Project Name: Pickleball Courts at Tumbleweed Park – Change Order No. 1 GMP 2
Page 1
Project No.: PR2206.401
Rev. 1/16/2024
Amendment authorized by Owner name: Mickey Ohland & Kurt Hoffman
Date: 8/5/24
Original Agreement amount:
$1,776,697.99
Previous Change Order total:
n/a
Last Agreement amount approved by Council:
$1,776,697.99
This Change Order:
$8,415,866.94
This Change Order + previous Change Order(s) not approved by
Council total:
$8,415,866.94
Revised Agreement total:
$10,192,564.93
Council Approval Required (yes indicates approval required)
Yes
No
Change Order(s) total over $100,000:
☒
☐
Agreement Time
Agreement time prior to this Change Order (including previous
change order(s):
365
Calendar Days
Net change resulting from this Change Order:
150
Calendar Days
Revised Agreement time (including this Change Order):
515
Calendar Days
Council Approval (if applicable)
Council Approval Date: September 12, 2024
CHANGE ORDER NO.
1
DATE
August 5, 2024
This Change Order No. 1 (“Change Order No. 1”) to the construction services agreement is made by
and between the City of Chandler, an Arizona municipal corporation, (“City”) and Hunter Contracting
Co. (“Contractor”), on this ________ day of ___________________, 2024 (“Effective Date” by Clerk).
Change Order not valid until signed by both the City and the Contractor. Contractor’s signature indicates
Agreement herewith, including any adjustments in the Agreement Price or Agreement Time.
Project Name:
Pickleball Courts at Tumbleweed Park GMP 2
Project No.:
PR2206.401
User Dept.:
Community Services Department
NTP Date: 7/22/2024
TO:
Hunter Contracting Co.
701 N. Cooper Rd., Gilbert, AZ 85233
(CONTRACTOR)
(Mailing Address)
michaelg@huntercontracting.com
(Email Address)
Contractor must make the following changes to this Agreement:
This Change Order No. 1 is for GMP 2 Construction Services as described in Exhibit “A”, which is
attached to and made a part of this Agreement by this reference. GMP 1 was approved by City
Council on July 18, 2024, for the purpose of ordering long-lead construction materials.
180
Calendar Days
545
Calendar Days
701 N. Cooper Rd.
Gilbert, AZ 85233
Phone: 480-892-0521
Fax: 480-892-4932
Pickleball Courts at Tumbleweed Park
GMP 2 @ 100% Plans rev2
Project No: PR2206.401
Submitted: July 31, 2024
GMP 2 @ 100% Plans rev2
EXHIBIT "A"
TABLE OF CONTENTS
COVER PAGE
1
TABLE OF CONTENTS
2
PROJECT DESCRIPTION
3
SUMMARY
4
SCHEDULE OF VALUES
5 – 8
ASSUMPTIONS & CLARIFICATIONS
9 – 11
LIST OF SUBCONTRACTORS
12 – 13
QUOTE COMPARISON / QUOTES
14 – 77
LIST OF GMP PLANS AND SPECIFICATIONS 78
SCHEDULE (Preliminary)
79
PROJECT DESCRIPTION
This project includes construction services for 18 standard post-tensioned concrete
pickleball courts and accompanying amenities including but not limited to: parking lot
with approximately 130 spaces, sidewalk, landscape, irrigation, restroom, equipment
storage, lighting, benches, practice areas, and shade canopies. Construction also
includes 3 standard post-tensioned concrete tennis courts at the Chandler Tennis
Center.
Tumbleweed Park is in the square mile bordered by Germann, McQueen, and Queen
Creek Roads, and Arizona Avenue, Chandler, Arizona. The pickleball portion of the
project is located at the southeast corner of Germann Rd and Pioneer Parkway. The
tennis court portion of the project is located at the Chandler Tennis Center, 2250 S.
McQueen Rd
GMP 2 DESCRIPTION
This GMP is for the construction scope which includes all of the labor, equipment,
materials, supervision, and subcontractors to construct the infrastructure (grading,
drainage, utilities, etc) and site programming; including the pickleball courts, restroom
building, parking lots, concrete flatwork, signage, associated fence, site furniture,
monument, wayfinding signs and work for the modifications of Pioneer Parkway.
Not included in this scope is any long-lead procurement materials included in GMP 1.
EXHIBIT D
CM @ RISK GMP SUMMARY
Date:
7/30/2024
100% - Project
GMP 2
A. Cost of Work
A1 Cost of Work (self perform, no mark-up)
$1,952,179.21
A2 Cost of Work (subcontractors, suppliers, material)
$4,042,454.66
TOTAL COST OF WORK:
$5,994,633.87
B. General Conditions
$688,847.55
$6,683,481.42
C. CM@Risk's Fee
8.50%
$568,095.92
SUBTOTAL 2 (A + B + C):
$7,251,577.34
D. Bonds and Insurance (on Subtotal 1)
D1 Bonds (Payment and Performance)
0.77%
$55,837.15
D2 Insurance
1.00%
$72,515.77
D3 Buildes Risk Insurance
$8,459.83
$136,812.75
SUBTOTAL 3 (SUBTOTAL 2 + BONDS & INS):
$7,388,390.09
E. Sales Tax
E1 Sales Tax
5.07%
$374,591.38
E2 Tax Credits
$0.00
$374,591.38
F. Approved Allowances
F1 Owner's Allowance
$0.00
F2 Owner's Allowance for Water and Wastewater
$0.00
$0.00
G. Contingencies
G1 Owner Contingency
$436,067.93
G2 Project Contingency (Material Escalation & Contractor)
$216,817.55
$652,885.48
$8,415,866.94
Establishment of Values:
a. Cost of Work (A) and Allowances (F) to be submitted with GMP Proposal.
b. General Conditions Cost (B) to be established in Baseline Cost Model.
c. CM@Risk Fee as set forth in Section 3.7.3 of this Contract
Project Name: Pickleball Courts at Tumbleweed Park
Project Location: Pioneer Pkwy / Germann Rd
TOTAL CONTINGENCIES:
TOTAL GMP PROPOSAL:
City of Chandler Project No.: PR2206.401
SUBTOTAL 1 (Cost of Work) (A + B):
TOTAL BONDS & INSURANCE:
TOTAL SALES TAX:
TOTAL ALLOWANCES:
Pickleball Courts at Tumbleweed Park
Date:
7/30/24
Project No. PR2206.401
Schedule of Values
Cost Model - 100%
Spec No. Bid Item Description
Bid Qty
UM
Unit Cost
Total Cost
1
REMOVALS & EARTHWORK
1
EA
426,406.14
$
426,406.14
$
1.1
Remove Asphalt Roadway
337
SY
30.01
$
10,113.37
$
1.2
Remove Concrete Curb and Gutter
668
LF
9.35
$
6,245.80
$
1.3
Remove Sidewalk/Driveway
2,148
SF
4.17
$
8,957.16
$
1.4
Clearing & Grubbing
6.25
AC
28,969.98
$
181,062.38
$
1.5
Pre-wet Site
6.25
AC
2,567.39
$
16,046.19
$
1.6
Precompact Ongrade/Fill Areas
25,188
SY
0.56
$
14,105.28
$
1.7
Excavation (Cut to Fill)
3,804
CY
8.37
$
31,839.48
$
1.8
Import
6,477
CY
15.72
$
101,818.44
$
1.9
Site Rough Grade +/- 0.1
29,745
SY
0.64
$
19,036.80
$
1.10
Site Finish Grade (Post Utilities) - Hunter
29,745
SY
1.25
$
37,181.25
$
2
SEWER
1
EA
85,381.49
$
85,381.49
$
2.1
Remove Cleanout, Connect to Existing
1
EA
1,088.59
$
1,088.59
$
2.2
6" PVC Sewer Line
445
LF
124.93
$
55,593.85
$
2.3
48" Sewer Manhole
1
EA
26,233.60
$
26,233.60
$
2.4
Sewer Cleanout
5
EA
743.09
$
3,715.45
$
2.5
Adjust Sewer Manhole
1
EA
1,000.00
$
1,000.00
$
2.6
Adjust Sewer Cleanout
5
EA
650.00
$
3,250.00
$
2.7
Sewer Pipe Materials
1
LS
(5,500.00)
$
(5,500.00)
$
3
WATER
1
EA
61,860.48
$
61,860.48
$
3.1
2" Copper Water Service Line
85
LF
162.82
$
13,839.70
$
3.2
2" Sch. 40 PVC Water Line and Fittings
148
LF
59.78
$
8,847.44
$
3.3
2" Reduce Pressure Backflow Prevention Unit & Cage
1
EA
4,075.61
$
4,075.61
$
3.4
2" Water Meter
1
EA
2,457.21
$
2,457.21
$
3.5
Bore Under Existing Concrete Curb/Sidewalk
4
EA
334.83
$
1,339.32
$
3.6
Remove & Replace Asphalt Roadway
40
SY
212.34
$
8,493.60
$
3.7
2" Copper Water Service Line (drinking fountain, not on plans)
180
LF
162.82
$
29,307.60
$
3.8
Water Pipe Materials
1
LS
(6,500.00)
$
(6,500.00)
$
4
STORM DRAIN
1
EA
176,346.57
$
176,346.57
$
4.1
12" HDPE
46
LF
180.12
$
8,285.52
$
4.2
18" HDPE
160
LF
272.74
$
43,638.40
$
4.3
24" HDPE
76
LF
239.73
$
18,219.48
$
4.4
Headwall - MAG 501-1
3
EA
9,018.72
$
27,056.16
$
4.5
Catch Basin - MAG 542-1 Single 3' Wing
2
EA
10,418.39
$
20,836.78
$
4.6
Catch Basin - MAG 542-2 Type I Single 3' Wing
1
EA
10,268.39
$
10,268.39
$
4.7
Trench Drain
287
LF
191.07
$
54,837.09
$
4.8
Drywell System
1
EA
24,829.99
$
24,829.99
$
4.9
Scupper - MAG 206-1
2
EA
11,687.38
$
23,374.76
$
4.10
Storm Drain Materials
1
LS
(55,000.00)
$
(55,000.00)
$
5
ELECTRICAL
1
EA
232,996.36
$
232,996.36
$
5.1
800 amp SES
(1)
EA
45,000.00
$
(45,000.00)
$
5.2
800 amp SES
1
EA
38,033.15
$
38,033.15
$
5.3
2-4" Sch 40 Trench, Conduit and Wire
130
LF
34.80
$
4,524.00
$
5.4
2-2" Sch 40 Trench, Conduit and Wire per C-104
230
LF
25.06
$
5,763.80
$
5.5
4-2" Sch 40 Trench, Conduit and Wire per C-104
1,530
LF
46.40
$
70,992.00
$
5.6
2-2.5" Sch 40 Trench, Conduit and Wire (to Restroom)
160
LF
41.44
$
6,630.40
$
5.7
Branch Circuitry Trench, Conduit and Wire
1
LS
246,664.31
$
246,664.31
$
5.8
Tie Conduit Sweeps into existing #9 Vault per C-103-1
1
EA
2,784.15
$
2,784.15
$
5.9
#3 Pull Box
5
EA
207.00
$
1,035.00
$
5.10
#7 Pull Box
1
EA
310.50
$
310.50
$
5.11
#7 Vault, C-103-1
3
EA
672.75
$
2,018.25
$
5.12
#9 Vault, C-103-1
1
EA
5,692.50
$
5,692.50
$
Schedule of Values
Cost Model - 100%
Spec No. Bid Item Description
Bid Qty
UM
Unit Cost
Total Cost
5.13
Transformer Pad
1
EA
5,119.11
$
5,119.11
$
5.14
Power Feed & 120V Connections: Drinking Fountain
1
EA
439.88
$
439.88
$
5.15
Lights and Receptacles (Ramada & Shade Structures)
12
EA
1,293.75
$
15,525.00
$
5.16
Light Poles and Fixtures (Pickleball Courts)
1
LS
404,741.93
$
404,741.93
$
5.17
Light Poles and Fixtures (Area and Site Lights)
1
LS
82,722.38
$
82,722.38
$
5.18
Light Pole and Fixture Materials
1
EA
(615,000.00)
$
(615,000.00)
$
6
CONCRETE FLATWORK
1
EA
878,695.56
$
878,695.56
$
6.1
Combined Curb & Gutter, MAG Std. Det. 220, Type "A", H=6"
2,164
LF
49.25
$
106,577.00
$
6.2
Ribbon Curb Per MAG Std. 220-1, Type B
135
LF
49.68
$
6,706.80
$
6.3
Roll Curb Per MAG Std. 220, Type D
30
LF
49.63
$
1,488.90
$
6.4
Single Curb, MAG 222 A
444
LF
45.51
$
20,206.44
$
6.5
Single Curb, MAG 222 B
92
LF
45.51
$
4,186.92
$
6.6
Concrete Apron & Valley Gutter, MAG Std. Det. 240
712
SF
19.92
$
14,183.04
$
6.7
Perpendicular Curb Ramp - Detail 4, Sheet C3.1
4
EA
3,760.95
$
15,043.80
$
6.8
Curb Ramp COC C-258 (Double Ramp)
6
EA
10,432.47
$
62,594.82
$
6.9
Concrete Sidewalk Per MAG Std. 230 (5" Thick)
45,036
SF
13.46
$
606,184.56
$
6.10
Landscape Header Curb - 6" x 6"
90
LF
8.32
$
748.80
$
6.11
Artificial Turf Edge
302
LF
51.32
$
15,498.64
$
6.12
Curb Ramp COC C-258 (Germann/Pioneer)
2
EA
12,637.92
$
25,275.84
$
7
SURFACING
1
EA
287,896.12
$
287,896.12
$
7.1
6" A.B.C. (Parking Lot)
2,526
SY
16.82
$
42,487.32
$
7.2
2" ACSC, 1/2" Mix (EVAC) (Parking Lot)
2,526
SY
18.29
$
46,200.54
$
7.3
8" A.B.C. (Parking Lot)
2,671
SY
18.84
$
50,321.64
$
7.4
3" ACSC, 1/2" Mix (EVAC) (Parking Lot)
2,671
SY
28.02
$
74,841.42
$
7.5
12" A.B.C. (Pioneer Patch)
713
SY
45.14
$
32,184.82
$
7.6
3" ACSC, 1/2" Mix (Pioneer)
713
SY
46.46
$
33,125.98
$
7.7
Striping & Signage
1
EA
7,622.00
$
7,622.00
$
7.8
Concrete Wheel Stops
6
EA
185.40
$
1,112.40
$
8
LANDSCAPING & IRRIGATION
1
EA
354,731.56
$
354,731.56
$
8.1
Irrigation System Complete
1
LS
75,467.81
$
75,467.81
$
8.2
Dust Control
20
DY
456.75
$
9,135.00
$
8.3
Landscape Fine Grading
1
EA
5,649.49
$
5,649.49
$
8.4
Root Barrier
59
EA
86.28
$
5,090.52
$
8.5
Trees
123
EA
617.22
$
75,918.06
$
8.6
5 Gal Accents
195
EA
26.39
$
5,146.05
$
8.7
5 Gal Shrubs
561
EA
17.76
$
9,963.36
$
8.8
Grasses - (1 Gal Shrubs)
149
EA
8.93
$
1,330.57
$
8.9
DG, 2" Depth
128,650
SF
0.59
$
75,903.50
$
8.10
Synthetic Turf w/Nailer Board
3,000
SF
22.50
$
67,500.00
$
8.11
90 Day Landscape Maintenance
1
EA
3,654.00
$
3,654.00
$
8.12
Median Pavers
835
SF
23.92
$
19,973.20
$
9
FENCES & GATES
1
EA
190,610.38
$
190,610.38
$
9.1
10' Chain Link Fence with 6' Windscreen (Pickleball)
1,264
LF
138.00
$
174,432.00
$
9.2
4' Chain Link Fence (Pickleball)
1,472
LF
56.00
$
82,432.00
$
9.3
Chain Link Man Gate (Pickleball)
18
EA
461.11
$
8,299.98
$
9.4
6' Wind Screen
(2,118)
LF
9.85
$
(20,862.30)
$
9.5
10' Wind Screen (Blue), Add Alternate
(2,118)
LF
25.35
$
(53,691.30)
$
10
SPORTS COURTS
1
EA
592,385.16
$
592,385.16
$
10.1
Pickleball Court Slab
44,171
SF
10.00
$
441,710.00
$
10.2
Pickleball Court Coating
44,171
SF
1.96
$
86,575.16
$
10.3
Pickleball Net / Equipment
18
EA
-
$
-
$
10.4
Pickleball Practice Wall
40
LF
4,727.50
$
189,100.00
$
10.5
Practice Wall Materials
(40)
LF
3,125.00
$
(125,000.00)
$
Schedule of Values
Cost Model - 100%
Spec No. Bid Item Description
Bid Qty
UM
Unit Cost
Total Cost
11
MONUMENT & WAYFINDING
1
LS
115,470.58
$
115,470.58
$
11.1
Lighted Pickleball Monument
1
AL
60,000.00
$
60,000.00
$
11.2
Wayfinding Signs
1
LS
20,000.00
$
20,000.00
$
11.3
Paddle Sign, Install
22
EA
2,521.39
$
55,470.58
$
11.4
Monument Materials
1
LS
(20,000.00)
$
(20,000.00)
$
12
AMENITIES
1
EA
167,484.70
$
167,484.70
$
12.1
Drinking Fountain
1
EA
9,500.00
$
9,500.00
$
12.2
15' 3-Row Bleachers
8
EA
3,257.58
$
26,060.64
$
12.3
Picnic Table
2
EA
1,795.80
$
3,591.60
$
12.4
ADA Picnic Table
4
EA
1,675.88
$
6,703.52
$
12.5
Trash Receptacle
13
EA
1,394.64
$
18,130.32
$
12.6
Bike Rack, GMP1
(6)
EA
1,437.00
$
(8,622.00)
$
12.7
Bike Rack
3
EA
4,385.56
$
13,156.68
$
12.8
Pickleball Bollard, GMP1
(8)
EA
2,303.60
$
(18,428.80)
$
12.9
Pickleball Bollard
8
EA
2,603.75
$
20,830.00
$
12.10
Bench
27
EA
1,629.64
$
44,000.28
$
12.11
Situp Bench, GMP1
(1)
EA
4,435.00
$
(4,435.00)
$
12.12
Situp Bench, Install
1
EA
4,621.31
$
4,621.31
$
12.13
Lower Back Bench, GMP1
(1)
EA
4,435.00
$
(4,435.00)
$
12.14
Lower Back Bench, Install
1
EA
5,135.29
$
5,135.29
$
12.15
Stretch Station, GMP1
(1)
EA
4,500.00
$
(4,500.00)
$
12.16
Stretch Station, Install + Addt'l Mtl Cost
1
EA
6,426.50
$
6,426.50
$
12.17
Concrete Seat Wall
80
LF
472.98
$
37,838.40
$
12.18
Paddle Rack
18
EA
661.72
$
11,910.96
$
13
FABRIC SHADE STRUCTURES
1
EA
224,521.40
$
224,521.40
$
13.1
36' x 23' Fabric Shade Structure
8
EA
22,242.14
$
177,937.12
$
13.2
36' x 23' Fabric Shade Structure at Championship Court
2
EA
23,292.14
$
46,584.28
$
14
RAMADAS
1
EA
(1,211.35)
$
(1,211.35)
$
14.1
20' x 20' Ramada, GMP1
(1)
EA
47,061.00
$
(47,061.00)
$
14.2
20' x 20' Ramada
1
EA
46,351.01
$
46,351.01
$
14.3
20' x 38' Ramada, GMP1
(1)
EA
79,924.00
$
(79,924.00)
$
14.4
20' x 38' Ramada
1
EA
79,422.64
$
79,422.64
$
15
BATHROOM BUILDING
1
EA
528,863.60
$
528,863.60
$
15.1
Concrete Slab
651
SF
57.38
$
37,354.38
$
15.2
Masonry Walls, (GMP 1)
(226)
LF
442.48
$
(100,000.48)
$
15.3
Masonry Walls
226
LF
387.65
$
87,608.90
$
15.4
Accessories
1
LS
14,120.00
$
14,120.00
$
15.5
Doors
10
EA
5,635.70
$
56,357.00
$
15.6
Roof
1,759
SF
20.43
$
35,936.37
$
15.7
Caulking & Sealants
1
LS
5,000.00
$
5,000.00
$
15.8
Plumbing
1
LS
94,245.00
$
94,245.00
$
15.9
Bathroom Electrical
1
EA
55,167.63
$
55,167.63
$
15.10
Termite Treatment
1
LS
1,000.00
$
1,000.00
$
15.11
Painting
1
LS
16,310.00
$
16,310.00
$
15.12
Urethene Concrete Floors
1
LS
9,000.00
$
9,000.00
$
15.13
Epoxy Cove Base
1
LS
1,000.00
$
1,000.00
$
15.14
Signage, building
1
LS
5,000.00
$
5,000.00
$
15.15
Final Cleaning
1
LS
1,000.00
$
1,000.00
$
15.16
Structural Steel, (GMP 1)
1
EA
(125,000.00)
$
(125,000.00)
$
15.17
Structural Steel
1
EA
168,920.00
$
168,920.00
$
15.18
Building General Requirements
1
EA
165,844.80
$
165,844.80
$
Schedule of Values
Cost Model - 100%
Spec No. Bid Item Description
Bid Qty
UM
Unit Cost
Total Cost
16
PROJECT REQUIREMENTS
1
EA
779,564.39
$
779,564.39
$
109-01
16.1
Mobilization
1
Each
28,053.60
$
28,053.60
$
105-01
16.2
Survey
1
Each
60,910.00
$
60,910.00
$
16.3
Quality Control Testing
1
EA
77,000.00
$
77,000.00
$
109-01
16.4
Traffic Control
1
Each
15,000.00
$
15,000.00
$
109-01
16.5
SWPPP
1
EA
104,466.43
$
104,466.43
$
109-01
16.6
Site Facilities (Fixed Costs)
1
LS
92,772.36
$
92,772.36
$
16.7
Duration Driven Costs (By Month)
10
MO
40,136.20
$
401,362.00
$
SUBTOTAL - COST
17
GENERAL CONDITIONS
1
EA
688,847.55
$
688,847.55
$
109-01
17.1
Project Manager
1,760
HR
110.45
$
194,392.00
$
109-01
17.2
Project Engineer
1,760
HR
77.23
$
135,924.80
$
109-01
17.3
Superintendent
1,760
HR
105.92
$
186,419.20
$
109-01
17.4
General Superintendent, Underground
40
HR
95.35
$
3,814.00
$
109-01
17.5
General Superintendent, Concrete
215
HR
95.35
$
20,500.25
$
109-01
17.6
Project Sponsor
215
HR
121.02
$
26,019.30
$
109-01
17.7
Project Safety Supervisor
215
HR
87.80
$
18,877.00
$
109-01
17.8
Truck, Pickup
6,053
HR
17.00
$
102,901.00
$
SUBTOTAL - GENERAL CONDITIONS
18
TENNIS COURTS
1
EA
892,630.73
$
892,630.73
$
18.1
Clearing & Grubbing
0.75
AC
28,621.58
$
21,466.19
$
18.2
Pre-wet Site
0.75
AC
2,567.39
$
1,925.54
$
18.3
Site Rough Grade +/- 0.1
3,685
SY
0.64
$
2,358.40
$
18.4
Site Finish Grade (Post Utilities) - Hunter
3,685
SY
1.25
$
4,606.25
$
18.5
Tennis Court Slab
21,650
SF
10.04
$
217,366.00
$
18.6
Tennis Court Coating
21,650
SF
1.50
$
32,475.00
$
18.7
Tennis Net
3
EA
-
$
-
$
18.8
Chain Link Fence & Gates (Tennis)
1
EA
117,420.00
$
117,420.00
$
18.9
12" HDPE
35
LF
147.07
$
5,147.45
$
18.10
Catch Basin - MAG 537 Type G
1
EA
5,270.98
$
5,270.98
$
18.11
Dumped Rip Rap - D50 = 4", T = 12"
780
SF
16.53
$
12,893.40
$
18.12
Concrete Sidewalk Per MAG Std. 230 (5" Thick)
876
SF
12.63
$
11,063.88
$
18.13
Tennis Court Electrical
1
EA
160,969.70
$
160,969.70
$
18.14
Headwall - MAG 501-1 (not called out on plans)
1
EA
9,018.72
$
9,018.72
$
18.15
6' Wind Screen, (GMP 1)
(602)
LF
9.85
$
(5,929.70)
$
18.16
10' Wind Screen (Blue), Add Alternate
(602)
LF
25.35
$
(15,260.70)
$
18.17
Light Poles and Luminaires, (GMP 1)
1
EA
(64,000.00)
$
(64,000.00)
$
18.18
2-Post Shade w/Bench
2
EA
12,919.81
$
25,839.62
$
18.19
Retrofit all Tennis Court Lighting (allowance)
1
AL
350,000.00
$
350,000.00
$
SUBTOTAL - COST
GRAND TOTAL - COST
$ 892,630.73
$ 5,102,003.14
$ 688,847.55
$ 6,683,481.42
Tumbleweed Park Softball Complex
Project No. PR2106.202
GMP 2 @ 100% Plans rev2
Assumptions & Clarifications
1) GENERAL: The following items included in GMP 1 have deductive cost line items so as to
ensure that these items are not doubled up in GMP 2:
a. Sewer, Water, & Storm Drain pipe Materials
b. Electrical SES, Light Poles, and Fixtures
c. 6’ Wind Screen
d. Practice Walls Materials
e. Monument Materials
f. Bike Rack, bollards, and exercise equipment materials
g. Ramadas
h. Masonry, Roof, and Structural Steel
2) Section 1 REMOVALS & EARTHWORK:
a. Earthwork calculations were generated using a combination of the plans and CAD
files.
3) Section 2 SEWER
a. All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date.
All other material is quoted for shipment within 30 days of quote/bid date. After 7
days for PVC and HDPE or 30 days for all other material, ALL quoted prices are
subject to review based on current market conditions. Contingency may be used if
material prices increase.
b. The sewer tie-in includes costs to remove and connect to an existing stub out from
an existing manhole. If this line is not at the proper grade or elevation, then
additional costs may need to be added to install the sewer system properly.
4) Section 3 WATER:
a. All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date.
All other material is quoted for shipment within 30 days of quote/bid date. After 7
days for PVC and HDPE or 30 days for all other material, ALL quoted prices are
subject to review based on current market conditions. Contingency may be used if
material prices increase.
b. A water service from the restroom building to the drinking fountain is not shown on
the plans but has been added to establish budget.
5) Section 4 STORM DRAIN:
a. All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date.
All other material is quoted for shipment within 30 days of quote/bid date. After 7
days for PVC and HDPE or 30 days for all other material, ALL quoted prices are
subject to review based on current market conditions. Contingency may be used if
material prices increase.
6) Section 5 ELECTRICAL:
a. All material is quoted for shipment within 30 days of quote/bid date. After 30 days
ALL quoted prices are subject to review based on current market conditions.
Contingency may be used if material prices increase.
7) Section 6 CONCRETE FLATWORK:
8) Section 7 SURFACING:
a. Asphalt is bid to be installed in a single lift for both the 2” and 3” pavement
sections. The price is for 1/2” MAG Marshall Asphalt Mix for the parking lot and
1/2” EVAC PG70-16TR Asphalt Mix for the Pioneer Rd.
9) Section 8 LANDSCAPING:
a. A Flow Sensor was not called out, a baseline spec is reflected to establish budget.
b. Irrigation gate valves do not have a spec, budget matches the 100% plans of the
Tumbleweed Diamonds project.
c. Decomposed Granite is priced to match existing, no spec is listed on the plans.
d. Cost of water to irrigate landscaping during the maintenance period is excluded.
10) Section 9 FENCES & GATES:
11) Section 10 SPORTS COURTS:
a. Post-Tension Engineering and testing on concrete slabs included.
b. Gameco Surfacing and Striping is included with 1 coat of primer and 3 coats of sand
filled colored acrylics with up to 2 colors chosen from Gameco color chart.
c. Equipment sleeves, posts, and nets are included.
12) Section 11 MONUMENT & WAYFINDING:
a. Monument pricing is budgetary and will be further clarified as all design alternatives
are reviewed and approved.
b. Wayfinding sign quantity is unknown and is budgetary.
13) Section 12 AMENITIES:
a. All material is quoted for shipment within 30 days of quote/bid date. After 30 days
ALL quoted prices are subject to review based on current market conditions.
Contingency may be used if material prices increase.
14) Section 13 FABRIC SHADE:
a. Fabric shade is bid to be Shade Systems monoslope T-Cantilever.
b. Fabric shade at the Championship Courts is not shown but has been added to
establish budget.
15) Section 14 RAMADAS:
a. Ramadas are bid to be Poligon Shelter as an alternative to Classic Recreation due to
lower cost and shorter procurement time.
16) Section 15 RESTROOM:
a. All material is quoted for shipment within 30 days of quote/bid date. After 30 days
ALL quoted prices are subject to review based on current market conditions.
Contingency may be used if material prices increase.
b. Block with integral water repellent - smooth 8-8-16 integral color from standard
color group and smooth 8-4-16 integral color from standard color group
c. Foundations Adult Changing Station, SS, Surface Mount is included
d. Plumbing fixtures are included per schedule on plans.
17) Section 16 PROJECT REQUIREMENTS:
a. All items as listed in the schedule of values.
b. Duration Driven Costs include:
i. Builders Risk Insurance
ii. Temporary Facilities
iii. Equipment Service
iv. Street Sweeper
v. Klein Tanks
vi. Construction Water
vii. Landscape Water
viii. GPS Station
18) Section 17 GENERAL CONDITIONS:
19) Section 18 TENNIS COURTS:
a. Please reference all clarifications for Section 10 above for the tennis courts as well.
b. Budget pricing is included for retrofit of existing tennis court lighting to LED lighting.
20) CONTINGENCY:
a. Project Contingency includes Cost Inflation Contingency as described for materials
above.
b. Owner and Contractor Contingency is included as a percentage of the total for use
for unforeseen items during construction.
EXHIBIT E
SUBCONTRACTOR DOCUMENTS WITH CM@RISK
Any subcontractor assumptions, clarifications, exclusions, terms & conditions, signature blocks, etc. included are strictly between the CM@RISK
and their subcontractors, and do not apply to the Agreement between the CM@RISK and the City.
SUBCONTRACTOR’S LIST FORM
Percentage of Total
Work Performed: 2.5%
Percentage of Total
Work Performed: 16.5%
Contact Phone: 602-699-6500
Contact Phone: 602-331-3045
Work Component: Structural Steel
Work Component: Electrical
Contact Name: Casey Gauthier
Contact Name: Ryan Ogg
Contact Email: casey@alstatesteel.com
Contact Email: ryan@eceinc.org
Percentage of Total
Work Performed: 5.7%
Percentage of Total
Work Performed: 0.2%
Company Name: Alstate Steel
Company Name: Echo Canyon Electric
Contact Phone: 602-399-2486
Contact Phone: 480-650-8500
Work Component: Fence
Work Component: Paint
Contact Name: Steve Adams
Contact Name: Joe Emig
Contact Email: steve@adamsfence.net
Contact Email: joe@craftmasterspainting.com
Company Name: Adams Fence
Company Name: Craft Masters
Contact Email: sales@azwashroom.com
Contact Phone: 602-437-8036
Work Component: Restroom Fixtures
Percentage of Total
Work Performed:
3QO
Eliseo Hernandez
eliseo3qo@outlook.com
623-432-6004
Plumbing
1.4%
If CM@Risk intends to subcontract any portion of this Agreement, the CM@Risk must submit the name, address, and contractor’s license
number (if applicable) of each subcontractor, including the work component of such subcontracting. Include the form with the bid submittal
documents. CM@Risk may make multiple copies of this form as needed.
Company Name:
Contact Name:
Contact Email:
Contact Phone:
Work Component:
Arizona Washroom Partitions
Company Name:
Contact Name: Dale Vanniman
Percentage of Total
Work Performed: 0.2%
Project Name: Pickleball Courts at Tumbleweed Park
Project No.: PR2206.401
Rev. 10/23/23
EXHIBIT E
Company Name: European Pavers
Company Name: L&L Asphalt
Contact Phone: 602-253-5242
Contact Phone: 623-434-1200
Work Component: Concrete Pavers
Work Component: Asphalt Paving
Contact Name: Renee Boyer
Contact Name: John Doerfler
Contact Email: renee@epswi.com
Contact Email: johnDoerfler@yahoo.com
Contact Name: Melonie Leslie
Contact Name: Joshua Dalmacio
Contact Email: bids@ggenterprises.biz
Contact Email: josh@d2surveying.com
Percentage of Total
Work Performed: 0.2%
Percentage of Total
Work Performed: 2.2%
Company Name: G&G Masonry
Company Name: D2 Surveying
Percentage of Total
Work Performed: 1.3%
Percentage of Total
Work Performed: 0.9%
Company Name: GA Sports (General Acrylics)
Company Name: Progressive Roofing
Contact Phone: 602-942-1983
Contact Phone: 480-221-1368
Work Component: Masonry
Work Component: Survey
Contact Phone: 602-569-9377
Contact Phone: 602-809-3821
Work Component: Sports Courts
Work Component: Roof
Contact Name: Kyle Watkins
Contact Name: Cory Rice
Contact Email: kwatkins@generalacrylics.com
Contact Email: cory.rice@progressiveus.com
Company Name: Intertwine
Company Name: SiteWorks Landscape
Contact Name: Trent Humber
Contact Name: Jeff Meyer
Percentage of Total
Work Performed: 1% - 11.6%
Percentage of Total
Work Performed: 0.5%
Work Component: Drywell
Work Component: Landscaping
Contact Email: estimator@intertwinecontractors.com
Contact Email: jmeyer@siteworksllc.net
Contact Phone: 520-450-3505
Contact Phone: 480-820-1600
Percentage of Total
Work Performed: 0.3%
Percentage of Total
Work Performed: 5.2%
Project Name: Pickleball Courts at Tumbleweed Park
Project No.: PR2206.401
Rev. 10/23/23
Compare and Award
HUNTER CONTRACTING COMPANY
Job Code:
24407-00 Tumbleweed Pickleball 100 - GMP2
Description:
This is GMP 2 based on 100% Plans
Cost Items
Quote Group:
AC Sub
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
11:18:48
AM
Quote Last
Changed:
7/12/2024
12:57:25
PM
(1 of 1)
Quote Description: AC Sub - 100%
AC Sub
AC Sub
Awarded Total:
148,505.51
0.00
0.00
Quoted Items Total:
139,605.51
179,590.80
183,817.86
Special Conditions:
8,900.00
0.00
0.00
Quoted Total:
148,505.51
179,590.80
183,817.86
Last Update:
7/12/2024 12:57:25 PM
6/14/2024 8:02:43 AM
6/14/2024 10:40:06 AM
Comparable Total:
148,505.51
179,590.80
183,817.86
Seller: L&L Asphalt LLC.
Cactus Asphalt
S & S Paving &
Construction
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
AC Sub
3.6.3.3
3" Asphalt Patch
40.00 SY
39.25
1,570.10
0.00
0.00
43.56
1,742.50
AC Sub
7.2.1
AC Mobilization -
Sub
1.00 EA
1,635.52
1,635.52
3,605.00
3,605.00
2,870.00
2,870.00
AC Sub
7.2.2
Place 2" Thick AC
(EVAC) (Parking
Lot) - Sub
2,526.00 SY
16.90
42,690.27
22.66
57,239.16
23.32
58,903.16
AC Sub
7.4.1
AC Mobilization -
Sub
1.00 EA
1,635.52
1,635.52
3,605.00
3,605.00
2,870.00
2,870.00
AC Sub
7.4.2
Place 3" Thick AC
(EVAC) (Parking
Lot) - Sub
2,671.00 SY
26.71
71,351.62
32.96
88,036.16
31.26
83,502.14
AC Sub
7.6.1
AC Mobilization -
Sub
1.00 EA
1,635.52
1,635.52
3,605.00
3,605.00
2,870.00
2,870.00
AC Sub
7.6.2
Place 3" Thick AC
(EVAC) - Sub
713.00 SY
39.25
27,986.97
32.96
23,500.48
43.56
31,060.06
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
1 of 23
Quote Group:
Amenities
Award
Status:
Incomplete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
4:36:50 PM
(1 of 2)
Quote Description: Amenities; Ramada; Shade
- 100%
Amenities - 100%
Amenities, Ramada - 100%
Amenities; Ramada; Shade
- 100%
Awarded Total:
0.00
0.00
98,486.20
0.00
Quoted Items Total:
87,024.00
93,277.00
147,766.15
0.00
Special Conditions:
0.00
0.00
0.00
0.00
Quoted Total:
87,024.00
93,277.00
147,766.15
0.00
Last Update:
7/12/2024 1:23:39 PM
7/12/2024 12:19:54 PM
7/12/2024 1:10:05 PM
7/12/2024 12:07:09 PM
Comparable Total:
87,024.00
93,277.00
147,766.15
156,700.00
Seller: Play It Safe Playgrounds
Dave Bang Assoc., Inc.
Exerplay
competitive Edge
Contracting
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Amenities
11.1.4
Install Monument
1.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
11.3.3
Paddle Sign, Install
22.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.1.1
Purchase Drinking
Fountain
1.00 EA
0.00
0.00
9,474.00
9,474.00
0.00
0.00
Amenities
12.2.1
15' 3-Row
Bleachers
8.00 EA
1,455.00
11,640.00
4,184.25
33,474.00
3,257.58
26,060.63
Amenities
12.2.2
Install 15' 3-Row
Bleachers
8.00 EA
1,765.00
14,120.00
0.00
0.00
3,655.15
29,241.20
0.00
0.00
Amenities
12.3.1
Picnic Table
2.00 EA
829.00
1,658.00
1,165.50
2,331.00
1,795.80
3,591.60
Amenities
12.3.2
Install Picnic Table
2.00 EA
350.00
700.00
0.00
0.00
435.63
871.25
0.00
0.00
Amenities
12.4.1
ADA Picnic Table
4.00 EA
859.00
3,436.00
1,239.50
4,958.00
1,675.88
6,703.50
Amenities
12.4.2
Install ADA Picnic
Table
4.00 EA
350.00
1,400.00
0.00
0.00
435.63
1,742.50
0.00
0.00
Amenities
12.5.1
Trash Receptacle
13.00 EA
905.00
11,765.00
0.00
0.00
1,394.64
18,130.30
Amenities
12.5.2
Install Trash
Receptacle
13.00 EA
350.00
4,550.00
0.00
0.00
435.63
5,663.13
0.00
0.00
Amenities
12.7.1
Bike Rack,
Materials
3.00 EA
0.00
0.00
3,357.33
10,072.00
0.00
0.00
Amenities
12.7.2
Bike Rack, Install
3.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.9.4.1 Footings
8.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.9.4.2 Bollards - Installed
under Pickleball
Bollards
8.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.10.1 Bench
27.00 EA
1,048.33
28,305.00
1,221.04
32,968.00
1,629.64
44,000.18
Amenities
12.10.2 Install Bench
27.00 EA
350.00
9,450.00
0.00
0.00
435.63
11,761.88
0.00
0.00
Amenities
12.12.2 Situp Bench, Install
1.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.14.2 Lower Back Bench,
Install
1.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.16.2 Stretch Station,
Install
1.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.18.1 Paddle Rack,
Materials
18.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
Amenities
12.18.2 Paddle Rack,
Install
18.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
2 of 23
(2 of 2)
Quote Description: Amenities; Wayfinding
Signs
Exercise
Awarded Total:
10,500.00
0.00
0.00
Quoted Items Total:
10,500.00
0.00
0.00
Special Conditions:
0.00
0.00
0.00
Quoted Total:
10,500.00
0.00
0.00
Last Update:
7/12/2024 4:36:50 PM
6/14/2024 8:07:03 AM
6/20/2024 4:51:44 PM
Comparable Total:
175,431.85
178,831.85
181,775.17
Seller: S&H Steel
Cactus Asphalt
Go Play Space
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Amenities
11.1.4
Install Monument
1.00 EA
Amenities
11.3.3
Paddle Sign, Install
22.00 EA
Amenities
12.1.1
Purchase Drinking
Fountain
1.00 EA
Amenities
12.2.1
15' 3-Row
Bleachers
8.00 EA
Amenities
12.2.2
Install 15' 3-Row
Bleachers
8.00 EA
Amenities
12.3.1
Picnic Table
2.00 EA
Amenities
12.3.2
Install Picnic Table
2.00 EA
Amenities
12.4.1
ADA Picnic Table
4.00 EA
Amenities
12.4.2
Install ADA Picnic
Table
4.00 EA
Amenities
12.5.1
Trash Receptacle
13.00 EA
Amenities
12.5.2
Install Trash
Receptacle
13.00 EA
Amenities
12.7.1
Bike Rack,
Materials
3.00 EA
3,500.00
10,500.00
Amenities
12.7.2
Bike Rack, Install
3.00 EA
Amenities
12.9.4.1 Footings
8.00 EA
Amenities
12.9.4.2 Bollards - Installed
under Pickleball
Bollards
8.00 EA
0.00
0.00
Amenities
12.10.1 Bench
27.00 EA
Amenities
12.10.2 Install Bench
27.00 EA
Amenities
12.12.2 Situp Bench, Install
1.00 EA
0.00
0.00
Amenities
12.14.2 Lower Back Bench,
Install
1.00 EA
0.00
0.00
Amenities
12.16.2 Stretch Station,
Install
1.00 EA
0.00
0.00
Amenities
12.18.1 Paddle Rack,
Materials
18.00 EA
Amenities
12.18.2 Paddle Rack,
Install
18.00 EA
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
3 of 23
Quote Group:
Drywell
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
11:28:27
AM
Quote Last
Changed:
6/14/2024
10:49:53
AM
(1 of 1)
Quote Description: Drywell
Drywell
Drywell
Awarded Total:
23,000.00
0.00
0.00
Quoted Items Total:
23,000.00
33,830.00
37,100.00
Special Conditions:
0.00
0.00
0.00
Quoted Total:
23,000.00
33,830.00
37,100.00
Last Update:
6/14/2024 9:50:29 AM
6/14/2024 10:29:09 AM
6/14/2024 10:49:53 AM
Comparable Total:
23,000.00
33,830.00
37,100.00
Seller: Intertwine
Pinal Excavating LLC dba
P.E. Drilling
Torrent Resources
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Drywell
4.8.1
Drywell - Sub
1.00 EA
23,000.00
23,000.00
33,830.00
33,830.00
37,100.00
37,100.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
4 of 23
Quote Group:
Electrical
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
11:08:31
AM
Quote Last
Changed:
7/12/2024
12:20:56
PM
(1 of 1)
Quote Description: Electrical
Electrical - 100%
Electrical
Awarded Total:
0.00
1,109,131.40
0.00
Quoted Items Total:
1,013,499.40
1,109,131.40
1,992,461.10
Special Conditions:
82,922.40
0.00
0.00
Quoted Total:
1,096,421.80
1,109,131.40
1,992,461.10
Last Update:
6/14/2024 4:03:47 PM
7/12/2024 12:20:56 PM
6/14/2024 3:55:22 PM
Comparable Total:
1,096,421.80
1,109,131.40
1,992,461.10
Seller: Hawkeye Electric
Echo Canyon Electric
Kimbrell Electric, Inc.
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Electrical
5.2
800 amp SES
1.00 EA
42,854.92
42,854.92
38,033.15
38,033.15
64,499.19
64,499.19
Electrical
5.3
2-4" Sch 40
Trench, Conduit
and Wire
130.00 LF
89.14
11,588.43
34.80
4,523.57
133.63
17,372.54
Electrical
5.4
2-2" Sch 40
Trench, Conduit
and Wire per C-
104
230.00 LF
47.67
10,964.44
25.06
5,763.19
49.90
11,477.62
Electrical
5.5
4-2" Sch 40
Trench, Conduit
and Wire per C-
104
1,530.00 LF
20.84
31,890.48
46.40
70,990.55
58.17
88,995.20
Electrical
5.6
2-2.5" Sch 40
Trench, Conduit
and Wire (to
Restroom)
160.00 LF
0.00
0.00
41.44
6,630.62
97.44
15,590.40
Electrical
5.7
Branch Circuitry
Trench, Conduit
and Wire
1.00 LS
0.00
0.00
246,664.31 246,664.31
183,064.39 183,064.39
Electrical
5.8
Tie Conduit
Sweeps into
existing #9 Vault
per C-103-1
1.00 EA
724.28
724.28
2,784.15
2,784.15
2,937.41
2,937.41
Electrical
5.9
#3 Pull Box
5.00 EA
361.02
1,805.12
207.00
1,035.00
1,417.75
7,088.76
Electrical
5.10
#7 Pull Box
1.00 EA
334.28
334.28
310.50
310.50
1,712.81
1,712.81
Electrical
5.11
#7 Vault, C-103-1
3.00 EA
1,039.99
3,119.96
672.75
2,018.25
799.31
2,397.94
Electrical
5.12
#9 Vault, C-103-1
1.00 EA
7,187.06
7,187.06
5,692.50
5,692.50
7,764.75
7,764.75
Electrical
5.13
Transformer Pad
1.00 EA
5,342.94
5,342.94
5,119.11
5,119.11
1,712.81
1,712.81
Electrical
5.14
Power Feed &
120V Connections:
Drinking Fountain
1.00 EA
445.71
445.71
439.88
439.88
342.56
342.56
Electrical
5.15
Lights and
Receptacles
(Ramada & Shade
Structures)
12.00 EA
2,359.47
28,313.66
1,293.75
15,525.00
7,261.56
87,138.77
Electrical
5.16
Light Poles and
Fixtures (Pickleball
Courts)
1.00 LS
-FREE-
-FREE-
404,741.93 404,741.93
909,285.72 909,285.72
Electrical
5.17
Light Poles and
Fixtures (Area and
Site Lights)
1.00 LS
-FREE-
-FREE-
82,722.38
82,722.38
216,036.66 216,036.66
Electrical
15.9.1
Electrical Conduit
and Wiring (within
5' of Building)
1.00 LS
16,975.94
16,975.94
25,054.25
25,054.25
13,898.40
13,898.40
Electrical
15.9.2
400 amp Wall
Mounted Panel
1.00 EA
2,785.68
2,785.68
2,070.00
2,070.00
8,394.05
8,394.05
Electrical
15.9.3
Lighting Control
Panel, wall
mounted
1.00 EA
3,482.10
3,482.10
6,665.40
6,665.40
8,866.03
8,866.03
Electrical
15.9.4
Light Fixture
(w/emergency
batter pack where
applicable)
22.00 EA
1,002.85
22,062.59
957.61
21,067.49
1,535.74
33,786.31
Electrical
15.9.5
Switches,
Receptacles, &
Motion Sensors
(trim)
1.00 EA
2,161.69
2,161.69
310.50
310.50
10,754.94
10,754.94
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
5 of 23
Electrical
18.12.1 Existing 800 amp
Panel Work
1.00 LS
-FREE-
-FREE-
943.92
943.92
1,101.28
1,101.28
Electrical
18.12.2 1.5" Trench,
Conduit & Wire
530.00 LF
63.96
33,896.17
28.91
15,321.00
48.45
25,679.60
Electrical
18.12.3 1" Trench, Conduit
& Wire
973.00 LF
128.28 124,815.23
34.22
33,293.24
30.11
29,298.89
Electrical
18.12.4 #3-1/2 Pull Box
3.00 EA
-FREE-
-FREE-
207.00
621.00
262.63
787.90
Electrical
18.12.5 Light Poles and
Luminaires
16.00 EA
46,604.44 745,671.12
6,924.41 110,790.54
15,154.76 242,476.19
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
6 of 23
Quote Group:
Exercise
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
6/20/2024
4:51:44 PM
(1 of 1)
Quote Description: Exercise
Awarded Total:
13,526.42
Quoted Items Total:
11,631.62
Special Conditions:
1,894.80
Quoted Total:
13,526.42
Last Update:
6/20/2024 4:51:44 PM
Comparable Total:
13,526.42
Seller: Go Play Space
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Exercise
12.12.1 Situp Bench,
Purchase
1.00 EA
3,735.75
3,735.75
Exercise
12.14.1 Lower Back Bench,
Purchase
1.00 EA
4,249.73
4,249.73
Exercise
12.16.1 Stretch Station,
Purchase
1.00 EA
5,540.94
5,540.94
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
7 of 23
Quote Group:
Fence
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
11:30:10
AM
Quote Last
Changed:
7/12/2024
12:53:33
PM
(1 of 2)
Quote Description: Fence
Fence
Fence (Revised)
Fence - 100%
Awarded Total:
0.00
0.00
0.00
382,584.00
Quoted Items Total:
351,957.12
366,770.24
370,121.70
382,584.00
Special Conditions:
0.00
0.00
0.00
0.00
Quoted Total:
351,957.12
366,770.24
370,121.70
382,584.00
Last Update:
6/14/2024 3:29:48 PM
6/14/2024 3:27:48 PM
7/12/2024 10:09:51 AM
7/12/2024 11:48:54 AM
Comparable Total:
346,027.42
360,840.54
370,121.70
382,584.00
Seller: Adam Fence
Diamond Iron
Vulcan Fence
Adam Fence
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Fence
9.1
10' Chain Link
Fence with 6'
Windscreen
(Pickleball)
1,264.00 LF
107.10 135,374.40
80.93 102,295.52
150.45 190,168.80
138.00 174,432.00
Fence
9.2
4' Chain Link
Fence (Pickleball)
1,472.00 LF
78.54 115,610.88
112.26 165,246.72
38.00
55,936.00
56.00
82,432.00
Fence
9.3
Chain Link Man
Gate (Pickleball)
18.00 EA
391.00
7,038.00
-FREE-
-FREE-
725.00
13,050.00
461.11
8,300.00
Fence
18.7
Chain Link Fence
& Gates (Tennis)
1.00 EA
93,933.84
93,933.84
99,228.00
99,228.00
110,966.90 110,966.90
117,420.00 117,420.00
Fence
18.14
6' Wind Screen,
(GMP 1)
-602.00 LF
0.00
0.00
0.00
0.00
(2 of 2)
Quote Description: Fence
Fence - 100%
Awarded Total:
0.00
0.00
Quoted Items Total:
397,321.63
419,488.36
Special Conditions:
0.00
0.00
Quoted Total:
397,321.63
419,488.36
Last Update:
6/14/2024 3:20:58 PM
7/12/2024 12:53:33 PM
Comparable Total:
391,391.93
413,558.66
Seller: Vulcan Fence
General Acrylics
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Fence
9.1
10' Chain Link
Fence with 6'
Windscreen
(Pickleball)
1,264.00 LF
160.69 203,113.80
116.20 146,874.78
Fence
9.2
4' Chain Link
Fence (Pickleball)
1,472.00 LF
52.78
77,697.02
116.20 171,044.04
Fence
9.3
Chain Link Man
Gate (Pickleball)
18.00 EA
738.05
13,284.90
0.00
0.02
Fence
18.7
Chain Link Fence
& Gates (Tennis)
1.00 EA
103,225.91 103,225.91
101,569.52 101,569.52
Fence
18.14
6' Wind Screen,
(GMP 1)
-602.00 LF
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
8 of 23
Quote Group:
Landscaping
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/27/2024
3:59:53 PM
Quote Last
Changed:
7/12/2024
12:07:13
PM
(1 of 1)
Quote Description: Landscaping - 100%
Landscaping
Landscaping
Awarded Total:
347,676.29
0.00
0.00
Quoted Items Total:
347,676.29
396,890.60
556,546.35
Special Conditions:
0.00
6,726.38
0.00
Quoted Total:
347,676.29
403,616.98
556,546.35
Last Update:
7/12/2024 12:07:13 PM
6/14/2024 3:47:42 PM
6/14/2024 3:49:03 PM
Comparable Total:
347,676.29
409,386.14
562,315.51
Seller: SiteWorks Landscape
development
LJ Landscapes
Sun Valley Landscape
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Landscapin
g
1.8.3
Structural Soil at
Tree Wells
50.00 CY
246.65
12,332.25
Landscapin
g
6.10
Landscape Header
Curb - 6" x 6"
90.00 LF
8.32
749.07
0.00
0.00
0.00
0.00
Landscapin
g
8.1
Irrigation System
Complete
1.00 LS
75,467.81
75,467.81
123,235.64 123,235.64
125,677.38 125,677.38
Landscapin
g
8.2
Dust Control
20.00 DY
456.75
9,135.00
0.00
0.00
1,358.13
27,162.50
Landscapin
g
8.3
Landscape Fine
Grading
1.00 EA
5,649.49
5,649.49
0.00
0.00
10,250.00
10,250.00
Landscapin
g
8.4
Root Barrier
59.00 EA
86.28
5,090.23
-FREE-
-FREE-
78.18
4,612.50
Landscapin
g
8.5
Trees
123.00 EA
617.22
75,917.94
869.45 106,942.30
835.42 102,756.54
Landscapin
g
8.6
5 Gal Accents
195.00 EA
26.39
5,146.05
33.67
6,565.38
48.86
9,527.49
Landscapin
g
8.7
5 Gal Shrubs
561.00 EA
17.76
9,964.76
33.66
18,885.96
24.25
13,606.96
Landscapin
g
8.8
Grasses - (1 Gal
Shrubs)
149.00 EA
8.93
1,330.87
16.16
2,407.88
18.45
2,749.05
Landscapin
g
8.9
DG, 2" Depth
128,650.0
0
SF
0.59
75,736.26
1.13 145,579.83
1.23 158,728.94
Landscapin
g
8.10
Turf Grass
0.00 SF
0.00
0.00
0.00
0.00
2.28
0.00
Landscapin
g
8.11
Synthetic Turf
w/Nailer Board
3,000.00 SF
22.50
67,502.58
0.00
0.00
28.70
86,100.00
Landscapin
g
8.12
90 Day Landscape
Maintenance
1.00 EA
3,654.00
3,654.00
-FREE-
-FREE-
15,375.00
15,375.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
9 of 23
Quote Group:
Masonry
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
12:42:02
PM
(1 of 1)
Quote Description: Masonry - 100%
Fence
Awarded Total:
87,610.00
0.00
Quoted Items Total:
87,610.00
96,201.00
Special Conditions:
0.00
0.00
Quoted Total:
87,610.00
96,201.00
Last Update:
7/12/2024 12:42:02 PM
6/14/2024 3:20:58 PM
Comparable Total:
87,610.00
96,201.00
Seller: G&G Masonry
Vulcan Fence
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Masonry
15.3
Masonry Walls
226.00 LF
387.65
87,610.00
425.67
96,201.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
10 of 23
Quote Group:
Paint
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
12:07:43
PM
(1 of 1)
Quote Description: Paint - 100%
Awarded Total:
16,310.00
Quoted Items Total:
16,310.00
Special Conditions:
0.00
Quoted Total:
16,310.00
Last Update:
7/12/2024 12:07:43 PM
Comparable Total:
16,310.00
Seller: CraftMasters
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Paint
15.11
Painting
1.00 LS
16,310.00
16,310.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
11 of 23
Quote Group:
Partitions
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
11:50:39
AM
(1 of 1)
Quote Description: Partitions - 100%
Awarded Total:
14,120.00
Quoted Items Total:
14,120.00
Special Conditions:
0.00
Quoted Total:
14,120.00
Last Update:
7/12/2024 11:50:39 AM
Comparable Total:
14,120.00
Seller: Arizona Washroom
Partitions
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Partitions
15.4.1
Grab Bars, TP
Dispensers,
Changing Stations,
Hand Dryers
1.00 LS
14,120.00
14,120.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
12 of 23
Quote Group:
Pavers
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
6/14/2024
3:49:03 PM
(1 of 1)
Quote Description: Pavers
Landscaping
Awarded Total:
13,819.25
0.00
Quoted Items Total:
13,819.25
21,063.75
Special Conditions:
0.00
0.00
Quoted Total:
13,819.25
21,063.75
Last Update:
6/14/2024 9:34:18 AM
6/14/2024 3:49:03 PM
Comparable Total:
13,819.25
21,063.75
Seller: European Pavers
Sun Valley Landscape
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Pavers
8.13.2
Median Pavers
Sub
835.00 SF
16.55
13,819.25
25.23
21,063.75
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
13 of 23
Quote Group:
Pipe Package
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
12:03:27
PM
Quote Last
Changed:
7/12/2024
12:39:27
PM
(1 of 1)
Quote Description: Pipe Package - 60%
Pipe Package - 60%
Pipe Package - 100%
Pipe Package
Awarded Total:
0.00
0.00
52,838.75
300.00
Quoted Items Total:
29,207.28
35,973.08
52,838.75
70,538.00
Special Conditions:
0.00
0.00
0.00
0.00
Quoted Total:
29,207.28
35,973.08
52,838.75
70,538.00
Last Update:
6/24/2024 12:40:07 PM
6/24/2024 12:39:53 PM
7/12/2024 12:39:27 PM
6/24/2024 12:28:30 PM
Comparable Total:
(32,765.86)
(26,000.07)
52,838.75
70,538.00
Seller: ALB Piping Products &
Services
Ferguson Waterworks
Fortiline
Core & Main
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Pipe
Package
2.1.1
Purchase Sewer
Connection Mtl
1.00 EA
0.00
0.00
300.00
300.00
Pipe
Package
2.2.1
Purchase 6" Sewer
Line
445.00 LF
11.07
4,925.92
6.99
3,110.77
7.19
3,200.00
7.08
3,150.00
Pipe
Package
2.4.1.1
Purchase Sewer
Cleanout Material
5.00 EA
682.33
3,411.67
486.99
2,434.93
300.00
1,500.00
380.00
1,900.00
Pipe
Package
2.7
Sewer Pipe
Materials
1.00 LS
0.00
0.00
0.00
0.00
Pipe
Package
3.1.1
Purchase 2"
Copper Pipe
85.00 LF
51.48
4,376.00
27.89
2,370.49
30.00
2,550.00
42.94
3,650.00
Pipe
Package
3.2.1
Purchase 2" PVC
Water Line
148.00 LF
6.41
948.00
2.23
330.47
3.55
525.00
3.04
450.00
Pipe
Package
3.3.1.1
Purchase 2"
Backflow Material
1.00 EA
1,975.00
1,975.00
1,695.70
1,695.70
2,125.00
2,125.00
2,350.00
2,350.00
Pipe
Package
3.4.1
Purchase 2" Meter
Box
1.00 EA
1,467.00
1,467.00
695.50
695.50
1,825.00
1,825.00
1,000.00
1,000.00
Pipe
Package
3.7.1
Purchase 2"
Copper Pipe
180.00 LF
30.00
5,400.00
43.00
7,740.00
Pipe
Package
3.8
Water Pipe
Materials
1.00 LS
0.00
0.00
0.00
0.00
Pipe
Package
4.1.1
Purchase - 12"
HDPE
46.00 LF
16.96
780.00
16.47
757.50
28.26
1,300.00
33.00
1,518.00
Pipe
Package
4.2.1
Purchase - 18"
HDPE
160.00 LF
36.36
5,818.18
29.82
4,770.91
22.03
3,525.00
38.00
6,080.00
Pipe
Package
4.3.1
Purchase - 24"
HDPE
76.00 LF
62.08
4,718.02
41.19
3,130.30
38.16
2,900.00
40.79
3,100.00
Pipe
Package
4.7.1
Buy Trench Drain
287.00 LF
0.00
0.00
54.24
15,566.00
94.08
27,000.00
134.84
38,700.00
Pipe
Package
4.10
Storm Drain
Materials
1.00 LS
0.00
0.00
0.00
0.00
Pipe
Package
18.8.1
Purchase - 12"
HDPE Storm Drain
35.00 LF
22.50
787.50
31.73
1,110.52
28.25
988.75
17.14
600.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
14 of 23
Quote Group:
Plumbing
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
11:48:42
AM
(1 of 1)
Quote Description: Plumbing - 100%
Plumbing
Plumbing
Awarded Total:
94,245.00
0.00
0.00
Quoted Items Total:
94,245.00
126,957.80
226,040.50
Special Conditions:
0.00
0.00
0.00
Quoted Total:
94,245.00
126,957.80
226,040.50
Last Update:
7/12/2024 11:48:42 AM
6/14/2024 10:38:35 AM
6/14/2024 10:35:26 AM
Comparable Total:
94,245.00
126,957.80
226,040.50
Seller: 3QO Plumbing
Ryan Mechanical Co.
RKS Plumbing
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Plumbing
12.1.2
Install Drinking
Fountain
1.00 EA
0.00
0.00
0.00
0.00
0.00
0.00
Plumbing
15.8
Plumbing
1.00 LS
94,245.00
94,245.00
126,957.80 126,957.80
226,040.50 226,040.50
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
15 of 23
Quote Group:
Ramada
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/29/2024
1:58:53 PM
Quote Last
Changed:
7/12/2024
1:43:38 PM
(1 of 1)
Quote Description: Amenities, Ramada - 100%
Installation; Ramada; Shade Amenities; Ramada; Shade
- 100%
Amenities; Ramada; Shade
- 100%
Awarded Total:
125,773.65
25,839.61
0.00
0.00
Quoted Items Total:
125,773.65
139,957.82
188,791.67
28,111.00
Special Conditions:
0.00
0.00
0.00
0.00
Quoted Total:
125,773.65
139,957.82
188,791.67
28,111.00
Last Update:
7/12/2024 1:10:05 PM
7/12/2024 1:43:38 PM
7/12/2024 1:23:39 PM
7/12/2024 12:07:09 PM
Comparable Total:
125,773.65
139,957.82
188,791.67
258,037.02
Seller: Exerplay
Miracle Playground Sales
Play It Safe Playgrounds
competitive Edge
Contracting
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Ramada
14.1.1
20' x 20' Ramada,
Purchase
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.1.3
20' x 20' Ramada
Freight &
Engineering
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.1.4
20' x 20' Ramada
Install
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.2.1
20' x 20' Ramada,
Purchase
1.00 EA
32,005.63
32,005.63
22,656.65
22,656.65
36,540.00
36,540.00
Ramada
14.2.2
20' x 20' Ramada
Freight &
Engineering
1.00 EA
2,314.45
2,314.45
9,218.50
9,218.50
4,880.00
4,880.00
Ramada
14.2.3
20' x 20' Ramada
Install
1.00 EA
7,421.00
7,421.00
9,698.48
9,698.48
12,000.00
12,000.00
9,416.00
9,416.00
Ramada
14.2.4
20' x 20' Ramada
Pole Base (24"
dia x 5')
4.00 EA
1,152.48
4,609.94
0.00
0.00
0.00
0.00
Ramada
14.3.1
20' x 38' Ramada,
Purchase
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.3.3
20' x 38' Ramada
Freight &
Engineering
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.3.4
20' x 38' Ramada
Install
-1.00 EA
0.00
0.00
0.00
0.00
Ramada
14.4.1
20' x 38' Ramada,
Purchase
1.00 EA
58,214.88
58,214.88
48,667.12
48,667.12
74,770.00
74,770.00
Ramada
14.4.2
20' x 38' Ramada
Freight &
Engineering
1.00 EA
3,098.58
3,098.58
9,218.50
9,218.50
8,530.00
8,530.00
Ramada
14.4.3
20' x 38' Ramada
Install
1.00 EA
13,499.25
13,499.25
14,658.96
14,658.96
17,415.00
17,415.00
14,232.00
14,232.00
Ramada
14.4.4
20' x 38' Ramada
Pole Base (24"
dia x 5')
4.00 EA
1,152.48
4,609.94
0.00
0.00
0.00
0.00
Ramada
18.17.1 2-Post Ramada
Shade
2.00 EA
0.00
0.00
9,591.36
19,182.72
6,780.00
13,560.00
Ramada
18.17.2 2-Post Shade
w/Bench Freight &
Engineering
2.00 EA
0.00
0.00
1,030.00
2,060.00
3,665.00
7,330.00
Ramada
18.17.3 2-Post Shade
w/Bench Install
2.00 EA
0.00
0.00
2,298.45
4,596.89
6,883.33
13,766.67
2,231.50
4,463.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
16 of 23
Quote Group:
Roof
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
1:24:07 PM
(1 of 1)
Quote Description: Roof - 100%
Awarded Total:
35,942.00
Quoted Items Total:
35,942.00
Special Conditions:
0.00
Quoted Total:
35,942.00
Last Update:
7/12/2024 1:24:07 PM
Comparable Total:
35,942.00
Seller: PROGRESSIVE ROOFING
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Roof
15.6
Roof
1,759.00 SF
20.43
35,942.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
17 of 23
Quote Group:
Shade
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
1:43:38 PM
(1 of 1)
Quote Description: Amenities; Ramada; Shade
- 100%
Installation; Ramada; Shade Amenities; Ramada; Shade
- 100%
Awarded Total:
0.00
218,921.35
0.00
Quoted Items Total:
189,443.75
218,921.35
83,693.00
Special Conditions:
0.00
0.00
0.00
Quoted Total:
189,443.75
218,921.35
83,693.00
Last Update:
7/12/2024 1:23:39 PM
7/12/2024 1:43:38 PM
7/12/2024 12:07:09 PM
Comparable Total:
189,443.75
218,921.35
782,303.82
Seller: Play It Safe Playgrounds
Miracle Playground Sales
competitive Edge
Contracting
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Shade
13.1.1
36' x 23' Fabric
Shade Structure,
buy
8.00 EA
7,846.25
62,770.00
12,098.38
96,787.04
Shade
13.1.2
36' x 23' Fabric
Shade Freight &
Engineering
8.00 EA
355.00
2,840.00
1,207.03
9,656.25
Shade
13.1.3
36' x 23' Fabric
Shade Install
8.00 EA
10,743.13
85,945.00
8,586.72
68,693.79
8,336.63
66,693.00
Shade
13.2.1
36' x 23' Fabric
Shade Structure,
buy at
Championship
Court
2.00 EA
7,846.25
15,692.50
12,098.38
24,196.76
Shade
13.2.2
36' x 23' Fabric
Shade Freight &
Engineering at
Championship
Court
2.00 EA
355.00
710.00
1,207.03
2,414.06
Shade
13.2.3
36' x 23' Fabric
Shade Install at
Championship
Court
2.00 EA
10,743.13
21,486.25
8,586.72
17,173.45
8,500.00
17,000.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
18 of 23
Quote Group:
Signs
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/21/2024
12:30:23
PM
Quote Last
Changed:
7/12/2024
10:18:10
AM
(1 of 1)
Quote Description: Monument; Wayfinding
Signs
Awarded Total:
0.00
4,820.40
Quoted Items Total:
2,008.50
4,820.40
Special Conditions:
0.00
0.00
Quoted Total:
2,008.50
4,820.40
Last Update:
7/12/2024 10:18:10 AM
6/14/2024 8:07:03 AM
Comparable Total:
2,008.50
9,820.40
Seller: Yesco
Cactus Asphalt
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Signs
7.7.2
Parking Lot
Signage
1.00 EA
2,008.50
2,008.50
3,708.00
3,708.00
Signs
7.8
Concrete Wheel
Stops
6.00 EA
0.00
0.00
185.40
1,112.40
Signs
15.14
Signage, building
1.00 LS
0.00
0.00
Signs
20.1.4.2 Bollards - Installed
under Pickleball
Bollards
8.00 EA
0.00
0.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
19 of 23
Quote Group:
Sport Court
Award
Status:
Complete
Reviewed: Yes
Last
Reviewed:
3/26/2024
3:22:52 PM
Quote Last
Changed:
7/12/2024
12:53:52
PM
(1 of 1)
Quote Description: Sport Court - 100%
Sport Court
Awarded Total:
777,721.62
0.00
Quoted Items Total:
777,721.62
962,365.85
Special Conditions:
0.00
0.00
Quoted Total:
777,721.62
962,365.85
Last Update:
7/12/2024 12:53:52 PM
6/14/2024 9:26:31 AM
Comparable Total:
777,721.62
962,365.85
Seller: General Acrylics
Elite Sports Builders
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Sport Court 10.1
Pickleball Court
Slab
44,171.00 SF
10.00 441,592.75
12.59 556,042.00
Sport Court 10.2
Pickleball Court
Coating
44,171.00 SF
1.96
86,471.25
1.56
69,122.93
Sport Court 10.3
Pickleball Net /
Equipment
18.00 EA
-FREE-
-FREE-
2,108.31
37,949.60
Sport Court 18.4
Tennis Court Slab
21,650.00 SF
10.04 217,259.50
12.22 264,519.70
Sport Court 18.5
Tennis Court
Coating
21,650.00 SF
1.50
32,398.12
1.24
26,851.41
Sport Court 18.6
Tennis Net
3.00 EA
-FREE-
-FREE-
2,626.74
7,880.21
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
20 of 23
Quote Group:
Steel
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
11:49:11
AM
(1 of 1)
Quote Description: Roof, Steel - 100%
Awarded Total:
168,920.00
Quoted Items Total:
168,920.00
Special Conditions:
0.00
Quoted Total:
168,920.00
Last Update:
7/12/2024 11:49:11 AM
Comparable Total:
168,920.00
Seller: Alstate Steel
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Steel
15.17.1 Structural Steel
1.00 LS
168,920.00 168,920.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
21 of 23
Quote Group:
Survey
Award
Status:
Complete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
1:11:47 PM
(1 of 1)
Quote Description: Survey - 100%
Survey - 100%
Awarded Total:
0.00
60,910.00
Quoted Items Total:
51,700.00
60,910.00
Special Conditions:
0.00
0.00
Quoted Total:
51,700.00
60,910.00
Last Update:
7/12/2024 1:11:47 PM
7/12/2024 1:11:09 PM
Comparable Total:
51,700.00
60,910.00
Seller: D2 Surveying
Pathways Land Surveys
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Survey
16.2.1
Survey
1.00 Each
47,000.00
47,000.00
55,310.00
55,310.00
Survey
16.2.2
Survey, ReStake-
10%
1.00 Each
4,700.00
4,700.00
5,600.00
5,600.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
22 of 23
13,910.00 13,910.00
60,910.00
60,910.00
0.00
60,910.00
60,910.00
Quote Group:
Wayfinding
Award
Status:
Incomplete
Reviewed: No
Last
Reviewed:
Quote Last
Changed:
7/12/2024
4:36:50 PM
(1 of 1)
Quote Description: Monument; Wayfinding
Amenities; Wayfinding
Awarded Total:
0.00
48,400.00
Quoted Items Total:
47,065.28
48,400.00
Special Conditions:
0.00
0.00
Quoted Total:
47,065.28
48,400.00
Last Update:
7/12/2024 10:18:10 AM
7/12/2024 4:36:50 PM
Comparable Total:
47,065.28
48,400.00
Seller: Yesco
S&H Steel
Quote
Group
Code
Description
Quantity UM
Unit
Total
Unit
Total
Unit
Total
Unit
Total
Wayfinding 11.2
Wayfinding Signs
1.00 LS
7,158.50
7,158.50
0.00
0.00
Wayfinding 11.3.1
Paddle Sign, 1-
Plate = 20ea; 2-
plate = 2ea
22.00 EA
1,813.94
39,906.78
2,200.00
48,400.00
7/12/2024 4:54 PM
Copyright © 2023 InEight Inc. All Rights Reserved.
23 of 23
ELISEO HERNANDEZ
7/5/24
3QO PLUMBING REVISED PROPOSAL
1
-3QO-
To: Hunter Contracting Co.
PLUMBING CONTRACTOR
Date: 07-05-2024
Phoenix, AZ – ROC# 322290
www.3QOPlumbing.com
Eliseo3QO@outlook.com
(623)432-6004
Project: Tumbleweed Park Pickleball.
Address: Chandler, AZ 85225.
REVISED PROPOSAL
Dear Sr,
Having carefully examined the bid documents including the plans, specifications, and other related
documents; and being familiar with conditions surrounding construction of the proposed project
including the availability of material and labor, 3QO LLC proposes to furnish all labor, material,
equipment, supplies, tools, transportation to provide and install:
•
ABS DWV underground.
•
No-hub cast iron DWV above ground.
•
Trenching, backfill and compaction.
•
Copper domestic water lines.
•
Plumbing fixtures per schedule or approved equal.
For the proposed project according to drawings dated 05-22-2024.
***Prices and availability are subject to change 30 days after the date of this proposal***
Lump Sum:
$91,500.00
Exclusions:
Export & import of spoils, additional work arising from unforeseen conditions, building permits, fees,
taxes, work beyond 5ft of foundation, general demolition, saw cut, demo, and patch-back of concrete
slab.
ELISEO HERNANDEZ
7/5/24
3QO PLUMBING REVISED PROPOSAL
2
Terms:
30day payment cycles.
Billing projections towards the end of each month.
Bill for stored materials on site
All T&M and change order work to be performed with the following rates: Supervisor $120/hr. Plumber
$100/hr. Apprentice and laborer $80/hr. 25% material markup.
DATE
Contractor
PROJECT
Job Address
Addenda(s) noted
Add Alternate
NONE
$127,760.00
QTY
UNIT PRICE
LINE TOTAL
1345
$138.00
$185,610.00
2
$750.00
$1,500.00
1400
$56.00
$78,400.00
16
$425.00
$6,800.00
$0.00
$0.00
600
$165.00
$99,000.00
241
$110.00
$26,510.00
3
$750.00
$2,250.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
SUBTOTAL
$400,070.00
SALES TAX
$0.00
TOTAL
$400,070.00
Add Alternate
12' H blue vinyl chain link w/ painted frame (no detail)
8' H blue vinyl divider chain link w/ painted frame (no detail)
4' W x 8' H blue vinyl chain link walk gate
DESCRIPTION
10' H blue vinyl chain link w/ painted frame & 6' H windscreen (1/LS502)
4' W x 8' H blue vinyl chain link walk gate (1/LS502)
4' H blue vinyl chain link w/ painted frame & Beacon rail padding (3/LS502)
4' W x 4' H blue vinyl chain link walk gate (3/LS502)
Tumbleweed Pickleball Courts- 100% Plans
July 9, 2024
503 W Watkins St.
Chandler, AZ 85286
FAX : (602) 256-7801
Phoenix, Az. 85003
PHONE: (602) 256-7800
Hunter
2250 S. McQueen Rd.
BASE BID
$272,310.00
Total with Alternate
$400,070.00
QUOTE
ADAMS FENCE, LLC.
Licensed
ROC 224210
EXCLUSIONS: grading, staking taxes, permits, bonds, fire dept, locks,
boxes, signs, mow curbs, saw cutting, and core drilling.
Contact Person(s): Steve Adams 602-399-2486
Steve@adamsfence.net
1
Steven Brinkerhoff
From:
Casey Gauthier <casey@alstatesteel.com>
Sent:
Thursday, July 11, 2024 4:51 PM
To:
Steven Brinkerhoff
Subject:
RE: Tumbleweed Park Pickleball - Chandler, AZ
Categories:
Pickleball - Tumbleweed
EXTERNAL EMAIL
I've reviewed them and didn’t notice anything, but I wanted to check in case you spotted something I might have missed. My num
Thank You,
Casey Gauthier | VP-Estimating
Alstate Steel | Phoenix, AZ
O: (602) 699-6500 | M: (505) 503-3221
www.Alstatesteel.com
From: Steven Brinkerhoff <steven.brinkerhoff@huntercontracting.com>
Sent: Thursday, July 11, 2024 4:48 PM
To: Casey Gauthier <casey@alstatesteel.com>
Subject: RE: Tumbleweed Park Pickleball - Chandler, AZ
I don’t know, I didn’t investigate your scope. But there hasn’t been a lot of changes overall.
Thank you,
Steven Brinkerhoff
Preconstruction Manager / Estimator
C (602) 541-0753
steven.brinkerhoff@huntercontracting.com
huntercontracting.com
701 N. Cooper Road
Gilbert, AZ 85233
2
CONFIDENTIAL COMMUNICATION: Emails and attachments from Hunter Contracting Co. may contain privileged and/or confidential information intended only for the use of the
If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this
email and all attachments and notify our offices by calling (480) 892-0521. Thank you.
License AZ: ROC070961, ROC067542, ROC 075851, ROC023057 | HDL AZ License: ROC192564
Hunter Contracting Co. | © 2024 | www.huntercontracting.com
From: Casey Gauthier <casey@alstatesteel.com>
Sent: Thursday, July 11, 2024 4:46 PM
To: Steven Brinkerhoff <steven.brinkerhoff@huntercontracting.com>
Subject: RE: Tumbleweed Park Pickleball - Chandler, AZ
EXTERNAL EMAIL
Steven,
I looked at the 100% plans, and I didn’t see any impact for steel. Let me know if I am overlooking something otherwise m
Thank You,
Casey Gauthier | VP-Estimating
Alstate Steel | Phoenix, AZ
O: (602) 699-6500 | M: (505) 503-3221
www.Alstatesteel.com
From: Steven Brinkerhoff <steven.brinkerhoff@huntercontracting.com>
Sent: Thursday, July 11, 2024 4:39 PM
To: Casey Gauthier <casey@alstatesteel.com>
Subject: RE: Tumbleweed Park Pickleball - Chandler, AZ
I haven’t had a chance to call you back, but we definitely need your updated pricing based on the 100% plans. We need it to
to run with you guys on this one.
Thank you,
You don't often get email from casey@alstatesteel.com. Learn why this is important
3
Steven Brinkerhoff
Preconstruction Manager / Estimator
C (602) 541-0753
steven.brinkerhoff@huntercontracting.com
huntercontracting.com
701 N. Cooper Road
Gilbert, AZ 85233
CONFIDENTIAL COMMUNICATION: Emails and attachments from Hunter Contracting Co. may contain privileged and/or confidential information intended only for the use of the
If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this
email and all attachments and notify our offices by calling (480) 892-0521. Thank you.
License AZ: ROC070961, ROC067542, ROC 075851, ROC023057 | HDL AZ License: ROC192564
Hunter Contracting Co. | © 2024 | www.huntercontracting.com
From: Casey Gauthier <casey@alstatesteel.com>
Sent: Friday, June 21, 2024 1:40 PM
To: Steven Brinkerhoff <steven.brinkerhoff@huntercontracting.com>
Subject: RE: Tumbleweed Park Pickleball - Chandler, AZ
EXTERNAL EMAIL
Good Afternoon Steven,
Could you let me know how our pricing looked on this one?
Thank You,
Casey Gauthier | VP-Estimating
Alstate Steel | Phoenix, AZ
O: (602) 699-6500 | M: (505) 503-3221
www.Alstatesteel.com
From: Casey Gauthier
Sent: Tuesday, June 11, 2024 1:16 PM
To: steven.brinkerhoff@huntercontracting.com
Subject: Tumbleweed Park Pickleball - Chandler, AZ
4
Good Afternoon Steven,
Please see the attached proposal above for the Tumbleweed Park Pickleball – Chandler, Arizona. Our price is Furnish and
the price reflecting ALL steel to be Galvanized, let me know if I misunderstood the requirements.
Thank You,
Casey Gauthier | VP-Estimating
Alstate Steel | Phoenix, AZ
O: (602) 699-6500 | M: (505) 503-3221
www.Alstatesteel.com
Arizona Washroom Partitions
4849 South 36th Street Phoenix, AZ 85040 Lic. ROC177163 Phone 602-437-8036 sales@azwashroom.com
Providing washroom partitions and accessories in Arizona for more than 40 years
To:
Hunter Contracting Co.
Date:
July 10, 2024 Revised
Attn: Steven Brinkerhoff
Quote:
24-6159
Project:
Tumbleweed Park Pickleball
2250 S. McQueen Rd.
Chandler, AZ 85286
Addenda Seen: 0
Toilet Accessories by Gamco, FOB AWP:
Materials – Revised per email dated 6/28/24, subject to approval.
8
B-165 1824
Channel Frame Mirror, 18x24
2
832-001-18
Grab Bar, 1 1/4" OD, Snap Flange, 18"
2
832-001-36
Grab Bar, 1 1/4" OD, Snap Flange, 36"
2
832-001-42
Grab Bar, 1 1/4" OD, Snap Flange, 42"
8
XL-SB
Hand Dryer, Automatic, Brushed Stainless
1
100SSE-SM
Foundations Adult Changing Station, SS, Surface Mount
13,280.00
$
Labor
Deliver and install accessories. One trip.
$ 510.00
Install 16 OFCI Toilet paper and soap dispensers. Same trip as above.
$ 240.00
Fire Equipment by JL Industries, FOB AWP:
Materials
1
COS5E
Cosmic Fire Extinguisher, 3A:40BC
90.00
$
Labor
Deliver only. Same trip as above.
No Charge
Note: Project assumed to be a Modification. Materials pricing EXCLUDES TPT tax for contractors, subject
to contractor supplying a valid Arizona Form 5000 Transaction Privilege Tax Exemption Certificate.
Prices good for 30 days.
Terms: Net 30 pending credit request and approval. Add 3% if paying by credit card.
Excluded: Bonds, backing, blocking, wall cuts, framing, and caulking. Grab Bar backing must be provided at proper
location to allow installation. Installation of grab bars on glass tile. Installation/tagging of fire extinguishers. ADA pipe
insulation and signage. Toilet paper and soap dispensers (furnished by owner).
Respectfully Submitted,
Dale S. Vanniman
Please sign below and return to Arizona Washroom Partitions to indicate acceptance of this quotation and
authorization to proceed with the order.
Signature
Date
P.O. Number
CraftMasters Painting, LLC. 18680 E. Reins Rd Queen Creek, AZ 85142
Joe Emig, joe@craftmasterpainting.com, 480.650.8500
Austin Abney, austin@craftmasterspainting.com, 480.620.9479
PROPOSAL
To:
Hunter Contracting Co.
Date:
June 11, 2024
Attention:
Steven Brinkerhoff
Office:
480.486.7067
Address:
701 N Cooper Rd
Gilbert, AZ 85233
Fax:
JOB NAME
JOB NUMBER
JOB ADDRESS
Pickleball at Tumbleweed Park
2250 S McQueen Rd
Chandler, AZ 85286
PROPOSAL SUMMARY
AMOUNT
Painting:
16,310
Tax
0
Total >>>>>>
16,310
CraftMasters Painting, Inc. is pleased to present the following bid for Tumbleweed Pickleball based
on GAA plans and specifications dated, April 12, 2024, and subject to the following inclusions,
exclusions and qualifications:
SCOPE OF WORK:
1
Prime and paint interior restroom CMU walls with 2-part epoxy paint.
2
Prime and paint (10) HM doors and frames.
3
Prime and paint exposed metal beams, columns and screens.
4
Seal exterior CMU walls with (2) coats of Rain Guard anti-graffiti coating for a 5-year
warranty.
EXCLUTIONS:
1
Epoxy flooring, base, site work.
QUALIFICATIONS
1
This proposal is valid for 30 days from the above date. CraftMasters will provide all labor,
materials, and equipment necessary to complete this job.
2
CraftMasters Painting is an Arizona limited liability company (LLC) licensed, bonded and
insured, and a member of the Painting and Decorating Contractors of America (PDCA) and
Better Business Bureau (BBB). License number: ROC171760. Workmanship warranty is for a
period of two (2) years and product warranties are as per manufacturer.
We look forward to working with you on this project. If you have any questions, please do not hesitate to
call.
Thank you for your business!
Pickleball Courts at Tumbleweed Park
Date:
7/10/24
Project No. PR2206.401
Bidder: Echo Canyon Electric
Identify which items are long-lead by listing the lead time in weeks, add line items if necessary.
Schedule of Values
Your 90%
Long
Lead
Bid ItemDescription
Bid Qty
UM
Unit Cost
Total Cost
Weeks
5
ELECTRICAL
1
EA
852,796.20
$
852,796.20
$
5.1
800 amp SES - purchase & install 52 weeks lead time
1
EA
26,745.00
$
36,747.00
$
5.1a
400 amp SES (alternate to replace 800 amp SES) - purchase &
install
EA
26,745.00
$
-
$
5.2
2-4" Sch 40 Trench, and Conduit for Secondary Utility feed
130
LF
33.62
$
4,370.60
$
5.3
2-2" Sch 40 Trench, Conduit and Wire per C-104
230
LF
24.21
$
5,568.30
$
5.4
4-2" Sch 40 Trench, Conduit and Wire per C-104
1,530
LF
44.83
$
68,589.90
$
2-2.5" Sch 40 Trench, conduit and wire power feed to Rest Room
160
40.04
$
6,406.40
$
Trench, conduit and wire for site branch circuitry
238,323.00
$
5.5
Tie Conduit Sweeps into existing #9 Vault per C-103-1
1
EA
2,690.00
$
2,690.00
$
5.6
#3 Pull Box
5
EA
200.00
$
1,000.00
$
5.7
#7 Pull Box
1
EA
300.00
$
300.00
$
5.8
#7 Vault, C-103-1
3
EA
650.00
$
1,950.00
$
5.9
#9 Vault, C-103-1
1
EA
5,500.00
$
5,500.00
$
5.10
Transformer Pad
1
EA
4,946.00
$
4,946.00
$
5.11
Power Feed & 120V Connections: Drinking Fountain
1
EA
425.00
$
425.00
$
5.12
Lights and Receptacles (Ramada & Shade Structures)
4
EA
1,250.00
$
5,000.00
$
5.13
Light Poles and Fixtures (Pickleball Courts) purchase & install
1
EA
391,055.00
$
391,055.00
$
5.14
Light Poles and Fixtures (Area and Site Lights) purchase & install
1
EA
79,925.00
$
79,925.00
$
Weeks
15
BATHROOM BUILDING
1
EA
53,302.06
$
53,302.06
$
15.8
Electrical Conduit and Wiring (including within 5' of building)
1
LS
24,207.00
$
24,207.00
$
15.9
400 amp Wall Mounted Panel
1
EA
2,000.00
$
2,000.00
$
15.10
Lighting Control Panel, Wall Mounted
1
EA
6,440.00
$
6,440.00
$
15.11
Light Fixture (w/emergency battery pack where applicable)
22
EA
925.23
$
20,355.06
$
15.13
Switches, receptacles, & motion sensors (trim)
1
EA
300.00
$
300.00
$
SUBTOTAL - COST
18
TENNIS COURTS (not included in total cost model above)
1
EA
Weeks
Electrical
1
EA
155,526.28
$
155,526.28
$
18.12
Existing 800 Amp Panel Work
1
EA
912.00
$
912.00
$
18.13
1.5" Trench, Conduit and Wire
530
LF
27.93
$
14,802.90
$
18.14
1" Trench, Conduit and Wire
973
LF
33.06
$
32,167.38
$
18.15
#3-1/2 Pull Box
3
EA
200.00
$
600.00
$
18.16
Light Poles and Luminaires
16
EA
6,690.25
$
107,044.00
$
GRAND TOTAL - COST
$ 906,098.26
$ 1,061,624.54
$ 155,526.28
1
Arizona * California * Nevada * Utah * New Mexico
1.25
European Pavers Southwest, Inc.
Arizona Branch
Tel (602) 253-5242
Fax (602) 797-0147
Segmental Paving Specialists for Over 40 Years
P O Box 21087, Phoenix, AZ 85036
Res. ROC092284
Com. ROC092211
June 10, 2024
Hunter Contracting
701 North Cooper Road
Gilbert, AZ 85233
Attention: Malcolm George
Re: Tumbleweed Park Pickleball Median Paver Bid
We are pleased to submit our quotation on the above referenced project. Breakdown is as follows:
To furnish and install 600 SF of Pavestone City Stone 3pc, 60mm Old Town Blend (or
approved equal) on 1” bedding sand and 4” abc base per MAG dtl 225 will be @ $16.55/sf =
Total Bid = $9,930.00
Included in the price is the 4” abc base, 1” sand setting bed, all paver material as noted above, 1
mobilization, and all labor to complete the same scope of work.
Excluded from the price is any excavation/rough grading, concrete work, filter fabric, pre-emergent,
traffic control/barricades, multiple mobilizations above 1, Davis Bacon wages, and the cost of any
taxes, bonds, permits, fees, tests, or inspections.
Notes:
- Additional mobilization costs will be $750 per mobilization.
- Pricing is good for 90 days from date of this bid.
- If contract is a final field measurement, then the owner will be responsible for the cost of all
special order product, regardless of final field measure. Credit will be available for
installation only.
- Pavers are not specified and bid assumes City Stone style to match existing. Will need approved
samples. If a different material selected, there may be cost impacts.
European pavers has WBE status in the event it effects the outcome of this bid.
If you have any questions regarding this bid, I can be reached at 602-397-4062.
Respectfully submitted,
Renee Boyer
European Pavers Southwest Inc.
renee@epswi.com
Proposal
Q003282
Please Issue Purchase Order to:
Proposal Date
Salesperson
7/1/2024
Kevin Solomon
480-323-0337
kevin@exerplay.com
Exerplay, Inc
PO Box 1160, Cedar Crest, NM 87008
fax to 505-281-0155
Chandler, City of; Tumbleweed PickleBall Park
Quantity
Item Code
Description
Unit Price
DISC.
Total Extended
CLASSIC RECREATION SYSTEMS
1.00
SHELTER
20’x20’ Northwest. Medallion-Lok Roof, 6:12 - 4:12 Roof Pitch, 7’6” Eave
Height, Tube Steel Fascia, 4 Surface Mount Columns , TGIC Poly Powder Coat w/
Zinc Rich Primer (Standard colors only **Upcharge for custom colors).
31,225.00
31,225.00
Note: Provision for Electrical: 1 Ea Outlet, 1 Ea Light
- NOTE - Lead time for Ramadas is approximately 26 weeks, anchor bolts and permits
by others.
1.00
ENGINEERING
Structural Calculations (Includes 3 sets - 24" x 36" copies) - NOTE - Lead time
for Structural Calcs is approximately 3-4 weeks
1,250.00
1,250.00
1.00
SHELTER
20’x38’ Northwest. Medallion-Lok Roof, 6:12 - 4:12 Roof Pitch, 7’6” Eave
Height, Tube Steel Fascia, 4 Surface Mount Columns, TGIC Poly Powder Coat w/
Zinc Rich Primer (Standard colors only **Upcharge for custom colors).
56,795.00
56,795.00
Note: Provision for Electrical: 2 Ea Outlet, 2 Ea Light
- NOTE - Lead time for Ramadas is approximately 26 weeks, anchor bolts and permits
by others.
1.00
ENGINEERING
Structural Calculations (Includes 3 sets - 24" x 36" copies) - NOTE - Lead time
for Structural Calcs is approximately 3-4 weeks
1,250.00
1,250.00
1.00
FREIGHT
Freight/shipping charges (123623 R1)
2,015.00
2,015.00
1.00
CEC-INSTALL
Installation of Ramadas (excludes footers, masonry & permits) (09619-1)
20,410.00
20,410.00
1.00
CEC-INSTALL
ADD OPTION: Pier Footings on Ramadas (09619-1)
8,995.00
8,995.00
SITE FURNISHINGS
8.00
SITE FURNISHINGS BL315LR • 3 Row x 15'L Low-Rise Aluminum Bleacher- 2014 IBC Compliant
2,650.00
21,200.00
1.00
FREIGHT
Freight/shipping charges (QUO0285238)
4,225.00
4,225.00
8.00
CEC-INSTALL
Installation of Bleachers (09619-1)
3,566.00
28,528.00
13.00
TR32CLASSIC
32 Gallon Classic Standard Trash Receptacle, Receptacle Only
670.00
8,710.00
13.00
FLATTOP32-HW
Flat Top for 32 Gallon Receptacles
187.00
2,431.00
13.00
LINER32-BLACK
Plastic Liner - Black Color
83.20
1,081.60
13.00
TR-SM-HW
Surface Mounting Kit for All Models
93.50
1,215.50
15.00
B6WBCLASSICWING6' Standard -Ribbed Steel- Wingline Bench, In-Ground Mount
1,076.00
16,140.00
12.00
SITE FURNISHINGS 86MODCLASSS • 6 Ft. Bench without Back and Arms, Ribbed Steel, 2 3/8" Legs,
lnground Mt.
1,726.00
20,712.00
4.00
T8RCHDCP
8' Regal Accessible Rectangular Portable Table
1,410.00
5,640.00
3.00
SITE FURNISHINGS T8RC • 8Ft. Table, 2 Attached 8Ft. Seats, Rounded Corners, 3/4" #9 Expanded
Metal, Two 2 3/8" Legs, Portable
1,527.00
4,581.00
1.00
FREIGHT
Freight/shipping charges (QUO0285238)
10,455.00
10,455.00
P.O. BOX 1160 Cedar Crest, NM 87008
1-800-457-5444
Exerplay.com
Fax 505-281-0155
Page: 1 of 4
Proposal
Q003282
Please Issue Purchase Order to:
Proposal Date
Salesperson
7/1/2024
Kevin Solomon
480-323-0337
kevin@exerplay.com
Exerplay, Inc
PO Box 1160, Cedar Crest, NM 87008
fax to 505-281-0155
Chandler, City of; Tumbleweed PickleBall Park
Quantity
Item Code
Description
Unit Price
DISC.
Total Extended
1.00
CEC-INSTALL
Installation of Site Furnishings (09619-1)
19,870.00
19,870.00
Note: *Pricing requires single, concurrent mobilization. Each additional mobilization will
incur a $975.00 charge.
THIS PROPOSAL IS SUBJECT TO THE ATTACHED TERMS AND CONDITIONS
Taxes subject to change
Subtotal
266,729.10
Tax Total:
0.00
Total
266,729.10
Proposal prepared by:
Ashley Gonzales
Accepted by:
Print Name:
Signature:
Date:
P.O. BOX 1160 Cedar Crest, NM 87008
1-800-457-5444
Exerplay.com
Fax 505-281-0155
Page: 2 of 4
Proposal
Q003282
General Terms and Conditions:
Pricing for all listed items is good for 30 days from date of quote. ExerPlay reserves the right to revise pricing if any quote approvals are received after the 30-day
timeframe, or if any portion of the quote is changed or removed. This may result in a delay in ordering materials for this project.
Pricing is for the listed items only and unless specifically shown on the quote, does not include freight, installation, engineering, offloading, storage, security, site
preparation, permitting, security/temporary fencing, hard dig conditions, saw cutting, core drilling, field painting, electrical, concrete slabs, masonry work, ABC
compaction, curbing, hand digging, excavation, spoil & waste removal, certification classes, background checks/badging, private line locating, or any applicable taxes or
bonds. To obtain a performance/payment bond, please add 3.5% of the total to this quote.
Any necessary permits (federal, state, and/or local building) or special inspections are the responsibility of the General Contractor or End Owner.
Any applicable taxes shown on the quote are calculated based on state, city or county rates and project-specific requirements. Any Requests to remove taxes are subject
to approval and MUST include an applicable tax-exempt certificate.
Please provide a signed quote, Purchase Order, or Contract to request an order. Further information such as shipping, colors, contact info, etc., may be needed before an
order can be placed. Contract terms are subject to review and approval.
Notwithstanding anything to the contrary in any Contract Documents, ExerPlay shall have no duty to defend or indemnify Owner, Customer, or any other party for that
portion of any claim arising out of the sole negligence of the indemnified party.
Owner or General Contractor understands that estimated shipment times for materials are subject to change due to manufacturer lead times. Please communicate your
project schedule, including any liquidated damages, to ExerPlay prior to ordering. ExerPlay shall not be liable for any loss caused by the timing of delayed shipments.
Billing and Payment Terms:
Current Customers: Unless otherwise negotiated and agreed upon, ExerPlay's payment terms are Net 30 from the date of the invoice, with approved credit; and Net
45 for contracted projects. ExerPlay's process is to bill the customer when the equipment ships. Surfacing and installation are billed upon completion. Bonds are billed
when ordered. Late payments may be subject to finance fees and/or legal action.
New Customers: New customers may be required to pay a deposit on equipment at time of order. Deposit amount to be determined, based on credit. The remainder of
that equipment, including freight, will be billed when it ships. Surfacing and installation are billed upon completion. Bonds are billed when ordered.
If paying by credit card, there will be a 3.5% fee added to the invoice.
Installation Terms:
If installation is included on the quote, the following guidelines must be followed:
1. It is recommended that any Landscape Structures Equipment be installed by a certified Landscape Structures installer, and that all other equipment be installed by a
CPSI Certified installer. ExerPlay reserves the right to request proof of certification.
2. Playground equipment MUST be installed over ADA compliant wood fiber or rubber surfacing. This area is not ADA compliant without surfacing and an accessible route
up to and into the playground area. Please contact us for more information.
3. Installation price does NOT include prevailing wages, Davis-Bacon wages, or TERO wages unless otherwise specified. Any changes in wage requirements at time of order
are subject to updated pricing.
4. Installation price is based on normal soil conditions. Unusual or hard dig soil conditions that require the use of a jack hammer, or other such equipment, will incur
additional charges by reason of such conditions and supervisory fee, and for an extension of the time of completion. Installation price does not include removal of anything
which may hinder installation of equipment, unless otherwise specified on our quote.
5. If Hard Dig conditions are known, please advise so we can quote accordingly to avoid any delays or additional fees. Hard Dig conditions will be considered anything that
cannot be excavated with a standard Bobcat mounted hydraulic auger. Hard Dig conditions will require a change order at a Time & Material rate. If an auger truck is
required to complete digging, it will be at the expense of the General Contractor or Owner, if a spoil report is not provided at the time of quoting.
P.O. BOX 1160 Cedar Crest, NM 87008
1-800-457-5444
Exerplay.com
Fax 505-281-0155
Page: 3 of 4
Proposal
Q003282
6. Finish grade is to be provided by others prior to arrival of installer.
7. Installer must have free and clear access to the install location(s). The installer is not responsible for damage done to existing surfacing/
landscaping that may occur when equipment & vehicles are being used in the normal course of construction. Reasonable access to the job site
for a Bobcat is assumed as a part of this quote.
8. Line-item pricing is for informational purposes only and is based upon being awarded the total project. All items are to be installed concurrently
if specific areas are not ready for installation, and an additional mobilization fee will be required via Change order unless otherwise specified on
the quote.
9. If any materials need to be unloaded on site by the installer, unloading must be coordinated at the same time as the installation. If special
arrangements need to be made, an additional trip charge for unloading may apply.
10. Our installation team will call 811 to conduct a line location service; however, often-times they do not mark lines on the actual property where
the installation will be done. The owner is responsible for blue-staking the job site and staking out any underground utilities prior to installation.
Owner is responsible should damage occur.
11.Neither ExerPlay nor Installers are responsible for vandalism, theft of equipment or subsequent repairs or replacement. Security fencing can be
provided upon request and added to the quote.
12. The job site MUST be ready, and area leveled, when the installer arrives to begin the job, unless specifically noted on the quote. Any downtime
or site delays caused by Owner or General Contractor will incur additional fees.
13. If equipment is to be shipped to the installer’s yard, it will be held for a maximum of 6 months from delivery, with intent to install in that time
frame; otherwise, storage fees may occur.
General Contractor is responsible for:
1. Adequate storage and layout area as well as security of equipment while on site.
2. Water, power, sanitary facilities, and trash container on site.
3. Free and clear vehicle access to site and all areas under the scope of work.
4. Movement of any utilities conflicting with the installation of the equipment (installer is not responsible for landscape irrigation).
5. Once the installers are on site, any delays or additional work incurred by the installation crew and caused by others (owners or other contractors) will be charged on a
cost-plus basis.
6. Any additional costs, i.e. demolition, relocation, excavation, surfacing materials, and labor due to abnormal soil conditions, are not included in price.
7. Please notify ExerPlay of any changes immediately. If any changes are made which we are not aware of, and which alter the installation, then all additional costs will be
passed on to the GC.
P.O. BOX 1160 Cedar Crest, NM 87008
1-800-457-5444
Exerplay.com
Fax 505-281-0155
Page: 4 of 4
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
CUSTOMER
PROJECT INFORMATION
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
QUOTING BRANCH
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
LINE
QUOTE
6/26/24
6511781
ALL BIDDERS MESA
4863 E. INGRAM ST.
MESA, AZ 85205
219895
******************************
* FORTILINE WATERWORKS *
* 4863 EAST INGRAM STREET *
* MESA AZ *
******************************
.
PHONE (480) 265-3636
FAX (480) 813-2350
.
.
ATTENTION: BIDDING CONTRACTOR
.
.
DATE: 06-26-2024
.
.
PLANS DATED: 06-12-2024
.
.
THIS TAKEOFF REPRESENTS OUR
INTERPRETATION OF THE PLANS &
SPECS. FINAL RESPONSIBILITY
FOR AMOUNTS AND ACCURACY OF
ITEMS BELONGS TO THE CUSTOMER.
.
.
THIS TAKEOFF IS OFFERED UNDER
FORTILINE WATERWORKS TERMS AND
CONDITIONS, IF YOU NEED A COPY
OF THOSE PLEASE CONTACT OUR
OFFICE.
.
SPECIAL ORDER MATERIAL MAY BE
SUBJECT TO RESTOCKING CHARGES
OR MAY NOT BE RETURNABLE.
.
QUOTATION BASED ON PURCHASE OF
TOTAL QUANITY, ANY DEVIATION
MAY RESULT IN PRICE CHANGES.
.
WE APPRECIATE THE OPPORTUNITY
TO QUOTE YOU AND LOOK FORWARD
TO WORKING WITH YOU ON THIS
PROJECT. GOOD LUCK !!!
.
.
.
.
.
1
TUMBLEWEED PARK PICKLEBALL CHANDLER
FORTILINE MESA
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
JOB NAME
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
LINE
6"X20' SDR35 PVC SEWER PIPE
3"X1000' SEWER DETECTOR TAPE
14GA TRACER WIRE GREEN 500'
6" CONC MANHOLE ADPT MA60
6" SDR35 PVC WYE GXG
6" SDR35 PVC 45 GXG
6" SDR35 PVC CAP G
6"X4" SDR35 PVC WYE GXG
4" SDR35 PVC 45 GXS
4"X20' SDR35 PVC SEWER PIPE
4" CPLG CI/PVCXCI/PVC 56-44
JAY R SMITH 4220 CLEANOUT ASSY
2X40' TYPE K SOFT COIL
2" CPLG PJCXPJC E2609
460
1
1
1
2
2
3
5
5
20
5
5
80
1
#4223S04-NS WITH BRONZE PLUG
COPPER TUBING
LOW LEAD
.
.
.
.
.
==============================
TUMBLEWEED PARK PICKLEBALL
2250 S MCQUEEN RD
CHANDLER, ARIZONA
==============================
****** SEWER ******
BID ITEM 2.2
6" PVC SEWER LINE
Package Sub-total:
BID ITEM 2.4
SEWER CLEANOUT
Package Sub-total:
Section Sub-total:
****** WATER ******
BID ITEM 3.1
2" COPPER WATER SERVICE LINE
Package Sub-total:
BID ITEM 3.2
680
690
700
710
720
730
740
800
810
820
830
840
940
950
FT
EA
EA
EA
EA
EA
EA
EA
EA
FT
EA
EA
FT
EA
6.0900
33.6400
97.3600
5.1600
55.4800
28.4600
16.9400
48.9900
12.6000
2.6300
5.6000
221.3600
20.0400
163.8000
2,801.40
33.64
97.36
5.16
110.96
56.92
50.82
244.95
63.00
52.60
28.00
1,106.80
1,603.20
163.80
219895
TUMBLEWEED PARK PICKLEBALL CHANDLE
6511781
2
6/26/24
3,156.26
1,495.35
4,651.61
1,767.00
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
JOB NAME
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
LINE
2" SCH40 PVC PIPE BE
4X200 BLUE POLYWRAP FOR 2" COP
2"X100' POLY TAPE
3"X1000' WATER DETECTOR TAPE
14GA TRACER WIRE BLUE 500'
2" SCH80 PVC ADPT HXM
2" SCH80 PVC 45 HXH
2" SCH80 PVC 22-1/2 HXH
2" SCH80 PVC CAP H
2" RED PRS BFP LF009M2QT
STEEL BFP ENC GUARDSHACK GS-3
2" BRASS MTR FLG NL
2" MTR GASKET DROP IN
2" BRASS METER BOLT & NUT SET
2" COPPER SWEAT MALE ADPT
2" COPPER SWEAT 90
2" CAST COPPER UNION
2" COPPER SWEAT FEMALE ADPT
2X20' TYPE K HARD COPPER TUBE
12X2 IP SDL BRZ AC/DIP
2" BALL CORP MIPXFIP NL
2" COPPER SWEAT MALE ADPT
2" BALL ANG VLV FIPXMTR FLG
19X30X12 POLY CONC METER BOX
#4 POLY LID W/READ HOLE F/CONC
12" N12 ASTM F2648 PIPE IB/WT
160
200
1
1
1
1
1
1
1
1
1
1
1
1
3
4
1
1
20
1
1
2
1
1
1
60
LEAD FREE
10X24X40
DOUBLE STRAP 13.14-14.48
W/LOCKWING NO LEAD
A6001854PCX12-MAG4 CHANDLER
MAG METER BOX CHANDLER SPEC
2" SCH 40 PVC WATER LINE
Package Sub-total:
BID ITEM 3.3
2" RPBA & CAGE
Package Sub-total:
BID ITEM 3.4
2" WATER METER ASSY
Package Sub-total:
Section Sub-total:
****** STORM DRAIN ******
BID ITEM 4.1
12" HDPE
1010
1020
1030
1040
1050
1060
1070
1080
1090
1150
1160
1170
1180
1190
1200
1210
1220
1230
1240
1300
1310
1320
1330
1340
1350
1440
FT
FT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
FT
EA
EA
EA
EA
EA
EA
FT
1.4800
.3200
5.5500
33.6000
97.3600
17.7900
15.2800
17.9600
14.3300
654.5300
581.8500
101.0100
1.1300
51.4400
33.6900
25.1500
130.5100
42.3100
17.2600
311.8000
379.0000
33.6900
468.0300
312.9900
277.7300
10.1800
236.80
64.00
5.55
33.60
97.36
17.79
15.28
17.96
14.33
654.53
581.85
101.01
1.13
51.44
101.07
100.60
130.51
42.31
345.20
311.80
379.00
67.38
468.03
312.99
277.73
610.80
219895
TUMBLEWEED PARK PICKLEBALL CHANDLE
6511781
3
6/26/24
502.67
2,109.65
1,816.93
6,196.25
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
JOB NAME
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
LINE
12" WATERSTOP GASKET 1202PS
12"X4" N12 RED CPLG WT 1274WT
12" N12 90 WT 1299WT
18" N12 ASTM F2648 PIPE IB/WT
18" WATERSTOP GASKET 1802PS
24" N12 ASTM F2648 PIPE IB/WT
24" WATERSTOP GASKET 2402PS
4'X6" DURASLOPE CHANNEL DS114
4'X6" DURASLOPE CHANNEL DS113
4'X6" DURASLOPE CHANNEL DS112N
4'X6" DURASLOPE CHANNEL DS112
4'X6" DURASLOPE CHANNEL DS111
4'X6" DURA SLOPE CHANNEL DS110
4'X6"DURA SLOPE CHANNEL DS109N
4'X6" DURA SLOPE CHANNEL DS109
4'X6" DURA SLOPE CHANNEL DS108
4'X6" DURA SLOPE CHANNEL DS107
4'X6"DURA SLOPE CHANNEL DS106N
4'X6" DURA SLOPE CHANNEL DS106
4'X6" DURA SLOPE CHANNEL DS105
4'X6" DURA SLOPE CHANNEL DS104
4'X6"DURA SLOPE CHANNEL DS103N
4'X6" DURA SLOPE CHANNEL DS103
2
2
1
160
4
80
2
2
2
4
2
2
2
2
2
2
2
2
2
2
2
4
2
NON-DOT
NON-DOT
NON-DOT
11.72"-12.06"
11.39"-11.72"
11.39"
11.05"-11.39"
10.71"-11.05"
10.38"-10.71"
10.38"
10.05"-10.38"
9.70"-10.05"
9.37"-9.70"
9.37"
9.04"-9.37"
8.70"-9.04"
8.37"-8.70"
8.37"
Package Sub-total:
BID ITEM 4.2
18" HDPE
Package Sub-total:
BID ITEM 4.3
24" HDPE
Package Sub-total:
BID ITEM 4.7
TRENCH DRAIN
1450
1460
1470
1530
1540
1600
1610
1670
1680
1690
1700
1710
1720
1730
1740
1750
1760
1770
1780
1790
1800
1810
1820
EA
EA
EA
FT
EA
FT
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
59.9500
172.7200
218.8000
19.5800
96.6600
32.4300
152.9400
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
119.90
345.44
218.80
3,132.80
386.64
2,594.40
305.88
288.96
288.96
577.92
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
577.92
288.96
219895
TUMBLEWEED PARK PICKLEBALL CHANDLE
6511781
4
6/26/24
1,294.94
3,519.44
2,900.28
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
JOB NAME
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
LINE
4"X6" DURA SLOPE CHANNEL DS102
4'X6" DURA SLOPE CHANNEL DS101
4'X6" DURASLOPE CHANNEL DS100N
4'X6" DURASLOPE CHANNEL DS100
4'X6" DURASLOPE CHANNEL DS099
4'X6" DURASLOPE CHANNEL DS098
4'X6" DURASLOPE CHANNEL DS097N
4'X6" DURASLOPE CHANNEL DS097
4'X6" DURASLOPE CHANNEL DS096
4'X6" DURASLOPE CHANNEL DS095
4'X6"DURA SLOPE CHANNEL DS094N
4'X6" DURASLOPE CHANNEL DS094
4'X6" DURASLOPE CHANNEL DS093
4'X6" DURASLOPE CHANNEL DS092
4"X6" DURASLOPE CHANNEL DS091N
4'X6" DURA SLOPE CHANNEL DS091
4'X6" DURASLOPE CHANNEL DS090N
UNIVERSAL END CAP F/DURA SLOPE
3/4" FRAME&CAP SCREWS BAG(12)
DURA SLOPE BOTTOM OUTLET ADPT
DURA SLOPE DI FRAME DS-200H
2' DURA SLOPE SLOTTED DI GRATE
DURA SLOPE GRATE SCREWS 629
4" N12 AASHTO M252 PIPE IB/WT
4" N12XSDR 35 ADAPT 0469AG
4" N12 90 WT 0499WT
8X1 IP SDL BRZ F/C900 9.05
1" BALL CORP MIPXPJC NL
1X60' TYPE K SOFT COIL
1" BALL ANG VLV PJXMSN NL
18"X25-3/4" CONCRETE MAG MB #2
#2 POLY LID W/READ HOLE F/CONC
2
2
2
2
2
2
2
2
2
2
4
2
2
2
2
2
2
4
4
2
144
144
4
20
2
1
1
1
60
1
1
1
8.03"-8.37"
7.69"-8.03"
7.36"-7.69"
7.36"
7.02"-7.36"
6.69"-7.02"
6.35"-6.69"
6.35" DEEP NEUTRAL
6.01"-6.35"
5.68"-6.01"
5.34"-5.68"
5.34"
5.00"-5.34"
4.67"-5.00"
4.34"-4.67"
4.34"
3.99"-4.34"
3.99"
DS-126
SINGLE STRAP
COPPER TUBING
MAG METER BOX CHANDLER SPEC
Package Sub-total:
Section Sub-total:
****** 1" WATER SERVICE ******
1830
1840
1850
1860
1870
1880
1890
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
2020
2030
2040
2050
2060
2070
2080
2130
2140
2150
2160
2170
2180
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
FT
EA
EA
EA
EA
FT
EA
EA
EA
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
144.4800
18.1400
6.8600
43.5800
48.4200
63.5900
30.1800
2.3600
40.1900
30.7300
97.5200
94.7300
12.0700
175.3500
72.5700
112.3800
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
288.96
577.92
288.96
288.96
288.96
288.96
288.96
288.96
72.56
27.44
87.16
6,972.48
9,156.96
120.72
47.20
80.38
30.73
97.52
94.73
724.20
175.35
72.57
112.38
219895
TUMBLEWEED PARK PICKLEBALL CHANDLE
6511781
5
6/26/24
26,998.19
34,712.85
BIDCNEW
QUOTE DATE
QUOTE NO
PAGE
QTY
DESCRIPTION
UOM
UNIT PRICE
TOTAL PRICE
CUSTOMER NO
JOB NAME
ALL STOCK DELIVERIES ARE SUBJECT TO SHIPPING CHARGES
LINE
All PVC and HDPE material is quoted for shipment within 7 days of quote/bid date. All other material is quoted for shipment within 30 days of quote/bid date.
After 7 days for PVC and HDPE or 30 days for all other material, ALL quoted prices are subject to review based on current market conditions.
Subtotal:
Tax:
Bid Total:
46,837.46
.00
46,837.46
219895
TUMBLEWEED PARK PICKLEBALL CHANDLE
6511781
6
6/26/24
Ent By AWP 6/26/24 12:07:51
Section Sub-total:
1,276.75
PO Box 5277
Peoria, AZ 85385
(602) 942-1983 Main
(602) 978-8806 Fax
License 321570
87,610.00
$
25,336.00
$
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
16)
17)
18)
19)
20)
21)
22)
23)
23)
24)
25)
1)
Anti-graffiti coating or CMU sealer
Offsite storage of materials or off site storage insurance
Crane hoisting
Site dust control
Delta 1 Plan Review Comments Resubmittal
5/22/24
Note: The above bid proposal is valid for 20 days . Proposal subject to change due to market increases, fuel/energy surcharges, freight
rate increases, lodging/per diem increases or changes to construction documents. Bid proposal subject to receiving a job specific AZ5005
form. Sufficient survey points and/or corner pins and/or gridlines must be provided to us in order to layout the building.Contract
acceptance contingent on schedule availability of G&G Masonry LLC and incorporation of inclusions and exclusions into subcontract.
Multiple movements of materials due to advance material procurement
Bid proposal based on:
Grout cancellation fees if grout has to be cancelled less than 24 hours from time of pour due to reasons
unrelated to G & G Masonry LLC other than weather events
Site walls, signs, benches
Splitface CMU
Textura fees
Simpson ties, straps or anchors (furnishing, unloading or storing)
Welding or weldable rebar
Water repellent testing
Concrete/Grout Washout
Masonry Bid Proposal
Date:
July 9, 2024
To:
Caulking and sealing
Material, freight and fuel surcharges may apply if implemented by supplier after time of bid. If increases
occur, a change order will be given for the difference in cost from time of bid to date of delivery to job site.
Breakout for releasing CMU order (long lead):
Project:
Tumbleweed Park Pickleball Building
Project Address:
2250 S. McQueen Road, Chandler, AZ 85286
Malcolm George - Hunter Contracting Co
From: Melonie Leslie, President
Material price escalations may apply to this project after date of executed contract if G & G Masonry has not
received approved construction drawings (including RFI responses that would prohibit being able to place a
valid material order), approved submittals, approved samples (including location designated material is to be
used), approved shop drawings, definitive masonry scheduled start date (changes or delays in schedule may
result in expiration of ready-mix pricing), ability to ship rebar and wire to a dry storage area on site.
Exclusions:
Sales tax
Bond
Permits
Water supply
Dry packing
Miscellaneous steel embeds, angles, bolts/nuts or lintels (furnishing, unloading or storing)
Flashing
Footings
Labor
Equipment
Block with integral water repellent - smooth 8-8-16 integral color from standard color group and smooth 8-4-
16 integral color from standard color group --- Lead time is 20 weeks minimum.
Inclusions:
Total Masonry bid proposal:
Raked mortar joints
Set miscellaneous steel embeds (under 200 pounds only) as required at time of masonry construction
(embeds furnished,offloaded and stored by others). Embeds and anchor bolts must be on site a minimum
of 5 work days prior to grouting. Embed and anchor bolt layouts must be provided in writing by others
prior to the start of masonry construction.
Set hollow metal frames at start of masonry construction (frames and spreaders furnished, offloaded and
stored by others).
Masonry lintels where required
Mortar - Lead time is 6 weeks minimum. Color pigment availability varies and limited integral color
options may be available.
Masonry trash cleanup to dumpster (dumpster and dumpster removal to be provided by others)
Duro wire
Grout
Rebar (furnished and installed)
Pollution Insurance
Masonry stems
Masonry control joints
CMU for one new restroom in finish pattern per 1/A301 - Note: construction must occur prior to
paving/curbing
Inspection/testing fees
Surveying
(602) 569-9377 • Fax (623) 298-1310 • Toll Free (800) 436-2279
22222 N 22nd Avenue • Phoenix, AZ 85027
www.generalacrylics.com
AZ Contractors # ROC077085/ ROC034868 • NV Contractors # 0059476 • NM Contractors # 30964 • UT Contractors # 7406753-5501
July 10, 2024
Attn: Malcom George
Hunter Contracting, Inc.
520-274-7324
Malcolm.george@huntercontracting.com
Tumbleweed Pickle Ball/Tennis 100% DRAWINGS
General Acrylics, Inc. will provide all Labor, tools and equipment necessary to complete the (18) Pickleball courts and (3) Tennis
courts
CONSTRUCT (18) PICKLEBALL COURTS:
•
General Contractor/Owner to provide:
o
Clear access to court area.
o
Water source
o
Subgrade prepared with .83% slope
•
Install (18) sets of net post sleeves in concrete footers.
•
Install 4” of aggregate and compact.
•
Install post-tension cabling spacing per layout/plans/PT engineering provided by General acrylics
•
Construct (4) 144’x64’, construct (2) 70’x44 5” Post Tensioned slab 4000 psi concrete for (18) Pickleball courts.
•
Construct (2) 10’x20’ practice courts ( there are not details on these courts) Hit wall by others
•
Caulk anything in our slabs ( fence poles or joints) any thing out side of our slab needs to be covered by others
including fence poles
•
PT Engineering and testing on concrete slabs included
•
Clean up from construction.
Court Construction- 432,934.07
NOTE: GC to do slot drain outside of courts
FENCING:
•
Construct 1328LF 10’ Black Vinyl perimeter fencing 1”3/4 mesh around pickleball courts
•
Construct 1400LF 4’ Black Vinyl perimeter/Divider fencing 1”3/4 mesh
•
Install 1328 LF6’Extreme Screen Windscreen (Green Or Black)
•
Includes (18) 4’gates
Fence/Windscreen- $311,691.28
GAMECO SURFACING AND STRIPING:
•
Allow courts 28 days for courts to cure before coating.
•
Wash and flood check all (16) Pickleball courts.
•
Apply (1) coat of Gameco primer to all courts.
•
Apply (3) coats of sand filled Gameco colored Acrylics over all (18) Pickleball courts and stripe.
o
Up to (2) colors to be chosen from Gameco color chart.
•
Clean up all General Acrylics related debris.
EQUIPMENT:
•
Provide/Install (18) sets of Pickleball sleeves
•
Provide/Install (18) sets of Douglas Premier XS Pickleball post (Green or Black)
•
Provide/Install (18) Douglas PN-30 Pickleball Nets
•
Clean up all General Acrylics related debris.
Equipment/Coatings- $84,775.74
(602) 569-9377 • Fax (623) 298-1310 • Toll Free (800) 436-2279
22222 N 22nd Avenue • Phoenix, AZ 85027
www.generalacrylics.com
AZ Contractors # ROC077085/ ROC034868 • NV Contractors # 0059476 • NM Contractors # 30964 • UT Contractors # 7406753-5501
Price $829,401.09 excludes taxes and bond
CONSTRUCT (3) TENNIS COURTS:
•
General Contractor/Owner to provide:
o
Clear access to court area.
o
Water source
o
Subgrade prepared with .83% slope
•
Install (3) sets of net post sleeves in concrete footers.
•
Install 4” of aggregate and compact.
•
Install post-tension cabling spacing per layout/plans/PT engineering provided by General acrylics
•
Construct (1) 120’x120’’ for (2) 60’x120 Tennis court’, construct (1) 60’x120’ 5” Post Tensioned slab 4000 psi concrete
for (3) Tennis courts. Note talked with Malcolm 3-26 in regards to the 120x120’
•
PT Engineering and testing on concrete slabs included
•
Clean up from construction.
Court Construction- $212,999.51
FENCING:
•
Construct 688LF 10’ Black Vinyl perimeter fencing 1”3/4 mesh around Tennis courts
•
Install 600 lf 6’Extreme Screen Windscreen (Green Or Black)
•
Includes (3) 4’gates
Fence/Windscreen- $99,577.96
GAMECO SURFACING AND STRIPING:
•
Allow courts 28 days for courts to cure before coating.
•
Wash and flood check all (3) Tennis courts.
•
Apply (1) coat of Gameco primer to all courts.
•
Apply (3) coats of sand filled Gameco colored Acrylics over all (3) Tennis courts and stripe.
o
Up to (2) colors to be chosen from Gameco color chart.
•
Clean up all General Acrylics related debris.
EQUIPMENT:
•
Provide/Install (3) sets of Tennis sleeves
•
Provide/Install (3) sets of Douglas Premier XS Tennis post (Green or Black)
•
Provide/Install (3) Douglas TN-36 tennis nets
•
Clean up all General Acrylics related debris.
Equipment/Coatings- $31,762.86
Price $344,340.33 excludes taxes and bond
NOTES:
•
ASBA & USTA require slope at .83% preferably in one direction
•
Pricing is based on all scopes going together
•
All courts must cure a minimum of 28 days before coating.
•
To eliminate pour backs all site concrete to be poured after the courts are constructed.
•
Bond rate is 1.5%
•
Preparation of the sub-base, and expressly excludes the condition or preparation of subgrade, and subgrade soils
conditions (including expansive or subsident soils). Subcontractor will not be responsible or liable for any subgrade
soils or soils conditions (including any moisture or compaction requirements). Any costs or expenses to evaluate
(602) 569-9377 • Fax (623) 298-1310 • Toll Free (800) 436-2279
22222 N 22nd Avenue • Phoenix, AZ 85027
www.generalacrylics.com
AZ Contractors # ROC077085/ ROC034868 • NV Contractors # 0059476 • NM Contractors # 30964 • UT Contractors # 7406753-5501
the soils conditions and prepare the subgrade, including excavation, compaction, re-compaction and grading, or
relating or attributable to subgrade settling or movement, shall not be the responsibility of Subcontractor.
EXCLUDES:
-
Tax
-
Bonds
-
Sidewalk
-
Slot drain
-
Shade structure
-
benches
-
Permits
-
Plans
-
Engineering
-
Soils Report
-
Testing
-
caulking
-
Staking
-
Subgrade prep
-
Lighting
-
Electrical
-
Pour-backs
-
Caulking
-
Dowels
-
Irrigation and Landscaping scope
GUARANTEE: All materials and work performed by Contractor is guaranteed for a period of two (2) years from the time
construction is completed. In the construction of concrete courts, shrinkage cracks and/or spalls may appear in the slab but do
not cause any structural damage or displacement. In order to minimize the possibility of shrinkage cracks and/or spalls,
Contractor uses the least reactive aggregate available. However, neither Contractor nor the concrete ready-mix companies
guarantee against shrinkage cracks and/or spalls that may occur in the concrete slab, and the terms of our guarantee do not
extend to such shrinkage cracks and/or spalls.
Respectfully,
Account Executive
Kyle Watkins
GENERAL ACRYLICS, INC.
Page 1
Proposal
Intertwine Environmental Contractors Inc
General Engineering Contractors, Lic. ROC 235693, 235694,
13790 W Jimmie Kerr Blvd. Casa Grande, AZ 85122
Office (520) 426-9372 Fax (520) 426-9093
WWW.IntertwineContractors.com
Date:
May 27, 2024
Attention : estimating
Project: Tumbleweed Park Drywell
Location: 2250 S. McQueen Rd.
Chandler AZ
Description
Qty
Unit Price
Total
Intertwines Dual Drywell system
Dual Interceptor Drywell System Approx 95'
1 ea
$23,000.00
$23,000.00
to Include:
Drilled Drywell 10' into permeable soil Approx 95'
15' Settling Chamber w/ 24'' cover
19' Drywell Chamber w/ perforated bottom & 24'' cover
4' cross over
6'' Perforated Pipe
Slurry Backfill top 3' of chambers
Total
$23,000.00
Notes: does not include storm drain tie in to drywell
Exclusions: Bond, permits, impact fees, sales tax, SWWP, Modified Wages, Barricades, Signage, staking, survey, fencing
layout, soil testing, dust control other than Our scope, R/W permit, special inspections, construction water, Water Meter,
concrete & paving, compaction testing, final grade, police officers, streetlights, stripping and signs, landscaping, DG for
landscaping, demo, dry utilities, hard dig, soil treatment, ins over 2 mil, offsite work, traffic control, variable message boards,
open trench signs, plan review, shadow truck, filled barrier walls, downspout channel and grates, site retaining or screen walls
and anything not listed on this proposal.
Trent Humber
Estimator/PM
Intertwine Environmental Contractors, Inc.
Cell (520) 450-3505
estimator@IntertwineContractors.com
Proposal
soren@goplayspace.com
Soren Selph
Prepared By:
2025-01-01
Expiration Date:
6/20/2024
Created or Revised Date:
00004409
Quote Number:
QUOTE
5698 S Shady Farm Lane
Murray, Utah 84107
801-274-0212
Please inventory product within 5 days of receipt and notify us of any problems.
We are a supplier only. Customer is responsible for accuracy and conformity to plans and specifications.
Freight has been quoted for single delivery. If customer requires multiple deliveries, additional costs will apply.
Customer will be prepared to receive material upon delivery, which may include offloading equipment. If unable, customer is
responsible for additional storage and/or re-consignment fees.
NOTES
City, State, Zip Code:______________________________
Ship to Address:__________________________________
Accepted Date:__________________________________
Shipping Contact Cell No.:___________________________
Steven Brinkerhoff
Shipping Contact Name:____________________________
Accepted By:____________________________________
Quote does NOT include Excavation, Installation, or surfacing. Includes Equipment & Freight only.
$13,526.42
Grand Total
$841.62
Sales/Use Tax
7.80%
Tax Percentage
$12,684.80
Total Cost
50% Deposit - Net 30
Payment Terms
Chandler, Arizona
Location
Tumbleweed Rec Center - AZ
Project Name
Qty Manufacturer Product Code
Product Description
Color
Install Type
Unit Price
Extended
Price
1
Kompan
FAZ60600-0001 FAZ60600-0001 - ABDOMINAL BENCH ORANGE ,
RAL 2010 SURFACE
Orange Surface Mount
$2,980.00 $2,980.00
1
Kompan
FSW223 -
KOMPAN
FSW223 STRETCH STATION ORANGE
Orange Surface Mount
$4,420.00 $4,420.00
1
Kompan
FAZ Orange
Lower Back Bench
Orange Surface Mount
$3,390.00 $3,390.00
1
Kompan
Freight
Freight - Kompan Equipment Freight
Lead times are
10-12 Weeks
$1,894.80 $1,894.80
MEMO
soren@goplayspace.com
Soren Selph
Prepared By:
2025-01-01
Expiration Date:
6/20/2024
Created or Revised Date:
00004409
Quote Number:
QUOTE
5698 S Shady Farm Lane
Murray, Utah 84107
801-274-0212
Please inventory product within 5 days of receipt and notify us of any problems.
We are a supplier only. Customer is responsible for accuracy and conformity to plans and specifications.
Freight has been quoted for single delivery. If customer requires multiple deliveries, additional costs will apply.
Customer will be prepared to receive material upon delivery, which may include offloading equipment. If unable, customer is
responsible for additional storage and/or re-consignment fees.
NOTES
1101 California Ave
Suite 209
Corona, CA 92881
Phone # (800) 264-7225
Fax # (877) 215-3869
www.miracleplayground.com
Estimate Number
MPS 1436
Estimate Date
06-06-2024
Expiration Date
08-07-2024
Customer
ALL BIDDERS
Sales Rep
Monte Corley
Email
monte@miracleplayground.com
Payment Terms
To Be Determined - Deposit May Be Required
Project Name
Tumbleweed Park Pickleball Courts Fabric Shade Structure
Item # & Description
Quantity
Total
Shade Systems
21' x 322' Monoslope T-Cantilever consisting of (10)
columns and (9) fabric canopies per attached drawing
dated 4/12/2024- 8'/12' Eave - Pier Mounted Columns
1
$93,968.00
$93,968.00
INSTALL NOT INCLUDED
APPROXIMATE LEAD TIME: 8 WEEKS FROM TIME OF ORDER
Sales Tax
$0.00
Product Total
$93,968.00
Item
Description
Quantity
Rate
Freight Shade
Systems
Freight Shade Systems
1
$8,400.00
Stamped Drawings
Stamped Drawings
Arizona Professional Engineer Sealed
Drawings and Calculations
1
$975.00
$9,375.00
Sales Tax
$0.00
Shipping, Handling and Non Taxable Services Total
$9,375.00
Grand Total
$103,343.00
NOTES AND EXCLUSIONS:
•
This estimate shall not become binding until signed and returned for approval.
•
A signature indicates acceptance of all terms, conditions, and prices listed.
•
A signed quote will not substitute for a Purchase Order if one is required by the Customer.
•
Exclusions: All Unloading, Storage, Installation, Site Work, Fees & Permits, outside of the quoted above.
•
Footing calculations for playground equipment can be added for an additional fee if required
•
Please note, in most locations, any shade (METAL, FABRIC, or PLASTIC) in excess of 120 sqft requires a
building permit.
•
It is the CUSTOMER’S RESPONSIBILITY to confirm with the local building department if permitting is
necessary.
•
If permitting is necessary, it is the CUSTOMER’S RESPONSIBILTY to request, pay, and obtain these
permits.
•
WE will provide the stamped engineering that is required to obtain the permit – this is part of our quote.
The CUSTOMER provides everything else such as permit application, fee payment, site plan, etc.
•
Your shade order will not be placed in the manufacturing queue until you have provided us the approved
drawings.
•
Because the permitting process varies greatly between agencies, any stated lead time does NOT include
the permitting process.
•
D2 Surveying
Estimate # 133-C-24
24468 N. Corn Street
Florence AZ, 85132
480-221-1368 (M)
1-888-765-7965 (F)
Proposal for Surveying Services
Tumbleweed Park (Pickleball)
Chandler, Arizona
Section A. Project Information
This project includes but is not limited to the survey work necessary for the construction of new
pickleball courts, restroom facility and tennis courts.
Section B. Scope of Work
This proposal includes the following items as they relate to survey layout and/or construction
staking:
1. Project management
2. Calculations and Control Verification
3. Stake saw cuts and Right of Way or Construction limits
4. Mass Grading layout (Retentions and Rough grade roadway)
5. Building layout
Pad envelope
Pad certification
Finish Floor rebar
Building corners or GRID lines
6. Stake wet utilities-water 50’ intervals and sewer 25’ intervals)
7. Stake storm drain 25’ intervals, catch basins, and underground storage tanks
8. Stake light pole foundations
9. Stake curb 25’ at intervals
10. Stake sidewalk at 50’ intervals
11. Bluetops 50’ intervals (No splits or ¼ crown lines set within 50’ of ½ roadway width)
12. Pavement markings at 50’ intervals and sign layout
13. Centerline monument staking and utility adjustments locations
14. Project As-Builts
EXCLUSIONS: The following items are excluded from this proposal but may be negotiated prior
to, or during the constructions process.
1. Boundary determination
2. Electric, Traffic Signals, ITS lines, Phone, Gas, irrigation, fiber optic, or Cable TV line
staking
3. Retention Verification
4. Blue tops within 50’ of grade controlling features (curb, pavement or bluetop hub)
5. Pothole surveys and pothole exhibits
6. Re-staking
Section C. Schedule
D2 Surveying can begin immediately upon award of project. There will be no scheduling
conflicts for any work requested 2 working days in advance. Any work requested with less than
2 days notice will be completed as quickly and efficiently as possible however accommodating a
schedule on that short notice cannot be guaranteed.
Section D. Summary of Cost
All work associated with the “Scope of Work” provided shall be budgeted at a cost of $47,000
for professional surveying services. Any work in addition to, or outside of this scope may be
negotiated prior to, or during the construction process by the assigned Survey Manager or
Estimating Department of D2 Surveying. All line items are estimated on the condition that D2
Surveying is provided with a design CAD file, if no cad file is provided D2 Surveying will have the
right to adjust this cost estimate.
Section E. Construction Progress Media
D2 Surveying can provide aerial construction progress photography and/or video with the use
of an unmanned aircraft system. This work can be provided on a monthly or quarterly basis.
The availability of this deliverable is subject to any FAA airspace restrictions. The additional
cost for this service will be: $ 500 per visit.
Section F. Acknowledgements
**Time & Material** for all extra work will be charged at a 4-hour minimum. See attached rate
sheet. D2 Surveying reserves the right to increase the minimum hour charge based on project
location.
**This proposal is based on current plans dated: 4-1-2024
**Proposal void after 30 days from date signed below and to the right.
D2 Surveying will complete all survey work set forth in the scope listed above. By signing this agreement, the signer
agrees to the terms of this proposal in principle, and he/she is authorized to approve such an agreement.
_______________________________
7-4-24
Client (or authorized signer)
Date
Joshua J. Dalmacio Owner/RLS
Date
-Thank you for providing D2 Surveying with the opportunity to work with your
company. We understand that it is a privilege to be given this opportunity and we
do not take that lightly.
EFFECTIVE 1/9/2024
D2SURVEYING.COM
24468 N. CORN STREET
FLORENCE AZ, 85132
480-221-1368
RATE
SHEET
THESE RATES ARE USED FOR GENERAL ESTIMATING AND ARE SUBJECT TO
CHANGE BASED ON SCOPE OF WORK, AVAILABILITY, PROJECT LOCATIONS,
ETC. D2 SURVEYING WAS FOUNDED ON THE PRINCIPLE OF PROVIDING
COMPETITIVE PRICING AND UNBEATABLE SERVICE TO ESTABLISH LONG
LASTING BUSINESS RELATIONSHIPS.
FOR ADDITIONAL PRICING INFORMATION PLEASE CONTACT JOSH OR JEREMY
DALMACIO; josh@d2surveying.com, jeremy@d2surveying.com, or
480-221-1368
SERVICE PROVIDED
1 MAN SURVEY CREW
2 MAN SURVEY TEAM
3 MAN SURVEY TEAM
GENERAL OFFICE
DRAFTING/SURVEY TECH/DRONE PROCESSING
SENIOR DRAFTER
LAND SURVEYOR/PROJECT MANAGER
DRONE FIELD CREW
PER HOUR
$ 170.00
$ 220.00
$ 260.00
$
70.00
$ 140.00
$ 180.00
$ 180.00
$ 290.00
Malcolm George, Steve Brinkerhoff
Hunter Construction
malcolm.george@huntercontracting.com
ROC: 073961 CR-42 (AZ)
Tumbleweed Park Pickelball
2250 S. McQueen Road
Chandler, AZ 85286
7/10/2024
PREPARED FOR:
Date:
7/10/2024
To:
Attn: Malcolm George
Re:
Tumbleweed Park Pickleball
Scope of Work:
07 41 13
Metal Roof Panels (as qualified below)
07 62 00
Sheet Metal Flashing & Trim (as qualified below)
Assumptions/
Typical 40-hour week work (no night work, weekends, or holidays).
Clarifications:
MBCI standard leads time on Standard Color, Signature 200 (22ga) 6-8 weeks
Base Bid:
$35,942
Material Tax:
$849
(if applicable)
Inclusions:
~Install 22ga standard color, 2-coat, Sil-Poly finish 1-1/2" x 36" MBCI PBR style Metal Roof
Panels (Signature 200 Series), including matching flashings and trims, over 30mil self-adhered,
high-temp underlayment, over ½” DensDeck Prime coverboard, over metal roof deck
(BY OTHERS) in areas specified on OST
~Includes manufacturers standard finish warranty and 2yr workmanship warranty by
Progressive.
Exclusions:
demo, tax, permits, bonds (add 1.5%), custom colors/ finishes, all wood, framing, sub-framing,
saw-cutting, temporary dry-in, protection of our installed metals from damage by OTHERS,
engineering and calculations, insulation, sheet metal fascia cladding, all other sheet metal,
painting, multiple mobilizations, general sealants, anything not specifically included above.
Please note:
This quote is based on our understanding of the plans dated April 12, 2024 provided to us by
Hunter Contracting Company and is contingent upon agreement to contract terms and schedule.
We note (1) addenda. Please see attached takeoff for coverage.
This quote reflects current market conditions and is valid for 30 days.
Oil canning is naturally inherent in metal and shall not be sole cause for rejection.
Contact:
Cory K. Rice 602-809-3821
cory.rice@progressiveus.com
SiteWorks Landscape Development
2915 W. Fairview Street
Chandler, AZ 85224
Phone:
Fax:
(480) 820-1600
(480) 820-1606
To:
Contact:
Hunter Contracting, Inc.
Steven Brinkerhoff
Tumbleweed Park Pickleball 100%
Project Name:
Bid Number:
7/11/24
Fax:
Gilbert, AZ 85233
Address:
701 N. Cooper Rd.
Phone:
(480) 632-4926
Project Location:
745 E Germann Rd, Chandler, AZ
Bid Date:
6/3/2024
Total Price
Unit Price
Unit
Item Description
Item #
Line #
Estimated Quantity
01-Irrigation
$3,248.00
$3,248.00
1.00
001
EACH
POC
$11,186.00
$4.70
2,380.00
002
LF
Mainline Sleeves
$4,592.00
$4.10
1,120.00
003
LF
Mainline Pipe
$683.00
$683.00
1.00
004
EACH
Master Valves
$2,119.00
$2,119.00
1.00
005
EACH
Flow Sensor NOTE: Flow Sensor Not Called
Out, Baseline Spec Reflected
$826.00
$413.00
2.00
006
EACH
QCV 1" NOTE: No Spec's, Matching
Tumbleweed Park 100%
$2,270.00
$454.00
5.00
007
EACH
Gate Valve-1.5" NOTE: No Spec's, Matching
Tumbleweed Park 100%
$9,030.00
$645.00
14.00
008
EACH
Drip RCV 1"
$14,644.00
$1.40
10,460.00
009
LF
Lateral Pipe Drip-Reclaim
$1,359.52
$0.29
4,688.00
010
LF
Controller Wire
$12,581.00
$23.00
547.00
011
EACH
Emitters-Multi
$1,819.00
$53.50
34.00
012
EACH
Flush Valve
$7,555.00
$7,555.00
1.00
013
EACH
Controllers
$2,440.00
$305.00
8.00
014
EACH
Grounding Rod
$74,352.52
Total Price for above 01-Irrigation Items:
02-Dust Control
$9,000.00
$450.00
20.00
015
DY
Dust Control
$9,000.00
Total Price for above 02-Dust Control Items:
03-Fine Grade
$5,566.00
$5,566.00
1.00
016
LS
Fine Grading
$5,566.00
Total Price for above 03-Fine Grade Items:
04-Root Barrior
$5,015.00
$85.00
59.00
017
EACH
Root Barrior Install
$5,015.00
Total Price for above 04-Root Barrior Items:
05-Trees
$73,008.00
$624.00
117.00
018
EACH
36"-Trees
$1,788.00
$298.00
6.00
019
EACH
24"-Trees
$74,796.00
Total Price for above 05-Trees Items:
06-Accents
$5,070.00
$26.00
195.00
020
EACH
05g-Accents
Page 1 of 3
Total Price
Unit Price
Unit
Item Description
Item #
Line #
Estimated Quantity
$5,070.00
Total Price for above 06-Accents Items:
07-Shrubs
$9,817.50
$17.50
561.00
021
EACH
05g-Shrubs
$1,311.20
$8.80
149.00
022
EACH
01g-Shrubs
$11,128.70
Total Price for above 07-Shrubs Items:
08-Inerts
$74,617.00
$0.58
128,650.00
023
SF
D.G. Allowance, No Spec On Plans Priced To
Match Existing D.G.
$74,617.00
Total Price for above 08-Inerts Items:
10-Mow Curb
$738.00
$8.20
90.00
025
LF
6X6 Mow Curb Plain - MINIMUM CHARGE
$738.00
Total Price for above 10-Mow Curb Items:
11-Artificial Turf
$61,500.00
$20.50
3,000.00
026
SF
Artificial Turf W/ Sub Base
$5,005.00
$13.00
385.00
027
LF
Nailerboard
$66,505.00
Total Price for above 11-Artificial Turf Items:
12-Maintenance
$3,600.00
$3,600.00
1.00
028
LS
90 Day Landscape Maintenance
$3,600.00
Total Price for above 12-Maintenance Items:
$330,388.22
Total Base Bid Price:
Add Alternate
$12,150.00
$135.00
90.00
100
TON
CU Structural Soil Supply And Install
$12,150.00
Total Price for above Items:
Notes:
• SiteWorks will recieve the site, clean, free of construction debris and at required subgrade elevation, ready to receive topsoil or mulch layer. All
other areas shall be received within 1/10' of finish grade.
• The jobsite shall be readily accessible to our construction equipment.
• This proposal is limited to the items clearly identified on this bid form. Any other specific items not identified herein should be deemed excluded.
• Electrical supply (120v) to the location and final hookup of the automatic irrigation controller to be furnished by others
• No removal, repair, replacement or protection of exsisting landscape or irrigation is included in this proposal.
• Removal of hard dig materials, (materials that requires larger than a 40hp trencher or rubber tired backhoe) is not included in this proposal. Such
material, if encountered shall be removed and charged for on a T & M basis.
• This proposal excludes All harscape elements, site furnishings, civil work, electrical, water meters, overtime, water and electrical costs.
• No import, export or translocation of soil is included in this proposal. All planting excavation to be spread onsite.
• No water meter or water meter fees are included in this proposal.
• This proposal is based on all work being performed in one continuous move. Any additional moves may require an additional mobilization fee.
• All permits, bond fees (provided as an alternate), sales taxes and fees are excluded from the scope of this proposal.
• Siteworks will have access to the site prior to paving or wall construction to allow for the installation of sleeves. No cutting or patching of concrete
or asphalt paving is included. No boring, jacking or jetting under pavements is included.
• Traffic and pedestrian control measures, if required are to be set up and maintained by others.
• SiteWorks is not responsible for underground utilities not buried to specific depth or clearly marked.
Page 2 of 3
• All costs for water during construction and throughout the maintenance period are excluded.
• All work under this proposal to be performed during regular working hours.
• Material pricing good for 30 days. Any material cost increases between now and actual start of landscape to be passed onto owner without
markup.
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
CONFIRMED:
SiteWorks Landscape Development
Authorized Signature:
Estimator:
Jmeyer
jmeyer@siteworksllc.net
Page 3 of 3
GMP 2 PLANS AND SPECIFICATIONS
The following documents were referenced to establish pricing for this GMP:
• Plans:
o “Tumbleweed Park Pickleball”; Project No. PR2206.201; 100% Submittal
dated June 12, 2024 by Dig Studio
o “Tumbleweed Park Pickleball & Restroom Facility”; Project No.
PR2206.201; 100% Submittal dated May 22, 2024 by Gilliam Architecture
& Associates
• Specifications:
o “Tumbleweed Park Pickleball Technical Specifications”; 100% Submittal
issued June 12, 2024 by Dig Studio
• Drainage & SWPPP:
o “Tumbleweed Pickleball Drainage Design Data Report”; dated June 12,
2024 by Huitt-Zollars, Inc.
o “Tumbleweed Pickleball Erosion and Sediment Control Plan”; dated June
12, 2024 by Gavan & Barker, Inc.
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
1
PROJECT NAME
347 daysFri 7/12/24
Thu 11/20/25
0 days?
2
PRECONSTRUCTION
56 days Fri 7/12/24
Mon 9/30/24
4 days
3
GMP 1 - City Council Date
1 day
Thu 7/18/24
Thu 7/18/24
0 days
13,4
4
GMP 1 - Contract
10 days Fri 7/19/24
Thu 8/1/24
0 days
3
5
5
GMP 1 - NTP
1 day
Fri 8/2/24
Fri 8/2/24
0 days
4
13,15,17,19,21
6
GMP 2 submission
1 day
Fri 7/12/24
Fri 7/12/24
58 days
7
7
GMP 2 - Council Date
1 day
Thu 9/12/24
Thu 9/12/24
16 days
6
8
8
GMP 2 Contract
10 days Fri 9/13/24
Thu 9/26/24
16 days
7
9
9
Permits & Permitted plans
1 day
Fri 9/27/24
Fri 9/27/24
16 days
8
10
10
GMP 2 NTP
1 day
Mon 9/30/24
Mon 9/30/24
16 days
9
30
11
CONSTRUCTION
270 daysMon 8/5/24
Tue 8/26/25
0 days
12
GMP 1 - Early Procurement
270 daysMon 8/5/24
Tue 8/26/25
0 days
13
Concrete Pole - Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
30 days
3,5
14
14
Concrete Poles - Procure
90 days Mon 8/19/24
Thu 12/26/24
30 days
13
83
15
CMU - Intergral Color - Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
39 days
5
16
16
CMU - Intergral Color - Procure Block
100 daysMon 8/19/24
Fri 1/10/25
39 days
15
271
17
Service Entrance Section - Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
0 days
5
18
18
SES - Procure
260 daysMon 8/19/24
Tue 8/26/25
0 days
17
74
19
ADS Pipe - Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
58 days
5
20
20
ADS Pipe - Procure
40 days Mon 8/19/24
Mon 10/14/24 58 days
19
45
21
3Form - Practice Wall - Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
152 days
5
22
22
3Form - Procure Pracice Wall
70 days Mon 8/19/24
Mon 11/25/24 152 days
21
296
23
Ramada - 20x20 Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
94 days
5
24
24
Ramada - 20x20 -Procure
150 daysMon 8/19/24
Fri 3/21/25
94 days
23
225
25
Ramada - 20x38 Submittal & City Review
10 days Mon 8/5/24
Fri 8/16/24
96 days
5
26
26
Ramada - 20x38 -Procure
150 daysMon 8/19/24
Fri 3/21/25
96 days
25
226
27
Windscreen Samples & City Review
10 days Mon 8/5/24
Fri 8/16/24
281 days
5
28
28
Windscreen - Procure
40 days Mon 8/19/24
Mon 10/14/24 281 days
27
29
GMP 2 - Construction
8 days
Tue 10/1/24
Thu 10/10/24
16 days
30
Set Up Construction Fencing
3 days
Tue 10/1/24
Thu 10/3/24
16 days
10
31
31
Install Trackout
1 day
Fri 10/4/24
Fri 10/4/24
16 days
30
32
32
Set Construction Trailer
3 days
Mon 10/7/24
Wed 10/9/24
16 days
31
33
33
Install Construction Signs
1 day
Thu 10/10/24
Thu 10/10/24
16 days
32
35
34
Grading
64 days Fri 10/11/24
Tue 1/14/25
16 days
35
Clear & Grub
5 days
Fri 10/11/24
Thu 10/17/24
16 days
33
36
36
Pre-Wet Site
10 days Fri 10/18/24
Thu 10/31/24
16 days
35
37
37
Rough Grade Site +/- 0.10
10 days Fri 11/1/24
Thu 11/14/24
16 days
36
41
38
Clean Up Grade Post Utilities
4 days
Thu 1/9/25
Tue 1/14/25
16 days
68,60
82
39
Underground Utilities
258 daysFri 11/15/24
Thu 11/20/25
0 days?
40
Water, Sewer, Storm Drain
47 days Fri 11/15/24
Fri 1/24/25
16 days
41
Pothole & Expose Sewer Tie in
3 days
Fri 11/15/24
Tue 11/19/24
16 days
37
42
42
Dig/Lay/Backfill Sewer to Restroom
7 days
Wed 11/20/24 Mon 12/2/24
16 days
41
43,264,62
43
Waterline Under Pioneer to Restroom
6 days
Tue 12/3/24
Tue 12/10/24
16 days
42
44,264,64,63,2
44
Waterline from Restroom to Drinking Fountain
3 days
Wed 12/11/24 Fri 12/13/24
16 days
43
45,66,65,264
45
Install 18" Storm Drain
3 days
Mon 12/16/24 Wed 12/18/24 16 days
44,20
46
46
Install 24" Storm Drain
2 days
Thu 12/19/24
Fri 12/20/24
16 days
45
47,55
47
Ex - Headwall - 24"
1 day
Mon 12/23/24 Mon 12/23/24 97 days
46
48
48
FPS - MAG 501 Headwall - 24"
3 days
Tue 12/24/24
Fri 12/27/24
97 days
47
49
49
Install 12" Storm - East
2 days
Mon 12/30/24 Tue 12/31/24
97 days
48
50
PROJECT N
7/12
9/30
GMP 1 - City Council Date
GMP 1 - Contract
GMP 1 - NTP
GMP 2 submission
GMP 2 - Council Date
GMP 2 Contract
Permits & Permitted plans
GMP 2 NTP
8/5
8/26
8/5
8/26
Concrete Pole - Submittal & City Review
Concrete Poles - Procure
CMU - Intergral Color - Submittal & City Review
CMU - Intergral Color - Procure Block
Service Entrance Section - Submittal & City Review
SES - Procure
ADS Pipe - Submittal & City Review
ADS Pipe - Procure
3Form - Practice Wall - Submittal & City Review
3Form - Procure Pracice Wall
Ramada - 20x20 Submittal & City Review
Ramada - 20x20 -Procure
Ramada - 20x38 Submittal & City Review
Ramada - 20x38 -Procure
Windscreen Samples & City Review
8/19
Windscreen - Procure
10/1
10/10
Set Up Construction Fencing
Install Trackout
Set Construction Trailer
Install Construction Signs
10/11
1/14
Clear & Grub
Pre-Wet Site
Rough Grade Site +/- 0.10
Clean Up Grade Post Utilities
Undergrou
Water, Sewer, Storm Drain
Pothole & Expose Sewer Tie in
Dig/Lay/Backfill Sewer to Restroom
Waterline Under Pioneer to Restroom
Waterline from Restroom to Drinking Fountain
Install 18" Storm Drain
Install 24" Storm Drain
Ex - Headwall - 24"
FPS - MAG 501 Headwall - 24"
Install 12" Storm - East
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 1
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
50
Ex - Headwall - 12" - East
1 day
Thu 1/2/25
Thu 1/2/25
97 days
49
51
51
FPS - MAG 501 Headwall - 12" - East
3 days
Fri 1/3/25
Tue 1/7/25
97 days
50
52
52
Install 12" Storm - West
2 days
Fri 1/17/25
Mon 1/20/25
90 days
51,82
53
53
Ex - Headwall - 12" - West
1 day
Tue 1/21/25
Tue 1/21/25
90 days
52
54
54
FPS - MAG 501 Headwall - 12" - West
3 days
Wed 1/22/25
Fri 1/24/25
90 days
53
137
55
Ex - Catch Basin No. 3
1 day
Mon 12/23/24 Mon 12/23/24 16 days
46,209
56,58
56
FPS - Catch Basin No. 3
3 days
Tue 12/24/24
Fri 12/27/24
16 days
55
57
57
Backfill Catch Basin - No. 3
1 day
Mon 12/30/24 Mon 12/30/24 16 days
56
58
58
Ex - Catch Basin No. 2
1 day
Tue 12/31/24
Tue 12/31/24
16 days
55,57
59
59
FPS - Catch Basin No. 2
3 days
Thu 1/2/25
Mon 1/6/25
16 days
58
60
60
Backfill Catch Basin - No. 2
2 days
Tue 1/7/25
Wed 1/8/25
16 days
59
311,38
61
Dry Utilities
204 daysTue 12/3/24
Fri 9/19/25
0 days
62
Install Conduit - Germann Road
3 days
Tue 12/3/24
Thu 12/5/24
17 days
42
200
63
Install Conduit - Pioneer
3 days
Wed 12/11/24 Fri 12/13/24
18 days
43
64
64
Install Conduit - Practice Courts, Restroom, Champion Courts
7 days
Mon 12/16/24 Tue 12/24/24
121 days
63,43
237,239
65
Install Conduit - Courts 1/4, & Common Area
3 days
Mon 12/16/24 Wed 12/18/24 35 days
44
83
66
Install Conduit - Center Plaza
3 days
Mon 12/16/24 Wed 12/18/24 23 days
44
67,223
67
Install Conduit - Courts 2/3 & Common Area
3 days
Thu 12/19/24
Mon 12/23/24 23 days
66
68
68
Install Conduit - Parking Lots
3 days
Tue 12/24/24
Fri 12/27/24
23 days
67
69,38
69
Grade - Transformer Pad
1 day
Mon 12/30/24 Mon 12/30/24 162 days
68
70
70
FPS Transformer pad
2 days
Tue 12/31/24
Thu 1/2/25
162 days
69
71
71
Set Transformer
1 day
Fri 1/3/25
Fri 1/3/25
162 days
70
72
72
Grade - SES Pad
1 day
Mon 1/6/25
Mon 1/6/25
162 days
71
73
73
FPS SES Pad
2 days
Tue 1/7/25
Wed 1/8/25
162 days
72
74
74
Set SES
2 days
Wed 8/27/25
Thu 8/28/25
0 days
73,18
75
75
Pull Conductors
10 days Fri 8/29/25
Fri 9/12/25
0 days
74
76
76
Inspection - City
1 day
Mon 9/15/25
Mon 9/15/25
0 days
75
77
77
Inspection SRP
1 day
Tue 9/16/25
Tue 9/16/25
0 days
76
78
78
SRP Pull Power
2 days
Wed 9/17/25
Thu 9/18/25
0 days
77
79
79
Energize Site
1 day
Fri 9/19/25
Fri 9/19/25
0 days
78
291
80
Pickleball Court Construction
258 daysFri 11/15/24
Thu 11/20/25
0 days?
81
Court 1 - Construction
118 daysWed 1/15/25
Mon 6/30/25
16 days
82
Fine Grade Existing Pad
2 days
Wed 1/15/25
Thu 1/16/25
16 days
38
83,106,52
83
Drill & Set Electrical Poles
3 days
Fri 1/17/25
Tue 1/21/25
16 days
14,82,65
107,84,142
84
Excavate Net post Footing
3 days
Wed 1/22/25
Fri 1/24/25
16 days
83
85
85
Install Net Anchor Footing
1 day
Mon 1/27/25
Mon 1/27/25
16 days
84
86
86
Pour & Install Edwards Sleeve Footings
3 days
Tue 1/28/25
Thu 1/30/25
16 days
85
87,108
87
Excavate Fence Footings - Perimeter Fence
3 days
Fri 1/31/25
Tue 2/4/25
16 days
86
88
88
Set Posts - Perimeter Fence
5 days
Wed 2/5/25
Tue 2/11/25
16 days
87
89
89
Excavate Fence Footings - Interior Fence
2 days
Wed 2/12/25
Thu 2/13/25
16 days
88
90
90
Set Posts - Interior Fence & Gates
3 days
Fri 2/14/25
Tue 2/18/25
16 days
89
91,111
91
Excavate Turn Downs
2 days
Wed 2/19/25
Thu 2/20/25
24 days
90
92,115
92
Place & Compact ABC
2 days
Fri 2/21/25
Mon 2/24/25
24 days
91
93,115
93
Place Vapor Barrier
2 days
Tue 2/25/25
Wed 2/26/25
24 days
92
94,117
94
Set Rebar & PT Cables
5 days
Thu 2/27/25
Wed 3/5/25
24 days
93
95,118
95
Pour PT Slab
3 days
Thu 3/6/25
Mon 3/10/25
26 days
94
96,119,225
96
Tension Slab - Pre Tension
1 day
Tue 3/11/25
Tue 3/11/25
29 days
95
97FS+7 days,12
97
Tension Slab - Final Tension
1 day
Fri 3/21/25
Fri 3/21/25
29 days
96FS+7 days
121
98
Install Horizontals & Fabric
5 days
Mon 6/9/25
Fri 6/13/25
53 days
122,229
99
Ex - Headwall - 12" - East
FPS - MAG 501 Headwall - 12" - East
Install 12" Storm - West
Ex - Headwall - 12" - West
FPS - MAG 501 Headwall - 12" - West
Ex - Catch Basin No. 3
FPS - Catch Basin No. 3
Backfill Catch Basin - No. 3
Ex - Catch Basin No. 2
FPS - Catch Basin No. 2
Backfill Catch Basin - No. 2
Dry Utilities
Install Conduit - Germann Road
Install Conduit - Pioneer
Install Conduit - Practice Courts, Restroom, Champion Courts
Install Conduit - Courts 1/4, & Common Area
Install Conduit - Center Plaza
Install Conduit - Courts 2/3 & Common Area
Install Conduit - Parking Lots
Grade - Transformer Pad
FPS Transformer pad
Set Transformer
Grade - SES Pad
FPS SES Pad
Set SES
Pull Conductors
Inspection - City
Inspection SRP
SRP Pull Power
Energize Site
11/15
11/20
Court 1 - Construction
Fine Grade Existing Pad
Drill & Set Electrical Poles
Excavate Net post Footing
Install Net Anchor Footing
Pour & Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
Excavate Fence Footings - Interior Fence
Set Posts - Interior Fence & Gates
Excavate Turn Downs
Place & Compact ABC
Place Vapor Barrier
Set Rebar & PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Install Horizontals & Fabric
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 2
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
99
Install - Gates
2 days
Mon 6/16/25
Tue 6/17/25
53 days
122,98
123,100
100
Install Cushioned Surface System
1 day
Wed 6/18/25
Wed 6/18/25
55 days
99
101
101
Install - Sportmaster color surfacing
2 days
Thu 6/19/25
Fri 6/20/25
55 days
100
102
102
Install Windscreen
3 days
Mon 6/23/25
Wed 6/25/25
55 days
101
103
103
Install Pickleball Net & Posts
2 days
Thu 6/26/25
Fri 6/27/25
55 days
102
104
104
Install Signs
1 day
Mon 6/30/25
Mon 6/30/25
55 days
103
128
105
Court 3 - Construction
258 daysFri 11/15/24
Thu 11/20/25
0 days?
106
Fine Grade Existing Pad
2 days
Fri 1/17/25
Mon 1/20/25
27 days
82
107,141
107
Drill & Set Electrical Poles
3 days
Wed 1/22/25
Fri 1/24/25
26 days
83,106
108
108
Excavate Net post Footing
3 days
Fri 1/31/25
Tue 2/4/25
22 days
107,86
109
109
Install Net Anchor Footing
1 day
Wed 2/5/25
Wed 2/5/25
22 days
108
110
110
Pour & Install Edwards Sleeve Footings
3 days
Thu 2/6/25
Mon 2/10/25
22 days
109
111
111
Excavate Fence Footings - Perimeter Fence
3 days
Wed 2/19/25
Fri 2/21/25
16 days
110,90
112
112
Set Posts - Perimeter Fence
5 days
Mon 2/24/25
Fri 2/28/25
16 days
111
113
113
Excavate Fence Footings - Interior Fence
2 days
Mon 3/3/25
Tue 3/4/25
16 days
112
114
114
Set Posts - Interior Fence & Gates
3 days
Wed 3/5/25
Fri 3/7/25
16 days
113
115
115
Excavate Turn Downs
2 days
Mon 3/10/25
Tue 3/11/25
16 days
114,91,92
116
116
Place & Compact ABC
2 days
Wed 3/12/25
Thu 3/13/25
16 days
115
117
117
Place Vapor Barrier
2 days
Fri 3/14/25
Mon 3/17/25
16 days
116,93
118,152
118
Set Rebar & PT Cables
5 days
Tue 3/18/25
Mon 3/24/25
16 days
117,94
119,153
119
Pour PT Slab
4 days
Tue 3/25/25
Fri 3/28/25
16 days
118,95
120,154
120
Tension Slab - Pre Tension
1 day
Mon 3/31/25
Mon 3/31/25
16 days
119,96
121FS+7 days
121
Tension Slab - Final Tension
1 day
Thu 4/10/25
Thu 4/10/25
16 days
120FS+7 days,97
130
122
Install Horizontals & Fabric
5 days
Mon 6/2/25
Fri 6/6/25
53 days
138,229
99,98,143
123
Install - Gates
2 days
Wed 6/18/25
Thu 6/19/25
53 days
99
124
124
Install Cushioned Surface System
3 days
Fri 6/20/25
Tue 6/24/25
53 days
123
125
125
Install - Sportmaster color surfacing
1 day
Wed 6/25/25
Wed 6/25/25
53 days
124
126
126
Install Windscreen
3 days
Thu 6/26/25
Mon 6/30/25
53 days
125
127
127
Install Pickleball Net & Posts
2 days
Tue 7/1/25
Wed 7/2/25
53 days
126
128
128
Install Signs
1 day
Thu 7/3/25
Thu 7/3/25
53 days
127,104
382,163
129
1/3 Common Area
1 day?
Fri 11/15/24
Fri 11/15/24
117 days?
130
Ex - Shade Structure Footings
2 days
Fri 4/11/25
Mon 4/14/25
16 days
121
131
131
Set Shade Columns & Pour Footings
4 days
Tue 4/15/25
Fri 4/18/25
16 days
130
132
132
Ex - Bench Footings
2 days
Mon 4/21/25
Tue 4/22/25
16 days
131
133
133
Fine Grade
3 days
Wed 4/23/25
Fri 4/25/25
16 days
132
134
134
FPS - Sidewalk
4 days
Mon 4/28/25
Thu 5/1/25
16 days
133
135
135
Install - Shade Over hang & Fabric
3 days
Fri 5/2/25
Tue 5/6/25
16 days
134
136
136
Install - Benches
2 days
Wed 5/7/25
Thu 5/8/25
16 days
135
137
137
Grade East Sidewalk
1 day
Fri 5/9/25
Fri 5/9/25
16 days
136,54
138
138
FPS - East Sidewalk
2 days
Mon 5/12/25
Tue 5/13/25
16 days
137
139,219,122
139
Caulk Joints
2 days
Wed 5/14/25
Thu 5/15/25
90 days
138
382
140
Court 2 - Construction
245 daysFri 12/6/24
Thu 11/20/25
0 days
141
Fine Grade Existing Pad
2 days
Tue 1/21/25
Wed 1/22/25
40 days
106
142,165
142
Drill & Set Electrical Poles
3 days
Thu 1/23/25
Mon 1/27/25
40 days
141,83
166,143
143
Excavate Net post Footing
3 days
Mon 6/9/25
Wed 6/11/25
74 days
142,122
144
144
Install Net Anchor Footing
1 day
Thu 6/12/25
Thu 6/12/25
74 days
143
145
145
Pour & Install Edwards Sleeve Footings
3 days
Fri 6/13/25
Tue 6/17/25
74 days
144
146
146
Excavate Fence Footings - Perimeter Fence
3 days
Wed 6/18/25
Fri 6/20/25
74 days
145
147
147
Set Posts - Perimeter Fence
5 days
Mon 6/23/25
Fri 6/27/25
74 days
146
148
Install - Gates
Install Cushioned Surface System
Install - Sportmaster color surfacing
Install Windscreen
Install Pickleball Net & Posts
Install Signs
Court 3 - C
Fine Grade Existing Pad
Drill & Set Electrical Poles
Excavate Net post Footing
Install Net Anchor Footing
Pour & Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
Excavate Fence Footings - Interior Fence
Set Posts - Interior Fence & Gates
Excavate Turn Downs
Place & Compact ABC
Place Vapor Barrier
Set Rebar & PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Install Horizontals & Fabric
Install - Gates
Install Cushioned Surface System
Install - Sportmaster color surfacing
Install Windscreen
Install Pickleball Net & Posts
Install Signs
1/3 Common Area
1/3 Common Area
Ex - Shade Structure Footings
Set Shade Columns & Pour Footings
Ex - Bench Footings
Fine Grade
FPS - Sidewalk
Install - Shade Over hang & Fabric
Install - Benches
Grade East Sidewalk
FPS - East Sidewalk
Caulk Joints
Court 2 - C
Fine Grade Existing Pad
Drill & Set Electrical Poles
Excavate Net post Footing
Install Net Anchor Footing
Pour & Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 3
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
148
Excavate Fence Footings - Interior Fence
2 days
Mon 6/30/25
Tue 7/1/25
74 days
147
149
149
Set Posts - Interior Fence & Gates
3 days
Wed 7/2/25
Mon 7/7/25
74 days
148
150
150
Excavate Turn Downs
2 days
Tue 7/8/25
Wed 7/9/25
74 days
149
151
151
Place & Compact ABC
2 days
Thu 7/10/25
Fri 7/11/25
74 days
150
152
152
Place Vapor Barrier
2 days
Mon 7/14/25
Tue 7/15/25
74 days
151,117
153
153
Set Rebar & PT Cables
5 days
Wed 7/16/25
Tue 7/22/25
74 days
152,118
154
154
Pour PT Slab
3 days
Wed 7/23/25
Fri 7/25/25
74 days
153,119
155
155
Tension Slab - Pre Tension
1 day
Mon 7/28/25
Mon 7/28/25
74 days
154
156FS+7 days
156
Tension Slab - Final Tension
1 day
Thu 8/7/25
Thu 8/7/25
74 days
155FS+7 days
157
Install Horizontals & Fabric
5 days
Mon 6/2/25
Fri 6/6/25
56 days
197,229
158
158
Install - Gates
2 days
Mon 6/9/25
Tue 6/10/25
56 days
157
181,159
159
Install Cushioned Surface System
1 day
Wed 6/11/25
Wed 6/11/25
62 days
158
160
160
Install - Sportmaster color surfacing
2 days
Thu 6/12/25
Fri 6/13/25
62 days
159
161
161
Install Windscreen
3 days
Mon 6/16/25
Wed 6/18/25
62 days
160
162
162
Install Pickleball Net & Posts
2 days
Thu 6/19/25
Fri 6/20/25
62 days
161
163
163
Install Signs
1 day
Mon 7/7/25
Mon 7/7/25
53 days
162,128
187
164
Court 4 - Construction
203 daysFri 12/6/24
Tue 9/23/25
17 days
165
Fine Grade Existing Pad
2 days
Thu 1/23/25
Fri 1/24/25
41 days
141
166,237
166
Drill& Set Electrical Poles
3 days
Tue 1/28/25
Thu 1/30/25
40 days
165,142
167,223
167
Excavate Net post Footing
3 days
Fri 1/31/25
Tue 2/4/25
40 days
166
168
168
Install Net Anchor Footing
1 day
Wed 2/5/25
Wed 2/5/25
40 days
167
169
169
Pour& Install Edwards Sleeve Footings
3 days
Thu 2/6/25
Mon 2/10/25
40 days
168
170
170
Excavate Fence Footings - Perimeter Fence
3 days
Tue 2/11/25
Thu 2/13/25
40 days
169
171
171
Set Posts - Perimeter Fence
5 days
Fri 2/14/25
Thu 2/20/25
40 days
170
172
172
Excavate Fence Footings - Interior Fence
2 days
Fri 2/21/25
Mon 2/24/25
40 days
171
173
173
Set Posts - Interior Fence& Gates
3 days
Tue 2/25/25
Thu 2/27/25
40 days
172
174
174
Excavate Turn Downs
2 days
Fri 2/28/25
Mon 3/3/25
40 days
173
175
175
Place& Compact ABC
2 days
Tue 3/4/25
Wed 3/5/25
40 days
174
176
176
Place Vapor Barrier
2 days
Thu 3/6/25
Fri 3/7/25
40 days
175
177,189
177
Set Rebar& PT Cables
5 days
Mon 3/10/25
Fri 3/14/25
40 days
176
178
178
Pour PT Slab
3 days
Mon 3/17/25
Wed 3/19/25
40 days
177
179,225,189
179
Tension Slab - Pre Tension
1 day
Thu 3/20/25
Thu 3/20/25
40 days
178
180FS+7 days
180
Tension Slab - Final Tension
1 day
Tue 4/1/25
Tue 4/1/25
40 days
179FS+7 days
192,229,216,23
181
Install Horizontals& Fabric
5 days
Wed 6/11/25
Tue 6/17/25
56 days
158,229
182
182
Install - Gates
2 days
Wed 6/18/25
Thu 6/19/25
56 days
181
183
183
Install Cushioned Surface System
1 day
Fri 6/20/25
Fri 6/20/25
56 days
182
184
184
Install - Sportmaster color surfacing
2 days
Mon 6/23/25
Tue 6/24/25
56 days
183
185
185
Install Windscreen
3 days
Wed 6/25/25
Fri 6/27/25
56 days
184
186
186
Install Pickleball Net & Posts
2 days
Mon 6/30/25
Tue 7/1/25
56 days
185
187
187
Install Signs
1 day
Tue 7/8/25
Tue 7/8/25
53 days
186,163
258
188
2/4 Common Area
26 days Thu 3/20/25
Thu 4/24/25
84 days
189
Ex - Shade Structure Footings
2 days
Thu 3/20/25
Fri 3/21/25
84 days
178,176
190
190
Set Shade Columns& Pour Footings
4 days
Mon 3/24/25
Thu 3/27/25
84 days
189
191
191
Ex - Bench Footings
2 days
Fri 3/28/25
Mon 3/31/25
84 days
190
192
192
Fine Grade
3 days
Wed 4/2/25
Fri 4/4/25
83 days
191,180
193
193
FPS - Sidewalk
4 days
Mon 4/7/25
Thu 4/10/25
83 days
192
194
194
Install - Shade Over hang& Fabric
3 days
Fri 4/11/25
Tue 4/15/25
83 days
193
195
195
Install - Benches
2 days
Wed 4/16/25
Thu 4/17/25
83 days
194
196
196
Grade West Sidewalk
1 day
Fri 4/18/25
Fri 4/18/25
83 days
195
197
Excavate Fence Footings - Interior Fence
Set Posts - Interior Fence & Gates
Excavate Turn Downs
Place & Compact ABC
Place Vapor Barrier
Set Rebar & PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Install Horizontals & Fabric
Install - Gates
Install Cushioned Surface System
Install - Sportmaster color surfacing
Install Windscreen
Install Pickleball Net & Posts
Install Signs
Court 4 - Construction
Fine Grade Existing Pad
Drill& Set Electrical Poles
Excavate Net post Footing
Install Net Anchor Footing
Pour& Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
Excavate Fence Footings - Interior Fence
Set Posts - Interior Fence& Gates
Excavate Turn Downs
Place& Compact ABC
Place Vapor Barrier
Set Rebar& PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Install Horizontals& Fabric
Install - Gates
Install Cushioned Surface System
Install - Sportmaster color surfacing
Install Windscreen
Install Pickleball Net & Posts
Install Signs
2/4 Common Area
Ex - Shade Structure Footings
Set Shade Columns& Pour Footings
Ex - Bench Footings
Fine Grade
FPS - Sidewalk
Install - Shade Over hang& Fabric
Install - Benches
Grade West Sidewalk
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 4
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
197
FPS - West Sidewalk
2 days
Mon 4/21/25
Tue 4/22/25
83 days
196
157,198
198
Caulk Joints
2 days
Wed 4/23/25
Thu 4/24/25
105 days
197
382
199
Germann Road - & Pioneer Improvements
24 days Fri 12/6/24
Fri 1/10/25
17 days
200
Grade Sidewalk
2 days
Fri 12/6/24
Mon 12/9/24
17 days
62
201,202,204
201
FPS - Sidewalk
5 days
Tue 12/10/24
Mon 12/16/24 238 days
200
202
Ex - East Scupper
1 day
Tue 12/10/24
Tue 12/10/24
157 days
200
203
203
FPS - East Scupper
3 days
Wed 12/11/24 Fri 12/13/24
157 days
202
205
204
Ex-West Scupper
1 day
Tue 12/10/24
Tue 12/10/24
17 days
200
205,206
205
FPS - West Scupper
3 days
Mon 12/16/24 Wed 12/18/24 157 days
204,203
207
206
Remove & Grade Sidewalk Ramp East
2 days
Wed 12/11/24 Thu 12/12/24
17 days
204
207,208
207
FPS Sidewalk Ramp East
2 days
Thu 12/19/24
Fri 12/20/24
157 days
206,205
211
208
Remove & Grade Sidewalk Ramp West
2 days
Fri 12/13/24
Mon 12/16/24 17 days
206
209
209
Pioneer Removals
3 days
Tue 12/17/24
Thu 12/19/24
17 days
43,208
210,55
210
Grade Curb & Gutter
3 days
Fri 12/20/24
Tue 12/24/24
155 days
209
211
211
FPS Curb & Gutter
3 days
Thu 12/26/24
Mon 12/30/24 155 days
210,207
212
212
Median Pavers
5 days
Tue 12/31/24
Tue 1/7/25
155 days
211
213
213
Subgrade Prep
2 days
Wed 1/8/25
Thu 1/9/25
155 days
212
214
214
AC Patch
1 day
Fri 1/10/25
Fri 1/10/25
155 days
213
310
215
South Sidewalks
197 daysMon 12/16/24 Tue 9/23/25
0 days
216
Ex & Set Trench Drain - East
3 days
Wed 4/2/25
Fri 4/4/25
40 days
180
218,217
217
Ex & Set Trench Drain - West
3 days
Mon 4/7/25
Wed 4/9/25
40 days
216
219
218
Grade South Sidewalk - East
1 day
Mon 4/7/25
Mon 4/7/25
64 days
216
220
219
Grade South Sidewalk - West
1 day
Wed 5/14/25
Wed 5/14/25
16 days
138,217
221,237
220
FPS - South Sidewalk - East
3 days
Tue 4/8/25
Thu 4/10/25
64 days
218
250,299
221
FPS - South Sidewalk - West
3 days
Thu 5/15/25
Mon 5/19/25
16 days
219
225,301,223
222
Center Plaza
17 days Tue 5/20/25
Thu 6/12/25
16 days
223
EX - Light Pole Footing
3 days
Tue 5/20/25
Thu 5/22/25
16 days
66,166,221
238,224
224
Install - Drinking fountain Sump
1 day
Mon 6/2/25
Mon 6/2/25
62 days
229,223
230
225
Ex for Ramada Footings - 20'x 20'
2 days
Tue 5/20/25
Wed 5/21/25
53 days
24,221,178,95
227,226
226
Ex for Ramada footing - 20' x 38'
2 days
Thu 5/22/25
Fri 5/23/25
53 days
26,225
228,227,229
227
Pour Ramads Footings - 20' x 20'
2 days
Tue 5/27/25
Wed 5/28/25
78 days
225,226
234
228
Pour Ramada Footings - 20' x 38'
2 days
Tue 5/27/25
Wed 5/28/25
65 days
226,237
235,230
229
Ex Turn down
4 days
Tue 5/27/25
Fri 5/30/25
53 days
180,226
224,122,157,18
230
FPS - Pump Concrete
3 days
Tue 6/3/25
Thu 6/5/25
62 days
224,228
231,233,235,23
231
Install Amenities
2 days
Fri 6/6/25
Mon 6/9/25
62 days
230
232
232
Install Landscape - Trees, Shrubs, DG
3 days
Tue 6/10/25
Thu 6/12/25
62 days
231
330
233
Set Drinking Fountain
1 day
Fri 6/6/25
Fri 6/6/25
69 days
230
262
234
Install Ramada - 20' x 20'
4 days
Fri 6/6/25
Wed 6/11/25
72 days
227,230
382
235
Install Ramada - 20' x 38'
4 days
Fri 6/6/25
Wed 6/11/25
72 days
228,230,237
382
236
Champion 1 & 2 - Construction
39 days Thu 5/15/25
Thu 7/10/25
22 days
237
Fine Grade Existing Pad
2 days
Thu 5/15/25
Fri 5/16/25
22 days
219,165,64
239,228,235
238
Drill & Set Electrical Poles
2 days
Fri 5/23/25
Tue 5/27/25
16 days
223,180
239
239
Excavate Net post Footing
2 days
Wed 5/28/25
Thu 5/29/25
16 days
238,237,64
240
240
Install Net Anchor Footing
1 day
Fri 5/30/25
Fri 5/30/25
16 days
239
241
241
Pour & Install Edwards Sleeve Footings
2 days
Mon 6/2/25
Tue 6/3/25
16 days
240
242
242
Excavate Fence Footings - Perimeter Fence
2 days
Wed 6/4/25
Thu 6/5/25
16 days
241
243
243
Set Posts - Perimeter Fence
3 days
Fri 6/6/25
Tue 6/10/25
16 days
242
244,341
244
Excavate Turn Downs
2 days
Wed 6/11/25
Thu 6/12/25
16 days
243
245
245
Place & Compact ABC
1 day
Fri 6/13/25
Fri 6/13/25
16 days
244
246
FPS - West Sidewalk
Caulk Joints
Germann Road - & Pioneer Improvements
Grade Sidewalk
FPS - Sidewalk
Ex - East Scupper
FPS - East Scupper
Ex-West Scupper
FPS - West Scupper
Remove & Grade Sidewalk Ramp East
FPS Sidewalk Ramp East
Remove & Grade Sidewalk Ramp West
Pioneer Removals
Grade Curb & Gutter
FPS Curb & Gutter
Median Pavers
Subgrade Prep
AC Patch
South Sidewalks
Ex & Set Trench Drain - East
Ex & Set Trench Drain - West
Grade South Sidewalk - East
Grade South Sidewalk - West
FPS - South Sidewalk - East
FPS - South Sidewalk - West
Center Plaza
EX - Light Pole Footing
Install - Drinking fountain Sump
Ex for Ramada Footings - 20'x 20'
Ex for Ramada footing - 20' x 38'
Pour Ramads Footings - 20' x 20'
Pour Ramada Footings - 20' x 38'
Ex Turn down
FPS - Pump Concrete
Install Amenities
Install Landscape - Trees, Shrubs, DG
Set Drinking Fountain
Install Ramada - 20' x 20'
Install Ramada - 20' x 38'
Champion 1 & 2 - Construction
Fine Grade Existing Pad
Drill & Set Electrical Poles
Excavate Net post Footing
Install Net Anchor Footing
Pour & Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
Excavate Turn Downs
Place & Compact ABC
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 5
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
246
Place Vapor Barrier
1 day
Mon 6/16/25
Mon 6/16/25
16 days
245
247
247
Set Rebar & PT Cables
3 days
Tue 6/17/25
Thu 6/19/25
16 days
246
248
248
Pour PT Slab
1 day
Fri 6/20/25
Fri 6/20/25
16 days
247
249
249
Tension Slab - Pre Tension
1 day
Mon 6/23/25
Mon 6/23/25
16 days
248
250
250
Tension Slab - Final Tension
1 day
Tue 6/24/25
Tue 6/24/25
16 days
249,220
251,259
251
Install Horizontals & Fabric
2 days
Wed 6/25/25
Thu 6/26/25
16 days
250
252
252
Install - Gates
1 day
Fri 6/27/25
Fri 6/27/25
16 days
251
253
253
Install Windscreen
1 day
Mon 6/30/25
Mon 6/30/25
16 days
252
254
254
Install Net Posts
1 day
Tue 7/1/25
Tue 7/1/25
16 days
253
255
255
Install Cushioned Surface System
1 day
Wed 7/2/25
Wed 7/2/25
16 days
254
256
256
Install - Sportmaster color surfacing
2 days
Thu 7/3/25
Mon 7/7/25
16 days
255
257
257
Install Pickleball net
1 day
Tue 7/8/25
Tue 7/8/25
16 days
256
258,350
258
Install Signs
1 day
Wed 7/9/25
Wed 7/9/25
53 days
257,187
382
259
Drill for Shade Structure Footings
1 day
Wed 6/25/25
Wed 6/25/25
52 days
250
260
260
Set Posts - Shade Structure
1 day
Thu 6/26/25
Thu 6/26/25
52 days
259
261
261
Grade Surrounding Sidewalk
3 days
Fri 6/27/25
Tue 7/1/25
52 days
260
262
262
FPS Surrounding Sidewalk
6 days
Wed 7/2/25
Thu 7/10/25
52 days
261,233
382
263
Restroom Construction
197 daysMon 12/16/24 Tue 9/23/25
0 days
264
Layout Building
1 day
Mon 12/16/24 Mon 12/16/24 41 days
43,42,44
265
265
Over Ex Pad
1 day
Tue 12/17/24
Tue 12/17/24
41 days
264
266
266
Install Water & Sewer
7 days
Wed 12/18/24 Fri 12/27/24
41 days
265
267
267
Install Electrical - Underground
2 days
Mon 12/30/24 Tue 12/31/24
41 days
266
268
268
Backfill Pad
1 day
Thu 1/2/25
Thu 1/2/25
41 days
267
269
269
Ex Footings
1 day
Fri 1/3/25
Fri 1/3/25
41 days
268
270
270
FPS - Footings
3 days
Mon 1/6/25
Wed 1/8/25
41 days
269
271
271
Set Stemwall & Grout
2 days
Mon 1/13/25
Tue 1/14/25
39 days
16,270
272
272
Fine Grade Pad
1 day
Wed 1/15/25
Wed 1/15/25
39 days
271
273,294
273
Set floor drains
4 days
Thu 1/16/25
Tue 1/21/25
39 days
272
274
274
FPS Building Floor
3 days
Wed 1/22/25
Fri 1/24/25
39 days
273
275
275
Install CMU
20 days Mon 1/27/25
Fri 2/21/25
39 days
274
276
276
Install Structural Steel
15 days Mon 2/24/25
Fri 3/14/25
39 days
275
277
277
Install Steel Mesh
7 days
Mon 3/17/25
Tue 3/25/25
39 days
276
278
278
Install Roof B Deck
4 days
Wed 3/26/25
Mon 3/31/25
39 days
277
279
279
Install Roof Deck
3 days
Tue 4/1/25
Thu 4/3/25
39 days
278
280
280
Install Roof Cap
3 days
Fri 4/4/25
Tue 4/8/25
39 days
279
281
281
Install flashing
4 days
Wed 4/9/25
Mon 4/14/25
39 days
280
282
282
Install Plumbing Fixtures
3 days
Tue 4/15/25
Thu 4/17/25
39 days
281
283,301
283
Install Drinking fountain
4 days
Fri 4/18/25
Wed 4/23/25
39 days
282
284
284
Install lighting Fixtures
5 days
Thu 4/24/25
Wed 4/30/25
39 days
283
285
285
Install Vent penetrations
2 days
Thu 5/1/25
Fri 5/2/25
39 days
284
286
286
Install Building Electrical Panel
5 days
Mon 5/5/25
Fri 5/9/25
39 days
285
287,297
287
Install Building Lighting Panel
5 days
Mon 5/12/25
Fri 5/16/25
42 days
286
288,291
288
Install Security wiring
2 days
Mon 5/19/25
Tue 5/20/25
42 days
287
289,291,302
289
Install Doors & thresholds
5 days
Fri 5/30/25
Thu 6/5/25
60 days
288,302
290
290
Paint Building
7 days
Fri 6/6/25
Mon 6/16/25
60 days
289,301
292,333
291
Power up building
2 days
Mon 9/22/25
Tue 9/23/25
0 days
79,288,287
382
292
Clean Building
2 days
Tue 6/17/25
Wed 6/18/25
67 days
290
382
293
Plaza/Practice Area
129 daysThu 1/16/25
Thu 7/17/25
39 days
294
Ex Practice Wall Footing
1 day
Thu 1/16/25
Thu 1/16/25
116 days
272
295
Place Vapor Barrier
Set Rebar & PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Install Horizontals & Fabric
Install - Gates
Install Windscreen
Install Net Posts
Install Cushioned Surface System
Install - Sportmaster color surfacing
Install Pickleball net
Install Signs
Drill for Shade Structure Footings
Set Posts - Shade Structure
Grade Surrounding Sidewalk
FPS Surrounding Sidewalk
Restroom Construction
Layout Building
Over Ex Pad
Install Water & Sewer
Install Electrical - Underground
Backfill Pad
Ex Footings
FPS - Footings
Set Stemwall & Grout
Fine Grade Pad
Set floor drains
FPS Building Floor
Install CMU
Install Structural Steel
Install Steel Mesh
Install Roof B Deck
Install Roof Deck
Install Roof Cap
Install flashing
Install Plumbing Fixtures
Install Drinking fountain
Install lighting Fixtures
Install Vent penetrations
Install Building Electrical Panel
Install Building Lighting Panel
Install Security wiring
Install Doors & thresholds
Paint Building
Power up building
Clean Building
Plaza/Practice Area
Ex Practice Wall Footing
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 6
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
295
FPS - Practice Wall Footing
2 days
Fri 1/17/25
Mon 1/20/25
116 days
294
296
296
Set Practice wall
2 days
Tue 1/21/25
Wed 1/22/25
116 days
22,295
297
297
Grade - Practice Slabs
1 day
Mon 5/12/25
Mon 5/12/25
39 days
286,296
298
298
FPS - Practice Slabs
3 days
Tue 5/13/25
Thu 5/15/25
39 days
297
299
299
Grade - Sidewalk - Around Practice
1 day
Fri 5/16/25
Fri 5/16/25
39 days
298,220
300
300
FPS - Sidewalk Around Practice Courts
3 days
Mon 5/19/25
Wed 5/21/25
39 days
299
301
301
Grade Sidewalk - Around Restroom
2 days
Thu 5/22/25
Fri 5/23/25
39 days
282,300,221
302,290
302
FPS - Sidewalk Around Restroom
3 days
Tue 5/27/25
Thu 5/29/25
39 days
301,288
303,289,311
303
Install Monument
3 days
Fri 5/30/25
Tue 6/3/25
63 days
302
304
304
Install Artificial Turf
3 days
Wed 7/9/25
Fri 7/11/25
39 days
303,328
305
305
Install Tree's
1 day
Mon 7/14/25
Mon 7/14/25
39 days
304
306
306
Install Shrubs
1 day
Tue 7/15/25
Tue 7/15/25
39 days
305
307
307
Place DG
1 day
Wed 7/16/25
Wed 7/16/25
39 days
306
308
308
Install Ammenities
1 day
Thu 7/17/25
Thu 7/17/25
39 days
307
331
309
Parking Lot Construction
42 days Fri 5/30/25
Tue 7/29/25
39 days
310
Drill & Set Concrete Light Poles
2 days
Fri 6/20/25
Mon 6/23/25
42 days
319,214
324
311
Fine Grade Parking Lot
2 days
Fri 5/30/25
Mon 6/2/25
39 days
60,302
312
312
Grade - Sidewalk Ramp C-258 -East
1 day
Tue 6/3/25
Tue 6/3/25
39 days
311
313
313
Grade - Sidewalk Ramp C-258 - West
1 day
Wed 6/4/25
Wed 6/4/25
39 days
312
314
314
FPS - Ramp C-258 - East
2 days
Thu 6/5/25
Fri 6/6/25
39 days
313
315
315
FPS- Ramp C-258 - West
2 days
Mon 6/9/25
Tue 6/10/25
39 days
314
316
316
Grade for Valley Gutter
1 day
Wed 6/11/25
Wed 6/11/25
39 days
315
317,318
317
FPS - Valley Gutter
2 days
Thu 6/12/25
Fri 6/13/25
39 days
316
319
318
Grade for Curb & Gutter
2 days
Thu 6/12/25
Fri 6/13/25
39 days
316
319,320
319
FPS - Curb & Gutter
4 days
Mon 6/16/25
Thu 6/19/25
39 days
318,317
310,329
320
Grade Perpendicular curb ramps
1 day
Mon 6/16/25
Mon 6/16/25
43 days
318
321
321
FPS - Perpendicular curb ramps
1 day
Tue 6/17/25
Tue 6/17/25
43 days
320
322
322
Ex & Install Structural Soil
2 days
Tue 6/24/25
Wed 6/25/25
39 days
321,329
323
323
Grade for Single Curb
1 day
Thu 6/26/25
Thu 6/26/25
39 days
322
324,325
324
FPS single curb
2 days
Fri 6/27/25
Mon 6/30/25
39 days
323,310
326
325
Grade for Roll Curb
1 day
Fri 6/27/25
Fri 6/27/25
40 days
323
326,327
326
FPS - Roll Curb
2 days
Tue 7/1/25
Wed 7/2/25
39 days
325,324
328
327
Grade Sidewalk
1 day
Mon 6/30/25
Mon 6/30/25
41 days
325
328
328
FPS - Sidewalk
3 days
Thu 7/3/25
Tue 7/8/25
39 days
327,326
333,304
329
Install - Landscape Irrigation
2 days
Fri 6/20/25
Mon 6/23/25
39 days
319
322,330
330
Install Tree's
1 day
Tue 6/24/25
Tue 6/24/25
55 days
329,232
331
331
Install Shrubs
1 day
Fri 7/18/25
Fri 7/18/25
39 days
330,308
332
332
Place DG
1 day
Mon 7/21/25
Mon 7/21/25
39 days
331,333
334
333
Subgrade Prep
2 days
Wed 7/9/25
Thu 7/10/25
45 days
290,328
332
334
Place & Compact ABC
2 days
Tue 7/22/25
Wed 7/23/25
39 days
332
335
335
Pave 2" AC - Parking Bays
1 day
Thu 7/24/25
Thu 7/24/25
39 days
334
336
336
Pave 3" AC - Drive Lane
1 day
Fri 7/25/25
Fri 7/25/25
39 days
335
337
337
Signage Install & Parking Bumpers
1 day
Mon 7/28/25
Mon 7/28/25
39 days
336
338
338
Striping
1 day
Tue 7/29/25
Tue 7/29/25
39 days
337
382
339
Tennis Court - Expansion
57 days Wed 6/11/25
Fri 8/29/25
16 days
340
Removals
3 days
Wed 6/11/25
Fri 6/13/25
25 days
341
Remove Existing Fence - North
1 day
Wed 6/11/25
Wed 6/11/25
25 days
243
342
342
Remove Existing Fence - East
1 day
Thu 6/12/25
Thu 6/12/25
25 days
341
343
FPS - Practice Wall Footing
Set Practice wall
Grade - Practice Slabs
FPS - Practice Slabs
Grade - Sidewalk - Around Practice
FPS - Sidewalk Around Practice Courts
Grade Sidewalk - Around Restroom
FPS - Sidewalk Around Restroom
Install Monument
Install Artificial Turf
Install Tree's
Install Shrubs
Place DG
Install Ammenities
Parking Lot Construction
Drill & Set Concrete Light Poles
Fine Grade Parking Lot
Grade - Sidewalk Ramp C-258 -East
Grade - Sidewalk Ramp C-258 - West
FPS - Ramp C-258 - East
FPS- Ramp C-258 - West
Grade for Valley Gutter
FPS - Valley Gutter
Grade for Curb & Gutter
FPS - Curb & Gutter
Grade Perpendicular curb ramps
FPS - Perpendicular curb ramps
Ex & Install Structural Soil
Grade for Single Curb
FPS single curb
Grade for Roll Curb
FPS - Roll Curb
Grade Sidewalk
FPS - Sidewalk
Install - Landscape Irrigation
Install Tree's
Install Shrubs
Place DG
Subgrade Prep
Place & Compact ABC
Pave 2" AC - Parking Bays
Pave 3" AC - Drive Lane
Signage Install & Parking Bumpers
Striping
Tennis Court - Expansion
Removals
Remove Existing Fence - North
Remove Existing Fence - East
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 7
Project: "Project Name"
Date: Fri 7/12/24
ID
Task Name
DurationStart
Finish
Total Slack
Predecessors
Successors
343
Install Temporay Fencing for Tennis Center
1 day
Fri 6/13/25
Fri 6/13/25
25 days
342
345
344
Pre - Slab Prep
26 days Mon 6/16/25
Tue 7/22/25
16 days
345
Rip Existing Pad
1 day
Mon 6/16/25
Mon 6/16/25
25 days
343
346
346
Rough Grade Existing Pad
1 day
Tue 6/17/25
Tue 6/17/25
25 days
345
347
347
Trench for Electrical Conduit
2 days
Wed 6/18/25
Thu 6/19/25
25 days
346
348
348
Fine Grade Existing Pad
1 day
Fri 6/20/25
Fri 6/20/25
25 days
347
349
349
Drill & Set Electrical Poles & Fixtures
2 days
Mon 6/23/25
Tue 6/24/25
25 days
348
350
350
Install Net Anchor Footing
1 day
Wed 7/9/25
Wed 7/9/25
16 days
349,257
351,354SS
351
Ex - 2 Post Shade Structure Footings
1 day
Thu 7/10/25
Thu 7/10/25
21 days
350
352
352
Pour - 2 Post Shade Structure Footings
2 days
Fri 7/11/25
Mon 7/14/25
21 days
351
353
353
Set - 2 post Shade Poles
1 day
Tue 7/15/25
Tue 7/15/25
21 days
352
361
354
Excavate Net post Footing
1 day
Wed 7/9/25
Wed 7/9/25
16 days
350SS
355
355
Pour& Install Edwards Sleeve Footings
2 days
Thu 7/10/25
Fri 7/11/25
16 days
354
356
356
Excavate Fence Footings - Perimeter Fence
2 days
Mon 7/14/25
Tue 7/15/25
16 days
355
357
357
Set Posts - Perimeter Fence
2 days
Wed 7/16/25
Thu 7/17/25
16 days
356
358
358
Excavate Fence Footings - Interior Fence
1 day
Fri 7/18/25
Fri 7/18/25
16 days
357
359
359
Set Posts - Interior Fence& Gates
2 days
Mon 7/21/25
Tue 7/22/25
16 days
358
361
360
Tennis Slab - Construction
16 days Wed 7/23/25
Wed 8/13/25
16 days
361
Excavate Turn Downs
1 day
Wed 7/23/25
Wed 7/23/25
16 days
359,353
362
362
Place& Compact ABC
1 day
Thu 7/24/25
Thu 7/24/25
16 days
361
363
363
Place Vapor Barrier
1 day
Fri 7/25/25
Fri 7/25/25
16 days
362
364
364
Set Rebar& PT Cables
3 days
Mon 7/28/25
Wed 7/30/25
16 days
363
365
365
Pour PT Slab
1 day
Thu 7/31/25
Thu 7/31/25
16 days
364
366
366
Tension Slab - Pre Tension
1 day
Fri 8/1/25
Fri 8/1/25
16 days
365
367FS+7 days
367
Tension Slab - Final Tension
1 day
Wed 8/13/25
Wed 8/13/25
16 days
366FS+7 days
369,375
368
Site - Concrete
12 days Thu 8/14/25
Fri 8/29/25
16 days
369
F/P/S - Concrete Sidewalk - Tie into Existing North Side
2 days
Thu 8/14/25
Fri 8/15/25
16 days
367
370
370
F/P/S - Concrete Sidewalk - East Side
2 days
Mon 8/18/25
Tue 8/19/25
16 days
369
376,372
371
Storm Drain
2 days
Wed 8/20/25
Thu 8/21/25
22 days
372
Excavate - Rip-Rap
1 day
Wed 8/20/25
Wed 8/20/25
22 days
370
373
373
Hand Place Rip Rap
1 day
Thu 8/21/25
Thu 8/21/25
22 days
372
382
374
Tennis Court Construction
12 days Thu 8/14/25
Fri 8/29/25
16 days
375
Install Edwards Posts
1 day
Thu 8/14/25
Thu 8/14/25
19 days
367
376
376
Hang Horizonals - Fence
2 days
Wed 8/20/25
Thu 8/21/25
16 days
370,375
377
377
Hang Fabric - Fence
3 days
Fri 8/22/25
Tue 8/26/25
16 days
376
378
378
Hang Windscreen
1 day
Wed 8/27/25
Wed 8/27/25
16 days
377
379
379
Install - Sportmaster Coating
1 day
Thu 8/28/25
Thu 8/28/25
16 days
378
380
380
Caulk Joints
1 day
Fri 8/29/25
Fri 8/29/25
16 days
379
382
381
Close Out
42 days Wed 9/24/25
Thu 11/20/25
0 days
382
Punch List - Walk
1 day
Wed 9/24/25
Wed 9/24/25
0 days
291,380,373,258,33383
383
Punch List
10 days Thu 9/25/25
Wed 10/8/25
0 days
382
384FS+30 days
384
Substantial Completion
1 day
Thu 11/20/25
Thu 11/20/25
0 days
383FS+30 days
385
385
Final Completion
0 days
Thu 11/20/25
Thu 11/20/25
0 days
384
Install Temporay Fencing for Tennis Center
Pre - Slab Prep
Rip Existing Pad
Rough Grade Existing Pad
Trench for Electrical Conduit
Fine Grade Existing Pad
Drill & Set Electrical Poles & Fixtures
Install Net Anchor Footing
Ex - 2 Post Shade Structure Footings
Pour - 2 Post Shade Structure Footings
Set - 2 post Shade Poles
Excavate Net post Footing
Pour& Install Edwards Sleeve Footings
Excavate Fence Footings - Perimeter Fence
Set Posts - Perimeter Fence
Excavate Fence Footings - Interior Fence
Set Posts - Interior Fence& Gates
Tennis Slab - Construction
Excavate Turn Downs
Place& Compact ABC
Place Vapor Barrier
Set Rebar& PT Cables
Pour PT Slab
Tension Slab - Pre Tension
Tension Slab - Final Tension
Site - Concrete
F/P/S - Concrete Sidewalk - Tie into Exis
F/P/S - Concrete Sidewalk - East Side
Storm Drain
Excavate - Rip-Rap
Hand Place Rip Rap
Tennis Court Construction
Install Edwards Posts
Hang Horizonals - Fence
Hang Fabric - Fence
Hang Windscreen
Install - Sportmaster Coating
Caulk Joints
Close Out
Punch List - Walk
Punch List
Substantial
Final Comp
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
024
Qtr 3, 2024
Qtr 4, 2024
Qtr 1, 2025
Qtr 2, 2025
Qtr 3, 2025
Qtr 4, 2025
Task
Split
Milestone
Summary
Project Summary
Inactive Summary
Deadline
Critical
Critical Split
Path Driving Predecessor Milestone Task
Path Driving Predecessor Summary Task
Path Driving Predecessor Normal Task
Path Driven Successor Milestone Task
Path Driven Successor Summary Task
Path Driven Successor Normal Task
Progress
Owner Name
Address
"Project Name"
Page 8
Project: "Project Name"
Date: Fri 7/12/24