Ordinance No, 5098

City of Chandler — Study Session (2024-06-10)

View PDF Meeting page

Extracted text (via ocr_local) 13027 characters
ORDINANCE NO. 5098

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CHANDLER,
ARIZONA GRANTING A NON-EXCLUSIVE UNDERGROUND HIGH
VOLTAGE POWER EASEMENT TO SALT RIVER PROJECT AGRICULTURAL
IMPROVEMENT AND POWER DISTRICT IN CONSIDERATION FOR THE
PAYMENT OF EIGHTEEN THOUSAND FIVE HUNDRED AND NO/100THS
DOLLARS ($18,500.00), BY AMAZON, TO ACCOMMODATE THE
INSTALLATION OF ELECTRIC VEHICLE CHARGING STATIONS ON THE
AMAZON SITE AT 3405 S. MCQUEEN ROAD, CHANDLER, ARIZONA.

WHEREAS, Amazon is adding electric vehicle charging stations to its site located at 3405 S.
McQueen Road in Chandler, Arizona; and

WHEREAS, in order to accommodate the installation and these vehicle charging stations, Salt River
Project Agricultural and Power District (“SRP”) requires a Non-Exclusive Underground High
Voltage Power Easement in order to provide additional electrical capacity to the Amazon site; and

WHEREAS, the City of Chandler is willing to grant the non-exclusive High Voltage Power Easement
to SRP, in consideration of the payment of Eighteen Thousand Five Hundred and no/100ths Dollars
($18,500.00), to accommodate this improvement to the Amazon site.

NOW, THEREFORE, BE IT ORDAINED by the City Council of the City of Chandler, Arizona, as
follows:

Section 1. That the City Council of the City of Chandler, Arizona, in consideration of the payment
of Eighteen Thousand Five Hundred and no/100ths Dollars ($18,500.00), authorizes and
approves the granting of a non-exclusive Underground High Voltage Power Easement
to SRP, under and across that certain property legally described and depicted in Exhibit
“A” attached hereto and made a part hereof by this reference.

Section 2. That the granting of said non-exclusive utility easement shall be in a form approved by
the City Attorney attached hereto as Exhibit “B”.

Section 3. That the Mayor of the City of Chandler, Arizona, is hereby authorized to execute the
easement and this Ordinance on behalf of the City.

INTRODUCED AND TENTATIVELY APPROVED by the City Council of the City of Chandler,
Arizona, this day of 2024.

ATTEST:

CITY CLERK MAYOR

Ordinance No. 5098

Page 2
PASSED AND ADOPTED by the Mayor and City Council of the City of Chandler, Arizona, this
day of , 2024.
ATTEST:
CITY CLERK MAYOR
CERTIFICATION

I HEREBY CERTIFY that the above and foregoing Ordinance No. 5098 was duly passed and adopted
by the City Council of the City of Chandler, Arizona, at a regular meeting held on the day of
, 2024, and that a quorum was present thereat.

CITY CLERK

APPROVED AS TO FORM

CITY ATTORNEY
4

Published in the Arizona Republic on:

EXHIBIT “A”
Legal Description

EXHIBIT ”A”
SRP JOB NUMBER: 13527218 DATE: 04-16-2024
SRP JOB NAME: AMAZON DPX7 EV PRIMARY METER PAGE: 1 OF 9
TTRRSS: 02S05E14

AN EASEMENT WITHIN A PARCEL OF LAND AS DESCRIBED IN DOCUMENT 2006-0626729 MARICOPA COUNTY
RECORDER (MCR) LOCATED IN THE NORTHWEST QUARTER OF SECTION 14, TOWNSHIP 2 SOUTH, RANGE 5 EAST
OF THE GILA AND SALT RIVER MERIDIAN, MARICOPA COUNTY, ARIZONA, BEING MORE PARTICULARLY
DESCRIBED AS FOLLOWS;

COMMENCING AT THE NORTHWEST CORNER OF SAID SECTION 14, BEING A BRASS CAP FLUSH, FROM WHICH
THE NORTH QUARTER CORNER OF SAID SECTION 14, BEING A BRASS CAP FLUSH, BEARS NORTH 88 DEGREES 49
MINUTES 55 SECONDS EAST, A DISTANCE OF 2647.39 FEET (BASIS OF BEARINGS);

THENCE ALONG THE NORTH LINE OF THE NORTHWEST QUARTER OF SAID SECTION 14, NORTH 88 DEGREES 49
MINUTES 55 SECONDS EAST, A DISTANCE OF 603.34 FEET TO THE NORTHWEST CORNER OF SAID PARCEL;

THENCE SOUTH 51 DEGREES 10 MINUTES 58 SECONDS EAST, A DISTANCE OF 124.50 FEET TO THE SOUTH LINE
OF AN SALT RIVER PROJECT (SRP) EASEMENT AS DESCRIBED IN DOCUMENT 2011-0448954 MCR AND THE POINT
OF BEGINNING;

THENCE ALONG THE SOUTH LINE OF SAID SRP EASEMENT, NORTH 88 DEGREES 49 MINUTES 55 SECONDS EAST,
A DISTANCE OF 8.00 FEET TO THE NORTHWEST CORNER OF AN 8.00 FOOT SRP EASEMENT AS DESCRIBED IN
DOCUMENT 2011-0448956 MCR;

THENCE ALONG THE WESTERLY LIMITS OF SAID SRP EASEMENT, SOUTH 01 DEGREES 09 MINUTES 57 SECONDS
EAST, A DISTANCE OF 28.51 FEET;

THENCE ALONG THE SOUTHERLY LIMITS OF SAID SRP EASEMENT, NORTH 88 DEGREES 49 MINUTES 55 SECONDS
EAST, A DISTANCE OF 8.00 FEET;

THENCE SOUTH 39 DEGREES 35 MINUTES 14 SECONDS WEST, A DISTANCE OF 12.25 FEET;
THENCE SOUTH 01 DEGREES 09 MINUTES 57 SECONDS EAST, A DISTANCE OF 62.45 FEET;
THENCE NORTH 88 DEGREES 50 MINUTES 03 SECONDS EAST, A DISTANCE OF 86.00 FEET;
THENCE SOUTH 01 DEGREES 09 MINUTES 57 SECONDS EAST, A DISTANCE OF 8.00 FEET;
THENCE SOUTH 88 DEGREES 50 MINUTES 03 SECONDS WEST, A DISTANCE OF 86.00 FEET;

THENCE SOUTH 01 DEGREES 09 MINUTES 57 SECONDS EAST, A DISTANCE OF 34.03 FEET TO THE BEGINNING OF
A CURVE, CONCAVE WESTERLY, AND HAVING A RADIUS OF 350.00 FEET;

EXHIBIT ”A”
SRP JOB NUMBER: 73527218 DATE: 04-16-2024
SRP JOB NAME: AMAZON DPX7 EV PRIMARY METER PAGE: 2 OF 9
TTRRSS: 02S05E14

THENCE ALONG SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 52 DEGREES 59 MINUTES 00
SECONDS, AN ARC LENGTH OF 323.66 FEET TO THE BEGINNING OF A REVERSE CURVE, CONCAVE
SOUTHEASTERLY AND HAVING A RADIUS OF 470.00 FEET;

THENCE ALONG SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 10 DEGREES 25 MINUTES 03
SECONDS, FOR AN ARC LENGTH OF 85.46 FEET;

THENCE SOUTH 49 DEGREES 05 MINUTES 16 SECONDS EAST, A DISTANCE OF 86.00 FEET;
THENCE SOUTH 40 DEGREES 54 MINUTES 44 SECONDS WEST, A DISTANCE OF 8,00 FEET;

THENCE NORTH 49 DEGREES 05 MINUTES 16 SECONDS WEST, A DISTANCE OF 6.00 FEET TO THE BEGINNING OF
A NON-TANGENT CURVE, CONCAVE SOUTHEASTERLY AND HAVING A RADIUS OF 390.00 FEET WHICH BEARS
SOUTH 49 DEGREES 40 MINUTES 31 SECONDS EAST;

THENCE ALONG SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 41 DEGREES 34 MINUTES 37
SECONDS, FOR AN ARC LENGTH OF 283.01 FEET;

THENCE SOUTH 01 DEGREES 15 MINUTES 09 SECONDS EAST, A DISTANCE OF 6.88 FEET TO THE SOUTHERLY
BOUNDARY OF SAID PARCEL;

THENCE ALONG SAID SOUTHERLY BOUNDARY, SOUTH 88 DEGREES 45 MINUTES 09 SECONDS WEST, A DISTANCE
OF 8.00 FEET;

THENCE NORTH 01 DEGREES 15 MINUTES 09 SECONDS WEST, A DISTANCE OF 6.88 FEET TO THE BEGINNING OF
CURVE, CONCAVE EASTERLY, AND HAVING A RADIUS OF 398.00 FEET;

THENCE ALONG SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 41 DEGREES 35 MINUTES 20
SECONDS, FOR AN ARC LENGTH OF 288.89 FEET;

THENCE NORTH 49 DEGREES 05 MINUTES 16 SECONDS WEST, A DISTANCE OF 80.00 FEET TO THE BEGINNING OF
A NON-TANGENT CURVE, CONCAVE SOUTHEASTERLY, AND HAVING A RADIUS OF 478.00 FEET WHICH BEARS
SOUTH 49 DEGREES 34 MINUTES 31 SECONDS EAST; : ‘

THENCE ALONG SAID CURVE TO THE RIGHT, THROUGH A CENTRAL ANGLE OF 11 DEGREES 23 MINUTES 05
SECONDS, FOR AN ARC LENGTH OF 94.98 FEET TO THE BEGINNING OF A REVERSE CURVE, CONCAVE
NORTHWESTERLY, AND HAVING A RADIUS OF 342.00 FEET;

THENCE ALONG SAID CURVE TO THE LEFT, THROUGH A CENTRAL ANGLE OF 52 DEGREES 59 MINUTES 00
SECONDS, FOR AN ARC LENGTH OF 316.26 FEET;

EXHIBIT ”A”
SRP JOB NUMBER: T3527218 DATE: 04-16-2024
SRP JOB NAME: AMAZON DPX7 EV PRIMARY METER PAGE: 3 OF 9
TTRRSS: 02S05E14

THENCE NORTH 01 DEGREES 09 MINUTES 57 SECONDS WEST, A DISTANCE OF 142.27 FEET TO THE POINT OF
BEGINNING.

SAID EASEMENT CONTAINS AN AREA OF 8207.80 SQUARE FEET, OR 0.20 ACRE, MORE OR LESS.

END OF DESCRIPTION

EXHIBIT

// //
A

QUEEN CREEK ROAD
nis i ne |
i LC] LEGEND
| SITE on SECTION AND CENTERLINE
aI ig PROPERTY LINE
3 | |
| fe LIMITS OF EASEMENT
Zi... _f44).—-— -—.- a
tal s) i
a po EXISTING EASEMENT
ol : 3
=: | lo
| fe ne TIE LINE
| 4 SECTION CORNER AS NOTED
|. es 4
OCOTILLIO ROAD
VICINITY MAP (NTS)
12S, RSE
GASRM
ABBREVIATION TABLE
APN ASSESSOR'S PARCEL NUMBER
LVI LAST VISUAL INSPECTION
(M) WE ASURED
MCR MARICOPA COUNTY RECORDER
NTS NOT TO SCALE
SRP SALT RIVER PROJECT
BASIS OF BEARINGS:
BASED ON THE MARICOPA COUNTY
LOW DISTORTION PROJECTION
COGRDINATE SYSTEM.
CAUTION

THE EASEMENT LOCATION AS HEREON DELINEATED MAY CONTAIN HI
IS HEREBY GIVEN THAT THE LOCATION OF UNDERGROUND ELECTR
VERIFIED AS REQUIRED BY ARIZONA REVISED STATUTES, SECTION

GH VOLTAGE ELECTRICAL EQUIPMENT, NOTICE
ICAL CONDUCTORS OR FACILITIES MUST BE
40-380.21, ET. SEQ.. ARIZONA BLUE STAKE

LAW, PRIOR TO ANY EXCAVATION.

NOTES

THIS EXHIBIT IS INTENDED TO ACCOMPANY AN EASEMENT. ALL

PARCELS SHOWN WERE PLOTTED FROM RECORD INFORMATION. AND

NO ATTEMPT HAS BEEN MADE TO VERIFY THE LOCATION OF ANY
BOUNDARIES SHOWN. THIS IS NOT AN ARIZONA BOUNDARY SURVEY.

ALL ELECTRIC LINES SHOWN ARE MEASURED
TO THE WINDOW OF THE EQUIPMENT PAD
UNLESS OTHERWISE NOTED.

SALT RIVER PROJECT
AGRICULTURAL IMPROVEMENT & POWER DISTRICT

SWZ SURVEY DIVISION
LAND DEPARTMENT

1.0. NUMBER: 13527218 SCALE: NTS

Lid. NUMBER: 97686 SHEET: 4 OF 9

AGENT: BALTRUS SHEET SIZE: 8.5"x11"
DRAWN: TODARO REVISION: 0

CHECKED BY: GOREHAM CREW CHIEF: PETERSON

DATE: 04-16-2024 JEP|FIELD DATE: 03-15-2024

AMAZON DPX? EV
PRIMARY METER
NW 174 SECTION 14
T.2 S.. R.5 E.
8.1 SOUTH 28.1 EAST

EXHIBIT

NORTHWEST CORNER SECTION 14
FND BRASS CAP FLUSH

// //
A

NORTH 1/4 CORNER SECTION 14
FOUND BRASS CAP FLUSH

LVI: 11-17-2010 LVI: 05-22-2019
POINT OF COMMENCEMENT QUEEN CREEK ROAD
N88°49°55"E 2647.39" (M) (BASIS OF BEARING) 4
a 603.34" Resctie) 120-58) ay her
| JI 7"
| SRP_EASEMENT
‘ IL 201 1-0448954 MCR
| rm
| jy | SEE DETAIL
i ; SHEET 6 THRU 9
al (AIRPORT. BOULEVARD
=: / CENTERL INE
SI /
al a /
a 7
Sl ,
3:
| APN 3053-42-022C
| PART O
2006-0626729 MCR ()
|
| |
;
186-42" 853-10
oe N88°45'09"E 1137.75 NORTH
LINE TABLE
BEARING | DISTANCE
Li $51°10'58"E | 124.50"

|
|
|
LINE
|
|
|
|

SALT RIVER PROJECT
AGRICULTURAL IMPROVEMENT & POWER DISTRICT

SN2F) SURVEY DIVISION
LAND DEPARTMENT

1.0. NUMBER: 13527218 SCALE: NTS

Lid. NUMBER: 97686 SHEET: 5 OF 9

AGENT: BALTRUS SHEET SIZE: 8.5'x11”
DRAWN: TODARO REVISION: 0

CHECKED BY: GOREHAM CREW CHIEF: PETERSON

DATE: 04-16-2024

JEP JFIELD DATE: 03-15-2024

AMAZON DPX? EV
PRIMARY METER
NW 174 SECTION 14
T.2 S.» R.5 E.
8.1 SOUTH 28.1 EAST

EXHIBIT “A”
N oa
\Y Cp I
ey) — j-———1 I. __ — — — —
Ne
/ SRP EASEMENT
point or secinninc/! | | 3011 0448554 MCR
1-4 | |
SRP. EASEMENT
| Ut” 2ort“oaaaese MCR
1
| % |
VV ‘
I ( lg
1 | i= |
1 | 13
noteo9's7’w_ dh soteog’s7"e |
142.27 | | 62.45" | 3 (N)
1 | |=
it
1 | |
11 \ ,
1 | N88°50'03"E_ 86-00
I _____ I? NORTH
if $88°50'03"W 86.00
Il $01°09'57"E
1 be 3493" |
1] |
1 | | LINE TABLE
1 | 40" LINE | BEARING | DISTANCE
ly Li | $51°10'58E | 124.50’
RADIUS= 342.00' L2_| N@8°49°55"E | 8.00°
DELTA= 52°59’ 00" I | snares 7
LENGTH= 316.26’ i L3_| sot*o9’57"E | 26.51
i L4_| N@8°49°55"E | 8.00
I I L5_ | $39°35'14"W | 12.25’
! DOs ato L6 | $01°09°57"E | 8.00
1] CeNcTH= 323.66’
| i
I
J
MATC)
7 !
SALT RIVER PROJECT SN2E SURVEY DIVISION
AGRICULTURAL IMPROVEMENT & POWER DISTRICT LAND DEPARTMENT
[.0. NUMBER: 13527218 SCALE: NTS
L.J. NUMBER: 97686 SHEET: 6 OF 9 AMAZON DPX7 EV
AGENT: BALTRUS SHEET SIZE: 8.5711" PRIMARY METER
DRAWN: TODARO REVISION: 0 NW 174 SECTION 14
CHECKED BY: GOREHAM CREW CHIEF: PETERSON T.2 S.. R.5 E.
DATE: 04-16-2024 JEP [FIELD DATE: 03-15-2024 8.1 SOUTH - 28.1 EAST

EXHIBIT “A”
M
7 pe ter 5
il
i
ii
an
// ‘
// !
i] / |
/ 1 /
ii /
/ RADIUS= 350.00°/ )

/ DELTA= 52°59’ 00"
LENGTH= 323.66’

‘ |

RADIUS= 342..00'
DELTA= 52°59'00” 77
LENGTH= 316.26" Sy /

an f
77 & NORTH
ky
a, is
7 7 le
L7 i
77 Se
47 /
Y y J
47 o- ra
A
>
/
,
,

SALT RIVER PROJECT SNBPN SURVEY DIVISION
aM: Teepe SE HAND DEP ARTMEN
LJ NUMBER: 97686 SHEET: 7 OF 9 AMAZON DPX? EV
AGENT: BALTRUS SHEET SIZE: 8.5°x11" PRIMARY METER
DRAWN: TODARO REVISION: 0 NW 174 SECTION 14
CHECKED BY: GOREHAM CREW CHIEF: PETERSON T.2 S.. RO E.
DATE: 04-16-2024 JEPIFIELD DATE: 03-15-2024 8.1 SOUTH - 28.1 EAST

EXHIBIT

// //
A

RADIUS= 342.00’
DELTA= 52°59’ 00"
LENGTH= 316.26’

ve
4“ f

RADIUS= 478.00’ “7

DELTA= 1192305" 47

LENGTH= 94.98’ OS? 7

7 RADIUS= 470.00’ aa
CURVE. TABLE 7 7 \— DELTAS 10°25'03" 7

CURVE | RADIUS DELTA LENGTH re, LENGTH= 85.46° <9
ci_| 350.00" | 52°59'00" | 323.66" |” + <r |

RADIUS= 398.00’
DELTA= 41°35'20"
LENGTH= 288.89"

/ /

/
4y

/ /
7 /yage05'16"W
/ 6.00' SD
= ns Se
RADIUS= 390.00",

NORTH

DELTA= 41°34'37”
LENGTH= 283.01'

SALT RIVER PROJECT
AGRICULTURAL IMPROVEMENT & POWER DISTRICT

SN'2F SURVEY DIVISION
LAND DEPARTMENT

1.0. NUMBER: 13527218 SCALE: NTS

Lid. NUMBER: 97686 SHEET: 8 OF 9

AGENT: BALTRUS SHEET SIZE: 8.5"x11”
DRAWN: TODARO REVISION: 0

CHECKED BY: GOREHAM CREW CHIEF: PETERSON

DATE: 04-16-2024 JEPIFIELD DATE: 03-15-2024

AMAZON DPX? EV
PRIMARY METER
NW 174 SECTION 14
T.2 S.. ROE.
8.1 SOUTH 28.1 EAST

// //
A

EXHIBIT

LENGTH= 288.89’

/
! /
il

‘
fon)
[=
x
Ie
3
+O
KR
1S
'&
s
|=
I
1

I

raDius= 398.00° / /
DELTA= cana /
/
/ 7

RADIUS= 390.00'

DELTA= 41°34'37"
LENGTH= 283.01!

NORTH
LINE TABLE
LINE BEARING DISTANCE
L7_| $01°15'09"E 6.88"
L8_ | $88°45'09"W 8.00’
L9__|_NO1°15'09"W 6.88"

SALT RIVER PROJECT

CAS%ES SURVEY DIVISION
LAND DEPARTMENT

AMAZON DPX7 EV

AGRICULTURAL IMPROVEMENT & POWER DISTRICT
T.0. NUMBER: 13527218 SCALE: NTS
L.J. NUMBER: 97686 SHEET: 9 OF 9
AGENT: BALTRUS SHEET SIZE: 8.5°x11" PRIMARY METER
DRAWN: TODARO REVISION: 0 NW 1/4 SECTION 14
CHECKED BY: GOREHAM CREW CHIEF: PETERSON T.2 S.. R.5 E.
DATE: 04-16-2024 JEP|FIELD DATE: 03-15-2024 8.1 SOUTH - 28.1 EAST