Amendment No. 3

City of Chandler — Study Session (2024-07-15)

View PDF Meeting page

Extracted text (via pymupdf) 6875 characters
Page 1 of 4 
City Clerk Document No.  
 
City Council Meeting Date: July 18, 2024 
AMENDMENT TO CITY OF CHANDLER AGREEMENT 
RIGHT OF WAY REPAIRS 
CITY OF CHANDLER AGREEMENT NO. PW1-745-4336 
THIS AMENDMENT NO. 3 (Amendment No. 3) is made and entered into by and between the City of 
Chandler, an Arizona municipal corporation (City), and Vincon Engineering Construction, LLC, 
(Contractor), (City and Contractor may individually be referred to as Party and collectively referred to 
as Parties) and made __________________________, 2024 (Effective Date). 
RECITALS 
WHEREAS, the Parties entered into an agreement for right of way repairs (Agreement); and 
WHEREAS, the term of the Agreement was August 1, 2021, through July 31, 2022, with the option of up 
to four one-year extensions; and 
WHEREAS, the Parties wish to exercise the third option through this Amendment to extend the 
Agreement for one year. 
AGREEMENT 
NOW THEREFORE, the Parties agree as follows: 
1.
The recitals are accurate and are incorporated and made a part of the Agreement by 
this reference.
2.
Section III is amended to read as follows: The Agreement is extended for a one-year period 
August 1, 2024, through July 31, 2025.
3.
Section IV, Price is amended to read as follows: The City will pay the Contractor the per unit cost 
set forth in Revised Exhibit B of the original Agreement, attached to and made a part of this 
Amendment No. 3. Total payments made to the Contractor during the term of this Amendment 
No. 3 will not exceed $200,000.
DocuSign Envelope ID: D7B6B0B4-8E52-4409-BA49-CD5D5037A145

Page 2 of 4 
4.
All other terms and conditions of the Agreement remain unchanged and in full force and effect.
If a conflict or ambiguity arises between this Amendment No. 3 and the Agreement, the terms
and conditions in this Amendment No. 3 prevail and control.
IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. 
FOR THE CITY 
FOR THE CONTRACTOR 
By: _________________________________________ 
By: _________________________________________ 
Its: ___________Mayor________________________ 
Its: _________________________________________ 
APPROVED AS TO FORM: 
By: _________________________________________ 
City Attorney 
ATTEST: 
By: _________________________________________ 
City Clerk 
DocuSign Envelope ID: D7B6B0B4-8E52-4409-BA49-CD5D5037A145
Member

Page 3 of 4 
 
REVISED EXHIBIT B-PRICING 
Section 1 – Routine Repairs / Service (requires a 14-day repair time). Prices are tax inclusive. 
 
Line 
# 
Description 
U.O.M.* 
Qty 
Unit Price 
1. 
Saw cut: per linear foot / per inch 
 
0-2.0” deep 
LF 
400 
$ 0.60 
 
2.1” – 3.0” deep 
LF 
400 
$ 1.21 
 
3.1” – 4.0” deep 
LF 
400 
$ 1.81 
 
Greater than 4.0” deep 
LF 
400 
$ 6.03 
2.a. 
EVAC Asphalt Removal & Replacement 
 
0” to 4.0” deep, 1 – 10 sq. yd. 
SY 
400 
$ 112.27 
 
0” to 4.0” deep, 11 – 100 sq. yd. 
SY 
400 
$ 106.23 
 
4” to 8” deep, 1 – 10 sq. yd. 
SY 
400 
$ 146.12 
 
4” to 8” deep, 11 – 100 sq. yd. 
SY 
400 
$ 140.09 
2.b. 
Rubberized Asphalt Removal & Replacement 
 
0” to 4.0” deep, 1 – 10 sq. yd. 
SY 
80 
$ 120.64 
3. 
2” Asphalt Cap 
SY 
800 
$ 42.22 
4. 
Asphalt milling up to 2” deep per sq. yd. 
SY 
80 
$ 10.86 
5. 
Asphalt milling between 2.1”-4.0” deep per sq. yd. 
SY 
80 
$ 12.06 
6. 
Sub-base and sub-base grade removal and 
replacement, per cu yd.  
 
CY 
 
80 
$ 223.18 
7. 
City of Chandler Uniformed Police Officer (if 
required).  Contractor to be paid the cost of hiring 
police officer. 
 
N/A 
 
N/A 
$ 3,500.00 
8. 
Traffic control for arterial and collector (per 24-hour 
day)  
 
DAY 
 
60 
$ 1,025.43 
9. 
Traffic control for local streets (per 24-hour day) 
 
DAY 
 
15 
$ 241.28 
10. 
New A/C only, 1” deep per sq. yd. 
SY 
75 
$ 18.10 
11. 
Remove concrete curb & gutter (per lineal foot) 
 
LF 
 
175 
$ 16.89 
12. 
Place concrete curb & gutter (per lineal foot) 
 
LF 
 
175 
$ 38.14 
13. 
Removal of concrete flatwork, 0-4” (per sq. ft.) 
 
SF 
 
120 
$ 4.22 
14. 
Removal of concrete flatwork, 4.1” – 8.0” (per sq. ft.) 
SF 
120 
$ 5.73 
15. 
Place finished concrete flatwork, 0-4” (per sq. ft.) 
SF 
400 
$ 11.95 
16. 
Place finished concrete flatwork, 4.1” – 8.0” (per sq. 
ft.) 
SF 
120 
$ 15.46 
17. 
Sidewalk, Per MAG Detail #230 
SF 
800 
$ 11.95 
18. 
Ramp, Per MAG Detail #235-1 (2017) 
EA 
1 
$ 1,289.78 
19. 
Valve Box/Collars Per COC Standard C307 & C317 
EA 
15 
$ 729.39 
20. 
Ramp, Per MAG Detail #235-5 (2017) 
EA 
1 
$ 1,289.78 
21. 
General survey 
EA 
20 
$ 120.64 
22. 
Crack seal (per lineal foot) 
LF 
400 
$ 1.81 
23. 
Minimum Charge for Projects under 5’ x 8’ in size 
EA 
20 
$ 3,015.97 
 
DocuSign Envelope ID: D7B6B0B4-8E52-4409-BA49-CD5D5037A145

Page 4 of 4 
 
Section 2 – Emergency Repairs / Service (requires a 7 day repair time). Prices are tax inclusive. 
Line 
# 
Description 
U.O.M.
* 
Qty 
Unit Price 
1. 
 
0-2.0” deep 
LF 
250 
$ 0.60 
 
2.1” – 3.0” deep 
LF 
250 
$ 1.21 
 
3.1” – 4.0” deep 
LF 
250 
$ 1.81 
 
Greater than 4.0” deep 
LF 
250 
$ 6.03 
2.a. 
 
0” to 4.0” deep, 1 – 10 sq. yd. 
SY 
250 
$ 112.27 
 
0” to 4.0” deep, 11 – 100 sq. yd. 
SY 
250 
$ 106.23 
 
4” to 8” deep, 1 – 10 sq. yd. 
SY 
250 
$ 146.12 
 
4” to 8” deep, 11 – 100 sq. yd. 
SY 
250 
$ 140.09 
2.b. 
 
0” to 4.0” deep, 1 – 10 sq. yd. 
SY 
50 
$ 120.64 
3. 
2” Asphalt Cap 
SY 
500 
$ 42.22 
4. 
Asphalt milling up to 2” deep per sq. yd. 
SY 
50 
$ 10.86 
5. 
Asphalt milling between 2.1”-4.0” deep per sq. yd. 
SY 
50 
$ 12.06 
6. 
Sub-base and sub-base grade removal and replacement, 
per cu yd.  
 
CY 
 
50 
$ 223.18 
7. 
City of Chandler Uniformed Police Officer (if required).  
Contractor to be paid the cost of hiring police officer. 
 
N/A 
 
N/A 
$ 3,500.00 
8. 
Traffic control for arterial and collector (per 24-hour day)  
 
DAY 
 
40 
$ 1,025.43 
9. 
Traffic control for local streets (per 24-hour day) 
 
DAY 
 
10 
$ 241.28 
10. 
New A/C only, 1” deep per sq. yd. 
SY 
50 
$ 18.10 
11. 
Remove concrete curb & gutter (per lineal foot) 
 
LF 
 
100 
$ 16.89 
12. 
Place concrete curb & gutter (per lineal foot) 
 
LF 
 
100 
$ 38.14 
13. 
Removal of concrete flatwork, 0-4” (per sq. ft.) 
 
SF 
 
75 
$ 4.22 
14. 
Removal of concrete flatwork, 4.1” – 8.0” (per sq. ft.) 
SF 
75 
$ 5.73 
15. 
Place finished concrete flatwork, 0-4” (per sq. ft.) 
SF 
250 
$ 11.95 
16. 
Place finished concrete flatwork, 4.1” – 8.0” (per sq. ft.) 
SF 
75 
$ 15.46 
17. 
Sidewalk, Per MAG Detail #230 
SF 
500 
$ 11.95 
18. 
Ramp, Per MAG Detail #235-1 (2017) 
EA 
1 
$ 1,289.78 
19. 
Valve Box/Collars Per COC Standard C307 & C317 
EA 
5 
$ 729.39 
20. 
Ramp, Per MAG Detail #235-5 (2017) 
EA 
1 
$ 1,289.78 
21. 
General survey 
EA 
10 
$ 120.64 
22. 
Crack seal (per lineal foot) 
LF 
250 
$ 1.81 
23. 
Minimum Charge for Projects under 5’ x 8’ 
EA 
10 
$ 3,015.97 
 
 
DocuSign Envelope ID: D7B6B0B4-8E52-4409-BA49-CD5D5037A145