Amendment No. 2 - DXP Hennesy

City of Chandler — Study Session (2025-08-11)

View PDF Meeting page

Extracted text (via pymupdf) 12444 characters
Page 1 of 12
City Clerk Document No. 
City Council Meeting Date:
August 14, 2025
AMENDMENT TO CITY OF CHANDLER AGREEMENT
WATER AND WASTEWATER EQUIPMENT MAINTENANCE AND REPAIR SERVICES
CITY OF CHANDLER AGREEMENT NO. PW2-936-4357
THIS AMENDMENT NO. 2 (Amendment No. 2) is made and entered into by and between the City of 
Chandler, an Arizona municipal corporation (City), and DXP Enterprises, Inc. dba Hennesy Mechanical 
Sales, (Contractor), (City and Contractor may individually be referred to as Party and collectively 
referred to as Parties) and made 
____________, 2025 (Effective Date).
RECITALS
WHEREAS, City Council approved the award of multiple Agreements for water and wastewater 
equipment maintenance and repair services (Agreement); and
WHEREAS, the term of the Agreement was September 1, 2021, through August 31, 2023, with the 
option of up to two additional two-year extensions; and
WHEREAS, the City wishes to extend the term of the multiple Agreements for water and wastewater 
equipment maintenance and repair services in an amount not to exceed $11,986,000 for the 
extension term; and
WHEREAS, the Parties wish to exercise the second option through this Amendment No. 2 to extend 
the Agreement for two years.
AGREEMENT
NOW THEREFORE, the Parties agree as follows:
1.
The recitals are accurate and are incorporated and made a part of the Agreement by this 
reference.   
2.
Section III, Period of Service is amended to read as follows:  The term of the Agreement is 
extended for a two-year period September 1, 2025, through August 31, 2027.
3.
Section IV, Payment of Compensation and Fees is amended to read as follows: The City will pay 
the Contractor the per unit cost set forth in Revised Exhibit B of the original Agreement, 
attached to and made a part of this Amendment No. 2. Total payments made to the Contractor 
during the term of this Amendment No. 2 will not exceed $11,986,000.

Page 2 of 12 
4.
All other terms and conditions of the Agreement remain unchanged and in full force and
effect. If a conflict or ambiguity arises between this Amendment No. 2 and the Agreement, the
terms and conditions in this Amendment No. 2 prevail and control.
IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. 
FOR THE CITY
FOR THE CONTRACTOR
By: _________________________________________
By: _________________________________________
Its: _____________Mayor______________________
Its: _________________________________________
APPROVED AS TO FORM:
By: _________________________________________ 
City Attorney 
ATTEST: 
By: _________________________________________ 
City Clerk

Page 3 of 12 
 
EXHIBIT B TO AGREEMENT 
PRICING 
 
 
EXHIBIT B -PRICE PAGES 
  
1)  Water Treatment and Booster 
Facilities Pump and Process 
Equipment Sales and Maintenance. 
This work will take place at the City's Pecos Water Treatment Facility and reservoir / booster stations at 
various locations throughout the City.  This category will Include work on all types of pumps, valves and 
process equipment common to water treatment and booster station facilities. 
  
2) Wastewater Facilities and Lift 
Station Pump and Process 
Equipment Sales and 
Maintenance.  
This work will take place at the City's Airport Water Reclamation Facility, Lone Butte Wastewater Facility, 
Ocotillo Water Reclamation Facility, Lift Stations and Wastewater Facilities at various locations 
throughout the City. This category will Include work on all types of pumps, valves and process 
equipment common to wastewater treatment and lift station facilities. 
  
3) Potable Well,  Injection Well, 
Aquifer Storage and Recovery Well 
(ASR), Monitor Well, and Leachate 
recovery well pump and 
Equipment Sales and 
Maintenance. 
This work will take place at various well locations throughout the City.  This category will Include work on 
both Lineshaft and Submersible type well pump systems, well maintenance, rehabilitation and repair, as 
well as work on all types of pumps, valves and process equipment common to potable, ASR and monitor 
well and leachate recovery facilities.
  
4) Chandler Reverse Osmosis 
Plant Pumps and Process 
Equipment Sales and 
Maintenance. 
This work will take place at the City's Reverse Osmosis Facility.  This category will Include work on all 
types of pumps, valves and process equipment common to Industrial reverse osmosis water treatment 
facilities. 
  
5) Other City Facilities 
This work will take place at the City's other facilities such as City owned buildings, parks, pools, and 
street storm water facilities.  This category will include work on all types of pumps, motors and 
equipment common to these facilities. 
  
5) OEM parts and service provider 
This work can take place in any of the City facilities.  This category is for all work to be performed by the 
authorized representative of the Manufacturer listed in Section 4 below

Page 4 of 12 
 
  
  
Section 1: Labor  
  
Description
Unit Cost
Unit 
of 
Meas
ure
1.1 
Electrician - Field 
$160 
Hourly 
Rate  
1.2
Electrician  - Shop
$160 
Hourly 
Rate  
1.3 
Laborer  - Field 
$160 
Hourly 
Rate  
1.4
Laborer - Shop
$160
Hourly 
Rate 
1.5 
Machinist - Field 
$160 
Hourly 
Rate  
1.6 
Machinist - Shop 
$160 
Hourly 
Rate  
1.7 
Mechanic - Field 
$160 
Hourly 
Rate  
1.8 
Mechanic - Shop 
$160 
Hourly 
Rate  
1.9 
Welder - Field 
$160 
Hourly 
Rate  
1.1 
Welder - Shop 
$160 
Hourly 
Rate  
1.11 
Operator - Field 
$160 
Hourly 
Rate  
1.12 
Supervisor - Field 
$175 
Hourly 
Rate  
1.13 
Technician - Field 
$175 
Hourly 
Rate  
1.14 
Multiplier for Overtime, Weekend 
and Holiday Work  
1.5 
Multipl
ier 
1.15 
Well Video Color w/sidescan 
(Includes Equipment & labor - 
N/A 
Cost 
Per

Page 5 of 12 
 
Written report and 2 copies of 
DVD) 
Well 
  
  
  
 
 
 
 
  
  
Type 1 Equipment, Section 2: Equipment 
  
Type 1 
Equipme
nt 
(1 hour Mob, 1 Hour Demob 
Allowed On This Machinery) 
Unit Cost 
Unit 
of 
Meas
ure 
2.1 
Air Compressor (450 CFM & 
Smaller) 
N/A 
Hourly 
Rate  
2.2 
Air Compressor (451 CFM & 
Larger) 
N/A 
Hourly 
Rate  
2.3 
Dump Truck 
N/A 
Hourly 
Rate  
2.4 
Pickup Truck 
$55 
Hourly 
Rate  
2.5 
Crane Truck 
$400 
Hourly 
Rate  
2.6 
Pump Service Truck 
$100 
Hourly 
Rate  
2.7 
Water Truck w/ 1 Man 
N/A 
Hourly 
Rate  
2.8 
Tractor Trailer & Driver 
$200 
Hourly 
Rate  
2.9 
Portable Steam Cleaner 
$50 
Hourly 
Rate  
2.1 
Portable Welding Machine 
$50 
Hourly 
Rate  
2.11 
Concrete Pump 
N/A 
Hourly 
Rate

Page 6 of 12 
 
  
Type 2 Equipment, (2 hour Mob, 
2 Hour Demob Allowed On This 
Machinery) 
Unit Cost 
Unit 
of 
Meas
ure 
2.2-1 
Pump Rig, 5 ton - 12 ton 
N/A 
Hourly 
Rate 
2.2-2 
Pump Rig, 13 -29 ton 
N/A 
Hourly 
Rate 
2.2-3 
Pump Rig, 30 - 49 ton & Larger 
with Walking Beam 
N/A 
Hourly 
Rate 
2.2-4 
Pump Rig, 30 - 49 ton & Larger 
N/A 
Hourly 
Rate 
2.2-5 
Pump Rig, 50 ton & larger with 
Walking Beam 
N/A 
Hourly 
Rate 
2.2-6 
Pump Rig, 50 ton & larger 
N/A 
Hourly 
Rate 
2.2-7 
Backhoe 
N/A 
Hourly 
Rate 
2.2-8 
Skip Loader 
N/A 
Hourly 
Rate 
  
  
  
  
  
Type 3 Equipment(Mob / Demob 
for each Item Includes both 
setup and tear down) 
Unit Cost 
Unit 
of 
Meas
ure 
2.3-1 
Cable Tool Drill Rig (20W or 22W) 
N/A 
Hourly 
Rate 
2.3-2 
Cable Tool Drill Rig (20W or 22W) 
Mob / Demob 
N/A 
Lump 
Sum 
2.3-3 
Cable Tool Drill Rig (28L or 60L) 
N/A 
Hourly 
Rate 
2.3-4 
Cable Tool Drill Rig (28L or 60L) 
Mob / Demob 
N/A 
Lump 
Sum 
2.3-5 
Cable Tool Drill Rig (36L or 48L) 
N/A 
Hourly 
Rate 
2.3-6 
Cable Tool Drill Rig (36L or 48L) 
Mob / Demob 
N/A 
Lump 
Sum

Page 7 of 12 
 
2.3-7 
Test Pump Assembly (0-100 gpm)  
N/A 
Hourly 
Rate 
2.3-8 
Test Pump Assembly (0-100 gpm) 
Mob / Demob 
N/A 
Lump 
Sum 
2.3-9 
Test Pump Assembly (101-500 
gpm) 
N/A 
Hourly 
Rate 
2.3-10 
Test Pump Assembly (101-500 
gpm) Mob / Demob 
N/A 
Lump 
Sum 
2.3-11 
Test Pump Assembly (1501-2500 
gpm) 
N/A 
Hourly 
Rate 
2.3-12 
Test Pump Assembly (1501-2500 
gpm) Mob / Demob 
N/A 
Lump 
Sum 
2.3-13 
Test Pump Assembly (501-1500 
gpm) 
N/A 
Hourly 
Rate 
2.3-14 
Test Pump Assembly (501-1500 
gpm) Mob / Demob 
N/A 
Lump 
Sum 
2.3-15 
Test Pump Engine & Fuel (300 HP 
& Below) 
N/A 
Hourly 
Rate 
2.3-16 
Test Pump Engine & Fuel (300 HP 
& Below) Mob / Demob 
N/A 
Lump 
Sum 
2.3-17 
Test Pump Engine & Fuel (301 HP 
through 500 HP) 
N/A 
Hourly 
Rate 
2.3-18 
Test Pump Engine & Fuel (301 HP 
through 500 HP) Mob / Demob 
N/A 
Lump 
Sum 
2.3-19 
Test Pump Engine & Fuel (501 HP 
through 750 HP) 
N/A 
Hourly 
Rate 
2.3-20 
Test Pump Engine & Fuel (501 HP 
through 750 HP) Mob / Demob 
N/A 
Lump 
Sum 
2.3-21 
Test Pump Operator & Fuel (751 
HP through 1,000 HP) 
N/A 
Hourly 
Rate 
2.3-22 
Test Pump Operator & Fuel (751 
HP through 1,000 HP) Mob / 
Demob 
N/A 
Lump 
Sum

Page 8 of 12 
 
  
Type 5, Special Contractor 
Owned Equipment/Tool Rental. 
(Contractor to add description 
of Specialized Contractor 
Owned Equipment not listed 
above.) 
Unit Cost 
Unit 
of 
Meas
ure 
2.4-1 
 Vibration Analyzer 
$50 
Hourly 
Rate 
2.4-2 
 Alignment Equipment 
$125/hour + man hour rate 
Per 
Day 
2.4-3 
  
We Add these cost to hourly rates 
Hourly 
Rate 
2.4-4 
  
Hourly 
Rate 
2.4-5 
  
Hourly 
Rate 
2.4-6 
  
Hourly 
Rate 
2.4-7 
  
Hourly 
Rate 
2.4-8 
  
Hourly 
Rate 
2.4-9 
  
Hourly 
Rate 
2.4-10 
  
Hourly 
Rate 
  
  
  
  
  
Section 3: Contractor / Non OEM 
Parts and Equipment 
  
  
Type 1  
Contractor Parts / Equipment 
Markups 
Mark Up Example: (15% Markup = Cost x 1.15) 
  
3.1 
Parts Markup for Items with an 
invoiced cost less than $9,999 / Ea 
30% 
  
3.2 
Parts Markup for Items with 
invoiced cost of greater than 
$10,000 / Ea 
25%

Page 9 of 12 
 
3.3 
Subcontractor Markup 
25% 
  
3.4 
Rental Equipment Markup 
20% 
  
  
  
  
  
  
Section 4, OEM Parts and 
Equipment 
Catalog Date and title 
% 
Disco
unt 
From 
List 
Price 
  
BLOWERS 
  
  
4.1 
Gardner Denver 
N/A 
% 
4.2 
Kaeser Co-Pak Pluss 
N/A 
% 
4.3 
Ingersoll Rand 
N/A 
% 
4.4 
Roots Rotary Lobe Blower 
N/A 
% 
4.5 
HIS/Atlas Copco 
N/A 
% 
4.6 
United Blower 
No Price list. Cost divided by .65 (or 35%) 
% 
4.7 
Spencer 
N/A 
% 
  
PUMPS 
  
  
4.8
Flygt Submersible Pumps
N/A 
%
4.9 
Grundfos Pumps 
N/A 
% 
4.10 
Simflo Pumps 
N/A 
% 
4.1 
Goulds Pumps 
N/A 
% 
4.12 
Fairbanks Morse Pumps 
No Price list. Cost divided by .65 (or 35%) 
                                                                           
 
% 
4.13 
Gorman Rupp 
N/A 
% 
4.14 
Wemco 
No Price list. Cost divided by .65 (or 35%) 
 
% 
4.15 
Peerless 
N/A 
% 
4.16 
Paco Pumps 
N/A 
% 
4.17 
Flowserve Pumps 
N/A 
% 
4.18 
Vanton Pump 
N/A 
% 
  
MOTORS 
  
  
4.19 
G.E. 
N/A 
%

Page 10 of 12 
 
4.20 
U.S. 
N/A 
% 
4.21 
Baldor 
N/A 
% 
4.22 
Toshiba 
N/A 
% 
4.23 
TECO/Westinghouse 
N/A 
% 
4.24 
WEG 
N/A 
% 
  
CLARIFIERS 
  
  
4.25 
EIMCO Claifier OEM Parts 
N/A 
% 
4.26 
Walker 
N/A 
  
  
CHEMICAL METERING PUMPS 
  
  
4.27 
Milton Roy 
No Price list. Cost divided by .65 (or 35%) 
 
% 
4.28 
Wallace and Tiernan (US Filter) 
ENCORE 
No Price list. Cost divided by .65 (or 35%) 
 
% 
4.29 
Prominent 
N/A 
% 
4.30
Alldos
N/A
%
4.31 
Seepex 
N/A 
% 
4.32 
Moyno 
No Price list. Cost divided by .65 (or 35%) 
 
% 
4.33 
Brendal Hose Pumps 
N/A 
% 
4.44 
Wanner Engineering/Hydra cell 
N/A 
% 
4.35 
UGSI (Cleanwater1) 
No Price list. Cost divided by .65 (or 35%) 
 
% 
4.36 
Pulsefeeders 
N/A  
% 
  
SCRUBBERS, EXHAUST FANS, 
VAPEX UNITS  
  
  
4.37 
US Filter 
N/A 
% 
4.38 
Vapex 
N/A 
% 
  
DEWATERING EQUIPMENT-BELT 
FILTER PRESSES, SLUDGE 
THICKENERS, PACKAGED 
POLYMER SYSTEMS  
  
  
4.39 
Ashbrooke Simon-Hartley 
N/A 
% 
  
VALVES & ACTUATORS

Page 11 of 12 
 
4.40 
Cla-Val 
N/A 
% 
4.41 
DeZurick Valves 
N/A 
% 
4.42 
Watts 
N/A 
% 
4.43 
Keystone 
N/A 
% 
4.44 
Techno 
N/A 
% 
4.45 
Vaimen 
N/A 
% 
4.46 
Baski 
N/A 
% 
4.47 
Indelac actuators 
N/A 
% 
4.48 
Koei actuators 
N/A 
% 
4.49
Auma
N/A
%
4.50 
Rotork 
N/A 
% 
4.51 
EIM 
N/A 
% 
  
MIXERS 
  
  
4.52 
Philadelphia Mixers SPX 
List price plus 25%. Use List X 25% 
% 
4.53 
Lightnin SPX 
List price plus 25%. Use List X 25% 
% 
  
WATER FILTERS 
  
  
4.54 
Tekleen 
List price plus 25%.  Use List X 25% 
% 
  
ELECTRICAL CONTROLS 
  
  
4.55 
Allen Bradley 
N/A 
% 
4.56 
Modicon/Schneider Electric PLC 
N/A 
% 
  
DeNora Products,Clortech and 
Bayoxide E33 Media, Tetra Filters, 
Encore Pumps, Toshiba Magnetic 
flow & density meters 
 
No List Pricing. Cost is Net divided by .65 = Sell price.

Page 12 of 12