January 15, 2025 Meeting Minutes

City of Chandler — Regular Meeting (2025-04-02)

View PDF Meeting page

Extracted text (via pymupdf) 25666 characters
1 
 
MINUTES OF THE TRANSPORTATION COMMISSION MEETING 
City of Chandler, Webex Meeting  
 
Wednesday, January 15, 2025, at 4:00 p.m.  
 
 
CALL TO ORDER / ROLL CALL  
Chair Heineking called the meeting to order at 4:01 p.m.  Ms. Sheri Passey 
completed roll call. Quorum present. 
 
Members in Attendance: 
Chair David Heineking  
Vice Chair David Lucas 
Commissioner Molly Olsen 
Commissioner John Repar 
Commissioner Luis Heredia 
Commissioner Dan Henderson  
Commissioner Dean Brennan  
 
Members Absent:  
None 
 
Staff Members Present: 
Jason Crampton, Transportation Planning Manager 
Nancy Jackson, Transportation Planning Program Coordinator 
Hezequias Rocha, Transportation Planning Program Coordinator 
Sheri Passey, Recording Secretary, Management Assistant  
John Knudson, Public Works & Utilities Director 
John McFarland, Transportation Manager 
Raymond Huang, Traffic Studies Engineer 
 
Webex Attendee’s: 
 
Ryan Peter, Strategic Initiatives Director 
 
Eric Watkins  
 
Danielle Larson, AZTEC 
Grant Thompson, Chandler Chamber of Commerce  
Sean Nugent 
 
Public Attendee’s: 
None

2 
 
 
SCHEDULED/UNSCHEDULED PUBLIC APPEARANCES 
None. 
 
CONSENT AGENDA 
 
None. 
 
Chair Heineking: Reminded the commissioners that when to please state their 
name for the recording secretary.  The first order is to approve the meeting minutes 
from July.   
 
ACTION AGENDA  
 
1. Approval of the Minutes of the Transportation Commission Regular Meeting 
of July 17, 2024. 
 
Chair Heineking: Has everyone had an opportunity to review the minutes from 
the July 17, 2024, meeting?   
 
Commissioner Repar:  Moved to approve the minutes from July 17. 
  
Vice Chair Lucas: Seconded.     
 
Chair Heineking:   I have a motion to approve.  All in favor say aye. Any 
opposed? None.  Minutes approved.  
 
Motion passed 5-0 by all Commissioner members present.  
 
2. 2025 Transportation Commission Meeting Schedule 
 
Mr. Jason Crampton, Transportation Planning Manager:  Mr. Chairman, we 
have a draft schedule in your packets, including today’s meeting.  It follows the 
same format used overs the past several years - meeting every other month on 
the third Wednesday of the month at 4:00 p.m.  The Commission has the 
opportunity to make any adjustments to the proposed schedule at this time. The 
4:00 p.m. meeting time was started about six years ago and the commission has 
continued to give consent for that meeting time.

3 
 
Vice Chair Lucas: Mr. Chair, the April meeting is out of order in terms of the 
cadences.  Is there a reason for that? 
 
Mr. Crampton:  Mr. Chairman.  Yes, the third Wednesday in March is over spring 
break so we pushed the meeting to April.   
 
Sheri Passey, Management Assistant/Recording Secretary:  Provided more 
history.  In 2024 the commission made a motion to move the March meeting to a 
different date because of spring break.  Therefore, we continued that same 
recommendation.  It can be moved back to March if that is the commission’s 
desire.  The meeting in April is also on the first Wednesday of the month instead 
of the third.   
 
 
Vice Chair Lucas: Mr. Chair, do the other commissioners have conflicts with the 
other dates? 
 
Mr. Crampton:  Mr. Chairman, I have not heard of any conflicts, but if you want 
to wait and get their input as they are running late, you have that discretion to act 
on this later in the meeting.   
 
Vice Chair Lucas: I will move to accept the 2025 meeting schedule.   
 
Commissioner Olsen: I second. 
 
Chair Heineking:   Any discussion?  None. All in favor say aye. Any opposed? 
None.   
 
The proposed 2025 Transportation Commission Meeting Schedule was passed 
5-0 by all Commissioner members present.  
 
3.  Title VI Implementation Plan for Transit Services – 2024 Update 
 
Chair Heineking: Next item is the Title Vi Implementation Plan Update, and I 
understand this is necessary for a council meeting.   
 
Mr. Crampton:  Introduced Hezequias Rocha to make the presentation on the 
Title VI Implementation Plan.

4 
 
Mr. Hezequias Rocha, Transportation Planning Program Coordinator:  Thank 
you Jason, and Mr. Chair.  This topic has been presented in a previous meeting 
which discussed the different types of Title VI plans we have in the city.  This is a 
presentation for the required update and needs city council approval.   
 
Title VI is a Federal law from the Civil Rights Act of 1964.  The law prevents 
discrimination based on the grounds of race, skin color or national origin, or 
being excluded from participation in or denied benefits of any program or 
activity receiving federal financial assistance.   
 
All Federal Transit Administration (FTA) grantees must comply with Title VI.  The 
City of Chandler is a subrecipient and must submit our Title VI Plan to our 
recipient, which is the City of Phoenix, every three years.  Our last update was in 
2021 which the City of Phoenix approved and became part of Chandler’s Title VI 
Plan.   
 
The first part of the Title VI Complaints and Investigation Procedures which 
includes the Notice to the Public, and complaint forms and logs.  Any complaint 
received in our transit services, based on the law; we are required to report in 
our plan.   
 
The plan includes efforts during the past three years of our Public Participation 
Plan and includes programs, activities and outreach of our transit services.  Our 
plan also includes Limited English Proficiency Plan which is an assessment of 
other languages that should be included.  Our plan identifies Spanish as a 
secondary language requirement and other language may also be supported.   
 
The 2024 Plan Updates (changes) include updates to the Public Notice to follow 
the City of Phoenix, the Title VI complaint forms, which come from Valley Metro 
who made updates, the Public Participant plan to reflect 2022-2024 activities, 
Limited English Proficient Plan, new census data, and the Transportation 
Commission membership. Additional updates include the Service and Fare 
Change section with updated route changes and the new Valley Metro fare 
system.  Our plan now requires the inclusion of Chandler Flex services due to 
the Federal funding in July of 2025.  A separate Complaints and Investigation 
Procedure is required for Chandler Flex.  The plan you received in your packet 
does not include the Chandler Flex procedures yet that was a recent change 
required therefore our deadline was extended by the City of Phoenix to April

5 
 
and going before City Council in March.  He concluded his presentation and 
asked if there were any questions.  
 
Commissioner Brennan Asked:  The number of complaints that have been filed 
in Chandler, if any?  Overall, how many in the past twelve months - 2024? 
 
Mr. Rocha Responded:  I don’t remember the exact number (he displayed the 
page in the Plan on the computer screen that reflected the complaints). There 
were two. 
 
Mr. Crampton Responded:  Usually there are any where from zero to two every 
time we update the plan, and we look back every three years.   
 
Commissioner Brennan Asked:  What type of complaint was it? Are those 
example (referring to what was being shown on the screen)? 
 
Mr. Rocha Responded:  Those are the actual complaints. 
 
Commissioner Brennan Commented:  I believe there was a federal law update 
in 1987 that expanded the types of groups that could not be discriminated 
against which included all the protected classes (elderly and disabled, not just 
race, color and national origin) do you know if that’s the case? 
 
Mr. Rocha Responded:  I am not familiar with that law but the Title VI rules that 
we follow are from the City of Phoenix and are based only on those groups 
mentioned. 
 
Commissioner Brennan Stated:  That’s based on the original? 
 
Mr. Crampton Responded.  Our 2021 Title VI update plan included those 
additional groups, and the City of Phoenix requested those groups be excluded 
because it is not a covered class under Title VI. It may be a protected class under 
a different law but not for the Title VI population which only includes race, color 
and national origin.     
 
Commissioner Brennan Asked:  When discussing notifications, you mentioned 
signs at the Park and Ride.  Are there signs anywhere else?

6 
 
Mr. Rocha Responded:  These are the signs (displayed on the screen) posted in 
English and in Spanish and they are posted in the Park and Ride and the Transit 
Center facilities.   
 
Chair Heineking Asked:  On the buses?   
 
Mr. Rocha Responded:  There are signs posted on the buses but those are 
supplied and managed by Valley Metro. 
 
Commissioner Brennan Asked: But they are not in the shelters (bus stops)? 
 
Mr. Rocha Responded:  No, they are not in the shelters. 
 
Mr. Crampton Added.  We also have posting at City Hall and signs will also be 
posted in Chandler Flex.   
 
Commissioner Brennan Commented:  It seems like it is difficult for people to 
learn what Title VI is.  I know Valley Metro conducts surveys on the buses once a 
year but I’m wondering if it might be helpful to do a survey or include 
information about Title VI to help people understand it and what they need to 
do to educate the public. 
 
Mr. Rocha Responded.  We will take note of it and make sure that whenever we 
are doing survey outreach or working with Valley Metro, we keep that in mind.   
 
Commissioner Brennan Commented:  There is a minor typo on page seven (7) 
of the Title VI Plan, investigating your Title VI Complaint…at the end of the seven 
steps. Then he asked - If the complaint is denied by the City of Phoenix, who can 
it be referred to? 
 
Mr. Rocha Responded.  A person has 180 days from the date of the event to file 
a complaint.  A complaint can be filed with the City of Phoenix, Valley Metro or 
City of Chandler.  If they filed the complaint with the City of Phoenix and don’t 
like the outcome, if they are still within the timeframe may file that same 
complaint with another agency.  However, not sure there will be a different 
outcome because at that point the FTA most likely will reach out to the City of 
Phoenix to see what the procedure was and what was the outcome.

7 
 
Chair Heineking Asked:  Any other comments or questions?  We are looking for 
a motion.   
 
Commissioner Olsen Made a motion:  I move to recommend approval of the 
Title VI Implementation Plan for the 2024 Update. 
 
Commissioner Brennan: Seconded the motion. 
 
Chair Heineking Asked:  Any further discussion?  All in favor say aye. Any 
opposed?  None. 
 
The commission recommended approval 7-0 of Title VI Implementation Plan – 
2024 Update.    
 
BRIEFINGS  
 
Chair Heineking:  Next up on the agenda Traffic Studies Briefing.   
 
4.  Traffic Studies Briefing 
 
Mr. Raymond Huang, Traffic Signals Engineer:  I will be presenting on my 
teams’ responsibilities.  Please feel free to ask any questions during the 
presentation or ask at the conclusion of the presentation.   
 
What do we do?  We review all temporary traffic control, review and issue permits 
and inspections, conduct traffic studies, signal warrant studies and traffic calming 
studies.  When the term warrant is used in traffic engineering it means a set of 
conditions need to be met.   
 
We review all the traffic crashes for the City of Chandler and find out if there is 
any pattern or anything we can do to improve to reduce crashes.  We are involved 
with development and CIP projects as part of the review team and we work with 
the three different school districts in Chandler (CUSD, Kyrene and Mesa), in 
addition to the many charter schools helping with school pick-up, drop-off and 
circulation.  We handle special events like the Ostrich Festival and the Christmas 
parade, and review, process and issue block party permits.   
 
Temporary Traffic Control is to protect construction workers by diverting traffic 
out of the way and protect divers alerting them they are in a construction zone.

8 
 
Many questions are received regarding temporary traffic control, but one of the 
most frequently asked is “why is no one is working in the work zone?”  There are 
several answers, but the top answer is it’s not a work zone.  In order to move 
traffic away, it takes up to a half a mile.  Other reasons include the work may be 
underground, waiting for the next phase of the project or miscommunication 
between the contractor and the traffic control company who sets up and removes 
the traffic control.  Recently City Council approved a new policy, passed on January 
9, implementing a Traffic Control Deposit (TCD).   For any temporary traffic control 
permits a deposit is required when a permit is pulled.  The deposit fee depends 
on the size of the project.  If the project finishes within the timeframe stated on 
the application one hundred percent (100%) of the deposit is returned.  However, 
every day after that deadline five percent (5%) of the deposit will be deducted up 
to twenty days. The goal is to encourage and give an incentive for the contractor 
to finish the job and get out of the right of way.  
 
Traffic Studies:  We conducted a lot of traffic studies.  We collect data like volume 
and speed which is plugged into our model, and we complete warrant studies to 
justify any changes we might have.  The most frequent study request is for a traffic 
signal control at an unsignalized intersection.  The second most popular request 
is for traffic calming (mainly related to speed). Certain conditions must be met in 
order to implement speed humps.  The most critical is the request must be for a 
local street.  Speed humps cannot be installed on an arterial street.  Our definition 
of a local street is it must have six driveways (connecting garage and roadway) 
within 500 feet and a speed of 25 miles per hour or slower.  Other considerations 
are traffic volume and excessive speed.  Definition of excessive speed is 32 miles 
per hour or faster.  And finally, it requires the support of the speed humps by the 
community through a signature on a petition.   
 
Traffic Crash Study:  We get our data from ADOT and then put it in a format we 
can complete a systematic study for all the intersections.  We do this type of study 
to see if there are any trends to go up and down with crashes and/or if there is a 
CIP project that we can make safety recommendations. For every private 
development or CIP project we have a process called pre-check.  If a developer 
comes into the city before they do anything we will provide them a list of 
requirements they will need to complete to do their project.   
 
School Traffic Safety:  We work with a lot of schools especially at the beginning of 
the school year regarding traffic circulation.  We have no jurisdiction over the 
schools, but we work with the district and/or headmaster to make

9 
 
recommendations. Only the schools and PD can enforce any rules, and it is up to 
the school to develop a plan.   
 
Special Events and Block Party:  We issue the permits for special events to assist 
with circulation ensuring people have a safe path of ingress and egress.  We also 
process block party permits.  Residents can come in and apply for a block party 
permit to shut down a local street at no costs to them.  We provide them 
barricades and yellow tape with the consensus from the neighbors.   
 
That concludes my presentation.  Does anyone have any questions? 
 
Vice Chair Lucas Asked:  On traffic calming - does the city not use speed cushions 
as opposed to speed humps?  You mentioned one of the negatives of installing 
speed humps is they slow down emergency response, but speed cushions allow 
fire engines and other emergency vehicles to staddle the cushions,   
 
Mr. Huang: Asked for clarification.  When you say speed cushion, are your talking 
about those things that go up and then there is a flat area and then they go down?  
 
Vice Chair Lucas Responded:  No, that would be a speed table.  Speed cushions 
are smaller segments rather than a continuous hump so the larger fire vehicles 
are able to straddle whereas a passenger vehicle cannot. 
 
Mr. Huang: Responded:  Those are designed for parking lots or parking structures 
to reduce traffic to 15 miles per hours and a lot more aggressive and does not 
slow down bigger vehicles.  In the public right-a-way we do not use speed bumps 
instead we use speed humps as they are designed to be more gradual to slow 
traffic down to 20-25 miles per hour.  We don’t want to slow down to 15 miles per 
hour.   
 
Commissioner Brennan: Asked.  Is the annual traffic report available online?   
 
Mr. Huang: Responded.  It currently is not available online, but you may submit 
a public request for a copy of the report.  We send a report to PD once a year.  
Generally, the report is available around August/September as ADOT releases 
the data to us during the summer.  The report is always released a year behind.  
In May/June the 2024 report will be released.

10 
 
Commissioner Brennan: Asked.  Does the report include vehicle vs pedestrian 
crashes and vehicle vs bicycle crashes? 
 
Mr. Huang: Responded.  Any crashes within the City of Chandler and the report 
is comprehensive. 
 
Commissioner Brennan: Asked.  Where can I get a copy of the report? 
 
Mr. Huang: Responded.  You can make a public records request through the 
city clerk’s portal.   
 
Commissioner Olson: Asked.  Quick question about the deposit program.  Do a 
lot of other cities in the Valley have programs similar or we have one of the first? 
 
Mr. Huang: Responded.  We looked at other cities and most have a rental fee.  
Other cities don’t require a deposit.  They charge contractors per mile per day 
and those are non-refundable.  The City did not want to put a burden on a 
contractor to do business in Chandler but to incentive them to get out of the 
right-a-way as soon as possible.  If they do their work and are a good player, 
they will get their deposit back.   
 
Mr. John Knudson, Public Works and Utilities Director: Added.   This policy 
does not apply to our capital improvement program.  We were concerned that if 
we did apply it to our capital improvement program, it would implement new 
language within our general conditions.   
 
Chair Heineking Asked:  Are there any questions or comments?  Our previous 
meeting when we did not have a quorum, a few of us received a briefing on 
Prop 479 prior to it being passed.   
 
5. Prop 479 Briefing 
 
Mr. Crampton Presented.  Thank you, Mr. Chairman.  Proposition 479 passed 
with 59% of the vote.  There was a legal challenge (lacking 60%) but was 
dismissed.  This is a continuation of the half cent sale tax of Proposition 400 
which was a continuation of Proposition 300 and has been in place for almost 40 
years.  Prop 479 extended it for another 20 years.

11 
 
The region wide investment plan includes 330 miles of freeway, 134 lane miles 
of new HOV lanes, 1,000 new or improved arterial lane miles and transit 
operations.  No sales tax will support light rail construction that will be provided 
by federal funding.   
Prop 400 allocated approximately 33% share of the revenue collected for transit 
but that increased to approximately 40%.  The freeways and arterial streets are 
still being heavily funding through this program.   
 
Overview of the arterial and freeway program.  New freeway construction is in 
blue and arterial streets in orange and are spread throughout the valley.  A 
major project is SR-30 in the west valley and construction on Loop 101 and 202 
including in Chandler.   
 
The region will continue to fund bus service (current service level), but an 
additional formula funding is available for transit.  This may be used to either 
expand their transit services or help cover the costs for cities paying with local 
funds. In Chandler we would like to use the formula funding to replace some of 
our local funding to free up funding and grow Chandler Flex.   
 
Quick comparison between Prop 400 and Prop 479.  Prop 400 had arterial, 
freeway and transit programs but also had smaller programs for bikes, 
competitive air quality and ITS.   Prop 479 is more diverse.  It has the three 
major programs plus more including emerging technology, safety, and arterial 
widening.   
 
Reviewing the projects funded in the southeast valley by Prop 400:  New 
Freeways/Widening: south mountain 202, SR-24, Loop 101, Loop 202, 1-10 and 
US-60.  Arterial Streets:  99 different projects (30 were in Chandler).  Transit/Bus 
Operations:   30 bus routes; $800 million for East Valley ($130 million in 
Chandler). And then light rail construction in Tempe and Mesa.   
 
Impact of Prop 400 Chandler Projects:  The green lines concentrated in the north 
and west portion of City is our funded bus service.  The blue lines indicate 
arterial street widening project mostly in southeast portion of City.   
 
Impact of Prop 479 Chandler Projects:  Continuation of the bus service.  The 
funding for the Ray Rd bus operations will move from local funding to the use of 
the formula funding.  We will extend the bus route along Arizona Ave to Ocotillo 
Rd to serve Hamilton High School and Snedigar Park.  And there are arterial

12 
 
street widening projects in north Chandler, and a few in west and south 
Chandler.   
 
The local funding savings being realized through the transition to the formula 
funding will be utilized to expand Chandler Flex.  If you want more information 
or have any questions, I would be happy to address them.  
 
Chair Heineking Asked. When does the funding start? 
 
Mr. Crampton Responded.  January 1, 2026. 
 
Commissioner Heredia Asked.  You mentioned a legal challenge?  There was a 
proposition passed? 
 
Mr. Crampton Responded.  Yes.  There was a proposition that was passed that 
requires any new tax increase must have 60% or more voter approval. 
Commissioner Olson do you remember when that was passed?   
 
Commissioner Olsen Responded.  I believe that proposition requiring the 60% 
passed in 2022.  I believe it was dismissed partially because it is not a new tax 
and partially because it’s not a statewide tax.   
 
Commissioner Heredia Asked.  Are they going to appeal? 
 
Mr. Crampton Responded. The legal challenge was dismissed.   
 
Chair Heineking Asked.  Questions? (None). 
 
Information Items 
 
6. January 2025 Project Status Update List 
 
Chair Heineking Moving to the next item – Project Status Update List.   
 
Mr. Crampton Spoke.  Mr. Chairman, I will review a few key updates.  If you 
have questions, please let me know.   
 
There was a public meeting for the Chandler Heights Phase Three project on 
Monday.  We apologize for the late notice to the commission but plenty of notice

13 
 
went out to the public.  There were seven people who attended with mostly 
positive support for the project. 
 
Frye Rd. Protected Bike Lanes Project received a successful bid from Granite 
Construction.  It is going to council on January 23 to award a construction 
contract.  Assuming council support will host a public meeting sometime in 
February.   
 
Paseo Trail/Riggs Road we applied for a Design Assistance grant we were 
awarded $60,000 grant to study.  Currently the trail stops at Riggs Rd and does 
not continue south.  Part of the challenge is that is Maricopa County jurisdiction, 
but we are looking into a safe crossing and then extending the trail as far as we 
can. We are hoping to work with the county to see if we can coordination or 
collaboration on this project. 
 
Roadway Safety Action Plan.  We were awarded a $560,000 grant to complete a 
citywide study on a roadway safety and develop an action plan.  We will work 
with Raymond’s group, our police department as well as the other 
transportation group in the city. However, there is a backlog at the Highway 
Administration to finalize the grant agreement due to the volume of 
agreements.  It is a waiting process.  But we will involve the commission with the 
study which will take approximately 18 month or longer. 
 
Chandler Flex – We are considering several different options for the future of 
Chandler Flex.  However, we will start using federal funding so a new RFP was 
issued, and the new contract will begin July 1.  All FTA rules regarding federal 
funding are required and will be followed. In addition, we are looking at possible 
expansion areas for Chandler Flex to serve more areas in Chandler.   
 
Those were the key projects.  If there are any questions? 
 
Chair Heineking Commented. Chandler Flex is an amazing program and very 
successful.  Good job bringing that to Chandler.  I imagine we will see if copied 
from the valley, if not elsewhere. 
 
MEMBER COMMENTS/ANNOUNCEMENTS 
 
Chair Heineking Asked.  Member Announcements?

14 
 
Commissioner Brennan Announced.  There is now an organized bike 
committee called Bike Chandler.  We will be ready to provide some 
information on the committee in time for the Family Bike Ride (if the date is 
finalized) and provide more information at that time.    
 
Mr. Crampton Asked.  Nancy, do we have a date on the Family Bike Ride? 
 
Mrs. Nancy Jackson, Transportation Planning Program Coordinator:  Yes, 
it will be the first Saturday, April 5.   
Chair Heineking Reminder.  We did approve the upcoming meeting 
schedule.  Any other comments or questions?  Thank you everyone. The 
meeting is adjourned.   
 
CALENDAR 
Next meeting will be held on Wednesday, April 2, 2025. 
 
Meeting was adjourned 4:58 p.m. 
  
 
 
________________________________________            _____________________________________ 
David Heineking, Chairman 
 
 
 
Sheri Passey, City of Chandler