Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
1 
Project No.: CA2201.401 
Rev. 10/11/2022 
 
 
 
CITY OF CHANDLER 
JOB ORDER PROJECT AGREEMENT  
 
Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM 
RENOVATIONS 
Project No. CA2201.401 
 
This JOB ORDER PROJECT AGREEMENT (”Job Order”) is made this ________ day of _________ 2023 (“Effective 
Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”) and Caliente 
Construction, Inc., an Arizona corporation, (“JOC Contractor”) and is entered into pursuant to Job Order 
Master Agreement No. JOC1910.401 (“JOC Master Agreement”). City and JOC Contractor may be referred to 
individually as “Party” or collectively as “Parties”). 
 
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as follows:   
 
 
RECITALS 
 
A. On or about December 17, 2019, the Parties entered into the JOC Master Agreement, which terms and 
conditions are made a part of and incorporated into this Job Order Project Agreement by this reference. 
 
B. City proposes to engage JOC Contractor to provide services for CENTER FOR THE ARTS BACKSTAGE 
RESTROOM AND DRESSING ROOM RENOVATIONS as more fully described in Exhibit "A", which is attached 
to and made a part of this Job Order by this reference. 
 
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for the 
compensation and fees set forth and as described in Exhibit ”B”, which is attached to and made a part of 
this Agreement by this reference. 
 
ARTICLE 1.  DESCRIPTION OF WORK 
 
The Parties enter into this Job Order Project Agreement for the CENTER FOR THE ARTS BACKSTAGE 
RESTROOM AND DRESSING ROOM RENOVATIONS, Project Number CA2201.401.  The scope of work 
consists of construction services for the backstage renovation at the Center of the Arts including renovations 
to the existing restrooms, dressing rooms, conference room and green room located in downtown Chandler 
at 250 North Arizona Avenue, Chandler, AZ 85225. The project consists of demolition of the existing interior 
as required for the installation and construction of the new renovation. The restrooms will be renovated to 
include updated fixtures including new toilets, stalls, sinks, cabinetry, and showers. The mainstage 
restrooms, star dressing restroom, and two additional restrooms are to have their layouts revised which

Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
2 
Project No.: CA2201.401 
Rev. 10/11/2022 
 
 
will include moving existing fixture locations, plumbing and new partition walls. Additionally, the current 
men’s mainstage restroom will remove the existing urinal to make room for a toilet stall. The dressing 
rooms, conference room and green room are to include new countertops, cabinetry, and sinks. Rooms and 
restrooms will also include new wall and floor finishes, upgraded LED lighting, and related electrical, 
plumbing, and other associated improvements, all as more particularly set forth in Exhibit “A” attached 
hereto and incorporated herein by reference. 
 
The JOC Contractor will not accept any change of scope, or change in contract provisions, unless issued in 
writing, as a contract amendment or change order and signed by the authorized signatories for each party. 
 
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached hereto 
and incorporated herein by reference, will be due prior to execution of each Job Order Project Agreement 
in the full amount of each Job Order. 
 
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement of Claims 
and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively attached hereto and 
incorporated herein by reference. 
 
ARTICLE 2.  PROJECT PRICE 
 
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master Agreement a fee 
not to exceed the Guaranteed Maximum Price of $663,371.42 Dollars determined and payable as set forth 
in JOC Master Agreement and Exhibit “B” attached hereto and made a part hereof by reference.  
 
ARTICLE 3.  CONTRACT TIME & SCHEDULE 
 
JOC Contractor agrees to complete all Construction within 103 calendar days from the Notice to Proceed 
(NTP) Date.  
 
ARTICLE 4.  PARTICIPANTS 
 
CITY: 
 
Construction Project Manager:  Raymond Potts 
 
Phone: 
480-782-3326 
 
Email: 
Raymond.potts@chandleraz.gov 
 
JOC CONTRACTOR: 
Caliente Construction, Inc.  
 
485 W. Vaughn St. 
Tempe, AZ  85283 
 
JOC Contractor Representative:  Lorraine Bergman 
 
Phone: 
480-894-5500 
 
Email: 
lbergman@calienteconstruction.com

Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
3 
Project No.: CA2201.401 
Rev. 10/11/2022 
 
 
 
ARTICLE 5. FORCED LABOR OF ETHNIC UYGHURS PROHIBITED  By entering into this Agreement, 
Contractor certifies and agrees Contractor does not currently use and will not use for the term of this 
Agreement: (i) the forced labor of ethnic Uyghurs in the People's Republic of China; or (ii) any goods or 
services produced by the forced labor of ethnic Uyghurs in the People's Republic of China; or (iii) any 
contractors, subcontractors or suppliers that use the forced labor or any goods or services produced by the 
forced labor of ethnic Uyghurs in the People's Republic of China. 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
5 
Project No.: CA2201.401 
Rev. 10/11/2022 
 
 
EXHIBIT A 
SCOPE OF WORK

One of the Valley’s Healthiest Employers 
485 West Vaughn, Tempe, Arizona 85283-3672  Phone: (480) 894-5500 Fax: (480) 894-2323 
AZ ROC091625  AZ ROC098769  AZ ROC164561   CA 770323   UT 4741522-550 NV 0078132 
ID RCE-28529   NM 85371   CO 233580   MT 159637 
Caliente Construction Inc. 
General Construction - Construction Management - Design/Build - Facilities Management 
   “We build more than structures; we build confidence and relationships that last” 
  
 
 
 
 
 
 
 
 
 
 
3/3/2023 
 
 
Ivan Magana 
Project Manager 
City of Chandler  
Public Works and Utilities – Capital Projects Division 
215 East Buffalo Street 
Chandler, AZ 85225 
 
 
RE: City of Chandler – Chandler Center For The Arts Backstage Restroom Remodel 
 
Mr. Magana, 
 
Thank you for the opportunity to provide our proposal for the Chandler Center For The Arts Backstage Restroom Remodel 
CA2201.201 Project.  
 
We have based the attached proposal on information received, Permit Submittal Document of Drawings by DFDG dated 
02.08.23. 
 
The Total Cost is $663,371.42.  See attached spreadsheets with bid tabulations and subcontractor back-up for further 
details. 
 
 
 
Please contact me at your convenience should you have any questions.  
 
Best Regards, 
 
 
 
Chad Slaymaker 
PROJECT MANAGER 
Caliente Construction Inc.

Caliente Construction Inc. 
 
 
              
 
                                                                                                
 
 
 
One of the Valles Healthiest Employers 
485 West Vaughn, Tempe, Arizona 85283-3672 Phone : (480) 894-5500 Fax : (480) 894-2323 
AZ ROC091625  AZ ROC098769  AZ ROC164561   CA 770323   UT 4741522-550 NV 0078132 
ID RCE-28529   NM 85371   CO 233580   MT 159637 
 
   “We build more than structures; we build confidence and relationships that last” 
General Construction - Construction Management - Design/Build - Facilities Management 
 
 
EXHIBIT A 
SCOPE-OF WORK 
 
 
 
PROJECT:  
City of Chandler – Chandler Center For The Arts Backstage Restroom Remodel(CA220.201) 
General Requirements: 
1) Provide office support, supervision, overhead/profit, taxes based on TPT, insurances, and bond. 
2) Provide Temporary Protection as required. 
3) Provide Temp Toilets and Washstation for Construction. 
4) Dumpsters as required. 
 
Construction: 
1) Demo of select rooms; Main Stage Dressing 1 & 2, Recital Dressing Room, Dressing Room, Restrooms, Makeup Room, Green 
Room, Hospitality Closet, and Conference Room 
2) Furnish and install new plumbing fixtures. Includes sawcut/removal/pour backs. 
3) Furnish and install Lighting & Outlets  
4) Furnish and Install new Restroom Partitions, Accessories, and Lockers 
5) Frame, Drywall, Flooring, Wall Tile, and Paint 
6) Furnish and install millwork 
7) Final Clean in areas effected by construction. 
 
Project Duration:   
Proposal based on onsite Project Duration of (9) weeks after procurement of materials (addition of scope via Allowance Use may 
require additional time to complete). 
 
Assumptions/Clarifications/Exclusions:  
See attached spreadsheets.

Caliente Construction Inc.
General Construction - Construction Management - Design/Build - Facilities Management
3/3/2023
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Due to the current volatile market, this proposal may be subject to Material Escalation Increase at 
any time from submission of proposal until all materials are onsite. Some vendors are not finalizing 
material costs until they are ordered and ready to ship.
Contractor Performance and Payment Bonds are included in this proposal.
Compliance with Owner Insurance Requirements is included.
Existing Finishes will be matched as close as possible.
Includes sanding and refinishing existing millwork at water heater location in main stage dressing
All openings specified in the door and frame schedule are included in this proposal. If other openings 
are found to be needing replacement or are out of compliance as determined by the AHJ, Caliente 
will provide pricing as needed.
City of Chandler Center of the Arts BOH Renovation
This proposal does not include any modifications to address possible ADA or Code Issues that are 
not specifically captured and specified in the drawings
Assumptions / Clarifications
Proposal based on 9 Weeks On-Site Construction.
Proposal based on normal working daytime hours, Monday through Friday.
Proposal based on access to site for duration of construction activity and adequate lay-down / staging 
area being provided by COC
Proposal includes Owner Allowance (14%) (no Contractor Mark-ups included) for any Unforeseen 
Conditions or Changes.
Excludes abatement of Aesbestos
Ceiling grid patching has been included with utilization of Attic Stock. Existing material is not 
HVAC is EXCLUDED No plans provided
Access controls are excluded
Fire Alarm and Firesprinkler are excluded
Relocation of Existing FF&E is excluded
Proposal includes Material Escalation Allowance (2.5%) (no Contractor Mark-ups included).
Proposal is based on information received from City of Chandler and Permit Submitted Drawings and 
Specs dated 02/08/23
Millwork to be Standard Custom Grade. AWI Premium is excluded.

Caliente Construction Inc.
General Construction - Construction Management - Design/Build - Facilities Management
3/3/2023
City of Chandler Center of the Arts BOH Renovation
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
1
ALLOWANCE - Owner Construction
 $      69,686.12 
2
ALLOWANCE - Permit Changes
 $      24,887.90 
3
ALLOWANCE - Material Escalation
 $      12,443.95 
3
ALLOWANCE - Lighting Wiring Allowance
 $        3,000.00 
Utility Company Fees.
Exclusions
Temp Water and Safety/Temp Protection Measures
Site Furnishings - Removal, Salvage, and/or Installation.
Removal of Owner equipment, furnishings, etc. (by Owner)
Allowances (Not Included in Base Proposal; No Markups)
Contractor Preconstruction Fees 
Design, Design Fees, or Permit Fees (unless noted otherwise)
Utility Company Fees
Materials Testing and Inspection (provided by CoC)
Contaminated Soils Removal, Asbestos/Mold/etc., Testing/Abatement, Hazardous Materials Handling 
(Current Report/Survey to provided by COC prior to start of Demolition)
Holiday, Nights/Weekends, Prevailing Wages, or Overtime Hours
Temporary Power, Lighting, and Water consumption; Cost is carried by Owner. Additional equipment 
required to perform scope of work will be supplied by the GC
Site Security or Cameras
Badging or Special Background Checks and/or associated costs
Maintenance of exsiting irrigation, plumbing, electrical, etc. systems not within scope-of-work
Materials Testing and Inspection (provided by CoC)
Right of Way Permits

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
BASE BID
23,215.00
$               
19,250.00
$               
26,000.00
$               
Demolition
1
Tile
 Included 
 Included 
 Included 
2
Carpet
 Included 
 Included 
 Included 
3
Millwork
 Included 
 Included 
 Included 
4
Plumbing Fixtures
 Included 
 Included 
 Included 
5
Drywall
Included 
Included 
Included 
6
Framing
Included 
Included 
Included 
7
Lighting
Excluded 
Included 
Included 
8
Partitions & Accessories
Included 
Included 
Included 
9
Lockers
 Included 
 Included 
 Included 
10
NESHAP
$                    600.00 
$                    600.00 
$                    600.00 
11
Haul Off
Included 
Included 
Included 
12
13
14
15
SALES TAX
-
$                          
-
$                          
-
$                          
SUBCONTRACTOR BID
23,215.00
$               
19,250.00
$               
26,000.00
$               
ADD-ONS
600.00
$                    
600.00
$                    
600.00
$                    
TOTAL BID     
23,815.00
$          
19,850.00
$          
26,600.00
$          
19,850.00
$          
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
2
-
$                          
-
$                          
-
$                          
3
-
$                          
-
$                          
-
$                          
SALES TAX
-
$                          
-
$                          
-
$                          
SCHEDULE PROVIDED:
TOTAL BID
23,815.00
$          
19,850.00
$          
26,600.00
$          
ALM Services
First Step 
Demolition
DESCRIPTION
March 3, 2023
BID DATE:
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
Aricona Specialty 
Demo
 
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
Demolition

1957 N. Hobson #101, Mesa Az 85203 
                      PH: 602-257-8000      FAX: 480-882-1432     
  
EMAIL: estimating@almservices.construction 
  
ROC:  291874 
 
 
 
 
 
 
CONTRACT / PROPOSAL 
 
Date:   
March 1, 2022 
 
 
Job No: 22 -   
Client:  
Caliente Construction  
   
Attn: Chad Slaymaker 
Address:         485 W Vaughn St  
 
 
Phone: 602-421-4793 
Address:   
Tempe, AZ 85283 
 
 
Email: cslaymaker@calienteconstruction.com 
______________________________________________________________________________________ 
Job Name: 
Center for the Arts Backstage TI 
Job Address:  250 N Arizona Ave 
Chandler, AZ 85225 
______________________________________________________________________________________ 
 
Client has agreed to the following scope of work for the following price and terms:  
1. ALM will provide labor, materials, and equipment to conduct select demolition as outlined below. 
2. Scope Of Work: Proposal Submitted from Plans; No site visit 
 
Scope of Work 
I: Plan Sheet  A103, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
0.10.A2 Min. Clear Space For Sink  
024.A1 Demolish Existing Flooring - Typ. At Room  
024.A3 Remove Light Fixture, (20)  
024.A6 Existing Lockers To Be Removed By Owner Prior To Construction  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design.  
024.A10 Remove Existing Sink; cap by others (10) 
024.A11 Remove Existing Wall Mounted Metered Air Freshener. (2) 
024.A12 Remove Existing Wall Finishes In Room  
024.B1 Remove Toilet (1) 
024.B2 Remove Urinal (1)( 
024.B3 Demolish Counter and Sink(s)  
024.C4 Remove Toilet Partition  
024.D2 Remove Door And Hardware. Remove Frame (2) 
028.A3 Existing Wall Mounted Vanity Lights, Mirrors and Electrical Raceways on All Walls To 
Remain  
028.A5 Existing Flooring And Wall Base To Remain

1957 N. Hobson #101, Mesa Az 85203 
                      PH: 602-257-8000      FAX: 480-882-1432     
  
EMAIL: estimating@almservices.construction 
  
ROC:  291874 
 
 
 
 
II: Plan Sheet  A105, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
0.10.A2 Min. Clear Space For Sink  
024.A1 Demolish Existing Flooring – (215 SF)  
024.A3 Remove Light Fixture; make safe by others (19) 
024.A5 Remove Existing Casework (6) 
024.A6 Existing Lockers To Be Removed By Owner Prior To Construction  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design.  
024.A10 Remove Existing Sink; cap by others (10) 
 024.A11 Remove Existing Wall Mounted Metered Air Freshener. (2) 
024.A12 Remove Existing Wall Finishes In Room 
024.B1 Remove Toilet (2) 
024.B3 Demolish Counter and Sink(s)  
024.C4 Remove Toilet Partition (2) 
024.D2 Remove Door And Hardware (4)  
028.A3 Existing Wall Mounted Vanity Lights, Mirrors And Electrical Raceways On All Walls To 
Remain  
028.A5 Existing Flooring And Wall Base To Remain 
 
III: Plan Sheet  A107, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
024.A3 Remove Light Fixture, Prep For New Fixture In Same Location (2) 
024.A4 Remove Existing Wall Mounted Sink; cap by others (2) 
024.B1 Remove Toilet (2) 
024.C5 Remove Wall Mounted Grab Bars (4) 
024.D2 Remove Door And Hardware. Remove Frame (2) 
024.E3 Remove Existing Mirror, Return Or Discard As Directed By Owner (2) 
024.E6 Remove Toilet Paper Dispenser, Return Or Discard As Directed By Owner  
028.A6 Existing LVT To Remain 
 
IV: Plan Sheet  A108, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
0.10.A3 ADA Compliant Roll In Base Cabinet  
024.A3 Remove Light Fixture (4) 
024.A5 Remove Existing Casework  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design. 
Modify As Required, Not Visible Supports  
024.A8 Existing Carpet And Rubber Base To Be Removed, Typ. At Room  
024.A9 Existing Refrigerator - Per Owner's Direction, Relocate Or Discard (1) 
024.A10 Remove Existing Sink; cap by others (1)  
024.C1 Existing Furniture To Be Removed (14 chairs, 1 conf table)  
024.C2 Remove wall mounted display board, return to owner 
 
V: Plan Sheet  A109, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
 
024.A3 Remove Light Fixture (6)  
024.A6 Existing Lockers To Be Removed By Owner Prior To Construction

1957 N. Hobson #101, Mesa Az 85203 
                      PH: 602-257-8000      FAX: 480-882-1432     
  
EMAIL: estimating@almservices.construction 
  
ROC:  291874 
 
 
 
 
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design. 
Modify As Required, Not Visible Supports (25 LF) 
024.A10 Remove Existing Sink; cap by others (1)  
028.A3 Existing Wall Mounted Vanity Lights, Mirrors And Electrical Raceways On All Walls To 
Remain 
 
VI: Plan Sheet A110, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
024.A3 Remove Light Fixture (2) 
024.A4 Remove Existing Wall Mounted Sink; cap by others (2)  
024.B1 Remove Toilet; cap by others (2) 
024.F2 Remove Existing Drinking Fountain (1) 
028.A2 Existing Fire Extinguisher Cabinet To Remain, Typ. 
 
VII: Plan Sheet A111, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
024.A3 Remove Light Fixture (2)  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design. 
Modify As Required (12 LF) 
024.D2 Remove Door And Hardware. Remove Frame If Required For New Design. Salvage And Re-
Use If Possible; Review With Owner. Return Remaining To Owner Stock Or Discard Per Owner 
Direction  
024.D5 Remove Existing Light Fixture (1) 
024.F6 Relocate Existing Lockers by others 
028.A3 Existing Wall Mounted Vanity Lights, Mirrors And Electrical Raceways On All Walls To 
Remain  
028.A8 Existing Mirror To Remain  
028.B4 Existing Electrical Panel To Remain. Maintain Required Servicing Clearance In Front Of Panel 
028.B5 Existing Wiremold Raceway To Remain 
 
VIII: Plan Sheet A112, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
010.A3 ADA Compliant Roll In Base Cabinet  
024.A1 Demolish Existing Flooring  
024.A3 Remove Light Fixture (11) 
024.A5 Remove Existing Casework  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design. 
Modify As Required, Not Visible Supports  
024.A10 Remove Existing Sink; cap by others (1)  
024.D2 Remove Door And Hardware. Remove Frame (1)  
024.G2 Wall To Be Removed (2 LF) 
 
IX: Plan Sheet A113, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
024.A1 Demolish Existing Flooring  
024.A4 Remove Existing Wall Mounted Sink; cap by others (1)  
024.A5 Remove Existing Casework  
024.A7 Demolish Countertop. Existing Countertop Supports To Remain For Re-Use In New Design. 
Modify As Required, Not Visible Supports

1957 N. Hobson #101, Mesa Az 85203 
                      PH: 602-257-8000      FAX: 480-882-1432     
  
EMAIL: estimating@almservices.construction 
  
ROC:  291874 
 
 
 
 
024.B1 Remove Toilet (1) 
024.B3 Demolish Counter and Sink(s) (1) 
024.C3 Demolish Wall/Floor Tile at Shower  
024.D2 Remove Door And Hardware. Remove Frame If Required For New Design. Salvage And Re-  
024.D5 Remove Existing Light Fixture (3) 
024.H9 Gypsum Board To Be Removed. Existing Ceiling Substrate/ Framing To Remain 
 024.H10 Gypsum Board Soffit To Be Removed (1) 
 
X: Plan Sheet A114, Dated 2/8/2023 Demolition Plan Keynotes & Bid Items as follows: 
024.A1 Demolish Existing Flooring (30 SF) 
024.A5 Remove Existing Casework  
024.D5 Remove Existing Light Fixture (1) 
024.F7 Remove Existing Toilet, Protect And Store For Re-Installation Per New Design (1) 
024.F8 Remove Existing Sink And Faucet, Protect And Store Sink For Re-Installation Per New Design. 
Provide New Faucet Per Design. (1) 
024.F9 Remove Existing Soap Dispenser, Protect And Store For Re-Installation Per New Design  
024.F10 Remove Mirror (1) 
024.F11 Remove Existing Toilet Paper Dispenser, Protect And Store For Re-Installation Per New 
Design (1) 
 
 
 
 
 
 
** 3 MOBS INCLUDED IN PRICE**  
 
**ADDITIONAL MOBS WILL COST $500.00 PER MOB** 
 
 
 
 
ALM to conduct above services for the sum of: $19,250.00 
 
 
PROPOSAL IS SUBMITTED FOR 7 (SEVEN) DAYS OF DEMOLITION USING 1 (ONE) CREW 
AND 1 (ONE) SCISSOR LIFT 
 
 
Acceptance of Proposal and Contract:  By signing below the authorized representative of Caliente 
Construction, Inc accepts the following terms and conditions, as outlined herein above. 
 
All work performed by ALM will be completed in a workmanship like manner, according to industry standard 
practices.  Any alteration or deviation from the above specifications involving extra costs will be performed 
after receiving an executed written change order(s) and will become an extra charge over and above the stated 
price herein above.   
 
Conditions and Contract Exclusions:

1957 N. Hobson #101, Mesa Az 85203 
                      PH: 602-257-8000      FAX: 480-882-1432     
  
EMAIL: estimating@almservices.construction 
  
ROC:  291874 
 
 
 
 
1. Exclusions to contract: MP&E disconnects, final floor prep, temporary power, dust control, site permits, 
designs and/or engineering and site inspections, temporary fencing, utility abandonments.  (Unless 
included in language elsewhere in contract.) 
2. This proposal is good 60 days from the ALM signed date below. 
3. Owner to provide reasonable access to the site, water, and power.  Any delays caused by any party other 
than ALM may result in additional charges due.   
4. Unforeseen conditions may result in additional charges due. 
5. Changes in scope, whether added, or as caused by items 3 or 4 above may not only increase the contract 
value but may also affect the completion deadline. 
6. Accelerated completion requests will result in additional charges. 
7. Notice is required by law as a final attempt at resolution in the event of any unresolved issues, you have 
the right to file a written complaint with the AROC during the warranty period, and they can be reached 
at 602-542-1525. 
 
Submitted by:   Jason Mitchell 
Project Manager 
Jason Mitchell 
     3/1/2023 
 
      
  Name  
 
Title 
 
 
Signature 
 
 
Date 
 
Acceptance Date: ___________________________________________  
 
Printed Name: ______________________________________________ 
 
Signature:       _________________________________________________

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
BASE BID
48,289.00
$              
50,795.00
$              
59,025.00
$              
Millwork
1
PL Countertops
 Included 
 Included 
 Included 
2
PL Uppers
 Included 
 Included 
 Included 
3
PL Bases
 Included 
 Included 
 Included 
4
Solid Surface Countertops
 Included 
 Included 
 Included 
5
In Wall Brackets FOB
 Included 
 Included 
 Included 
6
Locks
 Included 
 Included 
 Included 
7
Hardware
 Included 
 Included 
 Included 
8
Trash Bins
$                   100.00 
Included 
$                   100.00 
9
Touch Up Existing Millwork 137
$                   500.00 
$                   500.00 
$                   500.00 
10
Stain Existing Shelves
$                2,000.00 
$                2,000.00 
$                2,000.00 
11
12
13
14
15
SALES TAX
800.00
$                   
813.00
$                   
1,473.00
$                
SUBCONTRACTOR BID
48,289.00
$              
50,795.00
$              
59,025.00
$              
ADD-ONS
2,600.00
$                
2,500.00
$                
2,600.00
$                
TOTAL BID     
51,689.00
$         
54,108.00
$         
63,098.00
$         
51,689.00
$         
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
TEXTURA
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
51,689.00
$         
54,108.00
$         
63,098.00
$         
Red Mountain 
Woodworking
AZ Custom 
Millwork
DESCRIPTION
March 3, 2023
BID DATE:
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
Ellis & Company
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
Millwork

Project Proposal
2/25/2023
To: Caliente Construction
Project:
485 W Vaughn St
City:
Temoe, AZ 85283
Wages:
Attn: Chad Slaymaker
Plan Date:
Phone: 319-270-8844
Addendum:
Email: cslaymaker@calienteconstruction.com
Revision
Item
Unit Price
Qty.
Total
1
3,381
$     
1
3,381
$       
2
25,411
$   
1
25,411
$     
3
13,362
$   
1
13,362
$     
4
476
$        
1
476
$          
5
5,659
$     
1
5,659
$       
Total:
48,289
$     
6
3,727
$     
1
3,727
$       
Prevailing Wage (Add)
Center of the Arts BOH
Chandler, AZ
Non Union/Non Prevailing
2/8/2023
Laminate Cabinets and Countertops
50% Deposit prior to production, 25% at Install w/ Balance net 30
Only items above are included in bid.  Unless noted above locks, subtops, plumbing fixtures, 
supports, cleating & WI cert excluded.  All laminate to be on 3/4" MDF core unless specified 
above.
Scope of Work: Fabrication and installation of the cabinets and countertops for room 100, 102, 
103, 105, 109, 110, 131, 136, 137, 163, 164, & 58.  Finishes to be Wilsonart French Linen 5016-
38 and 1/2" LG Hi Macs Moondust.  Subtops and In Wall Support (Installed by others) included 
in the price.  Refinishing of all millwork not included and by others.  Option add price for 
Prevailing Wage installation given below.  All work to be done during daytime hours only and in 
1 phase of construction.
Description
Project Management and Drawings
Terms:
6 Weeks from Field Measure to Install
In Wall Supports (Installed by Others)
Solid Surface Countertops
Subtops
7645 E. Ray Rd. Suite 108 Mesa, Arizona 85212
Office: 714-988-2401
CA Lic #: 882440 - AZ Lic #: 319206 -  CA DIR #: 1000024338

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
TCH
Kelley Bros
TCH
BASE BID
25,350
$                   
33,073
$                   
-
$                         
Doors, Frames & Hardware
1
HM Frames
Included 
Included 
2
HM Doors
 Included 
 Included 
3
Wood Doors
Included 
Included 
4
Install
Included 
Included 
5
Schlage SFIC Cores
Included 
Included 
6
7
8
9
10
11
12
13
14
15
SALES TAX
-
$                         
-
$                         
-
$                         
SUBCONTRACTOR BID
25,350
$                   
33,073
$                   
-
$                         
ADD-ONS
-
$                         
-
$                         
-
$                         
TOTAL BID     
25,350
$              
33,073
$              
-
$                    
25,350
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                         
-
$                         
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
TEXTURA
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
25,350.00
$         
33,073.00
$         
-
$                    
DESCRIPTION
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
Doors, Frames & 
BID DATE: March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):

Doors
Hardware
Security
Phoenix Office
5670 South 40th Street Suite 1
Phoenix, AZ 85040
PROPOSAL
MARCH 01, 2023
To:
Attention:
Caliente Construction Inc
Pricing Expires 03/31/2023
Chad Slaymaker
Center for the Arts Backstage Restroom Remodel
Chandler, AZ 85225
Price Details
08110 | Steel Doors and Frames
8 Hollow Metal Frames
3 Hollow Metal Doors
08210 | Wood Doors
8 Wood Doors
08710 | Door Hardware
Hardware for above noted openings
99997 | Labor/Non-tax
Installation of Doors and Hardware noted above
Project Total
$25,350.00
Excludes Tax
Additional Details & Notes
Addenda / Plan Date
Based on Plans & Specs dated 12/15/22. 
Page 1/3

Doors
Hardware
Security
Phoenix Office
5670 South 40th Street Suite 1
Phoenix, AZ 85040
PROPOSAL
Notes & Exclusions
Total includes Tax of 7.8%
Excludes Glass and Glazing.
Excludes Aluminum Doors, Frames and Hardware.
Excludes Modification to Existing Doors & Frames. 
Access Panels by Others. 
Card Readers and Access Control by Others. 
Cores bid as Schlage Everest SFIC Interchangeable 
Cores. Premium High Security or cores by others may be additional and are excluded at this
time.
Includes Manufacturer Standard Warranties. 
Price is subject to revision if not accepted within 30 days. 
Lead Times:
Submittal lead time is 2-3 weeks from receipt of contract or LOI.
HMF lead time 8 weeks from time of order. Expediting is available at additional costs. 
Wood Door lead time is 14 weeks from time of order.  Expediting may be available at
additional cost. 
 
All Lead Times are Subject to Change.
Questions? Please call me direct at 480.371.6247 or email cmcpherson@tchco.com.
Page 2/3

Doors
Hardware
Security
Phoenix Office
5670 South 40th Street Suite 1
Phoenix, AZ 85040
PROPOSAL
Accepted By
Caliente Construction Inc
Signature
Print Name
Title
Date
Respectfully Submitted By:
Chris McPherson
Project Manager
Licenses
Arizona: ROC#250885
New Mexico: #364208
**All prices are confidential and are the property of TCH. Freight F.O.B. destination. Any changes to project documents may affect the price. All changes will
be required to have an executed change order signed by all parties prior to any material being released to jobsite. Back charges for work performed without
prior written authorization from TCH will not be accepted. This quotation is subject to change if not accepted in writing by 03/31/23. TCH is a material supplier,
no retainage will be accepted. All special order material is subject to a restocking fee.
**Payment Terms are net 30 days from date of invoice. Your FINANCE CHARGE is computed by a single periodic rate of 1.5% which is an ANNUAL PERCENTAGE
RATE of 18% applied to your "previous balance without deducting current payments and/or credits appearing on the face of the statement." Buyer expressly
agrees to pay all of Seller’s costs, expenses, and attorneys’ fees incurred for enforcement of collection of any amount due Seller under this agreement. Venue
is Washington County, MN.
**For warranty information, please go to www.tchco.com/warranty
Powered by TCPDF (www.tcpdf.org)
Page 3/3

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
Wall Assemblies
Hulse
Wall Assemblies
BASE BID
50,100
$                   
50,714
$                   
-
$                         
Framing & Drywall
1
Metal Studs
 Included 
 Included 
2
Drywall
 Included 
 Included 
3
Dens Shield @ Wet Locations
 Included 
 Included 
4
Backing
 Included 
 Included 
5
Install Frames
 Included  $                     1,500 
6
Patching @ Door Demo
 Included 
 Included 
7
Level 4 Finish
 Included 
 Included 
8
Insulation
 $                     6,592  $                     6,592 
9
10
Access Panel
 $                        150  $                        150 
11
12
13
14
15
SALES TAX
1,434
$                     
-
$                         
-
$                         
SUBCONTRACTOR BID
50,100
$                   
50,714
$                   
-
$                         
ADD-ONS
6,742
$                     
8,242
$                     
-
$                         
TOTAL BID     
58,276
$              
58,956
$              
-
$                    
58,276
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1 Room 131
-
$                         
-
$                         
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
TEXTURA
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
58,276.00
$         
58,956.00
$         
-
$                    
DESCRIPTION
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
Framing & Drywa
BID DATE: March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):

Center of the Arts back of House added insulation  3/2/2023 
 
 
Wall Assemblies, LLC 
3903 N. 16th Street, Phoenix, AZ 85016 
Phone: 602-989-5803 
ROC # 317938 
 
Job Name: Center of the Arts Back of House 
                   250 North Arizona Avenue 
                   Chandler AZ. 
Bid Date: February 22, 2023 
Wall Assemblies Bid #: 230054 and 230065 
 
Proposal to: Caliente Construction Inc. 
Attention: Chad Slaymaker    
 
From: Jim Schmitt 
Architect: D.F.D.G. Architecture 
 
 
WE HERBY SUBMIT SPECIFICATIONS AND ESTIMATES FOR: 
 
9250 Drywall: 
 
Plan Date: February 08, 2023 
1. 
Bid is based off an estimated Max deck height of 9’ AFF. 
2. 
Bid is figured as a single-phase project. 
3. 
New interior walls to be framed out of 358 or 6” 18-mil 20-gauge (EQ) studs and track to 6” above ceilings. 
4. 
Furrout walls to be of 3-5/8” studs and track to 6” above the ceilings. 
5. 
Touch up exiting walls after demo. 
6. 
Wet areas to have 5/8” XP drywall in lieu of 5/8” Type-X. 
7. 
Shower area to have 5/8” Dens-Shield on the walls and 5/8” XP drywall on the ceilings. 
8. 
Backing for bathrooms grab bars 2X6 wood or 6”16-gauge flat strap. 
9. 
6” 16-gauge flat strap added for upper cabinets backing and lockers. 
10. Setting of the hollow metal door and window jambs within our new framing only. 
11. Level # 4 smooth finish, or to match the existing building walls. 
• 
Material pricing valid until 4/30/23 a letter of intent or contract must be issued prior to materials being ordered. "All 
products are subject to pricing and availability." Materials must be ordered by this date, or we will get hit with the next 
month’s material price increases. 
• 
Materials must be delivered to jobsite prior to 5/30/23 to insure pricing. 
• 
Job bid based off standard stocking conditions. Window pull or Stair stocking to be at additional cost. 
 
EXCLUSIONS: Sales Tax, Off Hours, Fire Caulk, Insulation, Demo, wallcoverings, floors, doors, jambs, window frames or 
millwork. Any work on the block walls. 
 
SCHEDULE / MANPOWER: Pricing associated with a crew of 4-6 frames & Hangers and 2-4 Finishers. Schedule accelerations 
that would require a higher man count are subject to acceleration cost. 
 
NOTES: 
• 
This job is bid to start metal stud framing after all underground and concrete work is completed. If layout is required prior to metal 
framing starting will be an added cost of $500. 
• 
Job phasing or out of sequence work or delays for supplies, CAN LIGHTS, HM Jambs or other trades will be an added cost. 
• 
Patch and repair included in base bid is figured to be done as production work and not punch work.  
• 
GC supplied power or added cost for Wall Assemblies to provide temp power for our work will be an added cost of $500 
 
WE PROPOSE: hereby to furnish material and labor – complete in accordance with the above specifications, for the sum of: 
 BID AMOUNT 
 
                       
$49,990 
 
ALTERNATES: 
Alt. #1 Added cost to pay sales tax on the materials at the point of sale……$1,434. 
Alt. #2 Added cost for Textura Billing…. $110 
Alt. #3 Added cost for a Payment and Performance Bond…...$1,999. 
Alt.# 4 Added cost to add Acoustical insulation to new walls and ceilings………..$6,592 
Our duration for this work is 24 days = 7 days framing, 8 days for sheetrock, 9 days tapering, 
 
We appreciate your business… 
 
Acceptance: 
Date:

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
BASE BID
-
$                         
-
$                         
-
$                         
Acoustical Grid & ACT
1
Ceiling Touch up At Lights utilizing Attic 
Stock
 $                     1,500 
2
3
4
5
6
7
8
9
10
11
12
13
14
15
SALES TAX
-
$                         
-
$                         
-
$                         
SUBCONTRACTOR BID
-
$                         
-
$                         
-
$                         
ADD-ONS
1,500
$                     
-
$                         
-
$                         
TOTAL BID     
1,500
$                
-
$                    
-
$                    
1,500
$                
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                         
-
$                         
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
TEXTURA
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
1,500.00
$           
-
$                    
-
$                    
DESCRIPTION
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
BID DATE:
Acoustical Grid &
March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
Interior Concepts
Flooring & Beyond
Interior Concepts
BASE BID
47,973
$                   
51,376
$                   
-
$                         
Flooring
1
Carpet
Included 
Included 
2
Vinyl Plank
Included 
Included 
3
Base
Included 
Included 
4
Tile
Included 
Included 
5
Wall Tile
Included 
Included 
6
Shower Water Proofing
Included 
Included 
7
Transitions
Included 
Included 
8
Rubber Base in Recital
Included 
Included 
9
Floor Prep 
$                     5,000 
$                     5,000 
10
11
12
13
14
15
SALES TAX
2,965
$                     
2,500
$                     
-
$                         
SUBCONTRACTOR BID
47,973
$                   
51,376
$                   
-
$                         
ADD-ONS
5,000
$                     
5,000
$                     
-
$                         
TOTAL BID     
55,938
$              
58,876
$              
-
$                    
55,938
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1 Room 131
-
$                         
-
$                         
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
TEXTURA
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
55,938.00
$         
58,876.00
$         
-
$                    
DESCRIPTION
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
BID DATE:
Flooring
March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):

Page:1
CALIENTE CONSTRUCTION INC.
485 W. VAUGHN ST.
TEMPE, AZ                    85202
Proposal 1-019882
Today's Date
3/01/2023  11:55 AM
Quote Date
3/01/2023
Salesperson Name
JON DOUGHTY
Notes and Special Instructions
Ship To
CALIENTE / 0000
CALIENTE CONSTRUCTION INC.
CENTER OF THE ARTS BOH RENO
F 480-894-2323
250 N ARIZONA AVE
CHANDLER, AZ
Line Description
Quantity
Unit Price
Amount
001 CARPET TILE
- SPECIFIED
1,350.00 SQFT
$4.05
$5,467.50
CPT-1 SHAW CANOPY SUSPEND 9X36; COLOR BRANCH 88760
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
MATERIAL LEAD TIME: 2 WEEKS
002 VINYL PLANK
- SPECIFIED
100.00 SQFT
$6.65
$665.00
LVT-1 SHAW TERRAIN II 5MM 6X48; COLOR ECHO 00775
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
MATERIAL LEAD TIME: 2 WEEKS
003 4" RUBBER BASE
- SPECIFIED
1,200.00 LNFT
$1.35
$1,620.00
RB-1 MATCHING 4" COVE BASE; COLOR BLACK
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
MATERIAL LEAD TIME: 1-2 WEEKS
004 CERAMIC TILE
- SPECIFIED
390.00 SQFT
$17.55
$6,844.50
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC; COLOR TURKISH
SKYLINE MA86
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
MATERIAL LEAD TIME: 4-6 WEEKS
005 CERAMIC WALL TILE
- SPECIFIED
210.00 SQFT
$20.15
$4,231.50
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC; COLOR TURKISH
SKYLINE MA86
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
18" A.F.F ON SELECT WALLS PER ELEVATIONS
MATERIAL LEAD TIME: 4-6 WEEKS
006 CERAMIC WALL TILE
- SPECIFIED
1,535.00 EACH
$10.90
$16,731.50
WT-2 DALTILE MULTITUDE FLAT 12X24; COLOR URBAN GREY
MU18
PRICE INCLUDES; MATERIAL & LABOR

Page:2
CALIENTE CONSTRUCTION INC.
485 W. VAUGHN ST.
TEMPE, AZ                    85202
Proposal 1-019882
Today's Date
3/01/2023  11:55 AM
Quote Date
3/01/2023
Salesperson Name
JON DOUGHTY
Notes and Special Instructions
Ship To
CALIENTE / 0000
CALIENTE CONSTRUCTION INC.
CENTER OF THE ARTS BOH RENO
F 480-894-2323
250 N ARIZONA AVE
CHANDLER, AZ
Line Description
Quantity
Unit Price
Amount
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
ON SELECT WALLS PER ELEVATIONS
MATERIAL LEAD TIME: 4-6 WEEKS
007 CERAMIC WALL TILE
- SPECIFIED
250.00 EACH
$12.95
$3,237.50
WT-3 DALTILE MULTITUDE WAVE 12X24; COLOR URBAN GREY
MU18
PRICE INCLUDES; MATERIAL & LABOR
TO BE INSTALLED AS PER ATTACHED FINISH PLAN
ON SELECT WALLS PER ELEVATIONS
MATERIAL LEAD TIME: 4-6 WEEKS
008 SHOWER
- SPECIFIED
5.00 SQFT
$525.00
$2,625.00
ADDITIONAL LABOR AND SUNDRIES FOR SHOWERS
PRICE INCLUDES; LABOR, WATERPROOFING, & PAN LINER
TO BE INSTALLED AS PER ATTACHED FINISHPLAN
009 METAL TRANSITIONS
- SPECIFIED
1.00 SQFT
$3,470.00
$3,470.00
SCHLUTER JOLLY COLOR DARK ANTHRACITE
SCHLUTER FINEC COLOR DARK ANTHRACITE
SCHLUTER RENO TK COLOR SATIN ANODIZED
SCHLUTER AHKA COLOR DARK ANTHRACITE
SCHLUTER AHK COLOR DARK ANTHRACITE
PRICE INCLUDES; MATERIAL AND LABOR
010 2023 MRRA TPT EXPENSE
- MATERIAL ONLY
1.00 EACH
$2,965.00
$2,965.00
LAYOUTS & ESTIMATES TAKEN FROM SHEETS DATED 02.08.23
ALL LABOR RATES ARE FOR STANDARD ON-HOURS M-F 6A-6P
ADD-ALT1 - MATERIAL SALES TAX PAID BY INTERIOR CONCEPTS - ADD $2965.00
ADD-ALT2 - TEXTURA FEE PAID BY INTERIOR CONCEPTS - ADD $115.00
ADD-ALT3 - SUPPLY PAYMENT & PERFORMANCE BOND - ADD $1125.00
PLEASE NOTE BID ASSUMES ALL WORK AT SAME TIME - IF SEPARATE
MOBILIZATIONS ARE REQUIRED THEY WILL BE BILLED @ $150 PER MOBILIZATION

Page:3
CALIENTE CONSTRUCTION INC.
485 W. VAUGHN ST.
TEMPE, AZ                    85202
Proposal 1-019882
Today's Date
3/01/2023  11:55 AM
Quote Date
3/01/2023
Salesperson Name
JON DOUGHTY
Notes and Special Instructions
Ship To
CALIENTE / 0000
CALIENTE CONSTRUCTION INC.
CENTER OF THE ARTS BOH RENO
F 480-894-2323
250 N ARIZONA AVE
CHANDLER, AZ
Taxable
$47,857.50
Non-Taxable
$0.00
Sales Tax
$0.00
Grand Total
$47,857.50
Deposit
$0.00
Balance
$47,857.50
YOUR SIGNATURE INDICATES ACCEPTANCE OF THE ABOVE QUOTATION. NO PURCHASING OR
INSTALLATION SHALL BEGIN ON THIS JOB UNTIL THIS SIGNED PROPOSAL, A PURCHASE
ORDER, OR CONTRACT DOCUMENTS ARE RECEIVED.  PLEASE PROCEED WITH YOUR STANDARD
CONTRACT DOCUMENTS.  ALL PRICING IS VALID FOR 30 DAYS FROM QUOTE DATE.
STANDARD EXCLUSIONS UNLESS OTHERWISE NOTED: MAJOR FLOOR PREP (SEE DEFINITION
OF STANDARD FLOOR PREP), FLOOR PROTECTION, FURNITURE MOVING, DEMO, CLEANING,
WAXING AND SEALING OF FLOORS, BOND AND APPLICABLE TAXES.
UNLESS NOTED OTHERWISE ALL LABOR RATES ARE FOR STANDARD ON-HOURS M-F 6AM-6PM
LATE CHARGE/ATTORNEY'S FEES: THE UNDERSIGNED AGREES TO PAY LATE CHARGE OF 1.5%
PER MONTH OR PORTION THEREOF (18% APR) FOR ANY UNDISPUTED INVOICE NOT PAID
WHEN DUE. IN THE EVENT COLLECTION ACTION IS TAKEN TO COLLECT ANY INDEBTNESS,
I AGREE TO PAY ALL COSTS OF COLLECTION, INCLUDING REASONABL ATTORNEY'S FEES
AND COURT COSTS.
_____________________   ___________________
SIGNATURE            PRINT NAME

FLOOR PREP DEFINED 
 
Ordinary floor prep is included in all installed prices. Ordinary floor prep is defined as:   
1. Cleaning the floor so it is an acceptable substrate to receive floor cover. This includes 
scraping minor paint overspray and/or drywall mud that was missed by those sub 
contractors. 
2. Patching minor cracks in the substrate with a cement based floor patch such as Ardex 
Feather Finish. This product has self-drying technology that will help prevent any future 
mildew problems in the floor covering. This is not to exceed 1 bag per 600 sq ft of floor. 
Minor cracks are defined as any cracks smaller than the width of a credit card. Larger 
cracks should be chipped out by the concrete sub and filled.  
 
Extraordinary floor prep not covered in our bids is as follows: 
1. Any variance in sub-floor height greater than 3/16” of an inch over a ten (10) foot span 
AND 1/8” over (6) foot span. 
2. Removal of trash by other sub contractors. Floors should be swept prior to our arrival.  
3. Scraping excessive amounts of joint compound found on floor. This should be done by 
the drywall sub contractor. 
4. Fixing any saw cuts in the concrete that require leveling or grinding.  
5. Excessive paint overspray on the floor; this can be avoided very simply by your 
painters using a little care and a piece of cardboard. 
6. Conditions in the concrete requiring sanding or shot blasting. These are usually 
caused by curing compounds, moisture problems, or failure of demo. Contractor is to 
completely remove old flooring and adhesive residue. 
7. Any other substrate conditions exceeding ASTM 710 standards 
 
 
We will charge $75 per bag of Ardex Feather Finish floor patch for material and labor. 
For floors requiring more than 1/4” of patch material, we use Sika 325 self leveling 
underlayment. This will be charged @ $95 per bag for material and labor. One bag will 
do approx. 26 SF  to 1/4” thickness. Sanding and priming concrete floors will be billed @ 
$0.60 per sq. ft. 
 
TIME AND MATERIAL RATES 
 
Labor only rates are billed at $150/day truck fee and $65 per man hour for standard 
hours and $95 per man hour for overtime or premium time labor. 
 
Material costs to be billed out with standard 20% mark up for profit and overhead.

18
10' 4"
10' 5"
3' 0"
3' 0"
3' 7"
10' 5"
SHW
R1
3' 0"
3' 0"
SHW
R2
3' 0"
3' 0"
CHANDLER CENTER FOR THE ARTS
BACKSTAGE RR REMODEL
PLANSET DATED 02.08.23
FINISH PLAN
3/1/2023
Room Plan
1
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18

13
10' 4"
8' 8"
14
10' 4"
10' 5"
4' 5"
3' 0"
1' 9"
10' 11"
SHW
R1
4' 5"
3' 0"
SHW
R2
3' 0"
3' 0"
3/1/2023
Room Plan
2
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
RB-1 MATCH EXISTING 4": BLACK
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18

5' 4"
8' 10"
1' 10"
3' 0"
8' 10"
5' 4"
8' 10"
3' 0"
1' 10"
8' 10"
3/1/2023
Room Plan
3
FLOOR FINISH BY OTHER TRADE(S): ETR - LVP
METALS SCHLUTER DILEX-AHKA - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
WT-3 DALTILE MULTITUDE WAVE 12X24: URBAN GREY MU18

28 CPT
17' 1"
11' 2"
12' 11"
6' 3"
4' 2"
17' 5"
28 LVP
12' 11"
4' 5"
3' 2"
2' 2"
9' 2"
2' 0"
3/1/2023
Room Plan
4
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
LVT-1 SHAW TERRAIN II 20MIL 5MM 6X48: ECHO 00775
RB-1 MATCH EXISTING 4": BLACK

04
6' 9"
5' 0"
3' 9"
3' 0"
5' 0"
05
5' 2"
4' 11"
3' 0"
2' 2"
4' 11"
3/1/2023
Room Plan
5
FLOOR FINISH BY OTHER TRADE(S): ETR - LVP
METALS SCHLUTER DILEX-AHKA - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
WT-3 DALTILE MULTITUDE WAVE 12X24: URBAN GREY MU18

06 CPT
4' 11"
2' 7"
6' 5"
13' 8"
9' 2"
5' 10"
06 CONC
6' 7"
15' 5"
5' 0"
5' 4"
17' 6"
5' 5"
3/1/2023
Room Plan
6
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
FLOOR FINISH BY OTHER TRADE(S): ETR - CONCRETE
RB-1 MATCH EXISTING 4": BLACK
TRANSITIONS JOHNSONITE SSR - 40 - B: CPT TO CONC

163 CPT
32' 6"
10' 3"
3' 6"
9' 1"
19' 2"
1' 7"
4' 3"
1' 6"
5' 0"
5' 0"
13' 7"
7' 0"
13' 2"
163 
LVP
8' 0"
2' 1"
2' 2"
3' 6"
10' 3"
1' 5"
3/1/2023
Room Plan
7
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
LVT-1 SHAW TERRAIN II 20MIL 5MM 6X48: ECHO 00775
RB-1 MATCH EXISTING 4": BLACK

164
5' 5"
8' 2"
189
2' 5"
3' 1"
1' 8"
3' 0"
2' 1"
7' 2"
5' 6"
SHW
R1
3' 0"
3' 0"
3/1/2023
Room Plan
8
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18

6' 0"
5' 6"
3' 0"
2' 8"
5' 6"
3/1/2023
Room Plan
9
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18

3/1/2023
3D Report
1
3' 9"
3' 0"
3' 0"
3' 0"
3' 0"
5' 0"
3' 0"
6' 9"
6' 9"
3' 0"
3' 0"
5' 0"
3' 0"
3' 9"
3' 0"
3' 9"
3' 0"
5' 2"
4' 11"
3' 0"
2' 2"
3' 0"
3' 0"
4' 11"
5' 2"
3' 0"
5' 2"
3' 0"
4' 11"
3' 0"
4' 11"
3' 0"
3' 0"
2' 2"
3' 0"
2' 2"
FLOOR FINISH BY OTHER TRADE(S): ETR - LVP
METALS SCHLUTER DILEX-AHKA - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
WT-3 DALTILE MULTITUDE WAVE 12X24: URBAN GREY MU18
ELEVATION - RM 04 & 05 - 3D

3/1/2023
3D Report
1
6' 11"
5' 8"
3' 0"
1' 9"
1' 6"
1' 6"
3' 0"
10' 11"
6' 6"
5' 2"
1' 6"
10' 4"
6' 6"
1' 6"
1' 6"
3' 0"
5' 2"
10' 5"
6' 6"
5' 2"
6' 6"
1' 9"
3' 0"
4' 5"
1' 6"
3' 0"
6' 6"
4' 5"
3' 0"
1' 6"
6' 6"
3' 0"
1' 6"
3' 0"
6' 6"
3' 0"
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
ELEVATION - RM 14 - 3D

3/1/2023
3D Report
1
6' 6"
5' 3"
3' 0"
2' 2"
1' 6"
3' 0"
10' 5"
6' 6"
5' 2"
10' 4"
1' 6"
10' 4"
6' 6"
1' 6"
1' 6"
1' 6"
3' 0"
5' 2"
10' 5"
6' 6"
5' 2"
6' 6"
3' 7"
3' 0"
3' 0"
3' 0"
6' 6"
3' 0"
3' 0"
1' 6"
3' 0"
1' 6"
3' 0"
6' 6"
3' 0"
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
ELEVATION - RM 18 - 3D

3/1/2023
3D Report
1
1' 10"
3' 0"
3' 0"
8' 10"
3' 0"
2' 0"
8' 10"
2' 0"
5' 4"
5' 4"
3' 0"
8' 10"
2' 0"
1' 10"
3' 0"
1' 10"
2' 0"
8' 10"
5' 4"
8' 10"
3' 0"
1' 10"
8' 10"
3' 0"
2' 0"
5' 4"
3' 0"
5' 4"
2' 0"
8' 10"
8' 10"
0' 6"
3' 0"
0' 6"
2' 0"
3' 0"
1' 10"
2' 0"
1' 10"
FLOOR FINISH BY OTHER TRADE(S): ETR - LVP
METALS SCHLUTER DILEX-AHKA - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
WT-3 DALTILE MULTITUDE WAVE 12X24: URBAN GREY MU18
ELEVATION - RM 25 & 26 - 3D

3/1/2023
3D Report
1
3' 0"
2' 8"
5' 6"
5' 6"
6' 0"
5' 6"
6' 0"
6' 0"
6' 0"
5' 6"
6' 0"
6' 0"
2' 8"
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
ELEVATION - RM 131 - 3D

3/1/2023
3D Report
1
3' 0"
1' 4"
3' 0"
3' 1"
5' 5"
8' 2"
1' 1"
7' 2"
2' 1"
7' 2"
6' 6"
5' 6"
6' 6"
2' 5"
2' 5"
6' 6"
1' 8"
1' 8"
1' 4"
3' 0"
6' 6"
2' 1"
6' 6"
7' 2"
3' 0"
3' 0"
3' 0"
6' 6"
3' 0"
6' 6"
3' 0"
6' 6"
CPT-1 SHAW CANOPY SUSPEND 9X36: BRANCH 88760
METALS SCHLUTER DILEX-AHK - COLOR DARK ANTHRACITE
METALS SCHLUTER FINEC - COLOR DARK ANTHRACITE
METALS SCHLUTER JOLLY - COLOR DARK ANTHRACITE
METALS SCHLUTER RENO TK - COLOR SATIN ANODIZED
T-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-1 DALTILE MARBLE ATTACHE 2X2 MOSAIC: TURKISH SKYLINE MA86
WT-2 DALTILE MULTITUDE FLAT 12X24: URBAN GREY MU18
ELEVATION - RM 189 - 3D

2
SUB 1
SUB 2
SUB 3
SELECTED SUB
BASE BID
27,482
$                   
25,472
$                   
-
$                         
Painting
1
Drywall
Included 
Included 
2
Ceiling
Included 
Included 
3
Parge Coating
Included 
$                     5,000 
4
Doors&Frames
Included 
Included 
5
Exposed Conduits
Included 
Included 
6
Inwall Supports
 Included 
 Included 
7
8
9
10
11
12
13
14
15
SALES TAX
-
$                         
-
$                         
-
$                         
SUBCONTRACTOR BID
27,482
$                   
25,472
$                   
-
$                         
ADD-ONS
-
$                         
5,000
$                     
-
$                         
TOTAL BID     
27,482
$              
30,539
$              
-
$                    
27,482
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1 Room 131
1,135.00
$                
1,135.00
$                
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
28,617.00
$         
31,676.54
$         
-
$                    
AZ Pro Painting
Big Guns Painting
DESCRIPTION
March 3, 2023
BID DATE:
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
AZ Pro Painting
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
Painting

5424 South 39th Street 
Phoenix Arizona 85040 
Office 602-424-3411 
Fax 602-431-2248 
Certified SBE, DBE & WBE Contractor 
ROC 100810 
 
 
 
Date: 
Wednesday, March 1, 2023 
 
Proposal to:   Caliente Construction Inc. 
Project: Center of the Arts Back of House 
Renovations 
                    485 West Vaughn Street  
                    Tempe, Arizona 85283 
250 N. ARIZONA AVE.  
CHANDLER, AZ 85225 
Attention:    Chad Slaymaker 
Acknowledged Addendum: None 
 
 
 
 
 
Arizona Professional Painting will perform painting at above location as per plans as follows: 
 
Various Rooms highlighted in blue per A102 
Drywall Walls 
Accent Walls 
Drywall Ceilings 
Hollow Metal Doors & Frames 
Conduits per Note 099.E1 
Paint Corbel Supports at millwork where noted (Excludes millwork) 
Sikaguard Flexcoat at Ceiling in Recital Dressing 
 
Provide labor, material, and equipment for the sum of $27,482.00 
 ADD Material Sales Tax $409.00 
ADD Textura Fee $60.00 
 
 
Add Alternate: Room 131: 
Drywall Walls, Drywall Ceilings, Hollow Metal Doors & Frames 
Provide labor, material, and equipment for the sum of $1,115.00 
 ADD Material Sales Tax $18.00 
ADD Textura Fee $2.00 
 
*Product Substitutions may be Required due to Material Availability 
 
 
Exclusions:  
 
Flooring – Paint Strippers - Wood Doors & Frames – Wood Staining – Aluminum Doors & Frames – Wallcovering Install 
& Removal - Specialty/High Performance/Epoxy Paint – Millwork - Corner Guards - FRP - Signage – Stairwells – Skim 
Coat - Caulking at Dissimilar Substrates (not painted to painted) - Overtime hours (weekends are excluded) – Touch up 
or repairs to our work due to damage by other trades – Proposal is subject to change if not accepted within 60 days 
from bid date  
 
 
Respectfully Submitted, 
 
Jessica Santoyo | Estimator 
Cell: 602-881-5656 
Office: 602-424-3411 
E-mail: Jessica@azpropaint.com

Caliente Construction Inc.
General Construction - Construction Management - Design/Build - Facilities Management
Restroom Partitions & Accessories
2
SUB 1
SUB 2
SUB 3
SELECTED SUB
Beach Products
BASE BID
34,854
$                  
25,767
$                  
-
$                        
Specialties - Toilet Partitions & 
Restroom Accessories
1
Toilet Partitions
Included 
Included 
2
Grab Bars
Included 
Included 
3
Waste bins
Included 
Included 
4
Soap Dispensors
Included 
Included 
5
Lockers
Included 
Included 
6
Standard Mirrors
$                     2,830 
Included 
7
Shower Accessories
Included 
Included 
8
Toilet Accessories
Included 
Included 
9
10
11
12
13
14
15
SALES TAX
-
$                        
-
$                        
-
$                        
SUBCONTRACTOR BID
34,854
$                  
25,767
$                  
-
$                        
ADD-ONS
2,830
$                    
-
$                        
-
$                        
TEXTURA
-
$                        
TOTAL BID     
37,684
$             
25,767
$             
-
$                   
25,767
$             
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                        
-
$                        
-
$                        
2
-
$                        
-
$                        
-
$                        
3
-
$                        
-
$                        
-
$                        
SALES TAX
-
$                        
-
$                        
-
$                        
SCHEDULE PROVIDED:
TOTAL BID
37,684.00
$        
25,767.00
$        
-
$                   
Partitions & 
Accessories
DESCRIPTION
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
BID DATE: March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
Partitions & 
Accessories

www.partitionsco.com 
1220 South Pasadena Mesa, AZ 85210 
Phone (480) 969-6606 | Fax (480)-969-0459 
License ROC # CR60 110352| Tax ID#07370669 
Quote is good for 30 Days from date of proposal 
 
Customers without an open account or if material is non-stock may be required to pay 50% down.  We require a credit application completed and approved prior to establishing an account. Customers 
with an open account are required to pay “net 10 days”. We herewith submit our estimate for furnishing the material which is to be manufacturer’s standard construction unless specifically mentioned. 
See Manufactures catalog for further information. This quotation is based upon plans available to us as of this date. The price listed herein is subject to revision in the event of “last minute” addenda; 
bulletins; or amendments received by us after this date. Usage of any part of this proposal constitutes acceptance of the proposal and all associated terms and conditions in their entirety. Quotation is for 
immediate acceptance within 30 days, subject to change without notice thereafter. All shipments contingent upon strikes, fires, accidents or other delays beyond our control.  If quotation is freight 
allowed, it is based on material delivered to tailgate, consignee’s jobsite.  Consignee responsible for unloading and storing of materials. Consignee shall inspect material and is solely responsible for 
shortage or damage if not recorded on freight bill.  If there is a shortage or damage consignee is responsible for filing claim with carrier.  ALL COSTS OF COLLECTION INCLUDING REASONABLE 
ATTORNEY FEES TO BE PAID BY PURCHASER. LATE CHARGES OF 10% OF THE UNPAID BALANCE WILL ACCRUE MONTHLY. (MINIMUM OF $50.00 PER MONTH.)  Any litigation 
necessary falls under the jurisdiction of Maricopa County, Arizona. 
 
Friday, March 03, 2023 
 
 
 
 
Proposal # B206622 
TO: 
Caliente Construction Inc 
JOB: 
Center of the Arts Chandler 
ATTN: 
Jessica 
LOCATION: 
CHANDLER 
EMAIL: 
jmmolina@calienteconstruction.com 
PHONE: 
 
 
Toilet Partitions By: Accurate 
(4) Stalls/Phenolic Color Thru/Floor To Ceiling 
Furnished & Installed: $6,800.00 
 
Specification Section – Toilet Accessories 
Qty. 
No. 
Description 
Manufacturer Name 
8 
B-5806X18 
Grab Bar Diam Straight 18" 
Bobrick Washroom Equipment 
5 
B-5806X36 
Grab Bar Diam Straight 36" 
Bobrick Washroom Equipment 
5 
B-5806X42 
Grab Bar Diam Straight 42" 
Bobrick Washroom Equipment 
3 
B-6861 
Grab Bar 2-Wall Shwr 
Bobrick Washroom Equipment 
2 
B-43644 
Waste Recpt W/ Linermate 
Bobrick Washroom Equipment 
2 
B-35633 
Trimline Reces Wr 11.4L 
Bobrick Washroom Equipment 
2 
B-277 
Waste Recpt W/ Linermate 
Bobrick Washroom Equipment 
2 
ULINE-A 
Scott Pro Auto PTD 
Uline 
9 
B-4221 
Seat-Cover Disp 
Bobrick Washroom Equipment 
10 
SPECIALTY-A 
Scott Jumbo Roll Coreless 09602 
 
6 
B-270 
SND 
Bobrick Washroom Equipment 
9 
SPECIALTY-A 
Waxie Soap Dispenser 385840 
 
3 
PGMS-24X30 
CUT AND FIT 20"X30" PGMS 
Avalon Glass and Mirror 
2 
PGMS-24X36 
CUT AND FIT 24"X36" PGMS 
Avalon Glass and Mirror 
3 
PGMS-18X36 
CUT AND FIT 18"X36" PGMS 
Avalon Glass and Mirror 
328 
SC-500BN 
BN J-Mold G03236511 
Hydro Extrusion USA, LLC 
3 
B-5181 
Folding Shwr Seat-Reversible 
Bobrick Washroom Equipment 
5 
B-207X36 
Scr W/ Concealed Mount 
Bobrick Washroom Equipment 
50 
204-1 
Shwr Curtain Hook 
Bobrick Washroom Equipment 
5 
204-3 
Shwr Curtain 
Bobrick Washroom Equipment 
3 
B-2116 
Clothes Hook -H/D W/ Concld Mnt 
Bobrick Washroom Equipment 
Furnished & Installed: $9,195.00 
 
Lockers By: ASI Storage Solutions, Inc. 
Qty. 
Description 
15 
SQEJ009399-1 
Furnished & Installed: $9,715.00 
 
 
 
Plans dated 2-1-23

www.partitionsco.com 
1220 South Pasadena Mesa, AZ 85210 
Phone (480) 969-6606 | Fax (480)-969-0459 
License ROC # CR60 110352| Tax ID#07370669 
Quote is good for 30 Days from date of proposal 
 
Customers without an open account or if material is non-stock may be required to pay 50% down.  We require a credit application completed and approved prior to establishing an account. Customers 
with an open account are required to pay “net 10 days”. We herewith submit our estimate for furnishing the material which is to be manufacturer’s standard construction unless specifically mentioned. 
See Manufactures catalog for further information. This quotation is based upon plans available to us as of this date. The price listed herein is subject to revision in the event of “last minute” addenda; 
bulletins; or amendments received by us after this date. Usage of any part of this proposal constitutes acceptance of the proposal and all associated terms and conditions in their entirety. Quotation is for 
immediate acceptance within 30 days, subject to change without notice thereafter. All shipments contingent upon strikes, fires, accidents or other delays beyond our control.  If quotation is freight 
allowed, it is based on material delivered to tailgate, consignee’s jobsite.  Consignee responsible for unloading and storing of materials. Consignee shall inspect material and is solely responsible for 
shortage or damage if not recorded on freight bill.  If there is a shortage or damage consignee is responsible for filing claim with carrier.  ALL COSTS OF COLLECTION INCLUDING REASONABLE 
ATTORNEY FEES TO BE PAID BY PURCHASER. LATE CHARGES OF 10% OF THE UNPAID BALANCE WILL ACCRUE MONTHLY. (MINIMUM OF $50.00 PER MONTH.)  Any litigation 
necessary falls under the jurisdiction of Maricopa County, Arizona. 
 
 
*Pricing includes applicable taxes paid by subcontractor for materials on this project. 
 
 
Partitions and Accessories Co.  Craig Brazelton | 480-969-6606 | cbrazelton@partitionsco.com 
 
NOTE: Full height hinge/bracket systems for toilet partitions require flat and level wall surface for the full height of the hinge/bracket system.  Partitions & Accessories Co. will 
not be responsible for any gaps created by different wall elevations due to a difference in materials. Exclusions: Waiver of subrogation, bonds, cutouts, backing, blocking, 
liquidated damages, tackable wall panels, hand dryer installation (if applicable), installation of owner furnished accessories, demolition, reinstallation of existing partitions & 
accessories, structural and header support, and drilling or tapping of the steel, sway braces or support systems, pocket doors. Hand Dryers, material only – installation by 
others.  
To place the order, please sign and return a copy to us for processing. 
 
PRINTED NAME/TITLE: ________________________________ Signature: ________________________________ Date:_________________ 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Pages 1 of 2. Please see exclusions on next page.

www.partitionsco.com 
1220 South Pasadena Mesa, AZ 85210 
Phone (480) 969-6606 | Fax (480)-969-0459 
License ROC # CR60 110352| Tax ID#07370669 
Quote is good for 30 Days from date of proposal 
 
Customers without an open account or if material is non-stock may be required to pay 50% down.  We require a credit application completed and approved prior to establishing an account. Customers 
with an open account are required to pay “net 10 days”. We herewith submit our estimate for furnishing the material which is to be manufacturer’s standard construction unless specifically mentioned. 
See Manufactures catalog for further information. This quotation is based upon plans available to us as of this date. The price listed herein is subject to revision in the event of “last minute” addenda; 
bulletins; or amendments received by us after this date. Usage of any part of this proposal constitutes acceptance of the proposal and all associated terms and conditions in their entirety. Quotation is for 
immediate acceptance within 30 days, subject to change without notice thereafter. All shipments contingent upon strikes, fires, accidents or other delays beyond our control.  If quotation is freight 
allowed, it is based on material delivered to tailgate, consignee’s jobsite.  Consignee responsible for unloading and storing of materials. Consignee shall inspect material and is solely responsible for 
shortage or damage if not recorded on freight bill.  If there is a shortage or damage consignee is responsible for filing claim with carrier.  ALL COSTS OF COLLECTION INCLUDING REASONABLE 
ATTORNEY FEES TO BE PAID BY PURCHASER. LATE CHARGES OF 10% OF THE UNPAID BALANCE WILL ACCRUE MONTHLY. (MINIMUM OF $50.00 PER MONTH.)  Any litigation 
necessary falls under the jurisdiction of Maricopa County, Arizona. 
 
 
All items not specifically listed in scope of work are expressly excluded. Along with these listed below. 
 
• 
Backing, Blocking and Cutouts 
• 
Field verification of backing and cutouts – backing, blocking, cutout requirements are included with submittal package. 
• 
Hand Dryer installation  
• 
Partitions and Accessories Co. Warranty for Hand Dryers. (Warranty requests are to be communicated directly with the manufacturer). 
• 
Fire extinguisher certifications.  
• 
All consumable products including not limited to paper products, batteries, hand soap and anti-bacterial lotions. 
• 
All electrical connections – low and high voltage.  
 
 
**Please Note: Pricing Above is Subject to Change Due to Unprecedented Price Increases That We Are Experiencing from All of Our Manufacturers** 
 
Proposal Expiration & Potential Escalation 
Proposal is valid for 30 days from date of submission for acceptance via receipt of written LOI, NTP, or Contract with material purchases occurring within 90 
days and immediate delivery to jobsite. 
If material ordering cannot occur prior to 90 days an escalation cost of up to 15% may be implemented due to unpredictable and rapid increases in 
material and freight costs.  Additional escalation charges up to 15% may be implemented every 90 days thereafter.

Plumbing
2
SUB 1
SUB 2
SUB 3
SELECTED SUB
BASE BID
310,000
$                 
80,500
$                   
114,200
$                 
Plumbing
1
Make Safe 
 Included 
 Included 
 Included 
2
Plumbing Fixtures
Included 
Included 
Included 
3
Extend Piping
Included 
Included 
Included 
4
Insulation
Included 
Included 
Included 
5
Drinking Fountain
 Included 
 Included 
 Included 
6
Showers
 Included 
 Included 
 Included 
7
Hook up Dishwasher
 $                        300  $                        300  $                        300 
8
Camera Existing Lines
$                     1,800 
$                     1,800 
$                     1,800 
9
Plumbing in Room 131
$                     3,900 
$                     3,900 
$                     3,900 
10
Sawcut/Removal/Pourback
Included 
$                     4,450 
$                     4,450 
11
12
13
14
15
SALES TAX
8,500
$                     
6,038
$                     
4,500
$                     
SUBCONTRACTOR BID
310,000
$                 
80,500
$                   
114,200
$                 
ADD-ONS
6,000
$                     
10,450
$                   
10,450
$                   
TOTAL BID     
324,500
$            
96,988
$              
129,150
$            
96,988
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
324,500.00
$      
96,988.00
$         
129,150.00
$      
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
RKS Plumbing & 
Mechanical
BID DATE: March 3, 2023
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
Ryan Mechanical
RKS Plumbing & 
Mechanical
DESCRIPTION
Markade Plumbing

March 7th,  2023 
                                                  A PLUMBING Proposal For 
                                Center for the Arts, Back of House Renovations- 
 
Below please find our price for the above listed project. We are providing this bid to 
insure that you have coverage. Please contact us to review scheduling before awarding 
this project. 
 
PROVIDE & INSTALL:    
     
 
ADDENDA: none 
1) Demo fixtures. 
2) Rerough fixtures to new locations as indicated. 
3) Replace fixtures as specified 
TOTAL PRICE…………………………………………..  
$80,500.00 
 
 
 
 
 
Bond= + 1.5% 
 
EXCLUSIONS: 
1) Permits, fees, taxes & bond. 
2) Sawcut/removal/pourback, (add $4,450.00). 
3) X-ray. 
4) Night Work 5:00PM-3:00AM, (We have early mornings for 
demolition/noisy work). We cannot do night work at this time. 
5) Material Sales Tax, (add $6,038.00). 
6) Mechanical/HVAC/Fire Risers/Condensates/Gas/Cooler Drains. 
7) Site Work, Civil Work, Utility Relocation, Rock/Caliche Excavation, 
Temporary water, Imported Fills or Spoils Removal 
 
Sincerely, 
 
Joseph P. Ryan 
RYAN MECHANICAL CO. 
joe@ryanmechanical.com

Electrical
2
SUB 1
SUB 2
SUB 3
SELECTED SUB
K2 Electric
DP Electric
DP Electric
BASE BID
96,825
$                   
62,488
$                   
-
$                         
Electrical
1
Make Safe
 Included 
 Included 
2
Demo Fixtures
 $                   17,481 
 Included 
3
Lighting
 Included 
 Included 
4
Receptacles
 Included 
 Included 
5
Breakers
 Included 
 Included 
6
30 Day load Study
 Included 
 Included 
7
DMX Controller
 Excluded 
 Excluded 
8
9
10
11
12
13
14
15
SALES TAX
-
$                         
-
$                         
-
$                         
SUBCONTRACTOR BID
96,825
$                   
62,488
$                   
-
$                         
ADD-ONS
17,481
$                   
-
$                         
-
$                         
TOTAL BID     
114,306
$            
62,488
$              
-
$                    
62,488
$              
MARK-UPS:
Mark-up on Change Orders
ALTERNATES
1
-
$                         
2
-
$                         
-
$                         
-
$                         
3
-
$                         
-
$                         
-
$                         
SALES TAX
-
$                         
-
$                         
-
$                         
SCHEDULE PROVIDED:
TOTAL BID
114,306.00
$      
62,488.00
$         
-
$                    
BID PACKAGE: 
City of Chandler Center of the Arts BOH Renovation
BID DATE:
BID TALLY SHEET
RFI(s):
ADDENDUM(S):
DESCRIPTION
March 3, 2023

Feb. 28, 2023 
Chandler Center for the Arts  
 
 
Page 1 of 2 
2210 S. Roosevelt   TEMPE, AZ 85282  PHONE: 480.858.9070  FAX: 480.858.9067  DPELECTRIC.COM  ROC 111176 ROC 111170 ROC 289783 
DEPENDABLE PEOPLE DEPENDABLE PERFORMANCE 
Caliente Construction Inc. 
Attn: Chad Slaymaker  
 
DP Electric Inc. is pleased to provide you with a Proposal for the above referenced project. This proposal is based 
on drawings and job walk that happened on 2/22/23.  The drawing pages used were ED101, ED102, ED103, ED104, 
EP101, EP102, EP103, EP104 and EP601.  These prints are dated 2/8/23. 
 
Electrical Budget……………………………………………………………………………………$62,488.00 
Add Alternate Night Work…………………………………………………………………………. $1,350.00 
Add Alternate Weekend Work (Price listed is per hour worked) …………………………………..$25.00 extra per 
hour worked 
 
Qualification Notes: 
1. Tax included. 
2. 30-day load studies on all panels that we touch per the prints. 
3. Lighting package which includes new dimming switches.   
4. All demo and remodel based on the prints listed above. 
5. GC shall provide the Tax-Exempt Form 5005 to DP Electric if needed. 
6. This proposal is valid for (30-days) only. (See material escalation note at the end of this proposal) 
 
Exclusions: 
1. Any existing conditions/code violations.  
2. All overtime or afterhours work.  
3. Removal / Disposal of the electrical equipment to be performed by others, this proposal is based on make safe 
only.  
4. Dry utilities/Tel./Data/Fiber/AV/Security/CCTV/Sound Masking/PA/Fire Alarm/All Special Systems/ Nurse 
call parts and smarts. 
5. Proposal excludes temp power (is available upon request). EMS System in its entire. 
6. All formed and poured concrete, Saw cutting and Patch back, Core Drilling, equipment pads/ Roof jacks & roof 
patch. Traffic Controlling. 
7. Engineering/fees, permits/fees, special inspection fees, utility fees. 
8. Lightning Protection & Counterpoise Grounding Loop/  
9. Dry Wall Cutting and Patching/Painting. 
 
Insurance, Warranty & Spares: 
Proposal includes the basic “Additional Insured” insurance for GC & project owner Proposal includes (1) year warranty and (2) year 
workmanship DP Electric will only transfer the manufacturer’s warranties to Owner Lamps are not covered under warranty No Spares 
(no spare fuses, no spare lamps & no spare ballasts) 
 
Material Escalation: 
Any material escalation that exceeds 3% from the date of this proposal for the electrical rough materials shall be considered as additional cost to 
the project and shall be billed as material escalation change-order. This is due to volatility in price of steel & copper. 
 
If you have any questions, please feel free to contact us.  
Thank you. 
 
James Clark  
Project Manager  
M: 480-622-1216  
James.clark@dpelectric.com

Feb. 28, 2023 
Chandler Center for the Arts  
 
 
Page 2 of 2 
2210 S. Roosevelt   TEMPE, AZ 85282  PHONE: 480.858.9070  FAX: 480.858.9067  DPELECTRIC.COM  ROC 111176 ROC 111170 ROC 289783 
DEPENDABLE PEOPLE DEPENDABLE PERFORMANCE

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Caliente Construction Inc.
B230000 Center of the Arts Back of House Renovations
Center of the Arts Back of House Renovations
Name
 Email
 Phone
 Cell
 Status
 
 
American Cleaning Systems Inc.
 +1 602-267-7600
 Not Bidding
 
ACS ACS
 acsbids@acs-az.net
 +1 602-267-7600
 --
 Viewed
CPR Construction Cleaning
 +1 323-559-3692
 Bid Submitted
Corina Burton
 corina@cprconstructionclean.com
 +1 602-300-5906
 +1 323-559-3692
 Viewed
Jessica Maez
 jessica@cprclean.com
 --
 --
 Invited
EDGE Building Services, Inc.
 +1 602-531-4733
 Not Bidding
Javier Diaz
 javierd@edgebuildingservices.com
 --
 --
 Invited
John Perez
 johnp@edgebuildingservices.com
 +1 602-402-7133
 +1 602-402-7133
 Invited
Joshua Holland
 joshh@edgebuildingservices.com
 --
 +1 480-438-9928
 Invited
Project Admin
 projectadmin@edgebuildingservices.com
 --
 +1 602-739-2381
 Invited
Tegan Rhodes
 teganr@edgebuildingservices.com
 +1 602-739-2381
 --
 Viewed
Tom Walker
 tomw@edgebuildingservices.com
 --
 +1 480-406-9393
 Invited
National Maintenance Group dba SENTINEL MAINTENANCE
 +1 480-299-9255
 Not Bidding
Justin Honore
 justin@azsentinelmaintenance.com
 +1 317-835-1873
 +1 317-835-1873
 Invited
Ted Dance
 ted@azsentinelmaintenance.com
 +1 480-299-9255
 +1 480-299-9255
 Invited
 
 
ALM Services, LLC
 +1 602-257-8000
 Bid Submitted
Jason Mitchell
 jason.almservices@gmail.com
 +1 602-999-4125
 --
 Viewed
017400: Construction Cleaning
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST
024000: Demolition
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Arizona Specialty Demolition, LLC
 +1 602-843-8899
 Bid Submitted
Nick Hooey
 nick@azspecialtydemo.com
 +1 602-349-8159
 --
 Viewed
Taylor Collier
 taylor@azspecialtydemo.com
 +1 602-843-8899
 --
 Viewed
Trent Clark
 trent@azspecialtydemo.com
 +1 602-920-0102
 --
 Viewed
Dickens Quality Demo
 +1 602-258-8088
 Not Bidding
Craig Snider
 csnider@dickensquality.com
 +1 602-258-8088 ext. 215  +1 602-361-5173
 Viewed
First Step Demolition
 +1 623-248-5000
 Bid Submitted
Carlos Mejia
 carlos@firstdemoaz.com
 +1 602-248-5000
 +1 602-703-1388
 Viewed
Liberty Demolition Services
 +1 602-702-9058
 Not Bidding
Francisco Ortiz
 francisco.o@libertydemoservices.com
 --
 --
 Invited
Sebastian Cristerna
 sebastianlibertydemo@gmail.com
 +1 602-702-9058
 --
 Invited
M&P Venture Partners Demolition, LLC
 +1 602-455-4700
Buddy Mitchell
 accounting@mpvp.net
 +1 602-455-4700
 --
 Viewed
Estimates @MPVP.net
 estimates@mpvp.net
 +1 602-455-4700
 --
 Invited
 
 
Arizona Custom Millwork
 --
 Bid Submitted
Joseph Petramalo
 estimating@arizonacustom.com
 +1 208-421-0794
 --
 Viewed
Castaldi Custom Company
 +1 602-278-0054
 Not Bidding
Bill Clifton
 bill@castaldicustom.com
 +1 602-278-0054
 --
 Viewed
Josh Proffit
 josh@castaldicustom.com
 +1 602-278-0054
 --
 Invited
Corkery LLC dba European Techniques
 --
 Not Bidding
Randy L.
 randyl@europeantechniques.com
 +1 928-776-9957
 --
 Invited
062200: Millwork & Countertops
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST
 Not Bidding

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Ellis And Company
 +1 714-987-2577
 Bid Submitted
Jeremyha Lyle
 jeremyha@ellisdab.com
 +1 714-988-2401
 --
 Viewed
Micah Ellis
 mpellis@ellis-andcompany.com
 +1 714-988-2401
 --
 Invited
Gaston Contracting
 --
 Not Bidding
Brian McCoy
 bmccoy@gastoncontractingllc.com
 +1 602-278-4704
 +1 602-617-3683
 Invited
P3
 --
 Not Bidding
Allie Apodaca
 alejandraa@p3supply.net
 +1 480-826-6547
 --
 Invited
Red Mountain Woodworking
 --
 Bid Submitted
Sharon Gustafson
 estimator@redmountainwoodworking.com
 +1 480-982-1963 ext. 201  --
 Viewed
Styles Brothers Custom Millwork
 --
 Not Bidding
Michele Lough
 michele@stylesbrothers.com
 +1 623-931-3990
 --
 Invited
Rosalie Styles
 rosalie@stylesbrothers.com
 +1 623-931-3990
 --
 Invited
 
 
Kelley Bros.
 +1 602-254-5967
 Bid Submitted
Belinda Orosco
 borosco@kelleybros.com
 +1 602-254-5967
 +1 602-800-1594
 Viewed
Michael Juarez
 mjuarez@kelleybros.com
 +1 602-254-5967
 --
 Invited
Ken Watson Corporation
 +1 623-869-7900
 Not Bidding
Jeff Spino
 jspino@kenwatsoncorp.com
 +1 623-869-7900 ext. 111  --
 Invited
Joe Johnson
 jjohnson@kenwatsoncorp.com
 +1 623-869-7900 ext. 105  --
 Invited
Thomas McMahon
 tmcmahon@kenwatsoncorp.com
 +1 623-869-7900 ext. 109  --
 Invited
Lanmor Services Inc
 +1 623-869-6864
 Not Bidding
Bryan Blair
 bryan@lanmor.com
 +1 623-826-1489
 --
 Invited
081000/087000: Doors, Frames & Hardware
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Thistle Door, LLC
 --
 Not Bidding
Steve Smith
 thistledoor@cox.net
 +1 602-717-3975
 --
 Invited
Twin City Hardware
 --
 Bid Submitted
Andrew Kruse
 akruse@tchco.com
 +1 623-889-0380
 --
 Invited
Chris McPherson
 cmcpherson@tchco.com
 +1 480-371-6247
 +1 480-371-6247
 Viewed
 
 
Arizona Partition, Inc.
 +1 623-581-8105
 Not Bidding
Casey Keelen
 caseyk@arizonapartition.com
 +1 602-488-1150
 +1 602-488-1150
 Invited
Roy Robertson
 royr@arizonapartition.com
 +1 623-581-8105
 --
 Invited
Extreme Drywall Concepts LLC
 +1 623-444-6313
 Not Bidding
Chris Estrada
 chris@extremedrywallconcepts.com
 +1 623-444-6313
 +1 602-323-4568
 Invited
Estimating Department
 estimating@extremedrywallconcepts.com
 +1 623-444-6313
 --
 Viewed
Jennie Furlong
 jennie@extremedrywallconcepts.com
 +1 623-444-6313
 --
 Invited
Hulse Construction Co.
 +1 623-810-8557
 Bid Submitted
Pat Macgillivray
 pat@hulseconstruction.com
 --
 +1 602-582-5473
 Viewed
N K W Inc.
 +1 480-890-2100
 Not Bidding
Johan Coss
 estimating@nkwinc.net
 +1 480-890-2100
 --
 Invited
Tom Kamka
 tom@nkwinc.com
 +1 480-890-2100 ext. 216  +1 602-399-3410
 Invited
Silver Star Wall Systems
 --
 Not Bidding
Barry Williams
 barry@silverstarws.com
 --
 +1 623-693-7787
 Viewed
Jeff Haymaker
 jeff@silverstarws.com
 +1 623-466-8112
 --
 Invited
Steven Delgado
 steven@silverstarws.com
 +1 602-377-3552
 --
 Invited
092000/092216: Drywall & Framing
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Wall Assemblies LLC
 +1 602-687-2685
 Bid Submitted
Jim Schmitt
 jschmitt@wallassemblies.com
 --
 --
 Viewed
Juan Mondragon
 jmondragonv@wallassemblies.com
 +1 602-687-2685
 --
 Invited
Ken Heximer
 kheximer@wallassemblies.com
 +1 623-910-7495
 --
 Invited
 
 
Contemporary Flooring
 +1 602-529-3340
 Not Bidding
Jason Slocum
 jason@contemporaryflooring.net
 +1 480-364-2412
 +1 480-364-2412
 Invited
Envision Flooring LLC
 +1 623-444-8447
 Not Bidding
Geo Kucera
 geok@envisionflooringllc.com
 +1 623-444-8447
 +1 602-245-0677
 Invited
Nick Perez
 nickp@envisionflooringllc.com
 --
 --
 Invited
Flooring And Beyond LLC
 --
 Bid Submitted
Alfredo Garcia (vendor)
 asgarci3@yahoo.com
 +1 602-586-6948
 --
 Viewed
Freddy Velez
 freddy@flooringandbeyondllc.com
 +1 602-339-3937
 --
 Invited
Steven Furio (vendor)
 stevenfurio@w2fl c.com
 +1 443-768-2151
 --
 Viewed
Interior Concepts, Inc.
 +1 480-967-1384
 Bid Submitted
Jon Doughty
 jon@interiorconceptsaz.com
 +1 480-967-1384
 --
 Viewed
Interior Worx Commercial Flooring (Resource Arizona)
 +1 602-256-2862
 Not Bidding
Justin Holcombe
 justin.holcombe@resourcearizona.com
 +1 602-445-1029
 --
 Invited
 
 
Arizona Professional Painting
 +1 602-424-3411
 Bid Submitted
Ashley Pfeifle
 ashley@azpropaint.com
 +1 602-424-3411
 +1 602-397-0022
 Invited
Bids APP
 bids@azpropaint.com
 +1 602-424-3411
 --
 Viewed
Jessica Santoyo
 jessica@azpropaint.com
 +1 602-424-3411
 --
 Viewed
096000/096500: Flooring
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST
099000: Painting
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
Big Guns Painting
 +1 623-234-8343
 Bid Submitted
Monty Harris
 biggunspainting@gmail.com
 +1 623-234-8343
 --
 Viewed
Dallas Professional Painting LLC
 +1 623-337-4070
 Not Bidding
Jeff Riederer
 jeff@dallaspropainting.com
 +1 623-337-4070
 +1 602-526-1844
 Invited
Extreme Drywall Concepts LLC
 +1 623-444-6313
 Not Bidding
Chris Estrada
 chris@extremedrywallconcepts.com
 +1 623-444-6313
 +1 602-323-4568
 Invited
Jennie Furlong
 jennie@extremedrywallconcepts.com
 +1 623-444-6313
 --
 Viewed
Sanders & Wohrman Corporation
 +1 480-237-1500
 Not Bidding
AZ Estimating- Arizona Bid Invites
 azestimating@swcoatings.com
 +1 480-237-1500
 --
 Invited
 
 
Beach Products
 --
 Bid Submitted
 
Andrew Locke
 andrew@beachaz.com
 +1 602-272-6754 ext. 306  --
 Viewed
Paul Berry
 paul@beachaz.com
 +1 602-272-6754 ext. 309  --
 Invited
Scott Gartzke
 scott@beachaz.com
 +1 602-272-6754 ext. 304  --
 Invited
Inter-Co Inc.
 +1 623-398-6295
 Not Bidding
Estimator Estimating
 sales@inter-co.com
 +1 623-398-6295
 +1 602-710-0244
 Invited
Mike Holler
 mholler@inter-co.com
 +1 623-398-6295
 +1 520-591-3150
 Invited
Partitions & Accessories Co.
 +1 480-969-6606
 Bid Submitted
Craig Brazelton
 cbrazelton@partitionsco.com
 +1 480-969-6606
 --
 Viewed
Estimating Department
 pabids@partitionsco.com
 +1 480-969-6606
 --
 Invited
Mike Owen
 mike@partitionsco.com
 +1 480-969-6606
 N/A
 Invited
102200/102800: Toilet Partitions & Bathroom Accessories
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
 
 
Markade Plumbing
 +1 623-584-0220
 Bid Submitted
Eric Manalis
 estimating@markade.net
 +1 623-522-6782
 --
 Viewed
221000: Plumbing & Fixtures
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST
RKS Plumbing & Mechanical
 +1 602-996-1866
 Bid Submitted
Estimation Department
 estimation@rksplumbing.com
 +1 602-996-1866
 --
 Viewed
Ryan Mechanical Co.
 --
 Bid Submitted
Joe Ryan
 estimating@ryanmechanical.com
 +1 480-497-4526
 --
 Viewed
The Ultimate Plumber
 +1 480-986-7586
 Not Bidding
Estimating Department
 estimating@theultimateplumber.com
 +1 480-986-7586
 --
 Invited
Travis Trimberger
 travis@theultimateplumber.com
 +1 480-986-7586
 +1 480-375-5359
 Invited
Universal Piping
 +1 623-516-1000
 Not Bidding
Marlowe Snyder
 marlowe@universalpipingllc.com
 +1 623-516-1000
 +1 602-361-5063
 Invited
 
 
A.M.E. Electrical Contracting
 +1 602-437-7222
 Not Bidding
Brian Pero
 brian@ameelectrical.com
 +1 602-437-7222
 --
 Viewed
Cody Bemis
 cody@ameelectrical.com
 +1 602-437-7222
 +1 602-526-3705
 Invited
AJP Electric, Inc.
 +1 602-944-5477
 Not Bidding
Tom Hawkes
 tom.hawkes@ajpelectric.com
 +1 602-944-5477
 +1 602-451-5615
 Invited
261000: Electrical
Lead: Chad Slaymaker
Bids Due: Mar 1, 2023 at 12:00 PM MST
Armstrong Service Electric
 +1 623-252-0288
 Not Bidding
Jack Armstrong
 jack@armstrongserviceelectric.com
 +1 480-407-7922
 --
 Invited

3/3/23, 12:51 PM
Center of the Arts Back of House Renovations - Bidder List
https://app.buildingconnected.com/_/print/projects/63b5e6821486dc00379f4b3a/bidders-list
D. P. Electric, Inc.
 +1 480-858-9070
 Bid Submitted
Albert Kachekian
 albert@dpelectric.com
 +1 480-858-9070
 --
 Invited
Casey Kotzenmacher
 casey.kotzenmacher@dpelectric.com
 +1 480-937-1821
 --
 Viewed
Patrick Hunt
 patrick.hunt@dpelectric.com
 (480) 332-9281
 --
 Invited
james clark
 james.clark@dpelectric.com
 +1 480-622-1216
 --
 Viewed
Jenco, Inc.
 +1 480-607-9797
 Not Bidding
Aaron Jones
 ajones@jencoinc.com
 +1 480-513-1627
 +1 602-695-8120
 Invited
David Meacham
 dmeacham@jencoinc.com
 +1 480-467-9881
 +1 480-467-9881
 Invited
Ray Massa
 rmassa@jencoinc.com
 +1 480-721-6701
 --
 Invited
Ryan Aalgaard
 raalgaard@jencoinc.com
 --
 --
 Invited
K2 Electric
 --
 Bid Submitted
Ashley Whelihan
 awhelihan@k2elec.com
 --
 --
 Viewed
Nicholas Kredit
 nkredit@k2elec.com
 +1 602-454-7800 ext. 21
 +1 602-762-0238
 Invited
Russ Derks
 estimating@k2elec.com
 +1 480-352-5727
 +1 480-352-5727
 Viewed
WYE Electric
 +1 480-525-8613
 Not Bidding
WYE Estimating
 estimating@wyeelectric.net
 +1 480-525-8613
 --
 Invited
Prepared on Mar 3, 2023 at 12:51 PM MST

EXHIBIT B 
FEE SCHEDULE 
 
 
B-1 
Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
Project No.: CA2201.401 
Rev. 10/11/2022

3/3/2023
Negotiated Prices
425,328.00
$          
-
$                        
72,430.00
$             
-
$                        
-
$                        
SUBTOTAL (NEGOTIATED PRICES):
497,758.00
$          
8.00%
39,820.64
$             
TOTAL (NEGOTIATED PRICES + OVERHEAD & PROFIT):
537,578.64
$          
Sales Tax Percentage (Current Tax Rate)
TPT
5.070%
-
$                        
General Liability Insurance Percentage (Actual Cost per Job Order
1.00%
4,977.58
$               
Builder's Risk Insurance Percentage (Actual Cost per Job Order)
0.50%
2,488.79
$               
Payment Bond (Actual Cost per Job Order)
1.50%
8,308.44
$               
Performance Bond (Actual Cost per Job Order)
INC
0.00%
-
$                        
SUBTOTAL (INSURANCE, BONDS, & TAXES):
15,774.81
$            
COMBINED TOTAL (TOTAL + INSURANCE, BONDS, & TAXES):
553,353.45
$          
City's Allowance
110,017.97
$          
TOTAL JOB ORDER:
663,371.42
$  
JOB ORDER COST PROPOSAL
Overhead and Profit (Coefficient per Job Order Master Agreement)
Insurance, Bonds, & Taxes
Per the Job Order Master Agreement - This Fee Table includes all fees, costs, insurance and bond premiums, allowances, construction contingency, and taxes 
of any type necessary to fully, propertly and timely perform and construct the Work.  Also per the Job Order Master Agreement - For any portion of the Work 
which, either through this Contract, Change Order or otherwise, is performed and paid for on a cost, or time and materials basis, the costs may be 
reimbursed to JOC Contractor and chargeable against the Contract Price will be determined as set forth in MAG 109.5.
SUMMARY SHEET
Price of Subcontractor(s)
Price of Subconsultant(s)
General Conditions
Preconstruction Labor (if applicable)
Construction Labor (if applicable)
EXHIBIT "B"
City of Chandler Center of the Arts BOH Renovation

Project:
65671.00 Building Sq. Ft.
Owner:
City of Chandler
65671.00 Site Sq. Ft.
Architect:
DFDG
1.51 Site Acres
Bid Date:
3/3/2023
2 RFI(s)
Taxing Jurisdiction:
Chandler
0 Addenda
MRRA or TPT: 
MRRA
Permit Submittal - 02.08.23 Plan Set
 TOTALS 
DIVISION 1
GENERAL CONDITIONS/GENERAL REQUIREMENTS
72,430.00
$                              
DIVISION 2
EXISTING CONDITIONS
19,850.00
$                              
DIVISION 2
Demolition
19,850.00
$      
DIVISION 6
WOOD, PLASTICS, AND COMPOSITES
51,689.00
$                              
DIVISION 6
Millwork
51,689.00
$      
DIVISION 8
OPENINGS
-
$                                         
DIVISION 8
Doors, Frames & Hardware
25,350.00
$      
25,350.00
$                              
DIVISION 9
FINISHES
143,196.00
$                            
DIVISION 9
Framing & Drywall
58,276.00
$      
DIVISION 9
Flooring
55,938.00
$      
DIVISION 9
Acoustical Grid & ACT
1,500.00
$        
DIVISION 9
Painting
27,482.00
$      
DIVISION 10
SPECIALTIES
25,767.00
$                              
DIVISION 10
Specialties - Toilet Partitions & Restroom Acces
25,767.00
$      
DIVISION 22
PLUMBING
96,988.00
$                              
DIVISION 23
HEATING, VENTILATING, AND AIR CONDITIONING
-
$                                         
DIVISION 26
ELECTRICAL
62,488.00
$                              
497,758.00
$                            
CONTRACTOR FEE
8.00%
39,820.64
$                              
GENERAL LIABILITY INSURANCE
1.00%
4,977.58
$                                
BUILDERS RISK INSURANCE
0.50%
2,488.79
$                                
BONDING FEES
1.50%
8,308.44
$                                
SALES TAX
MRRA
-
$                                         
553,353.45
$                     
ALLOWANCES (Based on Subtotal cost of Work - Not included in Cost of Work; No Markups)
14.00%
69,686.12
$                              
5.00%
24,887.90
$                              
2.50%
12,443.95
$                              
LS
3,000.00
$                                
663,371.42
$                     
City of Chandler Center of the Arts BOH Renovation
DESCRIPTION
Subtotal of Cost Of Work
TOTAL PROJECT COST 
Total Cost of Work
ALLOWANCE - Owner Construction
ALLOWANCE - Material Escalation
ALLOWANCE - Lighting Wiring Allowance
ALLOWANCE - Permit Changes

9 Weeks
63 Calendar Days
CODE
ITEM
QTY
TYP
RATE/HR
SUBTOTAL
GENERAL CONDITIONS
 
00-1040 Project Manager
2.50
WK
4,200.00
$                                         
10,500.00
               
00-1043 Project Engineer
3.00
WK
2,960.00
$                                         
8,880.00
                 
00-1045 Superintendent
9.00
WK
3,800.00
$                                         
34,200.00
               
00-1044 Safety Manager
0.50
WK
4,200.00
$                                         
2,100.00
                 
00-1047 Project Coordinator
2.00
WK
2,400.00
$                                         
4,800.00
                 
TEMPORARY FACILITIES
01-5219
Portable Toilets
9.00
MO
500.00
$                                            
4,500.00
                 
VEHICHLES AND EQUIPMENT
00-1072
Small Tools
0.00
WK
250.00
$                                            
-
                          
00-1010
Project Pick Up Truck
0.00
WK
150.00
$                                            
-
                          
00-1020
Fuel
0.00
WK
185.00
$                                            
-
                          
01
GENERAL REQUIREMENTS
00-1080
Blueprinting / As builts / Close outs
1.00
LS
300.00
$                                            
300.00
                    
01-7410
Dumpster & Fees
3.00
PULL
550.00
$                                            
1,650.00
                 
01-5626
Temporary Fencing
1.00
LS
1,500.00
$                                         
1,500.00
                 
01-5600
Safety / Temp Protection
1.00
LS
1,500.00
$                                         
1,500.00
                 
01-7243
Final Bldg Clean
1.00
LS
2,500.00
$                                         
2,500.00
                 
TOTAL GENERAL CONDITIONS
72,430.00
$       
General Conditions
City of Chandler Center of the Arts BOH Renovation

EXHIBIT E 
 
 
E-1 
Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
Project No.: CA2201.401 
Rev. 10/11/2022 
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS 
 
________________________, Arizona 
 
Date ____________________________ 
Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
Project No.:  
CA2201.401 
To the City of Chandler, Arizona 
Gentlemen: 
This is to certify that all lawful claims for materials, rental of equipment and labor used in connection with 
the construction of the above project, whether by subcontractor or claimant in person, have been duly 
discharged. 
 
The undersigned, for the consideration of $________________________, as set out in the final pay estimate, as 
full and complete payment under the terms of the contract, hereby waives and relinquishes any and all 
further claims or right of lien under, in connection with, or as a result of the above described project.  The 
undersigned further agrees to indemnify and save harmless the City of Chandler against any and all liens, 
claims or liens, suits, actions, damages, charges and expenses whatsoever, which said City may suffer arising 
out of the failure of the undersigned to pay for all labor performances and materials furnished for the 
performance of said installation. 
 
Signed and dated at ________________, this _________ day of _______________ 20_____. 
 
 
__________________________________ 
               CONTRACTOR 
 
By _______________________________ 
STATE OF ARIZONA 
 
) 
) SS 
COUNTY OF MARICOPA 
) 
 
The foregoing instrument was subscribed and sworn to before me this __________ day of __________________ 
20 _________. 
 
___________________________________ 
 
 
 
 
 
                           Notary Public 
 
                     
 
___________________________________ 
 
 
 
 
 
                        My Commission Expires

EXHIBIT F 
 
 
F-1 
Project Name: CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS 
Project No.: CA2201.401 
Rev 10/11/2022 
CERTIFICATE OF COMPLETION 
 
Project: 
CENTER FOR THE ARTS BACKSTAGE RESTROOM AND DRESSING ROOM RENOVATIONS   
Project No.: 
CA2201.401 
 
 
(TO BE COMPLETED BY CONTRACTOR) 
 
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER PROJECT NO. 
CA2201.401 HAVE BEEN DELIVERED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND BID 
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE CONTRACT HAVE BEEN 
COMPLETED AS OF ____________________________. 
 
 
(Date) 
FIRM NAME: 
________________________________ 
 
PRINCIPAL: 
________________________________ 
         (Name) 
 
________________________________ 
      (Signature) 
 
________________________________ DATE: ___________________ 
          (Title) 
 
CERTIFIED BY ENGINEER/CONSULTANT (IF APPLICABLE): 
 
_________________________________ 
 
DATE: ____________________ 
      (Signature) 
 
_________________________________ 
 
        (Firm Name) 
  
PROJECT ACCEPTED BY USER DEPARTMENT 
 
_________________________________ 
 
DATE: ____________________ 
         (Signature) 
 
_________________________________ 
 
          (Dept. /Div.) 
_______________ Date of Final Walk-Through 
 
_______________ Date As-Built Received 
 
_______________ City As-Built Number