. 
Q4 
Mesa regularly revisits our floodplain ordinance document with ADWR and works closely with the 
FCDMC on floodplain regulatory matters/management. If anything, more regular trainings would be 
beneficial for city staff. 
 
Paradise Valley 
Q1 
Paradise Valley is no longer participating in the Plan 
Q2 
Q3 
Q4 
 
Peoria 
Q1 
As property proceeds thru the development process an early step to the review is to apply the floodplain 
ordinance.  This activity is performed by a representative to the Floodplain Administrator reporting 
directly to the Floodplain Administrator.  Special Flood Hazard Properties are “tagged” in our GIS system 
to identify an added review and approval required by the Floodplain Administrator. 
Q2 
Acknowledge DFIRM’s effective date October 16, 2013 which covers the whole city limits, and maintains 
all subsequent LOMC’s in-house.  Flood Control District of Maricopa County hosts updated and currently 
effective flood mapping including our community’s subsequent LOMC’s on their public GIS site. 
Q3 
Peoria is presently performing in accordance with a Corrective Action Plan as a result of the latest 
Community Assistance Visit.  The Corrective Action Plan includes adoption of a NFIP compliant 
Floodplain Ordinance, new Elevation Certificates and documentation and publication of procedures. 
Q4 Added floodplain mapping of undeveloped area within the city.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 403 
Phoenix 
Q1 
The National Flood Insurance Act of 1968, as amended in 1973, provides for a federally subsidized 
National Flood Insurance Program (NFIP) conditioned on active management and regulation of floodplain 
development by state and local governments. FEMA administers the NFIP as a part of its overall 
responsibilities in preventing and responding to natural events that damage private and public property and 
any life-threatening natural event including floods. The NFIP provides flood insurance at affordable rates 
through federal subsidy of the insurance offered by licensed insurance agents. This insurance is designed 
to provide an insurance alternative to disaster assistance to meet the escalating costs of repairing damage 
to buildings and their contents caused by floods. 
 
Participation in the NFIP is based on an agreement between local communities and the federal 
government. This agreement states if a community will adopt and enforce a floodplain management 
ordinance to reduce future flood risks to new construction in Special Flood Hazard Areas, the federal 
government will make flood insurance available within the community as a financial protection against 
flood losses.  
 
Availability of the subsidized flood insurance is contingent upon the development of a floodplain 
management system by the local municipality. Prevention of floods and resultant property damage is 
achieved through the delineation of property subject to flood events and the establishment of specific rules 
concerning development within these designated areas. FEMA publishes Flood Insurance Rate Maps 
(FIRM's) for certain flood prone areas that delineate different special flood hazard areas.  
 
The City of Phoenix participates in the NFIP and has adopted floodplain regulations and ordinances so that 
its citizens have access to the subsidized insurance. The role of the community is to enact and implement 
floodplain regulations required for participation in the NFIP. FEMA has regulations pertaining to 
floodplain management that must be followed in order for the city to continue as a member of the NFIP. 
The City of Phoenix has local policies to manage floodplains in a uniform and consistent manner. These 
policies are categorized as being FEMA related and non-FEMA related in nature. The policies strictly 
adhere to federal regulations governing floodplains and drainage design. 
 
The City of Phoenix Storm Water Policies and Standards Manual, 3rd Edition, December 2013, lists all 
applicable floodplain management regulations and policies for construction of new and substantially 
improved development projects within the city jurisdiction,

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 404 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q2 The City of Phoenix Flood Insurance rate Maps and Flood Insurance Studies are dated October 16, 2013 
Q3 
Elevation Certificates – If available with the city, a copy of the Elevation Certificate is provided free of 
charge to the owner of the property.  Staff also helps guide residents to hire an appropriate professional 
assistance to create and develop an Elevation Certificate when one is not available. 
 
Flood Hazard Identification Assistance – Floodplain Management staff help identify hazard zones for an 
existing and/or proposed structure within the vicinity of a flood hazard area. The city also works very 
closely with the regional entity, Flood Control District of Maricopa County (FCDMC), for future 
identification of flood hazard areas within the jurisdiction. 
 
Flood Insurance Acquisition – Floodplain Management staff help distribute several brochures and other 
available information for residents to purchase flood insurance policies. 
 
Public Involvement Activities – Throughout the year, several Public Open House Meetings are held within 
the city, to educate the public on flood hazard areas, and rules and regulations for development activities 
within the flood hazard areas. These meetings are coordinated with the Flood Control District of Maricopa 
County (FCDMC) and the Master Planning efforts under their lead role.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 405 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q4 
The City of Phoenix is planning to update the Floodplain Management Plan for the City of Phoenix.  
Current Floodplain Management plan is dated, December 1992, and is in a great need to be updated. The 
City of Phoenix has applied for a grant through the Arizona Department of Emergency Management 
(ADEM) to fund the study. 
 
On June 30, 2012, the City of Phoenix code, Chapter 32B, Floodplains, was updated following the 
Arizona Department of Water Resources (ADWR) guidelines as published in their model ordinances for 
the communities within the state. 
 
As a result of Area Drainage master Studies (ADMS), which are primarily done by the Flood Control 
District of Maricopa County (FCDMC), areas subject to development activities are identified with current 
or future flood hazard zones. These proactive steps help reduce the risk of loss of life and livestock within 
the flood-prone areas in the city. 
 
Queen Creek 
Q1 
The Flood Control District of Maricopa County provides the floodplain management for the town.  The 
town, as floodplain administrator, requires all applications for proposed new or substantially improved 
development that falls within FEMA special flood hazard areas to comply with the Maricopa County 
Floodplain Regulations and National Flood Insurance Program. 
Q2 The floodplain hazard maps for the town’s jurisdiction were updated in October 2013.  The current maps 
reflect the best available information at the time of the update. 
Q3 
The town, as floodplain administrator, has assisted customers who need help in obtaining elevation 
certificates as well as assist customers who have questions about flood hazard areas or how to interpret the 
FEMA flood insurance rate maps (FIRM).  The town has also worked with customers in removing flood 
hazard areas through the formal FEMA CLOMR/LOMR processes. 
Q4 Establish more local GIS functionality to better assist the town in local floodplain administration and 
management.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 406 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Salt River Pima-
Maricopa Indian 
Community 
Q1 
The Salt River Pima-Maricopa Indian Community (SRPMIC) is not a participant in the NFIP.  SRPMIC 
has exercised its right as a sovereign nation to not be a participant in NFIP.  In addition, SRPMIC is a self-
governance tribe which manages its own federal programs and services.  SRPMIC has however tried to 
meet the intent of the NFIP through its management of its Floodplain Program.  Some of those efforts are 
addressed in the answers to the following questions. 
 
1) New construction or substantially improved development within the community is reviewed based 
upon the SRO §Chapter 17.5 – Floodplain and Drainage Ordinance.  A few highlights are mentioned 
below: 
a) Building finished floor elevations must be elevated a minimum of 14-inches above the lot outfall. 
b) Storm water runoff from post-developed conditions cannot exceed the pre-developed conditions. 
c) Underground storage must be requested as a Waiver to the Floodplain and Drainage Ordinance. 
Q2 
The SRPMIC does not participate in the NFIP because of community sovereignty so mapping through the 
NFIP specific for SRPMIC is not available. There are FEMA FIRM maps available for areas near the 
community’s borders that are utilized.  Most of these maps indicate that the community is in Zone D.  
More detailed FIRM maps are available along the Salt River as these are utilized as needed. 
Q3 
The community provides civil engineering services for SHRRP and other home building project. The 
community assists in answering floodplain related questions for ECS-Compliance, for Public Works, and 
also for the Salt River Financial Services Institution. Approximately 20 residential driveways were 
improved to provide access during recent flood events. 
Q4 
Needs in this area are as follows: 
• Update the SRPMIC Floodplain and Drainage Ordinance. 
• A floodplain plan review checklist would be helpful.  One is currently being developed but not yet 
completed. 
• The community regularly participates in floodplain seminars and webinars to stay aware of current 
NFIP regulations.  Notification and support for tribes to attend these trainings would be helpful.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 407 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Salt River 
Project 
Q1 
Salt River Project is a political subdivision of the state, power and water provider to customers, primarily 
in Maricopa County, AZ and is not required to participate in the National Flood Insurance Program.  The 
municipalities cover the NFIP for citizens in their communities.  If SRP owns facilities that are in known 
floodplains where coverage is necessary SRP procures catastrophic flood coverage through the 
commercial insurance marketplace that does not specifically exclude locations that may be in a federal 
flood zone.   
Q2 Not applicable. 
Q3 Not applicable. 
Q4 Not applicable. 
 
Scottsdale 
Q1 
The City of Scottsdale requires applicants to submit drainage reports, improvement plans, and grading & 
drainage plans to the city’s one-stop shop. These items are reviewed by the city’s Stormwater 
Management Department for compliance with Chapter 37 of Scottsdale Revised Code, Stormwater and 
Floodplain Management. Our Stormwater and Floodplain Management Ordinance has been reviewed and 
approved by FEMA and the Arizona Department of Water Resources as compliant with the provisions of 
the National Flood Insurance Program. All review staff are Certified Floodplain Managers. A permit is not 
issued for construction until the city has approved the development proposal. 
Q2 
The City of Scottsdale and the Flood Control District of Maricopa County engage in new flood insurance 
studies as funds allow to keep the Flood Insurance Rate Maps updated. Quite a few developers have 
prepared applications for Letters of Map Revision, which were approved by the city and FEMA. 
Q3 
The city’s Records Department assists customers in obtaining Elevation Certificates on record and 
completes flood hazard determination forms upon request. The city’s Stormwater Management 
Department recommends the purchase of flood insurance to all residents. 
Q4 The city needs to continue to conduct flood insurance studies to keep the DFIRMS up-to-date. The city 
needs funding to continue to embark on capital improvement projects to mitigate existing flood hazards.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 408 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Surprise 
Q1 
The City of Surprise participates in the National Flood Insurance Program (NFIP) through the Department 
of Homeland Security's Federal Emergency Management Agency (FEMA).  As a participant of the NFIP, 
the city has adopted Floodplain Management Ordinances within chapter 122 of the City of Surprise 
Unified Development Code.  These requirements protect and regulate new or substantially improved 
development within flood prone areas in the city.  The city is dependent on FCDMC for floodplain 
management and permitting for properties located in a SFHA. 
Q2 
The current floodplain hazard maps (Flood Insurance Rate Maps) went into effect on October 16, 2013 – 
and will remain in effect until the latest “preliminary FIRM maps” are approved as the new effective maps 
by FEMA.  These preliminary maps, which were released for public comment in September 2014, are 
based on the results of the Wittman Surprise Floodplain Delineation Study.   The city is also engaged in 
confirming and finalizing Conditional Letter of Map Revisions that were started in the mid-2000s and not 
completed. 
Q3 
The city is actively engaged in flood mitigation efforts on a variety of levels. The city currently has a 10 
year Capital Improvement Program (CIP) that identifies numerous flood control improvement projects that 
seek to relieve property and roadway flooding.  On an annual basis the city seeks grant funding from a 
number of agencies to assist in funding these projects. The city’s survey crew assists in providing 
elevation certificates. In coordination with the Flood Control District of Maricopa County, the city hosts 
public outreach events for homeowners and businesses to learn more about existing floodplains/ways, 
flood insurance, and upcoming flood control improvements. 
Q4 The City of Surprise would like to strengthen and improve our scores in the Community Rating System. 
 
Tempe 
Q1 
We have few developable areas in Special Flood Hazard Areas (SFHA/100-yr floodplain) with the City of 
Tempe. When a new or substantial improvement project is submitted to Community Development (CD), 
they determine if it within a SFHA. If it is, our floodplain management section has SOPs and works with 
CD to assure the project follows our City’s Floodplain Codes. 
Q2 
The Flood Control District of Maricopa County (FCDMC) has completed Area Drainage Master Studies 
covering the city. They confirm the locations of current SFHAs and confirm locations of flood hazards 
which have experienced flooding in the past.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 409 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 
The City of Tempe participates in FEMA’s National Flood Insurance Program (NFIP), Community Rating 
System with a rating of Class 6. We provide a number of floodplain assistance services to the public. They 
Include: 
• We maintain the current and historic FIRMs (Flood Insurance Rate Maps)  
• We maintain records of Elevation Certificates we receive and provide directions on obtaining one 
• We provide completed Floodplain Determination Forms for property owners and direct them to the 
FEMA Map Service Center 
• We advise owners to purchase flood insurance if they are in the SFHA or not 
• We will visit home owner’s properties to advise on flood protecting their properties. 
• We advertise our services to property owners on our services on our website and in the “Tempe 
Today” news letter which goes to every home. 
Q4 
We recently had our FY2020 Community Assistance Contact visit from ADWR. They have reviewed our 
City Code and are in the process of revising it to match their recommendation. They also review our 
procedures and processes, which we adjust to improve. 
We have completed a Storm Drain Management Plans which outlines future storm drain improvements to 
address deficiencies into the future. 
Our first project will be designed this year and funded next. The major need is to obtain continual funding 
to complete these projects. 
 
Tolleson 
Q1 
All plans are run through the Building Department for Engineering to review and ensure all is in 
compliance with the Maricopa County Flood Plan.  City of Tolleson relies on the County Flood Plan for 
reviews. 
Q2 The countywide update of FEMA mapped floodplains in 2020 encompasses the jurisdictional limits of the 
City of Tolleson. 
Q3 The City of Tolleson is not currently providing additional formal community assistance activities, but 
rather relies on the FCDMC for these items. 
Q4 Tolleson relies on Flood Control District of Maricopa County for floodplain management.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 410 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Unincorporated 
Maricopa County 
Q1 
• The applicant submits a complete and accurate application to the One Stop Shop at Planning and 
Development (P&D) for a Building Permit and pays the appropriate building permit fee. If the property 
has floodplain on it they are required to obtain a Floodplain Use Permit. Review comments for the 
Floodplain Use Permit will be sent as part of the combined packet from P&D. 
• The applicant will be contacted when the Floodplain Use Permit is ready for issuance. 
 If an owner wishes to grant an agent, contractor or consultant authority to make decisions on their 
behalf, and has not already submitted a notarized Property Owner Authorization form, the form must 
be submitted at this time. 
 Applicant reviews the Floodplain Use Permit, Applicant’s Responsibilities, Warning and Disclaimer 
of Liability and Elevation Certificate, if required, with staff.  
 Submit the required fee. 
 Applicant signs the Floodplain Use Permit, Applicant’s Responsibilities and Warning and 
Disclaimer of Liability.  
 Permit issued. 
• If an Elevation Certificate was required, a complete and accurate Elevation Certificate must be 
submitted at final construction for staff to determine if the building complies with the Floodplain Use 
Permit requirements prior to a final inspection. 
• Per state statutes, the District must enforce the requirement of a Floodplain Use Permit for development 
in a floodplain. Violations are also pursued to assure compliance with the permit requirements and for 
the lack of obtaining a permit prior to building in a floodplain. 
Q2 
• Maricopa County refers to the Flood Insurance Rate Maps (FIRMs) by FEMA to determine if a 
particular parcel is in the Special Flood Hazard Area (SFHA). 
• When implementing floodplain development regulations, the District, on behalf of the County, uses 
FEMA’s SFHA as well as newly identified floodplains based on delineation studies. 
• The District continues to perform floodplain delineation studies to identify new areas in the 1% chance 
annual floodplain.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 411 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 
• FEMA conducted a Community Assistance Visit with the District in February 2010, but it is not yet 
closed.  
• An audit for the Community Rating System was conducted in February 2011. The District was awarded 
a Class 4 rating which is an improvement from the previous Class 5 rating. 
• The most recent audit was started in April 2015 and is currently under review. 
• The District provides assistance to the public in areas such as the identification of flooding hazards and 
flood zones, elevation certificate and flood insurance guidance, conducts outreach meetings to educate 
the public on various studies, flood hazard areas and updates and maintains an extensive GIS for the 
public’s use. 
• Provide jurisdictions with guidance and support during their Community Assistance Visits. 
• Elevation certificates are required for all new and substantially improved buildings in the regulatory 
floodplain. 
Q4 
• Development of a Floodplain Management Plan for unincorporated Maricopa County commenced in 
2015 and is currently in-progress. 
• The Comprehensive Report and Program, per ARS, was adopted on June 10, 2015. 
• The Floodplain Regulations for Maricopa County were most recently amended on June 24, 2014. 
• The Floodprone Properties Assistance Program (FPAP) has been approved for limited funding and the 
District is also pursuing grants for additional funding. 
• Continuation of floodplain delineation studies and updates. 
 
Wickenburg 
Q1 
The Town of Wickenburg turned over floodplain management authority to the Flood Control District of 
Maricopa County and Yavapai County Flood Control District in August 2014.  All floodplain related 
reviews and actions are deferred to those entities as appropriate. 
Q2 The current mapping was last updated and released in October 2013 and is currently adequate.  The town 
will work with FCDMC and YCFCD to identify and update mapping as needed.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 412 
Table 6-6:  NFIP program assessment for Maricopa County and participating jurisdictions  
Participating 
Jurisdiction 
Responses to Questions 1-4 
Q3 None at this time.  All floodplain related inquiries or requests are deferred to the FCDMC and YCFCD. 
Q4 
The lack of current staffing capacity forced the town to relinquish floodplain management duties to the 
FCDMC and YCFCD.  Additional staffing would be required to bring the floodplain management duties 
back under the town. 
 
Youngtown 
Q1 
Management responsibility for flood control has been delegated to the Flood Control District of Maricopa 
County as provided for in A.R.S. 48-2610. The Town Engineer is appointed as the National Flood 
Insurance Program Floodplain Coordinator for the town and is responsible for coordinating with the Flood 
Control District of Maricopa County. 
Q2 
The town has on file the revised Flood Insurance Study (FIS) for Maricopa County, Arizona and 
incorporated areas prepared by the Department of Homeland Security’s Federal Emergency Management 
Agency (FEMA).  Documents include: 
• Revised Flood Insurance Rate map (FIRM) Panel 
• Revised Firm Index 
• Revised FIS report 
Q3 Town staff is available to review Flood Insurance Maps, Index and provide guidance and requirements for 
raising designated parcels above the floodplain. 
Q4 Staff was provided with revised material (2013 updates) in 2014 to share with citizens and the community.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 413 
6.3 
Mitigation Actions/Projects and Implementation Strategy 
Mitigation actions/projects (A/P) are those activities identified by a jurisdiction that, 
when implemented, will have the effect of reducing the community’s exposure and risk to the 
particular hazard or hazards being mitigated.  The implementation strategy addresses the “how, 
when, and by whom?” questions related to implementing an identified A/P. 
The update process for defining the new list of mitigation A/Ps for the Plan was 
accomplished in three steps.  First, an assessment of the actions and projects specified in 
Section 6 of the 2015 Plan was performed, wherein each jurisdiction reviewed and evaluated 
their jurisdiction specific list.  Second, a new list of A/Ps for the Plan was developed by 
combining the carry forward results from the assessment with new A/Ps.  Third, an  
implementation strategy for the combined list of A/Ps was formulated.  Details of each step 
and the results of the process are summarized in the following sections. 
6.3.1 Previous Mitigation Actions/Projects Assessment 
The MJPT and LPT for each jurisdiction reviewed and assessed their 
jurisdiction’s actions and projects listed in Tables 6-8-1 through 6-8-28 of the 2015 
Plan.  The assessment included evaluating and classifying each of the previously 
identified A/Ps based on the following criteria: 
STATUS 
DISPOSITION 
Classification Explanation Requirement: 
Classification Explanation Requirement: 
“No Action”  
Reason for no progress 
“Keep” 
None required 
“In 
Progress” 
What progress has been 
made 
“Revise” 
Revised components 
“Complete” 
Date of completion and final 
cost of project (if applicable) 
“Delete” 
Reason(s) for exclusion. 
 
Any A/P with a disposition classification of “Keep” or “Revise” was carried 
forward to become part of the new A/P list for the Plan.  All A/Ps identified for deletion 
were removed and are not included in this updated plan.  The results of the assessment 
for each of the 2015 Plan A/Ps are summarized by jurisdiction in Tables 6-7-1 through 
6-7-28 in Appendix B. 
6.3.2 New Mitigation Actions / Projects and Implementation Strategy 
The first step in developing new mitigation actions/projects for the participating 
jurisdictions was to conduct a brainstorming session during Planning Team Meeting 
No. 4.  Using the goals, results of the vulnerability analysis and capability assessment, 
the Planning Team’s institutional knowledge of hazard mitigation needs in the county 
and jurisdictions, and the previous list developed for the 2015 Plan, the MJPT 
brainstormed to develop a comprehensive list of potential mitigation A/Ps that address 
the various hazards identified.  The results of that brainstorming effort are summarized 
below.  It is noted and acknowledged that several of the A/Ps listed are not purely 
mitigation and may not qualify as creditable mitigation A/Ps, but the MJPT chose to 
keep them anyway.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 414 
GENERAL MULTI-HAZARD: 
Install early warning sirens in select strategic locations as a part of a comprehensive emergency 
notification system to inform citizens of impending hazards such as dam failure, severe weather 
conditions, and severe wind events (particularly tornados). ***Addresses: Dam Failure, Flood,  
Severe Wind, Wildfire *** 
Use newsletters, flyers, utility bill inserts, website notices, radio and television announcements, 
social media and newspaper articles to educate the public about hazards impacting the county and 
how to be prepared in the case of a disaster event. ***Addresses: Dam Failure, Drought, Flood, 
Severe Wind, Wildfire *** 
Provide links on the community’s website to sources of hazard mitigation educational materials 
(e.g. – www.fema.gov) encouraging private citizens to be prepared for hazard emergencies. 
***Addresses: Dam Failure, Drought, Flood, Severe Wind, Wildfire *** 
Review and assess building and residential codes currently in use to determine if newer, more up-
to-date codes are available or required ***Addresses: Dam Failure, Drought, Flood, Severe Wind, 
Wildfire *** 
Promote the use of weather radios, especially in schools, hospitals and other locations where 
people congregate to inform them of the approach of severe weather events.  ***Addresses: 
Extreme Heat, Flood, Severe Wind, Wildfire*** 
Include conservation areas, bioretention and other site appropriate green stormwater 
infrastructure/low impact development in mitigation actions and education. ***Addresses: 
Drought, Extreme Heat, Flooding*** 
DAM FAILURE: 
Analyze and identify dam failure inundation limits to identify evacuation routes. 
Participate/Conduct occasional table top exercises to identify potential mitigation measures for 
increasing response effectiveness, such as evacuation route marking and permanent protection 
measures for intended shelters. 
Conduct annual dam safety inspections and reporting per Arizona Department of Water Resources 
guidelines and required schedule. 
Annually coordinate with federal, state, and local dam owners to get updates on any changes in 
dam safety conditions and emergency action plan information. 
Work with state and federal agencies to provide a disclosure to all potential buyers of real estate 
that are located within dam failure or emergency spillway inundation limits of an upstream dam or 
dams. 
Develop or update the inundation mapping for the emergency action plan for [name dam] in order 
to identify population and critical facilities and infrastructure at risk, and to determine the need for 
potential mitigation. 
DROUGHT: 
Public education of water conservation best practices through newsletter, flyers, social media and 
website notices. 
Develop and/or update an ordinance requiring strategic watering times and volumes during times 
of drought. 
Mandate/Encourage/Incentivize the use of drought resistant landscaping through ordinance 
development and/or enforcement. 
Coordinate with State Drought Task Force to perform drought management at the local/tribal level. 
Develop/Update a local Drought Management Plan to define various levels of conservation 
requirements that are based on drought severity triggers and enforced through utility billing 
structures and ordinance.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 415 
Implement a water harvesting program through the location, design and construction of dual 
functioning stormwater retention facilities with enhanced recharge elements designed into the 
basin. ***Addresses both Drought and Flood*** 
EXTREME HEAT: 
Identify, stock and communicate locations within the community that can serve as cooling stations 
during times of extreme heat. 
Perform a public information campaign at the onset of the extreme heat season to help educate the 
general public on ways to remain safe during periods of extreme heat. 
Partner with NGO’s (e.g. – The Salvation Army, church organizations, homeless shelters, etc.) to 
provide respite care and hydration stations to mitigate loss of life during extreme temperature 
events. 
Investigate and develop an implementation strategy for using “cool roofs” on any new or major 
roof rehabilitation projects of tribal/county/city/town owned buildings to lower the urban heat 
island effects. 
Investigate and develop an implementation strategy for using “cool pavements” on road resurfacing 
projects to lower urban heat island effects 
Conduct feasibility, vulnerability, and prioritization studies to identify at-risk places and 
populations and effective solutions to reduce heat exposure  
Add and maintain trees and other green infrastructure to provide shade and/or cooling  
Develop an urban forestry master plan to as a part of an overall strategy for maintaining heat 
reducing green infrastructure 
Increase the availability of shade structures at outdoor gathering places including transit stops, 
parks and playgrounds, schools, and recreation centers 
Revise municipal building and zoning codes to reduce the use of materials that contribute to the 
urban heat island effect 
Coordinate with other municipalities, county, regional, and state authorities, academic institutions, 
NGOs, and other partners to share information resources, best practices, community needs, and 
technical expertise related to management of heat and heat impacts 
Promote and expand programs that provide energy assistance to low income residents during the 
summer 
Adopt and enforce adjusted activity schedules and protocols for sports, recreation, and other 
outdoor programs when days exceed locally-relevant thresholds for heat-health risks 
Install and maintain new water fountains and water bottle filling stations at public places  
Extend hours for cooling centers and water distribution sites during extreme heat events 
Hire personnel with dedicated responsibilities for management of heat risks, and/or assign specific 
responsibilities to existing personnel 
Conduct cross-department and cross-agency training and coordination meetings for aligning 
programming and resources related to heat 
Generate quantitative and qualitative assessment of community heat risks and impacts through 
surveys, interviews, focus groups, and other social science and public health research methods 
FLOOD: 
Implement a water harvesting program through the location, design and construction of dual 
functioning stormwater retention facilities with enhanced recharge elements designed into the 
basin. ***Addresses both Drought and Flood*** 
Develop a community-wide, stormwater management plan that will analyze and identify problem 
flooding areas and propose long-term mitigation alternatives designed to reduce or eliminate the 
flood problems. 
Review, update and/or augment flood control ordinances to provide a greater level of protection 
than the minimum required by the NFIP.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 416 
Identify and map flood hazards in areas expected to grow or develop in the foreseeable future. 
Develop/augment a county/city/town wide GIS program that is integrated into Public Works, 
Development Services, Police, Fire/Rescue and Emergency Management to help prevent 
development in flood prone regions. 
Install automated flood barriers at low water crossings to discourage motorists from entering 
flooded road crossings. 
Install stream depth indicators at low water crossings to communicate the risk of entering flooded 
roadway crossings and provide a visual warning to motorists of flood conditions at the crossing 
location. 
FISSURE: 
Include addressing fissure risk as a regular part of the land development and public works projects 
review and permitting. 
Provide links to the Arizona Geologic Service website as a part of a public campaign to raise 
awareness to the hazards and locations of fissures. 
Coordinate with state and federal agencies (USGS, AZGS, ADWR, etc.) to study and map fissure 
activity in critical or key areas of the community so that effective mitigation or avoidance 
strategies can be implemented. 
Include geologic hazards  in the next General or Comprehensive Plan update to inform land use 
decision making and zoning efforts.  ***Addresses: Earthquake, Fissure, Landslide/Mudslide, 
Subsidence*** 
Develop/Increase/Enhance groundwater recharge to mitigate expansion of fissures and subsidence 
areas.  ***Addresses: Drought, Fissure, Subsidence*** 
LEVEE FAILURE:   (look for nexus with Dam Failure) 
Perform regular inspection and maintenance of existing levees to mitigate potential failure. 
Perform public outreach to citizens located within levee failure flood risk areas to provide 
awareness of potential increase in flood elevations with a levee failure. 
SEVERE WIND: 
Encourage homeowners to use tie-down straps and/or anchors to secure ancillary buildings and 
metal awnings or porches to mitigate the potential for flying debris during severe wind events.  
Retrofit sub-standard roofs of key critical facilities and infrastructure to meet modern building code 
standards and mitigate damages and impacts of severe wind events. 
Maintain/Install backup generators at key critical facilities such as fire and police stations, water 
pumping stations, sewer lift stations, etc., to provide emergency power for critical operations 
during power failures caused by severe wind events. 
SUBSIDENCE: 
Include addressing subsidence risk as a regular part of the land development and public works 
projects review and permitting. 
Provide links to the Arizona Department of Water Resources website as a part of a public 
campaign to raise awareness to the hazards and locations of active subsidence. 
Establish survey monuments and monitor elevations in critical or key areas of the community to 
measure impacts and trends of subsidence, with the goal of determining long term mitigation 
strategies to reduce the damage and losses that may yet be experienced. 
WILDFIRE: 
Develop and/or enforce a weed abatement ordinance. 
Educate public on proper fuels thinning, setbacks, and water storage for wildfire mitigation using 
Firewise type of programs and guidance documents. 
Conduct Fire safety education programs in local public schools. 
Enact and enforce burn and fireworks bans as needed during extraordinarily dry and extreme 
wildfire conditions / seasons to mitigate possible, unintended wildfire starts.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 417 
Perform, or encourage the performance of, routine roadside vegetation control to mitigate wildfire 
starts within the right-of-way areas along roadways and highways. 
Clear vegetation and wildfire fuels to create a defensible space around critical or key structures 
within the community and along perimeter areas of the wildland urban interface. 
 
Upon completion of the assessment summarized in Section 6.3.1, each 
jurisdiction’s LPT met and developed a new list of A/Ps using the goals and objectives, 
results of the vulnerability analysis and capability assessment, the above list of seed 
ideas, and the planning team’s institutional knowledge of hazard mitigation needs in 
their community.  The A/Ps can be generally classified as either structural or non-
structural.  Structural A/Ps typify a traditional “bricks and mortar” approach where 
physical improvements are provided to affect the mitigation goals.  Examples may 
include channels, culverts, bridges, detention basins, dams, emergency structures, and 
structural augmentations of existing facilities.  Non-structural A/Ps deal more with 
policy, ordinance, regulation and administrative actions or changes, buy-out programs, 
and legislative actions.  For each A/P, the following elements were identified: 
• 
ID No. – a unique alpha-numeric identification number for the A/P. 
• 
Description – a brief description of the A/P including a supporting 
statement that tells the “what” and “why” reason for the A/P. 
• 
Hazard(s) Mitigated – a list of the hazard or hazards mitigated by action. 
• 
Community Assets Mitigated – a brief descriptor to qualify the type of 
assets (existing, new, or both) that the proposed mitigation A/P addresses. 
• 
Estimated Costs – concept level cost estimates that may be a dollar amount 
or estimated staff time. 
Once the full list of A/Ps was completed to the satisfaction of the LPT, the team 
then set to work developing the implementation strategy for those A/Ps. The 
implementation strategy addresses the “priority, how, when, and by whom?” questions 
related to the execution and completion of an identified A/P.  Specific elements 
identified as part of the implementation strategy included: 
• 
Priority Ranking – each A/P was assigned a priority ranking of either 
“High”, “Medium”, or “Low”.  The assignments were subjectively made 
using a simple process that assessed how well the A/P satisfied the 
following considerations: 
o A favorable benefit versus cost evaluation, wherein the perceived direct 
and indirect benefits outweighed the project cost. 
o A direct beneficial impact on the ability to protect life and/or property 
from natural hazards. 
o A mitigation solution with a long-term effectiveness. 
• 
Planning Mechanism(s) for Implementation – where applicable, a list of 
current planning mechanisms or processes under which the A/P will be 
implemented.  Examples could include CIPs, General Plans, Area Drainage 
Master Plans, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 418 
• 
Anticipated Completion Date – a realistic and general timeframe for 
completing the A/P.  Examples may include a specific target date, a 
timeframe contingent upon other processes, or recurring timeframes. 
• 
Primary Agency and Job Title Responsible for Implementation – this 
would be the agency, department, office, or other entity and corresponding 
job title that will have responsibility for the A/P and its implementation. 
• 
Funding Source – the source or sources of anticipated funding for the A/P. 
Tables 6-8-1 through 6-8-28 summarize the updated mitigation A/P and 
implementation strategy for each participating Plan jurisdiction.  Projects listed in 
italics font are recognized as being more response and recovery oriented, but are 
considered to be a significant part of the overall hazard management goals of the 
community. 
 
 
 
 
 
 
 
 
 
 
[This space is intentionally blank]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 419 
Table 6-8-1:  Mitigation actions and projects and implementation strategy for Avondale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Building and 
Zoning Permitting 
Ongoing 
Building Safety, 
Development and 
Eng. services /  
Emergency 
Management 
General Fund 
2 
Conduct and/or participate in occasional 
table top exercises to identify potential 
mitigation measures for increasing response 
effectiveness, such as evacuation route 
marking and permanent protection measures 
for intended shelters. 
Dam 
Inundation 
New 
Staff Time 
Medium 
N/A 
Annually 
Emergency 
Management 
 
General Fund 
3 
Annually coordinate with federal, state and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information. 
Dam 
Inundation 
Both 
Staff Time 
Medium 
N/A 
Annually 
Emergency 
Management/ 
Public Works 
Dept. 
General Fund 
4 
Mandate, encourage and incentivize the use 
of drought resistant landscaping through 
Ordinance development and/or enforcement. 
Drought 
New 
Staff Time 
High 
N/A 
Annually 
Emergency 
Management /   
Water Resources 
City Clerk 
General Fund 
5 
Provide the public with educational 
information that lists water conservation 
best practices through newsletters, flyers, 
and website notices. 
Drought 
Existing 
$3,000 + 
Staff Time 
Medium 
Annual Community 
Outreach 
Publication 
Bi-Annually 
Emergency 
Management / 
Community 
Relations Dept. 
General Fund 
6 
Partner with local NGO's (local shelters, 
church organizations, salvation army, etc.) 
to provide respite care and hydration 
stations to mitigate loss of like during 
extreme temperature events.  
Extreme Heat 
New 
Staff Time 
High 
N/A 
Annually  
Emergency 
Management / Fire 
Department 
General Fund 
7 
Develop a community-wide, storm water 
management plan that will analyze and 
identify problem flooding areas and propose 
long-term mitigation alternatives designed 
to reduce or eliminate the flood problems. 
Utilize city interns to complete routine 
inspections of storm water drains to ensure 
no blockage in the case of a flood. 
Flood 
Both 
$250,000  
High 
N/A 
July 2024 
Public Works 
Dept. / 
Emergency 
Management 
Grants / General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 420 
Table 6-8-1:  Mitigation actions and projects and implementation strategy for Avondale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
8 
Promote the use of weather radios, 
especially in schools, hospitals and other 
locations where people congregate to inform 
them of the approach of severe weather 
events. 
Severe Wind 
New 
Staff Time 
High 
Annual Community 
Outreach 
Publication 
July 2024 
Community 
Relations /  
Emergency 
Management 
General Fund 
9 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting 
processes. 
Subsidence 
New 
Staff Time 
High 
Building and 
Zoning Permitting 
July 2024 
Development and 
Eng. services /  
Emergency 
Management 
General Fund 
10 
Maintain backup generators at key critical 
facilities such as fire and police stations, 
water pumping stations, sewer lift stations, 
etc., to provide emergency power for critical 
operations during power failures caused by 
severe wind events. 
Severe Wind 
New 
Staff Time 
High 
N/A 
Annually 
Facilities 
Emergency 
Management 
General Fund 
11 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the public on ways to remain safe 
during periods of extreme heat. 
 
Extreme Heat 
New 
Staff Time 
Medium 
Annual Community 
Outreach 
Publication 
Annually 
Community 
Relations /  
Emergency 
Management 
General Fund 
12 
Perform public outreach to citizens located 
within levee failure flood risk areas to 
provide awareness of potential increase in 
flood elevations with a levee failure. 
 
Levee Failure 
New 
Staff Time 
Medium 
Annual Community 
Outreach 
Publication 
Annually 
Community 
Relations /  
Emergency 
Management 
General Fund 
13 
Conduct and/or participate in occasional 
table top exercises to identify potential 
mitigation measures for increasing response 
effectiveness, such as evacuation route 
marking and permanent protection measures 
for intended shelters. 
Levee Failure 
New 
Staff Time 
Medium 
N/A 
Annually 
Emergency 
Management 
 
General Fund 
14 
Provide links to the Arizona Department of 
Water Resources website as a part of a 
public campaign to raise awareness to the 
hazards and locations of active subsidence. 
 
Subsidence 
New 
Staff Time 
Medium 
Annual Community 
Outreach 
Publication 
Annually 
Community 
Relations /  
Emergency 
Management 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 421 
Table 6-8-1:  Mitigation actions and projects and implementation strategy for Avondale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
15 
Perform, or encourage the performance of, 
routine roadside vegetation control to 
mitigate wildfire starts within the right-of-
way areas along roadways and highways. 
 
Wildfire  
New 
Staff Time 
Medium 
N/A 
Annually 
Fire Marshall / 
Emergency 
Management 
General Fund 
16 
Clear vegetation and wildfire fuels to create 
a defensible space around critical or key 
structures within the community and along 
perimeter areas of the wildland urban 
interface. 
 
Wildfire 
New 
Staff Time 
Medium 
N/A 
Annually 
Facilities / Fire 
Marshall / 
Emergency 
Management  
General Fund 
 
 
Table 6-8-2:  Mitigation actions and projects and implementation strategy for Buckeye  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
Medium 
NFIP and Floodplain 
Ordinance 
Ongoing 
Emergency 
Management / 
Emergency 
Manager / 
Engineering; City 
Engineer 
General Fund 
2 
Conduct annual life safety inspections 
regarding the management wildland fire 
fuels and wildfire risk along the WUI 
boundary 
Wildfire 
New 
Staff Time 
High 
CWPP 
Ongoing 
Fire; Emergency 
Management / Fire 
Chief; Emergency 
Manager 
General Fund / 
Grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 422 
Table 6-8-2:  Mitigation actions and projects and implementation strategy for Buckeye  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
3 
Enhance communication of City mitigation 
needs at the County and State level by 
establishing liaison positions from city to 
State legislature, State Fusion Centers, 
MCDEM, Water fusion group, MAG and 
other multi-jurisdictional task force work 
groups 
Flood, 
Wildfire, 
Severe Wind 
New 
Staff Time 
High 
EOP 
Ongoing 
Fire; Emergency 
Management, 
Mayor’s Office / 
Fire Chief; 
Emergency 
Manager, Mayor 
General Fund / 
Grants 
4 
Continue to support the Hazard Mitigation 
Plan by making sure the City is represented 
on related committees. 
All Hazards 
Both 
Staff Time 
Medium 
City Engineering 
Sub-committee 
Ongoing 
Emergency 
Management / 
Emergency 
Manager 
General Fund 
5 
Provide/improve water drainage systems 
Flood 
Both 
Staff Time 
Medium 
Current and updated 
City of Buckeye 
Engineering Design 
Standards 
Ongoing 
Engineering, City 
Engineer/Public 
Works; Public 
Works Director 
General Fund / 
Grants 
6 
Enforce Fire codes, require compliance 
Wildfire 
Both 
Staff Time 
High 
CWPP 
Ongoing 
Fire Code 
Enforcement / 
Code Enforcement 
Officer 
General Fund 
7 
Participate with Maricopa County and other 
jurisdictions in the update of the Community 
Wildfire Protection Plan (CWPP) 
Wildfire 
Both 
Staff Time 
High 
CWPP 
Ongoing 
Fire; Emergency 
Management / Fire 
Chief; Emergency 
Manager 
General Fund 
8 
Continue to perform public education of 
water conservation best practices and 
thunderstorm wind safety through the City’s 
social media and website resources. 
Drought, 
Severe Wind 
Both 
Staff Time 
High 
 
Ongoing 
Fire; Emergency 
Management / Fire 
Chief; Emergency 
Manager; Public 
Works Dept; PW 
Director / 
Development 
Services Dept; DS 
Director 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 423 
Table 6-8-2:  Mitigation actions and projects and implementation strategy for Buckeye  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Review and assess building and plumbing 
codes currently in use to determine if newer, 
more up-to-date codes are available for 
elevating standards for low water use 
fixtures and appliances, and wind loading 
requirements for roofs and awnings 
Drought, 
Severe Wind 
Both 
Staff Time 
High 
Building Codes 
Ongoing 
Public Works 
Dept; PW Director 
/ Development 
Services Dept; DS 
Director 
General Fund 
10 
Annually coordinate with federal, state, and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information. 
Dam Failure 
Both 
Staff Time 
Medium 
Maricopa County 
Flood Control 
District annual 
assessment 
Annually 
Fire; Emergency 
Management / 
Public Works 
Dept; PW Director 
General Fund 
11 
Work with state and federal agencies to 
provide a disclosure to all potential buyers 
of real estate that are located within dam 
failure or emergency spillway inundation 
limits of an upstream dam or dams. 
Dam Failure 
Both 
Staff Time 
Medium 
Ensure data is in 
public report, 
including FEMA 
flood zone 
determination 
Annually 
Fire; Emergency 
Management / 
Public Works 
Dept; PW Director 
/ Development 
Services Dept; DS 
Director 
General Fund 
12 
Continue to identify, stock and communicate 
locations within the community that can 
serve as cooling stations during times of 
extreme heat. 
Extreme Heat 
Both 
Staff Time 
Medium 
In cooperation with 
county CERT 
Seasonal and 
Annually 
Fire; Emergency 
Management / City 
PIO 
CERT Funds 
13 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
Both 
Staff Time 
Medium 
Via social media 
posts 
Seasonal and 
Annually 
City PIO 
General Funds 
14 
Continue to provide links to the Arizona 
Department of Water Resources website as a 
part of a public campaign to raise awareness 
to the hazards and locations of active 
subsidence. 
Subsidence 
Both 
Staff Time 
Low 
Work with PIO to 
link City Website to 
ADWR webpage 
Ongoing 
Public Works 
Dept; PW 
Directors / City 
PIO 
General Funds 
15 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting. 
Subsidence 
New 
Staff Time 
Low 
Development 
Review Process 
Ongoing 
Development 
Services; DS 
Director / 
Engineering; City 
Engineer 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 424 
 
Table 6-8-3:  Mitigation actions and projects and implementation strategy for Carefree  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
High 
Staff training, 
Floodplain 
regulations 
Annual-
Ongoing 
FCDMC / 
Floodplain Mgmt 
and Services 
Division / 
Floodplain 
Administrator / 
Building Official 
General Fund 
2 
Continue development of water storage, 
treatment and delivery systems to provide 
adequate water during times of drought 
Drought 
Both 
Specific 
project 
dependent 
High 
Carefree Water 
Company and 
Governing Board 
Annual – 
Ongoing 
Manager of 
Carefree Water 
Company 
Water 
Company 
budget and 
available grants 
3 
Maintain backup generators located at 
critical facilities (ex. Fire station, well sites, 
etc.) to provide emergency power for critical 
operations during power failures caused by 
severe wind events. 
Severe Wind 
Existing 
$5,000.00 
High 
Public Works 
Annual - 
Ongoing 
Public Works 
General Fund 
4 
Clear vegetation and wildfire fuels to create 
a defensible space around critical or key 
structures within the Town of Carefree. 
Wildfire 
Both 
Staff time 
High 
Building and site 
surveys, Staff 
conferences 
Annual – 
Ongoing 
Public Works / 
Fire Chief 
General Fund 
5 
Hold an annual citizens wildfire mitigation 
conference in the springtime each year. 
Wildfire 
Both 
Staff time 
High 
CWPP 
Annual – 
ongoing 
Town Fire Chief 
General fund 
6 
Encourage bridge or culvert construction 
where roads are in locations susceptible to 
flooding. 
Flood 
Both 
Staff time 
and studies 
unless 
actual 
project 
developed 
and then 
costs are to 
be 
determined 
per project 
Medium 
Staff conferences. 
Study drainage 
issues. Make 
recommendation for 
projects. Implement 
projects as funded. 
Annual – 
Ongoing 
Town Engineer 
General Fund, 
Permit Fess, 
Grants if 
available.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 425 
Table 6-8-3:  Mitigation actions and projects and implementation strategy for Carefree  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Site and install additional signage for wash 
crossings as well as sand bags to warn and 
discourage vehicular movements through 
these areas during flooding events 
Flood 
Both 
$20,000.00 
Medium 
Public Works 
Less than 
five years 
with funding 
Public Works 
General Fund 
8 
Perform regular brush cutting and median 
maintenance with town right-of-way to 
mitigate fuel sources for wildfire. 
Wildfire 
Both 
$10,000.00 
Medium 
Public Works 
Annual – 
Ongoing 
Public Works 
General Fund  
9 
Require all new construction to follow 
recognized and adopted building codes to 
mitigate damages and impacts of severe 
wind events. 
Severe Wind 
New 
Staff time 
Medium 
Staff conferences 
Annual - 
Ongoing 
Town Engineer / 
Building Official 
General Fund 
10 
Create a public education program 
describing water conservation best practices 
to be delivered to residents in their monthly 
water bill. In addition, provide water 
conservation related material through the 
town’s COINS system. 
Drought 
Existing 
Staff time 
Medium 
Staff conferences 
Annual – 
Ongoing 
Manager of 
Carefree Water 
Company / Staff 
General Fund 
11 
Identify, stock and communicate locations 
within the Town of Carefree that can serve 
as cooling stations during times of extreme 
heat. 
Extreme Heat 
Both 
Staff time / 
$500.00 
Medium 
Staff conferences 
Annual 
during 
extreme heat 
season 
Fire Chief, Town 
staff 
General Fund 
12 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
Both 
Staff time 
Medium 
Staff conferences 
Annual 
Town staff 
General Fund 
13 
Review and update the town’s Drainage 
Master Plan on an on-going basis to identify 
potential drainage and flooding hazards. 
Flood 
Both 
Staff time  
Medium 
Staff conferences. 
Make 
recommendations 
for potential projects 
and implement those 
projects as funding 
becomes available. 
Annual – 
ongoing 
Town engineer / 
Building official 
General fund, 
Permit fees, 
Grants 
14 
Continue to review and update the town’s 
Mass Evacuation plan for the Town of 
Carefree. 
All hazards 
Both 
Staff time 
Medium 
Staff / Agency 
conferences 
Annual – 
ongoing 
Carefree 
Emergency 
Manager / 
American Red 
Cross / Town Fire 
Chief 
General fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 426 
 
 
Table 6-8-4:  Mitigation actions and projects and implementation strategy for Cave Creek  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Staff Continuing 
Education 
Ongoing 
Town Engineer 
General Fund 
2 
Ensure building codes for construction are 
enforced to prevent roof damage from high 
winds. 
Severe Wind 
Both 
Staff Time 
High 
Staff review and 
field inspections. 
Ongoing 
Chief Building 
Official 
General Fund 
3 
Town Fire Marshal shall perform routine 
commercial structures inspections to 
identify and communicate code violations. 
Routinely inspect commercial structures. 
Flood, Severe 
Wind, Wildfire 
 Both 
Staff Time 
High 
Fire Safety 
Inspections. 
Ongoing 
Chief Building 
Official. Fire 
Marshal 
General Fund 
4 
Public Information Campaign to get more 
residents to subscribe to the CodeRed 
Extreme Weather Alert System. 
Flood, Severe 
Wind, Extreme 
Heat 
Both 
Staff time 
High 
Notices on Town’s 
Website. Pamphlets 
at town hall. 
Reminders at 
council meetings 
and in utility bills. 
Ongoing 
Town Marshal 
General Fund 
 
5 
Continuous Public Information Campaign to 
advise residents and visitors alike of risks 
from Wildfire. 
Wildfire 
Both 
$12,000 
High 
Fixed Signage 
advising of risks on 
main roadways in 
town. Handouts 
available at public 
facilities, 
identifying risks 
and ways to avoid 
Wildfires. Bulk 
clean up to help 
residents remove 
fuel loads from 
around residences. 
Ongoing 
Town Marshal / 
Building Safety 
General Fund 
6 
Continue to perform public education of 
water conservation best practices through 
newsletter, flyers, social media and website 
notices. 
Drought 
Both 
Staff Time 
High 
Drought 
Management 
Program 
Ongoing – 
annual 
Utilities 
Department 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 427 
Table 6-8-4:  Mitigation actions and projects and implementation strategy for Cave Creek  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Research the feasibility to either start a 
Town of Cave Creek Fire Department or 
form a Fire District and have a Fire 
Department provide Emergency services 
(Fire / EMS) with the geographical 
boundaries of the incorporated Town of 
Cave Creek. The forming of a Town of Cave 
Creek Fire entity verses the current 
subscription-based services, would increase 
Fire Safety and Wild Fire fighting 
capabilities drastically. 
Wildfire 
Both 
$2 Million 
High 
 
2023 
Cave Creek Fire 
Chief 
General Fund 
8 
Perform a Public Information Campaign to 
help educate the general public on ways to 
remain safe during periods of extreme heat. 
 Extreme Heat 
 Both 
Staff Time 
Medium 
Post Notices on 
Town Website. 
Ongoing 
Town Marshal 
General Fund 
9 
Review the existing Cave Creek general 
plan and zoning ordinance to determine how 
these documents help limit development in 
hazard areas.  Modify with additional 
guidelines, regulations, and land use 
techniques as necessary within the limits of 
state statutes, while also respecting private 
property rights. 
 Flooding 
 Both 
Staff Time 
Medium 
Staff review. 
Ongoing 
Planning and 
Zoning  
General Fund 
10 
Review and update the local Drought 
Management Plan to ensure it is current with 
the Town’s drought management goals and 
current water conservation needs. 
Drought 
Both 
Staff Time 
Medium 
Drought 
Management 
Program 
Completed 
Engineering 
Department / 
Town Engineer 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 428 
Table 6-8-5:  Mitigation actions and projects and implementation strategy for Chandler  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
High 
 
Staff Training/ 
Floodplain 
Regulations 
Annual-
Ongoing 
Development 
Services / City 
Engineer 
 
General Fund 
2 
Maintain the currency of the safety element 
of the Chandler General Plan. 
Drought, 
Extreme Heat, 
Flood, 
Severe Wind 
Both 
Staff time 
plus 
consultant 
cost for 
update of 
GP 
High 
Review and Update 
General Plan 
Annual-
Ongoing 
Planning 
Manager 
General Fund 
3 
Continue to ensure through proper planning, 
zoning and building codes that all safety 
measures are in place for new building 
construction and placement. The city will 
coordinate with the county flood control 
district. 
Flood, 
Severe Wind 
New 
Staff time 
High 
Continue to update 
codes to newest 
versions and add 
amendments were 
appropriate 
Annual-
Ongoing 
Development 
Services / 
Building Official 
General Fund 
4 
Continue to maintain a diverse water 
portfolio which includes surface water from 
Salt, Verde and Colorado River watersheds 
and groundwater. Minimize any reductions 
to existing supplies by protecting and 
securing existing water rights, and meeting 
environmental requirements of water 
supplies. Maximize the use of existing assets 
to ensure adequate water supply is available 
from over 30 groundwater wells, two 
surface water treatment plants, use of 
recharged water, and encourage the use of 
reclaimed water for appropriate purposes. 
Continue to implement the city’s Drought 
Plan. 
 Drought 
 Both 
Staff time 
High 
Continue to maintain 
a diverse city water 
portfolio by 
reviewing and 
updating current and 
future needs on a 
regular basis 
Annual-
Ongoing 
 Public Works 
and Utilities 
Director 
Enterprise Fund 
5 
Each city department will be encouraged to 
rank the vulnerability of existing assets, with 
assistance from the Emergency Management 
Workgroup, and implement protection plans 
as needed, with the highest vulnerability 
being implemented first. 
Drought, 
Extreme Heat, 
Flood, 
Severe Wind 
 Both 
Staff time 
Medium 
Emergency 
Management Group 
Meetings 
Annual-
Ongoing 
Fire Department 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 429 
Table 6-8-5:  Mitigation actions and projects and implementation strategy for Chandler  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
6 
Continue to ensure that the City of Chandler 
Drought Management Plan is updated to 
meet the needs of the city to mitigate 
drought severity.  
Drought  
 Both 
Staff time 
Medium 
Continue to review 
and update the plan 
as appropriate 
Ongoing 
 Public Works 
and Utilities 
Director 
Enterprise Fund 
7 
Annually coordinate with federal, state, and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information. 
Dam Failure 
 Both 
Staff time 
Medium 
Attend informational 
meetings 
Annual 
Fire Department 
General Fund 
8 
Provide links to the Arizona Department of 
Water Resources website as a part of a 
public campaign to raise awareness to the 
hazards and locations of active subsidence. 
Subsidence 
 Both 
Staff time 
Medium 
Maintain current 
webpage links 
Ongoing 
Communications 
and Public 
Affairs 
Department 
General Fund 
9 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting. 
Subsidence 
 Both 
Staff time 
Medium 
Maintain a robust 
zoning and planning 
evaluation process 
Ongoing 
Development 
Services 
Department 
General Fund 
 
Table 6-8-6:  Mitigation actions and projects and implementation strategy for El Mirage   
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
Flood 
Both 
Staff Time 
High 
Permit Review 
Ongoing 
City of EL Mirage 
FBLS, Building 
Official 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 430 
Table 6-8-6:  Mitigation actions and projects and implementation strategy for El Mirage   
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
2 
Review zoning ordinances prohibiting new 
development in 100-year floodplain on an 
annual basis. 
Flood 
Both 
Staff Time 
High 
None 
Ongoing 
Planning & 
Zoning / Director 
General Fund 
3 
Take active role in multi-agency plan and 
actions for flood mitigation (pro-active). 
Flood 
Both 
Staff Time 
High 
MCMJHMP 
Ongoing 
Engineering/Fire/
Public Works / 
Depth heads 
General Fund 
4 
Develop plan to design and install man-made 
flood protection devices where needed. 
 Flood 
Both 
Staff 
Time/UNK 
High 
None 
Ongoing 
City of El Mirage 
City 
Engineering/Fire/
Public Works / 
Dept heads 
General 
Fund/UNK 
5 
Educate the public on actions and resources 
to protect residents that do not have adequate 
ways to cool their homes in the event of an 
Extreme Heat Event through website notices 
and other social media alerts 
Extreme Heat 
Existing 
Staff Time 
High 
Anticipate the event 
and advise 
community through 
social media and 
other, means 
Seasonally and 
as needed. 
City of El 
Mirage/Fire/PD 
General Fund 
6 
Review annually and update as needed, 
existing building codes to manage new and 
existing construction practices and provide 
mitigation for Drought, Flood, and Severe 
Wind. 
Drought, 
Flood, 
Severe Wind 
New 
Staff Time 
High 
Permitting and Plan 
Review 
Annually 
FBLS / City 
Building Official 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 431 
Table 6-8-6:  Mitigation actions and projects and implementation strategy for El Mirage   
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Maintain collaboration efforts and 
interconnected water system with other water 
purveyors to ensure the community water 
supply in the event of a drought. 
Drought 
Both 
Staff Time 
High 
The City of El Mirage 
has interconnects 
with the City of 
Surprise as well as 
working with EPCOR 
to add an additional 
one.   
Ongoing 
Public Works / 
Director 
General fund 
8 
Participate in multi-agency coordination 
efforts to ensure cooperative plans. 
Multi-Hazard 
Both 
Staff Time 
Medium 
Through continuing 
auto and mutual aids 
agreements. 
Ongoing 
Fire Department / 
Fire Chief / 
Emergency 
Manager 
General fund 
9 
Train First Responders and other select city 
staff in hazard materials mitigation. 
HAZMAT 
 Existing 
Staff Time 
plus 
Training 
Cost 
Medium 
NIMS certification 
Ongoing 
Human 
Resources/depart
ment heads 
General fund 
10 
Recharge groundwater with CAP water to 
ensure the community water supply in the 
event of a drought. 
Drought 
Both 
$100,000 
Medium 
City of El Mirage has 
a CAP subcontract 
and recharges CAP 
water. 
On-going 
Public Works / 
Director 
General fund 
11 
Continue to implement a conservation 
education program to ensure the community 
water supply in the event of a drought. 
Drought 
Both 
Staff Time 
Medium 
Automated Water 
Meter Program 
Ongoing 
Public Works / 
Director 
General fund, 
utility payments 
12 
Provide cool potable water to citizens during 
extreme heat waves.  Dissemination of public 
information regarding hydration station and 
resource locations will be provided via 
website notices and social media 
Extreme heat 
Existing 
$2,000 
Medium 
None 
Seasonally and 
as needed. 
City of El Mirage 
Fire / Fire Chief 
Fire Dept 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 432 
Table 6-8-6:  Mitigation actions and projects and implementation strategy for El Mirage   
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
13 
Coordinate mitigation efforts with other local 
agencies that include but are not limited to:  
Luke AFB, Dysart School District, FCDMC 
and others, to I.D. problem areas and plans 
for mitigation 
Multi hazard 
Both 
Staff Time 
Low 
None 
Ongoing 
Fire Department / 
Emergency 
Manager 
General fund 
14 
Educate the public on suspected and 
imminent wind shear dangers from 
microburst and other natural wind threats 
through website notices and social media 
alerts.  
Severe Wind 
Both 
Staff Time 
Low 
None 
Annually 
During 
Monsoon 
Season 
Homeland 
Security / Safety 
and Emergency 
Management 
Officer 
General Fund 
15 
Provide citizens with warnings and escape 
routes from severe flooding or expected 
flooding. 
Dam Failure 
Existing 
Staff time 
Low 
McMicken Dam 
EAP, 
 
Waddell Dam EAP  
When 
necessary  
City of El Mirage 
Fire/ PD and 
Public Works. 
General fund 
16 
Participate/Conduct occasional tabletop 
exercises to identify potential mitigation 
measures for increasing response 
effectiveness, such as evacuation route 
marking, and permanent protection measures 
for intended shelters. 
Dam Failure 
Both 
Staff time 
Low 
McMicken Dam 
EAP, 
 
Waddell Dam EAP  
At least once 
over the next 
five years 
City of El Mirage 
Fire/ PD and 
Public Works / 
Dept heads 
General Fund 
17 
Provide links to the Arizona Department of 
Water Resources subsidence website and the 
Arizona Geologic Survey website as a part of 
a public campaign to raise awareness to the 
hazards and locations of active fissure and 
subsidence locations within the city. 
Fissure, 
Subsidence 
Both 
Staff Time 
Low 
None 
FY2021 
City of El Mirage 
/ City Engineer 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 433 
Table 6-8-6:  Mitigation actions and projects and implementation strategy for El Mirage   
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
18 
Annually coordinate with Federal, State and 
local dam owners to update any changes in 
dam safety conditions on emergency action 
plan information.  
Dam Failure 
Both 
Staff Time 
Low 
McMicken Dam 
EAP, Waddell Dam 
EAP 
On-going  
City of El Mirage 
Fire / Fire Chief 
and Public Works 
/ Director 
General Fund 
19 
Work with state and Federal agencies to 
provide disclosure information to all 
potential buyers of real estate that are located 
within the dam failure or emergency 
spillway inundation limits of an upstream 
dam or dams 
Dam Failure 
Both 
Staff Time 
Low 
City of El Mirage and 
community 
development 
On-Going 
City of El Mirage 
Fire / Fire Chief  / 
City Engineer and 
Community 
Development / 
Director 
General Fund 
20 
land development and public works projects 
will be reviewed for subsidence risk as a 
regular part of the review and permitting 
process. 
Subsidence 
Both 
Staff Time 
Low 
El Mirage 
Community 
Development  
On-Going 
Public Works, 
City Engineer 
General Fund 
 
Table 6-8-7:  Mitigation actions and projects and implementation strategy for Fort McDowell Yavapai Nation  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Prohibit building in floodplain and river 
area to maintain channel and protect 
riparian area. 
Flood 
Both 
Staff time 
for plan 
review- 
$15,000 
annually 
High 
Staff training and 
cooperation with 
Army Corp of 
Engineers and 
County Flood 
Control District. 
Annual/ 
Recurring 
Community and 
Economic 
Development 
Division/Planning 
Manager 
Tribal 
General 
Revenue 
Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 434 
Table 6-8-7:  Mitigation actions and projects and implementation strategy for Fort McDowell Yavapai Nation  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
2 
Conduct fuels reduction and establish fuel 
breaks in dense vegetation areas. 
Wildfire 
Both 
Staff costs - 
$,5000,  
High 
Cooperative efforts 
between BIA Fire 
Management 
Officer, Fire 
Department, 
Emergency 
Manager, Public 
Works Director 
Annual/ 
Recurring 
Fire Department/ 
Emergency 
Manager 
Tribal 
General 
Revenue 
Funds, 
PDMG and 
AFG grants 
3 
Pro-actively pursue pre-disaster and hazard 
mitigation grants to supplement tribal 
expenses associated with mitigation 
activities. 
All Hazards 
Both  
Determined 
by required 
matching 
funds. 
$10,000 
annually 
Medium 
Contract and Grants 
Administrator 
oversight. 
Annual/ 
Recurring 
All Department 
Directors 
Matching 
funds from 
Tribal 
General 
Revenue 
Funds 
4 
Publish suggested mitigation actions 
through print media and community website 
to reduce potential for wildfire and heat 
related medical emergencies. 
Drought, 
Extreme Heat, 
Wildfire 
Both  
Staff time, 
$2,500 
annually 
Medium 
Timely information 
distribution through 
social media, 
newsletter, website 
Annual/ 
Recurring 
Fire 
Department/Emerg
ency Manager 
Tribal 
General 
Revenue 
Funds 
5 
Limit development along river to protect 
wetlands, threatened species habitat and 
protect businesses from flooding. 
Flood 
Both 
Staff time 
for plan 
review and 
Enterprise 
equipment 
and labor, 
$50,000 
annually  
Medium 
Cooperative effort 
with Tribal 
Environmental            
Department, 
Enterprise 
employees, and 
others. 
Annual/  
Recurring  
Environmental 
Department/ 
Environmental 
Manager 
Tribal 
General 
Revenue 
Funds 
6 
Create and map access to high-risk wildfire 
areas. Provide weed abatement services in 
high risk areas to reduce risk of wildland 
fire. 
Wildfire 
Existing  
Staff time 
and 
$30,000 
annually 
Medium 
Cooperative effort 
by MCDOT, Tribal 
Public Works 
Department, Fire 
Department and 
BIA FMO 
Annual/ 
Recurring 
MCDOT and 
FMYN Public 
Works 
Department/ 
Public Works 
Manager, Fire 
Chief, BIA Fire 
Management 
Officer (FMO) 
MCDOT and 
Tribal 
General 
Revenue 
Funds, 
PDMG and 
AFG grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 435 
Table 6-8-7:  Mitigation actions and projects and implementation strategy for Fort McDowell Yavapai Nation  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Review existing building codes, modify or 
adopt codes to prevent development in 
hazard areas. 
Drought,  
Flood,  
Severe Wind, 
Wildfire 
New 
Staff time, 
$5,000 
annually 
 
Medium 
Collaborative effort 
with Community 
Economic 
Development 
Division, Fire 
Department, Legal 
Office 
Annual/ 
Recurring 
Community and 
Economic 
Development 
Division/Planning 
Project Manager / 
Fire Chief 
 
Tribal 
General 
Revenue 
Funds 
8 
Identify and mitigate hazards associated 
with new and existing developments 
through plan reviews to ensure plan/code 
compliance, including incorporation of 
drought tolerant or xeriscape landscapes on 
new developments. 
Drought,  
Flood,  
Severe Wind, 
Wildfire 
Both 
Staff time, 
$5,000 
Medium 
Cooperative efforts 
with Fire 
Department, , IT 
Department, 
Emergency 
Manager, MAG 
PSAP group 
Annual/ 
Recurring 
Community and 
Economic 
Development 
Division/License 
and Property Use 
Manager / Fire 
Chief 
 
Tribal 
General 
Revenue 
Funds 
9 
Ensure building codes addressing wind 
loading are enforced to prevent damage 
from high winds.  
Severe Wind 
Both  
Staff costs - 
$3,500 
Medium 
Collaborative effort 
with Community 
Economic 
Development 
Division, Fire 
Department, Legal 
Office 
Annual/ 
Recurring 
Community and 
Economic 
Development 
Division/Chief 
Building Inspector 
 
Tribal 
General 
Revenue 
Funds 
10 
Develop a drought emergency plan with 
criteria and triggers for drought-related 
actions. 
Drought 
Both 
Staff time, 
$15,000 
Medium 
Cooperative efforts 
with Public Works, 
Water System 
Manager, 
Emergency 
Manager, Planning 
Projects Manager 
October 2021 
Community 
Economic 
Development 
Division/ 
Emergency 
Manager 
Tribal 
General 
Revenue 
Funds 
11 
Analyze and map extensions of the dam 
failure inundation limits for Town of 
Fountain Hills owned dams, through 
FMYN lands to their confluence with the 
Verde River.  
Dam Failure 
Both 
$10,000 
Medium 
Coordination with 
Town of Fountain 
Hills and FCDMC 
FY2021 
Fire Department/ 
Emergency 
Manager 
Tribal 
General 
Revenue 
Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 436 
Table 6-8-7:  Mitigation actions and projects and implementation strategy for Fort McDowell Yavapai Nation  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
12 
Annually coordinate with Federal, State, 
and local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information 
Dam Failure 
Both 
Staff time 
Low 
Coordination with 
Salt River Project 
and USBR 
Annual 
Fire Department/ 
Emergency 
Manager 
Tribal 
General 
Revenue 
Funds 
13 
Coordinate training, planning, and 
communications to provide the community 
with information to combat the effects of 
infestations and diseases. 
Disease, 
Infestation, 
Pandemic. 
Both 
Staff time 
for Medical 
Clinic 
personnel 
Low 
Public Health 
surveillance and 
timely information 
distribution through 
newsletter, social 
media, and website. 
Annual/  
Recurring 
Medical Director, 
Clinic staff 
Tribal 
General 
Revenue 
Funds, IHS 
funds 
 
 
Table 6-8-8:  Mitigation actions and projects and implementation strategy for Fountain Hills 
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Maintain washes in Town by removing 
excessive brush and trim trees to reduce the 
threat of wildfire and flooding due to 
blockages 
Flood, 
Wildfire 
Both 
$150K/yr 
High 
Ongoing  
Annually 
Environmental 
Supervisor 
General Fund 
2 
Channel and Storm Drain Development 
 Flood 
 Both 
$1.5M 
High 
Ongoing 
Ongoing 
Town Engineer 
CIP 
3 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
Both 
Staff Time 
High 
Ongoing 
Ongoing 
Fire Department 
General Fund 
4 
Continuing use of recycled water for turf 
irrigation in Town parks and golf courses 
Drought 
Both 
$100K/yr 
High 
Ongoing 
Ongoing 
Parks 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 437 
Table 6-8-8:  Mitigation actions and projects and implementation strategy for Fountain Hills 
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
5 
Provide free wildland fire risk inspections to 
Town residents to identify areas on 
properties that need to have brush thinned or 
removed.  
Wildfire 
Both 
Staff Time 
High 
Ongoing 
Ongoing 
Fire Marshal 
General Fund 
6 
Analyze and identify dam failure inundation 
limits to identify/modify evacuation routes. 
Dam Failure 
Ex 
Staff Time 
Medium 
Ongoing 
Ongoing 
Town Engineer 
General Fund 
7 
Conduct bi-annual dam safety inspections 
and reporting per Arizona Department of 
Water Resources guidelines and required 
schedule. 
Dam Failure 
Both 
Staff Time 
Medium 
Bi-annual 
Ongoing 
Town Engineer 
General Fund 
8 
Enforce Building Codes to prevent roof 
damage from high winds. 
Severe Winds 
Both 
Staff Time 
Medium 
Ongoing 
Ongoing 
Building Official 
General Fund 
9 
Review General Plan and Ordinances for 
mitigating hazards and opportunities to 
incorporate Plan risk assessment and 
mitigation strategy. 
Flood, Severe 
Wind, Drought, 
Extreme Heat 
 Both 
Staff Time 
Medium 
Ongoing 
Ongoing 
Development 
Director 
General Fund 
10 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
Medium 
Ongoing 
Annually 
Town Engineer 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 438 
Table 6-8-9:  Mitigation actions and projects and implementation strategy for Gila Bend 
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Town Code 
ongoing 
 Town 
Planner/Engineer 
Town Funds 
2 
Pursue a mutual aid compact with county 
and state agencies to assist the town with 
hazard mitigation. 
Flood, 
Severe Winds, 
Wildfire 
Both 
Staff Time 
High 
Town, State, 
County, FEMA 
Ongoing 
Town Manager, 
Finance Director, 
Public Works 
Director 
Town, State, 
County 
3 
Develop a public awareness campaign to 
educate town residents about natural hazards 
impacting the community. 
Flood, 
Severe Winds, 
Wildfire 
Both 
Staff Time  
High 
Town/Maricopa 
County Flood 
Control 
Ongoing 
Town, Maricopa 
County Flood 
Control 
Town, FEMA, 
County 
4 
Develop and construct measures to mitigate 
flooding along Sand Tank and Scott Avenue 
Washes. 
Flood 
Both 
$12 million 
Low 
FEMA, Army 
Corps of Engineers, 
Maricopa County 
Flood Control, 
Town 
2027 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town, USDA, 
WIFA 
5 
Develop a plan to implement aquifer 
recharge per the recommendations of the 
recently completed aquifer study performed 
by The Global Institute of Sustainability 
(GIOS) at Arizona State University (ASU).  
Drought 
Both 
$90,000 
Medium 
The Global Institute 
of Sustainability 
(GIOS) at Arizona 
State University 
(ASU) 
2026 
Town Manager 
FEMA, County, 
State, Town, 
USDA, WIFA 
6 
Restrict water usage for irrigation during 
times of drought. 
Drought 
Both 
N/A 
High 
Town Code 
Ongoing 
Town Manager, 
Public Works 
Director 
Town Funds 
7 
Establish and staff a “cooling” station at the 
local community center 
Extreme Heat 
Both 
N/A 
High 
Social Services 
Ongoing 
Social Services 
Director, Town 
Manager 
Town Funds 
8 
Maintain and provide access to the public 
swimming pool during times of extreme 
heat to provide a means for cooling off. 
Extreme Heat 
Both 
Staff Time 
High 
Town Parks and 
Recreation 
Ongoing 
Town Manager, 
Parks & 
Recreation 
Director 
Town Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 439 
Table 6-8-9:  Mitigation actions and projects and implementation strategy for Gila Bend 
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Design and evaluate the concept of 
constructing a flood control reservoir, or 
series of reservoirs to intercept and store 
storm runoff.  The concept would provide 
both flood control benefits but also could be 
a source for groundwater recharge. 
Drought, 
Flood 
Both 
$2 million 
Low 
FEMA, Army 
Corps of Engineers, 
Maricopa County 
Flood Control, 
Town, USDA, 
WIFA 
2027 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town, USDA, 
WIFA 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town, USDA, 
WIFA 
10 
Perform investigational analyses to 
determine if removal of a substandard levee 
will provide more benefit through restoring 
local flood control currently blocked by 
levee and remove the threat of a levee 
failure. 
Levee Failure 
Both 
$700,000 
Medium 
FEMA, Army 
Corps of Engineers, 
Maricopa County 
Flood Control, 
Town 
2027 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town 
FEMA, Army 
Corps of 
Engineers, 
Maricopa County 
Flood Control, 
Town 
11 
Work with FCDMC and town forces (Fire, 
EMS, Streets, Parks, and Sheriff) to identify 
and plan for evacuation routes should the 
local levee fail 
Levee Failure 
Both 
N/A 
Medium 
Town and County 
2022 
Town / Town 
Engineer 
Town Funds 
12 
The Town will include potential subsidence 
in freeboard calculations for buildings in 
flood prone areas that are known to be 
active subsidence areas as well 
Flood, 
Subsidence 
New 
Staff Time 
Medium 
N/A 
As-Needed 
Town / Town 
Engineer 
Town Funds 
13 
The Town will use permeable driveways 
and paved pedestrian surfaces to reduce 
runoff and promote groundwater recharge to 
mitigate the effects of groundwater 
withdrawal on subsidence in the area. 
Flood, 
Subsidence 
New 
$50,000 
Low 
N/A 
As-Identified 
Town / Town 
Engineer 
Town Funds 
14 
Encourage the use of green infrastructure 
and low impact development measures to 
decrease paved surfaces that store and 
release heat 
Drought, 
Extreme Heat 
New 
Staff Time 
Low 
 
As Needed 
Town / Town 
Engineer 
Town Funds 
15 
Perform public information campaign using 
social media and webpages during the hot 
summer months to educate citizens on the 
potential health hazards associated with 
extreme heat events, 
Extreme Heat 
Both 
Staff Time 
Low 
 
Seasonally 
Social Services 
Director, Town 
Manager 
Town Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 440 
 
 
Table 6-8-10:  Mitigation actions and projects and implementation strategy for Gilbert  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations to reduce risks. 
Flood 
Both 
Staff time 
High 
Staff Training 
Floodplain 
Regulations 
Annual-
Ongoing 
Floodplain 
Administrator/ 
Plans Review 
and Inspection 
Manager 
General Fund 
Permit Fees 
2 
Proactive adoption of applicable master 
plans, land uses and developmental 
agreements to reduce risks. 
Flood 
New 
Staff Time 
High 
Coordination with 
County Flood 
Control & Chapter 
34 of Town Code  
Ongoing 
Engineering// 
Planning Service  
Manager  
General Fund 
3 
Implement the appropriate stage of the 
Water Supply Reduction Management Plan 
as adopted (May 2003) to reduce water use. 
 Extreme 
Heat/Drought 
 Both 
 Staff Time 
 High 
Coordination with 
Salt River Project, 
the Arizona Project, 
& AZ Department of 
Water Resources. 
 Ongoing 
Water Resource 
Manager & Town 
Manager 
General Fund 
4 
Gilbert will continue to participate in the 
Community Rating System (CRS) program 
and get credit for the various activities that 
assist property owners in receiving reduced 
insurance premiums.  
 Flood 
 Both 
 Staff Time 
 High 
Coordination with 
Flood Control 
District of Maricopa 
County  
 Ongoing 
Floodplain 
Administrator  
 General Fund 
5 
Work closely with FCDMC – Dam Safety to 
stay abreast of current mitigation efforts and 
timelines at Powerline FRS including the 
proposed Powerline Channel. 
 Flood/Fissure 
 Both 
 Staff Time 
 High 
Coordination with 
Flood Control 
District -Dam Safety 
 Ongoing 
Floodplain 
Administrator/ 
Emergency 
Management 
Coordinator 
 General Fund 
6 
Provide pertinent weather and hazard 
mitigation information to the public to raise 
awareness of local hazards by providing 
local weather service and Maricopa County 
Hazard Mitigation links from Town of 
Gilbert Home page.  
Extreme 
Heat/Flood/ 
Severe Wind 
Both 
Staff Time 
Medium 
Work with 
webmaster identify 
links 
Ongoing 
Emergency 
Management 
Coordinator/  
Webmaster 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 441 
Table 6-8-10:  Mitigation actions and projects and implementation strategy for Gilbert  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Participate in occasional tabletop exercises 
to identify potential mitigation measures for 
increasing response effectives such as 
evacuation and shelter functions.   
Dam 
Inundation/   
Levee 
Failure/Flood 
Both 
Staff Time 
High 
Coordination with 
Maricopa County 
Emergency 
Management and 
Flood Control  
Ongoing 
Emergency 
Management 
Coordinator 
General Fund 
8 
Promote the use of weather radios, 
especially in schools, hospitals and other 
locations where people congregate to inform 
them of the approach of severe weather.  
 Extreme 
Heat/Flood/ 
Severe Wind 
 Both 
 Staff Time 
 Medium 
 Coordinate with 
stakeholders and use 
of website and social 
media.  
 Ongoing 
 Emergency 
Management 
Coordinator/ 
Communication 
Office  
 General Fund 
9 
Use website and social media to encourage 
citizens to be prepared in case of a disaster 
event to raise awareness and participation. 
Dam 
Inundation/   
Levee 
Failure/Flood/ 
Drought 
Both 
Staff Time 
High 
Coordinate 
messaging with 
Communication 
Office for delivery 
Ongoing 
Emergency 
Manager/     
Communications 
Office 
General Fund  
10 
Review building permits in high risk and/or 
mapped fissure areas and require 
engineering evaluation prior to development 
to reduce impacts. 
Fissure 
New 
Staff Time 
High 
Development 
Services 
coordination with 
Town Engineers  
utilizing AZ 
Geographical Survey 
Maps 
Ongoing 
Town Engineer 
Permit & Plans 
Review and 
Inspection 
Manager 
General Fund 
11 
Monitor ADWR Subsidence Monitoring 
Program’s satellite imagery for local trends 
and impacts  with the goal of determining 
strategies to reduce damage and losses. 
Subsidence 
Both 
Staff Time 
High 
Coordinate with 
ADWR  
Ongoing 
Water Resource 
Manager 
General Fund 
12 
Provide link to the Arizona Department of 
Water Resource website as part of  a public 
campaign to raise awareness to the hazards 
and locations of active subsidence. 
Subsidence 
Both 
Staff Time 
High 
Coordinate with 
ADWR and 
webmaster 
Ongoing 
Water Resource 
Manager and 
Webmaster 
General Fund 
13 
Study and potential improvements to 
Vaughn Avenue Basin area to reduce 
potential of overtopping.   
Flooding 
Both 
$300,000 
High 
Coordinate with 
stakeholders 
Within 2 years 
of receiving 
grant funding 
Engineering/ 
Streets 
Manager/Public 
Works Director 
General Funds/ 
Grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 442 
Table 6-8-10:  Mitigation actions and projects and implementation strategy for Gilbert  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
14 
Improvement to Gilbert Road and Williams 
Field Road Intersection Drainage to reduce 
local flooding. 
Flooding 
Both 
$750,000 
High 
Coordinate with 
stakeholders 
Within 2 years 
of receiving 
grant funding 
Engineering/ 
Streets 
Manager/Public 
Works Director 
General Funds/ 
Grants 
15 
Study and potential improvement to 170th 
Street and San Tan Drainage to reduce local 
flooding.  
Flooding 
Both 
$300,000 
High 
Coordinate with 
stakeholders 
Within 2 years 
of receiving 
grant funding 
Engineering/ 
Streets 
Manager/Public 
Works Director 
General Funds/ 
Grants 
16 
Improvement to Commerce Area Drainage 
to reduce local flooding. 
Flooding 
Both 
$1,156,000 
High 
Coordinate with 
stakeholders 
Within 2 years 
of receiving 
grant funding 
Engineering/ 
Streets 
Manager/Public 
Works Director 
General 
Funds/CIP/ 
Grants 
17 
Study and potential improvement to 172nd 
Street south of Flintlock, implement design 
to protect roadway and underground utilities 
from future collapse and ensure rain water is 
diverted away from fissure area. 
Flooding/ 
Fissure 
Both 
$300,000 
High 
Coordinate with 
stakeholders 
Ongoing 
Engineering/ 
Streets 
Manager/Public 
Works Director 
General Funds/ 
Grants 
18 
Perform an Area Drainage Master Study 
(ADMS) for San Tan area to identify flood 
risks and potential areas of mitigation 
interest. 
Flooding 
Both 
Staff Time 
 
Coordination with 
Flood Control 
District of Maricopa 
County 
Within 2 years 
of receiving 
funding 
Floodplain 
Administrator 
FCDMC 
19 
Perform an Area Drainage Master Study 
(ADMS) for the Queen Creek / East Mesa / 
and Southeast Gilbert areas to identify flood 
risks and potential areas of mitigation 
interest. 
Flooding 
Both 
Staff Time 
 
Coordination with 
Flood Control 
District of Maricopa 
County 
Within 2 years 
of receiving 
funding 
Floodplain 
Administrator 
FCDMC

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 443 
Table 6-8-11:  Mitigation actions and projects and implementation strategy for Glendale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
In partnership with The Salvation Army, 
provide respite care and dehydration 
stations. This effort mitigates loss of life 
during extreme temperature. 
Extreme Heat 
Existing 
Staff time 
High 
N/A 
On-going 
Emergency 
Management 
Donations 
2 
Perform a public information campaign in 
coordination with the City of Glendale 
Marketing Department and Fire Department 
to educate and inform citizens of safety 
during periods of extreme heat.  
Extreme Heat 
Existing 
Staff time 
High 
N/A 
On-going 
Fire Department 
and Public 
Affairs / Public 
Information 
Officer 
GDEM/FD 
Budget 
3 
Ordinance compliance and maintenance of 
property (weed/brush abatement) 
Wildfire 
Existing 
Staff time 
High 
City Code 
On-going 
Code Compliance 
General Fund 
Budget 
4 
Reduce the risk of fires to communities 
located against a wildland interface through 
participation with Maricopa County and 
other local jurisdictions in the development 
of a Community Wildfire Protection Plan 
(CWPP) 
Wildfire 
Both 
Staff time 
High 
Healthy Forests 
Restoration Act of 
2003 (HFRA) 
2025 
Emergency 
Management / 
Emergency 
Management 
Coordinator 
General Fund 
Budget 
5 
Maintenance of Emergency Action Plan 
(EAP) of covered municipal water storage 
reservoir with a capacity of 12 million 
gallons. (Thunderbird Reservoir) 
Dam Failure 
Existing 
Staff time 
High 
Regulatory 
Requirement 
On-going 
Water Services / 
Water Facilities 
Supervisor 
Water Services 
Budget 
6 
Participation in the Annual ADWR 
inspection and survey of the Thunderbird 
Reservoir. 
Dam Failure 
Existing 
Staff time 
High 
Regulatory 
Requirement 
Annually 
Water Services / 
Water Facilities 
Supervisor 
Water Services 
Budget 
7 
Participation in annual EAP drills and 
tabletop exercises. 
Dam Failure 
Existing 
Staff time 
High 
Regulatory 
Requirement 
Annually 
Water Services / 
Water Facilities 
Supervisor  
Water Services 
Budget 
8 
Water Conservation Office conducting 
educational outreach to the public on best 
practices, via classes, flyers, website, social 
media  
Drought 
Existing 
Staff time 
High 
Municipal 
Conservation 
Program 
Requirement 
On-going 
Water Services / 
Environmental 
Programs 
Administrator 
Water Services 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 444 
Table 6-8-11:  Mitigation actions and projects and implementation strategy for Glendale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Encourage permanent reduction in amount 
of water used for landscaping purposes 
through Landscape Rebate up to $750 for 
residential and $3,000 for non-residential. 
Drought 
New 
Staff time 
High 
Municipal 
Conservation 
Program 
Requirement 
On-going 
Water Services / 
Environmental 
Programs 
Administrator 
Water Services 
Budget/Grant 
10 
Update Drought Management Plan (2016) to 
assist in management of operations when a 
drought is declared. 
Drought 
Existing 
Staff time 
High 
Regulatory 
Requirement 
On-going 
Water Services / 
Environmental 
Programs 
Administrator 
Water Services 
Budget 
11 
Conduct landscape classes (promote 
xeriscape) to encourage use of drought-
resistant landscaping 
Drought 
Existing 
Staff time 
High 
Municipal 
Conservation 
Program 
Requirement 
On-going 
Water Services / 
Environmental 
Programs 
Administrator 
Water Services 
Budget 
12 
Citywide plan to control stormwater, 
including identification of problem areas 
(drainage issues, illicit discharges, etc.). The 
City’s Stormwater Management Plan is 
reviewed annually and updated as needed. 
Flood 
Existing 
Staff time 
High 
Regulatory 
Requirement 
On-going 
Submitted to 
ADEQ in 
2014 
Engineering / 
Engineering 
Project Manager 
 
Water Services / 
Environmental 
Program 
Manager 
City and Water 
Services  
Budget 
13 
Maintain emergency generators at water and 
wastewater plants, water booster stations, 
and wastewater lift stations. 
Severe Wind 
Existing 
Staff time 
High 
N/A 
On-going 
Water Services / 
Water Services 
Supervisor 
Water Services 
Budget 
14 
Maintain emergency generators at public 
safety facilities, including police stations, 
fire stations and Glendale Regional Public 
Safety Training Center. 
Severe Wind  
Existing 
Staff time 
High 
N/A 
On-going 
Various 
Departments 
Fire Budget 
15 
Work with federal and state agencies, and 
local coalition to evaluate awareness of 
fissure risk zones and the problems caused 
by fissures. 
Fissures 
Existing 
Staff time 
High 
Development 
Services/Planning 
On-going 
Planning 
City Budget 
16 
Geological hazards addressed in General 
Plan and will be incorporated in the 
planning process for the next General Plan. 
Fissures 
Existing 
Staff time 
High 
Development 
Services/Planning 
On-going 
Planning 
City Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 445 
Table 6-8-11:  Mitigation actions and projects and implementation strategy for Glendale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
17 
Utilization of Development Services plans 
and procedures to survey and monitor 
elevations in the City of Glendale to 
determine and establish long term mitigation 
strategies. 
Subsidence 
Existing 
Staff time 
High 
Development 
Services/ 
Engineering 
On-going 
Planning 
City Budget 
18 
Development Services has utilized the risk 
as a regular risk of development and public 
work projects.  The lands used for such 
projects are inspected for subsidence issues 
prior to projects starting. 
Subsidence 
Existing 
 Staff time 
High 
Development 
Services/Field Ops 
On-going 
Planning 
City Budget 
19 
Inform citizens of risks associated with 
flood risk areas, specifically parks multi-use 
pathways. 
Levee Failure 
Existing 
Staff time 
High 
Public Facilities, 
Recreation & 
Special Events 
On-going 
Public Facilities, 
Recreation & 
Special Events 
City Budget 
20 
Work with Flood Control District of 
Maricopa County to determine potential 
effects of levee failure 
Levee Failure 
Existing 
Staff time 
High 
Emergency Action 
Plans 
On-gong 
Emergency 
Manager and 
Emergency 
Services 
Coordinator / 
Emergency 
Management 
City Budget 
21 
Participate in annual Flood Control District 
of Maricopa County Drill/Exercises 
Levee Failure 
Existing  
Staff time 
High 
N/A  
Annually 
Emergency 
Manager and 
Emergency 
Services 
Coordinator / 
Emergency 
Management  
City Budget 
22 
Enforce currently adopted building codes 
(2018 IBC and IRC) to mitigate damages 
due to severe wind events. 
Severe Wind 
New 
Staff time 
High 
Building Codes / 
Development 
Review and 
Building Inspection 
Processes 
On-going as 
needed 
Building Safety 
City Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 446 
Table 6-8-11:  Mitigation actions and projects and implementation strategy for Glendale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
23 
Encourage homeowners to use tie-down 
straps and/or anchors to secure ancillary 
buildings and metal awnings or porches to 
mitigate the potential for flying debris 
during severe wind events. 
Severe Wind 
Both 
Staff time 
High 
Building Codes / 
Development 
Review and 
Building Inspection 
Processes 
On-going as 
needed 
Building Safety 
City Budget 
24 
Use website and social media sources to 
raise public awareness to the impacts of 
flood and severe winds associated with 
monsoon season. 
Flood, 
Severe Wind 
Both 
Staff time 
High 
N/A 
On-going and 
seasonal 
Emergency 
Management  
City Budget 
 
Table 6-8-12:  Mitigation actions and projects and implementation strategy for Goodyear  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
High 
Staff training 
floodplain 
regulations 
Annual –
Ongoing 
City Engineer, 
Development 
Services Director 
General Fund 
Fees 
2 
Use newsletters, flyers, utility bill inserts, 
website notices, radio and television 
announcements, social media and newspaper 
articles to educate the public about hazards 
impacting Goodyear and how to be prepared 
in case of an emergency or disaster event. 
All Hazards 
Both 
Staff Time 
High 
Staff training 
Department/ 
Division 
coordination 
Annual-
Ongoing 
Digital 
Communications
PIOs 
Emergency 
Manager 
Dispatch  
Community Risk 
Reduction   
General Fund 
3 
Enforce the City of Goodyear’s weed 
abatement ordinance. 
Wildfire 
Both 
Staff time/ 
Volunteers 
High 
Code Compliance 
Annual-
Ongoing 
Building Official 
General Fund 
4 
Educate the public on proper fuels thinning, 
setbacks, and water storage for wildfire 
mitigation using Firewise type of programs 
and guidance documents. 
Wildfire 
Both 
Staff time 
High 
Fire 
Department/EM 
coordination 
Annual-
Ongoing 
Fire 
Chief/Emergency 
Manager 
Grant Funding 
and General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 447 
Table 6-8-12:  Mitigation actions and projects and implementation strategy for Goodyear  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
5 
Conduct wildfire safety education programs 
in the local schools through the Community 
Risk reduction program. 
Wildfire 
Both 
Staff time/ 
Volunteers 
High 
Community Risk 
Reduction 
Division/EM 
coordination 
Seasonal and 
as schools 
permit time 
Emergency 
Manager 
Community Risk 
Reduction 
General Fund 
and Grant 
Funding where 
available 
6 
Perform an information campaign at the 
onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
Both 
Staff time/ 
Volunteers 
High 
EM Division/ 
Community Risk 
Reduction Division 
coordination 
Seasonal 
 
Emergency 
Manager 
General Fund 
7 
Identify and communicate locations within 
the community that can serve as cooling 
stations during times of extreme heat. 
Extreme Heat 
Both 
Staff time/ 
Volunteers 
Interfaith 
community 
High 
EM Division/ 
Community Risk 
Reduction Division 
coordination 
As needed 
given 
population 
densities and 
heat events 
 
Emergency 
Manager 
General Fund 
8 
Participate in the Flood Control District of 
Maricopa County annual county-wide flood 
exercises to identify areas of mitigation 
interest regarding vulnerable critical 
infrastructure, emergency access and routes 
issues. 
Flood 
Both 
Staff time 
High 
Flood Control 
District/ 
MCDEM/EM 
coordination 
Bi-Annual 
Emergency 
Manager 
General Fund 
9 
Provide severe weather information to the 
City of Goodyear first responders and other 
employees that work outdoors for them to be 
aware to wear the proper personal protection 
equipment. 
Extreme Heat, 
Flood, 
Severe Wind 
and Weather 
Both 
Staff time 
High 
NWS/ 
EM Division 
coordination 
Annual-
Ongoing 
Emergency 
Manager 
General Fund 
10 
Work with the Flood Control District of 
Maricopa County to develop and update 
flood response plans as they pertain to the 
City of Goodyear and surrounding areas.   
Flood 
Both 
Staff time 
High 
Flood Control/ 
EM Division 
Annual-
Ongoing 
Emergency 
Manager 
General Fund 
11 
Install backup generators at key critical 
facilities such as fire and police stations, 
water pumping stations, sewer lift stations, 
etc., to provide emergency power for critical 
operations during power failures caused by 
severe wind events. 
Severe Wind 
and Weather 
Both 
Varies 
Department 
CIPs 
High 
Public Works 
Ongoing 
Public Works 
Enterprise Funds 
and General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 448 
Table 6-8-12:  Mitigation actions and projects and implementation strategy for Goodyear  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
12 
Provide links on the community’s website to 
sources of hazard mitigation educational 
materials encouraging residents of Goodyear 
to be prepared for hazard emergencies. 
All Hazards 
Both 
Staff Time 
Medium 
EM division 
Digital 
Communications 
Community Risk 
Reduction 
Annual-
Ongoing 
Emergency 
Manager 
General Fund 
13 
Participate in occasional dam failure 
exercises to identify mitigation measures for 
increasing response effectiveness, such as 
evacuation planning and coordinated 
intended shelters. 
Dam 
Inundation 
Both 
Staff time 
Medium 
Maricopa County 
EM/Police/Fire 
 
Bi-Annual 
Emergency 
Manager 
General Fund 
14 
Mandate, encourage or incentivize the use of 
drought resistant landscaping through 
ordinance development and/or enforcement. 
Drought 
Both 
Staff time 
Medium 
Staff training 
Department/ 
Division 
coordination 
 
Annual-
Ongoing 
Right of Way 
Development 
Services Director 
General Fund 
15 
Develop, update and maintain a local 
Drought Management Plan to define various 
levels of conservation or curtailment 
requirements that are based on drought 
severity triggers, system impacts, and 
enforced through utility billing structures 
and ordinance. 
Drought 
Both 
Staff time 
Medium 
Inter-
Departmentally 
updated & vetted 
 
Annual-
Ongoing 
Public Works / 
Water Resources 
Division  
General Fund 
16 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting 
processes. 
Subsidence 
Both 
Staff time 
Medium 
Staff training 
department/ 
Division 
coordination 
Annual-
Ongoing 
City Engineer, 
Development 
Services Director 
General Fund 
17 
Encourage/incentivize homeowners to use 
tie-down straps and/or anchors to secure 
metal awnings or porches to mitigate the 
potential for flying debris during severe 
wind events. 
Severe Wind 
Both 
Staff time/ 
Volunteers 
Medium 
Community Risk 
Reduction 
Annual-
Ongoing 
Emergency 
Manager 
General Fund 
18 
Provide links to Arizona Department of 
Water Resources website as part of a public 
campaign to raise awareness to the hazards 
and locations of active subsidence. 
Subsidence 
Both 
Staff time 
Medium 
EM Division/ 
Communications 
Division 
coordination 
Q4, FY 21 
Emergency 
Manager 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 449 
 
Table 6-8-13:  Mitigation actions and projects and implementation strategy for Guadalupe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Perform a public campaign at the onset of 
the extreme heat season to help educate the 
general public on ways to remain safe 
during periods of extreme heat. 
Extreme Heat 
Both 
Staff time 
Medium 
Extreme Heat Plan 
Ongoing 
Fire Dept – 
Public 
Information 
Officer (PIO) 
General fund 
2 
Identify, stock, and communicate locations 
within the community that can serve as 
cooling stations during times of extreme 
heat. 
Extreme Heat 
Both 
Staff time 
Medium 
Extreme Heat Plan 
Ongoing 
Fire Dept 
Emergency 
manager 
General fund 
3 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
Low 
Town General 
Plan/Code Review 
Ongoing 
Building 
Inspector/ 
Contractor 
General fund 
4 
Implement the education and mitigation 
actions as outlined in the town’s Stormwater 
Management Plan. 
Flood 
Both 
Staff time 
Low 
Stormwater 
Management Plan 
Ongoing 
Building 
Inspector/ 
Contractor 
General fund 
5 
Establish periodic monitoring and review of 
the Town of Guadalupe’s general plan and 
zoning ordinance to determine effectiveness 
at preventing and mitigating hazards. Based 
on the results, amend as necessary. 
Multi-Hazard 
Both 
Staff time 
Low 
Town General Plan 
Ongoing 
Town Manager 
or designee 
General fund 
6 
Participate in occasional table top exercises 
to identify potential mitigation measures for 
increasing response effectiveness, such as 
evacuation route marking and permanent 
protection measures for intended shelters. 
Dam 
Inundation 
Existing 
Staff time 
Low 
Flood Control Plan/ 
Emergency 
Operations Plan 
2022 
Emergency 
Manager/Flood 
Control District 
General fund 
7 
Develop or update the inundation mapping 
for the emergency action plan for Guadalupe 
Retention Dam in order to identify 
population and critical facilities and 
infrastructure at risk, and to determine the 
need for potential mitigation. 
Dam 
Inundation 
Existing 
Staff time 
Low 
Flood control Plan 
Ongoing 
Flood Control 
District 
General fund 
8 
Public education of water conservation best 
practices through newsletter, flyers, social 
media and website notices. 
Drought 
Both 
Staff time 
Low 
Drought 
Management Plan 
Ongoing 
Community 
Development 
General fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 450 
Table 6-8-13:  Mitigation actions and projects and implementation strategy for Guadalupe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Develop a local Drought Management Plan 
to define various levels of conservation 
requirement that are based on drought 
severity triggers. 
Drought 
Both 
Staff time 
Low 
Drought 
Management Plan 
Ongoing 
Community 
Development 
General fund 
10 
Review and update stormwater management 
plan that will analyze and identify problem 
flooding areas and propose long-term 
mitigation alternatives designed to reduce or 
eliminate the flood problems. 
Flood 
Both 
Staff time 
Low 
Storm water 
management plan 
Ongoing 
Building 
Inspector/ 
Contractor 
 General fund 
11 
Work with Flood Control District of 
Maricopa County to review, update, and/or 
augment flood control ordinances to provide 
a greater level of protection than the 
minimum required by the NFIP. 
Flood 
Both 
Staff time 
Low 
Storm water 
management plan 
Ongoing 
Building 
Inspector/ 
Contractor 
General fund 
12 
Review existing buildings, evaluate any 
substandard construction issues and 
implement repair and upgrade plan for 
future wind damage. 
Severe Wind 
Existing 
Staff time 
Low 
Hazard mitigation 
Plan 
Ongoing 
Building 
Inspector/ 
Contractor 
General fund 
13 
Encourage homeowners to use tie-down 
straps and/or anchors to secure ancillary 
buildings and metal awnings or porches to 
mitigate the potential for flying debris 
during severe wind events. 
Severe Wind 
Both 
Staff time 
Low 
Hazard Mitigation 
Plan 
Ongoing 
Emergency 
manager 
General fund 
 
 
Table 6-8-14:  Mitigation actions and projects and implementation strategy for Litchfield Park  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
NFIP/Staff 
Training/Floodplain 
Regulations 
Annual-
Ongoing 
City Engineer 
General 
Fund/Permit 
Fees

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 451 
Table 6-8-14:  Mitigation actions and projects and implementation strategy for Litchfield Park  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
2 
Annually coordinate with federal, state, and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information. 
Dam 
Inundation 
Both 
Staff Time 
High 
Coordination with 
Flood Control 
District -Dam 
Safety 
Annually 
Flood Control 
District of 
Maricopa County 
General Fund 
3 
Review Emergency Operations Plan for 
areas that can be updated in accordance 
with current warning measures that are now 
available through the national Weather 
Bureau and the Maricopa County 
Emergency Services. 
All Hazards 
Both 
Staff Time 
High 
Emergency 
Management 
Coordinator tasks 
Annual-
Ongoing 
Goodyear Fire / 
Maricopa County 
Sheriff, EM 
Coordinator, 
Public Works 
General Fund 
4 
Encourage city staff to become members of 
regional organizations that have hazard 
mitigation as a mission, to share in regional 
efforts and solutions to local and regional 
problems. 
All Hazards 
Both 
Staff Time 
High 
Staff Training 
Annual-
Ongoing 
Emergency 
Management 
Coordinator 
General Fund 
5 
Provide links on the community’s website to 
sources of hazard mitigation educational 
materials (e.g. – http://www.ready.gov/ and 
http://do1thing.com/) encouraging private 
citizens to be prepared for hazard 
emergencies. 
All Hazards 
N/A 
Staff Time 
Medium 
Emergency 
Management 
Coordinator tasks 
and coordination 
with Fire and LE 
partners 
Ongoing - 
Monthly 
Emergency 
Management 
Coordinator 
General Fund 
6 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
N/A 
Staff Time 
Medium 
Staff  
Ongoing-
Seasonal 
Emergency 
Management 
Coordinator/PIO 
General Fund 
7 
Review building permits for compliance 
with International Building Code for 
structure compliance to endure severe winds 
and electrical strikes, use drought resistant 
plumbing fixtures, and flood proofing. 
Drought, Flood,  
Severe Wind, 
Lightning 
Strike 
Both 
Staff Time 
Medium 
IBC/Staff Training 
Annual-
Ongoing 
Public Works / 
City Engineer 
General Fund 
8 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting. 
Subsidence 
Both 
Staff Time 
Low 
Engineering Review 
Ongoing 
City Engineer 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 452 
Table 6-8-15:  Mitigation actions and projects and implementation strategy for Mesa  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Maintain continuous water supply by 
continuing to install/replace water 
distribution system throughout the City of 
Mesa 
Drought 
Both 
$5-10M 
/yr. 
High 
5yr-CIP 
Ongoing 
Water Resources 
& Engineering 
Dept. 
Bond Funding 
2 
CAP (Signal Butte WTP) Phase II, 
expansion of water treatment plant at Elliot 
and Signal Butte 
Drought 
Both 
$92M 
High 
5yr-CIP 
2024-2025 
(estimated) 
Water Resources 
& Engineering 
Dept. 
Bond Funding 
(future) 
3 
Future Reclaimed Water Line and pump 
stations to convey Northwest Water 
Reclamation Plant effluent to Gila River 
Indian Community in exchange of CAP 
water  
Drought 
Both 
$70-80M 
High 
5-yr CIP 
2024 
Water Resources 
& Engineering 
Dept. 
Bond Funding 
(future) 
4 
Add potable water wells and/or redrill and 
equip existing wells 
Drought 
Both 
~ $ 2 M 
/yr. 
High 
5-yr-CIP 
Ongoing 
Water Resources 
& Engineering 
Dept. 
Bond Funding 
(future) 
5 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
High 
Building Permit 
Process 
Ongoing 
Development 
Services, 
Engineering 
Dept. 
General Fund, 
Permit Fees 
6 
 Update Storm Drain Master Plan 
Flood 
Both 
$500,000 
High 
City of Mesa Storm 
Drain Master Plan. 
Ongoing 
Engineering 
Dept. 
General Fund, 
Grants & future 
CIP budget. 
7 
Perform public information campaign at the 
start of the extreme heat season to educate 
the public. 
Extreme Heat 
Both 
Staff time 
& cost of 
supplies 
High 
On-going operations 
At the extreme 
event 
Fire/Medical 
Dept. & Public 
Information 
office. 
General Fund 
8 
Partner with NGO’s (e.g. – The Salvation 
Army, church organizations, shelters, etc.) to 
provide respite care and hydration stations to 
mitigate loss of life during extreme 
temperature events. 
Extreme Heat 
Both 
Staff time 
& cost of 
supplies 
High 
City of Mesa 
Emergency 
Operations Plan 
At the extreme 
event 
Fire/Medical 
Dept. & Public 
Information 
Office. 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 453 
Table 6-8-15:  Mitigation actions and projects and implementation strategy for Mesa  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Provide links on the City of Mesa Website 
to sources of hazard mitigation educational 
materials encouraging private citizens to be 
prepared for hazard emergencies. 
Dam Failure, 
Levee Failure 
Both 
Staff time 
Low 
City of Mesa 
Emergency 
Operations Plan 
On-going 
Fire/Medical 
Dept. & Public 
Information 
Office. 
General Fund 
10 
Participate/Conduct tabletop exercises to 
identify potential mitigation measures for 
increasing response effectiveness in the 
event of a dam failure. 
Dam Failure, 
Levee Failure 
Both 
Staff time 
Low 
City of Mesa 
Emergency 
Operations Plan 
Ongoing 
Development 
Services & 
Engineering 
Dept. 
General Fund 
11 
Clear vegetation & wildfire fuels to create a 
clear space around critical structures. 
Wildfire 
Both 
Staff time 
Medium 
Code enforcement 
& Fire Dept. 
Ongoing prior 
& during the 
dry season 
Fire/Medical 
Dept. & 
Development 
Services 
General Fund 
12 
Enforce burn & fireworks bans as needed 
during dry season. Enforce weed abatement 
ordinance. 
Wildfire 
Both 
Staff time 
Medium 
Code enforcement 
& Fire Dept. 
Ongoing prior 
& during the 
dry season 
Fire/Medical 
Dept. & 
Development 
Services 
General Fund 
13 
Maintain/install back-up generators at 
critical facilities such as Fire & Police 
Stations, water pumping stations, sewer lift 
stations, etc., to provide emergency power 
for critical operations during power failures 
caused by severe wind events. 
Severe Wind 
Both 
$2M + 
staff time. 
High  
Fire Department 
Emergency 
Management 
Division 
 Ongoing 
Water Resources, 
Engineering, 
Development 
Services, Parks 
Recreation and 
Community 
Facilities 
General Fund 
and CIP budget 
14 
Distribution Pole Maintenance & 
Replacement/Vegetation Management 
Programs  
Severe Wind 
Both 
$500,000 
High 
Annual CIP 
Ongoing 
Energy 
Resources 
Electric 
Bond Funding 
(future) 
15 
Include the subsidence and fissure risk as a 
regular part of development & public works 
projects review. 
Fissure, 
Subsidence 
Both  
Staff time 
Medium 
Engineering and 
Design Standards 
Ongoing 
Development 
Services & 
Engineering 
Dept. 
General Fund 
16 
Provide links to ADWR and AZGS websites 
on City website to raise awareness to 
locations of active fissure and subsidence. 
Fissure, 
Subsidence 
Both 
Staff time 
Medium 
Engineering and 
Design Standards 
Ongoing 
Development 
Services & 
Engineering 
Dept. 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 454 
Table 6-8-15:  Mitigation actions and projects and implementation strategy for Mesa  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
17 
The City of Mesa provides information to 
the public using the Community Emergency 
Notification System (CENS), also called 
Reverse 9-1-1. If an event occurs the 9-1-1 
dispatch center in Mesa will call and provide 
information and/or instruction to 
subscribers.  
Levee Failure, 
Dam Failure 
Both 
Staff time 
Low 
City of Mesa 
Communications 
 (9-1-1 Emergency 
System 
Ongoing 
City of Mesa 
Communications 
General Fund 
 
 
Table 6-8-16:  Mitigation actions and projects and implementation strategy for Paradise Valley  
Paradise Valley is no longer participating in the Plan. 
 
 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Staff training 
Floodplain 
regulations 
Annual -On 
going 
Development and 
Engineering 
General Funds 
Permit Fees 
2 
Assist with the revision of a water 
conservation plan for mitigating the impact 
of a drought on the public water supply. 
Drought 
Both 
Staff Time 
 
High 
Plan development 
Annual 
Public Works 
General funds 
3 
Work with the Flood Control District of 
Maricopa County to determine potential 
effects of a flash flood or flood affecting the 
city. Also provide sandbags and sand as 
required. 
Flooding 
Both 
Staff Time 
High 
Plan development 
Annual 
Public Works, 
City Engineering 
and Emergency 
Management 
Enterprise funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 455 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
4 
Work with the Flood Control District of 
Maricopa County to determine potential 
effects of a levee failure. 
Levee Failure 
Both 
Staff Time 
High 
Plan development 
 
Annual 
Public Works, 
City Engineering 
and Emergency 
Management 
General funds 
5 
Encourage a fire buffer along wild land-
urban interface areas. 
Wildfire 
New 
Staff Time 
Medium 
Building 
regulations and 
public awareness 
 
Annual 
Public Works, 
City Engineering 
and Fire 
Department 
General funds 
6 
Incorporate hazard profile data into city’s 
GIS for mapping of floodways, high wind 
areas, subsidence areas, hazardous materials, 
etc. 
All Hazards 
Both 
Staff Time 
High 
Plan development 
On going 
IT Department 
and Emergency 
Management 
General funds 
7 
Train key city staff on appropriate actions 
based on the Emergency Operations Plan. 
All 
New 
Staff Time 
High 
Staff training 
On going 
Emergency 
Management 
General funds 
8 
Participate in regional training 
opportunities as well as Emergency 
Operations Command exercises within city 
to prepare for emergencies. 
All 
Both 
Staff Time 
Medium 
Staff training 
On going 
Emergency 
Management and 
most city 
departments 
General funds 
9 
All Fire Department personnel should be 
trained at Operations level, currently 
command staff are trained at Operations – 
rest of personnel are trained at awareness 
level.  
All 
Existing 
Staff Time 
Medium 
Staff training 
On going 
Fire Department 
General funds 
10 
Police Department personnel should be 
trained at Operations level, currently 
command staff are trained at Operations – 
rest of personnel are trained at awareness 
level.  
All Hazards 
Existing 
Staff Time 
Medium 
Staff training 
On going 
Police 
Department 
General funds 
11 
Control development in flood areas 
Flood 
Existing 
Staff Time 
High 
Floodplain 
regulations  
Annual 
Planning and 
Zoning, 
Development and 
Engineering 
General funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 456 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
12 
Encourage flood-proof measures through 
building design 
Flood 
Existing 
Staff Time 
 
High 
Floodplain 
regulations and 
public awareness 
Annual 
Development and 
Engineering and 
Economic 
Development 
General funds 
13 
Utilize Public Service Announcements 
(PSAs) broadcast on Channel 11 to 
communicate hazard risk and emergency 
information. Produce corresponding flyers 
to be distributed to residents via utility bill 
mailings 
All Hazards 
Existing 
Staff Time 
Medium 
Staff training 
On going 
Office of 
Communications, 
Public Works 
and Emergency 
Management 
General funds 
14 
Research identified data limitations 
affecting the relative vulnerability of assets 
to drought 
Drought 
Existing 
Staff Time 
High 
Plan development 
Annual 
Public Works 
and GIS 
General funds 
15 
The City of Peoria will use newsletters, 
website notices, social media and newspaper 
articles to educate the public about hazards 
impacting the city and how to be prepared in 
the case of a disaster.  
All Hazards 
New 
Staff time 
Medium 
Public awareness 
On going 
Office of 
Emergency 
Management and 
the Office of 
Communications 
General Funds 
16 
The City of Peoria will provide links on the 
emergency management webpage for 
sources of hazard mitigation educational 
materials such as www.fema.gov 
encouraging private citizens to be prepared 
for hazard emergencies. 
All Hazards 
New 
Staff time 
Medium 
Public awareness 
On going 
Office of 
Emergency 
Management and 
the Office of 
Communications 
General Funds 
17 
The City of Peoria will review and assess 
building and residential codes currently in 
use to determine if newer, more up-to-date 
codes are available or required related to 
hazard mitigation. 
All Hazards 
New 
Staff time 
Medium 
Plan development 
On going 
Development and 
Engineering and 
Economic 
Development 
General Funds 
18 
The city will continue to promote the Storm 
Ready program and the use of weather 
radios, especially in schools, hospitals and 
other locations where people congregate to 
inform them of the approach of severe 
weather events.   
Flood, Extreme  
New 
Staff time 
Medium 
Public awareness 
On going 
Office of 
Emergency 
Management and 
the Office of 
Communications 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 457 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
19 
The City of Peoria working with Flood 
Control District of Maricopa County will 
continue to analyze and identify dam failure 
inundation limits to identify evacuation 
routes. 
Dam Failure 
Both 
Staff Time 
High 
Plan development 
Annual 
Public Works, 
City Engineering 
and Emergency 
Management 
General funds 
20 
The City of Peoria will participate/conduct 
occasional table top exercises to identify 
potential mitigation measures for increasing 
response effectiveness, such as evacuation 
route marking and permanent protection 
measures for intended shelters. 
Dam Failure 
New 
Staff time 
Medium 
Public awareness 
On going 
Office of 
Emergency 
Management 
General Funds 
21 
The City of Peoria working with the Flood 
Control District of Maricopa County will 
update the inundation mapping for the 
emergency action plan for Lake Pleasant in 
order to identify population and critical 
facilities and infrastructure at risk, and to 
determine the need for potential mitigation. 
Dam Failure 
existing 
Staff time 
High 
Floodplain 
regulations and 
public awareness 
Annual 
The Office of 
Emergency 
management and 
various City 
Departments 
General funds 
22 
The City of Peoria will conduct public 
education of water conservation best 
practices through a variety of media such as 
newsletter, flyers, social media and website 
notices. 
Drought 
Existing 
Staff Time 
High 
Plan development 
Annual 
Public Works 
and Office of 
Communications 
Enterprise funds 
23 
The City of Peoria encourages the use of 
drought resistant landscaping through 
ordinance development and/or enforcement. 
Drought 
Existing 
Staff Time 
High 
Plan development 
Annual 
Public Works 
and GIS 
Enterprise funds 
24 
The City of Peoria will continue to 
develop/update our local Drought 
Management Plan to define various levels of 
conservation requirements that are based on 
drought severity triggers. 
Drought 
Existing 
Staff Time 
High 
Plan development 
Annual 
Public Works 
and GIS 
Enterprise funds 
25 
The City of Peoria as practical will continue 
to use reclaimed water to irrigate city owned 
landscape or other operations such as our 
truck washing station. 
Drought 
Existing 
Staff Time 
High 
Plan development 
Annual 
Public Works, 
Community 
Services & 
Economic 
Development 
General funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 458 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
26 
City of Peoria will continue to identify and 
communicate locations within the 
community that can serve as cooling stations 
during times of extreme heat. 
Extreme Heat 
New 
Staff time 
High 
Public awareness 
Ongoing 
Office of 
Emergency 
Management and 
the Office of 
Communications 
General Funds 
27 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
New 
Staff time 
Medium 
Floodplain 
regulations and 
public awareness 
Ongoing 
Office of 
Emergency 
Management and 
the Office of 
Communications 
General Funds 
28 
The City of Peoria will review, update 
and/or augment flood control ordinances to 
provide a greater level of protection than the 
minimum required by the NFIP. 
Flood 
Existing 
Staff time 
Medium 
Floodplain 
regulations and 
public awareness 
June 2021 
Development and 
Engineering, 
City Admin 
Office 
General funds 
29 
Identify and map flood hazards in areas 
expected to grow or develop in the 
foreseeable future. 
Flood 
New 
Staff time 
Medium 
Floodplain 
regulations and 
public awareness 
Ongoing 
GIS 
General funds 
30 
The City of Peoria will continue to 
develop/augment a citywide GIS program 
that is integrated into Public Works, 
Development Services, Police, Fire/Rescue 
and Emergency Management to help prevent 
development in flood prone regions. 
Flood 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Office of 
Emergency 
Management and 
various City 
Departments 
General Funds 
31 
Perform public outreach to citizens located 
within levee failure flood risk areas to 
provide awareness of potential increase in 
flood elevations with a levee failure. 
Levee Failure 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
The Office of 
Emergency 
management and 
various City 
Departments 
General funds 
32 
Encourage homeowners to use tie-down 
straps and/or anchors to secure ancillary 
buildings and metal awnings or porches to 
mitigate the potential for flying debris 
during severe wind events.  
Severe Wind 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
The Office of 
Emergency 
management and 
various City 
Departments 
General funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 459 
Table 6-8-17:  Mitigation actions and projects and implementation strategy for Peoria  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
33 
Retrofit sub-standard roofs of key critical 
facilities and infrastructure to meet modern 
building code standards and mitigate 
damages and impacts of severe wind events. 
Severe Wind 
New 
Staff time 
Medium 
Plan development 
Ongoing 
Development and 
Engineering, 
Economic 
Development 
General funds 
34 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting. 
Subsidence 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Public Works, 
City 
Engineering, 
Building Safety 
General funds 
35 
Provide links to the Arizona Department of 
Water Resources website as a part of a 
public campaign to raise awareness to the 
hazards and locations of active subsidence. 
Subsidence 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Public Works, 
City Engineering 
& Building 
Safety 
General funds 
36 
Establish survey monuments and monitor 
elevations in critical or key areas of the 
community to measure impacts and trends 
of subsidence, with the goal of determining 
long term mitigation strategies to reduce the 
damage and losses that may yet be 
experienced. 
Subsidence 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Public Works, 
City Engineering 
& Building 
Safety 
Grant funding 
37 
Develop and/or enforce a weed abatement 
ordinance. 
Wildfire 
New 
Staff time 
Medium 
Plan development 
and Public 
awareness 
Ongoing 
Code 
Enforcement 
General funds 
38 
Educate public on proper fuels thinning, 
setbacks, and water storage for wildfire 
mitigation using Firewise type of programs 
and guidance documents. 
Wildfire 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Fire Department 
General 
Funds/grants 
39 
The Peoria Fire Department will conduct 
Fire safety education programs where 
appropriate such as Peoria and Deer Valley 
Schools as well as other educational facility 
and public events such as G.A.I.N. night. 
Wildfire 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Fire Department 
General 
Funds/grants 
40 
Enact and enforce burn and fireworks bans 
as needed during extraordinarily dry and 
extreme wildfire conditions / seasons to 
mitigate possible, unintended wildfire starts. 
Wildfire 
New 
Staff time 
Medium 
Public awareness 
Ongoing 
Fire Department 
General 
Funds/grants

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 460 
 
 
Table 6-8-18:  Mitigation actions and projects and implementation strategy for Phoenix  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood, Dam 
Inundation, 
Both 
Staff Time 
High 
Staff Training, Plan 
Review 
Annual-
Ongoing 
Public Works / 
Floodplain 
Manager 
General Funds 
2 
Continue to include in the General Plan 
policies that protect the natural flow regime 
of washes, designate areas for Open Space 
and Preserves, and when fiscally possible 
support the use of green stormwater 
infrastructure/low impact development to 
address multiple risks. 
Flood, 
Dam 
Inundation, 
Extreme Heat, 
Drought 
Both 
Staff time 
High 
Land acquisition 
and natural resource 
protection 
Annual - 
ongoing 
Parks and 
Recreation / 
PPPI 
Administrator 
Phoenix Parks 
Preserves 
Initiative; 
General Fund; 
Bonds 
3 
Storm Drain CIP Program.  Construct 
drainage facilities to mitigate flooding 
hazard to residents of the city. 
Flood, Levee 
Failure 
Both 
Variable 
High 
Staff Training, Plan 
Review, Design and 
Construction 
Ongoing 
Street 
Transportation 
Department/ 
Deputy Street 
Transportation 
Director 
Bonds/Impact 
Fees 
4 
Coordinate review and approval of 
development projects located within flood 
hazard areas with PDD and Floodplain 
Management. 
Flood, 
Extreme Heat 
Both 
Staff time 
High 
GIS 
Annual - 
ongoing 
Planning and 
Development 
Department / 
Planning 
Researcher 
Enterprise 
5 
Summer Respite regional program to 
network with faith-based organizations to 
provide heat relief, hydration and respite 
with wellness checks. Program services are 
provided for the affected populations. 
Extreme Heat 
N/A - people 
Donations 
totaling 
$70,000 
annually 
High 
Heat Relief 
Network  
Annual - 
ongoing 
Human 
Services/Family 
Advocacy 
Director 
Corporate, 
Community, and 
faith-based 
contributions 
6 
Maintain and execute the Drought Response 
Plan (Revision in Draft - No Ordinance 
Change) 
Drought 
Both 
Staff Time 
Medium 
Master Plan Update 
and Water Resource 
Plan Update 
Ongoing 
Water 
WSD Operating 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 461 
Table 6-8-18:  Mitigation actions and projects and implementation strategy for Phoenix  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
7 
Maintain and execute a water use awareness 
outreach program. 
Drought 
Both 
Staff Time 
Medium 
Master Plan Update, 
Water Resource 
Plan Update, 
Drought Response 
Plan 
Ongoing 
Water 
WSD Operating 
Budget 
8 
Revise and ratify the General Plan every ten 
years. 
Flood 
Both 
Staff time 
Medium 
State statute; 
Smart Growth 
Requirement 
Ongoing 
Planning and 
Development 
Department/ 
Planning 
Manager 
General Fund 
9 
Update and adopt a revised building code. 
Flood, 
Severe Wind, 
Excessive  
Heat 
Both 
Staff time; 
Materials 
Medium 
Staff training; 
Community 
Outreach; 
Plan review 
Annual - 
ongoing 
Planning and 
Development 
Department / 
Assistant 
Director 
Permit fees 
10 
Continue to ensure zoning stipulations are 
met before construction permits are issued, 
and zoning is compatible with the zoning 
ordinance. 
Flood, 
Excessive 
Heat 
Both 
Staff time 
Medium 
Zoning  
Ordinance; 
Staff training; 
Plan review 
Annual - 
ongoing 
Planning and 
Development 
Department / 
Deputy Director 
Permit fees 
11 
Dam/Levee Safety Program – Operate and 
Maintain Dams/Levees to mitigate flooding 
hazard to the residents of the city. 
Flood, Dam 
Inundation, 
Levee Failure 
Both 
Staff 
Time, 
Materials 
Medium 
Staff Training, Plan 
Review 
Annual - 
Ongoing 
Street 
Transportation 
Department / 
Deputy Street 
Transportation 
Director 
General Funds 
12 
Continue to provide links on the 
Phoenix.gov/Office of Emergency 
Management website to sources of hazard 
mitigation educational materials such as 
FEMA.gov and Ready.gov 
Dam 
Inundation, 
Drought, Flood, 
Severe Wind, 
Wildfire 
Both 
Staff Time 
Medium 
N/A 
Annual - 
ongoing 
Office of 
Homeland 
Security and 
Emergency 
Management, 
City of Phoenix 
IT 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 462 
Table 6-8-18:  Mitigation actions and projects and implementation strategy for Phoenix  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
13 
Continue to adhere to the City of Phoenix 
Building Standards and Review Process, 
which are regularly updated.  The Building 
and Review Process requires site 
assessment for presence of, among other 
conditions, subsidence and fissures. 
Subsidence, 
Fissure 
Both 
Staff Time 
Medium 
Staff Training, Plan 
Review, Design and 
Construction  
Annual - 
ongoing 
Street 
Transportation 
Department: 
Design and 
Construction 
Management 
General Funds 
14 
Enforce City Ordinance 39-7D, which 
addresses overgrown vegetation, dead trees, 
brush and weeds or other conditions that 
present a health, fire or safety hazard.    
Wildfire 
Both 
Staff Time 
Medium 
Staff Training, 
Zoning Ordinance 
with Neighborhood 
Preservation 
Ordinance 
Annual – 
Ongoing 
Neighborhood 
Services 
Department: 
Deputy Director, 
Preservation 
Division 
 
General Funds, 
Community 
Development 
Block Grant 
15 
Coordinate with private companies and 
public agencies to study and map 
subsidence and fissure activity in critical or 
key areas of the community so that effective 
mitigation or avoidance strategies can be 
implemented. 
Subsidence, 
Fissure 
Both 
Staff Time 
Low 
Staff Training, Plan 
Review, Design and 
Construction 
Annual - 
ongoing 
Street 
Transportation 
Department: 
Design and 
Construction 
Management 
General Funds 
16 
Design and construct Rio Salado Oeste in 
Salt River (19th Ave-83rd Ave), including 
low flow channel improvements and 
riparian/xeri-riparian vegetation to improve 
flow conveyance and increase native 
vegetation/habitat. 
Flooding and 
extreme heat 
Both 
Staff time, 
design and 
constructio
n expenses 
High 
Rio Reimagined, 
land acquisition, 
design and 
construction 
2030 
Parks and 
Recreation 
Department/Natu
ral Resource 
Division Deputy 
Director 
TBD; 
anticipated 
USACE Civil 
Works project 
funds and local 
city match 
17 
The “Take a Hike do it Right” Outreach 
Program aims to educate the general public, 
including visitors and resort/hotel staff, on 
hike/trail selection and hiking safety to 
avoid heat related illnesses. 
Extreme heat 
Both 
Staff time 
High 
Reincorporate 
original marketing 
strategies and 
enhance effort to 
wider audience   
On going 
Parks and 
Recreation 
Department/Natu
ral Resource 
Division Deputy 
Director 
TDB: Grants 
and possible 
funding from 
tourism related 
sources

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 463 
Table 6-8-18:  Mitigation actions and projects and implementation strategy for Phoenix  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
18 
 
Provide shade coverage at all City of 
Phoenix Bus Stops to shelter riders from 
excessive sunlight and extreme heat. Of the 
4050 bus stops in Phoenix, 1500 of them 
still require shading structure. The T2050 
plan will also implement a new bus shelter 
design to improve shading options for 
mitigating heat/sun issues for west-facing 
bus stops. 
Extreme Heat 
Both 
$20M 
(additional 
$1M per 
year for 
maintenan
ce and 
repair) 
High 
Public Transit 
Department's T2050 
Plan 
2025 
 
Public Transit 
Department/Facil
ities Deputy 
Director 
T2050 
19 
Increase frequency of bus routes around 
vulnerable communities (highest ridership, 
low income, minority) to minimize 
exposure to extreme heat while waiting for 
public transit. 
Extreme Heat 
Both 
$270M for 
Operating 
Service; 
$55M for 
the 
additional 
buses and 
replaceme
nt buses  
High 
Public Transit 
Department's T2050 
Plan 
2025 
 
Public Transit 
Department/Facil
ities Deputy 
Director 
T2050 
20 
Implement a notification system for 
Downtown Phoenix businesses to raise 
hazard awareness and provide advanced 
warning of potential threats in the area. 
All Hazards 
Both 
TBD, plan 
to put out 
RFP Q2 
2021 
High 
Downtown Phoenix 
Business Master 
Plan 
2022 
Downtown 
Phoenix 
Partnership/ 
Strategy and 
Community 
Affairs 
TBD 
 
Table 6-8-19:  Summary of mitigation actions and projects and implementation strategy for Queen Creek  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff time 
High 
Staff Training 
Floodplain 
Regulations 
Ongoing 
Development 
Services/ 
Floodplain 
Administrator 
General Fund 
Permit Fees

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 464 
Table 6-8-19:  Summary of mitigation actions and projects and implementation strategy for Queen Creek  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
2 
Annually coordinate with county to obtain 
updates on any changes in dam safety 
conditions and emergency action plans. 
Dam 
Inundation 
Both 
Staff time 
Low 
Emergency Action 
Plan for Powerline, 
Vineyard Road & 
Rittenhouse FRS 
Ongoing 
Fire & Medical 
Dept./Emergency 
Mgnt. Coord. 
Emergency 
Services Fund 
3 
Educate and inform residents about dam 
safety through the Town’s website and links 
to the Flood Control District of Maricopa 
County. 
Dam 
Inundation 
Both 
Staff time 
Medium 
N/A 
Ongoing 
Fire & Medical 
Dept./Emergency 
Mgnt. Coord. 
Emergency 
Services Fund 
4 
Educate and inform residents about water 
conservation through newsletters, social 
media, inserts, new customer packets, water 
wise workshops, high use notifications, 
regularly scheduled meter change outs and 
the Town’s website. 
Drought 
Both 
Staff time 
Medium 
ADEQ Required 
Best Management 
Practices (BMPs) 
Ongoing 
Utilities Services 
Dept./Water 
Conservation 
Spec. 
Utilities 
Services Fund 
5 
Maintain the Town’s Integrated Emergency 
and Drought Response Plan (ERDP). 
Drought 
Both 
Staff time 
High 
Integrated 
Emergency and 
Drought Response 
Plan (ERDP) 
Ongoing 
Utilities Services 
Dept./Water 
Division 
Utilities 
Services Fund 
6 
Educate and inform residents about extreme 
heat through newsletters, social media, 
inserts and/or the Town’s website. 
Extreme Heat 
Both 
Staff time 
Medium 
N/A 
Ongoing 
Fire & Medical 
Dept./Emergency 
Mgnt. Coord. 
Emergency 
Services Fund 
7 
Incorporate respite care and hydration 
stations into the CERT Shelter Management 
Continuing Education (CE) Program  
Extreme Heat 
Both 
Staff time 
Low 
CERT Continuing 
Education (CE) 
Program 
 Ongoing 
Fire & Medical 
Dept./Emergency 
Mgnt. Coord. 
Emergency 
Services Fund 
8 
Educate and inform residents about fissures 
through the Town’s website and links to the 
Arizona Geologic Service website. 
Fissure 
Both 
 Staff time 
Low 
N/A 
 Ongoing 
Development 
Services Dept. 
General Fund 
9 
Reviews permit submittals for proximity to 
Earth Fissure Map that may require 
additional geological report. 
Fissure 
Subsidence 
New 
Staff time 
Medium 
Staff Training 
Earth Fissure Map 
of the Chandler 
Heights Study Area 
Ongoing 
Development 
Services 
Dept./Engineering 
General Fund 
Permit Fees 
10 
Install backup generators with the 
construction of Fire Station 412 and Fire 
Station 415. 
Severe Wind 
New 
TBD 
High 
CIP/Design-Build 
project 
FY23 
Fire & Medical 
Dept./Deputy Fire 
Chief (Resources) 
TBD for FY22

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 465 
Table 6-8-19:  Summary of mitigation actions and projects and implementation strategy for Queen Creek  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
11 
Identify opportunities to underground 12Kv 
power lines to mitigate power failures 
caused by severe wind events. 
Severe Wind 
Existing 
TBD 
Medium 
CIP 
Ongoing 
Public Works CIP 
Division/CIP 
Project Manager 
SRP Aesthetic 
Funds 
General Fund 
12 
Encourage fire buffer zones around the 
north face of the San Tan Mountains to 
prevent entry into the Box Canyon Area. 
Wildfire 
Both 
Staff time 
Medium 
Maricopa County 
Community 
Wildfire Protection 
Plan 
Ongoing 
Fire & Medical 
Department 
Emergency 
Services Fund 
13 
Preform annual fuel thinning in the Queen 
Creek and Sonoqui Washes. 
Wildfire 
Both 
Staff time 
Medium 
N/A 
Ongoing 
Public Works 
Grounds 
Division/Grounds 
Superintendent 
General Fund 
 
 
Table 6-8-20:  Mitigation actions and projects and implementation strategy for Salt River Pima-Maricopa Indian Community  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Community Relations in coordination with 
Emergency Management to conduct public 
outreach/education on all hazards mitigation 
and emergency preparedness for community 
members.  Community members that are 
educated on what to do before and during a 
disaster will reduce the loss of life and 
property in a disaster. 
All Hazards 
Both 
Staff Time 
High 
TERC 
Ongoing 
Emergency 
Management/ 
Community 
Relations Office   
General Fund 
2 
Replace existing Health and Human 
Services building with a newly designed 
building to be named River People Health 
Center to mitigate flooding of old building 
Flood 
Both 
$98.4 
million 
High 
CIP 
2025 
ECS/ Construction 
Division 
Title 5 / CIP

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 466 
Table 6-8-20:  Mitigation actions and projects and implementation strategy for Salt River Pima-Maricopa Indian Community  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
3 
Conduct Master Drainage Study north of 
Arizona Canal to reduce flooding and 
develop water retention restore methods. 
Flood 
Drought 
Subsidence 
Both 
$875,000 
High 
CIP 
2025 
ECS/Design 
Division 
CIP 
4 
Conduct Fuel reduction project of light fuels 
in river bottom and community recreation 
areas to minimize the rapid spread of fire in 
this area.  
Wildfire 
Existing 
$80,000 
High 
Fire Management 
Plan 
Ongoing 
ECS/ Construction 
Division 
General Fund 
5 
Participate/conduct occasional table top 
exercises to identify potential mitigation 
measures for increasing response 
effectiveness, such as evacuation route 
marking and permanent protection measures 
for intended shelters. 
Dam Failure 
Both 
Staff Time 
High 
EMPG Work Plan 
2025 
Emergency 
Management/ 
Emergency 
Manager 
EMPG Grant 
6 
Annually coordinate with federal, state, and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information so that 
they can be integrated into SRPMIC 
response plans. 
Dam Failure 
Both 
Staff Time 
High 
Federal Dam Safety 
Inspection Program  
2025 
Public Works/  
Assistant Director 
General Fund 
7 
Implement a water harvesting program 
through the location, design and 
construction of dual functioning stormwater 
retention facilities with enhanced recharge 
elements designed into the basin. 
Drought 
Flood 
Subsidence 
Both 
$50,000 
Medium 
General Plan 
2025 
ECS/ 
Design Division 
CIP 
8 
Encourage homeowners to use tie-down 
straps and/or anchors to secure ancillary 
buildings and metal awnings or porches to 
mitigate the potential for flying debris 
during severe wind events. 
Severe Wind 
Both 
Staff Time 
Medium 
Code of Ordinance 
2025 
Public Works/ 
ECS 
General Fund 
9 
Maintain inventory, train response staff and 
continue communications on the locations 
within the community that serve as cooling 
stations and shelters during times of extreme 
heat. 
Extreme Heat  
Existing 
Staff Time 
Medium 
EMPG Work Plan 
Ongoing 
Emergency 
Management/ 
Emergency 
Manager  
EMPG Grant / 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 467 
Table 6-8-20:  Mitigation actions and projects and implementation strategy for Salt River Pima-Maricopa Indian Community  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / 
Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
10 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme Heat 
Existing 
Staff Time 
Medium 
TERC 
Ongoing 
Emergency 
Management/ 
Community 
Relations Office 
General Fund 
11 
Improve redundant communication systems 
through expansion of the current system for 
the Public Safety community.  
All Hazards 
Both 
$15,000 
Medium 
IT Plan 
2025 
Information 
Technology 
General Fund 
12 
Improve communications infrastructure 
through tower installs for partners within the 
Tribal community.  
All Hazards 
Both 
$140,000 
Medium 
IT Plan 
2021 
Information 
Technology 
CIP 
13 
Perform a public information campaign at 
the onset of severe winds created during 
monsoon seasons to help educate the general 
public on ways to remain safe from impacts 
related to the identified hazard.  
Severe Wind 
Both 
Staff Time 
Low 
EM Programmatic 
Initiative 
2025 
Emergency 
Management / 
Community 
Relations Office 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 468 
Table 6-8-21:  Mitigation actions and projects and implementation strategy for Scottsdale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
GRANITE REEF WATERSHED PHASE 2 
FLOOD HAZARD MITIGATION 
PROJECT: Construct channel 
improvements, storm drain improvements, 
and stormwater storage basins to provide 
100-year flood protection for hundreds of 
structures in the vicinity of Granite Reef 
Road between the Arizona Canal and the 
Salt River, then remap the floodplain to 
reflect these improvements, saving an 
estimated $1 million in flood insurance 
premiums annually. 
Flood 
Existing 
$51,055,600 
High 
Drainage and Flood 
Control Capital 
Improvement Plan 
and Granite Reef 
Watershed Phase 2 
Plan 
June 30, 2026 
Stormwater 
Management and 
Capital Project 
Management 
Bond 2000 + 
Stormwater Fees 
+ FCDMC + 
SRPMIC 
2 
RAWHIDE WASH FLOOD HAZARD 
MITIGATION PROJECT: Raise and/or 
strengthen existing floodwalls, improve 
scour protection for existing floodwalls, 
construct new floodwalls, including scour 
protection, and construct flood gates, from 
1/3 mile north of Happy Valley Road to 
Pinnacle Peak Road, to provide 100-year 
flood protection for 850 properties in 
Scottsdale, then remap floodplain to reflect 
these improvements, saving an estimated 
$500,000 in flood insurance premiums in 
Scottsdale annually.  Project also provides 
benefits to Phoenix by reducing drainage 
infrastructure costs downstream. 
Flood 
Existing 
$16,000,000 
High 
Drainage and Flood 
Control Capital 
Improvement Plan, 
Pinnacle Peak West 
Area Drainage 
Master Study/Plan, 
and Rawhide Wash 
Alternatives 
Analysis 
December 31, 
2024 
Stormwater 
Management and 
FCDMC  
Stormwater Fees 
+ FCDMC + 
City of Phoenix 
3 
REATA WASH FLOOD CONTROL 
PROJECT: Construct channel and levee 
improvements from Pinnacle Peak Road to 
WestWorld, to provide 100-year flood 
protection for 4600 properties, then remap 
floodplain to reflect these improvements, 
saving nearly $3 million in flood insurance 
premiums annually. 
Flood 
Existing and 
New 
$35,000,000 
High 
Drainage and Flood 
Control Capital 
Improvement Plan, 
Pinnacle Peak 
South Area 
Drainage Master 
Study, and Reata 
Wash Flood Control 
Plan 
June 30, 2026 
Stormwater 
Management and 
Capital Project 
Management 
Stormwater Fees 
+ FCDMC

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 469 
Table 6-8-21:  Mitigation actions and projects and implementation strategy for Scottsdale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
4 
PIMA ROAD DRAINAGE CHANNEL: 
Construct a drainage channel on the east 
side of Pima Road from Happy Valley Road 
to Pinnacle Peak Road to provide 100-year 
flood protection to 56 structures and reduce 
the frequency and severity of flooding for an 
additional 73 structures. 
Flood 
Existing 
$8,500,000 
High 
Drainage and Flood 
Control Capital 
Improvement Plan 
December 31, 
2022 
Stormwater 
Management and 
Capital Project 
Management 
Stormwater Fees 
+ FCDMC 
5 
Continue expanding our WebEOC software 
system to track incidents and resources in 
the event of an emergency. 
All Hazards 
Existing 
Staff Time 
High 
None 
Ongoing 
Fire Department 
General Fund 
6 
Promote the use of various cellphone 
warning systems and, weather radios, 
especially in schools, hospitals, and other 
locations where people congregate to inform 
them of the approach of severe weather 
events. 
Dam 
Inundation, 
Extreme 
Heat, Flood, 
Levee 
Failure, 
Severe Wind 
Existing 
Staff Time 
High 
None 
Ongoing 
Fire Department 
General Fund 
7 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the public on ways to remain safe 
during periods of extreme heat. 
Extreme Heat 
Existing 
Staff Time 
High 
Community 
Emergency 
Response Team 
(CERT) program. 
Ongoing 
Fire Department 
General Fund 
8 
Identify, stock, and communicate locations 
within the community that can serve as 
cooling stations during times of extreme 
heat. 
Extreme Heat 
Existing 
Staff Time 
High 
Community 
Emergency 
Response Team 
(CERT) program. 
Ongoing 
Fire Department 
General Fund 
9 
Review and evaluate current weed control 
ordinance to ensure adequate provisions are 
in place to protect properties along the wild 
land urban interface. 
Wildfire 
Existing 
Staff Time 
High 
Weed Control 
Ordinance 
Ongoing 
Fire Department 
General Fund 
10 
Encourage fire buffer zones along wild land 
urban interface areas to mitigate damages 
due to wildfire. 
Wildfire 
Existing 
Staff Time 
High 
None 
Ongoing 
Fire Department 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 470 
Table 6-8-21:  Mitigation actions and projects and implementation strategy for Scottsdale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
11 
Perform Hazardous Material Response 
Team & Fire Code Inspection on 
occupancies with Hazardous Materials to 
ensure safe storage and use of those 
HAZMATS. 
Hazardous 
Materials 
Existing 
Staff Time 
High 
None 
Ongoing 
Fire Department 
General Fund 
12 
Develop partnerships to locate and operate 
hydration stations during extreme heat 
events to reduce the risk to Scottsdale 
citizens. 
Drought 
Existing 
Staff Time 
High 
Drought 
Management Plan 
Ongoing 
Fire Department 
General Fund 
13 
Review/Update the city’s Drought 
Management Plan’s conservation 
requirements to evaluate drought severity 
triggers and their enforcement. 
Drought 
Existing 
Staff Time 
High 
Drought 
Management Plan 
Ongoing 
Fire Department 
General Fund 
14 
Use newsletters, flyers, utility bill inserts, 
website notices, radio and television 
announcements, social media and newspaper 
articles to educate the public about hazards 
impacting the county and city, and how to 
be prepared in the case of a disaster event. 
All Hazards 
Existing 
Staff Time 
High 
None 
Ongoing 
Fire Department 
General Fund 
15 
Update Flood Insurance Rate Maps as 
necessary. 
Flood 
Existing and 
New 
Staff Time + 
Variable Costs 
for 
Consultants 
Medium 
Stormwater 
and 
Floodplain 
Management 
Ordinance, 
NFIP 
regulations, 
and Area 
Drainage 
Master Studies 
Ongoing 
Stormwater 
Management 
Stormwater 
Storage In-Lieu 
Fees + FCDMC 
16 
ROOSEVELT DRIVE STORM DRAIN: 
Construct a storm drain system to reduce 
structural flood hazards for nearly 100 
properties in Scottsdale and Tempe. 
Flood 
Existing 
$7,520,000 
Medium 
Drainage and Flood 
Control Capital 
Improvement Plan 
June 30, 2026 
Stormwater 
Management and 
FCDMC 
Stormwater Fees 
+ FCDMC + 
City of Tempe

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 471 
Table 6-8-21:  Mitigation actions and projects and implementation strategy for Scottsdale  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
17 
CROSSROADS EAST PHASE 2 
DRAINAGE IMPROVEMENTS: Construct 
a drainage channel along the east side of 
Pima Road from just north of Hualapai 
Drive to Legacy Blvd., then west to the 
Loop 101 Detention Basin. 
Flood 
Existing and 
New 
$8,800,000 
Medium 
Drainage and Flood 
Control Capital 
Improvement Plan 
and Crossroads East 
Drainage Master 
Plan 
June 30, 2027 
Stormwater 
Management and 
Capital Project 
Management 
Stormwater Fees 
18 
Prepare a Stormwater Master Plan. 
Flood 
Existing and 
New 
$1,200,000 
Medium 
N/A 
June 30, 2029 
Stormwater 
Management 
General Fund 
and possibly 
FCDMC 
19 
Prepare a Floodplain Management Plan 
consistent with the requirements of the 
Community Rating System, which may 
result in lower flood insurance premiums 
city-wide. 
 Flood 
Existing and 
New 
$100,000 
Medium 
N/A 
June 30, 2027 
Stormwater 
Management 
Stormwater 
Storage In-Lieu 
Fees and FEMA 
20 
Include addressing subsidence and fissure 
risk as a regular part of the land 
development and public works projects 
review and permitting. 
Fissure, 
Subsidence 
Both 
Staff Time 
Low 
Development 
Review 
Ongoing 
Planning and 
Development 
Services and 
Public Works 
General Fund 
21 
Coordinate with state and federal agencies 
(USGS, AZGS, ADWR, etc.) to study and 
map fissure activity in critical or key areas 
of the community so that effective 
mitigation or avoidance strategies can be 
implemented. 
Fissure, 
Subsidence 
Both 
Staff Time 
Low 
None 
Ongoing 
Planning and 
Development 
Services and 
Public Works 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 472 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Continue to collaborate with Maricopa 
County Flood Control District, neighboring 
cities, state, and local agencies to educate 
and encourage participation in the Wittmann 
Area Drainage Master Study to identify 
flood and drainage hazards within the 
designated study area, which includes a 
portion of northwest Surprise. Surprise will 
help promote study related meetings and 
share outreach materials with residents and 
businesses to encourage participation 
through press releases, website posts, social 
media posts, and presentations at public 
meetings (city council, board of supervisors, 
study, etc.) 
 
Flood 
Both 
Staff Time 
High 
Wittmann Area 
Drainage Master 
Study 
Ongoing 
Marketing and 
Communications 
Department – 
PIO, Public 
Works, and 
Water Resource 
Management 
Department 
General Capital  
2 
Develop program and coordinate actions 
with FCDMC to access, mitigate, upgrade 
and redesign flood facilities. 
Flood 
Both 
Staff Time  
High 
N/A 
Annually  
Public Works/ 
City Engineer 
General Capital 
3 
Public education of water conservation best 
practices through newsletter, flyers, social 
media and website notices. 
Drought 
Both 
$25,000 
High 
Integrated Water 
Master Plan; 
Drought Plan 
Annually 
Ongoing 
Water Resource 
Management/Dir
ector 
Water Enterprise 
4 
Develop a local Drought Management Plan 
to define various levels of conservation 
requirement that are based on drought 
severity triggers and integrate with the City 
of Surprise Integrated Water Master Plan 
identifies numerous action plans in the event 
that we have drought conditions. 
Drought 
Both 
$50,000 
High 
COS Integrated 
Water Master Plan; 
Drought Plan 
Ongoing 
Water Resource 
Management/Dir
ector 
Water Enterprise 
5 
Enforce City ordinances governing the 
improvements within a floodplain. 
Flood 
New 
Staff Time 
High 
Engineering 
Development 
Standards & Muni. 
Code 
Ongoing 
Public 
Works/City 
Engineer & 
Building Official 
General Capital

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 473 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
6 
Reduce the risk of fires to communities 
within wildland-interface zones by 
participating in the development of a 
community wildfire protection plan. 
Wildfire 
Both 
$150,000 
Medium 
Fire Master Plan & 
5-yr CIP 
July 2021 
Fire Department/ 
Administrative 
Chief  
General Capital 
7 
Develop program that identifies bridge and 
culvert construction in flood susceptible 
areas 
Flood 
Both 
$250,000 
Medium 
5-yr CIP 
July 2025 
Public Works/ 
City Engineer 
General Capital 
8 
Research and identify available funding 
sources for pre-disaster hazard mitigation 
actions and projects. 
All Hazards 
Both 
Staff Time  
Medium 
Council Strategic 
Plan 
Ongoing  
Public Works/ 
City Engineer 
Fire Department  
General Capital 
9 
Facilitate appropriate wildfire fuel reduction 
through prioritization of hazardous fuel 
management areas (FMA) to assist land 
managers and fire departments in focusing 
future efforts towards the areas of highest 
concern from both an ecological and fuel 
management perspective. 
Wildfire 
Both 
$25,000 
Medium 
Fire Master Plan 
Annually 
Fire Department/ 
Administrative 
Chief 
General Capital 
10 
Promote wildfire awareness and education 
in the community through the use of 
website, social media, and printed materials. 
Awareness combined with education helps 
to reduce the risk of accidental human 
ignitions. 
Wildfire 
Both 
Staff Time 
Medium 
Fire Master Plan 
Annually 
Fire Department/ 
Administrative 
Chief 
 
 
City Marketing 
and 
Communications 
Department - 
PIO 
General Capital

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 474 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
11 
Enhance the capabilities of the fire 
departments by providing a foundation for 
pre-attack planning. Rapidly and easily 
accessing individual home pre-plans and 
district infrastructure adds efficiency and 
safety to fire department response and 
prescribed fire planning. 
Wildfire 
New 
Staff Time 
Medium 
Fire Master Plan 
Annually 
Fire Department/ 
Administrative 
Chief & Fire 
Marshal 
 
City Marketing 
and 
Communications 
Department - 
PIO 
General Capital 
12 
Ensure that City Staff, residences, 
businesses and visitors have access to the 
McMicken Dam Emergency Action Plan. 
This plan was prepared in December 2013 
by the Flood Control District of Maricopa 
County. This plan is available on the City’s 
website. 
Dam 
Inundation 
Both 
Staff Time 
Medium 
Fire Master Plan  
Annually/ 
Ongoing 
Emergency 
Manage 
 
City Engineer  
 
City Marketing 
and 
Communications 
Department - 
PIO 
General Capital 
13 
Participate in the McMicken Dam 
Rehabilitation study and construction. 
Dam 
Inundation 
Both 
Staff Time 
Medium 
General Plan 
Annually 
Ongoing 
Public 
Works/City 
Engineer 
Flood Control

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 475 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
14 
Identify, stock, and communicate locations 
within the community that can serve as 
cooling stations during times of extreme 
heat. 
Extreme Heat 
Both 
$15,000 
Medium  
5-year CIP 
Ongoing/ 
Annually 
Fire Department/ 
Administrative 
Chief 
 
City Human 
Service and 
Community 
Vitality 
Department 
 
City Manager’s 
Office - 
Emergency 
Manager 
 
City Marketing 
and 
Communications 
Department - 
PIO 
General Capital 
15 
Review and update stormwater management 
plan that will analyze and identify problem 
flooding areas and propose long-term 
mitigation alternatives designed to reduce or 
eliminate the flood problems. 
Flood 
Both 
$50,000 
Medium 
Stormwater 
Management Plan 
Ongoing/ 
Annually 
Water Resource 
Management/Dir
ector 
Water Enterprise 
16 
Participate in occasional tabletop exercises 
to identify potential mitigation measures for 
increasing response effectiveness, such as 
evacuation route marking and permanent 
protection measures for intended shelters. 
Dam 
Inundation 
Both 
Staff Time 
Low 
Fire Master Plan 
Annually/ 
Ongoing  
Fire Department/ 
Administrative 
Chief 
General Capital

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 476 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
17 
Perform a public campaign at the onset of 
the extreme heat season to help educate the 
general public on ways to remain safe 
during periods of extreme heat. 
Extreme Heat 
Both 
Staff Time 
Low 
Fire Master Plan 
Ongoing/ 
Annually  
Fire Department/ 
Administrative 
Chief 
 
City Human 
Service and 
Community 
Vitality 
Department 
 
City Manager’s 
Office - 
Emergency 
Manager 
 
City Marketing 
and 
Communications 
Department - PIO 
General Capital 
18 
Work with Flood Control District of 
Maricopa County to review, update, and/or 
augment flood control ordinances to provide 
a greater level of protection than the 
minimum required by the NFIP. 
Flood 
Both 
Staff Time 
Low  
Engineering 
Development 
Standards  
Ongoing/ 
Annually 
Public 
Works/City 
Engineer 
General Capital 
19 
Review existing City owned buildings, 
evaluate any substandard construction issues 
and implement repair and upgrade plan to 
mitigate future wind damage. 
Severe Wind 
Existing 
Staff Time 
Low 
City Facility 
Standards and 
Guidelines 
Ongoing 
Public 
Works/City 
Engineer 
General Capital 
20 
Encourage homeowners to use tie-down 
straps and/or anchors to secure ancillary 
buildings and metal awnings or porches to 
mitigate the potential for flying debris 
during severe wind events. 
Severe Wind 
Both 
Staff Time  
Low 
International 
Building Codes 
Ongoing 
Community 
Development/  
General Capital

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 477 
Table 6-8-22:  Mitigation actions and projects and implementation strategy for Surprise  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
21 
The City of Surprise will continue to 
inventory and monitor all of the known 
fissures within the current and future city 
boundary. These fissures will be surveyed 
on a regular basis to monitor for change. 
Areas with active fissures have been 
identified in the General Plan as regional, 
natural, open space areas for passive 
recreation. 
Fissure 
Both 
Staff Time 
Low 
COS General Plan; 
Benchmark Study 
Ongoing 
Public 
Works/City 
Engineer & Land 
Surveyor 
General Capital 
22 
Cooperate with the Flood Control District of 
Maricopa County in the monitoring of 
fissures and subsidence impacting 
McMicken Dam and coordinate in any 
required updates to the McMicken Dam 
Emergency Action plan, wherein the earth 
fissures and subsidence concerns are 
discussed in great detail. 
Dam 
Inundation; 
Fissure; 
Subsidence 
Both 
Staff Time 
Low 
McMicken Dam 
Emergency Action 
Plan 
Ongoing 
Public 
Works/City 
Engineer & Land 
Surveyor 
General Capital 
23 
The City of Surprise will continue to 
monitor subsistence with the placement of 
benchmarks at all of the City owned well 
sites.  Subsidence due to groundwater 
pumping will continue to be monitored on 
an annual basis.   
Subsidence 
Both 
Staff Time  
Low 
Geodetic Survey 
Control Map/ 
Database 
Ongoing  
Public 
Works/City 
Engineer & Land 
Surveyor 
General Capital

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 478 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Building Code 
Ongoing 
Community 
Development and Public 
Works Engineering/ 
Deputy Director and 
Principal Civil Engineer  
General 
Fund 
2 
Maintain Emergency Management Plan 
All 
Hazards 
Both 
Staff Time 
High 
City Wide 
Emergency 
Operations Plan 
Annual 
Tempe Fire / Assistant 
Chief 
General 
Fund 
3 
Maintain Hazardous Materials Response 
Team and First Responder Training and 
conduct Fire Code Inspections on 
Occupancies with hazardous materials. 
All 
Hazards 
Both 
Staff Time City 
Resources  
High 
N/A 
Ongoing 
Tempe Fire / Assistant 
Chief & Public Works / 
Hazardous Waste 
Compliance Supervisor 
General 
Fund  
4 
Utilization of Tempe Social Media 
platforms to educate the general public 
about the hazards of extreme heat, including 
Facebook and Twitter releases, and updates 
to the city website.  
Extreme 
Heat 
Both 
Staff time 
High 
N/A 
Ongoing / 
Seasonal 
City manager’s office / 
public Information 
Officer 
General 
fund 
5 
Provide continued maintenance and exercise 
of early warning sirens in select strategic 
locations as a part of a comprehensive 
emergency notification system to inform 
citizens of impending hazards such as dam 
failure, severe weather conditions, and 
severe wind events. 
Dam 
Failure, 
Flood, 
Severe 
Wind 
Both 
$5K/yr 
High 
N/A 
Yearly 
PW/WU 
General 
Fund 
6 
Water Utilities Division will continue to 
operate municipal water wells to maintain 
compliance with ADWR Active 
Management Area requirements to mitigate 
drawdown related issues caused by over 
pumping of groundwater, including 
subsidence. 
Subsidence 
Both 
Staff time 
High 
Water Resources 
Master Plan  
Ongoing 
Public Works – Water 
Utilities / Water 
Resources Manager 
Water 
Enterprise 
7 
Stormwater Outfall Inspection –activities for 
both condition and capacity of outfall 
locations to regional waterways. 
Flooding 
Both 
$150,000 / Staff 
Time 
High 
N/A 
Ongoing 
Public Works – 
Engineering and Water / 
Principal. Civil 
Engineer/ Env. 
Compliance Supv. 
Water 
Enterprise

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 479 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
8 
Develop a water infrastructure master plan 
which discusses water resources and 
identifies vulnerabilities to long-term water 
supply. This plan will determine what 
additional water resources may be available 
(CAP / Reclaimed / Adjudication) to offset 
long-term shortage. 
Drought 
Both 
$1,5000,000 
High 
Water Infrastructure 
Master Plan 
Q1 2022 
Public Works – Water 
Utilities / Principal 
Engineer 
Water 
Enterprise 
9 
Transit shelters constructed in areas with 
high ridership, heat islands and/or higher 
poverty levels in order to address heat 
vulnerability. 
Extreme 
Heat 
Both 
$22,000 per 
shelter 
High 
Capital 
Improvement Plan 
and Transportation 
Plan 
Ongoing 
Engineering and 
Transportation   
Equity and Inclusion 
Manager 
Sustainability  
General 
Fund and 
HURF  
10 
Create regional cooling utility that pays for 
urban forestry, cool material and green 
infrastructure across Maricopa County 
Extreme 
Heat 
Both 
$100,000,000 
per year 
High 
Climate Action Plan 
Update  
Ongoing 
Sustainability  
Intergovernmental 
Officer 
Regional 
tax 
(proposed
) 
11 
Maintain a regional resilience collaborative 
to develop resilience to extreme heat 
solution 
Extreme 
Heat 
Both 
$100,000 a year 
High 
Climate Action Plan 
Update 
Ongoing 
Sustainability  
Intergovernmental 
Officer 
Grants 
12 
Create a regional extreme heat and racial 
equity task force to address the impacts of 
extreme heat on communities of color.  
Extreme 
Heat 
Both 
$50,000 a year 
High  
Climate Action Plan 
Update 
Ongoing 
Sustainability 
Equity and Inclusion 
Manager 
Emergency Manager 
Grants 
13 
IGCC adoption w/ shade and cool material 
additions that ensure new buildings are more 
resilient to extreme heat  
Extreme 
Heat 
New 
$100,000 
annually  
High 
Climate Action Plan 
2025 
Community Services  
General 
Fund  
14 
Implementation of Urban Forestry Master 
Plan to support trees and shade in public and 
private landscapes  
Extreme 
Heat 
Both 
$4,000,000 
High 
Urban Forestry 
Master Plan 
Ongoing 
Community Services- 
Parks and Recreation 
General 
Fund 
15 
Adoption of Green infrastructure standards 
that promote widespread use of bioswales, 
curb cuts and other stormwater capture 
technologies in line with the City of Tucson, 
which also developed a Green Infrastructure 
Fund to support projects that follow their 
standards. 
Extreme 
Heat 
Both 
$100,000 
High 
Climate Action Plan 
Ongoing 
Engineering and 
Transportation Civil 
Engineer 
Community 
Development 
Sustainability   
General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 480 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
16 
Provide door-to-door energy assistance, 
weatherization, and energy savings training. 
Extreme 
Heat 
Both 
$200,000 
High 
Climate Action Plan 
Ongoing 
Human Services 
Sustainability 
Engineering and 
Transportation 
General 
Fund 
17 
Investment in microgrids/solar/local storage 
in order to provide energy resilience during 
outages and extreme heat events. 
Extreme 
Heat 
Both 
$2,000,000 per 
solar and 
battery 
investment  
High 
Climate Action Plan  
Ongoing 
Transportation and 
Engineering 
Energy Coordinator  
Sustainability  
General 
fund 
18 
Retrofit public buildings and private 
residences to improve energy efficiency and 
air conditioning in order to provide heat 
relief . 
Extreme 
Heat 
Both 
$200,000 per 
public building 
and $20,000 per 
residential 
building 
High 
Water Resources 
Master Plan  
Ongoing 
Public Works – Water 
Utilities / Water 
Resources Manager 
Water 
Enterprise 
19 
Develop and operate Resilience hubs and/or 
ENVISION hubs to provide community 
resilience opportunities for all Tempe 
residents. Some of these buildings will be in 
city buildings and some will be community 
operated in privately owned buildings. 
Extreme 
Heat 
Both 
$500,000 
High 
Climate Action Plan 
First one in 
2022 and then 
ongoing 
Human Services 
Emergency Manger  
Sustainability  
Grants 
and 
General 
Fund 
20 
Develop Extreme Heat Action Plan that 
includes mapping/lists of vulnerable 
residents, language capabilities, policy 
assessment + review to ensure prioritization. 
Extreme 
Heat 
Both 
$800,000 
High 
Climate Action Plan 
and Right to 
Breathe 
Ongoing 
Sustainability  
Emergency Manager  
Grants 
21 
Develop Climate Youth Councils in the 
Cool Kids program and build a culture of 
youth-driven, indigenous informed and arts-
enhanced urban cooling. 
Extreme 
Heat 
Both 
$50,000 
High 
Climate Action Plan 
Ongoing 
Sustainability  
Emergency Manager 
Community Services 
Human Services  
Grants 
22 
Research into cool materials efficacy – 
feasibility study/pilot testing + technical 
assistance/scenario analysis. 
Extreme 
Heat 
Both 
$600,000 
High 
Climate Action Plan  
Ongoing 
Engineering and 
Transportation 
Sustainability  
Grants 
and 
General 
Fund 
23 
Conduct policy work to ensure city and its 
residents receive federal and state resources, 
including LIHEAP and energy block grants. 
Include technical assistance to document 
impacts of policy, burden, level of need so 
non-profits and advocates have data to 
advocate for resources. 
Extreme 
Heat 
Both 
$100,000 
High 
Climate Action Plan  
Ongoing 
Sustainability  
Intergovernmental 
Officer  
Strategic Management 
and Diversity 
General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 481 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
24 
Staff training for heat safety. 
Extreme 
Heat  
Both 
$50,000 
High 
N/A 
Ongoing  
Risk Management  
Sustainability  
Emergency Manager 
Grants 
25 
The City of Tempe Water Utilities Division 
has a comprehensive set of planning 
documents that outline future water systems 
operations, including specific drought 
contingency plans and water system 
operations during drought cycles. Planning 
documents include the 1997 Tempe Water 
Resources Plan (updated in 2002), the 1999 
Tempe Integrated Water System Master 
Plan, and the 2002 Drought Management 
Strategy Plan. Tempe has implemented a 
number of measures from these plans to 
diversify the city’s water resources and to 
lessen the impact of drought on our 
community. Tempe will continue to develop 
additional groundwater storage and recovery 
programs to significantly reduce potential 
drought impacts. These efforts include 
storing, CAP water and reclaimed water in 
aquifers for future recovery (over 85,000 
acre-feet stored since the mid-1990s), and 
capital improvement projects to add new 
municipal wells and increase recovery well 
pumping capacity. 
Drought 
Both 
Staff Time 
Medium 
Water Utilities 
Business Plan / 
Water Resources 
Master Plan 
Ongoing 
Water Utilities Division 
/ Water Resources 
Manager 
Water 
Enterprise 
26 
Work with the Flood Control District of 
Maricopa to maintain and monitor the levee 
protection along the Salt River. 
Flood, 
Levee 
Failure 
Both 
Staff Time 
Medium 
N/A 
Ongoing 
FCDMC with Tempe 
Public Works  - 
Engineering / Principal 
Civil Engineer 
Outside 
agencies / 
General 
fund 
27 
Miscellaneous Flood Control and Storm 
Drainage Projects to improve drainage and 
reduce flooding potential in various 
locations. 
Flood 
Both 
Staff Time 
Medium 
N/A 
Ongoing 
Public Works  - 
Engineering / Principal. 
Civil Engineer  
General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 482 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
28 
Maintain CERT Program 
All 
Hazards 
Both 
4000 
Medium 
N/A 
Ongoing 
Fire Department 
Grants 
29 
Indian Bend Wash Levee Repairs – perform 
repairs identified during the last annual 
inspection on the levees bounding Indian 
Bend Wash to mitigate failure with the 
owner the FCDMC. 
Flooding, 
Levee 
Failure 
Existing 
Staff Time 
Medium 
N/A 
Ongoing 
Public Works - 
Engineering and  Field 
Operations/ Principal. 
Civil Engineer and 
Parks Manager  
General 
Fund 
30 
Ongoing project work in cooperation with 
ADOT to identify and mitigate flooding 
related to freeway systems. 
Flooding 
Existing 
Unknown 
Medium 
N/A 
Ongoing 
Public Works  - 
Engineering / Principal. 
Civil Engineer  
General 
Fund 
31 
Continued maintenance of Tempe Town 
Lake dam and flow control structures per 
ADWR and other agency guidelines / best 
practices.  
Dam 
Inundation 
Both 
Unknown 
Medium 
O&M Plan 
Ongoing 
Public Works  -
Engineering sr. Civil 
Engineer 
General 
Fund 
32 
Use the TFMR Newsletter to inform 
homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and 
metal awnings or porches to mitigate 
damages and impacts of severe wind events. 
Severe 
Wind 
Both 
Staff Time 
Medium 
TFMR Quarterly 
Newsletter 
Yearly 
Emergency Manager 
General 
Fund 
33 
Provide Links to the Arizona Department of 
Water Resources website as part of a public 
campaign to raise awareness to hazards and 
locations of active subsidence 
Subsidence 
Both 
Staff Time 
Medium 
City of Tempe 
Website-Emergency 
Preparedness 
Section 
 Yearly 
Emergency Manager 
General 
Fund 
34 
Create heat data monitoring for indoor heat 
monitoring and special events (WiFi, sensor 
system, deploy). 
Extreme 
Heat 
Both 
$50,000 
Medium 
Climate Action Plan 
Ongoing 
Sustainability  
Information Technology 
Human Services  
Community Services  
Grants 
35 
Maintain databases and inventories and 
regularly conduct impact assessments on 
how extreme heat is affecting operations. 
Extreme 
Heat 
Both 
$200,000 
Medium 
Climate Action Plan 
Ongoing 
Sustainability 
Information Technology 
General 
Fund 
36 
Perform coordination with faith-based 
organizations to develop cooperative 
strategies to minimizing the impacts of 
extreme heat. 
Extreme 
Heat 
Both 
$50,000 
Medium 
N/A 
Ongoing 
Sustainability 
Emergency Manager 
Human Services 
N/A

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 483 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
37 
Mountain rescue equipment – PPE for 
personnel (cool clothing) for first responders 
that conduct rescues in the extreme heat. 
Extreme 
Heat 
Both 
$10,000,000 
Medium 
TFMR Quarterly 
Newsletter 
Yearly 
Emergency Manager 
General 
Fund 
38 
Develop and maintain cooling center(s) 
across the city to provide refuge areas for 
heat relief. 
Extreme 
Heat 
Both 
$100,000 
Medium 
City of Tempe 
Website-Emergency 
Preparedness 
Section 
 Yearly 
Emergency Manager 
General 
Fund 
39 
Investments in hub or islands that allow for 
a systems of refuge areas that include Cool 
parks/park islands/right of way that are 
densely shaded. 
Extreme 
Heat 
Both 
$20,000,000 
Medium 
Parks and 
Recreation Master 
Plan and Urban 
Forestry Master 
Plan 
Ongoing 
Community Services: 
Parks and Recreation 
General 
Fund  
40 
Multi-use + canal path improvements and 
streetscapes that include shelters, tree shade 
and cool materials. 
Extreme 
Heat 
Both 
$4,000,000 
Medium 
Capital 
Improvement Plan 
and Transportation 
Plan 
Ongoing 
City Engineer and 
Transportation and 
Engineering 
General 
Fund and 
HURF 
41 
Adoption of new zoning code such as a 
walkable urban code that supports shade, 
elimination of surface parking lots and green 
infrastructure  
Extreme 
Heat 
Both 
$100,000 
Medium 
Urban Core Master 
Plan, Character 
Area Plans and 
General Plan 
Ongoing 
FCDMC with Tempe 
Public Works  - 
Engineering / Principal 
Civil Engineer 
General 
Fund 
42 
Green infrastructure pilot projects (fire 
station, Rio Salado, ASU Tempe Campus) 
that demonstrate use of stormwater to 
supplement potable water. These landscapes 
tend to be more resilient to drought while 
addressing extreme heat. 
Extreme 
Heat and 
Drought  
Both 
$25,000 to 
$100,000 a year  
Medium 
Climate Action 
Plan, Engineering 
standards and 
private development 
standards 
Ongoing 
Community 
Development 
Engineering and 
Transportation Civil 
Engineer  
Sustainability  
Grant 
funding  
43 
Maintain CERT Program and add heat 
vulnerability and heat relief training 
including how to staff cooling centers and 
resilience hubs 
Extreme 
Heat  
Both 
$20,000 
Medium 
Climate Action Plan 
and Emergency 
Management Plan 
Ongoing 
Fire Department 
Grants 
44 
Design and construct streetscape projects 
that prioritizes shade and cooling. 
Extreme 
Heat 
Both 
$2,000,000 
Medium 
Transportation 
Master Plan and 
Climate Action Plan  
Ongoing 
Engineering and 
Transportation Civil 
Engineer  
Sustainability 
General 
Fund and 
HURF

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 484 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
45 
Installation of artificial shade structures in 
heat islands to support pedestrians and 
customers of local businesses. 
Extreme 
Heat 
Both 
$400,000 
Medium 
Transportation 
Master Plan  
Ongoing 
Community 
Development 
Engineering and 
Transportation Civil 
Engineer  
Sustainability 
General 
Fund 
46 
Use of mobile generators and air 
conditioning units in case of extreme heat 
emergencies. 
Extreme 
Heat 
Existing 
$250,000 
Medium 
N/A 
Ongoing 
Fire Department 
Emergency Manager 
General 
Fund 
47 
Public education (incl about clothing), heat 
safety (everyday life) + signage. 
Extreme 
Heat 
Both 
$50,000 
Medium 
N/A 
Ongoing 
Public Works -
Engineering sr. Civil 
Engineer 
General 
Fund 
48 
Heat relief for special events including 
training, communications materials, mobile 
water stations, protocols and heat relief 
plans. 
Extreme 
Heat 
Both 
$500,000 
Medium 
N/A 
Ongoing  
Special Events Task 
Force 
Emergency Manager  
Risk Management  
Sustainability  
Grants  
49 
Support Medical Examiner office with 
resources and equipment. 
Extreme 
Heat 
Both  
$50,000 
Medium 
N/A 
Ongoing  
Emergency Manager  
Grants 
50 
Construct additional splash pads to provide 
heat relief for youth. 
Extreme 
Heat 
Both 
$500,000 
Medium 
Parks and 
Recreation Master 
Plan 
Ongoing 
Community Services 
General 
Fund 
51 
Participate with outside agencies to 
distribute bottled water and provide 
education about hazards associated with 
extreme heat. 
Extreme 
Heat 
Both 
$1,000 
Low 
N/A 
Ongoing 
Fire Department 
Grants 
52 
Tempe Town Lake warning system to 
ensure residents at the lake are aware of heat 
warnings through a nighttime lighting 
system. 
Extreme 
Heat 
Both 
$250,000 
Low 
N/A 
Ongoing 
Municipal Utility 
Emergency Manager 
General 
Fund 
53 
Develop cool clothing partnerships, 
distribution with non-profits such as 
FABRIC so that residents especially youth 
and those experiencing homeless have 
access to clothing that supports heat relief. 
Extreme 
Heat 
Both 
$100,000 
Low 
N/A 
Yearly 
Economic Development  
 
General 
Fund 
54 
Support amenities for pools (showers, 
shelters) for heat relief. 
Extreme 
Heat 
Both 
$500,000 
Low 
Parks and 
Recreation Master 
Plan 
Ongoing 
Community Services 
General 
Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 485 
Table 6-8-23:  Mitigation actions and projects and implementation strategy for Tempe  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency / Job 
Title 
Responsible for 
Implementation 
Funding 
Source(s) 
55 
Seek funds for workshops and conferences, 
including National Incident Management 
System and Arizona Emergency 
Management Association Conferences. 
All 
Hazards 
Both 
$3,000 
Low 
N/A 
Ongoing 
Fire Department 
Grants 
 
Table 6-8-24:  Mitigation actions and projects and implementation strategy for Tolleson  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations. 
Flood 
Both 
Staff Time 
High 
Regular Plan 
Reviews 
On-going 
City Engineer 
and Building 
Department 
General Fund 
2 
Install more storm drains and retention areas 
to reduce impact of flooding on the 
community.  Goes along with new and 
better codes. 
Flood  
Both  
Unknown 
without 
estimates at the 
time 
High 
As needed and as 
new plans and 
permits are 
requested 
On-going 
City Engineer 
and Building 
Department 
General Fund 
and Permit Fees 
3 
Provide sand and bags at different locations 
around the city for citizens to pick up and 
use to mitigate flooding damages. 
Flood 
Both 
App. $100 per 
ton for sand 
and unknown 
for price of 
bags 
High 
As needed 
On-going 
Field Operations 
General Fund 
4 
Educate public officials on the need of the 
mitigation plan. 
Flood, 
Severe 
Wind, 
Drought, 
Extreme 
Heat, 
Subsidence  
 Both 
Staff Time 
Medium 
Annually 
Upon 
adoption & 
on-going as 
needed. 
Emergency 
Manager 
N/A

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 486 
Table 6-8-24:  Mitigation actions and projects and implementation strategy for Tolleson  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
5 
Continue to review plans and update codes 
and ordinances. 
Flood, 
Severe 
Wind 
Both 
Staff Time 
High 
As Needed 
On-going 
City Engineer 
and Building 
Department, Fire 
Department, 
Police 
Department 
N/A 
6 
By using the local websites, mailers, social 
media and other forms of local 
communication, try to educate the public 
about water conservation. 
Drought 
Both 
Staff Time and 
minimal costs 
High 
Periodic through the 
year 
Spring and 
Summer 
Periods 
City Public 
Information 
Officer 
General Fund  
7 
Continue to work with the waste water 
department to use reclaimed water for 
multiple uses. 
Drought 
Both 
Staff Time 
High 
Education all 
individuals and 
other City 
departments 
involved 
Continuous   
Water/Wastewat
er Departments 
N/A 
8 
Provide water stations when needed for 
individuals during the extreme heat periods. 
Extreme 
Heat 
Both 
Cost of bottled 
water and Staff 
Time 
High 
Active areas of 
refuge as needed 
As Needed 
Fire Department 
& Police 
Department 
General Funds 
and Donations 
9 
Continue working with local school systems 
for relief areas if individuals were displaced 
due to the extreme heat. 
Extreme 
Heat 
Both 
Staff Time 
High 
General Plan, 
Emergency 
Operations Plan 
On-going 
Senior City Staff, 
Emergency 
Manager 
If needed 
General Funds, 
possible Grants 
10 
Educate homeowners and businesses to tie 
down or not leave loose items around during 
severe wind periods. 
Severe 
Wind 
New 
Staff Time and 
possible 
publication 
costs 
Medium 
By using current 
social media that is 
available. 
Periodic 
City Public 
Information 
Officer 
General Funds 
11 
Maintain the installed backup generators at 
the police and fire departments and City 
Hall.  Make sure new backup generators are 
in the plans for any new critical facilities. 
Severe 
Wind, 
Extreme 
Heat 
Both 
$10,000 per 
year plus Staff 
Time 
High 
Continual review of 
maintenance 
programs and 
quarterly checks 
Quarterly 
Field Operations 
Department 
General Funds 
12 
Include addressing subsidence risk as a 
regular part of the land development and 
public works projects review and permitting. 
Subsidence 
New 
Staff Time 
Medium 
Continual review of 
Plans and Permits 
On-going 
City Engineer 
and Building 
Department 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 487 
Table 6-8-24:  Mitigation actions and projects and implementation strategy for Tolleson  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
13 
Provide links to the AZ Department of 
Water Resources website as a part of a 
public campaign to raise the awareness to 
the hazards and locations of active 
subsidence.  This will be done through all 
social media. 
Subsidence 
New 
Staff Time 
Medium 
As needed and 
available time 
On-going 
City Public 
Information 
Officer 
General Funds 
 
 
Table 6-8-25:  Mitigation actions and projects and implementation strategy for Unincorporated Maricopa County  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Educate/advise Maricopa County resident on 
wildfire preparedness activities to include 
defensible spaces  
Wildfire 
New 
Staff Time 
Medium 
Website update, 
Continuous, 
throughout the year 
Annual 
Ongoing 
MC Emergency 
Management 
General Funds 
2 
Perform, or encourage the performance of, 
routine roadside vegetation control to 
mitigate wildfire starts within the right-of-
way areas along roadways and highways. 
Wildfire 
New 
$1 million 
High 
Transportation Plan 
Annual 
Ongoing 
MCDOT 
HURF 
3 
Continue to provide drought/water 
conservation information/links on the 
Maricopa.gov/emergency management 
website 
Drought 
New 
Staff Time 
Medium 
Website update, 
Continuous, 
throughout the year 
Annual 
Ongoing 
MC Emergency 
Management 
General Funds 
4 
Encourage drought-tolerant landscaping 
where landscaping is required for 
commercial and industrial developments 
Drought 
New 
Staff Time 
High 
Standard P&D 
procedure 
Annual 
Ongoing 
MC Planning & 
Development 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 488 
Table 6-8-25:  Mitigation actions and projects and implementation strategy for Unincorporated Maricopa County  
5 
Continue to provide information/links on the 
Maricopa.gov/emergency management 
website to sources of hazard mitigation 
educational materials. 
Extreme 
Heat, Flood, 
Severe 
Winds, 
Wildfires 
New 
Staff Time 
Medium 
Website update, 
Continuous, 
throughout the year 
Annual 
Ongoing 
MC Emergency 
Management 
General Funds 
6 
Inspect and monitor all structures (bridges 
and box culverts) under their control on a 
semi-annual basis. 
Flood 
Both 
$150,000 
High 
Transportation Plan 
Annual 
Ongoing 
MCDOT 
HURF 
7 
Encourage bridge or culvert construction 
where roads are in locations susceptible to 
flooding. 
Flood 
New 
$7,000,000 
High 
Transportation Plan 
Annual 
Ongoing 
MCDOT 
HURF 
8 
Review building permits to ensure that 
unincorporated Maricopa County residents 
are safe from flooding by meeting the NFIP 
requirements for development within a 
Special Flood Hazard Area through 
enforcement of Floodplain Regulations. 
Flood 
Both 
On-going 
High 
Floodplain 
Regulations for 
Maricopa County 
Ongoing 
FCDMC / 
Floodplain 
Administrator 
Flood Control 
Secondary 
Property Tax 
9 
Update Community Protection plan to 
include; identify actions that will reduce the 
risk of wildfires to communities within 
wildland-urban interface zones 
Wildfire 
Both 
$150,000 
High 
CWPP 5-Year 
Update 
Ongoing/ 
5 year updates 
MC Emergency 
Management 
BLM/CWPP 
Grant 
10 
Complete and start Area Drainage Master 
Studies/Plans to identify flooding hazards, 
mitigation solutions and provide notice to 
interested parties. 
Flood 
Both 
Project-
Dependent 
High 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
11 
Complete and start delineations/re-
delineations to identify flooding hazards and 
the means to share information. 
Flood  
Both  
Project-
Dependent 
High 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
12 
Operate and maintain flood control 
structures operated and maintained by 
FCDMC in order to prevent structural 
failure and to maintain their primary 
function. 
Dam 
Inundation, 
Levee 
Failure, 
Flood 
Both 
Project-
Dependent 
High 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
13 
Update the Flood Control District’s 
Comprehensive Report 2015, and separately 
the 2015 Floodplain Management Plan for 
Unincorporated Maricopa County to set the 
framework for mitigating flood hazards. 
Flood 
Both 
Staff Time 
High 
Comprehensive 
Report 
February 2021 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 489 
Table 6-8-25:  Mitigation actions and projects and implementation strategy for Unincorporated Maricopa County  
14 
Construct the Oak Street Basin and Storm 
Drain project to mitigate flooding hazards to 
existing and future homes. 
Flood  
Both 
$4.5-Million 
High 
5-year CIP 
Ongoing/ 
Funding-
Dependent 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
15 
Continue the Flood Control District’s 
Capital Improvement Program in order to 
construct facilities that mitigate flooding 
hazards throughout Maricopa County. 
Flood  
Both  
$40M-year 
High 
5-year CIP 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
16 
Design and construct new bridge and scour 
protection at Gilbert Road over the Salt 
River. 
Flood 
Existing 
$45.65 million 
High 
5 Year CIP 
June 2025 
MCDOT 
Federal Funds, 
STP, HURF 
17 
Continue the Floodprone Properties 
Assistance Program so that were appropriate 
property can be acquired and residents 
relocated from flood hazard areas, or 
floodproofing methods can be implement to 
reduce the flooding hazard. 
Flood 
Both 
Project-
Dependent 
Medium 
Floodprone 
Properties 
Assistance Program 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
18 
Review existing building codes to determine 
if they adequately protect new development 
in hazard areas. Where feasible and 
necessary, modify codes to help mitigate 
hazards imposed on such development 
within the limits of state statutes, while also 
respecting private property rights. 
Flood,  
Severe 
Wind 
New 
Staff Time 
High 
Standard P&D 
procedure 
Ongoing 
Planning and 
Development 
Department 
General fund 
19 
Continue public education program to assist 
residents in recognizing potential flooding 
and erosion hazards and inform them on 
how to reduce risk to life and property. 
Flood 
Both 
Staff Time 
Medium 
Comprehensive 
Report, and  
Floodplain 
Management  Plan 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
20 
Work with federal and state agencies, and 
local coalitions to elevate awareness of 
fissure risk zones and the problems fissures 
may cause. 
Fissure 
Both 
Staff Time 
High 
Standard P&D 
procedure 
Ongoing 
Planning and 
Development 
Department 
General fund 
21 
Continue to operate and maintain a flood 
warning system to alert communities and the 
public to flooding events. 
Dam 
Inundation, 
Levee 
Failure, 
Flood 
Both 
$1.5M-year 
High 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
22 
Develop and maintain Flood Response Plans 
and Emergency Action Plans to identify 
actions to be taken at specific locations for 
certain conditions during flooding events. 
Dam 
Inundation, 
Levee 
Failure, 
Flood 
Both 
$400K-year 
High 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 490 
Table 6-8-25:  Mitigation actions and projects and implementation strategy for Unincorporated Maricopa County  
23 
Maintain participation in NFIP’s 
Community Rating System to further inform 
and enhance public safety, protect the 
environment and reduce losses and damages 
to public and private property through 
continued outreach and various programs. 
Flood, Dam 
Inundation, 
Levee 
Failure 
Both 
Staff Time 
High 
Comprehensive 
Report, and  
Floodplain 
Management  Plan 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
24 
Investigate incorporating GI/LID and similar 
methods as part of flood and stormwater 
management facilities in order to reduce the 
amount of potable water needed to irrigate 
landscape areas, the impact on groundwater 
recharge and effects on reducing flood 
problems. Where appropriate these methods  
can be used to retrofit existing facilities 
(including the Durango Campus and 
maintenance yards) and be incorporated into 
the design of new facilities. 
Drought, 
Flood 
Both 
Project-
Dependent 
Medium 
Comprehensive 
Report 
Ongoing 
FCDMC / 
Director 
Flood Control 
Secondary 
Property Tax 
25 
Conduct public outreach to educate the 
residents about water conservation within 
the community via website, social media, 
mailers, and any other communication 
methods. 
Drought 
Both 
Staff Time and 
minimal cost 
High 
Periodic through the 
year 
Spring and 
Summer 
Periods 
MC Public 
Information 
Officer 
General Funds 
26 
Educate/advise subdivision developers about 
County subdivision regulations that outline 
and highlight the provisions for renewable 
water uses. 
Drought 
New 
Staff Time 
High 
Educate all 
individuals and 
other County 
Departments 
involved 
Continuous 
MC Planning/ 
Development 
General Funds 
27 
Continue to provide extreme heat  
information/links on the 
Maricopa.gov/emergency management 
website. 
Extreme 
Heat 
New 
Staff Time 
High 
Periodic throughout 
the year 
Spring and 
Summer 
Periods 
MC Emergency 
Management 
General Funds 
28 
Provide public education/outreach to County 
citizens by updating the County website to 
address subsidence & fissures. 
Fissure, 
Subsidence 
Both 
Staff Time, 
Printing Cost, 
(minimal) 
Medium 
Website update, 
Continuous, 
throughout the year 
Continuous 
MC Planning/ 
Development,  
Emergency 
Management 
General Funds 
29 
Provide public education/outreach to 
developers by raising awareness to 
subsidence and fissure hazards during pre-
construction and re-zoning permitting 
processes.  
Fissure, 
Subsidence 
New 
Staff Time, 
Printing Cost, 
(minimal) 
Medium 
MC Permit Review 
Process 
Continuous 
MC Planning/ 
Development 
General Funds

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 491 
 
 
Table 6-8-26:  Mitigation actions and projects and implementation strategy for Wickenburg  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Coordinate review of building permits for 
compliance with the Floodplain Ordinance 
and NFIP regulations with FCDMC. 
Flood 
Both 
Staff Time 
High 
Council 
approval/ordinance 
of FCMDC 
administrating 
regulations 
Ongoing 
Planning 
department 
General Fund 
2 
Remove vegetation in washes that bisect 
streets within town limits to reduce wildfire 
hazard and improve stormwater conveyance 
capacities. 
Flood,  
Wildfire 
Existing 
Staff Time 
Medium  
CWPP 
Ongoing 
Fire/ Public 
Works 
General 
Fund/Grants 
when applicable 
3 
Scheduling local drainage clean out and 
inventory 
Flood 
Existing 
Staff Time 
Medium 
As needed/ 
Annually at 
minimum 
Ongoing 
Public Works 
General Fund 
4 
Review Flood Hazard mitigation plan, 
identify areas prone to flood in the heavy 
rain events 
Flood 
Existing 
Staff Time 
Medium 
Annually 
ongoing 
Public 
Works/Fire/PD 
General Fund 
5 
Fuel Reduction program COOP with BLM. 
Identify Hazard areas, set up work group 
days with BLM crews and WFD crews for 
fuels work in and around the Hassayampa 
River areas Highest prone to fire. 
Wildfire 
Existing 
Staff Time 
High 
Work Agreement 
with BLM 
ongoing 
Fire/BLM 
Fuel Reduction 
Grant/ 
6 
Wickenburg Ranch/Martinez Creek Flood 
Hazards.  Work on new amendment to 
Flood Plan from Yavapai County regarding 
the new developed area around Martinez 
creek 
Flood 
New 
UNK 
Medium 
Plan amendments 
Ongoing as 
development 
occurs 
Planning/Buildin
g department.  
Emergency Mgt. 
General Fund/ 
Developer 
Funding 
7 
Public education on the dangers of living in 
the southwest Arizona  desert where 
extreme temperatures are common in the 
summer months 
Extreme Heat 
New 
Staff Time  
Medium 
Media outlets 
annual 
Fire/EMS 
General Fund 
8 
Provide water via the station or duty engine 
to individuals that present symptoms of heat 
related illness 
Extreme Heat 
Existing 
Staff Time 
High 
Regular duties as 
engine company 
daily 
Fire/EMS 
General 
Fund/Donations

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 492 
Table 6-8-26:  Mitigation actions and projects and implementation strategy for Wickenburg  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
9 
Review temporary structure permits for 
proper tie down and anchor methods. 
Severe Wind 
New 
Staff Time 
Medium 
Review IBC/IFC 
ongoing 
Planning 
department 
General Fund 
10 
Perform training and education for PW and 
PD crews regarding public safety actions 
that can be taken to mitigate the risk of 
damage and injury to the public on a pre-
event, during, and post-event basis for 
severe wind storms. 
Severe Wind 
Both 
Staff Time 
Medium 
Training for first 
responders  for 
severe weather 
incidents. 
ongoing 
Fire and PW 
General Fund 
11 
Review FHRP, in reference to Sunnycove 
and Cassandra Dam areas, on an annual 
basis to determine if adjustments are 
necessary due to changes in areas 
downstream of dams 
Dam 
Inundation  
Both 
Staff Time 
High 
Review plan with 
PW and Planning 
ongoing 
Fire/Emergency 
operations 
General Fund 
12 
Sols Wash evaluation and development of 
projects for brush clearing and correction of 
deficiencies in existing bank protection 
measures. 
Levee Failure 
Existing  
Staff time 
High 
Annual and as 
needed 
ongoing 
Public 
Works/Fire 
General Fund 
13 
Public outreach to areas impacted in heavy 
flood events thru social media and the 
Public Relations Office to communicate the 
residual risk of areas protected by these 
structures 
Dam 
Inundation, 
Levee Failure 
Existing  
Staff time 
Medium 
Emergency 
Operations 
Annual or as 
needed 
Public Works/ 
Emergency Mgt. 
General Fund/ 
community grant 
14 
Work with ADOT on Hwy 93 bank 
protection evaluation to ensure clearing of 
primary vegetation and correction of 
deficiencies are being done on a regular 
basis 
Levee Failure 
Existing 
Staff time 
High 
Current IGA with 
ADOT 
As needed 
Public Works 
General Fund 
15 
Perform public education of water 
conservation best practices through 
newsletter, flyers, social media and website 
notices. 
Drought 
Both 
Staff time 
Medium 
N/A 
Annual 
Water and 
Wastewater Dept 
General Fund 
16 
Continue to review plans and update codes 
and ordinances. 
Drought, 
Severe Wind 
New 
Staff time 
Medium 
N/A 
ongoing 
Planning 
Department 
General Fund

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 493 
 
 
 
Table 6-8-27:  Mitigation actions and projects and implementation strategy for Youngtown  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
1 
Review building permits for compliance 
with Floodplain Ordinance and NFIP 
regulations through ongoing coordination 
with FCDMC and compliance with current 
floodplain ordinance. 
Flood 
Both 
Staff Time 
High 
None 
Ongoing 
Public Works 
Dept./Building 
Inspector 
General 
Government 
Budget 
2 
Encourage the use of weather radios, 
especially in schools, rest homes, 
convalescent homes, retirement centers and 
other locations where people congregate to 
inform them of the approach of severe 
weather. 
Extreme 
Heat, Flood, 
Severe 
Wind, 
Wildfire 
Both 
Staff Time 
Medium 
Program is 
reviewed yearly 
and is ongoing 
Ongoing 
Emergency 
Services 
Manager/Town 
Webmaster 
General 
Government 
Budget 
3 
Provide town leadership role in support of 
efforts to limit development in the departure 
and approach corridors for Luke Air Force 
base. 
Transport-
ation 
Accident 
Both 
Staff Time 
Medium 
Flight/noise 
patterns are 
reviewed with each 
new development 
Ongoing 
Mayor/Town  
Manager/Public 
Works 
Manager/Town 
Management 
General 
Government 
Budget 
4 
Promote the availability of hazard mitigation 
information from county webpage by 
providing a notice of the Maricopa County 
Hazard Mitigation Plan posted on town’s 
website with link back to Maricopa County 
Emergency Management for additional 
information. 
All Hazards 
Both 
Staff Time 
Low 
None 
Ongoing 
Emergency 
Services 
Manager/Town 
Webmaster 
General 
Government 
Budget 
5 
Participate/ conduct occasional table top 
exercises to identify potential mitigation 
measures for increasing response 
effectiveness, such as evacuation route 
marking and permanent protection measures 
for indented shelters. 
Dam 
Inundation,  
Flood 
Both 
Staff Time 
Low 
None 
Ongoing 
Public Works 
Department/ 
Maricopa County 
General 
Government 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 494 
Table 6-8-27:  Mitigation actions and projects and implementation strategy for Youngtown  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
6 
Provide public education of water 
conservation best practices through 
newsletter, flyers, social media and website 
notices. 
Drought 
Both 
Staff Time 
High 
None 
Ongoing 
Public Works 
Department in 
collaboration 
with EPCOR 
Water 
General 
Government 
Budget 
7 
Perform a public information campaign at 
the onset of the extreme heat season to help 
educate the general public on ways to 
remain safe during periods of extreme heat. 
Extreme 
Heat 
Both 
Staff Time 
High 
None 
Ongoing 
Public Safety 
Department in 
collaboration 
with the 
Salvation Army  
General 
Government 
Budget 
 
8 
Develop a community-wide, storm water 
management plan that will analyze and 
identify problem flooding areas and propose 
long-term mitigation alternatives designed 
to reduce or eliminate the flood problems. 
Flood 
Both 
Staff Time 
Medium 
EOP 
Ongoing 
Public Works 
Department, 
ADEQ & 
FCDMC 
General 
Government 
Budget 
9 
Maintain/install backup generators at key 
critical facilities such as fire and police 
stations, water pumping stations, sewer lift 
stations, etc., to provide emergency power 
for critical operations during power failures 
caused by severe wind events. 
Severe 
Wind 
Both 
Staff Time 
High 
EOP 
Ongoing 
Public Works 
Department/APS 
General 
Government   
Budget 
10 
Provide links to the Arizona Department of 
Water Resources website as part of a public 
campaign to raise awareness to the hazards 
and locations of active subsidence. 
Subsidence 
Both 
Staff Time 
Medium 
None 
Ongoing 
Public Works 
Department and 
Arizona 
Department of 
Water Resources 
General 
Government 
Budget 
11 
Develop and/or enforce a weed abatement 
ordinance.  Conduct fire safety education 
programs in local public schools.  Enact and 
enforce burn and fireworks bans as needed 
during extraordinarily dry and extreme 
wildfire conditions & seasons to mitigate 
possible, unintended wildfire starts.  
Perform, or encourage the performance of 
routine, roadside vegetation control to 
mitigate wildfire starts within the right of 
way areas along roadways and highways. 
Wildfire 
Both 
Staff Time 
Medium 
None 
Ongoing 
Public Works 
Department, 
Code 
Enforcement, 
Sun City Fire 
District 
General 
Government 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Page 495 
Table 6-8-27:  Mitigation actions and projects and implementation strategy for Youngtown  
Mitigation Action/Project 
Implementation Strategy 
ID 
No. 
Description 
Hazard(s) 
Mitigated 
Community 
Assets 
Mitigated 
(Ex/New) 
Estimated 
Cost 
Priority 
Ranking 
Planning 
Mechanism(s) for 
Implementation 
Anticipated 
Completion 
Date 
Primary Agency 
/ Job Title 
Responsible for 
Implementation 
Funding 
Source(s) 
12 
Annually coordinate with Federal, State, and 
local dam owners to get updates on any 
changes in dam safety conditions and 
emergency action plan information 
Dam Failure 
Both 
Staff Time 
Low 
None 
Annually 
Public Safety / 
Emergency 
Services 
Manager 
General 
Government 
Budget 
13 
Work with state and Federal agencies to 
provide disclosure information to all 
potential buyers of real estate that are 
located within the dam failure or emergency 
spillway inundation limits of an upstream 
dam or dams. 
Dam Failure 
Both 
Staff Time 
Low 
None 
Ongoing 
Public Safety / 
Emergency 
Services 
Manager 
General 
Government 
Budget

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 496 
 
 
 
 
 
 
 
 
 
 
 
 
 
[This page is purposely blank]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 497 
SECTION 7:  PLAN MAINTENANCE PROCEDURES 
 
According to the DMA 2000 requirements, each plan must define and document processes or 
mechanisms for maintaining and updating the hazard mitigation plan within the established 
five-year planning cycle.  Elements of this plan maintenance section include: 
 Monitoring and Evaluating the Plan 
 Updating the Plan 
 Continued Public Participation 
The following sections provide a description of the past plan maintenance procedures 
and activities, and documents the proposed procedures and schedule for the next planning 
cycle. 
7.1 
Monitoring and Evaluation 
7.1.1 Past Plan Cycle 
Maricopa County and the participating jurisdictions recognize that this hazard 
mitigation plan is intended to be a “living” document with regularly scheduled 
monitoring, evaluation, and updating.  Section 7.1 of the 2015 Plan outlined a schedule 
of specific activities for annual evaluations of the 2015 Plan.  A poll of the MJPT 
regarding the past execution of the plan maintenance strategy was taken and the 
following tasks were accomplished: 
• The Town of Gilbert performed the annual reviews for years 2016 through 
2019. 
• MCDEM sent an email to all the 2015 Plan participating jurisdictions on two 
occasions in November and December 2017, requesting an annual review per 
the requirements of Section 7.1.2 of the 2015 Plan.  Most jurisdictions replied 
with some kind response.   
Challenges to meeting the stated review schedule primarily included: 
• 
Staff turnover and lack of continuity to original planning team. 
• 
Lack of communicating plan maintenance responsibilities to successors during 
staff changes. 
§201.6(c)(4):  [The plan shall include…] (4) A plan maintenance process that includes: 
(i) A section describing the method and schedule of monitoring, evaluating, and updating the mitigation plan within 
a five-year cycle. 
(ii) A process by which local governments incorporate the requirements of the mitigation plan into other planning 
mechanisms such as comprehensive or capital improvement plans, when appropriate. 
(iii) Discussion on how the community will continue public participation in the plan maintenance process. 
 
§201.6(d)(3):  Plans must be reviewed, revised if appropriate, and resubmitted for approval within five years in 
order to continue to be eligible for HMGP project grant funding.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 498 
MJPT discussed ways to improve on the Plan review and maintenance process 
over the next five years.  The results of those discussions are outlined in the following 
sections. 
7.1.2 Proposed Schedule and Scope 
Having a multi-jurisdictional plan can aid in the plan monitoring and evaluation 
through the  consolidation of information for all participating jurisdictions into one 
document.  The MJPT reviewed the current DMA 2000 rules and October 2011 FEMA 
guidance document and discussed a strategy for performing the required monitoring 
and evaluation of the Plan over the next 5-year cycle.  The MJPT has established the 
following monitoring and evaluation procedures: 
• Schedule – The Plan shall be reviewed on at least an annual basis.  MCDEM 
will take the lead to send out an email request to each jurisdiction via the MJPT 
on or around the month of May. 
• Review Content – Within the email request distributed by MCDEM, each of 
the jurisdictions will be requested to provide responses to the following 
questions: 
o Hazard Identification: Have the risks and hazards changed? 
o Goals and Objectives: Are the goals and objectives still able to address 
current and expected conditions? 
o Policy and Program Review:  Are updates or revisions necessary for 
the policies and programs listed in Tables 6-1-xx?  
o Mitigation Projects and Actions:  For each mitigation action/project 
summarized in Section 6.3.2: 
 Has there been activity on the project – Yes or No?   
 If Yes, briefly describe what has been done and the current status 
of the action/project. 
• Documentation – Each jurisdiction will review and evaluate the Plan as it 
relates to their community and document responses to the above questions in 
the form of an email.  MCDEM will archive email responses in a digital format 
and store with the Plan for incorporation during the next Plan update.  Any hard 
copies will be included in Appendix E. 
A formal presentation of the review material will be presented to a jurisdiction’s 
council or board only if a major update to the Plan is proposed prior to the next five year 
update.  
7.2 
Plan Update 
According to DMA 2000, the Plan requires updating and re-approval from FEMA 
every five years.  The plan update will adhere to that set schedule using the following 
procedure: 
 One year prior to the plan expiration date, the MJPT will re-convene to review and 
assess the materials accumulated in Appendix E.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 499 
 The MJPT will update and/or revise the appropriate or affected portions of the plan 
and produce a revised plan document. 
 The revised plan document will be presented before the respective councils and 
boards for an official concurrence/adoption of the changes. 
 The revised plan will be submitted to DEMA and FEMA for review, comment and 
approval. 
7.3 
Continued Public Involvement 
Maricopa County and participating jurisdictions are committed to keeping the public 
informed about hazard mitigation planning efforts, actions and projects.  Continued public 
involvement activities pursued by the Plan jurisdictions over the 2015 Plan cycle are 
summarized in Table 7-1. 
 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
ALL Participating 
Jurisdictions 
• Centralized posting of Plan was maintained on the MCDEM 
website with most of the participating jurisdictions maintaining 
web-link to the MCDEM website on their local website. 
Avondale 
• Closed Roads due to flooding or trees down due to monsoons or 
other major storms. 
• Christmas trees and cooking oil recycle events to prevent sewer 
blockages. 
• Firework safety 
• COVID-19 updates 
• Weather watcher courses 
• Police Citizen Academy 
• Volunteers in Police Services (VIPS) 
• Landscaping/Watering Tips 
• Multiple seasonal posts regarding hazards for certain 
seasons/time of year i.e. Monsoon season, heat related posts 
during summer months, winter advisory posts in colder months. 
• Phoenix Raceway 
• Holiday posts to include event posts and holiday specific hazard 
posts (Thanksgiving cooking etc)

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 500 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Buckeye 
• Identified, published and update as needed cooling station 
locations on city website and in news releases. 
• Post on various social media channels, electronic newsletters 
and new releases on seasonal weather related information 
(extreme heat, freeze warnings, flooding, etc.) 
• Provide link to ADWR’s website on several city webpages 
(Fire, Public Works, Water Resources) 
• Surveyed residents on the city’s Hazard Mitigation Plan through 
social media, electronic newsletters, news releases and city 
website.    
Carefree 
• The town of Carefree maintained an information program on 
it’s COINS email platform to keep residents aware of noted 
hazards and how they impact the town residents. This platform 
goes out to the majority of the residents. In addition, public 
workshops were conducted at the council chambers covering 
specific topics (i.e. wildfire safety) at appropriate times 
throughout each year. 
Cave Creek 
• The Town of Cave Creek has posted a notice on our website 
seeking public input in our Multi Hazard Mitigation plan. We 
shall continue to post this notice throughout the planning phase. 
We have also posted a notice in our utility bill seeking public 
input. 
Chandler 
• Maintained the Emergency Preparedness section of the 
Department's website; including pages for various emergency 
situations, CENS, and Chandler CERT Basic Training. The 
page includes helpful links to a variety of county, state and 
federal agencies, including MCDEM.  
• Used social media to post emergency preparedness tips, holiday 
safety tips, and responses to events or incidents reported in the 
news.  
• Conducted open house events for the public that are held at a 
different fire station each time. This includes an annual Public 
Safety Open House conducted in partnership with the Chandler 
Police Department.  
• Conducted an annual Drowning Prevention Campaign that 
includes volunteers walking door-to-door delivering water 
safety information to residents in selected neighborhoods. The 
campaign is promoted through media releases, social media 
sites, the City's cable TV channel, citywide newsletters, and 
public appearances.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 501 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
El Mirage 
• In the last 5 years, The city has posted the MJHMP and 
seasonal information that pertains to emergency preparation 
information on the Cities web site as well as the departments 
Facebook page and Twitter account. The El Mirage PIO has 
been actively involved with information sharing to the 
community with the Covid-19 situation.  In addition, the 
information is sent to local newspapers. The City Council is 
notified annually about the progress, changes, and intentions of 
Emergency Management.. 
Fountain Hills 
• Provided information to the community regarding seasonal risks 
(wildland fire, severe storms, flooding, etc.) on a regular basis 
via social media and newspaper articles. 
• Hazard brochures have been placed in all public buildings 
containing information regarding preparedness and mitigation 
of local hazards. 
• The Maricopa County Hazard Mitigation Plan is posted on the 
Town website. 
• The Town attained Storm Ready certification from the National 
Weather Service. 
• Provided wildland fire risk inspections to residents. 
Fort McDowell Yavapai 
Nation 
• Fort McDowell Yavapai Nation (FMYN) has utilized social 
media platforms and newsletters to communicate potential risks 
during wildfire, monsoon, excessive heat and other hazards that 
present during different times of the year.  Additionally, FMYN 
provides printed materials to increase public awareness of 
potential hazards specific to the Nation. 
Gila Bend 
• Made presentations as needed to the council regarding the status 
of the Plan and in particular, successful implementation of 
actions/projects. As projects, particularly those funded by 
grants, are undertaken and completed, the departments 
responsible for implementation provide updates and 
presentations to the Town Council.  
• Provided materials that elevate the public awareness of the 
hazards that may pose a risk to the community via website and 
social media.  For example, the Town’s social media and 
website platforms were utilized to inform the public regarding a 
water safety issue and mitigation measures they could take.   
Gilbert 
• Provided local hazard information on Gilbert Fire/Emergency 
Management website and maintained links to the 2015 Plan 
hosted on the County’s website. 
• Used social media to inform public of seasonal weather hazards 
and forecasts.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 502 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Glendale 
• The Glendale Division of Emergency Management, in 
coordination with the Glendale Fire Department Public 
Information Officer, has leveraged social media channels to 
provide public awareness and education for a variety of hazards 
(i.e. extreme heat; wildfire; flooding). Additionally, information 
was posted to the Glendale Division of Emergency 
Management’s website regarding flood and monsoon safety. 
Outreach related to Drought was communicated through Water 
Services using the City’s website and social media. 
Goodyear 
• Particularly, the Fire Department Community Education social 
media account includes routine messaging regarding wild fire 
potential, heat, winter weather, flooding, emergency 
preparedness, and other mitigation topics on a regular basis 
through the year.  These messages are often picked up and 
retweeted by @goodyearaz and @goodyearpolice.  
• Goodyear host a variety of presentations in city venues 
throughout the year.   Printed information on mitigation 
(specifically wildfire) and other emergency topics is routinely 
offered.  
• CERT classes are held annually (with the exception of 2020 due 
to the pandemic) wherein mitigation efforts are discussed in the 
context of preparedness and response.  
• Presentation to employees regarding emergency preparedness 
and the types of hazards faced in Goodyear are included in the 
“brown  bag” series and offered to all employees.   
• The LEAD program has offered a class on hazards and 
preparedness (offered as an elective).   The LEAD program 
consists of citizenry in a program regarding how the city 
operates and how they can become involved. 
Guadalupe 
• Use social media to post season hazards safety messages.  
• Provide Hazard awareness safety information at community 
events. 
Litchfield Park 
• Block Watch – Education and Outreach, advise of plan and 
location. 
• Website:  Hazard mitigation plan on the City website for public 
access. 
Mesa 
• The City of Mesa through the Mesa Fire/Medical 
Department Emergency Management Division has provided 
links to FEMA, and ADEM, as well as a downloadable 
Emergency Preparation Guide and information on how to 
prepare for an emergency.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 503 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Paradise Valley 
Paradise Valley is no longer participating in the Plan 
Peoria 
• The City of Peoria Office of Communications has used their 
social media accounts, website newsroom and with media and 
residents. 
Phoenix 
• The City of Phoenix utilized the communication office 
resources to inform and educate the community on different 
important hazard mitigation efforts. It increased social media 
presence by expanding its social media platforms. (Instagram, 
Twitter and Facebook) and continued preparing the City of 
Phoenix employee newsletter (City Connection) 
• The City of Phoenix implemented Resilient PHX, conducting 
workshops and educating the community on specific hazards 
and mitigation strategies identified in the hazard mitigation plan 
Queen Creek 
• Seek public input on Hazard Mitigation Plan utilizing website. 
• Used social media to inform public of seasonal weather hazards 
and forecasts. 
• Used the town’s water bill insert to discuss monsoon hazards 
and preparedness tips. 
• Presentations to small groups and clubs concerning local 
hazards. 
• Partnered with the National Weather Service (NWS) to host the 
SkyWarn Storm Spotter course. 
• Provide Community Emergency Response Team (CERT) 
training. 
Salt River Pima-Maricopa 
Indian Community 
• Quarterly Tribal Emergency Response Commission Meetings 
that are open to the public meetings and have “call to public” on 
the agenda. This meeting enables tribal members to hear 
updates on community hazards and mitigation efforts, as well as 
give them the opportunity to provide input into these efforts.  
• Community Relations in coordination with Emergency 
Management conducts public outreach/education on all hazards 
mitigation and emergency preparedness for community 
members.  Community members were educated on what to do 
before and during disasters to reduce the loss of life and 
property in a disaster. 
• Salt River Fire Department in Coordination with Emergency 
Management organized a Volunteer Organizations Active in 
Disasters (SR-VOAD) and re implemented the Salt River 
Community Emergency Response Team (SR-CERT) into the 
community to further disaster mitigation, preparedness, 
response, and recovery education and training.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 504 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Scottsdale 
• The City of Scottsdale is dedicated to the continued 
coordination and collaboration with internal (city) and external 
partners relating to the implementation or actions towards 
hazard mitigation.   
• Public education events such as community forums, mass 
mailing and local cable television about flooding hazards and 
wildfire hazards have been done in the previous five years.   
• Internal coordination which has included stormwater 
management, public works and emergency management 
agencies highlighting and coordinating mitigation efforts with 
emphasis on National Flood Insurance program impact has also 
been done in the last five years. 
• Scottsdale has participated in public involvement meetings 
regarding the Rawhide Wash Flood Hazard Mitigation Project, 
the Reata Wash Flood Control Project, the Granite Reef 
Watershed Flood Hazard Mitigation Project, the Desert 
Mountain Area Drainage Master Study, the Lower Indian Bend 
Wash Area Drainage Master Study/Plan, and the Arizona Canal 
and Fans 5 and 6 Floodplain Redelineation Projects.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 505 
Surprise 
Marketing and Communications Dept.  
The Marketing and Communications Department has supported the 
following departments in community communication strategies for 
Monsoon, Flooding, Wind, Extreme Heat and Cold, and Wildfire 
dangers. They have also supported directed campaigns to engage the 
community in preparedness planning and mitigation efforts (“Ready, 
Set, Go” evacuation planning, and “Ready.Gov Planning tool for 
families.”) Their efforts include: 
• June Monsoon - In coordination with the National Weather 
Service Monsoon awareness month, M&C developed the June 
Monsoon cartoon character and amplified NWS 4-phase 
messaging to the community through website, press release, and 
social media to prepare residents for Monsoon season storms 
and flooding.  
• Ready.maricopa.gov - In September 2020, the Emergency 
Manager worked with M&C to create messaging on the City of 
Surprise website for the four phases of Readiness Month and to 
encourage community members to download the 
Ready.maricopa.gov app, or go to the ready.maricopa.gov 
website and download family emergency preparedness plans. 
•  Amplification of the County’s messaging on the annual Palo 
Verde Drill and Siren tests - The city shared Maricopa County’s 
social media posts and messaging (Facebook and Twitter) 
regarding the annual Palo Verde Drill and Siren tests. 
• Amplification of the NWS messaging of predicted weather 
events - In an effort to amplify and notify Surprise residents 
about predicted weather events, Marketing and 
Communications shared messaging via Facebook and Twitter 
from the US National Weather Service Phoenix Arizona 
channels, as well as sent press releases when necessary. 
• Amplification of flooding threats including messaging 
regarding sand bag stations and flood protection – Utilizing 
weather forecasts provided by the National Weather Service – 
Phoenix, the city shared sand and bag information with 
residents when estimated rainfall was anticipated to be 
significant or above average. Communication mediums used to 
share sand and bag information included press release, web 
post, and social media (Facebook, Twitter, NextDoor) 
• Amplification of any heat related weather warnings - In an 
effort to amplify and notify Surprise residents about heat-related 
warnings, Marketing and Communications shared messaging 
via Facebook, Twitter, and NextDoor from the US National 
Weather Service Phoenix Arizona channels. 
Here are some additional events and ways Marketing and 
Communications shared/shares information:

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 506 
• Ready.gov National Preparedness Month (annual) – press 
release, website posts, social media posts 
• Southwest Monsoon (annual) – press release, website posts, 
social media posts 
• National Weather Service – Phoenix (annual) weather hazard 
messaging (excessive heat, flood, flash floods, etc.) – press 
release, website posts, social media posts 
• Stormwater Awareness Month (annual) – press release, website 
posts, social media posts 
• Wildfire Prevention - social media posts 
• 5-year hazard mitigation plan including website and social 
media notifications as well as placing information regarding the 
collection of community comments in the monthly water billing 
for Surprise residents. 
Emergency Manager 
• Applied for and obtained National Weather Service (NWS) 
Storm Ready Certification, affirming specific criteria were met 
in preparation for hazardous storm mitigation and response 
efforts. 
• Each year the Emergency Manager requests a Mayoral 
Proclamation from the Mayor of Surprise claiming July as 
Monsoon Awareness Month. This proclamation is made at a 
City Council Meeting and is also broadcast to the City of 
Surprise residents and highlights Monsoon season threats and 
reminds residents to get prepared for Monsoon Season storms. 
• Coordinated messaging with the Marketing and Communication 
Department regarding heat, rain, and flooding events within the 
city. 
• Coordinated annual awareness messaging regarding the Palo 
Verde Nuclear Plant annual siren test and WEA notification. 
• Partnered with the Phoenix office of the National Weather 
Service to coordinate location specific weather reports for major 
incidents and events. 
• Appeared on local KTAR Radio Station Podcast “Silent 
Witness 5.0 Info” to discuss Ready.gov website and the family 
emergency planning app. 
Water Resource Management Dept. 
• Implemented ‘My Surprise’ interactive web application to 
report issues and events throughout the city. This application 
allows users to report potholes, flooding, water & sewer issues, 
safety hazards, etc.  
• Constructed and activated 5 digital message boards throughout 
the city. These boards allow the city and other agencies to 
communicate regional updates.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 507 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Public Works Department (In coordination with Marketing 
and Communications Department) 
• Amplified Maricopa County Flood Control District Public 
announcements and requests for public input regarding planning 
documents through Surprise social media. 
• Provided real time updates of flooding incidents and road 
closures via social media. 
• Provided updates regarding seasonal weather and sandbag 
(flood mitigation) locations so they could be announced via 
social media any time rainy weather is predicted. 
• Public Works Department actively participated in GAIN 
(Getting AZ Involved in Neighborhoods) Safety Night Program 
to educate the public about safety tips associated with flooding, 
household hazard mitigation, and preparation. 
• Utilized social media, website, and water billing flyers to seek 
public input in the development of the Capital Improvement 
Budget and Development Impact Fees that incorporate major 
projects that contribute to strategies associated with the Hazard 
Mitigation Plan. 
 
Community Development Department 
• Regularly sought public input on development projects and 
approval of those projects by the Planning and Zoning 
Commission or City Council; all of which are televised public 
meetings. 
 
Fire Medical Department  
• The Fire Medical Department engaged in public messaging 
through website, and social media at the onset of wildfire 
season with tips on prevention, evacuation, and creation of a 
family plan to minimize the risk of suffering injury in a 
wildfire. 
• The Fire Medical Department along with the Human Services 
and Community Vitality Department utilized various websites 
and social media to message heat related survival strategies, as 
well as heat warnings and locations for heat relief stations and 
water distribution stations. 
• The Fire Medical Department held an Emergency Preparedness 
Fair to make residents aware of common threats including 
wildfires, extreme heat, flooding and flash flooding.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 508 
Table 7-1:  Continued public involvement activities performed by jurisdictions 
during the 2015 Plan cycle  
Jurisdiction 
Public Involvement Activity or Opportunity 
Tempe 
• Tempe Fire Medical Rescue has a newsletter that it sent out 
every quarter. We add information on flooding, Monsoons, high 
winds and extreme heat as well to keep our community engaged 
and prepared. 
• We work through our community centers to reach our 
neighborhoods. We teach preparedness and hand out brochures 
at different times of the year that relate to weather. 
Tolleson 
• Periodic emergency response updates to city council via the 
City Manager’s update to council 
• Maintenance of a city webpage whereby any prepared plans 
may be posted along with local contact(s) for more information. 
• Provided periodic hazard mitigation outreach via City’s social 
media platforms, to include Facebook, Instagram, and Twitter, 
along with citywide newsletter and local media. 
Unincorporated Maricopa 
County 
• Maricopa County through Maricopa County Department of 
Emergency Management and the Flood Control District of 
Maricopa County has provided season specific postings on 
social media reminding the public of the potential risks for 
hazards that may be prevalent at the time. This has allowed the 
public to provide feedback and ask questions. 
• Sought public input on Hazard Mitigation Plan utilizing the 
Maricopa County Department of Emergency Management 
website, social media and a public survey.  
• Maintained an interactive webpage providing a brief description 
and access to the Hazard Mitigation Plan.  
• Presentations to small groups and clubs concerning local 
hazards, handouts at community fairs and events. 
Wickenburg 
• Every fire season the fire department handed out and gave 
public presentation on fuel reduction projects and will assisted 
in surveying property to provide information and consultation 
on hazard reduction for homeowners. 
• Using social media, local newspaper, and radio, the Town 
provided annual public outreach to inform community of 
monsoon season hazards, mitigation measures and available 
assistance. 
Youngtown 
• Provided materials that elevate the public awareness of the 
hazards that may pose a risk to the community via safety fairs, 
county fairs, special celebrations, etc. 
• Maintained an interactive county/city/town webpage providing 
a brief description of the Plan with a link to the county’s 
website where the Plan is posted and a local contact for anyone 
with questions.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 509 
 
Table 7-2 summarizes activities for public involvement and dissemination of 
information that shall be pursued whenever possible and appropriate by the Plan jurisdictions. 
 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
ALL Participating 
Jurisdictions 
• Centralize posting of Plan to the MCDEM website with each 
participating jurisdiction providing a brief note and link to the 
county’s website on their local website, as appropriate. 
• LEPC meetings – regular announcement of hazard mitigation 
information and availability of the Plan for review and 
reference. 
• Presentation of mitigation actions/projects as they are 
implemented, to boards, councils, and/or trustees, as 
appropriate. 
Avondale 
• Use season-specific postings on social media reminding the 
public of the potential risks for hazards that may be prevalent at 
the time.  
• Provide content in City Magazine (RAVE) to elevate the public 
awareness of the hazards that may pose a risk prevalent at the 
time. 
Buckeye 
• Continue to increase awareness on seasonal potential hazards by 
posting regularly on the city’s various social media channels 
• Update city webpages regularly with current and specific 
information on potential hazards 
• Include timely, seasonal safety tips in bi-weekly electronic 
newsletters 
• Provide educational materials describing the various potential 
risks to the community at the city’s special events and water 
conservation presentations 
Carefree 
• The Town of Carefree will continue to use it’s COINS email 
information platform to provide information to the residents of 
Carefree concerning relevant aspects of the plan. This will 
include information on cooling center locations, wildland fire 
safety, flood warnings and safety, etc. In addition the town will 
provide water conservation materials and drought related 
information in monthly water bills to each residence. During the 
next five years of the plan, the town will hold a wildfire safety 
workshop at town hall in the late part of April. This will give 
the town an additional opportunity to explain to residents 
relevant portions of the plan. The last piece will be a request for 
public input prior to the next five year plan update.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 510 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Cave Creek 
• The Town of Cave Creek always appreciates citizen input 
whenever we are working on plans that will benefit the town 
and our residents. The Town of Cave Creek will continue to 
post a link upon our website seeking public input as it pertains 
to the Multi-Hazard Mitigation plan. The Town also provides 
lists of some common hazards within the town limits from 
drought to wildfire to name a few. This literature is made 
available throughout the town’s buildings and is available for 
the public. Cave Creek also frequently discusses hazards at 
public meetings throughout the calendar year and at these 
meetings we remind the public that handouts are available at 
town hall. Cave Creek pro-actively alerts our residents to 
extreme risks such as wildfires and droughts. 
Chandler 
• Continue to use season specific postings on social media 
reminding the public of the potential risks for hazards that may 
be prevalent at the time.   
• Continue to host open house events for the Public. 
• Continue to conduct the annual Drowning Prevention 
Campaign. 
El Mirage 
• To continue public involvement, the social media such as web 
postings will be utilized. Additional methods will and can 
include mailings, local newspaper, and other means of social 
media. The public may give feedback by emailing the 
department, the City, social media such as Facebook and a link 
to the county website has been provided on the City web page. 
The MJHMP has been posted with a link for citizen feedback. 
Fountain Hills 
• Provide presentations to community groups regarding hazards 
that may impact the Town. 
• Continued use of social media and print media to inform 
citizens of hazards that may impact the Town. 
• Continue to provide wildland fire risk inspections to residents. 
Fort McDowell Yavapai 
Nation 
• Fort McDowell Yavapai Nation plans to continue to present 
information to the community via social media, newsletter and 
in person as needed for specific annual hazards such as wildfire, 
flooding, heat and monsoon season.  Information is shared 
through the Fire Department, Events, Health Clinic and other 
departments to members of the Nation.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 511 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Gila Bend 
• Making presentations as needed to the council regarding the 
status of the Plan and in particular, successful implementation 
of actions/projects. As projects, particularly those funded by 
grants, are undertaken and completed, the departments 
responsible for implementation provide updates and 
presentations to the Town Council. Additionally, the Plan 
update will go before the Town Council for adoption upon 
completion of the update process.   
• Provide materials that elevate the public awareness of the 
hazards that may pose a risk to the community via website and 
social media.  These platforms are used to notify the public of 
the hazards associated with extreme heat events, monsoon 
season, severe wind events, wildfire potential, air quality, 
drought conditions and the steps they can take to mitigate their 
risk.    
Gilbert 
• Maintain an inter-active Town of Gilbert webpage providing a 
brief description of the Plan with a link to the County’s website 
where the Plan is posted and a local contact for anyone with 
questions. 
• Continue to leverage social media outlets to communicate 
seasonal weather hazards, forecasts, and possible mitigation 
measures. 
Glendale 
• The Glendale Division of Emergency Management will conduct 
information sessions with departments throughout the City of 
Glendale to provide them with awareness of the Hazard 
Mitigation Plan, as well as to increase inter-departmental 
communication regarding hazard mitigation. Public awareness 
and education regarding natural hazards will continue to occur 
through social media channels and via information posted to the 
Glendale Division of Emergency Management’s website. 
Outreach related to Drought will continue to be communicated 
through Water Services using the City’s website and social 
media platforms.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 512 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Goodyear 
• The Fire Department Community Education will continue 
creating unique and interesting social media messaging to 
engage the residents of goodyear on a variety of hazards they 
may face and how they can best mitigate, prepare and/or 
respond.  The City has a strong social media following.   To 
augment this, the City will provide Preparedness Tips in their 
once monthly publication (In Focus) regarding mitigation 
efforts of the city and what they can do to reduce hazards.  
Finally, the Emergency Management Division will continue to 
respond to requests for information, speakers and materials on 
risk reduction.   During plan maintenance, residents will be 
queried on social media and directed to the existing plan which 
is posted on Goodyear’s website.   
Guadalupe 
• Continue to use social media to post season hazards safety 
messages. 
• Provide Hazard awareness safety information at community 
events. 
• Post the hazard mitigation plan on town web site for public 
information. 
Litchfield Park 
• City admin meets regularly with neighborhood block programs.  
City staff and Council meets publicly with the community thru 
State of the City address and hazard mitigation is part of that 
presentation. 
• Website: Encourage citizens to sign up for emergency 
notifications thru Maricopa County.  Hazard Mitigation plans 
available on website. 
• Social media posts about seasonal dangers in community such 
as extreme heat or monsoons.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 513 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Mesa 
• The City of Mesa provides information to the public using the 
Community Emergency Notification System (CENS), also 
called Reverse 9-1-1. If an event, incident, disaster or 
emergency meeting the CENS activation criteria occurs, the 9-
1-1 dispatch center in Mesa will call and provide information 
and/or instruction to subscribers. A website is provided for 
potential subscribers that provide information, frequently asked 
questions, and registration information. 
• The City of Mesa through the Mesa Fire/Medical Department 
Emergency Management Division will continue to maintain an 
inter-active city webpage providing a brief description of the 
Maricopa County Hazard Mitigation Plan with a link to the 
county’s website where the Plan is posted and a local contact 
for anyone with questions and feedback. Links to FEMA, and 
ADEM are provided, as well as a downloadable Emergency 
Preparation Guide and information on how to prepare for an 
emergency. 
• The City of Mesa through the Mesa Fire/Medical Department 
Public Information Office will continue to provide season 
specific postings on social media reminding the public of the 
potential risks for hazards that may be prevalent at the time. 
This has allowed the public to provide feedback and ask 
questions. 
• The City of Mesa through the Mesa Fire/Medical Department 
will work with local communities to support their wildland fire 
mitigation efforts. 
Peoria 
• During the last five years, the Office of Emergency 
Management has promoted the Hazard Mitigation plan both 
internally with departmental accreditation programs and 
external during public events such as GAIN Night and 
Homeowner Association meetings.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 514 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Phoenix 
• Develop and maintain an E-mail distribution list for continuous 
feedback from the community, it will include community 
members, businesses, non-profits, City departments, etc. that 
will help the City of Phoenix distribute surveys and questioners 
on an annual basis.  
• Continue utilizing social media platforms to inform the 
community of upcoming community events, hazards in the area 
and how to prepare for them. 
• Distribute brochures and flyers to the community, to maintain 
public awareness on hazards in the area and encourage feedback 
from the community. 
• Present to governing boards summarizing the plan, give status 
on mitigation projects and request feedback.   
• Utilize workshops to educate and help develop mitigation 
efforts for individual risks.  Educate on hazard mitigation 
process and mitigation projects. 
Queen Creek 
• Continue to make presentations to local groups concerning local 
hazards. 
• Continue to raise public awareness of monsoon hazards, 
preparedness tips and other weather related events utilizing 
Town social media, website and other tools as available and 
appropriate. 
• Continue to offer training through Town resources and 
partnerships including the CERT and Skywarn programs. 
• Investigate the requirements of the NWS StormReady Program 
and evaluate how appropriate it is to implement for the Town.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 515 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Salt River Pima-Maricopa 
Indian Community 
• Quarterly Tribal Emergency Response Commission Meetings 
that are open to the public meetings and have “call to public” on 
the agenda. This meeting enables tribal members to hear 
updates on community hazards and mitigation efforts, as well as 
give them the opportunity to provide input into these efforts. 
• Community Relations in coordination with Emergency 
Management conducts public outreach/education on all hazards 
mitigation and emergency preparedness for community 
members.  Community members were educated on what to do 
before and during disasters to reduce the loss of life and 
property in a disaster. 
• Salt River Fire Department in Coordination with Emergency 
Management organized a Volunteer Organizations Active in 
Disasters (SR-VOAD) and re implemented the Salt River 
Community Emergency Response Team (SR-CERT) into the 
community to further disaster mitigation, preparedness, 
response, and recovery education and training. 
Scottsdale 
• The plan and proposed changes will be posted on the city’s 
Emergency Management website and will contain an email 
address and phone number to which people can direct 
comments and concerns.   
• A public meeting will be held after each annual evaluation or 
when deemed necessary by the Office of Emergency 
Management.  The meetings will offer a forum for concerns, 
opinions, or ideas about the plan.  The Office of Emergency 
Management will be responsible for using city resources to 
publicize the annual public meeting and for maintaining public 
involvement through Scottsdale City Cable (Channel 11), the 
City’s Emergency Management webpage, appropriate City of 
Scottsdale social media accounts and local newspapers.   
• At least one public involvement meeting will be held regarding 
the Granite Reef Wash Phase 2 Flood Hazard Mitigation Project 
and associated Floodplain Redelineations after Phase 1 and 
Phase 2.  At least one public involvement meeting will be held 
regarding the Reata Wash Flood Control Project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 516 
Surprise 
Marketing and Communications Dept.  
• Surprise will continue to collaborate with the Flood Control 
District of Maricopa County, neighboring cities, state and 
local agencies to educate and encourage participation in the 
Wittman Area Drainage Master Study. The purpose of the 
study is to identify flood and drainage hazards within the 
designated study area, which includes a portion of northwest 
Surprise. During the course of the study, Surprise will help 
promote study related meetings and share outreach materials 
with residents and businesses to encourage participation. 
Outreach channels will include press releases, website posts, 
social media posts, and presentations at public meetings (city 
council, board of supervisors, study, etc.) 
• In September of each year, the Emergency Manager and 
M&C will deliver messaging on the City of Surprise website 
for the four phases of Readiness Month and to encourage 
community members to download the Ready.maricopa.gov 
app, or go to the ready.maricopa.gov website and download 
family emergency preparedness plans. 
• Every June, in coordination with the National Weather 
Service Monsoon awareness month, M&C will amplify 
NWS 4-phase messaging to the community through website 
and social media to prepare residents for Monsoon season 
storms and flooding. 
• The Marketing and Communications Department will 
continue to support departments in their efforts to involve the 
public in various messaging while proactively initiating 
messaging regarding local hazards and threats to the 
community including extreme weather, Monsoon Season 
storms and flooding, wildfires, and other threats.  
Emergency Manager 
• Will perform planning maintenance to maintain the City’s 
National Weather Service (NWS) Storm Ready Certification, 
re-affirming specific criteria were met in preparation for 
hazardous storm mitigation and response efforts. 
• Continue to author and request a Mayoral Proclamation from 
the Mayor of Surprise claiming July as Monsoon Awareness 
Month. This proclamation will be made at a City Council 
Meeting and will be broadcast to the City of Surprise 
residents and will highlight Monsoon season threats and 
remind residents to get prepared for Monsoon Season storms. 
• Coordinate messaging with the Marketing and 
Communication Department regarding heat, rain, and 
flooding events within the city.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 517 
• Coordinate annual awareness messaging regarding the Palo 
Verde Nuclear Plant annual siren test and WEA notification. 
• Partner with the Phoenix office of the National Weather 
Service to coordinate location specific weather reports for 
major incidents and events.  
Water Resource Management Dept. 
• The Water Resource Management Department will be 
engaging in an update to our Integrated Water Infrastructure 
Improvement Plan. As part of this update there will be public 
participation in a variety of forums such as City Council 
Work Sessions, Department Hosted Open House events (in-
person or virtual), and Key Stakeholder Engagement at their 
Public Meetings (Epcor Water, MWD, HOAs, El Mirage). 
Public Works Department 
• Continue various efforts to seek public input in the 
development of the Capital Improvement Budget and 
Development Impact Fees that incorporate projects that seek 
to fulfil the intent of the Hazard Mitigation Plan. 
• Conduct annual council presentations from various 
departments requesting the authority to apply for grants that 
seek to gain funding for projects that will mitigate the 
identified hazards. 
• Advertise Flood Control District public announcements and 
requests for public input regarding planning documents 
through social media. 
• Continue to provide updates regarding seasonal weather and 
sandbag (flood mitigation) locations via social media any 
time rainy weather is predicted. 
• Public Works Department will continue to actively 
participate in GAIN (Getting AZ Involved in 
Neighborhoods) Safety Night Program to educate the public 
about safety tips associated with flooding, household hazard 
mitigation, and preparation. 
• Utilizing social media, website, and water billing flyers, 
Public Works will continue to seek public input in the 
development of the Capital Improvement Budget and 
Development Impact Fees that incorporate major projects 
that contribute to strategies associated with the Hazard 
Mitigation Plan. 
Community Development Department 
• Community Development Department will be updating the 
City’s General Plan, which is the guiding document for the 
City’s long and short-term development. It is an intensive 
process that involves lengthy public outreach and 
opportunities for input, and presents opportunities to educate

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 518 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
the community regarding hazard mitigation efforts in 
development projects. 
Fire Medical Department  
• During the next 5 years, the SFMD will continue to partner 
with the Marketing and Communications Department and 
Surprise Channel 11 (TV station) to create and distribute 
effective messaging to the residents and visitors of Surprise 
Arizona to include:   
o Wildfire Danger: Information for Surprise residents 
in the growing urban interface. 
o Hydration Stations: Utilizing neighborhood Fire 
Stations to distribute water to the homeless. 
o Monsoon Awareness: Don’t be caught by surprise in 
Surprise. 
o Flash Flooding: Avoid Low Water Crossings during 
rainstorms. 
Tempe 
• Tempe will continue to reach out to our community centers in 
the next 5 years. We plan to bring in our CERT team, also 
partnering with ASU to pass out water and teach about extreme 
heat. Including updated links on relevant city websites.  
• Tempe will continue to post on social media about the severe 
heat and other weather implications for our community 
members.  
• Tempe’s CERT team plans to set up booths at safety fairs and 
various public events for community members to take in order 
to prepare themselves for flooding, high-winds and extreme 
heat. 
Tolleson 
• Periodic emergency response updates to city council via the 
City Manager’s update to council 
• Maintenance of a city webpage whereby any prepared plans 
may be posted along with local contact(s) for more information. 
• Provide hazard mitigation information at Citywide health and 
safety fair 
• Provide periodic hazard mitigation outreach via City’s social 
media platforms, to include Facebook, Instagram, and Twitter, 
along with citywide newsletter and local media.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 519 
Table 7-2:  Continued public involvement activities or opportunities identified by 
each participating jurisdiction  
Jurisdiction 
Public Involvement Activity or Opportunity 
Unincorporated Maricopa 
County 
• Maricopa County through Maricopa County Department of 
Emergency Management will continue to maintain a dedicated 
webpage hosting a copy of the Plan and providing a mechanism 
for submitting comments or questions regarding the Plan and 
hazard mitigation in general. 
• Maricopa County will continue to remain active on Twitter, 
Facebook and Nextdoor to continually engage the public in 
ways to mitigate and prepare for emergencies.  
• Maricopa County will continue to keep the residents informed 
and educated on project and improvement within their county. 
We will strive to increase our public involvement and outreach 
via current and future communication tools. 
• Maricopa County will post all county approved plans on the 
respective department’s websites, as appropriate. Informed 
residents are prepared residents. 
• Maricopa County Department of Emergency Management will 
continue to make presentations to local groups concerning local 
hazards. 
Wickenburg 
• Every fire season the fire department will out and give public 
presentation on fuel reduction projects and will assist in 
surveying property to provide information and consultation on 
hazard reduction for homeowners. 
• Using social media, local newspaper, and radio, the Town 
provides annual public outreach to inform community of 
monsoon season hazards, mitigation measures and available 
assistance. 
• The Town will leverage the newly created Public Relations 
office to disseminate hazard mitigation information through the 
Town’s website and social media platforms. 
• Use the Civic Ready messaging system, which utilizes both 
email and text messaging to inform the public of predicted or 
occurring hazards within the jurisdiction. 
Youngtown 
• Provide materials that elevate the public awareness of the 
hazards that may pose a risk to the community via safety fairs, 
county fairs, special celebrations, etc. 
• Maintain an interactive county/city/town webpage providing a 
brief description of the Plan with a link to the county’s website 
where the Plan is posted and a local contact for anyone with 
questions.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 520 
7.4 
Monitoring of Tribal Mitigation Activities 
The following sections describe the FMYN’s and SRPMIC’s strategy for reviewing 
and assessing the progress of the mitigation goals and actions/projects identified in the Plan.  
The strategy below is similar to the 2015 Plan, but updated to include additional detail in the 
form of a table format for use in the annual progress assessment of the defined mitigation 
actions/projects (A/P).  Details are summarized in the following subsections. 
7.4.1 Goals Achievement 
Unless otherwise directed or warranted, the goals and objectives review will 
coincide with the annual overall Plan review and update schedule presented in Section 
7.1.2.  Goals will be assessed using a subjective approach and a summary of the 
assessment will be included in the annual review memorandum. 
7.4.2 Actions/Projects Progress 
Tables 6-8-7 and 6-8-20 summarize the implementation strategy for each of the 
A/Ps identified in the FMYN and SRPMIC mitigation strategies.  For each annual 
review and plan update, the respective LPT will coordinate with the agency or agencies 
identified as the lead for each A/P, to assess the implementation status of the identified 
action/project and generate a brief memorandum summarizing the status of each project 
using the format below.  Tables 6-7-7 and 6-7-20 summarize the assessments of the 
2015 Plan mitigation A/Ps performed by the LPT for this update. 
Project ID 
and 
Description 
Lead Agency 
and Contact 
Info 
Current Status of 
Action/Project 
Project 
Disposition 
Explanation 
Include the ID 
and description 
of project as 
included in Table 
6-8-7 
Provide the name, 
agency affiliation, and 
contact information 
(phone and email) of 
person or persons 
contacted 
Assign one of the following 
status descriptors as 
appropriate: 
• 
NO ACTION 
• 
IN-PROGRESS 
• 
COMPLETED 
Provide a 
descriptor of 
either KEEP or 
DROP to identify 
future disposition 
of action/project. 
Provide a description 
of the current project 
status including date 
of implementation, 
challenges faced, 
percent completed, 
funding sources used, 
etc.. 
7.4.3 Project Closeouts 
Once an A/P is implemented, its progress will be monitored by the LPT on at 
least an annual basis as described in Section 7.4.2.  For FEMA supported projects, 
progress reports will be required on a quarterly basis throughout the project duration.  
The degree of quarterly reporting will be dependent upon the type of A/P, its funding 
source, and the associated requirements.  At a minimum, the quarterly report shall 
address: 
 Project Completion Status 
 Project Challenges/Issues (If any) 
 Budgetary Considerations (Cost Overruns or Underruns) 
 Detailed Documentation of Expenditures 
 
Upon completion of projects, a member of the LPT will visit the project location 
to view the final results.  A closed project will also change status to “Completed” and

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 521 
will then be monitored for effectiveness in the intended mitigation.  FEMA supported 
project closeouts will include an audit of the A/P financials as well as other 
guidelines/requirements set forth under the funding or grant rules, and any attendant 
administrative plans developed by FMYN and/or SRPMIC.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 522 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
[This page is purposely blank]

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 523 
SECTION 8: PLAN TOOLS 
8.1 
Acronyms 
A/P .................Mitigation Action/Project 
ADEM  ...........Arizona Division of Emergency Management 
ADEQ  ...........Arizona Department of Environmental Quality 
ADWR  ..........Arizona Department of Water Resources 
AGFD  ............Arizona Game and Fish Department 
ARS  ...............Arizona Revised Statutes 
ASCE  ............American Society of Civil Engineers 
ASERC  ..........Arizona State Emergency Response Commission 
ASLD  ............Arizona State Land Department 
ASU ...............Arizona State University 
AZDEQ  .........Arizona Department of Environmental Quality 
AZGS  ............Arizona Geological Survey 
BLM  ..............Bureau of Land Management 
CAP  ...............Central Arizona Project 
CAP  ...............Community Assistance Program 
CFR  ...............Code of Federal Regulations 
CRS  ...............Community Rating System 
CWPP  ............Community Wildfire Protection Plan 
DEMA  ...........Arizona Department of Emergency and Military Affairs 
DFIRM  ..........Digital Flood Insurance Rate 
DMA 2000  ....Disaster Mitigation Act of 2000 
DOT  ..............Department of Transportation 
EHS  ...............Extremely Hazardous Substance 
EPA  ...............Environmental Protection Agency 
EPCRA  ..........Emergency Planning and Community Right to Know Act 
FCDMC..........Flood Control District of Maricopa County 
FEMA  ...........Federal Emergency Management Agency 
FMA ...............Flood Mitigation Assistance Grant Program 
FMYN ............Fort McDowell Yavapai Nation 
GIS  ................Geographic Information System 
HAZMAT  .....Hazardous Material 
HAZUS-MH  .Hazards United States Multi-Hazard 
HMA ..............Hazard Mitigation Assistance 
IFCI  ...............International Fire Code Institute 
LEPC  .............Local Emergency Planning Committee 
MCDEM  .......Maricopa County Department of Emergency Management 
MCDOT .........Maricopa County Department of Transportation 
MJHMP  .........Multi-Jurisdictional Hazard Mitigation Plan 
MMI  ..............Modified Mercalli Intensity 
NCA ...............National Climate Assessment 
NCDC  ...........National Climate Data Center 
NDMC ...........National Drought Mitigation Center

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 524 
NESDIS .........National Environmental Satellite, Data and Information Service 
NFHL .............National Flood Hazard Layer 
NFIP  ..............National Flood Insurance Program 
NFPA  ............National Fire Protection Association 
NHC  ..............National Hurricane Center 
NIBS  .............National Institute of Building Services 
NID  ...............National Inventory of Dams 
NIST  ..............National Institute of Standards and Technology 
NSF  ...............National Science Foundation 
NOAA  ...........National Oceanic and Atmospheric Administration 
NRC  ..............National Response Center 
NWS  ..............National Weather Service 
PDSI  ..............Palmer Drought Severity Index 
RL  .................Repetitive Loss 
SARA  ............Superfund Amendments and Reauthorization Act 
SRLP  .............Severe Repetitive Loss Properties 
SRL  ...............Severe Repetitive Loss 
SRP  ...............Salt River Project 
SRPMIC .........Salt River Pima Maricopa Indian Community 
UBC  ..............Uniform Building Code 
USACE  .........United States Army Corps of Engineers 
USDA  ............United States Department of Agriculture 
USFS  .............United States Forest Service 
USGCRP ........U.S. Global Change Research Program 
USGS  ............United States Geological Survey 
VA ..................Vulnerability Analysis 
WUI ...............Wildland Urban Interface 
8.2 
Definitions 
The following terms and definitions are provided for reference and are a slight 
modification of the list originally presented by the State of Arizona in the 2013 State of Arizona 
Hazard Mitigation Plan. 
ARIZONA HAZARDS 
Dam Failure  
A dam failure is a catastrophic type of failure characterized by the sudden, rapid and 
uncontrolled release of impounded water. Dam failures are typically due to either overtopping 
or piping and can result from a variety of causes including natural events such as floods, 
landslides or earthquakes, deterioration of foundation or compositional materials, penetration 
by vegetative roots or animal burrows, fissures or improper design and construction. Such a 
failure presents a significant potential for a disaster as significant loss of life and property 
would be expected in addition to the possible loss of power and water resources.  
Drought  
A drought is a deficiency of precipitation over on extended period of time, resulting in water 
shortage for some activity, group or environmental sector. "Severe" to "extreme" drought

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 525 
conditions endanger livestock and crops, significantly reduce surface and ground water 
supplies, increase the potential risk for wildland fires, increase the potential for dust storms, 
and cause significant economic loss. Humid areas are more vulnerable than arid areas. Drought 
may not be constant or predictable and does not begin or end on any schedule. Short term 
droughts are less impacting due to the reliance on irrigation and groundwater in arid 
environments. 
Earthquake  
An earthquake is a naturally-induced shaking of the ground, caused by the fracture and sliding 
of rock within the Earth's crust. The magnitude is determined by the dimensions of the 
rupturing fracture (fault) and the amount of displacement that takes place. The larger the fault 
surface and displacement, the greater the energy. In addition to deforming the rock near the 
fault, this energy produces the shaking and a variety of seismic waves that radiate throughout 
the Earth. Earthquake magnitude is measured using the Richter Scale and earthquake intensity 
is measured using the Modified Mercalli Intensity Scale. 
Extreme Heat 
Extreme Heat refers to environmental conditions with high air temperatures, often in 
combination with high shortwave or longwave radiation (sunlight, or heat radiated from 
buildings and other surfaces) and/or high humidity. Under certain conditions, low or high wind 
speeds can also increase the risks associated with high heat. Extreme heat poses threats to the 
health and well-being of humans, animals, and plants, as well as critical infrastructure systems 
including food, water, energy, and transportation. The major human health risks associated 
with extreme heat are as follows: 
• Heat Cramps: May occur in people unaccustomed to exercising in the heat and 
generally ceases to be a problem after acclimatization.  
• Heat Syncope: This refers to sudden loss of consciousness and is typically associated 
with people exercising who are not acclimated to warm temperatures.  Causes little or 
no harm to the individual. 
• Heat Exhaustion: While much less serious than heatstroke, heat exhaustion victims may 
complain of dizziness, weakness, or fatigue. Body temperatures may be normal or 
slightly to moderately elevated. The prognosis is usually good with fluid treatment. 
• Heatstroke: Considered a medical emergency, heatstroke is often fatal.  It occurs when 
the body’s responses to heat stress are insufficient to prevent a substantial rise in the 
body’s core temperature. While no standard diagnosis exists, a medical heatstroke 
condition is usually diagnosed when the body’s temperature exceeds 105°F due to 
environmental temperatures.  Rapid cooling is necessary to prevent death, with an 
average fatality rate of 15 percent even with treatment. 
Fissure 
Earth fissures are tension cracks that open as the result of subsidence due to severe overdrafts 
(i.e., pumping) of groundwater, and occur about the margins of alluvial basins, near exposed 
or shallow buried bedrock, or over zones of differential land subsidence.  As the ground slowly 
settles, cracks form at depth and propagate towards the surface, hundreds of feet above.  
Individual fissures range in length from hundreds of feet to several miles, and from less than 
an inch to several feet wide.  Rainstorms can erode fissure walls rapidly causing them to widen 
and lengthen suddenly and dangerously, forming gullies five to 15- feet wide and tens of feet 
deep.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 526 
Flooding  
Flooding is an overflowing of water onto normally dry land and is one of the most significant 
and costly of natural disasters. Flooding tends to occur in Arizona during anomalous years of 
prolonged, regional rainfall (typical of an El Nino year), and is typified by increased humidity 
and high summer temperatures.  
Flash flooding is caused by excessive rain falling in a small area in a short time and is a critical 
hazard in Arizona. Flash floods are usually associated with summer monsoon thunderstorms 
or the remnants of a tropical storm. Several factors contribute to flash flooding: rainfall 
intensity and duration, topography, soil conditions, and ground cover. Most flash flooding is 
caused by slow-moving thunderstorms or thunderstorms repeatedly moving over the same area 
and can occur within a few minutes or hours of excessive rainfall, or a quick release from a 
dam or levee failure. Thunderstorms produce flash flooding, often far from the actual storm 
and at night when natural warnings may not be noticed. 
Landslide / Mudslide 
Landslides like avalanches are massive downward and outward movements of slope-forming 
materials. The term landslide is restricted to movement of rock and soil and includes a broad 
range of velocities. Slow movements, although rarely a threat to life, can destroy buildings or 
break buried utility lines. A landslide occurs when a portion of a hill slope becomes too weak 
to support its own weight. The weakness is generally initiated when rainfall or some other 
source of water increases the water content of the slope, reducing the shear strength of the 
materials. A mud slide is a type of landslide referred to as a flow. Flows are landslides that 
behave like fluids: mud flows involve wet mud and debris. 
Levee Failure / Breach 
Levee failures are typically due to either overtopping or erosive piping and can result from a 
variety of causes including natural events such as floods, hurricane/tropical storms, or 
earthquakes, deterioration of foundation or compositional materials, penetration by vegetative 
roots or animal burrows, fissures, or improper design, construction and maintenance.  A levee 
breach is the opening formed by the erosion of levee material and can form suddenly or 
gradually depending on the hydraulic conditions at the time of failure and the type of material 
comprising the levee. 
Severe Wind 
Thunderstorms are characterized as violent storms that typically are associated with high 
winds, dust storms, heavy rainfall, hail, lightning strikes, and/or tornadoes. The 
unpredictability of thunderstorms, particularly their formation and rapid movement to new 
locations heightens the possibility of floods. Thunderstorms, dust/sand storms and the like are 
most prevalent in Arizona during the monsoon season, which is a seasonal shift in the winds 
that causes an increase in humidity capable of fueling thunderstorms. The monsoon season in 
Arizona typically is from late-June or early-July through mid-September. 
Tornadoes are violently rotating columns of air extending from a thunderstorm to the ground. 
The most violent tornadoes are capable of tremendous destruction with wind speeds in excess 
of 250 mph. Damage paths can exceed a mile wide and 50 miles long. The damage from 
tornadoes is due to high winds. The Fujita Scale of Tornado Intensity measures tornado / high 
wind intensity and damage.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 527 
Tropical Storms are storms in which the maximum sustained surface wind ranges from 39-73 
mph. Tropical storms are associated with heavy rain and high winds. High intensity rainfall in 
short periods is typical. A tropical storm is classified as a hurricane when its sustained winds 
reach or exceed 74 mph.  These storms are medium to large in size and are capable of producing 
dangerous winds, torrential rains, and flooding, all of which may result in tremendous property 
damage and loss of life, primarily in coastal populated areas. The effects are typically most 
dangerous before a hurricane makes landfall, when most damage occurs. However, Arizona 
has experienced a number of tropical storms that caused extensive flooding and wind damage.  
Subsidence 
Land subsidence in Arizona is primarily attributed to substantial groundwater withdrawal from 
aquifers in sedimentary basins. As the water is removed, the sedimentary layers consolidate 
resulting in a general lowering of the corresponding ground surface. Subsidence frequently 
results in regional bowl-shaped depressions, with loss of elevation greatest in the center and 
decreasing towards the perimeter. Subsidence can measurably change or reverse basin 
gradients causing expensive localized flooding and adverse impacts or even rupture to long-
baseline infrastructure such as canals, sewer systems, gas lines and roads. Earth fissures are 
the most spectacular and destructive manifestation of subsidence-related phenomena. 
Wildfire 
Wildfire is a rapid, persistent chemical reaction that releases heat and light, especially the 
exothermic combination of a combustible substance with oxygen. Wildfires present a 
significant potential for disaster in the southwest, a region of relatively high temperatures, low 
humidity, low precipitation, and during the spring moderately strong daytime winds. Combine 
these severe burning conditions with people or lightning and the stage is set for the occurrence 
of large, destructive wildfires.  
Winter Storm 
Winter storms bring heavy snowfall and frequently have freezing rain and sleet.  Sleet is 
defined as pellets of ice composed of frozen or mostly frozen raindrops or refrozen partially 
melted snowflakes. These pellets of ice usually bounce after hitting the ground or other hard 
surfaces. Freezing rain begins as snow at higher altitudes and melts completely on its way 
down while passing through a layer of air above freezing temperature, then encounters a layer 
below freezing at lower level to become super cooled, freezing upon impact of any object it 
then encounters. Because freezing rain hits the ground as a rain droplet, it conforms to the 
shape of the ground, making one thick layer of ice. Snow is generally formed directly from the 
freezing of airborne water vapor into ice crystals that often agglomerates into snowflakes.  
Average annual snowfall in Arizona varies with geographic location and elevation, and can 
range from trace amounts to hundreds of inches. Severe snow storms can affect transportation, 
emergency services, utilities, agriculture and basic necessities supply to isolated communities.  
In extreme cases, snow loads can cause significant structural damage to under-designed 
buildings. 
 
GENERAL PLAN TERMS 
Actions/Projects  
Specific actions or projects that help achieve goals and objectives.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 528 
Asset 
Any natural or human-caused feature that has value, including, but not limited to people; 
buildings; infrastructure like bridges, roads, and sewer and water systems; lifelines like 
electricity and communication resources; or environmental, cultural, or recreational features 
like parks, dunes, wetlands, or landmarks. 
Building 
A structure that is walled and roofed, principally above ground and permanently affixed to a 
site. The term includes a manufactured home on a permanent foundation on which the wheels 
and axles carry no weight. 
Critical Facilities and Infrastructure 
Systems or facilities whose incapacity or destruction would have a debilitating impact on the 
defense or economic security of the nation. The Critical Infrastructure Assurance Office 
(CIAO) defines eight categories of critical infrastructure, as follows: 
Telecommunications 
infrastructure: 
Telephone, 
data 
services, 
and 
Internet 
communications, which have become essential to continuity of business, industry, 
government, and military operations. 
Electrical power systems: Generation stations and transmission and distribution networks 
that create and supply electricity to end-users. 
Gas and oil facilities: Production and holding facilities for natural gas, crude and refined 
petroleum, and petroleum-derived fuels, as well as the refining and processing facilities for 
these fuels. 
Banking and finance institutions: Banks, financial service companies, payment systems, 
investment companies, and securities/commodities exchanges. 
Transportation networks: Highways, railroads, ports and inland waterways, pipelines, and 
airports and airways that facilitate the efficient movement of goods and people. 
Water supply systems: Sources of water; reservoirs and holding facilities; aqueducts and 
other transport systems; filtration, cleaning, and treatment systems; pipelines; cooling 
systems; and other delivery mechanisms that provide for domestic and industrial 
applications, including systems for dealing with water runoff, wastewater, and firefighting. 
Government services: Capabilities at the federal, state, and local levels of government 
required to meet the needs for essential services to the public. 
Emergency services: Medical, police, fire, and rescue systems. 
Disaster Mitigation Act of 2000 (DMA2K) 
A law signed by the President on October 30, 2000 that encourages and rewards local and state 
pre-disaster planning, promotes sustainability as a strategy for disaster resistance, and is 
intended to integrate state and local planning with the aim of strengthening statewide 
mitigation planning. 
Emergency Preparedness and Response (EPR) Directorate  
One of five major Department of Homeland Security Directorates which builds upon the 
formerly independent Federal Emergency Management Agency (FEMA). EPR is responsible 
for preparing for natural and human-caused disasters through a comprehensive, risk-based

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 529 
emergency management program of preparedness, prevention, response, and recovery. This 
work incorporates the concept of disaster-resistant communities, including providing federal 
support for local governments that promote structures and communities that reduce the chances 
of being hit by disasters. 
Emergency Response Plan 
A document that contains information on the actions that may be taken by a governmental 
jurisdiction to protect people and property before, during, and after a disaster. 
Federal Emergency Management Agency (FEMA) 
Formerly independent agency created in 1978 to provide a single point of accountability for 
all Federal activities related to disaster mitigation and emergency preparedness, response and 
recovery. As of March 2003, FEMA is a part of the Department of Homeland Security’s 
Emergency Preparedness and Response (EPR) Directorate. 
Flood Insurance Rate Map (FIRM) 
Map of a community, prepared by FEMA that shows the special flood hazard areas and the 
risk premium zones applicable to the community. 
Frequency 
A measure of how often events of a particular magnitude are expected to occur. Frequency 
describes how often a hazard of a specific magnitude, duration, and/or extent typically occurs, 
on average. Statistically, a hazard with a 100-year recurrence interval is expected to occur once 
every 100 years on average, and would have a 1% chance – its probability – of happening in 
any given year. The reliability of this information varies depending on the kind of hazard being 
considered. 
Geographic Information Systems (GIS) 
A computer software application that relates physical features on the earth to a database to be 
used for mapping and analysis. 
Goals  
General guidelines that explain what you want to achieve. Goals are usually broad statements 
with long-term perspective. 
Hazard 
A source of potential danger or adverse condition. Hazards include both natural and human-
caused events.  A natural event is a hazard when it has the potential to harm people or property 
and may include events such as floods, earthquakes, tornadoes, tsunami, coastal storms, 
landslides, and wildfires that strike populated areas. Human-caused hazard events originate 
from human activity and may include technological hazards and terrorism. Technological 
hazards arise from human activities and are assumed to be accidental and/or have unintended 
consequences (e.g., manufacture, storage and use of hazardous materials). While no single 
definition of terrorism exists, the Code of Federal Regulations defines terrorism as “…unlawful 
use of force and violence against persons or property to intimidate or coerce a government, the 
civilian population, or any segment thereof, in furtherance of political or social objectives.”   
Hazard Event 
A specific occurrence of a particular type of hazard.  
Hazard Identification

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 530 
The process of identifying hazards that threaten an area. 
Hazard Mitigation 
Cost effective measures taken to reduce or eliminate long-term risk associated with hazards 
and their effects. 
Hazard Profile 
A description of the physical characteristics of hazards and a determination of various 
descriptors including magnitude, duration, frequency, probability, and extent.  
HAZUS 
A GIS-based nationally standardized earthquake, flood and high wind event loss estimation 
tool developed by FEMA. 
Implementation Strategy 
A comprehensive strategy that describes how the mitigation actions will be implemented.  
Mitigate 
To cause to become less harsh or hostile; to make less severe or painful. Mitigation activities 
are actions taken to eliminate or reduce the probability of the event, or reduce its severity of 
consequences, either prior to or following a disaster/emergency. 
Mitigation Plan 
A systematic evaluation of the nature and extent of vulnerability to the effects of natural 
hazards typically present in a defined geographic area, including a description of actions to 
minimize future vulnerability to hazards. 
Objectives 
Defined strategies or implementation steps intended to attain the identified goals. Objectives 
are specific, measurable, and have a defined time horizon. 
100-Hundred Year Floodplain 
Also referred to as the Base Flood Elevation (BFE) and Special Flood Hazard Area (SFHA).  
An area within a floodplain having a 1% or greater chance of flood occurrence in any given 
year.    
Planning  
The act or process of making or carrying out plans; the establishment of goals, policies, and 
procedures for a social or economic unit.  
Probability 
A statistical measure of the likelihood that a hazard event will occur. 
Promulgation 
To make public and put into action the Hazard Mitigation Plan via formal adoption and/or 
approval by the governing body of the respective community or jurisdiction (i.e. – town or city 
council, county board of directors, etc.). 
Q3 Data 
The Q3 Flood Data product is a digital representation of certain features of FEMA's Flood 
Insurance Rate Map (FIRM) product, intended for use with desktop mapping and Geographic 
Information Systems technology. The digital Q3 Flood Data are created by scanning the 
effective FIRM paper maps and digitizing selected features and lines. The digital Q3 Flood

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 531 
Data are designed to serve FEMA's needs for disaster response activities, National Flood 
Insurance Program activities, risk assessment, and floodplain management.  
Repetitive Loss Property 
A property that is currently insured for which two or more National Flood Insurance Program 
losses (occurring more than ten days apart) of at least $1,000 each have been paid within any 
10 year period since 1978. 
Risk 
The estimated impact that a hazard would have on people, services, facilities, and structures in 
a community; the likelihood of a hazard event resulting in an adverse condition that causes 
injury or damage. Risk is often expressed in relative terms such as a high, moderate, or low 
likelihood of sustaining damage beyond a particular threshold due to a specific type of hazard 
event. It also can be expressed in terms of potential monetary losses associated with the 
intensity of the hazard. 
Substantial Damage  
Damage of any origin sustained by a structure in a Special Flood Hazard Area whereby the 
cost of restoring the structure to its before-damaged condition would equal or exceeds 50% of 
the market value of the structure before the damage. 
Vulnerability  
Describes how exposed or susceptible to damage an asset is. Vulnerability depends on an 
asset's construction, contents, and the economic value of its functions. Like indirect damages, 
the vulnerability of one element of the community is often related to the vulnerability of 
another. For example, many businesses depend on uninterrupted electrical power–if an electric 
substation is flooded, it will affect not only the substation itself, but a number of businesses as 
well. Often, indirect effects can be much more widespread and damaging than direct effects. 
Vulnerability Analysis  
The extent of injury and damage that may result from a hazard event of a given intensity in a 
given area. The vulnerability analysis should address impacts of hazard events on the existing 
and future built environment. 
Vulnerable Populations 
Any segment of the population that is more vulnerable to the effects of hazards because of 
things such as lack of mobility, sensitivity to environmental factors, or physical abilities. These 
populations can include, but are not limited to, senior citizens and school children. 
GENERAL HAZARD TERMS 
Fujita Scale of Tornado Intensity 
Rates tornadoes with numeric values from F0 to F5 based on tornado winds peed and damage 
sustained. An F0 indicates minimal damage such as broken tree limbs or signs, while an F5 
indicates severe damage sustained. 
Liquefaction 
The phenomenon that occurs when ground shaking (earthquake) causes loose soils to lose 
strength and act like viscous fluid. Liquefaction causes two types of ground failure: lateral 
spread and loss of bearing strength.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
Page 532 
Modified Mercalli Intensity Scale 
The Modified Mercalli Intensity Scale is commonly used in the United States by seismologists 
seeking information on the severity of earthquake effects. Intensity ratings are expressed as 
Roman numerals between I at the low end and XII at the high end. The Intensity Scale differs 
from the Richter Magnitude Scale in that the effects of any one earthquake vary greatly from 
place to place, so there may be many Intensity values (e.g.: IV, VII) measured from one 
earthquake. Each earthquake, on the other hand, should have just one Magnitude, although the 
several methods of estimating it will yield slightly different values (e.g.: 6.1, 6.3).  
Monsoon 
A monsoon is any wind that reverses its direction seasonally. In the Southwestern U.S., for 
most of the year the winds blow from the west/northwest. Arizona is located on the fringe of 
the Mexican Monsoon which during the summer months turns the winds to a more 
south/southeast direction and brings moisture from the Pacific Ocean, Gulf of California, and 
Gulf of Mexico. This moisture often leads to thunderstorms in the higher mountains and 
Mogollon Rim, with air cooled from these storms often moving from the high country to the 
deserts, leading to further thunderstorm activity in the desert. A common misuse of the term 
monsoon is to refer to individual thunderstorms as monsoons. 
Richter Magnitude Scale 
A logarithmic scale devised by seismologist C.F. Richter in 1935 to express the total amount 
of energy released by an earthquake. While the scale has no upper limit, values are typically 
between 1 and 9, and each increase of 1 represents a 32-fold increase in released energy. 
Urban Heat Island Effect 
The EPA defines Urban Heat Islands (UHI) as urbanized areas that experience higher 
temperatures than outlying areas. Structures such as buildings, roads, and other infrastructure 
absorb and re-emit the sun’s heat more than natural landscapes such as forests and water 
bodies. Urban areas, where these structures are highly concentrated and greenery is limited, 
become “islands” of higher temperatures relative to outlying areas. Daytime temperatures in 
urban areas are about 1–7°F higher than temperatures in outlying areas and nighttime 
temperatures are about 2-5°F higher.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix A 
 
Official Resolution of Adoption

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix B 
 
Planning Process Documentation

1
Scott Ogden
From:
Rudy Perez (EMG) <Rudy.Perez@Maricopa.Gov>
Sent:
Friday, August 28, 2020 4:42 PM
To:
nathan.nixon@itcaonline.com; alan.sinclair@bia.gov; Dan Colgan; kshaver@blm.gov; fmueller@blm.gov; Jaret Rogers; 
Dave.Ramirez@usda.gov; selover@asu.edu; fbloom@azgfd.gov; ann.youberg@azgs.az.gov; Carrie Heglund; 'Ptrick Kernan, P.E 
(pkernan@cap-az.com)'; 'Ron.Sauntman (Ron.Sauntman@yavapai.us)'; 'Charles Kmet'; cmelford@gilacountyaz.gov; 
Kim.M.Gavigan@usace.army.mil; btcosson@azwater.gov; degliskis@azdot.gov; 'Chris Nutter (nutter.chris@azdeq.gov)'
Cc:
Hector Andrade (EMG)
Subject:
Maricopa County Hazard Mitigation Plan 2021
Attachments:
MCMJHMP 2021_Organization Invitation Letter Text.docx
All, 
 
Maricopa County and our jurisdiction partners have started the update process for our Hazard Mitigation Plan. See the 
attached letter for additional information on the plan. If you are interested in participating in the planning team 
meetings or attend as an observer, please let me know. 
 
Give me a call at  602‐273‐1411 if you have questions. 
 
Thank you, 
 
 
Rudy Perez 
Senior Planner 
Maricopa County Emergency Management 
5630 E. McDowell Rd Phoenix, AZ 85008 
O: 602.273.1411 | C: 602.509.6135

MARICOPA COUNTY MULTI-JURISDICTIONAL  
HAZARD MITIGATION PLAN - 2021 UPDATE 
 
 
DATE:  
August 28, 2020 
TO: 
 
Interested Agencies and Organizations Within or Near Maricopa County 
FROM: 
The Maricopa County Multi-Jurisdictional Hazard Mitigation Plan – Multi-Jurisdictional 
Planning Team 
RE: 
Invitation of Participation 
 
In 2004, and again in 2010 and 2015, Maricopa County and 27 other jurisdictions comprised of tribes, 
cities, towns, and other governmental organizations substantially located within the county boundaries, 
developed and/or updated a multi-jurisdictional hazard mitigation in compliance with federal regulations 
set forth by the Disaster Mitigation Act of 2000 (DMA 2000).  The DMA 2000 legislation requires local, 
county, tribal and state governments to develop a multi-hazard mitigation plan for their respective 
jurisdiction in order to be eligible to receive certain hazard mitigation and public assistance funds.  The last 
2015 Plan was submitted to the Federal Emergency Management Agency (FEMA) and approved in late 
2015.  The 2015 Plan will expire in December of 2020 and requires a full update and re-approval with the 
Arizona Department of Emergency and Military Affairs (AzDEMA) and FEMA to maintain compliance 
with the DMA 2000 legislation.  
The goal of mitigation planning is to reduce or eliminate long-term risk to life and property from natural 
hazard events.  Mitigation is not how we respond to natural disasters like floods and wildfires, but rather 
how we as a community can lessen or prevent the impact of such things in the first place.  The mitigation 
planning process involves identifying and profiling the natural hazards most likely to occur in a community, 
assessing vulnerability to these hazards, and establishing goals, actions, and projects that mitigate the 
associated risks.  The development of this mitigation plan will also ensure continued eligibility on the part 
of the county, tribes and communities for non-emergency, federal hazard mitigation grants. Each 
participating jurisdiction is a stakeholder in the Plan and the updated document will ultimately be 
resubmitted to AzDEMA and FEMA for review and approval, and formally adopted by each jurisdiction. 
Maricopa County and the 26 participating jurisdictions have organized a multi-jurisdictional planning team 
and have begun an effort to review and update the 2015 Plan.  As a prominent agency and/or organization 
in or near Maricopa County, you are invited to attend the upcoming planning team meetings as a subject 
matter expert and/or representative of the community at large.  Public and agency/organization input on the 
mitigation planning process is important to the planning team.  Residents and interested 
agencies/organizations are encouraged to educate themselves about the existing plan and offer comments 
on the update.  The planning team anticipates having an updated plan draft by February 2021, at which time 
the public will be provided the opportunity to review the plan and comment.  
If you are interested in attending the planning team meetings as a participant or just as an observer, please 
contact the following for additional information and schedules.  Please note that during this season of 
COVID19 restrictions, the planning process will be performed in a fully digital environment using web-
based meeting tools. 
 
Rudy Perez – Senior Planner 
Maricopa County Emergency Management 
602-273-1411 
Rudy.Perez@Maricopa.Gov

MARICOPA COUNTY MULTI-JURISDICTIONAL  
HAZARD MITIGATION PLAN – 2021 UPDATE 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
MEETING DATE: July 16, 2020 
MEETING TIME: 9:00AM – 1:00PM 
MEETING LOCATION: via Zoom 
DISTRIBUTION: Meeting Attendees 
FROM: 
W. Scott Ogden, P.E. – JE Fuller 
RE: 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
ATTENDEES:  
Name 
Jurisdiction/Agency/Organization 
Tom Abbott 
City of Surprise 
Hector Andrade 
Maricopa County 
John Bailey 
Maricopa County 
Mark Barnhart 
Fort McDowell Yavapai Nation 
Wayne Clement 
Town of Guadalupe 
Michael Conlin 
City of Glendale 
Marty Crossland 
City of Goodyear 
Travis Cutright 
City of Mesa 
Mike Davis 
City of Mesa 
Therese Derivan 
City of Mesa 
Darrell Duty 
City of Tempe 
Mary Evans 
JE Fuller 
Josh Friedman 
Town of Gilbert 
Joe Fusco 
City of El Mirage 
Melanie Gall 
Arizona State University 
Brian Gerber 
Arizona State University 
Sheri Gibbons 
Arizona State University 
George Good 
City of Tolleson 
Bob Goodhue 
City of Peoria 
Mary Goodman 
Town of Gilbert 
John Hatler 
Maricopa County 
Glenn Jones 
City of Peoria 
Michael Kennedy 
City of Mesa 
John Kraetz 
Town of Carefree 
Joe LaFortune 
Town of Queen Creek 
Sara Latin 
Maricopa County

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 1  
p. 2 
07/16/2021 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
Name 
Jurisdiction/Agency/Organization 
Bob Lee 
Town of Paradise Valley 
Grace Logan 
Arizona State University 
Troy Lutrick 
City of Scottsdale 
Jeff McMenemy 
City of Glendale 
Tracy Montgomery 
City of Surprise 
Nicole Munson 
City of Glendale 
Tim Murphy 
Flood Control District of Maricopa County 
Scott Myers 
Maricopa County 
Terry Nelson 
Salt River-Pima Maricopa Indian Community 
Dan Nissen 
City of Peoria 
Scott Ogden 
JE Fuller 
Patrick O'Toole 
Salt River Project 
John Padilla 
APS 
Rudy Perez 
Maricopa County 
Travis Rand 
City of Buckeye 
Anne Reichman  
Arizona State University 
Larry Rooney 
City of Avondale 
Megan Sheldon 
City of Glendale 
Warren Sprecher 
City of Mesa 
Adam Stein 
Town of Cave Creek 
Julie Syrmopoulos 
City of Goodyear 
Suzy Vargo 
City of Chandler 
Pete Weaver 
Town of Gilbert 
Mike Winters 
Town of Fountain Hills 
 
AGENDA 
 
1. INITIAL INTRODUCTIONS  
2. DMA2K OVERVIEW AND UPDATE REQUIREMENTS 
a. General DMA2K Overview 
b. Update Requirements  
3. DISCUSSION OF SCOPE AND SCHEDULE  
4. PLANNING PROCESS 
a. Discussion of Last Planning Process 
b. Planning Team Roles and Responsibilities 
5. PUBLIC INVOLVEMENT 
a. Discuss Past Strategy 
b. Formulate New Strategy  
c. Additional Agency / Organization Invitations 
6. RISK ASSESSMENT

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 1  
p. 3 
07/16/2021 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
a. Hazard List Identification 
b. Existing Plans, Studies, Reports and Technical Information 
7. EMAP DISCUSSION 
a. Purpose 
b. Supplemental Requirements to Regular DMA2000 Plan 
c. Current EMAP Annex for Unincorporated Maricopa County 
d. Go or No-Go Discussion 
DISCUSSION 
 
Agenda Item 1: 
• Rudy Perez opened the meeting and made a few introductory remarks regarding the 
plan update process.  He then introduced Scott Ogden of JE Fuller as the returning 
contractor and turned the rest of the meeting over to him. 
• Introductions were made by all via a roll call of Zoom attendees, with each person 
noting whether they were a returning multi-jurisdictional planning team (MJPT) 
member from the last planning cycle. 
• It is noted that the following jurisdictions were not represented at the meeting:  El 
Mirage, Gila Bend, Litchfield Park, Phoenix, Wickenburg, and Youngtown.  Rudy 
Perez and others from MCDEM will follow up with each of the jurisdictions. 
 
Agenda Item 2: 
• S. Ogden presented an overview of the scope and update elements for the project.   
• It was noted that the current Plan expires December 22, 2020, and that the update 
process will need to be prioritized to complete the Plan update and minimize the 
period of the Plan being expired.  
• S. Ogden outlined a summary of the DMA 2000 process and FEMA grant programs 
that are eligibility impacted. 
• S. Ogden briefly discussed the FEMA 2011 Local Plan review guidance document 
and noted the major areas in the plan that will require extra attention or detail to meet 
some of the requirements outlined in the guidance document.  He did the same with 
the newer 2017 Tribal Plan guidance document. 
Agenda Item 3: 
• Five virtual meetings using the Zoom platform are planned for the update process, 
with the fifth meeting being optional.  The following dates were set for meetings 2, 3, 
and 4: 
o Mtg No. 2 – August 20, 2020 – 9am to Noon 
o Mtg No. 3 – October 8, 2020 – 9am to Noon 
o Mtg No. 4 – November 19, 2020 – 9am to Noon 
o Mtg No. 5 – TBD and only if needed

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 1  
p. 4 
07/16/2021 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
• JE Fuller will also plan for separate tribal meetings to update the tribal planning 
elements and coordinate those directly with each Tribe. 
Agenda Item 4a: 
• Those returning members of the previous cycle MJPT were asked to provide feedback 
on the previous planning effort and process used to update the plan.  Approximately 
one-third of the meeting attendees were involved in the prior plan update.  In general, 
the returning members expressed satisfaction with the process used during the last 
cycle and felt that the effort was effective and efficient. 
Agenda Item 4b: 
• S. Ogden presented a discussion on the various levels of communication and planning 
team roles and responsibilities.  The overall planning process will be accomplished 
using three levels of contact. 
o Rudy Perez of MCDEM will function as the primary point of contact 
(PPOC) for the plan update effort and will have the responsibility of 
overall administration for the planning effort.  Primary duties will include 
scheduling meeting facilities, general contact with the planning team, 
consultant contract management, and liaison between the planning team 
and DEMA/FEMA. 
o Each jurisdiction will appoint at least one jurisdictional point of contact 
(JPOC).  The JPOC will be responsible for attendance at the MJPT 
meetings, ensuring task assignments are completed, and coordination with 
the local planning team in their own jurisdiction. 
o The local planning team is comprised staff and others that meet at the 
jurisdictional level to discuss and complete assignments given at the MJPT 
meetings.  This is where the primary work of updating the various Plan 
elements will occur. 
• In general, JE Fuller will communicate with the MJPT through the JPOCs.  JE Fuller 
will plan to use their Citrix Sharefile site for distribution and collection of documents.  
Links and access credentials will be provided to each JPOC in a future email.  Any 
jurisdiction that is unable to use the Sharefile site, will need to work out separate 
arrangements with JE Fuller or MCDEM. 
Agenda Item 5: 
• S. Ogden presented an overview of the past plan cycle public involvement strategy 
and led the MJPT in a discussion evaluating the effectiveness of the effort.  There 
were only a few comments and feedback received from the public at large during the 
last plan cycle.  The MJPT was mixed on satisfaction with the responses to the past 
effort and discussed new options for reaching out.  COVID19 challenges make any 
type of face-to-face public engagements difficult if not prohibitive. Other options 
including the use of online questionnaires, more social media, and direct contact 
utility bill inserts, and other methods were discussed.   
• JE Fuller will work with a few select members of the planning team to prepare a 2 to 
3-page questionnaire that can be made available both online and via direct

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 1  
p. 5 
07/16/2021 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
distribution measures.  All responses will be directed to the PPOC for review and 
tallying. 
• Other public involvement strategies for the 2021 Plan update will employ agency 
social media accounts and online presence (websites, Facebook, Twitter, NextDoor, 
etc.), local newspaper notices, bulletins and flyers in community newsletters and 
utility bill inserts. 
• JE Fuller will work members of the Arizona State University (ASU), MCDEM and 
other MJPT members to draft a questionnaire.  Melanie Gall of ASU volunteered to 
convert the questionnaire to a format for implementing online through Qualtrics.  
• S. Ogden will provide template documents and language suitable for use by each 
jurisdiction in their individual efforts.  MCDEM will take responsibility for updating 
the county website that hosts the current plan and for placing the public notices in the 
regional newspapers.  Each jurisdiction will provide website notices that direct the 
public to the county website, as well as develop notices to post in municipal 
buildings, in local newspapers, bulletins and utility bill inserts, etc., as they see fit. 
• S. Ogden worked with the MJPT to develop a list of other agencies and/or 
organizations that may have an interest in the mitigation planning for the county and 
developed a contact list. JE Fuller will work with the MJPT and MCDEM to get 
contact information and the invitations sent out before the next meeting. 
Agenda Item 6: 
• The MJPT discussed the current list of hazards assessed in the Plan and 
compared/contrasted that list with the list of hazards discussed in the 2018 State of 
Arizona Hazard Mitigation Plan.  There was significant discussion of the recent 
COVID19 pandemic and whether the team wanted to include Disease or something 
related to the Plan.  The conclusion was no based-on questions about being able to 
come up with reasonable mitigation actions and projects and the consensus that any 
actions would be more along the lines of preparedness and response.  
• No other hazards not in the current plan, were identified for inclusion and the final 
team consensus was to keep the hazard list the same for the update. 
Agenda Item 7: 
• Rudy Perez gave a brief overview of the Emergency Management Accreditation 
Program (EMAP) and the County’s purpose and intent to participate.  The EMAP 
program’s risk assessment and mitigation elements can be significantly satisfied with 
the MJHMP but will still require some additional work and the addition of human-
caused hazards and related mitigation actions.  The extra elements for the 
Unincorporated County will be provided in an Annex to the MJHMP. 
• The MJPT was polled to see if any other jurisdictions were interested in preparing an 
EMAP annex as a part of pursuing EMAP accreditation as a jurisdiction.  No other 
MJPT members responded, so only Unincorporated Maricopa County will be 
preparing the annex.

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 1  
p. 6 
07/16/2021 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
MEETING SUMMARY: 
• S. Ogden reviewed the action items and initial assignments for the MJPT. 
• JE Fuller will prepare and send an email with the Sharefile link and other instructions 
• Next Meeting: 
Date: August 20, 2020 
Time: 9am to Noon 
Place: via Zoom (calendar invite with links to be distributed) 
 
ACTION ITEM SUMMARY: 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
1-1 
Review and become familiar with the 2015 MCMJHMP 
All Jurisdictions 
[8/20/20] 
1-2 
JE Fuller to provide template public involvement 
materials for use by the MJPT. 
JE Fuller 
[7/23/20] 
1-3 
JE Fuller work with ASU, MCDEM and others to 
prepare a questionnaire for obtaining public feedback and 
responses to hazard related questions.  The final version 
will be converted by ASU into an online form. 
JE Fuller, ASU, 
MCDEM, etc. 
[8/20/20] 
1-4 
Use the public involvement template documents provided 
by JE Fuller to develop and post website notices and 
develop newsletters, fliers, utility inserts, and public 
notices for publishing in local newspapers, social media, 
and others. 
All Jurisdictions 
[8/20/20]

MARICOPA COUNTY MULTI-JURISDICTIONAL  
HAZARD MITIGATION PLAN – 2021 UPDATE 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
MEETING DATE: August 20, 2020 
MEETING TIME: 9:00AM – 12:00PM 
MEETING LOCATION: via Zoom 
DISTRIBUTION: Meeting Attendees 
FROM: 
W. Scott Ogden, P.E. – JE Fuller 
RE: 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
ATTENDEES:  
Name 
Jurisdiction/Agency/Organization 
Tom Abbott 
City of Surprise 
Hector Andrade 
Maricopa County 
Mark Barnhart 
Fort McDowell Yavapai Nation 
Michael Boule 
City of Surprise 
Kevin Burke 
City of Peoria 
Mark Christian 
Coconino County 
Wayne Clement 
Town of Guadalupe 
Lisa Collins 
City of Glendale 
Mike Conlin 
City of Glendale 
Kelly Corsette 
City of Scottsdale 
C. Ashley Couch 
City of Scottsdale 
Travis Cutright 
City of Mesa 
Therese Derivan 
City of Mesa 
Josh Friedman 
Town of Gilbert 
Melanie Gall 
Arizona State University 
Kim Gathers 
City of Phoenix 
Brian Gerber 
Arizona State University 
Bob Goodhue 
City of Peoria 
Ken Goucher 
City of Scottsdale 
Randy Grant 
City of Scottsdale 
Brad Hartig 
City of Scottsdale 
Rhonda Humbles 
City of Peoria 
Glenn Jones 
City of Peoria 
Harry Jones 
City of Mesa 
Rob Kidder 
City of Mesa 
John Kraetz 
Town of Carefree

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 2  
p. 2 
08/20/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
Name 
Jurisdiction/Agency/Organization 
Joe LaFortune 
Town of Queen Creek 
Lee Lambert 
City of Surprise 
Bob Lee 
Town of Paradise Valley 
Troy Lutrick 
City of Scottsdale 
Art Miller 
City of Peoria 
Tracy Montgomery 
City of Surprise 
Nicole Munson 
City of Glendale 
Tim Murphy 
Flood Control District of Maricopa County 
Terry Nelson 
Salt River-Pima Maricopa Indian Community 
Dan Nissen 
City of Peoria 
Scott Ogden 
JE Fuller 
Brent Olson 
City of Phoenix 
Jared Palacios 
City of Avondale 
Rich Peel 
Maricopa County 
Rudy Perez 
Maricopa County 
Cape Powers 
City of Peoria 
Anne Reichman  
Arizona State University 
Larry Rooney 
City of Avondale 
Michelle Seitz 
City of Tempe 
Nancy Selover 
Arizona State Climate Office 
Antonio Shin 
City of Phoenix 
Jana Smith 
Maricopa County 
Warren Sprecher 
City of Mesa 
Adam Stein 
Town of Cave Creek 
Julie Syrmopoulos 
City of Goodyear 
Kristin Tytler 
City of Surprise 
Kathy Valenzuela 
Town of Gila Bend 
Suzy Vargo 
City of Chandler 
Pete Weaver 
Town of Gilbert 
Nicole Wiley 
City of Surprise 
Matthew Williams 
City of Litchfield Park 
Mike Winters 
Town of Fountain Hills 
 
AGENDA 
 
1. INTRODUCTIONS / ROLL CALL 
2. TASK ASSIGNMENT STATUS REVIEW 
3. GENERAL – Community Description Review 
4. PLAN MAINTENANCE STRATEGY 
a. Review/Discuss Maintenance and Monitoring Over Last Plan Cycle

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 2  
p. 3 
08/20/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
b. Develop New Monitoring Schedule 
c. Develop Plan Update Schedule 
5. RISK ASSESSMENT 
a. Critical Facility Review/Update 
b. Review hazard profile mapping and data for each hazard 
c. CPRI Update 
d. Discuss and Profile Development Trends 
i. Past Plan Cycle 
ii. Future Development 
DISCUSSION 
 
Agenda Item 1: 
• Rudy Perez opened the meeting and made a few introductory remarks regarding the 
process and status of the planning effort.   
• Scott Ogden of JE Fuller led the team through a roll-call of each jurisdiction and 
attending agency. 
• It is noted that the following jurisdictions were not represented at the meeting:  
Buckeye, El Mirage, Tolleson, Wickenburg, and Youngtown.  Rudy Perez and others 
from MCDEM will follow up with each of the non-attending jurisdictions. 
 
Agenda Item 2: 
• A quick review of the Mtg No. 1 action items and assigned tasks was conducted. 
• Several communities have started the public outreach through postings to websites 
and other community forums. 
• MCDEM, ASU, FCDMC and JE Fuller worked to modify and refine the hazard 
mitigation questionnaire and ASU converted the text forms to an online format using 
Qaultrics.  All responses will copied to a database which can be downloaded and 
summarized as needed. 
• The MJPT agreed to keep the questionnaire live at least until the draft plan is 
published. 
• MCDEM also worked with ASU to translate the questionnaire into Spanish and that 
version will also be posted. 
• The team requested that Spanish versions of the other notification materials be made 
available.  MCDEM, ASU and the City of Surprise will work together to get the 
templates translated. 
Agenda Item 3: 
• Review and update of the community description sections was discussed and assigned 
as work tasks as follows for each jurisdiction: 
o Review and update first section of text as needed

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 2  
p. 4 
08/20/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
o Review and verify jurisdictional boundaries shown on the location maps 
provided 
o Verify logos being used. 
• JE Fuller will prepare a worksheet in MSWord for each jurisdiction and provide to 
the JPOCs via an email.  Edits and requested changes will be communicated to JE 
Fuller via a return email with a deadline of Oct 8th (Mtg No. 3). 
Agenda Item 4a: 
• The MJPT reviewed Section 7.1 of the 2015 Plan and discussed past monitoring and 
evaluation efforts over the last plan cycle.  Each jurisdiction was asked to provide a 
bullet list of specific activities they performed during the last plan cycle in the form 
of an email to JE Fuller. 
Agenda Item 4b: 
• The MJPT reviewed and decided to retain the monitoring and review strategy 
outlined in Section 7.1.2 for the next plan cycle.  
Agenda Item 4c: 
• The MJPT reviewed and decided to retain the plan update strategy outlined in Section 
7.2 for the next plan cycle.  
Agenda Item 5a: 
• The MJPT reviewed the definitions and summaries of the critical facilities and 
infrastructure (CFI) outlined in Section 5.2.4 of the 2015 Plan. 
• JE Fuller will prepare a review package of currently identified CFI for each 
jurisdiction and provide to each JPOC for review and update.  Included in the 
package will be a spreadsheet, GIS shapefile and KMZ file for use in Google Earth.  
Updates will be provided to JE Fuller before Oct 8th (Mtg No. 3). 
• The MJPT had discussions regarding securing the CFI data.  The group was reminded 
that the data and resulting vulnerabilities are only summarized in the plan and are not 
mapped or detailed.  The detailed data will be secured and not shared outside the 
MJPT.  It will be the responsibility of the MJPT to keep the data secured at the 
jurisdictional level. 
Agenda Item 5b: 
• Profile information for each of the plan hazards was reviewed by the MJPT.  
Highlights of that review are noted by the bullets below: 
o Dam failure profile mapping is still in progress.  JE Fuller requested data 
from the City of Phoenix. Kim G. will request the data and get back to JE 
Fuller. 
o Levee failure profile mapping is in progress and waiting on final data-sets 
from FCDMC. 
o Drought - Nancy S. noted that new graphs showing historic drought levels 
are now available through the U.S. Drought Monitor website.

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 2  
p. 5 
08/20/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
o Extreme Heat – ASU will be assisting with the review and update of the 
extreme heat profile and sharing research on mitigation. 
o Wildfire – recent wildfires will have an impact on the risk moving forward 
in the next plan cycle.  The 2015 Plan profile information will be 
evaluated and adjusted accordingly. 
o Subsidence – several of the active subsidence zones have expanded since 
the last plan cycle and are correlated with the continuing strong drought. 
o Flood, Fissure, and Severe Wind will be similar to the 2015 Plan profiles 
and no significant changes are anticipated. 
Agenda Item 5c: 
• The CPRI section and purpose was reviewed by the MJPT. Each jurisdiction’s 
planning team was tasked with reviewing their values in the 2015 Plan for each 
hazard and responding with any desired adjustments by the Oct 8th meeting. 
Agenda Item 5d: 
• The current planning requirements for addressing the development trends was 
reviewed by the MJPT.  JE Fuller will provide a worksheet for each jurisdiction to 
complete that discusses the development activity of the past plan cycle and the 
anticipated development trends for the next plan cycle.  The worksheets will be due 
by the Oct 8th meeting. 
MEETING SUMMARY: 
• S. Ogden reviewed the action items and assignments for the MJPT for Meeting 
number 2. 
• JE Fuller will prepare and send the various worksheets discussed to each jurisdiction 
for completion by the next meeting scheduled for October 8th. 
• Next Meeting: 
Date: October 8, 2020 
Time: 9am to Noon 
Place: via Zoom (calendar invite with links has been distributed) 
 
ACTION ITEM SUMMARY: 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
Mtg 1 
See Mtg No. 1 Notes for prior action items. 
All Jurisdictions 
[8/20/20] 
2-1 
Develop and distribute worksheet packages discussed 
during meeting 
JE Fuller 
[NLT 8/28/20] 
2-2 
Review and provide edits for Community Description 
worksheet package via a return email to JE Fuller 
All Jurisdictions 
[10/8/20]

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 2  
p. 6 
08/20/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
ACTION ITEM SUMMARY: 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
2-3 
Review and edit Critical Facility and Infrastructure list as 
needed and return edited spreadsheet via email to JE 
Fuller 
All Jurisdictions 
[10/8/20] 
2-4 
Review and edit CPRI for each hazard as desired.  
Communicate any changes via an email to JE Fuller 
All Jurisdictions 
[10/8/20] 
2-5 
Complete Development Trend worksheet and return to JE 
Fuller via an email 
All Jurisdictions 
[10/8/20]

MARICOPA COUNTY MULTI-JURISDICTIONAL  
HAZARD MITIGATION PLAN – 2021 UPDATE 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
MEETING DATE: October 8, 2020 
MEETING TIME: 9:00AM – 11:15AM 
MEETING LOCATION: via Zoom 
DISTRIBUTION: Meeting Attendees 
FROM: 
W. Scott Ogden, P.E. – JE Fuller 
RE: 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
ATTENDEES:  
Name 
Jurisdiction/Agency/Organization 
Tom Abbott 
City of Surprise 
Heather Allemang 
 
Hector Andrade 
Maricopa County 
Mark Barnhart 
Fort McDowell Yavapai Nation 
Michael Boule 
City of Surprise 
Kevin Burke 
City of Peoria 
Mark Christian 
Coconino County 
Wayne Clement 
Town of Guadalupe 
Lisa Collins 
City of Glendale 
Mike Conlin 
City of Glendale 
Kelly Corsette 
City of Scottsdale 
C. Ashley Couch 
City of Scottsdale 
Travis Cutright 
City of Mesa 
Therese Derivan 
City of Mesa 
Alan English 
City of Peoria 
Mary Evans 
JE Fuller 
Josh Friedman 
Town of Gilbert 
Joe Fusco 
Town of El Mirage 
Melanie Gall 
Arizona State University 
Kim Gathers 
City of Phoenix 
Brian Gerber 
Arizona State University 
Brett Gilliland 
City of Buckeye 
Bob Goodhue 
City of Peoria 
Elliot Harwood 
Maricopa County 
Rhonda Humbles 
City of Peoria 
Laura Hyneman 
City of Mesa

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 3  
p. 2 
10/08/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
Name 
Jurisdiction/Agency/Organization 
Glenn Jones 
City of Peoria 
Harry Jones 
City of Mesa 
Braden Kay 
City of Tempe 
Rob Kidder 
City of Mesa 
John Kraetz 
Town of Carefree 
Joe LaFortune 
Town of Queen Creek 
Lee Lambert 
City of Surprise 
Bob Lee 
Town of Paradise Valley 
Daylynn Little 
City of Scottsdale 
Mike Luecker 
U.S. Army Corps of Engineers 
Troy Lutrick 
City of Scottsdale 
Richard Manzo 
City of Mesa 
Dee McKenzie 
City of Mesa 
Tracy Montgomery 
City of Surprise 
Nicole Munson 
City of Glendale 
Tim Murphy 
Flood Control District of Maricopa County 
Terry Nelson 
Salt River-Pima Maricopa Indian Community 
Kyle Nicholson 
City of Mesa 
Dan Nissen 
City of Peoria 
Scott Ogden 
JE Fuller 
Carlos Padilla 
Jared Palacios 
City of Avondale 
Rudy Perez 
Maricopa County 
Arif Rahman 
City of Mesa 
Travis Rand 
City of Buckeye 
Jaret Rogers 
National Weather Service 
Larry Rooney 
City of Avondale 
Fred Rustam 
City of Mesa 
Craig Sears 
City of Mesa 
Michelle Seitz 
City of Tempe 
Antonio Shin 
City of Phoenix 
Amy Sloane 
Town of Wickenburg 
Jana Smith 
Maricopa County 
Daren Sweet 
Az DEMA 
Julie Syrmopoulos 
City of Goodyear 
Kristin Tytler 
City of Surprise 
Kathy Valenzuela 
Town of Gila Bend 
Suzy Vargo 
City of Chandler 
Pete Weaver 
Town of Gilbert

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 3  
p. 3 
10/08/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
Name 
Jurisdiction/Agency/Organization 
Nicole Wiley 
City of Surprise 
Matthew Williams 
City of Litchfield Park 
Mike Winters 
Town of Fountain Hills 
 
AGENDA 
 
d. NFIP Statistics and Compliance 
4. OTHER DISCUSSION 
DISCUSSION 
 
Agenda Item 1: 
• Scott Ogden of JE Fuller led the team through a roll-call of each jurisdiction and 
attending agency. 
• It is noted that the following jurisdictions were not represented at the meeting:  Cave 
Creek, Tolleson, and Youngtown.  Rudy Perez and others from MCDEM will follow 
up with each of the non-attending jurisdictions. 
 
Agenda Item 2: 
• A quick review of the Mtg No. 1 and action items and assigned tasks was conducted. 
• Most communities have either started or completed the public outreach through 
postings to websites and other community forums. 
• Other assigned tasks are in various stages of completion.  A status report of 
assignments through October 8, 2020 is appended to end of these notes. 
Agenda Item 3a: 
• A review of the requirements for assessing and evaluating the 2015 Plan mitigation 
actions and projects (A/Ps) was presented and discussed. The planning team (PT) 
reviewed 2015 Plan’s assessment of the 2010 A/Ps for context and will use the same 
process for this update. 
1. INTRODUCTIONS / ROLL CALL 
2. TASK ASSIGNMENT STATUS REVIEW 
3. MITIGATION STRATEGY 
a. Existing Mitigation Action/Project Assessment 
b. Capability Assessment 
i. Legal and Regulatory (Codes / Ordinances) 
ii. Administrative and Technical Staff Resources 
iii. Fiscal Capabilities  
c. Plans / Manuals / Guidelines / Studies Integration and Incorporation 
i. Past Plan Cycle 
ii. Future Strategy

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 3  
p. 4 
10/08/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
• The worksheet format for preparing the updated assessment of the 2015 Plan A/Ps 
was reviewed and discussed. JE Fuller will distribute the worksheets to each 
jurisdiction for completion by the next meeting. 
Agenda Item 3b: 
• An overview of the Capability Assessment (CA) was presented and discussed and the 
CA summarized in the 2015 Plan was reviewed.   
• Each jurisdiction was tasked with reviewing and editing their jurisdiction-specific 
tables in the 2015 Plan and providing edits and/or updates to JE Fuller by the next 
meeting. 
Agenda Item 3c: 
• The planning team reviewed and discussed the Plan Integration and Incorporation 
section of the 2015 Plan and the current FEMA plan review guidance. 
• JE Fuller reviewed a worksheet for summarizing the updated elements that will be 
distributed for use by the jurisdictions.  Once completed, JE Fuller will merge the 
edits into the 2021 Plan.  Each jurisdiction will need to complete each of the sections.   
• If the standard operating procedure for a jurisdiction is unchanged from the 2015 Plan 
entry, the worksheet box can be noted as such. 
• Worksheets are due by the next meeting date. 
Agenda Item 3d: 
• The planning team reviewed and discussed the NFIP Compliance section of the 2015 
Plan. 
• JE Fuller will provide an updated Table 6-5 
• Each jurisdiction shall review the responses to questions 1 through 4 in Section 6.2.4 
of the 2015 Plan and provide updates to JE Fuller. 
Agenda Item 4: 
• The planning team revisited the discussions from Mtg No. 1 regarding the inclusion 
of Pandemic and HAZMAT as hazards in the Plan, and especially in regard to recent 
incidents of each. 
• JE Fuller noted that both were included in the 2015 EMAP Annex 
• Concerns were raised by some team members regarding the effectiveness of having 
the analyses with 5-years before an update. 
• The planning team concluded that some form of recognition of the two hazards 
should be included in the risk assessment, but not carried out to a full hazard profile 
and vulnerability analysis.  JE Fuller will add a few paragraphs to acknowledge the 
recent events. 
MEETING SUMMARY: 
• S. Ogden reviewed the action items and assignments for the MJPT for Meeting 
number 3.

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 3  
p. 5 
10/08/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
• JE Fuller will prepare and send the various worksheets discussed to each jurisdiction 
for completion by the next meeting scheduled for November 19th. 
• Next Meeting: 
Date: November 19, 2020 
Time: 9am to Noon 
Place: via Zoom (calendar invite with links has been distributed) 
 
ACTION ITEM SUMMARY (ALL MEETINGS): 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
Mtg 1 
See Mtg No. 1 Notes for prior action items. 
All Jurisdictions 
[8/20/20] 
2-1 
Develop and distribute worksheet packages discussed 
during meeting 
JE Fuller 
[NLT 8/28/20] 
2-2 
Review and provide edits for Community Description 
worksheet package via a return email to JE Fuller 
All Jurisdictions 
[10/8/20] 
2-3 
Review and edit Critical Facility and Infrastructure list as 
needed and return edited spreadsheet via email to JE 
Fuller 
All Jurisdictions 
[10/8/20] 
2-4 
Review and edit CPRI for each hazard as desired.  
Communicate any changes via an email to JE Fuller 
All Jurisdictions 
[10/8/20] 
2-5 
Complete Development Trend worksheet and return to JE 
Fuller via an email 
All Jurisdictions 
[10/8/20] 
3-1 
Complete the Existing Mitigation A/P Assessment 
Worksheet 
All Jurisdictions 
[11/19/20] 
3-2 
Review and edit as needed the jurisdiction-specific 
Capability Assessment tables in the 2015 Plan and 
providing edits and/or updates to JE Fuller 
All Jurisdictions 
[11/19/20] 
3-3 
Complete the Plan Integration and Incorporation 
worksheet provided and return to JE Fuller. 
All Jurisdictions 
[11/19/20] 
3-4 
Review and edit as needed the NFIP Compliance 
responses to Questions 1 through 4 in Section 6.2.4 
of the 2015 Plan and provide edits and/or updates to 
JE Fuller 
All Jurisdictions 
[11/19/20]

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 3  
p. 6 
10/08/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
 
 
 
ACTION ITEM NO
FROM MEETING NOTES:
1-3 &1-4
2-2
2-3
2-4
2-5
Jurisdiction
PI Website 
Postings, 
Newspaper 
Notice, etc.
DUE 08/20/20
Community 
Description  
worksheet (text, 
boundary, logo)
DUE 10/08/20
Review and 
Update Critical 
Facility List as 
needed
DUE 10/08/20
CPRI Review. Edits 
to JE Fuller via an 
email
DUE 10/08/20
Complete 
Development 
Trends worksheet 
and provide to 
JEF
DUE 10/08/20
MARICOPA COUNTY (UNINC)
Completed
EDITS Provided
EDITS Provided
Completed
AVONDALE
Completed
EDITS Provided
EDITS Provided
NO EDITS Required
Completed
BUCKEYE
Completed
EDITS Provided
Not Complete
CAREFREE
Completed
EDITS Provided
Completed
CAVE CREEK
Not Complete
Not Complete
CHANDLER
Completed
Not Complete
EL MIRAGE
Not Complete
Not Complete
FT McDOWELL YAVAPAI NATION
Completed
EDITS Provided
NO EDITS Required
Completed
FOUNTAIN HILLS
Completed
EDITS Provided
NO EDITS Required
Completed
GILA BEND
Not Complete
Not Complete
GILBERT
Completed
EDITS Provided
EDITS Provided
EDITS Provided
Completed
GLENDALE
Not Complete
EDITS Provided
EDITS Provided
Completed
GOODYEAR
Completed
Not Complete
GUADALUPE
Not Complete
EDITS Provided
Completed
LITCHFIELD PARK
Not Complete
Not Complete
MESA
Completed
EDITS Provided
EDITS Provided
Completed
PARADISE VALLEY
Completed
NO EDITS Required
EDITS Provided
NO EDITS Required
Not Complete
PEORIA
Completed
EDITS Provided
Completed
PHOENIX
Not Complete
EDITS Provided
Not Complete
QUEEN CREEK
Not Complete
Not Complete
SALT RIVER PIMA-MARICOPA I.C.
Completed
EDITS Provided
EDITS Provided
Completed
SCOTTSDALE
Completed
EDITS Provided
EDITS Provided
Completed
SURPRISE
Completed
NO EDITS Required
EDITS Provided
Completed
TEMPE
Completed
EDITS Provided
Completed
TOLLESON
Not Complete
Not Complete
WICKENBURG
Not Complete
Completed
YOUNGTOWN
Not Complete
Not Complete

MARICOPA COUNTY MULTI-JURISDICTIONAL  
HAZARD MITIGATION PLAN – 2021 UPDATE 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
MEETING DATE: November 19, 2020 
MEETING TIME: 9:00AM – 11:25AM 
MEETING LOCATION: via Zoom 
DISTRIBUTION: Meeting Attendees 
FROM: 
W. Scott Ogden, P.E. – JE Fuller 
RE: 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update – MJPT Meeting No. 4 
ATTENDEES:  
Name 
Jurisdiction/Agency/Organization 
Tom Abbott 
City of Surprise 
Marc Ahlstrom 
City of Mesa 
Hector Andrade 
Maricopa County 
Mark Barnhart 
Fort McDowell Yavapai Nation 
Tony Christofferson 
Town of Wickenburg 
Wayne Clement 
Town of Guadalupe 
Travis Cutright 
City of Mesa 
James Delaittre 
City of Glendale 
Theresa Derivan 
City of Mesa 
Mary Evans 
JE Fuller 
Josh Friedman 
Town of Gilbert 
Melanie Gall 
Arizona State University 
Kim Gathers 
City of Phoenix 
Brian Gerber 
Arizona State University 
Brett Gilliland 
City of Buckeye 
Bob Goodhue 
City of Peoria 
Elliot Harwood 
Arizona State University 
David Hondula 
Arizona State University 
Laura Hyneman 
City of Mesa 
Glenn Jones 
City of Peoria 
Harry Jones 
City of Mesa 
Braden Kay 
City of Tempe 
Rob Kidder 
City of Mesa 
John Kraetz 
Town of Carefree 
Joe LaFortune 
Town of Queen Creek 
Bob Lee 
Town of Paradise Valley

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 2 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
Name 
Jurisdiction/Agency/Organization 
Daylynn Little 
City of Scottsdale 
David Luhan 
City of Goodyear 
Richard Manzo 
City of Mesa 
Charlie McDermott 
Arizona State University 
Tracy Montgomery 
City of Surprise 
Nicole Munson 
City of Glendale 
Tim Murphy 
Flood Control District of Maricopa County 
Terry Nelson 
Salt River-Pima Maricopa Indian Community 
Scott Ogden 
JE Fuller 
Carlos Padilla 
City of Mesa 
Jared Palacios 
City of Avondale 
Rudy Perez 
Maricopa County 
Arif Rahman 
City of Mesa 
Travis Rand 
City of Buckeye 
Jake Rhoades 
 
Larry Rooney 
City of Avondale 
Michelle Seitz 
City of Tempe 
Antonio Shin 
City of Phoenix 
Jana Smith 
Maricopa County 
Kevin Spirlong 
City of Surprise 
Warren Sprecher 
City of Mesa 
Adam Stein 
Town of Cave Creek 
Julie Syrmopoulos 
City of Goodyear 
Kristin Tytler 
City of Surprise 
Kathy Valenzuela 
Town of Gila Bend 
Suzy Vargo 
City of Chandler 
Pete Weaver 
Town of Gilbert 
Nicole Wiley 
City of Surprise 
Matthew Williams 
City of Litchfield Park 
Mike Winters 
Town of Fountain Hills

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 3 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
 
AGENDA 
 
6. PROMULGATION PROCESS 
DISCUSSION 
 
Agenda Item 1: 
• Scott Ogden of JE Fuller led the team through a rollcall of each jurisdiction and 
attending agency. 
• It is noted that the following jurisdictions were not represented at the meeting:  El 
Mirage, Gila Bend, Tolleson, and Youngtown.  Rudy Perez and others from MCDEM 
will follow up with each of the non-attending jurisdictions. 
 
Agenda Item 2: 
• A quick review of the progress of action items and assigned tasks for Mtg Nos. 1-3 
was performed 
• Several communities have substantially completed all the assignments with several 
others at various stages of progress.  A few communities are substantially behind. 
• Status report amended with post-meeting edits is attached at the end of these notes. 
Agenda Item 3a: 
• FEMA has recently created a new process by which outside entities may request 
repetitive loss data.  JE Fuller has prepared the necessary data request letter and will 
update the RL plan information when the data is received. 
Agenda Item 3b: 
• JE Fuller has completed the vulnerability analysis (VA).  The results will documented 
in an updated draft of the Plan Section 5.  Highlights included: 
o Substantially new Extreme Heat section thanks to Arizona State 
University (ASU) and National Weather Service (NWS) contributions 
o All hazard profile maps have been updated 
1. INTRODUCTIONS / ROLL CALL 
2. TASK ASSIGNMENT STATUS REVIEW 
3. RISK ASSESSMENT 
a. Repetitive Loss Properties 
b. Vulnerability Analysis Results Review 
4. MITIGATION STRATEGY 
a. Develop/Update Goals 
b. Action/Project Identification 
c. Implementation Strategy 
5. PLAN MAINTENANCE STRATEGY  
a. Continued Public Involvement

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 4 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
o Critical facility and infrastructure (CFI), population and residential 
building exposures have all been updated 
o Population exposures are based on using 2015 population estimates that 
have been aggregated at the Census Block level by the Arizona 
Department of Health Services. 
• The updated DRAFT of Section 5 of Plan will be provided to the MJPT on or before 
the end of November. 
Agenda Item 4a: 
• The planning team reviewed and discussed the 2015 Plan goals along with the 2018 
State Plan goals.  Some discussion regarding adding the “human-caused” to the 
references to hazards was had.  The group concluded that the since the MJPT opted to 
not include human-caused hazards, adding the phrase “human caused” to the Plan 
goal statements would not be appropriate. 
• The MJPT opted to keep the 2015 Plan goals and carry them forward to the new Plan. 
Agenda Items 4b and 4c: 
• The planning team reviewed and discussed the process for developing the new set of 
Plan mitigation actions/projects (A/P) and the implementation strategy for those new 
A/Ps.   
• The team reviewed the various categories and types of mitigation A/Ps and updated 
the comprehensive list of potential A/Ps summarized in beginning of the 2015 Plan 
Section 6.3.2.  It was noted that ASU participants had provided several new entries 
for extreme heat.  Several other A/Ps were edited or added to the list. 
• JE Fuller will provide each community with a pre-loaded worksheet table to use as 
their starting point for developing the new list of A/Ps.  The 2015 Plan A/Ps identified 
to be carried forward will also be populated into the worksheet.  Preparation of the 
worksheets is predicated on receiving the Item 3-1 worksheet, so all communities that 
have not submitted that worksheet were encouraged to do so ASAP. 
Agenda Items 5a: 
• The planning team reviewed requirements for performing continued public 
involvement after the Plan was adopted and reviewed the responses provided in the 
2015 Plan. 
• Each community was tasked with updating the continued public involvement section 
and was provided with a worksheet to aid in the effort.  
Agenda Items 6: 
• JE Fuller reviewed the promulgation process and schedule for the rest of the planning 
effort.  Key dates and milestones included: 
o Targeted Draft Plan submittal to MJPT for review and comment by mid-
January 2021.  It was noted that this date is contingent upon JE Fuller 
receiving all the required assignments and worksheets by no later than 
January 8, 2021.

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 5 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
o Target Draft Plan submittal to DEMA is end of January 2021 
o Target Final Draft Plan submittal to FEMA through DEMA is end of 
February 2021. 
o Target Approvable Pending Adoption (APA) letter from FEMA by early 
May 2021. 
o Official Resolutions of Adoption will begin after receipt of APA letter 
from FEMA. 
MEETING SUMMARY: 
• S. Ogden reviewed the action items and assignments for the MJPT for Meeting 
number 4. 
• JE Fuller will schedule the special Tribal meetings with Fort McDowell Yavapai 
Nation and Salt River Pima-Maricopa Indian Community for the second week of 
December. 
• JE Fuller will prepare and send the various worksheets discussed to each jurisdiction 
for completion by no later than January 8, 2021. 
ACTION ITEM SUMMARY (ALL MEETINGS): 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
Mtg 1 
See Mtg No. 1 Notes for prior action items. 
All Jurisdictions 
[8/20/20] 
2-1 
Develop and distribute worksheet packages discussed 
during meeting 
JE Fuller 
[NLT 8/28/20] 
2-2 
Review and provide edits for Community Description 
worksheet package via a return email to JE Fuller 
All Jurisdictions 
[10/8/20] 
2-3 
Review and edit Critical Facility and Infrastructure list as 
needed and return edited spreadsheet via email to JE 
Fuller 
All Jurisdictions 
[10/8/20] 
2-4 
Review and edit CPRI for each hazard as desired.  
Communicate any changes via an email to JE Fuller 
All Jurisdictions 
[10/8/20] 
2-5 
Complete Development Trend worksheet and return to JE 
Fuller via an email 
All Jurisdictions 
[10/8/20] 
3-1 
Complete the Existing Mitigation A/P Assessment 
Worksheet 
All Jurisdictions 
[11/19/20] 
3-2 
Review and edit as needed the jurisdiction-specific 
Capability Assessment tables in the 2015 Plan and 
providing edits and/or updates to JE Fuller 
All Jurisdictions 
[11/19/20] 
3-3 
Complete the Plan Integration and Incorporation 
worksheet provided and return to JE Fuller. 
All Jurisdictions 
[11/19/20]

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 6 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update 
ACTION ITEM SUMMARY (ALL MEETINGS): 
ITEM 
NO. 
DESCRIPTION 
RESPONSIBILITY 
[DUE DATE] 
3-4 
Review and edit as needed the NFIP Compliance 
responses to Questions 1 through 4 in Section 6.2.4 
of the 2015 Plan and provide edits and/or updates to 
JE Fuller 
All Jurisdictions 
[11/19/20] 
4-1 
Review, edit and complete the New Mitigation A/P 
worksheet and provide to JE Fuller. 
All Jurisdictions 
[01/08/21] 
4-2 
Complete the continuing public involvement 
worksheet and provide to JE Fuller. 
All Jurisdictions 
[01/08/21] 
4-3 
Review the draft plan when provided and respond 
with comments in 2-weeks. 
All Jurisdictions 
[Tentatively 01/31/21]

Meeting Notes – Multi-Jurisdictional Planning Team Mtg No. 4  
p. 7 
11/19/2020 
 
 
Maricopa County Multi-Jurisdictional Hazard Mitigation Plan 
2021 Update

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-1:  Avondale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Building Safety, 
Development and Eng. 
Services / Emergency 
Management 
• Staff time 
• Ongoing 
In Progress 
Keep 
City Engineer serves as the City’s Floodplain Manager to ensure 
the Engineering Division, and in partnership with Public Works, is 
meeting these standards. 
2 
Conduct and/or participate in occasional table top 
exercises to identify potential mitigation measures for 
increasing response effectiveness, such as evacuation 
route marking and permanent protection measures for 
intended shelters. 
• Emergency 
Management/ Public 
Works Dept. 
• Staff Time 
• December 15 
No Action 
Keep 
The City is planning to conduct future tabletop exercises to 
identify potential mitigation measures increasing response 
effectiveness 
3 
Annually coordinate with federal, state and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information. 
• Emergency 
Management/ Public 
Works Dept 
• Staff Time 
• December 15 
In Progress 
Keep 
The City of Avondale does not contain any dams within the City 
limits.  The Maricopa County Flood Control District provides 
updates to the City of Avondale on upstream Dam safety 
conditions as necessary. 
4 
Mandate, encourage and incentivize the use of drought 
resistant landscaping through Ordinance development 
and/or enforcement. 
• Emergency 
Management/ Water 
Resources City Clerk 
• Staff Time 
• July 15 
In Progress 
Keep 
https://www.avondaleaz.gov/government/departments/public-
works/water/water-conservation 
 
https://www.avondaleaz.gov/home/showdocument?id=14730 
Landscape code Section 12 
Drought Ordinance  
5 
Provide the public with educational information that 
lists water conservation best practices through 
newsletters, flyers, and website notices. 
• Emergency 
Management/ 
Community Relations 
Dept 
• $3,000 + Staff Time 
• March 16 
In Progress 
Keep 
Led by Water Staff support by Marketing as needed. No cost for 
Marketing using ongoing marketing tools. Cost for workshops 
incorporated into Water Dept. Outreach. Education and campaigns 
shared in RAVE 3x yearly, ongoing Spring & Fall workshops, 
weekly social posts, website information updates. 
 
6 
Partner with local NGO's (local shelters, church 
organizations, salvation army, etc.) to provide respite 
care and hydration stations to mitigate loss of like 
during extreme temperature events.  
• Emergency 
Management / Fire 
Department 
• Staff Time 
• September 15 
In Progress 
Keep 
City of Avondale participates in the Heat Relief Network 
coordinated by Maricopa Association of Governments (MAG) 
each summer between May 1st and Sept 30th.  Avondale’s two (2) 
heat relief sites provided cold water and heat refuge M-F 8am – 
5pm

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-1:  Avondale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
7 
Identify, stock and communicate locations within the 
community that can serve as cooling stations during 
times or extreme heat. Ensure that on-hand drinking 
water supplies are sufficient enough to provide to the 
whole community. 
• Emergency 
Management / Public 
Works Dept. 
• Minimal + Staff Time 
• June 15 
Complete 
Delete 
Heat relief sites are a seasonal activity.  Neighborhood and Family 
Services staff will begin planning and generating resources in 
March for a May1st start date. City of Avondale participates in the 
Heat Relief Network coordinated by Maricopa Association of 
Governments (MAG) each summer between May 1st and Sept 
30th.  Avondale’s two (2) heat relief sites provided cold water and 
heat refuge M-F 8am – 5pm 
8 
Develop a community-wide, storm water management 
plan that will analyze and identify problem flooding 
areas and propose long-term mitigation alternatives 
designed to reduce or eliminate the flood problems. 
Utilize city interns to complete routine inspections of 
storm water drains to ensure no blockage in the case of 
a flood. 
• Public Works Dept. / 
Emergency 
Management 
•  
• September 15 
In Progress 
Keep 
A Stormwater Management Plan (SWMP) was developed for the 
City of Avondale in compliance with Small Municipal Separate 
Storm System (Small MS4) Permit number AZG2016-002.  The 
SWMP was issued on September 30, 2016.  Inspection and 
maintenance of City Storm Drains is performed by a City 
Contractor through an annual contract. 
9 
Identify and map flood hazards in areas expected to 
grow or develop in the foreseeable future. 
• Public Works Dept 
• Staff Time 
• July 15 
Complete 
Delete 
Floodplain maps are retained by the City Engineer, who is also the 
City’s Floodplain Manager.  Any development within a mapped 
floodplain requires a Floodplain Use Permit, and these are 
reviewed with ADWR during our 5-year Audits.  The largest 
growth in the City is expected in the southern portion of the City 
and flood hazards, as they are identified, will be closely 
monitored. 
10 
Identify and create an organizational chart or roster 
with lists or maps of important project features to 
prevent a levee failure. Complete an annual review of 
evacuation routes and emergency shelter locations in 
order to determine if they fulfill the evacuation and 
sheltering needs of the community.  
• Public Works Dept. / 
Emergency 
Management 
• Staff Time 
• September 15 
Complete 
Delete 
The Maricopa County Flood Control District performs levee 
inspections and maintenance regularly.  The City of Avondale 
follows the same protocol as Maricopa County, and once a hazard 
is understood and projected impact area determined, first 
responders will decide on the safest routes to use for evacuation 
and which locations to open as a shelter, if needed.   
11 
Identify and maintain a list or annotated map that 
describes each project feature and areas of concern 
during a flood event. Develop and maintain a detailed 
table of project features that may need to be closed, 
such as floodgates, flap gates, etc.  
• Public Works Dept. / 
Emergency 
Management 
• Staff Time 
• September 15 
Complete 
Delete 
Maricopa County maintains a list of roads within the Avondale 
City limits that are of concern during a flood event (i.e. Lower 
Buckeye Rd and El Mirage Rd) requiring road closure using 
traffic barriers.  County forces typically install and remove the 
barriers as needed.  City Public Works staff is on-hand to provide 
flood relief at localized flooding areas using vacuum equipment.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-1:  Avondale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
12 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potentials for flying 
debris during severe wind events. 
• Building Safety, 
Community Relations / 
Emergency 
Management 
• Staff Time 
• October 15 
Complete 
Delete 
Annual Building Safety month media release and social media 
posts during that month (May). No cost to Marketing 
 
 
13 
Promote the use of weather radios, especially in 
schools, hospitals and other locations where people 
congregate to inform them of the approach of severe 
weather events. 
• Community Relations / 
Emergency 
Management 
• Staff Time 
• October 15 
In Progress 
Keep 
Annual Weather watcher training information shared via media 
release and social. Weather warning, sandbag distribution, 
monsoon safety details shared on social seasonal or based on 
current conditions.  Lead direction by Public Safety, supplemental 
from Public Works based on weather related clean up 
14 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting processes. 
• Development and Eng. 
Services / Emergency 
Management 
• Staff Time 
• December 15 
In Progress  
Keep 
Engineering Division in Development & Engineering Services 
reviews projects for compliance codes. 
15 
Provide links to the Arizona Department of Water 
Resources website as a part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Water Resources / 
Community Relations 
• Staff Time 
• June 15 
Complete 
Delete 
https://new.azwater.gov/hydrology/field-services/land-subsidence-
arizona 
 
https://new.azwater.gov/  
16 
Use newsletters, flyers, utility bill inserts, website 
notices, radio and television announcements, and 
newspaper articles to educate the public about hazards 
impacting the county and how to be prepared in the 
case of a disaster event. 
• Community Relations / 
Emergency 
Management 
• No incremental costs 
• March 16 
Complete 
 
Delete 
Direction shared from County Emergency Services sites, unless 
otherwise directed by fire staff. Annual Emergency Preparedness 
Month (Sept) media release, and social share.  Rave public 
education as directed by Fire on topics. 
 
17 
Conduct Fire Safety education programs in local 
public schools and community organizations within 
the city. 
• Fire Department / 
Emergency 
Management 
• Staff Time 
• October 15 
Complete 
Delete 
Annual commodities cost of $10,000 and FTE is provided from 
the general fund. Programs are delivered a variety of ways 
including in-person and virtual at schools, fire stations, 
community events, etc.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-2:  Buckeye assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Emergency 
Management 
/ Emergency 
Manager 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Development Services and Engineering are lead in reviewing plans and 
permits per the adopted flood plain ordinance. 
2 
Meet with flood control and state land to develop cut 
Wildfire breaks at key locations in the Gila River 
• Fire; 
Emergency 
Management; 
Public Works 
/ Directors 
• Staff Time 
• Ongoing 
Complete 
Delete 
Completed in 2017 from Office of the State Forestry Grant #WFHF15B-315. 
3 
Develop water conservation plan. 
• Engineering / 
City 
Engineer 
• Staff Time 
• Ongoing 
Complete 
Delete 
City Water Conservation is published on City Website: 
https://www.buckeyeaz.gov/residents/water-resources/water-conservation 
4 
Conduct annual life safety inspections regarding the 
management wildland fire fuels and wildfire risk along 
the WUI boundary 
• Fire; 
Emergency 
Management/ 
Fire Chief; 
Emergency 
Manager 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Working on inspections of fire fuels annually.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-2:  Buckeye assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
5 
Enhance communication of City mitigation needs at 
the County and State level by establishing liaison 
positions from city to State legislature, State Fusion 
Centers, MCDEM, Water fusion group, MAG and 
other multi-jurisdictional task force work groups 
• Fire; 
Emergency 
Management, 
Mayor’s 
Office / Fire 
Chief; 
Emergency 
Manager, 
Mayor 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Involved liaison with MCDEM and other jurisdictions/organizations. 
6 
Continue to support the Hazard Mitigation Plan by 
making sure the City is represented on related 
committees. 
• Emergency 
Management 
/ Emergency 
Manager 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Development and planning departments will continue to utilize plans for 
future development.  
7 
Implement Sever Wind deployment protection 
procedures (local) 
• Fire; 
Emergency 
Management; 
Public Works 
/ Directors 
• Staff Time 
• Ongoing 
Complete 
Delete 
In City of Buckeye 2020 EOP under Annex C – Severe Storms and Floods. 
8 
Provide/improve water drainage systems 
• Engineering, 
City 
Engineer 
• Staff Time 
• Ongoing 
In Progress 
Keep 
City’s stormwater system is continually being mapped as part of the City’s 
MS4 permit. Example here: 
 
https://buckeyearizona.maps.arcgis.com/apps/opsdashboard/index.html#/d09
65135ce7c4f98916d4bc9da8841f9

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-2:  Buckeye assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
9 
Enforce Fire codes, require compliance 
• Fire Code 
Enforcement 
/ Code 
Enforcement 
Officer 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Adopted July 2014, IFC 2012 with Amendments. 
10 
Participate with Maricopa County and other 
jurisdictions in the update of the Community Wildfire 
Protection Plan (CWPP) 
• Fire; 
Emergency 
Management 
/ Fire Chief; 
Emergency 
Manager 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Updated CWPP Plan 1/2020. 
11 
Annually coordinate with federal, state, and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information. 
• Fire; 
Emergency 
Management 
/ Public 
Works Dept; 
PW Director 
• Staff Time 
• Annually 
In Progress 
Keep 
Annual meetings with state and local owners.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-2:  Buckeye assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
12 
Work with state and federal agencies to provide a 
disclosure to all potential buyers of real estate that are 
located within dam failure or emergency spillway 
inundation limits of an upstream dam or dams. 
• Fire; 
Emergency 
Management 
/ Public 
Works Dept; 
PW Director 
/ 
Development 
Services 
Dept; DS 
Director 
• Staff Time 
• Annually 
No Action 
Keep 
The Gillespie Dam is in incorporated Maricopa County within the City of 
Buckeye Municipal Planning Area (MPA). As development occurs in this 
area that annexes into Buckeye, these cautions should be placed in the public 
report. 
 
Engineering works with developments downstream of spillways, requiring 
them to provide modeling of the PMF for the spillway also requiring an 
emergency action plan in the case of a spillway event. 
13 
Continue to identify, stock and communicate locations 
within the community that can serve as cooling 
stations during times of extreme heat. 
• Fire; 
Emergency 
Management 
/ City PIO 
• Staff Time 
• Seasonal and 
Annually 
Ongoing 
Keep 
The activity has been performed annually since 2016 and was included in 
public information campaign for extreme heat. In City of Buckeye EOP 2020 
Annex – C Excessive Heat Emergencies. 
14 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• City PIO 
• Staff Time 
• Seasonal and 
Annually 
Ongoing 
Keep 
The activity has been performed annually since 2016 and included news 
releases, web pages, social media reminders and e-newsletter notifications. 
15 
Provide links to the Arizona Department of Water 
Resources website as a part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Public Works 
Dept; PW 
Directors / 
City PIO 
• Staff Time 
• FY 2020 
In Progress 
Revise 
Have sent the link that speaks to the three areas in Buckeye that are mapped 
by ADWR including West Valley, Buckeye and Gila Bend subsidence maps. 
https://new.azwater.gov/hydrology/field-services/land-subsidence-arizona

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-2:  Buckeye assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
16 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting. 
• Development 
Services; DS 
Director 
• Staff Time 
• FY 2020 
Ongoing 
Keep 
There have been no active fissures identified in the Buckeye MPA. There is 
only mapping of areas of potential subsidence.  All development is required 
to do their due diligence on subsidence. 
 
 
Table 6-7-3:  Carefree assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Floodplain Mgmt and 
Services Division / 
Floodplain 
Administrator / 
Building Official 
• Staff time 
• Annual-Ongoing 
On-going 
Keep 
Over the past 5 years, the Maricopa County Flood Control District 
has reviewed all building permits for compliance. At the time of 
this review we were unable to get an accurate count as to how 
many reviews the district has performed over the past five years. 
2 
Review and update the town’s Drainage Master Plan 
that will identify potential drainage hazards, solutions, 
budgets and prioritization. 
• Town Engineer / 
Building Official 
• Staff Time 
• Annual-Ongoing 
Completed 
Delete 
The Town’s Drainage Master Plan has been reviewed and 
updated. The plan is on record at Town Hall. 
3 
Continue development of water storage, treatment and 
delivery systems to provide adequate water during 
times of drought 
• Manager of Carefree 
Water Company 
• Specific project 
dependent 
• Annual-Ongoing 
On-going 
Keep 
The Town is working towards consolidating all water resources 
located within the Town under the Carefree Water company and 
further enhancing storage capacity.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-3:  Carefree assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
4 
Encourage bridge or culvert construction where roads 
are in locations susceptible to flooding. 
• Town Engineer 
• Staff time and studies 
unless actual project 
developed and then 
costs are to be 
determined per project 
• Annual-Ongoing 
On-going 
Keep 
The Town has an annual inspection program to ensure 
unobstructed flows. This program is administered and performed 
by the Town’s Streets and Maintenance Dept., and has been a 
continuing program during the past five years of the plan cycle. 
 5 
Review and update the town’s Mass Evacuation 
strategy for the Town of Carefree. 
• Carefree Emergency 
Manager / American 
Red Cross Town Fire 
Chief 
• Staff time 
• Annual-Ongoing 
Completed 
Delete 
The Mass Evacuation Plan for the Town of Carefree was 
reviewed, updated and included in the Town’s 2014 Emergency 
Operations Plan. 
6 
Site and install additional signage for wash crossings 
as well as sand bags to warn and discourage vehicular 
movements through these areas during flooding events 
• Public Works 
• $20,000.00 
• Less than five years 
with funding 
On-going 
Keep 
The Town has posted signage during the monsoon seasons and 
during other adverse weather events each of the past five years. 
7 
Perform regular brush cutting and median maintenance 
with town right-of-way to mitigate fuel sources for 
wildfire. 
• Public Works 
• $10,000.00 
• Annual-Ongoing 
On-going 
Keep 
The Town purchased a brush chipper to aid in the removal of 
encroaching brush along the Town’s rights-of-way. This is 
performed as needed throughout the year by the Town’s Streets 
and Maintenance Dept. This program has been in effect throught 
the past plan cycle. 
8 
Maintain backup generators located at critical facilities 
(ex. Fire station, well sites, etc.) to provide emergency 
power for critical operations during power failures 
caused by severe wind events. 
• Public Works 
• $5,000.00 
• Annual-Ongoing 
On-going 
Keep 
The Town has an annual contract through a third-party vendor to 
service, maintain, and repair all Town owned back-up generators. 
This has been an on-going program for the past five years. 
9 
Require all new construction to follow recognized and 
adopted building codes to mitigate damages and 
impacts of severe wind events. 
• Town Engineer / 
Building Official 
• Staff time 
• Annual-Ongoing 
On-going 
Keep 
This function is overseen by the Town’s Building Dept. 
10 
Create a public education program describing water 
conservation best practices to be delivered to residents 
in their monthly water bill. In addition, provide water 
conservation related material through the town’s 
COINS system. 
• Manager of Carefree 
Water Company / Staff 
• Staff time 
• Annual-Ongoing 
On-going 
Keep 
The Carefree Water Company promoted water conservation 
through it’s rate structure and messaging within it’s water bills 
during the previous plan cycle.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-3:  Carefree assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
11 
Clear vegetation and wildfire fuels to create a 
defensible space around critical or key structures 
within the Town of Carefree. 
• Public Works / Fire 
Chief 
• Staff time 
• Annual-Ongoing 
On-going 
Keep 
This has been a continuous program performed throughout the 
past five years by the Town’s Streets and Maintenance Dept. 
12 
Identify, stock and communicate locations within the 
Town of Carefree that can serve as cooling stations 
during times of extreme heat. 
• Fire Chief, Town staff 
• Staff time / $500.00 
• Annual during extreme 
heat season 
On-going 
Keep 
The fire station has served as a cooling station throughout the past 
five years and always continues to be stocked with bottled water 
and electrolyte beverages. 
13 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Town staff 
• Staff time 
• Annual 
On-going 
Keep 
The Town has and continues to distribute notifications to the 
community through it’s digital newsletter information about 
extreme heat education.  
 
 
Table 6-7-4:  Cave Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Town Engineer 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Town Engineer utilizes Floodplain ordinance as well as 
NFIP regulation during plan reviews.  
2 
Ensure building codes for construction are enforced to 
prevent roof damage from high winds. 
• Chief Building 
Official 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The Town of Cave Creek Building Official reviews all site 
plans for compliance.  Cave Creek Building Inspector 
conducts field inspections for compliance with applicable 
Building Codes. 
3 
Town Fire Marshal shall perform routine commercial 
structures inspections to identify and communicate 
code violations.  Routinely inspect commercial 
structures. 
• Chief Building 
Official, Fire 
Marshal 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Cave Creek’s Fire Official conducts routine commercial 
business inspections for compliance with the IFC.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-4:  Cave Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
4 
Perform a Public Information Campaign to help 
educate the general public on ways to remain safe 
during periods of extreme heat. 
• Town Marshal 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The Town of Cave Creek frequently posts heat index 
warnings during times of extreme heat. 
5 
Review the existing Cave Creek general plan and 
zoning ordinance to determine how these documents 
help limit development in hazard areas: Modify with 
additional guidelines, regulations, and land use 
techniques as necessary within the limits of state 
statutes, while also respecting private property rights. 
• Planning and Zoning 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The Town of Cave Creek is currently attempting to have 
an updated General Plan adopted.  Planning staff 
frequently refers to the General Plan. 
6 
Public Information Campaign to get more residents to 
subscribe to the CodeRed Extreme Weather Alert 
System 
• Town Marshal 
• Staff time 
• 10/2015 
Ongoing 
Keep 
In May of 2020 the Town of Cave Creek initiated an add 
campaign to increase awareness to the CODERED 
Emergency Alert System to include Weather Alerts at no 
additional costs to residents. 
7 
Continuous Public Information Campaign to advise 
residents and visitor alike the risks from Wildfire. 
• Town Marshal 
• Staff Time, Printed 
Materials 
• Ongoing 
Ongoing 
Keep 
The Town of Cave Creek averages 6-9 Public Information 
adds or notices to include frequently mentioning Wildfire 
Awareness and precautions within Cave Creek.  Cave 
Creek also actively maintains a Fire Risk Index posted 
prominently as visitors and residents enter town. 
8 
Continue to perform public education of water 
conservation best practices through newsletter, flyers, 
social media and website notices. 
• Engineering 
Department / Town 
Engineer 
• Staff Time $1,000 
per year 
• Ongoing-annual 
Ongoing 
Keep 
The Town of Cave Creek Utilities staff frequently speaks 
to residents on ways to conserve water. Handouts are 
available at Town Hall regarding water conservation tips. 
9 
Review and update the local Drought Management 
Plan to ensure it is current with the Town’s drought 
management goals and current water conservation 
needs. 
• Engineering 
Department / Town 
Engineer 
• Staff Time 
• FY 2017 
Completed 
Keep 
In September of 2019 The Town of Cave Creek Utilities 
Department updated the Town of Cave Creek Drought 
Contingency Plan. 
 
 
 
Table 6-7-5:  Chandler assessment of previous plan cycle mitigation actions/projects

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Development 
Services/City Engineer 
• Staff time 
• Annual-Ongoing 
Ongoing 
Keep 
The City of Chandler is continuing to review building permits 
for compliance. 
2 
Maintain the currency of the safety element of the 
Chandler General Plan. 
• Planning Manager 
• Staff time-consultant cost 
for update of GP 
• Annual-Ongoing 
Ongoing 
Keep 
The City of Chandler is in the process to revise the General 
Plan in 2020. Safety elements will be included into the 
planning process. 
3 
Continue to ensure through proper planning, zoning 
and building codes that all safety measures are in place 
for new building construction and placement. The city 
will coordinate with the county flood control district. 
• Development 
Servicest/Building 
Official 
• Staff time 
• Annual-Ongoing 
Ongoing 
Keep 
The City of Chandler completed the posting of the Hazard 
Mitigation Plan to civic and private groups though the 
Chandler website 
4 
Continue to maintain a diverse water portfolio which 
includes surface water from Salt, Verde and Colorado 
River watersheds and groundwater. Minimize any 
reductions to existing supplies by protecting and 
securing existing water rights and meeting 
environmental requirements of water supplies. 
Maximize the use of existing assets to ensure adequate 
water supply is available from over 30 groundwater 
wells, two surface water treatment plants, use of 
recharged water, and encourage the use of reclaimed 
water for appropriate purposes. Continue to implement 
the city’s Drought Plan. 
• Public Works and Utilities 
Director 
• Staff time 
• Annual-Ongoing 
Ongoing 
Keep 
The City of Chandler will continue to maximize the use of 
finite water resources in all phases of city operations and 
planning.  The Integrated Water, Wastewater and Reclaimed 
Master Plan project was most recently updated in 2018 and is 
updated every four to six years.  
5 
Each city department will be encouraged to rank the 
vulnerability of existing assets, with assistance from 
the Emergency Management Workgroup, and 
implement protection plans as needed, with the highest 
vulnerability being implemented first. 
• Fire Department 
• Staff time 
• Annual-Ongoing 
Ongoing 
Keep 
Several internal departments have completed a vulnerability 
assessment; however, there are remaining assessments which 
have not been completed but are in progress.  The City of 
Chandler will continue towards completion of this task. 
6 
Continue to ensure that the City of Chandler Drought 
Management Plan is updated to meet the needs of the 
city to mitigate drought severity.  
• Public Works and Utilities 
Director 
• Staff time 
• Ongoing 
Ongoing 
Keep 
The City of Chandler will continue to maintain a current 
Integrated Water, Wastewater and Reclaimed Master Plan, 
understanding the potential impact of a sever drought. 
7 
Annually coordinate with federal, state, and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information. 
• Fire Department 
• Staff time 
• Annual 
Ongoing 
Keep 
The City of Chandler will continue to coordinate with federal, 
state, and local dam owners to get updates on any changes in 
dam safety conditions and emergency action plan information.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-5:  Chandler assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
8 
Analyze and identify dam failure inundation limits to 
identify and/or update evacuation routes. 
• Fire Department/Public 
Works and  Utilities 
Department 
• Staff time 
• Ongoing 
No Action 
Delete 
The City is no longer within a dam inundation hazard zone and 
does not own any dams. 
9 
Provide links to the Arizona Department of Water 
Resources website as a part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Communications and 
Public Affairs Department 
• Staff time 
• Ongoing 
Ongoing 
Keep 
The City of Chandler will continue its public campaign to raise 
awareness to the hazards and locations  
10 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting. 
• Development Services 
Department 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Chandler requires a geo-technical report to be submitted for all 
new development projects.  The issue of subsidence risk is not 
a specific checklist item when reviewing the plans and reports, 
but the geo-technical engineer evaluates all soil types and 
properties on-site and addresses any items of concern.  In 
addition, the geo-tech provides specifications for proper 
construction techniques, such as soil compaction. 
 
 
Table 6-7-6:  El Mirage assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• City of El Mirage 
FBLS, Building 
Official 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Plans are reviewed once they are submitted through TAC 
and engineering review.  Work in the floodplain requires 
MCFCD input. 
2 
Review zoning ordinances prohibiting new 
development in 100-year floodplain on an annual 
basis. 
• Planning & Zoning / 
Director 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
El Mirage City Code chapter 153 addresses floodplain 
management.  Developments in floodplains adhere to 
MCFCD rules.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-6:  El Mirage assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
3 
Take active role in multi-agency plan and actions for 
flood mitigation (pro-active). 
• Engineering/Fire/Public 
Works / Dept heads 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The City of El Mirage works with MCFCD on flood 
mitigation 
4 
Develop plan to design and install man-made flood 
protection devices where needed. 
• City of El Mirage City 
Engineering/Fire/Public 
Works / Dept heads 
• Staff Time/UNK 
• Ongoing 
Ongoing 
Keep 
City staff reviews project opportunities to install flood 
mitigation devices whenever available. 
5 
Construct flood control measures as a part of the El 
Mirage Road project to mitigate flooding by the El 
Mirage Wash.  El Mirage Road project will elevate the 
roadway section by the Lower EL Mirage Wash area 
to mitigate flooding. 
• Engineering / City 
Engineer 
• Staff Time 
• Undetermined at this 
point 
Complete 
Delete 
This was completed as a CIP project 
6 
Recharge groundwater with CAP water to ensure the 
community water supply in the event of a drought. 
• Public Works / Director 
• $100,000 
• Ongoing 
Ongoing 
Keep 
This was purchased in October and the water 
recharge has been completed. This is done annually.  
7 
Review annually and update as needed, existing 
building codes to manage new and existing 
construction practices and provide mitigation for 
Drought, Flood, and Severe Wind. 
• FBLS / City Building 
Official 
• Staff Time 
• Annually 
Completed 
Keep 
This annual review has been completed.  
8 
Participate in multi-agency coordination efforts to 
ensure cooperative plans. 
• Fire Department / Fire 
Chief 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Participation with the Life Safety Council and the 
Regional Operational Consistency Committee. 
9 
Train First Responders and other select city staff in 
hazard materials mitigation. 
• Fire department / 
department heads 
• Staff Time plus 
Training Cost 
• Ongoing 
Ongoing 
Keep 
City staff trained in NIMS, first responders completed. 
New hires and elected officials or required to completed 
the needed training.  
10 
Coordinate efforts with other local agencies that 
include but are not limited to:  Luke AFB, Dysart 
School District, FCDMC and others, to I.D. problem 
areas and plans for mitigation 
• Fire Department / Fire 
Chief 
• Staff Time 
• Ongoing 
Complete 
Keep 
Multiple meetings have been completed,  and or are in the 
coordinating phase

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-6:  El Mirage assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
11 
Maintain collaboration efforts and interconnected 
water system with other water purveyors to ensure the 
community water supply in the event of a drought. 
• Public Works / Director 
• Staff Time 
• Ongoing 
Complete 
Keep 
El Mirage is interconnected with the City of Surprise. 
12 
Continue to implement a conservation education 
program to ensure the community water supply in the 
event of a drought. 
• Public Works / Director 
• Staff Time 
• Ongoing 
Complete 
Keep 
These are sent out in water bills and on the City web 
page. 
13 
Educate the public on suspected and imminent wind 
shear dangers from micro burst and other natural wind 
threats through website notices and social media alerts.  
• Homeland Security / 
Safety and Emergency 
Management Officer 
• Staff Time 
• Annually During 
Monsoon Season 
Ongoing 
Keep 
This is provided on the City web page as well as the 
Maricopa County Emergency Broadcast System to cell 
phones, radio stations and local TV channels. 
14 
Educate the public on actions and resources to protect 
residents that do not have adequate ways to cool their 
homes in the event of an Extreme Heat Event through 
website notices and other social media alerts 
• City of El 
Mirage/Fire/PD 
• Staff Time 
• Seasonally and as 
needed. 
Ongoing 
Keep 
This is provided on the City web page and social media.  
15 
Provide cool potable water to citizens during extreme 
heat waves.  Dissemination of public information 
regarding hydration station and resource locations will 
be provided via website notices and social media 
• City of El Mirage Fire / 
Fire Chief 
• $2,000 
• Seasonally and as 
needed 
Complete 
Keep  
The City utilizes bottled water, in coolers, around the 
City. The locations are posted on the City web page. 
16 
Provide citizens with warnings and escape routes from 
severe flooding or expected flooding. 
• City of El Mirage 
Fire/PD and Public 
Works. 
• Staff time 
• When necessary 
Ongoing 
Keep 
The City has no designated escape routes.  The City 
provides warnings and portable sings during an event.  
17 
Participate/Conduct occasional table top exercises to 
identify potential mitigation measures for increasing 
response effectiveness, such as evacuation route 
marking and permanent protection measures for 
intended shelters. 
• City of El Mirage 
Fire/PD and Public 
Works / Dept heads 
• Staff time 
• At least once over the 
next five years 
Ongoing 
Keep 
Departments participate in meetings to go over these measures.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-6:  El Mirage assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
18 
Coordinate with state and federal agencies (USGS, 
AZGS, ADWR, etc.) to study and map fissure and 
subsidence activity in critical or key areas of the city 
so that effective mitigation or avoidance strategies can 
be implemented. 
• City of El Mirage Fire/ 
PD and Public Works / 
Dept heads 
• Staff Time 
• At least once over the 
next five years 
Complete 
Delete 
Multi agency meeting covered this in this fiscal year.   
19 
Provide links to the Arizona Department of Water 
Resources subsidence website and the Arizona 
Geologic Survey website as a part of a public 
campaign to raise awareness to the hazards and 
locations of active fissure and subsidence locations 
within the city. 
• City of El Mirage Fire / 
Fire Chief 
• Staff Time 
• FY2016 
Complete 
Keep 
Completed in 2016 and posted on the City web page. 
20 
Annually coordinate with Federal, State and local dam 
owners to update any changes in dam safety conditions 
on emergency action plan information.  
• City of El Mirage Fire / 
Fire Chief and Public 
Works / Director 
• Staff Time 
• On-going 
Complete 
Keep 
The City of El Mirage Engineer participates in this annually.  
21 
Work with state and Federal agencies to provide 
disclosure information to all 
potential buyers of real estate that are located within 
the dam failure or emergency 
spillway inundation limits of an upstream dam or dams 
• City of El Mirage Fire / 
Fire Chief and 
Community 
Development / Director 
• Staff Time 
• On-Going 
Ongoing 
Keep 
This is ongoing for the City of El Mirage.  
 
 
Table 6-7-7:  Fort McDowell Yavapai Nation assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-7:  Fort McDowell Yavapai Nation assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
1 
Prohibit building in floodplain and river area to 
maintain channel and protect riparian area. 
• Community and Economic 
Development 
Division/Planning 
Manager 
• Staff time for plan review-
$15,000 annually 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
2 
Pro-actively pursue pre-disaster and hazard mitigation 
grants to supplement tribal expenses associated with 
mitigation activities. 
• All Department Directors 
• Determined by required 
matching funds. $10,000 
annually 
• Annual/Recurring 
No Action 
Keep 
This is an annual/recurring action/project. 
3 
Publish suggested mitigation actions through print 
media and community website to reduce potential for 
wildfire and heat related medical emergencies. 
• Fire 
Department/Emergency 
Manager 
• Staff time, $2,500 annually 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
4 
Limit development along river to protect wetlands, 
threatened species habitat and 
protect businesses from flooding. 
• Environmental 
Department/Environmental 
Manager 
• Staff time for plan review 
and Enterprise equipment 
and labor, $50,000 
annually 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
5 
Create and map access to high-risk wildfire areas. 
Provide weed abatement services in high risk areas to 
reduce risk of wildland fire. 
• MCDOT and FMYN 
Public Works 
Department/Public Works 
Manager, Fire Chief, BIA 
Fire Management Office 
(FMO) 
• Staff time and $30,000 
annually 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-7:  Fort McDowell Yavapai Nation assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
6 
Coordinate training, planning, and communications to 
provide the community with information to combat the 
effects of infestations and diseases. 
• Medical Director, Clinic 
staff 
• Staff time for Medical 
Clinic personnel 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
7 
Install diesel powered emergency generator in critical 
facilities identified as sheltering locations  
• Fire 
Department/Emergency 
Manager 
• Staff time - $5,000, 
equipment cost - $112,000 
• November 2016 
Complete 
Delete 
Diesel powered generator was installed at sheltering location 
and completed 2020. 
8 
Implement and exercise an area-wide telephone 
Emergency Notification System. (Reverse 9-1-1) 
• Fire 
Department/Emergency 
Manager 
• Staff time-$15,000, 
Reverse 9-1-1- system use 
costs - $2,500 
• Annual/Recurring 
Complete 
Delete 
The Nation has contracted with Rave communications to 
provide area-wide telephone Emergency Notification System. 
This system has been utilized and exercised multiple times.  
Adopted in 2017. 
9 
Review existing building codes, modify or adopt codes 
to prevent development in hazard areas. 
• Community and Economic 
Development 
Division/Planning Project 
Manager / Fire Chief 
• Staff time, $5,000 annually 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
10 
Identify and mitigate hazards associated with new and 
existing developments through plan reviews to ensure 
plan/code compliance, including incorporation of 
drought tolerant or xeriscape landscapes on new 
developments. 
• Community and Economic 
Development 
Division/License and 
Property Use Manager / 
Fire Chief 
• Staff time, $5,000 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
11 
Ensure building codes addressing wind loading are 
enforced to prevent damage from high winds.  
• Community and Economic 
Development 
Division/Chief Building 
Inspector 
• Staff costs - $3,500 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-7:  Fort McDowell Yavapai Nation assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
12 
Develop a drought emergency plan with criteria and 
triggers for drought-related actions. 
• Community Economic 
Development 
Division/Emergency 
Manager/Water Resource 
Administrator 
• Staff time, $15,000 
• August 2018 
No Action 
Revise 
Completion date should be revised to October 2021.  
13 
Conduct fuels reduction and establish fuel breaks in 
dense vegetation areas. 
• Fire 
Department/Emergency 
Manager 
• Staff costs - $5,000 
• Annual/Recurring 
In Progress 
Keep 
This is an annual/recurring action/project. 
14 
Annually coordinate with Federal, State, and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information 
• Fire 
Department/Emergency 
Manager 
• Staff time 
• Annual 
In Progress 
Keep 
This is an annual/recurring action/project. 
15 
Analyze and map extensions of the dam failure 
inundation limits for Town of Fountain Hills owned 
dams, through FMYN lands to their confluence with 
the Verde River.  
• Fire 
Department/Emergency 
Manager/Water Resource 
Administrator 
• $10,000 
• FY2019 
Revise 
Keep 
Completion date should be revised to FY2021 
 
 
Table 6-7-8:  Fountain Hills assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Town Engineer/Plans 
Reviewer 
• Staff Time 
• Annually 
Ongoing/In 
Progress 
Keep 
Commercial, residential, and Public Works projects are reviewed 
by either Town Engineer and/or Assistant Town Engineer for 
Floodplain encroachment.  Coordination with either FEMA or 
MCFCD is performed where for compliance.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-8:  Fountain Hills assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
2 
Maintain washes in Town by removing excessive 
brush and trim trees to reduce the threat of wildfire and 
flooding due to blockages 
• Environmental 
Supervisor 
• $150K/yr 
• Annually 
Ongoing/In 
Progress 
Keep 
Managed by Town Staff and 25% of the washes are cleared on an 
annual basis.  Washes are on a rotation schedule.  
3 
Enforce Building Codes to prevent roof damage from 
high winds. 
• Building Official 
• Staff Time 
• Ongoing 
Ongoing/In 
Progress 
Keep 
Process is through our building permit application and plan 
review.  
4 
Review General Plan and Ordinances for mitigating 
hazards. 
• Development Director 
• Staff Time 
• Ongoing 
Ongoing/In 
Progress 
Keep 
Updates to Plan and Ordinances includes consideration hazard 
mitigation in the review process. 
5 
Channel and Storm Drain Development 
• Town Engineer 
• $1.5M 
• Ongoing 
Ongoing/In 
Progress 
Keep 
Annual assessment of existing Town storm drains and 
infrastructure are reviewed for erosion and necessary 
improvements.  New storm drain and channel improvements 
within undeveloped regions of the Town are reviewed by the 
Town Engineer and Engineering Consultants for capacity and 
compliance.     
6 
Analyze and identify dam failure inundation limits to 
identify evacuation routes. 
• Town Engineer 
• Staff Time 
• Ongoing 
Ongoing/In 
Progress/ 
Completed 
(Emergency 
Evacuation 
Routes)  
Keep 
Dam Failure inundation limits not determined to date.   
Emergency Evacuation routes have been established by the 
Emergency Operations plan.   
7 
Conduct bi-annual dam safety inspections and 
reporting per Arizona Department of Water Resources 
guidelines and required schedule. 
• Town Engineer 
• Staff Time 
• Ongoing 
Ongoing/In 
Progress 
Keep 
ADWR performs annual assessments for the Town     
8 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Fire Department 
• Staff Time 
• Ongoing 
Ongoing/In 
Progress 
Keep 
This is an annual campaign to inform residents of the dangers of 
excessive heat. 
 
Table 6-7-9:  Gila Bend assessment of previous plan cycle mitigation actions/projects

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Town 
Planner/Engineer 
• N/A 
• Ongoing 
In Progress 
Keep 
 
Building permits are reviewed for compliance with the Floodplain 
Ordinance and NFIP Regulation by the Town Engineer. 
2 
Pursue a mutual aid compact with county and state 
agencies to assist the town with hazard mitigation. 
• Town Manager, 
Finance Director, 
Public Works Director 
• N/A 
• Ongoing 
In Progress 
Keep 
Coordination with surrounding entities with regards to emergency 
management, while ongoing, has increased significantly largely 
due to the pandemic.  
3 
Develop a public awareness campaign to educate town 
residents about natural hazards impacting the 
community. 
• Town, Maricopa 
County Flood Control 
• $5,000 
• Ongoing 
In Progress 
Keep 
The Town provides hazard information and mitigation measures to 
the public via social media at logical times throughout the year 
(i.e. monsoon season, fire season, etc.) but can expand this effort. 
4 
Develop and construct measures to mitigate flooding 
along Sand Tank and Scott Avenue Washes. 
• FEMA, Army Corps of 
Engineers, Maricopa 
County Flood Control, 
Town 
• $12 million 
• 2022 
In Progress 
Keep 
A plan for mitigation of flooding has be developed.  Funding for 
construction is needed.  
5 
Develop a plan to implement aquifer recharge per the 
recommendations of the recently completed aquifer 
study performed by The Global Institute of 
Sustainability (GIOS) at Arizona State University 
(ASU).  
• Town Manager 
• $90,000 
• 2016 
No Action  
Keep 
Limited funding has impeded the Town’s ability to complete this 
project, but it remains a priority.  
6 
Restrict water usage for irrigation during times of 
drought. 
• Town Manager, Public 
Works Director 
• N/A 
• Ongoing 
In Progress  
Keep 
The Town continues to limit water usage for irrigation during 
times of drought.  
7 
Establish and staff a “cooling” station at the local 
community center 
• Social Services 
Director, Town 
Manager 
• N/A 
• Ongoing 
In Progress 
Keep 
The Town typically runs the cooling station out of the community 
center from May to September and will continue this effort. 
8 
Maintain and provide access to the public swimming 
pool during times of extreme heat to provide a means 
for cooling off. 
• Town Manager, Parks 
& Recreation Director 
• $5,000 
• Ongoing 
In Progress 
Keep 
The town will continue to operate the public swimming pool and 
provide access to the public when restrictions of the pandemic are 
lifted.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-9:  Gila Bend assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
9 
Design and evaluate the concept of constructing a 
flood control reservoir, or series of reservoirs to 
intercept and store storm runoff.  The concept would 
provide both flood control benefits but also could be a 
source for groundwater recharge. 
• FEMA, Army Corps of 
Engineers, Maricopa 
County Flood Control, 
Town, USDA, WIFA 
• $2 million 
• 2018 
No Action 
Keep 
Limited funding has impeded the Town’s ability to complete this 
project, but it remains a priority. 
10 
Perform investigational analyses to determine if 
removal of a substandard levee will provide more 
benefit through restoring local flood control currently 
blocked by levee, and remove the threat of a levee 
failure. 
• FEMA, Army Corps of 
Engineers, Maricopa 
County Flood Control, 
Town 
• $700,000 
• 2018 
No Action 
Keep 
Limited funding has impeded the Town’s ability to complete this 
project, but it remains a priority. 
11 
Work with MCDEM and town forces (Fire, EMS, 
Streets, Parks, and Sheriff) to identify and plan for 
evacuation routes should the local levee fail 
• Town / Town Engineer 
• N/A 
• 2016 
No Action 
Keep 
Significant staff turnover has led to a lack of progress for this 
action.  
12 
The Town will include potential subsidence in 
freeboard calculations for buildings in flood prone 
areas that are known to be active subsidence areas as 
well 
• Town / Town Engineer 
• Staff Time 
• As Needed 
In Progress 
Keep 
Town Engineer evaluates the freeboard associated with buildings 
in flood prone areas on a case by case basis and includes potential 
subsidence in that consideration.   
13 
The Town will use permeable driveways and paved 
pedestrian surfaces to reduce runoff and promote 
groundwater recharge to mitigate the effects of 
groundwater withdrawal on subsidence in the area. 
• Town / Town Engineer 
• $50,000 
• As Identified 
In Progress 
Keep 
This activity will continue on a case by case basis as projects 
arise.  
 
 
 
Table 6-7-10:  Gilbert assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-10:  Gilbert assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations to reduce 
risks. 
• Floodplain 
Administrator/Plans Review 
and Inspection Manager 
• Staff time 
• Annual-Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
2 
Proactive adoption of applicable master plans, land 
uses and developmental agreements to reduce risks. 
• Engineering / Planning 
Service Manager 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
3 
Implement the appropriate stage of the Water Supply 
Reduction Management Plan as adopted (May 2003) 
to reduce water use. 
• Water Resource Manager & 
Town Manager 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
4  
Gilbert will continue to participate in the Community 
Rating System (CRS) program and get credit for the 
various activities that assist property owners in 
receiving reduced insurance premiums.  
• Floodplain Administrator 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
5 
Work closely with FCDMC – Dam Safety to stay 
abreast of current mitigation efforts and timelines at 
Powerline FRS (two safety deficiencies)    
• Floodplain 
Administrator/Emergency 
Management Coordinator 
• Staff Time 
• Ongoing 
In Progress 
Keep 
The “Unsafe Dam – with Elevated Risk of Failure” 
designation for the Powerline FRS has been removed after 
the Flood Control District of Maricopa County completed the 
IDSM project (as noted in letter from Engineering Manager 
Ravi Murphy, dated 11.25.14).  However, deficiencies for 
foundation concerns remain.  Therefore ADWR currently has 
a Safety Deficiency assigned to the dam. FCDMC is 
currently working with engineering consultants to replace the 
Powerline FRS with a channel.  The design has advanced 
past the 60% level.   
Completed work with Flood Control District of Maricopa 
County on a Gilbert Flood Response Plan (FRP).  Town 
Council adopted and Mayor signed on 08/15/2019. 
6 
Provide pertinent weather and hazard mitigation 
information to the public to raise awareness of local 
hazards by providing local weather service and 
Maricopa County Hazard Mitigation links from Town 
of Gilbert Home page.  
• Emergency Management 
Coordinator / Webmaster 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence.  
Weather information linked to Emergency Mgt. web page, 
ongoing.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-10:  Gilbert assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
7 
Participate in occasional table top exercises to identify 
potential mitigation measures for increasing response 
effectives such as evacuation and shelter functions.   
• Emergency Management 
Coordinator 
• Staff Time 
• December 2015 
In Progress 
Revise 
Revise description to reflect on-going occurrence. 
Continue to participate in regional exercises, training and 
drills to improve response capabilities   
8  
Promote the use of weather radios, especially in 
schools, hospitals and other locations where people 
congregate to inform them of the approach of severe 
weather.  
• Emergency Management 
Coordinator/Communication 
Office 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
Continue to participate in regional exercises, training and 
drills to improve response capabilities to include     
9. 
Use website and social media to encourage citizens to 
be prepared in case of a disaster event to raise 
awareness and participation. 
• Emergency 
Manager/Communications 
Office 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
Ongoing. Continue to deliver personal and family 
preparedness messaging, including during National 
Preparedness Month, to include the Manager’s Update, and 
other social media educational spotlights. 
10  
Review building permits in high risk fissure areas and 
require engineering evaluation prior to development to 
reduce impacts. 
• Town Engineer Permit & 
Plans Review and 
Inspection Manager 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence 
11 
Monitor ADWR Subsidence Monitoring Program’s 
satellite imagery for local trends and impacts with the 
goal of determining strategies to reduce damage and 
losses. 
• Water Resource Manager 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence. 
12 
Provide link to the Arizona Department of Water 
Resource website as part of a public campaign to raise 
awareness to the hazards and locations of active 
subsidence. 
• Water Resource Manager 
and Webmaster 
• Staff Time 
• Ongoing 
In Progress 
Revise 
Revise description to reflect on-going occurrence. 
Subsidence is relatively stable in Gilbert. Water Resource 
Manager monitors yearly ADWR data for changes or 
concerns. 
 
13 
Improvement to Vaughn Avenue Basin to reduce 
potential of overtopping.   
• Engineering/Streets 
Manager/Public Works 
Director 
• $30,000 
• Within 2 years of receiving 
grant funding 
No Action 
Keep 
No progress, ongoing.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-10:  Gilbert assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
14 
Improvement to Gilbert Road and Williams Field 
Road Intersection Drainage to reduce local flooding. 
• Engineering/Streets 
Manager/Public Works 
Director 
• $750,000 
• Within 2 years of receiving 
grant funding 
No Action 
Keep 
No progress, ongoing. 
15 
Improvement to 170th Street and San Tan Drainage to 
reduce local flooding.  
• Engineering/Streets 
Manager/Public Works 
Director 
• $40,000 
• Within 2 years of receiving 
grant funding 
No Action 
Keep 
No progress, ongoing. 
16 
Improvement to Coldwater Boulevard Drainage to 
reduce local flooding. 
• Engineering/Streets 
Manager/Public Works 
Director 
• $60,000 
• Within 2 years of receiving 
grant funding 
Complete 
Delete 
This project was completed several years ago, with a 
partnership with FCDMC (Small Project Assistance). 
17 
Improvement to Powerline Trail Drainage at Holliday 
Farms to reduce local flooding. 
• Engineering/Streets 
Manager/Public Works 
Director 
• $213,000 
• Within 2 years of receiving 
grant funding 
Complete 
Delete 
CIP completed this project in 2015. 
18 
Improvement to Commerce Area Drainage to reduce 
local flooding. 
• Engineering/Streets 
Manager/Public Works 
Director 
• $1,156,000 
• Within 2 years of receiving 
grant funding 
No Action 
Keep 
No progress, ongoing. 
19 
Improvement to 172nd Street south of Flintlock, 
implement design to protect roadway and underground 
utilities from future collapse and ensure rain water is 
diverted away from fissure area. 
• Engineering/Streets 
Manager/Public Works 
Director 
• $100,000 
• Ongoing 
No Action 
Keep 
Geotech study completed, no other progress, ongoing.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-11:  Glendale assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
In partnership with The Salvation Army, provide 
respite care and dehydration stations. This effort 
mitigates loss of life during extreme temperature. 
• Emergency 
Management 
• Staff time 
• On-going 
In Progress 
Keep 
Annual efforts undertaken in coordination with Community 
Services staff to provide respite care and hydration stations in 
locations throughout the city. 
2 
Perform a public information campaign in 
coordination with the City of Glendale Marketing 
Department and Fire Department to educate and 
inform citizens of safety during periods of extreme 
heat.  
• Fire Department 
Emergency 
Management 
Marketing 
• Staff time 
• On-going 
In Progress 
Keep 
Public information has been provided via social media channels to 
educate and inform citizens of ways to stay safe during periods of 
extreme heat. 
3 
Ordinance compliance and maintenance of property 
(weed/brush abatement) 
• Code Compliance 
• Staff time 
• On-going 
In Progress 
Keep 
Code Compliance continually enforces weed/brush abatement 
ordinance compliance through regular inspections or response to 
complaints. 
4 
Conduct regular inspections of washes and take 
corrective action by enforcing existing ordinances to 
prevent a corridor for wildfires. 
• Building Safety and 
Public Safety 
• Staff time 
• On-going 
No Action 
Delete 
Status/Disposition explanation: 
Many of the washes located in the City of Glendale are under the 
jurisdiction of the state or federal entities; therefore, the City of 
Glendale does not have enforcement jurisdiction. 
5 
Maintenance of Emergency Action Plan of Covered 
municipal water storage reservoir with a capacity of 12 
million gallons. (Thunderbird Reservoir). 
• Water Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Description to read: 
Maintenance of Emergency Action Plan (EAP) of covered 
municipal water storage reservoir with a capacity of 12 million 
gallons. (Thunderbird Reservoir) 
 
Status explanation: 
Water Services continues to maintain the Emergency Action Plan 
as required by the Arizona Department of Water Resources’ 
(ADWR) Dam Safety program. 
6 
Participation in the Annual ADWR inspection and 
survey of the Thunderbird Reservoir. 
• Water Services 
• Staff time 
• On-going 
In Progress 
Keep 
Water Services complies with the requirements of the Arizona 
Department of Water Resources’ Dam Safety program. 
7 
Participation in the bi-monthly EAP drills and table 
top exercises. 
• Water Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Description to read: 
Participation in annual EAP drills and tabletop exercises. 
 
Status explanation: 
Water Services’ staff participate in scheduled EAP drills and 
tabletop exercises.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-11:  Glendale assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
8 
Water Conservation Office conducting educational 
outreach to the public on best practices, via classes, 
flyers, website, social media  
• Water Services 
• Staff time 
• On-going 
In Progress 
Keep 
Water Services’ staff provide classes, flyers and other information 
on water efficiency ahead of and during drought conditions 
9 
Encourage permanent reduction in amount of water 
used for landscaping purposes through Landscape 
Rebate up to $750.00 for residential and $3000 for 
non-residential. 
• Water Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Description to read: 
Encourage permanent reduction in amount of water used for 
landscaping purposes through Landscape Rebate up to $750 for 
residential and $3,000 for non-residential. 
 
Status explanation: 
Water Services’ staff provide landscape consultations and rebates 
ahead of and during drought conditions 
10 
Update Drought Management Plan (2004) to assist in 
management of operations when a drought is declared. 
• Water Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Description to read: 
Update Drought Management Plan (2016) to assist in management 
of operations when a drought is declared. 
 
Status explanation: 
The Drought Management Plan was updated in 2016 and is 
currently under review for additional updates. 
11 
Conduct landscape classes (promote xeriscape) to 
encourage use of drought-resistant landscaping 
• Water services 
• Staff time 
• On-going 
In Progress 
Keep 
Water Services’ staff provide classes, flyers and other information 
on xeriscape ahead of and during drought conditions. 
12 
Manage storm-water at its source to reduce water used 
for landscaping and prevent flooding.  Funded in part 
by a grant from Water Infrastructure Finance Authority 
of Arizona, to develop a toolkit of low impact 
development options. 
• Water Services / 
Engineering 
• Staff time 
• On-going 
Complete 
Delete 
The low-impact development toolkit was completed in April 2015. 
13 
City-wide plan to control stormwater pollution, 
including identification of problem areas (drainage 
issues, illicit discharges, etc.). 
• Engineering 
• Staff time 
• On-going Submitted to 
ADEQ for 
review/approval in 
2014 
In Progress 
Revise 
Change Description to read: 
Citywide plan to control stormwater, including identification of 
problem areas (drainage issues, illicit discharges, etc.). The City’s 
Stormwater Management Plan is reviewed annually and updated 
as needed.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-11:  Glendale assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
14 
Maintain emergency generators at water and 
wastewater plants, water pumping station and 
wastewater lift stations 
• Various Departments 
• Staff time 
• On-going 
In Progress 
Revise 
 
Change Description to read: 
Maintain emergency generators at water and wastewater plants, 
water booster stations, and wastewater lift stations. 
 
Status explanation: 
Water Services continues to maintain emergency generators for 
treatment plants, booster stations and wastewater lift stations 
15 
Maintain emergency generators at fire stations and 
Glendale Regional Public Safety Training Center. 
• Various Departments 
• Staff time 
• On-going 
In Progress 
Revise 
 
Change Description to read: 
Maintain emergency generators at public safety facilities, 
including police stations, fire stations and Glendale Regional 
Public Safety Training Center. 
 
Status explanation: 
The City continues to maintain generators at public safety 
facilities. Annual maintenance and inspections are conducted. 
There are also several portable generators available at Fire 
Resource Management should they be necessary.  
 
16 
Work with federal and state agencies, and local 
coalition to evaluate awareness of fissure risk zones 
and the problems caused by fissures. 
• Development Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Lead Agency to Planning 
17 
Geological hazards addressed in General Plan and will 
be incorporated in the planning process for the next 
General Plan. 
• Development Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Lead Agency to Planning 
18 
Utilization of Development Services plans and 
procedures to survey and monitor elevations in the 
City of Glendale to determine and establish long term 
mitigation strategies. 
• Development Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Lead Agency to Planning 
19 
Development Services has utilized the risk as a regular 
risk of development and public work projects.  The 
lands used for such projects are inspected for 
subsidence issues prior to projects starting. 
• Development Services 
• Staff time 
• On-going 
In Progress 
Revise 
Change Lead Agency to Planning

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-11:  Glendale assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
20 
Educate the public through publication partnering with 
the Community Services Department and Parks and 
Recreation to inform citizens of risks associated to 
flood risks areas (parks multi-use pathways). 
• Community Services 
Department 
• Staff time 
• On-going 
In Progress 
Revise 
Change Description to read: 
Inform citizens of risks associated with flood risk areas, 
specifically parks multi-use pathways. 
 
Change Lead Agency to Public Facilities, Recreation & Special 
Events 
21 
Work with Flood Control District of Maricopa County 
to determine potential effects of levee failure 
• Emergency 
Management 
• Staff time 
• On-going 
In Progress 
Keep 
Emergency Management Staff has met with Flood Control District 
of Maricopa County to review and discuss revised Emergency 
Action Plans for levees that have impact to the City of Glendale.  
22 
Participate in annual Flood Control District of 
Maricopa County Drill/Exercises 
• Emergency 
Management 
• Staff time 
• On-going 
In Progress 
Keep 
Emergency Management staff participates in the annual 
drills/exercises conducted by the Flood Control District of 
Maricopa County. 
23 
Enforce currently adopted building codes (2012 IBC 
and IRC) to mitigate damages due to severe wind 
events. 
• Development Services 
• Staff time 
• On-going as needed 
In Progress 
Revise 
Change Description to read: 
Enforce currently adopted building codes (2018 IBC and IRC) to 
mitigate damages due to severe wind events. 
 
Change Lead Agency to Building Safety 
24 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potential for flying 
debris during severe wind events. 
• Development Services 
• Staff time 
• On-going as needed 
In Progress 
Revise 
Change Lead Agency to Building Safety 
25 
Use website and social media sources to raise public 
awareness to the impacts of flood and severe winds 
associated with monsoon season. 
• Emergency 
Management 
• Staff time 
• On-going and seasonal 
In Progress 
Keep 
Emergency Management maintains information on the website 
regarding monsoon and flood safety. Additionally, in partnership 
with the Fire Department, public awareness information is shared 
via social media channels. 
 
 
Table 6-7-12:  Goodyear assessment of previous plan cycle mitigation actions/projects

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• City Engineer, 
Development Services 
Director 
• Staff time 
• Annual - Ongoing 
Complete 
Keep 
Ongoing practice with each building permit submittal 
2 
Promote and share mitigation programs with state, 
county, local jurisdictions, and private, civic, and non-
profit organizations. 
• Fire Chief / Emergency 
Manager 
• Staff Time 
• Annual-Ongoing 
No Action 
Delete 
Uncertain of action 
3 
Use newsletters, flyers, utility bill inserts, website 
notices, radio and television announcements, social 
media and newspaper articles to educate the public 
about hazards impacting Goodyear and how to be 
prepared in case of an emergency or disaster event. 
• Communications 
Division / PIOs / 
Emergency Manager 
• Staff Time 
• Annual - Ongoing 
Complete 
Keep 
Messaging is continual and season appropriate.  Will begin to 
implement the “Ready, Set Go” evacuation program.   
4 
Provide links on the community’s website to sources 
of hazard mitigation educational materials encouraging 
residents of Goodyear to be prepared for hazard 
emergencies. 
• Emergency Manager 
• Staff Time 
• Annual-Ongoing 
Complete 
Keep 
Maintained this plan, along with the CWPP plan on the 
Emergency Management Division website through redesign.  Will 
use these links in social media as discussed above. 
5 
Participate in occasional dam failure tabletop exercises 
to identify mitigation measures for increasing response 
effectiveness, such as evacuation route marking and 
permanent protection measures for intended shelters. 
• Emergency Manager 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
Held Flood TTX with unified command leadership staff and staff 
from various departments.   Will continue to rotate in Flooding 
TTX, especially as related to Bullard Wash as development 
continues.  
6 
Mandate, encourage or incentivize the use of drought 
resistant landscaping through ordinance development 
and/or enforcement. 
• City Engineer, 
Development Services 
Director 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
The City Water department promotes xeriscaping, water 
conservation and use reduction on a regular basis.  This year’s 
campaign calls for a resident created tagline.  This program and 
messaging will continue in the future. 
7 
Develop, update and maintain a local Drought 
Management Plan to define various levels of 
conservation or curtailment requirements that are 
based on drought severity triggers, system impacts, 
and enforced through utility billing structures and 
ordinance. 
• Water Resources 
Division 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
City of Goodyear has both a Conservation Plan and a Curtailment 
(both currently being updated) which are based on demand as a 
percentage of our supply.  There is considerable public 
information and campaigns regarding about water conservation 
that have occurred and will continue.   
8 
Partner with NGO’s to provide respite care and 
hydration stations to mitigate loss of life during 
extreme temperature events. 
• Emergency Manager 
• Staff time 
• Annual-Ongoing 
No action 
Delete 
Goodyear has participated in a water drive to assist nearby 
jurisdictions with hydration stations supplies. Goodyear takes a 
different approach based largely on development patterns.  PD 
maintains a homeless outreach team which serves somewhat in 
this capacity.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-12:  Goodyear assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
9 
Perform an information campaign at the onset of the 
extreme heat season to help educate the general public 
on ways to remain safe during periods of extreme heat. 
• Emergency Manager 
• Staff time/Volunteers 
• Annual-Ongoing 
Complete 
Keep 
Heat warnings, weather alerts and other Heat related material are 
regularly communicated throughout the year and will continue to 
be.  Additional communication channels could be sought to assist 
with this messaging.  
10 
Identify and communicate locations within the 
community that can serve as cooling stations during 
times of extreme heat. 
• Emergency Manager 
• Staff time / Volunteers 
• Annual-Ongoing 
In Progress 
Keep 
Cooling center was established during two-day power outage.   An 
update with locations and the Red Cross is appropriate at this time.   
11 
Provide links to the Arizona Geologic Service website 
as a part of a public campaign to raise awareness to the 
hazards and locations of fissures. 
• Emergency Manager 
• Staff time 
• Q3, 2015 
No Action 
Delete 
No mapped fissures in the potential development area for the next 
5-10 years. 
12 
Include addressing fissure and subsidence risk as a 
regular part of the land development and public works 
projects review and permitting processes. 
• City Engineer, 
Development Services 
Director 
• Staff time 
• Annual-Ongoing 
No Action 
Revise 
Remove reference to fissures and keep subsidence only 
13 
Participate in the Flood Control District of Maricopa 
County annual county-wide flood exercises to identify 
areas of mitigation interest regarding vulnerable 
critical infrastructure, emergency access and routes 
issues. 
• Emergency Manager 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
Participation in past exercises and will continue to participate with 
next cycle 
14 
Provide severe weather information to the City of 
Goodyear first responders and other employees that 
work outdoors for them to be aware to wear the proper 
personal protection equipment. 
• Emergency Manager 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
The Emergency Manager has developed a distribution list within 
the city which is used to warn of pending weather which can 
impact operations and personnel.   It is also used to gather damage 
information from storms.  It has proven quite effective at ensuring 
staff is keep cool and that water pipes in outlying areas don’t 
freeze. 
15 
Work with the Flood Control District of Maricopa 
County to develop and update flood response plans as 
they pertain to the City of Goodyear and surrounding 
areas.   
• Emergency Manager 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
The Bullard Wash Response Plan was complete in 2012.   Since 
that time the plan has been updated and Goodyear will continue to 
work with the Flood Control District to ensure updates and 
subsequent protocols are kept current.  
16 
Encourage/incentivize homeowners to use tie-down 
straps and/or anchors to secure metal awnings or 
porches to mitigate the potential for flying debris 
during severe wind events. 
• Emergency Manager 
• Staff time / Volunteers 
• Annual-Ongoing 
No action 
Keep 
Goodyear will place more emphasize on this in the future.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-12:  Goodyear assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
17 
Install backup generators at key critical facilities such 
as fire and police stations, water pumping stations, 
sewer lift stations, etc., to provide emergency power 
for critical operations during power failures caused by 
severe wind events. 
• Public Works 
• $60k-$100k 
• EOY 2015 
In Progress 
Keep 
A Threat Vulnerability Assessment has been completed by the 
Water/Waste Water Division, where in key locations were 
identified for generators/hot taps, etc.  These improvements are 
now imbedded within their CIP. Additionally, all fire stations have 
generators, as does Telecommunications. The bulk of secondary 
fuel delivery for the city is also serviced by generators.   
18 
Provide links to Arizona Department of Water 
Resources website as part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Emergency Manager 
• Staff time 
• Q3, 2015 
No progress 
Keep 
Emergency Management will ensure the that Water Waste Water 
Division is utilizing this in their water saving campaigns and 
social media messaging.  
19 
Enforce the City of Goodyear’s weed abatement 
ordinance. 
• Building Official 
• Staff time / Volunteers 
• Annual-Ongoing 
Complete 
Keep 
This is an ongoing Code compliance matter.   General messaging 
is usually sent out in the late Spring when weeds are becoming fire 
hazards.  
20 
Educate the public on proper fuels thinning, setbacks, 
and water storage for wildfire mitigation using 
Firewise type of programs and guidance documents. 
• Fire Chief / Emergency 
Manager 
• Staff time 
• Annual-Ongoing 
Complete 
Keep 
The Goodyear Fire Department assisted five plats of the Estrella 
Mountain Community in qualifying for the FireWise Program, 
which includes another fuel reduction event in Corgett Wash.   
Since that time, program qualifications have increased 
significantly and management at the HOA has turned over.  The 
Fire Department intends to recoup the program in the future and 
once re-established, turn it over the HOA for continued projects 
along Corgett Wash. 
21 
Conduct wildfire safety education programs in the 
local schools through the Community Risk reduction 
program. 
• Emergency Manager 
• Staff time / Volunteers 
• Annual-Ongoing 
No action 
Keep 
Emergency Management will work with Community Education 
regarding embedding the wildfire safety message, specifically the 
Ready, Set, Go evacuation program, into the school programs 
where and when possible.  
 
 
Table 6-7-13:  Guadalupe assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-13:  Guadalupe assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Building Inspector / 
Contractor 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Ongoing review of plans to be Flood control compliant 
2 
Implement the education and mitigation actions as 
outlined in the town’s Stormwater Management Plan. 
• Building Inspector / 
Contractor 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Ongoing Community education outreach 
3 
Establish periodic monitoring and review of the Town 
of Guadalupe’s general plan and zoning ordinance to 
determine effectiveness at preventing and mitigating 
hazards. Based on the results, amend as necessary. 
• Town Manager or 
designee 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
General Plan and zoning ordinance review to assess hazard 
reduction 
4 
Participate in occasional table top exercises to identify 
potential mitigation measures for increasing response 
effectiveness, such as evacuation route marking and 
permanent protection measures for intended shelters. 
• Emergency Manager 
• Staff time 
• 2018 
Annual 
Open ended 
Flood Control Plan/ Emergency operations plan review 
5 
Develop or update the inundation mapping for the 
emergency action plan for Guadalupe Retention Dam 
in order to identify population and critical facilities 
and infrastructure at risk, and to determine the need for 
potential mitigation. 
• Flood Control District 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Maricopa County Flood Control District 
6 
Public education of water conservation best practices 
through newsletter, flyers, social media and website 
notices. 
• Community 
Development 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Continue community outreach 
7 
Develop a local Drought Management Plan to define 
various levels of conservation requirement that are 
based on drought severity triggers. 
• Community 
Development 
• Staff time 
• Ongoing 
Ongoing  
Open ended 
Community Water use review 
8 
Perform a public campaign at the onset of the extreme 
heat season to help educate the general public on ways 
to remain safe during periods of extreme heat. 
• Fire Dept – Public 
Information Officer 
(PIO) 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Annual using social media

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-13:  Guadalupe assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
9 
Identify, stock, and communicate locations within the 
community that can serve as cooling stations during 
times of extreme heat. 
• Fire Dept Emergency 
Manager 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Rehydration locations established 
10 
Review and update stormwater management plan that 
will analyze and identify problem flooding areas and 
propose long-term mitigation alternatives designed to 
reduce or eliminate the flood problems. 
• Building Inspector / 
Contractor 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Part of the storm water management plan 
11 
Work with Flood Control District of Maricopa County 
to review, update, and/or augment flood control 
ordinances to provide a greater level of protection than 
the minimum required by the NFIP. 
• Building Inspector / 
Contractor 
• Staff time 
• Ongoing 
Ongoing  
Open Ended 
Part of the storm water management plan 
12 
Review existing buildings, evaluate any substandard 
construction issues and implement repair and upgrade 
plan for future wind damage. 
• Building Inspector / 
Contractor 
• Staff time 
• Ongoing 
Ongoing 
On hold 
Pending funding 
13 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potential for flying 
debris during severe wind events. 
• Emergency Manager 
• Staff time 
• Ongoing 
Ongoing 
Open ended 
Annual social media outreach 
 
 
 
Table 6-7-14:  Litchfield Park assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• City Engineer 
• Staff Time 
• Annual-Ongoing 
Ongoing 
Keep 
Reviews continue as  plans are submitted

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-14:  Litchfield Park assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
2 
Annually coordinate with federal, state, and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information. 
• Flood Control District 
of Maricopa County 
• Staff Time 
• Annually 
Ongoing 
Keep 
Annual updates 
3 
Review Emergency Operations Plan for areas that can 
be updated in accordance with current warning 
measures that are now available through the national 
Weather Bureau and the Maricopa County Emergency 
Services. 
• Goodyear Fire / 
Maricopa County 
Sheriff, EM 
Coordinator, Public 
Works 
• Staff Time 
• Annual-Ongoing 
Ongoing 
Keep 
Staff attends DEMA meetings regularly, and is aware of on-going 
issues.  
4 
Encourage city staff to become members of regional 
organizations that have hazard mitigation as a mission, 
to share in regional efforts and solutions to local and 
regional problems. 
• Emergency 
Management 
Coordinator 
• Staff Time 
• Annual-Ongoing 
Ongoing 
Keep 
Emergency Management Coordinator-ACM carries these duties.  
5 
Develop a policy to replace the use of hazardous 
materials with other products as soon as a safe, 
reliable source is available and proven to be as 
effective. 
• Public Works / 
Director 
• Staff Time 
• Ongoing 
Implemented 
Delete-
completed 
Non-hazardous materials are used whenever possible. 
6 
Provide links on the community’s website to sources 
of hazard mitigation educational materials (e.g. – 
http://www.ready.gov/ and http://do1thing.com/) 
encouraging private citizens to be prepared for hazard 
emergencies. 
• Emergency 
Management 
Coordinator 
• Staff Time 
• Ongoing-Monthly 
Completed 
Keep 
Provided on website 
7 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Emergency 
Management 
Coordinator / PIO 
• Staff Time 
• Ongoing - Seasonal 
Ongoing-
annually 
Keep 
Provided annually thru City social media 
8 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting. 
• City Engineer 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Ongoing thru permitting process

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-14:  Litchfield Park assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
9 
Review building permits for compliance with 
International Building Code for structure compliance 
to endure severe winds and electrical strikes, use 
drought resistant plumbing fixtures, and flood 
proofing. 
• Public Works / City 
Engineer 
• Staff Time 
• Annual-Ongoing 
Ongoing 
Keep 
Ongoing as plans are reviewed 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Maintain continuous water supply by continuing to 
install/replace water distribution system throughout the 
City of Mesa 
• Water Resources & 
Engineering Dept. 
• $120 M 
• 2018 
In Progress 
Keep 
City of Mesa Water Resources continue to install/replace water 
distribution system components (including pipeline, pumps, wells 
etc.) as part of its Capital Improvement project. 
Water Resources maintains an annual budget for installation and 
replacement of facilities to maintain the existing water system 
based on needs. 
2 
CAP (Signal Buttes WTP), future treatment plant at 
Elliot and Ellsworth 
• Water Resources & 
Engineering Dept. 
• $130 M 
• 2019 
Complete 
Delete 
Signal Butte WTP was completed in June 2018 and has been in 
service since, providing water to Southeast part of the City. Phase 
II design has started, which is addition to the original scope. 
3 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Development 
Services, 
Engineering Dept. 
• Staff time 
• On-going 
On-Going 
Keep 
The City building permit process requires all properties within the 
Maricopa County Flood Control District to obtain a permit from 
the District and submit it to the City to receive a building permit 
from the City. 
4 
Construct remaining elements of the Storm Drain 
Master Plan 
• Engineering Dept. 
• $108 M 
• On-going 
In Progress 
Keep 
Engineering regularly evaluates projects to incorporate storm 
drain improvements as outlined in the Storm Drain Master Plan.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
5 
Perform public information campaign at the start of the 
extreme heat season to educate the public. 
• Fire /Medical Dept 
& Public 
Information Office 
• Staff time & cost of 
supplies 
• At the extreme event 
In Progress 
Keep 
•Monsoon season educational campaigns on various city websites, 
social media posts, and media alerts to news agency in which we 
offer interviews and visuals examples. 
•Summer heat warnings with regards to outdoor activities, older 
adults, hot vehicles, etc. on social media, weblinks, new media 
advisories. 
•Hydration donation campaign to assist the unsheltered and 
homeless during the summer months; press conference, social 
media posts, weblinks.  
Campaign messaging and visuals on Facebook, Twitter, and 
Instagram @MesaFireDept 
6 
Partner with NGO’s (e.g. – The Salvation Army, 
church organizations, shelters, etc.) to provide respite 
care and hydration stations to mitigate loss of life 
during extreme temperature events. 
• Fire/Medical Dept & 
Public Information 
Office 
• Staff time & cost of 
supplies 
• At the extreme event 
In Progress 
Keep 
Prior to the start of the extreme heat season, contact those agencies 
in Mesa, and develop plans as to how we support each other.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
7 
Provide links on the City of Mesa Website to sources 
of hazard mitigation educational materials encouraging 
private citizens to be prepared for hazard emergencies. 
• Fire/Medical Dept & 
Public Information 
Office 
• Staff time 
• On-going 
In Progress 
Keep 
•https://www.mesaaz.gov/residents/fire-medical/fire-life-safety-
education/heat-related-illness 
•https://www.mesaaz.gov/residents/emergencies-power-outages 
•https://www.mesaaz.gov/residents/emergencies-power-
outages/sandbags-storm-preparation  
•https://www.mesaaz.gov/residents/emergencies-power-
outages/family-preparedness-guide  
•Hydration donation campaign to assist the unsheltered and 
homeless during the summer months: 
https://www.mesaaz.gov/things-to-do/volunteer/hydration-
donation   
•Monsoon ready virtual flyer: 
https://www.mesaaz.gov/home/showdocument?id=21991 
(source: https://www.mesaaz.gov/residents/streets-
transportation/safety-education )  
On Facebook, Twitter, and Instagram @MesaFireDept  
8 
Participate/Conduct tabletop exercises to identify 
potential mitigation measures for increasing response 
effectiveness in the event of a dam failure. 
• Development 
Services & 
Engineering Dept. 
• Staff time 
• On-going 
On-Going 
Keep 
This effort is led by the County and other stakeholders.  The City 
participates when invited. 
9 
Address fissure risk as a regular part of development 
& public works projects review. 
• Development 
Services & 
Engineering Dept. 
• Staff time 
• On-going 
In Progress 
Delete 
Per Development Services & Engineering, this is encompassed in 
item 14

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
10 
Clear vegetation & wildfire fuels to create a clear 
space around critical structures. 
• Fire/Medical Dept & 
Development 
Services 
• Staff time 
• On-going prior & 
during the dry 
season 
In Progress 
Keep 
The City of Mesa follows the 2018 International Fire Code 
Section 304 as it relates to wildfires: 
Combustible Waste Material 
304.1 Waste accumulation prohibited. Combustible waste material 
creating a fire hazard shall not be allowed to accumulate in 
buildings or structures or upon premises. 
 
304.1.1 Waste material. Accumulations of wastepaper, wood, hay, 
straw, weeds, litter or combustible or flammable waste or rubbish 
of any type shall not be permitted to remain on a roof or in any 
court, yard, vacant lot, alley, parking lot, open space, or beneath a 
grandstand, bleacher, 
pier, wharf, manufactured home, recreational vehicle or other 
similar structure. 
 
304.1.2 Vegetation. Weeds, grass, vines or other growth 
that is capable of being ignited and endangering property, 
shall be cut down and removed by the owner or occupant 
of the premises. Vegetation clearance requirements in 
urban-wildland interface areas shall be in accordance with 
the International Wildland-Urban Interface Code.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
11 
Enforce burn & fireworks bans as needed during dry 
season. Enforce weed abatement ordinance. 
• Fire/Medical Dept & 
Development 
Services 
• Staff time 
• On-going prior & 
during the dry 
season 
In Progress 
Keep 
ARS 36-1601 restricts use of fireworks.  We enforce the following 
regarding open burning: 
2018 International Fire Code Section 307 as it relates to burn & 
fireworks bans - Open Burning, Recreational Fires And Portable 
Outdoor Fireplaces; 
 
307.1 General. A person shall not kindle or maintain or authorize 
to be kindled or maintained any open burning unless conducted 
and approved in accordance with Sections 307.1.1 through 307.5. 
 
307.1.1 Prohibited open burning. Open burning shall be prohibited 
when atmospheric conditions or local circumstances make such 
fires hazardous. Exception: Prescribed burning for the purpose of 
reducing the impact of wildland fire when authorized by the fire 
code official. 
 
307.2 Permit required. A permit shall be obtained from the fire 
code official in accordance with Section 105.6 prior to kindling a 
fire for recognized silvicultural or range or wildlife management 
practices, prevention or control of disease or pests, or a bonfire. 
Application for such approval shall only be presented by and 
permits issued to the owner of the land on which the fire is to be 
kindled. 
 
307.2.1 Authorization. Where required by state or local law or 
regulations, open burning shall only be permitted with prior 
approval from the state or local air and water quality management 
authority, provided that all conditions specified in the 
authorization are followed. 
12 
Maintain/install back-up generators at critical facilities 
such as Fire & Police Stations, water pumping stations, 
sewer lift stations, etc., to provide emergency power 
for critical operations during power failures caused by 
severe wind events. 
• Water Resources, 
Engineering, 
Development 
Services, Facilities 
Maintenance 
• $2 M + staff time 
• 2019 
In Progress 
Keep 
PRCF-Facilities Maintenance continue to maintain emergency 
generators at critical facilities. However, most of these units do 
not provide full backup functions for the facility.  It will only 
backup the safety items in the facility. The total estimated cost to 
add new generators for a full backup of all Fire Stations and PD 
sites will be $10,850,000. 
Water Resources - Back-up generator and reliability of pumping 
station, lift station and plants are an integral part of WR Capital 
Improvement Program 
Water Resources and Facilities Maintenance Departments 
continually evaluate facilities for the need of new of upgraded 
generators.  Projects are initiated once a need is identified.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-15:  Mesa assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
13 
Include the subsidence risk as a regular part of 
development & public works projects review. 
• Development 
Services & 
Engineering Dept. 
• Staff time 
• On-going 
On-Going 
Keep 
Building permit applications are required to submit soils 
investigations that would identify issues with subsidence and/or 
fissures.  
Public Works projects typically include a geotechnical study that 
evaluates a project site for fissure and subsidence risks. 
14 
Provide links to ADWA website to raise awareness to 
locations of active subsidence. 
• Development 
Services & 
Engineering Dept. 
• Staff time 
• On-going 
In Progress 
Keep 
Development Services will add the links to their website for 
instructions for Residential and Commercial Construction. 
Engineering will add the links to the Engineering and Design 
Standards. 
15 
Provide links to Arizona Geologic Service website to 
raise awareness to the hazard & locations of fissures. 
• Development 
Services & 
Engineering Dept. 
• Staff time 
• On-going 
In Progress 
Delete 
Per Development Services & Engineering, this is encompassed in 
item 14 
16 
The City of Mesa provides information to the public 
using the Community Emergency Notification System 
(CENS), also called Reverse 9-1-1. If an event occurs 
the 9-1-1 dispatch center in Mesa will call and provide 
information and/or instruction to subscribers.  
• City of Mesa 
Communications 
• Staff time 
• On-going 
In Progress 
Keep 
Item description is self-explanatory.  Will only be utilized in the 
event of a life/safety emergency. 
 
Table 6-7-16:  Paradise Valley assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permit applications for compliance 
with Floodplain Ordinance and NFIP regulations. 
• Engineering 
Department 
• Staff time 
• Annual-Ongoing 
*** 
*** 
Paradise Valley is no longer participating in the Plan

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-16:  Paradise Valley assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
4 
Continue the under grounding project for existing 
utilities on major roads thereby eliminating utility 
poles. 
• Engineering 
Department 
• $3,800,000 
• 2014 
“ 
“ 
“ 
2 
Adopt the 2009 International Codes (Building, 
Residential, Mechanical, Plumbing & Electrical) for 
use by the town. 
• Building Safety 
Division 
• Staff time & $2,000 
for books 
• July 1, 2010 
“ 
“ 
“ 
3 
Conduct regular inspections of washes to ensure that 
they are maintained in a debris free condition. 
• Building Safety & 
Public Works 
Departments 
• Staff time 
• Annual-Ongoing 
“ 
“ 
“ 
5 
Conduct regular inspections of washes and take 
corrective action by enforcing existing ordinances to 
prevent a corridor for wildfires. 
• Building Safety & 
Public Works 
Departments 
• Staff time 
• Annual-Ongoing 
“ 
“ 
“ 
6 
Update the current Emergency Operations Plan. 
• Building Safety 
Division, Emergency 
Management Unit 
• Staff time 
• Ongoing 
“ 
“ 
“ 
8 
Maintain effective communications with state, county 
and local government agencies by the various town 
departments within their respective responsibility. 
• All Departments 
• Staff time 
• Ongoing 
“ 
“ 
“ 
7 
Educate and inform residents, businesses and visitors 
by conducting a media campaign, via local newspaper 
to publicize ways to mitigate disasters including steps 
that they can protect themselves. 
• Building Safety 
Department 
• Staff time 
• Annual-Ongoing 
“ 
“ 
“ 
 
Table 6-7-17:  Peoria assessment of previous plan cycle mitigation actions/projects

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Planning and Zoning 
• Staff Time 
• Annual-Ongoing 
Ongoing 
Delete 
This is an ongoing process required under the Floodplain 
Management Ordinance and enforced by the Floodplain 
Administrator for the City of Peoria. If possible would like to 
remove as a mitigation project. 
2 
Assist with the revision of a water conservation plan 
for mitigating the impact of a drought on the public 
water supply. 
• Public Works 
• Staff Time 
• Annual 
Ongoing 
Revise 
Review and update Water Conservation plan as necessary. 
3 
Work with the Flood Control District of Maricopa 
County to determine potential effects of a flash flood 
or flood affecting the city. Also provide sandbags and 
sand as required. 
• Public Works, City 
Engineering and 
Emergency Management 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual campaign. 
4 
Work with the Flood Control District of Maricopa 
County to determine potential effects of a levee failure. 
• Public Works, City 
Engineering and 
Emergency Management 
• Staff Time 
• Annual 
Ongoing 
Keep 
Coordinate Levee Emergency Action Plans and Levee 
Accreditations with FCDMC  
5 
Encourage a fire buffer along wild land-urban interface 
areas. 
• Public Works, City 
Engineering and Fire 
Department 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual campaign. 
6 
Incorporate hazard profile data into city’s GIS for 
mapping of floodways, high wind areas, subsidence 
areas, hazardous materials, etc. 
• Public Works, City 
Engineering and 
Emergency Management 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
City has a Flood/Storm GIS Layer. Do not see other GIS layers.   
7 
Train key city staff on appropriate actions based on 
the Emergency Operations Plan. 
• Emergency Management 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. I agree. Training 
needs to be scheduled 
8 
Participate in regional training opportunities as well 
as Emergency Operations Command exercises within 
city to prepare for emergencies. 
• Emergency Management 
and most city departments 
• Staff Time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. 
9 
All Fire Department personnel should be trained at 
Operations level, currently command staff are trained 
at Operations – rest of personnel are trained at 
awareness level.  
• Fire Department 
• Staff Time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-17:  Peoria assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
10 
Police Department personnel should be trained at 
Operations level, currently command staff are trained 
at Operations – rest of personnel are trained at 
awareness level.  
• Police Department 
• Staff Time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. 
11 
Control development in flood areas 
• Planning and Zoning 
• Staff Time 
• Annual 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
12 
Encourage flood-proof measures through building 
design 
• Building safety and 
Economic Development 
• Staff Time 
• Annual 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
13 
Utilize Public Service Announcements (PSAs) 
broadcast on Channel 11 to communicate hazard risk 
and emergency information. Produce corresponding 
flyers to be distributed to residents via utility bill 
mailings 
• Office of 
Communications, Public 
Works and Emergency 
Management 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
This program will be supported through the Office of 
Communications in support from city stakeholders. 
14 
Research identified data limitations affecting the 
relative vulnerability of assets to drought 
• Public Works and GIS 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual process. 
15 
The City of Peoria will use newsletters, website 
notices, social media and newspaper articles to educate 
the public about hazards impacting the city and how to 
be prepared in the case of a disaster.  
• Office of Emergency 
Management and the 
Office of 
Communications 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be part of an annual campaign.  
16 
The City of Peoria will provide links on the emergency 
management webpage for sources of hazard mitigation 
educational materials such as www.fema.gov 
encouraging private citizens to be prepared for hazard 
emergencies. 
• Office of Emergency 
Management and the 
Office of 
Communications 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be part of an annual campaign. 
17 
The City of Peoria will review and assess building and 
residential codes currently in use to determine if 
newer, more up-to-date codes are available or required 
related to hazard mitigation. 
• Building safety and 
Economic Development 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. I agree. This City 
also works with ADWR to keep the Floodplain Management 
Ordinance updated to meet State and FEMA requirements

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-17:  Peoria assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
18 
The city will continue to promote the Storm Ready 
program and the use of weather radios, especially in 
schools, hospitals and other locations where people 
congregate to inform them of the approach of severe 
weather events.   
• Office of Emergency 
Management and the 
Office of 
Communications 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be part of an annual campaign with a three year 
renewal cycle with the Phoenix NOAA office. Can we link to the 
FCDMC Survive the Storm webpage? 
19 
The City of Peoria working with Flood Control 
District of Maricopa County will continue to analyze 
and identify dam failure inundation limits to identify 
evacuation routes. 
• Public Works, City 
Engineering and 
Emergency Management 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual process and revised as 
growth continues within the city. Continue to coordinate with 
FCDMC to update the EAPs 
20 
The City of Peoria will participate/conduct occasional 
table top exercises to identify potential mitigation 
measures for increasing response effectiveness, such as 
evacuation route marking and permanent protection 
measures for intended shelters. 
• Office of Emergency 
Management 
• Staff time 
• Ongoing 
Ongoing 
Keep 
 
21 
The City of Peoria working with the Flood Control 
District of Maricopa County will update the inundation 
mapping for the emergency action plan for Lake 
Pleasant in order to identify population and critical 
facilities and infrastructure at risk, and to determine 
the need for potential mitigation. 
• The Office of Emergency 
Management and various 
City Departments 
• Staff time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual campaign. 
22 
The City of Peoria will conduct public education of 
water conservation best practices through a variety of 
media such as newsletter, flyers, social media and 
website notices. 
• Public Works and Office 
of Communications 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual campaign. 
23 
The City of Peoria encourages the use of drought 
resistant landscaping through ordinance development 
and/or enforcement. 
• Public Works and GIS 
• Staff Time 
• Annual 
Ongoing 
Keep 
This program will be part of an annual campaign. 
24 
The City of Peoria will continue to develop/update our 
local Drought Management Plan to define various 
levels of conservation requirements that are based on 
drought severity triggers. 
• Public Works and GIS 
• Staff Time 
• Annual 
Ongoing 
Keep 
Review and update Water Conservation plan as necessary. 
25 
The City of Peoria as practical will continue to use 
reclaimed water to irrigate city owned landscape or 
other operations such as our truck washing station. 
• Public Works, 
Community Services & 
Economic Development 
• Staff Time 
• Annual 
Ongoing 
Keep 
Review and update Water Conservation plan as necessary. Update 
City Code and Engineering Standards to require new development 
to extend, deliver and connect to the City’s reclaimed water 
system and establish a priority of delivery.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-17:  Peoria assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
26 
City of Peoria will continue to identify and 
communicate locations within the community that can 
serve as cooling stations during times of extreme heat. 
• Office of Emergency 
Management and the 
Office of 
Communications 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be supported through the Office of 
Communications in support from city stakeholders 
27 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Office of Emergency 
Management and the 
Office of 
Communications 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be supported through the Office of 
Communications in support from city stakeholders 
28 
The City of Peoria will review, update and/or augment 
flood control ordinances to provide a greater level of 
protection than the minimum required by the NFIP. 
• The Office of Emergency 
Management and various 
City Departments 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process. 
The Development and Engineering Department is in the process 
of completing the ADWR - Community Assistance Visit (CAV). 
As part of the CAV, ADWR is reviewing the City’s Floodplain 
Management Code. As ADWR findings and recommendations are 
forwarded to Development and Engineering Dept and CAO the 
City Code will be updated.   
29 
Identify and map flood hazards in areas expected to 
grow or develop in the foreseeable future. 
• GIS 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
Flood hazards will be identified as updated drainage studies are 
completed. The City is currently partnering with FCDMC to 
update the Wittmann ADMP/S and North Peoria ADMP/S. In 
2019 the City coordinate with FCDMC to update the Floodplain 
Management Plan.  
30 
The City of Peoria will continue to develop/augment a 
citywide GIS program that is integrated into Public 
Works, Development Services, Police, Fire/Rescue 
and Emergency Management to help prevent 
development in flood prone regions. 
• Office of Emergency 
Management and various 
City Departments 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
31 
Perform public outreach to citizens located within 
levee failure flood risk areas to provide awareness of 
potential increase in flood elevations with a levee 
failure. 
• The Office of Emergency 
Management and various 
City Departments 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This program will be supported through the Office of 
Communications in support from city stakeholders 
32 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potential for flying 
debris during severe wind events.  
• The Office of Emergency 
Management and various 
City Departments 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process. 
The CAV identified a flaw in the city’s Floodplain Management 
Ordinance related to Mobile Home Parks. ADWR will work with 
City to update ordinance.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-17:  Peoria assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp Date 
Status 
Disposition 
Explanation 
33 
Retrofit sub-standard roofs of key critical facilities and 
infrastructure to meet modern building code standards 
and mitigate damages and impacts of severe wind 
events. 
• Building Safety and 
Economic Development 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
34 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting. 
• Public Works, City 
Engineering, Building 
Safety 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process. 
Do not see this in City Code or Engineering Standards.  
35 
Provide links to the Arizona Department of Water 
Resources website as a part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Public Works, City 
Engineering & Building 
Safety 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. Do not see this in 
the City Code 
36 
Establish survey monuments and monitor elevations in 
critical or key areas of the community to measure 
impacts and trends of subsidence, with the goal of 
determining long term mitigation strategies to reduce 
the damage and losses that may yet be experienced. 
• Public Works, City 
Engineering & Building 
Safety 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. The City has a 
benchmark system which is updated every 5 years. Not sure who 
coordinates the subsidence issue.   
37 
Develop and/or enforce a weed abatement ordinance. 
• Code Enforcement 
• Staff time 
• Ongoing 
Ongoing 
Keep 
Supported through city codes, regulations and permitting process 
38 
Educate public on proper fuels thinning, setbacks, and 
water storage for wildfire mitigation using Firewise 
type of programs and guidance documents. 
• Fire Department 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. 
39 
The Peoria Fire Department will conduct Fire safety 
education programs where appropriate such as Peoria 
and Deer Valley Schools as well as other educational 
facility and public events such as G.A.I.N. night. 
• Fire Department 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project. 
40 
Enact and enforce burn and fireworks bans as needed 
during extraordinarily dry and extreme wildfire 
conditions / seasons to mitigate possible, unintended 
wildfire starts. 
• Fire Department 
• Staff time 
• Ongoing 
Ongoing 
Delete 
This is an ongoing process for the City of Peoria. If possible 
would like to remove as a mitigation project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-18:  Phoenix assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Dispositi
on 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Public Works / 
Floodplain 
Manager 
• Staff Time 
• Annual-Ongoing 
In 
Progress 
Revise 
Public Works updated the City’s Floodplain Management Plan in 2016.  The next 
update is scheduled for 2021. 
2 
Continue to include in the General Plan 
policies that protect the natural flow regimes 
of washes and designate areas for Open Space 
and Preserves. 
• Parks and 
Recreation / PPPI 
Administrator 
• Staff time 
• Annual-ongoing 
In 
Progress 
Revise 
Public Works updated the City’s Floodplain Management Plan in 2016.  The next 
update is scheduled for 2021. 
 
• 
Public Works worked with SRP to ensure that tailwater in their canal systems 
would not increase during monsoon season. 
3 
Storm Drain CIP Program.  Construct 
drainage facilities to mitigate flooding hazard 
to residents of the city. 
• Street 
Transportation 
Department / 
Deputy Street 
Transportation 
Director 
• Variable 
• Ongoing 
In 
Progress 
Revise 
Public Works updated the City’s Floodplain Management Plan in 2016.  The next 
update is scheduled for 2021. 
4 
Coordinate data sharing and development 
communication within city departments 
through documentation in GIS 
• Planning and 
Development 
Department / 
Planning 
Researcher 
• Staff time 
• Annual-ongoing 
In 
Progress 
Revise 
• 
Yes, it reduced risks because it helped staff be aware of the project being 
developed in floodplain or flood hazard areas 
 
• 
Please change Description to the following: Coordinate review and approval of 
development projects located within flood hazard areas with PDD and Floodplain 
Management. (funding source changes to Enterprise) 
5 
Summer Respite regional program to network 
with faith-based organizations to provide heat 
relief, hydration and respite with wellness 
checks. Program services are provided for the 
affected populations. 
• Human Services / 
Homeless Services 
Deputy Director 
• Donations totaling 
$70,000 annually 
• Annual-ongoing 
In 
Progress 
Revise 
Emergency sheltering and heat respite cooling opportunities for vulnerable populations.   
Extreme Heat – Native Vegetation 
• 
Power failures 
• 
Short and long-term mitigation efforts 
• 
Tree planting campaign – long term mitigation effort (Office of Sustainability) 
• 
Reduce surface temperature / pavement, roofs – long term mitigation (PDD and 
Streets) 
• 
Identify current vegetation – shade/cooling areas 
• 
Add shade to all bus stop locations 
o 
More accessible shaded areas

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-18:  Phoenix assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Dispositi
on 
Explanation 
6 
Maintain and execute the Drought Response 
Plan (Revision in Draft - No Ordinance 
Change) 
• Water 
• Staff Time 
• Ongoing 
In 
Progress 
Revise 
• 
Avoid the use of portable water and add green infrastructure. 
• 
Bio soil (gather rainwater) 
• 
Add green infrastructure that utilizes less water. Support native vegetation. 
• 
Education – Community Outreach.  
7 
Maintain and execute a water use awareness 
outreach program. 
• Water 
• Staff Time 
• Ongoing 
Complete 
Keep 
This program will be sustained and maintained. 
https://www.phoenix.gov/waterservices/resourcesconservation 
8 
Revise and ratify the General Plan every ten 
years. 
• Planning and 
Development 
Department / 
Planning Manager 
• Staff time 
• Ongoing 
In 
Progress 
Revise 
Severe Winds 
• 
Structural damage, tree issues. Education is important. 
• 
2015 General Plan: contains goals and policies related to different efforts 
throughout the city.  The plan was approved by the voters in 2015.  We are 
currently working on an update report and plan to update the entire plan in 2025 
per state statute. 
 
https://www.phoenix.gov/pddsite/Documents/PZ/PlanPhx%20Draft%20General%20Pla
n%20Update.pdf 
9 
Update and adopt a revised building code. 
• Planning and 
Development 
Department / 
Deputy Director-
Building Official 
• Staff time; 
Materials 
• Annual-ongoing 
In 
Progress 
Keep 
Code cycles including local amendments and ordinances are updated every 3 years. The 
next “update” in 2021, should be a soft update. The last “hard” update was 2012 to 2018 
codes which is what PDD is under now. Hard updates are generally every 6 years. PDD 
skips a code cycle generally and only has a “partial/ soft” adoption which will more 
than likely be the case for 2021 codes. https://www.phoenix.gov/pdd/codes-ordinances

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-18:  Phoenix assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Dispositi
on 
Explanation 
10 
Continue to ensure zoning stipulations are met 
before construction permits are issued, and 
zoning is compatible with the zoning 
ordinance. 
• Planning and 
Development 
Department / 
Deputy Director 
• Staff time 
• Annual-ongoing 
In 
Progress 
Revise 
The current trend of urban infill is expected to continue for the foreseeable future. A 
decreasing availability of vacant properties has led to the repurposing of existing, 
under-utilized properties. City staff continues to work with developers, investment 
groups, the historic preservation community and concern citizen to strike the most 
appropriate balance between growth, livability and our history.   
The City of Phoenix Planning and Development Department has tracked development 
trends over the past five years and reported these trends to city management, the 
Development Advisory Board and the public. The most prominent development trends 
include:  
• 
Strong growth within the Infill Development District 
• 
Bio-medical and academic expansion 
• 
Traditional Growth Areas 
 
City of Phoenix Planning and Development (2020, July) Department -Infrastructure and 
Growth-Source KIVA database 
11 
Dam/Levee Safety Program – Operate and 
Maintain Dams/Levees to mitigate flooding 
hazard to the residents of the city. 
• Street 
Transportation 
Department / 
Deputy Street 
Transportation 
Director 
• Staff Time, 
Materials 
• Annual-ongoing 
In 
Progress 
Revise 
Dam Inundation – Inspection / clear vegetation / Update regulation / EAP (response 
oriented) Education 
• 
Maricopa County Flood Control – Notification when water is released, lock 
crossings 
• 
Codes – Flood plain ordinance was updated last year 
• 
Certifications depend on the system 
• 
Look into new dams as mitigation efforts 
• 
Notification system to inform the community  
12 
Continue to provide links on the 
Phoenix.gov/Office of Emergency 
Management website to sources of hazard 
mitigation educational materials such as 
FEMA.gov and Ready.gov 
• Office of 
Homeland Security 
and Emergency 
Management, City 
of Phoenix IT 
• Staff Time 
• Annual-ongoing 
In 
Progress 
Revise 
Incorporate updated/complete plan into OHSEM website 
• 
OHSEM manages Sand Program in every Council District

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-18:  Phoenix assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Dispositi
on 
Explanation 
13 
Continue to adhere to the City of Phoenix 
Building Standards and Review Process, 
which are regularly updated.  The Building 
and Review Process requires site assessment 
for presence of, among other conditions, 
subsidence and fissures. 
• Street 
Transportation 
Department: 
Maintenance 
Division 
• Staff Time 
• Annual-ongoing 
In 
Progress 
Revise 
Fissure – Locate and inform community (awareness) 
• 
Subsidence 
• 
Flooding/Flash flooding – Protection of natural channels (Clean Water Act) 
• 
Development Community - home builders. Update city flood plain, gather input 
from the community. 
• 
Bond Program 
14 
Enforce City Ordinance 39-7D, which 
addresses overgrown vegetation, dead trees, 
brush and weeds or other conditions that 
present a health, fire or safety hazard.    
• Neighborhood 
Services 
Department/Neighb
orhood 
Preservation 
Division 
• Staff Time 
• Annual-ongoing 
In 
Progress 
Keep 
Wildfire – Community education 
• 
Vegetation regulation for homes. 
• 
Community workshops and seminars 
15 
Coordinate with private companies and public 
agencies to study and map subsidence and 
fissure activity in critical or key areas of the 
community so that effective mitigation or 
avoidance strategies can be implemented. 
• Street 
Transportation 
Department:  
Design and 
Construction 
Management 
• Staff Time 
• Annual-ongoing 
In 
Progress 
Revise 
Fissure – Locate and inform community (awareness) 
• 
Subsidence 
• 
Flooding/Flash flooding – Protection of natural channels (Clean Water Act) 
• 
Development Community - home builders. Update city flood plain, gather input 
from the community. 
• 
Bond Program 
 
 
Table 6-7-19:  Queen Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-19:  Queen Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Development Services 
/ Floodplain 
Administrator 
• Staff time 
• Ongoing 
In Progress 
Keep 
Project is an ongoing activity. 
2 
Construct Box Culvert at Ocotillo Road and Queen 
Creek between Power and Recker Roads. 
• Public Works CIP 
Division / CIP Project 
Manager 
• $400,000 
• 2015 
Completed 
Delete 
Project was mislabeled.  Queen Creek Wash should be Sonoqui 
Wash.  Completed June 2016. 
3 
Annually coordinate with county to obtain updates on 
any changes in dam safety conditions and emergency 
action plans. 
• Fire & Medical Dept / 
Emergency Mgmt 
Coord 
• Staff time 
• Ongoing 
In Progress 
Keep 
Project is an ongoing activity. 
4 
Educate and inform residents about dam safety 
through the town’s website and links to the Flood 
Control District of Maricopa County. 
• Fire & Medical Dept / 
Emergency Mgmt 
Coord 
• Staff time 
• Ongoing 
No Action 
Keep 
Project was placed on hold.  Responsible staff was reassigned to a 
new department and assigned new duties. 
5 
Educate and inform residents about water conservation 
through newsletters, social media, inserts, new 
customer packets, water wise workshops, high use 
notifications, regularly scheduled meter change outs 
and the town’s website. 
• Utilities Services Dept 
/ Water Conservation 
Spec. 
• Staff time 
• Ongoing 
In Progress 
Keep 
Ongoing for all activities.  See Town website page – Water 
Conservation 
6 
Maintain the town’s Integrated Emergency and 
Drought Response Plan (ERDP). 
• Utilities Services Dept 
/ Water Division 
• Staff time 
• Ongoing 
No Action 
Keep 
No Activity.  Utility Services staff is reviewing their update 
process. 
7 
Educate and inform residents about extreme heat 
through newsletters, social media, inserts and/or the 
Town’s website. 
• Fire & Medical Dept / 
Emergency Mgmt 
Coord 
• Staff time 
• Ongoing 
In Progress 
Keep 
Ongoing activity for newsletters and social media.  Town website 
still needs to be updated

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-19:  Queen Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
8 
Incorporate respite care and hydration stations into the 
CERT Shelter Management Continuing Education 
(CE) Program  
• Fire & Medical Dept / 
Emergency Mgmt 
Coord 
• Staff time 
• Ongoing 
No Action 
Keep 
CERT Continuing Education (CE) program has been on hold until 
2019 when a citizen volunteer was added to the program to assist 
with organizational details.  Program was placed on hold for 2020 
due to COVID-19 Pandemic. 
9 
Educate and inform residents about fissures through 
the town’s website and links to the Arizona Geologic 
Service website. 
• Development Services 
Dept 
• Staff time 
• Ongoing 
In Progress 
Keep 
Ongoing.  See Town website page - Earth Fissures 
10 
Review permit submittals for proximity to Earth 
Fissure Map that may require additional geological 
report. 
• Development Services 
Dept / Engineering 
• Staff time 
• Ongoing 
In Progress 
Keep 
Project is an ongoing activity. 
11 
Complete an agreement with the Roosevelt Water 
Conservation District (RWCD) for the exchange of the 
town’s reclaimed effluent for CAP credits. 
• Utilities Services 
Department 
• Staff time $300,000 
• Winter 2015 
Complete 
Delete 
The agreement was completed and approved by the Town Council 
in November 2015. 
12 
Install backup generators with the construction of Fire 
Station 411 and the Public Safety Administration 
Building. 
• Fire & Medical 
Department 
• TBD 
• Fall 2016 and Spring 
2017 
Complete 
Delete 
 
Fire Station 411 completed March 2017. 
 
Law Enforcement Building (formerly Public Safety 
Administration Building) completed September 2017. 
 
Additional project: Fire Station 413 completed August 2017. 
 
13 
Identify opportunities to underground 12Kv power 
lines to mitigate power failures caused by severe wind 
events. 
• Public Works CIP 
Division / CIP Project 
Manager 
• $945,000 
• Ongoing 
In Progress 
Keep 
Ongoing.  Projects completed in 2016-2017 Ocotillo Road Loop to 
Loop; Ocotillo Road Crossing at Union Pacific Railroad; Ocotillo 
Road - Power to Recker Roads.  All future CIP projects include a 
power line mitigation component. 
14 
Encourage fire buffer zones around the north face of 
the San Tan Mountains to prevent entry into the Box 
Canyon Area. 
• Fire & Medical 
Department 
• Staff time 
• Ongoing 
No Action 
Keep 
No Activity.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-19:  Queen Creek assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
15 
Conduct a Community Hazard Risk Assessment and 
include the evaluation of wildfire hazard. 
• Fire & Medical 
Department 
• Staff time 
• Winter 2015 
Complete 
Delete 
The Community Hazard Risk Assessment was completed in 
August 2015. 
 
 
Table 6-7-20:  Salt River Pima – Maricopa Indian Community assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Community Relations in coordination with Emergency 
Management to conduct public outreach/education on 
all hazards mitigation and emergency preparedness for 
community members.  Community members that are 
educated on what to do before and during a disaster 
will reduce the loss of life and property in a disaster. 
• Emergency 
Management / 
Community Relations 
Office 
• 0 
• Ongoing 
In Progress 
Keep 
This remains an EM / Community Relations project which will 
continue within the next planned period. Measures to integrate 
newspaper and social media tool along with community functions 
has been an on-going effort toward completing this project. 
2 
Conduct fuel mitigation project of heavy fuels/large 
trees in the Preserve to mitigate wildland fire damages 
and spread. 
• Fire / Fire Chief 
• $3,000/ac 
• 2018 
No Action 
Delete 
On-going planning efforts within the Tribal community ceased 
due to contractual shortfalls with funding agency.   
3 
Replace existing Health and Human Services building 
with one designed to not flood due to having basement 
and older type construction 
• ECS / Construction 
Division 
• $30 million 
• 2020 
In Progress 
Revise 
Former Salt River Clinic building was demolished and new 
construction on new IHS funded building is currently underway. 
To be named River People Health Center.  
4 
Conduct Master Drainage Study north of Arizona 
Canal to reduce flooding and develop water retention 
restore methods. 
• ECS / Design Division 
• $500,000 
• 2025 
In Progress 
Revise 
85% completion on the Western side 
50% completion on the Eastern side.  
This project was broken into two projects during the previous 
planned period.  
5 
Conduct Fuel reduction project of light fuels in River 
bottom and Community recreation areas to minimize 
the rapid spread of fire in this area.  
• ECS / Construction 
Division 
• $75-$80,000 
• 2016 
In Progress 
Revise 
This project will continue throughout the next planned period. 
This project was expanded during the previous planned period by 
hiring additional 1-Full-time Employee and 3-Temporary 
Employees tasked with performing selective thinning near 
identified areas in the community.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-20:  Salt River Pima – Maricopa Indian Community assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
6 
Implement a water harvesting program through the 
location, design and construction of dual functioning 
stormwater retention facilities with enhanced recharge 
elements designed into the basin. 
• ECS / Design Division 
• $50,000 
• 2025 
In Progress 
Revise 
The drainage study data is the driver toward identifying 
development of infrastructure to support this project. New 
guidelines indicate the project will move toward building smaller 
water harvesting basins to reduce the need for large retention basin 
along watershed.   
7 
Complete process of Maintain/Install backup 
generators at key critical facilities such as fire and 
police stations, water pumping stations, sewer lift 
stations, etc., to provide emergency power for critical 
operations during power failures caused by severe 
wind events 
• Public Works / Facility 
Management Division 
• $100,000 
• 2017 
Complete 
Delete 
It was reported by the Community’s Public Works that all the 
projects were completed within the planned period.  
8 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potential for flying 
debris during severe wind events. 
• Public Works / ECS 
• Staff Time 
• 2025 
In Progress 
Revise 
It was reported through ECS that new recommendations will be 
made into code for Tribal Council approval outside of developing 
a Code of Ordinance. Currently, plans have been developed and 
have been implemented to support reduction of hazards by ECS 
performing inspections, providing permits, giving 
recommendations on foundations for primary residences but do 
not include ancillary buildings.  
9 
Participate/conduct occasional table top exercises to 
identify potential mitigation measures for increasing 
response effectiveness, such as evacuation route 
marking and permanent protection measures for 
intended shelters. 
• Emergency 
Management / 
Emergency Manager 
• Staff Time 
• 2025 
In Progress 
Revise 
EM continues to provide ongoing training and exercises to further 
develop Mass Care Shelter operations within the Community to 
further reduce impacts to this hazard.  
10 
Annually coordinate with federal, state, and local dam 
owners to get updates on any changes in dam safety 
conditions and emergency action plan information so 
that they can be integrated into SRPMIC response 
plans. 
• Public Works / 
Assistant Director 
• Staff Time 
• 2025 
In Progress 
Revise 
SRPMIC continues to engage stakeholders annually to provide 
updated information to update Tribal plans.   
11 
Maintain inventory, train response staff and continue 
communications on the locations within the 
community that serve as cooling stations and shelters 
during times of extreme heat. 
• Emergency 
Management / 
Emergency Manager 
• Staff Time 
• 2025 
In Progress 
Revise 
During the planning period Mass Care shelters plans have been 
developed; staff have been trained; equipment has been purchased 
and exercises have been conducted to further mitigate this hazard 
within the Community.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-20:  Salt River Pima – Maricopa Indian Community assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
12 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Emergency 
Management / 
Community Relations 
Office 
• Staff Time 
• 2025 
In Progress 
Revise 
EM and Community relations currently utilize the Community 
newspaper and social media to provide information to the public 
on measures to take to reduce the impact and respond to extreme 
heat events.  
13 
Further develop planning and coordination with Tribal 
community and local stakeholders involved in 
Evergreen wash public information mitigation and 
response efforts to reduce the impacts of personal life 
safety due to water releases through the Tribal 
community.  
• Emergency 
Management / Salt 
River Police 
• Staff Time 
• 2025 
In Progress 
Revise 
This project is intended to mitigate the hazard of Flooding/Flash 
flooding. 
14 
Improve redundant communication systems through 
expansion of the current system for the Public Safety 
community.  
• Information 
Technology 
• 2025 
In Progress 
Revise 
Information Technology will be working toward further 
developing the Moto Turbo System to include additional partners 
such as Senior Services, Tribal DOT, Courts, Emergency 
Management, and Education/Schools. This is an All Hazards 
mitigation project.  
15 
Improve communications infrastructure through tower 
installs for partners within the Tribal community.  
• Information 
Technology 
• 2021 
In Progress 
Revise 
Information Technology will be working toward installing new 
tower(s) within the Tribal community to support Education with 
Schools. This is an All-Hazards mitigation project.  
16 
Perform a public information campaign at the onset of 
severe winds created during monsoon seasons to help 
educate the general public on ways to remain safe from 
impacts related to the identified hazard.  
• Emergency 
Management / 
Community Relations 
Office 
• Staff Time 
• 2025 
In Progress 
Revise 
EM and Community relations currently utilize the Community 
newspaper and social media to provide information to the public 
on measures to take to reduce the impact and respond to severe 
wind events. 
 
Table 6-7-21:  Scottsdale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-21:  Scottsdale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review, update and/or augment flood control 
ordinances to provide a greater level of protection than 
the minimum required by the NFIP. 
• Planning and 
Development Services 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Ordinance update completed and adopted by the Scottsdale City 
Council in 2016. Reviews are conducted annually. 
2 
Identify and map flood hazards in areas expected to 
grow or develop in the foreseeable future.   
• Planning and 
Development Services 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
This is an ongoing project. Several areas in the north and central 
regions of the City of Scottsdale have been evaluated and have 
been re-delineated to more accurately reflect current conditions. 
3 
Implement a water harvesting program through the 
location, design and construction of dual functioning 
stormwater retention facilities with enhanced recharge 
elements designed into the basin, as a part of 
maintaining a Drought Management Plan in 
conjunction with SRP & APS to lessen the impact of 
drought. 
• Water Resources 
• $6,442,200 
• Ongoing 
No Action 
Delete 
In 2016 this project was studied and determined to be not feasible. 
Project to be deleted from plan.  
4 
UPPER CAMELBACK WASH WATERSHED 
Construct channel improvements, storm drains, 
stormwater storage basins, and culverts to provide 
100-year structural flood protection to nearly 500 
structures in the vicinity of 92nd St to 96th St from 
Shea Blvd. to Sweetwater Ave. 
• Planning and 
Development Services 
and Public Works 
• $19,189,269 
• April 2015 
Complete 
Delete 
This project is 100% completed, and in maintenance phase. 
5 
GRANITE REEF WATERSHED Construct channel 
improvements, storm drain improvements, and 
stormwater storage basins to provide 100-year flood 
protection to hundreds of structures in the vicinity of 
Granite Reef Road between the Arizona Canal and the 
Salt River.  . 
• Planning and 
Development Services 
and Public Works 
• $51,055,600 
• June 30, 2021 
In Progress 
Keep 
This project is in its first phase of implementation, with two 
phases, and several sub-phases. Phases 1A and 1B are complete.  
Phase 1C is under construction.  Phase 2A is in final design phase.  
Phases 2B and 2C will move into final design phase in FY 22/23 
and FY 24/25, respectively, and these phases will move into 
construction in FY 23/24 and FY 25/26, respectively.  Its 
anticipated completion date has been moved to June 30, 2026. 
Information about this project can be found at: 
https://www.scottsdaleaz.gov/construction/project-list/granite-
reef-watershed-drainage-and-flood-control-improvement 
6 
CROSSROADS EAST PHASE 1: Drainage projects 
and transportation repair projects. 
• Planning and 
Development Services 
and Public Works 
• $15,094,034 
• June 30, 2020 
In Progress 
Keep 
This project is under construction.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-21:  Scottsdale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
7 
As a part of the Automated Flood Warning System, 
install automated flood barriers at low water crossings 
to discourage motorists from entering flooded road 
crossings. 
• Planning and 
Development Services, 
Emergency Services, 
and Public Works 
• Staff Time 
• Ongoing 
No Action 
Keep 
No activity. This project has been discussed and public/private 
partnerships have been considered to implement automated 
system. To date no funding has been allocated to accomplish this 
so the project has not moved forward as of this update. 
8 
As a part of the Automated Flood Warning System, 
install stream depth indicators at low water crossings 
to communicate the risk of entering flooded roadway 
crossings and provide a visual warning to motorists of 
flood conditions at the crossing location. 
• Planning and 
Development Services, 
Emergency Services, 
and Public Works 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
There are depth indicators installed in multiple flood-prone 
roadways throughout the City of Scottsdale. There may be 
additional opportunities to enhance the deployment of these 
features and will need to be further assessed to determine the most 
appropriate locations. 
9 
Review and evaluate current weed control ordinance to 
ensure adequate provisions are in place to protect 
properties along the wild land urban interface. 
• Fire Department 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The Weed Control Ordinance was last updated and enacted in 
2016. This remains an ongoing project to assess the impact and 
effectiveness of the ordinance. 
10 
Encourage fire buffer zones along wild land urban 
interface areas to mitigate damages due to wildfire. 
• Fire Department 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
This is being accomplished through the active FireWise Program 
implemented within Scottsdale. This is an ongoing project in place 
by the Scottsdale Fire Department, and reported through the 
Community Wildfire Protection Plan 
11 
Perform Hazardous Material Response Team & Fire 
Code Inspection on occupancies with Hazardous 
Materials to ensure safe storage and use of those 
HAZMATS. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
Scottsdale Fire Department has an active and credentialed 
Hazardous Materials Team and conducts HazMat inspections 
through its Fire and Life Safety Division 
12 
Develop partnerships to locate and operate hydration 
stations during extreme heat events to reduce the risk 
to Scottsdale citizens. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
Partnerships have been developed with the Scottsdale Parks and 
Recreation Division to open and operate cooling centers within the 
Community Centers. These centers will be activated when needed 
during times of extreme conditions warranting opening of such a 
center. 
13 
Review/Update the city’s Drought Management Plan’s 
conservation requirements to evaluate drought severity 
triggers and their enforcement. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
The City of Scottsdale Drought Management Plan was adopted by 
the Scottsdale City Council in 2015 and is on an annual review 
cycle.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-21:  Scottsdale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
14 
Use newsletters, flyers, utility bill inserts, website 
notices, radio and television announcements, social 
media and newspaper articles to educate the public 
about hazards impacting the county and city, and how 
to be prepared in the case of a disaster event. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
Since 2011 the City of Scottsdale has conducted Community 
Emergency Response Team (CERT) training for Scottsdale 
residents. This program consists of a 21-hours training course 
following FEMA CERT Basic Training curriculum to help 
residents become better prepared and more resilient should 
disaster strike. This training has been traditionally offered two 
times per year.  
 
Beginning the 3rd quarter of 2018 the Office of Emergency 
Management implemented a 2-hour Ready Scottsdale program to 
help educate Scottsdale residents in the identified threats and 
hazards existing in the city and discuss how to become better 
prepared. This training has been offered monthly and has been 
well-accepted by the residents. 
15 
Continue expanding our WebEOC software system to 
track incidents and resources in the event of an 
emergency. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
The City of Scottsdale currently uses WebEOC Disaster 
Information Management System as a means for maintaining 
information in the Emergency Operations Center. In the past year 
the Scottsdale Office of Emergency Management has expanded 
the use of WebEOC by developing a Department Operating 
Center (DOC) concept of use. Currently the single DOC using 
WebEOC is Scottsdale Water, who has trained with the system, 
and has used it during a joint EOC / DOC functional exercise. 
16 
Promote the use of weather radios, especially in 
schools, hospitals and other locations where people 
congregate to inform them of the approach of severe 
weather events. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
Continue to advocate for purchase and use of NOAA Weather 
Radios, and currently equipped the Scottsdale Police Dispatch 
Center and Emergency Operations Center with S.A.M.E Weather 
Radio / All-Hazard Alert Radios. The Scottsdale Office of 
Emergency Management has included information about and 
advocating the use of NOAA Weather Radios during Community 
Emergency Response Team and Ready Scottsdale training events. 
17 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
Maintain and continue expanding our community 
emergency response team (CERT) training. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
The Scottsdale Office of Emergency Management has included 
information about extreme heat issues during Community 
Emergency Response Team and Ready Scottsdale training events.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-21:  Scottsdale assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
18 
Identify, stock and communicate locations within the 
community that can serve as cooling stations during 
times of extreme heat. 
• Fire Department 
• Ongoing 
Ongoing 
Keep 
These centers have been identified in the City of Scottsdale 
Emergency Operations Plan. This plan was activated during an 
excessive heat event coupled with a power outage during the 
summer of 2015. 
19 
Include addressing subsidence and fissure risk as a 
regular part of the land development and public works 
projects review and permitting. 
• Planning and 
Development Services 
and Public Works 
• Staff 
• Ongoing 
Ongoing 
Keep 
This is an ongoing endeavor and has been positively impacted by 
Scottsdale Water in their selective pumping from wells in the city. 
20 
Coordinate with state and federal agencies (USGS, 
AZGS, ADWR, etc.) to study and map fissure activity 
in critical or key areas of the community so that 
effective mitigation or avoidance strategies can be 
implemented. 
• Planning and 
Development Services 
and Public Works 
• Staff 
• Ongoing 
Ongoing 
Keep 
The only fissure area in the City of Scottsdale is near Taliesin 
West and Ancala.  There is no active development activity in that 
area, nor is any anticipated.  Moreover, starting quite a few years 
ago, we have a net zero groundwater budget in Scottsdale.  What 
that means is that the amount of groundwater withdrawn in 
Scottsdale is, on average, replenished by a combination of 
infiltration of precipitation and injection of treated wastewater into 
the ground.  Therefore, the water table in Scottsdale should be 
relatively stable over time, although it would be subject to regular 
fluctuations due to natural drought and wet cycles.  
21 
As a part of the Neighborhood Stormwater 
Management Improvements program, develop a 
community-wide, stormwater management plan that 
will analyze and identify problem flooding areas and 
propose long-term mitigation alternatives designed to 
reduce or eliminate the flood problems. The program 
will also identify and map flood hazards in areas 
expected to grow or develop in the foreseeable future. 
• Planning and 
Development Services 
and Public Works 
• $200,000 
• Ongoing 5-year CIP 
In Progress 
Keep 
The Drainage and Flood Control Program Manager has developed 
a multi-year Stormwater Master Plan that has been proposed to 
city management. Additionally, the Drainage and Flood Control 
Program Manager has several projects outlined, with area maps, 
outlining potential problem areas and proposing mitigation 
measures to alleviate the threat.  The Drainage and Flood Control 
Program Manager has also approved a scope and fee for an on-call 
stormwater engineering consultant to develop a CRS-compliant 
Floodplain Management Plan that will supplement the current 
Multi-Jurisdictional Hazard Mitigation Plan.  A notice-to-proceed 
will be given as soon as Scottsdale City Council approves funding.  
The Drainage and Flood Control Program Manager has discussed 
financial participation in the development of a Floodplain 
Management Plan with FEMA, who is generally supportive of 
funding $75,000 toward the total cost of $100,000.  The Drainage 
and Flood Control Program Manager will ask FEMA to budget 
and program its funding as soon as the Scottsdale City Council 
approves $25,000 of funding for its share.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Reduce the impact of flooding in Section 10 (Martin 
Acres) area of City of Surprise. Construct a new 
conveyance channel from south of U.S. 60 to provide 
drainage away from Martin Acres. 
• Public Works / City 
Engineer 
• $1,700,000 
• September 2015 
In Progress 
Delete 
The City Collaborated with the Flood Control 
District of Maricopa County to receive a SPAP 
grant to help with flooding mitigation in this 
area. In the design process, it became apparent 
that the scope and necessary budget was much 
larger than initially anticipated, therefore the 
project was put on hold until additional funding 
becomes available.  
2 
Reduce the risk of fires to communities within 
wildland-interface zones by participating in the 
development of a community wildfire protection plan. 
• Fire Department / 
Administrative 
Chief 
• $150,000 
• July 2020 
In Progress 
Keep 
The city has previously looked into this, due to 
limited staffing nothing has been formalized.  As 
staffing allows the FD will work with the city’s 
EM to ensure all the urban interface needs are 
addressed. 
3 
Develop program and coordinate actions with FCDMC 
to access, mitigate, upgrade and redesign flood 
facilities. 
• Public Works / City 
Engineer 
• Staff Time  
• Annually 
In Progress 
Revise 
The city remains available to collaborate with 
FCDMC to upgrade or re-design existing flood 
facilities on as needed basis. There are currently 
no identified needs at the time.  
4 
Develop program that identifies bridge and culvert 
construction in flood susceptible areas 
• Public Works / City 
Engineer 
• $250,000 
• July 20 25 
In Progress 
Revise  
FCDMC is in the process of updating the 
Whitman ADMP. This update will provided 
updated information as to where flooding issues 
may exist to help identify flood susceptible areas. 
The city is also in the process of creating a 
Transportation Development Impact Fee (DIF), 
where regional roadway needs are identified. 
Drainage infrastructure associated with these 
roadways will be included in the DIF. These two 
items will be key in the development of this 
bridge/culvert program.  
5 
Research and identify available funding sources for 
pre-disaster hazard mitigation actions and projects. 
• Public Works / City 
Engineer Fire 
Department 
• Staff Time 
• Ongoing 
In Progress 
Keep 
The city continues to search for and identify 
available funding sources for pre-disaster hazard 
mitigation actions and projects. Planning for 
these projects is incorporated into our annual 
CIP.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
6 
Original Town Site Overall Drainage Master Plan 
• Public Works / City 
Engineer 
• $250,000 
• TBD 
Complete  
Delete 
The Original Town Site Overall Drainage Master 
Plan was completed in the late 1990’s. In 2019 
the City hired a consultant firm to re-evaluate the 
flooding potential identified in the original 
master plan. The results of this plan incorporated 
updated drainage standards, revised rainfall 
factors, constructed draining improvements and 
historic flooding instances. The report concluded 
that the areas previously identified have a lower 
likelihood of flooding and the costs associated 
with the improvements are not in alignment with 
the expected benefits. The City will continue to 
monitor this area and incorporate our current 
drainage standards for development within the 
Original Town Site.  
7 
Participate in occasional table top exercises to identify 
potential mitigation measures for increasing response 
effectiveness, such as evacuation route marking and 
permanent protection measures for intended shelters. 
• Fire Department / 
Administrative 
Chief 
• Staff Time 
• Annually / Ongoing 
In Progress 
Keep 
These efforts are ongoing. The Surprise FD 
participates in almost all of the regional exercises 
that take place.  The FD also hosted a tabletop 
and a full scale deployment exercise for the 
central region UASI groups that targeted 
mobilization, communication and deployment of 
resources and staff.   
8 
Ensure that City Staff, residences, businesses and 
visitors have access to the McMicken Dam Emergency 
Action Plan. This plan was prepared in December 
2013 by the Flood Control District of Maricopa 
County. This plan is available on the City’s website. 
• Emergency Manger 
& City Engineer 
• City Marketing and 
Communications 
Department - PIO 
• Staff Time 
• Annually / Ongoing 
In Progress 
Keep 
Since the creation of the last plan, the City of 
Surprise created an Emergency Manager 
position. This position will support the City 
Engineer to communicate this information with 
support from the City PIO.. 
9 
Participate in the McMicken Dam Rehabilitation study 
and construction. 
• Public Works / City 
Engineer 
• Staff Time 
• 2020 
In Progress 
Keep 
City of Surprise staff remains available to 
provide review and input to FCDMC as needed 
for this project.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
10 
Public education of water conservation best practices 
through newsletter, flyers, social media and website 
notices. 
• Water Resource 
Management / 
Director 
• $25,000 
• Ongoing 
In Progress 
Keep 
This is an ongoing annual task accomplished by 
our Water Conservation Specialist. 
N/A 
11 
Develop a local Drought Management Plan to define 
various levels of conservation requirement that are 
based on drought severity triggers and integrate with 
the City of Surprise Integrated Water Master Plan 
identifies numerous action plans in the event that we 
have drought conditions. 
• Water Resource 
Management / 
Director 
• $50,000 
• Ongoing 
Complete 
Keep  
This plan was completed in December of 2020. 
This plan is required to be updated every 5 years. 
N/A 
12 
Perform a public campaign at the onset of the extreme 
heat season to help educate the general public on ways 
to remain safe during periods of extreme heat. 
• Fire Department / 
Administrative 
Chief 
• City Human 
Service and 
Community Vitality 
Department 
• City Manager’s 
Office - Emergency 
Manager 
• City Marketing and 
Communications 
Department - PIO 
• Staff Time 
• Ongoing / Annually 
In Progress 
Keep 
This is an ongoing mitigation effort. The FD 
partners with its regional partners to get the 
extreme heat messages out to the public.  The FD 
also designates 2 water stations for members of 
the public to obtain water if they are unable to 
provide for themselves.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
13 
Identify, stock, and communicate locations within the 
community that can serve as cooling stations during 
times of extreme heat. 
• Fire Department / 
Administrative 
Chief 
• City Human 
Service and 
Community Vitality 
Department 
• City Manager’s 
Office – Emergency 
Manager 
• City Marketing and 
Communications 
Department - PIO 
• $15,000 
• Ongoing /  
Annually 
In Progress 
Keep 
Surprise Fire Medical Department and the City 
Emergency Manager will partner with Surprise 
Human Service and Community Vitality 
Department to continue to identify the best 
locations to serve the largest populations of 
community members impacted by the heat. 
These locations are and will continue to be 
shared with the community through various 
methods of communication.  
14 
Review and update stormwater management plan that 
will analyze and identify problem flooding areas and 
propose long-term mitigation alternatives designed to 
reduce or eliminate the flood problems. 
• Water Resource 
Management / 
Director 
• $50,000 
• Ongoing / Annually 
In Progress 
Keep 
The Water Department in coordination with the 
Public Works Department is continually studying 
regional and localized flooding issues and 
implementing solution in coordination with the 
Flood Control District. 
15 
Work with Flood Control District of Maricopa County 
to review, update, and/or augment flood control 
ordinances to provide a greater level of protection than 
the minimum required by the NFIP. 
• Public Works / City 
Engineer 
• Staff Time 
• Ongoing / Annually 
In Progress 
Keep 
The Engineering Department ensures the flood 
control ordinance is kept up to date and 
coordinates with FCDMC when updates are 
necessary. The FCDMC is the city’s floodplain 
administrator.  
16 
Enforce City ordinances governing the improvements 
within a floodplain. 
• Public Works / City 
Engineer & 
Building Official 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Code Enforcement (CE) unit enforces violations 
of all City Ordinances as they become aware of 
them. CE staff will continue to work with Public 
Works and other departments regarding this 
ongoing/continuing enforcement. 
17 
Review existing City owned buildings, evaluate any 
substandard construction issues and implement repair 
and upgrade plan to mitigate future wind damage. 
• Public Works / City 
Engineer 
• Staff Time 
• Ongoing 
In Progress  
Keep 
The city is currently in the RFQ process to select 
a consultant for the upcoming City-Wide 
Building Condition Assessment. The assessment 
is anticipated to be completed by 6-30-2021.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
18 
Encourage homeowners to use tie-down straps and/or 
anchors to secure ancillary buildings and metal 
awnings or porches to mitigate the potential for flying 
debris during severe wind events. 
• Community 
Development 
• Staff Time 
• Ongoing 
In Progress 
Keep 
All buildings, ancillary buildings, awnings and 
porches require a permit. Through the permitting 
process, staff check to ensure the foundation/tie 
down mechanism/s meet the standards for lift 
during a severe weather event.  
19 
The City of Surprise will continue to inventory and 
monitor all of the known fissures within the current 
and future city boundary. These fissures will be 
surveyed on a regular basis to monitor for change. 
Areas with active fissures have been identified in the 
General Plan as regional, natural, open space areas for 
passive recreation. 
• Public Works / City 
Engineer & Land 
Surveyor 
• Staff Time 
• Ongoing 
In Progress 
Keep 
The City Survey Department continues to keep 
track of subsidence related issues on a regular 
basis.  
20 
Cooperate with the Flood Control District of Maricopa 
County in the monitoring of fissures and subsidence 
impacting McMicken Dam and coordinate in any 
required updates to the McMicken Dam Emergency 
Action plan, wherein the earth fissures and subsidence 
concerns are discussed in great detail. 
• Public Works / City 
Engineer & Land 
Surveyor 
• Staff Time 
• Ongoing 
In Progress 
Keep 
City of Surprise staff remains available to 
provide review and input to the FCDMC as 
needed for this project.  
21 
The City of Surprise will continue to monitor 
subsistence with the placement of benchmarks at all of 
the City owned well sites.  Subsidence due to 
groundwater pumping will continue to be monitored 
on an annual basis.   
• Public Works / City 
Engineer & Land 
Surveyor 
• Staff Time 
• Ongoing 
In Progress 
Keep 
The City of Surprise continues to monitor 
subsidence with the placement of benchmarks at 
all of the City owned well sites. Subsidence due 
to groundwater pumping will continue to be 
monitored on an annual basis. 
22 
Facilitate appropriate wildfire fuel reduction through 
prioritization of hazardous fuel management areas 
(FMA) to assist land managers and fire departments in 
focusing future efforts towards the areas of highest 
concern from both an ecological and fuel management 
perspective. 
• Fire Department / 
Administrative 
Chief 
• $25,000 
• Annually 
In Progress 
Keep  
This effort is ongoing. This project has been 
reviewed multiple times, and although the city 
has a relatively small fuel load, there are a few 
remaining areas that should be targeted for 
cleaning. This will require a project manager be 
assigned and will likely take multiple fiscal years 
to complete.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-22:  Surprise assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
23 
Promote wildfire awareness and education in the 
community through the use of website, social media, 
and printed materials. Awareness combined with 
education helps to reduce the risk of accidental human 
ignitions. 
• Fire Department / 
Administrative 
Chief 
• City Marketing and 
Communications 
Department - PIO 
• Staff Time 
• Annually 
In Progress 
Keep 
This is an ongoing effort. The FD does utilize all 
the communications mediums listed in the 
description. In addition, the FD has posted a 
“Wildfire Danger” sign at one of our newest 
location to keep the public up to date on the 
current threats.  The FD is also looking at future 
funding opportunities to purchase LED display 
boards to communicate with the public as well.  
24 
Enhance the capabilities of the fire departments by 
providing a foundation for pre-attack planning. 
Rapidly and easily accessing individual home pre-
plans and district infrastructure adds efficiency and 
safety to fire department response and prescribed fire 
planning. 
• Fire Department / 
Administrative 
Chief & Fire 
Marshal 
• Community 
Development 
Department 
• Staff Time 
• Annually 
In Progress 
Keep 
This is an ongoing project the FD manages well.  
Recently the Fire Marshal instituted a new code 
(901.2.1 – Fire Pre-incident Plan) that requires a 
new building to provide a pre-fire plan layer in 
the plans that can be uploaded for first 
responders to utilize when an event happens at 
their location.  This update will greatly enhance 
the quality of the plans available and also help 
the FD stay current with its building stock. 
 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• Community 
Development and 
Public Works 
Engineering / Deputy 
Director and Principal 
Civil Engineer 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
Staff is continuing to work together on this item, we are working 
with IT to get all permits flagged automatically for parcels in the 
SFHAs. AZDWR recently reviewed Tempe City Code as part of 
our FEMA Community Assistance Contact. Revisions will be 
going to City Council to align our Code with FEMA’s latest 
direction.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
2 
The City of Tempe Water Utilities Division has a 
comprehensive set of planning documents that outline 
future water systems operations, including specific 
drought contingency plans and water system 
operations during drought cycles. Planning documents 
include the 1997 Tempe Water Resources Plan 
(updated in 2002), the 1999 Tempe Integrated Water 
System Master Plan, and the 2002 Drought 
Management Strategy Plan. Tempe has implemented a 
number of measures from these plans to diversify the 
city’s water resources and to lessen the impact of 
drought on our community. Tempe will continue to 
develop additional groundwater storage and recovery 
programs to significantly reduce potential drought 
impacts. These efforts include storing, CAP water and 
reclaimed water in aquifers for future recovery (over 
85,000 acre-feet stored since the mid-1990s), and 
capital improvement projects to add new municipal 
wells and increase recovery well pumping capacity. 
• Water Utilities 
Division / Water 
Resources Manager 
• Staff Time 
• Ongoing 
In Process 
Keep 
• 
Working toward goal of increasing City owned well capacity 
to equivalent to average annual daily water demand (~43 
MGD), current capacity is approximately 26 MGD (City 
owned), approximately 43 MGD with available SRP well 
capacity.  
• 
In the process of purchasing 1 new non-member land well. 
• 
In the process of re-drilling 1 well and converting the 
existing well into a potable water recharge well. 
• 
Plans for drilling 1 additional non-member land well. 
• 
In the process of drilling and equipping 1 new recharge well 
and plans for the addition of at least 1 additional recharge 
well at the Ken McDonald Golf Course. 
• 
Plans for restarting Kyrene Reclamation Facility by 2025 to 
increase recharge. 
3 
Maintain Emergency Management Plan 
• Tempe Emergency 
Manager 
• Staff Time 
• Annual 
Ongoing 
Keep 
As we have experienced a variety of real-life incidents here in 
Tempe, we have captured lessons learned and best practices in the 
development of our After-Action Reports/Improvement Plans. 
Tempe’s Emergency Operation Plan (EOP) reflects the knowledge 
we have gained in response to these events. We consider the EOP 
a dynamic plan that will continue to capture and document lessons 
learned in future exercises and real-life emergencies. 
4 
Maintain Hazardous Materials Response Team and 
First Responder Training and conduct Fire Code 
Inspections on Occupancies with hazardous materials. 
• Tempe Fire / Assistant 
Chief & Public Works 
Hazardous Waste 
Compliance Supervisor 
• Staff Time City 
Resources 
• Ongoing 
Ongoing 
Keep 
With the ever-increasing utilization of chemicals, the extensive 
amount of high-tech research, and the educational and industrial 
activity in the City of Tempe, hazardous materials response 
continues to be one of Tempe’s strategic priorities. In the years to 
come we plan to maintain minimum staffing at 75% for each 
hazmat company, continually evaluate the effectiveness of our 
program and evaluate new equipment to improve safety and 
maintain industry standards as set forth in the Special Operations 
Regional Operations and Consistency Committee.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
5 
Work with the Flood Control District of Maricopa to 
maintain and monitor the levee protection along the 
Salt River. 
• FCDMC with Tempe 
Public Works – 
Engineering / Principal 
Civil Engineer 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
We work in conjunction with the Flood Control District of 
Maricopa County in review and permitting of all new 
developments along the Salt River and Indian Bend Wash to 
maintain access and levee integrity. Quarterly Coordination 
meeting are held to discuss outstanding issues. 
6 
Miscellaneous Flood Control and Storm Drainage 
Projects to improve drainage and reduce flooding 
potential in various locations. 
• Public Works – 
Engineering / Principal 
Civil Engineer 
• Staff Time 
• Ongoing 
Ongoing 
Keep 
The City has completed a Storm Drain Management Study which 
outlines our highest priority CIP projects based on flood 
protection. The highest rank projects are and will continue to be 
programmed into Tempe’s 5-Year and will be built and 
constructed as funding is available.  
7 
Maintain CERT Program 
• Fire Department 
• 4000 
• Ongoing 
Ongoing 
Keep 
Currently revised the CERT Strategic Plan. The priority areas for 
2020-2023 are as follows: 
 
Neighborhood Outreach, Education and 
Communication Strategy 
 
Collaboration with Partners 
 
Recruitment and Training 
 
Incident Response and Event Support 
 
Funding 
8 
Participate with outside agencies to distribute bottled 
water and provide education about hazards associated 
with extreme heat. 
• Fire Department 
• 1000 
• Ongoing 
Ongoing 
Keep 
The City of Tempe opens Cooling Centers, distributes bottled 
water and provides education about extreme heat to community 
members.  
The City of Tempe is working closely with ASU to combine 
emergency management and the city’s sustainability programs to 
align community resilience with preparedness for extreme heat 
events. 
9 
Seek funds for workshops and conferences, including 
National Incident Management System and Arizona 
Emergency Management Association Conferences. 
• Fire Department 
• 3000 
• Ongoing 
Ongoing 
Keep 
Tempe’s emergency management will continue to seek funds for 
workshops and conferences so that we can continually learn the 
latest in emergency preparedness, response and recovery efforts 
and collaborate with others in the field.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
10 
Indian Bend Wash Levee Repairs – perform repairs 
identified during the last annual inspection on the 
levees bounding Indian Bend Wash to mitigate failure 
with the owner the FCDMC. 
• Public Works – 
Engineering and Field 
Operations / Principal 
Civil Engineer and 
Parks Manager 
• Staff Time 
• Ongoing 
Ongoing 
Delete 
The FCDMC recently completed projects along the IBW to 
correct inlet pipes (outfalls) as determined by the inspection 
provided by the Tempe identified below.  
11 
Stormwater Outfall Inspection –activities for both 
condition and capacity of outfall locations to regional 
waterways. 
• Public Works – 
Engineering and Water 
/ Principal Civil 
Engineer / Env. 
Compliance Supv. 
• $150,000 / Staff Time 
• Ongoing 
Completed 
Report 
provided to 
FCDMC per 
USACE 
requirements 
Delete 
U.S. Army Corps of Engineers (USACE) periodically inspects 
structures in the Rehabilitation Program (RP) to ensure continued 
flooding protection. A Periodic Inspection Report (PIR) is created 
to document the results of the Corps work. The report identified 
the need for a condition assessment of the inlet pipes. This CA 
report was completed by the City of Tempe and the repair projects 
identified were completed as noted above.   
12 
Ongoing project work in cooperation with ADOT to 
identify and mitigate flooding related to freeway 
systems. 
• Public Works -  
Engineering / Principal 
Civil Engineer 
• Unknown 
• Ongoing 
Ongoing 
Keep 
This project has been on hold, but it is intended to be taken on 
within the 2021-2022-time frame.  
13 
Develop a water infrastructure master plan which 
discusses water resources and identifies vulnerabilities 
to long-term water supply. This plan will determine 
what additional water resources may be available 
(CAP / Reclaimed / Adjudication) to offset long-term 
shortage. 
• Public Works – Water 
Utilities / Principal 
Engineer 
• $1,500,000 
• Q1 2016 
On-going 
keep 
A Master Plan was completed in 2016, funding is available to 
update the plan by 2025, as needed. 
14 
Replacement of Western Tempe Town Lake Dam. 
This allows for the city to reliably mitigate high flow 
events on the Salt River, including upstream dam 
failure, while maintaining long-term operational 
functionality of the Town Lake. 
• PW / Engineering 
• $40,000,000 
• 1Q 2016 
Complete 
 
Delete 
The Replacement of the Western Tempe Town Lake Dame has 
been completed.  
15 
Develop dam inundation response plan for new Town 
Lake operations. Tempe is taking over operational 
responsibility for the Tempe Town Lake Dam and 
flow control structures from Salt River Project in CY 
2016. 
• Public Works – 
Engineering / Sr. Civil 
Engineer 
• Staff Time 
• 1Q 2016 
Complete 
Delete 
The existing dam inundation response plan was reviewed and 
revised. This plan is reviewed on an annual basis. The City of 
Tempe has taken over responsibility for the Tempe Town Lake 
Dam and flow control structures.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
16 
Continued maintenance of Tempe Town Lake dam and 
flow control structures per ADWR and other agency 
guidelines / best practices.  
• Public Works – 
Engineering Sr. Civil 
Engineer 
• Unknown 
• 1Q 2016 
On-going 
Keep 
Maintenance continues on the Tempe Town Lake dam and flow 
control structures.  
17 
Utilization of Tempe Social Media platforms to 
educate the general public about the hazards of 
extreme heat, including Facebook and Twitter releases, 
and updates to the city website.  
• City Manager’s Office 
/ Public Information 
Officer 
• Staff time 
• Ongoing/Seasonal 
On-going 
Delete 
Social Medical platforms are used to educate the general public on 
the hazards of extreme heat. This includes Facebook and Twitter 
releases as well as continued updates to the city website. As we 
have began to open Cooling Center in the City there have been 
information and locations provided to the public as well.  
18 
Maintain/Install backup generators at key critical 
facilities such as fire and police stations, water 
pumping stations, sewer lift stations, etc., to provide 
emergency power for critical operations during power 
failures caused by severe wind events. 
• Public Works – Water 
Utilities / Plant 
Electrician 
• $1,500,000 
• Ongoing 
Complete 
Delete 
We have installed and maintain through quarterly PMs generators 
for key critical facilities. These facilities include: 525, Apache PD, 
City Hall, Fire Stations 1,2,3,4,6 & 7, Fleet North, Library, Main 
PD, PD Courts, South PD and TPAC 
19 
Provide continued maintenance and exercise of early 
warning sirens in select strategic locations as a part of 
a comprehensive emergency notification system to 
inform citizens of impending hazards such as dam 
failure, severe weather conditions, and severe wind 
events. 
• PW / WU 
• $5K/yr 
• Yearly 
On-going 
Keep 
There are warning sirens located in the Tempe Dam location that 
can be used and heard by the general public for 2 miles. There has 
been discussion on the potential to use this in the case of 
emergencies and this discussion will continue into the next year 
2021. 
20 
Provide links to the Arizona Department of Water 
Resources website as a part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• City Manager’s Office 
/ Public Information 
Officer 
• Staff Time 
• Q3 2015 
Complete 
Delete 
The links have been provided and used for awareness and 
education to the public on the hazards and location of active 
subsidence.  
21 
Water Utilities Division will continue to operate 
municipal water wells to maintain compliance with 
ADWR Active Management Area requirements to 
mitigate drawdown related issues caused by over 
pumping of groundwater, including subsidence. 
• Public Works – Water 
Utilities / Water 
Resources Manager 
• Staff time 
• Ongoing 
Ongoing 
Keep 
This is an ongoing effort to reduce groundwater use for 
operational water quality needs.  Additional water treatment plant 
process improvements are currently under construction and others 
are planned to minimize groundwater use and are expected to be 
in place by 2030.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-23:  Tempe assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
22 
Enforce currently adopted building codes (2006 IBC) 
to mitigate damages due to severe wind events. 
• Community 
Development / Deputy 
Community 
Development Director 
• Staff time 
• Ongoing – As Needed 
Complete 
Delete 
Enforces the adopted building codes (2006 IBC) have become 
routine and will continue to be included and enforced in building 
codes for the City of Tempe. 
23 
Use website and social media sources to raise public 
awareness to the impacts of flood and severe winds 
associated with monsoon season. 
• City Manager’s Office 
/ Public Information 
Officer 
• Staff time 
• Ongoing and Seasonal 
Complete 
Delete 
This is a continued effort on a yearly basis to educate the general 
public on the impacts of flood and severe weather associated with 
monsoon season. It will continue to be done on an annual basis as 
a reminder during the season. 
 
 
Table 6-7-24:  Tolleson assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations. 
• City Engineer and 
Building Department 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Building permit review for compliance with the Floodplain 
Ordinance and NFIP regulations is an on-going task that will 
continue over the next 5 year cycle.  
2 
Install more storm drains and retention areas to reduce 
impact of flooding on the community.  Goes along 
with new and better codes. 
• City Engineer and 
Building Department 
• Unknown without 
estimates at the time 
• Ongoing 
In Progress 
Keep 
Retention areas are required with all new developments within the 
community. 
3 
Provide sand and bags at different locations around the 
city for citizens to pick up and use to mitigate flooding 
damages. 
• Field Operations 
• App. $100 per ton for 
sand and unknown for 
price of bags 
• Ongoing 
In Progress 
Keep 
Sandbags provided for periods of expected rain at appropriate 
citywide locations and public notification is accomplished via 
social media.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-24:  Tolleson assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
4 
Educate public officials on the need of the mitigation 
plan. 
• Senior City Staff 
• Staff Time 
• Annually 
In Progress 
Keep 
City Council is advised at time of adoption of the need for the 
Plan. 
5 
Continue to review plans and update codes and 
ordinances within the city limits. 
•  City Engineer and 
Building Department, 
Fire Department, 
Police Department 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Major review and adoption is completed every three years, with 
minor review and adoption completed on an as needed basis. 
6 
Conduct table top exercises that would involve a dam 
failure to measure the emergency response procedures.  
• Emergency Manager 
• Staff Time 
• Annually 
No Action 
Remove 
Tolleson is not vulnerable to Dam Failure and no mitigation is 
warranted.     
7 
Work with all agencies to provide disclosures to all 
buyers of real estate that would be affected by a dam 
failure. 
• City Engineer and 
Building Department 
• N/A 
• Ongoing 
No Action 
Remove  
Tolleson is not vulnerable to Dam Failure and no mitigation is 
warranted.  
8 
By using the local websites, mailers, social media and 
other forms of local communication, try to educate the 
public about water conservation. 
• City Public 
Information Officer 
• Staff Time and 
minimal costs 
• Spring and Summer 
Periods 
In Progress 
Keep 
Utilities Department provides water conservation information to 
customers through social media platforms and directly, through 
water bills.  
9 
Continue to work with the waste water department to 
use reclaimed water for multiple uses. 
• Water / Wastewater 
Departments 
• Staff Time 
• Continuous 
In Progress 
Keep 
City provides reclaimed water to the Palo Verde Nuclear 
Powerplant. 
10 
Provide water stations when needed for individuals 
during the extreme heat periods. 
• All City Staff 
• Cost of bottled water 
and Staff Time 
• As Needed 
In Progress 
Keep 
City continues to provide a water station at the Fire Department 
for individuals in need during periods of extreme heat. 
11 
Continue working with local school systems for relief 
areas if individuals were displaced due to the extreme 
heat. 
• Senior City Staff, 
Emergency Manager 
• Staff Time 
• Annually 
In Progress 
Keep 
The Tolleson High School is a designated emergency shelter.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-24:  Tolleson assessment of previous plan cycle mitigation actions/projects  
 
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
12 
Educate homeowners and businesses to tie down or not 
leave loose items around during severe wind periods. 
• City Public 
Information Officer 
• Staff Time and 
possible publication 
costs 
• Periodic 
In Progress 
Keep 
This is accomplished through the City’s social media platforms. 
13 
Maintain the installed backup generators at the police 
and fire departments.  Make sure new backup 
generators are in the plans for any new critical 
facilities. 
• Field Operations 
Department 
• $10,000 per year plus 
Staff Time 
• Quarterly 
In Progress 
Keep 
Monthly checks and annual maintenance are provided for the 
police and fire department generators.  The new City Hall will 
have a backup generator.  
14 
Include addressing subsidence risk as a regular part of 
the land development and public works projects 
review and permitting. 
• City Engineer and 
Building Department 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Accomplished during plan review process, as necessary. 
15 
Provide links to the AZ Department of Water 
Resources website as a part of a public campaign to 
raise the awareness to the hazards and locations of 
active subsidence.  This will be done through all the 
local social media. 
• City Public 
Information Officer 
• Staff Time 
• Ongoing 
No Action 
Keep 
 
 
 
 
 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
1 
Inspect and monitor all structures (bridges and box 
culverts) under their control on a semi-annual basis. 
• MCDOT 
• $150,000 
• Annual 
Ongoing 
Ongoing 
Keep 
This is an ongoing process 
2 
Encourage bridge or culvert construction where roads 
are in locations susceptible to flooding. 
• MCDOT 
• $7,000,000 
• Annual 
Ongoing 
Ongoing 
Keep 
This is an ongoing process 
3 
Review building permits to ensure that unincorporated 
Maricopa County residents are safe from flooding by 
meeting the NFIP requirements for development 
within a Special Flood Hazard Area through 
enforcement of Floodplain Regulations. 
• FCDMC / 
Floodplain 
Administrator 
• Ongoing 
• Ongoing 
On-going 
Keep 
This is a continuous and ongoing activity for the Flood Control District. 
4 
Develop a Community Wildfire Protection Plan to 
identify actions that will reduce the risk of wildfires to 
communities within wildland-urban interface zones. 
• MCDEM 
• $150,000 
• Ongoing / 5-
year updates 
Ongoing 
Keep 
The CWPP was last updated in 2020 and Maricopa County will continue to 
review and update its CWPP on a five year basis. 
5 
Complete and start Area Drainage Master 
Studies/Plans to identify flooding hazards, mitigation 
solutions and provide notice to interested parties. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Project-
Dependent 
• Ongoing 
On-going 
Keep 
This is a continuous and ongoing activity for the Flood Control District. 
6 
Complete and start delineations/re-delineations to 
identify flooding hazards and the means to share 
information. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Project – 
Dependent 
• Ongoing 
On-going 
Keep 
This is a continuous and ongoing activity for the Flood Control District.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
7 
Operate and maintain flood control structures operated 
and maintained by FCDMC in order to prevent 
structural failure and to maintain their primary 
function. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Project-
Dependent 
• Ongoing 
On-going 
Keep 
This is a continuous and ongoing activity. The Flood Control District 
recently implemented a major maintenance program to make repairs and 
updates to projects that can’t be accomplished by the normal maintenance 
process. 
8 
Update the Flood Control District of Maricopa County 
2009 Comprehensive Floodplain Management Plan 
and Program to set the framework in mitigating flood 
hazards. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Staff Time 
• 2015 
On-going 
Keep 
The District updated the Comprehensive Report in 2015 
(https://www.maricopa.gov/DocumentCenter/View/24742/Comprehensive-
Report-and-Program---2015), the next update is scheduled to be adopted 
by the end of 2020. The Floodplain Management Plan for Unincorporated 
Maricopa County was updated in 2015, and the next update is scheduled to 
be adopted by the end of calendar year 2020 
(https://www.maricopa.gov/5423/Floodplain-Management-Plan-2020-
Update). 
9 
Sonoqui Wash Channelization (Main Branch).  
Channelize an existing wash to contain flood flows 
and protect existing homes. 
• FCDMC / 
Chief 
Engineer & 
GM 
• $14 Million 
• Ongoing / 
Funding 
Dependent 
Complete 
Delete 
The project has been completed and this no longer needs to be tracked.  
The last phase (IIIB) was completed in September 2016, and the Letter of 
Map Revision (LOMR) became effective August 11, 2017. 
10 
Oak Street Basin and Storm Drain.  Construct a basin 
and storm drain to mitigate flooding hazards to 
existing and future homes. 
• FCDMC / 
Chief 
Engineer & 
GM in 
partnership 
with City of 
Mesa 
• $4.5 Million 
• Ongoing / 
Funding 
Dependent 
On-going 
Keep 
The Flood Control District is working on getting this project going and 
construction could start before the end of FY 2021.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
11 
Flood Control Capital Improvement Program.  
Construct facilities to mitigate flooding hazards to 
residents of Maricopa County. 
• FCDMC / 
Chief 
Engineer & 
GM 
• $80M-year 
• Ongoing 
On-going 
Keep 
Between FY 21 and FY 25 the Flood Control District is scheduled to invest 
$400 million in CIP projects in unincorporated and incorporated areas of 
Maricopa County. Many of these projects will be done in cooperation with 
project partners. 
12 
Design and construct new bridge and scour protection 
at Gilbert Road over the Salt River. 
• MCDOT 
• $43.95 
million 
• June 2018 
Ongoing 
Keep 
Construction start date December 2022 
13 
Floodprone Properties Assistance Program.  Acquire 
property and relocate residents from flood hazard areas 
or protect homes from flooding hazards through 
floodproofing. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Project-
Dependent 
• Ongoing 
On-going 
Keep 
While this program isn’t widely used, it does continue to be a potential 
alternative for reducing flood risks to individual homes. 
(https://www.maricopa.gov/550/Floodprone-Property-Assistance-Program) 
14 
Review existing building codes to determine if they 
adequately protect new development in hazard areas. 
Where feasible and necessary, modify codes to help 
mitigate hazards imposed on such development within 
the limits of state statutes, while also respecting 
private property rights. 
• Planning and 
Development 
Department 
• Staff Time 
• Ongoing 
On-going 
Keep 
Building codes are continually reviewed and updated via the Local 
Additions and Addenda where changes are needed. 
15 
Continue public education program to assist residents 
in recognizing potential flooding and erosion hazards 
and inform them on how to reduce risk to life and 
property. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Staff Time 
• Ongoing 
On-going 
Keep 
As part of the CRS Program the Flood Control District sends an annual 
newsletter to properties in the SFHA and located in areas protected by a 
levee. Letters are send to areas that have been identified has Repetitive 
Loss Areas. The District also uses traditional media and social media to 
publicize flood awareness and safety messages. 
16 
Work with federal and state agencies, and local 
coalitions to elevate awareness of fissure risk zones 
and the problems fissures may cause. 
• Planning and 
Development 
Department 
• Staff Time 
• Ongoing 
On-going 
Revise 
This has not been implemented yet and in general this would be something 
more likely to be led by Emergency Management as opposed to P&D.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
17 
Continue to operate and maintain a flood warning 
system to alert communities and the public to flooding 
events. 
• FCDMC / 
Chief 
Engineer & 
GM 
• $1.5M-year 
• Ongoing 
On-going 
Keep 
This is a continuous and ongoing activity for the Flood Control District. 
The information is share with other county agencies and communities.  
Many of the television and radio stations use the information in their 
reports. 
18 
Develop and maintain Flood Response Plans and 
Emergency Action Plans to identify actions to be taken 
at specific locations for certain conditions during 
flooding events. 
• FCDMC / 
Chief 
Engineer & 
GM 
• $400K-year 
• Ongoing 
On-going 
Keep 
The Flood Control will continue to develop and maintain EAPs and FRPs. 
Between 2016 and 2019 13 EAPs for dams were updated, completed EAPs 
for most of the levees, and 2 FRPs were updated. 
19 
Maintain participation in NFIP’s Community Rating 
System to further inform and enhance public safety, 
protect the environment and reduce losses and 
damages to public and private property through 
continued outreach and various programs. 
• FCDMC / 
Chief 
Engineer & 
GM 
• Staff Time 
• Ongoing 
On-going 
Keep 
The Flood Control District will continue to participate in CRS. 
20 
Conduct public outreach to educate the residents about 
water conservation within the community via website, 
social media, mailers, and any other communication 
methods. 
• MC Public 
Information 
Officer 
• Staff Time 
and minimal 
cost 
• Spring and 
Summer 
Periods 
On-going 
Revise 
Maricopa County will continue its on-going public outreach education for 
drought. 
21 
Educate/advise subdivision developers about County 
subdivision regulations that outline and highlight the 
provisions for renewable water uses. 
• MC Planning 
/ 
Development 
• Staff Time 
• Continuous 
On-going 
Keep 
Staff advise developers of subdivisions regulations throughout the 
entitlement process.  ADWR is notified of submission documents so that 
they may comment on a proposal.  Staff suggests that CAP water is utilized 
whenever available.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-25:  Unincorporated Maricopa County assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead 
Agency 
• Proposed 
Cost 
• Proposed 
Comp Date 
Status 
Disposition 
Explanation 
22 
Review county plans and procedures to open and 
operate cooling centers throughout the county. 
• MC 
Emergency 
Management 
• Staff Time 
• Spring and 
Summer 
Periods 
Completed 
Delete 
Completed 
23 
Work with Partners & Municipalities throughout the 
community to ensure resources are available. 
• MC 
Emergency 
Management 
• Staff Time 
• Spring and 
Summer 
Periods 
On-going 
Keep 
Will continue to work with community partners to ensure resources are 
available during extreme heat events. 
24 
Provide public education/outreach to County citizens 
by updating the County website to address subsidence 
& fissures. 
• MC Planning 
/ 
Development 
Emergency 
Management 
• Staff Time, 
Printing Cost 
(minimal) 
• Continuous 
On-going 
Keep 
An online brochure about subsidence is present on the website at this link: 
https://www.maricopa.gov/5145/Other-Natural-Hazards. 
25 
Provide public education/outreach to developers by 
raising awareness to subsidence and fissure hazards 
during pre-construction and re-zoning permitting 
processes.  
• MC Planning 
/ 
Development 
Emergency 
Management 
• Staff Time, 
Printing Cost 
(minimal) 
• Continuous 
On-going 
Keep 
Areas of potential subsidence have been identified and mapped by 
Maricopa County.  This information is often available through Plan Net.  
When Staff are aware of potential subsidence, Staff will require 
geotechnical analysis work on the site as a part of the conditions of 
approval for any entitlement to be completed prior to being able to receive 
construction permits.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-26:  Wickenburg assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Coordinate review of building permits for compliance 
with the Floodplain Ordinance and NFIP regulations 
with FCDMC. 
• Planning department 
• NA 
• Ongoing 
In Progress 
Keep 
This is an ongoing effort that will continue into the future as new 
developments occur.  
2 
Remove vegetation in washes that bisect streets within 
town limits to reduce wildfire hazard and improve 
stormwater conveyance capacities. 
• Fire / Public Works 
• NA 
• Ongoing 
In Progress 
Keep 
This is an ongoing effort that will continue into the future. 
3 
Scheduling local drainage clean out and inventory 
• Public Works 
• NA 
• Ongoing 
In Progress 
Keep 
Efforts are ongoing, typically before and after monsoon season, 
and will continue. 
4 
Review Flood Hazard mitigation plan, identify areas 
prone to flood in the heavy rain events 
• Public Works / Fire / 
PD 
• NA 
• Ongoing 
In Progress 
Keep 
Review is completed as needed to prepare for flooding events or 
to provide information to incoming personnel.  
5 
Fuel Reduction program COOP with BLM. Identify 
Hazard areas, set up work group days with BLM crews 
and WFD crews for fuels work in and around the 
Hassayampa River areas Highest prone to fire. 
• Fire / BLM 
• NA 
• Ongoing 
In Progress 
Keep 
Ongoing effort completed annually prior to fire season. 
6 
Wickenburg Ranch/Martinez Creek Flood Hazards.  
Work on new amendment to Flood Plan from Yavapai 
County regarding the new developed area around 
Martinez creek 
• Planning / Building 
Department 
Emergency Mgmt 
• UNK 
• Depends on growth 
rate. NA 
In Progress 
Keep 
As new phases of development come in, the Town is 
coordinating with Yavapai County to ensure that developments 
are safe from flooding. 
7 
Public education on the dangers of living in the 
southwest Arizona  desert where extreme temperatures 
are common in the summer months 
• Fire / EMS 
• N/A 
• Annual 
In Progress 
Keep 
Continue outreach efforts through the Public Relations Office in 
coordination with the Fire Department. 
8 
Provide water via the station or duty engine to 
individuals that present symptoms of heat related 
illness 
• Fire / EMS 
• NA 
• Daily 
In Progress 
Keep 
Continue to provide water to the community during periods of 
extreme heat.  
9 
Review temporary structure permits for proper tie 
down and anchor methods. 
• Planning Department 
• NA 
• Ongoing 
In Progress 
Keep 
Continue to provide review of temporary structure permits to 
ensure proper tie down and anchor methods.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-26:  Wickenburg assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
10 
Perform training and education for PW and PD crews 
regarding public safety actions that can be taken to 
mitigate the risk of damage and injury to the public on 
a pre-event, during, and post-event basis for severe 
wind storms. 
• Fire and PW 
• Staff Time 
• Ongoing 
In Progress 
Keep 
This is an ongoing effort undertaken as necessary to mitigate 
damage and injury caused by severe wind storms. 
11 
Review FHRP, in reference to Sunnycove and 
Cassandra Dam areas, on an annual basis to determine 
if adjustments are necessary due to changes in areas 
downstream of dams 
• Fire / Emergency 
Operations 
• Staff Time 
• Ongoing 
In Progress 
Keep  
In partnership with Maricopa County Flood Control District, 
continue to review to determine if adjustments are necessary. 
12 
Sols Wash survey and schedule work maintenance 
projects for brush clearing and inspection of existing 
bank protection measures. 
• Public Works / Fire 
• UNK. Staff time 
• Ongoing 
In Progress 
Keep 
Continue to inspect and maintain the wash as necessary.  
13 
Public outreach to areas impacted in heavy flood 
events thru community meetings to communicate the 
residual risk of areas protected by these structures 
• Public Works / 
Emergency Mgt. 
• Staff time 
• Annual or as needed 
In Progress  
Revise 
While public outreach to impacted areas will continue, the Town 
will provide this effort through Social Media Campaign and the 
Public Relations Office.  
14 
Work with ADOT on Hwy 93 bank protection 
maintenance to ensure maintenance clearing of 
primary vegetation is being done on a regular basis 
• Public Works 
• Staff time 
• As needed 
In Progress  
Keep 
 Ongoing effort to ensure bank protection is maintained.  
15 
Perform public education of water conservation best 
practices through newsletter, flyers, social media and 
website notices. 
• Water and Wastewater 
Dept 
• Staff time 
• Annual 
In Progress 
Keep 
Ongoing effort that will be emphasized through the Public 
Relations Office.  
16 
Encourage and incentivize the use of drought resistant 
landscaping through ordinance development and/or 
enforcement. 
• Water and Wastewater 
Dept 
• Staff time 
• 2020 
Complete 
Delete 
Town Code 14-19 was created in 2020 to include landscape 
irrigation and vegetation requirement for residential and 
commercial new construction.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
Table 6-7-27:  Youngtown assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
1 
Review building permits for compliance with 
Floodplain Ordinance and NFIP regulations through 
ongoing coordination with FCDMC and compliance 
with current floodplain ordinance. 
• Public Works Dept / 
Building Inspector 
• Staff Time 
• Ongoing 
In Progress 
Keep 
All building permits are reviewed for compliance with NFIP 
regulations.  Town coordinates with FCDMC to ensure 
compliance with floodplain ordinance.  
2 
Encourage the use of weather radios, especially in 
schools, rest homes, convalescent homes, retirement 
centers and other locations where people congregate to 
inform them of the approach of severe weather. 
• Emergency Services 
Manager / Town 
Webmaster 
• Staff Time 
• Ongoing 
In Progress  
Keep 
Weather Stations, manned by local volunteers, have been located 
within the Town campus.  
3 
Provide town leadership role in support of efforts to 
limit development in the departure and approach 
corridors for Luke Air Force base. 
• Mayor / Town 
Manager / Public 
Works Manager / 
Town Management 
• Staff Time 
• Ongoing 
In Progress 
Keep 
All building permits are reviewed for compliance within the 
Luke Air Force flight zone.  
4 
Promote the availability of hazard mitigation 
information from county webpage by providing a 
notice of the Maricopa County Hazard Mitigation Plan 
posted on town’s website with link back to Maricopa 
County Emergency Management for additional 
information. 
• Emergency Services 
Manager / Town 
Webmaster 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Town provide information regarding the HMP and links to 
County Emergency Management on their site.  
5 
Participate/ conduct occasional table top exercises to 
identify potential mitigation measures for increasing 
response effectiveness, such as evacuation route 
marking and permanent protection measures for 
indented shelters. 
• Public Works 
Department / Maricopa 
County 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Conducted table-top exercise with Fire, Public Works, and 
County to discuss best practices in the event of an incident at the 
battery storage facility.  
6 
Provide public education of water conservation best 
practices through newsletter, flyers, social media and 
website notices. 
• Public Works 
Department in 
collaboration with 
EPCOR Water 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Provide water conservation information on best practices via 
Town website and local newspaper.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-27:  Youngtown assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
7 
Perform a public information campaign at the onset of 
the extreme heat season to help educate the general 
public on ways to remain safe during periods of 
extreme heat. 
• Public Safety 
Department in 
collaboration with the 
Salvation Army 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Provide public information through the Town website at the 
onset of extreme heat season.  
8 
Develop a community-wide, storm water management 
plan that will analyze and identify problem flooding 
areas and propose long-term mitigation alternatives 
designed to reduce or eliminate the flood problems. 
• Public Works 
Department, ADEQ & 
FCDMC 
• Staff Time 
• Ongoing 
In Progress 
Keep 
The Public Works Director has developed a storm water 
management plan which has been approved by ADEQ. 
9 
Maintain/install backup generators at key critical 
facilities such as fire and police stations, water 
pumping stations, sewer lift stations, etc., to provide 
emergency power for critical operations during power 
failures caused by severe wind events. 
• Public Works 
Department / APS 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Backup generators installed at Life Stream Elderly Care Facility, 
& Public Works Facility, and Emergency Operation Command 
Center.  Backup generators are maintained biannually by Public 
Works Department. 
10 
Provide links to the Arizona Department of Water 
Resources website as part of a public campaign to 
raise awareness to the hazards and locations of active 
subsidence. 
• Public Works 
Department and 
Arizona Department of 
Water Resources 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Link is provided on Town website.  
11 
Develop and/or enforce a weed abatement ordinance.  
Conduct fire safety education programs in local public 
schools.  Enact and enforce burn and fireworks bans as 
needed during extraordinarily dry and extreme wildfire 
conditions & seasons to mitigate possible, unintended 
wildfire starts.  Perform, or encourage the performance 
of routine, roadside vegetation control to mitigate 
wildfire starts within the right of way areas along 
roadways and highways. 
• Public Works 
Department, Code 
Enforcement, Sun City 
Fire District 
• Staff Time 
• Ongoing 
In Progress 
Keep 
Coordinated with the Codes Enforcement, Fire and Medical 
Departments.  The weed abatement ordinance was adopted in 
2012, updated 2018 model codes to be adopted June 2021. 
12 
Annually coordinate with Federal, State, and local dam 
owners to get updates on any 
changes in dam safety conditions and emergency 
action plan information 
• Public Safety / 
Emergency Services 
Manager 
• Staff Time 
• Annually 
In Progress 
Keep 
Public Works department coordinates annually with Federal, 
State and local dam owners.

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
Table 6-7-27:  Youngtown assessment of previous plan cycle mitigation actions/projects  
ID 
Description 
• Lead Agency 
• Proposed Cost 
• Proposed Comp 
Date 
Status 
Disposition 
Explanation 
13 
Work with state and Federal agencies to provide 
disclosure information to all 
potential buyers of real estate that are located within 
the dam failure or emergency 
spillway inundation limits of an upstream dam or 
dams. 
• Public Safety / 
Emergency Services 
Manager 
• Staff Time 
• Ongoing 
In Progress 
Keep

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix C 
 
Public Involvement Records 
 
Appendix C files are housed and stored at the Maricopa County Department of Emergency 
Services and can be obtained upon request by contacting: 
 
 Rudy Perez 
Phone:  602.273.1411 
Email:  Rudy.Perez@Maricopa.gov

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix D 
 
Detailed Historic Hazard Records 
 
Appendix D files are housed and stored at the Maricopa County Department of Emergency 
Services and can be obtained upon request by contacting: 
 
 Rudy Perez 
Phone:  602.273.1411 
Email:  Rudy.Perez@Maricopa.gov

MARICOPA COUNTY  
MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 
2021 
 
 
FOR OFFICIAL USE ONLY 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appendix E 
 
Plan Maintenance Review Reports