Extracted text (via pymupdf)
2490 characters
SUBJECT: Request Airport Commission recommend City Council enter into an agreement with the Arizona Department of Transportation (ADOT) to accept a grant in an amount not to exceed $2,035,200 for the design and construction of the Taxiway B Extension – Phase 1 project. RECOMMENDATION: Staff requests the Airport Commission recommend City Council authorization to enter into an agreement with the Arizona Department of Transportation (ADOT) to accept a grant in an amount not to exceed $2,035,200 for the design and construction of the Taxiway B Extension – Phase 1 project. BACKGROUND/DISCUSSION: The City was notified by ADOT that it will receive a state grant for the design and construction of the first phase of the Taxiway B extension project. Additionally, this grant will be state funded at $2,035,200 with no local match required. The Airport has a partial length, parallel taxiway (Taxiway B) located between the two runways that primarily serves the eastern portion of the south runway. Aircraft frequently experience congestion on the four perpendicular taxiway connectors between the two runways and this congestion will increase when the south side of the Airport is developed. This project extends Taxiway B to the southwest, ultimately resulting in a full-length taxiway that will serve both runways. As identified in the Airport Master Plan Update, this extension will relieve congestion on the northern parallel taxiway (Taxiway A) and accommodate future demand on the southern parallel taxiway (Taxiway C). This project will mitigate possible aircraft ground conflicts and improve airfield efficiency and safety. Phase 1 addresses aircraft ground movement conflicts as identified by the Runway Safety Action Team and completes Taxiway Bs length between Taxiway N and Taxiway L. Phase 2 will complete the length between the Taxiway L and Runway 4L threshold. FINANCIAL IMPLICATIONS: This project is in the current 5-year Capital Improvement Program (CIP). An Arizona Department of Transportation (ADOT) grant is anticipated for 100% of the total project costs. There is no local matching share required. PROPOSED MOTION: Move the Airport Commission forward a recommendation to the City Council for authorization to enter into an agreement with the Arizona Department of Transportation (ADOT) to accept a grant in an amount not to exceed $2,035,200 for the design and construction of the Taxiway B Extension – Phase 1 project.