B4. TR221_D24618_TCE.PDF

Maricopa County — Formal (2023-09-13)

View PDF Item 71 Meeting page

Extracted text (via pymupdf) 7525 characters
WHEN RECORDED RETURN TO: 
Maricopa County Real Estate Department 
2801 W. Durango Street 
Phoenix, AZ 85009 
EXEMPT A.R.S. § 11-1134, A.2 
lli/SC 
TEMPORARY CONSTRUCTION EASEMENT 
Assessor's Parcel No.: 
Project No.: 
Project Name: 
Item No.: 
304-71-032C
TR221
Ocotillo Road ( 148th Street to Greenfield Road)
D24618 (WJ)
This Temporary Construction Easement is entered into by and between Linda M. Johnson, as 
Surviving Trustee of the PL Johnson Living Trust dated December 4, 2002, hereinafter 
referred to as GRANTOR, the owner of the real property situated in Maricopa County, Arizona, 
which property is set forth in instrument number 2019-0254868 in the official records of Maricopa 
County (the "Burdened Property"), and Maricopa County, a political subdivision of the State of 
Arizona, its assigns and successors in title or interest, hereinafter collectively called GRANTEE. 
GRANTOR hereby grants a Temporary Construction Easement ("TCE"), together with 
the right and privilege of entering upon the area subject to the conditions set forth herein, on, over, 
under and across that portion of the Burdened Property legally described on Exhibit "A" and 
depicted in Exhibit "B" attached hereto (the "Easement Area") for the purpose of facilitating 
construction of the project known as TR221 ("Project"). 
1. 
Term and Consideration. This TCE is hereby granted for the stated purpose for a 
period of twelve (12) months ("Term") which shall commence upon the written notice to the 
Grantor by the Grantee. GRANTEE estimates that the period of time stated above will be 
sufficient for completion of the work within the TCE Area. GRANTEE shall provide written 
notification to GRANTOR of the initiation of construction activities no less than thirty (30) 
calendar days in advance of construction activities. The consideration for the use of the TCE Area 
is One Thousand Five Hundred Thirty-Four and No/100 Dollars ($1,534.00) paid by 
GRANTEE to GRANTOR. This consideration is for the full Term described above. In the event 
GRANTEE determines that additional construction time within the TCE Area is needed for 
completion of the Project, GRANTEE shall be permitted to extend the term of this TCE by 
notifying the GRANTOR in writing and issuing a payment for the additional consideration in the 
amount of $127.83 for each additional month or part thereof for the required extension. 
Page 1 of7

Dated this f\ ....\h. day of_hAittJ-'j---k• 2023. 
Grantor(s): Linda M. Johnson, as Surviving Trustee of the PL Johnson Living Trust dated
Decem her 4, 2002. 
-----'---------=....=...a,:;-=
 
Linda M. Johnson, as Surv· ng Trustee (signature) 
STATE OF Ac,zo.JYh 
COUNTY OF 
('()e,,_1, l l.D'f2'
) 
) ss 
) 
The foregoing instrument was acknowledged before me this i j-\v-. 
day of Au5us..-\ 
2023, by Linda M. Johnson, as Surviving Trustee. 
My Commission Expires 
2 _z«<g,-25 
No 
Notary Stamp Seal 
Page 3 of7

RECOMMENDED FOR APPROVAL: 
Right of Way Agent 
Approved as to form and within the powers 
and authority of the Board of Supervisors 
Deputy County Attorney 
Date 
Right of Way Supervisor 
ACCEPTED: 
Board of Supervisors of Maricopa County 
By: 
Chairman of the Board 
ATTEST: 
Clerk of the Board of Supervisors 
Date 
Page 4 of7 
8/16/2023

EXHIBIT A 
LEGAL DESCRIPTION FOR 
OCOTILLO ROAD IMPROVEMENTS 
APN: 304-71-032C 
TEMPORARY CONSTRUCTION EASEMENT 
A PORTION OF THAT PARCEL OF LAND DESCRIBED IN DOCUMENT NO. 2019-0254867, BEING A PORTION OF THE SOUTHEAST 
QUARTER OF SECTION 16, TOWNSHIP 2 SOUTH, RANGE 6 EAST OF THE GILA AND SALT RIVER MERIDIAN, MARICOPA COUNTY, 
ARIZONA, AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: 
COMMENCING AT AN BRASS CAP FLUSH AT THE SOUTHEAST CORNER OF SAID SECTION 16, FROM WHICH AN ALUMINUM CAP 
FLUSH AT THE SOUTH QUARTER CORNER OF SAID SECTION 16, BEARS SOUTH 88 DEGREES 47 MINUTES 07 SECONDS WEST, 
(BASIS OF BEARINGS) 2,635.21 FEET; 
THENCE ALONG THE SOUTH LINE OF SAID SOUTHEAST QUARTER, SOUTH 88 DEGREES 47 MINUTES 07 SECONDS WEST, 330.57 
FEET; 
THENCE NORTH 1 DEGREES 12 MINUTES 53 SECONDS WEST, 65.00 FEET TO THE POINT OF BEGINNING; 
THENCE ALONG THE NORTH LINE OF THE SOUTH 65.00 FEET OF SAID SOUTHEAST QUARTER, SOUTH 88 DEGREES 47 MINUTES 07 
SECONDS WEST, 151.11 FEET; 
THENCE ALONG THE WEST LINE OF SAID PARCEL, NORTH O DEGREES 09 MINUTES 11 SECONDS EAST, 10.00 FEET; 
THENCE ALONG THE NORTH LINE OF THE SOUTH 75.00 FEET OF SAID SOUTHEAST QUARTER, NORTH 88 DEGREES 47 MINUTES 07 
SECONDS EAST, 151.16 FEET; 
THENCE ALONG THE EAST LINE OF SAID PARCEL, SOUTH O DEGREES 24 MINUTES 01 SECONDS WEST, 10.00 FEET TO THE POINT 
OF BEGINNING. 
CONTAINING AN AREA OF 1,511 SQUARE FEET OR 0.0347 ACRES, MORE OR LESS. 
SUBJECT TO EXISTING RIGHT-OF-WAY AND EASEMENTS. 
TEMPORARY CONSTRUCTION EASEMENT 
EPS Project#: 20-1407 
Town of Gilbert Project No.: ST-0990 
Section:.!§. Township: _g_§_ Range:.§!_ 
Date: 08/08/22 
Page 1 of 3 
Page 5 of 7 
1130 N. Alma School Road, Suite 120 
Mesa, Arizona 85201 
T:480.503.2250 I F:480.503.2258 
www . epsgroupinc . com

EXHIBIT A 
(A) 20' PROPERTY RIGHT,
DOCKET 1753, PAGE 245, M.C.R.
LEGAL DESCRIPTION FOR 
OCOTILLO ROAD IMPROVEMENTS 
APN: 304-71-032C 
TEMPORARY CONSTRUCTION EASEMENT 
I-­
LU 
LU 
0:: 
I-­
en 
:c 
1-
(0 
I.O 
........ 
I 
I 
I 
I 
PL JOHNSON LIVING TRUST
: 
: DOCUMENT 2019-0254867, M.C.R. 
I 
I 
I 
I-
15' ACCESS ESMT
I 
DOCUMENT 2019-254867, M.C.R.
o
T.C.E. 
c:x:
I
o 
0:: 
- - -1::;
- - I- ..,._:;....,,._....,......,......,.-,,j....,.,...- - P.O.B. - - - - -
~ 
------1
-
3: 
U:: 
_? 
 b-
-
-
-
-
:Z: 
L
---
N 

-------
LU 
---
  0C0TILL0 ROAD! \ =
ffi 
y1/4CORNER 
\ z{|;l}N 16, T2S, R6E 
2,304.64' 
_ _: 
330.57' 
;; 
S88°47'07"W 2,635.21' 
P.O.C. 
SOUTHEAST CORNER 
SECTION 16, T2S, R6E 
FOUND ACFL 
LEGEND 
P.O.B.
POINT OF BEGINNING 
P.O.C.
POINT OF COMMENCEMENT 
APN 
ASSESSORS PARCEL NUMBER 
ACFL 
ALUMINUM CAP FLUSH 
M.C.R. 
MARICOPA COUNTY RECORDER
R/W 
RIGHT-OF-WAY 
T.C.E. 
TEMPORARY CONSTRUCTION
EASEMENT 
LINE 
L1 
L2 
PROPOSED TEMPORARY CONSTRUCTION EASEMENT= 1,511 SQ. FT. 0.0347 AC. 
FOUND BCFL 
LINE TABLE 
BEARING 
LENGTH 
N00°09'11"E 
10.00' 
S00°24'01"W 
10.00' 
THIS EXHIBIT IS FOR GRAPHICAL REPRESENTATION ONLY TO BE USED IN CONJUNCTION WITH 
THE ATTACHED LEGAL DESCRIPTION AND DOES NOT CONSTITUTE A BOUNDARY SURVEY. 
NOT TO SCALE 
TEMPORARY CONSTRUCTION EASEMENT 
EPS Project#: 20-1407 
Town of Gilbert Project No.: ST-0990 
Section:A Township:B Range: §1 
Date: 08/08/22 
Page 2 of 3 
Page 6 of 7 
1130 N. Alma School Road, Suite 120 
Mesa, Arizona 85201 
T:480.503.2250 I F:480.503.2258
www. epsgroupinc.com

North: 818090.5289' East: 754258.0455' 
Segment #1 : Line 
Course: S88°47'07"W Length: 151.11' 
North: 818087.3254' East: 754106.9694' 
Segment #2 : Line 
Course: N00°09'11 "E Length: 10.00' 
North: 818097.3254' East: 754106.9961' 
Segment #3 : Line 
Course: N88°47'07"E Length: 151.16' 
North: 818100.5299' East: 754258.1222' 
Segment #4 : Line 
Course: S00°24'01"W Length: 10.00' 
North: 818090.5301' East: 754258.0523' 
Perimeter: 322.28' Area: 1511 Sq. Ft. 
Error Closure: 0.0070 Course: N79°29'47"E 
Error North: 0.00127 East: 0.00684 
Precision 1: 46038.57 
EXHIBIT A 
LEGAL DESCRIPTION FOR 
OCOTILLO ROAD IMPROVEMENTS 
APN: 304-71-032C 
TEMPORARY CONSTRUCTION EASEMENT 
TEMPORARY CONSTRUCTION EASEMENT 
EPS Project#: 20-1407 
Town of Gilbert Project No.: ST-0990 
Section: 1£ Township:> Range:§!. 
Date: 08/08/22 
Page 3 of 3 
Page 7 of 7 
1130 N. Alma School Road, Suite 120 
Mesa, Arizona 85201 
T:480.503.2250 I F:480.503.2258 
www . epsgroupinc .com