September 2025 Project Status Update
Extracted text (via pymupdf)
5015 characters
ROADWAY AND TRAFFIC PROJECTS Designer Contractor Status Comments PROJECT COST ESTIMATE ($MILLIONS) ST1614 Chandler Heights Road Improv. [McQueen Road to Gilbert Road for two through lanes each direction] Kimley-Horn Granite Construction Co Project is in closeout Federal Funds $20.90 ST1804 Chandler Heights Road Improv. [Gilbert Road to Val Vista Drive for two through lanes each direction] Kimley-Horn Sunland Asphalt Construction is underway. Federal Funds $9.80 ST2001 Lindsay Road Improv. [Ocotillo Road to Hunt Highway for two through lanes in each direction] Kimley-Horn tbd Project is currently out to bid. Federal Funds $27.20 ST2007 Hamilton Street Improv. [Appleby Road to Carob Drive] Nfra Consultants Redpoint Project is in closeout Federal Funds $5.20 ST2103 Intersection Improv. at Ray Road and Dobson Road Kimley Horn tbd Design is currently at 95%. Project needs ROW, and anticiaptes going out to bid Fall 2026. Grant funds & local funds $11.85 ST2301 Armstrong Way and Hamilton Street Improvement (Improves the south half of Armstrong Way and the west half of Hamilton Street) EPS Group, Inc. tbd Design underway. Construction tentatively scheduled Winter 2025. Local Funds $2.00 ST2303 Cooper Road - Insight Loop Extension (Connects Cooper Road to Insight Way & Emmett Dr intersection) Aztec tbd Design is currently at 90%. Project needs ROW, and anticiaptes going out to bid Summer 2026. Local Funds $9.30 ST2309 Alma School Road Germann Rd to Queen Creek Rd (widening Alma School Road from Germann Road tro Queen Creek Road) Olsson Associates tbd Design is currently ot 90%. Construction tentatively scheduled for bid in Fall 2025. Local Funds $11.30 ST2310 Alley Rehab PM10 Dust Emissions Reduction Phase 3 (FMA Areas 6, 24, 26, 27) Premier / Olsson tbd Design is at 100%. Federal Funds availlable in October 2025. Federally Funded $3.50 ST2403 McQueen Road Improvements - Warner Road to Pecos Road Study (Study to widen McQueen Road in three phases from Warner Road to Pecos Road) Kimley-Horn and Associates NA Design Study only Study is Locally Funded, Project will be Federally Funded and Design starts in FY 27-28 $84.00 ST2503 Kyrene Road Improvements - (Loop 202 to Chadnler Blvd) (Widening Kyrene Road from the Loop 202 Santan to Chandler Blvd including the intersection) tbd tbd Preparing for Design phase Federal Funds (RARF ALCP) $45.00 ST2504 Arizona Avenue and Warner Road Intersection Improvement tbd tbd Preparign for Design phase Local Funds $1.50 ST2603 Warner Road (Price Rd to Arizona Avenue) Study (Study to widen Warner Road in three phases from Price Road to Arizona Avenue) tbd NA Design study only Local Funds $14.00 ST2604 Chandler Boulevard Roadway Improvements (Price Road to Dobson Road) - Mill and Overlay tbd tbd Preparing for Design phase Federal Funded $6.30 ST2404 Willis Rd Improvement (Vine St to 1600 ft east) Strand tbd Design is at 95%. Project needs ROW, ancipates going out to bid Summer 2026. Local Funds $3.00 PR2106 Ryan Rd Improvements (RR xing to McQueen Rd) - Tumbleweed Park Diamond Field Complex Huitt-Zollars Hunter Design is approaching 60%. GMP3 will include roadway construction anticipated for Summer 2026. Local Funds $6.00 PEDESTRIAN, BICYCLE, AND TRANSIT PROJECTS Designer Contractor Status Comments PROJECT COST ESTIMATE ST2106 Frye Road Protected Bike Lanes [Paseo Trail to San Marcos Elementary School] TY Lin Granite Construction Co Construction underway. $13.5 Million grant awarded for construction and $650,000 for design. $14.00 TP2202 Kyrene Branch and Highline Canal Shared Use Paths Kimley-Horn tbd 95% Design. Right-of-Way in Process. Construction in early 2026. Federal grants have been awarded to fund study, design and construction. $4.50 Ashley and Paseo Trails Connection Y2K Engineering tbd Study completed by Y2K. 95% Design. Right-of-Way in Process. Construction in early 2026. Study was federally funded. Construction and design are locally funded. $1.00 Paseo Trail Riggs Road Crossing Kimley Horn tbd Study to develop preliminary design for a Paseo Trail crossing of Riggs Road and construction of the path between Riggs Road and Hunt Highway. Awarded $60,000 federal grant for study. $0.06 Roadway Safety Action Plan tbd tbd Comprehensive study to analyze safety for all road users and develop recommentations. Awarded $560,000 Safe Streets for All grant to complete study (with 20% local match). $0.70 Chandler Flex NA Via Completed Airpark Area Flexible Transit Study. Began minor implementation of study recommendations through a two square-mile expansion between Arizona Ave. and McQueen Rd. and Queen Creek Rd. and Chandler Height Rd. and opened the school-only zone (north of Chandler Blvd.) to all trip types. Awarded $2 Million grant for project startup and two years of operations. Awarded $1 Million congressionally-directed spending grant to continue operations. $1.3 Annually Transportation Project Status - September 2025