Kyrene Branch/Highline

City of Chandler — Regular Meeting (2025-04-02)

View PDF Meeting page

Extracted text (via pymupdf) 15168 characters
Transportation Commission April 02, 2025
Kyrene Branch & Highline
Canal Shared-Use Path
Project

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
EXISTING CANAL PATH NETWORK
S. KYRENE RD.
PRICE RD
E. BASELINE RD 
E. RAY RD
S. POWER RD
N. POWER RD
S. VAL VISTA DR
N. VAL VISTA DR
SOUTH CANAL
EASTERN CANAL
TEMPE CANAL
WESTERN LATERAL
CONSOLIDATED CANAL
GILBERT
QUEEN 
CREEK
MESA
TEMPE
SCOTTSDALE 
PHOENIX
HIGHLINE CANAL 
CHANDLER
KYRENE BRANCH 
CANAL
•	 Note: improved and unimproved 
path surfaces shown on the map
•	 Some portions of some path 
segments shown deviate from 
the canal at locations where the 
canal goes underground and a 
continuous path is not feasible
NOTES

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
PROJECT PURPOSE, OBJECTIVES, & SCHEDULE 
•	 Improve aesthetics, accessibility, and safety
•	 Connect to the Regional Trail System
•	 Maintain the historic public recreational use 
of canals
•	 Enhance crossing safety and connectivity
•	 Increase active transportation 
opportunities in Chandler
•	 Preliminary Planning Study Through MAG 
Design Assistance - Completed
•	 Final Design - Underway
Note: Design cannot be completed until Temporary Construction 
Easements have been obtained and the Environmental, Right-of-
Way, and Utility Clearances have been obtained.
•	 Construction - Beginning in Spring/Summer 
2026
PROJECT PURPOSE AND
 OBJECTIVES 
PROJECT 
SCHEDULE

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
KYRENE BRANCH CANAL & HIGHLINE CANAL SHARED USE PATH - LAND USE AND RIGHTS-OF-WAY
•	 The canal system is owned by the United States of America and 
is managed by SRP, acting on behalf of the Federal Bureau of 
Reclamation (BOR)-Beginning Sept 2023, SRP will restrict 'urban 
camping' on BOR Land. Violations will be considered trespassing.
•	 Since 1964, SRP and City Partners have developed over 80 miles 
of canal trails that are open to the public for recreational use.
•	 Improvements along the Highline Canal and Kyrene Branch Ca-
nal are granted through a Land Use License Agreement issued 
by SRP to the City of Chandler.
•	 The Roosevelt Ave. Bridge over the Kyrene Branch Canal is 
within SRP Right-of-Way.  License agreement prohibits the re-
striction of equestrian, bicycle and pedestrian use of canal banks.
NOTES
TUSCANY
TUSCANY
RHYTHM
RHYTHM
RHYTHM
RHYTHM
LUMIERE
LUMIERE
TUSCANY
TUSCANY
TROVITA
TROVITA
RAY RANCH 
RAY RANCH 
ESTATES
ESTATES
WARNER 
WARNER 
RANCH
RANCH
WARNER 
WARNER 
RANCH
RANCH
HEARTHSTONE 
HEARTHSTONE 
WEST
WEST
SUN 
SUN 
MEADOWS
MEADOWS
CITY OF TEMPE
CITY OF TEMPE
CITY OF TEMPE
CITY OF TEMPE
CITY OF PHOENIX
CITY OF PHOENIX
CITY OF PHOENIX
CITY OF PHOENIX
CITY OF CHANDLER
CITY OF CHANDLER
CITY OF CHANDLER
CITY OF CHANDLER
S. PRIEST DR.
RAY RD.
S. KYRENE RD.
KNOX RD.
DEL RIO ST.
LINDA LN.
IMPROVED PATH 
SURFACE
IMPROVED PATH 
SURFACE
UNIMPROVED 
PATH SURFACE
UNIMPROVED 
PATH SURFACE
UNIMPROVED 
PATH SURFACE
LEGEND:
	Canal
	Residential
	Commercial
	Subdivisions
	City Limits
10
SRP HIGHLI
NE CANA
L (PUBLIC ACCESS)
SRP HIGHLI
NE CANA
L (PUBLIC ACCESS)
SRP KY
RENE BRA
NCH C
AN
AL
 (PUB
LI
C ACCE
SS)
SRP KY
RENE BRA
NCH C
AN
AL
 (PUB
LI
C ACCE
SS)

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
CITY OF CHANDLER - TRANSPORTATION MASTER PLAN (2019 UPDATE) 
BICYCLE & PEDESTRIAN RECOMMENDATIONS 2020-2040
XY
#*
89:LMNO
89:LMNO
89:LMNO
#*
89:LMNO
89:LMNO
89:LMNOXY
#*
#*89:LMNO
XY
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
Appleby Trail
Ashley Trail
Eastern Canal Path
Consolidated Canal Path/Paseo Trail
Western Canal Path
Highline Lateral Canal Path
Kyrene Branch Canal Path
Elliot Rd
Warner Rd
Ray Rd
Pecos Rd
Germann Rd
Queen Creek Rd
Ocotillo Rd
Chandler Heights Rd
Chandler Blvd
Riggs Rd
Hunt Hwy
Val Vista Dr
Lindsay Rd
Gilbert Rd
Cooper Rd
McQueen Rd
Alma School Rd
Dobson Rd
Old Price Rd
Arizona Ave
McClintock Dr
Rural Rd
Kyrene Rd
56th St
Tempe
Mesa
Gilbert
Phoenix
?
ð
?
Þ
!"a$
Gila River
Indian Community
k
k
k
k
k
k
k
k
k
k
0
1
2
0.5
Miles
²
# Indicates Multijurisdictional Improvement
Note: 
k Indicates Programmed Improvement
City of Chandler
Transportation Master Plan
2019 Update
Bicycle/Pedestrian Recommendations
2020-2040
Legend
Study Area
City Limits
o
Airport
Railroad
State Highway
Major Street
Local Street
Bicycle Facilities
Bike Lane
Bike Route
Shared Use Path – Paved
Shared Use Path – Unpaved
!
!
!
Paved Shoulder
!(
T
Transit Facility with Enhanced
Bicycle Parking
89:LMNO
Shared Use Path Signalized
Crossing (if warranted)
#*
Crossing Signage Improvement
XY
Overpass/Underpass
!(
P
Park and Ride Facility with
Enhanced Bicycle Parking
On-Street Separated/Buffered
Bike Lane
Highline Lateral Canal Path 
Kyrene Branch Canal Path

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
KYRENE BRANCH CANAL NORTH
K2
TYPICAL SECTION (LOOKING NORTH)
KYRENE BRANCH CANAL - PROJECT AREA KEY MAP & PROPOSED IMPROVEMENTS 
RAILROAD
N. McKEMY AVE
N. ROOSEVELT AVE
W. KNOX RD
W. RAY RD
N. KYRENE RD
K2
K1
K3
K4
KEY MAP LEGEND
MIDBLOCK PEDESTRIAN SIGNAL
K1
KYRENE BRANCH CANAL NORTH 
SHARED USE PATH
K2
MCKEMY CROSSING
K3
KYRENE BRANCH CANAL SOUTH 
SHARED USE PATH
K4
W. KNOX RD
TEMPE KYRENE BRANCH
CANAL PATH
W. LINDA LN
KYRENE BRANCH CANAL SOUTH
K4
TYPICAL SECTION (LOOKING SOUTH)
NOTE:  ALL PROPOSED IMPROVEMENTS ARE WITHIN PUBLICLY OWNED PROPERTIES THAT ARE CURRENTLY OPEN TO THE PUBLIC, 
             INCLUDING PEDESTRIANS & BICYCLISTS.  
G1
G1
ACCESS GATE
G1

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
TuscanyHome
o
wnersAssociation
LosIn
f
ractores
Procesados
AcuerdoARS
A1
Ser••n
13-15
0
2
de
PROPIEDAD PRIVADA
Tu
s
canyHomeownersAssociat
i
on
LosInfractores
P
rocesados
AcuerdoARS
A1
Ser••n
13-1502
de
PROPI
E
DAD PRIVADA
TuscanyHomeownersAss
o
ciation
LosInfractores
Procesados
AcuerdoARS
A1
Se
r
••n
13-1502
de
PROPIEDAD PRIVADA
TuscanyHomeown
e
rsAssociation
LosInfrac
t
ores
Procesados
AcuerdoARS
A
1
Ser••n
13-1502
d
e
PROPIEDAD PRIVADA
TuscanyHomeo
w
nersAssociation
LosInfractores
Procesados
AcuerdoARS
A1
Ser••n
13-150
2
de
PROPIEDAD PRIVADA
ROOSEVELT
AVE
NORTH
TUSCANY
TUSCANY
TUSCANY
TUSCANY
MATCHLINE SEE BELOW LEFT
P3
Kyrene Branch Canal 
Shared Use Path 
Rest Area
BF
FS
M
MV
A
LINDA LN
KYRENE BRANCH CANAL
MCKEMY AVE
RAY RD
WARNER RANCH
WARNER RANCH
A
S
GU
C BELOW
Kyrene Branch Canal 
Shared Use Path 
1.6 miles
Kyrene Branch Canal 
Shared Use Path
Bike Repair Station 
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Kyrene Branch Canal 
Shared Use Path 
P3
Bike Repair Station 
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station 
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
P3
Bike Repair Station 
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station
KYRENE BRANCH CANAL AND RAY ROAD - ROLL PLOT
SEE MATCHLINE A BELOW
SEE MATCHLINE B BELOW
45
RAY RD
MCKEMY
AVE
NORTH
B.
FOR CONTINUATION SEE FIGURE A ABOVE
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station
Kyrene Branch Canal 
Shared Use Path 
Kyrene Branch Canal 
Shared Use Path 
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Shaded Rest Area
Bike Repair Station
SEE MATCHLINE A ABOVE
SEE MATCHLINE C NEXT PAGE
SEE MATCHLINE B ABOVE
NORTH

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
KYRENE BRANCH CANAL AND KYRENE ROAD - ROLL PLOT
KYRENE BRANCH CANAL
RAY RANCH ESTATES
TUSCANY
TROVITA
MATCHLINE SEE ABOVE RIGHT
KRISTIN LN
B.
NTINUATION
RE B ABOVE
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path 
Kyrene Branch Canal 
Shared Use Path 
Rest Area
0.27 miles
SEE MATCHLINE C PREVIOUS PAGE
SEE MATCHLINE D BOTTOM LEFT
RAY RANCH ESTATES
NORTH
SEE MATCHLINE D TOP RIGHT
SEE MATCHLINE E  RIGHT
SEE MATCHLINE E LEFT
45
KYRENE BRANCH CANAL
KYRENE RD
KNOX RD
KNOX RD
FOR CONTINUATION
SEE FIGURE B ABOVE
Paseo Trail 
Bike Repair Station  
1.6 miles
Kyrene Branch Canal 
Shared Use Path 
Paseo Trail 
1.6 miles
Kyrene Branch Canal 
Shared Use Path 
Kyrene Branch Canal 
Shared Use Path 
Rest Area
50 feet
Kyrene Branch Canal 
Shared Use Path
Paseo Trail 
Bike Repair Station  
1.6 miles
Kyrene Branch Canal 
Shared Use Path 
Kyrene Branch Canal 
Shared Use Path
1.6 miles
Kyrene Branch Canal 
Shared Use Path 
1.6 miles
Kyrene Branch Canal 
Shared Use Path 
Kyrene Branch Canal 
Shared Use Path
Paseo Trail 
Bike Repair Station  
1.6 miles
Paseo Trail 
Bike Repair Station  
1.6 miles
1.65 miles
Kyrene Branch Canal 
Shared Use Path
City of Tempe
City of Chandler
 
NORTH
NORTH

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
KYRENE ROAD MIDBLOCK PEDESTRIAN SIGNAL (LOCATED IN THE CITY OF TEMPE)
N. KYRENE RD
EXISTING CATCH BASIN
PROPOSED PLANTING
PROPOSED CITY 
OF TEMPE TRAFFIC 
SIGNAL
PROPOSED SIDEWALK RAMP
MIDBLOCK PEDESTRIAN SIGNAL
K1
PROPOSED 
SIDEWALK
PROPOSED SIGNALIZED
CROSSWALK
PROPOSED 
SIDEWALK
KYRENE 
BRANCH 
CANAL
KYRENE 
BRANCH 
CANAL

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
HIGHLINE CANAL - PROJECT AREA KEY MAP & PROPOSED IMPROVEMENTS 
54TH ST
W. ORCHID LN
W. RAY RD
S. PRIEST DR
SOUTH HIGHLINE 
LATERAL CANAL 
EXISTING HIGHLINE CANAL 
MULTI-USE PATH (TEMPE)
I-10 MARICOPA FREEWAY
CITY OF TEMPE
CITY OF CHANDLER
KEY MAP LEGEND
HIGHLINE CANAL SHARED USE PATH 
H1
HIGHLINE CANAL SHARED USE PATH  
TO 54TH ST BIKE LANES
H2
ORCHID LN TO 900’ SOUTH BIKE LANES
H4
54TH ST TO PRIEST DR BIKE LANES
H3
H1
H2
H3
H4
HIGHLINE CANAL SHARED USE  PATH
H1
TYPICAL SECTION (LOOKING NORTH)

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
HIGHLINE CANAL - ROLL PLOT
HIGHLINE CANAL
D LN
I-10 Pedestrian 
Bridge
0.5 miles
Highline Canal 
Shared Use Path
City of Tempe
Kiwanis Park
Western Canal Path 
0.25 miles
4.15 miles
3.82 miles
Shopping Centers
Ray Road
Priest Drive
g Centers
Ray Road
Priest Drive
P3
Highline Canal 
Shared Use Path 
Rest Area
NORTH

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
ORCHID LANE - ROLL PLOT
25
35
25
HIGHLINE CANAL
54TH ST
ORCHID LN
Highline Canal 
Shared Use Path
City of Tempe
Kiwanis Park
Western Canal Path 
0.25 miles
4.15 miles
3.82 miles
Shopping Centers
Ray Road
Priest Drive
Shopping Centers  
0.3 miles
1.6 miles
1.6 miles
Highline Canal 
Shared Use Path
0.13 miles
0.13 miles
Highline Canal 
Shared Use Path
Shopping Centers  
1.6 miles
P5
Highline Canal 
Shared Use Path
Ray Road
Shopping Centers
0.26 miles
0.3miles
Priest Drive  
0.29 miles
P3
Highline Canal 
Shared Use Path 
Rest Area
P3
Highline
Shared Use Pa
Rest Area
SEE MATCHLINE BELOW
SEE MATCHLINE ABOVE
PRIEST DR
NORTH
35
1.6 miles
1.6 miles
Highline Canal 
Shared Use Path
0.4 miles
1.6 miles
Highline Canal 
Shared Use Path
0.4 miles
NORTH

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
54TH ST - ROLL PLOT
35
25
54TH
54TH ST
RAY RD
ORCHID LN
54TH ST
35
Shopping Centers  
0.3 miles
1.6 miles
Highline Canal 
Shared Use Path
1.6 miles
1.6 miles
Highline Canal 
Shared Use Path
0.13 miles
Shopping Centers  
0.3 miles
1.6 miles
1.6 miles
Highline Canal 
Shared Use Path
0.13 miles
1.6 miles
Highline Canal 
Shared Use Path
1.6 miles
Highline Canal 
Shared Use Path
1.6 miles
P5
Highline Canal 
Shared Use Path
Ray Road
Shopping Centers
0.26 miles
0.3miles
Priest Drive  
0.29 miles
NORTH

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
TYPICAL STREET SECTIONS
ORCHID LN TO 900’ SOUTH BIKE LANES
H4
54TH ST TO PRIEST DR BIKE LANES
H3
HIGHLINE CANAL TO 54TH ST BIKE LANES
H2
WB
WB
SB
EB
EB
NB

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
POTENTIAL PROJECT ELEMENTS 
PHOENIX •  ARIZONA CANAL
VALLEY PATH WAYFINDING (KYRENE)
CUSTOM WAYFINDING (HIGHLINE)
SIGNAGE AND WAYFINDING OPTIONS
PROPOSED PATH LIGHTING
LIGHTING
CUSTOM BENCH SEATING (KYRENE)
PRE-FABRICATED BENCH SEATING (KYRENE)
ACCESS GATE (KYRENE)
SITE FURNISHINGS
TRASH RECEPTACLE
BIKE REPAIR STATION
NOTE: LOCATION WILL BE ON KYRENE 
BRANCH CANAL, SOUTH OF RAY ROAD. 
MUTT MITT DOG WASTE STATION
WEBCAST RINGBOLLARD
BICYCLE DIRECTIONAL SIGNAGE
-2"
P3
P2
8
2'-1"
2'-6"
P5
Highline Canal 
Shared Use Path
City of Tempe
Kiwanis Park
Western Canal Path 
0.25 miles
4.15 miles
2'-0"
3.82 miles
Shopping Centers
Ray Road
Priest Drive
DOUBLE SIDED
A
A
B
B

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
0.5 FC 
TEMPLATE LINE
ACTUAL 
LIGHT CUTOFF
PHOTOMETRIC WEB 
(DISTRIBUTION OF LIGHT IN 3D)
1.0 FC 
TEMPLATE LINE
RESIDENTIAL 
PROPERTY LINE (0.0 FC)
KYRENE PATH LIGHTING - LIGHT DISTRIBUTION EXHIBIT

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
PUBLIC MEETING SCHEDULE
Meeting
Date
Public Meeting #1
Preliminary Design - 30 Attendees
August 2022
Public Meeting #2
Final Design - 24 Attendees
December 2023
Stakeholder Meetings
Tuscany HOA and Warner Ranch HOA
March 2024 - August 2024
Transportation Commission Meeting
April 2025

CHANDLER,  ARIZONA
APRIL 2025
KYRENE/HIGHLINE CANAL SHARED USE PATHWAYS
PREVIOUS PUBLIC FEEDBACK 
Public Concerns
Response
Restricting private vehicles from using canal
SRP provided temporary access gates to restrict vehicular access; Permanent 
access gates included with this project
Traffic impacts for path users crossing Roosevelt Ave and 
protection of private property
Design includes proposed stop and stay on trail signs for path users 
approaching Roosevelt Ave. private property signage can be included with 
adjacent property owner coordination. 
Need lighting along path for safety/security but concerned with 
light spillage into backyards
Design includes proposed lighting along pathway utilizing a light fixture with a 
house side shield to prevent light spillage onto adjacent property  
Maintaining cleanliness of trash, debris, and pet waste
Design includes proposed trash receptacles and pet waste stations. City 
will begin maintaining path after construction (currently not being regularly 
maintained).
Traffic impacts due to new traffic signal on Ray Road
The new pedestrian traffic signal crossing Ray Road has been omitted from 
design
Missing sidewalk along Kyrene Road at north end of Kyrene 
Branch Canal path
Design includes proposed sidewalk along Kyrene Road to complete missing 
sidewalk gap
Designate and show hours the shared path is open for use. 
The 60% design included path hours on the multi-use path rules and 
regulations signs. Per comments received by SRP, the sign cannot state hours. 
This language has been removed from the rules and regulation signage.

Thank You!
QUESTIONS?