Extracted text (via pymupdf)
1582 characters
Arizona Avenue Shared-Use Path 5 Arizona Avenue Corridor Study Project Overview Corridor Limits – Ray to Western Canal ~ Approximately 2.5 Miles Feasibility Study/Assessment of Existing Sidewalk Infrastructure Goal: Enhancements to Existing Infrastructure Make Connections from Western Canal, Downtown Chandler, Neighboring Cities 6 Ray Road Warner Road Elliot Road Arizona Avenue Project Limits Guadalupe Road Western Canal Knox Road City Limits Arizona Avenue Corridor Study Corridor Existing Conditions Segment 1 Segment 2 E Ray Rd E Knox Rd E Highland St Arizona Ave N Study Limit E Highland St E Warner Rd E Corporate Pl Arizona Ave N Legend Bus Stop Restaurant Shared use path School Shopping 7 Arizona Avenue Corridor Study Segment 3 Segment 4 E Palomino Dr Arizona Ave E Comstock Dr E Elliot Rd E Chilton Dr N Legend Bus Stop Restaurant Shared use path School Shopping Arizona Ave E Chilton Dr E Tremaine Dr W Guadalupe Rd N Study Limit 8 Arizona Avenue Corridor Study 9 Key Points - Arizona Avenue Corridor Study 10 WHY • Arizona Avenue is identified as a future high-capacity transit corridor for bus rapid transit (BRT) in the 2050 MAG Regional Transportation Plan. • Shared-use path provides greater access to the regional transit network • Shared-use path enhances accessibility for multi-modal users. RIGHT-OF-WAY / UTILITIES ANTICIPATED COMPLETION • Utility and infrastructure conflicts are anticipated along the path alignment. • Path may be narrowed near challenging areas. • 15% Design Plans and a PA report will be completed by July 2024