Presentation - DT Planning and Neighborhoods

City of Chandler — Regular Meeting (2023-02-09)

View PDF Meeting page

Extracted text (via pymupdf) 5852 characters
City Council Neighborhoods Subcommittee
February 9, 2023
Downtown Area Planning 
and Neighborhoods Update

Agenda
2
• Development Update & CIP Projects
• Downtown Core
• Studies
• Downtown South
• City Initiatives
• ULI AZ TAP Study
• Next Steps

Redevelopment Update
3
• Completed Projects (Past 5 Years):
• Summit at San Marcos
• Overstreet & Overstreet Garage
• Oregon St. Parking Garage
• New Square Phase 1
• The Alexander & Johnathan 
• Arizona Avenue Improvements
• Chicago St. / Arizona Ave. Intersection

Redevelopment Update
4
• Current Projects:
• DC Heights Phase 1
• Encore Chandler 
• Shops on Frye
• Boston St. Improvements 
•
Construction summer 2023
• Wall St. Improvements
•
Construction summer 2023
• City Hall Public Parking & Alley 
Improvements
•
Construction late summer 2023
• Alley Improvements
•
FY 22-23 through FY 24-25

Redevelopment Update
5
• Future Projects:
• One Chandler
• New Square Phase 2
• DC Heights Phase 2
• District Downtown
• 336 S. Washington
• Sites 1 & 2 
• SWC Oregon St. & Chicago St.

Current Downtown Data
City Investment:   $70,450,000
Private Investment:   $452,700,000
ROI:   $1.00 to $6.40
Businesses
• 45+ Bars & Restaurants | 21 Retail Stores
• 315,000 SF Office | 432,000 SF Retail
Sales Tax Data
• FY 21-22 was the best year on record:
• Total Revenue Collected: FY 21-22: $2.11 million 
(FY 20-21: $1.34 million) 
• 57.4% YoY growth from FY 20-21 (previous best 
year on record)

Downtown Core
7

Purpose:
• Plan necessitated by Downtown 
growth – new destinations and 
more visitors
• Intended to unify visual 
language of Downtown 
wayfinding, direct vehicles to 
Downtown parking, provide 
direction for pedestrian traffic, 
and identify pedestrian comfort 
improvements 
• Aimed at creating an actionable, 
prioritized plan for staff to 
implement from
Pedestrian & Wayfinding Plan
8
Process:
• 13-month process (August 2021 -
September 2022) - Began with RFP – 12 
proposals - J2 selected by 5-member 
selection committee 
• Studied existing conditions, both by 
observation and by stakeholder survey
• Created final report to be used both as 
standalone direction and in capital 
projects

Pedestrian & Wayfinding Plan Recommendations 
9
• Recommends prioritized locations for 
signage, both leading into and within 
Downtown Chandler
• Includes placement recommendations for 
signage calling out multiple garage 
options
• Simple but highly legible design is 
instantly recognizable as a “Parking” sign
• Plan provides context-specific design, i.e. 
size, color, amount of information varies 
based on location

Alley Study
10
• Determined infrastructure needs for 
future development
• Suggested one-way vehicular access
• Leveraging access to alleys for 
driveways to minimize cub cuts and 
flexibility in smaller lots
• Lead directly into current CIP Project
• Alley 1: California St. to San Marcos 
Alley
• Alleys 2 & 3: Frye to Fairview between 
Washington St. & Arizona Ave.
Washington Alley Cross Section

Parking Study
11
• Last updated in 2014 
• Increase in both new development and 
redevelopment
• 2 new parking garages
• Redevelopment moving south into the 
Southside Village neighborhood
• Study will include Southside 
neighborhood
• How to address future parking needs
• Leveraging City owned property 
• Evaluating residential parking impacts

Southside Village Neighborhood
12

City Investment in Southside Village Neighborhood
13
• 2016 – Washington St. / Frye Rd. Upgrades 
• 2017 – Street Repaving & ADA Improvements
• 2018 - Arizona Avenue Improvements 
• 2018 – For Our City Day
• Provided dumpsters 2020 – 2022
• Awarded a TNR Neighborhood Grant
• Winn Park Playground Improvements 
• 2022 – Folley Mural completed at SW Corner of 
Washington St. & Frye Rd.

Current Initiatives
• Historic Conservation District
• Adopted in July 2022 (1st City historic 
designation)
• Historic Marker Project by end of 
FY22/23
• $10,000 donation to Chandler 
Museum from Chandler Historical 
Society for project collecting Oral 
Histories of neighborhood
• Harris Park playground equipment –
Envision program for community input
• Ongoing – Housing Rehabilitation 
projects
14

ULI – AZ TAP Study
Urban Land Institute – Arizona Technical Assistance Panel (AZ TAP):
• Assists municipalities in the preliminary study of unique land use planning, 
development, and redevelopment issues
• Principal Question: How will the City guide and manage evolving growth in the 
Southside Village area?
Process:
•
10-month process (December 2021 – October 2022)
•
8-member panel consisted of urban planners, developers, placemaking experts, traffic 
engineers, etc.
•
Public outreach and discussion with key stakeholders from the neighborhood
•
Full day retreat to include tour of area with committee and staff
•
Multi-departmental effort

ULI – AZ TAP Study Key Recommendations
• Overlay with adaptive reuse and infill policies specific for this area
• Look at City-owned property to assist in development or to create gravitational 
pulls to the area
• Organize strategies around a micro-niche economy of arts and culture that 
includes live-work and retail incubation
• Neighborhood scale – missing middle housing / gentle density
• Policies to protect fabric of the neighborhood and encourage development
• Reevaluate the most effective multi-modal design direction for Washington Street
• Connecting of neighborhood to downtown, parks, walkability
• Connect Delaware to Pecos
Indicates need to change current usage/code

•
South Arizona Avenue Corridor Area Plan 
Update (Currently in Budget)
•
Expected completion 2024
•
Area Plan last updated in 2006 - Design Guidelines in 2008
• Code Updates 
• Washington St. CIP – currently in CIP FY24/25
• Winn School Preservation (w/ Salvation Army)
• Washington Alley Improvements
•
Currently in CIP FY24/25
Next Steps
17

Questions? 
18