Presentation - Future Fire Station Planning
Extracted text (via pymupdf)
3861 characters
Chandler Fire Station Development Plan Quality of Life Subcommittee Meeting February 10, 2023 Fire Station 282 • Approved by voters in the 2021 Bond Election. • Total project cost is $12,000,000 • Project includes bringing adjacent basin to current standards. • Project is on schedule with a certificate of occupancy projected in October of 2023. • Once completed, a redeployment of resources and staff will occur. Fire Station 284 A 2018 facility condition assessment conducted by Faithful & Gould identified a need for $1.1 million in repairs. Regular maintenance and condition evaluation are ongoing. The Fire Station 4 project was recommended for reconstruction by the Public Safety Bond Subcommittee and approved by voters in the 2021 bond election. Fire Station 4 was built in 1986 and is the only station remaining that does not have separate sleeping quarters for men and women. The new station will include current design practices to reduce carcinogen exposure to firefighters. Station design is funded for $680,000 in FY 2028-29, and construction is funded for $8,787,000 in FY 2029-30. Fire Station 2812 Fire Station 2812 is in the earliest phase of planning. Chandler Fire Department (CFD) has been assessing building development, call volume growth, response times, and other factors that impact emergency response. CFD staff identified a desired area of the City to build Fire Station 2812, with a general location of Arizona Avenue and Queen Creek Road. CFD and the Public Works and Utilities staff identified a potential location for Fire Station 2812 on unused City property located on Queen Creek Road between McQueen Road and Arizona Avenue. Call Volume Growth FY 2019-20 – FY 2021-22 District FY 2019-20 FY 2020-21 FY 2021-22 Grand Total Growth *Station 281 2,114 2,301 2,297 6,712 8.0% *Station 2810 1,294 1,256 1,439 3,989 10.1% *Station 2811 1,033 1,070 1,262 3,365 18.1% Station 282 4,522 4,443 4,747 13,712 4.7% Station 283 2,987 2,774 3,217 8,978 7.1% Station 284 1,566 1,707 1,890 5,163 17.1% *Station 285 2,611 2,764 2,937 8,312 11.1% Station 286 2,063 2,127 2,195 6,385 6.0% *Station 287 1,474 1,679 1,879 5,032 21.6% Station 288 2,787 2,649 2,649 8,085 -5.2% Station 289 2,072 2,046 2,224 6,342 6.8% *Station directly impacted by Fire Station 2812 District 90th Percentile Response Times *Station 2811 06:53 *Station 2810 06:33 *Station 281 06:13 *Station 285 06:09 Station 289 06:09 *Station 287 06:01 Station 284 05:48 Station 283 05:34 Station 288 05:31 Station 282 05:28 Station 286 05:22 Response Times 2022 Target Area Experiencing Reduced Coverage & Redundancy Location Analysis: Current Responses Greater Than 5 Minutes Location Analysis: Incident Volume Inside 5-Minute Response Diamond Proposed Station Location Proposed site- 350’ x 235’ (1.9 acres) Deployment Impact of Additional Station District Current FY 21-22 Incidents Possible FY 21-22 Incidents W/ 2812 Change Out Of City 1846 1846 0 Station 281 2297 1910 -387 Station 2810 1439 1338 -101 Station 2811 1262 1176 -86 Station 2812 0 1280 1280 Station 282 4747 4747 0 Station 283 3217 3217 0 Station 284 1890 1890 0 Station 285 2937 2231 -706 Station 286 2195 2195 0 Station 287 1879 1879 0 Station 288 2649 2649 0 Station 289 2224 2224 0 Next Steps • Complete the Fire Station 2 project and redeploy response resources. • Evaluate the timing of the Fire Station 4 project based on response needs, ongoing building condition assessment, and fiscal considerations. Continue to maintain critical systems until station is fully reconstructed. • Continue to monitor response needs in South Chandler and include the design and construction of Fire Station 12 in years 9 and 10 in the CIP as a placeholder, with regular evaluation of demand and timing.