Agreement - CA2206.402

City of Chandler — Regular Meeting (2025-06-12)

View PDF Meeting page

Extracted text (via pymupdf) 86897 characters
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page 1 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
 
 
CITY OF CHANDLER 
JOB ORDER PROJECT AGREEMENT  
 
DOWNTOWN ALLEY IMPROVEMENTS  
(CALIFORNIA STREET TO SAN MARCOS ALLEYWAY) 
Project No. CA2206.402 
Council Date: June 12, 2025 
 
This JOB ORDER PROJECT AGREEMENT (”Job Order”) is made this _____ day of _____________ 2025 
(“Effective Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”) 
and Achen-Gardner Construction, LLC, an Arizona limited liability company, (“JOC Contractor”) 
and is entered into pursuant to Job Order Master Agreement No. JOC2404.401 (“JOC Master 
Agreement”). City and JOC Contractor may be referred to individually as “Party” or collectively as 
“Parties”). 
 
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as 
follows:   
 
RECITALS 
 
A. On or about February 7, 2024, the Parties entered into the JOC Master Agreement, which terms 
and conditions are made a part of and incorporated into this Job Order Project Agreement by this 
reference. 
 
B. City proposes to engage JOC Contractor for construction services as more fully described in 
Article 1 and Exhibit "A", which is attached to and made a part of this Job Order by this reference. 
 
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for 
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to and 
made a part of this Agreement by this reference. 
 
ARTICLE 1.  DESCRIPTION OF WORK 
 
The Parties enter into this Job Order Project Agreement for the Downtown Alley Improvements 
(California Street to San Marcos Alleyway), Project Number CA2206.402. The Downtown Alley 
Improvements consist of surface enhancements, stamp asphalt, valley gutter, vertical curbs, signs, 
and lighting improvements, all as more particularly set forth in Exhibit “A” attached hereto and 
incorporated herein by reference. 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page 2 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
The JOC Contractor will not accept any change of scope, or change in Agreement provisions, unless 
issued in writing, as a Agreement amendment or change order and signed by the authorized 
signatories for each party. 
 
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached 
hereto and incorporated herein by reference, will be due prior to execution of each Job Order 
Project Agreement in the full amount of each Job Order. 
 
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement 
of Claims and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively 
attached hereto and incorporated herein by reference. 
 
ARTICLE 2.  PROJECT PRICE 
 
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master 
Agreement a fee not to exceed the Guaranteed Maximum Price of $373,634.88 Dollars determined 
and payable as set forth in JOC Master Agreement and Exhibit “B” attached hereto and made a 
part hereof by reference.  
 
ARTICLE 3.  AGREEMENT TIME & SCHEDULE 
 
JOC Contractor agrees to complete all Construction within 90 calendar days from the Notice to 
Proceed (NTP) Date.  
 
ARTICLE 4.  JOB ORDER CONTACTS 
 
The following parties serve in the capacity below for this Job Order Project. 
 
CITY: 
 
Construction Project Manager:   Scott Riter 
 
Phone: 480-782-3328 
 
Email: Scott.Riter@chandleraz.gov 
 
JOC CONTRACTOR: 
Achen-Gardner Construction, LLC 
 
2195 West Chandler Boulevard, Suite 200, Chandler, AZ 85224 
 
JOC Contractor Representative:  Bryan Mueller 
 
Phone: 480-940-1300 
 
Email: bmueller@achen.com 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page 3 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
ARTICLE 5. FORCED LABOR OF ETHNIC UYGHURS PROHIBITED   
 
By entering into this Agreement, Contractor certifies and agrees Contractor does not currently use 
and will not use for the term of this Agreement: (i) the forced labor of ethnic Uyghurs in the 
People's Republic of China; or (ii) any goods or services produced by the forced labor of ethnic 
Uyghurs in the People's Republic of China; or (iii) any contractors, subcontractors or suppliers that 
use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in 
the People's Republic of China 
 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page 4 
Project No.:CA2206.402 
Rev. 3/19/2024 
IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date. 
“CITY”  
CITY OF CHANDLER 
                  Mayor
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
 City Clerk 
 Seal 
“JOC CONTRACTOR” 
ACHEN-GARDNER CONSTRUCTION, LLC 
Signature 
 Date 
Print Name 
Title 
Signer Email Address 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2
Vice President
May 20, 2025
bmueller@achen.com
Bryan Mueller
May 20, 2025

Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page A-1 
Project No.: CA2206.402 
Rev. 3/19/2024 
EXHIBIT A 
SCOPE OF WORK 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Hallway Alley Improvements California St. to San Marcos Alley Construction Proposal 
 
May 15, 2025 
 
 
 
 
 
 
 
 
 
  
City of Chandler | Public Works & Utilities Department 
Mr. Scott Riter 
215 E. Buffalo Street 
Chandler, Arizona 85224 
 
City of Chandler Project No.: CA2206.402 
Achen-Gardner Construction, LLC Project No.: 4105101 
 
Dear Mr. Riter: 
Attached please find Achen-Gardner Construction, LLC’s (“Achen-Gardner”) initial proposal for the 
Hallway Alley Improvements California St. to San Marcos Alley construction scope of work as noted on 
Exhibit “A” attached. The breakdown of the project costs is as follows: 
 
1) Project Total = $373,634.88 
 
The completed Proposal totals $333,634.88 for construction activities on the Chandler Alley Way 
Improvements project.  See Exhibit “B” for the Job Order Cost Proposal – Summary Sheet. 
 
Should you have any questions and/or comments, please feel free to contact me via cell phone at 
(480) 403-9399 or e-mail dbroderick@achen.com.   
 
Sincerely, 
 
 
 
 
 
 
ACHEN-GARDNER CONSTRUCTION, LLC  
 
 
 
Dan Broderick, Sr. Project Manager 
 
Attachments:  
Exhibit A - SCOPE OF WORK, PROJECT-SPECIFIC CONDITIONS 
 
Exhibit A.2 - PROJECT BASELINE SCHEDULE 
Exhibit B - JOB ORDER COST PROPOSAL SHEET 
 
Exhibit B.2 – GENERAL CONDITIONS AND SCHEDULE OF VALUES 
Exhibit B.3 - LIST OF GMP DOCUMENTS 
Exhibit G – SUBCONTRACTOR AND SUPPLIER QUOTATIONS 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT A: SCOPE OF WORK, PROJECT-SPECIFIC CONDITIONS 
MAY 15, 2025 
CITY OF CHANDLER – Hallway Alley Improvements California St. to San Marcos Alley 
PROJECT NO: CA2206.402 
 
 
Achen-Gardner Construction proposes to perform construction as noted in the following Exhibits and 
Scope of Work narrative:  
 
• 
This project scope includes subgrade preparation for approximately 513 square yards, followed by 
installing 3-inch asphalt concrete (AC) pavement over 6 inches of aggregate base course (ABC). It 
also includes 511 square yards of AC pavement and 300 linear feet of AC thickened edge. The scope 
further covers the construction of approximately 1,079 square feet of concrete valley gutter. 
Demolition and removals include existing asphalt pavement, water meter box, concrete valley 
gutter, and signage. Additional work items include installation of a traffic sign support system, 
removal and replacement of water meter boxes to traffic-rated utility box and cover, concrete 
equipment pad, void filling and compaction, pavement marking arrows, and placement of 740 
square feet of 3 inches of decomposed granite for landscape or ground cover treatment.  
• 
Additional add for asphalt stamping and painting is itemized and included in Exhibit B.2. 
• 
The quantities for this project (Project No. CA2206.402) are as per Exhibit B.2 – Schedule of Values. 
• 
Schedule Assumptions: Project duration is 4 weeks 
• 
Work hours shall be regular daytime work hours, Monday through Friday. This does not include the 
cost of any work to be done during unscheduled overtime or weekends. Any necessary weekend 
work will be an additional cost to the contract. 
• 
The proposal is based on the attached vendor’s and subcontractor’s proposals, including their 
inclusions and exclusions. 
• 
Owner’s (City) Allowance: Additional services may be required during the course of design and/or 
construction due to unforeseen circumstances/conditions. This allowance is intended for additional 
services (detailed description to be defined later) that will be provided upon written authorization 
from the city. 
• 
This Proposal excludes: 
o SWPPP plan, manual, and NOI (Achen Gardner is disturbing less than one acre) 
o City permit and plan review fees, Quality Assurance (QA), City inspection and testing costs, 
impact fees, and utility company fees 
o Handling/disposing of hazardous materials 
o Acquisition of temporary/permanent easements and/or rights-of-way 
o Night, weekend, and overtime hours 
o Off-duty police officers  
o The city is allowing full closure of the alley, and work will be continuous without interruption. 
o Relocation of the existing Guy wire and foundation 
 
 
 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

PROJECT: Chandler Downtown Alley 
Improvements
Date : 5/15/25
AGC Job #: 4105101
NOTES
7
8
9
10 11 12 13 14 15 16 17 18 19 20
21
22
23
24
25
26
27
28
29
30
31
X = Day Time Work
M T W T
F
S
S
M T W T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
N = Night Time Work
Mobilize and Yard Setup
X X
Remove Meter Boxes, Bollards, Signs
X X X
Remove Sidewalk and Ramp
X X X
Subgrade Prep and Scarify
X
X
FPS Concrete Slab
X X
X
X X
Place Concrete Curb
X X
Sawcut AC and Concrete
X
Concrete Valley Gutter and Tie-in
X
X X
Install Meter Boxes
X
Place ABC
X X
Remove AC
X
Place Decomposed Granite
X
Place Asphalt and Thickened Edge
X X
Stamp and Paint Asphalt
X X
Install Traffic Signage
X
Adjust Valves
X
Cleanup and Punchlist
X X X
July
ACTIVITY
Project Schedule
PROJECT SCHEDULE - CHANDLER ALLEYWAY IMPROVEMENTS
ACHEN-GARDNER CONSTRUCTION
2195 W. Chandler Boulevard, Suite 200
Chandler. AZ 85224
PHONE: (480) 940-1300   FAX: (480) 940-4576
EXHIBIT A.1 - PROJECT BASELINE SCHEDULE
MAY 15, 2025
CITY OF CHANDLER - Hallway Alley Improvements California St. to San Marcos Alley
Project NO. CA2206.402
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT B 
FEE SCHEDULE 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page B-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Negotiated Prices
53,645.00
$           
-
$                      
55,077.00
$           
-
$                      
171,783.00
$         
SUBTOTAL (NEGOTIATED PRICES):
280,505.00
$        
9.00%
25,245.45
$           
TOTAL (NEGOTIATED PRICES + OVERHEAD & PROFIT):
305,750.45
$        
Sales Tax Percentage (Current Tax Rate)
5.07%
15,501.55
$           
General Liability Insurance Percentage (Actual Cost per Job Order)
5,962.13
$             
Builder's Risk Insurance Percentage (Actual Cost per Job Order)
1,528.75
$             
Payment Bond (Actual Cost per Job Order)
2,446.00
$             
Performance Bond (Actual Cost per Job Order)
2,446.00
$             
SUBTOTAL (INSURANCE, BONDS, & TAXES):
27,884.43
$          
COMBINED TOTAL (TOTAL + INSURANCE, BONDS, & TAXES):
333,634.88
$        
City's Allowance
40,000.00
$          
TOTAL JOB ORDER:
373,634.88
$  
Price of Subconsultant(s)
5/12/2025
EXHIBIT "B"
JOB ORDER COST PROPOSAL
SUMMARY SHEET
Price of Subcontractor(s)
Per the Job Order Master Agreement - This Fee Table includes all fees, costs, insurance and bond premiums, allowances, construction 
contingency, and taxes of any type necessary to fully, properly and timely perform and construct the Work.  Also per the Job Order 
Master Agreement - For any portion of the Work which, either through this Contract, Change Order or otherwise, is performed and 
paid for on a cost, or time and materials basis, the costs may be reimbursed to JOC Contractor and chargeable against the Contract 
Price will be determined as set forth in MAG 109.5.
General Conditions
Preconstruction Labor (if applicable)
Construction Labor (if applicable)
Overhead and Profit (Coefficient per Job Order Master Agreement)
Insurance, Bonds, & Taxes
ENTER TAX % HERE:
5/15/2025
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

CITY OF CHANDLER - Alley way Improvements
PROJECT NO.:  CA2206.402
ACHEN-GARDNER CONSTRUCTION, LLC
550 S. 79th STREET
CHANDLER, AZ 85226
PROJECT NO.:  34105101
PAY ITEM
DESCRIPTION
QUANTITY
UM UNIT PRICE
TOTAL
188.01
PROJECT SUPERINTENDENT/VEHICLE
176.00
HR
150.93
 
26,563.68
188.02
PROJECT MANAGER/VEHICLE
44.00
HR
150.92
6,640.48
188.03
PROJECT ENGINEER/VEHICLE
44.00
HR
122.11
5,372.84
188.04
ICE AND WATER
20.00
DY
10.00
 
200.00
188.05
YARD RENTAL (CITY OWNED ON PROJECT SITE - NC)
1.00
LS
-
 
0.00
188.06
YARD FENCING
2.00
MO
650.00
 
1,300.00
188.07
YARD / FIELD TOILET (2)($150 EA / MO)
2.00
MO
500.00
 
1,000.00
188.08
BUY CONSTRUCTION WATER
1.00
LS
2,500.00
 
2,500.00
188.09
SWEEPING
1.00
LS
2,500.00
 
2,500.00
188.10
DUMP FEES
1.00
LS
2,500.00
 
2,500.00
188.16
END OF PROJECT CLEANUP
1.00
LS
5,000.00
 
5,000.00
188.17
SMALL TOOLS AND SUPPLIES
1.00
LS
1,500.00
 
1,500.00
GENERAL CONDITIONS (DIRECT COSTS)
55,077.00
188
MONTHLY GENERAL CONDITIONS
1
MO
55,077.00
 
5/12/2025
EXHIBIT B.2 - GENERAL CONDITIONS
5/12/2025
5/15/2025
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

LINE 
NO
DESCRIPTION
UNIT
QUANTITY
UNIT PRICE
EXTENDED PRICE
1
Construction Survey and Layout
LS
1
 $    9,055.00 
9,055.00
$ 
2
Mobilization/Demobilization
LS
1
 $ 26,548.00 
26,548.00
$ 
3
Subgrade Preparation
SY
513
 $         67.00 
34,371.00
$ 
4
Pavement Section No.1 (3" AC on 6" ABC)
SY
511
 $         37.00 
18,907.00
$ 
AC T
ned Edge (MAG STD DET 201, Type A)
LF
300
 $         21.00 
6,300.00
$ 
6
Single Curb (MAG Std Det 222, Type A)
LF
275
 $         32.00 
8,800.00
$ 
7
Concrete Valley Gutter (MAG Std Det 240) (MODIFIED)
SF
1,079
 $         14.00 
15,106.00
$ 
8
Adjust Valve Box Frame & Cover w/ Concrete Collar (MAG Std Det 391-1, Type A)
EA
3
 $    1,128.00 
3,384.00
$ 
9
Remove Asphaltic Concrete Pavement
SY
50
 $         67.00 
3,350.00
$ 
10
Remove Concrete Driveway
SF
33
 $         45.00 
1,485.00
$ 
11
Remove Concrete Valley Gutter
SF
10
 $       152.00 
1,520.00
$ 
12
Remove Water Meter Box
EA
6
 $       720.00 
4,320.00
$ 
13
Remove Sign
EA
1
 $       926.00 
926.00
$ 
14
Install Traffic Sign System
EA
6
 $       162.00 
972.00
$ 
15
Traffic Control
LS
1
 $    9,568.00 
9,568.00
$ 
16
Traffic Rated Box & Cover (MAG Std Det 319 Box Number 1324 w/ Circular Antennae)
EA
5
 $    1,460.00 
7,300.00
$ 
17
Concrete Pad
SF
16
 $       419.00 
6,704.00
$ 
18
Relocate Guy Wire and Foundation
EA
1
 na 
na
19
Fill & Compact Voids
EA
1
 $    9,665.00 
9,665.00
$ 
20
3" Decomposed Granite, 1/2" Minus (Desert Gold)
SF
740
 $         24.00 
17,760.00
$ 
21
Preformed Pavement Marking  Arrows
EA
3
 $       432.00 
1,296.00
$ 
22
Permits
LS
1
 $    4,365.00 
4,365.00
$ 
TOTAL CONSTRUCTION
 $             191,702.00 
ALT
Asphalt Stamping & Painting
SY
511
66
 $               33,726.00 
TOTAL CONSTRUCTION WITH ALTERNATE
 $             225,428.00 
1
Install Streetlight
EA
2
na
na
Date Printed: 4/15/2025                                                                                           Dibble                                                                                                                           Page 1
055.00
$ 
2
Mobilization/Demobilization
LS
1
 $ 26,548.00 
26,548.00
$ 
3
Subgrade Preparation
SY
513
 $         67.00 
34,371.00
$ 
4
Pavement Section No.1 (3" AC on 6" ABC)
SY
511
 $         37.00 
18,907.00
$ 
5
AC Thickened Edge (MAG STD DET 201, Type A)
LF
300
 $         21.00 
6,300.00
$ 
6
Single Curb (MAG Std Det 222, Type A)
LF
275
 $         32.00 
8,800.00
$ 
7
Concrete Valley Gutter (MAG Std Det 240) (MODIFIED)
SF
1,079
 $         14.00 
15,106.00
$ 
8
Adjust Valve Box Frame & Cover w/ Concrete Collar (MAG Std Det 391-1, Type A)
EA
3
 $    1,128.00 
3,384.00
$ 
9
Remove Asphaltic Concrete Pavement
SY
50
 $         67.00 
3,350.00
$ 
10
Remove Concrete Driveway
SF
33
 $         45.00 
1,485.00
$ 
11
Remove Concrete Valley Gutter
SF
10
 $       152.00 
1,520.00
$ 
12
Remove Water Meter Box
EA
6
 $       720.00 
4,320.00
$ 
13
Remove Sign
EA
1
 $       926.00 
926.00
$ 
14
Install Traffic Sign System
EA
6
 $       162.00 
972.00
$ 
15
Traffic Control
LS
1
 $    9,568.00 
9,568.00
$ 
16
Traffic Rated Box & Cover (MAG Std Det 319 Box Number 1324 w/ Circular Antennae)
EA
5
 $    1,460.00 
7,300.00
$ 
17
Concrete Pad
SF
16
 $       419.00 
6,704.00
$ 
18
Relocate Guy Wire and Foundation
EA
1
 na 
na
19
Fill & Compact Voids
EA
1
 $    9,665.00 
9,665.00
$ 
20
3" Decomposed Granite, 1/2" Minus (Desert Gold)
SF
740
 $         24.00 
17,760.00
$ 
21
Preformed Pavement Marking  Arrows
EA
3
 $       432.00 
1,296.00
$ 
22
Permits
LS
1
 $    4,365.00 
4,365.00
$ 
TOTAL CONSTRUCTION
 $             191,702.00 
ALT
Asphalt Stamping & Painting
SY
511
66
 $               33,726.00 
TOTAL CONSTRUCTION WITH ALTERNATE
 $             225,428.00 
1
Install Streetlight
EA
2
na
na
Date Printed: 4/15/2025                                                                                           Dibble                                                                                                                           Page 1
HALL WAY ALLEY
City of Chandler Project No. CA2206.401 April 15, 2025
QUANTITIES (100% SUBMITTAL)
REMOVALS & RELOCATIONS
IMPROVEMENTS BY APS
Proposal for construction services - 5/15/25
General Conditions included in Exhibit B:
     Price of Subcontractors $53,645.00 
     Price of AGC Self Performance: $171,783.00
     Sub total = $225,428.00
    General Conditions = $55,077.00
Project Subtotal = $280,505.00
EXHIBIT B.2 - SCHEDULE OF VALUES
MAY 15, 2025
CITY OF CHANDLER - Hallway Alley Improvements California St. to San Marcos Alley
Project NO. CA2206.402
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT B.3: LIST OF JOC DOCUMENTS 
MAY 15, 2025 
CITY OF CHANDLER – Hallway Alley Improvements California St. to San Marcos Alley 
PROJECT NO: CA2206.401 
 
 
• 
Dibble - 100% plan set Downtown Alley Improvements (California, Boston & Commonwealth) – 
Dated April 15, 2025. 
• 
City of Chandler via Andrew Sprea, PE. – 100% Technical Specifications, Hallway Alley 
Improvements California St. to San Marcos Alley City of Chandler Project No. CA2206.401 – 
Dated April 15, 2025. 
• 
Dibble – Hallway Alley Quantities (100% Submittal) – Dated April 15, 2025. 
 
 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT C 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page C-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
 
 
PERFORMANCE BOND 
 
 
ARIZONA STATUTORY PERFORMANCE BOND 
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Agreement amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:___________________________________________________ 
 
(hereinafter "Principal"), and __________________________________________________________ (hereinafter "Surety"), a 
corporation organized and existing under the laws of the State of ______________ with its principal office in the City of 
_____________________________, holding a certificate of authority to transact surety business in Arizona issued by the 
Director of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto 
__________________________(hereinafter "Obligee") in the amount of ________________________________________________ 
(Dollars) ($___________), for the payment whereof, Principal and Surety bind themselves, and their heirs, administrators, 
executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated  
 
the ____________ day of _______________________, 20___ for construction of Downtown Alley Improvements (California Street 
to San Marcos Alleyway), CA2206.402 which Agreement is hereby referred to and made a part hereof as fully and to the 
same extent as if copies at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal faithfully performs and 
fulfills all the undertakings, covenants, terms, conditions and agreements of the Agreement during the original term of 
the Agreement and any extension of the Agreement, with or without notice of the Surety, and during the life of any 
guaranty required under the Agreement, and also performs and fulfills all the undertakings, covenants, terms, 
conditions, and agreements of all duly authorized modifications of the Agreement that may hereafter be made, notice 
of which modifications to the Surety being hereby waived, the above obligation is void.  Otherwise it remains in full force 
and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2, 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions of Title 34, 
Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length in this Agreement. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that 
may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
____________________________________ 
PRINCIPAL         
 
SEAL 
___________________________________ 
             AGENT OF RECORD 
By _________________________________ 
____________________________________ 
SURETY  
 
SEAL 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT D 
 
 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page D-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
PAYMENT BOND 
 
 
ARIZONA STATUTORY PAYMENT BOND 
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES 
(Penalty of this Bond must be 100% of the Agreement amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:________________________________________________  
 
(hereinafter "Principal"), as Principal, and _________________________________________(hereinafter "Surety"), a corporation 
organized and existing under the laws of the State of __________________   with its principal office in the City of 
__________________, holding a certificate of authority to transact surety business in Arizona issued by the Director of the 
Department of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto 
________________________  (hereinafter "Obligee") in the amount of ________________________________________________ 
(Dollars) ($___________), for the payment whereof, the Principal and Surety bind themselves, and their heirs, 
administrators, executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated the _________ day of 
_______________________, 20___ for construction of Downtown Alley Improvements (California Street to San Marcos 
Alleyway), CA2206.402 which Amendment is hereby referred to and made a part hereof as fully and to the same extent 
as if copied at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal promptly pays all moneys 
due to all persons supplying labor or materials to the Principal or the Principal's subcontractors in the prosecution of 
the work provided for in said Agreement, this obligation is void. Otherwise it remains in full force and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions, conditions 
and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length 
in this Agreement. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that 
may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
____________________________________ 
PRINCIPAL         
 
SEAL 
___________________________________ 
                 AGENT OF RECORD 
By _________________________________ 
____________________________________ 
SURETY  
 
SEAL 
___________________________________ 
                  AGENT ADDRESS 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT E 
 
 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page E-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS 
 
________________________, Arizona 
 
Date ____________________________ 
Project: 
DOWNTOWN ALLEY IMPROVEMENTS (CALIFORNIA STREET TO SAN MARCOS 
ALLEYWAY)   
Project No.: CA2206.402 
 
To the City of Chandler, Arizona 
Gentlemen: 
This is to certify that all lawful claims for materials, rental of equipment and labor used in 
connection with the construction of the above project, whether by subcontractor or claimant in 
person, have been duly discharged. 
 
The undersigned, for the consideration of $________________________, as set out in the final pay 
estimate, as full and complete payment under the terms of the Agreement, hereby waives and 
relinquishes any and all further claims or right of lien under, in connection with, or as a result of 
the above described project.  The undersigned further agrees to indemnify and save harmless 
the City of Chandler against any and all liens, claims or liens, suits, actions, damages, charges 
and expenses whatsoever, which said City may suffer arising out of the failure of the 
undersigned to pay for all labor performances and materials furnished for the performance of 
said installation. 
 
Signed and dated at ________________, this _________ day of _______________ 20_____. 
 
 
__________________________________ 
                       CONTRACTOR 
 
By _______________________________ 
STATE OF ARIZONA  
) 
) SS 
COUNTY OF MARICOPA 
) 
 
The foregoing instrument was subscribed and sworn to before me this __________ day of 
__________________ 20 _________. 
___________________________________ 
 
 
 
 
 
Notary Public 
___________________________________ 
 
 
 
 
 
My Commission Expires
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT F 
 
 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page F-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
CERTIFICATE OF COMPLETION 
Project: 
DOWNTOWN ALLEY IMPROVEMENTS (CALIFORNIA STREET TO SAN MARCOS 
ALLEYWAY)   
Project No.: CA2206.402 
(TO BE COMPLETED BY CONTRACTOR) 
 
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER PROJECT NO. 
CA2206.402 HAVE BEEN DELIVERED IN ACCORDANCE WITH THE AGREEMENT DOCUMENTS AND BID 
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE AGREEMENT HAVE BEEN 
COMPLETED AS OF ____________________________. 
 
 
(Date) 
 
FIRM NAME: 
________________________________ 
 
PRINCIPAL: 
________________________________ 
         (Name) 
 
________________________________ 
      (Signature) 
 
________________________________ DATE: ___________________ 
          (Title) 
 
CERTIFIED BY ENGINEER/CONSULTANT (IF APPLICABLE): 
 
_________________________________ 
 
DATE: ____________________ 
      (Signature) 
 
_________________________________ 
 
        (Firm Name) 
  
PROJECT ACCEPTED BY USER DEPARTMENT 
 
_________________________________ 
 
DATE: ____________________ 
         (Signature) 
 
_________________________________ 
 
          (Dept. /Div.) 
 
_______________ Date of Final Walk-Through 
 
_______________ Date As-Built Received 
 
_______________ City As-Built Number 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT G 
 
 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page G-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
SUBCONTRACTOR DOCUMENTS WITH JOC CONTRACTOR 
 
Any subcontractor assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the JOC Contractor and their 
subcontractors, and do not apply to the Agreement between the JOC Contractor and 
the City. 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

QUOTATION  
 
 
Date: 05/01/2025 
Quote #: 2008899320 
Account: 213235 
 
 
 
 ACCOUNT :  ACHEN-GARDNER
CONSTRUCTION LLC 
 
QUOTE NAME : CHANDLER HALL WAY ALLEY / 179
W COMMONWEALTH AVE / CHANDLER 
 
Bill-To Address: 2195 W. CHANDLER BLVD,
Suite 200  
CHANDLER AZ 85224
 
Attn: Carson Bryce 
 
Ship-To Address: 179 W COMMONWEALTH
AVE AZ051099 
CHANDLER AZ 85225
 
 
Effective Date: 05/01/2025 
Expiration Date: 05/31/2025 
Upon Acceptance Price Valid Until: 09/30/2025 
 
Sales Representative: Lyndsay Ervine
Phone: +1 (480) 647-5404
Email: ervinel@vmcmail.com
 
100 - Aggregates
Plant
 
Product ID
 
Product Name
 
Qty
 
U/M
 
Unit Price
 
Haul Rate
 
Total
Delivered
Price
 
VAL VISTA SAND
& GRAVEL 
 
16272 
 
MAG SPEC ABC
LIME TREATED 
 
 
169
 
TON 
 
$14.25 
 
$9.20 
 
$23.45 
 
200 - Asphalt
Plant
 
Product ID
 
Product Name
 
Qty
 
U/M
 
Unit Price
 
Haul Rate
 
Total
Delivered
Price
 
SAN TAN HMA 
 
331517T 
 
1/2" EVAC PG
70-10 
 
 
100
 
TON 
 
$81.00 
 
$9.00 
 
$90.00 
 
 
ADDITIONAL CHARGES
 
Product ID
 
Product Name
 
Price/%
 
Per UOM
 
ENVFEE 
Environmental Fee -Agg & Asphalt 
 $4.00 
LOAD 
 
 
1           
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

ADDITIONAL INFORMATION
 
HMA ORDER VOLUME: All daily orders under 100 tons of asphalt will incur Gomez Price plus the haul charge.
MATERIAL PRICING: Quoted material prices are valid only until the quote/sales order expiration date,
regardless of quote acknowledgment or PO status. Prices for materials provided after the expiration date are
subject to increase.
PRODUCTION AND AVAILABILITY: Vulcan Materials plants serve multiple customers and strive to meet all
production timelines. However, Vulcan is not responsible for project or trucking delays due to material or
production availability. Quotes are subject to product/material availability, and production is scheduled on a
first-come, first-served basis.
MATERIAL SPECIFICATIONS: Quoted materials are based on specifications not reviewed. Any required
changes or substitutions from what is on this quote are subject to price adjustment.
 
 
 
Logistics / Hauling:
Trucking is based on availability and Vulcan Materials will not be held responsible for schedule impacts due to
trucking shortages. The delivered price is based on 23.50 tons (full load); a short load fee will apply if under
23.50 tons. Truck stand-by will be charged on-site after the first 20 minutes at the rate of $100 per hour or
$1.67 per minute. All night work will be subject to an 8-hour minimum hourly haul charge and subject to
additional charges pending the hauler charging an additional 8 hrs due to days' worth of work that is lost. Any
cancellation of night work needs to be done 24 hours ahead of schedule. All weekend work will be subject to a
4-hour minimum hourly haul charge.
 
 
Product Availability:
Prices quoted are for regular business hours: Monday - Friday, 6 AM to 5 PM. Plant premiums will apply for
nightwork and/or weekends. Overtime will be subject to a charge of $350.00 per hour.
The quote is subject to product or material availability due to current aggregate demand.
 
 
 
 
 
2           
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Prices quoted above do not include any state or local sales and use tax, if any applies for this project.
Prices quoted are for shipments during normal daytime working hours unless other shipping hours are mutually agreed upon
in writing by both parties.
 
All prices are FOB point of shipment from the designated location unless a delivered price is stated. Terms are Net 15 prox. Please note
standard terms and conditions apply. (Subject to credit approval).
 
This quote is limited to acceptance within 30 days from the date of this quotation after which time quotation is subject to review/revision.
Please contact Sales prior to placing the order.
 
Accepted by: _________________________________
 
Sales Representative: __________________________
 
Date: ___________________________________
 
Date: ___________________________________
 
 
 
We appreciate the opportunity to provide you this quote and trust that Vulcan will have the pleasure of serving your needs for this and future projects.
 
 
 
3           
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

GENERAL TERMS AND CONDITIONS 
  
Prices are based on the terms and conditions set forth on page 1 of this Quotation, of which these General Terms and Conditions form a part, the 
terms and conditions stated in Customer’s Application for Business Credit, and, if applicable, any terms and conditions relating to the delivery or 
shipment of materials by truck, barge, vessel, rail or other means which are provided by Vulcan to Customer in addition to this Quotation (each, a  
“Vulcan Sales Document”, and collectively, the “Vulcan Sales Documents”).  Prices are available only to the customer specifically named therein, and 
are only for the quantities mentioned in such Quotation or Sales Order plus or minus 10% of such quantities. A charge of 1.5% per month, (18% 
annum), will accrue on a daily basis from the date of invoice and will continue to accrue on a daily basis on any unpaid balance, both before and after 
judgment, until the date the balance is paid in full, or at the maximum amount permitted by law in which the sale occurred, whichever is less.  
However, the assessment of a finance charge on invoices paid in full by the payment due date will be waived.  Quotation is offered for furnishing the 
total aggregate requirements for the project only.  Customer’s contract with Vulcan regarding the sale by Vulcan to Customer of the materials listed in 
this Quotation is subject to the terms and conditions set forth in the Vulcan Sales Documents.  Prices reflect Customer's acceptance of materials at 
the quoted plant based upon gradation analysis performed and reported by Vulcan's certified plant quality control personnel. Any penalties that result 
from in place sampling shall be the full responsibility of Customer.  
  
THE TERMS AND CONDITIONS OF THE VULCAN SALES DOCUMENTS GOVERN THE RIGHTS AND OBLIGATIONS OF THE PARTIES  
If Customer has issued a purchase order for the materials quoted by Vulcan in this Quotation, this Quotation is not an acceptance of said purchase 
order, or any of its terms or conditions, which are hereby rejected.  Any sale by Vulcan to Customer of the materials listed in this Quotation shall be 
subject to the terms and conditions set forth in the Vulcan Sales Documents, and Customer’s receipt or acceptance of said materials shall constitute 
acceptance of the offer that this Quotation constitutes.  Any terms or conditions of a subsequent purchase order issued by Customer that are 
inconsistent with the terms and conditions of the Vulcan Sales Documents shall be null and void.   
  
SHIPMENT AND DELIVERY  
Unless a "delivered" price is quoted by Vulcan in the Vulcan Sales Documents, all prices are F.O.B. point of shipment from the locations designated.  
All taxes applicable to the sale or delivery of materials that are not paid directly by Customer will be added to the sales price, invoiced to and paid by 
Customer, unless Customer provides Vulcan with satisfactory evidence of exemption from same. Shipment will be in accordance with Customer’s 
reasonable instructions or, if none, then by whatever means Vulcan shall deem practicable.  The quantities of material delivered to Customer shall be 
conclusively presumed to be the quantities shown on the tickets produced from a certified weigh scale at Vulcan’s quarry or sales yard.  
  
CREDIT AND DEFAULT  
Vulcan shall have no obligation to ship or deliver except upon its determination prior to each shipment or delivery that Customer is worthy of the 
credit to be extended and is not in default upon any obligation to Vulcan. Upon default, Customer agrees to pay all of Vulcan’s collection expenses, 
including attorneys’ fees.  
  
INSURANCE  
A Memorandum of Insurance containing current information regarding Vulcan’s insurance program is available at 
https://marshdigital.marsh.com/marshconnect/viewMOI.action?clientId=632529479  
  
  
EXCULPATORY PROVISIONS  
Vulcan shall have no liability for delay or failure to make shipments, or delivery, as a result of strikes, labor problems, severe weather conditions, 
casualty, mechanical breakdown or other conditions beyond Vulcan’s reasonable control.  In no event shall Vulcan be liable for any incidental or 
consequential damages. Vulcan’s liability and Customer’s exclusive remedy for any cause of action arising out of the provision of material quoted 
herein shall be the replacement of, or payment of the purchase price for, the materials which are the subject of this Quotation  
  
CHANGE OF TERMS  
Vulcan may change the price and/or quantity upon 30 days’ notice to Customer.  Vulcan shall also have right to change, modify or amend any other 
terms and conditions upon written notice of such change to customer.  The effect of the change shall be as stated in the written notice and accepted 
by Customer upon placing of orders with seller following receipt of such notice.  
  
APPLICABLE LAW  
All orders are subject to acceptance by Vulcan at the headquarters of its Mountain West Division in Phoenix, Arizona, and the laws of the state in 
which the materials was shipped from shall apply to the sale of all materials subject hereto.  In the event material is imported into the U.S., the law in 
the state in which the material was sold to the customer will prevail.  All disputes regarding finance charges shall be governed by Alabama law  
  
  
LIMITED WARRANTY AND WARRANTY DISCLAIMER  
Vulcan warrants for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with Vulcan’s 
specifications for said material or the specifications set forth in Vulcan’s quotation.  VULCAN HEREBY EXCLUDES ALL WARRANTIES OF  
MERCHANTABILITY AND FITNESS FOR ANY PURPOSE, AND ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, OF THE MATERIAL SOLD 
HEREUNDER, OTHER THAN THE EXPRESS WARRANTY STATED ABOVE.  In addition, except to the extent otherwise set forth in the 
specifications described above, Vulcan makes no warranty whatsoever with respect to specific gravity, absorption, whether the material is innocuous,  
non-deleterious, or non-reactive, or whether the material is in conformance with any plans, other specifications, regulations,  ordinances,  statutes, or 
other standards applicable to Customer’s job or to said material as used by Customer.  VULCAN SHALL IN NO EVENT BE  
RESPONSIBLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGE CAUSED BY NON-COMPLIANCE OF THE MATERIAL WITH  
SPECIFICATIONS, OR FOR ANY DEFECTS IN THE MATERIAL SOLD HEREUNDER  
 
 
 
4           
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

1027 East Curry Road, Tempe AZ 85288 – T: 480-446-9000 F: 480-446-9001 AZROC#155125
421 West Palmer Ave, Glendale, CA 91204 - T: 480-446-9000 F: 480-446-9001 CAROC#1042300
Dba Creative Paving Coating Solutions
Proposal
Achen-Gardener Construction
Bryon Lively 
(602) 741-1054
2195 W Chandler Blvd #200, Chandler, AZ 85224
Via e-mail to: blively@achen.com 
May 7, 2025
Job Number: 250150 
City of Chandler Alleyway
Chandler, AZ
Creative Paving Solutions proposes furnishing the materials and performing the labor necessary to complete the 
line items listed below:
Line Item 1 – Stamped Asphalt– We will prep, layout, stamp, coat, and seal approximately 4,557 square feet of existing 
new asphalt using Decocoat Polymer Systems DP-200 and Decocoat Polymer Systems Sealer Concentrate. The pattern 
and color will determined by the owner. We will do this work for $6.75 per square foot for a total of $30,759.75 plus 
applicable sales taxes. 
THIS PRICE DOES NOT INCLUDE MULTICOLOR STAMPED ASPHALT, ASPHALT/CONCRETE REPAIR, TRAFFIC 
CONTROL, ASPHALT/CONCRETE PAVING, WEEKEND WORK, DAVIS BACON WAGES, UNION WAGES AND/OR 
PREMIUM PAY NOT CAUSED BY CREATIVE PAVING. 
CREATIVE PAVING IS NOT RESPONSIBLE FOR CURRENT AND/OR FUTURE CRACKS OR BELOW GRADE MOISTURE. 
THE SCHEDULE CAN CHANGE DUE TO INCLEMENT WEATHER.
●
Any additional square footage will be charged at the same rates as shown above per square foot plus applicable 
sales taxes.
●
Prices are valid for sixty days from the date of this proposal.
●
Payment will be made as follows:
o
Payments will be due 30 days after invoicing. We offer a 2% discount on any full invoice (without 
retention deducted) paid within 7 days of invoice date.  Invoices not paid within 45 days of invoice date 
will be subject to a 1.8% finance charge per month.
o
FINAL BILLING WILL BE BASED ON FIELD MEASUREMENTS OF ACTUAL WORK 
COMPLETED.  IF ACTUAL FIELD MEASUREMENTS ARE 10% OR GREATER LESS THAN 
INITIALLY PROPOSED AN INCREASE IN THE PRICE PER SQUARE FOOT MAY BE REQUIRED.
●
Creative Paving Solutions is not responsible for and will not warranty any damage caused by anyone other than 
Creative Paving Solutions.
●
Creative Paving Solutions will warranty all labor and material supplied by Creative Paving Solutions for one year 
from the date of substantial completion of this project.
●
Exclusions:
o
Surveying and/or engineering
o
Bonds and permits
o
Cleaning prior to commencement of work (Heavy Duty)
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

FERGUSON WATERWORKS #1821
1800 NORTH ARIZONA AVENUE
CHANDLER, AZ 85225-7014
Phone: 602-495-8420
Fax: 602-262-4276
Deliver To: EXP 12/21 EM ECMS
From:
Hector Flores 
hector.flores@ferguson.com
Comments:
HOW ARE WE DOING?  WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to 
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=3083&on=11045
16:51:51 MAY 07 2025
FERGUSON WATERWORKS #3083
Price Quotation
Phone: 602-495-8420
Fax: 602-262-4276
Bid No:
B451989
Bid Date:
05/07/25
Quoted By:
HBF
Cust Phone:
480-940-1300
Terms:
NET 10TH PROX
Customer:
ACHEN GARDNER CONSTRUCTIO
2195 W CHANDLER BLVD STE 200
CHANDLER, AZ 85224
Ship To:
ACHEN GARDNER CONSTRUCTIO
2195 W CHANDLER BLVD STE 200
CHANDLER, AZ 85224
Cust PO#:
CHANDLER, AZ
Job Name:
HALL WAY ALLY IMPROV
Page 1 of 2
 Item
 Description
 Quantity
 Net Price
 UM
 Total 
OB132451JH
B1324 #2 TRFC RATED LID
5
406.740
EA
2033.70
OB1324BOX
B1324 #2 TRFC RATED BX W /BLTS
5
259.440
EA
1297.20
BGRE5LHVTSK4WCL35 5-1/4 VLV BX LID WTR W/ 4 SKT CL35
3
67.490
EA
202.47
IVBATS16
16 SLIP VLV BX TOP SECT
3
73.260
EA
219.78
IVBABS24
24 SLIP VLV BX BOT SECT
3
85.180
EA
255.54
IVBABS36
36 SLIP VLV BX BOT SECT
3
120.950
EA
362.85
SDC457BL
DEBRIS CAP F/ 461S TOP BLUE
3
91.250
EA
273.75
Net Total:
$4645.29
Tax:
$0.00
Freight:
$0.00
Total:
$4645.29 
Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours).  SHIPMENTS BEYOND 48 HOURS SHALL BE
AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE
Due to the uncertain impact of potential tariffs, Ferguson's quotation/proposal has not included any provision or contingency for future tariffs or increase of 
existing tariffs. Ferguson reserves the right to adjust prices to reflect the impact of any new or increased tariffs that affect our costs at the time of shipment. 
Ferguson will provide notice of any such adjustments along with documentation supporting the changes. 
 
CONTRACTOR CUSTOMERS: IF YOU HAVE DBE/MBE/WBE//VBE/SDVBE/SBE GOOD FAITH EFFORTS DIVERSITY GOALS/ REQUIREMENTS ON A 
FEDERAL, STATE, LOCAL GOVERNMENT, PRIVATE SECTOR PROJECT, PLEASE CONTACT YOUR BRANCH SALES REPRESENATIVE 
IMMEDIATELY PRIOR TO RECEIVING A QUOTE/ORDER.
ARE NOT FIRM UNLESS NOTED OTHERWISE.
https://www.ferguson.com/content/website-info/terms-of-sale
LEAD LAW WARNING: It is illegal to install products that are not "lead free" in accordance with US Federal or other applicable law in potable water 
systems anticipated for human consumption. Products with *NP in the description are NOT lead free and can only be installed in non-potable 
applications. Buyer is solely responsible for product selection. 
Buyer shall accept delivery of products within 60 days of Seller receiving the products at Seller's warehouse. If Buyer causes or requests a delay in 
delivery of the products, Buyer may be subject to storage fees and additional costs caused by such delay. Seller reserves the right to requote the 
products and reschedule the delivery date, subject to manufacturer's lead times and price increases, if Buyer is unable to accept delivery within 60 
days.
Seller not responsible for delays, lack of product or increase of pricing due to causes beyond our control, and/or based upon
Local, State and Federal laws governing type of products that can be sold or put into commerce.  This Quote is offered contingent upon the
Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or
on the web at 
Govt Buyers:  All items are open market unless noted otherwise.
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Page 2 of 2
16:51:51 MAY 07 2025
FERGUSON WATERWORKS #3083
Price Quotation
Fax: 602-262-4276
Reference No: B451989
HOW ARE WE DOING?  WE WANT YOUR FEEDBACK!
Scan the QR code or use the link below to 
complete a survey about your bids:
https://survey.medallia.com/?bidsorder&fc=3083&on=11045
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Quote Number: 
Q10023676-0
Created On: 
4/30/2025
Quote Expires On:
5/30/2025
Project:
City of Chandler Hall Way Alley
Account:
Achen Gardner Construction 
LLC
Project Address:  
Account Number:
40005
179 W Commonwealth Ave
Chandler, AZ 85225
Contact:       
Carson Bryce
Estimated Start Date:
5/26/2025
E-mail:
cbryce@achen.com
Project End Date:
11/30/2025
Phone:
480-940-1300
Customer Service: 
Sales Office Address: PO Box 741805 Kilgore Companies
Los Angeles, CA  90074-1805
MATERIAL PRICING
Item Code
Description
Quantity
Unit Price
12504
MAG-B 2500 PSI 1" ROCK
10 CY
$134.00
-Escalator of $8.00 effective 6/1/2025 recurring every 12 months
--
13004
3000 PSI MAG-A
10 CY
$136.00
-Escalator of $8.00 effective 6/1/2025 recurring every 12 months
--
14004
MAG-AA 4000 PSI, 1" ROCK
40 CY
$140.00
-Escalator of $8.00 effective 6/1/2025 recurring every 12 months
--
12506
MAG-B CURB 2500 1" SLIPFORM
20 CY
$136.00
-Escalator of $8.00 effective 6/1/2025 recurring every 12 months
--
SUNDRIES AND SURCHARGES
Item
Comments
Price
Unit
Fuel Surcharge RMX
$35.00
EA
WEEKEND TRUCK TIME
$50.00
HRS
ENVIRONMENTAL CHARGE
$25.00
EA
Load Size: 0.00 > 6.00
$200.00
CY
Additional Products & Services
Hot Water
$2.50
PCY
Recover per 1/2 hour
$4.00
OZ
Micro Fiber
$7.50
PCY
Color Wash Out
$25.00
EA
Nitrogen Cooling
$9.50
GAL
Non-Chloride Accerator (per 1%)
$0.00
GAL
Macro Fiber (Structural)
$7.00
PCY
Color Seal
$0.00
PCY
Chilled Water
$2.50
PCY
Respectfully,
Arizona Materials
Sales Rep: Randy Schmolke
Phone: 602-342-6595
Email: Randy.Schmolke@azmatl.com
Customer Acceptance
Signed by:
Date:
__Taxable     __Tax Exempt (Attach Certificate)
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Quote Number: 
Q10023676-0
Created On: 
4/30/2025
Quote Expires On:
5/30/2025
CLAUSES
Delivery availability
The seller is not responsible for delays in delivery due to conditions or circumstances beyond his control.
To insure quality, the minimum order size will be two cubic yards.
The seller accepts no responsibility for damages to any curb and beyond the curb line.
It is the intent of the Seller to have ready mixed concrete arrive at Purchaser’s site at the time and rate ordered by Purchaser, but cooperation and 24-
hour advance notice are necessary to facilitate timely delivery. Seller agrees to use its best ability and dispatch in meeting requested delivery 
schedules, but cannot guarantee same. Special arrangements must be made for deliveries of over 100 cubic yard per hour.
Customer must notify dispatch of quoted project, when orders are placed.
Buyer is responsible to provide access for the delivery of products under the delivery vehicle’s own power. Our delivery vehicle(s) carry chains that can 
be used for an additional fee. The use of heavy equipment to propel delivery vehicle(s) in any way through inaccessible areas will not be permitted. In 
the event a tow truck is needed to retrieve delivery vehicle(s) due to poor access, the Buyer will be billed for the towing cost and delivery vehicle’s time 
related to the recovery and delivery.
Seller is not responsible for failure to make delivery when prevented by strikes; D.O.T. drivers’ hour of service; by accidents or necessary repairs to 
machines or equipment; by fire, flood, power failure, water supply failure, or adverse weather conditions; by inability to procure materials or fuel; by 
Government regulations, requirements or orders; or by any other causes beyond the Seller control.
Prior to unloading concrete, Purchaser shall inspect delivery tickets for conformity with order. The seller reserves the right to take test cylinders from the 
concrete as delivered.
The seller will not be responsible for any concrete pumping overtime charges.
When deliveries are made to places other than on paved streets, Purchaser must provide suitable roadways or approaches, permitting safe access of 
trucks to the point of delivery under their own power. Seller reserves the right to refuse deliveries in the event such roadways are not provided. If 
Purchaser orders deliveries beyond the curb line, Purchaser shall be responsible for removal of mud from trucks wheels and tires, and Purchaser 
assumes all liability for, and agrees to hold Seller harmless from, damage to trucks, sidewalks, driveways, roads, or other property, resulting from truck 
weight or inadequate roadways or approaches to discharge points.
Payment terms
All credit sales are subject to the terms and conditions of a separate credit agreement between Seller and Purchaser, including but not limited to the 
express agreement that, in addition
Accounts that are 60 days past due will be closed until balance is paid.
The seller strictly follows State Lien Law, issuing construction notice, notice to owner, preliminarynotice or notice to contractor, and/or intent to lien 
filings, accordingly, without incident.
As to any matter wherein Purchaser intends to make a claim against Seller, written notice must be given to Seller promptly upon discovery of facts upon 
which the claim may be based, the Seller shall be given full opportunity to investigate them. Otherwise said claim shall be deemed waived.
All Charge Accounts are due and payable 30 days after the date of the invoice. Any account not following the aforementioned payment terms are 
deemed to be past due. All Past Due Accounts are subject to interest at the rate of 1 ½ percent per month (18% Per Annum) applied to the principal 
monthly, plus any cost of collection, including, but not limited to, reasonable attorney's fees. NO RETENTION ALLOWED.
Pricing conditions
Purchase order numbers, if required by customer, must be provided prior to purchase.
Materials are quoted based on most recent information and specifications given to us by our customer.
Seller will accept no responsibility for final color, or variations in color, due to the many variables that affect it.
When orders are placed for this project it constitutes acceptance of the prices, terms and conditions of this quotation.
Since Seller has no control over the placing, curing, or handling of concrete after unloading, Seller cannot and does not guarantee the finished work for 
which its concrete is used.
Prices are subject to change if data or specifications change.
Prices quoted are for the above referenced project only. Prices are good for thirty (30) calendar days from the quote date and through Expiration Date, if 
the quote is accepted. After 30 days, customer will need to request a new quotation.
Price quote and customer account is subject to cancellation for an overdue account.
Concrete Pricing subject to change based on market conditions
This quotation is subject to credit approval. We reserve the right to cancel this quotation if credit terms are not met.
Subject to cement supply and availability, price increases, and supply of diesel fuel.
All order backs/split loads under 11 yds on one order are subject to Short Load Charges.
Arizona Materials will not be responsible for any concrete pumping overtime charges.
Applicable sales, excise, or use taxes are not included in the prices on the quote. Sales Tax can only be provided as an estimate, if needed. Customers 
are responsible for paying any such taxes, which are, or may become applicable.
___Taxable ____Tax Exempt (Attach Certificate)
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Quote Number: 
Q10023676-0
Created On: 
4/30/2025
Quote Expires On:
5/30/2025
Customer must provide a copy of the tax exempt certificate before ordering any materials to not charge sales tax, otherwise taxes are due and payable 
within credit terms.
Product performance
It is Contractors responsibility to contact Arizona Materials Quality Control Department with any concrete issues/concerns no later than 48 Hours after 
placement.
All materials are produced in conformance with ACI / ASTM Standards. Contractor is responsible to provide safe access to the point of delivery.
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

To:
Contact:
Estimating Dept.
Frank Church
City Of Chandler - Alley Improvements
Project Name:
Bid Number:
250258
Fax:
Address:
Phoenix, AZ
Phone:
Project Location:
California St & Hall Way Alley, Chandler, AZ
Bid Date:
5/9/2025
Total Price
Unit Price
Unit
Item Description
Item #
Estimated Quantity
$1,200.00
$400.00
3.00
01
EACH
Preformed Pavement Arrow
$1,800.00
$1,800.00
1.00
02
EACH
Mobilization
$3,000.00
Total Bid Price:
Notes:
• Our Quotation Excludes the Following: Survey, Sweeping, Stripe Obliteration, Sealer for Obliteration/ Rumble Strips, Traffic Control, Sales Tax,
Permits, Bond, As-Built Drawings, Removal/ Disposal of Lead or Asbestos Based Striping.  Contractor to supply water and debris dump location on
jobsite.
• Striping survey is required per ADOT Specification 925-3.  Payment Terms Net 30 Days (Retainage to match Owner's holding)/ A minimum of 14
days notice required prior to starting work.
• 1 Final markings mobilization included.  Adjust mobilizations to fit your project schedule; Any Additional mobilizations will be billed at unit rate
above.
• This quote excludes any project management/ billing website fees (i.e. Textura)
• All railroad and/ or specialty insurance is excluded. A standard C.O.I. extension to match Owner's requirements.
• Bond Rate: $15.00/ $1000.00 (Minimum $100.00)
NAICS Code: 237310
• Pavement Marking License Number: 280635
This Estimate is Valid for 45 Days. PMI must receive up-to-date plans and specifications prior to mobilization
• Quantities shown are estimates only. Actual quantities installed will be used for billing. Quote to be used as part of our subcontract.
ACCEPTED:
The above prices, specifications and conditions are satisfactory
and hereby accepted.
Buyer:
Signature:
Date of Acceptance:
CONFIRMED:
PMI AZ
Authorized Signature:
Estimator:
Frank Church
602-717-5388   frank.church@pmiaz.com
Page 1 of 1
5/7/2025 1:16:36 PM
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 1 of 11      
 
 
PROPOSAL  
FOR  
PROFESSIONAL SERVICES 
 
CLIENT 
Achen Gardner 
DATE OF ORDER 
05/07/2025 
CONTACT 
Andy Mortensen 
PROPOSAL NO. 
P25004331 
ADDRESS 
     2195 W Chandler Blvd, 
Suite 200 
TELEPHONE 
NO. 
     480-940-1300 
 
Chandler AZ      85224 
EMAIL NO. 
Amortensen@achen.com 
 
 
 
 
 
 
PROPOSAL NAME Chandler Hall Way Alley Improvements 
 
SITE LOCATION  
Chandler, AZ 
PROPOSAL SUMMARY 
Dear Andy: 
Attached is our proposal for providing professional surveying services as requested for the Chandler Hall 
Way Alley Improvement project located at Frye Road and Arizona Avenue in Chandler, Arizona 
We appreciate the opportunity to submit our Scope of Understanding to you and look forward to being part 
of your team on a great project.  
Feel free to contact me with any comments or questions you may have for us or if there is anything else we 
need to provide to you to complete this bid.  I can be reached at 623-262-1581.   
Please keep Atwell in mind for your future survey needs and any of your upcoming projects.  
  
Thank you, 
 
 
 
 
 
Randall R. Hager, PLS 
Survey Director
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 2 of 11         
THE ATWELL CLIENT PROMISE 
The Atwell Client Promise serves as a set of guideposts to demonstrate the company’s commitment to our 
clients and partners. In an effort to better understand our clients’ perceptions, satisfaction and expectations of 
Atwell and our leaders, we launched a national initiative to gather client feedback. The Atwell Promise is a 
direct result of our clients’ feedback and prioritized from our clients’ perspective. The Atwell Promise is our 
commitment to you as we strive to develop a long-term relationship and support your project needs. 
 
WE WILL BUILD STRONG RELATIONSHIPS 
We will develop long-term, trusting relationships with our clients and maintain genuine interest in their success 
by understanding their drivers, goals and expectations. 
 
WE WILL PROVIDE INDUSTRY EXPERTISE AND MAINTAIN PROJECT KNOWLEDGE 
We will provide dedicated thought leaders and technical professionals who will deliver industry specific 
knowledge and project experience to every project. 
 
WE WILL BE RESPONSIVE AND EXECUTE ON EVERY TASK 
We will maintain a nimble organizational structure for maximum flexibility to better serve the needs of our 
Clients and respond immediately to a Client’s urgent requests and project deadlines. 
 
WE WILL CONTINUE TO HIRE AND DEVELOP TECHNICALLY SOUND PROFESSIONALS 
We will continue to recruit, develop and retain team members that have the technical expertise, passion and 
commitment to health and safety to serve our Client’s project needs. 
 
WE WILL PROVIDE QUALITY DELIVERABLES AND MAINTAIN A CULTURE OF EXCELLENCE 
We will maintain a culture of excellence focused on Client service and industry best practices to ensure 
accuracy, consistency and constructability for each project. 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 3 of 11         
EXHIBIT A 
 
SCOPE OF WORK FOR CHANDLER HALL WAY ALLEY IMPROVEMENTS 
Based upon our understanding of project requirements and discussions with you we have developed 
the following scope of services: 
 
1.Control: 
a. Establish horizontal control and vertical control points for site staking. 
b.  Set control points for contractor use. 
c.  Asbuilt existing surface utilities for future readjustments. 
d.  Provide demo limits 
 
2.Staking 
a. Stake new curb at 25’ intervals 
b.  Stake Valley Gutter at 25’ intervals 
c.  Stake existing utility rims for re-adjustment after paving. 
d.  Provide layout for new signs. 
 
3.As-Builts: 
a. Complete asbuilts on Civil plans for submittal to city jurisdiction. 
 
NOTE: Atwell will work closely with the client\contractor to insure As-built data is obtained and provided 
to the Atwell survey (office) team to quickly review and complete the As-built analysis.  It is the 
Client\Contractors responsibility to contact the Atwell Survey Project Manager in a timely manner 
when the improvements are ready to be As-built in order to provide sufficient time to schedule the 
Atwell survey team for collection of As-built data.  If the underground utility has been backfilled prior 
to As-built data collection, it may require the Contractor to expose said utility at Contractor’s 
expense, till field as-built has been completed.  
 
CLARIFICATIONS 
PROJECT UNDERSTANDINGS 
• 
Anything not specifically stated is excluded from this Scope of Services. 
ASSUMPTIONS: 
In preparing the proposal, we have assumed the following: 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 4 of 11         
• 
Atwell has access to the site. 
• 
Proposal based on the unapproved City of Phoenix, Plans by Hilgart Wilson dated 10-31-24. 
 
INFORMATION TO BE PROVIDED BY THE CLIENT: 
In preparing the proposal, it is understood the following be provided by the Client: 
 
Client to provide current set of approved construction plans,  
Client to provide CADD files of the current plans to assist in setting up the staking calculations 
for field crews.   
 
ADDITIONAL SERVICES 
We have the capability to provide services outside of the agreed upon Scope of Services.  These 
services would be considered Additional Services and would be provided on a Time and Material basis 
and billed in accordance with the attached Professional Services Fee Schedule.  Additional Services 
will only be provided at the written request of the client. 
 
 
EXHIBIT B 
 
Scope & Fee Proposal Work Authorization – Services 
Task 
Task Description 
Original Fee 
Type 
Initial 
1 
Site Control/Demo Limits 
$2,000 
FF 
 
2 
Rough Grade 
$4,000 
FF 
 
3 
As-Builts 
$2,390 
 
 
4 
Calcs/Coordination 
Included in 
Fees Above 
FF 
 
  
Total: 
$8,390 
 
 
 
 
 
 
 
 
 
 
 
 
 
FF=Fixed Fee 
TME = Time & Materials 
 
Upon receipt of this signed proposal and work authorization, Atwell will commit the staff and resources 
necessary to begin work on the project. 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 5 of 11         
 
Invoices will be submitted monthly for work completed and payment is expected within thirty (30) days 
of the date of the invoice.  In the event of non-payment, services may be suspended.   
 
All project related reimbursable expenses, including vehicle mileage, lodging, travel, travel time, 
computer time, outside data reports, postage, shipping, reproductions will be billed separately at cost 
under Task 98.  
 
All fees and hourly rates quoted within this contract may increase annually after the beginning of each 
year. The original Atwell Agreement is enforceable for all subsequent work orders. The client shall pay 
all fees and permit charges 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 
P25004331 
 
Page 6 of 11         
 
Exhibit C 
2024 PROFESSIONAL SERVICES FEE SCHEDULE 
REAL ESTATE & LAND DEVELOPMENT 
PROJECT MANAGEMENT SERVICES 
Senior Project Manager 
$255/hour 
Project Manager I-III 
$212 to $240/hour 
Associate Project Manager I-II 
$178 to $195/hour 
Project Coordinator I-III 
$105 to $137/hour 
ENGINEERING & PLANNING SERVICES 
Senior Technical Advisor 
$325/hour 
Senior Project Engineer 
$223/hour 
Engineer/Designer I-V 
$141 to $212/hour 
Planner/Designer I-V 
$141 to $212/hour 
Technician I-V 
$65 to $126/hour 
SURVEYING & MAPPING SERVICES 
Senior Project Surveyor 
$223/hour 
Project Surveyor I-V 
$141 to $212/hour 
Senior Crew Chief 
$164/hour 
Crew Chief I-III 
$109 to $146/hour 
Crew Member I-II 
$80 to $95/hour 
Certified sUAS Pilot 
$190/hour 
Technician I-V 
$65 to $126/hour 
GIS Services 
$113 to $170/hour 
ENVIRONMENTAL & ECOLOGICAL SERVICES 
Senior Environmental/Ecological Consultant 
$223/hour 
Environmental Consultant I-V 
$141 to $212/hour 
Technician I-V 
$65 to $126/hour 
PROGRAM MANAGEMENT & CONSTRUCTION ADVISORY SERVICES 
Program Manager I-II 
$270 to $282/hour 
Senior Construction Manager 
$225/hour 
Construction Manager I-II 
$195 to $212/hour 
Construction Engineer I-II 
$138 to $175/hour 
Construction Coordinator 
$128/hour 
Estimating Services 
$178 to $212/hour 
Safety Coordinator 
$142/hour 
MISCELLANEOUS 
Project Controller Services 
$102 to $124/hour 
Project Executive 
$325/hour 
Expert Witness 
$250/hour 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 P25004331
 
 
Page 7 of 11         
PROFESSIONAL SERVICES AGREEMENT 
Chandler Hall Way Alley Improvements  
P25004331 
These terms and conditions and the documents set forth in this Professional Services Agreement (the 
"Agreement") are entered into between Atwell, LLC, a Michigan limited liability company ("Atwell") and Achen 
Gardner  ("Client") as of the date set forth in this Agreement.  
 
1. Authorization for Work to Proceed:  Upon 
execution of the Agreement, receipt of specified 
retainer fees, and completion of all other preliminary 
requirements set forth herein, Atwell shall proceed 
with the work (also referred to herein as the 
“services”), 
unless 
stated 
otherwise 
in 
the 
Agreement. 
2. Scope of Services: The Scope of Work is set 
forth in the Proposal.  
3. Standard of Practice: Services performed by 
Atwell under the Agreement will be conducted in 
a manner consistent with the  level of care and 
skill ordinarily exercised by members of the 
profession currently practicing in the same locality 
under similar conditions. No other representation 
expressed or implied and no warranty or 
guarantee is included or intended in the 
Agreement or in any report, opinion, document, or 
otherwise.  Client acknowledges that Atwell has 
made no implied or express representation, 
warranty or condition with respect to the services, 
findings, recommendations or advice to be 
provided by Atwell, except as expressly set forth 
herein. 
4. Billing and Payment:  Client shall pay Atwell for 
services performed in accordance with the rates 
and charges set forth in the Proposal. All fees and 
hourly rates quoted in the Proposal may be 
increased annually and as otherwise agreed by 
Atwell and Client. Invoices will be submitted by 
Atwell on a monthly basis and shall be due and 
payable within thirty (30) calendar days of the 
invoice date. 
5. Billing Dispute:  In the event any bill or portion 
thereof is disputed by Client, Client shall notify 
Atwell in writing within fourteen (14) days of 
receipt of the bill in dispute.  In the event a portion 
of a bill is in dispute, Client hereby agrees to pay 
the undisputed portion of the bill in accordance 
with the terms set forth herein. Client and Atwell 
shall work together to resolve the dispute, but in 
the event Atwell and Client do not resolve such 
dispute within sixty (60) days of notice of dispute, 
Atwell may terminate the Agreement. 
6. Failure to Pay:  If Client for any reason fails to 
pay any undisputed portion of Atwell’s invoices 
within thirty (30) days of receipt, Atwell may 
suspend services to Client.  Client shall waive any 
claim against Atwell and shall defend, hold 
harmless, and indemnify Atwell from and against 
any damages or claims for injury or loss stemming 
from Atwell's suspension of services. Client shall 
also pay Atwell’s reasonable demobilization costs 
resulting from the suspension of services. In the 
event the project is remobilized, Client shall also 
pay the cost of remobilization and the parties may  
renegotiate certain contract terms and conditions 
including, but not limited to, those associated with 
budget, schedule, or scope of services. 
7. Termination:  The Agreement may be terminated 
with cause by either party upon at least seven (7) 
calendar day's written notice.  For purposes of this 
section, "Cause" shall be defined as failure by the 
other party to perform in accordance with the 
terms of the Agreement. In the event of such 
termination for cause, Atwell specifically retains 
and reserves, to the fullest extent permitted by 
law, all causes of action, claims, and remedies, in 
contract and in tort, in connection with or relating 
to  Client’s duties set forth in this Agreement. 
Atwell may terminate the Agreement without 
cause and without written notice in the event that 
(1) site conditions become unsafe for the 
performance of the services by Atwell; or (2) if 
Client fails to pay any invoice in accordance with 
the Agreement. In no event shall Atwell be 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 P25004331
 
 
Page 8 of 11         
 
responsible for Client’s lost profits or other 
damages arising out of Atwell's decision to 
terminate performance of services.  In the event 
the Agreement is terminated with or without 
cause, Atwell shall be paid for services performed 
up to the termination date plus all incurred and 
documented termination expenses. For purposes 
of this Agreement, "termination expenses" shall 
include personnel and equipment rescheduling 
and reassignment adjustments and all other 
related costs incurred directly attributable to 
termination of the Agreement.  
8. Additional Services:  Any services to be 
provided by Atwell to Client not included or 
contemplated by this Agreement shall be 
specifically identified and agreed in writing. 
9. Work Product:  All documents produced or 
created by Atwell including, but not limited to, 
memoranda, internal reports, boring logs, field 
data, field notes, laboratory data, calculations and 
estimates, are instruments of service, and such 
instruments of service  shall remain property of 
Atwell. Atwell is deemed the author and owner of 
the instruments of service, regardless of whether 
or not the services are completed, and Atwell shall 
retain all common law, statutory and other 
reserved rights, including copyrights.  Upon 
receipt by Atwell of payment in full for its services, 
Client shall receive a fully paid license to use 
Atwell’s Work Product for this Project.  In the 
event Client uses, re-uses, or modifies Atwell’s 
Work Product for any other use or purpose, Client 
shall defend, indemnify, and hold harmless Atwell 
from all claims arising or in any way related to 
such use, re-use, or modification.  Any and all 
environmental and material samples obtained by 
Atwell pursuant to this Agreement may, at the sole 
discretion of Atwell, be discarded thirty (30) days 
following completion of the services unless 
otherwise mutually agreed in writing by Atwell and 
Client. 
10. Electronic Data:  If Client is provided copies in 
electronic format of deliverables prepared by 
Atwell ("Electronic Data"), for use in connection 
with preparation by Client of drawings or other 
submittals, as-built or record drawings, or for any 
other purpose, Client’s use of such Electronic 
Data shall be at the sole risk of Client. Client 
agrees that the Electronic Data shall not be used 
for 
any 
purpose 
other 
than 
the 
project 
contemplated under this Agreement. Client 
acknowledges that the information contained in 
the Electronic Data may not be complete, may not 
be to scale, and may be subject to subsequent 
changes by Atwell. Client acknowledges that 
anomalies and errors can be introduced into the 
Electronic Data when it is transferred or used in 
an incompatible computer environment and that 
Atwell shall not be held liable for any such 
anomalies or errors. Further, Client accepts the 
risks associated with and the responsibility for any 
damage to hardware, software or computer 
systems or networks related to any use of the 
Electronic Data. The Electronic Data is being 
furnished on an "as-is" basis.  
11. Excuse of Performance (Force Majeure):  
Atwell shall not be liable for delays in performance 
or for non-performance due to acts of God, war, 
riot, fire, acts or threats of terrorism, labor trouble, 
unavailability 
of 
materials 
or 
components, 
explosion, 
accident, 
compliance 
with 
governmental requests, laws, regulations, order 
or actions, unforeseen circumstances, or causes 
beyond Atwell’s reasonable control. 
12. No Setoff:  Client is prohibited from and shall not 
setoff against or recoup from any invoiced amounts 
due or to become due from Client or its subsidiaries 
or affiliates any amounts due or to become due to 
Atwell or its subsidiaries or affiliates, whether arising 
under the Agreement or otherwise. 
13. Assigns:  Client may not delegate, assign, 
subcontract or transfer its duties or interest in the 
Agreement without the written consent of Atwell.  
14. Waiver: The failure of either party to enforce any 
right or remedy provided in the Agreement or by 
law on a particular occasion will not be deemed a 
waiver of that right or remedy on a subsequent 
occasion or a waiver of any other right or remedy. 
15. Limitation of Liability:  The Parties acknowledge 
that the project pricing provided is based upon 
Atwell’s willingness to accept a reasonable and 
fair level of risk and Client’s willingness to cap 
such 
risk 
at 
a 
level 
reflective 
of 
such 
compensation.  Accordingly, it is expressly agreed 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 P25004331
 
 
Page 9 of 11         
 
that Client's sole and maximum recovery against 
Atwell for any claim arising out of this Agreement, 
whether in contract, tort or otherwise, is the lesser 
of three (3) times the amount of money paid by 
Client to Atwell under this Agreement or 
$250,000, and that an award of damages not to 
exceed such amount is Client's sole and exclusive 
remedy against Atwell.  Under no circumstance 
shall Atwell be liable to Client for any loss or 
damage of any nature not arising from the work to 
be provided by Atwell herein. Notwithstanding 
anything else in this Agreement to the contrary, 
neither party shall be liable to the other for any 
incidental, 
special, 
consequential, 
punitive, 
exemplary, “benefit of the bargain”, or lost profit 
damages.  
16. Indemnification; Limitation on Time Period to 
Bring Claims:  Client  agrees, to the fullest extent 
permitted by law, to indemnify and hold harmless 
Atwell, its managers, members, employees, 
officers, 
agents 
and 
affiliates, 
against 
all 
damages, liabilities or costs, including reasonable 
attorneys' fees and all costs of legal defense, 
arising out of or in any way connected with the 
project or services under the Agreement, 
excepting only those damages, liabilities or costs 
solely and directly caused by  the negligent 
performance  or willful misconduct by Atwell. 
Client agrees, to the fullest extent permitted by 
law, to indemnify and hold harmless Atwell, its 
managers, members, employees, officers, agents 
and affiliates, against all damages, liabilities or 
costs, including reasonable attorneys' fees and all 
costs of legal defense, arising out of or 
attributable to the negligence of Client, its 
successors, employees, agents or invitees. Client 
agrees to indemnify Atwell from claims arising out 
of any certifications which are required to be 
signed on behalf of Client during the course of the 
work contemplated by this Agreement. No action, 
suit or other proceeding shall be instituted against 
Atwell in connection with the work contemplated 
by this Agreement more than one  (1) year after 
the last date of service under this Agreement. 
Atwell agrees to indemnify and hold harmless 
Client, its managers, employees and officers 
against damages, liabilities, or costs, including 
reasonable attorneys’ fees where recoverable by 
law to the extent caused by the negligent 
performance or willful misconduct by Atwell.  
17. Notice of Lien:  Atwell hereby notifies Client that 
Atwell may utilize all available lien rights in 
connection with its provision of services under the 
Agreement. In order to perfect any construction 
lien in favor of Atwell, Client agrees to provide, if 
applicable, any Notice of Commencement or any 
other notice required by the applicable Lien Laws. 
18. Job Site Safety:  Client assumes sole and 
complete responsibility for the safety of all 
persons and property where the work to be 
performed is at Client's site.  In the event that 
Atwell provides a health and safety officer at 
Client's site, Atwell shall be authorized to take any 
and all measures on behalf of Client that in 
Atwell's opinion will maintain generally accepted 
health and safety standards for personnel at the 
site.  Atwell will inform Client of such deficiencies 
relating to the specifications and applicable 
regulations known to Atwell, but Atwell shall not 
be  responsible for the failure of Client or its 
agents to follow the recommendations of Atwell 
personnel. Client waives any claim and all 
damages against Atwell for, and agrees to 
indemnify and hold Atwell harmless from, any 
claim for liability for injury or loss to Client or 
others stemming from such measures, except to 
the extent such claim for injury or loss results from 
the direct negligence of Atwell. 
19. Disclosure of Hazardous Substances and/or 
Conditions:  Client hereby acknowledges that it 
shall be the duty of Client to notify Atwell of any 
known or suspected hazardous substances which 
have or may have been used, stored or disposed 
of on the work site.  This duty shall also apply to 
any hazardous substance with which Atwell may 
be provided or which exists or may exist on or 
near any premises upon which services are to be 
performed by Atwell employees, agents or 
subcontractors. Disclosure and notification to 
Atwell shall be required immediately upon 
discovery of any other hazardous substances or 
upon discovery of increased concentrations of 
previously disclosed substances. All decisions 
related to the disposal of hazardous substances 
shall be made solely by Client, and Atwell shall 
not select the disposal site nor shall Atwell 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 P25004331
 
 
Page 10 of 11         
 
arrange in any other way for the disposal of any 
hazardous substances found on or removed from 
the work site. 
To the extent that the Agreement between Atwell and 
Client includes subsurface activities (including, 
but not limited to, soil borings, well installation or 
test pit excavation), Client shall furnish Atwell with 
diagrams clearly identifying the location and 
boundaries of the site's subsurface structures 
(including, but not limited to, pipes, tanks, cables, 
sewers, and utilities).  Atwell shall not be liable for 
any damage to any subsurface structures or injury 
or loss arising from damage to subsurface 
structures which are incorrectly located or not 
identified on the diagrams provided by Client. 
20. Estimates 
for 
Proposed 
Construction:  
Construction cost estimates, quantity estimates, 
schedules 
and 
any 
earthwork 
quantity 
calculations are estimates only and are calculated 
and provided in good faith by Atwell.  Atwell has 
no control over external  factors, including, but not 
limited to, market conditions and construction 
procedures.  Atwell and Client each acknowledge 
and agree that such estimates may vary from final 
proposals, bids, schedules or actual construction 
costs. 
21. Stamp on Drawings:  Atwell shall not be liable 
for any plans or specifications produced under 
this Agreement until such drawings are stamped 
as 
"approved" 
by 
all 
relevant 
government/municipal agencies and/or building 
department officials. 
22. Dispute Resolution:  Other than as to a dispute 
arising from alleged non-payment, such Dispute 
shall first be submitted to designated authorized 
representatives of the Parties to attempt to reach a 
negotiated resolution. In the event such a 
resolution cannot be reached within a reasonable 
time, at the demand of either Party the matter shall 
be submitted to non-binding mediation using a 
single mediator selected by mutual agreement of 
the parties.  In the event the parties cannot agree 
on a mediator, or in the event the Dispute is not 
resolved within a reasonable time, at the demand 
of either Party the matter shall be submitted to 
binding 
arbitration 
in 
accordance 
with 
the 
Commercial Arbitration Rules of the American 
Arbitration 
Association 
then 
in 
effect 
(the 
"Expedited 
Procedures"); provided, that the 
arbitration shall not be conducted by the American 
Arbitration Association.  The Parties shall select a 
single arbitrator by mutual agreement or, failing 
such agreement, the arbitrator shall be appointed 
by a court of competent jurisdiction sitting in 
Oakland County, Michigan, to which jurisdiction 
and venue the Parties hereby consent. The 
arbitration shall be held in Oakland County, 
Michigan, and the laws applicable to the arbitration 
proceeding shall be the laws of Michigan without 
regard to principles of conflict of laws.  The parties 
agree that the arbitrator shall have all powers 
provided by law and the terms and conditions of 
this Agreement. However, the arbitrator shall have 
no power to vary or modify any of the provisions of 
this Agreement.  Any party to this Agreement may 
bring an action in any court having jurisdiction, 
including a summary or expedited proceeding, to 
specifically enforce this Agreement, and an action 
or motion to compel arbitration may be brought at 
any time, even after a Dispute has been raised in a 
court of law, or after this Agreement has been 
completed, terminated, or paid in full. 
 
Judgment.  The arbitration award rendered by the 
arbitrator shall be final and non-appealable and 
judgment may be entered upon it in accordance 
with the applicable law in any court having 
jurisdiction thereof. 
Costs and Expenses.  Each Party shall bear its own 
costs of Arbitration and shall pay one-half of the 
Arbitrator’s fees and costs. The prevailing party 
shall be entitled to payment by the other Party of 
its actual costs and reasonable attorney fees. 
23. Severability:  If any portions of this Agreement 
shall be, for any reason, invalid or unenforceable, 
the 
remaining 
portion 
or 
portions 
shall 
nevertheless be valid, enforceable and carried 
into effect, and this Agreement shall be construed 
in all respects as if such invalid, void or 
unenforceable provisions were omitted. 
24. Entire Agreement:  The Agreement, including all 
attached 
Exhibits, 
constitutes 
the 
entire 
agreement between the parties with respect to 
their subject matter, and supersedes all prior oral 
or written representations or agreements by the 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

Achen Gardner | Chandler Hall Way Alley Improvements 
CONFIDENTIAL   
05/07/2025  
 P25004331
 
 
Page 11 of 11         
 
parties with respect to the proposed subject 
matter of the Agreement, including Client's 
request for proposal or any purchase order or 
terms and conditions. No subsequent terms, 
conditions, 
understandings, 
or 
agreements 
purporting to modify the terms of the Agreement 
will be binding unless in writing and signed by both 
parties. 
25. Governing Law:  The Agreement shall be 
governed by the laws of the State of Michigan 
without regard to principles of conflict of laws. 
26. Agreement Construction:  Both Parties having 
had an equal opportunity to negotiate the terms of 
this Agreement and to consult with counsel prior 
to execution, neither Party shall be considered the 
drafter of the Agreement and it shall not be 
construed against one Party more than the other. 
27. Notices:  Any notice required or permitted to be 
given under this Agreement shall be in writing, 
and either personally delivered to the other party 
or mailed to the last known current address of the 
other party by certified mail, return receipt 
requested.       
28. Miscellaneous: Notwithstanding Section 25 
above, the parties agree that if the services are 
performed in a state which limits liability, 
including but not limited to, Fla. Stat.§ 
558.0035,  the laws of that state shall govern 
with respect to limiting liability and the Client 
agrees and waives all claims the Client or 
anyone claiming by through or under them, 
may have against an individual design 
professional 
employed 
by 
Atwell 
for 
negligence arising out of the rendering of 
services under this Agreement.  Projects in 
North Carolina are deemed contracted through 
and performed by Atwell, LLC, a Michigan limited 
liability company d/b/a Atwell, PLLC pursuant to 
an Amended Certificate of Authority issued by the 
North Carolina Department of State on July 30, 
2021 under NC COA# P-2380.
 
ACCEPTED BY: 
ATWELL, LLC 
Achen Gardner 
 
By:   
_________________ 
       Signature 
 
Randall R. Hager, PLS 
Director                                                                   
 
By:   
 
 
 
 
 
           Signature 
 
Name:  
 
 
 
 
 
ITS:   
 
 
 
                    
 
 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2

EXHIBIT H 
 
 
 
Project Name: Downtown Alley Improvements (California Street to San Marcos Alleyway) 
Page H-1 
Project No.:CA2206.402 
Rev. 3/19/2024 
 
BUILDERS RISK INSURANCE 
 
 
 
Docusign Envelope ID: 9EC46727-5B91-4B91-8768-8D7161961AE2