Agreement

City of Chandler — Regular Meeting (2025-12-11)

View PDF Meeting page

Extracted text (via pymupdf) 24826 characters
Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1 
 
Project No.:   
CA2402.451 
Rev. 2/28/2025 
Page 1 
 
 
 
AMENDMENT NO. 1 TO  
CONSTRUCTION MANAGEMENT SERVICES AGREEMENT 
 
DR. A.J. CHANDLER PARK RENOVATION PHASE 1 
PROJECT NO. CA2402.451 
 
Council Date: December 11, 2025 
 
THIS AMENDMENT NO. 1 (“Amendment No. 1”) to the professional services agreement 
dated June 17, 2025, (the “Agreement”) is made by and between the City of Chandler, an 
Arizona municipal corporation, (“City”) and Dibble CM, LLC, a Delaware corporation, 
(“Consultant”), on this ______ day of ___________________, 2025, (“Effective Date” by Clerk).  (City 
and Consultant may individually be referred to as “Party” and collectively referred to as 
“Parties”). 
 
RECITALS 
 
A. 
The Parties entered into the Agreement for construction management services 
(“Services”) for the Dr. A.J. Chandler Park Renovation Phase 1 project. 
 
B. 
The Parties have determined that it is necessary and desirable for the Consultant to 
perform services for the City under the terms and conditions set forth in this Amendment 
No. 1 and the Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the 
Agreement and this Amendment No. 1, the Parties agree to amend and modify the 
Agreement as follows. 
 
SECTION I – CONSULTANT’S SERVICES 
 
The Consultant’s Services are modified as described in the Exhibit "A" attached to and 
made part of this amendment by reference.  
 
SECTION II – PERIOD OF SERVICE 
 
The Period of Service is increased by 370 calendar days for a revised total of 640 calendar 
days. 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1 
 
Project No.:   
CA2402.451 
Rev. 2/28/2025 
Page 2 
 
SECTION III – PAYMENT OF COMPENSATION AND FEES 
 
The consultant fees are increased by $620,140 and will be payable in accordance with 
Exhibit "B" attached to and made part of this amendment by reference, for a revised 
total not to exceed $679,980. 
 
SECTION IV – CONFLICT AMONG DOCUMENTS 
 
The Agreement, this Amendment No. 1, and any previous amendments constitute the 
complete agreement between the Parties concerning the subject matter of the Agreement 
and replace any prior oral or written communications between the Parties.  If a conflict or 
ambiguity arises between the Agreement and this Amendment 1, the instrument in the 
following order prevails and controls: (1) this Amendment 1; (2) any previous amendments 
from most recent to oldest; and (3) the Agreement. 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW 
 
 
 
 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1 
Project No.:   
CA2402.451
Rev. 2/28/2025 
Page 3 
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be duly 
executed.  Each Party warrants and represents that its respective signatories whose 
signatures appear below have been and are on the date of signature duly authorized to 
execute this Amendment No. 1. 
“CITY”  
CITY OF CHANDLER 
Mayor 
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
City Clerk 
Seal 
“CONSULTANT” 
DIBBLE CM, LLC 
Signature
Date 
Print Name 
Title 
Signer Email Address 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
November 18, 2025
president
KC Brandon
kcbrandon@dibblecm.com
November 18, 2025

Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1 
 
Project No.:   
CA2402.451 
Rev. 2/28/2025 
Page 4 
 
AMENDMENT NO. 1 (cont.) 
PROJECT:  DR. A.J. CHANDLER PARK RENOVATION PHASE 1 
PROJECT NO.: CA2402.451 
 
These changes result in the following adjustments of Agreement amount and/or time: 
 
Amendment authorized by Owner name: Kim Moyers / Lauren Koll / Mickey Ohland  Date: 11/3/2025 
Consultant Contact Name: KC Brandon                                   email:  kcbrandon@dibblecom.com 
Original Agreement amount: 
$59,840 
Previous Amendment(s) total: 
$0 
Last Agreement amount approved by Council: 
N/A 
This Amendment: 
$620,140 
This Amendment + previous Amendment(s) not approved by Council total: 
$620,140 
Revised Agreement total: 
$679,980 
Council Approval Required (yes indicates approval required) 
Yes 
No 
Amendment(s) total over $100,000: 
☒ 
☐ 
Amendment(s) total causes Agreement to exceed $100,000:  
☒ 
☐ 
Agreement Time 
Notice to Proceed (NTP) date for Original Agreement: 
6/17/2025 
Agreement time prior to this Amendment                             
270 
(including previous  amendments): 
Calendar Days 
Net change resulting from this Amendment: 
370 
Calendar Days 
Revised Agreement time (including this Amendment): 
640 
Calendar Days 
Council Approval (if applicable) 
Council Approval Date:    12/11/2025 
 
cc:  Project Manager, Consultant, Owner, File 
 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Project Name: CA2402.451 – Amendment No. 1 
 
Project No.: Dr. A.J. Chandler Park Renovation Phase 1 
Rev 2/28/2025 
Page A-1 
 
EXHIBIT A 
SCOPE OF WORK 
 
 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

October 30, 2025 
 
City of Chandler 
 
Attn: 
Mr. Scott Riter 
 
Construction Project Manager 
 
Public Works and Utilities Department 
 
Re: 
Project No. CA2402.451 Amendment 1 
 
Dr. AJ Chandler Park 
 
Construction Management and Inspection Services Proposal 
 
 
Dear Mr. Riter, 
 
Dibble CM is pleased to submit our construction management and inspection services proposal (Amendment 
1) for this project. This proposal is based on the overall project duration provided by the CMAR contractor. This 
Amendment 1 agreement adds an additional 370 Calendar Days. Following is a summary of the services we will 
provide: 
Construction Administration Activities 
• 
Monitor job progress and document quantities of work completed. 
• 
Review the contractor’s pay requests and make recommendations to the city. 
• 
Monitor the Contractor’s progress in relation to the approved project schedule. Notify the 
Contractor and City of any deviations from the approved schedule which may cause a delay to 
the scheduled completion date.  Request schedule recovery plans and revised schedules when 
needed, to show progress in conformance with contract requirements. Review and provide 
comments to schedule updates submitted by the Contractor. 
• 
Evaluate Contractor requests for extra cost work, or construction contract time extensions and 
make recommendations to the City regarding approval or rejection.  Prepare Contract 
Contingency and Allowance approval documents for processing and final summary based on 
approved requests. 
• 
Conduct progress meetings to review the current schedule and work progress and to facilitate 
resolution of construction issues. Prepare minutes of the meetings and distribute to the 
attendees and project stakeholders. 
• 
Maintain files and documentation of all information related to the project including 
correspondence, submittals, RFIs, inspection reports, test reports, pay applications, progress 
schedules, meeting minutes, field directives, and job photos.  
• 
Review, provide comments and coordinate with City and Engineer for submittal and RFI 
responses. 
• 
Provide responses for non-critical Submittals and RFIs. 
• 
Utilize Project Site software for document control including all RFIs, Submittals, Daily Reports, 
etc. 
• 
Assist with utility coordination. 
• 
Provide public outreach by utilizing MakPro as a subcontractor. 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Construction Inspection Activities 
• 
Provide construction inspection and observe contractor’s work. 
• 
Measure and document pay quantities. 
• 
Monitor Contractor’s Quality Control field testing, review materials test reports, and notify the 
Contractor of deficiencies in the work as indicated in the tests and reports. 
• 
Coordinate QA testing of the Contractor’s work as required with the City’s Quality Assurance 
material testing firm.  
• 
Observe and document unforeseen conditions, changed conditions, and extra work activities 
performed by the contractor. 
• 
Review contractor’s red-line as-built drawings on a weekly basis. 
 
Project Close-Out Activities 
• 
Schedule and conduct a pre-final walk-through with the Contractor and Engineer and 
prepare a punch list for the Contractor’s use prior to the final project walk-through. 
• 
Conduct a final project walk-through with the Contractor, Engineer, and Owner when 
appropriate. 
• 
Review Contractor request for final payment, verify final quantities, and make recommendation 
to the Owner for final payment. 
• 
Review Contractor red line drawings and coordinate with Engineer for as-built drawings. 
 
 
Dibble CM appreciates this opportunity.  Please let me know if you have any questions or comments regarding 
this proposal.    
 
Respectfully, 
 
Marc Stern 
 
Marc Stern 
Construction Manager 
Dibble CM 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

1 
 
EXHIBIT “A” Amendment 1 
 
CONSTRUCTION MANAGEMENT 
SCOPE OF SERVICES 
CA2402.451 
Dr. AJ Chandler Park 
 
PROJECT TASKS 
 
 
3. CONSTRUCTION MANAGEMENT  
A. Task 3.1 Weekly Construction Meetings 
i. Consultant must conduct weekly construction meetings.  Each meeting 
includes agenda and minutes; Request for Information (RFI); Shop Drawing; 
Request for Information (RFI); Field Directive (FD); Material Certification; and 
Allowance Logs. Consultant assumes (52) fifty two weekly meetings will be 
held. 
B. Task 3.2 CPM Schedule 
i. Consultant must review Contractor’s monthly CPM schedule updates 
submitted with each payment application, identify CPM tasks behind schedule 
that may affect critical path items, project substantial and final completion 
dates and initiate correspondence to City regarding those tasks. Consultant 
assumes (12) twelve reviews of updated CPM schedule.  
C. Task 3.3 Requests for Information (RFI’s) 
i. Consultant must review, evaluate, and respond to Contractor Requests for 
Information (RFI’s); and prepare and maintain a submittal log of all RFI’s. 
Consultant assumes a (40) forty RFI responses.  
D. Task 3.4 Shop Drawing Submittals 
i. Consultant must review, evaluate, and respond to Contractor shop drawing 
submittals; and prepare and maintain a submittal log of all shop drawing 
submittals. Consultant assumes (80) eighty reviews.  
E. Task 3.5 Requests for Proposal (RFP) 
i. Consultant must prepare Requests for Proposal (RFP) documents detailing 
requested additional work tasks; review and evaluate Contractor RFP 
responses (cost derivatons) with approval recommendations; and prepare and 
maintain a submittal log list of all RFP’s. Consultant assumes (15) fifteen RFPs.   
F.  Task 3.6 Field Directives (FD’s) 
i. Consultant must prepare Field Directive (FD) documents detailing requested 
additional work tasks; review and evaluate Contractor FD responses with 
approval recommendations; and prepare and maintain a submittal log list of 
all FD’s. Consultant assumes (15) fifteen FD’s.   
G. Task 3.7 Contractor Payment Applications 
i. i.Consultant must review and evaluate Contractor monthly payment 
applications and make recommendation for payment; maintain a weekly 
record of constructed pay quantities and compile monthly totals; and 
coordinate payment application with the City quantity report and the 
inspectors’ daily logs. Consultant assumes  (12) twelve payment applications, 
with (2) two reviews each. 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

2 
 
 
 
H. Task 3.8 Field Coordination 
i. Consultant to assist in coordinating utility connections. 
ii. Maintain communication and act as a liaison with contractor, public outreach 
firm, and city. 
 
 
4. CONSTRUCTION INSPECTION 
a. Task 4.1 Inspection Services 
i. Consultant must provide weekly construction inspection to verify materials 
and installations conform to construction documents; prepare daily inspection 
reports documenting Contractor construction activities and progress during 
field inspection visits; and perform intermittent erosion control inspections. 
Consultant assumes 1 inspector full time 40 hrs.  per week for (12) twelve 
months. Consultant assumes 300 hrs. of overtime for project duration. 
b. Task 4.2 Project Closeout    
i. Consultant must compile non-conformance list prior to Substantial 
Completion; schedule and conduct Substantial Completion inspection; 
prepare Substantial Completion punch list generated from Substantial 
Completion inspection; track items on punch list and note completed items; 
and complete and distribute Substantial Completion certificates. 
ii. Consultant must schedule and conduct Final Completion inspection; and 
complete and distribute Final Completion certificates. 
iii. Consultant must provide all documents in an electronic version that matches 
the City’s filing system, so it can be imported into City’s files. 
iv. Consultant must participate in a meeting with City staff and Designer to review 
request for information log to discuss lessons learned during the course of 
construction. 
 
5. 
MATERIALS TESTING 
a. Task 5.1 Quality Assurance (QA) Test Program 
i. Consultant must coordinate with Contractor’s testing representative to obtain 
required QA tests and sample; complete sampling and compaction testing of 
subgrade (including lime-stabilized subgrade base), aggregate base and 
asphalt concrete materials in new asphalt concrete pavement areas; complete 
sampling and compaction testing of subgrade, aggregate base (where 
required) and concrete for new curbs, gutters, sidewalks and concrete 
pavement and structures; and complete sampling and compaction testing of 
backfill for new irrigation, sewer, water, storm drain pipe, and dry utilities. 
 
6. 
RECORD DRAWINGS  
a. Task 6.1 Record Drawings 
i.  Review and monitor Contractor’s weekly updates on red-line drawing set. 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

3 
 
 
 
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS 
1. 
Application fees for City reviews and permits will be paid by CITY. 
2. 
The Owner’s Allowance will only be utilized with prior written approval from the City 
representative. 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Project Name: Dr. A.J. Chandler Park Renovation Phase 1 – Amendment No. 1 
 
Project No.: CA2402.451 
Rev. 2/28/2025 
 
Page B-1 
EXHIBIT B 
FEE SCHEDULE 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Task
Cost
3
3.1
56,160.00
$                    
3.2
4,320.00
$                      
3.3
35,800.00
$                    
3.4
44,750.00
$                    
3.5
5,400.00
$                      
3.6
5,400.00
$                      
3.7
12,840.00
$                    
3.8
Utility Coordination
7,200.00
$                      
171,870.00
$                 
4
4.1
394,680.00
$                  
4.2
25,200.00
$                    
419,880.00
$                 
5
5.1
-
$                                
-
$                                
6
6.1
9,690.00
$                      
9,690.00
$                      
18,700.00
$                    
-
$                                
-
$                                
-
$                                
18,700.00
$                    
Description
Requests for Proposal (RFP)
CPM Schedule
Requests for Information (RFI's)
Shop Drawing Submittals
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
FEE SCHEDULE
EXHIBIT "B" Amendment 1
Field Directives (FD's)
Contractor Payment Applications
Record Drawings
SUBTOTAL TASK 5:
SUBTOTAL SUBCONSULTANTS:
MakPro
SUBCONSULTANTS
CA2402.451
DR. AJ CHANDLER PARK
(NOT TO EXCEED FEE)
RECORD DRAWINGS
SUBTOTAL TASK 4:
QA Test Program ( If needed this will be billed to the Owners allowance)
MATERIALS TESTING
Inspection Services
CONSTRUCTION INSPECTION
SUBTOTAL TASK 2:
SUBTOTAL TASK 3:
Project Closeout
Weekly Construction Meetings
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

-
$                                
-
$                                
-
$                                
620,140.00
$        
Owner's Allowance
SUBTOTAL ALLOWANCES:
PROJECT TOTAL:
ALLOWANCES
Direct Expense Allowance
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

EXHIBIT "B.1"
Staff Hours and Fee Proposal
Dibble CM Staff Hours and Fee By Task
Billing Rate
-
$                      
185.00
$               
175.00
$               
156.00
$           
234.00
$           
-
$                  
-
$                  
Task
Resident 
Engineer
Senior 
Construction 
Manager
Project Engineer
Senior 
Construction 
Inspector
Senior 
Inspector 
Overtime
Total Task 
Hours
Total Task Fee
Construction Management
Attend all weekly meetings, site meetings, stakeholder meetings.
156
156
312
56,160.00
$             
CPM schedule reviews
12
12
24
4,320.00
$               
CMAR  pay app review
24
48
72
12,840.00
$             
Request for Information reviews
80
120
200
35,800.00
$             
Shop drawings/submittals reviews
100
150
250
44,750.00
$             
RFPs and FDs
30
30
60
10,800.00
$             
Utility coordination
20
20
40
7,200.00
$               
Inspections
Full time 40 hours per week x 52 weeks
2080
2,080
324,480.00
$           
Overtime 
300
70,200.00
$             
-
$                         
Close Out
Pre-Final Inspection and Punch List 
20
20
40
7,200.00
$               
Final Inspection 
10
10
20
3,600.00
$               
Record drawings/review contractor final redline drawings
24
30
54
9,690.00
$               
Closeout Documents
40
40
80
14,400.00
$             
Sub-Contractors
MakPro
18,700.00
$             
-
$                         
-
$                         
-
$                         
-
$                         
Total Hours
516
636
2080
300
3,232
Total Fee 
-
$                      
95,460.00
$          
111,300.00
$       
324,480.00
$   
70,200.00
$      
-
$                  
-
$                  
620,140.00
$           
Fee Summary
Resident Engineer 
-
$                      
Senior Construction Manager - Marc Stern
95,460.00
$          
Project Engineer - Julia Cruz
111,300.00
$        
Senior Inspector - Jason Woodbury
394,680.00
$        
Sub-Contractors - MakPro
18,700.00
$          
Owner Allowance 
-
$                      
Total
620,140.00
$       
Dr. AJ Chandler Park Exhibit B.1
• This is a time and materials proposal based on the current scope of work and schedule.
• Prices are all-inclusive.  There are no additional charges for mileage or other incidental expenses.
• Proposal is for 12 months of construction management and inspection services with a proposed NTP in January, 2026 for construction start.
10/30/2025
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Project Name:  Dr. A.J. Chandler Park Renovation Phase 1 
 
 
Project No.:  CA2402.451 
Rev. 2/28/2025 
Page C-1 
 
 
EXHIBIT “C” 
SUBCONSULTANT DOCUMENTS WITH CONSULTANT 
 
 
Any subconsultant assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the Consultant and their 
subconsultants, and do not apply to the Agreement between the Consultant and 
the City. 
 
 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

MakPro Services, LLC 
2036 N. Gentry • Mesa, AZ 85213 
Office: 480-890-1927 
Email:  teresa@makprosvc.com 
October 29, 2025 
Mr. Marc Stern 
Dibble Engineering 
3020 E. Camelback Rd., Suite 201 
Phoenix, AZ  85016 
Dear Marc: 
MakPro Services, LLC (MakPro) is pleased to provide the following scope and cost estimate for 
public outreach services during construction for the City of Chandler’s Dr. AJ Chandler Park 
Improvements (CA2402.451). Construction is scheduled to begin in early 2026 and be complete 
in December 2026, approximately one year. Public outreach is an important element in projects 
such as this, that take place in Chandler’s downtown and require close communication with 
downtown businesses. MakPro has a long history of working in Chandler’s downtown, and many 
times, this small link is all that is needed to help a project run more smoothly. 
There are a variety of public outreach tools which can be used to establish appropriate 
communication with the effected stakeholders of a project. The services included in this scope 
and fee are based on my experience with the City of Chandler and Downtown Chandler on 
previous projects. This estimate is based on an estimated 1-year construction schedule. In 
addition, the public outreach services have been categorized into tasks; however, adjusting one 
task may require adjustment of other tasks as there are economies of scale and efficiencies 
embedded in the cost estimate.     
Please take a moment to review this scope and cost estimate and if I’ve missed or 
misunderstood any of the project characteristics, or if you’d like to customize this proposal in 
some other way, please let me know.   
Task 1:  Pre-Construction and Project Progress Meetings, and Team Communication 
MakPro will prepare for and attend the pre-construction meeting and weekly progress meetings 
during construction (1 year ~ 52 meetings), as well as participate in ongoing team communica-
tions throughout the project. 
Task 2:  Construction Notice & Stakeholder Communications 
Prior to start of construction, MakPro shall develop, print, coordinate and mail one printed pre-
construction notice to project area stakeholders, and property owners directly adjacent to the 
work area. In addition, MakPro will coordinate with businesses more directly impacted by the 
work, and attend, as needed, DCCP Merchant Meetings to provide information on the project.  
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140

Mr. Marc Stern, Dibble Construction Management 
             October 29, 2025 
Public Outreach Services – Dr. AJ Chandler Park Improvements (CA2402.451) 
 
 
Task 3:  Project Communications   
• 
Project Webpage: MakPro shall maintain a project webpage on ChandlerAz.gov for the 
project, which is capable of multilingual information, and will include information related to 
the project construction schedule and how to contact the project team. The site will be 
updated with any new information on a regular basis. 
 
• 
Project E-Updates: MakPro shall prepare regular email updates, approximately every 2-3 
weeks or to convey significant project milestones, with upcoming construction schedule 
information, which will be shared with the DCCP, and we’ll also maintain a distribution list of 
those interested in the project.   
 
• 
Hotline: MakPro shall maintain a 24-hour bilingual project hotline to respond to inquiries or 
complaints, maintain a call log and coordinate with the project team to respond to calls. 
 
Provided below are the estimated hours for each task, as well as printing and postage costs: 
Activity 
Principal Hrs 
($120/hr) 
Associate 
Hrs ($100/hr) 
Total 
Public Outreach Services 
 
 
 
Task 1: Pre-construction & Progress Meetings 
40 
12 
$6,000 
Task 2: Construction Notice & Stakeholder Communications 
25 
15 
$4,500 
Task 3: Project Communications  
                (Hotline: 13 mos @ $300/mo) 
20 
 
10 
$3,400 
$3,900 
Sub Total 
85 
37 
$17,800 
Printing/Distribution Cost (1 mailing at approx. 300 pieces each) 
$900 
Grand Total 
$18,700 
 
The total cost for public outreach services as identified above based on a 1-year project 
schedule should not exceed $18,700.00. This cost estimate assumes a labor rate of 
$120/hour for principal and $100/hour for associate hours. The project hotline is billed at 
$300/mo for availability 24/7, and scheduled progress meetings are assumed to be virtual, and 
have a one-hour minimum. Also, this estimate incorporates efficiencies from one task/activity to 
another, so removal of an activity may require an adjustment of hours in other activities.   
 
This proposal assumes any displays, exhibits, engineering designs or details, required for public 
meetings or information will be provided by the owner, construction manager, or contractor. 
MakPro is not responsible for documenting existing property conditions, project signage, traffic 
signage, or distribution of direct door hanger notifications which may be required to 
accommodate the contractor’s work (e.g., water service disruptions). Changes of substance to 
this proposal during the project may affect the final cost. 
 
Thank you for the opportunity to work with you and the City of Chandler on this project.  
Should you have questions or need additional information related to this proposal, please feel 
free to contact me at (480) 890-1927. 
 
Sincerely, 
 
Teresa Makinen 
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140