Project Name: Fiber to the Home - Sunrise – Amendment No. 1 
Page 1 
Project No.: DS2501.451 
Rev. 5/13/2024 
 
 
 
AMENDMENT NO. 1 TO  
CONSTRUCTION MANAGEMENT SERVICES AGREEMENT 
 
FIBER TO THE HOME - SUNRISE 
Project No. DS2501.451 
 
Council Date: January 23, 2025 
 
THIS AMENDMENT NO. 1 (“Amendment No. 1”) to the professional services agreement dated 
September 27, 2024, (the “Agreement”) is made by and between the City of Chandler, an Arizona 
municipal corporation, (“City”) and Sunrise Engineering, LLC, a Utah limited liability company, 
(“Consultant”), on this ______ day of ___________________, 2025, (“Effective Date” by Clerk).  (City and 
Consultant may individually be referred to as “Party” and collectively referred to as “Parties”). 
 
RECITALS 
 
A. 
The Parties entered into the Agreement for Construction Management Services 
(“Services”) for the Fiber to the Home - Sunrise project. 
 
B. 
The Parties have determined that it is necessary and desirable for the Consultant to 
perform services for the City under the terms and conditions set forth in this Amendment No. 1 
and the Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the 
Agreement and this Amendment No. 1, the Parties agree to amend and modify the Agreement 
as follows. 
 
SECTION I – CONSULTANT’S SERVICES 
 
The Consultant’s Services remain the same as described in the Agreement.

Project Name: Fiber to the Home - Sunrise – Amendment No. 1 
Page 2 
Project No.: DS2501.451 
Rev. 5/13/2024 
 
SECTION II – PERIOD OF SERVICE 
 
The Period of Service is increased by 187 calendar days for a revised total of 457 calendar days. 
 
SECTION III – PAYMENT OF COMPENSATION AND FEES 
 
The Fees are increased by $372,392 and will be payable in accordance with Exhibit "B" attached 
to and made part of this amendment by reference, for a revised total not to exceed $455,397. 
 
SECTION IV – CONFLICT AMONG DOCUMENTS 
 
The Agreement, this amendment, and any previous amendments constitute the complete 
agreement between the Parties concerning the subject matter of the Agreement and replace 
any prior oral or written communications between the Parties.  If a conflict or ambiguity arises 
between the Agreement and this amendment, the instrument in the following order prevails 
and controls: (1) this amendment; (2) any previous Amendments from most recent to oldest; 
and (3) the Agreement. 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: Fiber to the Home - Sunrise – Amendment No. 1 
Page 3 
Project No.: DS2501.451
Rev. 5/13/2024 
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be duly 
executed.  Each Party warrants and represents that its respective signatories whose signatures 
appear below have been and are on the date of signature duly authorized to execute this 
Amendment No. 1. 
“CITY” CITY OF CHANDLER 
MAYOR 
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
 Seal 
“CONSULTANT” 
SUNRISE ENGINEERING, LLC 
Signature  
  Date 
Print Name 
Title 
Signer Email Address 
12/16/2025
Geoffrey S. Child, P.E.
Vice President
gchild@sunrise-eng.com

Project Name: Fiber to the Home - Sunrise – Amendment No. 1 
Page 4 
Project No.: DS2501.451 
Rev. 5/13/2024 
 
Amendment No. 1 (cont.) 
Project No. DS2501.451 
 
 
These changes result in the following adjustments of Agreement amount and/or time: 
 
Amendment authorized by Owner name: Dennis Aust 
 
 
Date: 12/13/2024 
Consultant email:  gchild@sunrise-eng.com 
Original Agreement amount: 
$83,005 
Previous Amendment(s) total: 
$0 
Last Agreement amount approved by Council: 
$0 
This Amendment: 
$372,392 
This Amendment + previous Amendment(s) not approved by 
Council total: 
$372,392 
Revised Agreement total: 
$455,397 
Council Approval Required (yes indicates approval required) 
Yes 
No 
Amendment(s) total over $100,000: 
☒ 
☐ 
Amendment(s) total causes Agreement to exceed $100,000:  
☒ 
☐ 
Agreement Time 
Agreement time prior to this Amendment (including previous 
amendments): 
270 
Calendar Days 
Net change resulting from this Amendment: 
187 
Calendar Days 
Revised Agreement time (including this Amendment): 
457 
Calendar Days 
Council Approval (if applicable) 
Council Approval Date: January 23, 2025 
 
cc:  Project Manager, Consultant, Owner, File

Project Name: Fiber to the Home - Sunrise - Amendment No. 1 
Page A-1 
Project No.: DS2501.451 
Rev 3/12/2024 
 
EXHIBIT A 
SCOPE OF WORK

EXHIBIT “A” 
SCOPE OF HOURLY NOT TO EXCEED SERVICES 
 
Page 2 of 6 
Contract Amendment Scope of Services 
It is our understanding that the City of Chandler (COC) is in need of On-Call Inspection Services for 
the Telecommunications and Utility Franchise’s (TUF) projects.  SE will provide an inspector as 
requested by the COC. The inspector will be from Sunrise Engineering’s (SE) local Mesa office. The 
original contract budget will be increased in order to perform the tasks below and the schedule 
duration of which will be approximately through December 2025. The COC may choose to extend 
the duration and/or increase the budget in the future.  
 
Further details of the proposed scope of work tasks are as follows: 
 
Phase 0001  –  TUF On-Call Inspection Services 
 
Task 001 Inspection: This task may include field inspections, verifying documents and other 
duties as requested by the COC for projects within the COC Rights-of-Way.  
 
Inspections will include providing documentation of construction activities for utility 
work in the Right-of-Way and Utility Easements. It will also include reviewing, 
inspecting, coordinating and documenting construction work to ensure compliance 
with City, MAG and Federal specifications and conformance with field conditions. 
Coordination with city staff of various departments (traffic control, locators, solid 
waste, CIP, etc.) may also be required to ensure projects are deconflicted. 
 
Duties are further outlined below: 
 
• Inspects construction projects for appropriate materials, methods, and 
workmanship according to project specifications, city standards, and all 
governing standards. 
• Conducts and actively participates in pre-construction and on-going meetings, 
virtual and in the field, to help eliminate confusion over inspection 
requirements and procedures. 
• Maintains detailed daily inspection reports on assigned projects and provides 
them to city staff for city records. 
• Interprets and applies engineering data, specifications, City, MAG, and ADOT 
specifications. 
• Provides recommendations for construction alternatives within the scope of 
the plans (e.g. running line changes, minor location adjustments for fiber 
cabinet equipment, handholes or pedestals, etc.) to contractors to help resolve 
conflicts in the field. 
• Documents and ensures changes are provided to city staff for city records. 
• Verifies project construction materials testing results, verifies materials 
supplied to project and determines compliance with required specifications.

EXHIBIT “A” 
SCOPE OF HOURLY NOT TO EXCEED SERVICES 
 
Page 3 of 6 
 
Phase 0002 – Allowances 
 
Task 001 Vehicle Mileage: This allowance will be for reimbursing vehicle mileage expenses 
for SE Construction Inspection. Mileage will be tracked from commuting to/from the 
SE’s local Mesa office to/from the project sites within the City limits. The rate for 
the mileage reimbursement is as shown in Exhibit B.  
 
Task 002 Owner’s Allowance: Due to the nature of this project additional services may be 
required during the course of the project due to unforeseen circumstances.  This 
allowance is intended for additional services (detailed description to be defined 
later) that will be provided upon written authorization from the City. 
 
 
Scope of Work Conditions 
A. Time and Material tasks will be performed in accordance with Exhibit B. 
B. To the extent possible the City shall give SE at least a 48-hour notice of requested inspection 
service needs.  
C. SE reserves the right to change personnel at any time, for any reason, but shall give the City 
advance notice of any proposed changes.  
D. Traffic Control Plan (TCP) reviews and approvals are not a part of the scope of work. 
However, monitoring traffic control devices and setup in the field and ensuring safe practice 
will be necessary as part of the job duties of the Construction Observers (Inspectors).

Project Name: Fiber to the Home - Sunrise -  Amendment No. 1 
Page B-1 
Project No.: DS2501.451 
Rev. 3/12/2024 
EXHIBIT B 
FEE SCHEDULE

EXHIBIT “B” 
COST SUMMARY – MAN-HOUR – HOURLY RATES 
 
Page 4 of 6 
 
 
 
 
 
 
Cost Summary
Phase
Task
Work Task Description
Original 
Contract Total
Contract 
Amendment
New Contract 
Total
*Fee Type
0001
TUF On-Call Inspection Services
001
Inspection
$71,028
$71,028
002
Inspection (Contract Amendment 01)
$356,312
$356,312
Subtotal
$71,028 
$356,312
$427,340
T&M NTE
0002
Allowances
001
Vehicle Mileage
$1,977
$16,080
$18,057
002
Owner's Allowance
$10,000
$10,000
Subtotal
$11,977 
$16,080
$28,057
T&M NTE
$83,005
$372,392
$455,397
T&M NTE
*Lump Sum = Fixed Fee; T&M = Time & Materials; NTE = Not to Exceed
CONTRACT TOTAL (Not to Exceed)

EXHIBIT “B” 
COST SUMMARY – MAN-HOUR – HOURLY RATES 
 
Page 5 of 6 
 
 
 
City of Chandler
TUF On-Call Inspections Services - Contract Amendment  No. 01
Phase
Task
Work Task Description
Admin 
III
Construction 
Observer IV
Construction 
Observer III
Mileage
(hours)
   ($)   
0001
TUF On-Call Inspection Services
001 Inspection
002 Inspection (Contract Amendment 01)
48
1000
1600
2648
$356,312
Subtotal
$356,312
0002
Allowances
001 Vehicle Mileage
24000
$16,080
002 Ow ner's Allow ance
$0
Subtotal
$16,080
48
1000
1600
24000
2648
$372,392
$69.00
$145.00
$130.00
$0.670
$3,312
$145,000
$208,000
$16,080
SUBTOTAL
$372,392
CONTRACT AMENDMENT TOTAL
$372,392
Sub-total Hours/Miles/Days
Hourly Billing Rate
Total Dollars

EXHIBIT “B” 
COST SUMMARY – MAN-HOUR – HOURLY RATES 
 
Page 6 of 6 
 
CODE CLASSIFICATION
RATE
CODE CLASSIFICATION
RATE
101
Engineer (E.I.T.) I
$123
per h our
051
Administrative I
$49
per hour
102
Engineer (E.I.T.) II
$133
052
Administrative II
$59
103
Engineer (E.I.T.) III
$143
053
Administrative III
$69
104
Engineer III
$173
105
Engineer IV
$193
921
Survey Tech I
$89
106
Engineer V
$213
922
Survey Tech II
$99
110
Principal Engineer
$233
930
Survey CAD Tech
$139
711
Project Manager I
$168
935
Survey Crew Chief
$165
712
Project Manager II
$188
940
Survey Manager
$175
301
Engineering Tech I
$99
945
Registered Surveyor
$189
302
Engineering Tech II
$119
950
Principal Surveyor
$209
303
Engineering Tech III
$132
351
Construction Observer I
$95
304
Engineering Tech IV
$142
352
Construction Observer II
$115
401
CAD Technician I
$94
353
Construction Observer III
$130
402
CAD Technician II
$104
354
Construction Observer IV
$145
403
CAD Technician III
$114
357
Construction Manager I
$135
404
CAD Technician IV
$124
358
Construction Manager II
$160
510
Civil Plan Reviewer
$155
MILE
Mileage
$0.670 per mile
SUNRISE ENGINEERING
Arizona Offices
2024- 1.1 Fee Schedule