Agreement

City of Chandler — Regular Meeting (2025-03-27)

View PDF Meeting page

Extracted text (via pymupdf) 180525 characters
Project Name: Mesquite Groves Park 
Page 1 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
 
 
 
PROFESSIONAL SERVICES AGREEMENT 
 Design Services  
MESQUITE GROVES PARK 
Project No. PR2401.202 
Council Date: March 27, 2025 
 
 
This Agreement (“Agreement”) is made and entered into on the ______ day of_________________, 2025 
(“Effective Date”), by and between City of Chandler, an Arizona municipal corporation, ("City''), 
and J2 Engineering & Environmental Design, LLC, an Arizona corporation, ("Consultant") 
(City and Consultant may individually be referred to as “Party” and collectively referred to as 
“Parties”). 
 
RECITALS 
 
A. City proposes to engage Consultant to provide Design Services for Mesquite Groves Park 
project as more fully described in Exhibit "A", which is attached to and made a part of this 
Agreement by this reference. 
 
B. Consultant is ready, willing, and able to provide the services described in Exhibit “A” for 
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to 
and made a part of this Agreement by this reference. 
 
C. City desires to enter into an Agreement with Consultant to provide these services under 
the terms and conditions set forth in this Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and the mutual promises contained in this 
Agreement, City and Consultant agree as follows: 
 
SECTION I--CONSULTANT’S SERVICES 
 
Consultant must perform the services described in Exhibit “A” to City’s satisfaction within the 
terms and conditions of this Agreement and within the care and skill that a person who 
provides similar services in Chandler, Arizona exercises under similar conditions. All work or 
services furnished by Consultant under this Agreement must be performed in a skilled and 
workmanlike manner.  All fixtures, furnishings, and equipment furnished by Consultant as 
part of the work or services under this Agreement must be new, or the latest model, and of 
the most suitable grade and quality for the intended purpose of the work or service.

Project Name: Mesquite Groves Park 
Page 2 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
 
SECTION II--PERIOD OF SERVICE 
 
Consultant must perform the services described in Exhibit “A” for the term of this 
Agreement.  Unless amended in writing by the Parties, the Agreement term expires 800  
calendar days after the Notice to Proceed (NTP) Date. 
 
SECTION III--PAYMENT OF COMPENSATION AND FEES 
 
Unless amended in writing by the Parties, Consultant’s compensation and fees as more fully 
described in Exhibit “B” for performance of the services approved and accepted by City 
under this Agreement must not exceed $4,731,605 for the full term of the Agreement. 
Consultant may not increase any compensation or fees under this Agreement without the 
City’s prior written consent. Consultant must submit monthly requests for payment of 
services approved and accepted during the previous billing period and must include, as 
applicable, detailed invoices and receipts, a narrative description of the tasks accomplished 
during the billing period, a list of any deliverables submitted, and any subconsultant’s or 
supplier’s actual requests for payment plus similar narrative and listing of their work. 
Consultant must submit an Application and Certification for Payment Sheet with the monthly 
request for payment to: CapitalProjects.Payables@chandleraz.gov. Payment for those 
services negotiated as a lump sum will be made in accordance with the percentage of the 
work completed during the preceding billing period. Services negotiated as a not-to-exceed 
fee will be paid in accordance with the work effort expended on the service during the 
preceding month. All requests for payment must be submitted to City for review and 
approval. City will make payment for approved and accepted services within 30 calendar days 
of City’s receipt of the request for payment. Consultant bears all responsibility and liability for 
any and all tax obligations that result from Consultant’s performance under this Agreement.  
 
SECTION IV--CITY'S OBLIGATIONS 
 
As part of Consultant’s services under this Agreement, City will provide furnished items, 
services, or obligations as detailed in Exhibit “D”. 
 
SECTION V--GENERAL CONDITIONS 
 
5.1 Notices. Unless otherwise provided herein, demands under this Agreement must be in 
writing and will be deemed to have been duly given and received either (a) on the date of 
service if personally served on the party to whom notice is to be given, or (b) on the third day 
after the date of the postmark of deposit by first class United States mail, registered or 
certified, postage prepaid and properly addressed as follows:

Project Name: Mesquite Groves Park 
Page 3 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
 
 
To City: 
City of Chandler - Public Works & Utilities Department 
Attn:  CIP City Engineer: Daniel Haskins, P.E. 
P.O. Box 4008, Mail Stop 407 
Chandler, AZ 85244-4008 
Phone:  480-782-3335         Email:  Daniel.Haskins@chandleraz.gov 
With a copy to: 
City of Chandler - Public Works & Utilities Department 
Attn: Alyssa Siqueiros, Project Manager 
P.O. Box 4008, Mail Stop 407, Chandler, AZ 85244-4008 
Phone: 480-782-3343               Email: Alyssa.Siqueiros@chandleraz.gov 
To Consultant: 
LEGAL COMPANY NAME: J2 Engineering & Environmental Design, LLC 
Mailing Address:  4649 East Cotton Gin Loop, Suite B2, Phoenix AZ 85040 
Physical Address:   4649 East Cotton Gin Loop, Suite B2, Phoenix AZ 85040 
Statutory Agent Name: James P. O’Sullivan 
Statutory Agent Mailing Address: 
2525 East Camelback Road, 7th Floor,
Phoenix AZ 85016 
Statutory Agent Physical Address: 
2525 East Camelback Road, 7th Floor,
Phoenix AZ 85016 
CONSULTANT’S AUTHORIZED PROJECT REPRESENTATIVE  
Name: 
Jeffrey Velasquez 
Title: 
Vice President 
Phone:  602-438-2221 
Email: 
jvelasquez@j2design.us 
 
5.2 Records/Audit. Records of Consultant’s direct personnel payroll, reimbursable expenses 
pertaining to this Agreement and records of accounts between City and Consultant must be 
kept on the basis of generally accepted accounting principles and must be made available to 
City and its auditors for up to three years following City’s final acceptance of the services 
under this Agreement (this requirement is increased to five years if construction of this 
project is federally funded). City, its authorized representative, or any federal agency, 
reserves the right to audit Consultant’s records to verify the accuracy and appropriateness of 
all cost and pricing data, including data used to negotiate this Agreement and any 
amendments. City reserves the right to decrease the total amount of Agreement price or 
payments made under this Agreement or request reimbursement from Consultant following 
final Agreement payment on this Agreement if, upon audit of Consultant’s records, the audit 
discloses Consultant has provided false, misleading, or inaccurate cost and pricing data. 
Consultant will include a similar provision in all of its Agreements with subconsultants who 
provide services under the Agreement to ensure that City, its authorized representative, or 
the appropriate federal agency, has access to the subconsultants’ records to verify the

Project Name: Mesquite Groves Park 
Page 4 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
accuracy of all cost and pricing data. City reserves the right to decrease Agreement price or 
payments made on this Agreement or request reimbursement from Consultant following 
final payment on this Agreement if the above provision is not included in subconsultant 
agreements, and one or more subconsultants refuse to allow City to audit their records to 
verify the accuracy and appropriateness of all cost and pricing data. If, following an audit of 
this Agreement, the audit discloses Consultant has provided false, misleading, or inaccurate 
cost and pricing data, and the cost discrepancies exceed 1% of the total Agreement billings, 
Consultant will be liable for reimbursement of the reasonable, actual cost of the audit. 
 
5.3 Alteration in Character of Work. Whenever an alteration in the character of work results 
in a substantial change in this Agreement, thereby materially increasing or decreasing the 
scope of services, cost of performance, or Project schedule, the work will be performed as 
directed by City. However, before any modified work is started, a written amendment must 
be approved and executed by City and Consultant. Such amendment must not be effective 
until approved by City. Additions to, modifications, or deletions from this Agreement as 
provided herein may be made, and the compensation to be paid to Consultant may 
accordingly be adjusted by mutual agreement of the Parties. It is distinctly understood and 
agreed that no claim for extra services or materials furnished by Consultant will be allowed 
by City except as provided herein, nor must Consultant do any work or furnish any materials 
not covered by this Agreement unless such work is first authorized in writing. Any such work 
or materials furnished by Consultant without prior written authorization will be at 
Consultant’s own risk, cost, and expense, and Consultant hereby agrees that without written 
authorization Consultant will make no claim for compensation for such work or materials 
furnished. 
 
5.4 Termination. City and Consultant hereby agree to the full performance of the covenants 
contained herein, except that City reserves the right, at its discretion and without cause, to 
terminate or abandon any service provided for in this Agreement, or abandon any portion of 
the Project for which services have been performed by Consultant. In the event City abandons 
or suspends the services, or any part of the services as provided in this Agreement, City will 
notify Consultant in writing and immediately after receiving such notice, Consultant must 
discontinue advancing the work specified under this Agreement. Upon such termination, 
abandonment, or suspension, Consultant must deliver to City all drawings, plans, 
specifications, special provisions, estimates and other work entirely or partially completed, 
together with all unused materials supplied by City. Consultant must appraise the work 
Consultant has completed and submit Consultant’s appraisal to City for evaluation. City may 
inspect Consultant’s work to appraise the work completed. Consultant will receive 
compensation in full for services performed to the date of such termination. The fee will be 
paid in accordance with Section Ill of this Agreement, and as mutually agreed upon by 
Consultant and City. If there is no mutual agreement on payment, the final determination will 
be made in accordance with the "Disputes" provision in this Agreement. However, in no event 
may the fee exceed the fee set forth in Section Ill of this Agreement nor as amended in 
accordance with Section "Alteration in Character of Work." City will make the final payment 
within 60 days after Consultant has delivered the last of the partially completed items and 
the Parties agree on the final fee. If City is found to have improperly terminated the 
Agreement for cause or default, the termination will be converted to a termination for 
convenience in accordance with the provisions of this Agreement.

Project Name: Mesquite Groves Park 
Page 5 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
5.5 Indemnification. To the extent permitted by law, the Consultant ("lndemnitor") must 
indemnify, save and hold harmless City and its officers, officials, agents and employees 
("lndemnitee") from any and all claims, actions, liabilities, damages, losses or expenses 
(including court costs, attorneys' fees and costs of claim processing, investigation and 
litigation) ("Claims") caused or alleged to be caused, in whole or in part, by the wrongful, 
negligent or willful acts, or errors or omissions of Consultant or any of its owners, officers, 
directors, agents, employees, or subconsultants in connection with this Agreement. This 
indemnity includes any claim or amount arising out of or recovered under workers' 
compensation law or on account of the failure of Consultant to conform to any federal, state 
or local law, statute, ordinance, rule, regulation or court decree. Consultant must indemnify 
lndemnitee from and against any and all Claims, except those arising solely from 
lndemnitee's own negligent or willful acts or omissions. Consultant is responsible for primary 
loss investigation, defense and judgment costs where this indemnification applies. In 
consideration of the award of this Agreement, Consultant agrees to waive all rights of 
subrogation against lndemnitee for losses arising from or related to this Agreement. The 
obligations of Consultant under this provision survive the termination or expiration of this 
Agreement. 
 
5.6 Insurance Requirements. Consultant must procure insurance under the terms and 
conditions and for the amounts of coverage set forth in Exhibit “C” against claims that may 
arise from or relate to performance of the work under this Agreement by Consultant and its 
agents, representatives, employees, and subconsultants. Consultant and any subconsultant 
must maintain this insurance until all of their obligations have been discharged, including any 
warranty periods under this Agreement. These insurance requirements are minimum 
requirements for this Agreement and in no way limit the indemnity covenants contained in 
this Agreement. City in no way warrants that the minimum limits stated in Exhibit “C” are 
sufficient to protect Consultant from liabilities that might arise out of the performance of the 
work under this Agreement by Consultant, Consultant’s agents, representatives, employees, 
or subconsultants. Consultant is free to purchase such additional insurance as may be 
determined necessary. 
 
5.7 Cooperation and Further Documentation. Consultant agrees to provide City such other 
duly executed documents as may be reasonably requested by City to implement the intent 
of this Agreement. 
 
5.8 Successors and Assigns. City and Consultant each bind itself, its partners, successors, 
assigns, and legal representatives to the other party to this Agreement and to the partners, 
successors, assigns, and legal representatives of such other party in respect to all covenants 
of this Agreement. Neither City nor Consultant may assign, sublet, or transfer its interest in 
this Agreement without the written consent of the other party. In no event may any 
contractual relation be created between any third party and City. 
 
5.9 Disputes. In any dispute arising out of an interpretation of this Agreement or the duties 
required not disposed of by agreement between Consultant and City, the final determination 
at the administrative level will be made by City Engineer. 
 
5.10 Completeness and Accuracy of Consultant’s Work. Consultant must be responsible for 
the completeness and accuracy of Consultant’s services, data, and other work prepared or

Project Name: Mesquite Groves Park 
Page 6 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
compiled under Consultant’s obligation under this Agreement and must correct, at 
Consultant’s expense, all willful or negligent errors, omissions, or acts that may be discovered.  
Correction of errors disclosed and determined to exist during any construction of the project on 
architectural or engineering drawings and specifications must be accomplished by Consultant.  
The cost of the design necessary to correct those errors attributable to Consultant and any 
damage incurred by City as a result of additional construction costs caused by such engineering 
or architectural errors will be chargeable to Consultant and will not be considered a cost of the 
Work.  The fact that City has accepted or approved Consultant’s work will in no way relieve 
Consultant of any of Consultant’s responsibilities. 
 
5.11 Reporting. Written monthly reports, along with updated work schedules, will be made by 
Consultant in the format prescribed by City.  These reports will be delivered to City per schedule.  
When requested by City, Consultant will attend Council meetings and provide finished documents 
including correspondence for Council action, supporting charts, graphs, drawings and colored 
slides of same. 
 
5.12 Withholding Payment. City reserves the right to withhold funds from Consultant’s 
payments up to the amount equal to the claims City may have against Consultant until such 
time that a settlement on those claims has been reached. 
 
5.13 City's Right of Cancellation. The Parties acknowledge that this Agreement is subject to 
cancellation by City under the provisions of Section 38-511, Arizona Revised Statutes (A.R.S.). 
 
5.14 Independent Consultant. For this Agreement Consultant constitutes an independent 
contractor. Any provisions in this Agreement that may appear to give City the right to direct 
Consultant as to the details of accomplishing the work or to exercise a measure of control 
over the work means that Consultant must follow the wishes of City as to the results of the 
work only. These results must comply with all applicable laws and ordinances. 
 
5.15 Project Staffing. Prior to the start of any work under this Agreement, Consultant must 
submit to City detailed resumes of key personnel that will be involved in performing services 
prescribed in the Agreement. City hereby acknowledges its acceptance of such personnel to 
perform services under this Agreement. At any time hereafter that Consultant desires to 
change key personnel while performing under the Agreement, Consultant must submit the 
qualifications of the new personnel to City for prior approval. Key personnel include, but are 
not limited to, principals-in-charge, project manager, and project Consultant. Consultant will 
maintain an adequate and competent staff of qualified persons, as may be determined by 
City, throughout the performance of this Agreement to ensure acceptable and timely 
completion of the Scope of Services. If City objects, with reasonable cause, to any of 
Consultant’s staff, Consultant must take prompt corrective action acceptable to City and, if 
required, remove such personnel from the Project and replace with new personnel agreed to 
by City. 
 
5.16 Consultants or Subconsultants. Prior to beginning the work, Consultant must furnish City 
for approval the names of consultants or subconsultants to be used under this Agreement. 
Any subsequent changes are subject to City’s written prior approval.

Project Name: Mesquite Groves Park 
Page 7 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
5.17 Force Majeure. If either party is delayed or prevented from the performance of any act 
required under this Agreement by reason of acts of God or other cause beyond the control 
and without fault of the Party (financial inability excepted), performance of that act may be 
excused, but only for the period of the delay, if the Party provides written notice to the other 
Party within ten days of such act. The time for performance of the act may be extended for a 
period equivalent to the period of delay from the date written notice is received by the other 
Party. 
 
5.18 Compliance with Federal Laws. Consultant understands and acknowledges the 
applicability of the Americans with Disabilities Act, the Immigration Reform and Control Act 
of 1986 and the Drug Free Workplace Act of 1989 to it. Consultant agrees to comply with these 
laws in performing this Agreement and to permit City to verify such compliance. 
 
5.19 No Israel Boycott. By entering into this Agreement, Consultant certifies that Consultant 
is not currently engaged in, and agrees for the duration of the Agreement, not to engage in a 
boycott of Israel as defined by state statute. 
 
5.20 Legal Worker Requirements. A.R.S. § 41-4401 prohibits City from awarding an Agreement 
to any consultant who fails, or whose subconsultants fail, to comply with A.R.S. § 23-214(A). 
Therefore, Consultant agrees Consultant and each subconsultant it uses warrants their 
compliance with all federal immigration laws and regulations that relate to their employees 
and their compliance with § 23-214, subsection A. A breach of this warranty will be deemed a 
material breach of the Agreement and may be subject to penalties up to and including 
termination of the Agreement. City retains the legal right to inspect the papers of any 
Consultant’s or subconsultant’s employee who provides services under this Agreement to 
ensure that Consultant and subconsultants comply with the warranty under this provision. 
 
5.21 Lawful Presence Requirement. A.R.S. §§ 1-501 and 1-502 prohibit City from awarding an 
Agreement to any natural person who cannot establish that such person is lawfully present 
in the United States. To establish lawful presence, a person must produce qualifying 
identification and sign a City-provided affidavit affirming that the identification provided is 
genuine. This requirement will be imposed at the time of Agreement award. This requirement 
does not apply to business organizations such as corporations, partnerships, or limited 
liability companies. 
 
5.22 Covenant Against Contingent Fees. Consultant warrants that no person has been 
employed or retained to solicit or secure this Agreement upon an agreement or 
understanding for a commission, percentage, brokerage, or contingent fee, and that no 
member of the Chandler City Council, or any City employee has any interest, financially, or 
otherwise, in Consultant’s firm. For breach or violation of this warrant, City may annul this 
Agreement without liability or, at its discretion, to deduct from the Agreement price or 
consideration, the full amount of such commission, percentage, brokerage, or contingent fee. 
 
5.23 Non-Waiver Provision. The failure of either Party to enforce any of the provisions of this 
Agreement or to require performance of the other Party of any of the provisions hereof must 
not be construed to be a waiver of such provisions, nor must it affect the validity of this 
Agreement or any part thereof, or the right of either Party to thereafter enforce each and 
every provision.

Project Name: Mesquite Groves Park 
Page 8 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
 
5.24 Disclosure of Information Adverse to City’s Interests. To evaluate and avoid potential 
conflicts of interest, Consultant must provide written notice to City, as set forth in this Section, 
of any work or services performed by Consultant for third parties that may involve or be 
associated with any real property or personal property owned or leased by City. Such notice 
must be given 7 business days prior to commencement of the services by Consultant for a 
third party, or 7 business days prior to an adverse action as defined below. Written notice 
and disclosure must be sent in accordance with Section 6.7 above.  An adverse action under 
this Agreement includes, but is not limited to: (a) using data as defined in the Agreement 
acquired in connection with this Agreement to assist a third party in pursuing administrative 
or judicial action against City; or (b) testifying or providing evidence on behalf of any person 
in connection with an administrative or judicial action against City; or (c) using data to produce 
income for Consultant or its employees independently of performing the services under this 
Agreement, without the prior written consent of City. Consultant represents that except for 
those persons, entities, and projects identified to City, the services performed by Consultant 
under this Agreement are not expected to create an interest with any person, entity, or third 
party project that is or may be adverse to City’s interests. Consultant’s failure to provide a 
written notice and disclosure of the information as set forth in this Section constitute a 
material breach of this Agreement. 
 
5.25 Data Confidentiality and Data Security. As used in the Agreement, "data" means all 
information, whether written or verbal, including plans, photographs, studies, investigations, 
audits, analyses, samples, reports, calculations, internal memos, meeting minutes, data field 
notes, work product, proposals, correspondence and any other similar documents or 
information prepared by, obtained by, or transmitted to Consultant or its subconsultants in 
the performance of this Agreement. The Parties agree that all data, regardless of form, 
including originals, images, and reproductions, prepared by, obtained by, or transmitted to 
Consultant or its subconsultants in connection with Consultant’s or its subconsultant’s 
performance of this Agreement is confidential and proprietary information belonging to City. 
Except as specifically provided in this Agreement, Consultant or its subconsultants must not 
divulge data to any third party without City’s prior written consent. Consultant or its 
subconsultants must not use the data for any purposes except to perform the services 
required under this Agreement. These prohibitions do not apply to the following data 
provided to Consultant or its subconsultants have first given the required notice to City: (a) 
data which was known to Consultant or its subconsultants prior to its performance under this 
Consultant or its subconsultants by a third party, who to the best of Consultant’s or its 
subconsultants’ knowledge and belief, had the legal right to make such disclosure and 
Consultant or its subconsultants are not otherwise required to hold such data in confidence; 
or (c) data which is required to be disclosed by virtue of law, regulation, or court order, to 
which Consultant or its subconsultants are subject. In the event Consultant or its 
subconsultants are required or requested to disclose data to a third party, or any other 
information to which Consultant or its subconsultants became privy as a result of any other 
Agreement with City, Consultant must first notify City as set forth in this Section of the request 
or demand for the data. Consultant or its subconsultants must give City sufficient facts so 
that City can be given an opportunity to first give its consent or take such action that City may 
deem appropriate to protect such data or other information from disclosure. All data must 
continue to be subject to the confidentiality agreements of this Agreement. Consultant or its 
subconsultants assume all liability to maintain the confidentiality of the data in its possession

Project Name: Mesquite Groves Park 
Page 9 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
and agrees to compensate City if any of the provisions of this Section are violated by 
Consultant, its employees, agents or subconsultants. Solely for the purposes of seeking 
injunctive relief, it is agreed that a breach of this Section must be deemed to cause irreparable 
harm that justifies injunctive relief in court. Consultant agrees that the requirements of this 
Section must be incorporated into all subagreements entered into by Consultant. A violation 
of this Section may result in immediate termination of this Agreement without notice. 
 
5.26 Personal Identifying Information-Data Security. Personal identifying information, 
financial account information, or restricted City information, whether electronic format or 
hard copy, must be secured and protected at all times by Consultant or its subconsultants. At 
a minimum, Consultant or its subconsultants must encrypt or password-protect electronic 
files. This includes data saved to laptop computers, computerized devices, or removable 
storage devices. When personal identifying information, financial account information, or 
restricted City information, regardless of its format, is no longer necessary, the information 
must be redacted or destroyed through appropriate and secure methods that ensure the 
information cannot be viewed, accessed, or reconstructed. In the event that data collected or 
obtained by Consultant or its subconsultants in connection with this Agreement is believed 
to have been compromised, Consultant or its subconsultants must immediately notify City 
contact. Consultant agrees to reimburse City for any costs incurred by City to investigate 
potential breaches of this data and, where applicable, the cost of notifying individuals who 
may be impacted by the breach. Consultant agrees that the requirements of this Section must 
be incorporated into all subcontracts entered into by Consultant. It is further agreed that a 
violation of this Section must be deemed to cause irreparable harm that justifies injunctive 
relief in court. A violation of this Section may result in immediate termination of this 
Agreement without notice. The obligations of Consultant or its subconsultants under this 
Section must survive the termination of this Agreement. 
 
5.27 Jurisdiction and Venue. This Agreement is made under and must be construed in 
accordance with and governed by the laws of the State of Arizona without regard to the 
conflicts or choice of law provisions thereof. Any action to enforce any provision of this 
Agreement or to obtain any remedy with respect hereto must be brought in the courts 
located in Maricopa County, Arizona, and for this purpose, each Party hereby expressly and 
irrevocably consents to the jurisdiction and venue of such court. 
 
5.28 Survival. All warranties, representations, and indemnifications by Consultant must 
survive the completion or termination of this Agreement. 
 
5.29 Modification. Except as expressly provided herein to the contrary, no supplement, 
modification, or amendment of any term of this Agreement will be deemed binding or 
effective unless in writing and signed by the Parties.  
 
5.30 Severability. If any provision of this Agreement or the application to any person or 
circumstance may be invalid, illegal or unenforceable to any extent, the remainder of this 
Agreement and the application will not be affected and will be enforceable to the fullest 
extent permitted by law. 
 
5.31 Integration. This Agreement contains the full agreement of the Parties. Any prior or 
contemporaneous written or oral agreement between the Parties regarding the subject

Project Name: Mesquite Groves Park 
Page 10 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
matter is merged and superseded. 
 
5.32 Time is of the Essence. Time of each of the terms, covenants, and conditions of this 
Agreement is hereby expressly made of the essence. 
 
5.33 Date of Performance. If the date of performance of any obligation or the last day of any 
time period provided for should fall on a Saturday, Sunday, or holiday for City, the obligation 
will be due and owing, and the time period will expire, on the first day after which is not a 
Saturday, Sunday or legal City holiday. Except as may otherwise be set forth in this 
Agreement, any performance provided for herein will be timely made if completed no later 
than 5:00 p.m. (Chandler time) on the day of performance. 
 
5.34 Third Party Beneficiary. Nothing under this Agreement will be construed to give any 
rights or benefits in the Agreement to anyone other than City and Consultant, and all duties 
and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive 
benefit of City and Consultant and not for the benefit of any other party. 
 
5.35 Conflict in Language. All work performed must conform to all applicable City of Chandler 
codes, ordinances, and requirements as outlined in this Agreement. If there is a conflict in 
interpretation between provisions in this Agreement and those in Exhibit "A", the provisions 
in this Agreement prevail. 
 
5.36 Document/Information Release. Documents and materials released to Consultant, 
which are identified by City as sensitive and confidential, are City’s property. The 
document/material must be issued by and returned to City upon completion of the services 
under this Agreement. Consultant secondary distribution, disclosure, copying, or duplication 
in any manner is prohibited without City’s prior written approval. The document/material 
must be kept secure at all times. This directive applies to all City documents, whether in 
photographic, printed, or electronic data format.  
 
5.37 Exhibits. The following exhibits are made a part of this Agreement and are incorporated 
by reference: 
 
  
 
 
Exhibit A - Scope of Services / Schedule 
Exhibit B - Compensation and Fees 
Exhibit C - Insurance Requirements 
Exhibit D - Special Conditions 
Exhibit E – Subconsultant Documents with Consultant (if applicable) 
Exhibit F - Federal Requirements (if applicable)  
 
5.38 Special Conditions. As part of the services Consultant provides under this Agreement, 
Consultant agrees to comply with and fully perform the special terms and conditions set forth 
in Exhibit “D”, which is attached to and made a part of this Agreement. 
 
5.39 Non-Discrimination and Anti-Harassment Laws. Consultant must comply with all 
applicable City, state, and federal non-discrimination and anti-harassment laws, rules, and 
regulations.

Project Name: Mesquite Groves Park 
Page 11 
Project No.: PR2401.202 
 Rev. 1/12/2024 
 
 
 
5.40 Licenses and Permits. Beginning with the Effective Date and for the full term of this 
Agreement, Consultant must maintain all applicable City, state, and federal licenses and 
permits required to fully perform Consultant’s services under this Agreement. 
 
5.41 Warranties. Consultant must furnish a one-year warranty on all work and services 
performed under this Agreement. Consultant must furnish, or cause to be furnished, a two-
year warranty on all fixtures, furnishings, and equipment furnished by Consultant, 
subconsultants or suppliers under this Agreement. Any defects in design, workmanship, or 
materials that do not comply with this Agreement must be corrected by Consultant (including, 
but not limited to, all parts and labor) at Consultant’s sole cost and expense. All written 
warranties and redlines for as-built conditions must be delivered to City on or before City’s 
final acceptance of Consultant’s services under this Agreement.  
 
5.42 Cooperative Purchasing Agreement (S.A.V.E. – Strategic Alliance for Volume 
Expenditures).  In addition to City of Chandler and with the approval of Consultant, this 
Agreement may be extended for use by other municipalities, school districts, and government 
agencies of the State.  Any such usage by other entities must be in accordance with the 
ordinance, charter, or procurement rules and regulations of the respective political entity.   
 
5.43 Budget Approval into Next Fiscal Year.  This Agreement will commence on the Effective 
Date and continue in full force and effect until it is terminated or expires in accordance with 
the provisions of this Agreement.  The Parties recognize that the continuation of this 
Agreement after the close of the City's fiscal year, which ends on June 30 of each year, is 
subject to the City Council's approval of a budget that includes an appropriation for this item 
as an expenditure.  The City does not represent that this budget item will be actually adopted. 
This determination is solely made by the City Council. 
 
5.44 Forced Labor of Ethnic Uyghurs Prohibited.  By entering into this Agreement, Contractor 
certifies and agrees Contractor does not currently use and will not use for the term of this 
Agreement: (i) the forced labor of ethnic Uyghurs in the People's Republic of China; or (ii) any 
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of 
China; or (iii) any contractors, subcontractors or suppliers that use the forced labor or any 
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of 
China. 
 
5.45 License to City for Reasonable Use. With this Agreement, Consultant and its 
subconsultants hereby grant a license to City, its agents, employees, and representatives for 
an indefinite period of time to reasonably use, make copies, and distribute as appropriate 
the Documents, works or deliverables developed or created as a result of the Project and this 
Agreement. This license also includes the making of derivative works.

2-19-25
Jeffrey Velasquez
Principal
jvelasquez@j2design.us

Project Name: Mesquite Groves Park 
Page A-1  
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
EXHIBIT “A” 
SCOPE OF SERVICES/SCHEDULE

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
1
February 10, 2025
Alyssa Siqueiros
Design Project Manager
City of Chandler Capital Projects
215 E. Buffalo Street
Chandler, AZ 85225
Re: PR2401.202 – Mesquite Groves Park Final Design
Alyssa,
J2 Engineering and Environmental Design, LLC (J2 Design) is pleased to provide professional 
final design services for the PR2401.202 Mesquite Groves Park project.  This scope of services is 
based upon our understanding of the project from the master planning and public input 
process, as well as the scope memorandum and comments received from City of Chandler on 
January 9, 2025.  J2 will serve as the prime consultant for the project. 
Project Understanding:  The City of Chandler will be developing the 90-acre Mesquite Groves 
Park site near the corner of Riggs Road and Val Vista Drive, just north of Basha High School.  It 
is J2’s understanding that the site will be constructed in three phases of approximately 30 
acres each.  The project will be designed at one time by the design team, with considerations 
for phased construction development.  
The project will be delivered via the Construction Manager at Risk (CMAR) delivery method.  
The design team anticipates producing multiple GMP (gross maximum price) deliverable 
packages in order to streamline construction activities.   
Current construction funding has been set up by the City for a Phase One build.  Phases Two 
and Three may be constructed if the City’s intended Parks Bond initiative is successful in the 
Fall of 2025.  Construction will most likely be phased, but phasing limits are not known at this 
time.  Post-design services are not included with this fee proposal; Post-design services may 
be added at a later date as requested by City of Chandler. 
Our estimated Not-to-Exceed fee for this project is as follows.

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
2
Design:
J2 Design (project mgmt. / landscape architecture / site civil eng.)
$2,567,927.00
Action Sports Design (skate park / cycle track)
$182,000.00
DLR Architecture (restroom buildings, ramadas, enclosures)
$695,000.00
Ethos Engineering (structural / geotechnical)
$93,107.00
Lisa Ranzenberger (signage / wayfinding)
$10,788.00
Nfra, Inc. (roadway civil and utilities)
$315,750.00
Wright Engineering (electrical engineering & lighting)
$172,850.00
Subtotal Design:
$4,037,422.00
Allowances:
City of Chandler Owner’s Allowance
$400,000.00
Utility Potholing
$4,500.00
MCESD Submittal Requirements and Fees
$20,000.00
Phasing Package Sets for Phases Two and Three
$100,000.00
Architectural Additions to Scope as Needed
$75,000.00
Structural Retaining Wall Design
$11,555.00
Structural Entry Monument Design
$10,128.00
Traffic Circle Consultation as Needed (TBD)
$10,000.00
Additional Public Outreach as Needed (MakPro / J2)
$30,000.00
Additional Meetings as Needed
$10,000.00
Architectural Food Service Consultant for Concessions as Needed 
$10,000.00
Legal Descriptions & Exhibits for Easements / TCE’s
$5,000.00
Lake Water Quality Design (Aquatic Consulting & Testing)
$8,000.00
Subtotal Allowances:
$694,183.00
Total Design and Allowances:
$4,731,605.00
Thank you for the opportunity to provide professional services on this landmark project and 
for the ability for J2 to serve the City of Chandler once again.  Please contact me if you have 
any questions.
Sincerely,
Jeffrey Velasquez, PLA, ASLA
Principal Landscape Architect
jvelasquez@j2design.us
m 480.720.0858
cc: Mickey Ohland, Kurt Hoffman, City of Chandler

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
3
PR2401.202 Mesquite Groves Park 
Scope of Services:  Design
Based on City Staff and Public Input, the program for the Mesquite Groves Park site is 
anticipated to be:
•
2 to 3 multi-use fields
•
3 to 4 diamond fields
•
A 2-zone dog park
•
Skate Park with Cycle/Pump-Track
•
6 Post-Tension Pickleball Courts
•
2 Post-Tension Basketball Courts
•
2 to 6 Sand Volleyball Courts
•
Splash Pad with Recirculated Water System
•
Major Destination Inclusive Playground
•
Secondary Inclusive Playground at Multi-Use Field Area
•
Possible Small Playground at Diamond Field Plaza
•
4 to 5-Acre Fishing Lake with Pump Enclosure including Pumps, Wet Well, Water 
Feature, and Recirculation System
•
Maintenance Yard with Storage and Small Office Building (similar to the maintenance 
yard at Veterans Oasis Park in Chandler)
•
2 Restroom-Concession Buildings
•
2 Standard Restroom Buildings
•
Possible cricket field overlayed on the multi-use fields
•
Picnic Ramadas
•
Large Destination Ramadas
•
Soft-surface Jogging Trails and Concrete Paths
•
Possible exercise nodes
•
Area for a possible future 25,000 square foot recreation center
•
Area for a possible future air-nasium or field house
•
Parking lots and park roadway
•
Lighting and electrical improvements, including sports lighting
•
Traffic signal at Val Vista Drive, including coordination with Town of Gilbert
•
Fabric shade structures
•
Site amenities (benches, bike racks, drinking fountains)
•
Utility infrastructure
•
Possible undergrounding of part of the RWCD canal along Cloud Road alignment
•
Landscape and Irrigation with Central Controllers

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
4
Task 100:  Site Investigation
J2 will attend a kick-off meeting with key stakeholders on the project.  J2 will attend a site visit 
with the team.
Note: Site Survey was competed as part of the PR2401.201 master plan agreement.  Survey of 
sanitary sewer pipe inverts and manhole depths is to be completed under that master plan 
agreement as well.
J2 will request as-builts and previous geotechnical and drainage reports from the City 
associated with the site and surrounding areas to review.  
J2 Team will request a bluestake design ticket to identify utilities within the area and request 
mapping for those affected utilities.
J2 will coordinate the geotechnical investigation, including agronomy testing.
Meetings:
•
Kick-off Meeting - One (1) meeting.  This meeting is anticipated to be two (2) hours in 
duration.  J2 will have five (5) representatives at this meeting.
•
Site Visit - One (1) meeting.  This meeting is anticipated to be three (3) hours in 
duration.  J2 will have six (6) representatives at this meeting.
Deliverables:
•
Geotechnical Report, to include recommendations for building sites, pavement zones, 
and lake area
Task 200:  Public Involvement
J2 will prepare public presentation boards and attend a public meeting to update the 
surrounding community on design status.  J2 anticipates that this meeting may occur 
sometime around the 60% design submittal stage.  J2 will provide presentation boards for the 
public meeting.  City of Chandler will be responsible for securing meeting locations and 
rooms.  J2 is carrying an allowance for public involvement assistance from MakPro, as 
needed.  Should MakPro’s services be approved by City of Chandler, MakPro will provide all 
meeting notification advertisement mailers for the public.  
Deliverables: For the public meeting (exact deliverables may vary depending upon the final 
approved engagement strategy)
•
One (1) Plan View Presentation Board portraying the project improvements on an 
aerial background (estimated 36”x48” board size).

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
5
•
One (1) Supplemental Presentation Board (24”by 36”) with additional graphic images 
such as sections, elevations, perspectives, and hardscape elements, as required, to 
portray the key elements or features of the project to the public
•
Video Fly Through on a loop
Meetings:
•
Public Meeting – One (1) meeting.  This meeting is anticipated to be three (3) hours in 
duration.  J2 will have three (3) representatives at the meeting.
•
Note: this public meeting task may be substituted for a Parks Commission or other 
meeting as required by City of Chandler if a public meeting is not required. 
Task 300:  Design Development: Advanced Concepts
J2 will develop advanced concepts for specific areas of the project for various elements and 
amenities throughout the park.  The J2 team will work collaboratively with COC staff to 
develop these advanced concepts.  Areas of focus for these concepts will include, but will not 
be limited to:  playgrounds, splash pad, shade elements, lake zone, parking areas, sports 
facilities, entry monuments, architecture, traffic circle, traffic calming measures, circulation 
patterns, landscape palette, hardscape materials, lighting, and the other COC and 
community-desired program elements.  J2 will develop concept plans and sketches in a 3D 
model utilizing a combination of CAD, Sketchup, and Lumion software – in addition to 
photoshop, cad and hand-drawn sketches.  Where appropriate, J2 will extract various 
perspective views from the 3D models to portray design intent.  
After receiving input on the preliminary advanced concept designs, J2 will refine the concepts 
with COC input.  J2 will continue to develop a video flythrough rendering of the park showing 
the proposed amenities.  The refinements from Task 300 will be utilized in the construction 
documents preparation to follow in Task 400
Deliverables:
•
Preliminary Advanced Concepts (24”x36”)(PDF) Plan and Perspective Views – Up to 
thirty (30) design elements.
•
Refinements of Advanced Concepts (24”x36”)(PDF) Plan and Perspective Views – Up 
to thirty (30) design elements.
•
Flythrough Video (mp4) in Lumion/Sketchup.
Task 400 – Construction Documents (30%, 60%, 95%, and Final)
J2 will develop construction documents, and provide staged submittals at the 30%, 60%, 95%, 
and Final levels of completion.  J2 will submit one (1) full-size hard copy set of plans at each 
stage to COC Parks Office for review.  Final approved plans will be used by the CMAR to 
provide their final GMP.  J2 will also submit a Pre-Tech Review Package of project elements to 
COC at the 30% review stage to facilitate design review coordination with COC staff.  Pre-
Tech Package is anticipated to contain thirty (30) full-size 24”x36” sheets.

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
6
The Design plans developed by J2 are anticipated to include the following:
1.
Overall Project Cover Sheet
2.
General Notes Sheet
3.
Legends and Abbreviations Sheet
4.
Master Sheet Index
5.
Plan Key Map Sheet
6.
Site Plan
7.
Fire Access Plan
8.
Quantities Summary Sheet
9.
Storm Water Management Plans and Details
10. Coordinate Geometry Plans
11.
Coordinate Geometry Control Tables
12. Lake and Pump Plans and Details
13. Mass Grading Plans (early GMP)
14. Final Grading Plans (secondary GMP)
15. Grading Enlargement Plans
16. Grading Enlargements
17. Grading Typical Sections Sheets
18. Parking Lot Paving Plans
19. Dry Utility Coordination
20. Site Civil Details
21. Storm Drain Plan & Profile Sheets
22. Hardscape Summary and Quantity Sheets
23. Hardscape Plans and Details
24. Hardscape Enlargement Plans
25. Landscape Summary/Gen Notes/Quantity Sheet
26. Landscape Plans and Details
27. Irrigation Summary/Gen Notes/Quantity Sheets
28. Irrigation Plans and Details
29. Irrigation Mainline Plans and Wire Diagram Sheets
30. Site Electrical Plans and Details (By Subconsultant)
31. Traffic Signal Plans and Details (By Subconsultant)
32. Site Structural Plans and Details (By Subconsultant)
33. Building and Pump House Architectural Plans and Details, including MPE & Structural 
(By Subconsultant)
34. Signing and Marking Plans and Details (By Subconsultant)
35. Wet Utility Plans and Details (By Subconsultant)
36. Roadway Plans and Details (By Subconsultant)
Construction document sheets will utilize the City of Chandler standard border and at full-
size will be 24”x36”.  Plan view sheets will be at 1”=20’ scale, 1” =40’ scale, and enlargements at

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
7
scales appropriate for public works construction.  It is assumed that the site will be covered 
by twenty-six (26) plan view sheets at 20-scale and thirteen (13) sheets at 40-scale.  The 
construction document set, including cover sheet, plan sheets, and detail sheets is 
anticipated to contain three hundred fifty-seven (357) sheets produced by J2.  
J2 will participate in Value Engineering and Cost Reconciliation Efforts at each design 
deliverable stage.
J2 will develop Technical Specifications/Special Provisions for the project improvements 
starting at the 60% staged submittal and each subsequent submittal.  
J2 will develop an Opinion of Probable Construction Cost for the project improvements 
starting at the 60% staged submittal and each subsequent submittal.  Cost estimates will be 
broken out based on project phases beginning with 60% submittal stage. 
J2 will develop a draft and final drainage report for on-site improvements.
J2 and subconsultants will conduct utility coordination in conjunction with CMAR and City.  J2 
will conduct dry utility design coordination (telecom, fiber-optic, and other communication 
coordination, as well as natural gas coordination as required).  
Deliverables:
•
Design Plans (30%, 60%, 95%, Final), one (1) full-size PDF set
•
Pre-Tech Review Package in Conjunction with 30% Submittal, one (1) full-size 
PDF set
•
Specifications (60%, 95%, Final), one (1) PDF set
•
Opinion of Probable Construction Cost (30%, 60%, 95%, Final), one PDF set w/ 
excel spreadsheet
•
Drainage Report (Draft and Final), one (1) PDF set
Task 500:  Design Meetings
J2 anticipates an 18-month design schedule, inclusive of pre-design and final design tasks.  
J2 will attend bi-weekly design meetings for a total of thirty-six (36) meetings over the course 
of the 18 months.  Each meeting is anticipated to be two (2) hours in duration.  J2 will have 
four (4) representatives at each meeting and will provide and distribute meeting minutes 
after the meetings.
J2 will attend comment resolution meetings after each submittal for a total of four (4) 
meetings.  Each meeting is anticipated to be three (3) hours in duration.  J2 will have four (4) 
representatives at each meeting and will provide and distribute meeting minutes after the 
meetings.

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
8
J2 will attend Design Specialty / Focus Group meetings to obtain input from various user 
groups.  The following focus groups are anticipated:
•
Buildings and Maintenance Yard
•
Skate Park / Pump Track (2 meetings)
•
Landscape Materials
•
Irrigation Materials and Practices
•
Splash Pad
•
Inclusive Playground
•
Special Events
•
Site Electrical
•
Utilities / MUD
•
Signage and Wayfinding
•
Concessions
•
Local Sports User Groups
•
High School / CUSD
•
Public Safety (Police and Fire Review)
•
Planning Department
Each specialty / focus group is anticipated to have two (2) meetings, including follow-up, for 
a total of thirty (30) meetings.  Each meeting is anticipated to be three (3) hours in duration.  
J2 will have four (4) representatives at each meeting and will provide and distribute meeting 
minutes after the meetings.
J2 will attend Value Engineering and Cost Reconciliation Meetings with City and Contractor.  It 
is assumed that there will be eight (8) meetings, with each meeting being two (2) hours in 
duration.  J2 will have four (4) representatives at each meeting and will provide and distribute 
meeting minutes after the meetings.
Design Allowances
The following allowances may only be utilized if authorized in advance by the City.  These 
allowances will not be authorized until a full modified scope is known and may need to be 
increased if the required scope exceeds the established allowance amount.  The following 
allowances have been established for this project:
City of Chandler Owner’s Allowance:  An allowance has been established to procure 
additional design services should the City choose to add or adjust scope or design efforts 
beyond this original level of involvement.
Utility Potholing:  An allowance has been established to procure utility potholing services as 
needed to cover any initial potholing required prior to selection of the CMAR.
Maricopa Environmental Services Department (MCESD) Submittal Requirements and Fees:  
An allowance has been established to pay for the expedited permit review fees that will be

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
9
charged by MCESD for design features (splash pad, water line, sewer lines, reclaimed water) 
review and approval.  This allowance amount assumes that J2 Team will prepare 
documentation for splash pad variances for No Fencing and No Lifeguard.  This allowance 
has also been established to provide various reports, graphics or plan modifications based 
on MCESD requirements and comments on the plans.  
Phasing Package Sets for Phases Two and Three:  An allowance has been established to 
break the project into phased construction plan sets and/or multiple GMP packages in order 
to address budget or schedule constraints.
Architectural Additions to Scope as Needed:  An allowance has been established to add 
additional buildings or modified architectural scope beyond the original assumptions.
Structural Retaining Wall Design:  An allowance has been established to add structural 
retaining wall design and calculations as needed for playgrounds, splash pad, or other park 
amenities. 
Structural Entry Monument Design:  An allowance has been established to add structural 
entry monument design and calculations as needed for the park site. 
Traffic Circle Consultation as Needed (TBD):  An allowance has been established to add 
traffic circle engineering consultation as needed for the park. Note: NFra will provide the civil 
engineering design of the traffic circle; the allowance will cover a third-party specialist if 
required.
Additional Public Outreach as Needed (MakPro / J2) :  An allowance has been established to 
provide additional public outreach as needed for the project.  MakPro or J2 may perform the 
outreach based on City requirements. 
Additional Meetings as Needed:  An allowance has been established to provide additional 
meetings as needed for the project.
Architectural Food Service Consultant for Concessions as Needed:  An allowance has been 
established to provide for an architectural food service consultant if needed.  This consultant 
would provide input and coordination on food types and concession building requirements. 
Legal Descriptions & Exhibits for Easements / TCE’s:  An allowance has been established to 
provide legal descriptions and exhibits for temporary construction easements and /or other 
easements as needed for the project.  
Lake Water Quality Design (Aquatic Consulting & Testing):  An allowance has been 
established to provide lake water quality design consulting by Dr. Rick Amalfi of Aquatic 
Consulting & Testing, as needed for the project.

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
10
General Project Understanding:
COC shall designate a person for the project to act as the Client’s representative with respect 
to the services to be performed or furnished by the Design Team under this agreement. Such 
person, department, or committee shall have complete authority to transmit instructions, 
receive information, interpret, and define the Client's policies and decisions with respect to 
the Design Team's services for the Project. COC shall also provide key team personnel to be 
available in coordination meetings including operations and plan review representatives.
COC shall make available to the Design Team all existing available data and records relevant 
to the site.
COC shall approve in a timely manner all criteria and information as to Client's requirements 
for the Project including planning objectives and constraints, performance requirements, any 
budgetary limitations, and the submittal by the Design Team at the various phases and 
GMP’s of the project.
COC shall furnish to the Design Team, upon the request of the Design Team for performing 
the services, any existing pertinent data prepared by or services of others, including 
electronic base maps, drawings of physical conditions in or relating to existing surface or 
subsurface utilities or structures within the planning area, hydrographic surveys, 
environmental, biological, or cultural assessments, impact statements, and other relevant 
environmental, biological, or cultural studies pertaining to the project.
COC shall give prompt notice to Design Team whenever Client observes or otherwise 
becomes aware of any development that affects the scope of services or the time schedule 
of the Design Team.
COC warrants and represents that members of the Design Team have the right to enter upon 
the real property involved herein, and extends this right to J2. The Design Team agrees to 
exercise due care in the performance of all services pursuant hereto. 
The Design Team has provided no environmental, biological, or cultural investigations on this 
site/project, has no knowledge of any adverse environmental, biological, or cultural 
conditions on the site/project, and is not responsible for and has no liability for any such 
condition should one be found. It is the responsibility of the COC to investigate and make 
these environmental, biological, or cultural determinations based on the best knowledge and 
information available at the time of this project. Clearance to begin work shall be given prior 
to directing or ordering the preparation of any engineering documents.
The Design Team provides construction documents in full or in part freehand drafting and 
electronic CAD format. Any electronic files provided are for information and convenience

J2 Engineering and Environmental Design, LLC
4649 E. Cotton Gin Loop, B2 Phoenix, AZ 85040
602.438.2221 www.j2design.us
M:\Proposals\Chandler\2025\Mesquite Groves Final Design\2025-02-10 M Groves Proposal.doc
11
purposes only and the final approved/sealed hard copy plans shall prevail.  All construction 
documents will be developed to the COC design and construction standards and 
specifications.
Design Assumptions and Exclusions:
1.
Boundary Survey or ALTA Survey is not included in this scope of services.
2.
COC will provide all existing as-built information to J2.
3.
The Design Team has not included any re-platting, or rezoning efforts in this scope 
of services.  
4.
The Design Team is not providing or producing any 404/408 Permits or 404/408 
Applications nor are we providing any environmental, cultural, or biological 
investigations or clearances (Categorical Exclusions, NEPA type documents). 
5.
Reproduction of all hard copy sets shall be paid by others and has not been 
included in this scope or proposal. One (1) hard copy set of plans shall be delivered 
by J2 to Parks Department for review at each submittal stage (30%, 60%, 95%, and 
Final).
6.
The Design Team is not providing the cost for permitting fees for this project, 
beyond the allowance established for MCESD fees.  All permitting fees will be paid 
by City.
7.
This scope of services does not include the design of any construction sequencing 
or traffic control plans.
8.
This scope of services assumes an eighteen (18) month design schedule.
9.
For public meeting(s), COC will be responsible for securing a meeting room and 
location.  J2 is carrying an allowance for public involvement assistance from 
MakPro, as needed.  Should MakPro’s services be approved by City of Chandler, 
MakPro will provide all meeting notification advertisement mailers for the public.
We would expect to start our services promptly after receipt of a Notice to Proceed, and 
complete our services in a timely manner.  This Exhibit represents the entire understanding of 
the Scope of Work as set out herein and may only be modified in writing signed by both 
parties.

February, 2025
The J2 team scope of work is based upon this conceptual master plan
exhibit, which is current as of February 2025.

ID
Task 
Mode
Task Name
Duration
Start
Finish
Predecessors
1
Mesquite Groves Park Design
637 days
Tue 4/1/25
Wed 9/8/27
2
Notice to Proceed
1 day
Tue 4/1/25
Tue 4/1/25
3
Kickoff Meeting
1 day
Tue 4/1/25
Tue 4/1/25
4
Site Investigation
60 days
Tue 4/1/25
Mon 6/23/25
5
Geotechnical Report, Site Survey, Site Investigation, 
Utilites Mapping
60 days
Tue 4/1/25
Mon 6/23/25
6
Preliminary Advanced Concepts
74 days
Tue 4/1/25
Fri 7/11/25
7
Preliminary Advanced Concepts
30 days
Tue 4/1/25
Mon 5/12/25
8
Agency Review
5 days
Tue 5/13/25
Mon 5/19/25
7
9
Refinements of Advanced Concepts
20 days
Mon 5/19/25
Fri 6/13/25
8
10
Agency Review
5 days
Mon 6/16/25
Fri 6/20/25
9
11
Flythough Video
15 days
Mon 6/23/25
Fri 7/11/25
10
12
Park Phasing Analysis
30 days
Mon 6/23/25
Fri 8/1/25
10
13
Phase 1 and 2 Park Design (Phase Area TBD)
337 days
Mon 6/23/25
Tue 10/6/26
14
30% Construction Documents (Total Site)
81 days
Mon 6/23/25
Mon 10/13/25
15
30% Park Design
60 days
Mon 6/23/25
Fri 9/12/25
10
16
Agency Review
15 days
Mon 9/15/25
Fri 10/3/25
15
17
Comment Resolution
5 days
Mon 10/6/25
Fri 10/10/25
16
18
CMAR Selection
1 day
Mon 10/13/25
Mon 10/13/25 17
19
60% Construction Documents
91 days
Tue 10/14/25
Tue 2/17/26
14
20
60% Park Design
70 days
Tue 10/14/25
Mon 1/19/26
18
21
Agency Review
15 days
Tue 1/20/26
Mon 2/9/26
20
22
Comment Resolution
5 days
Tue 2/10/26
Mon 2/16/26
21
23
Public Outreach/Meeting
1 day
Tue 2/17/26
Tue 2/17/26
22
24
95% Construction Documents
90 days
Wed 2/18/26
Tue 6/23/26
19
25
95% Park Design
70 days
Wed 2/18/26
Tue 5/26/26
23
26
Agency Review and First Permit Review
15 days
Wed 5/27/26
Tue 6/16/26
25
27
Comment Resolution
5 days
Wed 6/17/26
Tue 6/23/26
26
28
Final Construction Documents
75 days
Wed 6/24/26
Tue 10/6/26
24
29
Final Park Design
60 days
Wed 6/24/26
Tue 9/15/26
27
30
Agency Review and Second Permit Review
15 days
Wed 9/16/26
Tue 10/6/26
29
31
Phase 1 and 2 Design Completed - Ready for 
Construction
0 days
Tue 10/6/26
Tue 10/6/26
30
32
Phase 3 Park Design
241 days
Wed 10/7/26
Wed 9/8/27
31
33
60% Construction Documents
80 days
Wed 10/7/26
Tue 1/26/27
31
34
60% Park Design
60 days
Wed 10/7/26
Tue 12/29/26
31
35
Agency Review
15 days
Wed 12/30/26
Tue 1/19/27
34
36
Comment Resolution
5 days
Wed 1/20/27
Tue 1/26/27
35
37
95% Construction Documents
80 days
Wed 1/27/27
Tue 5/18/27
36
38
95% Park Design
60 days
Wed 1/27/27
Tue 4/20/27
36
39
Agency Review and First Permit Review
15 days
Wed 4/21/27
Tue 5/11/27
38
40
Comment Resolution
5 days
Wed 5/12/27
Tue 5/18/27
39
41
Final Construction Documents
81 days
Wed 5/19/27
Wed 9/8/27
40
42
Final Park Design
60 days
Wed 5/19/27
Tue 8/10/27
40
43
Agency Review and Second Permit Review
21 days
Wed 8/11/27
Wed 9/8/27
42
44
Phase 3 Design Completed - Ready for Construction
0 days
Wed 9/8/27
Wed 9/8/27
43
4/1
4/1
10/6
9/8
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
N
D
J
F
M
A
M
J
J
A
S
O
5
Half 2, 2025
Half 1, 2026
Half 2, 2026
Half 1, 2027
Half 2, 2027
Task
Split
Milestone
Summary
Project Summary
Inactive Task
Inactive Milestone
Inactive Summary
Manual Task
Duration-only
Manual Summary Rollup
Manual Summary
Start-only
Finish-only
External Tasks
External Milestone
Deadline
Progress
Manual Progress
Page 1
Mesquite Groves Park
Date: Wed 2/12/25
PR 2401.202 Mesquite Groves Park - Preliminary Schedule (Combined Phase 1&2)

Project Name: Mesquite Groves Park 
Page B-1 
Project No.: PR2401.202  
Rev. 1/12/2024 
 
 
EXHIBIT “B” 
COMPENSATION AND FEES

PR2401.202 - Mesquite Groves Park - Final Design
EXHIBIT "B-1"
Lump Sum Cost Per Task
TASK DESCRIPTION
SUBTOTAL
Task 100 - Site Investigation
$
23,410.00
Task 200 - Public Involvement
$
29,819.00
Task 300 - Design Development: Advanced Concepts
$
133,071.00
Task 400 - Construction Documents (30%, 60%, 95%, Final)
$
2,235,144.00
401 30% Design Submittal
$
436,581.00
402 60% Design Submittal
$
467,898.00
403 95% Design Submittal
$
502,993.00
404 Final Design Submittal
$
534,307.00
405 Specs, Estimate, Utilities, Drainage Report, Permitting, QA-QC
$
293,365.00
Task 500 - Design Meetings
$
146,483.00
Task 600 - Subconsultant Tasks
$
1,469,495.00
601 Action Sports Design - Skate Park and Cycle Track Design
$
-
$
182,000.00
602 DLR Architecture - Restroom Buildings, Ramadas, Maintenance Building,
Enclosure Design
$
-
$
695,000.00
603 Ethos Engineering - Structural, Geotechnical, Agronomy
$
-
$
93,107.00
604 Lisa Ranzenberger - Signage and Wayfinding Design
$
-
$
10,788.00
605 Nfra, Inc. - Roadway  Civil Enginering and Utility Design
$
-
$
315,750.00
606 Wright Engineering - Electrical, Traffic Signal, and Lighting Design
$
-
$
172,850.00
ALLOWANCES
$
694,183.00
701 City of Chandler Owner's Allowance
$
-
$
400,000.00
702 Utility Potholing
$
4,500.00
703 MCESD Submittal Requirements and Fees
$
-
$
20,000.00
704 Phasing Package Sets for Phases Two and Three
$
-
$
100,000.00
705 Architectural Additions to Scope as Needed
$
-
$
75,000.00
706 Structural Retaining Wall Design
$
-
$
11,555.00
707 Structural Entry Monument Design
$
-
$
10,128.00
708 Traffic Circle Consultation as Needed
$
-
$
10,000.00
709 Additional Public Outreach as Needed (MakPro/J2)
$
-
$
30,000.00
710 Additional Meetings as Needed
$
-
$
10,000.00
711 Architectural Food Service Consultant for Concessions
$
10,000.00
712 Legal Descriptions & Exhibits for Easements / TCE's
$
-
$
5,000.00
713 Lake Water Quality Design (Aquatic Consulting & Testing)
$
-
$
8,000.00
TOTAL COST:
$
4,731,605.00
J2 Design
4649 E. Cotton Gin Loop, Suite B2
Phoenix, AZ 85040
602.438.2221
www.j2design.us

PR2401.202 Mesquite Groves Park Final Design
City of Chandler
J2 Engineering and Environmental Design, LLC
2/10/2025
Project Manager 
Senior /      
Principal QA-QC
Project 
Engineer Sr.
Project 
Engineer
Engineer
Landscape 
Architect Sr.
Landscape 
Architect
Designer Sr.
Designer
Jeff Velasquez        Jeff 
Holzmeister      Aaron 
Allan
Jason Touchin
Bill Fogell      Grant 
Treinen
Alex Bramhall
Seth Placko      
Kurt Montei    
Adam Hawkins
Kexin Zhao    
Shane Hanneman
Kevin Wallin       
Aaron Hendrickson  
Andy Fleetwood 
Maria Rios    Suzie 
White    Aurelio 
Lopez
215.27
$                   
192.47
$            
132.32
$            
111.77
$             
202.60
$           
136.76
$             
120.93
$              
91.46
$              
Task #
Hours Total
100
101
Kick-off Meeting (1)
2
2
0
0
2
2
2
0
10
102
Site Visit (1)
3
3
3
0
3
3
3
0
18
103
Utility and As-built Research and mapping
0
8
16
24
4
12
24
16
104
104
Subconsultant Coordination
2
0
0
2
24
0
0
0
28
200
201
Public Meeting (1)
2
0
0
0
24
24
0
24
74
202
Engagement Material Development
0
0
0
0
20
12
24
60
116
203
Subconsultant Coordination
2
0
0
0
20
0
4
0
26
300
301
Concept Plans for Elements and Amenities
8
4
6
8
40
60
140
160
426
302
Design Development Refinement for Elements and Amenities
8
4
8
8
20
40
100
120
308
303
3D Modeling Design Renderings
1
1
0
0
4
16
120
128
270
304
Subconsultant Coordination
20
0
4
0
20
40
0
0
84
400
401
Develop Plans and Details - 30% Design (357 Sheets) 
20
395
400
300
395
400
595
690
3195
402
Develop Plans and Details - 60% Design (357 Sheets) 
20
400
430
305
430
485
650
695
3415
403
Develop Plans and Details - 95% Design (357 Sheets) 
24
410
460
335
450
505
740
775
3699
404
Develop Plans and Details - Final Design (357 Sheets) 
24
415
490
340
485
590
795
780
3919
405
Pre-Tech Review Package (30 Sheets) 
8
8
4
0
16
24
44
60
164
406
Specifications
12
40
0
0
44
40
0
0
136
407
Opinion of Probable Construction Cost
16
24
0
0
40
48
48
60
236
408
Dry Utilities Coordination
2
4
8
16
0
0
8
0
38
409
Draft and Final Drainage Report
0
24
20
40
0
0
20
24
128
410
City Permitting Coordination and Documentation
16
0
16
0
40
48
24
4
148
411
Project QA/QC
120
48
0
0
48
0
0
0
216
412
Subconsultant Coordination
8
120
40
40
240
200
80
40
768
500
501
Bi-weekly Meetings (36)
72
72
0
0
0
72
72
0
288
502
Design Specialty / Focus Group meetings (30)
90
90
0
0
90
0
90
0
360
503
Comment Resolution Meetings (4) and Comment Responses
12
12
0
0
0
12
0
12
48
504
Value Engineering and Cost Reconcilitation Meetings (4)
16
0
16
0
16
0
16
0
64
505
Subconsultant Coordination
8
4
8
0
40
20
0
0
80
516
2088
1929
1418
2515
2653
3599
3648
18366
111,079.00
$        
401,877.00
$  
255,245.00
$  
158,490.00
$ 
509,539.00
$  
362,824.00
$   
435,227.00
$    
333,646.00
$  
2,567,927.00
$         
Subconsultants:
Fee Amount
Action Sports Design (skate park / cycle track)
182,000.00
$        
DLR Architecture (restroom buildings, ramadas, enclosures)
695,000.00
$        
Ethos Engineering (structural / geotechnical / agronomy)
93,107.00
$          
4,731,605.00
$      
Lisa Ranzenberger (signage / wayfinding)
10,788.00
$          
Nfra, Inc. (roadway civil engineering & utilities)
315,750.00
$        
Wright Engineering (electrical engineering and lighting)
172,850.00
$        
Total Subconsultants:
1,469,495.00
$     
Allowances:
Fee Amount
City of Chandler Owner's Allowance
400,000.00
$        
Utility Potholing 
4,500.00
$            
MCESD Submittal Requirements and Fees
20,000.00
$          
Phasing Package Sets for Phases Two and Three
100,000.00
$        
Architectural Additions to Scope as Needed
75,000.00
$          
Structural Retaining Wall Design
11,555.00
$          
Structural Entry Monument Design
10,128.00
$          
Traffic Circle Consultation as Needed (TBD)
10,000.00
$          
Additional Public Outreach as Needed (MakPro / J2)
30,000.00
$          
Additional Meetings as Needed
10,000.00
$          
Architectural Food Service Consultant for Concessions as Needed
10,000.00
$          
Legal Descriptions & Exhibits for Easements / TCE's
5,000.00
$            
Lake Water Quality Design (Aquatic Consulting & Testing)
8,000.00
$            
Date
Total Allowances:  $        694,183.00 
Jeffrey Velasquez, PLA, ASLA
Principal
J2 Engineering and Environmental Design, LLC
Design Development: Advanced Concepts
Total Fee J2, Subconsultants, and Allowances:
Labor Category:
Rate:
Task Description:
Site Investigation
Public Involvement
Staff Names:
J2 Hours per Labor Category:
J2 Fee per Labor Category (Rounded to Nearest Whole Dollar):
Construction Documents (30%, 60%, 90%, Final)
Design Meetings
February 10, 2025
12

Project Name: Mesquite Groves Park 
Page C-1 
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
EXHIBIT “C” 
INSURANCE REQUIREMENTS 
 
1. 
General. 
 
1.1 At the same time as execution of this Agreement, Consultant must furnish City a certificate 
of insurance on a standard insurance industry ACORD form.  The ACORD form must be 
issued by an insurance company authorized to transact business in the State of Arizona 
possessing a current A.M. Best, Inc. rating of A-7, or better and legally authorized to do 
business in the State of Arizona with policies and forms satisfactory to City.  Provided, 
however, the A.M. Best rating requirement will not be deemed to apply to required Workers’ 
Compensation coverage.  
 
1.2 Consultant and any of its subconsultants must procure and maintain, until all of their 
obligations have been discharged, including any warranty periods under this Agreement are 
satisfied, the insurances set forth below. 
 
1.3 The insurance requirements set forth below are minimum requirements for this Agreement 
and in no way limit the indemnity covenants contained in this Agreement. 
 
1.4 City in no way warrants that the minimum insurance limits contained in this Agreement are 
sufficient to protect Consultant from liabilities that might arise out of the performance of 
the Agreement services under this Agreement by Consultant, its agents, representatives, 
employees, subconsultants, and Consultant is free to purchase any additional insurance as 
may be determined necessary. 
 
1.5 Failure to demand evidence of full compliance with the insurance requirements in this 
Agreement or failure to identify any insurance deficiency will not relieve Consultant from, 
nor will it be considered a waiver of its obligation to maintain the required insurance at all 
times during the performance of this Agreement. 
 
1.6 Use of subconsultants:  If any work is subcontracted in any way, Consultant must execute a 
written Agreement with subconsultant containing the same Indemnification Clause and 
Insurance Requirements as City requires of Consultant in this Agreement. Consultant is 
responsible for executing the Agreement with the subconsultant and obtaining Certificates 
of Insurance and verifying the insurance requirements. 
 
2. 
Minimum Scope and Limits of Insurance.  Consultant must provide coverage with limits of 
liability not less than those stated below. 
 
2.1 Professional Liability.  If the Agreement is the subject of any professional services or work 
performed by Consultant, or if Consultant engages in any professional services or work 
adjunct or residual to performing the work under this Agreement, Consultant must maintain 
Professional Liability insurance covering errors and omissions arising out of the work or 
services performed by Consultant, or anyone employed by Consultant, or anyone whose 
acts, mistakes, errors and omissions Consultant is legally liable, with a liability limit of 
$1,000,000 each claim and $2,000,000 all claims.  In the event the Professional Liability 
insurance policy is written on a “claims made” basis, coverage must extend for 3 years past

Project Name: Mesquite Groves Park 
Page C-2 
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
completion and acceptance of the work or services, and Consultant, or its selected Design 
Professional will submit Certificates of Insurance as evidence the required coverage is in 
effect.  The Design Professional must annually submit Certificates of Insurance citing that the 
applicable coverage is in force and contains the required provisions for a 3 year period. 
 
2.2 Commercial General Liability-Occurrence Form.  Consultant must maintain “occurrence” form 
Commercial General Liability insurance with a limit of not less than $2,000,000 for each 
occurrence, $4,000,000 aggregate.  Said insurance must also include coverage for products 
and completed operations, independent contractors, personal injury and advertising injury. 
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess 
insurance must be “follow form” equal or broader in coverage scope than underlying 
insurance. 
 
2.3 Automobile Liability-Any Auto or Owned, Hired and Non-Owned Vehicles  
 
Vehicle Liability:  Consultant must maintain Business/Automobile Liability insurance with a 
limit of $1,000,000 each accident on Consultant owned, hired, and non-owned vehicles 
assigned to or used in the performance of Consultant’s work or services under this 
Agreement.  If any Excess or Umbrella insurance is utilized to fulfill the requirements of this 
paragraph, the Excess or Umbrella insurance must be “follow form” equal or broader in 
coverage scope than underlying insurance. 
 
2.4 Workers Compensation and Employers Liability Insurance:  Consultant must maintain Workers 
Compensation insurance to cover obligations imposed by federal and state statutes having 
jurisdiction of Consultant employees engaged in the performance of work or services under 
this Agreement and must also maintain Employers’ Liability insurance of not less than 
$1,000,000 for each accident and $1,000,000 disease for each employee. 
 
3. 
Additional Policy Provisions Required. 
 
3.1 Self-Insured Retentions or Deductibles.  Any self-insured retentions and deductibles must be 
declared and approved by City.  If not approved, City may require that the insurer reduce or 
eliminate any deductible or self-insured retentions with respect to City, its officers, officials, 
agents, employees, and volunteers. 
 
3.1.1. Consultant’s insurance must contain broad form contractual liability coverage. 
 
3.1.2. Consultant’s insurance coverage must be primary insurance with respect to City, its 
officers, officials, agents, and employees.  Any insurance or self-insurance maintained 
by City, its officers, officials, agents, and employees will be in excess of the coverage 
provided by Consultant and must not contribute to it. 
 
3.1.3. Consultant’s insurance must apply separately to each insured against whom claim is 
made or suit is brought, except with respect to the limits of the insurer's liability. 
 
3.1.4. Coverage provided by Consultant must not be limited to the liability assumed under 
the indemnification provisions of this Agreement.

Project Name: Mesquite Groves Park 
Page C-3 
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
3.1.5. The policies must contain a severability of interest clause and waiver of subrogation 
against City, its officers, officials, agents, and employees, for losses arising from Work 
performed by Consultant for City. (Does not apply to Professional Liability coverage.) 
 
3.1.6. Consultant, its successors and or assigns, are required to maintain Commercial 
General Liability insurance as specified in this Agreement for a minimum period of 3 
years following completion and acceptance of the Work.  Consultant must submit a 
Certificate of Insurance evidencing Commercial General Liability insurance during this 
3-year period containing all the Agreement insurance requirements, including 
naming City of Chandler, its agents, representatives, officers, directors, officials and 
employees as Additional Insured as required. 
 
3.1.7. If a Certificate of Insurance is submitted as verification of coverage, City will 
reasonably rely upon the Certificate of Insurance as evidence of coverage, but this 
acceptance and reliance will not waive or alter in any way the insurance requirements 
or obligations of this Agreement.   
 
3.2.  Insurance Cancellation During Term of Agreement.  
3.2.1. If any of the required policies expire during the life of this Agreement, Consultant 
must forward renewal or replacement Certificates to City within 10 days after the 
renewal date containing all the required insurance provisions. 
 
3.2.2. Each insurance policy required by the insurance provisions of this Agreement must 
provide the required coverage and must not be suspended, voided or canceled 
except after thirty (30) days prior written notice has been given to City, except when 
cancellation is for non-payment of premium, then ten (10) days prior notice may be 
given.  Such notice must be sent directly to Chandler Law-Risk Management 
Department, Post Office Box 4008, Mailstop 628, Chandler, Arizona 85225. If any 
insurance company refuses to provide the required notice, Consultant or its 
insurance broker must notify City of any cancellation, suspension, non-renewal of any 
insurance within seven (7) days of receipt of insurers’ notification to that effect.  
 
3.3 
City as Additional Insured.  The policies are to contain, or be endorsed to contain, the following 
provisions: 
3.3.1. The Commercial General Liability and Automobile Liability policies are to contain, or 
be endorsed to contain, the following provisions:  City, its officers, officials, agents, 
and employees are additional insureds with respect to liability arising out of activities 
performed by, or on behalf of, Consultant; Products and Completed operations of 
Consultant; and automobiles owned, leased, hired, or borrowed by Consultant. 
 
3.3.2. City, its officers, officials, agents, and employees must be additional insureds to the 
full limits of liability purchased by Consultant even if those limits of liability are in 
excess of those required by this Agreement.

Project Name: Mesquite Groves Park 
Page D-1 
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
EXHIBIT “D” 
SPECIAL CONDITIONS 
 
 
Standard Details and Specifications. Consultant must be familiar with City’s latest revision of 
the MAG Specifications and MAG Standard Details as amended by City.  City’s current 
amendment to the MAG Specifications, part of City’s Unified Development Manual, may be found 
and downloaded from City’s website at http://www.chandleraz.gov/udm.   
 
City Ownership of Project Documents. All work products (electronically or manually 
generated) including, but not limited to: plans, specifications, cost estimates, field notes, 
tracings, studies, investigations, design analyses, original drawings, original mylars, Computer 
Aided Drafting and Design (CADD) file diskettes which reflect all final drawings, and other 
related documents which are prepared in the performance of this Agreement (collectively 
referred to as "Documents") are to be and remain the property of City and are to be delivered 
to the Project Manager before the final payment is made to Consultant. In the event these 
Documents are altered, modified or adapted without the written consent of Consultant, 
which consent Consultant must not unreasonably withhold, City agrees to hold Consultant 
harmless to the extent permitted by law from the legal liability arising out of City's alteration, 
modification or adaptation of the Documents. 
 
Re-use of Documents. The parties agree the documents, drawings, specifications and designs, 
although the property of City,  are prepared for this specific project and are not intended nor 
represented by Consultant to be suitable for re-use for any other project.  Any re-use without 
written verification or adaptation by Consultant for the specific purpose intended will be at 
City’s sole risk and without liability or legal exposure to Consultant. 
 
Documents to Bear Seal. Consultant and its subconsultants must endorse by professional 
seal all plans, works, and deliverables prepared by each for this Agreement as required by 
state law.

Project Name: Mesquite Groves Park 
E-1 
Project No.: PR2401.202 
Rev. 1/12/2024 
 
 
 
EXHIBIT “E” 
SUBCONSULTANT DOCUMENTS WITH CONSULTANT 
 
 
Any subconsultant assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the Consultant and their 
subconsultants, and do not apply to the Agreement between the Consultant and 
the City.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78734 | ph: 1.512.387.5827 
 Action Sports Design/ Development
 Skateparks/ Plazas
 Bike Parks/ Facilities
 Construction Administration
DATE: February 5, 2025 
TO: 
Jeff Velasquez, PLA, ASLA 
Principal Landscape Architect 
J2 Engineering & Environmental Design 
4649 E. Cotton Gin Loop, Suite B2  
Phoenix, AZ 85040 
FROM: Mike McIntyre, PLA, Principal 
Action Sports Design, LLC 
12400 W Hwy 71, Suite 350-348 
Austin, TX 78738 
RE:  
Mesquite Groves-Skatepark & Pump Track Planning and Design Services 
Dear Jeff: 
ASD (Action Sports Design, LLC) is prepared to perform professional design services for all tasks 
outlined within the proposed scope of work for the Mesquite Groves Skatepark and Pump Track 
Planning and Design Services. This Proposal, should it be accepted by you, shall be considered the 
outlined scope of work which consists of a skatepark and pump track project approximately 35,000 
sq. ft. of riding surface at an average of $65.00 per sq. ft., with a target construction budget of 
$2,275,000.00 designed and integrated within the Mesquite Groves Park Master Plan. 
A policy of ASD is to provide the Client with a scope of work and fee summary. The proposed design 
process is to be performed by ASD (Designer) for J2 Engineering & Environmental Design (CLIENT) 
includes the following:  
TASK 1.0 – PROGRAMMING & CONCEPTUAL DESIGN 
Objectives: 
•
Define scope of work, schedule, program and overall items of coordination.
•
Establish the project working relationship with all members of the project design team.
•
Review any applicable studies, concepts, existing data sources, and any other work done to
date in the interest of this project.
•
Conduct site visit and perform site analysis, site location review and recommendation study.
•
Prepare conceptual and schematic design providing detailed direction as to the materials,
location and dimensioning of the design elements.
•
To develop an estimate of probable construction cost.
•
To conduct Skatepark & Pump Track specific public design workshop to gain neutral design
concepts without defining materials/ mediums first before suggestive design layouts
1.1 
Project Kick-off Meeting #1 (ASD/CLIENT)- Online Meeting 
•
ASD will perform Kick-Off meeting with the city and applicable groups determined by the city.
ASD will issue a data sheet/questionnaire for the Client to complete prior to the first project
meeting. This data sheet will assist ASD in the programming and design of the Skatepark &
Pump Track.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
•
Meet with Client staff and team consultants to verify work program, schedules and channels of
communication.
•
Review project scope, schedule, and budget with design team.
•
Project overview and distribution of design team responsibilities.
1.2 
Data Collection (ASD/ CLIENT) 
•
Data will be collected as it relates to the existing site and proposed development to ensure an
understanding of the site and park program. Existing information pertinent to the project scope
of work will be gathered and distributed to all design team members during this phase of the
work by the Client.
•
Geo-technical investigation by client.
•
Site Survey to be provided by client.
1.3 
Skatepark & Pump Track Flow and Skill Level Diagrams (ASD)
•
Develop two (2) alternative bubble diagrams illustrating the layout and program relationships
of the Skatepark & Pump Track to the adjacent site amenities.
•
Diagram activity zones, approximate size of amenities and circulation throughout each
transition zone.
1.4 
Public Meeting #1 (ASD/CLIENT/ Public) ASD (2 team members) in person 
•
City/Client shall provide ASD with any operational or maintenance issues pertaining to other
parks within the Client’s oversight that may pertain to the skatepark. ASD will use this
information to respond to any existing park issues that may be addressed in the design of this
project.
•
City/Client shall provide ASD with any applicable municipality and surrounding area guidelines,
specifications, and detailing as it relates to any designed element within the project. Client &
City shall additionally inform ASD of any special requirements for this project (City approved
development plans, previously approved conceptual plans, special guidelines, area plans,
etc.).
•
Three separate meetings will occur on the same date:
•
Client Staff Meeting – This meeting will include the Client Staff.
•
Design Team/Project Consultant Meeting – This meeting will include the Client Staff, City
Staff, public agencies and any team consultants related to the project.
•
Public-Skatepark & Pump Track Meeting #1 – The public meeting, typically starting
between 6:00 – 7:00 pm, will be held to facilitate a work session to develop consensus and
present the Skatepark & Pump Track bubble diagrams & to conduct first design workshop.
ASD will present various Skatepark & Pump Track Styles and Elements for public feedback
on design direction.
Task 1.0 Deliverables 
1.1 
Memorandum of project understanding and scope – submitted to Client & City for review and 
approval.  
1.2 
Diagrammatic sketches of proposed site layout concepts. 
1.3 
Public Meeting #1 materials/ results: sign in sheet, meeting agenda, questionnaires, pros and 
cons exercise sheets, power point presentation, group sketches and online results. 
•
Client shall receive copies of each task item in 8 ½” x 11”, 11”x17” and 24”x36” in digital format.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
TASK 2.0 SCHEMATIC DESIGN PHASE 
2.1      Skatepark & Pump Track Conceptual Layout Plans-Online Meetings-3 
•
Based upon specific design criteria gathered from the Client/City and public input obtained from
the first public meeting, ASD will prepare (2) conceptual design plans that will depict site
facilities and relationships. Specific concept to be reviewed under this contract shall be limited
to the following items:
•
Develop a maximum of two (2) conceptual Skatepark & Pump Track designs identifying
horizontal layout of the park based on the conceptual bubble diagram layout and client
approval.
•
Pedestrian access and circulation system.
•
Relationship between Skatepark & Pump Track elements and existing/proposed recreation
areas.
•
Landforms and grading concept (Skatepark & Pump Track limit of work only).
2.2      Project Specific Skatepark & Pump Track Online link and progress 
•
Items displayed on the website will include concept photos/drawings.
•
Community will have the opportunity to interact with ASD via e-mail and provide design
feedback.
2.3      Develop Final Skatepark & Pump Track Schematic Master Plan 
•
Develop (2) final Skatepark & Pump Track master plans based on conceptual layouts, design
team input, City input, client input, and public design workshop comments.
2.4      Preliminary Skatepark & Pump Track Cost Estimate 
•
Determine preliminary cost for the Skatepark & Pump Track elements.
•
Cost estimate shall be based upon general square footage prices, based on current market
conditions.
2.5 
 
Public Meeting #2-Present Skatepark & Pump Track Design (ASD/CLIENT) ASD (2 members) 
In Person 
•
Two separate meetings will occur on the same date:
•
Design Team/Project Consultant Meeting – This meeting will include the Client Staff, City Staff,
and any team consultants related to the project.
•
Public-Skatepark & Pump Track Meeting #2 – The public meeting, typically starting between
6:00 – 7:00 pm, will be held to facilitate a work session to develop consensus and present the
refined concept based on workshop #1 feedback.
2.6  
Site Survey 
•
Provided by client.
2.7  
Geo-Technical Investigation 
•
Provided by client.
2.8  
Storm Water Management Plan 
•
Storm Water Management Plan provided by client.
Task 2.0 Deliverables 
2.1     Conceptual site plans and improvement sketches to be used as a basis for the future construction 
documents. 
2.3      Final Skatepark & Pump Track schematic master plan. 
2.4      Preliminary costs for Skatepark & Pump Track based on current market conditions. 
2.5      Final Skatepark & Pump Track Design graphics in 3-D Format. 
•
Client shall receive copies of each task item in 8 ½” x 11”, 11”x17” and 24”x36” in digital format.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
TASK 3.0-DESIGN DEVELOPMENT PHASE 
Objectives: 
•
To refine the schematic design providing detailed direction as to the materials, location and
dimensioning of the design elements.
•
To refine an estimate of probable construction cost and budget.
•
Upon review by the Client of the Schematic Design plans, ASD shall prepare the Design
Development drawings setting forth, in technical detail, the requirements for construction of the
design. Evolutionary adjustments to the Design Development documents will be incorporated
into the work prior to the start of Construction Documents.
3.1 
Project Meeting #3 – DD Coordination (ASD/CLIENT) Online Meetings-3 
•
ASD will make available to the Client a copy of the final plan prior to project meeting #3.
•
Evaluate Skatepark & Pump Track plan for security, access and code compliance.
•
Review plan for innovation, value engineering, and review design schedule.
3.2 
Materials Research (ASD)
•
Identify proposed materials and furnishings to be used within the Skatepark & Pump Track
elements.
•
Identify all products, materials and approximate cost.
3.3 
Prepare Base Information (ASD) 
•
Prepare base information for inclusion in all future design documents.
•
ASD will coordinate drawings within our scope of work with Project Design Team members as
updates become available.
3.4 
Site Plan (ASD) 
•
Convey major site features relevant to the Skatepark & Pump Track placement on site. Survey
will be provided by Client.
3.5 
Preliminary Skatepark & Pump Track Material Reference Plan (ASD) 
•
Identify all major amenities in the Skatepark & Pump Track Master Plan by keynote description.
•
Reference all major details, enlargements and sections.
3.6 
Preliminary Layout Plan (ASD)
•
Final location of Skatepark & Pump Track elements using horizontal coordinates, curve data &
vertical elevations for surface areas only.
•
Enlarged layout plan for the Skatepark & Pump Track using horizontal coordinates, curve data
& vertical elevations for surface areas only.
3.7       3-D Perspective Views (ASD) 
•
ASD shall prepare a 3-D rendering of the Skatepark & Pump Track elements for the
construction documents.
3.8 
Preliminary Grading and Drainage Plan & Coordination (ASD) 
•
Proposed surface spot grades at necessary points to convey intended elevations and direction
of flow.
•
Location and sizing of drainage structures, sizing and location of retention basins, invert, and
finish grades of drains by client provided Civil Engineer.  ASD to provide surface elevations
from edge of concrete inward and rim elevations for drain locations.
3.9 
Sections/Profiles Plan (ASD) 
•
Vertical sections at appropriate scale conveying the overall Skatepark & Pump Track design
intent. 
3.10 
Construction Details (ASD/PROJECT DESIGN TEAM) 
•
Provide sufficient construction detailing for the construction of all elements within this project
that falls under this scope of work within the project limit of work lines.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
 
3.11      Specifications (ASD/PROJECT DESIGN TEAM) 
• 
Provide 60% specifications for all elements within this project that falls under this scope of work 
within the project limit work lines. 
3.12 
Preliminary Statement of Probable Construction Costs – 60% (ASD) 
• 
Prepare cost estimate for the Skatepark & Pump Track within the project’s limit of work. 
3.13 
Storm Water Management Plan- 60% 
• 
Storm water Management Plan within the project limit of work by client if applicable. 
3.14       General Skatepark & Pump Track Lighting Guidelines (ASD) 
• 
ASD will provide general Skatepark & Pump Track lighting layout plan and photometrics for the 
lighting including lighting type, manufacturer, power requirements.  City to provide electrical 
hookup options and location for manufacturer. 
3.15 
60% Client Review Submittal (CLIENT/ASD) 
• 
Submit 60% plan set, specifications, and construction estimate for review by client. 
• 
It shall be the responsibility of the client to review all material and respond to ASD with any 
comments or questions in a timely manner. 
• 
Project Meeting #4 – DD Review (ASD/CLIENT)-Phone 
• 
Client review of 60% submittal. 
 
Task 3.0 Deliverables 
3.1 
Preferred Master Plan rendered on 24” x 36” sheet at an appropriate scale and revised sketches 
of any amenity revisions in digital format.  
3.2 
Cut-sheets and/or product samples for submittal to client for review and approval.  
3.3 
Individual coordination items in sketch format for submittal to Project Design Team as necessary 
to complete the 60%plan set.  
 
 
• 
24”x36” 60% plan set in digital format.60% Specifications in digital format. Cost Estimate in digital 
format. 
 
TASK 4.0-FINAL CONSTRUCTION DOCUMENTS  
 
Objectives: 
• 
Upon review by the Client of the Design Development documents, ASD shall finalize the 
construction contract documents setting forth, in technical detail, the requirements for 
construction of the design.   
• 
The construction documents shall include all items necessary to build the entire Skatepark & 
Pump Track elements from edge of deck inward.   
• 
Construction documents shall include, but not be limited to: layout, surface grading & drainage, 
materials, sections, details and other plans as necessary to facilitate the construction of the 
proposed project. 
• 
ASD will submit 90% plans to the client for review, revisions, and approval. 
• 
Make required revisions as requested by the Client to present to the Client 100% final, 
professional sealed plans for bidding. 
 
 
4.1 
Project Meeting #5 – CD Overview (ASD/CLIENT) Online Meetings-3 
• 
Review approved Design Development drawings and Master Schedule. 
4.2 
90% Construction Documents (ASD/PROJECT DESIGN TEAM) 
• 
ASD will finalize plans to facilitate construction of this Skatepark & Pump Track project. These 
90% construction documents at a minimum shall include: 
• 
Skatepark & Pump Track Features Plan 
• 
Skatepark & Pump Track Materials Plan 
• 
Skatepark & Pump Track Jointing Plan 
• 
Skatepark & Pump Track Concrete Plan

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
• 
Skatepark & Pump Track Layout Plan 
• 
Skatepark & Pump Track Surface Grading and Drainage Plan 
• 
Skatepark & Pump Track Sections and Profiles Plan 
• 
Skatepark & Pump Track Construction Details 
• 
Skatepark & Pump Track Specifications in CSI Format 
• 
Estimate of Probable Construction Cost. 
 
 
• 
Site grading plan-Surface only from edge of deck inward.  
• 
Skatepark & Pump Track drainage plan- Surface only from edge of deck inward. 
 
4.3 
Statement of Probable Construction Cost – 95% (ASD/PROJECT DESIGN TEAM) 
• 
Develop spreadsheet of all Skatepark & Pump Track improvement quantities and unit rates for 
probable construction cost. 
• 
If necessary, ASD will identify acceptable alternatives to align the probable construction cost 
with the available construction budget. The cost estimate will be submitted with the 95% plan 
set to allow for any necessary design adjustments prior to 100% plan submittal and acceptance. 
• 
A final cost estimate based on a current market value that falls within budget will be submitted 
with the 100% final construction documents. 
4.4 
90% Specifications (ASD/PROJECT DESIGN TEAM) 
• 
Refine and revise as necessary technical specifications in CSI (Construction Specification 
Institute) format for all Skatepark & Pump Track construction. 
4.5 
100% Biddable Construction Document Submittal (ASD/PROJECT DESIGN TEAM) 
• 
ASD will finalize plans to facilitate construction of this Skatepark & Pump Track project. These 
final construction documents at a minimum shall include: 
• 
Layout and materials plans with enlargements as necessary  
• 
Signage plan  
• 
Site grading plan-Surface only from edge of deck inward. 
• 
Site drainage plan- Surface only from edge of deck inward. 
 
Task 4.0 Deliverables 
4.1 
Full signed and sealed bid-ready improvement plans. 
4.2 
Revised statement of probable costs. 
4.3 
Revised specifications.  
4.4 
Final submittal from ASD to the Client’s Project Mangers shall include the following: 
• 
Original construction drawings. 
• 
Original technical specifications and table of contents in either PDF or Word format Client to 
provide ASD with final submittal requirements.  
• 
Should the Client request digital files of the work done for archiving purposes ASD will provide 
the AutoCAD files per City requirements.  Construction shall be based on signed and sealed 
hard copy plans only. 
• 
Client shall receive (3) copies of each task item in 8 ½” x 11”, 11”x17” and 24”x36” format in 
their applicable format. 
 
 
END OF SCOPE

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
 
 
ATTACHMENT A 
 
 
FEES AND EXPENSES 
 
1. 
All services to be performed hereunder shall be performed pursuant to the fee schedule attached hereto 
as Attachment “A” and incorporated herein by this reference.  Invoices will be e-mailed end  of each 
month from ASD’s office and continuing through the contract period.  Any additional services agreed in 
writing outside the outlined scope requested by J2 shall be billed as per the attached 2025 Hourly Rate 
Sheet, Attachment “B".   
 
ACCEPTANCE 
 
If this proposal meets with your approval, please sign, and return it to our office.  When accepted, 
this proposal will serve as a mutual commitment between ASD and J2 for the above outlined 
services and fees.  Work will be scheduled upon receipt of the signed agreement. 
 
 
AGREED TO:  ACTION Sports Design, LLC 
 
 
 
                      
 
 
 
February 05, 2025 
By: 
 
 
 
 
 
ACTION Sports Design, LLC 
 
Date 
 
 
 
  
 
 
APPROVED BY:  J2 
 
 
 
 
 
By: 
 
 
 
 
 
J2  
 
 
              
 
Date

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
 
 
DESIGN FEE SUMMARY 
 
Fees for the Design Services within the proposed scope of work are outlined below.  The fees are 
lump sum not to exceed totals.   
 
Fee is based off a 35,000 sq. ft. skatepark and pump track at an average of $65.00 per sq. ft. with a 
target construction budget of $2,275,000.00 x .08% fee specialty planning, design, public meetings 
and sealed construction documents.  
SCOPE OF SERVICES-DESIGN 
     FEE AMOUNT 
 
1.0 
Programming & Conceptual Design 
$27,300.00 
   
 
2.0 
Schematic Design Phase 
$36,400.00 
 
3.0 
Design Development 
$54,600.00 
 
4.0 
Construction Documents 
$63,700.00 
 
 
 
Total Not to Exceed Fees: 
$182,000.00 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note: All expenses are covered in the above-noted fee.
Reimbursable expenses and billing rates are shown on
Attachment B for additional services above and beyond
this scope of work if requested by City of Chandler. No
additional services shall be performed unless approved
in writing by City of Chandler.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
 
 
PROJECT ASSUMPTIONS 
 
The following assumptions shall apply to the proposed scope of work and submitted fees: 
• 
All written documents will be generated using Microsoft Word.   
• 
All spreadsheet documents will be generated using Microsoft Excel. 
• 
All project scheduling will be generated using Microsoft Project. 
• 
The Client will provide all existing digital files to ASD that accurately portrays the boundaries of the 
selected site, existing grading, utilities, drainage, and site amenities if available.  Client will provide a 
Site Survey for the construction documents. 
• 
ASD will stamp their drawings necessary to bid the project including Structural Engineering.  ASD has 
not retained possible specialty engineering that might be required, but available such as: Electrical 
Engineer, Architect, Geotechnical Engineer, or any specialty consultants that may be required for the 
project. Should the Client require additional engineering it will be at direct cost plus 10% coordination 
fee with client pre-approval.  
• 
The Client shall be provided General Conditions of the  technical specifications and any specialty 
bidding requirement documents for the specifications.  ASD will provide all of the technical 
specifications. 
• 
Additional meetings, if required and approved, will be billed at our standard hourly rates (hourly rate 
sheet attached as Attachment “B”). 
• 
Additional plan sets, if required and approved, will be billed at our standard in-house, or out-of-house, 
duplication rates. 
• 
Data collected and methods used shall at a minimum be as follows: 
• 
Plan Processing Requirements – The Client shall outline to ASD and the design team the process 
required for the ultimate approval of all reports, plans, specifications, and cost estimates.  The 
Client shall provide ASD with any specific details, title blocks, specifications, and/or document 
formatting required by the Client.  A Project Manager employed by the Client shall be provided to 
assist ASD and the design team in the submittal and approval process during the entire duration 
of the project. 
• 
Budgeting – The Client shall inform ASD of the proposed construction budget of this project. 
• 
Gather existing reports/studies/record drawings – The Client shall provide ASD with all available 
information for water, sewer, electrical, and irrigation prior to the site visit.  The Client shall 
provide ASD and design team any available “as-built” plans/notes, all existing digital files for 
existing conditions (grades, facilities, past improvements), as well as a current site survey. 
• 
Coordination of Utilities – The Client shall provide ASD with addresses, phone numbers, and 
contacts for all utility companies servicing the site.  This information shall be utilized to verify 
existing services and determine requirements to adequately serve the park development.  The 
utility companies shall also be expected to provide underground utility locations critical to the 
project as well as describing any existing or future utility easements.  Specific processing 
requirements shall be provided to ASD for each utility company involved in the project site. 
• 
Survey and Mapping – The Client shall provide ASD with a current survey locating all above and 
below ground utilities, appurtenances, structures, and easements.  If current survey spots do not 
exist client shall hire a surveyor to gather such pertinent data. 
• 
 Topographic Mapping – The Client shall provide ASD with a current overall base map displaying 
the site’s relief through contour and spot elevations.  Should a current overall base map not exist, 
ASD shall hire a surveyor to gather such survey points necessary.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
• 
Geotechnical Report – If a current geo-technical report is available, it shall be the responsibility of 
the Client to provide ASD with the report prepared specifically for the project site.  Should an 
existing report be available it shall be a maximum of 1 year old.  If the report is over 1 year old, 
the original firm preparing the report shall issue a letter testifying that the report is still valid and 
no corrections or updates need to be prepared for the report.  The letter shall be dated within 30 
days of ASD’s receipt of the Geotechnical report.  The report shall be completed and sealed by a 
Geotechnical Engineer registered in the state where the project site is located.   
At a minimum the report is to include the following; vicinity map of the project limits, plot 
plan/aerial showing location of borings, detailed description of the findings and recommendations, 
a detailed report of the laboratory tests performed, and an executive summary stating general 
findings and recommendations.  Should a current geo-technical report not exist, upon the Client’s 
request, ASD can interview potential sub-consultants, negotiate a contract with the sub-
consultant and coordinate the testing and preparation of the report. 
 
 
DELIVERY FORMAT 
 
The following assumptions shall apply to the proposed scope of work and submitted fees: 
• 
All written documents will be generated using Microsoft Word.   
• 
All spreadsheet documents will be generated using Microsoft Excel. 
• 
All project scheduling will be generated using Microsoft Project.  
 
PROJECT CONDITIONS 
 
• 
Client Approvals.  A written request by the Client to commence each phase constitutes approval of 
prior design.  Changes, directed and approved by Client requiring redesign and/or revisions during 
subsequent phases, will be considered as additional services and will be documented and billed on 
an hourly basis.  
• 
Offsite Improvements:  Responsibilities for the preparation and coordination of construction 
documents and exhibits for all off-site improvements not specifically outlined in this scope or work are 
not included in this fee proposal.

ACTION Sports Design, LLC | 12400 W Hwy 71, Suite 350-348 | Austin, TX 78738 | ph: 1.512.387.5827 
 
 
 
 
 Action Sports Design/ Development 
 Skateparks/ Plazas 
 Bike Parks 
 Construction Administration 
 
 
 
ATTACHMENT B 
 
 
2025 ASD-HOURLY RATES & EXPENSES SCHEDULE-ADDITIONAL SERVICES 
 
 
ASD-FIRM TITLE 
RATE/ HR. 
DIRECT EXPENSES/ ALLOWANCE 
Principal 
$ 210.00 
• Flights (based on coach fare rates) 
Associate 
$ 175.00 
• Car Rental (based on mid-size car rate, 
Project Manager 
$ 165.00 
  Applicable taxes, fees, insurance and fuel. 
Lead Designer 
$ 140.00 
• Accommodations (not to exceed $175/night) 
Lead Graphics 
$ 110.00 
• Mileage (paid at current irs rate per mi) 
Drafting/ Production 
$   95.00 
• Meals ($50.00/per day allowance) 
Clerical/ Administration 
$   65.00 
• Parking Fees (airport, garage, meters) 
• Tolls 
• Printing/Duplicating/Plotting/Blueprinting 
• Phone/Fax 
• Messenger 
  
• Postage/Federal Express 
  
• Graphics 
• Physical and 3D Models 
 
 
 
 
 
 
 
 
 
Note: All expenses are covered in the proposed fee
shown on the DESIGN FEE SUMMARY page.
Reimbursable expenses and billing rates are shown on
this Attachment B page for additional services above
and beyond the scope of work if requested by City of
Chandler. No additional services shall be performed
unless approved in writing by City of Chandler.

DLR Group inc.
an Arizona corporation 
6225 North 24th Street, Suite 250 
Phoenix, AZ  85016 
 
 
 
January 21, 2025 
Mr. Jeff Velasquez 
J2 Engineering and Environmental Design LLC 
Re:  Architectural and Engineering Design Services for Mesquite Groves Park Buildings (Chandler) 
 
Dear Mr. Velasquez, 
 
We are pleased to be able to continue work with you and J2 Engineering to design the service buildings of 
Mesquite Groves Park.  The proposal is based upon our recent discussions with you and emailed scope 
memorandum. 
 
Project Understanding: DLR Group will Design and provide construction services for the following buildings at 
Mesquite Groves Park:  
• 
Maintenance Yard with Storage and Small Office Building 
• 
(2) Restroom-Concession Buildings 
• 
(2) Standard Restroom Buildings 
• 
Small Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Large Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Wall Enclosure Design (1 design to be applied to site walls such as pump enclosure, maintenance yard 
and trash enclosures) 
 
The Proposed DLR Group lump sum fee is as follows: 
 
Task 100, 30% Construction Documents for Mesquite Groves Park Buildings = $170,000 
Task 200, 60% Construction Documents for Mesquite Groves Park Buildings = $238,000 
Task 300, 95% Construction Documents for Mesquite Groves Park Buildings = $238,000 
Task 400, 100% Construction Documents for Mesquite Groves Park Buildings = $34,000 
Total Lump Sum = $680,000 
 
The Proposed DLR Group Reimbursable Allowance for printing, travel and reimbursable expenses as approved/ 
requested by client is as follows: 
Total Reimbursable Allowance = $15,000 
 
*Reimbursables includes printing costs (exclusive of presentation material) and others to be determined by 
client. All items billed at 1.1x actual cost. 
 
 
Scope of Services 
 
Task 100.  30% Construction Documents for Mesquite Park Buildings 
DLR Group shall prepare the 30% construction documents for the following scope: 
• 
Maintenance Yard with Storage and Small Office Building 
• 
(2) Restroom-Concession Buildings 
• 
(2) Standard Restroom Buildings

Mr. Jeff Velasquez 
January 21, 2025 
Page 2 
 
 
 
• 
Small Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Large Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
 
Products 
1. Develop 30% Construction Documents for Cost Estimate pricing to include: Architectural floor plans, 
elevations and engineering narratives (Structural, Mechanical, Plumbing and Electrical Engineering).    
2. Response to City Client Comments following submittal  
 
Meetings 
1. One (1) MPE Coordination with City of Chandler and J2 regarding preferences and standards. 
2. One (1) City of Chandler design input for materiality, plans and aesthetics including preferences and 
standards. 
3. Up to two (2) J2 coordination meetings.  
4. Up to three (3) virtually attended project coordination meetings. 
5. One (1) 30% document page turn with City of Chandler and J2. 
 
Fee 
1. 30% Architectural and Engineering Design Services for construction documents = $170,000 
 
Task 200.  60% Construction Documents for Mesquite Park Buildings  
DLR Group shall prepare the 60% construction documents for the following scope: 
• 
Maintenance Yard with Storage and Small Office Building 
• 
(2) Restroom-Concession Buildings 
• 
(2) Standard Restroom Buildings 
• 
Small Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Large Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Wall Enclosure Design (1 design to be applied to site walls such as pump enclosure, maintenance yard 
and trash enclosures) 
 
Products 
1. Develop 60% Construction Documents for Cost Estimate pricing to include: Architectural floor plans, 
elevations, engineering plans (Structural, Mechanical, Plumbing and Electrical Engineering) and 
specifications.    
2. Response to City Client Comments following submittal  
 
Meetings 
1. Up to two (2) J2 coordination meetings  
2. Up to four (4) virtually attended project coordination meetings. 
3. One (1) 60% document page turn with City of Chandler and J2. 
4. One (1) 60% Cost Estimate RFIs and budget resolution. 
 
Fee 
1. 60% Architectural and Engineering Design Services for construction documents = $238,000 
 
Task 300.  95% Construction Documents for Mesquite Park Buildings 
DLR Group shall prepare the 95% construction documents for the following scope: 
• 
Maintenance Yard with Storage and Small Office Building 
• 
(2) Restroom-Concession Buildings 
• 
(2) Standard Restroom Buildings 
• 
Small Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering)

Mr. Jeff Velasquez 
January 21, 2025 
Page 3 
 
 
 
• 
Large Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Wall Enclosure Design ( 1 design to be applied to site walls such as pump enclosure, maintenance yard 
and trash enclosures) 
 
Products 
1. Develop 95% Construction Documents for Cost Estimate pricing to include: Architectural floor plans, 
elevations, engineering plans (Structural, Mechanical, Plumbing and Electrical Engineering) and 
specifications.    
2. Response to City Client Comments following submittal  
 
Meetings 
1. Up to two (2) J2 coordination meetings  
2. Up to four (4) virtually attended project coordination meetings. 
3. One (1) 95% document page turn with City of Chandler and J2. 
4. One (1) 95% Cost Estimate RFIs and budget resolution. 
 
Fee 
1. 95% Architectural and Engineering Design Services for construction documents = $238,000 
 
Task 400.  100% Construction Documents for Mesquite Park Buildings 
DLR Group shall prepare the 100% construction documents for the following scope: 
• 
Maintenance Yard with Storage and Small Office Building 
• 
(2) Restroom-Concession Buildings 
• 
(2) Standard Restroom Buildings 
• 
Small Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Large Picnic Ramada Design (Architectural and Structural Engineering only, lighting provided by J2 site 
lighting consultant, Wright Engineering) 
• 
Wall Enclosure Design ( 1 design to be applied to site walls such as pump enclosure, maintenance yard 
and trash enclosures) 
 
Products 
1. Develop 100% Construction Documents stamped and sealed for City of Chandler permit review/ 
construction. 
2. Regulatory Review Submittal Package 
3. Regulatory Review Comments and Responses (assuming no more than 2 rounds of comments) 
 
Meetings 
1. Up to one (1) J2 coordination meetings  
2. Up to one (1) virtually attended project coordination meetings. 
3. One (1) 100% document page turn with City of Chandler and J2. 
4. One (1) 100% GMP RFIs and budget resolution. 
 
Fee 
1. 100% Architectural and Engineering Design Services for construction documents = $34,000 
 
 
 
Assumptions and Clarifications: 
1. Projects are Construction Manager at Risk   
2. Site work, civil engineering, surveying, fire flow tests and geotechnical testing are not included with this 
scope. 
3. Regulatory review will go through City of Chandler and Maricopa County plan review and permit fees are 
not included.   
4. Special Inspections and Testing to be provided by others.

Mr. Jeff Velasquez 
January 21, 2025 
Page 4 
 
 
 
5. Commissioning to be provided by others.  
6. Design may be issued in multiple packages (by building) and packaging needs to be determined prior 
to 60% document submittal.   
7. Public meetings are not anticipated. 
8. Fire suppression and fire alarm to be performance based only and design provided by others as 
deferred submittal.  
9. IT and security are limited to conduit and backbox and coordination with client’s preferred vendor. 
10. Electrical engineering scope limited to buildings identified. Site lighting and power to be coordinated 
with J2 consultant, Wright Engineering.  
11. Food Service Consultant for concessions building(s) not included in scope.   
12. Scope of services limited to the buildings identified.   
13. Reproduction services to be provided by others. 
14. Meeting notes, distribution and meeting coordination provided by others.  
15. Meetings listed anticipated to be 1 hour in length. 
16. Post Design/ Construction phase services may be added as a separate contract at City request. 
 
The above fees shall be billed monthly according to the percentage completed.  If this general understanding is 
not correct, or if J2 and City of Chandler feels additional design services are needed beyond this scope of work, 
such services can be provided on an additional time and materials basis at the rates shown in this proposal. 
 
Hourly Billable Rates 
Employee or Category 
Rate
Principal
$235/hr
Senior Architect/ Engineer/ Interior Designer
$205/hr
Architect/ Engineer/ Interior Designer
$175/hr
Junior Architect/ Engineer, Interior Designer, BIM Manager
$145/hr
Job Captain, Architect/ Engineer in Training, Junior Interior 
Designer
$115/hr
Drafter/ Administrator
$90/hr
 
 
 
Thank you for this opportunity to work with J2 Engineering. 
 
Sincerely, 
 
 
 
Carmen Wyckoff 
Architect | Vice President 
 
cc: Katrina Leach

February 4, 2025 
 
J2 Engineering & Environmental Design  
4649 East Cotton Gin Loop, Suite B2 
Phoenix, AZ 85040 
 
Attn: Jeff Velasquez, PLA, ASLA 
 
Principal 
 
Re: Mesquite Groves Park, City of Chandler – Revision 1 
Scope and Fee Proposal – Design Services For Geotechnical and Structural 
Services 
 
Dear Jeff: 
As requested, Ethos Engineering LLC (Ethos) is pleased to present this proposal to 
provide geotechnical and structural engineering services for Mesquite Groves Park. This 
proposal includes our proposed scope of work, work-hour estimate, and fee proposal for 
engineering services.  This revisions addresses comments from the project team. 
1.0. 
PROJECT UNDERSTANDING 
We understand that J2 Engineering & Environmental Design (J2 Design) has been 
selected by the City of Chandler (City) to provide professional design services for the 
Mesquite Groves Park project. This project spans approximately 90 acres near the 
intersection of Riggs Road and Val Vista Drive, just north of Basha High School. The park 
will feature a variety of new amenities, including sport courts, playgrounds, a 5-acre fishing 
lake, sports fields, restroom/concession/office buildings, maintenance yard, and parking 
facilities. 
As part of the design team, Ethos will act as a subconsultant to J2 Design, offering 
geotechnical and structural engineering design services. 
2.0. 
SCOPE OF SERVICES 
Ethos’ scope of work will include geotechnical and structural design to accompany the 
construction documents prepared by J2 Design. The following sections outline our 
proposed scope of services for geotechnical and structural engineering design. 
2.1. 
GEOTECHNICAL DESIGN 
Ethos has been asked to provide geotechnical design services for the project. The 
geotechnical scope of work will include subsurface drilling to address the proposed 
improvements. This, and any pavement needs, will be addressed by our investigation. 
Percolation testing will consist of a combination of shallow backhoe test pits (to 
accommodate testing) and adjacent confirmation test borings.

February 4, 2025 
Scope and Fee Proposal –Geotechnical and Structural 
Mesquite Groves Park, Chandler 
2 
 
 
Ethos will prepare a Geotechnical Field Investigation Plan (FIP) showing the intended 
boring locations, equipment access, and equipment information and submit to the City and 
project team. We will also coordinate with the City for approval to work within their right-
of-way. It is assumed that no additional permit fees or right-of-way permits will be required 
from additional entities (i.e. Maricopa County). 
Ethos will mark the test boring locations. Prior to any excavations, we will contact AZ 811 
and will coordinate with park personnel to locate any on-site buried utilities which are near 
planned borings. A private utility locator is also included as part of this scope. 
2.1 
Test Drilling 
We will perform twenty truck-mounted hollow stem auger (HSA) test borings advanced to 
depths ranging from 5 to 20 feet or to the practical depth of auger refusal, whichever is 
less. Test drilling will be performed by ACS Services as a subcontractor to Ethos. Ethos 
will coordinate with ACS to schedule the field work. Sampling will consist of drive samples 
taken at selected intervals of 2.5 to 5 feet. Bulk samples of auger cuttings will also be 
collected for testing. All borings will be backfilled with soil cuttings when completed. Given 
the undeveloped nature of the site, traffic control is not anticipated. 
2.2 
Percolation Testing for Stormwater Retention 
Ethos will subcontract ACS to provide a backhoe with operator to excavate eight test pits 
to a depth of 1 foot for the performance of double-ring percolation testing. ACS will also 
drill one HSA test boring to a depth of 15 feet adjacent to each pit to determine the soil 
profile below the test section. Testing will be performed until stabilized rates are 
established. The test pits and borings will be backfilled with soil cuttings once testing is 
completed. 
2.3 
Laboratory Testing  
Ethos will deliver all samples to ACS for laboratory testing. Testing is estimated to be the 
following: 22 grain-size analysis, 22 Atterberg limits (plasticity index) tests, 22 ring density 
tests, 3 moisture-density relation (standard Proctor), 3 swell tests, and 3 corrosion suite 
of tests. 
2.4  
Agronomy Testing 
Ethos will have an agronomy subconsultant sample, test and provide agronomic 
recommendations for the proposed multi-use fields. 
2.5 
Engineering Analysis & Reporting 
Ethos will perform engineering analyses of the data obtained from the exploration to 
prepare a Geotechnical Report for the project. The report will be prepared under the 
supervision of a Professional Civil Engineer registered in the State of Arizona. We plan on

February 4, 2025 
Scope and Fee Proposal –Geotechnical and Structural 
Mesquite Groves Park, Chandler 
3 
 
 
preparing a draft and final Geotechnical Report addressing the building structures and 
pavement. 
Generally, the Geotechnical Report will include the following data: 
• 
Description of the area covered by the report and existing site conditions, including 
map. 
• 
Description of the geology and topography of the area, including soil types, and 
drainage characteristics and estimated depth to groundwater. 
• 
A site plan showing the boring locations and a description of procedures and 
equipment used in the subsurface investigation program. The field investigation 
discussion will include descriptions of the soil types, penetration test results, and 
in situ test results. 
• 
Results of laboratory tests and a description of test methods. Laboratory test 
results will include classification and engineering properties for all major soil strata 
in the study area. 
• 
A discussion of geological and geotechnical conditions and results with reference 
to specific locations on the Project. 
• 
Recommendations for: 
o Site grading and foundation design for proposed building structures 
including vertical and lateral resistance of soils. 
o Temporary and permanent cut and fill slopes.  
o Evaluation of shrink/swell potential and the impact on foundations, where 
applicable. 
o Impacts of compressible, hydro-collapsible, and/or expansive soils, if 
present, and proposed mitigations. 
o Pavement recommendations for new roadways. 
o Construction considerations. 
o Results of percolation testing, and 
o Suitability of materials (borrow, aggregates, etc.) that can be obtained from 
project excavations. 
• 
Report will also include the following items in the appendix: 
o Plan view locations of field sampling/testing  
o Copies of the boring logs and field/laboratory test data used for the analysis 
and design. 
2.2. 
STRUCTURAL DESIGN 
The park amenities include the construction of six pickleball courts and two basketball 
courts. Ethos has been requested to provide structural engineering services for the 
basketball and pickleball post-tensioned slab courts. Our structural scope of work involves 
preparing calculations and details for the design of two separate post-tensioned (PT) 
concrete slabs. The first PT slab design (approximately 60’x108’) will accommodate three 
pickleball courts. Two identical slabs will be constructed for a total of six pickleball courts. 
The second PT slab design (approximately 94’x108’) will accommodate two basketball 
courts.

February 4, 2025 
Scope and Fee Proposal –Geotechnical and Structural 
Mesquite Groves Park, Chandler 
4 
 
 
Ethos will prepare structural calculations, construction plans, special provisions, and a 
cost estimate for the post-tensioned courts. These deliverables will align with the project 
submittal milestones, which are summarized in the next section. Sealed structural 
calculations will be submitted at the Final submittal. 
Additionally, we understand that structural design will be required for some undefined 
items as the design progresses. This may include retaining wall design in the playground 
areas and entry monument elements throughout the park. These additional items are 
included as allowances and are not part of the main scope of work summarized above. 
3.0. 
PROJECT MEETINGS AND MANAEMENT 
The Project Engineer will lead the overall design efforts for this task, attend meetings, and 
manage submittals. As indicated by J2 Design, the project will include a kick-off meeting, 
comment resolution meetings, and design progress meetings. Ethos will attend a total of 
twelve (12) meetings throughout the design phase. These meetings are anticipated to be 
virtual and will occur on an as-needed basis to coordinate the work. Our scope includes a 
kick-off meeting at the site to familiarize ourselves with the project. 
4.0. 
SCHEDULE 
The project is anticipated to have 30%, 60%, 95%, 100% (Pre-final), and Final submittals. 
After the 30% submittal, the project will be broken down into phases. Structural design is 
expected to commence after the 30% stage submittal. Ethos will ensure the necessary 
manpower is available to meet all submittal milestones. 
5.0. 
PROJECT FEES 
A summary of the fees, per discipline, is presented in the following table: 
Billing Group 
Total 
Geotechnical 
$59,427.67 
Structural 
$33,679.58 
TOTAL:
$93,107.25 
 
Allowances for additional structural items are included in this proposal. Upon approval 
from the City and J2, Ethos will perform the work on a time-and-material (TM), not-to-
exceed (NTE) basis. 
 
• 
Allowance 1, for retaining wall design, is estimated at $11,555.00. 
• 
Allowance 2, for the design of entry monument elements, is estimated at 
$10,128.00.

February 4, 2025 
Scope and Fee Proposal –Geotechnical and Structural 
Mesquite Groves Park, Chandler 
5 
 
 
Assumptions: 
The following assumptions/inclusions are summarized below: 
• 
Traffic control will not be required to perform the field investigation.  
• 
Unrestricted daytime work hours. 
• 
Full-size project drawing set (24”x36”) (PDF) will be provided for each submittal. 
• 
A contract for post-design services during construction will be issued to Ethos at 
the completion of the design services if desired by the Owner. 
 
Exclusions: 
• 
Survey 
• 
City Permit Fees 
• 
Public Involvement 
• 
Environmental, biological and cultural assessment, investigations and clearance 
for construction to be provided by the City of Chandler. 
 
6.0 
CLOSURE 
We appreciate the opportunity to submit this work scope and estimate of costs and look 
forward to working with you on this project. If you have any questions or require additional 
information pertaining to this proposal, we would be pleased to discuss them with you. 
Sincerely, 
Ethos Engineering, LLC 
Reviewed By: 
 
 
 
Michelle Contreras, EIT 
 
 
 
Francisco J. Garza, P.E. 
Structural Designer   
 
 
 
President 
 
t:\2025xxx - j2 - mesquite groves parks\scope and fee proposals\rev1\j2 -mesquite groves park -  cost proposal - 2024-02-
04.docx 
 
Attachments:  
Cost Summary; Work-hour Estimate (Structural); 
 
Cost Summary; Work-hour Estimate (Geotechnical); 
 
Subcontractor Estimates (ACS and Agronomy)

Item/Task
Project Manager
Sr. Geotech Engineer
Engineer/Senior 
Designer
Design Engineer
Sr. CADD Designer 
TOTAL
Billing Group 03:Geotechnical
Layout, AZ811
1
8
9
Field Investigation - Drilling
2
32
34
Field Investigation - Percs
2
32
34
Lab Testing
1
4
5
Engineering Analysis & Draft and Final Geotechnical Report
6
18
28
12
8
72
0
Total Billing Group 03:Geotechnical
7
23
72
44
8
154
Fee Total Billing Group 03:Geotechnical
2,142.00
$           
5,129.00
$                        
10,512.00
$                 
4,840.00
$            
832.00
$                        
23,455.00
$          
TOTAL HOURS
7
23
72
44
8
154
Geotechnical 
Ethos Engineering, LLC - Geotech
Mesquite Groves Park
J2 Engineering & Environmental Design
City of Chandler
1

Ethos Engineering, LLC
Estimated Direct Labor 
Average Hourly Loaded Rates
Classification
Hours
Rate
Cost
Project Manager
7
$306.00
$2,142.00
Sr. Geotech Engineer
23
$223.00
$5,129.00
Engineer/Senior Designer
72
$146.00
$10,512.00
Design Engineer
44
$110.00
$4,840.00
Sr. CADD Designer 
8
$104.00
$832.00
154
Total Estimated Labor:
$23,455.00
Estimated Direct Expenses
(Listed by Item at Estimated Actual Cost - NO MARKUP)
Mileage (Personal Vehicle)
266 Miles @ $0.655/mi.
$174.23
Total Estimated Direct Expenses:
$174.23
Estimated Outside Services
Test Drilling (ACS - See Attached)
$23,028.30
Laboratory Testing (ACS - See Attached)
$6,430.14
Utility Location (Onpoint)
$1,850.00
Agronomy Testing  (See Attached)
$4,490.00
Total Estimated Outside Services:
$35,798.44
Total Estimated Cost:
$59,427.67
4-Feb-25
Signature
Date
J2 Engineering & Environmental Design
Derivation of Cost Proposal
Mesquite Groves Park
Summary
Geotechnical Services
City of Chandler

Page:
1 of 1
Proposal #:
2560005 rev1
Proposal Date:
2/4/2025
Ethos
Pancho Garza
9180 S Kyrene Rd, #104
Tempe, AZ 85284
 
Item
Quantity
Unit
Cost
Price
Drilling
Mob/Demob 
1
HR
225.00
$                            
225.00
$                  
Auger Drilling 
235
FT
32.78
$                              
7,703.30
$               
DR Infiltrometer testing (to include report)
8
EA
1,750.00
$                         
14,000.00
$             
Backhoe and Operator (10-hr/day)
2
DY
550.00
$                            
1,100.00
$               
Drilling Total
23,028.30
$             
Lab
Grain Size Analysis C136 & C117
22
EA
95.00
$                              
2,090.00
$               
Atterberg Limits (placticity Index) D4318
22
EA
85.96
$                              
1,891.12
$               
Undisturbed Ring Density/Moisture D2937
22
EA
40.32
$                              
887.04
$                  
Moisture Density Relationship (Proctor) D698
3
EA
138.86
$                            
416.58
$                  
One-Dimensional Swell Test D4546
3
EA
100.05
$                            
300.15
$                  
pH and Minimum Resistivity AZ 236E
3
EA
166.75
$                            
500.25
$                  
Sulfates and Chlorides AZ 733b/736b
3
EA
115.00
$                            
345.00
$                  
Lab Total
6,430.14
$               
Total Lump Sum Costs
29,458.44
$             
Charles Johnson "Eddie"
Charles Johnson "Eddie"
Thank you for the opportunity to provide a quote for one of your potential jobs.
Chandler, AZ 85249
Subject: Advance 4 1/4" HSA borings, (two to 20', Five to 5', five to 10', and eight to 15') for a total of 235'. Additionally 
ACS will perform 8 DR Perc Testing adjacent to the 15' borings and Lab Testing. Ethos will call in utilities and provide 
any permits and TC needed. 
Mesquite Groves Park
SWC Cloud St and Val Vista Dr
Project Name:
Location:
DBE   SBE   WBE
SERVICES LLC
A C S

Victoria Normandin, LLC
8612 S. Newberry Lane
Tempe, AZ 85284
Cell:  602-799-7248
Email:  vicn@cox.net
Pancho Garza, PE
pgarza@ethosengineers.com
Ethos Engineers
9180 S. Kyrene Road, #104
Tempe, AZ 85284
Mesquite Groves Park
Costs for Agronomy Testing and Recommendations   1/20/2025
Soil samples (0-1', 1-2', 2-3') will be taken by Ethos at six locations.
Samples will be submitted to Motzz Laboratory for analyses.
Irrigation water source will be sampled and tested prior to planting.
Item
Price
Quantity
Quote
Site Evaluation
(per unit )
($)
Bioassay Analysis
175.00
6
1050.00
Complete Nutrient Analysis
70.00
6
420.00
Standard Nutrient Analysis
35.00
8
280.00
Texture Analysis (sand-silt-clay, classification)
30.00
14
420.00
%OM, Organic Matter
30.00
6
180.00
Irrigation suitability
65.00
1
65.00
Site Visit
200.00
2
400.00
Agronomy Report (hr) Landscape/ Water quality
200.00
6
1200.00
4015.00
Price
Quantity
Quote
Ball fields at finish grade (if required)
per field
Complete Nutrient Analysis
70.00
1
70.00
%OM, Organic Matter
30.00
1
30.00
Sampling and travel (hr)
175.00
1
175.00
Agronomy Report (hr) Turf / Water quality 
200.00
1
200.00
per field
475.00

Item/Task
Project Manager
Sr. Structural Engineer
Structural Engineer
Design Engineer
Sr. CADD Designer 
TOTAL
Billing Group 01:Administration, Coordination, Submittals
Administration and Coordination
2
2
Project Related Meetings (12 each)
8
4
12
Submittal Process (30%, 60%, 95%, Pre-Final, Final)
2
2
4
6
14
Calculation Report 
2
4
6
Special Provisions
1
2
5
8
Total Billing Group 01:Administration, Coordination, Submittals
13
10
0
13
6
42
Fee Total Billing Group 01:Administration, Coordination, Submittals
3,978.00
$                   
2,230.00
$                       
-
$                             
1,430.00
$                   
624.00
$                      
8,262.00
$                   
Billing Group 02:Structural Design of Miscellaneous Structures
General Notes, Index of Drawings
4
4
8
8
24
PT Basketball Courts (1 Sheet)
1
8
8
24
24
65
PT Pickelball Courts ( 1  Sheet)
1
8
8
24
24
65
PT Details
1
6
6
15
12
40
Total Billing Group 02:Structural Design of Miscellaneous Structures
3
26
26
71
68
194
Fee Total Billing Group 02:Structural Design of Miscellaneous Structures
918.00
$                      
5,798.00
$                       
3,796.00
$                   
7,810.00
$                   
7,072.00
$                   
25,394.00
$                 
TOTAL HOURS
16
36
26
84
74
236
TOTAL STRUCTURAL HOUR DOLLARS
4,896.00
$                   
8,028.00
$                       
3,796.00
$                   
9,240.00
$                   
7,696.00
$                   
33,656.00
$                 
Ethos Engineering, LLC - Structures
J2 Engineering & Environmental Design
Mesquite Groves Park
City of Chandler

Ethos Engineering, LLC
Estimated Direct Labor 
Average Hourly Loaded Rates
Classification
Hours
Rate
Cost
Project Manager
16
$306.00
$4,896.00
Sr. Structural Engineer
36
$223.00
$8,028.00
Structural Engineer
26
$146.00
$3,796.00
Design Engineer
84
$110.00
$9,240.00
Sr. CADD Designer 
74
$104.00
$7,696.00
236
Total Estimated Labor:
$33,656.00
Estimated Direct Expenses
(Listed by Item at Estimated Actual Cost - NO MARKUP)
Mileage (Personal Vehicle)
36 Miles @ $0.655/mi.
$23.58
Total Estimated Direct Expenses:
$23.58
Total Estimated Cost:
$33,679.58
Estimated Allowances
A1. Retaining Wall Design
$11,555.00
A2. Miscellaneous Structures (Entry Monument Elements)
$10,128.00
1/20/2025
Signature
Date
****************************************************************************************************************************
Derivation of Cost Proposal
Mesquite Groves Park
Summary
J2 Engineering & Environmental Design
Structural Services
City of Chandler

January 16, 2025
For:
Project:
Mesquite Groves Park 
Chandler, AZ
Facility Signage 
Conceptual Development -  30% Submittal
Generate a location plan with associated messages as a means of ensuring proper sign placement and content.  
Placement and configuration to account for traffic patterns and viewpoints/sightlines for best visibility and use. 
Plan will be used as a basis for conceptual development so that the resulting signs can properly 
accommodate all needed information.
Review the location/message plan with City of Chandler, making any requested modifications prior 
to beginning conceptual development.
Upon approval of the location plan, develop 2 concepts for each of the following:
1- Court/Amenity Rules* - inclusive of both graphics and structure
2 -Vehicular and Pedestrian Directionals 
3 - Field and Court ID signs 
4 - Ramada markers with scheduling mechanism
Concepts to be developed utilizing color elevations and plan views as necessary to convey intent.
Submit to City of Chandler for review and comment and make any required revisions for final approval of selected concept.
Conceptual Development Total $6655
*Copy for rules panels to be provided by City of Chandler
J2 Engineering and Environmental Design -Jeff Velasquez
sheet 1 of 2
LISA RANZENBERGER
Signage and Wayfinding Design

LISA RANZENBERGER
6 0 2 . 7 2 2 . 9 8 4 8
l i s a r a n z e n b e r g e r @ i c l o u d . c o m
sheet 2 of 2
Design Development/Design Intent Documentation - 60%, 95% and Final Submittals
Refine approved conceptual drawings as expected by industry standards and as needed to convey intent and 
as required for bidding as well as preparation of shop drawings by a fabricator.
 Drawings to include elevations, plans, descriptions, details and notations to communicate necessary 
lay-out and associated dimensions, material and finish specifications, hardware specifications if 
necessary for aesthetic intent, fabrication techniques as required to achieve aesthetic intent as well 
as to address maintenance and/or durability concerns.
Any structural/electrical intent will be outlined only as it may relate to the aforementioned.
Required structural engineering and electrical design will be the responsibility of the fabricator.
Along with the drawings, technical specifications in the appropriate format and a 
probable cost estimate will be developed.
Design Development/Design Intent Documentation   $3283
Graphic Panel File Production
Generate full-size PDF or illustrator print files court/amenity rules for fabricator use in production.
Graphic Panel Production Files Total $850
Conceptual Development Total 
 $6655
Design Development/Design Intent Documentation 
$3283
Graphic Panel File Production                          
$850     
GRAND TOTAL 
$10788
Proposal does not include generation and submittal of a Comprehensive Sign Plan should one be required.

NFra Inc.                                    77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                       a transportation engineering firm 
 
 
January 16, 2025 
 
 
Jeff Velasquez, PLA. ASLA 
J2 Engineering & Environmental Design 
4649 E. Cotton Gin Loop 
Suite B2 
Phoenix, AZ 85040 
 
RE: 
Project No.: PR2401.201 
Project Name: MESQUITE GROVES PARK 
Scope of Work and Fee Proposal 
 
Dear Mr. Velasquez, 
 
NFra Inc. is pleased to provide professional roadway and utility engineering design services for the 
Mesquite Groves Park project for the City of Chandler in a subconsultant role to J2. Our scope of 
services and fees are based upon our understanding of the project from our conversations, emails, and 
exhibits provided to us. Our understanding is NFra will design the new roadway improvements for 
Hillcrest Drive (main road through park) and Cloud Drive as well as the proposed water, reclaimed 
water, and sewer improvements. 
 
Our fees include: 
 Task 100: Roadway and Utility Design: 
 
$273,350.00 
 Task 200: Meetings and Site Visits:  
 
    $8,010.00 
 Task 300: Quantities/Estimate/Specs/QC/Phasing:   $34,390.00  
TOTAL 
 
$315,750.00 
 
We are looking forward to working with J2 and the City of Chandler on this project. If you have any 
questions, please feel free to contact me at (602) 443-6066 or rweyrauch@nfrainc.us. 
 
 
Sincerely, 
 
Randy Weyrauch, P.E. 
Project Manager 
 
 
 
 
 
 
 
L:\Project Management\J2 Engineering\Mesquite Park\Submittal 011625\Jeff Velasquez Cover Letter_Mesquite Park_011625.doc

NFra Inc.                                    77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                   a transportation engineering firm 
 
Page 1 of 4 
CLIENT: 
 
 
CITY OF CHANDLER 
SUBCONSULTANT TO: 
J2 ENGINEERING and ENVIRONMENTAL DESIGN, LLC (J2) 
PROJECT NAME:  
MESQUITE GROVES PARK 
PROJECT NO: 
 
PR2401.201 
TBD 
 
SCOPE OF WORK – DESIGN PHASE 
 
A. PROJECT UNDERSTANDING 
City of Chandler will be developing the 90-acre Mesquite Groves Park site located on the northwest 
corner of the Riggs Road and Val Vista Drive intersection, just north of Basha High School. It is 
anticipated that the site will be constructed in three phases consisting approximately of 30 acres each. 
The entire site will be designed as one document at the 30% stage and then separated into three 
documents starting with the 60% stage to accommodate phased construction. Project amenities will 
include multi-use fields, diamond fields, dog park, skate park, tennis courts, pickleball courts, 
volleyball courts, disc golf course, splash pad, playgrounds, fishing lake, restrooms, concession 
building, recreation center, ramadas, trails, parking lots and roadways. 
 
 
Task 100: Roadway and Utility Design Services: 
 
 
Hillcrest Drive: NFra will provide design services to prepare construction documents for a new 
roadway that will connect existing Hillcrest Drive on the west side of the park to Val Vista Drive on the 
east side of the park. Design limits at parking lot access points will terminate at the parking lot curb 
returns where match lines will be coordinated with J2. Curb and gutter and sidewalks will be provided 
on both sides of the new roadway. Corner ramps will be provided at each parking lot curb return; eight 
parking lot access points are anticipated. NFra will coordinate with J2 on the drainage discharge 
locations, it is anticipated that sags in the roadway will be needed to convey runoff to roadside retention 
basins. 
 
 
Cloud Drive: NFra will provide design services to prepare construction documents for a new roadway 
that will connect existing Val Vista Drive to the City’s maintenance yard facility located at the north 
end of the park. Curb and gutter and sidewalk will be provided on the south side of the roadway. NFra 
will coordinate with RWCD to underground their open irrigation ditch. RWCD relocations will be 
designed and prepared by their design consultant. Permit application will be submitted along with final 
sealed plans to RWCD to obtain a construction permit. 
 
Plan and profile sheets will be prepared at a scale of 1" = 20' and grading detail sheets will be prepared 
at a scale of 1" = 10' or 1" = 5'. Quantities will be provided on the roadway plan sheets. 
 
 
 
Signing and Pavement Marking Plans: NFra will prepare signing and pavement marking plans for 
Hillcrest Drive and Cloud Drive. J2 will provide signing and pavement marking plans for the parking 
lots. 
 
Waterline: NFra will provide design services to prepare construction documents for a new 12" 
waterline that will follow the new roadway alignment and connect to existing 12" waterlines in 
Hillcrest Drive and Val Vista Drive completing a looped system. Fire hydrants will be provided to meet 
spacing requirements and new water services will be provided at locations where amenities are needed 
throughout the park. New water service sizes and meter sizes will be provided by the City. Plan and 
profile sheets will be prepared at a scale of 1" = 20'.

NFra Inc.                                    77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                   a transportation engineering firm 
 
Page 2 of 4 
 
Reclaimed Waterline: NFra will provide design services to prepare construction documents for new 
reclaimed waterlines that will serve the proposed lake and provide a connection from the City’s 
Hillcrest Recovery Well site located near the northwest corner of the Basha High School property to an 
existing 12" reclaimed waterline stub out near the Riggs Road and Hillcrest Drive intersection. A new 
line will be designed from the Hillcrest Recovery Well site to the lake’s wet well. The size of the line 
will be provided to NFra by others. Design of the lake’s wet well and modifications to the existing well 
site, if needed, will be provided by others. New water service sizes and meter sizes will be provided by 
the City. Plan and profile sheets will be prepared at a scale of 1" = 20'. 
 
Sewer Line: NFra will provide design services to prepare construction documents to extend an existing 
8" sewer line north from an existing stub out at a manhole located at the Riggs Road and Hillcrest Drive 
intersection. The new sewer main will be extended along existing Hillcrest Drive and the new roadway 
alignment within the park. New sewer services will be provided at locations where amenities are 
needed throughout the park. New sewer service sizes will be provided by the City. Plan and profile 
sheets will be prepared at a scale of 1" = 20'. 
 
Potholing: Potholing to locate and verify existing utilities that may be in conflict with new 
improvements will be provided by others. NFra will assist with preparing a pothole request list at the 
60% stage. Survey of existing sewer manhole lids, inverts, and pipe sizes will be completed by the 
project’s survey firm and provided to NFra. 
 
MCESD Approval to Construct Permit: NFra will submit the permit application and final sealed 
plans to Maricopa County Environmental Services Department (MCESD) to obtain the Approval to 
Construct (ATC) permits for the waterline, sewer line, and reclaimed waterline. If modeling is required 
for the submittal, it will be provided by the City and include information from their overall master plans 
that established the existing pipe sizes that were intended to serve the park. 
 
Utility Coordination: NFra will coordinate with the City, Design Team, and MCESD for the proposed 
City owned utilities (water, reclaimed water and sewer). NFra will coordinate with other utilities to 
determine potential conflicts that need to be resolved and to provide services for the new park 
amenities. New park services may include gas lines from Southwest Gas, electrical from SRP, and fiber 
/ communication lines from Cox and/or Lumen. No other utilities are anticipated. Load calculations, 
completed forms, and pipe sizes will be provided to utility provider by others that are designing the 
service needs. NFra is only providing the utility coordination, not the design. 
 
NFra will coordinate with RWCD and their designer for the irrigation ditch relocation along Cloud 
Drive. The relocation design will be completed by RWCD’s designer. 
 
Submittals: All submittals will be made to J2 for their distribution to project stakeholders for review as 
the design progresses. The final submittal will include sealed documents for construction. Construction 
drawings will be submitted to J2 in electronic format, saved to 22" x 34" (ANSI “D” size) for plotting 
at true half size (11" x 17") pdf’s. J2 will provide the border sheet for plan production. Submittals will 
occur at the following stages: 
 
 
Pre-Tech Submittal: NFra will submit preliminary CAD files that outline the design 
intent for the new roadway and utility improvements to J2 for their incorporation into the 
overall submittal to the City.

NFra Inc.                                    77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                   a transportation engineering firm 
 
Page 3 of 4 
 
30% Submittal: NFra will submit CAD files, pdfs of the roadway and utility design plans 
and opinion of probable construction costs to J2 for their incorporation into the overall 
project documents. 
 
 
60% Submittal: NFra will submit CAD files, pdfs of the roadway and utility design 
plans, specifications, and opinion of probable construction costs to J2 for their 
incorporation into the overall project documents. 
 
 
95% Submittal: NFra will submit CAD files, pdfs of the roadway and utility design 
plans, specifications, and opinion of probable construction costs to J2 for their 
incorporation into the overall project documents. 
 
 
100% Submittal: NFra will submit CAD files, pdfs of the roadway and utility design 
plans, specifications, and opinion of probable construction costs to J2 for their 
incorporation into the overall project documents. 
 
 
Final Submittal, Sealed: NFra will submit CAD files, sealed pdfs (22" x 34" and 11" x 
17") of the design plans, sealed specifications, and final opinion of probable construction 
costs to J2 for bid advertisement. Utility plans will be submitted to MCESD with the ATC 
permit applications. 
 
Task 200: Meetings and Site Visits: 
NFra will attend the following meetings to discuss the project improvements.  
 
 
Design Kickoff Meeting (1): Two representatives from NFra will attend to establish the 
goals and objectives of the project. Meeting is anticipated to be two hours in length. 
 
 
Comment Resolution Meetings (4): One representative from NFra will attend to discuss 
and resolve comments. Meetings are anticipated to be three hours in length with 
comments tentatively addressed by NFra prior to meeting. 
 
 
Team Design Meetings (10): One representative from NFra will attend coordination 
meetings with J2 and the City. These meetings will be used to address design issues and 
issues that will arise in the preparation of the construction documents. Meetings are 
anticipated to be two hours in length. 
 
 
Site Visit: NFra will perform a site investigation to identify and confirm existing features 
and potential conflicts with the new improvements. Two representatives from NFra will 
conduct the site visit which is anticipated to be three hours in length. 
 
Task 300: Quantities / Estimates / Specifications / QC / Phasing: 
NFra will assist J2 in quantifying and estimating construction costs for the NFra designed components 
of the project. 
 
NFra will assist J2 in preparing specifications for the NFra designed components of the project. The 
latest MAG Standard Details and Specifications along with current City of Chandler supplemental 
Details and Specifications will be used and referenced for the design improvements. Specifications 
will be submitted starting with the 60% submittal.

NFra Inc.                                    77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937 
                                   
                               
                                  
                   a transportation engineering firm 
 
Page 4 of 4 
NFra will conduct internal quality control on all plans and calculations prior to each submittal to 
ensure conformance to project requirements. 
 
NFra will prepare 30% design plans as one package for the entire park site. Subsequent submittals will 
be broken out into three separate documents for construction phasing. 
 
B. 
ASSUMPTIONS 
1. 
Geotechnical investigations and reports will be completed by others with required information 
for the roadway and utility designs provided to NFra. 
2. 
Topographic survey and any supplemental survey deemed necessary will be completed by 
others. Topographic and base files will be provided to NFra by J2. 
3. 
Required legal descriptions and exhibits will be prepared by others. 
4. 
Parking lot designs are not included in NFra’s scope of work. Parking lots and site civil grading 
to be designed by J2. 
5. 
Drainage analysis, design, preparation of plans, and reports are not included in NFra’s scope of 
work, including roadside retention basins. 
6. 
Traffic lighting, signals, and electrical plans are not included in NFra’s scope of work. 
7. 
SWPPP and Erosion Control plans are not included in NFra’s scope of work. 
8. 
Pothole investigations will be conducted by others with data provided to NFra. 
9. 
Reproduction of all submittals/review sets/bid sets and submittals to the City’s portal will be 
made by J2. 
10. Record drawing plans and existing conditions will be provided to NFra by J2. 
11. Public meetings are not required to be attended by NFra. 
12. Permitting, permitting fees, review fees, or other design related fees are not included in NFra’s 
scope of work or expenses, including MCESD, RWCD or other utility fees. Project’s allowance 
budget will be used to cover these fees. 
13. Post Design Services is not included in NFra’s scope of work. 
14. Front cover sheet and legend sheet of plans to be completed by J2. 
15. Riggs Road sewer main is deep enough to extend and provide coverage to the entire park. The 
Riggs Road sewer is the only connection needed for the project. 
16. Water, sewer, and reclaimed water services and connections within buildings, restrooms, 
concession stands, dog parks, pump stations, and lakes will be designed by others. 
17. Any modifications to the existing Hillcrest Recovery Well equipment or site will be completed 
by others. 
18. Buildings and lake wet well be designed by others, including all utilities. 
19. The locations of the existing intersections at Val Vista Drive do not need to be modified. Park 
improvements will match improvements constructed with the Town of Gilbert’s ST112 project. 
 
C. COMPENSATION 
 
Compensation will be on a lump sum not to exceed basis: 
Design Service Fees:  $315,750.00 
 
D. SCHEDULE  
 
J2 will establish and provide NFra the design schedule.

NFra Inc.          77 East Thomas Road, Suite 200; Phoenix, Arizona 85012 • 602.277.0967 • Fax: 602.277.5937
a transportation engineering firm
DESIGN SERVICES
ESTIMATED DIRECT LABOR
MESQUITE GROVES PARK
Estimated
Avg. Hourly
Labor
Classification
Labor Hours
Rate
Cost
Project Manager
157
$215.00
$33,755.00
Senior Project Engineer
927
$185.00
$171,495.00
Designer / Technician
884
$125.00
$110,500.00
1968
Total Estimated Labor   
$315,750.00
TOTAL ESTIMATED COST - DESIGN SERVICES
$315,750.00
1/16/2025
CONSULTANT SIGNATURE
DATE
(Randy Weyrauch, P.E.)
Client: City of Chandler
Subconsultant To: J2 Engineering and Environmental Design, LLC
Project: Mesquite Groves Park
Project No.: PR2401.201
1/16/2025

NFra Inc.
Client: City of Chandler 
Project: Mesquite Groves Park
PR2401.201
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
A
B
C
D
E
F
G
H
J
City of Chandler - Mesquite Groves Park
TOTAL
Project
Sr. Project 
Designer
HOURS
Manager
Engineer
Technician
Labor Classification Rate
$215.00
$185.00
$125.00
Task 100: Roadway and Utility Design Services
Roadway
Roadway General Note Sheet
NA
1
6.0
6
0
2
4
Roadway Geometric Control Sheet
100
1
9.0
9
1
4
4
Typical Section Sheet
NA
1
15.0
15
1
6
8
Corner Ramp Detail Sheets
10
5
23.0
115
5
50
60
Intersection Grading Sheets
10
1
16.0
16
2
6
8
Hillcrest Drive Plan and Profile Sheets
20
7
35.0
245
21
105
119
Cloud Drive Plan and Profile Sheets
20
3
35.0
105
9
45
51
Signing and Pavement Marking Sheets
20
8
12.0
96
4
40
52
Modeling to Create Cross Sections for Hillcrest and Cloud
NA
NA
NA
54
2
32
20
Utilities
Utility Cover Sheet
NA
1
6.0
6
0
3
3
Utility General Note Sheets
NA
3
3.0
9
0
3
6
Misc Detail Sheets
NA
3
13.3
40
4
20
16
Water Main Plan and Profile Sheets
20
7
28.0
196
7
91
98
Water Service Sheets
20
8
13.0
104
8
40
56
Fire Hydrant Profile Sheets
10
2
27.0
54
2
20
32
Sewer Main Plan and Profile Sheets
20
9
28.0
252
9
117
126
Sewer Service Sheets
20
4
26.0
104
8
40
56
Reclaimed Water Main Plan and Profile Sheets
20
6
27.0
162
12
66
84
Utility Coordination
NA
NA
NA
80
8
48
24
RWCD Coordination and Permit Application
NA
NA
NA
36
6
20
10
MCESD Coordination and Submittals for ATC Permits
NA
NA
NA
28
4
20
4
Task 100: Sub Task Hours per Category
70
24.7
1732
113
778
841
1732
Task 100: Sub Task Fee per Category
$24,295.00
$143,930.00
$105,125.00
$273,350.00
Task 200: Meetings and Site Visits
Design Kickoff Meeting (1)
NA
NA
NA
4
2
2
0
Comment Resolution Meetings (4)
NA
NA
NA
12
6
6
0
Team Design Meetings (10)
NA
NA
NA
20
6
14
0
Site Visit (1)
NA
NA
NA
6
0
3
3
Task 200: Sub Task Hours per Category
NA
NA
42
14
25
3
42
Task 200: Sub Task Fee per Category
$3,010.00
$4,625.00
$375.00
$8,010.00
Task 300: Quantities / Estimates / Specifications / QC / Phasing
Quantities and Estimates
NA
NA
NA
28
4
16
8
Specifications
NA
NA
NA
60
10
50
0
Quality Control (Pre-Tech, 30%, 60%, 95%, 100%)
NA
NA
NA
26
12
10
4
Design Plan Set Phasing after 30%
NA
NA
NA
80
4
48
28
Task 300: Sub Task Hours per Category
NA
NA
194
30
124
40
194
Task 300: Sub Task Fee per Category
$6,450.00
$22,940.00
$5,000.00
$34,390.00
TOTAL HOURS PER CATEGORY
1968
157
927
884
1968
TOTAL FEE PER CATEGORY
$33,755.00
$171,495.00
$110,500.00 $315,750.00
SCALE
TOTAL
NO. SHTS.
HRS/SHT
1/16/2025
Estimate of Labor Hours by Sheets

P R O P O S A L
B 2 5 - 0 0 0 4
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
Electrical Engineering & Lighting Design
January 10, 2025 
J2 Engineering & Environmental Design 
4649 E Cotton Gin Loop, Ste. B2 
Phoenix, AZ 85040 
Re: 
Mesquite Groves Park
Attn:  Jeff Velasquez  
Wright Engineering appreciates this opportunity to submit a proposal for electrical engineering 
services on the above referenced project. The following services will be performed in a professional 
manner to meet City of Chandler requirements: 
Electrical Design Scope of Services: 
1.
Coordinate design with City of Chandler, J2 and other design team members, CMAR, and SRP 
as noted: 
a.
Project coordination will be performed primarily via email, telephone calls, and virtual 
meetings.  
b.
Up to (8) eight in-person design coordination meetings are included in this scope. 
c.
Up to (4) four comment resolution meetings are included in this scope 
2.
Design the electrical power system to meet local codes and requirements. 
3.
Prepare 24” X 36” electrical construction drawings in 3 separated phase plan sets, showing 
all new equipment to include the following: 
a.
Electrical service entrance and distribution equipment 
b.
2-3 lighted Multi-Use fields (with cricket overlay) 
c.
3-4 lighted ball fields 
d.
A 2-zone lighted dog park 
e.
Skate park and cycle/pump track lighting 
f.
6 lighted pickleball courts 
g.
2 lighted basketball courts 
h.
2-6 lighted sand volleyball courts 
i.
Lighting in air-nasium or field house structure 
j.
Splash pad: 
1)
Power feed for controller and pumps 
2)
Lighting  
k.
Major destination playground lighting 
l.
Secondary inclusive playground lighting 
m.
Small playground lighting at ball fields 
n.
Power to the fishing lake pumping system including pumps, water feature and 
recirculation system  
o.
Large event or food truck receptacles (up to 8) 
p.
Maintenance Yard: 
1)
Yard lighting and GFCI outlets

Mesquite Groves Park   
Page 2 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
2)
Electric gates power 
3)
Maintenance bays lighting and outlets 
4)
Small office building power and lighting 
5)
Communications conduits for cameras (equipment and locations by the city) 
q.
Power feed to restroom and concession buildings (4 locations) 
r.
2 restroom and concession buildings power and lighting 
1)
Including power for electronic door locks 
s.
2 standard restroom buildings power and lighting  
1)
Including power for electronic door locks 
t.
12 picnic ramada power and lighting 
u.
4 large destination ramadas power and lighting 
1)
Ceiling fan power 
2)
Outdoor kitchen space power 
v.
Pathway and trail lighting with lighting at exercise nodes 
w.
Parking lot & drive isle lighting 
x.
Fabric shade structure mounted lighting 
y.
Irrigation controller power 
z.
Communications systems conduits (WiFi, etc.) 
aa.
Infrastructure coordination with SRP for future Recreation Center (~25,000 sq ft) 
4.
Prepare photometric calculations showing all lighting averages, uniformities and spill light 
mitigation/control at adjacent property lines.  
5.
All lighting on/off control will be designed per client’s requirements. All necessary equipment 
will be shown on the plans. 
6.
For the equipment listed above prepare: 
a.
Elevation views
b.
Installation details
c.
Load calculations
d.
Single line diagrams
e.
Panel schedules
f.
Power conduit and wire table 
g.
System fault current calculations 
h.
Voltage drop calculations 
7.
Prepare an engineer’s opinion of probable electrical construction costs coordinated with 
CMAR at each of 3 last submittals broken out by park construction phase.  
8.
Prepare project specific electrical specifications per City of Chandler standards. 
9.
Perform in-house QAQC review and modifications. 
10.
The above plans will be provided to client at 30%, 60%, 95% and Final (100%) levels for 
submittal review and comment. Submittals will be made via email in digital PDF format. 
Client will submit to the City as required. 
11.
Municipal and team conflict review comments will be responded to and addressed. 
12.
Structural calculations for the light foundations will be completed by the team structural 
engineer.

Mesquite Groves Park   
Page 3 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
Public Street Lighting Design Scope of Services: 
1.
Coordinate design with J2, civil engineer and CMAR as noted: 
a.
Project coordination will be performed via email, telephone calls, and virtual 
meetings, in-person meetings are not included in this scope. 
2.
Visit the site to determine existing adjacent street lighting conditions. Up to (1) one visit. 
3.
Prepare sealed photometric calculation drawings 24 x 36. The photometric calculations will 
show the existing and proposed lighting levels for all streets and intersections as required.  
4.
Design will include the required lighting locations to meet Chandler requirements. 
5.
Prepare 24” X 36” street light construction drawings showing all street lighting for the 
following streets: 
a.
Hillcrest Drive extension throughout the park continuing to Val Vista Drive (~3540 
linear feet) 
b.
Design of City Fiber Optic Network extension conduits along Hillcrest Drive 
6.
Prepare an engineer’s estimate of probable street lighting construction costs with CMAR 
coordination. 
7.
Perform in-house QAQC review and modifications. 
8.
The above plans will be provided to client for submittal review and comment at 30%, 60%, 
95% and Final (100%) levels. Submittals will be made via email in digital PDF format. Client 
will submit to the City as needed. 
9.
Municipal review comments will be responded to and addressed. 
Please Note:  All underground electrical utilities, providing power to public street lights, shall be 
designed by local utility company.  
Traffic Signal Design Scope of Services: 
1.
Coordinate design with J2, civil engineer, CMAR, City of Chandler and Town of Gilbert as 
noted: 
a.
Project coordination will be performed via email, telephone calls, and virtual 
meetings, this task includes one pre-design meeting. 
2.
Visit the site to determine existing adjacent signal conditions. This task will include identifying 
potential overhead and underground conflicts. Up to (1) one visit. 
3.
Prepare 24” X 36” traffic signal construction drawings for one intersection: 
a.
S. Val Vista Drive and Hillcrest Drive 
4.
Design all new equipment including vehicle and pedestrian indications, vehicle detection, 
pre-emption equipment, signal poles, mast arms, foundations, signal pole mounted 
luminaires, illuminated street name signs, controller cabinet, power service pedestal, 
antenna, and video cameras. 
5.
All equipment will be designed to meet local codes and ordinances as well as ADA, MUTCD, 
OSHA, NESC, and other applicable state and federal requirements as adopted by the local 
jurisdiction. 
6.
Prepare equipment schedule identifying all equipment required. 
7.
Prepare conduit and conductor table to power all equipment. 
8.
Prepare an internal illuminated street name sign equipment schedule.

Mesquite Groves Park   
Page 4 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
9.
Coordinate tie in of the traffic signal interconnect conduit into signal system. Traffic signal 
interconnect design is not included in this scope. 
10.
Prepare single line diagram and load calculations for power service pedestal as required. 
11.
Prepare an engineer’s estimate of probable construction costs in coordination with CMAR 
with item and unit cost breakdown. 
12.
Perform in-house QA/QC review. 
13.
Coordinate with client regarding review comments from design team and municipality. 
14.
The above plans will be provided to client for submittal review and comment at 30%, 60%, 
95% and Final (100%) levels. Submittals will be made via email in digital PDF format. Client 
will submit to the City as needed. 
15.
Municipal review comments will be responded to and addressed. 
Responsibilities of Others: 
1.
Provide Wright Engineering Corp. electronic base files in an AutoCAD format which includes 
all proposed and existing utilities, all proposed improvements, and any existing conditions 
that affect this scope. 
2.
Wright Engineering will submit plans to the civil engineer or landscape architect for submittal 
to the local government agencies for approval and permits. 
3.
Designation of location of Utility Company point of electrical service connection for electric 
meters and public street lighting will be determined by the local utility company. The owner is 
responsible for coordination of the design of all electrical utility power services. 
Final Deliverables: 
1.
Upon completion of the design, we will provide final sealed documents bearing the signature 
of a registered electrical engineer in the State of Arizona. 
Engineering Fee: 
The above services will be provided as follows:  
1.
Electrical Design Services: $146,080.00 (Lump Sum) 
2.
Public Street Lighting Design Services: $6,260.00 (Lump Sum) 
3.
Traffic Signal Design Services: $20,510.00 (Lump Sum) 
Please Note: Services as stated above can be provided in whole or part to meet client needs. 
Hourly Rate Schedule: 
Any services listed as billed hourly or not specifically included in the Scope of Services section 
shall be payable at the following rates: 
Principal 
 
$210/hour 
 
Designer 
$130/hour 
Senior Engineer 
$180/hour 
 
Drafter  
$110/hour 
Engineer 
 
$150/hour 
 
Admin  
$80/hour

Mesquite Groves Park   
Page 5 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
Printing Charges: 
Although not anticipated, any printing and delivery requested will be charged at cost. 
Billing: 
We will bill you on a monthly basis for these services. Payment terms are Net 30 days. This 
proposal will be valid for the next 90 days. If you have any questions, please contact us at your 
earliest convenience. 
I look forward to working with you on this project. Please show your acceptance of this proposal by 
signing below and returning one copy for my records.  
Sincerely, 
R. Scott Wright, P.E., LC 
Wright Engineering Corporation

Mesquite Groves Park   
Page 6 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
Acceptance: 
The Client agrees that the technical methods, techniques, and pricing information contained in any 
proposal submitted by Wright Engineering pertaining to this project or in this Agreement or any 
addendum thereto, are to be considered confidential and proprietary, and shall not be released or 
otherwise made available to any third party without the express written consent of Wright 
Engineering. 
I have received and read Appendix ‘A’ and agree to all terms and conditions as outlined in Appendix 
‘A’ and this proposal. By signing, the proposal becomes the agreement and is executed.  
Accepted this __________ day of ________________  2025 
______________________________________________________________________ 
(Company Name) 
______________________________________________________________________ 
(Signature) 
______________________________________________________________________ 
(Print or Type Name)                 
______________________________________________________________________ 
(Title) 
Client Billing Information: 
______________________________________________________________________ 
(Contract / Accounts Payable Contact Name) 
______________________________________________________________________ 
(Address) 
______________________________________________________________________ 
(Business Phone) 
 
(Mobile Phone)  
______________________________________________________________________ 
(Email) 
It is our desire to keep communication flowing freely. To contact us for contract information or 
accounts payable information, please email Cami Penrod at cpenrod@wrightengineering.us or call 
us at 480.497.5829.

Mesquite Groves Park   
Page 7 of 7 
January 10, 2025 
480.497.5829 |  165 East Chilton Drive, Chandler, AZ 85225
wrightengineering.us
Appendix ‘A’ 
Terms and Conditions 
Certifications 
Wright Engineering Corp. shall not be required to execute any 
document that would result in its certifying, guaranteeing or warranting 
the existence of conditions whose existence Wright Engineering Corp. 
cannot ascertain. 
Termination of Services 
This agreement may be terminated by the Client or Wright Engineering 
Corp. should the other fail to perform its obligations hereunder. In the 
event of termination, the Client shall pay Wright Engineering Corp. for 
all service and reasonable expenses rendered to the date of 
termination. 
Ownership of Documents 
All documents produced by Wright Engineering Corp. under this 
agreement shall remain the property of Wright Engineering Corp. and 
may not be used by the Client for any other endeavor without the 
written consent of Wright Engineering Corp. 
Billings/Payments 
Invoices for Wright Engineering Corporation services shall be 
submitted, at Wright Engineering Corporation’s option, either upon 
completion of such services or on a monthly basis.  Invoices shall be 
payable within 30 days after the invoice date.  If the invoice is not paid 
within 30 days, Wright Engineering Corporation may, without waiving 
any claim or right against the Client, and without liability whatsoever to 
the Client, terminate or suspend the performance of the service.  
Accounts unpaid 60 days after the invoice date may be subject to a 
monthly service charge of one-and-one-half percent (1.5%) (or the 
maximum rate allowed by law, whichever is less) on the then unpaid 
balance.  In the event any portion, or all of an account remains unpaid 
90 days after billing, the Client shall pay all costs of collection 
including reasonable attorney’s fees. 
Unauthorized Changes 
In the event the Client, the Client’s contractors or subcontractors, or 
anyone for whom the Client is legally liable makes or permits to be 
made any changes to any reports, plans, specifications or other 
construction documents prepared by Wright Engineering Corp. 
without obtaining Wright Engineering Corporation’s prior written 
consent, the Client shall assume full responsibility for the results of 
such changes. Therefore, the Client agrees to waive any claim against 
Wright Engineering Corp. and to release Wright Engineering Corp. from 
any liability arising directly or indirectly from such changes. In addition, 
the Client agrees, to the fullest extent permitted by law, to indemnify 
and hold harmless Wright Engineering Corp. from any damages, 
liabilities or costs, including reasonable attorneys’ fees and costs of 
defense, arising from such changes.  
Permits and Approvals 
It is the responsibility of the Client to obtain all permits and approvals 
normally required by law for projects similar to the one for which Wright 
Engineering Corporation’s services are being engaged. Wright 
Engineering Corp. may assist the Client as requested in applying for 
those permits and approvals for an additional fee. This service is not 
included in the Basic Services of this Agreement. 
Construction Supervision 
The Consultant shall not supervise, direct or have control over the 
Contractor’s work nor have any responsibility for the construction 
means, methods, techniques, sequences or procedures selected by 
the Contractor nor for the Contractor’s safety precautions or programs 
in connection with this Work. These rights and responsibilities are 
solely those of the Contractor in accordance with the Contract 
Documents. The Consultant shall not be responsible for any acts or 
omissions of the Contractor, subcontractor, any entity performing any 
portions of the Work, or any agents or employees of any of them. The 
Consultant does not guarantee the performance of the Contractor and 
shall not be responsible for the Contractor’s failure to perform its Work 
in accordance with the Contract Documents or any applicable laws, 
codes, rules or regulations. 
Changed Conditions 
If, during the term of this Agreement, circumstances or conditions that 
were not originally contemplated by or known to the Consultant are 
revealed, to the extent that they affect the scope of services, 
compensation, schedule, allocation of risks or other material terms of 
this Agreement, the Consultant may call for renegotiation of 
appropriate portions of this Agreement. The Consultant shall notify the 
Client of the changed conditions necessitating renegotiation, and the 
Consultant and the Client shall promptly and in good faith enter into 
renegotiation of this Agreement to address the changed conditions. If 
terms cannot be agreed to, the parties agree that either party has the 
absolute right to terminate this Agreement, in accordance with the 
Termination provision hereof. 
Attorneys’ Fees 
In the event of any litigation arising from or related to this Agreement or 
the services provided under this Agreement, the prevailing party shall 
be entitled to recover from the non-prevailing party all reasonable 
costs incurred, including staff time, court costs, attorneys’ fees and all 
other related expenses in such litigation. 
Arbitration 
In an effort to resolve any conflicts that arise during the design and 
construction of the Project or following the completion of the Project, 
the Client and the Consultant agree that all disputes between them 
arising out of or relating to this Agreement or the Project shall be 
submitted to non-binding arbitration unless parties mutually agree 
otherwise. 
Proprietary Information 
The Client agrees that the technical methods, design details, 
techniques and pricing data contained in any material submitted by 
Wright Engineering Corp pertaining to this Project or this Agreement 
shall be considered confidential and proprietary, and shall not be 
released or otherwise made available to any third party without the 
express written consent of Wright Engineering Corp. 
Indemnification 
The Consultant and the Subconsultant mutually agree, to the fullest 
extent permitted by law, to indemnify and hold each other harmless 
against all damages, liabilities or costs, including reasonable 
attorneys’ fees and defense costs, arising from their own negligent 
acts in the performance of their services under this Agreement, to the 
extent that each party is responsible for such damages, liabilities and 
costs on a comparative basis of fault.  
Insurance 
Wright Engineering Corporation shall carry and maintain the following 
types of insurance that covers the entire scope of work described in the 
contract: (i) commercial general liability (Bodily Injury/Property 
Damage) $1,000,000 per occurrence and $2,000,000 general 
aggregate; and (ii) an umbrella policy in the amount of $4,000,000 per 
occurrence and $4,000,000 aggregate. 
Limitation of Liability 
Neither the engineer, the engineer’s consultants, nor their agents or 
employees shall be jointly or individually liable to the owner in an 
amount in excess of our insurance limits.

Project Name: Mesquite Groves Park 
Page F-1 
Project No.: PR2401.202  
Rev. 1/24/2024 
 
 
 
EXHIBIT “F” 
FEDERAL REQUIREMENTS 
 
 
N/A