Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page 1
Project No.: WA2408.401
Rev. 1/16/2024
CITY OF CHANDLER
JOB ORDER PROJECT AGREEMENT
Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Project No. WA2408.401
Council Date: October 16, 2025
This JOB ORDER PROJECT AGREEMENT (”Job Order”) is made this _____ day of _____________ 2025,
(“Effective Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”)
and MGC Contractors, Inc., an Arizona corporation, (“JOC Contractor”) and is entered into
pursuant to Job Order Master Agreement No. JOC2411.401 (“JOC Master Agreement”). City and
JOC Contractor may be referred to individually as “Party” or collectively as “Parties”).
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as
follows:
RECITALS
A. On or about March 1, 2024, the Parties entered into the JOC Master Agreement, which terms
and conditions are made a part of and incorporated into this Job Order Project Agreement by this
reference.
B. City proposes to engage JOC Contractor for construction services as more fully described in
Exhibit "A", which is attached to and made a part of this Job Order by this reference.
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to and
made a part of this Agreement by this reference.
ARTICLE 1. DESCRIPTION OF WORK
The Parties enter into this Job Order Project Agreement for the Brooks Crossing Water Production
Facility Pressure Reducing Valve Addition, Project Number WA2408.401. The scope of work
consists of installation of a pressure reducing valve addition at the Brooks Crossing Water
Production Facility, all as more particularly set forth in Exhibit “A” attached hereto and
incorporated herein by reference.
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page 2
Project No.: WA2408.401
Rev. 1/16/2024
The JOC Contractor will not accept any change of scope, or change in Agreement provisions, unless
issued in writing, as a Agreement amendment or change order and signed by the authorized
signatories for each party.
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached
hereto and incorporated herein by reference, will be due prior to execution of each Job Order
Project Agreement in the full amount of each Job Order.
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement
of Claims and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively
attached hereto and incorporated herein by reference.
ARTICLE 2. PROJECT PRICE
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master
Agreement a fee not to exceed the Guaranteed Maximum Price of $960,686.14 Dollars
determined and payable as set forth in JOC Master Agreement and Exhibit “B” attached hereto
and made a part hereof by reference.
ARTICLE 3. AGREEMENT TIME & SCHEDULE
JOC Contractor agrees to complete all Construction within 100 calendar days from the Notice to
Proceed (NTP) Date.
ARTICLE 4. JOB ORDER CONTACTS
The following parties serve in the capacity below for this Job Order Project.
CITY:
Construction Project Manager: Adam Kleiser
Phone: 480-782-3325
Email: adam.kleiser@chandleraz.gov
JOC CONTRACTOR:
MGC Contractors, Inc.
P. O. Box 61748, Phoenix, AZ 85082
JOC Contractor Representative: Bryan Forster
Phone: 602-695-9652
Email: bforster@mgccontractors.com
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page 3
Project No.: WA2408.401
Rev. 1/16/2024
ARTICLE 5. FORCED LABOR OF ETHNIC UYGHURS PROHIBITED
By entering into this Agreement, Contractor certifies and agrees Contractor does not
currently use and will not use for the term of this Agreement: (i) the forced labor of ethnic
Uyghurs in the People's Republic of China; or (ii) any goods or services produced by the
forced labor of ethnic Uyghurs in the People's Republic of China; or (iii) any contractors,
subcontractors or suppliers that use the forced labor or any goods or services produced
by the forced labor of ethnic Uyghurs in the People's Republic of China.
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page 4
Project No.: WA2408.401
Rev. 1/16/2024
IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date.
“CITY” CITY OF CHANDLER
Mayor
RECOMMENDED BY:
Daniel Haskins, P.E.
CIP City Engineer
APPROVED AS TO FORM:
City Attorney
ATTEST:
City Clerk
Seal
“JOC CONTRACTOR”
MGC CONTRACTORS, INC.
Signature
Date
Print Name
Title
Signer Email Address
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Projects Director
Bforster@mgccontractors.com
Bryan Forster
September 18, 2025
September 18, 2025
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page A-1
Project No.: WA2408.401
Rev. 1/16/2024
EXHIBIT A
SCOPE OF WORK
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Project Number WA2408.401
Cost Proposal– REV2
Project Name:
Brooks Crossing WPF - PRV Additions Project
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
4110 E. Elwood St. Phoenix, Arizona 85040 Telephone (602) 437-5000 Fax (602) 470-4000
License Numbers ROC069949 & ROC071441
September 4th, 2025
City of Chandler Water Resources
975 E Armstrong Way
Chandler, AZ 85225
Attn: Adam Kleiser
Re:
Cost Proposal
Brooks Crossing WPF-PRV Additions Project – WA2408.401
Dear Adam:
In accordance with the information provided, we are pleased to offer a cost proposal for the Brooks Crossing
WPF-PRV project. The total price for this scope of work is ($960,686.14) Nine Hundred Sixty Thousand Six
Hundred Eighty-Six dollars and Fourteen Cents. We have included bond and sales tax. Below is a further
breakdown of the proposal and scope of work. Please note the following clarifications:
Tank
Location
Design Engineer
Brooks Crossing WPF
Calle Del Norte and
Longmore Street
Wilson Engineers
Included scope:
• Demolition Work:
-
Demo existing Shotcrete in/around the work area.
-
Demo existing Curb & Gutter.
• 12” Tie-in:
-
Assist the Hydro-Vac Crew with deep excavation, with an assumed depth of 14 feet or more per
the design plans.
-
Install Deep Trench Boxes to work on the 12” line safely. We have included engineering costs due
to the excavation being deeper than 18ft, as required.
-
Dig, Lay, and Backfill the 12” DI Pipe and Valves.
-
Pressure test installed 12” piping.
-
Disinfection
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
4110 E. Elwood St. Phoenix, Arizona 85040 Telephone (602) 437-5000 Fax (602) 470-4000
License Numbers ROC069949 & ROC071441
• 8’’ Waterline Piping:
-
Dig, Lay and Backfill the 8” DI Pipe and Valves.
-
Install Trench Boxes to work on the 8” line safely. No engineering costs were included due to the
assumed depth.
-
Pressure test installed 8” waterline.
-
Disinfection
• PRV Mechanical Valve & Fittings:
-
Layout and install all above-ground PRV piping, valves, and fittings.
-
Trim out the above-ground piping.
-
Pressure test installed above-ground piping.
-
Coating of the installed above-ground piping – performed by subcontractor.
• Concrete Work:
-
Form, Pour, Finish, and Strip the Curb and Gutter.
-
Form, Pour, Finish, and Strip PRV Vault SOG.
-
Form, Pour, Finish, and Strip the PRV Pad and Walls.
• Private Utility Location Services and Blue Staking.
• CADD drawings and as-builts
• Operations and maintenance manuals for all required equipment.
• Any Additional work requested by Wilson Engineering and approved by the City.
Allowance Breakdown:
Clarifications, Assumptions, and Exclusions:
• Total Allowances are included in the overall project cost. These allowances will only be used once the
City of Chandler has approved them.
• We have excluded third-party inspection. This includes soil compaction, concrete cylinder testing, and
inspections of exposed piping coatings.
• We have excluded third-party reservoir tank inspections, including coatings and structural inspections,
No.
Description
Quantity
Unit
Total Allowance
1 CMU Wall Replacement – Per Plans
1
LS
$ 26,100.00
2 Residents Side – Pool Mural Painting
1
LS
$ 39,200.00
3 1 Sack CLSM for Backfill & Haul-Off Spoils - Per Plans
1
LS
$ 53,600.00
4 Vac-Truck Potholing for 12” Tie-in
1
LS
$ 38,600.00
5 Tank Isolation Line-stop, current valve seating concerns
1
LS
$ 29,800.00
6 Repurpose the existing gate and create an equipment entry point
1
LS
$ 6,000.00
7 Tank Disinfection, Cleaning and Inspection Assistance – Third Party
1
LS
$ 74,900.00
8 Owner’s Contingency
1
LS
$ 60,000.00
TOTAL ALLOWANCE
$ 328,200.00
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
4110 E. Elwood St. Phoenix, Arizona 85040 Telephone (602) 437-5000 Fax (602) 470-4000
License Numbers ROC069949 & ROC071441
as well as any repairs that may be needed due to those inspections. However, we have included costs
for internal scaffolding erection and disassembly for tank inspection purposes in Allowance
Breakdown Item 7. $10,000 has been included for Wilson’s Tank inspections.
• We have excluded any required permitting, except for dust control and SWPPP.
• We have excluded design engineering costs.
• We have excluded public outreach.
• We have included Confined Space Entry and the required equipment for reservoir tank inspections.
• We have included the cost of pressure washing the inside of the tank in preparation for the required
inspection.
• We have included an allowance for 1 sack CLSM for all excavations. If native or AB backfill is
authorized, we will need to price that material and utilize this allowance as needed. Backfill material
from Vac-Truck spoils cannot be used for backfilling, and costs for backfill materials, other than pipe
bedding, have not been included in base pricing.
• The Potholing and Excavating costs were factored to the depth of the pipe per the design plans.
Thank you for the opportunity to be of service. If you have any questions, please do not hesitate to call.
Sincerely,
Bryan Forster
Projects Director
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Item No
Agency
Reviewer
Com
ment
Yes/
No
Location
(Total Cost
Breakdown)
Review Comments
Disposition
Code
Response
Responder
1
COC
AK
Y
The Tax rate appears to be high. Can MGC verify that this is correct.
A
The sales tax calculation is incorrect and will be adjusted in revised
proposal.
AMT
2
COC
AK
Y
Construction Survey/Staking seems low. I assume that Utils wants GIS Data Dictionary applied to
this for info on the water pipe being installed.
A
Additional Survey/Staking funds to be added in revised proposal.
AMT
3
COC
AK
Y
The project number needs to be updated to WA2408.401
A
To be adjusted in revised proposal.
AMT
4
COC
AK
Y
Provide the backup information/quotes/correspondence for the scope related to the tank
inspection.
A
Clarification of the contents of the tank inspection scope will be
included in the revised proposal
AMT
5
COC
AK
Y
Add an Owner’s contingency of $60K.
A
To be added in revised proposal.
AMT
6
COC
AK
Y
For Wilson’s tank inspection, we requested that we reserve the right for cutting/welding back a
steel coupon(s) from the tank floor, should the magnetic scanning require further investigation.
Can MGC confirm that this scope can be accommodated in the Proposal?
C
In the clarified inspection scope, Wilson has an inspection allowance of
$10,000.00. Please confirm if the allowance total needs adjustment.
AMT
7
COC
AK
Y
$53k was included as an allowance item for slurry backfill. The design documents call for slurry
backfill in the shot-crete excavations, Why was this cost included as an Allowance and not
included in the cost of the work?
C
This was included as an allowance because the depth and exact location
of existing piping is not known until we pothole.
AMT
8
COC
AK
Y
Remove highlight on cover page, address to Adam Kleiser, & change wording of "owner's
allowance" to "owner's contingency".
A
To be updated in revised proposal.
AMT
24473 - COC Brooks Crossing PRV Cost Proposal
Project Name: Brooks Crossing PRV
Name: City of Chandler
Submittal: Consultant:
Contractor: MGC Contractors, Inc.
Date: 09/04/2025
Disposition Codes:
A. Will Comply
B. Consultant to Evaluate
C. Client to Evaluate
D. No Further Action
E. Further Understanding is Required
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT B
FEE SCHEDULE
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page B-1
Project No.: WA2408.401
Rev. 1/16/2024
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Negotiated Prices
172,531.43
$
-
$
110,009.40
$
-
$
245,166.62
$
SUBTOTAL (NEGOTIATED PRICES):
527,707.45
$
11.00%
58,047.82
$
TOTAL (NEGOTIATED PRICES + OVERHEAD & PROFIT):
585,755.27
$
Sales Tax Percentage (Current Tax Rate)
7.80%
30,519.70
$
General Liability Insurance Percentage (Actual Cost per Job Order)
10,554.15
$
Builder's Risk Insurance Percentage (Actual Cost per Job Order)
379.95
$
Payment Bond (Actual Cost per Job Order)
5,277.07
$
Performance Bond (Actual Cost per Job Order) (P&P Included Above)
-
$
SUBTOTAL (INSURANCE, BONDS, & TAXES):
46,730.87
$
COMBINED TOTAL (TOTAL + INSURANCE, BONDS, & TAXES):
632,486.14
$
City's Allowance
328,200.00
$
TOTAL JOB ORDER:
960,686.14
$
Price of Subconsultant(s)
EXHIBIT "B"
JOB ORDER COST PROPOSAL
SUMMARY SHEET
Price of Subcontractor(s) and Supplier(s)
Per the Job Order Master Agreement - This Fee Table includes all fees, costs, insurance and bond premiums, allowances, construction
contingency, and taxes of any type necessary to fully, propertly and timely perform and construct the Work. Also per the Job Order Master
Agreement - For any portion of the Work which, either through this Contract, Change Order or otherwise, is performed and paid for on a
cost, or time and materials basis, the costs may be reimbursed to JOC Contractor and chargeable against the Contract Price will be
determined as set forth in MAG 109.5.
General Conditions
Preconstruction Labor (if applicable)
Construction Labor & Equipment (if applicable)
Overhead and Profit (Coefficient per Job Order Master Agreement)
Insurance, Bonds, & Taxes
ENTER TAX % HERE:
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
CITY OF CHANDLER - BROOKS CROSSING WPF-PRV ADDITIONS PROJECT
TOTAL PROJECT BREAKDOWN
Project Number:
Contractor:
Date:
% of
Activity ID#
Description
Total
Cost
Comments
00.00.00
Construction Indirect Costs Summary
00.00.00
Division 0 - Bidding and Contract Requirements
00.01.00
Sales Tax
3.18%
30,519.70
$
00.02.00
Sales Tax Deduct
0.00%
-
$
00.03.00
Profit & Overhead
6.04%
58,047.82
$
00.04.00
Insurance (GL, IF, PL)
1.10%
10,554.15
$
00.04.00
Builders Risk Insurance
0.04%
379.95
$
00.05.00
Payment & Performance Bond
0.55%
5,277.07
$
00.00.00
Sub-Total
10.9%
104,778.69
$
01.00.00
Division 1 - General Requirements
01.01.00
Preconstruction Services
0.00%
-
$
01.02.00
General Conditions - Project Staff
7.76%
74,520.40
$
01.03.00
General Conditions - Project Site Temporary Facilities
3.69%
35,489.00
$
01.00.00
Sub-Total
11.5%
110,009.40
$
00+01
Sub-Total Indirect Costs
22.4%
214,788.09
$
02.00.00
SUBCONTRACTORS & SUPPLIERS
02.01.00
Above Ground PRV Piping Coating Subcontractor
0.77%
7,350.00
$
A-O Paintings
02.02.00
Required Civil and Pipe Materials for Project
17.19%
165,181.43
$
03.00.00
Sub-Total
18.0%
172,531.43
$
03.00.00
SUBCONSULTANT(S)
03.01.00
No Sub Consultants
0.00%
-
$
04.00.00
Sub-Total
0.0%
-
$
04.00.00
MGC SELF-PERFORMED WORK (LABOR & EQUIPMENT)
04.01.00
Demolition Work
0.39%
3,773.52
$
04.02.00
12" Tie-In Piping
13.61%
130,796.80
$
04.04.00
8" Waterline Piping
4.49%
43,135.60
$
04.04.00
PRV Mechanical Valve & Fittings
2.30%
22,143.50
$
04.05.00
Concrete Work
4.72%
45,317.20
$
04.00.00
Sub-Total
25.5%
245,166.62
$
02+03+04
Sub-Total Direct Costs
43.5%
417,698.05
$
00+01+02+03+04
Overall Total (Indirects & Directs)
632,486.14
$
CITYS ALLOWANCE (Includes 19.07% On Top of Direct Costs for Sales Tax, Profit & OH, Insurance, & Bond)
CMU Wall Replacement
2.72%
26,100.00
$
Rounded Up to Nearest $100
Mural Painting
4.08%
39,200.00
$
Rounded Up to Nearest $100
Purchase 1 Sack CLSM for Backfill & Haul-Off Spoils
5.58%
53,600.00
$
Rounded Up to Nearest $100
Vac Truck Potholing
4.02%
38,600.00
$
Rounded Up to Nearest $100
Tank Isolation Linestop
3.10%
29,800.00
$
Rounded Up to Nearest $100
Repurpose Existing Gate
0.62%
6,000.00
$
Rounded Up to Nearest $100
Tank Disinfection, Cleaning, & Inspection Assistance - 3rd Party
7.80%
74,900.00
$
Rounded Up to Nearest $100
Owner's Contingency
6.25%
60,000.00
$
Rounded Up to Nearest $100
05.00.00
Sub-Total
34.2%
328,200.00
$
00+01+02+03+04+05
Overall Total (Indirects, Directs, & City Allowance)
960,686.14
$
JOC2411.401 - WA2408.401
MGC Contractors, Inc
04-Sep-25
Page 2 of 8
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Unit
Total
Program Leader (Includes Vehicle)
HR
0.0
$181.20
$0
Sr. Project Manager (Includes Vehicle)
HR
0.0
$171.20
$0
Project Manager (Includes Vehicle)
HR
0.0
$141.80
$0
Project Engineer (Includes Vehicle)
HR
0.0
$106.85
$0
Project Superintendent (Includes Vehicle)
HR
0.0
$141.26
$0
CAD Engineer
HR
0.0
$65.16
$0
Administration
HR
0.0
$50.00
$0
QA/QC Manager (Includes Vehicle)
HR
0.0
$171.20
$0
HR
0.0
$0
$0
Unit
Total
Pickup Truck (Included Above)
HR
$28.00
$0.00
Supervisor (Heavy Duty) Truck (Included Above)
HR
$36.20
$0.00
$0.00
Unit
Total
$0
$0
$0
$0
$0
Preconstruction (01.01.00)
Labor
Position
Unit
Quantity
Labor Cost
Total Labor Cost:
Equipment
Item
Unit
Quantity
Equipment Cost
Total Material Cost:
Total Equipment Cost:
Miscellaneous
Item
Unit
Quantity
Material Cost
Page 3 of 8
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Unit
Total
Program Leader (Includes Vehicle)
HR
2.0
$161.00
$322.00
Sr. Project Manager (Includes Vehicle)
HR
8.0
$149.00
$1,192.00
Project Manager (Includes Vehicle)
HR
240.0
$132.00
$31,680.00
Project Engineer (Includes Vehicle)
HR
320.0
$102.00
$32,640.00
Project Superintendent (Includes Vehicle)
HR
0.0
$132.00
$0.00
CAD Engineer
HR
40.0
$65.16
$2,606.40
Administration
HR
16.0
$50.00
$800.00
QA/QC Manager (Includes Vehicle)
HR
0.0
$132.00
$0.00
Safety Manager (Includes Vehicle)
HR
40.0
$132.00
$5,280.00
$74,520.40
Unit
Total
Pickup Truck (Included Above)
HR
$0.00
$0.00
Supervisor (Heavy Duty) Truck (Included Above)
HR
$0.00
$0.00
$0.00
Unit
Total
$0.00
$0.00
$0.00
$0.00
$0.00
Project Staff (01.02.00)
Labor
Position
Unit
Quantity
Labor Cost
Total Labor Cost:
Equipment
Item
Unit
Quantity
Equipment Cost
Total Material Cost:
Total Equipment Cost:
Miscellaneous
Item
Unit
Quantity
Material Cost
Page 4 of 8
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
CITY OF CHANDLER - BROOKS CROSSING WPF-PRV ADDITIONS PROJECT
01.03.00
Division 01
BY:
-
#
DESCRIPTION
QUANT
UNIT
UNIT COST
AMOUNT
Comments
1. Mobilization/Demobilization:
-
- Company Equipment
6
Ea
1,000
$
6,000
$
0
Ea
600
$
-
$
- Rental Equipment
0
Ea
650
$
-
$
- Equipment Delivery
0
Ea
400
$
-
$
- Other
0
Ea
400
$
-
$
2. Permits
-
$
- Local
0
Ea
-
$
- County
1
Ea
1,100
$
1,100
$
Dust Control Permit
- Railroad
0
Ea
-
$
- Other
0
Ea
-
$
3. Trailers:
-
$
- MGC - storage
2.5
Mo
250
$
625
$
- MGC - office
2.5
Mo
450
$
1,125
$
Towable Office Trailer (Small)
- Engineer's office
0
-
$
4. Temporary/Cellular Phone
2.5
Mo
150
$
375
$
5. Temporary Power:
-
$
- Set-up
1
Ea
200
$
200
$
- Construction - monthly
2.5
Mo
225
$
563
$
- Trailer - construction mo.
2.5
Mo
75
$
188
$
- Trailer - Engineer mo.
0
-
$
6. J-Jon/Sanitation Facilities
2.5
Mo
850
$
2,125
$
7. Water - drinking/ice
10.5
WK
218
$
2,289
$
8. Water - construction
2.5
Mo
750
$
1,875
$
Backflow w/ Certs
9. Temporary Fencing:
-
$
- Set-up
0
LS
50
$
-
$
- Monthly Charges
0
Mo
300
$
-
$
10. Surveying/Construction Staking
6
Ea
2,200
$
13,200
$
Updated Units per CoC Comments
11. Subcontractor Bonds
0
-
$
12. Construction Testing
0
Mo
-
$
-
$
13. Design/P.E. Stamp
0
-
$
14. Dumpster - monthly
3
Ea
500
$
1,500
$
Dump Fees
3
LS
350
$
1,050
$
15. Clean-up
0
LS
1,500
$
-
$
16. AGC Fees
0
LS
-
$
17. Site Signage
0
LS
950
$
-
$
18. Liquidated Damages
0
-
$
19. Traffic Control:
0
Dy
150
$
-
$
Traffic plates
0
Mo
2,500
$
-
$
Traffic officer
0
Hr
75
$
-
$
20. Subsistence
0
-
$
21. Courier Fees
0
-
$
22. Reprographics
1
Ea
350
$
350
$
23. O&M Costs
2
Ea
150
$
300
$
Time & Binder Materials
OCR Recognition
0
-
$
24. Security Costs
0
Mo
-
$ Capture Cam
25. Insurance - Builders Risk
0
Mo
576
$
-
$
Included Elsewhere in Proposal
26. Dust Control - Materials
1
LS
300
$
300
$
27. Other
0
Mo
260
$
-
$
Sweeper Once/Month
28. SWPPP Permit
1
LS
1,100
$
1,100
$
SWPPP Materials
1
LS
350
$
350
$
27. Per Diem
0
Dy
-
$
28. Hotel / Subsistence
0
Rm
-
$
29. Engineering -
0
LS
-
$
-
$
-
$
30. Communications
2.5
MO
350
$
875
$
Internet $400, Printer $300
-
TOTAL
35,489
$
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
CITY OF CHANDLER - BROOKS CROSSING WPF-PRV ADDITIONS PROJECT
Work Order Breakdown (04.00.00)
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
HRS
$ Total
Craft
#
Water & Wastewater Facilities Projects
Info
Supt
Forman
For Line
04.00.00 Self-Perform Work
04.01.00 Demolition Work
04.01.01
Craft Supervision
10.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10.0
1,587
$
04.01.02
Demo Existing Shotcrete (4" Thick)
0.0
0.0
8.0
0.0
0.0
0.0
0.0
0.0
16.0
0.0
8.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
24.0
1,944
$
04.01.03
Demo Existing Curb & Gutter
0.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
2.0
0.0
1.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.0
243
$
04.02.00 12" Tie-In Piping
04.02.01
Craft Supervision
168.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
168.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
168.0
26,657
$
04.02.02
Assist Hydro-Vac Crew
0.0
0.0
0.0
0.0
0.0
0.0
0.0
40.0
120.0
0.0
0.0
0.0
0.0
0.0
0.0
80.0
0.0
0.0
160.0
31,416
$
04.02.03
Set Deep Trench Boxes for 12" Install
0.0
0.0
80.0
0.0
0.0
0.0
0.0
0.0
240.0
0.0
0.0
80.0
0.0
0.0
0.0
0.0
0.0
0.0
320.0
38,195
$
04.02.04
Dig,Lay,Backfill 12" DI Pipe & Valves
0.0
0.0
80.0
0.0
0.0
0.0
80.0
40.0
80.0
0.0
0.0
40.0
40.0
40.0
40.0
0.0
0.0
0.0
280.0
32,692
$
04.02.05
Pressure Test 12" Piping
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.0
893
$
04.02.06
Disinfect 12" Piping (Install Appuretenances, Disinfection by Sub)
0.0
0.0
0.0
0.0
0.0
0.0
8.0
0.0
8.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.0
945
$
04.03.00 8" Waterline Piping
04.03.01
Craft Supervision
48.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
48.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
48.0
7,616
$
04.03.02
Dig,Lay,Backfill 8" DI Pipe & Valves
0.0
0.0
80.0
0.0
0.0
0.0
80.0
40.0
80.0
0.0
0.0
40.0
40.0
40.0
40.0
0.0
0.0
0.0
280.0
32,692
$
04.03.03
Pressure Test 8" Piping
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.0
24.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
32.0
1,883
$
04.03.04
Disinfect 8" Piping (Install Appuretenances, Disinfection by Sub)
0.0
0.0
0.0
0.0
0.0
0.0
8.0
0.0
8.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.0
945
$
04.04.00 PRV Mechanical Valve & Fittings
04.04.01
Craft Supervision
50.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
50.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
50.0
7,934
$
04.04.02
Layout Above Ground PRV Piping
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.0
248
$
04.04.03
Install Above Ground PRV Pipe, Valves, & Fittings
0.0
0.0
0.0
0.0
0.0
0.0
80.0
40.0
80.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
200.0
12,166
$
04.04.04
Trim-Out Above Ground PRV Piping
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.0
4.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.0
359
$
04.04.05
Pressure Test Above Ground PRV Piping
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8.0
16.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
24.0
1,437
$
04.05.00 Concrete Work
04.05.01
Craft Supervision
80.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
80.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
80.0
12,694
$
04.05.02
Form and Strip Curb & Gutter
0.0
12.0
0.0
12.0
24.0
0.0
0.0
0.0
12.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12.0
0.0
60.0
3,740
$
04.05.03
Pour and Finish Curb & Gutter
0.0
4.0
0.0
4.0
8.0
0.0
0.0
0.0
4.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.0
0.0
20.0
1,247
$
04.05.04
Form and Strip PRV Vault SOG
0.0
16.0
0.0
16.0
32.0
0.0
0.0
0.0
16.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.0
0.0
80.0
4,987
$
04.05.05
Form and Strip PRV Vault Walls
40.0
0.0
0.0
40.0
80.0
0.0
0.0
0.0
80.0
40.0
0.0
0.0
0.0
0.0
0.0
0.0
40.0
0.0
240.0
18,262
$
04.05.06
Pour and Finish PRV Pad and Walls
8.0
0.0
0.0
8.0
0.0
24.0
0.0
0.0
16.0
8.0
0.0
0.0
0.0
0.0
0.0
0.0
8.0
8.0
56.0
4,389
$
-
$
A
Total Column
404.0
32.0
249.0
80.0
144.0
24.0
256.0
180.0
824.0
404.0
9.0
160.0
80.0
80.0
80.0
80.0
80.0
8.0
2,193.0
245,167
$
B
Unit Cost
116.27
$
64.60
$
56.91
$
64.16
$
46.93
$
55.88
$
57.28
$
63.00
$
50.80
$
37.40
$
69.47
$
248.13
$
94.68
$
34.50
$
12.00
$
275.00
$
13.25
$
13.25
$
5.00
$
C
Total Cost $
46,973
$
2,067
$
14,171
$
5,133
$
6,758
$
1,341
$
14,664
$
11,340
$
41,859
$
15,110
$
625
$
39,701
$
7,574
$
2,760
$
960
$
22,000
$
1,060
$
106
$
10,965
$
245,167
$
EQUIPMENT
LABOR
Back
Hoe
Pipefitter
Foreman
Supt Truck
Carp Jour
Wacker
Excavator-
330 Sized
Small
Tools
Hi Cycle
Vibrator
Rammax
Genset &
Cords
Vactor
Truck
Laborer
Equip
Operator
SM (3.5)
Loader
Pipefitter
Finisher
Carp Appr
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Item #
Description
Size
Quantity
Unit
Cost Each
Total
Notes
02.02.00
CITY OF CHANDLER - BROOKS CROSSING WPF-PRV ADDITIONS PROJECT
Required Civil and Pipe Materials for Project
04.01.00
Demolition Work
04.01.01
Craft Supervision
04.01.01A
No Materials for This Item
1
LS
-
$
-
$
04.01.02
Demo Existing Shotcrete (4" Thick)
04.01.02A
Double Saw Cut Around Shotcrete for Demolition
672
LF
4.00
$
2,688.00
$
04.01.02B
Haul-Off Shotcrete Rubble & Curb/Gutter
2
HRS
135.00
$
270.00
$
04.01.02C
Dump Fee for Haul-Off
1
EA
550.00
$
550.00
$
04.01.03
Demo Existing Curb & Gutter
04.01.03A
Haul-Off Shotcrete Rubble & Curb/Gutter
2
HRS
135.00
$
270.00
$
04.01.03B
Dump Fee for Haul-Off
1
EA
550.00
$
550.00
$
04.02.00
12" Tie-In Piping
04.02.01
Craft Supervision
04.02.01A
No Materials for This Item
1
LS
-
$
-
$
04.02.02
Assist Hydro-Vac Crew
04.02.02A
Purchase ABC for Displaced Hydro Vac Materials
240
TNs
21.50
$
5,160.00
$
04.02.03
Set Deep Trench Boxes for 12" Install
04.02.03A
Type in Material
-
$
04.02.04
Dig,Lay,Backfill 12" DI Pipe & Valves
04.02.04A
Pipe & Valves for 12" Tie-In
1
LS
39,531.46
$
39,531.46
$
See BI#1 in PTO for Breakdown.
04.02.05B
Rent Trench Shoring
160
HRS
87.20
$
13,952.00
$
04.02.05C
Rental Trench Shoring Engineering Design
1
LS
4,190.51
$
4,190.51
$
04.02.05D
Pipe Bedding
13.2
TONS
21.50
$
283.80
$
04.02.05E
Pipe Accessories
40
LF
2.18
$
87.20
$
04.02.05
Pressure Test 12" Piping
04.02.05A
Rent Hydrostatic Test Pump
8
HRS
23.08
$
184.64
$
04.02.05B
Pipe Accessories (Tapping Saddles, Corp Stops, Gauge, Test Piping)
1
LS
1,000.00
$
1,000.00
$
04.02.06
Disinfect 12" Piping (Install Appuretenances, Disinfection by Sub)
04.02.06A
Disinfection Sub for 12" Piping
1
LS
500.00
$
500.00
$
04.03.00
8" Waterline Piping
04.03.01
Craft Supervision
04.03.01A
No Materials for This Item
1
LS
-
$
-
$
04.03.02
Dig,Lay,Backfill 8" DI Pipe & Valves
04.03.02A
Pipe & Valves for 8" DI Pipe
1
LS
16,501.07
$
16,501.07
$
See BI#2 in PTO for Breakdown.
04.03.02B
Rent Trench Shoring
40
HRS
87.20
$
3,488.00
$
04.03.02C
Pipe Bedding
95.7
TONS
21.50
$
2,057.55
$
04.03.02D
Pipe Accessories
1
LS
368.42
$
368.42
$
04.03.03
Pressure Test 8" Piping
04.03.03A
Rent Hydrostatic Test Pump
40
HRS
23.08
$
923.20
$
04.03.03B
Pipe Accessories (Tapping Saddles, Corp Stops, Gauge, Test Piping)
1
LS
1,000.00
$
1,000.00
$
04.03.04
Disinfect 8" Piping (Install Appuretenances, Disinfection by Sub)
04.03.04A
Disinfection Sub for 8" Piping
1
LS
1,100.00
$
1,100.00
$
04.04.00
PRV Mechanical Valve & Fittings
04.04.01
Craft Supervision
04.04.01A
No Materials for This Item
1
LS
-
$
-
$
04.04.02
Layout Above Ground PRV Piping
04.04.02A
No Materials for This Item
1
LS
-
$
-
$
04.04.03
Install Above Ground PRV Pipe, Valves, & Fittings
04.04.03A
Pipe & Valves PRV to Reservoir
1
LS
51,327.94
$
51,327.94
$
See BI#3 in PTO for Breakdown.
04.04.03B
Type in Material
-
$
04.04.03C
Type in Material
-
$
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Item #
Description
Size
Quantity
Unit
Cost Each
Total
Notes
04.04.03D
Type in Material
-
$
04.04.04
Trim-Out Above Ground PRV Piping
04.04.04A
Pipe Accessories & Pipe Support Grout
1
LS
550.00
$
550.00
$
04.04.05
Pressure Test Above Ground PRV Piping
04.04.05A
Rent Hydrostatic Test Pump
8
HRS
23.08
$
184.64
$
04.04.05B
Pipe Accessories
1
LS
450.00
$
450.00
$
04.05.00
Concrete Work
04.05.01
Craft Supervision
04.05.01A
No Materials for This Item
1
LS
-
$
-
$
04.05.02
Form and Strip Curb & Gutter
04.05.02A
Form Accessories
48
SF
2.00
$
96.00
$
04.05.02A
Form Lumber
48
SF
6.00
$
288.00
$
04.05.03
Pour and Finish Curb & Gutter
04.05.03A
3000# Concrete
1.1
CY
125.00
$
137.50
$
04.05.03B
Ice/Nitro Concrete Adder
1.1
CY
15.00
$
16.50
$
04.05.03C
Ready Mix Environmental Fee
1
EA
20.00
$
20.00
$
04.05.03D
Ready Mix Fuel Fee
1
EA
15.00
$
15.00
$
04.05.03E
Short Load Concrete Fee
1
EA
200.00
$
200.00
$
04.05.03F
Reinforcing Steel
350
LBS
1.00
$
350.00
$
04.05.04
Form and Strip PRV Vault SOG
04.05.04A
Included Under 04.05.05A
1
LS
-
$
-
$
04.05.05
Form and Strip PRV Vault Walls
04.05.05A
Form Accessories
473
SF
2.00
$
946.00
$
04.05.05B
Form Lumber
473
SF
6.00
$
2,838.00
$
04.05.06
Pour and Finish PRV Pad and Walls
04.05.06A
4000# Concrete
22
CY
160.00
$
3,520.00
$
04.05.06B
Ice/Nitro Concrete Adder
22
CY
15.00
$
330.00
$
04.05.06C
Ready Mix Environmental Fee
2
EA
20.00
$
40.00
$
04.05.06D
Ready Mix Fuel Fee
2
EA
15.00
$
30.00
$
04.05.06E
Reinforcing Steel
4800
LBS
1.00
$
4,800.00
$
A
Small Tools and Safety
A.1
Safety ($2 per MH of labor)
2193
HRS
2.00
$
4,386.00
$
Total Cost
165,181.43
$
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT C
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page C-1
Project No.: WA2408.401
Rev. 1/16/2024
PERFORMANCE BOND
ARIZONA STATUTORY PERFORMANCE BOND
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES
(Penalty of this bond must be 100% of the Agreement amount)
KNOW ALL MEN BY THESE PRESENTS THAT:___________________________________________________
(hereinafter "Principal"), and __________________________________________________________ (hereinafter "Surety"), a
corporation organized and existing under the laws of the State of ______________ with its principal office in the City of
_____________________________, holding a certificate of authority to transact surety business in Arizona issued by the
Director of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto
__________________________(hereinafter "Obligee") in the amount of ________________________________________________
(Dollars) ($___________), for the payment whereof, Principal and Surety bind themselves, and their heirs, administrators,
executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated
the ____________ day of _______________________, 20___ for construction of Brooks Crossing Water Production Facility
Pressure Reducing Valve Addition, WA2408.401 which Agreement is hereby referred to and made a part hereof as
fully and to the same extent as if copies at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal faithfully performs and
fulfills all the undertakings, covenants, terms, conditions and agreements of the Agreement during the original term of
the Agreement and any extension of the Agreement, with or without notice of the Surety, and during the life of any
guaranty required under the Agreement, and also performs and fulfills all the undertakings, covenants, terms,
conditions, and agreements of all duly authorized modifications of the Agreement that may hereafter be made, notice
of which modifications to the Surety being hereby waived, the above obligation is void. Otherwise it remains in full force
and effect.
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2,
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions of Title 34,
Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length in this Agreement.
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that
may be fixed by a judge of the court.
Witness our hands this ________________ day of ____________________, 20__.
____________________________________
PRINCIPAL
SEAL
___________________________________
AGENT OF RECORD
By _________________________________
____________________________________
SURETY
SEAL
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT D
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page D-1
Project No.: WA2408.401
Rev. 1/16/2024
PAYMENT BOND
ARIZONA STATUTORY PAYMENT BOND
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES
(Penalty of this Bond must be 100% of the Agreement amount)
KNOW ALL MEN BY THESE PRESENTS THAT:________________________________________________
(hereinafter "Principal"), as Principal, and _________________________________________(hereinafter "Surety"), a corporation
organized and existing under the laws of the State of __________________ with its principal office in the City of
__________________, holding a certificate of authority to transact surety business in Arizona issued by the Director of the
Department of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto
________________________ (hereinafter "Obligee") in the amount of ________________________________________________
(Dollars) ($___________), for the payment whereof, the Principal and Surety bind themselves, and their heirs,
administrators, executors, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated the _________ day of
_______________________, 20___ for construction of Brooks Crossing Water Production Facility Pressure Reducing
Valve Addition, WA2408.401 which Amendment is hereby referred to and made a part hereof as fully and to the same
extent as if copied at length herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal promptly pays all moneys
due to all persons supplying labor or materials to the Principal or the Principal's subcontractors in the prosecution of
the work provided for in said Agreement, this obligation is void. Otherwise it remains in full force and effect.
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions, conditions
and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length
in this Agreement.
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that
may be fixed by a judge of the court.
Witness our hands this ________________ day of ____________________, 20__.
____________________________________
PRINCIPAL
SEAL
___________________________________
AGENT OF RECORD
By _________________________________
____________________________________
SURETY
SEAL
___________________________________
AGENT ADDRESS
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT E
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page E-1
Project No.: WA2408.401
Rev. 1/16/2024
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS
________________________, Arizona
Date ____________________________
Project Name:
Brooks Crossing Water Production Facility Pressure Reducing Valve
Addition
Project No.:
WA2408.401
To the City of Chandler, Arizona
Gentlemen:
This is to certify that all lawful claims for materials, rental of equipment and labor used in
connection with the construction of the above project, whether by subcontractor or claimant in
person, have been duly discharged.
The undersigned, for the consideration of $________________________, as set out in the final pay
estimate, as full and complete payment under the terms of the Agreement, hereby waives and
relinquishes any and all further claims or right of lien under, in connection with, or as a result of
the above described project. The undersigned further agrees to indemnify and save harmless
the City of Chandler against any and all liens, claims or liens, suits, actions, damages, charges
and expenses whatsoever, which said City may suffer arising out of the failure of the
undersigned to pay for all labor performances and materials furnished for the performance of
said installation.
Signed and dated at ________________, this _________ day of _______________ 20_____.
__________________________________
CONTRACTOR
By _______________________________
STATE OF ARIZONA
)
) SS
COUNTY OF MARICOPA
)
The foregoing instrument was subscribed and sworn to before me this __________ day of
__________________ 20 _________.
___________________________________
Notary Public
___________________________________
My Commission Expires
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT F
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page F-1
Project No.: WA2408.401
Rev. 1/16/2024
CERTIFICATE OF COMPLETION
Project:
Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Project No.: WA2408.401
(TO BE COMPLETED BY CONTRACTOR)
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER PROJECT NO.
WA2408.401 HAVE BEEN DELIVERED IN ACCORDANCE WITH THE AGREEMENT DOCUMENTS AND BID
SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE AGREEMENT HAVE BEEN
COMPLETED AS OF ____________________________.
(Date)
FIRM NAME:
________________________________
PRINCIPAL:
________________________________
(Name)
________________________________
(Signature)
________________________________ DATE: ___________________
(Title)
CERTIFIED BY ENGINEER/CONSULTANT (IF APPLICABLE):
_________________________________
DATE: ____________________
(Signature)
_________________________________
(Firm Name)
PROJECT ACCEPTED BY USER DEPARTMENT
_________________________________
DATE: ____________________
(Signature)
_________________________________
(Dept. /Div.)
_______________ Date of Final Walk-Through
_______________ Date As-Built Received
_______________ City As-Built Number
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT G
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page G-1
Project No.: WA2408.401
Rev. 1/16/2024
SUBCONTRACTOR DOCUMENTS WITH JOC CONTRACTOR
Any subcontractor assumptions, clarifications, exclusions, terms & conditions,
signature blocks, etc. included are strictly between the JOC Contractor and their
subcontractors, and do not apply to the Agreement between the JOC Contractor and
the City.
N/A
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
EXHIBIT H
Project Name: Brooks Crossing Water Production Facility Pressure Reducing Valve Addition
Page H-1
Project No.: WA2408.401
Rev. 1/16/2024
BUILDERS RISK INSURANCE
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
1 | P a g e
GIS / GPS Data Delivery Requirements
Contractor shall provide survey grade GPS / GIS data, meeting the following requirements for all
facilities to be owned and/or operated by the City of Chandler.
a) ESRI File Geodatabase format:
All GPS point data, along with corresponding GIS Attribute data, must be submitted in ESRI File
Geodatabase format. The City of Chandler will provide a copy of the File Geodatabase in ESRI
ArcGIS format. Please submit your request through the Project Manager.
b) Data dictionary and Attribute data:
Attribute data should be provided for each of the GPS’d Utility Features listed in Section ‘d’ below.
All Attribute data should conform to the ESRI File Geodatabase format, provided by the City. A
copy of the data dictionary is also attached here for reference.
c) Coordinate System:
Horizontal Datum: Arizona State Plane Coordinates, Central Zone NAD83 (HARN)
Vertical Datum: NAVD88
d) Point Data for GPS:
1) Water System Features:
•
Water main location (top of pipe), size and material (one (1) coordinate provided every 100 feet
minimum) and at fittings.
•
Water fitting location (top of feature), size, material and type including: Bend (22.5, 45, or 90),
Tee, Tapping Sleeve, Cross, Coupling, End Cap, Line Stop, Reducer, Saddle, Other.
•
Water valve location (center of valve box cover), size and type.
•
Fire hydrant location (top of hydrant), manufacturer and year.
•
Water service line location (at connection to main, any bends, and termination at meter box or
meter vault or at the edge of easement or ROW), size and material.
•
Water blow-off and air release valve location (center of cover), size, type and manufacturer.
•
Water manhole or vault location (center of cover), size and type.
2) Waste Water System Features:
•
Sewer manhole and cleanout location (center of cover), size, material, and cover type.
•
Sewer gravity main location (invert of pipe), size, material and flow direction (from) at all
manholes, cleanouts and structures.
•
Sewer service line location, size and material (at connection to main, and termination at
cleanout, or stub out at edge of the easement or ROW).
•
Sewer force main location (top of pipe), size, and material (one (1) coordinate provided every
100 feet minimum) and at fittings.
EXHIBIT I
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
2 | P a g e
•
Sewer force main (and gravity) fitting location (top of feature), size, material and type including:
Bend (22.5, 45, or 90), Tee, Tapping Sleeve, Cross, Coupling, End Cap, Linestop, Reducer,
Saddle, Wye, Other
•
Sewer force main valve location (center of valve box cover), size and type.
•
Sewer force main air release valve location (center of cover), size, type and manufacturer.
•
Sewer force main manhole or vault location (center of cover), size and material.
•
Sewer structure (center of structure), type (diversion, junction box).
3) Reclaimed Water System Features:
•
Reclaimed main location (top of pipe), size, and material (one (1) coordinate provided every
100 feet minimum) and at fittings.
•
Reclaimed fitting location (top of feature), size, material and type including: Bend (22.5, 45, or
90), Tee, Tapping Sleeve, Cross, Coupling, End Cap, Linestop, Reducer, Saddle, Other.
•
Reclaimed valve location (center of valve box cover), size and type.
•
Reclaimed service line location (at connection to main, any bends, and termination at meter
box or meter vault or at the edge of easement or ROW), size and material.
•
Reclaimed blow-off and air release valve location (center of cover), size, type and
manufacturer.
•
Reclaimed manhole or vault location (center of cover), size and type.
4) Storm Water System Features:
•
Storm manhole and cleanout location (center of cover), size, material, and cover type.
•
Storm gravity main location (invert of pipe), size, material, and flow direction (from) at all
manholes, cleanouts and structures.
•
Storm structure location (center of structure), type and category including: Drywell, Catch
Basin, Scupper, Bubbler Box, and Collection Vault.
5) Streetlight Feature:
•
Streetlights
6) Standard GPS Metadata on all points collected: Date, Time, Horizontal Accuracy, Vertical Accuracy,
Latitude, Longitude, Altitude, Surveyor, and Comments.
7) Electronic Data Submittal: Each submittal must consist of
•
ESRI – ArcGIS Geodatabase with cumulative data and attributes
•
Construction plans with collected utilities clearly redlined and changes marked
The frequency of data submittals will be every two weeks after water, sewer, reclaim or storm
assets go into the ground. Please email submittals to: GIS@chandleraz.gov
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
3 | P a g e
DATA DICTIONARY: WATER
WATER_BACKFLOW
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
GIS_BACKFLOW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
GIS_BACKFLOW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
GIS_BACKFLOW_SPATIALSOURCE
SIZE
SIZE
Double
TYPE
TYPE
Text
25
GIS_BACKFLOW_TYPE
MANUFACTURER
MANUFACTURER
Text
25
GIS_BACKFLOW_MANUFACTURER
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
15
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
4 | P a g e
WATER_FITTING
Field Name
Alias Name
Data Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
WS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
WS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WS_SPATIALSOURCE_STD
MATERIAL
MATERIAL
Text
20
WS_FITTING_MATERIAL
DIAMETER1
DIAMETER1
Text
8
RWS_FITTING_DIAMETER
DIAMETER2
DIAMETER2
Text
8
RWS_FITTING_DIAMETER
TYPE
TYPE
Text
30
WS_FITTING_TYPE
BEND
BEND
Text
20
WS_FITTING_BEND
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
5 | P a g e
WATER_HYDRANT
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
Feature Owner
Text
25
WS_FEATUREOWNER
LIFECYCLESTATUS
Lifecycle Status
Text
25
WS_LIFECYCLESTATUS
SPATIALSOURCE
Spatial Source
Text
25
WS_SPATIALSOURCE_STD
BARRELDIAMETER
Barrel Diameter
Double
LARGENOZZLEDIAMETER
Large Nozzle Diameter
Double
SMALLNOZZLEDIAMETER
Small Nozzle Diameter
Double
OUTLETCONFIGURATION
Outlet Configuration
Double
SEATDIAMETER
Seat Diameter
Double
MANUFACTURER
Manufacturer
Text
25
WS_HYD_MANUFACTURER
YEARMANUFACTURED
Manufacture Year
Text
25
HASLOCK
Has Lock ?
Text
25
GIS_BOOLEAN_YES_NO
COLOR
Color
Text
25
WS_HYD_COLOR
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
25
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
6 | P a g e
WATER_MANHOLE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
WS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
WS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WS_SPATIALSOURCE_STD
ACCESSDIAMETER
ACCESSDIAMETER
Text
8
ACCESSTYPE
ACCESSTYPE
Text
20
GROUNDTYPE
GROUNDTYPE
Text
20
WS_SYSVAL_GROUNDTYPE
COVERMATERIAL
COVERMATERIAL
Text
10
COVERTYPE
COVERTYPE
Text
8
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
7 | P a g e
WATER_METER
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
Feature Owner
Text
20
GBA_WMSL_FEATUREOWNER
LIFECYCLESTATUS
Lifecycle Status
Text
25
GBA_WMSL_LIFECYCLESTATUS
SPATIALSOURCE
Spatial Source
Text
25
GBA_STATIC_SPATIALSOURCE
DIAMETER
DIAMETER
Double
WS_METER_DIAM
MANUFACTURER
Manufacturer
Text
25
WS_METER_MANUFACTURER
METERTYPE
Meter Type
Text
25
WS_METER_TYPE
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
15
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
8 | P a g e
WATER_SYSTEM_VALVE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATURE OWNER
Text
20
WS_SYSVAL_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLE STATUS
Text
20
WS_SYSVAL_LIFECYCLESTATUS
SPATIALSOURCE
SPATIAL SOURCE
Text
20
WS_SYSVAL_SPATIALSOURCE
TYPE
TYPE
Text
25
WS_SYSVAL_TYPE
VALVETYPE
VALVE TYPE
Text
10
WS_SYSVAL_VALVETYPE
FUNCTION
FUNCTION
Text
25
WS_SYSVAL_FUNCTION
GROUNDTYPE
GROUNDTYPE
Text
25
WS_SYSVAL_GROUNDTYPE
DIAMETER
Diameter
Text
8
WS_SYSVAL_DIAM
GPS_DATE
GPS DATE
Date
GPS_TIME
GPS TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
9 | P a g e
Water Domains:
Domain name
WS_LIFECYCLESTATUS
ABANDONED
ABANDONED
ACTIVE
ACTIVE
FUTURE
FUTURE
INACTIVE
INACTIVE
REMOVED
REMOVED
UNKNOWN
UNKNOWN
Domain name
WS_FEATUREOWNER
COC
Chandler
COG
Gilbert
COM
Mesa
COP
Phoenix
COT
Tempe
COUNTY
Maricopa County
GOULD
Gould
GRIC
GRIC
INTEL
Intel
MICROCHIP
Microchip
MOTOROLA
Motorola
PRIVATE
Private
SRP
SRP
SRVWUA
SRVWUA
UNKNOWN
UNKNOWN
Domain name
WS_SYSVAL_SPATIALSOURCE
APPROVED PLANS
APPROVED PLANS
ASBUILT
ASBUILT
DESIGN
DESIGN
GPS
GPS
HYDRMAINT
HYDRMAINT
ORTHOPHOTO
ORTHOPHOTO
TM7
TM7
UNKNOWN
UNKNOWN
Domain name
WS_SYSVAL_LIFECYCLESTATUS
FUTURE
FUTURE
UNKNOWN
UNKNOWN
INACTIVE
INACTIVE
ACTIVE
ACTIVE
REMOVED
REMOVED
ABANDONED
ABANDONED
Domain name
WS_HYD_MANUFACTURER
AMERICANDARLING AMERICANDARLING
AVK
AVK
CLOW
CLOW
DRESSER
DRESSER
GREENBERG
GREENBERG
KENNEDY
KENNEDY
MUELLER
MUELLER
PACIFIC
PACIFIC
UNKNOWN
UNKNOWN
WATEROUS
WATEROUS
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
10 | P a g e
Domain name
WS_FITTING_BEND
HORIZONTAL
HORIZONTAL
VERTICAL
VERTICAL
Domain name
WS_FITTING_TYPE
11B
11B
22B
22B
45B
45B
90B
90B
COUPLING
COUPLING
CROSS
CROSS
ENDCAP
ENDCAP
LINESTOP
LINESTOP
OTHER
OTHER
REDUCER
REDUCER
SADDLE
SADDLE
TAPPING SLEEVE
TAPPING SLEEVE
TEE
TEE
UNKNOWN
UNKNOWN
WYE
WYE
Domain name
WS_SYSVAL_DIAM
2
2
3
3
4
4
6
6
8
8
10
10
12
12
16
16
20
20
24
24
30
30
36
36
42
42
48
48
54
54
Domain name
WS_SYSVAL_GROUNDTYPE
CONCRETE
CONCRETE
ASPHALT
ASPHALT
LANDSCAPE
LANDSCAPE
UNKNOWN
UNKNOWN
Domain name
WS_HYD_COLOR
0
YELLOW
1
BLACK/YELLOW
2
RED
3
UNKNOWN
Domain name
WS_SPATIALSOURCE_STD
ASBUILT
ASBUILT
DESIGN
DESIGN
FIELD
FIELD
GPS
GPS
ORTHOPHOTO
ORTHOPHOTO
UNKNOWN
UNKNOWN
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
11 | P a g e
S
Domain name
WS_METER_DIAM
0.63
.63
0.75
.75
1
1
1.5
1.5
2
2
2.5
2.5
3
3
4
4
6
6
8
8
10
10
Domain name
WS_SYSVAL_FEATUREOWNER
COC
COC
PRIVATE
PRIVATE
COM
COM
MOTOROLA
MOTOROLA
INTEL
INTEL
UNKNOWN
UNKNOWN
TOG
TOG
Domain name
WS_FITTING_MATERIAL
DI
DI
PVC
PVC
BRASS
BRASS
STL
STL
COPPER
COPPER
AC
AC
CC
CC
CI
CI
Domain name
WS_METER_MANUFACTURER
BADGER METERS
BADTER METERS
NEPTUNE METERS
NEPTUNE METERS
PRECISION METERS
PRECISION METERS
BADGER-NEPTUNE
BADGER-NEPTUNE
SENSUS
SENSUS
Domain name
WS_SYSVAL_TYPE
STANDARD
STANDARD
BLOWOFF
BLOWOFF
ARV
ARV
AIR VACUUM
AIR VACUUM
PERMASEAL
PERMASEAL
Domain name
WS_METER_TYPE
BYPASS
BYPASS
COMBO
COMBO
CMPND
CMPND
DISC
DISC
MAG
MAG
FDTEC
FDTEC
MLTJET
MLTJET
TURBIN
TURBIN
Ultrasonic
Ultrasonic
Domain name
GBA_WMSI_LIFECYCLESTATUS
Operational
Operational
Empty
Empty
Out of Service
Out of Service
Abandoned
Abandoned
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
12 | P a g e
Domain name
WS_SYSVAL_FUNCTION
INLINE
INLINE
HYDRANT
HYDRANT
STUBOUT
STUBOUT
UNKNOWN
UNKNOWN
SERVICE
SERVICE
BYPASS
BYPASS
WPF
WPF
FDC
FDC
VAULT
VAULT
BACKFLOW
BACKFLOW
PUMPOUT
PUMPOUT
PUMPSTATION
PUMPSTATION
FIRELINE
FIRELINE
ARV
ARV
ZONE_SPLIT_VALVES
ZONE_SPLIT_VALVES
Domain name
WS_SYSVAL_VALVETYPE
GATE
GATE
BUTTERFLY
BUTTERFLY
BALL
BALL
PLUG
PLUG
PIV
PIV
UNKNOWN
UNKNOWN
INSERTA
INSERTA
Domain name
GIS_BACKFLOW_MANUFACTURER
FEBCO
FEBCO
WATTS
WATTS
WILKINS
WILKINS
AMES
AMES
CONBRACO
SERVICE
HERSEY
HERSEY
RAIN BIRD
RAIN BIRD
APOLLO VALVES
APOLLO VALVES
METRON
METRON
OTHER
OTHER
Domain name
GIS_BACKFLOW_FEATUREOWNER
COC
COC
PRIVATE
PRIVATE
CONTRACTOR
CONTRACTOR
INTEL
INTEL
OCA
OCA
OMG
OMG
TOG
TOG
UNKNOWN
UNKNOWN
Domain name
GIS_BACKFLOW_TYPE
Air Gap
Air Gap
Unknown
Unknown
Double Check Detector
Double Check Detector
Pressure Vacuum Breaker
Pressure Vacuum Breaker
Double Check
Double Check
Reduced Pressure Detector
Reduced Pressure Detector
Atmoshpheric Vacuum
Breaker
Atmoshpheric Vacuum
Breaker
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
13 | P a g e
DATA DICTIONARY: SEWER
SEWER CLEANOUT
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
WW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
WW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WW_SPATIALSOURCE
RIM_ELEV
RIM_ELEV
Double
INV_ELEV
INV_ELEV
Double
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
14 | P a g e
SEWER CONTROL VALVE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
WW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
WW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WW_SPATIALSOURCE
TYPE
TYPE
Text
25
WW_CONTROL_VALVE_TYPE
DIAMETER
DIAMETER
Text
8
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
15 | P a g e
SEWER_FITTING
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
WW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
WW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WW_SPATIALSOURCE
MATERIAL
MATERIAL
Text
20
WW_FITTING_MATERIAL
TYPE
TYPE
Text
30
WW_FITTING_TYPE
BEND
BEND
Text
20
WW_FITTING_BEND
SIZE
SIZE
Text
20
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
16 | P a g e
SEWER_MANHOLE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
WW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
WW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
WW_SPATIALSOURCE
TYPE
TYPE
Text
20
WW_MH_TYPE
COVER_MATERIAL
COVER_MATERIAL
Text
25
WW_MH_COVER_MATERIAL
COVER_HOLE
COVER_HOLE
Text
25
WW_MH_COVER_HOLE
COVER_SIZE
COVER_SIZE
Text
20
WW_MH_COVER_SIZE
RIM_ELEV
RIM_ELEV
Double
INV_ELEV
INV_ELEV
Double
LINING
LINING
Text
255
WW_MH_LINER
WALL_MATERIAL
WALL_MATERIAL
Text
255
WW_MH_WALL_MATERIAL
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
17 | P a g e
Sewer Domains:
Domain name
WW_MH_COVER_MATERIAL
ALUMINUM
ALUMINUM
CASTIRON
CASTIRON
HDPE COMPOSITE - CAP
HDPE COMPOSITE - CAP
HDPE COMPOSITE - EJ
HDPE COMPOSITE - EJ
HDPE COMPOSITE - HD20
HDPE COMPOSITE - HD20
STEEL
STEEL
UNKNOWN
UNKNOWN
Domain name
WW_FEATUREOWNER
COC
COC
PRIVATE
PRIVATE
TOG
TOG
UNKNOWN
UNKNOWN
Domain name
WW_SPATIALSOURCE
GPS
GPS
ASBUILT
ASBUILT
UNKNOWN
UNKNOWN
Domain name
WW_MH_COVER_SIZE
0
Unknown
4
4
6
6
8
8
22
22
24
24
26
26
28
28
30
30
32
32
38
38
48
48
60
60
Domain name
WW_MH_COVER_HOLE
UNKNOWN
UNKNOWN
SEALED
SEALED
Domain name
WW_MH_LINER
CAST-IN-PLACE
CAST-IN-PLACE
CEMENTITIOUS
CEMENTITIOUS
COMPOSITE
COMPOSITE
CURED-IN-PLACE
CURED-IN-PLACE
EPOXY
EPOXY
FR PLASTIC INSERT
FR PLASTIC INSERT
FR POLYMER INSERT
FR POLYMER INSERT
INSERT
INSERT
UNKNOWN
UNKNOWN
Domain name
WW_MH_WALL_MATERIAL
NONE
NONE
COMPOSITE
COMPOSITE
UNKNOWN
UNKNOWN
CONCRETE
CONCRETE
POURED
POURED
TLOCK
TLOCK
PRECAST
PRECAST
BRICK
BRICK
Domain name
WW_LIFECYCLESTATUS
ABANDONED
ABANDONED
ACTIVE
ACTIVE
INACTIVE
INACTIVE
PULLED
PULLED
UNKNOWN
UNKNOWN
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
18 | P a g e
Domain name
WW_FITTING_MATERIAL
PVC
PVC
DIP
DIP
HDPE
HDPE
RCP
RCP
ACP
ACP
ABS
ABS
RUBBER
RUBBER
CONCRETE
CONCRETE
CLAY
CLAY
STEEL ENCASED VCP
STEEL ENCASED VCP
TLOCK LINE
TLOCK LINE
LINED RCP
LINED RCP
PVC LINED RCP
PVC LINED RCP
PVC LINED DIP
PVC LINED RCP
Domain name
WW_FITTING_TYPE
TEE
TEE
WYE
WYE
90 BEND
90 BEND
45 BEND
45 BEND
22 BEND
22 BEND
11 BEND
11 BEND
ENCAP
ENCAP
PLUG
PLUG
REDUCER
REDUCER
ARV
ARV
FLOW METER
FLOW METER
NO FLOW POINT
NO FLOW POINT
OWNERSHIP CHANGE
OWNERSHIP CHANGE
OTHER
OTHER
UNKNOWN
UNKNOWN
COUPLING
COUPLING
Domain name
WW_FITTING_BEND
HORIZONTAL
HORIZONTAL
VERTICAL
VERTICAL
NONE
NONE
Domain name
WW_CONTROL_VALVE_TYPE
AIRRELEASE
AIRRELEASE
AIRVACUUMRELEASE
AIRVACUUMRELEASE
PRESSURERELIEF
PRESSURERELIEF
VACUUMRELEASE
VACUUMRELEASE
UNKNOWN
UNKNOWN
N/A
N/A
Domain name
WW_MH_TYPE
0
UNKNOWN
1
SANITARY SEWER
2
ARV
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
19 | P a g e
DATA DICTIONARY: RECLAIM
RECLAIM_WATER_BACKFLOW
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
GIS_BACKFLOW_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
GIS_BACKFLOW_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
GIS_BACKFLOW_SPATIALSOURCE
SIZE
SIZE
Double
TYPE
TYPE
Text
25
GIS_BACKFLOW_TYPE
MANUFACTURER
MANUFACTURER
Text
25
GIS_BACKFLOW_MANUFACTURER
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
15
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
20 | P a g e
RECLAIM_WATER_FITTING
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
RWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
RWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
RWS_SPATIALSOURCE
MATERIAL
MATERIAL
Text
20
RWS_MAIN_OR_SERVICE_MATERIAL
DIAMETER1
DIAMETER1
Text
8
RWS_FITTING_DIAMETER
DIAMETER2
DIAMETER2
Text
8
RWS_FITTING_DIAMETER
TYPE
TYPE
Text
30
RWS_FITTING_TYPE
BEND
BEND
Text
20
RWS_FITTING_BEND
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
8
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
8
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
21 | P a g e
RECLAIM_WATER_MANHOLE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
RWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
RWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
RWS_SPATIALSOURCE
ACCESSDIAMETER
ACCESSDIAMETER
Text
8
ACCESSTYPE
ACCESSTYPE
Text
20
GROUNDTYPE
GROUNDTYPE
Text
20
RWS_GROUNDTYPE
COVERMATERIAL
COVERMATERIAL
Text
10
RWS_COVER_MATERIAL
COVERTYPE
COVERTYPE
Text
8
RWS_COVER_TYPE
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
22 | P a g e
RECLAIM_WATER_METER
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
Feature Owner
Text
20
GBA_WMSL_FEATUREOWNER
LIFECYCLESTATUS
Lifecycle Status
Text
25
GBA_WMSL_LIFECYCLESTATUS
SPATIALSOURCE
Spatial Source
Text
25
GBA_STATIC_SPATIALSOURCE
DIAMETER
DIAMETER
Double
RWS_METER_DIAM
MANUFACTURER
Manufacturer
Text
25
RWS_METER_MANUFACTURER
METERTYPE
Meter Type
Text
25
RWS_METERTYPE
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
15
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
23 | P a g e
RECLAIM WATER SYSTEM VALVE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATURE OWNER
Text
20
RWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLE STATUS
Text
20
RWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIAL SOURCE
Text
20
RWS_SPATIALSOURCE
TYPE
TYPE
Text
25
RWS_SYSVAL_TYPE
VALVETYPE
VALVE TYPE
Text
10
RWS_SYSVAL_VALVETYPE
FUNCTION
FUNCTION
Text
25
RWS_SYSVAL_FUNCTION
GROUNDTYPE
GROUNDTYPE
Text
25
RWS_SYSVAL_GROUNDTYPE
DIAMETER
DIAMETER
Double
RWS_SYSVAL_DIAM
GPS_DATE
GPS DATE
Date
8
GPS_TIME
GPS TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS COMMENT
Text
30
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
24 | P a g e
Reclaim Water Domains:
Domain name
RWS_FITTING_BEND
HORIZONTAL
HORIZONTAL
VERTICAL
VERTICAL
Domain name
RWS_SYSVAL_VALVETYPE
BALL
BALL
BUTTERFLY
BUTTERFLY
GATE
GATE
INSERTA
INSERTA
PIV
PIV
PLUG
PLUG
UNKNOWN
UNKNOWN
Domain name
RWS_MAIN_OR_SERVICE_MATERIAL
AC
AC
CC
CC
CI
CI
CU
COPPER
DI
DI
PVC
PVC
UNKNOWN
UNKNOWN
AC
AC
CC
CC
Domain name
RWS_SYSVAL_FUNCTION
ARV
ARV
INLINE
INLINE
PUMPOUT
PUMPOUT
PUMPSTATION
PUMPSTATION
SERVICE
SERVICE
STUBOUT
STUBOUT
UNKNOWN
UNKNOWN
VAULT
VAULT
Domain name
RWS_FITTING_TYPE
11B
11B
22B
22B
45B
45B
90B
90B
COUPLING
COUPLING
CROSS
CROSS
ENDCAP
ENDCAP
LINESTOP
LINESTOP
MECHANICAL JOINT
MECHANICAL JOINT
OTHER
OTHER
RECHARGE WELL
RECHARGE WELL
REDUCER
REDUCER
SADDLE
SADDLE
TAPPING SLEEVE
TAPPING SLEEVE
TEE
TEE
UNKNOWN
UNKNOWN
WYE
WYE
Domain name
RWS_SYSVAL_TYPE
ARV
ARV
AIR VACUUM
AIR VACUUM
BLOWOFF
BLOWOFF
PERMASEAL
PERMASEAL
STANDARD
STANDARD
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
25 | P a g e
Domain name
RWS_SPATIALSOURCE
ASBUILT
ASBUILT
FIELD
FIELD
GPS
GPS
ORTHOPHOTO
ORTHOPHOTO
UNKNOWN
UNKNOWN
Domain name
RWS_GROUNDTYPE
ASPHALT
ASPHALT
CONCRETE
CONCRETE
DIRT
DIRT
UNKNOWN
UNKNOWN
Domain name
RWS_SYSVAL_GROUNDTYPE
ASPHALT
ASPHALT
CONCRETE
CONCRETE
LANDSCAPE
LANDSCAPE
UNKNOWN
UNKNOWN
Domain name
RWS_LIFECYCLESTATUS
ABANDONED
ABANDONED
ACTIVE
ACTIVE
INACTIVE
INACTIVE
REMOVED
REMOVED
UNKNOWN
UNKNOWN
Domain name
RWS_FITTING_DIAMETER
0.63
0.63
0.75
0.75
1
1
1.25
1.25
1.5
1.5
2
2
2.5
2.5
3
3
4
4
6
6
8
8
10
10
12
12
15
15
16
16
18
18
20
20
24
24
30
30
Domain name
RWS_SYSVAL_DIAM
1.5
1.5
2
2
3
3
4
4
6
6
8
8
10
10
12
12
16
16
20
20
24
24
30
30
36
36
42
42
48
48
9999
UNKNOWN
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
26 | P a g e
Domain name
RWS_COVER_MATERIAL
CAST IRON
CAST IRON
ALUMINUM
ALUMINUM
UNKNOWN
UNKNOWN
Domain name
RWS_METER_DIAM
0.63
.63
0.75
.75
1
1
1.5
1.5
2
2
2.5
2.5
3
3
4
4
6
6
8
8
10
10
Domain name
RWS_COVER_TYPE
SEALED
SEALED
VENTED
VENTED
BOLTED
BOLTED
UNKNOWN
UNKNOWN
Domain name
RWS_METER_MANUFACTURER
BADGER METERS
BADGER METERS
NEPTUNE METERS
NEPTUNE METERS
PRECISION METERS
PRECISION METERS
BADGER-NEPTUNE
BADGER-NEPTUNE
SENSUS
SENSUS
Domain name
RWS_FEATUREOWNER
COC
CHANDLER
COM
MESA
INTEL
INTEL
OCA
OCA
OMG
OMG
PRIVATE
PRIVATE
SRP
SRP
TOG
GILBERT
UNKNOWN
UNKNOWN
Domain name
RWS_METERTYPE
BYPASS
BYPASS
COMBO
COMBO
CMPND
CMPND
DISC
DISC
MAG
MAG
FDTEC
FDTEC
MLTJET
MLTJET
TURBIN
TURBIN
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
27 | P a g e
DATA DICTIONARY: STORM
STORM_BUBBLER_BOX
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
GRATE_OPENINGS_NUM
GRATE_OPENINGS_NUM
Short
SWS_GRATE_OPENINGS
GRATE_LENGTH
GRATE_LENGTH
Double
8
SWS_GRATE_LENGTH
GRATE_WIDTH
GRATE_WIDTH
Double
8
SWS_GRATE_WIDTH
DRYWELL_ASSOC
DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
28 | P a g e
STORM_CATCHBASIN
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
STRUCTURE_TYPE
STRUCTURE_TYPE
Short
SWS_STRUCTURE_TYPE
CATCHBASIN_TYPE
CATCHBASIN_TYPE
Text
25
SWS_CB_TYPE
CITY_EMBLEM
CITY_EMBLEM
Text
5
GIS_BOOLEAN_YES_NO
ACCESS_OPENING_TYPE
ACCESS_OPENING_TYPE
Text
25
SWS_CB_ACCESS_OPENING_TYPE
GRATE_LENGTH
GRATE_LENGTH
Double
SWS_GRATE_LENGTH
GRATE_WIDTH
GRATE_WIDTH
Double
SWS_GRATE_WIDTH
LID
LID
Text
5
GIS_BOOLEAN_YES_NO
LID_TYPE
LID_TYPE
Text
25
SWS_CB_LID_TYPE
DRYWELL_CONN
DRYWELL_CONN
Text
5
GIS_BOOLEAN_YES_NO
OUTLET_CONN
OUTLET_CONN
Text
5
GIS_BOOLEAN_YES_NO
BUBBLERBOX_CONN
BUBBLERBOX_CONN
Text
5
GIS_BOOLEAN_YES_NO
BUBBLERBOX_DRYWELL_ASSOC
BUBBLERBOX_DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
LAKE_DRAIN
LAKE_DRAIN
Text
5
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
29 | P a g e
STORM_COLLECTION_VAULT
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
20
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
20
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
20
SWS_SPATIALSOURCE
INLET_NUM
INLET_NUM
Short
SWS_CV_NUMB_INLETS
INLET_DIAM
INLET_DIAM
Short
SWS_CV_PIPE_SIZE
INLET_PIPE_TYPE
INLET_PIPE_TYPE
Text
30
SWS_CV_PIPE_TYPE
NUISANCE_LINE_ASSOC
NUISANCE_LINE_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
DRYWELL_ASSOC
DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
LID_GRATE
LID_GRATE
Text
5
SWS_LID_GRATE
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
30 | P a g e
STORM_DRAIN_MANHOLE
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
STRUCTURE_TYPE
STRUCTURE_TYPE
Short
2
SWS_STRUCTURE_TYPE
CHANDLER_NAME
CHANDLER_NAME_ON_LID
Text
5
GIS_BOOLEAN_YES_NO
DIAMETER
DIAMETER
Short
2
SWS_SDMH_SIZE
VENT_HOLE
VENT_HOLE
Text
30
GIS_BOOLEAN_YES_NO
ACCESS_OPENING_TYPE
ACCESS_OPENING_TYPE
Text
25
SWS_SDMH_ACCESS_OPENING_TYPE
LID_TYPE
LID_TYPE
Text
30
SWS_SDMH_TYPE
LID_TEXT
LID_TEXT
Text
30
SWS_SDMH_LID_TEXT
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
31 | P a g e
STORM_DRYWELL
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
FIELD_LOC
FIELD_LOC
Text
100
SWS_DW_LOCATION
INSTALLER
INSTALLER
Text
30
SWS_DW_INSTALLER
CHAMBER_TYPE
CHAMBER_TYPE
Text
30
SWS_DW_CHAMBER_TYPE
LID_SIZE
LID_SIZE
Short
SWS_DW_LID_SIZE
LID_TYPE
LID_TYPE
Text
25
SWS_DW_LID_TYPE
NUISANCE_LINE_ASSOC
NUISANCE_LINE_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
CONCRETE_PAD
CONCRETE_PAD
Text
5
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
32 | P a g e
STORM_INLET
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
CATCHBASIN_TYPE
CATCHBASIN_TYPE
Text
25
SWS_CB_TYPE
FIELD_LOC
FIELD_LOC
Text
100
SWS_FIELD_LOC
GRATE_ASSOC
GRATE_ASSOC
Text
25
GIS_BOOLEAN_YES_NO
GRATE_LENGTH
GRATE_LENGTH
Double
SWS_GRATE_LENGTH
GRATE_WIDTH
GRATE_WIDTH
Double
SWS_GRATE_WIDTH
INLET_PIPE_DIAM
INLET_PIPE_DIAM
Short
SWS_INLET_PIPE_DIAM
INLET_NUMBER
NUMBER_OF_INLETS
Short
SWS_INLET_NUMBER
TRASHRACK_ASSOC
TRASHRACK_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
TRASH_LENGTH
TRASH_LENGTH
Double
TRASH_WIDTH
TRASH_WIDTH
Double
NUISANCE_LINE_ASSOC
NUISANCE_LINE_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
BUBBLER_BOX_DRYWELL_ASSOC
BUBBLER_BOX_DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
HEADWALLASSOC
HEADWALLASSOC
Text
5
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
33 | P a g e
STORM_OUTLET
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
GRATE_ASSOC
GRATE_ASSOC
Text
25
GIS_BOOLEAN_YES_NO
GRATE_LENGTH
GRATE_LENGTH
Double
SWS_GRATE_LENGTH
GRATE_WIDTH
GRATE_WIDTH
Double
SWS_GRATE_WIDTH
INLET_PIPE_DIAM
INLET_PIPE_DIAM
Short
SWS_INLET_PIPE_DIAM
INLET_NUMBER
NUMBER_OF_INLETS
Short
SWS_INLET_NUMBER
TRASHRACK_ASSOC
TRASHRACK_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
TRASH_LENGTH
TRASH_LENGTH
Double
TRASH_WIDTH
TRASH_WIDTH
Double
NUISANCE_LINE_ASSOC
NUISANCE_LINE_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
BUBBLER_BOX_DRYWELL_ASSOC
BUBBLER_BOX_DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
HEADWALLASSOC
HEADWALLASSOC
Text
5
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
34 | P a g e
STORM_SCUPPER
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
FEATUREOWNER
Text
25
SWS_FEATUREOWNER
LIFECYCLESTATUS
LIFECYCLESTATUS
Text
25
SWS_LIFECYCLESTATUS
SPATIALSOURCE
SPATIALSOURCE
Text
25
SWS_SPATIALSOURCE
CITY_EMBLEM
CITY_EMBLEM
Text
5
GIS_BOOLEAN_YES_NO
NUMBER_OPENINGS
NUMBER_OPENINGS
Short
WIDTH
WIDTH
Double
SPILLWAY_ASSOC
SPILLWAY_ASSOC
Text
25
GIS_BOOLEAN_YES_NO
HEADWALL_ASSOC
HEADWALL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
NUISANCE_LINE_ASSOC
NUISANCE_LINE_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
BUBBLERBOX_ASSOC
BUBBLERBOX_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
BUBBLER_BOX_DRYWELL_ASSOC
BUBBLER_BOX_DRYWELL_ASSOC
Text
5
GIS_BOOLEAN_YES_NO
LAKE_DRAIN
LAKE_DRAIN
Text
5
GIS_BOOLEAN_YES_NO
RIPRAP
RIPRAP
Text
25
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
35 | P a g e
Storm Domains:
Domain name
SWS_DW_LOCATION
AIRPORT
AIRPORT
CITYRETENTION
CITY RETENTION
PARK
PARK
PARKING_LOT
PARKING LOT
PRIVATERETENTION
PRIVATE RETENTION
STREET
STREET
WELL_SITE
WELL SITE
Domain name
SWS_LIFECYCLESTATUS
ACTIVE
ACTIVE
REMOVED
REMOVED
ABANDONED
ABANDONED
INACTIVE
INACTIVE
FUTURE
FUTURE
Domain name
SWS_GRATE_OPENINGS
1
1
2
2
3
3
4
4
5
5
6
6
Domain name
SWS_GRATE_LENGTH
12
12
24
24
28
28
30
30
36
36
38
38
40
40
50
50
60
60
76
76
Domain name
SWS_SPATIALSOURCE
APPROVED_PLANS
APPROVED_PLANS
ASBUILT
ASBUILT
DESIGN
DESIGN
FIELD
FIELD
GPS
GPS
ORTHOPHOTO
ORTHOPHOTO
UNKNOWN
UNKNOWN
Domain name
SWS_CB_LID_TYPE
STEEL
STEEL
CONCRETE
CONCRETE
Domain name
SWS_DW_CHAMBER_TYPE
DOUBLE
DOUBLE
SINGLE
SINGLE
TRIPLE
TRIPLE
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
36 | P a g e
Domain name
SWS_SDMH_SIZE
22
22
24
24
26
26
28
28
30
30
32
32
38
38
Domain name
SWS_SDMH_LID_TEXT
CHANDLER_SANITATION_SEWER
CHANDLER SANITATION SEWER
CHANDLER_STORM/SEWER
CHANDLER STORM/SEWER
NONE
NONE
OTHER
OTHER
STORM SEWER
STORM SEWER
Domain name
SWS_DW_INSTALLER
McGUCKINDRILLING
McGUCKIN DRILLING
TORRENTRESOURCES
TORRENT RESOURCES
WACODRILLING
WACO DRILLING
OTHER
OTHER
Domain name
SWS_DW_LID_SIZE
22
22
24
24
25
25
26
26
32
32
38
38
Domain name
SWS_CB_ACCESS_OPENING_TYPE
NONE
NONE
RECTANGULAR
RECTANGULAR
ROUND
ROUND
SQUARE
SQUARE
Domain name
SWS_STRUCTURE_TYPE
1
CATCH BASIN
2
SCUPPER
3
DRYWELL
4
MANHOLE
5
OUTLET
6
INLET
7
BUBBLERBOX
8
SPILLWAY
9
SEPARATOR
Domain name
SWS_FEATUREOWNER
ADOT
ADOT
CITY_OF_CHANDLER
CITY_OF_CHANDLER
HOA
HOA
OTHER
OTHER
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
37 | P a g e
Domain name
SWS_GRATE_WIDTH
6
6
12
12
16
16
18
18
24
24
28
28
30
30
36
36
38
38
44
44
72
72
Domain name
SWS_DW_LID_TYPE
STEEL
STEEL
GRANITE
GRANITE
CONCRETE_SEALED
CONCRETE_SEALED
GRATE
GRATE
Domain name
SWS_INLET_PIPE_DIAM
12
12
13
13
14
14
15
15
16
16
18
18
24
24
26
26
30
30
36
36
42
42
46
46
60
60
72
72
Domain name
SWS_SDMH_ACCESS_OPENING_TYPE
NONE
NONE
RECTANGULAR
RECTANGULAR
ROUND
ROUND
SQUARE
SQUARE
Domain name
SWS_FIELD_LOC
PARK
PARK
WELLSI
WELL_SITE
PRKLOT
PARKING_LOT
STREET
STREET
AIRPOR
AIRPORT
CTYRTN
CITYRETENTION
PVRET
PRIVATERETENTION
Domain name
SWS_SDMH_TYPE
PRESSURIZED
PRESSURIZED
NON-PRESSURIZED
NON-PRESSURIZED
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
38 | P a g e
Domain name
SWS_INLET_NUMBER
1
1
2
2
3
3
4
4
Domain name
SWS_CV_PIPE_SIZE
12
12
14
14
16
16
18
18
20
20
24
24
30
30
36
36
Domain name
SWS_CB_TYPE
TYPE_A
TYPE_A
TYPE_B
TYPE_B
TYPE_C
TYPE_C
TYPE_D
TYPE_D
TYPE_E
TYPE_E
TYPE_F
TYPE_F
TYPE_G
TYPE_G
TYPE_H
TYPE_H
TYPE_Q
TYPE_Q
NONE
NONE
Domain name
SWS_LID_GRATE
LID
LID
GRATE
GRATE
Domain name
SWS_CV_PIPE_TYPE
CONCRETE
CONCRETE
OTHER
OTHER
METAL
METAL
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
39 | P a g e
DATA DICTIONARY: MISCELLANEOUS POINTS
MISCELLANEOUS POINT
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
SIZE
SIZE
Double
MATERIAL
MATERIAL
Text
30
UTILITY_TYPE
UTILITY_TYPE
Text
30
PW_UTILITY_TYPE
NOTES
NOTES
Text
150
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
50
Domains:
Domain name
PW_UTILITY_TYPE
WATER
WATER
WASTEWATER
WASTEWATER
RECLAIM
RECLAIM
STORM
STORM
OTHER
OTHER
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
40 | P a g e
DATA DICTIONARY: STREETLIGHTS
STREETLIGHTS
Field Name
Alias Name
Type
Length
Domain
OBJECTID
OBJECTID
OID
SHAPE
SHAPE
Geometry
FEATUREOWNER
POLE_OWNER
Text
10
ST_STLITINV_FEATUREOWNER
SPATIALSOURCE
SPATIALSOURCE
Text
25
GBA_STATIC_SPATIALSOURCE
POLENUMBER
POLENUMBER
Text
10
POLE_HEIGHT
POLE_HEIGHT
Short
POLE_TYPE
POLE_TYPE
Text
30
TE_STLITINV_POLE_TYPE
POLE_COAT
POLE_COAT
Text
30
TE_STLITINV_POLE_COAT
FOUNDATION
FOUNDATION
Text
30
GIS_BOOLEAN_YES_NO
GPS_DATE
GPS_DATE
Date
GPS_TIME
GPS_TIME
Text
10
LATITUDE
LATITUDE
Double
LONGITUDE
LONGITUDE
Double
ALTITUDE
ALTITUDE
Double
HORIZONTAL_ACCURACY
HORIZONTAL_ACCURACY (m)
Double
VERTICAL_ACCURACY
VERTICAL_ACCURACY (m)
Double
GPS_COMMENT
GPS_COMMENT
Text
255
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC
41 | P a g e
Streetlights Domains:
Domain name
ST_STLITINV_FEATUREOWNER
COC
CITY OF CHANDLER
PRIVATE
PRIVATE
SRP
SRP
AP
APS
Domain name
GBA_STATIC_SPATIALSOURCE
GPS
GPS
ORTHOPHOTO
ORTHOPHOTO
APPROVED_PLANS
APPROVED_PLANS
GEOCODED
GEOCODED
UNKNOWN
UNKNOWN
Domain name
TE_STLITINV_POLE_TYPE
SL 1
SL 1
SL 6
SL 6
SL 8
SL 8
SL 10
SL 10
SL 16
SL 16
SL 17
SL 17
CURVED
CURVED
CUSTOM
CUSTOM
STERNBERG
STERNBERG
SIGNAL POLE
SIGNAL POLE
POWER POLE
POWER POLE
Domain name
TE_STLITINV_POLE_COAT
GALVANIZED
GALVANIZED
PAINTED
PAINTED
POWDER COATED
POWDER COATED
Docusign Envelope ID: 95486FF9-A66D-4B46-9FED-F539DE0C91AC