Extracted text (via ocr_local)
2452 characters
LANDSCAPE WITHIN ROW & PUE TO BE SETE:DATA, INSTALLED WITH [ DESCRIPTION [ACREAGE — PHASE 1 oO ‘GROSS ACREAGE ‘49.30 AC. fo) NET ACREAGE 44.73 AC. PECOS ROAD em fe) PARCELS SIGNAGE em: FLOOR PARKING REQUIREMENTS ACREAGE| USE | AREA | FLOORAREA | KEYS | UNITS Density | PARKING NUMBER eaTES RATIO. _|REQUIRED PROVIDED [PARCEL 1 BLOG 1A MU 16,000 SF. 250 SF. 64 BLDG 1-8 RET. 7,000 §.F. 250 S.F. 28 BLDG 1-C REST 5,500 S.F. 69 BLDG 1-D REST 4,000 S.F. 35. BLDG 1-€ MU 31,500 S.F. 200 158 KEY, BLDG 1-F HOTEL 88,900 SF. | 180 KEYS 1/100 PUBLIC 210 [PARCEL 1 TOTAL 8.42 AC. 0.42 | 152,900 S.F. |180 KEYS 564 493 [PARCEL 2 2 BLDG 2-A RET 15,500 S.F. | 250sF. | 62 | | BLOG 2-8 REST 6,000 5.F. 75 FS | ae me BLDG 2-C REST 6,000 S.F. 75 4, orth : : BLDG 2-D REST 4,000 S.F. ee | 0 [dS te, the, st ; i - [buns 2€ REST 2,900 S.F. 36 BLOG 2-F REST 5,800S.F. | [250 SF. 23 [ BLDG 2-6 RET. 14,000 S.F._| [250 s.r. 56 BLDG 2-H RET. 8,400 S.F. 250 S.F. 34 [PARCEL 2 TOTAL! 8.38 AC. 0.17 | 62,600 S.F. 396 366 [ParceL 3 BLDG 3-A OFFICE 32,000 SF. 200 SF. 160 ORTAL [ BLDG 3-8 OFFICE 32,000 S.F. 200 S.F. 160 [PARCEL 3 TOTAL] 8.19 AC. 0.18 | 64,0005.F. 320 299 [PaRceL 4 BLOG +A | Lmr_| | 395 UNITS | 52.0 DU/AC | 1.8PERUNIT | 716 [PARCEL 4 TOTAL| 7.60 AC.) l [395 UNITS 52.0 DU/AC [716 725 [PARCEL 5) LANDSCAPE WITHIN BLOG 5A _| LMF _| [400 UNITS | 43.5 DU/AC | L.SPERUNIT | 725 ROW & PUE TO BE [PARCELS TOTAL| 9.20 AC.| l |400 UNITS | 43.5 DU/AC [725 725 INSTALLED WITH PHASE 1 [PARCELS 6A & 6B BLDG 6-A OFFICE 120,000 S.F. 200 SF. 600 BLDG 6-8 OFFICE 180,000 S.F. 200 S.F. 900) BLOG 6-8 OFFICE OSF. [PARCEL 6 TOTAL! 3.08 AC. 2.24 | 300,000 S.F. 1500 1700 L TOTAL MULTI-FAMILY, MF 795 UNITS I RET 44,900 S.F. RESTAURANT REST 34,200 S.F. MIXED. Mu 47,500 S.F. HOTEL 88,900 S.F._|180 KEYS OFFICE 364,000 S.F. L_““‘torat [44-87 Ac.| COMM | 0.30 | 579,500 S.F. |180 KEYS | 795 UNITS 4/221 4,308 EXISTING POWER POLE oe TYPICAL MAIN STREET AT RETAIL Here EXISTING STREET LIGHT oo TYPICAL MAIN STREET AT RESIDENTIAL EXISTING TRAFFIC SIGNAL oo TYPICAL MAIN STREET AT OFFICE PLAN AND REPRESENTATIVE IMAGERY SHALL BE CONSIDERED CONCEPTUAL. FINAL SITE DESIGN FULL TRAFFIC MOVEMENT MATERIALS TO BE PROVIDED AT THE TIME OF FINAL IMPROVEMENT PLANS. LOOP 202 RIGHT IN / RIGHT OUT ONLY S| PROPOSED TRAFFIC SIGNAL NOTE: GRAPHIC MATERIALS SHOWN ARE PRELIMINARY AND SUBJECT TO CHANGE. ALL SITE a Y~ 400 2 DISTRICT DOWNTOWN Se Conceptual Site Plan ABLASTUDIO.COM & =) Fl L A