Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page 1 
Project No.: WA2203.451 
Rev. 5/13/2024 
 
 
 
AMENDMENT NO. 1 TO  
CONSTRUCTION MANAGEMENT SERVICES AGREEMENT 
 
WATER MAIN REPLACEMENT 2022 
Project No. WA2203.451 
 
Council Date: April 10, 2025 
 
THIS AMENDMENT NO. 1 (“Amendment No. 1”) to the professional services agreement dated 
October 9, 2024, (the “Agreement”) is made by and between the City of Chandler, an Arizona 
municipal corporation, (“City”) and Dibble CM, LLC, an Arizona Limited Liability Company, 
(“Consultant”), on this ______ day of ___________________, 2025, (“Effective Date” by Clerk).  (City and 
Consultant may individually be referred to as “Party” and collectively referred to as “Parties”). 
 
RECITALS 
 
A. 
The Parties entered into the Agreement for Construction Management Services 
(“Services”) for the Water Main Replacement 2022 project. 
 
B. 
The Parties have determined that it is necessary and desirable for the Consultant to 
perform services for the City under the terms and conditions set forth in this Amendment No. 1 
and the Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the 
Agreement and this Amendment No. 1, the Parties agree to amend and modify the Agreement 
as follows. 
 
SECTION I – CONSULTANT’S SERVICES 
 
The Consultant’s Services are modified as described in the Exhibit "A" attached to and made 
part of this amendment by reference.

Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page 2 
Project No.: WA2203.451 
Rev. 5/13/2024 
 
SECTION II – PERIOD OF SERVICE 
 
The Period of Service is increased by 365 calendar days for a revised total of 730 calendar 
days. 
 
SECTION III – PAYMENT OF COMPENSATION AND FEES 
 
The Fees are increased by $862,802.50 and will be payable in accordance with Exhibit "B" 
attached to and made part of this amendment by reference, for a revised total not to exceed 
$939,177.50. 
 
SECTION IV – CONFLICT AMONG DOCUMENTS 
 
The Agreement, this amendment, and any previous amendments constitute the complete 
agreement between the Parties concerning the subject matter of the Agreement and replace 
any prior oral or written communications between the Parties.  If a conflict or ambiguity arises 
between the Agreement and this amendment, the instrument in the following order prevails 
and controls: (1) this amendment; (2) any previous Amendments from most recent to oldest; 
and (3) the Agreement. 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page 3 
Project No.: WA2203.451
Rev. 5/13/2024 
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be duly 
executed.  Each Party warrants and represents that its respective signatories whose signatures 
appear below have been and are on the date of signature duly authorized to execute this 
Amendment No. 1. 
“CITY” CITY OF CHANDLER 
MAYOR 
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
 Seal 
“CONSULTANT” 
DIBBLE CM, LLC 
Signature  
  Date 
Print Name 
Title 
Signer Email Address 
3/14/2025
KC Brandon
President
kcbrandon@dibblecm.com

Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page 4 
Project No.: WA2203.451 
Rev. 5/13/2024 
 
Amendment No. 1 (cont.) 
Project No. WA2203.451 
 
 
These changes result in the following adjustments of Agreement amount and/or time: 
 
Amendment authorized by Owner name: Jeff Auker 
 
 
Date: 2/25/2025 
Consultant email:  kcbrandon@dibblecm.com 
Original Agreement amount: 
$76,375 
Previous Amendment(s) total: 
$0 
Last Agreement amount approved by Council: 
$0 
This Amendment: 
$ 862,802.50 
This Amendment + previous Amendment(s) not approved by 
Council total: 
$ 862,802.50 
Revised Agreement total: 
$939,177.50 
Council Approval Required (yes indicates approval required) 
Yes 
No 
Amendment(s) total over $100,000: 
☒ 
☐ 
Amendment(s) total causes Agreement to exceed $100,000:  
☒ 
☐ 
Agreement Time 
Notice to Proceed (NTP) date for Original Agreement: 
10/23/2024 
Agreement time prior to this Amendment (including previous 
amendments): 
365 
Calendar Days 
Net change resulting from this Amendment: 
365 
Calendar Days 
Revised Agreement time (including this Amendment): 
730 
Calendar Days 
Council Approval (if applicable) 
Council Approval Date: 4/10/2025 
 
cc:  Project Manager, Consultant, Owner, File

Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page A-1 
Project No.: WA2203.451 
Rev 3/12/2024 
 
EXHIBIT A 
SCOPE OF WORK

1 
 
EXHIBIT “A” Amendment 1 
 
CONSTRUCTION MANAGEMENT 
SCOPE OF SERVICES 
WA2203.451 
CITY OF CHANDLER WATERMAIN REPLACEMENT 
 
PROJECT TASKS 
 
 
3. CONSTRUCTION MANAGEMENT  
A. Task 3.1 Weekly Construction Meetings 
i. Consultant must conduct weekly construction meetings.  Each meeting 
includes agenda and minutes; Request for Information (RFI); Shop Drawing; 
Request for Information (RFI); Field Directive (FD); Material Certification; and 
Allowance Logs. Consultant assumes (36) thirty six weekly meetings will be 
held. 
B. Task 3.2 CPM Schedule 
i. Consultant must review Contractor’s monthly CPM schedule updates 
submitted with each payment application, identify CPM tasks behind schedule 
that may affect critical path items, project substantial and final completion 
dates and initiate correspondence to City regarding those tasks. Consultant 
assumes (8) eight reviews of updated CPM schedule.  
C. Task 3.3 Requests for Information (RFI’s) 
i. Consultant must review, evaluate, and respond to Contractor Requests for 
Information (RFI’s); and prepare and maintain a submittal log of all RFI’s. 
Consultant assumes a (15) fifteen RFI responses.  
D. Task 3.4 Shop Drawing Submittals 
i. Consultant must review, evaluate, and respond to Contractor shop drawing 
submittals; and prepare and maintain a submittal log of all shop drawing 
submittals. Consultant assumes (20) twenty reviews.  
E. Task 3.5 Requests for Proposal (RFP) 
i. Consultant must prepare Requests for Proposal (RFP) documents detailing 
requested additional work tasks; review and evaluate Contractor RFP 
responses (cost derivatons) with approval recommendations; and prepare and 
maintain a submittal log list of all RFP’s. Consultant assumes (7) seven RFPs.   
F.  Task 3.6 Field Directives (FD’s) 
i. Consultant must prepare Field Directive (FD) documents detailing requested 
additional work tasks; review and evaluate Contractor FD responses with 
approval recommendations; and prepare and maintain a submittal log list of 
all FD’s. Consultant assumes (7) seven FD’s.   
G. Task 3.7 Contractor Payment Applications 
i. i.Consultant must review and evaluate Contractor monthly payment 
applications and make recommendation for payment; maintain a weekly 
record of constructed pay quantities and compile monthly totals; and 
coordinate payment application with the City quantity report and the 
inspectors’ daily logs. Consultant assumes  (8) eight payment applications, with 
(2) two reviews each.

2 
 
 
 
H. Task 3.8 Field Coordination 
i. Consultant to assist in coordinating the installation of waterlines to residents’ 
properties.  
ii. Maintain communication and act as a liaison with contractor, residents, public 
outreach firm, and city. 
 
 
4. CONSTRUCTION INSPECTION 
a. Task 4.1 Inspection Services 
i. Consultant must provide weekly construction inspection to verify materials 
and installations conform to construction documents; prepare daily inspection 
reports documenting Contractor construction activities and progress during 
field inspection visits; and perform intermittent erosion control inspections. 
Consultant assumes 2 inspectors full time 40 hrs.  per week for (9) nine 
months. Consultant assumes 380 hrs. of overtime for project duration. 
b. Task 4.2 Project Closeout    
i. Consultant must compile non-conformance list prior to Substantial 
Completion; schedule and conduct Substantial Completion inspection; 
prepare Substantial Completion punch list generated from Substantial 
Completion inspection; track items on punch list and note completed items; 
and complete and distribute Substantial Completion certificates. 
ii. Consultant must schedule and conduct Final Completion inspection; and 
complete and distribute Final Completion certificates. 
iii. Consultant must provide all documents in an electronic version that matches 
the City’s filing system, so it can be imported into City’s files. 
iv. Consultant must participate in a meeting with City staff and Designer to review 
request for information log to discuss lessons learned during the course of 
construction. 
 
5. 
MATERIALS TESTING 
a. Task 5.1 Quality Assurance (QA) Test Program 
i. Consultant must coordinate with Contractor’s testing representative to obtain 
required QA tests and sample; complete sampling and compaction testing of 
subgrade (including lime-stabilized subgrade base), aggregate base and 
asphalt concrete materials in new asphalt concrete pavement areas; complete 
sampling and compaction testing of subgrade, aggregate base (where 
required) and concrete for new curbs, gutters, sidewalks and concrete 
pavement and structures; and complete sampling and compaction testing of 
backfill for new irrigation, sewer, water, storm drain pipe, and dry utilities. 
 
6. 
RECORD DRAWINGS  
a. Task 6.1 Record Drawings 
i.  Review and monitor Contractor’s weekly updates on red-line drawing set.

3 
 
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS 
1. 
Application fees for City reviews and permits will be paid by CITY. 
2. 
The Owner’s Allowance will only be utilized with prior written approval from the City 
representative.

Project Name: Water Main Replacement 2022 – Amendment No. 1 
Page B-1 
Project No.: WA2203.451 
Rev. 3/12/2024 
EXHIBIT B 
FEE SCHEDULE

Task
Cost
3
3.1
94,080.00
$                    
3.2
9,600.00
$                      
3.3
23,895.00
$                    
3.4
24,040.00
$                    
3.5
16,535.00
$                    
3.6
20,440.00
$                    
3.7
17,040.00
$                    
3.8
Field Coordination for Private Property Waterline Installations
28,095.00
$                    
233,725.00
$                 
4
4.1
528,327.50
$                  
4.2
41,800.00
$                    
570,127.50
$                 
5
5.1
-
$                                
-
$                                
6
6.1
13,950.00
$                    
13,950.00
$                    
7,500.00
$                      
7,500.00
$                      
-
$                                
-
$                                
15,000.00
$                    
WA2205.451
CITY OF CHANDLER WATERMAIN REPLACEMENT
(NOT TO EXCEED FEE)
RECORD DRAWINGS
SUBTOTAL TASK 4:
QA Test Program ( See below under subconsultant)
MATERIALS TESTING
Inspection Services
CONSTRUCTION INSPECTION
SUBTOTAL TASK 2:
SUBTOTAL TASK 3:
Project Closeout
Weekly Construction Meetings
SUBTOTAL TASK 5:
SUBTOTAL SUBCONSULTANTS:
J2 Landscape Arcitecht (Allowance)
ACS (QA Test Program) (Allowance)
SUBCONSULTANTS
Field Directives (FD's)
Contractor Payment Applications
Record Drawings
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
FEE SCHEDULE
EXHIBIT "B" Amendment 1
Description
Requests for Proposal (RFP)
CPM Schedule
Requests for Information (RFI's)
Shop Drawing Submittals
CONSTRUCTION MANAGEMENT

-
$                                
30,000.00
$                    
30,000.00
$                    
862,802.50
$        
Owner's Allowance
SUBTOTAL ALLOWANCES:
PROJECT TOTAL:
ALLOWANCES
Direct Expense Allowance

Page 1
WA2203.451 Exhibit C Staff Hours Construction CM Services Phase 1.xlsx
Dibble CM Staff Hours and Fee By Task
Billing Rate
240.00
$               
185.00
$               
170.00
$               
152.00
$           
228.00
$           
141.50
$           
212.25
$           
110.00
$             
Task
Sr. Resident 
Engineer
Construction 
Manager
Project Engineer
Senior 
Construction 
Inspector
Senior 
Construction 
Inspector 
Overtime
Construction 
Inspector
Construction 
Inspector 
Overtime
Administrative 
Assistant
Total Task 
Hours
Total Task Fee
Construction Management
Weekly meetings
160
98
195
40
493
94,080.00
$            
CPM schedule reviews
18
12
18
48
9,600.00
$              
Pay Apps
18
12
54
12
96
17,040.00
$            
Request for Information reviews
40
15
60
12
127
23,895.00
$            
Shop drawings/submittals reviews
50
12
50
12
124
24,040.00
$            
Request for Proposals (RFP)
24
7
48
12
91
16,535.00
$            
Field Coordination
35
35
70
12
152
28,095.00
$            
Field Directives (FD)
35
12
50
12
109
20,440.00
$            
Inspection Services
Construction Inspections
1525
230
1500
150
3,405
528,327.50
$         
-
$                       
-
$                       
Close Out
Pre-Final Inspection and Punch List 
30
10
30
70
14,150.00
$            
Final Inspection 
15
10
15
40
8,000.00
$              
Record drawings/review contractor final redline drawings
25
20
25
70
13,950.00
$            
Closeout Documents
25
10
50
30
115
19,650.00
$            
Sub-Contractors
ACS Allowance
7,500.00
$              
J2 Allowance
7,500.00
$              
-
$                       
-
$                       
-
$                       
Total Hours
475
253
665
1525
230
1500
150
142
4,940
Total Fee 
114,000.00
$       
46,805.00
$         
113,050.00
$       
231,800.00
$   
52,440.00
$     
212,250.00
$   
31,837.50
$     
15,620.00
$        
832,802.50
$         
Fee Summary
Resident Engineer - Roger Teske
114,000.00
$       
Construction Manager - Marc Stern
46,805.00
$         
Project Engineer - Julia Cruz
113,050.00
$       
Inspectors Peter Carpentieri/Saige Born
528,327.50
$       
Administrative Assistant Jennifer Drury
15,620.00
$         
Sub-Contractors
15,000.00
$         
Owner Allowance
30,000.00
$         
Total
862,802.50
$       
Exhibit C Phase 1
• This is a time and materials proposal based on the current scope of work and schedule.
• Prices are all-inclusive.  There are no additional charges for mileage or other incidental expenses.
• Proposal is for construction administration and inspection services based on CMAR schedule
2/26/2025