Tumbleweed Ranch Master Plan

City of Chandler — Regular Meeting (2024-08-15)

View PDF Meeting page

Extracted text (via pymupdf) 12357 characters
Master Plan for
The Ranch at Tumbleweed Park
Prepared by:
29 March  2024

City of Chandler
|        01
Master Plan for The Ranch at Tumbleweed Park
Project Summary	
	
	
	
	
	
	
	
02
Vision Statement	
	
	
	
	
	
	
	
02
Background & History	
	
	
	
	
	
	
02
Proposed Master Plan Improvements	
	
	
	
	
03
Master Plan Design Report	
	
	
	
	
	
	
04
Site Context Plan	
	
	
	
	
	
	
	
04
Master Plan	 	
	
	
	
	
	
	
	
05
Master Plan - Parking	
	
	
	
	
	
	
06
Master Plan - Access	
	
	
	
	
	
	
07
Master Plan - Circulation	
	
	
	
	
	
	
08
Master Plan - Daily Use	
	
	
	
	
	
	
10
Master Plan - Special Event		
	
	
	
	
	
24
Project Budget, Phasing Plan, & Implementation Strategy	
	
30	
	
Budgeting Zone Map	
	
	
	
	
	
	
31
Phase 1 Site Plan	
	
	
	
	
	
	
	
32
Phase 2 Site Plan	
	
	
	
	
	
	
	
33
Phase 3 Site Plan	
	
	
	
	
	
	
	
34
Phase 4 Site Plan	
	
	
	
	
	
	
	
35
Table of Contents

City of Chandler
|        02
Master Plan for The Ranch at Tumbleweed Park
Vision Statement
The vision of The Ranch at Tumbleweed Park is to create a vibrant cultural destination that anchors 
the southern half of the existing Tumbleweed Park campus.  Its overall focus will be on the history 
of Chandler’s culture of innovation and will celebrate and honor this history of innovation and the 
people who have contributed to it.
Dr. Chandler’s almost unceasing drive for the next “big thing” drove him to constantly seek new 
innovations: in land development, water control, sources of water, ranching, agriculture, fruit 
production, solar power, tourism, finance, architecture, community development, and the list goes 
on.  Dr. Chandler created a culture of innovation driven by opportunity.  Countless others, from all 
walks of life, have continued that legacy in Chandler and continually make it the “Community of 
innovation” it is today.
The Ranch at Tumbleweed Park is the place to celebrate and honor this history of innovation and the 
people who have made it.
Background & History
The Ranch at Tumbleweed Park is comprised of 19 acres in the southeast corner of Tumbleweed 
Park, 2205 S. McQueen Road, Chandler, AZ.  The Ranch was originally developed in the early 2000s 
and features four historic structures, a small stage and amphitheater, deomonstration agricultural 
fields, and antique agricultural equipment displays.
The Ranch is currently managed by the Chandler Museum, a division within the Cultural 
Development Department of the City of Chandler.  The City of Chandler Parks Department maintains 
the physical grounds.  Orignally conceived as the City’s main interpretive space for Chandler’s 
agricultural and foodways heritage, the Ranch grew into the main location for Chandler Museum’s 
school field trip program and the Museum’s signature special event, the annual Chandler Chuck 
Wagon Cook-off.  In the past, additional community special events also occur t the Ranch including 
the Ostrich Festival and several high school cross-country track meets.  The Ranch is open daily for 
recreational visitors and has become a popular location for professional photographers to shoot 
outdoor portraits.  The Ranch is also used by outside non-profit organizations includign the Future 
Farmers of America and Weeders Gardening Club.
Over the past 25 years, there have been multiple studies and master plans completed for The Ranch 
at Tumbleweed Park including the following:
	•
Public History Master Plan, 1999
	•
Tumbleweed Ranch Program Plan, 2000
	•
Edwards House Building Assessment Report, 2005
	•
the Ranch at Tumbleweed Park Master Plan, 2006
	•
Additional Mapping of Triangular Garden Area, 2013
Master Plan for The Ranch at Tumbleweed Park
Project Summary

City of Chandler
|        03
Master Plan for The Ranch at Tumbleweed Park
Proposed Master Plan Improvements
The Ranch at Tumbleweed Park is planned to have a multi-phased improvement plan to create 
a vibrant cultural destination that supports daily activity for Chandler residents as well as special 
events.  Proposed Master Plan improvements will include the following:
General Site Improvements:
	•
Create a prominent new site entrance at The Ranch and an impmroved public face on 
Centennial Parkway.
	•
Develop a tree master plan for the entire 19 acre site to create shady activity zones and 
provide opportunities to interpret Chandler’s fruit crop history.
	•
Expand parking capacity to support daily programming and special events.
The Water Promenande:  A redesigned interpretation of the importance of water and canals to 
Chandler’s history along the existing canals.
	•
Featuring a public art piece and water feature that represents a dredge that created the 
water infrastructure and the ever-important canals that deliver this creitical natural resource.
	•
A space to interpret Chandler’s environmental history, and the innovatins of today and 
water’s future.
	•
Feature interpretation about the recharge wells on site and their role in ensuring that the 
water aquafer stays healthy.
	•
A shady promenade that welcoms visitors to The Ranch.
History Path:  An interpretive pathway with redesigned historical kiosks featuring severl of 
Chandler’s innovators, cultural groups, important places, and events.
	•
This History Path will be the central hub of a completely redesigned and redeveloped 
historical kiosk program that will ultimately include kiosks in every one of Chandler’s 78 parks 
that will become Chandler’s History Trail.
Historic Structures:  Restoration of four historic structures so that they can be open to the 
public on a regular basis including enhanced interpretation of historic structures.
Twin Barns:  Redesign area including two new barn structures to support daily programming 
and support special events.
	•
Shady area for family picnics, daily programming, and community gatherings.
	•
A relocated and redesigned Red Shed amphitheater to support educational programs and 
small events.
	•
Dedicated event area for signature event, the Chandler Chuck Wagon Cook-off.
	•
Space designed to be able to support private events such as weddings or family reunions.
Adventure Play:  Develop a new adventure play area for families featuring a signature tree 
house, interpretive play, and interactive water features.
The Innovation Shed:  Build a new large interpretive building to house large farm equipment 
pieces and interpret Chandler’s agricultural history and be a mix of indoor and outdoor spaces.
	•
This new interpretive buildign will also allow for changing and rotational exhibitions on 
Chandler’s innovators and other areas of Chandler history.
The Barn:  Build a new large barn structure to house a state of the art special event area.
	•
Flexible structure designed to support a wide range of programs including farmers market, 
arts & cultural festivals, outdoor movies, and small concerts.
The Citrus Camp:  Develop citrus orchard along with newly recreated historic structures that 
are open to the public and support daily programming.
The Farm:  Demonstration agricultural fields located on the eastern portion of the site. Includes 
the ability to support community gardening education programs.

City of Chandler
|        04
Master Plan for The Ranch at Tumbleweed Park
Site Context Plan

City of Chandler
|        05
Master Plan for The Ranch at Tumbleweed Park
Master Plan

City of Chandler |        06
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Parking

City of Chandler
|        07
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Access

City of Chandler
|        08
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Circulation

City of Chandler
|        09
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Circulation

City of Chandler
|        10
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        11
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        12
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        13
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        14
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        15
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        16
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        17
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        18
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        19
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        20
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        21
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        22
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        23
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Daily Use

City of Chandler
|        24
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        25
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        26
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        27
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        28
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        29
Master Plan for The Ranch at Tumbleweed Park
Master Plan - Special Event

City of Chandler
|        30
Master Plan for The Ranch at Tumbleweed Park
Project Budget
The Project Cost Estimate is based on the 2023 Master Plan and is organized in a series of site 
zones to allow for implementation over multiple phases.  The Project Cost Estimate is as follows:
General Site Improvements:  (Grading, Infrastructure, and Trees)	
	
$  1,125,000
Zone A - The Barn  	
	
	
	
	
	
	
	
$  4,977,500
Zone B - The Water Promenande  	
	
	
	
	
	
$  1,055,625
Zone C - The Farmhouse		
	
	
	
	
	
	
$  1,330,313
Zone D - The Twin Barns		
	
	
	
	
	
	
$  3,946,250
Zone E - The Treehouse / Adventure Play	
	
	
	
	
$  1,625,000
Zone F - The Innovation Shed	
	
	
	
	
	
	
$  4,503,125
Zone G - The Citrus Camp	
	
	
	
	
	
	
$  2,300,375
Zone H - The Farm	
	
	
	
	
	
	
	
$      312,500
Total - All Zones	 	
	
	
	
	
	
	
	
$ 21,175,688
Phasing Plan
The Ranch at Tumbleweed Park is planned to have four phases as follows:
Phase 1 - General Site Improvements & 30% Design All Phases	
	
$  1,425,760
Phase 2 - Zones B, C, & D		
	
	
	
	
	
	
$  6,237,205
Phase 3 - Zones A, E, & F		
	
	
	
	
	
	
$ 10,939,041
Phase 4 - Zones G & H	
	
	
	
	
	
	
	
$  2,573,682
Total - All Phases		
	
	
	
	
	
	
	
$ 21,175,688
Implementation Strategy
The Ranch at Tumbleweed Park is planned to have a multi-phased improvement plan to create a 
vibrant cultural destination that supports daily activities for Chandler residents as well as special 
events.  Proposed project phasing is as follows:
FY 2023 - 2024:  
Funded design costs for Zone B - The Water Promenade, Zone D - The Twin Barns, Zone E - 
The Treehouse / Adventure Play, and General Site Improvements to include grading, planting 
of trees, and a pedestrian pathway with historical interpretive signage.
FY 2025 - 2026:  Design & Construction of Zone C - The Farmhouse
FY 2026 - 2027:  Final Design & Construction of Headwaters and Twin Barns
FY 2027 - 2028:  Final Design & Construction of Zone E - The Treehouse / Adventure Play
FY 2028 - 2029:  Final Design for Zone F - Innovation Shed and Zone A - The Barn
FY 2029 - 2030:  Construction of Zone F - Innovation Shed and Zone A - The Barn
Master Plan for The Ranch at Tumbleweed Park
Project Budget & Implementation Strategy

City of Chandler
|        31
Master Plan for The Ranch at Tumbleweed Park
Project Budget

City of Chandler
|        32
Master Plan for The Ranch at Tumbleweed Park
Phasing Plan

City of Chandler
|        33
Master Plan for The Ranch at Tumbleweed Park
Phasing Plan

City of Chandler
|        34
Master Plan for The Ranch at Tumbleweed Park
Phasing Plan

City of Chandler
|        35
Master Plan for The Ranch at Tumbleweed Park
Phasing Plan