PROJECT PURPOSE AND
OBJECTIVES
•
MAG Design Assistance Study
•
Evaluate 10-ft wide, concrete
shared use path alignment
alternatives
•
Evaluate crossing improvements
at Riggs Road, 116th Street,
UPRR, and Elmhurst Drive
•
Final deliverable – Project
Assessment Report and
Preliminary (15%) Plans
PROJECT LOCATION
•
Along the SRP Consolidated
Canal between Riggs Road and
Hunt Highway

NEED FOR THE PROJECT
•
Existing Paseo Trail system runs
through Chandler, Gilbert, and Mesa
•
Provides connectivity to Heritage
Trail, Western Canal Path, Frye Road
protected bike lanes, and existing
bike lanes on nine arterial streets
•
Final segment of an overall 9.2-mile
bicycle and pedestrian corridor

SHARED USE PATH
ALIGNMENT ALTERNATIVES
•
Evaluated two overall pathway
alignment alternatives
•
Divided alternatives into four
distinct segments
1.
Riggs to AZ Ave
2.
AZ Ave to Hunt
3.
Riggs to UPRR/Path Xing
4.
UPRR/Path Xing to Hunt
•
Identified advantages/
disadvantages for each

ADVANTAGES
•
Direct connection to Chandler Paseo Trail
•
Maximizing improvements within City owned
parcels
•
Leveraging familiarity of path users with
existing route
•
Taking advantage of adjacent open space
DISADVANTAGES
•
UPRR crossing improvement approval process
•
UPRR right-of-way agreement
•
Avoiding existing overhead power
•
Terminating at a complicated intersection

CROSSING ALTERNATIVES – RIGGS ROAD
Pedestrian Hybrid Beacon
Pedestrian Signal

CROSSING ALTERNATIVES – 116th STREET
High-Vis Sidewalk & RRFBs
Raised Sidewalk & RRFBs
Raised Sidewalk
High-Vis Sidewalk

CROSSING ALTERNATIVES – ELMHURST DRIVE
High-Vis Sidewalk
High-Vis Sidewalk & Detectable Edge

CROSSING ALTERNATIVES MATRIX – RIGGS ROAD

CROSSING ALTERNATIVES MATRIX – 116TH STREET

PREFERRED PATH ALIGNMENT
•
Direct connection to
Chandler Paseo Trail
•
Maximizing improvements
within City owned
parcels/minimizing need for
SRP agreement
•
Terminates at City owned
parcels on AZ Ave for future
trailhead and parking
•
Leveraging familiarity of path
users with existing route
•
Taking advantage of
adjacent open space along
UPRR right-of-way
•
Creates future opportunity
for looped system

PREFERRED RIGGS ROAD CROSSING
•
Higher driver compliance compared to PHB
•
Illuminates crossing at night
•
Improves safety for trail users
•
Increases likelihood of pedestrians and
bicyclists continuing trail to the south
•
Consistent with other signalized arterial
crossings along the Paseo Trail

PREFERRED 116th STREET CROSSING
•
Maricopa County preferred alternative
•
Visually notifies drivers of trail crossing
(day/night)
•
Encourages trail use with safer crossing
Note: Based on the preferred path
alignment, no crossing improvements will
be proposed for Elmhurst Drive

PROJECT SCHEDULE
•
Task 1: Project Kick-off Meeting and Scope of Work: 04/10/2025
•
Task 2: Stakeholder Matrix and Meeting Schedule – 05/28/2025
•
Task 2: Data Collection Memorandum – 06/04/2025
•
Task 3: Data Analysis Technical Memorandum – 07/14/2025
•
Task 4: Draft Project Assessment Report and Preliminary (15%) Plans – 09/04/2025
•
Task 5: Final Project Assessment Report and Preiminary (15%) Plans – targeting October 2025
•
Task 6: Executive Summary and Regional Significance Report – targeting November 2025
STAKEHOLDER OUTREACH/PROJECT MEETINGS
•
Project Kick-off Meeting – 04/03/2025
•
Path Alignment & Crossing Alternatives Review Meeting – 07/14/2025
•
City of Chandler-Maricopa County Stakeholder Meeting – 07/31/2025
•
Transportation Commission Meeting – 09/17/2025
•
Public Outreach – Public survey for public comment/feedback (at completion of PA)