McQueen Road Corridor Study Transportation Commission Meeting Kimley-Horn | Michael Grandy & Ryan Marks November 19, 2025 | City of Chandler Today’s Agenda § Project History § Public Survey Results § Traffic Study Findings § Alternative Evaluation and Recommendations § Typical Roadway Sections § Drainage Retention § Intersection Layouts 2 Project History 3 THIS PROJECT § Recommended for Major Arterial Improvements in 2019 TMP Project History 4 § Warner Rd to Chandler Blvd: Phased Arterial Set Up For Future Inside Widening § Chandler Blvd to Pecos Rd: Minor Arterial Not Set Up For Future Widening Inside Widening Project History 5 § Three McQueen Rd segments planned for improvements in City CIP § Phase 1 – Warner Rd to Ray Rd Design/Construction: FY27-28/FY29-30 § Phase 2 – Ray Rd to Chandler Blvd Design/Construction: FY28-29/FY30-31 § Phase 3 – Chandler Blvd to Pecos Rd Design/Construction: FY29-30/FY31-32 Public Survey Results § Lack of Bicycle Safety § Bike lanes or paths to be considered § Preference for Separated Shared-Use Path vs. On-Street Bike Lanes § Traffic/Congestion § Major safety concern, especially near the five schools along the corridor 693 Responses (Aug/Sep 2024) 6 Traffic Study Findings 7 § Warner, Ray, and Chandler intersections in City Top 25 for crash rate (1 fatal, 10 serious injury crashes) § Rear end (35%) and left-turn (25%) crashes most common § LOS D or better at all intersections in existing condition § LOS E/F by 2050 at most intersections if no improvements are made § LOS D or better at all intersections by 2050 with recommended improvements § Recommendations: § Widen McQueen Road to six lanes § Widen major intersections to include dual left- turn lanes and dedicated right-turn lanes Alternative Evaluation (Phase 1 & 2) 8 Phase 1 – Warner Road to Ray Road Phase 2 – Ray Road to Chandler Boulevard Alternative Evaluation (Phase 1 & 2) 9 Phase 1 – Warner Road to Ray Road Alternative Evaluation (Phase 1 & 2) 10 Phase 2 – Ray Road to Chandler Boulevard Alternative Recommendation (Phase 1) 11 Phase 1 – Warner Road to Ray Road Alternative Recommendation (Phase 2) 12 Phase 2 – Ray Road to Chandler Boulevard Alternative Evaluation (Phase 3) 13 Phase 3N – Chandler Blvd to Frye Rd Phase 3S – Frye Road to Pecos Road Alternative Evaluation (Phase 3) 14 Phase 3N – Chandler Boulevard to Frye Road Alternative Evaluation (Phase 3) 15 Phase 3S – Frye Road to Pecos Road Alternative Recommendation (Phase 3) 16 Phase 3 – Chandler Blvd to Pecos Road Alternative Recommendation (Phase 3) 17 MATCH LINE MATCH LINE Alternative Evaluation (Intersections) 18 § Two alternatives for each intersection § Alternative 1: § Symmetrical widening § Add dual lefts (McQueen) and right turns (all approaches) § Alternative 2: § Reduced widening § Shifted alignment § Shared-use path to reduce impacts Alternative 1 Alternative 2 Alternative Recommendation (Intersections) 19 § Alternative 1 “B” – Symmetrical Widening, Add Dual Lefts (McQueen) and Right Turns (All Approaches) with Shared-Use Path on West Side Alternative 1 “B” Questions/Comments? 20