Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1
Project No.:
CA2402.451
Rev. 2/28/2025
Page 1
AMENDMENT NO. 1 TO
CONSTRUCTION MANAGEMENT SERVICES AGREEMENT
DR. A.J. CHANDLER PARK RENOVATION PHASE 1
PROJECT NO. CA2402.451
Council Date: December 11, 2025
THIS AMENDMENT NO. 1 (“Amendment No. 1”) to the professional services agreement
dated June 17, 2025, (the “Agreement”) is made by and between the City of Chandler, an
Arizona municipal corporation, (“City”) and Dibble CM, LLC, a Delaware corporation,
(“Consultant”), on this ______ day of ___________________, 2025, (“Effective Date” by Clerk). (City
and Consultant may individually be referred to as “Party” and collectively referred to as
“Parties”).
RECITALS
A.
The Parties entered into the Agreement for construction management services
(“Services”) for the Dr. A.J. Chandler Park Renovation Phase 1 project.
B.
The Parties have determined that it is necessary and desirable for the Consultant to
perform services for the City under the terms and conditions set forth in this Amendment
No. 1 and the Agreement.
AGREEMENT
NOW, THEREFORE, in consideration of the premises and mutual promises contained in the
Agreement and this Amendment No. 1, the Parties agree to amend and modify the
Agreement as follows.
SECTION I – CONSULTANT’S SERVICES
The Consultant’s Services are modified as described in the Exhibit "A" attached to and
made part of this amendment by reference.
SECTION II – PERIOD OF SERVICE
The Period of Service is increased by 370 calendar days for a revised total of 640 calendar
days.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1
Project No.:
CA2402.451
Rev. 2/28/2025
Page 2
SECTION III – PAYMENT OF COMPENSATION AND FEES
The consultant fees are increased by $620,140 and will be payable in accordance with
Exhibit "B" attached to and made part of this amendment by reference, for a revised
total not to exceed $679,980.
SECTION IV – CONFLICT AMONG DOCUMENTS
The Agreement, this Amendment No. 1, and any previous amendments constitute the
complete agreement between the Parties concerning the subject matter of the Agreement
and replace any prior oral or written communications between the Parties. If a conflict or
ambiguity arises between the Agreement and this Amendment 1, the instrument in the
following order prevails and controls: (1) this Amendment 1; (2) any previous amendments
from most recent to oldest; and (3) the Agreement.
SIGNATURE PAGE TO FOLLOW
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1
Project No.:
CA2402.451
Rev. 2/28/2025
Page 3
IN WITNESS WHEREOF, the Parties hereto have caused this Amendment No. 1 to be duly
executed. Each Party warrants and represents that its respective signatories whose
signatures appear below have been and are on the date of signature duly authorized to
execute this Amendment No. 1.
“CITY”
CITY OF CHANDLER
Mayor
RECOMMENDED BY:
Daniel Haskins, P.E.
CIP City Engineer
APPROVED AS TO FORM:
City Attorney
ATTEST:
City Clerk
Seal
“CONSULTANT”
DIBBLE CM, LLC
Signature
Date
Print Name
Title
Signer Email Address
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
November 18, 2025
president
KC Brandon
kcbrandon@dibblecm.com
November 18, 2025
Project Name: Dr. A.J. Chandler Park Renovation Phase 1– Amendment No. 1
Project No.:
CA2402.451
Rev. 2/28/2025
Page 4
AMENDMENT NO. 1 (cont.)
PROJECT: DR. A.J. CHANDLER PARK RENOVATION PHASE 1
PROJECT NO.: CA2402.451
These changes result in the following adjustments of Agreement amount and/or time:
Amendment authorized by Owner name: Kim Moyers / Lauren Koll / Mickey Ohland Date: 11/3/2025
Consultant Contact Name: KC Brandon email: kcbrandon@dibblecom.com
Original Agreement amount:
$59,840
Previous Amendment(s) total:
$0
Last Agreement amount approved by Council:
N/A
This Amendment:
$620,140
This Amendment + previous Amendment(s) not approved by Council total:
$620,140
Revised Agreement total:
$679,980
Council Approval Required (yes indicates approval required)
Yes
No
Amendment(s) total over $100,000:
☒
☐
Amendment(s) total causes Agreement to exceed $100,000:
☒
☐
Agreement Time
Notice to Proceed (NTP) date for Original Agreement:
6/17/2025
Agreement time prior to this Amendment
270
(including previous amendments):
Calendar Days
Net change resulting from this Amendment:
370
Calendar Days
Revised Agreement time (including this Amendment):
640
Calendar Days
Council Approval (if applicable)
Council Approval Date: 12/11/2025
cc: Project Manager, Consultant, Owner, File
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Project Name: CA2402.451 – Amendment No. 1
Project No.: Dr. A.J. Chandler Park Renovation Phase 1
Rev 2/28/2025
Page A-1
EXHIBIT A
SCOPE OF WORK
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
October 30, 2025
City of Chandler
Attn:
Mr. Scott Riter
Construction Project Manager
Public Works and Utilities Department
Re:
Project No. CA2402.451 Amendment 1
Dr. AJ Chandler Park
Construction Management and Inspection Services Proposal
Dear Mr. Riter,
Dibble CM is pleased to submit our construction management and inspection services proposal (Amendment
1) for this project. This proposal is based on the overall project duration provided by the CMAR contractor. This
Amendment 1 agreement adds an additional 370 Calendar Days. Following is a summary of the services we will
provide:
Construction Administration Activities
•
Monitor job progress and document quantities of work completed.
•
Review the contractor’s pay requests and make recommendations to the city.
•
Monitor the Contractor’s progress in relation to the approved project schedule. Notify the
Contractor and City of any deviations from the approved schedule which may cause a delay to
the scheduled completion date. Request schedule recovery plans and revised schedules when
needed, to show progress in conformance with contract requirements. Review and provide
comments to schedule updates submitted by the Contractor.
•
Evaluate Contractor requests for extra cost work, or construction contract time extensions and
make recommendations to the City regarding approval or rejection. Prepare Contract
Contingency and Allowance approval documents for processing and final summary based on
approved requests.
•
Conduct progress meetings to review the current schedule and work progress and to facilitate
resolution of construction issues. Prepare minutes of the meetings and distribute to the
attendees and project stakeholders.
•
Maintain files and documentation of all information related to the project including
correspondence, submittals, RFIs, inspection reports, test reports, pay applications, progress
schedules, meeting minutes, field directives, and job photos.
•
Review, provide comments and coordinate with City and Engineer for submittal and RFI
responses.
•
Provide responses for non-critical Submittals and RFIs.
•
Utilize Project Site software for document control including all RFIs, Submittals, Daily Reports,
etc.
•
Assist with utility coordination.
•
Provide public outreach by utilizing MakPro as a subcontractor.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Construction Inspection Activities
•
Provide construction inspection and observe contractor’s work.
•
Measure and document pay quantities.
•
Monitor Contractor’s Quality Control field testing, review materials test reports, and notify the
Contractor of deficiencies in the work as indicated in the tests and reports.
•
Coordinate QA testing of the Contractor’s work as required with the City’s Quality Assurance
material testing firm.
•
Observe and document unforeseen conditions, changed conditions, and extra work activities
performed by the contractor.
•
Review contractor’s red-line as-built drawings on a weekly basis.
Project Close-Out Activities
•
Schedule and conduct a pre-final walk-through with the Contractor and Engineer and
prepare a punch list for the Contractor’s use prior to the final project walk-through.
•
Conduct a final project walk-through with the Contractor, Engineer, and Owner when
appropriate.
•
Review Contractor request for final payment, verify final quantities, and make recommendation
to the Owner for final payment.
•
Review Contractor red line drawings and coordinate with Engineer for as-built drawings.
Dibble CM appreciates this opportunity. Please let me know if you have any questions or comments regarding
this proposal.
Respectfully,
Marc Stern
Marc Stern
Construction Manager
Dibble CM
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
1
EXHIBIT “A” Amendment 1
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
CA2402.451
Dr. AJ Chandler Park
PROJECT TASKS
3. CONSTRUCTION MANAGEMENT
A. Task 3.1 Weekly Construction Meetings
i. Consultant must conduct weekly construction meetings. Each meeting
includes agenda and minutes; Request for Information (RFI); Shop Drawing;
Request for Information (RFI); Field Directive (FD); Material Certification; and
Allowance Logs. Consultant assumes (52) fifty two weekly meetings will be
held.
B. Task 3.2 CPM Schedule
i. Consultant must review Contractor’s monthly CPM schedule updates
submitted with each payment application, identify CPM tasks behind schedule
that may affect critical path items, project substantial and final completion
dates and initiate correspondence to City regarding those tasks. Consultant
assumes (12) twelve reviews of updated CPM schedule.
C. Task 3.3 Requests for Information (RFI’s)
i. Consultant must review, evaluate, and respond to Contractor Requests for
Information (RFI’s); and prepare and maintain a submittal log of all RFI’s.
Consultant assumes a (40) forty RFI responses.
D. Task 3.4 Shop Drawing Submittals
i. Consultant must review, evaluate, and respond to Contractor shop drawing
submittals; and prepare and maintain a submittal log of all shop drawing
submittals. Consultant assumes (80) eighty reviews.
E. Task 3.5 Requests for Proposal (RFP)
i. Consultant must prepare Requests for Proposal (RFP) documents detailing
requested additional work tasks; review and evaluate Contractor RFP
responses (cost derivatons) with approval recommendations; and prepare and
maintain a submittal log list of all RFP’s. Consultant assumes (15) fifteen RFPs.
F. Task 3.6 Field Directives (FD’s)
i. Consultant must prepare Field Directive (FD) documents detailing requested
additional work tasks; review and evaluate Contractor FD responses with
approval recommendations; and prepare and maintain a submittal log list of
all FD’s. Consultant assumes (15) fifteen FD’s.
G. Task 3.7 Contractor Payment Applications
i. i.Consultant must review and evaluate Contractor monthly payment
applications and make recommendation for payment; maintain a weekly
record of constructed pay quantities and compile monthly totals; and
coordinate payment application with the City quantity report and the
inspectors’ daily logs. Consultant assumes (12) twelve payment applications,
with (2) two reviews each.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
2
H. Task 3.8 Field Coordination
i. Consultant to assist in coordinating utility connections.
ii. Maintain communication and act as a liaison with contractor, public outreach
firm, and city.
4. CONSTRUCTION INSPECTION
a. Task 4.1 Inspection Services
i. Consultant must provide weekly construction inspection to verify materials
and installations conform to construction documents; prepare daily inspection
reports documenting Contractor construction activities and progress during
field inspection visits; and perform intermittent erosion control inspections.
Consultant assumes 1 inspector full time 40 hrs. per week for (12) twelve
months. Consultant assumes 300 hrs. of overtime for project duration.
b. Task 4.2 Project Closeout
i. Consultant must compile non-conformance list prior to Substantial
Completion; schedule and conduct Substantial Completion inspection;
prepare Substantial Completion punch list generated from Substantial
Completion inspection; track items on punch list and note completed items;
and complete and distribute Substantial Completion certificates.
ii. Consultant must schedule and conduct Final Completion inspection; and
complete and distribute Final Completion certificates.
iii. Consultant must provide all documents in an electronic version that matches
the City’s filing system, so it can be imported into City’s files.
iv. Consultant must participate in a meeting with City staff and Designer to review
request for information log to discuss lessons learned during the course of
construction.
5.
MATERIALS TESTING
a. Task 5.1 Quality Assurance (QA) Test Program
i. Consultant must coordinate with Contractor’s testing representative to obtain
required QA tests and sample; complete sampling and compaction testing of
subgrade (including lime-stabilized subgrade base), aggregate base and
asphalt concrete materials in new asphalt concrete pavement areas; complete
sampling and compaction testing of subgrade, aggregate base (where
required) and concrete for new curbs, gutters, sidewalks and concrete
pavement and structures; and complete sampling and compaction testing of
backfill for new irrigation, sewer, water, storm drain pipe, and dry utilities.
6.
RECORD DRAWINGS
a. Task 6.1 Record Drawings
i. Review and monitor Contractor’s weekly updates on red-line drawing set.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
3
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS
1.
Application fees for City reviews and permits will be paid by CITY.
2.
The Owner’s Allowance will only be utilized with prior written approval from the City
representative.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Project Name: Dr. A.J. Chandler Park Renovation Phase 1 – Amendment No. 1
Project No.: CA2402.451
Rev. 2/28/2025
Page B-1
EXHIBIT B
FEE SCHEDULE
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Task
Cost
3
3.1
56,160.00
$
3.2
4,320.00
$
3.3
35,800.00
$
3.4
44,750.00
$
3.5
5,400.00
$
3.6
5,400.00
$
3.7
12,840.00
$
3.8
Utility Coordination
7,200.00
$
171,870.00
$
4
4.1
394,680.00
$
4.2
25,200.00
$
419,880.00
$
5
5.1
-
$
-
$
6
6.1
9,690.00
$
9,690.00
$
18,700.00
$
-
$
-
$
-
$
18,700.00
$
Description
Requests for Proposal (RFP)
CPM Schedule
Requests for Information (RFI's)
Shop Drawing Submittals
CONSTRUCTION MANAGEMENT
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
FEE SCHEDULE
EXHIBIT "B" Amendment 1
Field Directives (FD's)
Contractor Payment Applications
Record Drawings
SUBTOTAL TASK 5:
SUBTOTAL SUBCONSULTANTS:
MakPro
SUBCONSULTANTS
CA2402.451
DR. AJ CHANDLER PARK
(NOT TO EXCEED FEE)
RECORD DRAWINGS
SUBTOTAL TASK 4:
QA Test Program ( If needed this will be billed to the Owners allowance)
MATERIALS TESTING
Inspection Services
CONSTRUCTION INSPECTION
SUBTOTAL TASK 2:
SUBTOTAL TASK 3:
Project Closeout
Weekly Construction Meetings
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
-
$
-
$
-
$
620,140.00
$
Owner's Allowance
SUBTOTAL ALLOWANCES:
PROJECT TOTAL:
ALLOWANCES
Direct Expense Allowance
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
EXHIBIT "B.1"
Staff Hours and Fee Proposal
Dibble CM Staff Hours and Fee By Task
Billing Rate
-
$
185.00
$
175.00
$
156.00
$
234.00
$
-
$
-
$
Task
Resident
Engineer
Senior
Construction
Manager
Project Engineer
Senior
Construction
Inspector
Senior
Inspector
Overtime
Total Task
Hours
Total Task Fee
Construction Management
Attend all weekly meetings, site meetings, stakeholder meetings.
156
156
312
56,160.00
$
CPM schedule reviews
12
12
24
4,320.00
$
CMAR pay app review
24
48
72
12,840.00
$
Request for Information reviews
80
120
200
35,800.00
$
Shop drawings/submittals reviews
100
150
250
44,750.00
$
RFPs and FDs
30
30
60
10,800.00
$
Utility coordination
20
20
40
7,200.00
$
Inspections
Full time 40 hours per week x 52 weeks
2080
2,080
324,480.00
$
Overtime
300
70,200.00
$
-
$
Close Out
Pre-Final Inspection and Punch List
20
20
40
7,200.00
$
Final Inspection
10
10
20
3,600.00
$
Record drawings/review contractor final redline drawings
24
30
54
9,690.00
$
Closeout Documents
40
40
80
14,400.00
$
Sub-Contractors
MakPro
18,700.00
$
-
$
-
$
-
$
-
$
Total Hours
516
636
2080
300
3,232
Total Fee
-
$
95,460.00
$
111,300.00
$
324,480.00
$
70,200.00
$
-
$
-
$
620,140.00
$
Fee Summary
Resident Engineer
-
$
Senior Construction Manager - Marc Stern
95,460.00
$
Project Engineer - Julia Cruz
111,300.00
$
Senior Inspector - Jason Woodbury
394,680.00
$
Sub-Contractors - MakPro
18,700.00
$
Owner Allowance
-
$
Total
620,140.00
$
Dr. AJ Chandler Park Exhibit B.1
• This is a time and materials proposal based on the current scope of work and schedule.
• Prices are all-inclusive. There are no additional charges for mileage or other incidental expenses.
• Proposal is for 12 months of construction management and inspection services with a proposed NTP in January, 2026 for construction start.
10/30/2025
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Project Name: Dr. A.J. Chandler Park Renovation Phase 1
Project No.: CA2402.451
Rev. 2/28/2025
Page C-1
EXHIBIT “C”
SUBCONSULTANT DOCUMENTS WITH CONSULTANT
Any subconsultant assumptions, clarifications, exclusions, terms & conditions,
signature blocks, etc. included are strictly between the Consultant and their
subconsultants, and do not apply to the Agreement between the Consultant and
the City.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
MakPro Services, LLC
2036 N. Gentry • Mesa, AZ 85213
Office: 480-890-1927
Email: teresa@makprosvc.com
October 29, 2025
Mr. Marc Stern
Dibble Engineering
3020 E. Camelback Rd., Suite 201
Phoenix, AZ 85016
Dear Marc:
MakPro Services, LLC (MakPro) is pleased to provide the following scope and cost estimate for
public outreach services during construction for the City of Chandler’s Dr. AJ Chandler Park
Improvements (CA2402.451). Construction is scheduled to begin in early 2026 and be complete
in December 2026, approximately one year. Public outreach is an important element in projects
such as this, that take place in Chandler’s downtown and require close communication with
downtown businesses. MakPro has a long history of working in Chandler’s downtown, and many
times, this small link is all that is needed to help a project run more smoothly.
There are a variety of public outreach tools which can be used to establish appropriate
communication with the effected stakeholders of a project. The services included in this scope
and fee are based on my experience with the City of Chandler and Downtown Chandler on
previous projects. This estimate is based on an estimated 1-year construction schedule. In
addition, the public outreach services have been categorized into tasks; however, adjusting one
task may require adjustment of other tasks as there are economies of scale and efficiencies
embedded in the cost estimate.
Please take a moment to review this scope and cost estimate and if I’ve missed or
misunderstood any of the project characteristics, or if you’d like to customize this proposal in
some other way, please let me know.
Task 1: Pre-Construction and Project Progress Meetings, and Team Communication
MakPro will prepare for and attend the pre-construction meeting and weekly progress meetings
during construction (1 year ~ 52 meetings), as well as participate in ongoing team communica-
tions throughout the project.
Task 2: Construction Notice & Stakeholder Communications
Prior to start of construction, MakPro shall develop, print, coordinate and mail one printed pre-
construction notice to project area stakeholders, and property owners directly adjacent to the
work area. In addition, MakPro will coordinate with businesses more directly impacted by the
work, and attend, as needed, DCCP Merchant Meetings to provide information on the project.
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140
Mr. Marc Stern, Dibble Construction Management
October 29, 2025
Public Outreach Services – Dr. AJ Chandler Park Improvements (CA2402.451)
Task 3: Project Communications
•
Project Webpage: MakPro shall maintain a project webpage on ChandlerAz.gov for the
project, which is capable of multilingual information, and will include information related to
the project construction schedule and how to contact the project team. The site will be
updated with any new information on a regular basis.
•
Project E-Updates: MakPro shall prepare regular email updates, approximately every 2-3
weeks or to convey significant project milestones, with upcoming construction schedule
information, which will be shared with the DCCP, and we’ll also maintain a distribution list of
those interested in the project.
•
Hotline: MakPro shall maintain a 24-hour bilingual project hotline to respond to inquiries or
complaints, maintain a call log and coordinate with the project team to respond to calls.
Provided below are the estimated hours for each task, as well as printing and postage costs:
Activity
Principal Hrs
($120/hr)
Associate
Hrs ($100/hr)
Total
Public Outreach Services
Task 1: Pre-construction & Progress Meetings
40
12
$6,000
Task 2: Construction Notice & Stakeholder Communications
25
15
$4,500
Task 3: Project Communications
(Hotline: 13 mos @ $300/mo)
20
10
$3,400
$3,900
Sub Total
85
37
$17,800
Printing/Distribution Cost (1 mailing at approx. 300 pieces each)
$900
Grand Total
$18,700
The total cost for public outreach services as identified above based on a 1-year project
schedule should not exceed $18,700.00. This cost estimate assumes a labor rate of
$120/hour for principal and $100/hour for associate hours. The project hotline is billed at
$300/mo for availability 24/7, and scheduled progress meetings are assumed to be virtual, and
have a one-hour minimum. Also, this estimate incorporates efficiencies from one task/activity to
another, so removal of an activity may require an adjustment of hours in other activities.
This proposal assumes any displays, exhibits, engineering designs or details, required for public
meetings or information will be provided by the owner, construction manager, or contractor.
MakPro is not responsible for documenting existing property conditions, project signage, traffic
signage, or distribution of direct door hanger notifications which may be required to
accommodate the contractor’s work (e.g., water service disruptions). Changes of substance to
this proposal during the project may affect the final cost.
Thank you for the opportunity to work with you and the City of Chandler on this project.
Should you have questions or need additional information related to this proposal, please feel
free to contact me at (480) 890-1927.
Sincerely,
Teresa Makinen
Docusign Envelope ID: B61AD334-F39C-4898-AB33-265C96A2E140