Extracted text (via pymupdf)
3942 characters
Public Housing Utility Allowance Schedules Effective 07/01/2025 MONTHLY UTILITY ALLOWANCE SCHEDULE Effective Date: July 01, 2024 Building Type: Semi-Detached/Duplex Kingston Arms AZ 28-1 (All Electric) 1BR 2BR 3BR 4BR 5BR Electric (APS) $94.00 $127.00 Building Type: Semi-Detached/Duplex Casa Del Sol, Casa de Esperanza, Casa Bonita, Casa Rosas AZ 28-2, 3 1BR 2BR 3BR 4BR 5BR Electric (APS) , Natural Gas $103.00 $129.00 $149.00 $175.00 $198.00 Building Type: Detached House Scattered Sites AZ 28-9 & 28-11 (All Electic) 1BR 2BR 3BR 4BR 5BR Electric (APS) , Water, Sewer, Trash $229.00 $285.00 $325.00 $365.00 Electric (SRP) , Water, Sewer, Trash $198.00 $230.00 $260.00 $290.00 Building Type: Detached House Scattered Sites AZ 28-9 & 28-11 (All Gas) 1BR 2BR 3BR 4BR 5BR Electric (APS) , Natural Gas, Water, Sewer, Trash $219.00 $255.00 $285.00 $317.00 Electric (SRP) , Natural Gas, Water, Sewer, Trash $220.00 $250.00 $276.00 $305.00 F:\HOUSING\#Housing Admin. Supervisor\07 UTILITY ALLOWANCE SCHEDULES\2024 Utility Allowance Schedules\Copy of Chandler AZ-PH Update-Proposed UAs.xlsx CITY OF CHANDLER HOUSING AND REDEVELOPMENT DIVISION, AZ PUBLIC HOUSING F:\HOUSING\#Housing Admin. Supervisor\07 UTILITY ALLOWANCE SCHEDULES\2024 Utility Allowance Schedules\Copy of Chandler AZ-PH Update-Proposed UAs.xlsx 2 MONTHLY UTILITY ALLOWANCES Chart 1 Effective July 01, 2024 Building Type: Semi-Detached/Duplex Kingston Arms AZ-28-1 (All Electric) (EE Equip: Win,H,WH,Ins,CFL) 1BR 2BR 3BR 4BR 5BR Electricity (L&A,A/C,H,WH,C) (APS) $94.00 $127.00 Building Type: Semi-Detached/Duplex Casa del Sol, Casa de Esperanza, Casa Bonita, Casa Rosas AZ-28-2, 3 (EE Equip: Win,WH,Ins,CFL) 1BR 2BR 3BR 4BR 5BR Electricity (L&A,A/C) (APS) $46.00 $59.00 $73.00 $92.00 $107.00 Natural Gas (H,WH,C) $57.00 $70.00 $76.00 $83.00 $91.00 Totals $103.00 $129.00 $149.00 $175.00 $198.00 A monthly average cost of the summer and winter adjustments were used for the electric and natural gas costs where applicable. L&A= Lights & Appliances EE Equip= Energy Efficient Equipment A/C=Air Conditioning Win= Windows H= Space Heating Ins= Insulation WH= Water Heating CFL= 100% Fluorescent Lighting C= Cooking APS= AZ Public Service SRP= Salt River Proj Note: Public Housing utility allowances are calculated similar to method of utility providers. These allowances are not calculated by end use (like Section 8), but by total usage for each utility type. CITY OF CHANDLER HOUSING AND REDEVELOPMENT DIVISION, AZ PUBLIC HOUSING F:\HOUSING\#Housing Admin. Supervisor\07 UTILITY ALLOWANCE SCHEDULES\2024 Utility Allowance Schedules\Copy of Chandler AZ-PH Update-Proposed UAs.xlsx 3 CITY OF CHANDLER HOUSING AND REDEVELOPMENT DIVISION, AZ PUBLIC HOUSING Building Type: Detached House Scattered Sites AZ-28-9, 28-11 (All Electric) (EE Equip: Win,H,WH,Ins,CFL) 1BR 2BR 3BR 4BR 5BR Electricity (L&A,A/C,H,WH,C) (APS) $162.00 $214.00 $250.00 $286.00 Electricity (L&A,A/C,H,WH,C) (SRP) $131.00 $159.00 $185.00 $211.00 Water $19.00 $23.00 $27.00 $31.00 Sewer $28.00 $28.00 $28.00 $28.00 Trash Collection $20.00 $20.00 $20.00 $20.00 Totals with APS $229.00 $285.00 $325.00 $365.00 Totals with SRP $198.00 $230.00 $260.00 $290.00 Building Type: Detached House Scattered Sites AZ-28-9, 28-11 (All Gas) (EE Equip: Win,WH,Ins,CFL) 1BR 2BR 3BR 4BR 5BR Electricity (L&A,A/C) (APS) $60.00 $81.00 $99.00 $116.00 Electricity (L&A,A/C) (SRP) $61.00 $76.00 $90.00 $104.00 Natural Gas (H,WH,C) $92.00 $103.00 $111.00 $122.00 Water $19.00 $23.00 $27.00 $31.00 Sewer $28.00 $28.00 $28.00 $28.00 Trash Collection $20.00 $20.00 $20.00 $20.00 Totals with APS $219.00 $255.00 $285.00 $317.00 Totals with SRP $220.00 $250.00 $276.00 $305.00