Amendment No. 5

City of Chandler — Regular Meeting (2025-02-06)

View PDF Meeting page

Extracted text (via pymupdf) 10982 characters
Project Name: ARV Study and Rehabilitation – Amendment No. 5 
Page 1 
Project No.: WW2110.101
Rev. 5/13/2024 
AMENDMENT NO. 5 TO  
CONSULTANT SERVICES AGREEMENT 
ARV STUDY AND REHABILITATION 
Project No. WW2110.101 
Council Date: February 6, 2025 
THIS AMENDMENT NO. 5 (“Amendment No. 5”) to the professional services agreement dated 
March 2, 2023, (the “Agreement”) is made by and between the City of Chandler, an Arizona 
municipal corporation, (“City”) and Construction Product Marketing, LLC dba CPM Pipelines, 
a limited liability company, (“Consultant”), on this ______ day of ___________________, 2025,
(“Effective Date” by Clerk).  (City and Consultant may individually be referred to as “Party” and 
collectively referred to as “Parties”). 
RECITALS 
A.
The Parties entered into the Agreement for Consultant Services (“Services”) for the ARV
STUDY AND REHABILITATION project.
B.
The Parties have determined that it is necessary and desirable for the Consultant to
perform services for the City under the terms and conditions set forth in this Amendment No. 5
and the Agreement.
AGREEMENT 
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the 
Agreement and this Amendment No. 5, the Parties agree to amend and modify the Agreement 
as follows. 
SECTION I – CONSULTANT’S SERVICES 
The Consultant’s Services are modified as described in the Exhibit "A" attached to and made 
part of this amendment by reference.

Project Name: ARV Study and Rehabilitation – Amendment No. 5 
Page 2 
Project No.: WW2110.101 
Rev. 5/13/2024 
 
SECTION II – PERIOD OF SERVICE 
 
The Period of Service is increased by 180 calendar days for a revised total of 930 calendar days. 
 
SECTION III – PAYMENT OF COMPENSATION AND FEES 
 
The Fees are increased by $181,007.79 and will be payable in accordance with Exhibit "B" 
attached to and made part of this amendment by reference, for a revised total not to exceed 
$210,007.79. 
 
SECTION IV – CONFLICT AMONG DOCUMENTS 
 
The Agreement, this amendment, and any previous amendments constitute the complete 
agreement between the Parties concerning the subject matter of the Agreement and replace 
any prior oral or written communications between the Parties.  If a conflict or ambiguity arises 
between the Agreement and this amendment, the instrument in the following order prevails 
and controls: (1) this amendment; (2) any previous Amendments from most recent to oldest; 
and (3) the Agreement. 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: ARV Study and Rehabilitation – Amendment No. 5 
Page 3 
Project No.: WW2110.101
Rev. 5/13/2024 
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 5 to be duly 
executed.  Each Party warrants and represents that its respective signatories whose signatures 
appear below have been and are on the date of signature duly authorized to execute this 
Amendment No. 5. 
“CITY” CITY OF CHANDLER 
MAYOR 
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
 Seal 
“CONSULTANT” 
CONSTRUCTION PRODUCT MARKETING, LLC 
DBA CPM PIPELINES 
Signature  
Date 
Print Name 
Title 
Signer Email Address 
Bella Burks
Director of Business Operations
bella@cpmpipelines.com
1/14/2025

Project Name: ARV Study and Rehabilitation – Amendment No. 5 
Page 4 
Project No.: WW2110.101
Rev. 5/13/2024 
Amendment No. 5 (cont.) 
Project No. WW2110.101 
These changes result in the following adjustments of Agreement amount and/or time: 
Amendment authorized by Owner name: Jermaine Swinton 
Date: 1/7/2025 
Consultant email:  Steve Burks  -   steve@cpmpipelines.com 
Original Agreement amount: 
$29,000 
Previous Amendment(s) total: 
$0 
Last Agreement amount approved by Council: 
$N/A 
This Amendment: 
$181,007.79 
This Amendment + previous Amendment(s) not approved by 
Council total: 
$181,007.79 
Revised Agreement total: 
$210,007.79 
Council Approval Required (yes indicates approval required) 
Yes 
No 
Amendment(s) total over $100,000: 
☒ 
☐ 
Amendment(s) total causes Agreement to exceed $100,000: 
☒ 
☐ 
Agreement Time 
Agreement time prior to this Amendment (including previous 
amendments): 
750 
Calendar Days 
Net change resulting from this Amendment: 
180 
Calendar Days 
Revised Agreement time (including this Amendment): 
930 
Calendar Days 
Council Approval (if applicable) 
Council Approval Date: 
cc:  Project Manager, Consultant, Owner, File

Project Name: ARV Study and Rehabilitation - Amendment No. 5 
Page A-1 
Project No.: WW2110.101 
Rev 3/12/2024 
 
EXHIBIT A 
SCOPE OF WORK

Exhibit A
Ocotillo ARV Notes
Location 1
Remove existing ARV and 90. Install new 4-inch isolation valve, reinstall existing 90 and install 
new 4-inch 986 ARV. Use three BNG (Bolts, Nuts, and Gasket) Kits. Discharge will be connected 
using Fernco and Flexible Tube Hose.
Location 2
Remove existing ARV and 90. Install new 4-inch isolation valve, reinstall the 90 and the 986 ARV with 
new Internal function unit and discharge elbow. Use three BNG (Bolts, Nuts, and Gasket) Kits. 
Discharge will be connected using Fernco and Flexible Tube Hose.
Location 3
Remove existing ARV. Install one new 4-inch Isolation Valve and new 986 ARV. Use three BNG (Bolts, 
Nuts, and Gasket) Kits. Discharge will be connected using Fernco and Flexible Tube Hose.
Location 4
Remove two existing ARV's, 90's, and isolation valves. install two new 6-inch isolation valves, reinstall 90's 
and existing ARV's with new Internal Function Units. Use six BNG (Bolts, Nuts, and Gasket) Kits. 
Location 5
Remove two existing ARV’s and isolation valves. Install two new 6-inch isolation valves and new 986 
ARV’s. Use six BNG (Bolts, Nuts, and Gasket) Kits. Discharge will be connected using Fernco and 
Flexible Tube Hose.
Location 6
No Action Required.
Location 7
Remove existing ARV and 90. Install one new 4-inch isolation valve, reinstall the 90 and install 
new 4-inch 986 ARV. Use three BNG (Bolts, Nuts, and Gasket) Kits. Discharge will be connected 
using Fernco and Flexible Tube Hose.
Location 8
Remove two existing ARV’s and isolation valves. Install two new 6-inch isolation valves and 6-inch 986 
ARV’s. Use six BNG (Bolts, Nuts, and Gasket) Kits. Discharge will be connected using Fernco and 
Flexible Tube Hose.

Project Name: ARV Study and Rehabilitation - Amendment No. 5 
Page B-1 
Project No.: WW2110.101 
Rev. 3/12/2024 
EXHIBIT B 
FEE SCHEDULE

Estimate
Date
1/8/2025
Estimate #
5125-REV3
Name / Address
City of Chandler
3333 S. Old Price Road
Chandler, AZ 85248
ATTN: Lisa Corral
Rep
CPM
Project
Total
CPM Pipelines
3625 E Atlanta Ave, Suite #2
Phoenix, AZ 85040
Item
Description
Qty
U/M
Rate
Total
CONFINED SPACE (D...
CONFINED SPACE ENTRY SUPPORT PER
DAY
**Final total of days will appear on final
invoice
6 day
3,000.00
18,000.00
Field Service
Assessment Field Staff Per Day
6 LS
7,500.00
45,000.00
Mobilization (DY)
MOBILIZATION PER DAY
**Final total of days will appear on final
invoice
6 day
1,500.00
9,000.00
TRAFFIC CONTROL
Traffic Control 
**Final cost will appear on final invoice
**Cancellation will be charged if not
cancelled 2 hours before start time.**
6 LS
1,238.635
7,431.81
9864"FLGSS
HTEC 986 4" FLG SEWER AIR RELEASE
VALVE, STAINLESS STEEL
3 ea
5,055.15333
15,165.46
98845100
98845100 
M988 Internal Function Unit
2 ea
832.955
1,665.91
98645000
FUNCTION UNIT W.O.FLANGE FOR
MODEL 986
1 ea
705.27
705.27
HTEC
HTEC 6" Flanged 986 SS
4 ea
5,610.0725
22,440.29
9864000165
9864000165
HTEC 986 Outlet Elbow w/Strainer and
Camlock Coupling
1 ea
131.94
131.94
Page 1

Estimate
Date
1/8/2025
Estimate #
5125-REV3
Name / Address
City of Chandler
3333 S. Old Price Road
Chandler, AZ 85248
ATTN: Lisa Corral
Rep
CPM
Project
Total
CPM Pipelines
3625 E Atlanta Ave, Suite #2
Phoenix, AZ 85040
Item
Description
Qty
U/M
Rate
Total
PARTS (ea)
BZF1004A6F3RH                                            
4" ZF1, Class 150, Full Port Ball Valve           
Split Body, Floating Ball, Flanged, Raised
Face                                                                  
CF8M (ISO Tapped) Body, RTFE Seat,
316SS Ball and Stem                                        
Hand Lever, NACE, ISO Mounting Pad          
4 ea
1,458.2975
5,833.19
PARTS (ea)
BZF1006A6F3RH                                            
6" ZF1, Class 150, Full Port Ball Valve           
Split Body, Floating Ball, Flanged, Raised
Face                                                                  
CF8M (ISO Tapped) Body, RTFE Seat,
316SS Ball and Stem                                        
Hand Lever, NACE, ISO Mounting Pad          
6 ea
3,472.82
20,836.92
PARTS(FT)
PEX Hose
2" CLEAR BRAIDED VINYL TUBING
100 ft
8.7065
870.65
PARTS (ea)
3-1/2 - 4 FLANGE 304 BOLT/NUT SET
12 ea
24.55917
294.71
PARTS (ea)
4 NEO FF GASKET 150# 1/8"
12 ea
2.04583
24.55
PARTS (ea)
3-1/2 - 4 FLANGE 304 BOLT/NUT SET
18 ea
47.46556
854.38
PARTS (ea)
6" NEO FF GASKET 150# 1/8
18 ea
3.05333
54.96
PARTS (ea)
156-22 / 1056-22
2" PLASTIC TO PLASTIC COUPLER
Non Return / Non Cancellable
11 ea
7.65545
84.21
Page 2

Estimate
Date
1/8/2025
Estimate #
5125-REV3
Name / Address
City of Chandler
3333 S. Old Price Road
Chandler, AZ 85248
ATTN: Lisa Corral
Rep
CPM
Project
Total
CPM Pipelines
3625 E Atlanta Ave, Suite #2
Phoenix, AZ 85040
Item
Description
Qty
U/M
Rate
Total
PARTS (ea)
156-42ECC 1056-42ECC
4" X 2" PLASTIC X PLASTIC ECCENTRIC
COUPLER
Non Return / Non Cancellable
11 ea
37.49273
412.42
Subcontractor Services(...
Subcontractor Services - VAC Truck
Allowance
48 hr
466.69
22,401.12
Subcontractor Services
Subcontractor Services - Waste Disposal
Allowance
1
4,800.00
4,800.00
Subcontractor Services
Owners Allowance
1
5,000.00
5,000.00
TERMS&CONDITIONS
Please review our Terms & Conditions of Sale
on our website under Products & Services.
1 ea
0.00
0.00
**EXPECTATIONS**
Page 3

Estimate
Date
1/8/2025
Estimate #
5125-REV3
Name / Address
City of Chandler
3333 S. Old Price Road
Chandler, AZ 85248
ATTN: Lisa Corral
Rep
CPM
Project
Total
CPM Pipelines
3625 E Atlanta Ave, Suite #2
Phoenix, AZ 85040
Item
Description
Qty
U/M
Rate
Total
The city will shut down and depressurize the
line before CPM Staff opens or removes any
air valves without isolation valves or isolation
valves for replacement.
Bolts and nuts will be cut off and removed and
new hardware and gaskets used to replace or
install any isolation valves (will be either
horizontal to the 90 or vertical depending on
space constraints)
Discharge pipes where possible will be
reconnected to the existing HDPE discharge
pipes using flexible reinforced hose and
rubber fernco couplings for ease of installation
and disassembly in the future. 
Page 4
Quotes are vaild for 30 days.
Check our valve inventory at http://www.cpmpipelines.com
PLEASE NOTE: Due to new tax laws, tax will be charged if a tax-exempt certificate cannot
be provided prior to any sale.  Please email(bella@cpmpipelines.com) with any questions.
If Paying with Credit Card there will be a 5% fee added to invoice
$181,007.79