Extracted text (via pymupdf)
1941 characters
Willis Road Improvements Transportation Commission May 21, 2025 1 Project Limits 2 Frye Road from Paseo Trail to San Marcos Park (2.5 miles) Alma School Road Arizona Avenue West Willis Road S Tumbleweed Ln S Holguin way EM0 EM AP2 Slide 2 EM0 Spelled out West, Road, and Avenue Mireles, Estefany, 2025-05-14T16:41:33.454 EM1 North arrow needed, please confirm direction Mireles, Estefany, 2025-05-14T16:43:37.802 AP2 Cite source of map Pridemore, Ashley, 2025-05-14T18:23:21.962 Project Funding and Timeline 3 Frye Road from Paseo Trail to San Marcos Park (2.5 miles) • Transportation Master Plan Update – 2019 • Design ($204,262) • Council Award – February 8, 2024 • Design currently at 90% stage • Construction ($2.0 to 2.4 million estimate) • Construction bid anticipated for late 2025 EM0 EM1 Slide 3 EM0 Replaced with long dash Mireles, Estefany, 2025-05-14T16:42:29.533 EM1 Revised text size so they are the same on next two slides Mireles, Estefany, 2025-05-14T16:47:49.936 Design Elements 4 • Completing south half of Willis Road to include: • Widened asphalt pavement • Curb and gutter • Sidewalk • Signing and striping • Utility relocations Proposed Typical Section AP0 AP1 Slide 4 AP0 Will your audience understand the limits of the project this includes Pridemore, Ashley, 2025-05-14T18:24:25.086 AP1 Consider adding caption “Proposed Typical Section” with limits Pridemore, Ashley, 2025-05-14T18:25:23.713 Added Features 5 1. Median island 2. Pedestrian crossing 3. Chicane Proposed Chicane Section West Willis Road 1 2 3 AP0 Slide 5 AP0 Consider adding caption “Proposed Typical Section” with limits since none of the bullets are shown on this graphic Pridemore, Ashley, 2025-05-14T18:25:51.326 Planned Public Outreach 6 • Project Info Website • Outreach to Nearby residents/Businesses • Website setup to allow accept comments • Potential return to Commission after Public Outreach Questions and Comments 7