Extracted text (via pymupdf)
9512 characters
Page 2 of 4. All other terms and conditions of the Agreement remain unchanged and in full force and effect. If a conflict or ambiguity arises between this Amendment No. 2 and the Agreement, the terms and conditions in this Amendment No. 2 prevail and control. IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. FOR THE CITY FOR THE CONTRACTOR By: _________________________________________ By: _________________________________________ Its: _____________Mayor______________________ Its: _________________________________________ APPROVED AS TO FORM: By: _________________________________________ City Attorney ATTEST: By: _________________________________________ City Clerk Page of EXHIBIT B TO AGREEMENT PRICING EXHIBIT B -PRICE PAGES 1) Water Treatment and Booster Facilities Pump and Process Equipment Sales and Maintenance. This work will take place at the City's Pecos Water Treatment Facility and reservoir / booster stations at various locations throughout the City. This category will Include work on all types of pumps, valves and process equipment common to water treatment and booster station facilities. 2) Wastewater Facilities and Lift Station Pump and Process Equipment Sales and Maintenance. This work will take place at the City's Airport Water Reclamation Facility, Lone Butte Wastewater Facility, Ocotillo Water Reclamation Facility, Lift Stations and Wastewater Facilities at various locations throughout the City. This category will Include work on all types of pumps, valves and process equipment common to wastewater treatment and lift station facilities. 3) Potable Well, Injection Well, Aquifer Storage and Recovery Well (ASR), Monitor Well, and Leachate recovery well pump and Equipment Sales and Maintenance. This work will take place at various well locations throughout the City. This category will Include work on both Lineshaft and Submersible type well pump systems, well maintenance, rehabilitation and repair, as well as work on all types of pumps, valves and process equipment common to potable, ASR and monitor well and leachate recovery facilities. 4) Chandler Reverse Osmosis Plant Pumps and Process Equipment Sales and Maintenance. This work will take place at the City's Reverse Osmosis Facility. This category will Include work on all types of pumps, valves and process equipment common to Industrial reverse osmosis water treatment facilities. 5) Other City Facilities This work will take place at the City's other facilities such as City owned buildings, parks, pools, and street storm water facilities. This category will include work on all types of pumps, motors and equipment common to these facilities. 5) OEM parts and service provider This work can take place in any of the City facilities. This category is for all work to be performed by the authorized representative of the Manufacturer listed in Section 4 below Page of Section 1: Labor Description Unit Cost Unit of Measure 1.1 Electrician - Field $101 Hourly Rate 1.2 Electrician - Shop $101 Hourly Rate 1.3 Laborer - Field $101 Hourly Rate 1.4 Laborer - Shop $101 Hourly Rate 1.5 Machinist - Field $101 Hourly Rate 1.6 Machinist - Shop $101 Hourly Rate 1.7 Mechanic - Field $101 Hourly Rate 1.8 Mechanic - Shop $101 Hourly Rate 1.9 Welder - Field $101 Hourly Rate 1.1 Welder - Shop $101 Hourly Rate 1.11 Operator - Field $101 Hourly Rate 1.12 Supervisor - Field $101 Hourly Rate 1.13 Technician - Field $101 Hourly Rate 1.14 Multiplier for Overtime, Weekend and Holiday Work 1.25 Multiplier 1.15 Well Video Color w/sidescan (Includes Equipment & labor - Written report and 2 copies of DVD) $1,400.00 Cost Per Well Page of Type 1 Equipment, Section 2: Equipment Type 1 Equipment (1 hour Mob, 1 Hour Demob Allowed On This Machiney) Unit Cost Unit of Measure 2.1 Air Compressor (450 CFM & Smaller) $95 Hourly Rate 2.2 Air Compressor (451 CFM & Larger) $125 Hourly Rate 2.3 Dump Truck $55 Hourly Rate 2.4 Pickup Truck $38 Hourly Rate 2.5 Crane Truck $117 Hourly Rate 2.6 Pump Service Truck $63 Hourly Rate 2.7 Water Truck w/ 1 Man $135 Hourly Rate 2.8 Tractor Trailer & Driver $253 Hourly Rate 2.9 Portable Steam Cleaner $45 Hourly Rate 2.1 Portable Welding Machine $55 Hourly Rate 2.11 Concrete Pump $203 Hourly Rate Type 2 Equipment, (2 hour Mob, 2 Hour Demob Allowed On This Machinery) Unit Cost Unit of Measure 2.2-1 Pump Rig, 5 ton - 12 ton $69 Hourly Rate 2.2-2 Pump Rig, 13 -29 ton $82 Hourly Rate 2.2-3 Pump Rig, 30 - 49 ton & Larger with Walking Beam $82 Hourly Rate 2.2-4 Pump Rig, 30 - 49 ton & Larger $82 Hourly Rate Page of 2.2-5 Pump Rig, 50 ton & larger with Walking Beam $107 Hourly Rate 2.2-6 Pump Rig, 50 ton & larger $107 Hourly Rate 2.2-7 Backhoe $75 Hourly Rate 2.2-8 Skip Loader $75 Hourly Rate Type 3 Equipment(Mob / Demob for each Item Includes both setup and tear down) Unit Cost Unit of Measure 2.3-1 Cable Tool Drill Rig (20W or 22W) N/A Hourly Rate 2.3-2 Cable Tool Drill Rig (20W or 22W) Mob / Demob N/A Lump Sum 2.3-3 Cable Tool Drill Rig (28L or 60L) N/A Hourly Rate 2.3-4 Cable Tool Drill Rig (28L or 60L) Mob / Demob N/A Lump Sum 2.3-5 Cable Tool Drill Rig (36L or 48L) N/A Hourly Rate 2.3-6 Cable Tool Drill Rig (36L or 48L) Mob / Demob N/A Lump Sum 2.3-7 Test Pump Assembly (0-100 gpm) $150 Hourly Rate 2.3-8 Test Pump Assembly (0-100 gpm) Mob / Demob $9,510 Lump Sum 2.3-9 Test Pump Assembly (101-500 gpm) $225 Hourly Rate 2.3-10 Test Pump Assembly (101-500 gpm) Mob / Demob $9,510 Lump Sum 2.3-11 Test Pump Assembly (1501-2500 gpm) $275 Hourly Rate 2.3-12 Test Pump Assembly (1501-2500 gpm) Mob / Demob $9,510 Lump Sum 2.3-13 Test Pump Assembly (501-1500 gpm) $250 Hourly Rate 2.3-14 Test Pump Assembly (501-1500 gpm) Mob / Demob 9,510.00 Lump Sum 2.3-15 Test Pump Engine & Fuel (300 HP & Below) $37 Hourly Rate 2.3-16 Test Pump Engine & Fuel (300 HP & Below) Mob / Demob $3,250 Lump Sum Page of 2.3-17 Test Pump Engine & Fuel (301 HP through 500 HP) $307 Hourly Rate 2.3-18 Test Pump Engine & Fuel (301 HP through 500 HP) Mob / Demob $3,250 Lump Sum 2.3-19 Test Pump Engine & Fuel (501 HP through 750 HP) $315 Hourly Rate 2.3-20 Test Pump Engine & Fuel (501 HP through 750 HP) Mob / Demob $3,250 Lump Sum 2.3-21 Test Pump Operator & Fuel (751 HP through 1,000 HP) $182 Hourly Rate 2.3-22 Test Pump Operator & Fuel (751 HP through 1,000 HP) Mob / Demob $91 Lump Sum Type 5, Special Contractor Owned Equipment/Tool Rental. (Contractor to add description of Specialized Contractor Owned Equipment not listed above.) Unit Cost Unit of Measure 2.4-1 N/A Hourly Rate 2.4-2 N/A Per Day 2.4-3 N/A Hourly Rate 2.4-4 N/A Hourly Rate 2.4-5 N/A Hourly Rate 2.4-6 N/A Hourly Rate 2.4-7 N/A Hourly Rate 2.4-8 N/A Hourly Rate 2.4-9 N/A Hourly Rate Page of 2.4-10 N/A Hourly Rate Section 3: Contractor / Non OEM Parts and Equipment Type 1 Contractor Parts / Equipment Markups Mark Up Example: (15% Markup = Cost x 1.15) 3.1 Parts Markup for Items with an invoiced cost less than $9,999 / Ea 25% 3.2 Parts Markup for Items with invoiced cost of greater than $10,000 / Ea 25% 3.3 Subcontractor Markup 25% 3.4 Rental Equipment Markup 25% Section 4, OEM Parts and Equipment Catalog Date and title % Discount From List Price BLOWERS 4.1 Gardner Denver N/A % 4.2 Kaeser Co-Pak Pluss N/A % 4.3 Ingersoll Rand N/A % 4.4 Roots Rotary Lobe Blower N/A % 4.5 HIS/Atlas Copco N/A % 4.6 United Blower N/A % 4.7 Spencer N/A % PUMPS 4.8 Flygt Submersible Pumps N/A % 4.9 Grundfos Pumps 15% % 4.10 Simflo Pumps 15% % 4.1 Goulds Pumps 15% % 4.12 Fairbanks Morse Pumps N/A % 4.13 Gorman Rupp N/A % 4.14 Wemco N/A % Page of 4.15 Peerless N/A % 4.16 Paco Pumps N/A % 4.17 Flowserve Pumps 15% % 4.18 Vanton Pump N/A % MOTORS 4.19 G.E. 15% % 4.20 U.S. 15% % 4.21 Baldor N/A % 4.22 Toshiba N/A % 4.23 TECO/Westinghouse N/A % 4.24 WEG N/A % CLARIFIERS 4.25 EIMCO Claifier OEM Parts N/A % 4.26 Walker N/A CHEMICAL METERING PUMPS 4.27 Milton Roy N/A % 4.28 Wallace and Teirnan (US Filter) N/A % 4.29 Prominent N/A % 4.30 Alldos N/A % 4.31 Seepex N/A % 4.32 Moyno N/A % 4.33 Brendal Hose Pumps N/A % 4.44 Wanner Engineering/Hydra cell N/A % 4.35 UGSI N/A % 4.36 Pulsefeeders N/A % SCRUBBERS, EXHAUST FANS, VAPEX UNITS 4.37 US Filter N/A % 4.38 Vapex N/A % DEWATERING EQUIPMENT-BELT FILTER PRESSES, SLUDGE THICKENERS, PACKAGED POLYMER SYSTEMS 4.39 Ashbrooke Simon-Hartley N/A % VALVES & ACTUATORS Page of 4.40 Cla-Val N/A % 4.41 DeZurick Valves N/A % 4.42 Watts N/A % 4.43 Keystone N/A % 4.44 Techno N/A % 4.45 Vaimen N/A % 4.46 Baski N/A % 4.47 Indelac actuators N/A % 4.48 Koei actuators N/A % 4.49 Auma N/A % 4.50 Rotork N/A % 4.51 EIM N/A % MIXERS 4.52 Philidelphia Mixers N/A % 4.53 Lightnin N/A % WATER FILTERS 4.54 Tekleen N/A % ELECTRICAL CONTROLS 4.55 Allen Bradley N/A % 4.56 Modicon/Schneider Electric PLC N/A % Applicable Tax Rate Work done in Chandler: _____% All other Phoenix Rate _______% %