Soutthside Village Neighborhood Presentation
Extracted text (via pymupdf)
9631 characters
City Council Work
Session
April 24, 2025
Washington Street Alignment &
Southside Village Neighborhood
Washington Street Area Vision
Southside Village Neighborhood
• Among the oldest and most
diverse areas in the City
• Home of Winn School, built in
1929
• First traditional Black and
Latino neighborhood. Home to
many prominent families and
leaders (Coy Payne, Zora Folley,
et al).
2006 Washington
Alignment
Original intent of the alignment
•
South Arizona Avenue Corridor
Area Plan
•
Use to support larger
development along Arizona
Avenue
•
Traffic Reliever
•
Utility Corridor
•
S Curve was the preferred option
Studies
2006
South Arizona Entry
Corridor Study
2007
South Arizona Area Plan
2022
Urban Land Institute –
Arizona Technical
Assistance Program
2022
Wayfinding Study (J2
Design)
2023
Parking Study (Walker
Consulting)
2023
Washington Street
Alignment Study (Lokahi)
2024
Downtown Region Area
Update (anticipated
completion in early 2025)
Future of neighborhood and development within the southeast quadrant of downtown
• Smaller lot development
• Adaptive Reuse
• Neighborhood uses
• Use of alleys
Development to the South
South AZ Corridor Study –
➢High & medium density
residential development
➢Assemblage of small parcels
➢Revision of neighborhood streets
to facilitate traffic for new growth
Neighborhood Enhancement Since 2021
• Neighborhood engagement
• Zora Folley Mural/Museum Exhibit
• Harris Park Improvements
• Neighborhood Parties/Envision Events
• New Historic Markers
• Continued engagement and support for the
non-profit serving the neighborhood
• Funding Habitat for Humanity homes & CDBG
housing rehab projects
Cultural Development and Neighborhood Resources met with
stakeholders to ensure continued involvement and transparency
through future studies
Commitment:
Urban Land Institute AzTAP (2022)
➢ Allow the continuation of economic development while protecting multi-
generational housing and the neighborhood that holds so much rich history
➢ Analyze and suggest development growth opportunities
➢ South Arizona Avenue Corridor Area Plan not aligning with the type of
development occurring and proposed
2022: City Council approved Southside Village Neighborhood as the first
Historic Conservation District
AzTAP Process
• Community-chosen stakeholder
interviews
• Committee of experts
• Study area plans
• Tour & all-day workshop
•
Keep the historic neighborhood intact
•
Consider traffic circulation during development
•
Placemaking, walkability, park development
•
Winn School as a historic neighborhood asset
Community Input
Recommendations
• Create an overlay to allow for flexibility of adaptive reuse policies
• Micro-niche economy of arts and culture through live-work units
• Gentle density options (infill of existing single-family
neighborhoods to allow additional units on lots)
• Creating an urban form to protect the fabric of the neighborhood
Tree canopies, lighting, sidewalks and signage to transition the area, making it
feel intentional, walkable and clearly identifying boundaries for redevelopment.
Placemaking Elements
Salvation Army Property
.79 acres - Winn School & trailers
.95 acres - Vacant Salvation Army
property
1.74 acres - Total Salvation Army
property
Winn Park = .80 acres
Winn School was built on Saragosa Street in
response to a petition from the Hispanic community
in the Southside Chandler neighborhood.
Residents living in Southside and Winn’s Addition
submitted a petition (in both English and Spanish) to
the Chandler school board in June 1929 requesting a
school be built for their children in their
neighborhood.
In 1967, CUSD dedicated Winn School to the City of
Chandler for a community center.
The City leased and then sold Winn School to the
Salvation Army in 1981 for $13,500.
Winn School
Salvation Army at Winn School Campus
• Concerns with location of homelessness services
• Preservation of historic building
Salvation Army commissioned a needs assessment to
determine if they should stay in their current location or
consider relocation in the Southeast Valley.
City is currently in communication with the Salvation
Army for possible acquisition of Winn School if they
relocate.
Salvation Army has served the community through
school-aged services, homelessness outreach
Community Input
• Cultural Center
• Neighborhood uses
Schematic of Salvation Army at
Washington Street
• 80’ right of way width
• Anchors Salvation Army on the southeast
corner of Washington Street and Saragosa
Street
• 12 angled parking spaces on the east side of
Washington Street (18 currently)
• Potential additional parking on west side of
Washington Street to accommodate
Salvation Army parking needs
• Shift of Winn Park to the east
Parking Study (2023)
• Studied City property within the
Southside Village Neighborhood
• Recommend City-owned lots for future
surface parking
• Allow lots to be used toward parking
calculations in smaller developments
AzTAP recommended allowing City-owned parking lots to be used for food trucks,
farmers markets, etc., to encourage local economic development.
Downtown Region Area Plan (DRAP, 2025)
The Downtown Region Area Plan
will:
• Guide all future development decisions
within the region
• Provide a high-level view of how the
future built environment within the
region should look
• Set policies that define types of
developments that can be considered
DRAP is consistent with recommendations from AzTAP and the Washington
Street Alignment Study
New Recommendations
• Adaptive Reuse
• Commerce Routes
• Mixed Uses
• Alley Activation
• Downtown Gateways
• Character Area Guidelines
Examples from DRAP
Washington Street Alignment (2023)
Community Input
Research 4 options for
the alignment of
Washington Street
• 100% consensus opening to Pecos Rd
• Allow for neighborhood traffic circulation
• Right-only lane on Fairview Avenue
• Traffic calming
• Minimize on-street parking from businesses on
Arizona Ave
N
S
N
S
Washington Street Alignment Options
1. Keep current alignment
(no-build alternative)
2. Pedestrian Path at Pecos
3. Washington Street
extension to Pecos with “S”
curve
4. Street shift extension with
intersection at Pecos
Community Input
Unanimous request to provide access to Washington Street from Pecos Road,
without strong opinions regarding exact alignment
Option 2
Option 2
Option 3
Option 3
Option 4
Washington Street Alignment
Stakeholder Meetings Feedback
Stakeholder Meetings
•
November 2021 – Overall Neighborhood
Meeting – Kickoff
•
January 2023 – Southside Village Reunion at
Harris Park
ULI AZ TAP
•
April 2022 – ULI AZ Tap Meeting Stakeholder
Meeting (Harris Park)
•
May 2022 – Panel Day
•
Individual Stakeholder interviews chosen by
neighborhood
Washington Street Meeting
•
August 2023 - Meeting with Southside Village
Stakeholder Meeting
•
November 2023 –Washington Street Kick Off Meeting
(Community Input Meeting Mt. Olive with Southside
Village Stakeholder Meeting )
•
December 2023 – Salvation Army Stakeholder Meeting
•
March 2024 – Southside Village Stakeholder Meeting
•
January 2024 – Light and Life Church Stakeholder
Meeting
•
June 2024 – Salvation Army Leadership Board Meeting
•
August 2024 –Southside Village Stakeholder Meeting
Downtown Region Area
•
August 2024 – Multiple meetings throughout the
month
Over 72 residents attended the
various meetings, with neighborhood leaders assisting
with communication on all meetings
Preferred Option
Housing Options with Excess City-owned property
Future Housing Opportunities
•
City has acquired all right-of-way anticipated
to be necessary for the extension of
Washington Street. An estimated 25 parcels
were purchased, most zoned either MF-2 or
SF-8.5.
•
The designs for Washington Street extension
and Winn Park must finalized before
redeveloping any of these parcels. However,
the City can start now envisioning with the
neighborhood the types of housing that
would be appropriate.
Staff are working with a consultant to:
•
Capacity test for city properties housing
types, number of houses, and possible site
plans for properties.
•
Evaluate economic feasibility and
development models, including preferred
method of construction (RFP, self develop,
etc.), possible community partners, and
financing/ownership/partnership structures.
•
Goal: To build new attainable/affordable
housing product types in Chandler.
How the Washington Street Alignment Supports
Neighborhood Feedback
Neighborhood traffic calming
Right only lane on Fairview Avenue
Minimize on-street parking from businesses on Arizona Ave
Allow for neighborhood traffic circulation
Washington Street provides a buffer from traditional neighborhood
and development
Recommended Next Steps
Continue discussions with Salvation Army regarding their long-range plans and possible reacquisition
of Winn School property as a historic site, park, and neighborhood center – Fall 2025
Finalize Washington Street recommended option design and begin design of replacement Winn
Park (both currently funded in FY 2025-2026) – Spring 2026
Complete utility assessment needs assessment – Summer 2026
Complete the Downtown Region Area Plan (DRAP) for future City Council adoption and report back to
neighborhood stakeholders – May – P&Z / June - Study Session / June – Ordinance intro and adoption
Utilize excess property for housing with development partner(s) after final design of
Washington Street and Winn Park determined – June 2025
Continue neighborhood communication and outreach