www.eziqc.com Summary Of Costs Statewide General Contracting JOC 2 Generators and related equipment (long lead materials only) - City of Chandler PD JOC Project Name: 22-CityofChandler-0009.00 JOC Project Number: Amount of Proposal: $977,674.14 Purchase Order Amount to Contractor The SJ Anderson Company Contractor: Contractor: The SJ Anderson Company 8/3/2022 Price Proposal Summary - CSI Job Order Contract www.eziqc.com Statewide JOC Contract 2 Generators and related equipment (long lead materials only) - City of Chandler PD Job Order Title: Job Order Number: Contract Number: Date: ADSPO17-174290-ez 22-CityofChandler-0009.00 August 03, 2022 This project is for the city of chandler main Police Department Generator Replacement. S. J. Anderson Co. was asked if we could supply an equipment only proposal for the special electric gear. Due to the times that we are in as far as supply issues. we have the equipment that is on the plan set dated 6/30/22. The Electric plans are from LSW Engineering, dated 6/30/22 and they are 95% plans as of this date. Some of the items are NPP priced, and they have ship dates as well. All of the equipment in this proposal will be long lead time items, anywhere from 60 to 75 week as of today's date 8/2/22. We will work with the city of Chandler on dates after the submittals are approved by the Engineer, at that point we will be able to lock in the shipment dates. I will let the city know of any and all updates on the ship dates. S. J. Anderson Co. will not be able to supply a job equipment schedule at this time. All of this equipment will be FOB City of Chandler, and the city will store all of the equipment until the project starts. Detailed Scope: Proposal Name: Proposal Value: Proposal created by Contractor: 2 Generators and related equipment (long lead materials only) - City of Chandler PD The SJ Anderson Company $977,674.14 01 - General Requirements: $55,020.96 23 - Heating, Ventilating, And Air-Conditioning (HVAC): $43,725.23 26 - Electrical: $878,927.95 $977,674.14 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona . The Percent of NPP on this Proposal: 44.34% 1 Page 1 of 1 8/3/2022 Price Proposal Summary - CSI Price Proposal Detail - CSI Job Order Contract August 03, 2022 22-CityofChandler-0009.00 ADSPO17-174290-ez Date: Job Order Title: Job Order Number: Contract Number: 2 Generators and related equipment (long lead materials only) - City of Chandler PD 1.1989-Option 5 - Non-State - Owner Funded - Normal Working Hours, 1.0626-Option 5 - Non-State ezIQC Reimbursable Fee Adjustment Factor(s) Used: Proposal created by Contractor: Proposal Value: Proposal Name: 2 Generators and related equipment (long lead materials only) - City of Chandler PD The SJ Anderson Company $977,674.14 CSI Number Line Total Description UOM Mod. Rec# 01 - General Requirements 01 22 16 00 0004 TaxesThe Contractor shall pay all sales, consumer, use and other similar taxes required by Law for which an exemption does not exist. If the Contractor is required to pay sales tax on non-exempt material, equipment, services or other items purchased in connection with a Purchase Order, the Member will reimburse the Contractor for such tax, without mark-up, provided the Contractor submits the appropriate documentation therefore. The base cost of the Taxes is $1.00. The quantity used will adjust the base cost to the actual Taxes (e.g. quantity of 125 = $125.00 Taxes). 1 $55,020.96 EA Installation = x x $55,020.96 Factor Unit Price Quantity Total 1.0626 $1.00 51,779.56 User Note: Tax Subtotal for 01 - General Requirements: $55,020.96 23 - Heating, Ventilating, And Air-Conditioning (HVAC) 23 13 23 16 0020 2,000 Gallon, Steel Storage Tank, Double Wall, With 3/16" Shell, Aboveground With Supports, Coating And Fittings 2 $35,262.29 EA Installation = x x $35,262.29 Factor Unit Price Quantity Total 1.1989 $14,706.10 2.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 23 13 23 16 0020 For 1/4" Thick Shell, Add 3 Mod $8,462.94 EA Installation = x x $8,462.94 Factor Unit Price Quantity Total 1.1989 $3,529.46 2.00 Subtotal for 23 - Heating, Ventilating, And Air-Conditioning (HVAC): $43,725.23 26 - Electrical 26123 1600A GSB 4 $279,590.14 Ea. 2290 Installation = x x $279,590.14 Factor Unit Price Quantity Total 1.0626 $263,118.90 1.00 NPP Task User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26123 Switchgear 5 $153,937.69 Ea. 2295 Installation = x x $153,937.69 Factor Unit Price Quantity Total 1.0626 $144,868.90 1.00 NPP Task User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 2.00 Page 1 of 3 8/3/2022 Price Proposal Detail - CSI 2 Generators and related equipment (long lead materials only) - City of Chandler PD 22-CityofChandler-0009.00 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. CSI Number Line Total Description UOM Mod. Rec# 26 - Electrical 26 22 13 00 0149 15 kVA, 480 Volt Delta 208Y/120 Volt, 3 Phase, K-1, NEMA 2 Enclosure, 150 Degree C Temperature Rise, Aluminum Windings, NEMA Premium Efficient Dry Type Transformer 6 $2,637.02 EA Installation = x x $2,637.02 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $2,199.53 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26 24 13 00 0234 1,200 Amperes, 480 Volt, Copper, Structure Per Section, Switchboard 7 $6,907.08 EA Installation = x x $6,907.08 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $2,880.59 2.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22. Required per RFI #1 26 24 13 00 0244 50 To 1,600 Amperes, DSL-416, Main Breaker With Current Limiter, Amptector Static Trip 8 $12,796.70 EA Installation = x x $12,796.70 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $10,673.70 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22. Required per RFI#1 26 32 13 13 0020 500 KW Diesel Generator Set, 3 Phase (Cummins DFEK) 9 $249,511.23 EA Installation = x x $249,511.23 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $104,058.40 2.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26 32 13 13 0020 For Quietsite Level 2 Steel Diesel Generator Enclosure, Add 10 Mod $139,037.66 EA Installation = x x $139,037.66 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $57,985.51 2.00 26 36 23 00 0049 1,000 Amperes, Automatic Transfer Switch/Service Entrance, 3 Pole Circuit Breaker, NEMA 1 Enclosure (Cummins OTPCSE1000) 11 $22,927.99 EA Installation = x x $22,927.99 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $19,124.19 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26 36 23 00 0049 For Four Pole Circuit Breaker, Add 12 Mod $5,667.34 EA Installation = x x $5,667.34 Factor Unit Price Quantity Total Excludes Equipment Excludes Labor 1.1989 $4,727.12 1.00 26 36 23 00 0049 For NEMA 3R Enclosure, Add 13 Mod $2,617.50 EA Installation = x x $2,617.50 Factor Unit Price Quantity Total 1.1989 $2,183.25 1.00 26 36 23 00 0051 Auxiliary Contacts For Automatic Transfer Switch 14 $271.11 EA Installation = x x $271.11 Factor Unit Price Quantity Total 1.1989 $226.13 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26 36 23 00 0052 Battery Charger For Automatic Transfer Switch 15 $2,220.21 EA Installation = x x $2,220.21 Factor Unit Price Quantity Total 1.1989 $1,851.87 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 26 36 23 00 0053 Elevator Relay Signal For Automatic Transfer Switch 16 $806.28 EA Installation = x x $806.28 Factor Unit Price Quantity Total 1.1989 $672.52 1.00 User Note: All equipment on this proposal is per LSW Engineering 95% plans, dated 6/30/22 Subtotal for 26 - Electrical: $878,927.95 Page 2 of 3 8/3/2022 Price Proposal Detail - CSI 2 Generators and related equipment (long lead materials only) - City of Chandler PD 22-CityofChandler-0009.00 Job Order Number: Job Order Title: Price Proposal Detail - CSI Continues.. $977,674.14 Proposal Total This proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub-totals and the proposal total is due to rounding of the line totals and sub-totals. PO should be directly issued to the Contractor and not Gordian or The State of Arizona The Percent of NPP on this Proposal: 44.34% Page 3 of 3 8/3/2022 Price Proposal Detail - CSI