Transportation Commission Nov Project Status
Extracted text (via pymupdf)
5224 characters
Projects Designer Contractor Status Comments PROJECT COST ESTIMATE ($MILLIONS) ST1503, Cooper Road Improv. [Alamosa Drive (approx.. 3,500 ft. north of Chandler Heights Road) to Riggs Road for two through lanes each direction] Entellus Pulice Construction Construction underway. Completion scheduled for Winter 2022. Federal funds $19.30 ST1614, Chandler Heights Road Improv. [McQueen Road to Gilbert Road for two through lanes each direction] Kimley-Horn Granite Construction Company Construction underway. Completion scheduled for Winter 2023. Federal funds $20.90 ST1616, Ocotillo Road Improv. [Gilbert Road to 148th Street for two through lanes each direction] Ritoch-Powell Haydon Companies, LLC Construction Starts November/December 2022. Completion scheduled Fall 2023. Federal funds $6.80 ST1804, Chandler Heights Road Improv. [Gilbert Road to Val Vista Drive for two through lanes each direction] Kimley-Horn tbd Design in progress. Bid scheduled for Winter 2023. Federal funds $20.90 ST2001, Lindsay Road Improv. [Ocotillo Road to Hunt Highway for two through lanes in each direction] Kimley-Horn tbd Design in progress. Bid scheduled for Winter 2023. Federal funds $27.20 ST2002, Traffic Study of Kyrene Road [Chandler Boulevard to Loop 202] AZTEC n/a Study complete. $0.20 ST2006, Traffic Signal at Warner Road and Nevada Street Stanley Consultants B&F Contracting Construction order long-lead materials underway. Construction scheduled Winter 2022. $0.60 ST2007, Hamilton Street Improv. [Appleby Road to Carob Drive] Nfra Consultants tbd Design underway. Construction scheduled for Fall 2023 $5.20 ST2009, Dobson Road Improv. at Intel Driveways #1 and #4 [Price Rd / Market Pl to Chaparral Way] Premier DCS Contracting Construction in progress. Completion date extended to coordinate with other projects. Funded by 20% from Intel and 80% from State TPT per ARS 42-5032.02 $0 City Cost (Intel Funded) ST2012, Arterial Congestion Monitoring [Install data collection devices at major intersections, and use data to map traffic congestion and mobility.] Y.S. Mantri & Assoc. CS Construction Construction order long-lead materials November 2022. Construction scheduled for Winter 2022. Grant funds $1.30 ST2103, Intersection Improv. at Ray Road and Dobson Road tbd tbd Study almost complete. Application for grant funding is submitted. Study only. Future phases tbd. $0.20 ST2104, Traffic Signal at Ocotillo Road and Pinelake Way Y2K Engineering tbd Design in progress. $0.80 ST2113, Alley Rehab PM10 Dust Emissions Reduction 2 (FMA Areas 16, 25, 39, and 40) Premier / Olsson tbd Design in progress. Bid scheduled for Spring 2023 Federal funds $2.4 (tbc) ST2110, Chandler Video Detection Cameras Y.S. Mantri & Assoc. tbd Invitation to Bid underway. Federally Funded $1.7(tbc) ST2209, Chandler Local Detection and Communication Systems(Replaces existing video detecting cameras with new video cameras) tbd tbd Design in Progress Federally Funded $0.50 ST2210, Chandler ICM Detection and Communication Systems(Replaces existing video detecting cameras near freeways with new video cameras) tbd tbd Design in Progress Federally Funded $0.60 ST2301 Armstrong Way and Hamilton Street Improvement(Improves the south half of Armstrong Way and the west half of Hamilton Street) tbd tbd Design scheduled for Spring 2023 $2.00 ST2303 Cooper Road - Insight Loop Extension(Connects Cooper Road to Insight Way & Emmett Dr intersection) tbd tbd Design scheduled for Summer 2023 $9.30 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS ST2106, Frye Road Protected Bike Lanes [Paseo Trail to San Marcos Elementary School] TY Lin tbd Study completed by Y2K. Design underway. Construction in fall 2023. $3.2 Million grant awarded for construction and $650,000 for design. $6.00 TP2202, Kyrene Branch and Highline Canal Shared Use Paths Kimley-Horn tbd Study complete. Request for Qualifications for a designer to go out November 14, 2022. Construction in 2024-25. Federal grants have been awarded to fund study, design and construction. $4.00 Ashley and Paseo Trails Connection Y2K Engineering tbd Study complete. Design in FY 2023. Construction in 2024-25. Study is federally funded. Construction and design grant funding will be pursued. $1.00 Hunt Highway Bicycle Improvements and Traffic Calming Study Rick Engineering tbd Study underway, to be completed mid 2023. Federally funded. Study will look at a potential shared use path or separated bike lanes along with recommendations for traffic calming between Cooper Rd. and Val Vista Dr. $0.10 Tumbleweed Park ADA Improvements N/A Vincon Construction complete. Sidewalk and curb ramp improvements throughout and adjacent to park. $0.40 Protected Bike Lanes Study Y2K Engineering tbd Study to kickoff late 2022. Federally funded. Study will prioritize opportunities to install protected bike lanes on arterial and collector streets in Chandler. $0.10 Chandler Flex NA Via Study completed in collaboration with Valley Metro. Contract awarded to Via. Operations began July 11, 2022. Awarded $2 Million grant for project startup and two years of operations. $2.10 Transportation Project Status - November 16, 2022 ROADWAY AND TRAFFIC PROJECTS