Extracted text (via pymupdf)
28302 characters
www.eziqc.com Summary Of Costs Statewide General Contracting JOC 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental JOC Project Name: 22-CityofChandler-0009.01 JOC Project Number: Amount of Proposal: $332,212.57 Purchase Order Amount to Contractor The SJ Anderson Company Contractor: Contractor: The SJ Anderson Company 10/10/2022 Price Proposal Summary - CSI Job Order Contract www.eziqc.com Statewide JOC Contract 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental Job Order Title: Job Order Number: Contract Number: Date: GC-CTR061840-ez 22-CityofChandler-0009.01 October 10, 2022 This proposal is to install all of the equipment, concrete, masonry and fencing per the Owner provided drawings. There is another proposal for all of the equipment per the drawing. Title on the drawings is city of Chandler Main Police Department Generator Replacement, dated 8/05/22. These plans are not approved at this time, and our proposal will not have any permit fees. We will construct everything per this plan set. The Owner will have to set the time of construction based on the equipment delivery schedule. S. J. Anderson Company will not be responsible for any and all unforeseen conditions, example any existing utilities that would have to be relocated. Owner schedule. Owner will handle the existing generator and transfer switch after we remove it. Detailed Scope: Proposal Name: Proposal Value: Proposal created by Contractor: 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental The SJ Anderson Company $332,212.57 01 - General Requirements: $28,311.45 02 - Site Work: $6,195.21 03 - Concrete: $18,992.93 04 - Masonry: $3,606.64 08 - Openings: $9,176.79 09 - Finishes: $174.04 10 - Specialties: $778.74 26 - Electrical: $246,130.31 31 - Earthwork: $692.17 32 - Exterior Improvements: $18,154.29 $332,212.57 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona . The Percent of NPP on this Proposal: 0.00% 1 Page 1 of 1 10/10/2022 Price Proposal Summary - CSI Price Proposal Detail - CSI Job Order Contract October 10, 2022 22-CityofChandler-0009.01 GC-CTR061840-ez Date: Job Order Title: Job Order Number: Contract Number: 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 1.0700-Non-State ezIQC Reimbursable Fee, 1.2123-Non State Agency - NWH - Owner Funded Adjustment Factor(s) Used: Proposal created by Contractor: Proposal Value: Proposal Name: 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental The SJ Anderson Company $332,212.57 CSI Number Line Total Description UOM Mod. Rec# 01 - General Requirements 01 22 16 00 0004 TaxesThe Contractor shall pay all sales, consumer, use and other similar taxes required by Law for which an exemption does not exist. If the Contractor is required to pay sales tax on non-exempt material, equipment, services or other items purchased in connection with a Purchase Order, the Member will reimburse the Contractor for such tax, without mark-up, provided the Contractor submits the appropriate documentation therefore. The base cost of the Taxes is $1.00. The quantity used will adjust the base cost to the actual Taxes (e.g. quantity of 125 = $125.00 Taxes). 1 $18,700.42 EA Installation = x x $18,700.42 Factor Unit Price Quantity Total 1.0700 $1.00 17,477.03 User Note: Tax 01 56 26 00 0005 Temporary 6' High Chain Link Fence And Posts, Up To 6 Months 2 $1,460.82 LF Installation = x x $1,460.82 Factor Unit Price Quantity Total 1.2123 $4.82 250.00 User Note: temporary construction fence 01 56 26 00 0005 For >100 To 250, Deduct 3 Mod -$45.46 LF Installation = x x $-45.46 Factor Unit Price Quantity Total 1.2123 $-0.15 250.00 01 56 26 00 0005 For Each LF Shade Cloth, Add 4 Mod $772.84 LF Installation = x x $772.84 Factor Unit Price Quantity Total 1.2123 $2.55 250.00 01 71 13 00 0003 Standard Equipment Delivery, Pickup, Mobilization And Demobilization Using A Tractor Trailer With Up To 53' BedIncludes loading, tie-down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as bulldozers, motor scrapers, hydraulic excavators, gradalls, road graders, loader-backhoes, heavy duty construction loaders, tractors, pavers, rollers, bridge finishers, straight mast construction forklifts, telescoping boom rough terrain construction forklifts, telescoping and articulating boom man lifts with >40' boom lengths, etc. 5 $3,002.26 EA Installation = x x $3,002.26 Factor Unit Price Quantity Total 1.2123 $1,238.25 2.00 User Note: bob cat & backhoe 01 71 23 16 0019 Survey Clear Area For Underground Utilities 6 $1,729.26 ACR Installation = x x $1,729.26 Factor Unit Price Quantity Total 1.2123 $2,852.85 0.50 User Note: locate underground utilities 01 74 19 00 0017 40 CY Dumpster (6 Ton) "Construction Debris"Includes delivery of dumpster, rental cost, pick-up cost, hauling, and disposal fee. Non-hazardous material. 7 $2,691.31 EA Installation = x x $2,691.31 Factor Unit Price Quantity Total 1.2123 $555.00 4.00 User Note: construction debris 2.00 Page 1 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# Subtotal for 01 - General Requirements: $28,311.45 02 - Site Work 02 41 13 13 0029 >6" To 9" By Machine, Break-up And Remove Welded Wire Reinforced Concrete Paving 8 $5,288.09 SY Installation = x x $5,288.09 Factor Unit Price Quantity Total 1.2123 $35.69 122.22 User Note: 1100 SF / 9 = 122.22 SY per plan A-1.2 02 41 19 13 0015 Saw Cut Minimum ChargeFor projects where the total saw cutting charge is less than the minimum charge, use this task exclusively. This task should not be used in conjunction with any other tasks in this section. 9 $907.12 EA Installation = x x $907.12 Factor Unit Price Quantity Total 1.2123 $748.26 1.00 User Note: cut existing concrete pad Subtotal for 02 - Site Work: $6,195.21 03 - Concrete 03 31 13 00 0005 6" 3,000 PSI Slab On Grade Concrete Slabs Assembly 10 $7,422.38 SF Installation = x x $7,422.38 Factor Unit Price Quantity Total 1.2123 $6.08 1,007.00 User Note: 53' x 19 ' = 1007 SF per drawing A-2.2 03 31 13 00 0005 For >1,000 To 2,000, Add 11 Mod $1,001.04 SF Installation = x x $1,001.04 Factor Unit Price Quantity Total 1.2123 $0.82 1,007.00 03 31 13 00 0023 Concrete Pump, Place 3,000 PSI Concrete Spread FootingsExcludes pumping equipment. 12 $659.68 CY Installation = x x $659.68 Factor Unit Price Quantity Total 1.2123 $172.20 3.16 User Note: wall footer per drawing A-2.2 & 03 31 13 00 0023 For Up To 20, Add 13 Mod $61.37 CY Installation = x x $61.37 Factor Unit Price Quantity Total 1.2123 $16.02 3.16 03 31 13 00 0027 Concrete Pump, Place 3,000 PSI Concrete Mat FoundationExcludes pumping equipment. 14 $2,140.75 CY Installation = x x $2,140.75 Factor Unit Price Quantity Total 1.2123 $138.39 12.76 User Note: 2 generator pads. 23' x 5' x 1.5' = 172.5 / 27 = 6.38 CY x 2 = 12.76 CY 03 31 13 00 0027 For Up To 20, Add 15 Mod $38.52 CY Installation = x x $38.52 Factor Unit Price Quantity Total 1.2123 $2.49 12.76 03 31 13 00 0093 4" Equipment Pad With Rebar 16 $1,102.51 SF Installation = x x $1,102.51 Factor Unit Price Quantity Total 1.2123 $14.21 64.00 User Note: 3 pads, 1) 4' x 10' = 40 SF. 2) 2' x 10' = 20 SF. 3) 2' x 2' = 4 SF. 64 total SF 03 61 16 00 0002 Cementitious Flowable Grout 17 $6,566.68 CY Installation = x x $6,566.68 Factor Unit Price Quantity Total 1.2123 $287.97 18.81 User Note: 20' x 8" x 12'-10" /9 = 18.81 CY solid grout filled wall per drawing S-1.1 Subtotal for 03 - Concrete: $18,992.93 Page 2 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 04 - Masonry 04 05 19 26 0012 #5, Grade 60, Horizontal Placed, Steel Masonry Reinforcement Bar 18 $592.81 LF Installation = x x $592.81 Factor Unit Price Quantity Total 1.2123 $1.63 300.00 User Note: New wall & generator pads 5' x 20' = 100' per drawing 04 05 19 26 0024 #5, Grade 60, Vertical Placed, Steel Masonry Reinforcement Bar 19 $450.98 LF Installation = x x $450.98 Factor Unit Price Quantity Total 1.2123 $1.86 200.00 User Note: re bar for new wall per drawing S-1.1 04 05 23 13 0005 6-7/8" Width, Rubber, Masonry Control Joint 20 $225.78 LF Installation = x x $225.78 Factor Unit Price Quantity Total 1.2123 $7.76 24.00 User Note: control joint on wall 04 22 23 13 0023 4" x 8" x 16", Solid, Normal Weight, Concrete Block 21 $2,156.92 SF Installation = x x $2,156.92 Factor Unit Price Quantity Total 1.2123 $6.95 256.00 User Note: New C M U wall per drawing A-2.2 & S.1.1 04 22 23 13 0034 6" x 8" x 16", Normal Weight, Bond Beam Or Lintel Concrete Block 22 $180.15 LF Installation = x x $180.15 Factor Unit Price Quantity Total 1.2123 $7.43 20.00 User Note: bond bean per plan S-1.1 Subtotal for 04 - Masonry: $3,606.64 08 - Openings 08 12 13 13 0107 3' x 6'-8" Through 7'-2" High, 6-7/8" Through 8-3/4" Deep, 16 Gauge, Knock Down Hollow Metal Door Frame 23 $599.66 EA Installation = x x $599.66 Factor Unit Price Quantity Total 1.2123 $494.65 1.00 User Note: Frame for Opening 001 08 12 13 13 0107 For Welded Frames, Add 24 Mod $112.15 EA Installation = x x $112.15 Factor Unit Price Quantity Total 1.2123 $92.51 1.00 08 13 13 13 0049 3' x 7' x 1-3/4", 18 Gauge, Level 2 Heavy Duty, Honeycomb Core, Hollow Metal Door 25 $1,117.29 EA Installation = x x $1,117.29 Factor Unit Price Quantity Total 1.2123 $921.63 1.00 User Note: Door for Opening 001 08 13 13 13 0049 For 90 Minute Fire Rated Door, Add 26 Mod $113.20 EA Installation = x x $113.20 Factor Unit Price Quantity Total 1.2123 $93.38 1.00 08 13 13 13 0049 For 3 Hour Fire Rated Door, Add 27 Mod $159.42 EA Installation = x x $159.42 Factor Unit Price Quantity Total 1.2123 $131.50 1.00 08 71 11 00 0038 4-1/2" x 4-1/2", Standard Duty, Full Mortise, Ball Bearing, Wrought Steel Hinge 28 $813.57 PR Installation = x x $813.57 Factor Unit Price Quantity Total 1.2123 $111.85 6.00 User Note: Hinges for Openings Page 3 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 08 - Openings 08 71 11 00 0038 For Pair Of Non-Removable Pins (NRP), Add 29 Mod $10.91 PR Installation = x x $10.91 Factor Unit Price Quantity Total 1.2123 $6.00 1.50 08 71 11 00 2144 3' Push Bar, Fire Rated, Rim Type, Exit Device (Von Duprin Series XP98-F/XP99-F)Clear anodized satin aluminum US28 (BHMA 628) finish. 30 $1,429.35 EA Installation = x x $1,429.35 Factor Unit Price Quantity Total 1.2123 $1,179.04 1.00 User Note: door hardware for 001 08 71 11 00 2179 Knob Trim With 110NL Cylinder (Von Duprin Series 98/99, K)Satin chrome plated US26D (BHMA 626) finish. 31 $451.56 EA Installation = x x $451.56 Factor Unit Price Quantity Total 1.2123 $372.48 1.00 User Note: door hardware for 001 08 71 11 00 2201 8'-6" Keyed Removable Steel Mullion, 2" x 3" x 1/8" Wall Thickness (Von Duprin KR4954-86)For use with Von Duprin Panic rim devices. 32 $959.31 EA Installation = x x $959.31 Factor Unit Price Quantity Total 1.2123 $791.31 1.00 User Note: removable mullion for pair 08 71 11 00 2261 Surface Mounted High Security Door Closer With Metal Cover (LCN 4510) 33 $2,280.77 EA Installation = x x $2,280.77 Factor Unit Price Quantity Total 1.2123 $470.34 4.00 User Note: door/gate closures 08 71 11 00 2313 Extra Heavy Duty Cylindrical, F86 Storeroom Or Closet LocksetSatin chrome plated US26D (BHMA 626) - BHMA 156.2-1989, Grade 1(Corbin Russwin CL 3300). 34 $1,129.60 EA Installation = x x $1,129.60 Factor Unit Price Quantity Total 1.2123 $465.89 2.00 User Note: locksets for gates Subtotal for 08 - Openings: $9,176.79 09 - Finishes 09 91 13 00 0225 2 Coats Paint, Brush/Roller Work, Paint Exterior Metal Door Frame And Trim 35 $26.79 LF Installation = x x $26.79 Factor Unit Price Quantity Total 1.2123 $1.30 17.00 User Note: paint opening 001 frame 09 91 13 00 0238 2 Coats Paint, Sprayed, Paint Exterior Metal DoorBoth faces 36 $147.25 EA Installation = x x $147.25 Factor Unit Price Quantity Total 1.2123 $121.46 1.00 User Note: paint opening 001 door Subtotal for 09 - Finishes: $174.04 10 - Specialties 10 44 13 00 0075 13-11/16" x 27-3/16" x 6-1/2" Inside Dimensions, Surface Mount Stainless Steel Fire Extinguisher Cabinet 37 $628.92 EA Installation = x x $628.92 Factor Unit Price Quantity Total 1.2123 $518.78 1.00 User Note: Fire extinguisher cabinet Page 4 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 10 - Specialties 10 44 16 13 0012 10 LB Dry Chemical, Type ABC Portable Fire Extinguisher 38 $149.82 EA Installation = x x $149.82 Factor Unit Price Quantity Total 1.2123 $123.58 1.00 User Note: Extinguisher Subtotal for 10 - Specialties: $778.74 26 - Electrical 26 05 19 16 0013 #14 AWG,Type THHN-THWN, 600 Volt, Copper, Single Solid Cable, Installed In Conduit 39 $989.82 MLF Installation = x x $989.82 Factor Unit Price Quantity Total 1.2123 $408.24 2.00 User Note: DETAIL 4 E3.1 26 05 19 16 0014 #12 AWG, Type THHN-THWN, 600 Volt, Copper, Single Solid Cable, Installed In Conduit 40 $965.92 MLF Installation = x x $965.92 Factor Unit Price Quantity Total 1.2123 $531.18 1.50 User Note: E3.1 E2.1 NOTE #1,5 26 05 19 16 0015 #10 AWG,Type THHN-THWN, 600 Volt, Copper, Single Solid Cable, Installed In Conduit 41 $836.80 MLF Installation = x x $836.80 Factor Unit Price Quantity Total 1.2123 $690.26 1.00 User Note: E2.1 6A, 6B, 6C, 6D 26 05 19 16 0131 1/0 AWG, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable 42 $5,781.62 MLF Installation = x x $5,781.62 Factor Unit Price Quantity Total 1.2123 $4,769.13 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 19 16 0134 4/0 AWG, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable 43 $9,948.24 MLF Installation = x x $9,948.24 Factor Unit Price Quantity Total 1.2123 $8,206.09 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 19 16 0137 350 MCM, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable 44 $16,160.06 MLF Installation = x x $16,160.06 Factor Unit Price Quantity Total 1.2123 $13,330.08 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 19 16 0139 500 MCM, Type THHN-THWN, 600 Volt, Underground Feeder And Branch Circuits, Single Stranded Copper Cable 45 $22,218.48 MLF Installation = x x $22,218.48 Factor Unit Price Quantity Total 1.2123 $18,327.54 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 19 16 0295 500 MCM, Type THHN-THWN, 600 Volt, Copper, Single Stranded Cable, Installed In Conduit 46 $21,298.34 MLF Installation = x x $21,298.34 Factor Unit Price Quantity Total 1.2123 $17,568.54 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 23 00 0011 #20/10 Conductor, Low Volt Thermostat Cable 47 $516.34 MLF Installation = x x $516.34 Factor Unit Price Quantity Total 1.2123 $851.84 0.50 User Note: E5.1 AND 3.1 FEEDER SCHEDULE Page 5 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 26 - Electrical 26 05 26 00 0043 4/0 AWG Copper Bare Single Solid Conductor 48 $9,403.16 MLF Installation = x x $9,403.16 Factor Unit Price Quantity Total 1.2123 $7,756.46 1.00 User Note: E5.1 AND 3.1 FEEDER SCHEDULE 26 05 26 00 0091 225 Amperes, Copper Flexible Braid Jumper Strap, 24" Length 49 $6,155.57 EA Installation = x x $6,155.57 Factor Unit Price Quantity Total 1.2123 $317.35 16.00 User Note: DETAIL 6 E3.1 26 05 26 00 0100 2-1/2" To 4" Conductor, Bonding Jumper, Metallic Conduit 50 $2,823.93 EA Installation = x x $2,823.93 Factor Unit Price Quantity Total 1.2123 $232.94 10.00 User Note: DETAIL 6 E3.1 26 05 26 00 0107 1/2" Diameter x 10' Long Copper-Clad Ground Rods 51 $488.44 EA Installation = x x $488.44 Factor Unit Price Quantity Total 1.2123 $67.15 6.00 User Note: DETAIL 6 E3.1 26 05 26 00 0161 3/4" Bronze Ground Rod Clamp 52 $112.38 EA Installation = x x $112.38 Factor Unit Price Quantity Total 1.2123 $15.45 6.00 User Note: DETAIL 6 E3.1 26 05 26 00 0165 2-1/2" To 3" Bronze Ground Clamps For Pipe 53 $1,276.41 EA Installation = x x $1,276.41 Factor Unit Price Quantity Total 1.2123 $43.87 24.00 User Note: DETAIL 6 E3.1 26 05 26 00 0167 4" To 6" Bronze Ground Clamps For Pipe 54 $1,201.49 EA Installation = x x $1,201.49 Factor Unit Price Quantity Total 1.2123 $82.59 12.00 User Note: DETAIL 6 E3.1 26 05 29 00 0007 >2' Length x 1-5/8" Wide x 1-5/8" High, 14 Gauge, Steel Unistrut Channel 55 $5,097.72 LF Installation = x x $5,097.72 Factor Unit Price Quantity Total 1.2123 $8.41 500.00 User Note: NOTE 8 E0.1 26 05 29 00 0168 3/4", One Hole Steel Conduit Strap 56 $146.08 EA Installation = x x $146.08 Factor Unit Price Quantity Total 1.2123 $2.41 50.00 User Note: NOTE 8 E0.1 26 05 29 00 0314 14-1/2" Length, 50 LB Tensile Strength, Nylon Cable Ties 57 $111.39 C Installation = x x $111.39 Factor Unit Price Quantity Total 1.2123 $45.94 2.00 User Note: NOTE 8 E0.1 26 05 29 00 0336 1/4" Diameter, 4" Length, Zinc Plated Steel, Toggle Bolt 58 $332.17 EA Installation = x x $332.17 Factor Unit Price Quantity Total 1.2123 $5.48 50.00 User Note: NOTE 8 E0.1 Page 6 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 26 - Electrical 26 05 29 00 0338 3/8" Diameter, 4" Length, Zinc Plated Steel, Toggle Bolt 59 $412.18 EA Installation = x x $412.18 Factor Unit Price Quantity Total 1.2123 $6.80 50.00 User Note: NOTE 8 E0.1 26 05 29 00 0352 5/16" Diameter, 2" Length, Zinc Plated Steel, Hanger Lag Bolt With Hex Nut 60 $114.56 EA Installation = x x $114.56 Factor Unit Price Quantity Total 1.2123 $1.89 50.00 User Note: NOTE 8 E0.1 26 05 29 00 0375 3/8" Diameter, Plain Finish Steel, Low Carbon Threaded Rod 61 $76.37 LF Installation = x x $76.37 Factor Unit Price Quantity Total 1.2123 $2.52 25.00 User Note: NOTE 8 E0.1 26 05 33 13 0009 3/4" Electrical Metallic Tubing (EMT) Conduit Assembly With 2 #12 Copper THHN And 1 #12 Copper Insulated Grounding ConductorIncludes conduit, set screw connectors, set screw couplings, straps, wire as indicated. Not for use where detail is available. 62 $2,298.16 CLF Installation = x x $2,298.16 Factor Unit Price Quantity Total 1.2123 $631.90 3.00 User Note: NOTE 6 E2.1 26 05 33 13 0069 1-1/4" Rigid Galvanized Steel (RGS) Conduit With Threaded Coupling 63 $1,126.95 LF Installation = x x $1,126.95 Factor Unit Price Quantity Total 1.2123 $13.28 70.00 User Note: NOTE 6 E2.1 26 05 33 13 0071 2" Rigid Galvanized Steel (RGS) Conduit With Threaded Coupling 64 $1,725.22 LF Installation = x x $1,725.22 Factor Unit Price Quantity Total 1.2123 $20.33 70.00 User Note: NOTE 6 E2.1 26 05 33 13 0075 4" Rigid Galvanized Steel (RGS) Conduit With Threaded Coupling 65 $8,679.10 LF Installation = x x $8,679.10 Factor Unit Price Quantity Total 1.2123 $59.66 120.00 User Note: NOTE 6 E2.1 FEEDER SCHEDULE 26 05 33 13 0080 3/4" Rigid Galvanized Steel (RGS) 90 Degree Standard Radius Elbow 66 $3,907.85 EA Installation = x x $3,907.85 Factor Unit Price Quantity Total 1.2123 $21.49 150.00 User Note: NOTE 6 E2.1 FEEDER SCHEDULE 26 05 33 13 0082 1-1/4" Rigid Galvanized Steel (RGS) 90 Degree Standard Radius Elbow 67 $263.09 EA Installation = x x $263.09 Factor Unit Price Quantity Total 1.2123 $36.17 6.00 User Note: NOTE 6 E2.1 FEEDER SCHEDULE 26 05 33 13 0083 1-1/2" Rigid Galvanized Steel (RGS) 90 Degree Standard Radius Elbow 68 $305.94 EA Installation = x x $305.94 Factor Unit Price Quantity Total 1.2123 $42.06 6.00 User Note: NOTE 6 E2.1 FEEDER SCHEDULE 26 05 33 13 0088 4" Rigid Galvanized Steel (RGS) 90 Degree Standard Radius Elbow 69 $5,014.56 EA Installation = x x $5,014.56 Factor Unit Price Quantity Total 1.2123 $172.35 24.00 User Note: NOTE 6 E2.1 FEEDER SCHEDULE Page 7 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 26 - Electrical 26 05 33 13 0484 1-1/4" Rigid Galvanized Steel (RGS) Fire Stop Fitting 70 $7,301.44 EA Installation = x x $7,301.44 Factor Unit Price Quantity Total 1.2123 $301.14 20.00 User Note: E4.1 NOTE 5 E0.1 26 05 33 13 0487 2-1/2" Rigid Galvanized Steel (RGS) Fire Stop Fitting 71 $4,328.06 EA Installation = x x $4,328.06 Factor Unit Price Quantity Total 1.2123 $595.02 6.00 User Note: E4.1 NOTE 5 E0.1 26 05 33 13 0490 4" Rigid Galvanized Steel (RGS) Fire Stop Fitting 72 $25,357.92 EA Installation = x x $25,357.92 Factor Unit Price Quantity Total 1.2123 $871.55 24.00 User Note: E4.1 NOTE 5 E0.1 26 05 33 13 0606 3/4" Electrical Metallic Tubing (EMT) Conduit 73 $760.11 LF Installation = x x $760.11 Factor Unit Price Quantity Total 1.2123 $4.18 150.00 User Note: DETAIL 2 E4.1 26 05 33 13 0625 4" Electrical Metallic Tubing (EMT) 90 Degree Elbow 74 $662.13 EA Installation = x x $662.13 Factor Unit Price Quantity Total 1.2123 $91.03 6.00 User Note: E2.1 NOTE3 26 05 33 13 0650 3/4" Electrical Metallic Tubing (EMT) Compression Coupling 75 $136.08 EA Installation = x x $136.08 Factor Unit Price Quantity Total 1.2123 $4.49 25.00 User Note: DETAIL 4 E3.1 26 05 33 13 0683 3/4" Electrical Metallic Tubing (EMT) Straight Box Compression Connector 76 $130.02 EA Installation = x x $130.02 Factor Unit Price Quantity Total 1.2123 $4.29 25.00 User Note: DETAIL 4 E3.1 26 05 33 13 1471 3/4" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End 77 $384.30 LF Installation = x x $384.30 Factor Unit Price Quantity Total 1.2123 $3.17 100.00 User Note: DETAIL 2 E4.1 26 05 33 13 1473 1-1/4" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End 78 $585.54 LF Installation = x x $585.54 Factor Unit Price Quantity Total 1.2123 $4.83 100.00 User Note: DETAIL 2 E4.1 26 05 33 13 1474 1-1/2" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End 79 $691.01 LF Installation = x x $691.01 Factor Unit Price Quantity Total 1.2123 $5.70 100.00 User Note: DETAIL 3 E4.1 26 05 33 13 1479 4" Schedule 40 Polyvinyl Chloride (PVC) Conduit With Coupled End 80 $11,448.96 LF Installation = x x $11,448.96 Factor Unit Price Quantity Total 1.2123 $15.74 600.00 User Note: E2.1 NOTE3 Page 8 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 26 - Electrical 26 05 33 13 1788 1" x 1-1/2" Explosion Proof Malleable Iron Conduit Sealing Fitting, Horizontal/Vertical 81 $785.79 EA Installation = x x $785.79 Factor Unit Price Quantity Total 1.2123 $108.03 6.00 User Note: NOTE 5 E0.1 26 05 33 13 1795 4" x 5" Explosion Proof Malleable Iron Conduit Sealing Fitting, Horizontal/Vertical 82 $25,681.17 EA Installation = x x $25,681.17 Factor Unit Price Quantity Total 1.2123 $882.66 24.00 User Note: NOTE 5 E0.1 26 05 46 00 0003 25' Treated Wood Pole, Class 3, Machine Dig And Set 83 $835.53 EA Installation = x x $835.53 Factor Unit Price Quantity Total 1.2123 $689.21 1.00 User Note: CIVIL PLAN 26 32 13 19 0020 500 KW Natural Gas Generator Set, 3 Phase (Cummins GFJB) 84 $22,478.37 EA Installation = x x $22,478.37 Factor Unit Price Quantity Total Excludes Material 1.2123 $9,270.96 2.00 User Note: E1.1 NOTE 1 26 33 43 00 0002 Solid State Battery Charger, 6 Cell Single Phase With Wall Bracket, 208/240/480 Volt 85 $5,976.35 EA Installation = x x $5,976.35 Factor Unit Price Quantity Total 1.2123 $2,464.88 2.00 User Note: E1.1 NOTE 1 26 33 53 00 0076 Uninterrupted Power Supply Remote Status Panel 86 $8,799.19 EA Installation = x x $8,799.19 Factor Unit Price Quantity Total 1.2123 $3,629.13 2.00 User Note: E1.1 NOTE1 Subtotal for 26 - Electrical: $246,130.31 31 - Earthwork 31 13 13 00 0003 >6" To 12" D.B.H. (Diameter At Breast Height) Tree RemovalIncludes cutting up tree, chipping and loading. 87 $692.17 EA Installation = x x $692.17 Factor Unit Price Quantity Total 1.2123 $570.96 1.00 User Note: Remove existing Tree per drawing A-1.2 Subtotal for 31 - Earthwork: $692.17 32 - Exterior Improvements 32 31 13 13 0009 10" Diameter Hole, Auger By Machine Fence Post Hole In Soil 88 $374.77 VLF Installation = x x $374.77 Factor Unit Price Quantity Total 1.2123 $11.89 26.00 User Note: 13 holes 2' deep per plan A-2.2 & A-9.1.1 32 31 13 13 0039 10" Diameter, Grout Fill For Post Hole 89 $458.30 VLF Installation = x x $458.30 Factor Unit Price Quantity Total 1.2123 $14.54 26.00 User Note: 13 holes 2' deep per plan A-2.2 & A-9.1.1 Page 9 of 10 10/10/2022 Price Proposal Detail - CSI 2 Generators and related equipment (Construction phase) - City of Chandler PD Supplemental 22-CityofChandler-0009.01 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 32 - Exterior Improvements 32 31 19 00 0009 10' Wrought Iron Fence, Verticals At >2-1/2" To 3" On Center 90 $12,830.43 LF Installation = x x $12,830.43 Factor Unit Price Quantity Total 1.2123 $144.98 73.00 User Note: Demo existing per plan Page A-1.2. New fence per drawing A2.2 & A-9.1.1 32 31 19 00 0009 For Verticals Up To 2" On Center, Add 91 Mod $2,146.96 LF Installation = x x $2,146.96 Factor Unit Price Quantity Total 1.2123 $24.26 73.00 32 31 19 00 0018 10' Single Wrought Iron Gate, Hardware And Associated Trim 92 $674.06 LF Installation = x x $674.06 Factor Unit Price Quantity Total 1.2123 $185.34 3.00 User Note: Per plan A-2.2 32 31 19 00 0026 10' Double Wrought Iron Gate, Hardware And Associated Trim 93 $1,669.77 LF Installation = x x $1,669.77 Factor Unit Price Quantity Total 1.2123 $229.56 6.00 User Note: Per plan A-2.2 Subtotal for 32 - Exterior Improvements: $18,154.29 $332,212.57 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona . The Percent of NPP on this Proposal: 0.00% Page 10 of 10 10/10/2022 Price Proposal Detail - CSI