Exhibit F - Maintenance Responsibility Matrix

City of Chandler — Regular Meeting (2023-08-17)

View PDF Meeting page

Extracted text (via pymupdf) 9856 characters
Exhibit "F"
Maintenance Responsibility Matrix
Equipment (if applicable)
Scope
Responsible 
Party
Misc.
Specialized Gym Equipment
Repair/Maintenance/Replacement
B&G
Gym Flooring
Repair/Maintenance/Replacement
B&G
Kitchen Equipment
Repair/Maintenance/Replacement
B&G
Security Alarm System
Repair/Maintenance/Replacement
B&G
Fire Sprinkler System
Repair/Maintenance/Replacement
COC
Sports Equipment (Score Boards, Backboards)
Repair/Maintenance/Replacement
B&G
Computer/Data/Phone Equipment
Repair/Maintenance/Replacement
B&G
Fitness Equipment
Repair/Maintenance/Replacement
B&G
Membership Tracking System
Repair/Maintenance/Replacement
B&G
Custodial Services
30 Hours Weekly Custodial Services
COC
Fire/Life Safety 
(Per NFPA)
Fire Alarm Inspection
Inspection of all Fire Alarm units: Complete process is 
completed within a year in quarterly intervals, verify labeling 
of panel and breaker, change batteries
COC
Fire Extinguisher Certification
Certify all fire extinguishers
COC
Fire Pump (power and controls)
Disconnect PM,exercise, visual, clean, IR, service per IR 
report, clean control panel
COC
Fire Pump: Battery Replacement
Replacement of batteries in unit, coinsides with generator 
battery replacement
COC
Fire Pump: 2 year NFPA Service
2yr Service
COC
Fire Pump: Testing
Fire pump test, diesel svc, ctrlr test/Flow Test
COC
Fire Riser Pressure Gauge
Visual Inspection of pressure guage and readings
COC
Riser Pressure Guage Replacement
Replace per NFPA interval
COC
Fire Riser
Certification of Fire Risers
COC
Fire Sprinkler
Inspection of fire sprinkler system/Fire Risers
COC
Fire Sprinkler
Inspection of fire sprinkler system/Fire Risers
COC
Fire Sprinkler Line Flush
Flush wet and dry lines
COC
Fire Alarm Monitoring
monitoring
COC
Drop Down Doors: Test and Cert.
Inspection, test, reset, certification
COC
Fire Rated Door Insp
Inspection - condition, door seals, closers
COC
1 of 7

Exhibit "F"
Maintenance Responsibility Matrix
Access Control Access Control Boards
COC
Various Power Supplies
COC
Card/Keypad Readers
COC
Backup Batteries
COC
Door/Door Hardware/Key Cores
COC
CCTV
Camera Lens Cleaning
Verify operation
B&G
DVR
Software updates
B&G
Overhead 
doors
Door assemblies
Inspect, clean, and lube
COC
Operators
Inspect, clean, and lube
COC
COC
RollingGates
Gate Assemblies
Inspect, clean, and lube
COC
Operators
Inspect, clean, and lube
COC
Track assemblies
Inspect, clean, and lube
COC
General 
Maintenance
Automatic Doors
automatic door PM.
COC
ADA Operators
Battery change to pushpad 
COC
Door Pull Test
ADA door pull test
COC
Glass Sliders
COC
Ice Machine Cleaning
PM/Deep Clean
COC
Roof: PM
Inspect roof membrane for penetrations/wear/damage
COC
Wheel Chair Lifts
Weekly Test
COC
Exterior Power Wash
COC
Solar Power Systems
Steam Clean solar panels
COC
Paint Touchup
COC
Bird Cleanup/ Trapping 
COC
Indoor/Outdoor Signage 
COC
P-Traps
Fill traps with water
COC
Celing Tiles Checks
Broken, stained
COC
Window Cleaning
Contract cleaning
COC
2 of 7

Exhibit "F"
Maintenance Responsibility Matrix
Lights Check
COC
Building wear and tear
paint and finishes
COC
Batteries Check on Fire Panels
COC
Carpet
General Cleanliness
COC
Mister Checks 
COC
Stair and Railing Check
COC
Pest Control Service
COC
Street Sweeping
COC
Bathroom Wall Tile Replacement
When needed
COC
Parking Lot Ashpalt and Striping
Resurface, overlay, re- seal, re-stripe
COC
Landscape/Exterior Hardscape
COC
Plumbing
Jetting
Jetting service
COC
Backflow Assemblies & Locations
Test and certs
COC
P-Traps
Primer check
COC
Sump Pump/Pump Station
Verify flow and operation
COC
Roof Drains
Clean/flush
COC
RR Fixture Inspection
Test and check for leaks
COC
Water Heaters
Visual inspection of water connections,exercise ball valves 
and temp check
COC
Garbage Disposal Checks
COC
Faucet Battery Replacement 
COC
Automated Flush Battery Replacement 
COC
Flush Valve Checks
COC
Plumbing leaks
COC
Isolation valves - exercise
COC
Mechanical
Mini Split Units/Filter change
Preventative Maintenance
COC
Air Handler Filter change
Air handlers A/C and fan coils
COC
Boiler Domestic: Inspection
Preventative maintenance
COC
Chiller: PM
Preventative maintenance
COC
Chilled Water Pumps (3 Pumps)
Preventative maintenance lube
COC
Cooling tower PM
Preventative maintenance
COC
Condenser Water Pumps (3 Pumps)
Preventative maintenance lube
COC
Water Feature Pumps (1 Pump)
Preventative maintenance lube
COC
3 of 7

Exhibit "F"
Maintenance Responsibility Matrix
HVAC AHU Cabinet Cleaning and Inspection
Clean/Inspect/Lubricate/function check
COC
HVAC Belts: Change Out
Air handlers A/C and fan coils
COC
Cooling Tower Cleaning
Annual PM 
COC
Vapor Exhaust Fans
Restrooms: PM
COC
Water Flow Sensors
Inspect and clean the Chilled waterflow sensors
COC
Plate/Frame Heat Exchanger
Clean Sheets/Repair or replace gaskets, Flush
COC
Strainers or screens
Clean and inspect
COC
Coil Flush
Heating and cooling coils
COC
HVAC Water Treatment: Testing
Water treatment for central plant chilled water loop
COC
Electrical
Electrical Service PM
Visual inspection of Service, Clean, IR, Exercise Main Service 
Disconnect and Run Generator, verify building power, 
verify/calibrate/document breaker trip settings, verify/service 
surge protection and monitoring systems.
COC
Battery Replacement: Generator
Emergency power generator
COC
Transformers Normal and Emergency
Visual, IR, Tighten Lug connections per IR report
COC
Transformer Disconnects
Visual, IR, Tighten Lug connections per IR report, label/verify 
Line and Load breaker location and Panel, verify spare fuses at 
Disconnect, verify ARC Flash Decal
COC
Distribution Panels
Visual inspection, clean, IR, tighten connections per IR report, 
label/verify individual switches, calibrate switch trip settings, 
spare switch inventory
COC
Sub-Panels
Visual, IR, tighten connections per IR report, clean, verify 
labeling of panel, update/verify panel schedule, stock spare 
breakers
COC
Equipment disconnects
Visual,clean, IR, Tighten connections per IR report, clean, 
verify labeling of line and load on disconnect, verify ARC Flash 
Decal
COC
Lighting Panels
Visual, IR, Service per IR report, clean, Check controls-
photo/scheduler, Verify controller is present and functional, 
Label/verify panel labels and ARC Flash decal, Verify/update 
panel schedule
COC
4 of 7

Exhibit "F"
Maintenance Responsibility Matrix
Lighting Dimmer Panels(council chambers)
Visual, IR, Service per IR report, Verify labeling and Arc Flash 
decals, verify/update panel schedules, verify presence of 
spare dimmers 
COC
Interior Lighting PM
replace lamps, ballasts, drivers and sensors as needed, verify 
spares present 
COC
Exterior Lighting PM
replace lamps, and ballasts as needed, verify spare lamps, 
ballasts, and drivers
COC
COC
Chiller #1: 4160V Starter (HV)
Visual and Mechanical Inspection of the Chiller Starters
COC
Chiller
Exercise breaker, Disconnect PM, verify labeling of line and 
load, clean, verify spare fuses present, IR, service per IR 
report
COC
Chiller Insulation Testing
Visual/mechanical inspection of the chiller starter MCC
COC
Cooling tower
Exercise breaker, Disconnect PM, verify labeling of line and 
load, clean, verify spare fuses present, IR, service per IR 
report
COC
Pump motors
Exercise breaker, Disconnect PM, verify labeling of line and 
load, clean, verify spare fuses present, IR, service per IR 
report
COC
Air handlers
Exercise breaker, Disconnect PM, verify labeling of line and 
load, clean, verify spare fuses present, IR, service per IR 
report
COC
A/C units, mini-split and package units
Exercise breaker, Disconnect PM, verify labeling of line and 
load, clean, verify spare fuses present, IR, service per IR 
report
COC
VFD
Verify labeling of panel, circuit, and equipment at VFD, Check 
connections, IR, clean, check conductor insulation at 
connections, 
COC
Mechanical Room PM
Install new light bulbs in mechanical rooms, verify function of 
switches and sensors
COC
Code Blue Phones, PM & Certified
Code Blue PM - Parking Lot/Structure
COC
5 of 7

Exhibit "F"
Maintenance Responsibility Matrix
Electrical Sub/main: PM (HV)
Preventative maintenance/Annual IR scan
COC
Emergency Lighting
Manual test of exit signs and egress lighting batteries
COC
Emergency Transformers (HV)
Preventative Maintenance
COC
Generator: Breaker PM
Visual/mechanical inspection of the generator circuit breaker
COC
Generator: Load Test
COC
Generator Exercise
Automatically initiated, verified by Maint. Tech
COC
Transfer Switch PM
Visual, Clean, IR, tighten connections per IR report, 
COC
Generator:  PM
Annua PM and load test
COC
COC
COC
Ground Fault System (HV)
Visual/mechanical inspection of the ground fault systems
COC
Inverter: PM
Preventative maintenance inverters/Parking Structure
COC
IR Testing
Infrared testing of electrical
COC
Inverters 
Replace batteries in PS1 inverters basement level
COC
Relay switch gear
Preventative Maintenance & electrical testing of all relays
COC
Switch Gear UPS
Replace batteries switch gear UPS/Gen Sync
COC
Switchgear UPS: PM
Preventative maintenance switch gear UPS/Gen Sync PM
COC
Transformer Oil Testing
test the transformer oil
COC
UPS Battery Replacement
Replace batteries
COC
UPS PM
Replace, check
COC
Ductile Bussing PM
Visual, IR, Service per IR report
COC
Solar Power Systems
Quarterly PM done by Service Contract Provider
COC
Clean Electrical Rooms
Clean, dust, sweep, open gutters and inspect conductor 
insulation and connections, install new lamps in fixtures
COC
Power to Water Heater and Connections
PM disconnect, inspect, exercise, clean, label/verify, verify 
spare fuses present, check connections at H2O, 
COC
6 of 7

Exhibit "F"
Maintenance Responsibility Matrix
Power to Re-Circulation Pumps
PM disconnect, inspect, exercise, clean, label/verify, verify 
spare fuses present, check connections at pump
COC
Parking Lot Lights
Repair, replace, relamp
COC