Project Name: PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION Amendment No. 1 
Page 1 
Project No.: WW2210.451
Rev. 8/9/2023 
AMENDMENT NO. 2 TO PROFESSIONAL SERVICES AGREEMENT 
CONSTRUCTION MANAGEMENT SERVICES 
PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION
Project No. WW2210.451 
Council Date: September 21, 2023              Item No. 
THIS AMENDMENT NO. 2 (“Amendment No. 2”) to the professional services agreement dated 
April 3, 2023 (the “Agreement”) is made by and between the City of Chandler, an Arizona 
municipal corporation, (“City”) and Entellus, Inc., an Arizona corporation, (“Consultant”), on 
this ______ day of ___________________, 202 (“Effective Date”).  (City and Consultant may 
individually be referred to as “Party” and collectively referred to as “Parties”). 
RECITALS 
A.
The Parties entered into the Agreement for: Construction Management Services
(“Services”) for the PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION project. 
B.
The Parties have determined that it is necessary and desirable for the Consultant to
perform additional services for the City under the terms and conditions set forth in this
Amendment No. 1 and the Agreement.
AGREEMENT 
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the 
Agreement and this Amendment No. 1, the Parties agree to amend and modify the Agreement 
as follows. 
SECTION I – CONSULTANT’S SERVICES 
The Consultant’s Services are modified as described in the Exhibit "A" attached to and made 
part of this amendment by reference.

Project Name: PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION Amendment No. 1 
Page 2 
Project No.: WW2210.451 
Rev. 8/9/2023 
 
SECTION II – PERIOD OF SERVICE 
 
The Period of Service remains the same as described in the Agreement. 
 
SECTION III – PAYMENT OF COMPENSATION AND FEES 
 
The Fees are increased by $538,717.11 and will be payable in accordance with Exhibit "B" 
attached to and made part of this amendment by reference, for a revised total not to exceed 
$580,218.83. 
 
SECTION IV – CONFLICT AMONG DOCUMENTS 
 
The Agreement, this amendment, and any previous amendments constitute the complete 
agreement between the Parties concerning the subject matter of the Agreement and replace 
any prior oral or written communications between the Parties.  If a conflict or ambiguity arises 
between the Agreement and this amendment, the instrument in the following order prevails 
and controls: (1) this amendment; (2) any previous Amendments from most recent to oldest; 
and (3) the Agreement. 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION Amendment No. 1 
Page 3 
Project No.: WW2210.451
Rev. 8/9/2023 
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 2 to be duly 
executed.  Each Party warrants and represents that its respective signatories whose signatures 
appear below have been and are on the date of signature duly authorized to execute this 
Amendment No. 2. 
“CITY” CITY OF CHANDLER
MAYOR 
RECOMMENDED BY: 
Kimberly Moon, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
Seal 
“CONSULTANT”
ENTELLUS, INC.
Signature
Date 
Print Name 
Title 
Signer Email Address 
$XJXVW
:LOOLDP$/LQFN3(
3UHVLGHQW	&(2
OLQFN#HQWHOOXVFRP
gnature
Digitally signed by Kimberly Moon
DN: C=US, 
E=Kimberly.Moon@ChandlerAZ.gov, O=City of 
Chandler, OU=Capital Projects Division, 
CN=Kimberly Moon
Date: 2023.08.15 12:09:22-07'00'

Project Name: PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION Amendment No. 2 
Page 4 
Project No.: WW2210.451 
Rev. 8/9/2023 
 
Amendment No. 2 (cont.) 
Project No. WW2210.451 
  
 
These changes result in the following adjustments of Agreement amount and/or time: 
 
Amendment authorized by Owner name: Jermaine Swinton 
 
 
Date: 08/09/2023 
Consultant email:  linck@entellus.com, rubert@entellus.com , pyoung@entellus.com 
Original Agreement amount: 
$41,501.72 
Previous Amendment(s) total: 
$0 
Last Agreement amount approved by Council: 
$0 
This Amendment: 
$538,717.11 
This Amendment + previous Amendment(s) not approved by 
Council total: 
$538,717.11 
Revised Agreement total: 
$580,218.83 
Council Approval Required (yes indicates approval required) 
Yes 
No 
Amendment(s) total over $100,000: 
܈ 
܆ 
Amendment(s) total causes Agreement to exceed $100,000:  
܈ 
܆ 
Agreement Time 
Agreement time prior to this Amendment (including previous 
amendments): 
560 
Calendar Days 
Net change resulting from this Amendment: 
0 
Calendar Days 
Revised Agreement time (including this Amendment): 
560 
Calendar Days 
Council Approval (if applicable) 
Council Approval Date: September 21, 2023 
Item No. _____ 
 
cc:  Project Manager, Consultant, Owner, File

1 
 
 
EXHIBIT “A” 
 
CONSTRUCTION MANAGEMENT 
SCOPE OF SERVICES 
 
PROJECT TASKS 
1. 
PRE-CONSTRUCTION ASSISTANCE 
A. Task 1.1 Preconstruction Assistance  
i. Consultant must attend the pre-construction meeting.  
ii. Consultant must attend the pre-construction public meeting.  
 
2. 
CONSTRUCTION MANAGEMENT  
A. Task 2.1 Weekly Construction Meetings 
i. Consultant must conduct weekly construction meetings.  Each meeting 
includes agenda and minutes; Request for Information (RFI); Shop Drawing; 
Request for Information (RFI); Field Directive (FD); Material Certification; and 
Allowance Logs. Consultant assumes 43 weekly meetings will be held.
B. Task 2.2 CPM Schedule 
i. Consultant must review and evaluate Contractor’s initial CPM schedule and 
provide recommendations for acceptance.  
ii. Consultant must review Contractor’s monthly CPM schedule updates 
submitted with each payment application, identify CPM tasks behind schedule 
that may affect critical path items, project substantial and final completion 
dates and initiate correspondence to City regarding those tasks. Consultant 
assumes 10 reviews of updated CPM schedule.  
C. Task 2.3 Requests for Information (RFI’s) 
i. Consultant must review, evaluate, and respond to Contractor Requests for 
Information (RFI’s); and prepare and maintain a submittal log of all RFI’s. 
Consultant assumes 15 RFI responses.  
D. Task 2.4 Shop Drawing Submittals 
i. Consultant must review, evaluate, and respond to Contractor shop drawing 
submittals; and prepare and maintain a submittal log of all shop drawing 
submittals. Consultant assumes 35 reviews.  
E. Task 2.5 Requests for Proposal (RFP) 
i. Consultant must prepare Requests for Proposal (RFP) documents detailing 
requested additional work tasks; review and evaluate Contractor RFP 
responses (cost derivations) with approval recommendations; and prepare 
and maintain a submittal log list of all RFP’s. Consultant assumes 10 RFPs.   
F.  Task 2.6 Field Directives (FD’s)

2 
 
i. Consultant must prepare Field Directive (FD) documents detailing requested 
additional work tasks; review and evaluate Contractor FD responses with 
approval recommendations; and prepare and maintain a submittal log list of 
all FD’s. Consultant assumes 15 FD’s.   
G. Task 2.7 Contractor Payment Applications 
i. Consultant must review and evaluate Contractor monthly payment 
applications and make recommendation for payment; maintain a weekly 
record of constructed pay quantities and compile monthly totals; and 
coordinate payment application with the City quantity report and the 
inspectors’ daily logs. Consultant assumes 10 payment applications, with 2 
reviews each. 
H.  Task 2.8 Public Outreach 
i. Consultant must provide public outreach services, whether by Consultant or 
subconsultant.  Tasks will include: create and maintain project website; 
maintain a 24-hour bilingual project hotline to respond to inquiries, 
complaints and maintain a call log; public weekly email updates; public 
interactions with property owners as a liaison between property owners and 
the 
City; 
coordination 
meetings; 
project 
meetings; 
public 
meeting 
coordination; federal funds required partnering process (project team 
partnering meeting, maintaining status). 
 
3. 
CONSTRUCTION INSPECTION 
A. Task 3.1 Inspection Services 
i. Consultant must provide weekly construction inspection to verify materials 
and installations conform to construction documents; prepare daily inspection 
reports documenting Contractor construction activities and progress during 
field inspection visits; and perform intermittent erosion control inspections. 
Consultant generally assumes 1 inspector full time 5 days per week for 10 
months.  
B. Task 3.2 Landscape / Irrigation Inspection Services (NOT USED)     
i. Consultant 
must 
provide 
Irrigation 
system 
layout 
and 
installation 
observations; attend and observe irrigation system pressure tests; and attend 
a nursery visit to tag and inspect plant material. Consultant assumes 0 site 
visits.  
C. Task 3.3 Project Closeout    
i. Consultant must compile non-conformance list prior to Substantial 
Completion; schedule and conduct Substantial Completion inspection; 
prepare Substantial Completion punch list generated from Substantial 
Completion inspection; track items on punch list and note completed items; 
and complete and distribute Substantial Completion certificates. 
ii. Consultant must schedule and conduct Final Completion inspection; and 
complete and distribute Final Completion certificates. 
iii. Consultant must provide all documents in an electronic version that matches 
the City’s filing system, so it can be imported into City’s files. 
iv. Consultant must participate in a meeting with City staff and Designer to review 
request for information log to discuss lessons learned during the course of 
construction. 
4. 
UTILITY COORDINATION  
A. Task 4.1 Utility Coordination  
i. Consultant must complete Acceptance of Construction (AOC) applications and 
submit to MCESD for reclaimed water booster pump and potable water/sewer 
improvements.

3 
 
 
5. 
MATERIALS TESTING 
A. Task 5.1 Quality Control (QC) Test Program 
i. Consultant must review and verify Contractor’s Quality Control material test 
type and frequencies are consistent with City and MAG; review and evaluate 
Contractor’s QC test schedule and provide recommendations on acceptance; 
and review and evaluate all Contractor sampling, test, and inspection results 
for conformance with construction documents.  
B. Task 5.2 Quality Assurance (QA) Test Program 
i. Consultant must prepare and maintain a materials Quality Assurance plan per 
City and MAG. 
ii. Consultant must coordinate with Contractor’s testing representative to obtain 
required QA tests and sample; complete sampling and compaction testing of 
subgrade (including lime-stabilized subgrade base), aggregate base and 
asphalt concrete materials in new asphalt concrete pavement areas; complete 
sampling and compaction testing of subgrade, aggregate base (where 
required) and concrete for new curbs, gutters, sidewalks and concrete 
pavement and structures; and complete sampling and compaction testing of 
backfill for new irrigation, sewer, water, storm drain pipe, and dry utilities. 
 
6. 
RECORD DRAWINGS  
A. Task 6.1 Record Drawings 
i.  Review and monitor Contractor’s weekly updates on red-line drawing set. 
 
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS 
1. 
Application fees for City reviews and permits will be paid by CITY. 
2. 
The Owner’s Allowance will only be utilized with prior written approval from the City 
representative.

Task
Cost
1
1.1
4,995.12
$                    
4,995.12
$                    
2
2.1
33,957.32
$                  
2.2
6,151.40
$                    
2.3
4,951.64
$                    
2.4
10,818.72
$                  
2.5
2,962.00
$                    
2.6
3,548.42
$                    
2.7
6,989.35
$                    
2.8
17,146.72
$                  
86,525.57
$                 
3
3.1
300,539.88
$                
3.2
-
$                              
3.3
3,682.64
$                    
304,222.52
$               
4
4.1
3,817.68
$                    
3,817.68
$                    
5
5.1
14,210.68
$                  
5.2
5,902.10
$                    
20,112.78
$                 
6
6.1
7,643.44
$                    
7,643.44
$                    
16,400.00
$                  
35,000.00
$                  
-
$                              
51,400.00
$                 
60,000.00
$                  
60,000.00
$                 
538,717.11
$       
EXHIBIT "B"
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
FEE SCHEDULE
Public Outreach
Field Directive (FD)
Contractor Payment Applications
Description
Requests for Proposal (RFP)
CPM Schedule
Requests for Information (RFI)
Shop Drawing Submittals
Pre-Construction Assistance
Weekly Construction Meetings
PRE-CONSTRUCTION ASSISTANCE
CONSTRUCTION MANAGEMENT
SUBTOTAL TASK 1:
Utility Coordination 
SUBTOTAL TASK 3:
SUBTOTAL TASK 4:
Landscape/Irrigation Inspection Services (NOT USED)
Project Closeout
UTILITY COORDINATION
Inspection Services
CONSTRUCTION INSPECTION
SUBTOTAL TASK 2:
SUBTOTAL ALLOWANCES:
PROJECT TOTAL:
SUBTOTAL TASK 6:
SUBTOTAL SUBCONSULTANTS:
MakPro
SUBCONSULTANTS
ALLOWANCES
SAECO
Owner's Allowance
Record Drawings
QC Test Program
MATERIALS TESTING
SUBTOTAL TASK 5:
QA Test Program
RECORD DRAWINGS

Project Title: Price Road Frontage Road Sewer Rehabilitation
Date: August 8, 2023
Clients Project #: WW2210.451
Entellus Project #: 615.126
Client: City of Chandler
Total
SECTION
TASK
Hours
254.32
$                     
200.46
$                          
95.74
$                       
132.18
$                     
85.27
$                       
1
1.1
Pre-Construction Assistance
2
10
20
3
2
37
1
2
10
20
3
2
37
2
2.1
Weekly Construction Meetings
4
65
129
43
22
263
2.2
CPM Schedule
24
14
38
2.3
Requests For Information (RFI's)
2
15
15
32
2.4
Shop Drawing Submittals
2
18
70
90
2.5
Requests for Proposal (RFPs)
10
10
20
2.6
Field Directives (FDs)
2
8
15
25
2.7
Contractor Payment Applications
10
20
20
5
55
2.8
Public Outreach
65
43
108
2
10
215
316
63
27
631
3
3.1
Inspection Services
131
261
1886
2278
3.2
Landscape/Irrigation Inspection Services (If Applicable)
0
0
0
3.3
Project Close-Out
4
8
16
28
3
0
135
269
1902
0
2306
4
4.1
Utility Coordination
8
16
8
32
4
0
8
16
0
8
32
5
5.1
QC Test Program
22
43
43
108
5.2
QA Test Program
10
20
15
45
5
0
32
63
58
0
153
6
6.1
Record Drawings
5
10
43
58
6
0
5
10
43
0
58
12
405
694
2069
37
3217
Construction Management
Construction Inspection
Utility Coordination
TOTAL ESTIMATED HOURS
SUBTOTAL
SUBTOTAL
SUBTOTAL
Materials Testing
SUBTOTAL
Record Drawings
SUBTOTAL
WORK ITEM
DESCRIPTION
SUBTOTAL
Pre-Construction Assistance
PRINCIPAL
CONSTRUCTION 
MANAGER
ADMIN
EXHIBIT B-2
LABOR ESTIMATE
CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES
EIT
SENIOR 
INSPECTOR
3033 N. 44th Street, Suite 250, Phoenix, AZ 85018
(602) 244-2566
www.entellus.com
engineers@entellus.com
P:\600\615126A-Price Road Sewer Rehab CM\A_ADMIN\1. Contract & Addendum\615.126 - CA&I HOUR & FEE PROPOSAL (Exhibit B, B-1, B-2) - Rev 0
1 of 1

Project Name: PRICE ROAD FRONTAGE ROAD SEWER REHABILITATION Amendment No. 2 
Page C-1 
Project No.: WW2210.451 
Rev. 8/7/23 
EXHIBIT “C” 
SUBCONSULTANT DOCUMENTS WITH CONSULTANT 
 
 
Any subconsultant assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the Consultant and their 
subconsultants, and do not apply to the Agreement between the Consultant and 
the City.

MakPro Services, LLC 
2036 N. Gentry • Mesa, AZ 85213 
 
Office: 480-890-1927 
Email:  teresa@makprosvc.com 
 
 
August 6, 2023 
 
 
Mr. Paul Young 
Entellus, Inc. 
3033 N. 44th Street, Suite 250 
Phoenix, Arizona  85018 
 
Dear Paul: 
 
MakPro Services, LLC (MakPro) is pleased to provide the following proposal for public 
outreach services for the City of Chandler’s Price Road Sewer Rehabilitation Project 
construction (WW2210), which includes sewer pipeline rehabilitation, manhole replacement 
and rehabilitation, a sewer bypass and sewer pipeline abandonment in northbound Price 
Road frontage road from Elliot Road to south of Frye Road. Public outreach is an important 
element in projects that directly impact nearby stakeholders and provides a link between 
the project and the community it impacts.  
 
There are a variety of public outreach tools which can be used to establish appropriate 
communication with the effected stakeholders of a project. The services included in this 
scope and fee are based on the information you provided for an estimated 10-month 
construction schedule, with construction estimated to begin in November 2023.  
 
As part of the public outreach for this project, MakPro proposes to:   
x 
establish a 24-hour construction hotline for inquiries and maintain a call log.   
x 
develop a construction notification for nearby properties to inform them of the start of 
construction and any information related to schedule and sequencing. 
x 
develop and distribute periodic e-updates to stakeholders with project progress. 
x 
attend weekly progress meetings to identify community impacts and better understand 
the construction sequencing/schedule. 
 
The total cost for the public outreach services as identified above should not exceed 
$16,400.00, as detailed in the proposed cost estimate which follows. This proposed cost 
estimate assumes an hourly labor rate of $110 per hour and a $300/mo fee for the project 
hotline.

Mr. Paul Young, Entellus, Inc. 
 
    August 6, 2023  
                          
Public Outreach Services for Price Road Sewer Rehabilitation Project Construction (WW2210)  
 
 
 
 Proposed Cost Estimate 
Activity 
Est 
Hours 
Fees 
Reimb 
Expenses 
Total 
Public Outreach Services:  
 
 
 
 
Project Hotline (10 months @ $300)  
 
$3,000 
 
$3,000 
Develop, print, and distribute one 
construction notification and collect 
contact info 
20 hrs 
$2,200 
 
$2,200 
Provide periodic e-updates (approx 15) 
and respond to stakeholder inquiries or 
issues 
34 hrs 
$3,740 
 
$3,740 
Progress meetings and project 
administration (assumed to be “virtual” 
attendance) (Approx 36 weekly mtgs – 1 
hr each with small allowance for prep 
time or longer mtgs) 
44 hrs 
$4,840 
 
$4,840 
Reimbursable Expenses (printing / 
postage)  
 
 
$2,620 
$2,620 
Total Public Outreach Services:  
98 hrs 
$13,780 
$2,620 
$16,400 
 
Reimbursable expenses for this project have been estimated based on a distribution to 
those nearest the actual construction activities, not necessarily the entire corridor. The 
estimated cost is based on a 2-up half-color postcard. MakPro is not responsible for 
documenting existing property conditions, project signage or traffic signage, or any direct 
doorhanger notifications related to service disruptions. Progress or scheduled meetings 
have a one-hour minimum, and it is assumed this project is not federally funded so has no 
specific requirements for public outreach. This cost estimate is based on efficiencies across 
tasks, so adjustments to one activity may require adjustments to other activities. Changes 
of substance to this proposal during the project may affect the final cost.  
Thank you for the opportunity to work with you and the City of Chandler on this project.  
Should you have questions or need additional information related to this proposal, please 
feel free to contact me at (480) 890-1927. 
 
Sincerely, 
 
 
Teresa Makinen 
Principal

5861 S. Kyrene Rd. Ste.5 
Tempe Arizona 85283 
Ofc: (480)659-4101 
Fax: (480)659-5484 
www.SAECOSafe.com 
          
Price Road Frontage Road Sewer Rehabiliation 
Fee Schedule 
Professional Services 
Professional Engineer 
$225/Hr. 
Senior Project Manager/Engineer/Geologist/Environmental Scientist 
$195/Hr. 
Project Manager/Engineer/Geologist/Environmental Scientist 
$140/Hr. 
Senior Staff Engineer/Geologist/Environmental Scientist/Sr. Special Inspector 
$95/Hr. 
Staff Engineer/Geologist/Environmental Scientist/Special Inspector 
$80/Hr. 
Civil Inspector 
$115/Hr. 
Technical Illustrator/CAD Operator 
$75/Hr. 
Geotechnical/Environmental/Laboratory Assistant 
$65/Hr. 
Materials Supervisor 
$100/Hr. 
Senior Materials Technician (ATTI, ACI) 
$78/Hr. 
Materials Technician 
$68/Hr. 
Report Preparation/Dispatch 
$65/Hr. 
NDT and Special/Steel Inspector 
$95/Hr. 
Core-Drilling (1-technician crew) 
$100/Hr. 
Sample Runner (No Trip Charge) 
$50/Hr. 
OTHER CHARGES 
 
Expert Witness Testimony 
$350/Hr. 
Vapor Emissions Kits 
$30/Hr. 
Field Vehicle Usage 
$0.80/mi 
Field Equipment Use 
$45/day 
Direct Project Expenses 
Cost plus 15% 
 
NOTES 
For field and laboratory technicians and special inspectors, overtime rates at 1.5 times the regular rates will be charged for work 
performed in excess of 8 hours in one day Monday through Friday and all day on Saturday and Sunday.  The 1.5 times the regular 
rate also applies to work performed after 5 pm and before 5 am.  Rates at twice the regular rates will be charged for all work in 
excess of 12 hours in one day and all day on holidays. Lead time for any requested service is 24 hours.  
 
Special Inspector and Field Technician rates are based on a 4-hour minimum charge. Field personnel are charged portal to portal. 
Cancellations must be 2 hours prior to scheduled service time to not incur 4-hour minimum charge. 
 
A $500 charge will be billed for services requested day of.

SCHEDULE OF FEES FOR LABORATORY TESTING 
Laboratory Test, Test Designation, and Price per Test 
 
SOILS 
Atterberg Limits, Dry Preparation, D4318/T89,T90 ........................ $75 
Atterberg Limits, Wet Preparation, D4318/T89,T90 ..................... $105 
California Bearing Ratio (CBR), D1883 .......................................... $375 
Chloride and Sulfate Content, ARIZ 733, 736 ................................. $60 
Consolidation, (with 2 time rates) D2435, T216 ........................... $235 
Consolidation, Full Cycle (without time rates) .............................. $170 
Consolidation, (response-to-wetting, includes 5 points) ................ $95 
Direct Shear – Undisturbed, D 3080, T236 ................................... $295 
Direct Shear – Remolded, D 3080, T236 ....................................... $350 
Expansion Index, D 4829, UBC 18-2 .............................................. $175 
Expansion Potential, D 4546 ........................................................... $95 
Hydraulic Conductivity, D5084 ..................................................... $405 
Hydrometer Analysis, D422, T88 .................................................. $140 
Double Hydrometer Analysis, D422, T88 ...................................... $175 
Moisture, Ash, & Organic Matter of Peat/Organic Soils ................. $85 
Moisture Only, D 2216, T265 .......................................................... $15 
Moisture and Density, D2937 ......................................................... $25 
Permeability, CH, D2434, T215 ..................................................... $295 
pH and Resistivity, ARIZ 236 ......................................................... $105 
Proctor Density, D1557, D698, T99, T180 ..................................... $125 
R-value, D2844, T190 .................................................................... $425 
Sand Equivalent, D2419, T176 ........................................................ $55 
Sieve Analysis, D422 ..................................................................... $100 
Sieve Analysis, 200 Wash, D1140 ................................................... $85 
Specific Gravity, D 854 .................................................................... $75 
Thermal Resistivity (ASTM 5334, IEEE442) ................................... $900 
Triaxial Shear, C.U., three points, D4767, T297 ......................... $1,500 
Triaxial Shear, U.U., one point, D2850, T296 ................................ $500 
Unconfined Compression, D2166, T208 ....................................... $150 
Wax Density, D1188 ....................................................................... $75 
 
ASPHALT CONCRETE 
Asphalt Content/Gradation (Ignition Oven), T308, D6307 ........... $175 
Marshall Stability, Flow and Unit Weight, T245 ........................... $175 
Marshall and Unit Weight T245 .................................................... $175 
Maximum Theoretical Unit Weight (Rice), D 2041 ....................... $175 
Gyratory Density, T312 ................................................................. $165 
Bulk Specific Gravity, per specimen, D 2726................................... $15 
Bulk Specific Gravity, per specimen (coated), D 1188 .................... $50 
AGGREGATES 
Absorption, Coarse, C127 ............................................................... $55 
Absorption, Fine, C128 ................................................................... $75 
Clay Lumps and Friable Particles, C142 .......................................... $95 
Fractured Face ARIZ 212 ................................................................. $95 
Los Angeles Abrasion, C131 or C535 ............................................ $155 
Potential Reactivity of Aggregates, C1567/C1260 ........................ $900 
Resistance of Rock to W/D, USACE CRD-C 169-97 .................... $1,500 
Sand Equivalent, T176 .................................................................... $55 
Sieve Analysis, C136 ....................................................................... $50 
Sieve Analysis (including wash), C136 and C117 ............................ $80 
Sulfate Soundness (per size fraction), C88 ................................... $350 
Specific Gravity, Coarse, C127 ........................................................ $55 
Specific Gravity, Fine, C128 ............................................................ $65 
Unit Weight C29, T19 ..................................................................... $45 
 
MASONRY 
Concrete Block Compression Test, 8x8x16, C140  .......................... $65 
Cores, Compression or Shear Bond ................................................ $25 
Masonry Grout, UBC 21-18  ........................................................... $16 
Masonry Mortar, UBC 21-16 .......................................................... $16 
Masonry Prism, half size, compression, UBC 21-17 ....................... $85 
 
CONCRETE 
Compression Tests, 4 x 8 Cylinder, C39 (set of 4) ......................... $100 
Compression Tests, 6 x 12 Cylinder, C39 ........................................ $30 
Compression Test, Slurry ................................................................ $25 
Concrete Beam Modulus of Rupture .............................................. $60 
Concrete Mix Design Review, Job Spec ........................................ $125 
Concrete Mix Design, per Trial Batch, ACI .................................... $650 
Concrete Cores, Compression (excludes sampling), C42 ................ $40 
Non-shrink Grout Cubes, 2” (1 set of 3 cubes) C109 ...................... $50 
Gunite/Shotcrete, Panels, 3 cut cores per panel and test, ACI .... $190 
 
 
 
 
 
 
 
*Special preparation of standard test specimens will be charged at the technician’s hourly rate. 
 