Chandler Water Resources and Policy Update Presentation

City of Chandler — Work Session (2025-02-03)

View PDF Meeting page

Extracted text (via pymupdf) 8220 characters
Chandler Water Resources 
& Policy Update:
Protecting our Water Future
City Council Work Session – Feb. 3, 2025

Agenda
•
Chandler’s Diverse Water Supplies
•
Salt & Verde System Update
•
Colorado River System Update
•
Phoenix AMA Groundwater Management
•
Water Policy Update
•
Sustainable Water Allocation Policy
•
Drought Management Plan
•
Next Steps

Surface Water 
Snow and rain runs off 
into rivers, lakes and 
streams. The water is 
stored in reservoirs 
behind dams.
Groundwater
Water stored 
underground in 
the space 
between sand 
and gravel.
Where does our water come from?

Diverse Water Supplies
Drinking Water
•
Colorado River
•
Salt & Verde Rivers
•
New Conservation – Raised Roosevelt Dam
•
Roosevelt Flood Control Space
•
Roosevelt Water Conservation District
•
Groundwater
Reclaimed Water
•
Gila River Indian Community Exchange
•
Direct use – over 400 customers
•
Aquifer recharge

Salt & Verde Rivers
2025
Reservoirs ~ 70% full
Delivered via Salt River Project (SRP) canals
Chandler’s SRP water
57% of annual supplies

Colorado River
2024 - 2026
Tier 1 Shortage
Delivered via Central Arizona Project (CAP) canal
Chandler’s CAP water
37% of annual supplies

Groundwater
33 Active Wells
72 MGD capacity
Groundwater
6-10% of total annual use

Water Demand Trends

1980 Groundwater Management Act (GMA)
Created groundwater regulation for      
“Active Management Areas” or AMAs. 
Goal is a balance between well pumping         
and aquifer recharge
Recharge & Replenishment
The GMA requires water providers (in AMAs) to 
replenish the water they pump 
or
recharge CAP water (or effluent) prior to pumping 
and accrue underground storage credits.
Sustainable 
Water 
Management
100-Year 
Assured 
Water Supply 
Annual 
Reporting
Limits on well 
pumping
Conservation 
Programs

Colorado River Post-2026

Colorado River Post-2026
Hope for the best and plan for the worst…

Colorado River Post-2026
Planning for the best (and the worst)…

Regional projects provide additional operational flexibility
Regional Partnerships and Infrastructure
Roosevelt Dam Flood Control Space
Five-year pilot program to optimize 
the use of Roosevelt flood control 
space. Opportunities for planned 
deviations from normal operations, 
extending from 20 days to 120 days.

Restore lost capacity due to sedimentation and add height to 
increase available storage space
Bartlett Dam Modification
Proposed Dam Alignment

Provides operational flexibility to deliver supplies to stored in the Salt River 
Project system into the Central Arizona Project Canal system
SRP/CAP Interconnect Facility

Temporary Deviation from the Flood Control Manual extends to 120 Days
Roosevelt Dam Flood Control Space
Chandler will benefit from this project by 
gaining access to a new water supply that 
can be stored in the SRP system and used to 
meet customer demand in portions of our 
service area that currently receive Colorado 
River water.

Water Conservation Successes
Since increasing our grass removal incentives in October 2023, all 
programs have seen a significant increase in participation.
Water Efficient Technology Rebate– Actively working with 
roughly a dozen customers on projects not yet complete. Four rebates 
complete since Oct. 2023, totaling $13,500.

Upgrades to Chandler’s water treatment capabilities and replacement of 
wastewater and reclaimed metering infrastructure
2024 Water Infrastructure Investments

Reclaimed Water Interconnect Facility (RWIF) –
First deliveries, in Oct. 2024, to a new membrane 
treatment facility constructed to increase Chandler’s 
aquifer recharge deliveries, as well as provide additional 
water for industrial cooling at Intel’s expanded facilities.

Two new aquifer injection wells at Tumbleweed Park for 
Aquifer Storage & Recovery (ASR) and improvements to 
the reclaimed water conveyance infrastructure between 
the RWIF and Tumbleweed.

Pecos Water Treatment Plant upgrades to improve water 
quality – new Granular Activated Carbon (GAC) filters

Wastewater and reclaimed water metering infrastructure 
upgrades
Chandler Reclaimed Water Interconnect Facility – Opened October 2024

Focus on Assured Water Supply Program and solutions to address 
unmet demand for groundwater in the Phoenix AMA
2024 Legislative Session

Work with lawmakers, stakeholders and other leaders to support policies that:
Water Policy

Water Policy

Preparing for Shortages
With increasing pressure on our local aquifer and uncertainty of future Colorado 
River availability, it is a good time to review the steps we are taking to prepare: 
Drought Management Plan– Update drought plan 
triggers to match more current water supply expectations and 
further evaluate demand management strategies

2015 Water Allocation Policy
Additional 
water 
needed?

Allocation Policy - Proposed Amendments
As Chandler approaches build-out, changes in water availability and land 
use may require amendments to the sustainable water allocation policy:
Reclaimed/Landscape Water– Add applicability for *all* types 
of water use, including reclaimed and landscape meters.

Planning
Design
Construction
Warranty
ACTIVE
CLOSED
PENDING
Conceptual
Completed
Allocation Policy Procedures
DEVELOPMENT PROJECT LIFECYCLE
Implementation of Chandler’s Sustainable Water Allocation Policy requires early 
coordination between multiple city departments - Public Works & Utilities, 
Economic Development, and Development Services (Planning, Civil Engineering, 
and Building Safety). 
Policy amendments will involve updates to the timing of when a proposed project 
is asked to submit a sustainable water use application.
Pre-Tech Site 
Application,
Pre-Tech Meeting, 
Zoning Application
Development Plan 
Review, P&Z 
Commission Approval, 
City Council Approval
Civil Plan Review, 
Building Plan 
Review, Plan 
Approval, Permitting
Construction Inspection, 
Final Inspection, C of O, 
As-Built Plans
Letter of 
Acceptance
End of One-Year 
Warranty Period

Allocation Policy Amendment Goals
The 2015 policy was designed to address non-residential development of 
vacant land. As redevelopment becomes more prevalent, amendments are 
needed to ensure Chandler’s finite water resources are allocated as planned.
Reclaimed/Landscape Water– The current policy excludes 
reclaimed water and water served through landscape meters. These are 
valuable and limited water supplies which require careful management.

Drought Management Plan –
Proposed Updates
Update drought plan triggers to match current water supply expectations, 
remove reclaimed exemption and update outdated language 
Expiration of Drought Stage– One year after issuance or January 
1st of a normal water supply year. Current plan does not address 
procedures to determine when a drought stage expires.

Current triggers for Stage 2 and Stage 3 are no longer appropriate
Drought Plan Triggers –
Proposed Updates
Declaration
Current Triggers
New Triggers
Responses
Stage 1
Water Resource 
Manager
A surface water 
shortage is predicted.
A surface water shortage is likely.
Increased public information and 
education 
Stage 2
Municipal 
Utilities Director
SRP reduced to less than 
1.8 AF/acre (about 40%) 
and/or CAP supplies 
reduced 10%   
A surface water shortage occurs
Mandatory water restrictions for 
municipal operations.
Stage 3
City Manager
SRP reduced to less than 
1.5 AF/acre (about 50%) 
and/or CAP supplies 
reduced 15%   
A surface water shortage occurs, 
reducing surface water supplies by 
more than 50% 
Mandatory water restrictions for 
municipal operations.  
Voluntary water reductions for 
businesses and residents.
Stage 4
City Council
Conditions where it is  
unlikely that the City will 
be able to deliver 
sufficient water to meet 
all demands.
A surface water shortage occurs, 
reducing surface water supplies by 
more than 60% and/or supplies 
are insufficient to meet customer 
demands
Mandatory water restrictions for 
municipal operations, businesses 
and residents.

Next Steps
Regional Infrastructure– Participate in feasibility of 
Bartlett Dam Modification, construction of the SRP/CAP 
Interconnect Facility, and maximize investments in the 
temporary deviation for Roosevelt Dam Flood Control Space

Questions?
Thank you!