JOB ORDER PROJECT AGREEMENT

Solid Waste Complex Recycle Collection Area Relocation

Project No. SW2102.401
Council Date: November 7, 2024

This JOB ORDER PROJECT AGREEMENT (“Job Order”) is made this day of 202
("Effective Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”)
and SDB, INC, an Arizona corporation, ("JOC Contractor”) and is entered into pursuant to Job
Order Master Agreement No. JOC2402.401 (“JOC Master Agreement”). City and JOC Contractor
may be referred to individually as “Party” or collectively as “Parties”).

City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as
follows:

RECITALS

A. On or about February 5, 2024, the Parties entered into the JOC Master Agreement, which
terms and conditions are made a part of and incorporated into this Job Order Project Agreement
by this reference.

B. City proposes to engage JOC Contractor for construction services as more fully described in
Article 1 and Exhibit "A", which is attached to and made a part of this Job Order by this reference.

C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to and
made a part of this Agreement by this reference.

ARTICLE 1. DESCRIPTION OF WORK

The Parties enter into this Job Order Project Agreement for the Solid Waste Complex Recycle
Collection Area Relocation, Project Number SW2102.401. The scope of work consists of
construction of new concrete pavement, asphalt pavement, curbs, drainage and retention
improvements, drywells installation, block retaining wall, water and power connections,
and underground utilities improvements, all as more particularly set forth in Exhibit “A”
attached hereto and incorporated herein by reference.

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page 1
Project No.: SW2102.401
Rev. 3/19/2024

The JOC Contractor will not accept any change of scope, or change in Agreement provisions, unless
issued in writing, as a Agreement amendment or change order and signed by the authorized
signatories for each party.

Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached
hereto and incorporated herein by reference, will be due prior to execution of each Job Order
Project Agreement in the full amount of each Job Order.

At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement
of Claims and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively
attached hereto and incorporated herein by reference.

ARTICLE 2. PROJECT PRICE
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master
Agreement a fee not to exceed the Guaranteed Maximum Price of $1,928,681.32 Dollars

determined and payable as set forth in JOC Master Agreement and Exhibit “B” attached hereto
and made a part hereof by reference.

ARTICLE 3. AGREEMENT TIME & SCHEDULE

JOC Contractor agrees to complete all Construction within 180 calendar days from the Notice to
Proceed (NTP) Date.

ARTICLE 4. JOB ORDER CONTACTS

The following parties serve in the capacity below for this Job Order Project.

CITY: Construction Project Manager: Adam Kleiser
Phone: | 480-782-3325

Email: | Adam.Kleiser@chandleraz.gov

JOC CONTRACTOR: __| SDB, INC.
1001 S Edward Drive, Tempe, AZ 85281

JOC Contractor Representative: Salvador Encinas

Phone: | 480-967-5810

Email: | Sal.encinas@sdb.com

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page 2
Project No.: SW2102.401
Rev. 3/19/2024

ARTICLE 5. FORCED LABOR OF ETHNIC UYGHURS PROHIBITED

By entering into this Agreement, Contractor certifies and agrees Contractor does not
currently use and will not use for the term of this Agreement: (i) the forced labor of ethnic
Uyghurs in the People's Republic of China; or (ii) any goods or services produced by the
forced labor of ethnic Uyghurs in the People's Republic of China; or (iii) any contractors,
subcontractors or suppliers that use the forced labor or any goods or services produced
by the forced labor of ethnic Uyghurs in the People's Republic of China

SIGNATURE PAGE TO FOLLOW

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page 3
Project No.: SW2102.401
Rev. 3/19/2024

IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date.

“CITY” CITY OF CHANDLER “JOC CONTRACTOR”

SDB, INC

©
Wc ioli5124
MAYOR Signpture | Date

RECOMMENDED BY: SANDOR. ENGNAS

Print Name
(Ont Mahon BTC MH.
Daniel Haskins, P.E. Title

IP City Engi
CIP City Engineer SAL ENCINAS@SOB.G@M
APPROVED AS TO FORM: Signer Email Address
City Attorney qe
ATTEST:
City Clerk Seal

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page 4

Project No.: SW2102.401
Rev. 3/19/2024

EXHIBIT A
SCOPE OF WORK

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page A-1
Project No.: SW2102.401
Rev. 3/19/2024

~ SDB CONTRACTING
| SERVICES

Adam Kleiser
Construction Project Manager
City of Chandler | Public Works & Utilities Department

October 9, 2024

EXHIBIT A - SW2201.401 RECYCLE COLLECTION AREA RELOCATION

Dear Mr. Kleiser and Members of the City Council,

tam writing to provide an overview of the key elements and scope of work for the Solid Waste Complex Recycle
Collection Area Relocation.

Project Overview

The scope of the project involves the relocation of the recycle collection area within the Solid Waste Complex. This
relocation is critical to enhance operational efficiency and accommodate future growth. The work includes a combination
of site preparation, grading, utility adjustments, paving, and installation of necessary infrastructure.

Key Elements of the Scope of Work

1.

Site Preparation and Grading

» Grading work is required to ensure proper drainage within the retention basins, which are sized for 100-year,
2-hour storm events. These basins are strategically located to the north and southeast of the project site.

» Drywells and erosion control measures such as riprap will be installed to maintain site integrity and manage
stormwater runoff.

2. Utility Adjustments
» Existing utility lines, including water, sanitary sewer, and storm drains, will be uncovered and inspected. Any necessary
repairs or modifications will be made to ensure the systems function as designed.
» New underground utilities, including water service, electrical conduit, and fiber optic conduit, will be installed per
city standards.
3. Paving and Infrastructure
» The project includes the installation of asphalt concrete and Portland cement concrete pavement, along with curb
and gutter structures.
» Vertical and roll curbs, ribbon curbs, and drainage systems such as spillways will be constructed to manage site flow
and maintain accessibility.
4, Fencing and Site Improvements
» Chain-link fencing will be installed as per ADOT standards. Landscaping restoration will include granite covering,
installation of irrigation systems, and replanting trees where applicable.
» Compliance with pre-emergent herbicide treatments and post-construction landscape maintenance is required for
a period of 90 days following conditional acceptance.
5. Compliance and Inspection
» The contractor must adhere to all City of Chandler and Maricopa Association of Governments (MAG) specifications.
Inspections will be performed by the city at critical stages, including utility tie-ins and grading completion.
» Final acceptance will be granted upon submission of certified “As-Built” plans, photo documentation, and after all
site improvements and inspections are successfully completed.
» The agreement completion time is 180 calendar days following Notice to Proceed.
Conclusion

The Solid Waste Complex Recycle Collection Area Relocation project aims to modernize the facility's infrastructure while
ensuring full compliance with environmental and city standards. Upon completion, the project will support the growing
waste management needs of Chandler and contribute to the city’s sustainability goals.

We are committed to delivering quality results and are excited to begin this collaboration. Please review at your earliest
convenience. | would be happy to discuss any questions or modifications you might have.

Sincerely,

j-—

Eric Hoffmann
Director of Preconstruction
(480) 299-7714 | eric.hoffmann@sdb.com

1001S. Edward Drive | Tempe, AZ 85281 | 480.967.5810 Ph | 480.967.5841 Fx | sdb.com

EXHIBIT B
FEE SCHEDULE

Project Name: Solid Waste Complex Recycle Collection Area Relocation Page B-1
Project No.: SW2102.401
Rev. 3/19/2024

EXHIBIT "B"

JOB ORDER COST PROPOSAL
SUMMARY SHEET

$W2202.401 - COC Recycle Collection Area Relocation

Negotiated Prices

Price of Subcontractor(s) $ 1,393,173.39
Price of Subconsultant(s) $ -
General Conditions $ 141,953.75
Preconstruction Labor (if applicable) $ -
Construction Labor (if applicable) $ -
SUBTOTAL (NEGOTIATED PRICES):| $ 1,535,127.14
Overhead and Profit (Coefficient per Job Order Master Agreement) 6.00% $ 92,107.63
TOTAL (NEGOTIATED PRICES + OVERHEAD & PROFIT):| $ 1,627,234.77
Insurance, Bonds, & Taxes
Sales Tax Percentage (Current Tax Rate) ENTER TAX % HERE:| 5.07% $ 93,059.95
General Liability Insurance Percentage (Actual Cost per Job Order) 1.50% | $ 28,500.49
Builder's Risk Insurance Percentage (Actual Cost per Job Order) 0.75% | $ 14,356.40
Payment Bond (Actual Cost per Job Order) 1%|$ 12,017.00
Performance Bond (Actual Cost per Job Order) Included Above | $ :
SUBTOTAL (INSURANCE, BONDS, & TAXES): $ 147,933.84
COMBINED TOTAL (TOTAL + INSURANCE, BONDS, & TAXES):| $ 1,775,168.60
City's Allowance (Typically 10%) $ 153,512.71
TOTAL JOB ORDER:| $ _1,928,681.32

Per the Job Order Master Agreement - This Fee Table includes all fees, costs, insurance and bond premiums, allowances,
construction contingency, and taxes of any type necessary to fully, propertly and timely perform and construct the Work. Also per
the Job Order Master Agreement - For any portion of the Work which, either through this Contract, Change Order or otherwise, is
performed and paid for on a cost, or time and materials basis, the costs may be reimbursed to JOC Contractor and chargeable

against the Contract Price will be determined as set forth in MAG 109.5.

hey SDB, Inc
Th 1001 S. Edward Dr
cD SDB saves theres

480-967-5810
PROPOSAL
CUSTOMER: Gity of Chandler BID DATE: 9/18/2024
ADDRESS: we EGueen Creek Rd PROPOSAL NO.: 24-15-0005
CITY, STATE & ZIP Chandler, AZ, 85225 PROPOSAL TYPE.: Lump Sum

JOB DES! COC Recycle Collection Area Relocation REV 2 ARCHITECT/ ENGINEER: Ritoch-Powsl ssociates
CONTACT: FafizNoo PLANS DATED: wero
We are pleased to offer the following Proposal for proposed construction of COC Recycle Collection Area Relocation REV 2
Based off the Contract Documents and Drawings by Ritoch-Powell & Associates

DIV 1 “GENERAL REQUIREMENTS & ALLOWANCES

General Conditions $ 88,692.80
General Requirements $ 53,260.95
Subcontractor Bond - For M&J and Torrent Resources $ 19,104.49
Storm Water Pollution Prevention Plan - Desert Services $ 16,371.00
Dust Control - Desert Services $ 21,335.00
Quality Control & Testing - Western Technologies $ 42,200.00
Survey & Staking - $3 Arizona $ 15,500.00

DIV 3 CONCRETE
Site Concrete - M&J Construction $ 723,504.89

DIV 20-23 MECHANICAL
Plumbing - SDB Civil Plug $ 34,133.01
DIV 26 -28 ELECTRICAL & SPECIAL SYSTEMS

Electrical - M7 Contracting $ 49,820.00
DIV 31 - EARTHWORK
Clear & Grub / Site Demolition & Removals - M&J Construction $ 14,800.00
Grading - M&J Construction $ 424,500.00
DIV 32 - EXTERIOR IMPROVEMENTS
Asphait Paving & Base - M&J Construction & Falcon Contracting $ 243,680.00
Landscape & Irrigation Allowance $ 19,375.00
Fence - Westem Fence 8 43,050.00
Drywells - Torrent Resources $ 85,800.00
‘SUB TOTAL $ 1,535,127.14
Overhead & Profit 6.00% $ 92,107.63
TAX 6.07% $ 93,059.95
General Liability Insurance Percentage 1.50% $ "28,500.49
Builder's Risk Insurance Percentage 0.75% $ 74,356.40
Payment Bond 1.00% $ 12,017.00
Performance Bond Included Above ~§ =
OWNER CONTINGENCY 10.00% $ 153,512.71
TOTAL Fh

ASSUMPTIONS & CLARIFICATIONS

The intent of this breakout is strictly for accounting purposes and not intended to be stand-alone scopes.

+ This proposal is based of doing work during normal working hours.
Each drywell chamber is estimated to require 8 hours of drilling time. Should the soil prove to be particularly hard or unstable and exceeds the
estimated 8 hours, additional costs will be incurred.

* This price shall remain valid for 30 days from bid date above.

* Site security or watchman, by Owner.

+ Overtime or after-hours work is only included for MEP tie-ins and shutdowns.

Premium time unless otherwise noted.

+ Off-Site construction is not required for this job.

+ Exclude any and all work not described.

+ Onsite soils are considered suitable for reuse onsite.

+ Multiple Mobilations.

+ Excavation 7 Drilling through unexpected rock-like soll conditions or correction for unstable soils will incur additional costs.
+ Excluding concrete collars for drywell chambers.

+ Any and all unforeseen conditions,

AGREEMENT TERMS AND CONDITIONS

‘of this Proposal | Work S08, inc to furnish labor, material, equipment and other resources required to complete the work
described herein and as required by the Owner for which the Owner agrees to pay the amount shown above. All pricing Is priced at day of estimate any increase
in material, equipment, and labor above 5% will be added to the contract at time of purchase via additive change order.

Thank you, Accepted by:
‘SDB, Inc City of Chandler

Jared Foerster & Jared McCostlin
Prepared by

Eric Hoffmann
Reviewed by

SDB, INC. 9/17/2024 Page 1
COC Recycle Collection Area Relocation REV 2
CC DESCRIPTION Each Mths] Wks] _Hours| Labor Rate[ Labor $ Rate Maienal$ | Sub$ [ Equp$ Total
[
l
Oa] _3.0| 13] 196] $110.24 78,601 a —___| $16,601 44
EE) $104.10 $4,132 -|s 5 $54,132.
3. 43] 104] $78.00 12 $8.11 al
02) 3.0] 13] 104] $75.46 B47 $7,847.36]
CONSTRUCTION PROJECT MANAGEMENT SUBTOTAL 884 EE $ : 388,652.80]
INSURANCE s
[Grading / Excavation Permit 7 $500.00 [$300 $500.00)
|Dust Control Permit lintab 1-2 |Acres| $2.00
INPDS Stormwater Discharge Permit in tab 1-2 3.0) $250.00 | SWPPP SWPPP
INPDS Groundwater Di Permit in tab 1-2 3.0), $250.00 | SWPPP |SwePP__|
— [Block Wall Permit 4 $200.09
[Construction Water Permit 71 $750.00 |$ 750 $750.
_ 3.0 $200.00 | $600
4[_ 3.0) ‘$150.00 [$450 $450.
1 24 $400.00 $ 1,200] 54 200,
91-0200 |Janttorial - Portable tolats & Cleaning Fees EX) $700.00 $300 .
-0200 [Project Signage 2 $68.07 |$ 552) $400.00|$ 800 1,351.7
01-0200 |Site Fencing 660) $5.00 =__3000
01-0200 |Con-Ex's 2 $400.00 $_ 2400
91-0200 [Oumpsters. ae $476.00 $3,563
‘01-0200 [Project Housekeeping - Dally Jobsite Cleanup 1 a7 5.603 1602.98
01. [Construction Water 25 4 97 579 3224 $4,823.17
oF. Maintain Access & Roads. 2| 43] 77] $68.97 985 $ =| $ 10,999| $18,984.
01-0200 tae FACILITIES SUBTOTAL 47,720 $__4004|$ 3,300 | $ 18.162] $43,275.
04-0600 ¥ =
071-0600 |fRadar (locator Service) 7) $300.00 53,000 35,0001
101-0800 [SAFETY SUBTOTAL $ = $ =[5 3,000 $ =| _ $3,000.09]
$703. 863875| 150 | 575583 37,655.83)
= 5 $1656] 5 -l$ =| $1,655.83]
soma 2a] $420.00 =_ 2600 i
0} $0.
START-UP, TEST, FINAL SUBTOTAL $ 5 $ ag B ~
‘OTALS. 47,720 $_7,0001$