Consultant CHANGE ORDER - BOS APPROVAL
Maricopa County Deparment of Transportation
Date: 8/17/2023
Change Order Number:
1
Amount:
$610,921.05
Agenda Item No.
C-64-22-197-X-00
Contract No: 2022-001
Work Order No:
TT0339
Consultant Name: TRISTAR ENGINEERING
Project Name: Gilbert Rd Bridge at Salt River
Intial Amount:
$5,366,006
Contract Notice to Proceed Date:
3/23/2022
Total Prior Change Orders:
$0.00
This change order will expand the Scope of Work for Materials Sampling and Testing to be all encompassing, rather than limited, as per the attached Revisions
to Scope of Work. Additional budget to accommodate this expansion is detailed in the attached Fee Proposal. Allowances for overtime are also included in the
Fee Proposal.
With this Change Order, the total amount of this contract has increased 11.4%
By reason of this change 0 days extension of time will be allowed for administrative purposes, after the time allowed for construction work.
With inclusion of this change, this contract has a revised cumulative performance period of 1115 days.
The contract completion date is: 4/11/2025
By reason of this change 0 days extension of time will be allowed for construction work. The construction work completion date is:
By mutual agreement of the parties, the following contract change(s) are incorporated into the above-identified contract. All other contract terms and conditions remain unchanged.
The following financial information is submitted:
Initial Contract Amount
$5,366,006.00
Amended Contract Amount w/ previous change orders
$5,366,006.00
Current Change Order Request
$610,921.05
Amended Contract Amount w/ current change order
$5,976,927.05
We, the undersigned Consultant, do hereby agree that upon execution of this Change Order that we will perform all work as identified above, and as may be
described in attachment(s) and will accept the above specified amount(s) as full payment thereof.
IN WITNESS WHEREOF, the parties herein have executed this Contract Change Order:
Principal (Signature)
Printed Name John Hall
Title
Date
MARICOPA COUNTY DEPARTMENT OF TRANSPORTATION
Consultant (if applicable) -
Date
Project Manager - Lisa Ruane
Date
Branch Manager -
Date
Division Manager -
Date
I certify that this change is within the limits authorized by the Maricopa County
Procurement Code
I certify that funds are available to accomplish this Change Order
Contract Services - Beverly Krumm
Date
CIP Cash Flow Manager - Charles Williams
Date
Deputy Transportation Director - Steven Wilcox
Date
IGA PM (if applicable) -
Date
RECOMMENDED BY:
ACCEPTED AND APPROVED:
Transportation Director/Engineer - Jesse Gutierrez
Date
Chairman, Board of Supervisors -
Date
LEGAL REVIEW
ATTEST:
Approved as to form and within the powers and authority granted under the laws
of the State of Arizona to the Maricopa County Department of Transportation.
Deputy County Attorney -
Date
Clerk of the Board -
Date
COUNTY APPROVAL
Contract No. 2022-001
Change Order No. 1
Revised Sections in Scope of Work
3.2.7 CONSULTANT shall maintain close contact with Contractor and keep
continuously aware of the current schedule. CONSULTANT shall keep
Contractor aware of the inspection and testing requirements and the effect
these have on work scheduling, in order to avoid delays and
misunderstandings.
Revise Paragraph 3.2.7 to read:
CONSULTANT shall prepare a Project Materials Sampling and Testing Plan in
accordance with Appendix A19 of the Construction Management Manual and
submit to COUNTY for review. Perform all quality assurance and acceptance
testing and reporting for the PROJECT.
3.2.8 The MCDOT Materials Branch will perform the majority of quality assurance
and acceptance testing, excepting testing of the reinforcing steel
(555.02100A), and the Cement Stabilized Alluvium (222.01000), for which the
CONSULTANT will perform Quality Assurance testing. CONSULTANT shall
coordinate with the MCDOT Lab personnel, and give sufficient advanced
notice (48 hours minimum) of required testing. Utilization of the MCDOT
Materials Laboratory Work Request Form is required. All samples shall be
obtained in accordance with the MCDOT materials procedures or applicable
ASTM or AASHTO sampling methods. Ensure Certificates of Compliance
and/or Certificates of Analysis of material is provided and in compliance with
requirements.
Revise Paragraph 3.2.8 to read:
Consultant will perform quality assurance and acceptance testing, inclusive of
testing of the reinforcing steel (555.02100A), and the Cement Stabilized
Alluvium (222.01000). All samples shall be obtained in accordance with the
MCDOT materials procedures or applicable ASTM or AASHTO sampling
methods. Ensure Certificates of Compliance and/or Certificates of Analysis of
material is provided and in compliance with requirements.
3.2.9 Consultant staffing shall include an Inspector at the plant throughout girder
fabrication for Inspection to ensure fabrication is in conformance with all
applicable plans, details and specifications. COUNTY (MCDOT Materials Lab)
will make the cylinders for the concrete incorporated into the girders for
MCDOT testing.
Contract No. 2022-001
Change Order No. 1
Revise Paragraph 3.2.9 to read:
Consultant staffing shall include an Inspector at the plant throughout girder
fabrication for Inspection to ensure fabrication is in conformance with all
applicable plans, details and specifications. CONSULTANT will make the
cylinders for the concrete incorporated into the girders for testing at an
AASHTO Accredited Lab.
3.2.10 Consultant shall perform sampling and testing of steel reinforcement
incorporated into the Project in accordance with the ADOT Materials Testing
Manual – Series 900, Appendix C, Table 5, and the Project Materials Sampling
and Testing Plan. Testing is in addition to the Certificates of Compliance.
Corporate Office
Chandler Office
Gilbert Office
Tucson Office
10625 N. 25th Avenue
135 E. Chilton Drive
175 S. Hamilton Place
3161 E. 47th Street
Suite 103
Suite 201
Bldg. 6, Suite 113
Tucson, AZ 85713
Phoenix, AZ 85029
Chandler, AZ 85225
Gilbert, AZ 85233
Mailing Address: PO Box 35278, Phoenix, AZ 85069-5278
Tel: (602) 288-5594 Fax: (602) 288-5592
August 9, 2023
Lisa Ruane, PE
Construction Engineer
Construction & Materials Division
Maricopa County Department of Transportation
2901 West Durango Street
Phoenix, AZ 85009-6357
Re:
Fee Proposal, Change Order No. 1 — Contract No. 2022-001
Construction Administration Services
TT0339 – Gilbert Road Bridge at Salt River
Ms. Ruane:
Please find attached for your consideration our revised fee proposal for Change Order No. 1 to provide
construction materials field and laboratory testing on the above referenced project, as requested by
MCDOT.
In preparing our fee proposal, we have addressed the comments in your emails dated March 29, 2023 and
August 8, 2023, as well as our phone conversation on August 4, 2023. The attached fee proposal includes
the following:
•
Materials Coordinator – Quality Testing (QT): additional hours for this position to reflect the
increased workload coordinating all field sampling, testing, sample delivery, etc.
•
Laboratory Testing – Quality Testing (QT): all required lab testing billed at QT’s standard rates.
•
Construction Materials Tester – Tristar: one full-time position during peak construction activities,
currently anticipated to be 17 months.
•
Sample Runner – Tristar: one part-time position, approximately 5 hours per week, during peak
construction activities to aid in delivering samples to the QT Laboratory for testing.
•
Girder Inspector/Tester – Consultant Engineering, Inc. (CEI): one additional full-time position
during girder fabrication, which is anticipated to be a 24-hour per day operation.
An overtime allowance was not provided separately by MCDOT in our original contract, as indicated by
the standard note on Table D. Therefore, an allowance equivalent to approximately 10% of all eligible
hours for hourly field personnel has been included with this request in Table A for both Tristar and CEI.
We understand that prior approval of the MCDOT Project Monitor is required prior to using these
allowances. An updated Table D is included for Tristar, CEI, and QT.
Please do not hesitate to contact me at (602) 904-3986 or jhall@tristar-az.com to discuss any questions or if
you require any additional information. We look forward to continuing to work with you, your MCDOT
colleagues, the Salt River Pima-Maricopa Indian Community, and the City of Mesa on this project.
Sincerely,
TRISTAR ENGINEERING & MANAGEMENT, INC.
John D. Hall, P.E.
Vice President
FEE PROPOSAL - TABLE A
CONSULTANT
COST PROPOSAL SUMMARY
Cost Proposal Summary (No Optional Tasks)
Page 1 of 3
Maricopa County Department of Transportation
CONSULTANT: Tristar Engineering and Management, Inc.
CONTRACT NO.: 2022-001
PROJECT NAME: TT0339 Gilbert Road Bridge at Salt River
DIRECT LABOR
Classifications
Man-hours
Hourly Rates
Labor Costs
Sr. Resident Engineer
$89.81
Project Supervisor
$57.05
Field Office Supervisor
$49.84
Lead Inspector
$44.50
Inspector
$31.61
Electrical/Utility Inspector
$37.86
Construction Materials Tester
2,924
$30.45
$89,035.80
Sample Runner
380
$23.10
$8,778.00
Consultant’s Subtotal Direct Labor
$97,813.80
Consultant’s Overhead @ 136.24% of Direct Labor
$133,261.52
Consultant’s Profit @ 10% of Direct Labor + Overhead
$23,107.53
Consultant’s Total Direct Labor
$254,182.85
DIRECT AND OUTSIDE EXPENSES
DESCRIPTION
EXPENSE AMOUNT
Mileage – 50,000 mi @ $0.56/mi
$28,000.00
Testing Supplies
$10,000.00
Nuclear Density Gauge Rental (18 months)
$11,700.00
Consultant’s Total Direct and Outside Expenses
$49,700.00
OPTIONAL TASK ALLOWANCES
DESCRIPTION
ALLOWANCE AMOUNT
Overtime Allowance
$100,000.00
Consultant’s Total Optional Task Allowances
$100,000.00
FEE PROPOSAL - TABLE A
CONSULTANT
COST PROPOSAL SUMMARY
Cost Proposal Summary (No Optional Tasks)
Page 2 of 3
Maricopa County Department of Transportation
SUBCONSULTANT(s)
NAME OF SUBCONSULTANT
TASK
TOTAL COST
Consultant Engineering, Inc. (CEI)
Construction Admin./Inspection
$115,194.58
Quality Testing, LLC (QT)
Const. Admin./Mat’l Testing
$91,843.62
Wood, Patel & Associates, Inc.
Survey
Logan Simpson
Enviro./Landscape Inspection
Total Subconsultant(s) $207,038.20
Consultant’s Total Direct Labor
$254,182.85
Consultant’s Total Direct and Outside Expenses
$49,700.00
Consultant’s Total Optional Task Allowances
$100,000.00
Total:
$403,882.85
Consultant’s Totals of Direct Labor and
Direct and Outside Expenses
$403,882.85
TOTAL PROPOSED FEE $610,921.05
(Inclusive of Consultant and Subconsultant[s] total proposed fee.)
Tristar Engineering and Management, Inc.
Firm
Signature
Vice President
Title
08/09/2023
Date
FEE PROPOSAL - TABLE B
CONSULTANT/SUBCONSULTANT NAME: Tristar Engineering and Management, Inc.
CONTRACT NO: 2022-001
PROJECT NAME: TT0339 Gilbert Road Bridge at Salt River
DATE: 08/09/2023
MAN-HOURS
PROJECT PERSONNEL
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTALS
Sr. Resident Engineer
0
Project Supervisor
0
Field Office Supervisor
0
Lead Inspector
0
Inspector
0
Electrical/Utility Inspector
0
Construction Materials Tester
0
Sample Runner
0
MAN-HOURS
PROJECT PERSONNEL
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTALS
Sr. Resident Engineer
0
Project Supervisor
0
Field Office Supervisor
0
Lead Inspector
0
Inspector
0
Electrical/Utility Inspector
0
Construction Materials Tester
86
172
172
172
172
172
172
1118
Sample Runner
20
20
20
20
20
20
20
140
MAN-HOURS
PROJECT PERSONNEL
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTALS
Sr. Resident Engineer
0
Project Supervisor
0
Field Office Supervisor
0
Lead Inspector
0
Inspector
0
Electrical/Utility Inspector
0
Construction Materials Tester
172
172
172
172
172
172
172
172
172
172
86
1806
Sample Runner
20
20
40
20
20
20
20
20
20
20
20
240
MAN-HOURS
PROJECT PERSONNEL
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTALS
Sr. Resident Engineer
0
Project Supervisor
0
Field Office Supervisor
0
Lead Inspector
0
Inspector
0
Electrical/Utility Inspector
0
Construction Materials Tester
0
Sample Runner
0
TOTAL
3304
2022 ESTIMATED MAN-HOURS
CONSULTANT/SUBCONSULTANT
Page 1 of 1
SCHEDULED PROJECT MAN-HOURS
2023 ESTIMATED MAN-HOURS
2024 ESTIMATED MAN-HOURS
2025 ESTIMATED MAN-HOURS
1
TABLE C
CONSULTANT/SUBCONSULTANT
ESTIMATED MAN-HOURS AND DIRECT LABOR
CONSULTANT/SUBCONSULTANT NAME: Tristar Engineering and Management, Inc.
PROJECT NAME: TT0339 Gilbert Road Bridge at Salt River
DATE: 08/09/2023
DIRECT LABOR CLASSIFICATIONS
TOTAL
TOTAL
CONTRACT TASK/PHASE
Sr. Resident
Engineer
($89.81/HR)
Project
Supervisor
($57.05/HR)
Field Office
Supervisor
($49.84/HR)
Lead
Inspector
($44.50/HR)
Inspector
($31.61/HR)
Elect/Util
Inspector
($37.86/HR)
Const. Matl.
Tester
($30.45/HR)
Sample
Runner
($23.10/HR)
MAN-HOURS
LABOR
Pre-Construction/Bidding Phase
0
$0.00
Construction
2924
380
3304
$97,813.80
Post-Construction/Closeout
0
$0.00
TOTAL
0
0
0
0
0
0
2924
380
3304
$97,813.80
PAGE 1 OF 1
Contract No.: 2022-001
1
OVERTIME RATE DESIGNATION - TABLE D
CONSULTANT
COST PROPOSAL SUMMARY
CONSULTANT: Tristar Engineering and Management, Inc.
CONTRACT NO.: 2022-001
PROJECT NAME: TT0339 Gilbert Road Bridge at Salt River
DIRECT LABOR
Classifications
Hourly Rates
OT Factor
OT Rate
Sr. Resident Engineer
$89.81
1.0
$89.81
Project Supervisor
$57.05
1.0
$57.05
Field Office Supervisor
$49.84
1.0
$49.84
Lead Inspector
$44.50
1.0
$44.50
Inspector
$31.61
1.0
$31.61
Electrical/Utility Inspector
$37.86
1.0
$37.86
Construction Materials Tester
$30.45
1.0
$30.45
Sample Runner
$23.10
1.0
$23.10
Overtime allowance will be provided separately by MCDOT and will require approval by the MCDOT
Project Manager prior to use.
Overhead and profit will be applied to the base OT rate for actual hours worked over 40 in a single week.
Tristar Engineering and Management, Inc.
Firm
Signature
Vice President
Title
08/09/2023
Date
August 09, 2023
Mr. John D. Hall
jhall@tristar-az.com
Vice President
Tristar Engineering and Management, Inc.
10625 N. 25th Avenue, Suite 103
Phoenix, AZ 85029
Re:
MCDOT 2022-001, Gilbert Road Bridge at Salt River, TT0339
Construction Administration Services
Fee Proposal
CEI Project No: 893.00
Dear Mr. Hall:
Consultant Engineering, Inc. (CEI) continues to appreciate the opportunity to provide our services to Tristar
Engineering and Management, Inc. for the Maricopa County Department of Transportation Contract No. 2022-001,
Gilbert Road Bridge at Salt River, Work Order TT0339.
Attached, please find our additional fee proposal as requested depicting the additional inspection needed for girder
fabrication testing/inspection. Please note these additional hours are based on previous work experience of similar
scope; full time for approximately 4 months. Also included, we have shown an overtime allowance for our Lead
Inspectors and Girder Inspector/Tester. We’ve also included an updated Table D that was shown in correctly in our
original cost proposal, dated December 1, 2022. Our Proposed Rate for Classification has included a COLA average
over the anticipated three-year contract.
If you have any questions or require additional information, please feel free to contact me at 480-689-6472 or
blizzet@cei-az.com. CEI looks forward to continuing to work with you as well as MCDOT on this contract.
Sincerely,
CONSULTANT ENGINEERING, INC.
Brian Lizzet, PE, CCM
Vice President
Attachments:
CEI Fee Schedule
cc:
Maher Osman, CEI
John Patterson, CEI
Contract Administration (CEI #893.00)
FEE PROPOSAL - TABLE A
SUBCONSULTANT
COST PROPOSAL SUMMARY
Cost Proposal Summary (No Optional Tasks)
Page 3 of 3
Maricopa County Department of Transportation
SUBCONSULTANT:
Consultant Engineering, Inc.
CONTRACT NO.:
2002-001
PROJECT NAME:
TT0339: Gilbert Road Bridge at Salt River
DIRECT LABOR
Classifications
Man-hours
Hourly Rates
Labor Costs
Inspector Tech
(Girders/Sampling)
688
$ 33.50
$ 23,048.00
Subconsultant’s Subtotal Direct Labor
$
23,048.00
Subconsultant’s Overhead @
140.64 % of Direct Labor
$
32,414.71
Subconsultant’s Profit @
10% of Direct Labor + Overhead
$
5,546.27
Subconsultant’s Total Direct Labor
$
61,008.98
DIRECT AND OUTSIDE EXPENSES
DESCRIPTION
EXPENSE AMOUNT
Mileage @ $0.56/Mile @ 34,720 Miles
$19,443.20
Subconsultant’s Total of Direct and Outside Expenses
$
19,443.20
OPTIONAL TASK ALLOWANCES
DESCRIPTION
ALLOWANCE AMOUNT
Overtime Allowance
$34,742.40
Subconsultant’s Total Optional Task Allowances
$
34,742.40
SUBCONSULTANT’S TOTAL PROPOSED FEE
$
115,194.58
Firm
Signature
Title
Date
Consultant Engineering, Inc.
Vice President
08/09/2023
FEE PROPOSAL - TABLE B
CONSULTANT/SUBCONSULTANT NAME:
Consultant Engineering, Inc.
CONTRACT NO:
2022-001
PROJECT NAME:
TT0339: Gilbert Road Bridge at Salt River
DATE:
8/9/2023
MAN-HOURS
PROJECT PERSONNEL
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
TOTALS
Inspector (Girders/Sampling)
18.5
192
126
184
167.5
688
TOTAL
688
2023 ESTIMATED MAN-HOURS
CONSULTANT/SUBCONSULTANT
Page1 of 1
SCHEDULED PROJECT MAN-HOURS
Maricopa County Department of Transportation
Contract Templates\Table B - Sch Proj ManHrs
TABLE C
CONSULTANT/SUBCONSULTANT
ESTIMATED MAN-HOURS AND DIRECT LABOR
CONSULTANT/SUBCONSULTANT NAME:
Consultant Engineering, Inc.
Contract No.:
2022-001
PROJECT NAME:
TT0339: Gilbert Road Bridge at Salt River
DATE:
8/09/2023
Resident
Engineer
(Structures)
Project
Supervisor
(Structures)
Lead
Inspector
(Girders)
Lead
Inspector
(Roadway)
Landscape
Architect
Schedule
Reviewer
Inspector
(Girders/
Sampling)
$ 68.00 $ 45.00 $ 38.50 $ 38.50 $ 47.00 $ 63.00 $ 33.50
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
($/HR)
MAN-HOURS
LABOR
Pre-Construction/Pre-Bid
0
-
$
Construction
688
688
23,048.00
$
Post-Construction/Close-Out
0
-
$
TOTAL
0
0
0
0
0
0
688
23,048.00
$
DIRECT LABOR CLASSIFICATIONS
CONTRACT TASK/PHASE
TOTAL
TOTAL
PAGE 1 OF 1
Maricopa County Department of Transportation
Contracts Templates\Table C - Est Man Hrs Direct Labor
OVERTIME RATE DESIGNATION - TABLE D
SUBCONSULTANT
COST PROPOSAL SUMMARY
SUBCONSULTANT:
Consultant Engineering, Inc.
CONTRACT NO.:
2022-001
PROJECT NAME:
TT0339: Gilbert Road Bridge at Salt River
DIRECT LABOR
Classifications
Hourly Rates
OT Factor
OT Rate
Lead Inspector (Girders)
$ 38.50
1.0
$ 38.50
Lead Inspector (Roadway)
$ 38.50
1.0
$ 38.50
OT allowance will be provided separately by MCDOT and will require approval by the MCDOT Project
Manager prior to use.
Overhead and profit will be applied to the base OT rate for actual hours worked over 40 in a single week.
Firm
Signature
Title
Date
Consultant Engineering, Inc.
Vice President
8/09/2023
175 South Hamilton Place, Building 6, Suite 114, Gilbert, AZ 85233
Quality Testing, LLC
John Hall, PE
August 7, 2023
Tristar Engineering and Management (Tristar)
Re:
MCDOT Contract 2022-001, QT JOB 21100.00
CA on Gilbert Road Bridge at Salt River (TT0339)
Change Order Request #1 – ¾ Time Materials Coordinator Plus Laboraory
Quality Testing, LLC (QT) – Cost Proposal
Dear Mr. Hall:
Based on the revised scope of work provided by MCDOT, which includes our team now providing all field
testing for the project and performing lab testing for all soils, concrete and asphalt samples at QT’s
laboratory, a revised laboratory testing estimate has been developed. Previously this change order request
was submitted with the material coordinator position increased to full-time. As previously discussed, hours
for the materials coordinator and other positions have been further refined by using the to-date hours
expended for each position plus additional hours budgeted to the end of construction. The following
revisions have been incorporated into this request:
All hours included on this cost proposal are based on actual hours expended through August 4,
2023, plus additional hours budgeted to the end of construction.
Hours for the material manager position have been reduced from 320 hours to 148 hours. This
reduction in hours is justified by the increased materials coordinator hours.
The materials coordinator position is estimated to be ¾-time for the remainder of the
construction schedule.
Direct labor hours for the traffic control specialist position have been reduced from 16 to 6 hours
per month for the remainder of the project. This reduction in hours is based on the actual
workload for this position to-date.
Additional field technician time has been included to cover additional field testing not originally
included in our scope.
Additional laboratory testing has been included for work not originally included in our scope.
Behind this cover letter, please find our revised fee proposal (Tables A, B and C) and our detailed estimate
for laboratory testing. Please let me know if there are any questions regarding this change order request.
Thank you.
Sincerely,
Jeffery M. Schaper, PE (AZ #49950)
President, QT
Construction Materials Testing, Inspection & Geotechnical Services
We Make Quality Our Business
OFFICE: (480) 496-2000 ● FAX: (480) 496-2001 ● www.qt-az.com
SUBCONSULTANT:
CONTRACT NO:
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
Consultant's Subtotal Direct Labor
Consultant's Overhead @
161.73%
of Direct Labor
Consultant's Profit @
10.00%
of Direct Labor + Overhead
Subconsultant's Total Direct Labor
CURRENT CONTRACT AMOUNT w/ PREVIOUS CHANGE ORDERS
CURRENT CHANGE ORDER REQUEST
$508,354.88
$91,843.62
FEE PROPOSAL - TABLE A
SUBCONSULTANT
COST PROPOSAL SUMMARY
Traffic Control Specialist
180
$46.95
$8,451.00
Quality Testing, LLC
2022-001, Task 1
DIRECT LABOR
Classifications
Man-Hours
Hourly Rates
Labor Costs
Field Technician (CTB)
760
$32.63
$24,798.80
Materials Manager
142
$88.00
$12,496.00
Materials Coordinator
3556
$34.68
$123,322.08
$273,433.48
Expense Amount
$486,751.50
$44,250.14
$169,067.88
$1,344.00
Subconsultant's Total of Direct and Outside Expenses
Subconsultant's Total Direct Labor
DIRECT AND OUTSIDE EXPENSES
$8,120.00
$224.00
$113,447.00
Description
Materials Manager Mileage (8 trips X 50 miles/trip = 400 miles) X ($0.56/mile)
Materials Coordinator Mileage (290 trips X 50 miles/trip = 14500 miles) X ($0.56/mile)
Traffic Control Specialist Mileage (48 trips X 50 miles/trip = 2400 miles) X ($0.56/mile)
Field Technician (CTB) Mileage (70 trips X 50 miles/trip = 3500 miles) X ($0.56/mile)
$1,960.00
$101,799.00
Lab Testing Fees (billed based on actual testing per attached fee schedule)
$486,751.50
Quality Testing, LLC
Firm
SUBCONSULTANT'S TOTAL PROPOSED FEE
$600,198.50
Signature
President
Title
8/7/2023
Date
Cost Proposal Summary (No Optional Tasks )
Maricopa County Department of Transportation
Page 1 of 6
CONSULTANT/SUBCONSULTANT :
Quality Testing, LLC
CONTRACT NO: 2022-001, Task 1
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
DATE:
VERSION: CO#1, V3
MAN-HOURS
PROJECT PERSONNEL
JAN
2022
FEB
2022
MAR
2022
APR
2022
MAY
2022
JUN
2022
JULY
2022
AUG
2022
SEP
2022
OCT
2022
NOV
2022
DEC
2022
TOTALS
PRE
PRE
PRE
PRE
PRE
CON
Materials Manager
8
8
Materials Coordinator
5
1
5
0
14
35
60
Traffic Control Specialist
15
15
Field Technician (CTB)
0
TOTAL
83
FEE PROPOSAL - TABLE B
ESTIMATED MAN-HOURS
CONSULTANT/SUBCONSULTANT
Page 1 of 4
SCHEDULED PROJECT MAN-HOURS
8/7/2023
copa County Department of Transportation
Contract Templates\Table B - Sch Proj ManHrs
CONSULTANT/SUBCONSULTANT :
Quality Testing, LLC
CONTRACT NO: 2022-001, Task 1
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
DATE:
VERSION: CO#1, V3
FEE PROPOSAL - TABLE B
CONSULTANT/SUBCONSULTANT
SCHEDULED PROJECT MAN-HOURS
8/7/2023
MAN-HOURS
PROJECT PERSONNEL
JAN
2023
FEB
2023
MAR
2023
APR
2023
MAY
2023
JUN
2023
JULY
2023
AUG
2023
SEP
2023
OCT
2023
NOV
2023
DEC
2023
TOTALS
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
Materials Manager
6
4
4
4
4
4
4
4
4
38
Materials Coordinator
134
129
96
93
86
166
146
130
130
130
130
130
1500
Traffic Control Specialist
14.5
14.5
5
4.25
3.5
3.5
5.75
6
6
6
6
6
81
Field Technician (CTB)
3
225
304
228
760
TOTAL
2379
ESTIMATED MAN-HOURS
Page 2 of 4
copa County Department of Transportation
Contract Templates\Table B - Sch Proj ManHrs
CONSULTANT/SUBCONSULTANT :
Quality Testing, LLC
CONTRACT NO: 2022-001, Task 1
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
DATE:
VERSION: CO#1, V3
FEE PROPOSAL - TABLE B
CONSULTANT/SUBCONSULTANT
SCHEDULED PROJECT MAN-HOURS
8/7/2023
MAN-HOURS
PROJECT PERSONNEL
JAN
2024
FEB
2024
MAR
2024
APR
2024
MAY
2024
JUN
2024
JULY
2024
AUG
2024
SEP
2024
OCT
2024
NOV
2024
DEC
2024
TOTALS
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
CON
Materials Manager
4
4
4
4
4
4
4
4
4
4
4
4
48
Materials Coordinator
130
130
130
130
130
130
130
130
130
130
130
130
1560
Traffic Control Specialist
6
6
6
6
6
6
6
6
6
6
6
6
72
Field Technician (CTB)
0
TOTAL
1680
ESTIMATED MAN-HOURS
Page 4 of 4
copa County Department of Transportation
Contract Templates\Table B - Sch Proj ManHrs
CONSULTANT/SUBCONSULTANT :
Quality Testing, LLC
CONTRACT NO: 2022-001, Task 1
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
DATE:
VERSION: CO#1, V3
FEE PROPOSAL - TABLE B
CONSULTANT/SUBCONSULTANT
SCHEDULED PROJECT MAN-HOURS
8/7/2023
MAN-HOURS
PROJECT PERSONNEL
JAN
2025
FEB
2025
MAR
2025
APR
2025
TOTALS
CON
CON
PST
PST
Materials Manager
4
4
20
20
48
Materials Coordinator
130
130
88
88
436
Traffic Control Specialist
6
6
12
Field Technician (CTB)
0
TOTAL
496
Page 4 of 4
ESTIMATED MAN-HOURS
copa County Department of Transportation
Contract Templates\Table B - Sch Proj ManHrs
CONSULTANT/SUBCONSULTANT :
Quality Testing, LLC
CONTRACT NO: 2022-001, Task 1
PROJECT NAME:
Gilbert Road at Salt River Bridge / TT0339
DATE:
8/7/2023
VERSION:
CO#1, V3
TOTAL
TOTAL
CONTRACT TASK/PHASE
Materials Mgr
Mat'ls Coordinator
Traffic Control Spc
Field Tech (CTB)
MAN-HOURS
LABOR
88.00 / hr
34.68 / hr
46.95 / hr
32.63 / hr
(Burdened)
Pre-Construction
0
25
0
0
25
$2,496.12
Construction
102
3355
180
760
4397
$456,548.52
Post-Construction
40
176
0
0
216
$27,706.86
142
3556
180
760
4638
$486,751.50
ESTIMATED MAN-HOURS AND DIRECT LABOR
DIRECT LABOR CLASSIFICATIONS
PAGE 1 OF 1
TABLE C
CONSULTANT/SUBCONSULTANT
Maricopa County Department of Transportation
Contracts Templates\Table C - Est Man Hrs Direct Labor
CONCRETE AND MASONRY (NOT INCLUDING FIELD LABOR)
Est. Add
15%
301 Compressive Strength, Cylindrical Specimen (ASTM C39, AASHTO T22)
Each
16.00
$
2756
3170
50,720.00
$
302 Flexural Beam Testing (ASTM C78, AASHTO T97)
Each
40.00
$
0
0
-
$
303 Obtain Concrete Cores (ASTM C42, AASHTO T24)
Each
LABOR
304 Trim Concrete Specimen
Each
9.00
$
0
0
-
$
305 Masonry Grout Prisms, Compressive Strength (ASTM C1019)
Each
22.00
$
0
0
-
$
306 Mortar Cubes, Compressive Strength (ASTM C109)
Each
22.00
$
0
0
-
$
307 Mortar Cylinders, Compressive Strength (ASTM C780)
Each
22.00
$
0
0
-
$
308 CMU, Net Area/Absorption (ASTM C 140)
Each
57.00
$
0
0
-
$
309 CMU, Compressive Strength (ASTM C140)
Each
48.00
$
0
0
-
$
310 CMU, Full Set (6 CMU Total)(ASTM C140)
Set
320.00
$
0
0
-
$
311 Masonry Prism, Grouted, Compressive Strength (ASTM C1314)
Each
110.00
$
0
0
-
$
312 Masonry Prism, Ungrouted, Compressive Strength (ASTM C1314, C140)
Each
110.00
$
0
0
-
$
313 Shotcrete Panel Core, Compressive Strength (ASTM C42, C39, AASHTO T2
Each
57.00
$
0
0
-
$
314 Concrete Floor Moisture Vapor Emission Rate
Each
35.00
$
0
0
-
$
315 Concrete Mix Design
Each
Quote
CONCRETE AND MASONRY SUBTOTAL
50,720.00
$
SOIL & AGGREGATE (NOT INCLUDING FIELD LABOR)
Est. Add
20%
401 Bulk Density & Voids (ASTM C29, AASHTO T19)
Each
57.00
$
0
0
-
$
402 Flakiness Index (ARIZ 233C)
Each
95.00
$
0
0
-
$
403 Flat & Elongated Particles in CA (ASTM D4791)
Each
112.00
$
0
0
-
$
404 Fractured Particles in CA (Fractured Faces) (ASTM D5821)
Each
97.00
$
5
6
582.00
$
405 Abrasion of Coarse Aggregate (LA) (ASTM C131, AASHTO T96)
Each
225.00
$
0
0
-
$
406 Sulfate Soundness of Aggregates (ASTM C88, T104)
Each
320.00
$
0
0
-
$
407 Uncompacted Voids of Fine Aggregate (ASTM C1252, AASHTO T304)
Each
93.00
$
5
6
558.00
$
408 Moisture Determination (ASTM D2216, D4944, AASHTO T265, T217)
Each
18.00
$
5
6
108.00
$
409 In-Situ Moisture / Unit Wt. (ring sample) (ASTM D2216, AASHTO T265)
Each
36.00
$
0
0
-
$
410 Plasticity Index, Dry Prep (ASTM D4318, AASHTO T89, T90)
Each
85.00
$
0
0
-
$
411 Plasticity Index, Wet Prep (ASTM D4318, AASHTO T89, T90)
Each
120.00
$
48
58
6,960.00
$
412 Proctor, Modified (ASTM D1557, AASHTO T180)
Each
150.00
$
0
0
-
$
413 Proctor, Standard (ASTM D698, AASHTO T99)
Each
120.00
$
20
24
2,880.00
$
414 Proctor, Soil Cement Mixtures (ASTM D558, AASHTO T134)
Each
150.00
$
3
4
600.00
$
415 Sand Equivalent (ASTM D2419, AASHTO T176)
Each
110.00
$
0
0
-
$
416 Sieve Analysis (ASTM C136, C117, AASHTO T27, T11)
Each
75.00
$
48
58
4,350.00
$
417 Specific Gravity/Absorption (Coarse Agg.)(ASTM C127, AASHTO T85)
Each
57.00
$
1
2
114.00
$
418 Specific Gravity/Absorption (Fine Agg.)(ASTM C128, AASHTO T84)
Each
75.00
$
0
0
-
$
419 Specific Gravity of Soils (ASTM D854, AASHTO T100)
Each
150.00
$
0
0
-
$
420 pH Determination (ASTM D2976, ARIZ 236)
Each
45.00
$
5
6
270.00
$
421 Resistivity Determination (ARIZ 236)
Each
57.00
$
5
6
342.00
$
422 Hydrometer Analysis (ASTM D422, AASHTO T88)
Each
300.00
$
0
0
-
$
423 Shrinkage Factor (AASHTO T92)
Each
150.00
$
0
0
-
$
424 Expansion Index (ASTM D4829)
Each
150.00
$
0
0
-
$
425 One Dimensional Swell/Settlement (ASTM D4546)
Each
150.00
$
0
0
-
$
426 California Bearing Ratio (CBR) (3 points) (ASTM D1883, AASHTO T193)
Each
600.00
$
0
0
-
$
427 Direct Shear Test (per point)(ASTM D3080, AASHTO T236)
Each
94.00
$
0
0
-
$
428 Unconfined Compressive Strength (ASTM D2166, AASHTO T208)
Each
94.00
$
0
0
-
$
429 One Dimensional Consolidation (ASTM D2435, AASHTO T216)
Each
150.00
$
0
0
-
$
430 Remolding Soil Sample (ARIZ 249)
Each
38.00
$
0
0
-
$
431 Field Percolation Test
Each
Quote
432 Clay Lumps & Friable Particles in Aggregates (ASTM C142, AASHTO T112
Each
96.00
$
0
0
-
$
433 Collapse Potential of Soils (ASTM D5333)
Each
150.00
$
0
0
-
$
434 Lightweight Pieces in Aggregate (ASTM C123, AASHTO T113)
Each
150.00
$
0
0
-
$
435 Triaxial Shear Test (ASTM D7181/4767/2850, AASHTO T297/T296 )
Each
Quote
436 Durability Index (ASTM D3744)
Each
Quote
437 Organic Impurities (ASTM C40)
Each
225.00
$
0
0
-
$
438 Compressive Strength of CTB or Soil Cement Specimen (ARIZ 241a)
Each
94.00
$
66
80
7,520.00
$
SOIL & AGGREGATE SUBTOTAL
24,284.00
$
UNIT
UNIT
RATE
MIN
QTY
EST
QTY
EXTENDED
AMOUNT
Quality Testing
175 S. Hamilton Place
Bld 6, Ste 114
Gilbert, AZ 85233
(480)496-2000, (480)496-2001 FAX
www.qt-az.com
GILBERT ROAD BRIDGE AT SALT RIVER
MCDOT Project TT0399
LABORATORY TESTING ESTIMATE
(Based on Project Bid Tabulation Quantities)
UNIT
UNIT
RATE
MIN
QTY
EST
QTY
EXTENDED
AMOUNT
Quality Testing
175 S. Hamilton Place
Bld 6, Ste 114
Gilbert, AZ 85233
(480)496-2000, (480)496-2001 FAX
www.qt-az.com
GILBERT ROAD BRIDGE AT SALT RIVER
MCDOT Project TT0399
LABORATORY TESTING ESTIMATE
(Based on Project Bid Tabulation Quantities)
ASPHALT MIXTURES (NOT INCLUDING FIELD LABOR)
Est. Add
10%
501 Core Bulk Specific Gravity/Thickness (ASTM D2726, AASHTO T166)
Each
20.00
$
24
27
540.00
$
502 Core Bulk Specific Gravity/Thickness (Coated) (ASTM D1188, AASHTO T27
Each
38.00
$
0
0
-
$
503 Drill AC Cores (up to 8" thickness)
Each
30.00
$
24
27
810.00
$
504 Ignition Oven - Calibration (per mix) (ASTM D6307, AASHTO T308)
Each
699.00
$
4
5
3,495.00
$
505 Ignition Oven - Asphalt Cement Content (ASTM D6307, AASHTO T308)
Each
125.00
$
21
24
3,000.00
$
506 Ignition Oven - Gradation (ASTM C136, AASHTO T27)
Each
75.00
$
21
24
1,800.00
$
507 Marshall Specimen Bulk Density (ASTM D6926, D2726, AASHTO T245)
Set of 3
150.00
$
0
0
-
$
508 Marshall Stability & Flow (ASTM D6927)
Set of 3
18.00
$
0
0
-
$
509 Maximum Specific Gravity of HMA Mixture (ASTM D2041, T209)
Set of 3
155.00
$
21
24
3,720.00
$
510 Gyratory Compaction (ASTM D6925, D2726, AASHTO T312, T166)
Set of 2
190.00
$
21
24
4,560.00
$
511 Nuclear Asphalt Content Gauge - Calibration (ASTM D4125, T287)
Each
750.00
$
0
0
-
$
512 Moisture Induced Damage of HMA (TSR) (ASTM D4867, AASHTO T283)
Set of 6
550.00
$
0
0
-
$
513 Asphalt Concrete Mix Design
Each
Quote
514 Quantitative Extraction of Hot Mix Asphalt (HMA)(ASTM D2172, AASHTO T1
Each
Quote
ASPHALT MIXTURES SUBTOTAL
17,925.00
$
ASPHALT CEMENT
Est. Add
0%
601 PG Verification (AASHTO M320)
Each
980.00
$
3
3
2,940.00
$
602 PG Classification (AASHTO R29)
Each
1,200.00
$
0
0
-
$
603 Dynamic Shear Rheometer (ASTM D7175, AASHTO T315)
Each
230.00
$
0
0
-
$
604 Dynamic Shear Rheometer, Temp Sweep (ASTM D7175, AASHTO T315)
Each
300.00
$
0
0
-
$
605 Bending Beam Rheometer (ASTM D6648, AASHTO T313)
Each
300.00
$
0
0
-
$
606 Bending Beam Rheometer with RTFO/PAV Aging
Each
600.00
$
0
0
-
$
607 Bending Beam with Physical Hardening (ASTM D6648, AASHTO T313)
Each
490.00
$
0
0
-
$
608 Rotational Viscosity (ASTM D4402, AASHTO T316)
Each
110.00
$
0
0
-
$
609 Rotational Viscosity, (ASTM D2994, ASTM D4878/D5018)
Each
150.00
$
0
0
-
$
610 Rotational Viscosity, Temp Sweep 3 Points (ASTM D4402, AASHTO T316)
Each
260.00
$
0
0
-
$
611 Rotational Viscosity, Temp Sweep 4 Points (ASTM D4402, AASHTO T316)
Each
300.00
$
0
0
-
$
612 Pressure Aging Vessel (ASTM 6521, AASHTO R28)
Each
230.00
$
0
0
-
$
613 Rolling Thin Film Oven (ASTM D2872, AASHTO T240)
Each
150.00
$
0
0
-
$
614 Rolling Thin Film Oven with Mass Loss (ASTM D2872, AASHTO T240)
Each
190.00
$
0
0
-
$
615 Multiple Stress Creep Recovery (MSCR) (ASTM 7405, AASHTO T350)
Each
450.00
$
0
0
-
$
616 Absolute Viscosity (140ºF, 60ºC) (ASTM D2171, AASHTO T202)
Each
110.00
$
0
0
-
$
617 Kinematic Viscosity (275ºF, 135ºC or 140ºF, 60ºC) (ASTM D2170, AASHTO
Each
150.00
$
0
0
-
$
618 Ductility of Bituminous Materials (ASTM D113, AASHTO T51)
Each
150.00
$
0
0
-
$
619 Elastic Recovery (ASTM D6084, AASHTO T301)
Each
150.00
$
0
0
-
$
620 Flash & Fire Point, Cleveland Open Cup, (ASTM D92, AASHTO T48)
Each
110.00
$
0
0
-
$
621 Flash & Fire Point, Cleveland Open Cup, co-polymer product (ASTM D92, AA
Each
150.00
$
0
0
-
$
622 Flash & Fire Point, Tag Open Cup (ASTM D3143, AASHTO T79)
Each
150.00
$
0
0
-
$
623 Penetration (@ Temperatures other than 77ºF; 25ºC) (ASTM D5, AASHTO T
Each
115.00
$
0
0
-
$
624 Penetration (@ 77ºF; 25ºC) (ASTM D5, AASHTO T49)
Each
110.00
$
0
0
-
$
625 Penetration Grade (PG) Asphalt Verification (AASHTO M20)
Each
750.00
$
0
0
-
$
626 Softening Point of Bitumen (Ring & Ball) (ASTM D36, AASHTO T53)
Each
110.00
$
0
0
-
$
627 Specific Gravity of Binder (ASTM D70, AASHTO T228)
Each
110.00
$
0
0
-
$
628 Soulubility of Asphalt Materials in Tricloroethylene (ASTM D2042, AASHTO
Each
190.00
$
0
0
-
$
629 Water in Petroleum Products (ASTM D95, AASHTO T55)
Each
300.00
$
0
0
-
$
ASPHALT CEMENT SUBTOTAL
2,940.00
$
ASPHALT RUBBER
Est. Add
0%
650 Brookfield Viscosity (ASTM D2994 or ASTM D5018)
Each
150.00
$
0
0
-
$
651 Brookfield Viscosity Crack Sealant (ASTM D2196)
Each
190.00
$
0
0
-
$
652 Rotational Viscosity
Each
110.00
$
0
0
-
$
653 Resilience (ASTM D5329)
Each
110.00
$
0
0
-
$
654 Specific Gravity of Crumb Rubber (ASTM D1817, CT208)
Each
230.00
$
0
0
-
$
655 Bulk Density of Crumb Rubber
Each
190.00
$
0
0
-
$
656 Rubber Gradation (ASTM C136)
Each
110.00
$
0
0
-
$
657 Haake Viscosity
Each
110.00
$
0
0
-
$
658 Cone Penetration (ASTM D5329, AASHTO T59)
Each
110.00
$
0
0
-
$
ASPHALT RUBBER SUBTOTAL
-
$
UNIT
UNIT
RATE
MIN
QTY
EST
QTY
EXTENDED
AMOUNT
Quality Testing
175 S. Hamilton Place
Bld 6, Ste 114
Gilbert, AZ 85233
(480)496-2000, (480)496-2001 FAX
www.qt-az.com
GILBERT ROAD BRIDGE AT SALT RIVER
MCDOT Project TT0399
LABORATORY TESTING ESTIMATE
(Based on Project Bid Tabulation Quantities)
EMULSIONS & CUTBACK ASPHALT
Est. Add
0%
701 Emulsion Verification, RS-1, RS-2, SS-1, SS-1h (ASTM D977, AASHTO M14
Each
1,130.00
$
1
1
1,130.00
$
702 Emulsion Verification, HFRS-2 (ASTM D977, AASHTO M140)
Each
1,130.00
$
0
0
-
$
703 Emulsion Verification, QS-1H (ASTM D977, AASHTO M140)
Each
1,050.00
$
0
0
-
$
704 Emulsion Verification, CRS-1, CRS-2, CSS-1, CSS-1h (ASTM D2397, M208)
Each
1,130.00
$
0
0
-
$
705 Emulsion Verification, CQS-1h (ASTM D2397, AASHTO M208)
Each
1,050.00
$
0
0
-
$
706 Emulsion Verification, CQS-1h (MAG 713)
Each
1,130.00
$
0
0
-
$
707 Identification of Cationic Slow Setting Emulsion (AASHTO T59)
Each
150.00
$
0
0
-
$
708 Identification of Cationic Slow Setting Emulsion (AASHTO T59, Section 27
Each
300.00
$
0
0
-
$
709 Emulsified Asphalt/Aggregate Coating (AASHTO T59)
Each
150.00
$
0
0
-
$
710 Residue by Evaporation (ASTM D244, AASHTO T59)
Each
110.00
$
0
0
-
$
711 Residue by Evaporation (ASTM D2393, CT331)
Each
190.00
$
0
0
-
$
712 Residue by Evaporation, Low Temperature (ASTM D7497)
Each
300.00
$
0
0
-
$
713 Residue and Oil Distillate by Distillation (ASTM D244, AASHTO T59)
Each
260.00
$
0
0
-
$
714 Vaccum Distillation of Modified Emulsion (ARIZ 504)
Each
230.00
$
0
0
-
$
715 Density of Emulsified Asphalt (ASTM D6837, AASHTO T59)
Each
150.00
$
0
0
-
$
716 Low Temperature Distillation (ASTM D244, AASHTO T59)
Each
315.00
$
0
0
-
$
717 Float Test (ASTM D139)
Each
150.00
$
0
0
-
$
718 Distillate Fraction on Cutback (ASTM D402, AASHTO T78)
Each
340.00
$
0
0
-
$
719 Demulsibility (ASTM D244, AASHTO T59)
Each
150.00
$
0
0
-
$
720 Cement Mixing Test
Each
150.00
$
0
0
-
$
721 Coating (SE214) (AASHTO T59)
Each
80.00
$
0
0
-
$
722 High Float Emulsion Verification (ASTM D977, AASHTO M140)
Each
1,200.00
$
0
0
-
$
723 Particle Charge (ASTM D244, AASHTO T59)
Each
110.00
$
0
0
-
$
724 pH Determination
Each
110.00
$
0
0
-
$
725 Saybolt Furol Viscosity (ASTM D88, AASHTO T72)
Each
150.00
$
0
0
-
$
726 Settlement, 5-Day (ASTM D244, AASHTO T59)
Each
230.00
$
0
0
-
$
727 Sieve Test (ASTM D244, AASHTO T59)
Each
110.00
$
0
0
-
$
728 Storage Stability, 1-Day (ASTM D244, AASHTO T59)
Each
190.00
$
0
0
-
$
729 Resistance to Water (ASTM D2939)
Each
300.00
$
0
0
-
$
730 Resistance to Freezing (ASTM D2939)
Each
190.00
$
0
0
-
$
731 Resistance to Heat (ASTM D2939)
Each
300.00
$
0
0
-
$
732 Resistance to Kerosene (ASTM D2939)
Each
530.00
$
0
0
-
$
733 Freezing (ASTM D6929, AASHTO T59)
Each
190.00
$
0
0
-
$
734 Wet Track Abrasion, 1-Hour (ASTM D3910/ISSA TB100)
Each
280.00
$
0
0
-
$
735 Wet Track Abrasion, 6-Day (ASTM D3910/ISSA TB100)
Each
350.00
$
0
0
-
$
736 Monolayer Loaded Wheel Test (ISSA TB109)
Each
255.00
$
0
0
-
$
737 Wet Cohesion Test (ISSA TB109)
Each
55.00
$
0
0
-
$
738 Extraction for AC Content (AASHTO T164)
Each
300.00
$
0
0
-
$
EMULSIONS & CUTBACK ASPHALT SUBTOTAL
1,130.00
$
OTHER
Est. Add
10%
803 Determination of Bituminous Distributer Truck Transverse Spread Rate (ARI
Each
950.00
$
0
0
-
$
850 Tensile Strength of Rebar
Each
120.00
$
172
190
22,800.00
$
OTHER SUBTOTAL
22,800.00
$
PROJECT GRAND TOTAL
119,799.00
$
ALREADY INCLUDED IN ORIGINAL CONTRACT
(18,000.00)
$
REMAINING ESTIMATE
101,799.00
$