PLH24-0018 Pecos & McQueen Storage Exhibits

City of Chandler — Study Session (2024-10-14)

View PDF Meeting page

Extracted text (via pymupdf) 18370 characters
9/12/24

Pecos & McQueen Storage 
 
Southeast Corner of Pecos and McQueen 
Chandler, Arizona, APN No. 303-29-019P 
 
 
Request & Background 
 
The Applicant is requesting a Use Permit to allow for the development of this long-vacant 
parcel with a new, Class-A, internalized self-storage facility with associated 
improvements.   
 
For years, the Property has been owned by the Circle K Corporation, who envisioned 
developing a convenience market on site.  Their plans have since changed, providing the 
opportunity for this more compatible development.  The project provides an ideal 
transition between two (2) heavily traversed arterials and the adjacent residential 
neighborhood.  The proposed use will act as a buffer from these arterials, while also 
providing a low-intensity commercial use with predictable hours of operations without the 
negative aspects many other “by-right,” commercial uses contain (noise, odor, late night 
deliveries, etc.). 
 
 
Property & Background 
 
The site in question is roughly 2.8-acres of vacant land located at the southeast corner of 
Pecos Road and McQueen Road.  See aerials attached at TAB A.  The Property has a 
General Plan designation of “Neighborhoods” and is zoned Community Commercial (C-
2).  See General Plan and Zoning Maps attached at TAB B.  The C-2 district specifically 
permits “self-storage, mini-warehousing” with the acquisition of a Use Permit.   
 
 
Adjacent Zoning & Uses 
 
As noted above, the Property is zoned C-2 and undeveloped.  The Property is at the 
intersection of two (2) major arterials (Pecos and McQueen), but also abuts single-family 
residential to the east and south.  The proposed use creates a perfect buffer from the 
major roadways to the adjacent residential.  Self-storage has predictable hours of 
operation, minimal traffic generation, and lacks most of the negative aspects produced by 
many other commercial uses (noise, odors, traffic, off-hour deliveries, etc.).  The adjacent 
zoning and land uses include:  
 
• North:  
Pecos Road.  PAD with a developed commercial center    
• East:   
PAD for single family residential.   
• South:  
PAD for single family residential.   
• West:   
McQueen Road.  AG-1 undeveloped corner parcel, followed by SF- 
33 zoned single family residential.

Pecos / McQueen Storage – Use Permit Narrative – v3 
Project Details  
 
 
Site Design & Summary 
 
The project consists of roughly 118,000 square feet of new, Class-A, internalized self-
storage and associated improvements.  A copy of the preliminary site plan is attached 
at TAB C.  The project is custom designed for this unique site, providing large, 
landscaped setbacks along the south and east property lines.  No outdoor storage is 
permitted, and the building is specifically designed with only interior accessed units 
(no exterior roll-up door units).   
 
The building features one (1) basement level and two (2) above grad levels, topping 
out at 33’-4” in height, well below the permitted height.  The site is accessed from 
either Pecos or McQueen with the office located closest to the intersection.  Visitor 
parking is provided at two locations, but no parking occurs along the south property 
line.  The internal drive aisle is positioned along the south portion of the site (along 
with a large landscape setback), providing additional buffer to the adjacent residential.  
The project will also complete the long lacking sidewalks along Pecos while also 
making significant pedestrian and landscaping improvements along both road 
frontages. 
 
The project is in complete conformance with the required development standards of 
the C-2 zoning district.  Preliminary development standards for the project include:  
 
 
Standard 
Provided 
 
Building Setback 
• 
North –  50’-0” 
• South – 56’-0” 
• 
East –   56’-0” 
• 
West –  50’-0” 
 
 
 
• 50’-0” minimum  
• 56’-0” minimum 
• 56’-0” minimum 
• 50’-0” minimum 
 
Landscape Setback 
• 
North –  50’-0” 
• South – 25’-0” 
• 
East –   20’-0” 
• 
West –  50’-0” 
 
 
• 50’-0” minimum  
• 25’-0” minimum  
• 20’-0” minimum 
• 50’-0” minimum 
 
Building Height – 45’-0” max. 
 
 
33’-4” feet (2 story) 
 
Lot Coverage 
 
 
33.6% (41,635/123,858) 
 
Parking 
 
 
12 spaces plus 2 loading spaces

Pecos / McQueen Storage – Use Permit Narrative – v3 
 
 
Site Access  
 
Access is provided from both McQueen Road and from Pecos Road.  Both access 
points are limited to right-in / right-out only.   
 
The proposed Pecos Road access driveway is located over 258’ west of the existing 
Bedford Drive – exceeding the minimum separation requirement of 150’.  This 
placement does not align with the existing median cut in Pecos Road, resulting in the 
limited right-in / right-out maneuvers as well as avoiding any conflicts with traffic 
maneuvers on the north side of Pecos Road. 
 
The proposed McQueen Road access driveway is located just over 165’ south of the 
intersection with Pecos Road.  This driveway location is within an existing right turn 
lane on McQueen Road.  We propose to extend the existing right turn lane to provide 
adequate space for vehicle stacking south of the new driveway into the storage site.  
The existing tapper will be adjusted as needed to accommodate lengthening of the 
turn lane.  What we propose is the maximum vehicle stacking we can provide south 
of the driveway, while maintaining the ability to reconstruct the lane tapper with 
sidewalk and remain clear of the existing power poles in this area.  
 
 
Building Architecture 
 
Aesthetically, the proposal focuses on two interconnected ideas: connection to the 
surrounding environment and sense of motion.  Situated on a narrow corner parcel 
immediately adjacent to residential on the south and east sides, it was important for 
the proposal to achieve program goals while respecting the privacy of the residents.  
As such, the southern and eastern façades have very few glazing locations, mostly 
limited to clerestory windows for natural lighting.  Site lighting is also limited on these 
façades.  
 
The palette of materials utilized includes a variety of concrete block, stucco and metal 
panels, which at the core feature a light and dark desert gray to anchor the building to 
its surroundings.  Split-face charcoal gray concrete block and metal paneling add a 
distinct contrast and tie the main building mass to colorful perforated metal panel 
accents, starting the idea of motion on the northern façade.  The color of these metal 
panels fluctuates, creating a sense of randomized motion.   
 
At the rental office, a rust-colored roof element picks up this motion and transfers it to 
the southern façade where the metal panel accents continue.  This time, however, the 
randomized colors are balanced by the steady growth of the surrounding concrete 
block bump-outs, which increase in width at each iteration while the metal panel 
accents maintain their size.  This “inchworm” pattern furthers the sense of motion and 
creates a neighborhood-friendly scale without the use of windows.  The idea of motion

Pecos / McQueen Storage – Use Permit Narrative – v3 
creates variety at each façade, creating a bridge between visual interest and respect 
for our neighbors. 
 
 
Landscape Design 
 
Proposed landscaping consists of a variety of desert compatible trees, shrubs, 
accents, cacti with decomposed granite topping for dust control.  Tree, shrub and 
accent placement along the north and west street frontages follows a random/natural 
arrangement following the contoured retention basins in these areas.  The south and 
east landscape areas have a more linear arrangement to provide a uniform landscape 
buffer at all areas where this property abuts residential property.  Tree and shrub 
selections were made to be compatible with established landscaping in the 
surrounding neighborhood. 
 
 
Parking 
 
The primary customer parking area is located on the west side of the building directly 
adjacent to the rental office entry.  Five (5) regular parking spaces along with one (1) 
accessible space are provided at this location.  An additional seven (7) regular parking 
spaces are provided at the east side of the site near the east drive-in loading area.  
These additional spaces are provided for customer use while visiting the facility.  
Additionally, two interior loading areas are being provided – one at the northeast 
corner and one at the southwest corner.  These loading areas will provide a climate-
controlled environment as well as buffer all loading activities from adjacent properties. 
 
 
Hours of Operation 
 
Office hours are typically 9am to 6pm with extended access for existing customers 
with security access from 7am to 10pm.   
 
 
Contact Information 
 
Should adjacent resident wish to contact a development representative, they may do 
so at: 
 
David M. Brown 
Wentworth Property Company 
802 N. 3rd Avenue, Phoenix, AZ 85003 
602.875.5014 
dbrown@wentprop.com

Pecos / McQueen Storage – Use Permit Narrative – v3 
Use Permit Criteria 
 
Ordinance Section 35-305 discusses the review and approval criteria for Use Permits.  To 
grant approval, two (2) conditions must be met: 
 
1. The request is in conformance with the general plan and its policies. 
 
Response: 
The request is in conformance with and promotes numerous policies outlined in 
the Chandler General Plan.  A sampling includes: 
 
 
1.1.1 Land Use & Development 
(f)  Encourage compatible infill projects.  
 
• The project fills a long-vacant infill site with an appropriate, low-intensity use 
which will help to buffer the adjacent residential from these two (2) arterial 
roads.  
 
(h) Emphasize pedestrian and bicycle connectivity to transit facilities.  
 
• The project will complete a long missing segment of sidewalk along Pecos 
Road, while vastly improving the pedestrian comfort along both road 
frontages.  New sidewalks, street lighting, and landscaping will be 
incorporated on both frontages.  A new bus bay will also be constructed with 
this project.  
 
(l) Ensure compatible transition between residential areas and incompatible 
land uses as well as between intensity of land uses (e.g., between 
employment and residential). 
 
• The project provides an ideal transition between two (2) heavily traversed 
arterials and the adjacent residential neighborhood.  The proposed use will 
act as a buffer from these arterials, while also providing a low-intensity 
commercial use with predictable hours of operations and void of the 
negative aspects many other commercial uses contain (noise, odor, late 
night deliveries, etc.).  
 
 
 
1.1.3 Design & Aesthetics 
(b)  Consider a more diverse building façade and color palette for the built 
environment.  
(f)    Continue to promote excellence in building and site design. 
 
• The project provides a diverse and interesting façade for the built 
environment.  As noted above, the palette of materials includes a variety of 
concrete block, stucco and metal panels.  Split-face charcoal gray concrete 
block and metal paneling add a distinct contrast and tie the main building

Pecos / McQueen Storage – Use Permit Narrative – v3 
mass to colorful perforated metal panel accents, starting the idea of motion 
on the northern façade.  The color of these metal panels fluctuates, creating 
a sense of randomized motion. 
 
 
 
1.1.4 Streets  
(e)  Discourage through-traffic in neighborhoods.   
 
• No cut-through traffic will occur with this development.  The site is fully 
contained with access provided directly onto Pecos Road and McQueen 
Road.  The use is also renowned for its lack of traffic generation.  
 
 
2. The request will not be detrimental to persons residing or working in the vicinity, to 
adjacent property, to the neighborhood or to the public welfare in general, and that 
the use will be in full conformity with the conditions, requirements or standards 
prescribed by this Code or higher as may be deemed necessary by City Council in 
any one (1) situation. 
 
Response: 
This criterion is at the heart of this request.  This is a commercial zoned site and, 
as such, could permit a variety uses that could be viewed as detrimental to the 
adjacent neighborhood.  In fact, the site was previously planned for a convenience 
store.  Many other commercial uses (permitted by right) with their associated noise, 
traffic, deliveries, and back of house activity would not be appropriate given the 
close proximity to residential.  This proposal recognizes the existing conditions and 
provides a low-impact, non-invasive use that can help to buffer the adjacent 
residential from the arterial roads.  The use is ideal and appropriate for the location.  
 
 
In considering the application, the ordinance provides several factors for examination 
including, but not limited to:  
 
1. Consistency with general plan. 
 
Response:  
As noted above, the project is in conformance with the General Plan 
“Neighborhood” designation and advances the stated goals of the General Plan.  
 
 
2. Ingress and egress to property and proposed structures, pedestrian and vehicular 
circulation with particular reference to fire protection. 
 
Response:   
Access is provided from both McQueen Road and from Pecos Road.  Both access 
points are limited to right-in / right-out only and designed to accommodate access 
for customers, emergency vehicles and refuse vehicles.  Turn templates are shown

Pecos / McQueen Storage – Use Permit Narrative – v3 
on the site plan to demonstrate maneuvering clearance is provided.  A 31’ wide 
drive lane along the south face of building provides a through site connection of 
the two access driveways.  No gated access control is proposed on this site. 
 
 
3. Off-street parking and loading. 
 
Response:  
The project is in complete compliance with parking requirements.  All parking is 
provided on site.  Parking and loading areas are located in convenient and 
functional locations and are screened appropriately  
 
 
4. General compatibility of use with adjacent property and property in the district. 
 
Response:   
Self-storage is an ideal use for this location.  It creates a perfect buffer from the 
major roadways to the adjacent residential.  Self-storage has predictable hours of 
operation, minimal traffic generation, and lacks most of the negative aspects 
produced by many other commercial uses (noise, odors, traffic, off-hour deliveries, 
etc.).   
 
 
5. Impact on public services, including schools, recreation and utilities. 
 
Response:  
The project will have minimal, if any, impact on public services.  Self-storage is a 
low intensity use requiring minimal water, sewer or utilities.  No additional burden 
is placed upon the school system as a result of the use.     
 
 
6. Screening and buffering of uses. 
 
Response: 
Customer activity at this facility will be concentrated around the two loading areas 
provided – one at the northeast corner of the building and one at the southwest 
corner of the building.  Due to the proximity of single-family residential properties 
to the east and south of the Property, it was deemed best to internalize all loading 
activities within the building – eliminating any impact to these neighborhoods.  
Additionally, all vehicle circulation, parking areas and refuse enclosure are 
buffered from the residential properties with a minimum 20’ (east) and 25’ (south) 
landscape area with densely spaced trees.  The building is even further away from 
these property lines as the drive-aisle creates additional separation.  Lastly, there 
is an existing 6’ tall masonry screen wall separating this property from the 
residential neighborhoods at both the east and south boundaries.

Pecos / McQueen Storage – Use Permit Narrative – v3 
 
7. Signage. 
 
Response: 
A proposed monument sign and building signage will be a separate submittal. 
 
 
8. Exterior lighting with reference to adjacent properties. 
 
Response: 
Exterior lighting will be provided with a combination of fully shielded pole mounted 
fixtures and building mounted fixtures.  Pole mounted fixtures will be limited to a 
maximum height of 15’ and be utilized exclusively at the parking areas and 
driveways near the public streets.  Building mounted fixtures will be provided on 
the north, east and south sides.  Lights will be mounted at a maximum height of 
14’.  All fixtures will be placed and specified to achieve zero-foot candle readings 
at the east and south property boundaries adjacent to residential. 
 
 
9. Stormwater retention and landscaping. 
 
Response: 
Storm water from the building, parking and driveways will surface flow to a series 
of connected surface retention basins located around the perimeter of the site.  
Retention basins within the street front setbacks are sized to utilize no more than 
50% of that setback area and are nicely contoured to a natural appearance. 
 
Proposed landscaping consists of a variety of desert compatible trees, shrubs, 
accents, cacti with decomposed granite topping for dust control.  Tree, shrub and 
accent placement along the north and west street frontages follows a 
random/natural arrangement following the contoured retention basins in these 
areas.  The south and east landscape areas have a more linear arrangement to 
provide a uniform landscape buffer at all areas where this property abuts 
residential property. 
 
Tree and shrub selections were made to be compatible with established 
landscaping in the surrounding neighborhood. 
 
 
10. Site and building design for conformance with the general plan and policies and 
City standards. 
 
Response: 
As noted in the Use Permit Criteria above, the project adheres to the design 
recommendations of the General Plan.  The project provides a diverse building 
façade and color palette.  This includes a variety of concrete block, stucco and

Pecos / McQueen Storage – Use Permit Narrative – v3 
metal panels.  Split-face charcoal gray concrete block and metal paneling add a 
distinct contrast and tie the main building mass to colorful perforated metal panel 
accents, starting the idea of motion on the northern façade.  The color of these 
metal panels fluctuates, creating a sense of randomized motion. 
 
 
 
We look forward to working further with the City to complete this exciting project.   
 
Thank you

8/24/27