Arizona Ave Shared Use Path

City of Chandler — Regular Meeting (2024-05-15)

View PDF Meeting page

Extracted text (via pymupdf) 1582 characters
Arizona Avenue Shared-Use Path
5

Arizona Avenue Corridor 
Study
Project Overview
Corridor Limits – Ray to Western Canal ~ 
Approximately 2.5 Miles
Feasibility Study/Assessment of Existing 
Sidewalk Infrastructure
Goal: Enhancements to Existing 
Infrastructure
Make Connections from Western Canal, 
Downtown Chandler, Neighboring Cities
6
Ray Road
Warner Road
Elliot Road
Arizona Avenue
Project Limits
Guadalupe Road
Western Canal
Knox Road
City Limits

Arizona Avenue Corridor Study
Corridor Existing Conditions 
Segment 1
Segment 2
E Ray Rd
E Knox  Rd
E Highland St
Arizona Ave
N
Study Limit
E Highland St
E  Warner Rd
E Corporate Pl
Arizona Ave
N
Legend
Bus Stop 
Restaurant 
Shared use path
School 
Shopping
7

Arizona Avenue Corridor Study
Segment 3
Segment 4
E Palomino Dr
Arizona Ave
E Comstock Dr
E Elliot Rd
E Chilton Dr
N
Legend
Bus Stop 
Restaurant 
Shared use path
School 
Shopping
Arizona Ave
E Chilton Dr
E Tremaine Dr
W Guadalupe Rd
N
Study Limit
8

Arizona Avenue Corridor Study
9

Key Points - Arizona Avenue Corridor Study
10
WHY
•
Arizona Avenue is identified as a future high-capacity transit corridor for 
bus rapid transit (BRT) in the 2050 MAG Regional Transportation Plan.
•
Shared-use path provides greater access to the regional transit network
•
Shared-use path enhances accessibility for multi-modal users.
RIGHT-OF-WAY / 
UTILITIES
ANTICIPATED 
COMPLETION
•
Utility and infrastructure conflicts are anticipated along the path 
alignment. 
•
Path may be narrowed near challenging areas.  
•
15% Design Plans and a PA report will be completed by July 2024