Amendment No. 1

City of Chandler — Study Session (2025-12-08)

View PDF Meeting page

Extracted text (via pymupdf) 6322 characters
Page 1 of 4
                                                               
City Clerk Document No. 
City Council Meeting Date:
December 11, 2025
AMENDMENT TO CITY OF CHANDLER AGREEMENT
CONCRETE REPAIR AND MAINTENANCE SERVICES
CITY OF CHANDLER AGREEMENT NO. PW5-745-4850
THIS AMENDMENT NO. 1 (Amendment No. 1) is made and entered into by and between the City of 
Chandler, an Arizona municipal corporation (City), and Temcon Concrete Construction, LLC, 
(Contractor), (City and Contractor may individually be referred to as Party and collectively referred to 
as Parties) and made 
_____________, 2025 (Effective Date).
RECITALS
WHEREAS, the Parties entered into an agreement for concrete repair and maintenance services
(Agreement); and
WHEREAS, the term of the Agreement was January 1, 2025, through December 31, 2025, with the option 
of up to four one-year extensions; and
WHEREAS, the Parties wish to exercise the first option through this Amendment to extend the 
Agreement for one year.
AGREEMENT
NOW THEREFORE, the Parties agree as follows:
1.
The recitals are accurate and are incorporated and made a part of the Agreement by this 
reference.   
2.
Section III is amended to read as follows: The Agreement is extended for a one-year period 
January 1, 2026, through December 31, 2026.
3. 
Section IV, Price is amended to read as follows: The City will pay the Contractor the per unit cost 
set forth in Revised Exhibit B of the original Agreement, attached to and made a part of this 
Amendment No. 1. Total payments made to the Contractor during the term of this Amendment 
No. 1 will not exceed $6,700,000.00.

Page 2 of 4 
4.
All other terms and conditions of the Agreement remain unchanged and in full force and effect.
If a conflict or ambiguity arises between this Amendment No. 1 and the Agreement, the terms
and conditions in this Amendment No. 1 prevail and control.
IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. 
FOR THE CITY
FOR THE CONTRACTOR
By: _________________________________________
By: _________________________________________
Its: _________________________________________
Its: _________________________________________
APPROVED AS TO FORM:
By: _________________________________________ 
City Attorney 
ATTEST: 
By: _________________________________________ 
City Clerk

Page 3 of 4 
 
Revised Exhibit B 
Pricing 
 
*Prices are tax inclusive 
 
**Quantities are listed as estimates ONLY and are NOT guaranteed. 
Item
  
 
 
 Unit 
Extended
No.
Description 
Qty
Unit
Price  
Price
1  
Saw cut, Remove and Dispose of all 
concrete and asphalt from curb ramps, 
driveways, alley entrances, sidewalks, 
and valley gutters or concrete aprons.
600,000
SF
$                  4.50 
$   2,700,000.00 
2 
Saw cut, Remove and Dispose of 
concrete curb and gutter or median 
curb 
25,000
LF
 $                  6.00 
 $       150,000.00 
3  
Sidewalk per MAG Detail 230  
95,000
SF 
 $                  6.00 
 $       570,000.00 
4  
Curb & Gutter, Median Curb per MAG 
Detail 220-1, 220-2, 221, 222, or 223
30,000 
LF 
$               24.00 
$        720,000.00 
5  
Asphalt Patch Back, 2 feet wide 
minimum 
55,750 
SF 
$               15.00 
 $       836,250.00 
6  
Horizontal Curb Cut 
100
LF
$               10.00 
$            1,000.00 
7  
ADA Truncated Domes per MAG Detail 
234
7,500 
SF 
$               25.00   $       187,500.00 
8  
Curb Ramps Either/Or per MAG Details 
(236-1, 236-2, 236-3, 236-4) Single or 
Two Singles Creating a DUAL. 
350 
EA 
$        2,750.00 
 $       962,500.00 
9 
Curb Ramps Either/Or per MAG Details 
(237-1, 237-2, 236-3) Single or Two 
Singles Creating a DUAL 
200 
EA 
$        2,500.00   $       500,000.00 
10  
Curb Ramp per MAG Detail 236-5 
(modified single) (blended transition 
200 
EA 
$        2,500.00 
 $       500,000.00 
11
Curb Ramps Either/Or per MAG Details 
( 238-1, 238-2, 238-3)  
45 
EA 
$        1,800.00  
$          81,000.00 
12  
Valley Gutters per MAG Detail 240
11,000
SF
 $                  9.50 
 $       104,500.00 
13
Concrete Apron per MAG Detail 240 
100,000
SF 
$               11.00  
$    1,100,000.00 
14  
Driveway or Alley Entrance per MAG 
Detail 260
100,000 
SF 
 $                  9.85 
 $       985,000.00 
15  
Residential driveway (walk behind) per 
MAG Detail 250-2, 4” thick
3,000 
SF 
 $                  4.75 
$          14,250.00 
16  
Commercial Driveway per   MAG Detail 
250-1, 6" Thick 
30,000 
SF 
 $                  8.00 
 $       240,000.00 
17  
Commercial driveway (walk behind) per 
MAG Detail 250-2, 6” thick
3,000 
SF 
 $                  8.50 
$          25,500.00 
18  
Return Style Driveways per MAG Detail 
251
3,000 
SF 
 $                  8.50 
 $         25,500.00

Page 4 of 4 
 
19
Bus Shelter Pad per COC Detail C-230, 
4" Thick
5,000
SF
$                  8.00 
$         40,000.00 
20
Bus Bay per COC Detail C-231, 9" Thick
1,100
SF 
$               10.25 
 $         11,275.00 
21 
Obliterate Striping, 4” equivalent 
7,000
LF
$                  2.00 
$          14,000.00 
22
Seal Obliterated Striping, 4” equivalent 
7,000
LF
$                  0.50 
$            3,500.00 
23
Striping, White Paint, 4” equivalent 
1,500
LF
 $                  0.50 
 $               750.00 
24
Striping, Yellow Paint, 4” equivalent  
500
LF
 $                  0.50 
$                250.00 
25 
Striping, White Thermoplastic, 4” 
equivalent 
5,000
LF
$                  1.50 
$           7,500.00 
26
School Crosswalk, 24”x10’ Yellow High 
Visibility Crosswalk Rectangles
2 
SET 
$            125.00 
 $               250.00 
27 
School Roll Out Yellow Dots, 24” 
Diameter 
15 
EA 
$               25.00  
 $               375.00 
28 
Traffic Control Residential and Collector 
Roadway Sections. Contractor to be 
paid as invoiced PER DAY) 
AL=allowance 
1
AL
$25,000 
$25,000 
29 
Traffic Control Arterial Roadway 
Sections. (Contractor to be paid as 
invoiced PER DAY) AL=allowance 
1 
AL 
$75,000 
$75,000 
30 
City of Chandler Uniformed Police 
Officer.  (Contractor to be paid as 
invoiced the actual cost of hiring police 
officer per day) AL=allowance 
1 
AL 
$100,000.00 
$100,000.00 
31 
Catch Basin Remove and Replacement 
(Top) (SF)
1 
SF 
$135.00 
$135.00 
32 
Catch Basin Remove and Replacement 
(Bottom) (EA) 
1
EA 
$4,500.00 
$4,500.00