Pedestrian Connectivity Study

City of Chandler — Regular Meeting (2024-05-15)

View PDF Meeting page

Extracted text (via pymupdf) 913 characters
TRANSPORTATION CO MMISSIO N
Citywide  Pedestrian Connectivity Study
Arizona Avenue Shared-Use Path
Ashley Trail Connection Project
May 15, 2024
1

Pedestrian Connectivity Study
2

PROJECT OVERVIEW
• Purpose: Identify Gaps in the 
Sidewalk Network Citywide
• Deliverable: GIS Database Tool 
Utilized to Prioritize 
Opportunities for 
Improvements
3

Key Points – Citywide  Pedestrian Connectivity Study
4
WHY
•
Enhance sidewalk connectivity or potentially construct shared-use paths.
•
Develop an inventory of existing sidewalks and gaps.
•
Develop a prioritization strategy.
•
Engage public feedback to help identify areas that need enhancements. 
ANALYSIS
ANTICIPATED 
COMPLETION
•
GIS symbology and other public GIS datasets to create graphics.
•
Assist the public and the City to visualize current infrastructure and gaps.  
•
Connectivity analysis, prioritization memo, and GIS dataset completed 
by July 2024