Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 1 
 
 
 
PROFESSIONAL SERVICES AGREEMENT 
 CONSTRUCTION MANAGEMENT SERVICES  
 LINDSAY ROAD IMPROVEMENTS (OCOTILLO ROAD TO HUNT HIGHWAY) 
PROJECT NO.  ST2001.451; FEDERAL NO. CHN-0(246) D; ADOT NO. T024301C 
 
Council Date: January 22, 2026 
 
 
THIS AGREEMENT (“Agreement”) is made and entered into on the  _______ day of _______________, 
2026, (“Effective Date”), by and between City of Chandler, an Arizona municipal corporation, 
("City''), and Consultant Engineering, Inc., an Arizona corporation, ("Consultant") (City and 
Consultant may individually be referred to as “Party” and collectively referred to as “Parties”). 
 
RECITALS 
 
A. City proposes to engage Consultant to provide construction management services for 
Lindsay Road Improvements (Ocotillo Road to Hunt Highway) project (“Project”) as more fully 
described in Exhibit "A" (“Services”), which is attached to and made a part of this Agreement 
by this reference. 
 
B. Consultant is ready, willing, and able to provide the services described in Exhibit “A” for 
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to 
and made a part of this Agreement by this reference. 
 
C. City desires to enter into an Agreement with Consultant to provide these services under 
the terms and conditions set forth in this Agreement. 
 
AGREEMENT 
 
NOW, THEREFORE, in consideration of the premises and the mutual promises contained in this 
Agreement, City and Consultant agree as follows: 
 
SECTION I--CONSULTANT’S SERVICES 
 
Consultant must perform the services described in Exhibit “A” to City’s satisfaction within the 
terms and conditions of this Agreement and within the care and skill that a person who 
provides similar services in Chandler, Arizona exercises under similar conditions. All work or 
services furnished by Consultant under this Agreement must be performed in a skilled and 
workmanlike manner.  All fixtures, furnishings, and equipment furnished by Consultant as 
part of the work or services under this Agreement must be new, or the latest model, and of 
the most suitable grade and quality for the intended purpose of the work or service.  
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 2 
 
 
SECTION II--PERIOD OF SERVICE 
 
Consultant must perform the services described in Exhibit “A” for the term of this 
Agreement.  Unless amended in writing by the Parties, the Agreement term expires 850 
calendar days after the Notice to Proceed (NTP) Date. 
 
SECTION III--PAYMENT OF COMPENSATION AND FEES 
 
Unless amended in writing by the Parties, Consultant’s compensation and fees as more fully 
described in Exhibit “B” for performance of the services approved and accepted by City 
under this Agreement must not exceed $2,888,276 for the full term of the Agreement. 
Consultant may not increase any compensation or fees under this Agreement without the 
City’s prior written consent. Consultant must submit monthly requests for payment of 
services approved and accepted during the previous billing period and must include, as 
applicable, detailed invoices and receipts, a narrative description of the tasks accomplished 
during the billing period, a list of any deliverables submitted, and any subconsultant’s or 
supplier’s actual requests for payment plus similar narrative and listing of their work. 
Consultant must submit an Application and Certification for Payment Sheet with the monthly 
request for payment to: CapitalProjects.Payables@chandleraz.gov. Payment for those 
services negotiated as a lump sum will be made in accordance with the percentage of the 
work completed during the preceding billing period. Services negotiated as a not-to-exceed 
fee will be paid in accordance with the work effort expended on the service during the 
preceding month. All requests for payment must be submitted to City for review and 
approval. City will make payment for approved and accepted services within 30 calendar days 
of City’s receipt of the request for payment. Consultant bears all responsibility and liability for 
any and all tax obligations that result from Consultant’s performance under this Agreement.  
 
SECTION IV--CITY'S OBLIGATIONS 
 
As part of Consultant’s services under this Agreement, City will provide furnished items, 
services, or obligations as detailed in Exhibit “D”. 
 
SECTION V--GENERAL CONDITIONS 
 
5.1 Notices. Unless otherwise provided herein, demands under this Agreement must be in 
writing and will be deemed to have been duly given and received either (a) on the date of 
service if personally served on the party to whom notice is to be given, or (b) on the third day 
after the date of the postmark of deposit by first class United States mail, registered or 
certified, postage prepaid and properly addressed as follows: 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 3 
 
 
 
To 
City: 
City of Chandler - Public Works & Utilities Department 
Attn:  CIP City Engineer: Daniel Haskins, P.E. 
P.O. Box 4008, Mail Stop 407 
Chandler, AZ 85244-4008 
Phone:  480-782-3335     Email:  Daniel.Haskins@chandleraz.gov 
With a copy to: 
City of Chandler - Public Works & Utilities Department 
Attn: Jason Garcia, Construction Project Manager 
P.O. Box 4008, Mail Stop 407, Chandler, AZ 85244-4008 
Phone: 480-782-3453     Email: Jason.Garcia@chandleraz.gov 
To Consultant: 
LEGAL COMPANY NAME: Consultant Engineering, Inc. 
Mailing Address:  PO Box 37167, Phoenix, AZ 85069 
Physical Address:  10625 N. 25th Avenue, Suite 200 
Phoenix, AZ 85029 
Statutory Agent Name: John Patterson 
Statutory Agent Mailing Address: PO Box 37167, Phoenix, AZ 85069 
Statutory Agent Physical Address: 10625 N. 25th Avenue, Suite 200 
Phoenix, AZ 85029 
CONSULTANT’S AUTHORIZED PROJECT REPRESENTATIVE  
Name: Brian Lizzet 
Title: Project Manager/Principal 
Phone:  480-689-6472 
Email: blizzet@cei-az.com 
 
5.2 Records/Audit. Records of Consultant’s direct personnel payroll, reimbursable expenses 
pertaining to this Agreement and records of accounts between City and Consultant must be 
kept on the basis of generally accepted accounting principles and must be made available to 
City and its auditors for up to three years following City’s final acceptance of the services 
under this Agreement (this requirement is increased to five years if construction of this 
project is federally funded). City, its authorized representative, or any federal agency, 
reserves the right to audit Consultant’s records to verify the accuracy and appropriateness of 
all cost and pricing data, including data used to negotiate this Agreement and any 
amendments. City reserves the right to decrease the total amount of Agreement price or 
payments made under this Agreement or request reimbursement from Consultant following 
final Agreement payment on this Agreement if, upon audit of Consultant’s records, the audit 
discloses Consultant has provided false, misleading, or inaccurate cost and pricing data. 
Consultant will include a similar provision in all of its Agreements with subconsultants who 
provide services under the Agreement to ensure that City, its authorized representative, or 
the appropriate federal agency, has access to the subconsultants’ records to verify the 
accuracy of all cost and pricing data. City reserves the right to decrease Agreement price or 
payments made on this Agreement or request reimbursement from Consultant following 
final payment on this Agreement if the above provision is not included in subconsultant 
Brian Lizzet
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 4 
 
agreements, and one or more subconsultants refuse to allow City to audit their records to 
verify the accuracy and appropriateness of all cost and pricing data. If, following an audit of 
this Agreement, the audit discloses Consultant has provided false, misleading, or inaccurate 
cost and pricing data, and the cost discrepancies exceed 1% of the total Agreement billings, 
Consultant will be liable for reimbursement of the reasonable, actual cost of the audit. 
 
5.3 Alteration in Character of Work. Whenever an alteration in the character of work results 
in a substantial change in this Agreement, thereby materially increasing or decreasing the 
scope of services, cost of performance, or Project schedule, the work will be performed as 
directed by City. However, before any modified work is started, a written amendment must 
be approved and executed by City and Consultant. Such amendment must not be effective 
until approved by City. Additions to, modifications, or deletions from this Agreement as 
provided herein may be made, and the compensation to be paid to Consultant may 
accordingly be adjusted by mutual agreement of the Parties. It is distinctly understood and 
agreed that no claim for extra services or materials furnished by Consultant will be allowed 
by City except as provided herein, nor must Consultant do any work or furnish any materials 
not covered by this Agreement unless such work is first authorized in writing. Any such work 
or materials furnished by Consultant without prior written authorization will be at 
Consultant’s own risk, cost, and expense, and Consultant hereby agrees that without written 
authorization Consultant will make no claim for compensation for such work or materials 
furnished. 
 
5.4 Termination. City and Consultant hereby agree to the full performance of the covenants 
contained herein, except that City reserves the right, at its discretion and without cause, to 
terminate or abandon any service provided for in this Agreement, or abandon any portion of 
the Project for which services have been performed by Consultant. In the event City abandons 
or suspends the services, or any part of the services as provided in this Agreement, City will 
notify Consultant in writing and immediately after receiving such notice, Consultant must 
discontinue advancing the work specified under this Agreement. Upon such termination, 
abandonment, or suspension, Consultant must deliver to City all drawings, plans, 
specifications, special provisions, estimates and other work entirely or partially completed, 
together with all unused materials supplied by City. Consultant must appraise the work 
Consultant has completed and submit Consultant’s appraisal to City for evaluation. City may 
inspect Consultant’s work to appraise the work completed. Consultant will receive 
compensation in full for services performed to the date of such termination. The fee will be 
paid in accordance with Section Ill of this Agreement, and as mutually agreed upon by 
Consultant and City. If there is no mutual agreement on payment, the final determination will 
be made in accordance with the "Disputes" provision in this Agreement. However, in no event 
may the fee exceed the fee set forth in Section Ill of this Agreement nor as amended in 
accordance with Section "Alteration in Character of Work." City will make the final payment 
within 60 days after Consultant has delivered the last of the partially completed items and 
the Parties agree on the final fee. If City is found to have improperly terminated the 
Agreement for cause or default, the termination will be converted to a termination for 
convenience in accordance with the provisions of this Agreement. 
 
5.5 Indemnification. To the extent permitted by law, the Consultant ("lndemnitor") must 
indemnify, save and hold harmless City and its officers, officials, agents and employees 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 5 
 
("lndemnitee") from any and all claims, actions, liabilities, damages, losses or expenses 
(including court costs, attorneys' fees and costs of claim processing, investigation and 
litigation) ("Claims") caused or alleged to be caused, in whole or in part, by the wrongful, 
negligent or willful acts, or errors or omissions of Consultant or any of its owners, officers, 
directors, agents, employees, or subconsultants in connection with this Agreement. This 
indemnity includes any claim or amount arising out of or recovered under workers' 
compensation law or on account of the failure of Consultant to conform to any federal, state 
or local law, statute, ordinance, rule, regulation or court decree. Consultant must indemnify 
lndemnitee from and against any and all Claims, except those arising solely from 
lndemnitee's own negligent or willful acts or omissions. Consultant is responsible for primary 
loss investigation, defense and judgment costs where this indemnification applies. In 
consideration of the award of this Agreement, Consultant agrees to waive all rights of 
subrogation against lndemnitee for losses arising from or related to this Agreement. The 
obligations of Consultant under this provision survive the termination or expiration of this 
Agreement. 
 
5.6 Insurance Requirements. Consultant must procure insurance under the terms and 
conditions and for the amounts of coverage set forth in Exhibit “C” against claims that may 
arise from or relate to performance of the work under this Agreement by Consultant and its 
agents, representatives, employees, and subconsultants. Consultant and any subconsultant 
must maintain this insurance until all of their obligations have been discharged, including any 
warranty periods under this Agreement. These insurance requirements are minimum 
requirements for this Agreement and in no way limit the indemnity covenants contained in 
this Agreement. City in no way warrants that the minimum limits stated in Exhibit “C” are 
sufficient to protect Consultant from liabilities that might arise out of the performance of the 
work under this Agreement by Consultant, Consultant’s agents, representatives, employees, 
or subconsultants. Consultant is free to purchase such additional insurance as may be 
determined necessary. 
 
5.7 Cooperation and Further Documentation. Consultant agrees to provide City such other 
duly executed documents as may be reasonably requested by City to implement the intent 
of this Agreement. 
 
5.8 Successors and Assigns. City and Consultant each bind itself, its partners, successors, 
assigns, and legal representatives to the other party to this Agreement and to the partners, 
successors, assigns, and legal representatives of such other party in respect to all covenants 
of this Agreement. Neither City nor Consultant may assign, sublet, or transfer its interest in 
this Agreement without the written consent of the other party. In no event may any 
contractual relation be created between any third party and City. 
 
5.9 Disputes. In any dispute arising out of an interpretation of this Agreement or the duties 
required not disposed of by agreement between Consultant and City, the final determination 
at the administrative level will be made by City Engineer. 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 6 
 
5.10 Completeness and Accuracy of Consultant’s Work. Consultant must be responsible for 
the completeness and accuracy of Consultant’s services, data, and other work prepared or 
compiled under Consultant’s obligation under this Agreement and must correct, at 
Consultant’s expense, all willful or negligent errors, omissions, or acts that may be discovered.  
Correction of errors disclosed and determined to exist during any construction of the project on 
architectural or engineering drawings and specifications must be accomplished by Consultant.  
The cost of the design necessary to correct those errors attributable to Consultant and any 
damage incurred by City as a result of additional construction costs caused by such engineering 
or architectural errors will be chargeable to Consultant and will not be considered a cost of the 
Work.  The fact that City has accepted or approved Consultant’s work will in no way relieve 
Consultant of any of Consultant’s responsibilities. 
 
5.11 Reporting. Written monthly reports, along with updated work schedules, will be made by 
Consultant in the format prescribed by City.  These reports will be delivered to City per schedule.  
When requested by City, Consultant will attend Council meetings and provide finished documents 
including correspondence for Council action, supporting charts, graphs, drawings and colored 
slides of same. 
 
5.12 Withholding Payment. City reserves the right to withhold funds from Consultant’s 
payments up to the amount equal to the claims City may have against Consultant until such 
time that a settlement on those claims has been reached. 
 
5.13 City's Right of Cancellation. The Parties acknowledge that this Agreement is subject to 
cancellation by City under the provisions of Section 38-511, Arizona Revised Statutes (A.R.S.). 
 
5.14 Independent Consultant. For this Agreement Consultant constitutes an independent 
contractor. Any provisions in this Agreement that may appear to give City the right to direct 
Consultant as to the details of accomplishing the work or to exercise a measure of control 
over the work means that Consultant must follow the wishes of City as to the results of the 
work only. These results must comply with all applicable laws and ordinances. 
 
5.15 Project Staffing. Prior to the start of any work under this Agreement, Consultant must 
submit to City detailed resumes of key personnel that will be involved in performing services 
prescribed in the Agreement. City hereby acknowledges its acceptance of such personnel to 
perform services under this Agreement. At any time hereafter that Consultant desires to 
change key personnel while performing under the Agreement, Consultant must submit the 
qualifications of the new personnel to City for prior approval. Key personnel include, but are 
not limited to, principals-in-charge, project manager, and project Consultant. Consultant will 
maintain an adequate and competent staff of qualified persons, as may be determined by 
City, throughout the performance of this Agreement to ensure acceptable and timely 
completion of the Scope of Services. If City objects, with reasonable cause, to any of 
Consultant’s staff, Consultant must take prompt corrective action acceptable to City and, if 
required, remove such personnel from the Project and replace with new personnel agreed to 
by City. 
 
5.16 Consultants or Subconsultants. Prior to beginning the work, Consultant must furnish City 
for approval the names of consultants or subconsultants to be used under this Agreement. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 7 
 
Any subsequent changes are subject to City’s written prior approval. 
 
5.17 Force Majeure. If either party is delayed or prevented from the performance of any act 
required under this Agreement by reason of acts of God or other cause beyond the control 
and without fault of the Party (financial inability excepted), performance of that act may be 
excused, but only for the period of the delay, if the Party provides written notice to the other 
Party within ten days of such act. The time for performance of the act may be extended for a 
period equivalent to the period of delay from the date written notice is received by the other 
Party. 
 
5.18 Compliance with Federal Laws. Consultant understands and acknowledges the 
applicability of the Americans with Disabilities Act, the Immigration Reform and Control Act 
of 1986 and the Drug Free Workplace Act of 1989 to it. Consultant agrees to comply with these 
laws in performing this Agreement and to permit City to verify such compliance. 
 
5.19 No Israel Boycott. By entering into this Agreement, Consultant certifies that Consultant 
is not currently engaged in, and agrees for the duration of the Agreement, not to engage in a 
boycott of Israel as defined by state statute. 
 
5.20 Legal Worker Requirements. A.R.S. § 41-4401 prohibits City from awarding an Agreement 
to any consultant who fails, or whose subconsultants fail, to comply with A.R.S. § 23-214(A). 
Therefore, Consultant agrees Consultant and each subconsultant it uses warrants their 
compliance with all federal immigration laws and regulations that relate to their employees 
and their compliance with § 23-214, subsection A. A breach of this warranty will be deemed a 
material breach of the Agreement and may be subject to penalties up to and including 
termination of the Agreement. City retains the legal right to inspect the papers of any 
Consultant’s or subconsultant’s employee who provides services under this Agreement to 
ensure that Consultant and subconsultants comply with the warranty under this provision. 
 
5.21 Lawful Presence Requirement. A.R.S. §§ 1-501 and 1-502 prohibit City from awarding an 
Agreement to any natural person who cannot establish that such person is lawfully present 
in the United States. To establish lawful presence, a person must produce qualifying 
identification and sign a City-provided affidavit affirming that the identification provided is 
genuine. This requirement will be imposed at the time of Agreement award. This requirement 
does not apply to business organizations such as corporations, partnerships, or limited 
liability companies. 
 
5.22 Covenant Against Contingent Fees. Consultant warrants that no person has been 
employed or retained to solicit or secure this Agreement upon an agreement or 
understanding for a commission, percentage, brokerage, or contingent fee, and that no 
member of the Chandler City Council, or any City employee has any interest, financially, or 
otherwise, in Consultant’s firm. For breach or violation of this warrant, City may annul this 
Agreement without liability or, at its discretion, to deduct from the Agreement price or 
consideration, the full amount of such commission, percentage, brokerage, or contingent fee. 
 
5.23 Non-Waiver Provision. The failure of either Party to enforce any of the provisions of this 
Agreement or to require performance of the other Party of any of the provisions hereof must 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 8 
 
not be construed to be a waiver of such provisions, nor must it affect the validity of this 
Agreement or any part thereof, or the right of either Party to thereafter enforce each and 
every provision. 
 
5.24 Disclosure of Information Adverse to City’s Interests. To evaluate and avoid potential 
conflicts of interest, Consultant must provide written notice to City, as set forth in this Section, 
of any work or services performed by Consultant for third parties that may involve or be 
associated with any real property or personal property owned or leased by City. Such notice 
must be given 7 business days prior to commencement of the services by Consultant for a 
third party, or 7 business days prior to an adverse action as defined below. Written notice 
and disclosure must be sent in accordance with Section 6.7 above.  An adverse action under 
this Agreement includes, but is not limited to: (a) using data as defined in the Agreement 
acquired in connection with this Agreement to assist a third party in pursuing administrative 
or judicial action against City; or (b) testifying or providing evidence on behalf of any person 
in connection with an administrative or judicial action against City; or (c) using data to produce 
income for Consultant or its employees independently of performing the services under this 
Agreement, without the prior written consent of City. Consultant represents that except for 
those persons, entities, and projects identified to City, the services performed by Consultant 
under this Agreement are not expected to create an interest with any person, entity, or third 
party project that is or may be adverse to City’s interests. Consultant’s failure to provide a 
written notice and disclosure of the information as set forth in this Section constitute a 
material breach of this Agreement. 
 
5.25 Data Confidentiality and Data Security. As used in the Agreement, "data" means all 
information, whether written or verbal, including plans, photographs, studies, investigations, 
audits, analyses, samples, reports, calculations, internal memos, meeting minutes, data field 
notes, work product, proposals, correspondence and any other similar documents or 
information prepared by, obtained by, or transmitted to Consultant or its subconsultants in 
the performance of this Agreement. The Parties agree that all data, regardless of form, 
including originals, images, and reproductions, prepared by, obtained by, or transmitted to 
Consultant or its subconsultants in connection with Consultant’s or its subconsultant’s 
performance of this Agreement is confidential and proprietary information belonging to City. 
Except as specifically provided in this Agreement, Consultant or its subconsultants must not 
divulge data to any third party without City’s prior written consent. Consultant or its 
subconsultants must not use the data for any purposes except to perform the services 
required under this Agreement. These prohibitions do not apply to the following data 
provided to Consultant or its subconsultants have first given the required notice to City: (a) 
data which was known to Consultant or its subconsultants prior to its performance under this 
Consultant or its subconsultants by a third party, who to the best of Consultant’s or its 
subconsultants’ knowledge and belief, had the legal right to make such disclosure and 
Consultant or its subconsultants are not otherwise required to hold such data in confidence; 
or (c) data which is required to be disclosed by virtue of law, regulation, or court order, to 
which Consultant or its subconsultants are subject. In the event Consultant or its 
subconsultants are required or requested to disclose data to a third party, or any other 
information to which Consultant or its subconsultants became privy as a result of any other 
Agreement with City, Consultant must first notify City as set forth in this Section of the request 
or demand for the data. Consultant or its subconsultants must give City sufficient facts so 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 9 
 
that City can be given an opportunity to first give its consent or take such action that City may 
deem appropriate to protect such data or other information from disclosure. All data must 
continue to be subject to the confidentiality agreements of this Agreement. Consultant or its 
subconsultants assume all liability to maintain the confidentiality of the data in its possession 
and agrees to compensate City if any of the provisions of this Section are violated by 
Consultant, its employees, agents or subconsultants. Solely for the purposes of seeking 
injunctive relief, it is agreed that a breach of this Section must be deemed to cause irreparable 
harm that justifies injunctive relief in court. Consultant agrees that the requirements of this 
Section must be incorporated into all subagreements entered into by Consultant. A violation 
of this Section may result in immediate termination of this Agreement without notice. 
 
5.26 Personal Identifying Information-Data Security. Personal identifying information, 
financial account information, or restricted City information, whether electronic format or 
hard copy, must be secured and protected at all times by Consultant or its subconsultants. At 
a minimum, Consultant or its subconsultants must encrypt or password-protect electronic 
files. This includes data saved to laptop computers, computerized devices, or removable 
storage devices. When personal identifying information, financial account information, or 
restricted City information, regardless of its format, is no longer necessary, the information 
must be redacted or destroyed through appropriate and secure methods that ensure the 
information cannot be viewed, accessed, or reconstructed. In the event that data collected or 
obtained by Consultant or its subconsultants in connection with this Agreement is believed 
to have been compromised, Consultant or its subconsultants must immediately notify City 
contact. Consultant agrees to reimburse City for any costs incurred by City to investigate 
potential breaches of this data and, where applicable, the cost of notifying individuals who 
may be impacted by the breach. Consultant agrees that the requirements of this Section must 
be incorporated into all subcontracts entered into by Consultant. It is further agreed that a 
violation of this Section must be deemed to cause irreparable harm that justifies injunctive 
relief in court. A violation of this Section may result in immediate termination of this 
Agreement without notice. The obligations of Consultant or its subconsultants under this 
Section must survive the termination of this Agreement. 
 
5.27 Jurisdiction and Venue. This Agreement is made under and must be construed in 
accordance with and governed by the laws of the State of Arizona without regard to the 
conflicts or choice of law provisions thereof. Any action to enforce any provision of this 
Agreement or to obtain any remedy with respect hereto must be brought in the courts 
located in Maricopa County, Arizona, and for this purpose, each Party hereby expressly and 
irrevocably consents to the jurisdiction and venue of such court. 
 
5.28 Survival. All warranties, representations, and indemnifications by Consultant must 
survive the completion or termination of this Agreement. 
 
5.29 Modification. Except as expressly provided herein to the contrary, no supplement, 
modification, or amendment of any term of this Agreement will be deemed binding or 
effective unless in writing and signed by the Parties.  
 
5.30 Severability. If any provision of this Agreement or the application to any person or 
circumstance may be invalid, illegal or unenforceable to any extent, the remainder of this 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 10 
 
Agreement and the application will not be affected and will be enforceable to the fullest 
extent permitted by law. 
 
5.31 Integration. This Agreement contains the full agreement of the Parties. Any prior or 
contemporaneous written or oral agreement between the Parties regarding the subject 
matter is merged and superseded. 
 
5.32 Time is of the Essence. Time of each of the terms, covenants, and conditions of this 
Agreement is hereby expressly made of the essence. 
 
5.33 Date of Performance. If the date of performance of any obligation or the last day of any 
time period provided for should fall on a Saturday, Sunday, or holiday for City, the obligation 
will be due and owing, and the time period will expire, on the first day after which is not a 
Saturday, Sunday or legal City holiday. Except as may otherwise be set forth in this 
Agreement, any performance provided for herein will be timely made if completed no later 
than 5:00 p.m. (Chandler time) on the day of performance. 
 
5.34 Third Party Beneficiary. Nothing under this Agreement will be construed to give any 
rights or benefits in the Agreement to anyone other than City and Consultant, and all duties 
and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive 
benefit of City and Consultant and not for the benefit of any other party. 
 
5.35 Conflict in Language. All work performed must conform to all applicable City of Chandler 
codes, ordinances, and requirements as outlined in this Agreement. If there is a conflict in 
interpretation between provisions in this Agreement and those in Exhibit "A", the provisions 
in this Agreement prevail. 
 
5.36 Document/Information Release. Documents and materials released to Consultant, 
which are identified by City as sensitive and confidential, are City’s property. The 
document/material must be issued by and returned to City upon completion of the services 
under this Agreement. Consultant secondary distribution, disclosure, copying, or duplication 
in any manner is prohibited without City’s prior written approval. The document/material 
must be kept secure at all times. This directive applies to all City documents, whether in 
photographic, printed, or electronic data format.  
 
5.37 Exhibits. The following exhibits are made a part of this Agreement and are incorporated 
by reference: 
 
  
 
 
Exhibit A - Scope of Services / Schedule 
Exhibit B - Compensation and Fees 
Exhibit C - Insurance Requirements 
Exhibit D - Special Conditions 
Exhibit E – Subconsultant Documents with Consultant (if applicable) 
Exhibit F - Federal Requirements (if applicable)  
 
5.38 Special Conditions. As part of the services Consultant provides under this Agreement, 
Consultant agrees to comply with and fully perform the special terms and conditions set forth 
in Exhibit “D”, which is attached to and made a part of this Agreement. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway)   
 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
 Rev. 9/30/25 
Page 11 
 
5.39 Non-Discrimination and Anti-Harassment Laws. Consultant must comply with all 
applicable City, state, and federal non-discrimination and anti-harassment laws, rules, and 
regulations. 
 
5.40 Licenses and Permits. Beginning with the Effective Date and for the full term of this 
Agreement, Consultant must maintain all applicable City, state, and federal licenses and 
permits required to fully perform Consultant’s services under this Agreement. 
 
5.41 Warranties. Consultant must furnish a one-year warranty on all work and services 
performed under this Agreement. Consultant must furnish, or cause to be furnished, a two-
year warranty on all fixtures, furnishings, and equipment furnished by Consultant, 
subconsultants or suppliers under this Agreement. Any defects in design, workmanship, or 
materials that do not comply with this Agreement must be corrected by Consultant (including, 
but not limited to, all parts and labor) at Consultant’s sole cost and expense. All written 
warranties and redlines for as-built conditions must be delivered to City on or before City’s 
final acceptance of Consultant’s services under this Agreement.  
 
5.42 Cooperative Purchasing Agreement (S.A.V.E. – Strategic Alliance for Volume 
Expenditures).  In addition to City of Chandler and with the approval of Consultant, this 
Agreement may be extended for use by other municipalities, school districts, and government 
agencies of the State.  Any such usage by other entities must be in accordance with the 
ordinance, charter, or procurement rules and regulations of the respective political entity.   
 
5.43 Budget Approval into Next Fiscal Year.  This Agreement will commence on the Effective 
Date and continue in full force and effect until it is terminated or expires in accordance with 
the provisions of this Agreement.  The Parties recognize that the continuation of this 
Agreement after the close of the City's fiscal year, which ends on June 30 of each year, is 
subject to the City Council's approval of a budget that includes an appropriation for this item 
as an expenditure.  The City does not represent that this budget item will be actually adopted. 
This determination is solely made by the City Council. 
 
5.44 Forced Labor of Ethnic Uyghurs Prohibited.  By entering into this Agreement, Contractor 
certifies and agrees Contractor does not currently use and will not use for the term of this 
Agreement: (i) the forced labor of ethnic Uyghurs in the People's Republic of China; or (ii) any 
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of 
China; or (iii) any contractors, subcontractors or suppliers that use the forced labor or any 
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of 
China. 
 
5.45 License to City for Reasonable Use. With this Agreement, Consultant and its 
subconsultants hereby grant a license to City, its agents, employees, and representatives for 
an indefinite period of time to reasonably use, make copies, and distribute as appropriate 
the Documents, works or deliverables developed or created as a result of the Project and this 
Agreement. This license also includes the making of derivative works.  
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
 Rev. 9/30/25 
Page 12 
This Agreement will be in full force and effect only when it has been approved and executed 
by the duly authorized City officials. 
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the Effective Date. 
“CITY”  
CITY OF CHANDLER 
Mayor 
RECOMMENDED BY: 
Daniel Haskins, P.E. 
CIP City Engineer   
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
 City Clerk 
 Seal 
“CONSULTANT” 
CONSULTANT ENGINEERING, INC. 
Signature 
 Date 
Print Name 
Title 
Signer Email Address 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433
blizzet@cei-az.com
December 10, 2025
Brian Lizzet
Sr. Vice President
December 12, 2025

Project Name:  Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:  ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
Rev. 9/30/2025 
Page A-1 
EXHIBIT “A” 
SCOPE OF SERVICES/SCHEDULE 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Email: 
Jason.Garcia@chandleraz.gov 
December 04, 2025 
Mr. J. Jason Garcia 
Construction Project Manager  
City of Chandler 
Public Works & Utilities | Capital Projects 
PO Box 4008, Mail Stop 407 
Chandler, AZ 85244-4008 
Re: 
CEI Scope and Fee Schedule 
Lindsay Road Improvements – Hunt Highway to Ocotillo Road 
City of Chandler Project No.: ST2001.451  
Federal Project No.: CHN-0(246)D 
ADOT Project No.: T024301C 
CEI Project No. 0125037.00 
Dear Mr. Garcia: 
Consultant Engineering, Inc. (CEI) would like to thank the City of Chandler for selecting our firm for the Lindsay Road Improvements project, 
from Hunt Highway to Ocotillo Road. 
Attached, please find our fee proposal, the Construction Management Scope of Services (Exhibit “A”) and Fee Schedules (Exhibit “B”) as 
well as sub consultants’ fee schedules (Exhibits “C”, “D” and “E”) and Procore Fees (Exhibit “F”) for your consideration. Our total fee for 
this project is $2,888,276. The proposal is based on a total construction duration of 730 calendar days as well as pre-construction 
assistance and typical close-out services. 
The proposal effort hours for the key staff members during construction include Brian Lizzet (Project Manager/Senior Resident Engineer) 
with a 47% time commitment; Pat Mahoney (Resident Engineer) with a 26% time commitment; John Helton (Chief Inspector/Materials 
Coordinator) with a 100% time commitment; Daniel Blount (Senior Inspector) with a 100% time commitment; Mike Larsen (Senior Electrical 
Inspector) with a 25% time commitment; a Construction Inspector with a 25% time commitment; Shanelle Barber (Administrator/Manager) 
with a 19% time commitment; Dan Ross (Schedule Reviewer) with a 4% time commitment; and Mark Schalliol (Landscape Architect) with 
a 3% time commitment. We have also included allotted time for Saturdays. 
Our sub-consultants’ proposals include Makinen Professional Services for public outreach, Quality Testing for QA materials testing 
services, and Epsilon Engineering Consultants for Independent Assurance Testing services. Finally, we have direct expenses utilizing the 
online platform Procore, which will be billed directly each month. This proposal assumes a 3-year subscription. 
If you have any questions or require additional information, please feel free to contact me at 480-689-6472 or blizzet@cei-az.com. 
CEI looks forward to continuing working with you and the City of Chandler on this contract. 
Sincerely, 
CONSULTANT ENGINEERING, INC. 
Brian Lizzet, PE, CCM 
Senior Vice President 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

EXHIBIT “A” 
CONSTRUCTION MANAGEMENT 
SCOPE OF SERVICES 
(FHWA FUNDED PROJECTS) 
PROJECT TASKS 
1.
PRE-CONSTRUCTION ASSISTANCE
A. Task 1.1 Preconstruction Assistance
i. Consultant will have general project coordination with City and contractor
(10 hours for SRE, RE, CI, and FAS)
ii. Consultant must attend the pre-construction meeting.  (2 hours for SRE,
RE, CI, SIC)
iii. Consultant will review project plans, documents and take pre-
construction photos (16 hours for SIC)
iv. Consultant must review and evaluate Contractor’s initial CPM schedule
and provide recommendations for acceptance. (16 hours for Schedule
Reviewer)
v. Consultant will attend the Pre-Construction Meeting (2 hours each)
2.
CONSTRUCTION MANAGEMENT
A. Task 2.1 Weekly Construction Meetings
i. Consultant must conduct weekly construction meetings.  Each meeting
includes agenda and minutes; Request for Information (RFI); Shop
Drawing; Request for Information (RFI); Field Directive (FD); Material
Certification; and Allowance Logs. Consultant assumes 110 weekly
meetings will be held. (4 hours each for SRE; 1 hour each for RE)
B. Task 2.2 CPM Schedule
i. Consultant must review Contractor’s monthly CPM schedule updates
submitted with each payment application, identify CPM tasks behind
schedule that may affect critical path items, project substantial and final
completion dates and initiate correspondence to City regarding those
tasks. Consultant assumes 24 reviews of updated CPM schedule. (8 hours
each month for Schedule Reviewer).
C. Task 2.3 Requests for Information (RFI’s)
i. Consultant must review, evaluate, and respond to Contractor Requests
for Information (RFI’s); and prepare and maintain a submittal log of all
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Page 2
RFI’s. Consultant assumes a maximum of 50 RFI responses. (4 hours each 
reply for SRE and 4 Hours each for SRE includes site visits)  
D. Task 2.4 Shop Drawing Submittals
i. Consultant must review, evaluate, and respond to Contractor shop
drawing submittals; and prepare and maintain a submittal log of all shop
drawing submittals. Consultant assumes a maximum of 60 reviews. (4
hours for SRE and 40 hours for RLA – includes site visits to nurseries)
E. Task 2.5 Requests for Proposal (RFP)
i. Consultant must prepare Requests for Proposal (RFP) documents
detailing requested additional work tasks; review and evaluate Contractor
RFP responses (cost derivations) with approval recommendations; and
prepare and maintain a submittal log list of all RFP’s. Consultant assumes
20 RFPs.  (4 hours each for SRE)
F.
Task 2.6 Field Directives (FD’s)
i. Consultant must prepare Field Directive (FD) documents detailing
requested additional work tasks; review and evaluate Contractor FD
responses with approval recommendations; and prepare and maintain a
submittal log list of all FD’s. Consultant assumes 30 FD’s.  (4 hours each
for SRE)
G. Task 2.7 Contractor Payment Applications
i. Consultant must review and evaluate Contractor monthly payment
applications and make recommendation for payment; maintain a weekly
record of constructed pay quantities and compile monthly totals; and
coordinate payment application with the City quantity report and the
inspectors’ daily logs. Consultant assumes a maximum of 24 payment
applications, with 2 reviews each. (2 hours each for SRE, RE)
H. Task 2.8 Public Outreach
i. Consultant must provide public outreach services, whether by Consultant
or subconsultant.  Tasks will include: create and maintain project website;
maintain a 24-hour trilingual project hotline to respond to inquiries,
complaints and maintain a call log; public weekly email updates; public
interactions with property owners as a liaison between property owners
and the City; coordination meetings; project meetings; public meeting
coordination; federal funds required partnering process (project team
partnering meeting, maintaining status). (2 hours each month for SRE
with PRC).
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Page 3
3.
CONSTRUCTION ADMINISTRATION
A. Task 3.1 Federal Compliance Administration
i. Consultant must provide administrative support to City staff for federal
reporting requirements. Consultant assumes 1 administrative Support for
24 months at 33 hours per month.
B. Task 3.2 Administrative Support
i. Consultant must provide administrative support to City staff throughout
project for 24 months. (20 hours/month for SRE)
4.
CONSTRUCTION INSPECTION
A. Task 4.1 Inspection Services
i. Consultant must provide weekly construction inspection to verify
materials and installations conform to construction documents; prepare
daily inspection reports documenting Contractor construction activities
and progress during field inspection visits; and perform intermittent
erosion control inspections.  Consultant assumes 4 inspectors
throughout the project’s duration.  2 full-time inspectors (CI/MC, SIC).  1
part time SIE for 6 months and 1 part time Construction Inspector for
6 months.  Consultant assumes 10 hours/month overtime for SIC and
Construction Inspector. Consultant also assumes 5 hours/week for
RE to review Construction inspection reports.
ii. Consultant will conduct onsite employee interviews in compliance with
the US Department of Labor and deliver forms, confidentially, to the City
(included in inspection hours).
B. Task 4.2 Landscape / Irrigation Inspection Services
i. Consultant must provide Irrigation system layout and installation
observations; attend and observe irrigation system pressure tests; and
attend a nursery visit to tag and inspect plant material. Consultant
assumes 12 site visits. (8 hours each for RLA)
C. Task 4.3 Project Closeout
i. Consultant must compile non-conformance list prior to Substantial
Completion; schedule and conduct Substantial Completion inspection;
prepare Substantial Completion punch list generated from Substantial
Completion inspection; track items on punch list and note completed
items; and complete and distribute Substantial Completion certificates.
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Page 4
(20 hours for SRE and RE; 40 hours for CI/MC and SIC; 24 hours for 
RLA) 
ii. Consultant must schedule and conduct Final Completion inspection; and
complete and distribute Final Completion certificates. (20 hours for RE).
5.
UTILITY COORDINATION
A. Task 5.1 Utility Coordination
i. Consultant must complete Acceptance of Construction (AOC) applications
and submit to MCESD for reclaimed water booster pump and potable
water/sewer improvements.  (0 hours – this is completed by EOR)
ii. Coordination with various utilities including SRP. Southwest Gas, RWCD,
and Telcom  (10 hours/month for SRE)
6.
MATERIALS TESTING
A. Task 6.1 Quality Control (QC) Test Program
i. Consultant must review and verify Contractor’s Quality Control material
test type and frequencies are consistent with City, MAG, and ADOT
requirements; review and evaluate Contractor’s QC test schedule and
provide recommendations on acceptance; and review and evaluate all
Contractor sampling, test, and inspection results for conformance with
construction documents. (4 hours total for RE)
B. Task 6.2 Quality Assurance (QA) Test Program
i. Consultant must prepare and maintain a materials Quality Assurance plan
per City, MAG, and ADOT requirements. QA plan will be reviewed and
approved by ADOT prior to initiating construction activities. (8
hours/month for RE)
ii. Consultant must coordinate with Contractor’s testing representative to
obtain required QA tests and sample; complete sampling and compaction
testing of subgrade (including lime-stabilized subgrade base), aggregate
base and asphalt concrete materials in new asphalt concrete pavement
areas; complete sampling and compaction testing of subgrade, aggregate
base (where required) and concrete for new curbs, gutters, sidewalks and
concrete pavement and structures; and complete sampling and
compaction testing of backfill for new irrigation, sewer, water, storm drain
pipe, and dry utilities. (Included in hours for SIC under Inspection
Services)
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Page 5
C. Task 6.3 Material Certifications
i. Consultant must review and verify material certifications are met
including “Buy America” requirements; and prepare and maintain
materials certificate and “Buy America” requirement submittal log. (10
hours/month for CI/MC)
D. Task 6.4 Independent Assurance (IA) Test Program
i. Consultant must provide 3rd party independent quality assurance
sampling and testing per the approved QA program produced in task
6.2.i. (8 hours/month for RE).
7.
RECORD DRAWINGS
A. Task 7.1 Record Drawings
i.
Review and monitor Contractor’s weekly updates on red-line drawing set.
(2 hours for SRE, 10 hours for RE, 40 hours for CI)
ASSUMPTION, CLARIFICATIONS, AND EXCLUSIONS 
1.
Procore costs are based on dues owed for project duration (3-year subscription).
2.
Application fees for City reviews and permits will be paid by CITY.
3.
The Owner’s Allowance will only be utilized with prior written approval from the City
representative (Shown as $100,000).
4.
Contract work must be performed in accordance with Exhibit D Title VI Assurances
Appendix A and Exhibit E Title VI Assurances Appendix E.
5.
Abbreviations and Personnel:
-
PM/SRE – Project Manager/Senior Resident Engineer (Brian Lizzet)
-
RE/PS – Resident Engineer/Project Supervisor (Pat Mahoney)
-
CI/MC – Chief Inspector/Materials Coordinator (John Helton)
-
SIC – Senior Inspector Civil (Daniel Blount)
-
SIE – Senior Inspector Electrical (Mike Larsen)
-
FAS – Federal Administrator Specialist (Shanelle Barber)
-
RLA – Registered Landscape Architect (Mark Schalliol)
-
PRC – Public Relations Consultant (Teresa Makinen)
-
Construction Inspector (TBD)
-
Schedule Reviewer (Dan Ross)
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name:  Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:  ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C 
Rev. 9/30/2025 
Page B-1 
 
EXHIBIT “B” 
COMPENSATION AND FEES 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Task
Cost
1
1.1
$15,730.00
15,730.00
$
 
2
2.1
$132,550.00
2.2
$35,520.00
2.3
$50,000.00
2.4
$66,600.00
2.5
$20,000.00
2.6
$30,000.00
2.7
$43,680.00
2.8
$12,000.00
390,350.00
$               
3
3.1
$99,000.00
3.2
$120,000.00
SUBTOTAL TASK 3:
219,000.00
$               
4
4.1
$1,605,900.00
4.2
$15,840.00
4.3
$31,260.00
1,653,000.00
$            
SUBTOTAL TASK 4:
Public Outreach
Landscape/Irrigation Inspection Services
Project Closeout
CONSTRUCTION ADMINISTRATION
Inspection Services
Pre-Construction Assistance
EXHIBIT "B-1"
CONSTRUCTION MANAGEMENT
SCOPE OF SERVICES
(FHWA FUNDED PROJECTS)
FEE SCHEDULE
Description
PRE-CONSTRUCTION ASSISTANCE
Requests for Proposal (RFP)
CPM Schedule
Requests for Information (RFI)
CONSTRUCTION MANAGEMENT
CONSTRUCTION INSPECTION
SUBTOTAL TASK 1:
SUBTOTAL TASK 2:
Shop Drawing Submittals
Weekly Construction Meetings
Field Directive (FD)
Administrative Support
Contractor Payment Applications
Federal Compliance Administration
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Page 2
 
 
5
5.1
$60,000.00
60,000.00
$                 
6
MATERIALS TESTING
6.1
$820.00
6.2
$39,360.00
6.3
$36,000.00
6.4
$39,360.00
115,540.00
$               
7
7.1
$8,550.00
8,550.00
$                   
60,500.00
$                 
190,720.00
$               
12,555.00
$                 
263,775.00
$               
62,331.00
$                 
100,000.00
$               
100,000.00
$               
2,888,276.00
$   
Owner's Allowance
SUBTOTAL ALLOWANCES:
PROJECT TOTAL:
SUBTOTAL TASK 7:
SUBTOTAL SUBCONSULTANTS:
Makinen Professional Services ("MakPro")
Epsilon Geotechnical & Material, LLC, ("EGM")
SUBCONSULTANTS
ALLOWANCES
Quality Testing, LLC ("QT")
DIRECT EXPENSES
Procore Fees ($15M ACV) - 2 years + Implementation + 5% increase year 3
QA Test Program
Utility Coordination 
Record Drawings
Material Certifications
IA Test Program
RECORD DRAWINGS
SUBTOTAL TASK 5:
SUBTOTAL TASK 6:
QC Test Program
UTILITY COORDINATION
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Classification
Hours
Hourly Rate
Cost
Pre-construction Phase - 2 months
Project Manager/Senior Resident Engineer (Brian Lizzet) 
14
$250.00
$3,500.00
Resident Engineer (Pat Mahoney)
14
$205.00
$2,870.00
Chief Inspector/Materials Coordinator (John Helton)
14
$150.00
$2,100.00
Senior Inspector Civil (Daniel Blount)
20
$140.00
$2,800.00
Senior Inspector Electrical (Mike Larsen)
0
$140.00
$0.00
Construction Inspector (TBD)
0
$125.00
$0.00
Landscape Architect (Mark Schalliol)
0
$165.00
$0.00
Schedule Reviewer (Dan Ross)
16
$185.00
$2,960.00
Administrator/Manager (Shanelle Barber)
12
$125.00
$1,500.00
Subtotal Pre-construction
 
$15,730.00
Construction Phase - 24 months
Project Manager/Senior Resident Engineer (Brian Lizzet) 
1944
$250.00
$486,000.00
Resident Engineer (Pat Mahoney)
1074
$205.00
$220,170.00
Chief Inspector/Materials Coordinator (John Helton)
4128
$150.00
$619,200.00
Senior Inspector Civil (Daniel Blount)
4128
$140.00
$577,920.00
Senior Inspector Overtime
240
$210.00
$50,400.00
Senior Inspector Electrical (Mike Larsen)
1032
$140.00
$144,480.00
Construction Inspector (TBD)
1032
$125.00
$129,000.00
Construction Inspector (TBD) - Overtime
120
$187.50
$22,500.00
Landscape Architect (Mark Schalliol)
136
$165.00
$22,440.00
Schedule Reviewer (Dan Ross)
192
$185.00
$35,520.00
Administrator/Manager (Shanelle Barber)
792
$125.00
$99,000.00
Subtotal Construction
 
$2,406,630.00
Post-Construction/Close-Out Phase - 3 months
Project Manager/Senior Resident Engineer (Brian Lizzet) 
22
$250.00
$5,500.00
Resident Engineer (Pat Mahoney)
50
$205.00
$10,250.00
Chief Inspector/Materials Coordinator (John Helton)
80
$150.00
$12,000.00
Senior Inspector Civil (Daniel Blount)
40
$140.00
$5,600.00
Construction Inspector (TBD)
0
$125.00
$0.00
Schedule Reviewer (Dan Ross)
0
$185.00
$0.00
Landscape Architect (Mark Schalliol)
24
$165.00
$3,960.00
Administrator/Manager (Shanelle Barber)
20
$125.00
$2,500.00
Subtotal Post-Construction
 
$39,810.00
CEI TOTAL
$2,462,170.00
Subconsultants 
Makinen Professional Services - Exhibit "C"
$60,500.00
Quality Testing, LLC - Exhibit "D"
$190,720.00
Epsilon Geotechnical & Material, LLC- Exhibit "E"
$12,555.00
Subconsultants Subtotal
$263,775.00
Direct Expenses
Procore Fees ($15M ACV)  - Exhibit "F"
$62,331.00
Owner's Allowance
Owner's Allowance
$100,000.00
Total Cost
$2,888,276.00
Limitations & Conditions and Assumptions:
All rates are loaded rates and include all equipment, trucks, cell phones, laptops,  gas, maintenance, Citrx Sharefile and office supplies.
Pre-construction and post-construction hours are based on anticipated tasks as per the scope of work.
Fee based on Construction duration of 24 months / 730 calendar days + 60 days start up and 90 days close out
Inspectors will be fully equipped with vehicles, computers, cell phones, inspector tools, camera, and equipment required to perform their tasks.
Overtime hours for field staff will be billed at 1.5 times the billing rate
Subconsultants' schedule of efforts and cost break-down is attached.
                       CM Services Fee Proposal (Exhibit B-2)
LINDSAY ROAD IMPROVEMENTS - HUNT HWY TO OCOTILLO ROAD
City of Chandler Project No. ST2001.451 | Federal Number: CHN-0(246)D | ADOT Project No. T024301C
Cost Proposal - December 2025
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page C-1 
 
EXHIBIT “C” 
INSURANCE REQUIREMENTS 
1.
General.
1.1 At the same time as execution of this Agreement, Consultant must furnish City a certificate 
of insurance on a standard insurance industry ACORD form.  The ACORD form must be 
issued by an insurance company authorized to transact business in the State of Arizona 
possessing a current A.M. Best, Inc. rating of A-7, or better and legally authorized to do 
business in the State of Arizona with policies and forms satisfactory to City.  Provided, 
however, the A.M. Best rating requirement will not be deemed to apply to required Workers’ 
Compensation coverage.  
1.2 Consultant and any of its subconsultants must procure and maintain, until all of their 
obligations have been discharged, including any warranty periods under this Agreement are 
satisfied, the insurances set forth below. 
1.3 The insurance requirements set forth below are minimum requirements for this Agreement 
and in no way limit the indemnity covenants contained in this Agreement. 
1.4 City in no way warrants that the minimum insurance limits contained in this Agreement are 
sufficient to protect Consultant from liabilities that might arise out of the performance of 
the Agreement services under this Agreement by Consultant, its agents, representatives, 
employees, subconsultants, and Consultant is free to purchase any additional insurance as 
may be determined necessary. 
1.5 Failure to demand evidence of full compliance with the insurance requirements in this 
Agreement or failure to identify any insurance deficiency will not relieve Consultant from, 
nor will it be considered a waiver of its obligation to maintain the required insurance at all 
times during the performance of this Agreement. 
1.6 Use of subconsultants:  If any work is subcontracted in any way, Consultant must execute a 
written Agreement with subconsultant containing the same Indemnification Clause and 
Insurance Requirements as City requires of Consultant in this Agreement. Consultant is 
responsible for executing the Agreement with the subconsultant and obtaining Certificates 
of Insurance and verifying the insurance requirements. 
2.
Minimum Scope and Limits of Insurance.  Consultant must provide coverage with limits of
liability not less than those stated below. 
2.1 Professional Liability.  If the Agreement is the subject of any professional services or work 
performed by Consultant, or if Consultant engages in any professional services or work 
adjunct or residual to performing the work under this Agreement, Consultant must maintain 
Professional Liability insurance covering errors and omissions arising out of the work or 
services performed by Consultant, or anyone employed by Consultant, or anyone whose 
acts, mistakes, errors and omissions Consultant is legally liable, with a liability limit of 
$1,000,000 each claim and $2,000,000 all claims.  In the event the Professional Liability 
insurance policy is written on a “claims made” basis, coverage must extend for 3 years past 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page C-2 
 
completion and acceptance of the work or services, and Consultant, or its selected Design 
Professional will submit Certificates of Insurance as evidence the required coverage is in 
effect.  The Design Professional must annually submit Certificates of Insurance citing that the 
applicable coverage is in force and contains the required provisions for a 3 year period. 
2.2 Commercial General Liability-Occurrence Form.  Consultant must maintain “occurrence” form 
Commercial General Liability insurance with a limit of not less than $2,000,000 for each 
occurrence, $4,000,000 aggregate.  Said insurance must also include coverage for products 
and completed operations, independent contractors, personal injury and advertising injury. 
If any Excess insurance is utilized to fulfill the requirements of this paragraph, the Excess 
insurance must be “follow form” equal or broader in coverage scope than underlying 
insurance. 
2.3 Automobile Liability-Any Auto or Owned, Hired and Non-Owned Vehicles 
Vehicle Liability:  Consultant must maintain Business/Automobile Liability insurance with a 
limit of $1,000,000 each accident on Consultant owned, hired, and non-owned vehicles 
assigned to or used in the performance of Consultant’s work or services under this 
Agreement.  If any Excess or Umbrella insurance is utilized to fulfill the requirements of this 
paragraph, the Excess or Umbrella insurance must be “follow form” equal or broader in 
coverage scope than underlying insurance. 
2.4 Workers Compensation and Employers Liability Insurance:  Consultant must maintain Workers 
Compensation insurance to cover obligations imposed by federal and state statutes having 
jurisdiction of Consultant employees engaged in the performance of work or services under 
this Agreement and must also maintain Employers’ Liability insurance of not less than 
$1,000,000 for each accident and $1,000,000 disease for each employee. 
3.
Additional Policy Provisions Required.
3.1 Self-Insured Retentions or Deductibles.  Any self-insured retentions and deductibles must be 
declared and approved by City.  If not approved, City may require that the insurer reduce or 
eliminate any deductible or self-insured retentions with respect to City, its officers, officials, 
agents, employees, and volunteers. 
3.1.1. Consultant’s insurance must contain broad form contractual liability coverage. 
3.1.2. Consultant’s insurance coverage must be primary insurance with respect to City, its 
officers, officials, agents, and employees.  Any insurance or self-insurance maintained 
by City, its officers, officials, agents, and employees will be in excess of the coverage 
provided by Consultant and must not contribute to it. 
3.1.3. Consultant’s insurance must apply separately to each insured against whom claim is 
made or suit is brought, except with respect to the limits of the insurer's liability. 
3.1.4. Coverage provided by Consultant must not be limited to the liability assumed under 
the indemnification provisions of this Agreement. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page C-3 
 
3.1.5. The policies must contain a severability of interest clause and waiver of subrogation 
against City, its officers, officials, agents, and employees, for losses arising from Work 
performed by Consultant for City. (Does not apply to Professional Liability coverage.) 
3.1.6. Consultant, its successors and or assigns, are required to maintain Commercial 
General Liability insurance as specified in this Agreement for a minimum period of 3 
years following completion and acceptance of the Work.  Consultant must submit a 
Certificate of Insurance evidencing Commercial General Liability insurance during this 
3-year period containing all the Agreement insurance requirements, including
naming City of Chandler, its agents, representatives, officers, directors, officials and
employees as Additional Insured as required.
3.1.7. If a Certificate of Insurance is submitted as verification of coverage, City will 
reasonably rely upon the Certificate of Insurance as evidence of coverage, but this 
acceptance and reliance will not waive or alter in any way the insurance requirements 
or obligations of this Agreement.   
3.2.  Insurance Cancellation During Term of Agreement. 
3.2.1. If any of the required policies expire during the life of this Agreement, Consultant 
must forward renewal or replacement Certificates to City within 10 days after the 
renewal date containing all the required insurance provisions. 
3.2.2. Each insurance policy required by the insurance provisions of this Agreement must 
provide the required coverage and must not be suspended, voided or canceled 
except after thirty (30) days prior written notice has been given to City, except when 
cancellation is for non-payment of premium, then ten (10) days prior notice may be 
given.  Such notice must be sent directly to Chandler Law-Risk Management 
Department, Post Office Box 4008, Mailstop 628, Chandler, Arizona 85225. If any 
insurance company refuses to provide the required notice, Consultant or its 
insurance broker must notify City of any cancellation, suspension, non-renewal of any 
insurance within seven (7) days of receipt of insurers’ notification to that effect.  
3.3 
City as Additional Insured.  The policies are to contain, or be endorsed to contain, the following 
provisions: 
3.3.1. The Commercial General Liability and Automobile Liability policies are to contain, or 
be endorsed to contain, the following provisions:  City, its officers, officials, agents, 
and employees are additional insureds with respect to liability arising out of activities 
performed by, or on behalf of, Consultant; Products and Completed operations of 
Consultant; and automobiles owned, leased, hired, or borrowed by Consultant. 
3.3.2. City, its officers, officials, agents, and employees must be additional insureds to the 
full limits of liability purchased by Consultant even if those limits of liability are in 
excess of those required by this Agreement. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page D-1 
 
EXHIBIT “D” 
SPECIAL CONDITIONS 
N/A 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page E-1 
 
EXHIBIT “E” 
SUBCONSULTANT DOCUMENTS WITH CONSULTANT 
Any subconsultant assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the Consultant and their 
subconsultants, and do not apply to the Agreement between the Consultant and 
the City. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

MakPro Services, LLC 
2036 N. Gentry • Mesa, AZ 85213 
Office: 480-890-1927 
Email:  teresa@makprosvc.com 
October 24, 2025 
Mr. Brian Lizzet 
Consultant Engineering, Inc. 
135 E Chilton Dr., Suite 101 
Chandler, AZ  85225 
Dear Brian: 
MakPro Services, LLC (MakPro) is pleased to provide the following proposal for public outreach 
services for the City of Chandler’s Lindsay Road Improvements (ST2001.451 CHN0246D 
T024301C), which will widen Lindsay Road, from just north of Ocotillo Road to Hunt Highway, 
to four lanes (two lanes in each direction) with raised medians, bike lanes, center turn lane, 
curb, gutter, sidewalk, streetlights, drainage improvements and associated utility installation or 
relocations for the project. Public outreach is an important element in projects that impact 
neighboring residents and businesses and provides a link between the project and the 
community it impacts. The City of Chandler has developed a strong relationship with its 
residents and businesses, and during design MakPro was on-team to assist in the interaction 
with nearby stakeholders so it will be important to continue this communication into 
construction. Many times, this link is all that is needed to help a project run more smoothly.     
There are a variety of public outreach tools which can be used to establish appropriate 
communication with the effected stakeholders of a project. The services included in this scope 
and fee are based on my experience with the City of Chandler and CEI on similar current and 
previous projects, and previous experience during design for this project. This estimate is based 
on an estimated 2-year construction schedule. In addition, the public outreach services have 
been categorized into tasks; however, adjusting one task may require adjustment of other tasks 
as there are economies of scale and efficiencies embedded in the cost estimate.     
Please take a moment to review this scope and cost estimate and if I’ve missed or 
misunderstood any of the project characteristics, or if you’d like to customize this proposal in 
some other way, please let me know.   
Task 1:  Pre-Construction and Project Progress Meetings, and Team Communication 
MakPro will prepare for and attend the pre-construction meeting and progress meetings during 
construction (2 years ~ 110 meetings), as well as participate in ongoing team communications 
throughout the project. 
Task 2:  Public Meetings and Stakeholder/Resident Meetings 
MakPro will plan, prepare for and attend two public meetings, both to be conducted on the 
same day at different times to accommodate nearby residents and businesses, for which one 
notice will be provided. In addition, MakPro will coordinate and attend, as needed, any 
meetings with residents related to on-site property impacts, etc.  
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Mr. Brian Lizzet, Consultant Engineering, Inc. 
     
October, 24, 2025  
Public Outreach Svcs – Lindsay Road (Ocotillo to Hunt Hwy)  (ST2001.401 CHN0246D T024301C) 
Task 3:  Community Construction Notices & Communications  
Prior to start of construction, MakPro shall develop, print, coordinate and mail one printed pre-
construction notice to project area stakeholders, and property owners directly adjacent to the 
work area. As this is a federal project, collateral will be provided in English, Spanish and 
Mandarin languages.  It is expected there may be additional notifications for access restrictions 
or night work, so this estimate includes one additional mailer to accommodate that effort.   
MakPro will assist the construction management team with resident coordination for properties 
directly along Lindsay Road who will be more directly impacted by the work effort, and compile 
contact information for HOAs and any businesses to be able to communicate project efforts 
more expediently. Reimbursable expenses for postage/printing of pre-construction notices are 
included as part of this estimate. Based on our previous experience in this area during design, 
this would be a 1/4-mile radius distribution area from Ocotillo Road to Hunt Highway, with 
approx. 2,400 pieces. 
Task 4:  Project Communications  
•
Project Webpage: MakPro shall maintain a project webpage on ChandlerAz.gov for the
project, which is capable of multi-lingual information, and will include information related to
the project design, construction schedule and how to contact the project team. The site will
be updated with any new information on a regular basis.
•
Project E-Updates: MakPro shall prepare regular email updates, approximately every 2-3
weeks or to convey significant project milestones, with upcoming construction schedule
information and maintain a distribution list of those interested in the project.
•
Hotline: MakPro shall maintain a 24-hour bilingual project hotline to respond to inquiries or
complaints, maintain a call log and coordinate with the project team to respond to calls.
Provided below are the estimated hours for each task, as well as printing, postage, and 
translator costs: 
Activity 
Principal Hrs 
($120/hr) 
Associate 
Hrs ($100/hr) 
Total 
Public Outreach Services 
Task 1: Pre-construction & Progress Meetings 
100 
35 
$15,500 
Task 2: Public / Stakeholder Meetings 
30 
20 
$5,600 
Task 3: Community Construction Notices & Communications 
55 
35 
$10,100 
Task 4: Project Communications 
   (Hotline: 25 mos @ $300/mo) 
70 
30 
$11,400 
$7,500 
Sub Total 
255 
120 
$50,100 
Printing/Distribution Cost (2 mailings at approx. 2,400 pieces each) 
$9,600 
Translator Cost 
$800 
Grand Total 
$60,500 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Mr. Brian Lizzet, Consultant Engineering, Inc. 
     
October, 24, 2025  
Public Outreach Svcs – Lindsay Road (Ocotillo to Hunt Hwy)  (ST2001.401 CHN0246D T024301C) 
The total cost for public outreach services as identified above and based on a 24-month 
project schedule should not exceed $60,500.00, which includes a $10,400 estimate 
for printing, distribution and translation costs. This cost estimate assumes a labor rate of 
$120/hour for principal and $100/hour for associate hours. The project hotline is billed at 
$300/mo for availability 24/7, and scheduled progress meetings are assumed to be virtual, and 
have a one-hour minimum. In addition, this estimate incorporates efficiencies from one 
task/activity to another, so removal of an activity may require an adjustment of hours in other 
activities.   
This proposal assumes any displays, exhibits, engineering designs or details, required for public 
meetings or information will be provided by the owner, the design engineer, construction 
manager, or contractor. MakPro is not responsible for documenting existing property conditions, 
project signage, traffic signage, or distribution of direct door hanger notifications related to the 
project or its impacts (e.g., water service disruptions or access restrictions) which may be 
required for the contractor’s work. Changes of substance to this proposal during the project 
may affect the final cost. 
Thank you for the opportunity to work with CEI and the City of Chandler on this project. 
Should you have questions or need additional information related to this proposal, please feel 
free to contact me at (480) 890-1927. 
Sincerely, 
Teresa Makinen 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Quality Testing, LLC
175 S Hamilton Place, Bldg 6, #114
Gilbert, AZ 85233
(480) 496-2000 ▪ (480) 496-2001
www.qt-corp.com
SUB CONSULTANT :
PROJECT NAME :
PROJECT OWNER:
ESTIMATE NUMBER:
Project Scope:
Cost Estimate Summary:
Total Extended QT Direct Billable Labor
(Includes QC Supervisor, QC Reporting Tech, Field Tech, Etc.)
Total Laboratory Testing Fees
(Includes All Laboratory Testing)
Total Other Direct Costs
(Includes Vehicle, Subcontracted Services, etc. if Applicable)
Total Estimate of All Fees
10/23/2025
Date
This scope outlines the services to be provided over a 24-month period for Quality Acceptance (QA) testing, initial assembly of the 
Material Sample Checklist, and project management. The work will support the client’s construction and materials verification 
efforts through both field and laboratory testing, documentation, and reporting.
(1) Quality Acceptance (QA) Testing
Field Testing: Conduct QA testing on-site to verify material and construction compliance with project specifications. A field
technician will be assigned approximately 25% of the project duration.
Laboratory Testing: Perform lab tests on collected samples to ensure compliance with contract documents.
(2) Material Sample Checklist Assembly
Develop and maintain a comprehensive checklist of all required material samples. The tracking of sample submissions, testing
status, and results as well as regular updates to the sample checklist is to be performed by others.
(3) Project Management
Oversee all QA testing activities, ensuring alignment with project timelines and quality standards.
Coordinate field and lab personnel, manage schedules, and resolve any testing-related issues.
Maintain communication with the client and other stakeholders.
(4) Weekly Reporting
Provide detailed weekly reports summarizing field and lab test results, and any deviations or concerns.
City of Chandler
QT Project #25122.00
QT
Lindsay Road Improvements; Ocotillo to Hunt Hwy
18,000.00
$
 
190,720.00
$
 
125,072.00
$
 
47,648.00
$
 
Estimate Amount Defined Scope: This cost proposal is considered an estimate, subject to the GENERAL 
INFORMATION/ASSUMPTIONS as defined herein. For the estimate amount, QT will perform construction materials sampling and 
testing, both field and lab, that is specifically identified in this cost estimate.
Estimator
Signature
The following pages identify the time frame, resourcing, and other assumptions used in developing this cost estimate. Assumptions 
are based on the information provided by your office, and QT's experience on similar projects, at the time of this proposal. If there 
are changes to the contractor's schedule, re-testing, additional site visits or other items that are not part of the originally assumed 
visits, these visits will be outside this scope of work. Items outside this scope of work will be extra work that will be billed to the 
contractor based on the units and rates established here within.
Jeffery M. Schaper, President
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PROJECT NAME :
SCOPE OF SERVICES:
LABOR FEES
LABOR 
TYPE
REG
HOURS
REGULAR
RATE
ASS'D
% OT
OVERTIME
HOURS
OVERTIME
RATE(1)
EXTENDED
LABOR COST
Direct
0
284.00
$    
0%
0
284.00
$     
-
$
 
Direct
160
171.00
$    
0%
0
171.00
$     
27,360.00
$
 
Direct
8
124.00
$    
0%
0
124.00
$     
992.00
$
 
Direct
1170
80.00
$      
0%
0
120.00
$     
93,600.00
$
 
Indirect
520
-
$          
0%
0
-
$           
-
$
 
Direct
48
65.00
$      
0%
0
65.00
$       
3,120.00
$
 
0
-
$          
0%
0
-
$           
-
$
 
0
-
$          
0%
0
-
$           
-
$
 
SUBTOTAL DIRECT LABOR
125,072.00
$
 
VEHICLE AND PER-DIEM CHARGES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED VEHICLE
AND PER-DIEM
240
EA
75.00
$       
18,000.00
$
 
0
-
$           
-
$
 
SUBTOTAL VEHICLE AND PER-DIEM CHARGES
18,000.00
$
 
OTHER PROJECT DIRECT CHARGES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED OTHER 
PROJECT CHARGES
-
$
 
-
$
 
-
$
 
-
$
 
SUBTOTAL OTHER PROJECT DIRECT CHARGES
-
$
 
LAB TESTING FEES
NO.
UNITS
UNITS
UNIT
PRICE
EXTENDED
LABORATORY FEES
320
EA
18.00
$       
5,760.00
$
 
35
EA
75.00
$       
2,625.00
$
 
30
EA
85.00
$       
2,550.00
$
 
20
EA
120.00
$     
2,400.00
$
 
45
EA
125.00
$     
5,625.00
$
 
45
EA
75.00
$       
3,375.00
$
 
45
SET OF 2
190.00
$     
8,550.00
$
 
45
SET OF 3
155.00
$     
6,975.00
$
 
34
EA
20.00
$       
680.00
$
 
34
EA
30.00
$       
1,020.00
$
 
3
EA
1,130.00
$  
3,390.00
$
 
3
EA
699.00
$     
2,097.00
$
 
25
EA
97.00
$       
2,425.00
$
 
8
EA
22.00
$       
176.00
$
 
-
$           
-
$
 
TOTAL LABORATORY TESTING FEES
47,648.00
$
 
TOTAL ESTIMATE OF ALL FEES 
190,720.00
$         
Estimator
(1) Regular Rate X Overtime Premium of 1.5
CLASSIFICATION
Registered Professional Engineer
Project Manager
Project Materials Coordinator
Materials Technician
Lab Technician
Reporting Admin
Drill AC Cores (up to 8" thickness)
Emulsion Verification, RS-1, RS-2, SS-1, SS-1h (ASTM D977, AASHTO M140)
Ignition Oven - Calibration (per mix) (ASTM D6307, AASHTO T308)
Fractured Particles in CA (Fractured Faces) (ASTM D5821)
Masonry Grout Prisms, Compressive Strength  (ASTM C1019)
Ignition Oven - Gradation (ASTM C136, AASHTO T27)
Gyratory Compaction (ASTM D6925, D2726, AASHTO T312, T166)
Maximum Specific Gravity of HMA Mixture (ASTM D2041, T209)
Core Bulk Specific Gravity/Thickness (ASTM D2726, AASHTO T166)
DESCRIPTION
Sieve Analysis (ASTM C136, C117, AASHTO T27, T11)
Plasticity Index, Dry Prep (ASTM D4318, AASHTO T89, T90)
Proctor, Standard (ASTM D698, AASHTO T99)
Ignition Oven - Asphalt Cement Content (ASTM D6307, AASHTO T308)
Compressive Strength, Cylindrical Specimen (ASTM C39, AASHTO T22)
Date
Jeffery M. Schaper, President
October 23, 2025
DESCRIPTION
Trip Charge
DESCRIPTION
PROPOSAL SUMMARY 
Lindsay Road Improvements; Ocotillo to Hunt Hwy
Quality Acceptance Testing
COST PROPOSAL,  10/23/2025
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PROJECT NAME :
DATE:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
O-25
N-25
D-25
J-26
F-26
M-26
A-26
M-26
J-26
J-26
A-26
S-26
O-26
N-26
D-26
J-27
F-27
M-27
A-27
M-27
J-27
J-27
A-27
S-27
23
18
22
20
19
22
22
20
22
22
21
21
22
19
22
19
19
23
22
20
22
21
22
21
0%
0.02
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0.04
0%
0.04
0%
0.25
0.25
0.25
0.25
0.25
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.50
0.25
0.25
0%
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0%
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0%
0%
0%
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0%
0.00
0.25
0.25
0.25
0.25
0.25
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.25
0.50
0.50
0.25
0.25
0.25
0.25
0.25
0.50
0.25
0.25
0%
0.00
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0%
0.06
0.40
0.40
0.40
0.45
0.45
0.70
0.70
0.46
0.46
0.46
0.46
0.46
0.46
0.71
0.71
0.46
0.46
0.45
0.45
0.40
0.65
0.40
0.40
0%
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
 m-h
 m-h
 m-h
23
SCHEDULED PROJECTED MAN-HOURS 
TOTAL FTEs (DIRECT LABOR & VEHICLE)
TOTAL FTEs (ALL LABOR CLASSES)
TOTAL FTEs (INDIRECT LABOR ONLY)
TOTAL FTEs (DIRECT LABOR ONLY)
1906 m-h
520 m-h
1170 m-h
216 m-h
 m-h
 m-h
 m-h
1170 m-h
 m-h
 m-h
 m-h
 m-h
October 23, 2025
PROJECT PERSONNEL /
 SUB CONSULTANT MAN-HOURS
 m-h
Registered Professional Engineer
160 m-h
 m-h
 m-h
 m-h
160 m-h
OCT 2025 through SEP 2027
CONSULTANT :
SUBTOTAL
REGULAR
HOURS
%
OT
SUBTOTAL
O/T
TOTAL
Lindsay Road Improvements; Ocotillo to Hunt Hwy
QT
8 m-h
520 m-h
 m-h
 m-h
 m-h
8 m-h
1170 m-h
48 m-h
520 m-h
48 m-h
 m-h
 m-h
 m-h
Reporting Admin
Project Manager
Project Materials Coordinator
Materials Technician
Lab Technician
TOTAL ACTUAL POSITIONS
24
ABOVE PERIOD - MONTHLY FULL TIME EQUIV. (FTEs)
TOTAL FTEs (SUBCONTRACTED LABOR)
1170 m-h
1906 m-h
TOTAL VEHICLES
216 m-h
 m-h
520 m-h
ESTIMATED MONTHLY FTES
SCHEDULED PROJECT MAN-HOURS,  10/23/2025
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

13765 West Auto Drive, Suite 119, Goodyear, Arizona 85338 ● Phone: 623.882.9928 ● Fax: 623.882.9930 
October 22, 2025 
Consultant Engineering Inc. (CEI) 
10625 N 25th Ave #200,  
Phoenix, AZ 85029 
Attn: 
Mr. Brian Lizzet, PE, CCM 
Subject: 
Proposal for Material Testing Services 
Lindsay Rd Improvements Hunt Hwy to Ocotillo Rd 
Hunt Hwy to Ocotillo Rd 
City of Chandler, AZ 
EGM Proposal #: 25EGMP0193CMT 
Epsilon Geotechnical & Material, LLC, (EGM) is pleased to submit this proposal to provide 
Construction Materials Testing and Special Inspection Services at the above referenced subject 
site. This proposal reviews our understanding of the project information, outlines our proposed 
scope of services, and presents our fee estimate with the applicable schedule of unit rates for 
this project. 
SCOPE OF WORK 
Compaction Testing for Subgrade 
•
Collect soil samples and conduct laboratory compaction testing of proposed fill soils to
document material characteristics and conformance with the project requirements.
Aggregate Base Materials 
•
Collect aggregate base course (ABC) samples and conduct laboratory compaction
testing of aggregate to document material characteristics and conformance with the
project requirements.
Concrete Sampling and Testing 
•
Obtain concrete or grout samples and perform in place field sampling and testing
including temperature and slump.
•
Cast test cylinders for compressive strength tests.
•
Cure test cylinders and test compressive strength.
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Lindsay Rd Improvements Hunt Hwy to Ocotillo Rd 
         EGM Proposal No. 25EGMP0193CMT 
Chandler, AZ 
 
      October 22, 2025 
     2 of 4 
•
Provide reports on day-to-day basis or as required by the client.
Asphalt Paving 
•
Review proposed asphalt mix design to determine compliance to the project
specification.
•
Collect samples of asphalt mixture and conduct maximum density, bitumen content and
aggregate gradation tests. Mold Marshall pills from hot mix including specific gravity
and density.
•
Perform extraction and gradation on field samples to document that the asphalt meets
project specifications.
ADDITIONAL SPECIAL STRUCTURAL INSPECTIONS 
Qualified structural inspectors are available to perform special structural inspections. These 
services will be in addition to the scope of work set forth in this proposal and will be provided 
on a unit fee basis when requested by the client. Special structural inspections will be conducted 
in general accordance with the applicable sections of the International Building Code (IBC-
2006) current editions. 
Cost 
The proposed cost for the testing and inspections is outlined in the following cost estimate sheet 
and determined along with EGM’s General Terms and Conditions. 
LIMITATIONS 
Our representatives will be available to observe activities and conduct field and laboratory tests. 
Our work does not include supervision or direction of the actual work performed. The word 
"inspection" is used to mean periodic observation of the work conducted by others. Neither the  
The presence of our field representatives nor the observation or testing by EGM excuses the 
contractor for defects discovered in this work. It is the contractor’s responsibility to notify 
EGM, in advance, when testing or observations are required. EGM will not be responsible for 
work performed without our knowledge and not specifically inspected by the firm’s personnel. 
Our firm will not be responsible for the project or job-site safety on this project. 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Lindsay Rd Improvements Hunt Hwy to Ocotillo Rd 
         EGM Proposal No. 25EGMP0193CMT 
Chandler, AZ 
 
      October 22, 2025 
     3 of 4 
SCHEDULE 
EGM’s services will be provided on an on-call basis unless otherwise directed. Please note that 
it is the responsibility of the on-site contractor or owners’ representative to notify EGM when 
and what testing is required. We require that we be notified at least 24 hours in advance in order 
to adequately schedule our work at the site. We will assign a project manager to direct EGM’s 
on-site activities for the project. The project manager will review the field reports prepared by 
our on-site personnel and will be available to the client for consultation. 
FEE ESTIMATE 
Based on our understanding of the project information provided, and our experience with 
similar projects in this area, we have prepared a cost estimate for this project and have presented 
this estimate on the attached “EGM Project Cost Estimate.  
Our services will be charged at the unit rates per EGM’s Fee Schedule. You will be charged 
only for the actual amount of work performed. Any services requested that are in addition to 
the scope listed previously, will be additional charges and invoiced at the rates shown on the 
attached EGM Fee Schedule. If requested, we will be glad to review our scope of work to 
include any changes requested. 
AUTHORIZATION 
To authorize us to begin this work and to make this document the Agreement between us, 
please sign and return the executed Work Authorization and Agreement attached to this 
proposal. Please provide us with proper invoicing instructions and any special requirements on 
this Work Authorization and Agreement Sheet. Additional services requested, or special 
requirements not covered in this proposal should also be listed. If you issue a letter of 
authorization or purchase order, you must reference this proposal by date and proposal number. 
Please note that the attached General Terms and Conditions are an integral part of this proposal. 
On behalf of EGM, I would like to thank you for the opportunity to submit this proposal and we 
look forward to working with your team on this project.  If you have any questions, or if we can 
be of any additional assistance, please do not hesitate to contact us. 
Sincerely, 
Epsilon Geotechnical & Material, LLC,    
Mahdi Sadek, P.E. 
Principal 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Lindsay Rd Improvements Hunt Hwy to Ocotillo Rd 
         EGM Proposal No. 25EGMP0193CMT 
Chandler, AZ 
 
      October 22, 2025 
     4 of 4 
Attachments: 
Project Cost Estimate Sheet 
Fee Schedule 
Work Authorization and Agreement 
General Terms and Conditions 
Distribution: 
(1) Addressee
Prepared by: 
Signature: 
       Date: 
 
 
GK
10/22/25
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PLEASE COMPLETE/CORRECT ANY AVAILABLE INFORMATION 
Linsday Rd Improvements Hunt Hwy to Ocotillo Rd 
COST ESTIMATE 
Lab
Item
Plasticity Index
Proctor Density
Sieve Analysis
Mix Asphalt Binder Content
Mix Gyratory Bulk Density
Mix Maximum Theoretical Density
Mix Sieve Analysis
In Place Air Voids / Density
Compressive Strength (set of 4 cyl; 7D;2x28D;56H)
Field (incl. trip charge, travel time, tech on site, equipment costs)
Item
Soil Sampling (1 sample per trip)
Asphalt Sampling (1 sample per trip)
Asphalt Core (per Brian's request)
Concrete Sampling and Pickup (1 set per trip)
Field Totals
Administrative
Item
Clerical
Project Management
Prices are good till end of 12/31/2025
Mahdi Sadek
Admin Total
940
$ 
  
Grand Total
12,555
$                   
Lab Total
4
2
622
$
 
Total Cost
4
-
420
$
 
Total Labor Hour
Total No. of Trip
Total Cost
8
24
16
4,592
$
 
-
520
$
 
44
26
8,132
$ 
  
120
$
 
12
6
1,866
$
 
Total Labor Hour
Total No. of Trip
3,483
$ 
  
125
$
 
9
1,125
$
 
75
$
 
6
450
$
 
130
$
 
2
260
$
 
2
60
$
 
2
90
$
 
56
$
 
2
190
$
 
6
570
$
 
95
$
 
4
2
1,052
$
 
Lindsay Rd Improvements Estimate 
8
448
$
 
115
$
 
2
230
$
 
45
$
 
Unit Cost
Number of units
Total Cost
95
$
 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PLEASE COMPLETE/CORRECT ANY AVAILABLE INFORMATION 
Epsilon Geotechnical & Material, LLC 
PROJECT INFORMATION 
Date: October 22, 2025 
PROJECT NO. 
PROPOSAL NO.:   25EGMP0193CMT 
NATURE OF SERVICES: Material Testing Services & Special Inspections  
PROJECT NAME:       Lindsay Rd Improvements Hunt Hwy to Ocotillo Rd 
PROJECT LOCATION: City of Chandler, AZ 
LEGAL DESCRIPTION:  
SCOPE OF WORK:       See Proposal  
FEE ESTIMATE:($12,555) Twelve Thousand Five Hundred and Fifty-Five Dollars 
CLIENT INFORMATION 
NAME:  CONSULTANT ENGINEERING INC.      
ATTENTION:  BRIAN LIZZET, PE, CCM 
ADDRESS:    10625 N 25TH AVE #200, PHOENIX, AZ 85029 
PHONE: 
FAX NUMBER 
EMAIL: BLIZZET@CEI-AZ.COM 
SPECIAL INSTRUCTIONS 
INVOICING INSTRUCTIONS: (If other than above, invoices to be sent to): 
NAME:   
 
ATTENTION:  
ADDRESS:  
PHONE: 
EXT: 
FAX NUMBER: 
REPORT DISTRIBUTION: CLIENT 
COPIES;     CIVIL ENGINEER                COPIES; 
ARCHITECT           
COPIES;     OTHERS  
OTHER INSTRUCTIONS: 
PROPOSAL ACCEPTANCE 
THIS PROPOSAL, INCLUDING THE SCHEDULE OF FEES, AND THE GENERAL TERMS AND CONDITIONS,
IS ACCEPTED THIS     
 DAY OF   
, 2025. 
Print or type name and title of authorized representative 
Signature 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PLEASE COMPLETE/CORRECT ANY AVAILABLE INFORMATION 
Epsilon Geotechnical & Material, LLC 
Contract General Terms and Conditions 
Time and Materials Projects 
Billing and Payment: Invoices will be submitted on a progress basis for services performed during 
the term of the project. Payment will be due based on 30 days Net from the date of the Invoice.  
Controlling Law, Venue, Costs and Attorneys’ Fees: The parties agree that this Contract shall be 
construed in accordance with the laws of the State of Arizona to the fullest extent lawfully allowable 
without regard to conflict of laws principles/the choice-of-law doctrine, and that Maricopa County, 
Arizona shall be the venue and exclusive proper forum in which to adjudicate any case or controversy 
arising either, directly or indirectly, under or in connection with this Contract. The parties agree, in the 
event of a breach of this Contract, the breaching party will pay the other party’s costs and reasonable 
attorney fees incurred because of the breach, whether a lawsuit is instituted or not, and shall 
specifically include attorneys’ fees associated with demand or collection efforts resulting from Client’s 
failure to pay any sum owed hereunder immediately when it is due. Costs shall include taxable costs as 
well as non-taxable costs such as reasonable travel expenses, expert witness fees, copy, long-distance 
and fax charges as well as delivery charges.  
Material Breach and Time of the Essence: Time shall be considered of the essence with respect to 
any provision of this Contract related to payment by the Client. Client shall be considered in material 
breach of this Contract in the event any sum owed to EGM under this Contract is not paid in full 
immediately when due.  
Costs, Attorney’s Fees and Interest: In addition to any and all remedies and damages EGM may be 
entitled to hereunder, any and all sums owed to EGM by Client arising from or as a result of any term, 
provision or condition of this Contract or Client’s breach thereof including, but not limited to any 
EGM’s attorneys’ fees and expenses, shall incur interest at a rate of eighteen percent (18%) per annum 
on the unpaid balance, if such sum is not paid in full to EGM within three (3) business days of the date 
any such sum becomes due or the date of Client’s breach, whichever first occurs. Notwithstanding the 
foregoing, nothing contained herein shall be construed as to authorize or permit the payment of any 
such sum owed to EGM later than immediately on the date it is owed.  
Delays: The Client agrees that EGM is not responsible for damages arising directly or indirectly from 
any delays for causes beyond EGM's control. For purposes of this Contract, such causes include, but 
are not limited to, strikes or other labor disputes; supply shortages; severe weather disruptions or other 
natural disasters; fires; riots; war or other emergencies or acts of God; failure of any government 
agency to act in timely manner; failure of performance by the Client, the Client's contractors or 
consultants; or the discovery of any hazardous substances or differing conditions. In addition, if the 
delays resulting from any such causes increase the cost or time required by EGM to perform its 
services in an orderly and efficient manner, EGM shall be entitled to an equitable adjustment in the 
schedule and/or compensation. 
Dispute Resolution: Except for failure by Client to timely pay any sum owed to EGM immediately 
when due, in an effort to resolve any conflicts that arise during the design and construction of the 
project or following the completion of the project, the Client and EGM agree that all disputes between 
them arising out of or relating to this Contract and the project shall be submitted to nonbinding 
mediation unless the parties mutually agree otherwise. 
Indemnification: EGM agrees, to the fullest extent permitted by law, to indemnify and hold harmless 
the Client against damages, liability and costs arising from the negligent acts of EGM in the  
performance of professional services under this Contract, to the extent that EGM is responsible for 
such damages, liability and costs on a comparative basis of fault and responsibility between the 
consultants  
and the Client. EGM shall not be obligated to indemnify the Client for the Client's own negligence. 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PLEASE COMPLETE/CORRECT ANY AVAILABLE INFORMATION 
Information and/or Services Provided by Others: EGM assumes no responsibility or liability for 
work, testing, design(s) or recommendations performed or provided by other companies or independent 
contractors either independently or on behalf of EGM. 
Insurance: We are protected by Workmen's Compensation Insurance (and/or employer's liability 
insurance), and by Public Liability Insurance for bodily injury and property damage. EGM shall not be 
responsible for property damage from any cause beyond the coverage of our Insurance. 
Liability: Notwithstanding the foregoing, to the maximum extent permitted by law, the Client agrees 
to limit EGM's liability for the Client's damages to the sum of $50,000.00 or EGM's fee, whichever is 
greater. This limitation shall apply regardless of the cause of action or legal theory pled or asserted. 
Notice: Under the Mechanics' Lien Law (for the State of Arizona) any contractor, subcontractor, 
laborer, supplier or other person who helps to improve your property but is not paid for his work or 
supplies, has a right to enforce a claim against your property. This means that after a court hearing, 
your property could be sold by a court officer and the proceeds of the sale used to satisfy the 
indebtedness, this can happen even if you have paid your contractor in full, if the subcontractor, 
laborer, or supplier remains unpaid. 
Performance and Standard of Care: All work performed hereunder shall be in accordance with 
current standards of the profession. Work shall begin as soon as possible following receipt of this 
executed Contract and Work Order. The estimate submitted herein is subject to change if unusual or 
unforeseen elements develop or are discovered, or in the event services are added or changed. State and 
local rules and regulations are subject to changing interpretations. All reports will be written by EGM 
to meet the requirements of local governmental agencies; however, it is understood that governmental 
agency approval is discretionary, and accordingly, EGM cannot and does not guarantee approval of its 
reports by these agencies. All additional work after submittal of the initial report by EGM will be in 
addition to our estimate and will be billed hourly, Right-of-entry is hereby granted to the job site for 
EGM to perform the proposed site studies and subsurface explorations. We will take reasonable 
precautions to protect the environment during our field work but have not included in an 
estimate of the cost for restoration of damages which may result. 
Professional Opinion: Our professional services will be performed, our findings will be obtained, and 
our recommendations prepared in accordance with generally accepted engineering practices. The 
professional opinions of EGM will be based upon conditions revealed at exploration locations and 
reconnaissance of surrounding terrain. It is agreed that EGM is not responsible for the effect that 
unknowns such as acts of others on adjacent properties, variables of nature including, but not limited 
to, earthquakes, the works of man, Acts of God, and other variables beyond the control of EGM may 
have on any opinion rendered hereunder. No express or implied warranties are given hereunder 
regarding soil conditions apart from locations which have been explored and then only to the extent of 
such explorations, does EGM warrant its work. 
ACKNOWLEDGED AND AGREED TO this ______ day of _______________________, 2025. 
CLIENT: _______________________________ 
    (Print Client Name) 
By: ____________________________________ 
   (Signature of Client or Authorized Agent) 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

PROPOSED BY: 
Marco Ciccone 
marco.ciccone@procore.com 
6309 Carpinteria Avenue 
Carpinteria, CA 93013 
(866) 477-6267 
DD_SF_CPQ_Order_Form_V1.3.3 
Order Form 
Customer Name 
 Consultant Engineering, Inc. 
Quote Number 
Q-213795
Generated By 
Marco Ciccone 
BILL TO: 
Brian Lizzet 
blizzet@cei-az.com 
602.866.5090 
Consultant Engineering, Inc. 
10625 north 25th ave ste 200, phoenix, AZ 85029, United States 
Subscription Info 
Subscription Type 
Quote 
Start Date 
January 5, 2026 
End Date 
January 4, 2028 
Full Subscription Term 
24 
Billing Frequency 
Annual 
Payment Terms 
Net 30 
Auto Renewal 
No 
PO # 
Tax Exempt 
No 
VAT ID 
Currency 
USD 
Offer Valid Through 
December 5, 2025 
SHIP TO: 
Brian Lizzet 
blizzet@cei-az.com 
602.866.5090 
Consultant Engineering, Inc. 
10625 N 25TH AVE STE 200, PHOENIX, AZ 85029-2733, United States 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Year 1 Subscription 
Product Name 
Unit of Measure 
Qty 
Subscription Term 
Annual Fees 
Project Execution Essentials 
Tools: Conversations, Daily log, Drawings, Emails, Equipment 
Register, Forms, Observations, Photos, RFI, Specifications, 
Submittals, Timecard 
ACV(MM) 
15 
January 5, 2026 - January 4, 2027 
$18,386.95 
Subtotal 
$18,386.95 
Year 2 Subscription 
Product Name 
Unit of 
Measure 
Qty 
Subscription Term 
Annual Fees 
Project Execution Essentials 
Tools: Conversations, Daily log, Drawings, Emails, Equipment 
Register, Forms, Observations, Photos, RFI, Specifications, 
Submittals, Timecard 
ACV(MM) 
15 
January 5, 2027 - January 4, 2028 
$18,386.95 
Subtotal 
$18,386.95 
One Time Fees 
Product Name 
Unit of Measure 
Qty 
Fees 
Project Execution Essentials Implementation 
Description: Services are valid between Service Start Date 
and Service End Date specified in this contract or twelve (12) 
months, whichever occurs first. Customer's project timeline is 
12 weeks from Project Start Date. The mutually agreed upon 
Project Start Date shall be no more than thirty (30) days from 
the Service Start Date 
Each 
1 
$6,250.00 
Subtotal 
$6,250.00 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Total Fees 
One Time Fees: 
$6,250.00 
Subscription Fees: 
$36,773.90 
Total Fees: 
$43,023.90 
TERMS AND CONDITIONS 
The prices shown above have been rounded to two decimal places for display purposes. Prices quoted do not include taxes. One-time promotional pricing, when applicable on the 
Order, will expire at the end of the Subscription Term. 
The following are the Usage Metrics for the Services in accordance with the Unit of Measure listed in the Product Table above.  If Customer’s usage exceeds the quantity listed within 
the Product Table above, then Customer will be subject to additional Fees: 
Annual Construction Volume (“ACV”) means the aggregate dollar value of the construction work performed or put in place for all distinct projects for which Customer utilizes the 
Subscription Services identified with Customer’s Procore account(s) during each 12-month period identified on this Order. 
In addition to the tools listed above, all Procore clients have access to the following core tools: directory, documents, reports, and task, except for those clients who have purchased 
only Capital Planning and/or Portfolio Financials. 
This Order is governed by the terms of the Procore Subscription and Services Agreement (the “SSA”) and Data Processing Addendum (the “DPA”). To the extent this Order includes 
products governed by any service-specific terms found at https://procore.com/legal/pay-solution-terms (“Service-Specific Terms”), or by any Supplemental Terms found at 
https://www.procore.com/legal/configuration-services-supplemental-terms ("Supplemental Terms"), such Service-Specific Terms and Supplemental Terms also apply. This Order, the 
SSA, and the DPA , and any applicable Supplemental Terms constitute the entire agreement between Procore and Customer, superseding any other terms including, but not limited 
to, the terms of any Customer purchase order and any prior agreements between the Parties regarding Customer’s purchase of services from Procore. 
Each Party represents that it has the authority to enter into this Order. 
To view details of services purchased, please visit this page. 
Customer will have the Full Subscription Term to consume the total construction volume purchased, regardless of Annual Construction Volume, so long as the total construction 
volume cap is not exceeded. 
As part of a semi-annual business review between the Parties, Customer agrees to provide Work in Progress (WIP) reports to Procore semi-annually  to assess and report on current 
Construction Volume ('WIP Report(s)'). 
Customer may increase the Annual Construction Volume for the Product(s) specified on this Order during the Full Subscription Term in blocks of $5.00 million at a rate of 5% above 
the then-current basis points rate (Annual Fees / Annual Construction Volume) specified in this Order. Customer must provide written notice to Procore and execute a Procore Order 
purchasing such additional Annual Construction Volume no later than two (2) months prior to the Subscription End Date. This pricing does not apply to Overages. 
Procore and Customer agree to the below renewal pricing options, dependent on Customer executing a Procore Order. Basis point rate protection: Increases to the basis points rate 
(Annual Fees / Annual Construction Volume) of the Product Name(s) on this Order at time of renewal will not exceed the percentages below, which are based on changes in Annual 
Construction Volume upon renewal. 
(1) If the Annual Construction Volume increases by more than 10%: the basis points rate will not exceed the current rate (0% increase).
(2) If the Annual Construction Volume is equal, or increases less than 10%: the basis points rate will not increase by more than 5%.
(3) If the Annual Construction Volume decreases by 10% or less: the basis points rate will not increase by more than 10%.
EXHIBIT E
$43,023.90 + $19,307.10 = $62,331
$18386.95 x 1.05 = $19,307.1
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

The first year of the renewal term will be compared to the immediately prior subscription year when determining maximum basis points increases. If Products are removed, basis 
points rate protection is no longer valid. 
Consultant Engineering, Inc. (“Customer”) 
Signature: [wkjo53m_____________________] 
Name:  [fwgx1ou_____________________] 
Title:  [k7fpjj9_____________________] 
Date:  [30p7a9z_________] 
Procore Technologies, Inc. (“Procore”) 
Signature:  [91uc562_____________________] 
Name:  [olv60i6_____________________] 
Title:  [9yfs5nl_____________________] 
Date: [tp31vty_________] 
EXHIBIT E
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Project Name: Lindsay Road Improvements (Ocotillo Road to Hunt Highway) 
Project No.:   
ST2001.451; Federal No. CHN-0(246) D; ADOT No. T024301C
Rev. 9/30/2025 
Page F-1 
 
EXHIBIT “F” 
FEDERAL REQUIREMENTS 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

FEDERAL CONTRACT DOCUMENTS 
FOR 
PROFESSIONAL SERVICES  
DBE Goal 0%  – Race Neutral 
This is a federal funded contract with Federal Highway Administration (FHWA) 
and must comply with all related federal requirements. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

FEDERAL DOCUMENTS 
TABLE OF CONTENTS 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

RFQ-Contract TofC Rev 2025-05-01 
TABLE OF CONTENTS 
(for Professional Services RFQ/SOQ & Contract with 0% DBE Goal -DBE Race Neutral) 
1.0 
Requirements of ADOT for the Consultant SOQ Submittal 
2.0 
City SOQ Proposal Certifications Form 
3.0 
Lobby Certification Form 
4.0 
Federal Requirements 
5.0 
Verifications Statement 
6.0 
Forced Labor of Ethnic Uyghurs Ban Certification Form 
7.0 
Prompt Pay Provisions 
8.0 
Title VI Assurance, Appendix A and E 
9.0 
Records Retention 
10.0 
Federal Immigration and Nationality Act 
11.0 
Buy America / Build America-Buy America Requirements 
11.1 
Buy America / BABA Final Rule Waiver Guide-Project Specific 
11.2 
Buy America / BABA Data FHWA Requirements 
12.0 
DBE EPrise 
13.0 
DBE Documents 
13.1 
DBE Documents Instructions / Guide 
13.2 
ADOT On-Line Bidders-Proposers List (see Instructions) 
13.3 
DBE Form 3210PS Final Payment 
14.0 
Payment Requests 
14.1 
Pay Application Request Form 
14.2 
Subconsultant Summary Form 
15.0 
Subconsultant / Subcontract Requirements 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

1.0 
REQUIREMENTS OF ADOT 
 FOR THE CONSULTANT SOQ SUBMITTAL 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

2024-06-24 
 
Consultant Requirements for SOQ Submittal-Pg 1 of 2 
1.0 
CONSULTANT REQUIREMENTS  
FOR SOQ SUBMITTAL 
                       
 
This contract is a federal funded contract with Federal Highway Administration (FHWA) and must comply 
with all related federal requirements. 
 
1.1 
REQUIRED LICENSURE AND REGISTRATION 
SOQs will be accepted from any prime Consultant prequalified through the Arizona Department of 
Transportation (ADOT) Engineering Consultants Section (ECS) and properly registered with the Arizona 
Board of Technical Registration (BTR) at the time the SOQ is submitted to the City. This contract does 
require a Principal or Officer of the Firm responsible for this contract that is properly registered with the 
BTR at the time of SOQ submittal. It is the prime Consultant’s responsibility to verify that all 
Subconsultants, in the SOQ submittal, have the proper Arizona licenses and registrations, and DBE 
certification if applicable, for the services to be performed under this contract. 
 
1.2  
PRE-QUALIFICATION 
In order to submit an SOQ, the prime Consultant must have on file with ADOT ECS a current 
Prequalification Application/Statement. Subconsultants are not required by ADOT ECS or the City to be 
prequalified, but are encouraged to do so. ADOT ECS currently prequalifies firms on a bi-annual basis. 
Further information regarding the prequalification process can be found at the following ADOT ECS 
website:  
 
https://www.azdot.gov/business/engineering-consultants/consultant-prequalification 
 
Obtaining prequalification does not mean the firm is under contract or entitled to receive a contract. 
Obtaining prequalification means the firm has met minimum requirements to submit qualifications to be 
considered/evaluated for this project. 
 
The City will review prequalification status with ADOT ECS at the time of SOQ due date. If the firm is not 
prequalified on the SOQ submittal date, the SOQ will be rejected. 
 
1.3  
AUDIT & ANALYSIS REQUIREMENTS 
Within two (2) weeks after receiving notice of selection, the selected prime Consultant(s) and its 
Subconsultant(s) must submit financial documentation to ADOT Office of Audit & Analysis (A&A). If the 
selected prime Consultant(s) and its Subconsultant(s) have recently submitted their most current 
financial documents to ADOT A&A, contact ADOT A&A at (602) 712-7042 to inquire if you need to 
resubmit financial documents. Additionally, the selected prime Consultant(s) and its Subconsultant(s) 
are required to comply with ADOT Consultant Audit Guidelines. 
 
https://azdot.gov/about/audit-and-analysis 
 
Prime Consultants and its Subconsultants that propose on an overhead basis must have their Schedule 
of Indirect Costs and Financial Statements available for review by ADOT A&A within six (6) months of 
the completion of the Consultant’s preceding fiscal year-end (FYE). For example, a Consultant 
with December 31, 2013, FYE must have the required information available no later than June 30, 
2014. Noncompliance with this requirement will be considered failed negotiations unless 
waived in writing by the State. 
 
The items outlined above represent the information needed to begin the audit review process. Additional 
information and supporting documentation may be requested. Failure to comply with audit requirements 
within the established timeframes may be considered failed negotiations. Questions regarding ADOT’s 
audit requirements or related information must be directed to ADOT A&A at (602) 712-7042. 
 
The Consultant understands that a compliant accounting system is required in accordance with 
Generally Accepted Accounting Principles (GAAP), Federal Acquisition Regulation (FAR) of Title 48, 
Code of Federal Regulations (CFR)-Part 31, applicable Cost Accounting Standards (CAS), and ADOT 
Advance Agreement Guideline. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

2024-06-24 
 
Consultant Requirements for SOQ Submittal-Pg 2 of 2 
 
1.4  
STATE OF ARIZONA LOCAL OFFICE REQUIREMENTS 
All selected prime Consultant(s) must establish a local office in the State of Arizona prior to the contract 
Notice to Proceed (NTP) date if a local office does not already exist. 
 
1.5 
NOT ALLOWED IN SOQ SUBITTAL 
Inclusion of cost, work-hour, and plan-sheet estimates are not allowed in the SOQ. 
 
1.6 
BIDDERS-PROPOSERS LIST EMAIL VERIFICATION   
See the DBE Documents section for instructions. This email verification document must be submitted 
with SOQ and is not included in the limited page count submittal requirements. 
 
  
 
 
 
After contract award, a firm may request a debriefing with the City’s Project Manager. 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

2.0 
SOQ PROPOSAL CERTIFICATION FORM 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

CITY OF CHANDLER 
SOQ PROPOSAL CERTIFICATION FORM 
CONSULTANT NAME: 
______________________________________________________________ 
PROJECT NAME 
CITY PROJECT NO 
FEDERAL NO 
ADOT NO 
The statements below are to ensure Consultants are aware and in agreement with Federal, State, and City of 
Chandler Guidelines related to the award of this contract. Consultants shall submit the specific Certification form 
attached to the related SOQ advertised. Failure to sign and submit this Certification Form as specified in this 
SOQ with the SOQ proposal will result in the SOQ proposal being rejected. 
Submission of the SOQ by the Consultant certifies that to the best of its knowledge: 
1. The Consultant and its subconsultant have not engaged in collusion with respect to the contract under 
consideration. 
2. The Consultant, its principals and subconsultants have not been suspended or debarred from doing business 
with any government entity. 
3. The Consultant shall have the proper Arizona licenses(s) and registration(s) for services to be performed under 
this SOQ and contract. Furthermore, the Consultant and Key Team Members including Subconsultants are 
currently licensed to provide the required services as requested in the SOQ package. 
4. The Consultant’s signature on any SOQ proposal or contract constitutes an authorization to the City to 
ascertain the eligibility of the Consultant, its principals and subconsultants to enter into contract with the City 
and with any other governmental agency. 
5. The Consultant’s Project Team members are employed by the Consultant on the date of submittal.
6. All information and statements written in the proposal are true and accurate and that the City reserves the 
right to investigate, as deemed appropriate, to verify information contained in proposals. 
7. All members of the Project Team who are former City employees did not have or provide information that 
gives the Consultant a competitive advantage, and either (1) concluded their employment with City at least 
12 months before the date of the SOQ or (2) have not made any material decisions about this project while 
employed by the City of Chandler. 
8. Work, equating at least 51% of the contract value, shall be completed by the Consultant unless otherwise 
specified in the SOQ or contract. 
9. No federally appropriated funds have been paid or shall be paid by or on behalf of the Consultant for the 
purpose of lobbying. 
10. The Consultant understands that it is required to have a compliant accounting system, in accordance with 
Generally Accepted Accounting Principles (GAAP), Federal Acquisition Regulation (FAR) of Title 48, Code of 
Federal Regulations (CFR)-Part 31, applicable Cost Accounting Standards (CAS), and ADOT Advance 
Agreement Guideline. 
2020-04-27
SOQ Certification Form Pg 1 of 2 
ST2001.451 
CHN-0(246)D
T024301C
 Professional Services for Construction Management Services:  Lindsay Road Improvements 
(Ocotillo Road to Hunt Highway) 
Consultant Engineering, Inc.
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

11. Due to the project having federal aid funds, the Consultant affirmatively ensures that in any subcontract 
entered into pursuant to this advertisement, disadvantaged business enterprises shall be afforded full and 
fair opportunity to submit proposals/bids in response to this invitation and shall not be discriminated again 
on the grounds of race, color, or national origin in consideration for an award, in accordance with Title VI of 
the Civil Rights Act of 1964, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department 
of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted 
programs of the Department of Transportation. 
12. The Consultant shall utilize all Project Team members, subconsultants and DBE firms, if applicable, submitted 
in the SOQ and shall not add other Project Team members or subconsultants, unless the Consultant has 
received prior written approval from the City. Furthermore, Consultant understands that each Subconsultant 
must be approved through a City of Chandler approval process. 
13. The Consultant shall either meet its DBE goal commitment and any other DBE commitments or make Good 
Faith Efforts to meet the DBE goal commitments as stated in its SOQ proposal or Cost Proposal and shall 
report on a timely basis its DBE utilization as detailed in the contract. 
14. If selected, the Consultant is committed to satisfactorily carry out the Consultant’s commitments as detailed 
in the contract and its SOQ proposal. 
I hereby certify that I have read and agree to adhere to the fourteen (14) statements above and/or that the 
statements are true to the best of my knowledge as a condition of award of this contract.  This form must be 
signed by a Principal of the Consultant. 
Name (Print): 
____________________________________________ 
Title: _______________________________ 
Name (Signature): 
_____________________________________________ 
Date: _______________________________ 
2020-04-27
SOQ Certification Form Pg 2 of 2 
Brian C. Lizzet, PE, CCM
Sr. Vice President
9/24/2025
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

3.0 
 
LOBBY CERTIFICATION FORM 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

DISCLOSURE OF LOBBYING ACTIVITIES 
Approved by OMB 
Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352
 0348-0046 
(See reverse for public burden disclosure.) 
1. Type of Federal Action: 
a. contract
b. grant
c. cooperative agreement
d. loan
e. loan guarantee
f. loan insurance 
2. Status of Federal Action: 
a. bid/offer/application
 b. initial award
 c. post-award
3. Report Type: 
a. initial filing 
b. material change 
For Material Change Only: 
year _________ quarter _________ 
date of last report ______________ 
4. Name and Address of Reporting Entity: 
Prime
Subawardee
Tier ______, if known :
Congressional District, if known :
5. If Reporting Entity in No. 4 is a Subawardee, Enter Name 
and Address of Prime: 
Congressional District, if known :
6. Federal Department/Agency: 
7. Federal Program Name/Description: 
CFDA Number, if applicable: _____________ 
8. Federal Action Number, if known :
9. Award Amount, if known :
$
10. a. Name and Address of Lobbying Registrant 
(if individual, last name, first name, MI):
b. Individuals Performing Services (including address if 
different from No. 10a )
(last name, first name, MI ):
Information requested through this form is authorized by title 31 U.S.C. section
11. 1352. This disclosure of lobbying activities is a material representation of fact 
upon which reliance was placed by the tier above when this transaction was made 
or entered into. This disclosure is required pursuant to 31 U.S.C. 1352. This 
information will be available for public inspection. Any person who fails to file the 
required disclosure shall be subject to a civil penalty of not less than $10,000 and 
not more than $100,000 for each such failure. 
Signature:
Print Name: 
Title:
Telephone No.: _______________________ Date: 
Federal Use Only: 
Authorized for Local Reproduction 
Standard Form LLL (Rev. 7-97) 
4c
PRINT
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Brian C. Lizzet, PE, CCM
Sr. Vice President
9/24/2025
480.689.6472
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

4.0 
 
FEDERAL REQUIREMENTS 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Rev 2025-05-16   Page 1 of 2 
PROFESSIONAL SERVICES FEDERAL REQUIREMENTS ACKNOWLEDGEMENT 
Federal Funded RFQ / Contract - Professional Services 
 
1. CA Agency Requirements 
a. The City of Chandler has strict federal requirements to maintain the federal funds. 
b. Reoccurring Federal Requirement Discrepancies without correction may result in contract termination. 
2. UTracs Registration 
a. All Consultants and Subconsultants working on a federal funded project must be registered on the 
UTracs.azdot.gov website / database which includes a 5-digit registration number. This will be verified. 
3. Federal Contract SAM Requirements To Work on a Federal Funded Contract (for Consultants and Subconsultants) 
a. Cannot have unresolved federal tax liens. 
b. Cannot have been debarred from a federal contract in the last three years. 
c. Must use E-Verify for employment. 
d. Must have and maintain current ROC license ** if business type requires ROC license in Arizona. 
4. Title VI 
a. Must adhere to Title VI Compliance - related topics:  Race, Color, sex, national origin, age, or disability. 
b. During Contract, citizen complaints related to Title VI must be handed over to the City of Chandler Federal 
Compliance. 
5. Buy America AND Build America-Buy America 
a. Requirements apply to this contract/project.  Please see the Buy America section. 
6. Prompt Pay & Payment Reporting in DOORs   
a. All Consultants and Subconsultants for this contract must be registered in ADOT DOORs and have a current up 
to date profile. 
b. Monthly reporting of payment made/received is a requirement for Consultants and Subconsultants. 
c. Payments from Prime to Subconsultant must be made within seven (7) days from receiving payment from the 
City. Subconsultant’s payments to lower tiers must be made within seven (7) days of receipt of payment to Prime.  
d. There are penalties for non-reporting and / or non-payment. 
7. Subconsultants 
a. Subconsultants must be approved by the City PRIOR to any work being performed by Subconsultant. 
b. City will provide required forms and federal documents that must be included in subcontracts. 
8. Documentation Requirements 
a. All documents, emails, reports, invoices, back up documents to pay applications MUST have the Project Name 
and Project Numbers (City, Federal, ADOT).  
9. Pay Applications / Invoicing / Billing 
a. Pay Application forms will be provided to the Consultant. 
b. Pay Applications (request for payment) must be submitted by calendar month for all work the previous month.  
This includes all subconsultants’ work and subconsultants’ invoices. 
c. Consultant will need to submit Pay Applications by the 10th day of each month unless otherwise specified during 
the course of the contract/project. There may be holidays or fiscal year end that can affect this deadline. 
d. No Consultant work or Subconsultant work can be paid for that has a work performed prior to the Prime Contract 
NTP date and no Subconsultant work can be paid for that has occurred prior to the Subconsultant being approved 
by the City. 
e. Consultant will include Subconsultants’ invoices for the same work period as the Consultant’s Pay Application 
month work period.  Expenses submitted must be for the same working month as the Prime’s pay application.  If a 
prior month expense was missed, you may include it with an explanation on the document.  Per FHWA, this 
cannot be a reoccurring process. 
f. 
Pay Application will include the City provided Subconsultant Payment Summary Form with each pay application.  
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Rev 2025-05-16   Page 2 of 2 
10. DBE Subconsultants / Subcontracts 
a. No DBE Subconsultant Subcontract can be deleted, cancelled, reduced, or terminated without the required 
process which includes notification to the City. Per the City’s CA Agency status and ADOT’s requirements, 
Consultant must notify the City as soon as this issue arises. The City will then provide instructions, forms, and the 
process / steps that must be followed. 
b. There will be specific DBE forms for the DBE Subcontracts/Subconsultants. 
c. DBE Subcontract must show dollars applied to each work task description. 
d. When a DBE Subconsultant’s subcontract work is complete and paid for, Consultant and DBE must fill out, sign, 
and submit to City, DBE Final Payment Certification Form 3210PS. 
11. Retention 
a.  Federal required retention is to maintain contract documentation for five (5) years from contract completion. 
 
FOR CM SERVICES ONLY: 
12. Project Meetings 
a. Project meetings will be set up by CM Services. 
b. Project Agenda including current up to date logs to be provided the day before the meetings. 
c. Minutes to be provided within two working days of the meeting with an allowable time for corrections. 
d. Contractor will be required to provide a 3-week look ahead schedule for the meetings. This will need to be 
included in the meeting agenda, and the meeting minutes. 
13. Tracking Logs 
a. CM Services will maintain and provide weekly and at pay application time, current updated logs for RFIs, RFPs, 
Material Certs, Field Directives, T&Ms, Allowance Usage, Lump Sum progressive payments, etc. 
14. Contractor Employee Interviews 
a. CM Services will perform the required employee interviews related to the Contractor and Subcontractors for the 
US Department of Labor / Certified Payroll review requirements.    
b. City will provide the forms and guidelines for this task. 
15. T&M Work 
a. No T&M work will occur prior to a City provided T&M work and documentation requirements review. This review to 
include CM Services Project Manager, CM Services Inspector, and the Contractor. 
16. Inspector Requirements 
a. A City of Chandler Inspector Guide will be provided and required for each inspector to sign and return the 
signature page to the City of Chandler Federal Compliance. 
b. Inspector Field / Daily Reports  
i. These reports are the certified documentation of work on site performed, subcontractors and others on site, 
quantities completed. 
ii. City of Chandler forms are required unless CM Services form is approved. 
iii. All quantities being approved for the contractor must be documented on an Inspector’s Field / Daily Report. 
iv. Per FHWA, Inspector Field / Daily Reports must include documentation for each contractor/subcontractor:  
number of crew members on site, basic classification type breakdown (example: 2 operators, 4 laborers, 1 
water truck driver) and equipment that the contractor/subcontractor is using. 
v. Inspector Field / Daily Reports must include a copy of the City provided list of approved subcontractors and 
document which subcontractors were on site on the date of the daily report.  This may be waived by the City if 
the list of approved subcontractors is less than 2 and clearly documented on the daily report. 
vi. Inspector Field / Daily Reports will be submitted to the City at a minimum, once per week, no later than the 
following Tuesday of the following week. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

5.0 
 
VERIFICATIONS STATEMENT 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

VERIFICATION STATEMENT 
FOR 
NO FEDERAL TAX LIENS,
NO DEBARMENTS, 
USE OF E-VERIFY FOR EMPLOYMENT HIRING 
UTRACS REGISTRATION/STATUS 
ROC LICENSE 
FEDERAL EMPLOYER IDENTIFICATION NUMBER (EIN) 
This form represents certifying compliance for items listed below: 
a)
This company has no outstanding unresolved federal tax liens.
b)
This company has not been suspended or debarred from working on a federal funded contract, does not 
have a proposed debarment pending, has not been indicted, convicted, or had a civil judgement rendered 
against the firm by a court of competent jurisdiction in any matter involving fraud or official misconduct 
within the past three (3) years as specified by Code of Federal Regulations 49 CFR. 
c)
This company uses E-Verify for employment verifications. 
d)
This company has a current UTracs Registration (https://utracs.azdot.gov) 
e)
ROC License: To work on a federal funded project, all contractors, subcontractors, consultants, 
subconsultants must have an ROC license (exception if business type does not require ROC license in 
Arizona). For bidding process, For Construction, Low Bidder will have 60 days from Bid Opening Day to 
obtain the required State ROC license. 
f)
EIN: Must have an Employer Identification Number (EIN) if you are the Prime. For Subcontractors and 
Subconsultants - you are required only If required by Law / Federal Requirements. If not required by Law 
to have an EIN number, you may write in “not applicable’ below.
**It is recommended that all companies working on a federal funded contract be registered on the SAM website. 
(www.sam.gov)
If unable to certify to the statements above, company is ineligible to enter into an agreement for federal 
funded contracts with the City of Chandler. 
Company Name:
Company UTracs No: 
Company ROC No: 
(if applicable) 
EIN: 
Name of Person Signing:
Title of Person Signing: 
Signature:
Date of Signature: 
Rev 2024-09-27
Consultant Engineering, Inc.
 10192
ROC-N/A. Consultant Engineering, Inc. is a professional engineering 
firm licensed with the Arizona Board of Technical Registration #10032
TIN/FEIN: 86-0821774  SAM.gov Unique Identity No. MCMTJJ9YMDB8
Brian C. Lizzet, PE, CCM
Sr. Vice President
9/24/2025
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

6.0 
FORCED LABOR OF ETHNIC UYGHURS 
CERTIFICATION FORM 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

FORCED LABOR OF ETHNIC UVGHURS BAN 
Infrastructure Delivery and Operations 
Certification Form 
Forced Labor of Ethnic Uyghurs Ban 
Please note that if any of the following apply to the Consultant, then the Offeror shall select the "Exempt Consultant" 
option below: 
•
Consultant is a sole proprietorship;
•
Consultant has fewer than ten (10) employees; OR 
•
Consultant is a non-profit organization.
Pursuant to A.R.S. § 35-394, the State of Arizona prohibits a public entity from entering into or renewing a contract with a 
company unless the contract includes written certification that the company does not use the forced labor, or any goods or 
services produced by the forced labor, or use any consultants, subconsultants, or suppliers that use the forced labor or any 
goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of China. 
Under A.R.S. §35-394: 
1. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability 
partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-
owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees. 
(a) Based in part on the fact that the entity does business in Israel or in territories controlled by Israel. 
(b) In a manner that discriminates on the basis of nationality, national origin or religion and that is not based on a valid 
business reason. 
2. "Public entity" means this State, a political subdivision of this State or an agency, board, commission or department of this State 
or a political subdivision of this State. 
In compliance with A.R.S. §§ 35-394 et seq., all offerors must select one of the following: 
The Company submitting this Offer does not use, and agrees not to use during the term of the contract, any of the 
following:
•
Forced labor of ethnic Uyghurs in the People's Republic of China; 
□
• Any goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of China; or 
•
Any Consultants, Subconsultants, or suppliers that use the forced labor or any goods or services produced by 
the forced labor of ethnic Uyghurs in the People's Republic of China. 
□
The Company submitting this Offer does participate in use of Forced Uyghurs Labor as described in A.R.S. § 35-394. 
Exempt Consultant.
Indicate which of the following statements applies to this Consultant (may be more than one): 
□ 
D Consultant is a sole proprietorship; 
□ Consultant has fewer than ten (10) employees; and/or
□ Consultant is a non-profit organization.
Company Name 
Signature of Person Authorized to Sign 
Address 
Printed Name 
City 
State 
Zip 
Title 
ADOT ECS Contract Required Document as of 07-01-2024
Forced Labor of Ethnic Uyghurs Ban Certification Form (rev 10-2022} 
Consultant Engineering, Inc.
10625 North 25th Avenue, Ste. 200
Phoenix                                              AZ                 85029

Brian C. Lizzet, PE, CCM
Sr. Vice President
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

7.0 
PROMPT PAY PROVISION 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Prompt Pay and Payment Reporting Provisions- 1/5 
 
CONSTRUCTION AND PROFESSIONAL SERVICES/DESIGN CONTRACTS 
PROMPT PAY AND PAYMENT REPORTING PROVISIONS 
 
**  FOR USE ON LPA FEDERAL AID PROJECTS  ** 
 
(07/24/2023) 
 
MEASUREMENTS AND PAYMENT: 
 
(A) Partial Payments:  
 
If satisfactory progress is being made, the contractor shall receive a payment based on the 
amount of work completed. Progress payments may be made by the LPA/Subrecipient 
Procurement Office to the contractor on the basis of an approved estimate of the work 
performed during a preceding period of time. The progress payments will be paid on or 
before 14 days after the estimate of the work is approved. The estimate of the work will be 
deemed received by the LPA/Subrecipient Procurement Office on submission to the person 
designated by the LPA/Subrecipient Procurement Office for the submission, review or 
approval of the estimate of the work. The LPA/Subrecipient Procurement Office by mutual 
agreement may make progress payments on contracts of less than 90 days and will make 
monthly progress payments on all other contracts. Payment to the contractor on the basis of 
a duly certified and approved estimate of the work performed during the preceding calendar 
month under the contract may include payment for material and equipment. 
 
An estimate of the work submitted will be deemed approved and certified for payment after 
seven days from the date of submission unless before that time the LPA/Subrecipient 
Procurement Office or Designee prepares and issues a specific written finding setting forth 
those items in detail in the estimate of the work that are not approved for payment under the 
contract. The contractor shall work with the LPA/Subrecipient or the LPA/Subrecipient 
Designee to finalize monthly estimate. The progress payments will be paid on or before 14 
days after the estimate of the work is certified and approved in accordance with Arizona 
Revised Statutes Section 34-221. 
 
The contractor shall pay to the contractor's subcontractors or material suppliers and each 
subcontractor shall pay to the subcontractor's subcontractor or material supplier, within 
seven days of receipt of each progress payment the respective amounts allowed the 
contractor or subcontractor on account of the work performed by the subcontractors, to the 
extent of each subcontractor's interest.  
 
No contract for construction services may materially alter the rights of any contractor, 
subcontractor, or material supplier to receive prompt and timely payment. 
 
A subcontractor may notify the LPA/Subrecipient Procurement Office in writing requesting 
that the subcontractor be notified by the Subrecipient Procurement Office in writing within 
five days from payment of each progress payment made to the contractor. 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Prompt Pay and Payment Reporting Provisions- 2/5 
(B) No Retainage on Progress Payments: 
 
(1) This is a federally-funded project. Therefore, notwithstanding A.R.S. § 34-221, 
the LPA/Subrecipient Procurement Office will not withhold retainage from 
progress payments. Neither the contractor, nor the subcontractor of any tier, 
may withhold any retainage on progress payments to subcontractors or 
suppliers of any tier.  
 
(2) This provision does not prevent the LPA/Subrecipient Procurement Office from 
withholding retainage or reducing payments where otherwise provided in the 
contract. These cases may include, but are not limited to:  
 
(a) Delayed work;  
(b) Work that is not satisfactorily performed; or   
(c) 
A failure to submit necessary reports, certifications, or documents to 
the LPA/Subrecipient Procurement Office. 
 
(C) Subcontractor Payments:  
 
 
 
(1) 
No Retainage: 
 
(a) This is a federally-funded project. Therefore, notwithstanding A.R.S. § 
34-221, neither the contractor, nor the subcontractor of any tier, may 
withhold any retainage on progress payments to subcontractors or 
suppliers of any tier.  
 
(b) Pursuant to Subsection (B)(2) of this Specification, the contract does 
not prevent the LPA/Subrecipient Procurement Office from withholding 
retainage or reducing payments where otherwise provided in the 
contract. These cases may include, but are not limited to:  
 
(i) 
Delayed work;  
(ii) 
Work that is not satisfactorily performed; or  
(iii) 
A failure to submit necessary reports, certifications, 
or 
documents 
to 
the 
LPA/Subrecipient 
Procurement Office.  
 
(c) When the LPA/Subrecipient Procurement Office withholds retainage or 
reduces payments under Subsection (B)(2) of this Specification, the 
contractor may withhold retainage on progress payments to 
subcontractors or suppliers of any tier. However, the contractor may 
only withhold a reasonable amount of retainage.  
 
(d) For the purpose of this section, a “reasonable amount” of retainage is 
based on the subcontractor’s involvement or the supplier’s involvement 
in the cause for the LPA/Subrecipient Procurement Office’s reduction 
of payment. The final amount retained from all subcontractors and 
suppliers shall not be higher than the amount retained by the 
LPA/Subrecipient. However, tier subcontracts shall include provisions 
that comply with this section. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Prompt Pay and Payment Reporting Provisions- 3/5 
 
 
 
(2) 
No Set-offs Arising from Other Contracts: 
 
If a subcontractor is performing work on multiple contracts for the same contractor or 
subcontractor of any tier, the contractor or subcontractor of any tier shall not withhold or 
reduce payment from its subcontractors on the contract because of disputes or claims on 
another contract. 
 
 
 
(3) 
Partial Payment: 
 
The contractor and each subcontractor of any tier shall make prompt partial payments to its 
subcontractors within seven days of receipt of payment from the LPA/Subrecipient 
Procurement Office. Notwithstanding any provision of Arizona Revised Statutes Section 34-
221, the parties may not agree otherwise.  
 
 
 
 
(4) 
Final Payment: 
 
The contractor and each subcontractor of any tier shall make prompt final payment to each 
of its subcontractors.  The contractor and each subcontractor of any tier shall pay all 
monies, including retention, due to its subcontractor within seven days of receipt of 
payment. Notwithstanding any provision of Arizona Revised Statutes Section 34-221, the 
parties may not agree otherwise. 
 
 
 
(5)  Payment Reporting:  
 
For the purposes of this subsection “Reportable Contracts” means any subcontract, of any 
tier, DBE or non-DBE, by which work shall be performed on behalf of the contractor and any 
contract of any tier with a DBE material supplier. 
 
The requirements of this subsection apply to all Reportable Contracts. 
 
Payment Reporting for all Reportable Contracts shall be done through the LPA DBE System 
which can be accessed at AZ UTRACS on the Arizona Transportation Business Portal at 
www.azutracs.com. No later than fifteen calendar days after the preconstruction conference, 
the contractor shall log into the system and enter or verify the name, contact information, 
and subcontract amounts for Reportable Contracts on the project. As Reportable Contracts 
are approved over the course of the contract, the contractor shall enter the subcontractor 
information in the LPA DBE System. Reportable contracts information shall be entered into 
the system no later than five calendar days after approval by the LPA/Subrecipient 
Procurement Office. 
 
The contractor shall report on a monthly basis indicating the amounts actually paid and the 
dates of each payment under any Reportable Contract on the project. The contractor shall 
provide information for payments made on all Reportable Contracts during the previous 
month by the last day of the current month. In the event that no payments were made during 
a given month, the contractor shall identify that by entering a dollar value of zero. If the 
contractor does not pay the full amount of any invoice from a subcontractor, the contractor 
shall note that and provide the reasons in the comment section of the Monthly Payment 
Audit of the LPA DBE System. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Prompt Pay and Payment Reporting Provisions- 4/5 
 
In addition, the contractor shall require that all participants in any Reportable Contract 
electronically verify receipt of payment on the contract within 15 days of receipt of electronic 
payment notification and the contractor shall actively monitor the system to ensure that the 
verifications are input. The contractor shall proactively work to resolve any payment 
discrepancies in the system between payment amounts it reports and payment confirmation 
amounts reported by others. 
 
The contractor shall ensure that all Reportable Contract payment activity is in the LPA DBE 
System. This includes all lower-tier Reportable Contracts. 
 
The contractor shall maintain records for each payment explaining the amount requested by 
the subcontractor, and the amount actually paid pursuant to the request, which may include 
but are not limited to, estimates, invoices, pay requests, copies of checks or wire transfers, 
and lien waivers in support of the monthly payments in the system. 
 
The contractor shall ensure that a copy of this Subsection is included in every Reportable 
Contract of every tier. 
 
 
 
 
(a) Sanctions for Inadequate Reporting:  
 
For each month that the contractor fails to submit timely and complete payment information 
the LPA/Subrecipient Procurement Office will retain $5,000 as sanctions from the monies 
due to the contractor. After 90 consecutive days of non-reporting, the sanctions will increase 
to $10,000 for each subsequent month which the contractor fails to report until the 
information is provided. These sanctions will be in addition to all other retention or liquidated 
damages provided for elsewhere in the contract. 
 
 
 
(6)  
Completion of Work: 
 
A subcontractor's work is satisfactorily completed when all the tasks called for in the 
subcontract have been accomplished, documented, and accepted by the LPA/Subrecipient 
Procurement Office.  
 
 
 
 
(7)  
Disputes:   
 
If there is a discrepancy between what is reported by the contractor in the LPA DBE System 
and what the subcontractor indicates, an alert email will automatically be sent to the 
contractor. The email will be sent to the email address provided by the contractor in the 
LPA DBE System. It is the contractor’s responsibility to ensure that the email address in 
the system is kept current. 
 
The contractor shall provide a verifiable explanation of the discrepancy in the LPA DBE 
System as early as practicable but in no case later than seven days after the date of the 
alert email. 
 
The LPA/Subrecipient will determine whether the contractor has acted in good faith 
concerning any such explanations. The LPA/Subrecipient and ADOT BECO reserves the 
right to request and receive documents from the contractor and all subcontractors of any 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Prompt Pay and Payment Reporting Provisions- 5/5 
tier, in order to determine whether prompt payment requirements are met. 
 
The contractor shall implement and use the dispute resolution process outlined in the 
subcontract or by following the LPA/Subcrecipient escalation process, to resolve payment 
disputes. 
 
 
 
(8)  
Non-compliance: 
 
Failure to make prompt partial payment, or prompt final payment including any retention, 
within the time frames established above, will result in remedies, as the LPA/Subrecipient 
Procurement Office deems appropriate, which may include but are not limited to: 
 
(a) Sanctions: These sanctions will be in addition to all other retention or 
liquidated damages provided for elsewhere in the contract. 
 
(i) The LPA/Subrecipient Procurement Office will withhold two times the 
disputed dollar amount not paid to each subcontractor. 
(ii) If full payment is made within 30 days of the LPASubrecipient 
Procurement Office’s payment to the contractor, the amount withheld by 
the LPA/Subrecipient Procurement Office will be released. 
(iii) If full payment is made after 30 days of the LPA/Subrecipient 
Procurement Office’s payment to the contractor, the LPA/Subrecipient 
Procurement Office will release 75 percent of the funds withheld.  The 
LPA/Subrecipient Procurement Office will retain 25 percent of the 
monies withheld as sanctions. 
 
 (b) Additional Remedies.  If the contractor fails to make prompt payment for 
three consecutive months, or any four months over the course of one 
project, or if the contractor fails to make prompt payment on two or more 
projects within 24 months, the LPA/Subrecipient Procurement Office may, 
in addition, invoke the following remedies: 
 
(i) Withhold monthly progress payments until the issue is resolved and full 
payment has been made to all subcontractors, subject to the sanctions 
described in paragraph (a) above, 
(ii) Terminate the contract for default, 
(iii) Disqualify the contractor from future bidding, temporarily or 
(iv) permanently, depending on the number and severity of violations, if 
applicable. 
 
In determining whether sanctions will be assessed, the extent of the sanctions, or additional 
remedies assessed, the LPA/Subrecipient will consider whether there have been other 
violations on this or other contracts, whether the failure to make prompt payment was due to 
circumstances beyond the contractor’s control, and other circumstances.  The contractor 
may, within 15 calendar days of receipt of the decision of the LPA/Subrecipient, escalate the 
decision according to the contract’s escalation process.  
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

8.0 
TITLE VI 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

9.0 
 
RECORDS RETENTION 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

RECORDS RETENTION 
Contractor and Subcontractor Project Records 
(Reference to A.R.S.35-214) 
 
 
The contractor, subcontractors and all suppliers shall keep and maintain all books, papers, records, files, 
accounts, reports, bid documents with backup data, including electronic data, and all other material relating to the 
contract and project for five (5) years following completion and acceptance of the work. 
 
All of the above material shall be made available for auditing, inspection, and copying and shall be produced upon 
request to the Agency.  
The City of Chandler – Capital Projects 
 215 E Buffalo Street, Mail Stop 407 
Chandler, Arizona 85225. 
 
The contractor shall insert the above requirement in each subcontract purchase order and lease agreement and 
shall also include in all subcontracts, a clause requiring subcontractors to include the above requirement in any 
lower-tier subcontract, purchase order, or lease agreement. 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

10.0 
FEDERAL IMMIGRATION  
AND  
NATIONALITY ACT 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Federal Immigration and Nationality Act 
(Reference to Arizona Executive Order 2005-30) 
 
The contractor, including all subcontractors, shall comply with all federal, state and local immigration laws and 
regulations, as set forth in Arizona Executive Order 2005-30, relating to the immigration status of their employees 
who perform services on the contract during the duration of the contract.  The Agency (City of Chandler) shall 
retain the right to perform random audits of contractor and subcontractor records or to inspect papers of any 
employee thereof to ensure compliance. 
 
By submission of a bid, the contractor warrants that the contractor and all prosed subcontractors are and shall 
remain in compliance with all federal, state, and local immigration laws and regulations relating to the immigration 
status of their employees who perform services on the contract.  The Agency may, at its sole discretion, require 
evidence of compliance from the contractor or subcontractor.  Should the Agency request evidence of 
compliance, the contractor or subcontractor shall have ten (10) working days from receipt of the request to supply 
adequate information.  The Department and Agency (City of Chandler) will accept, as evidence of compliance, a 
showing by the contractor or subcontractor, that it has followed the employment verification provisions of the 
Federal Immigration and Nationality Act as set forth in Sections 274A and 274B of that Act, including 
implementation of regulations and agreements between the Department of Homeland Security and the Social 
Security Administration's verification service.  The contractor shall include the requirements of this provision in all 
subcontracts for this project. 
 
Failure to comply with the immigration laws or to submit proof of compliance constitutes a material breach of 
contract.  The Agency will recue the contractor's compensation by $10,000 for the initial instance of non-
compliance by the contractor or a subcontractor.  Should the same contractor or subcontractor commit 
subsequent violations within a two (2) year time period from the initial violation, the contractor's compensation will 
be reduced by $50,000 for each violation.  The third instance by the same contractor or subcontractor within a two 
(2) year period may result, in addition to the $50,000 reduction in compensation, in removal of the offending 
contractor of subcontractor, suspension of work in whole or in part or, in the case of a third violation by the 
contractor, termination of the contract for default  in addition, the Department may debar a contractor or 
subcontractor who has committed three (3) violations within a two (2) year period for up to one (1) year.  For 
purposes of this paragraph, a violation by a subcontractor does not count as a violation by the contractor. 
 
Any delay resulting from a sanction under this subsection is a non-excusable delay.  The contractor is not entitled 
to any compensation or extension of time for any delays or additional costs resulting from a sanction under this 
subsection. 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

11.0 
BUY AMERICA / BABA REQUIREMENTS 
 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Rev 2025-04-22 
 
 
BUY AMERICA 
THE FINAL RULE, THE WAIVER, THE 55%, THE DATE DEADLINES 
 
 
Project Name: 
Lindsay Road Improvements 
Federal Funds Obligation Date: 
06-18-2025 
Project Numbers: 
ST2001-401 CHN0246D T024301C 
Item No Below To Follow: 
1 
Agency Rep: 
Janece Ray 
 
03/17/2025: FHWA FINAL RULE SIGNED - This has deadline phases for the Buy America Requirements. 
The Final Rule amends FHWA’s Buy America regulation to terminate FHWA’s general waiver for manufactured products 
and establish Buy America requirements for manufactured products with respect to Federal-aid highway projects.  The 
standards for applying Buy America to manufactured products are generally consistent with the Office of Management and 
Budget’s (OMB) guidance implementing the Build America, Buy America Act (BABA) provisions of the infrastructure 
investment and Jobs Act (also known as the Bipartisan Infrastructure Law (BIL)). 
 
 
Item Number below to be marked by 
Agency with applicable requirement 
(X=Applicable, na=Not Applicable) 
 
 
X  
jray 
1 
10/01/2025 
Before this date 
Federal funds officially obligated to 
Agency before this date. 
Waiver is in effect 
 
2 
10/01/2025 
On and after this date 
(and before 10/01/2026 
Federal funds officially obligated to 
the Agency. 
Final Assembly requirements 
 
3 
10/01/2026 
On and after this date 
Federal funds officially obligated to 
Agency from this date forward. 
All manufactured products permanently 
incorporated into the project must meet 
both the Final Assembly requirement 
and the 55% requirement. 
 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Rev 2025-04-22 
 
DEFINITIONS / DETAILS 
 
IRON/STEEL REQUIREMENTS; 
FHWA is required, by statute, to ensure that all projects funded under Title 23 of the United States Code, use only steel, 
iron, and manufactured products that are produced in the United States. 23 U.S.C. 313, FHWA refers to these 
requirements as “Buy America” requirements. FHWA’s Buy America requirement for manufactured products mandates 
that all such products used on Federal aid projects must be ‘produced in the United States.”.  23 U.S.C. 313 The Buy 
America requirements for manufactured products has existed in some form since the enactment of the Surface 
Transportation Assistance Act of 1978.  
 
THE WAIVER 
In 1983 following the passage of the 1982 STAA, FHWA determined that it would be in the public interest to waive the Buy 
America requirements for manufactured products, with that waiver knows as the “Manufactured Products General 
Waiver”. Under the Manufactured Products General Waiver, manufactured products that were permanently incorporated 
into Federal-aid projects did not need to be produced domestically (in the US) apart from predominantly iron or steel 
components of manufactured products.   The ’waiver’ does not apply to Iron and Steel. 
: 
FINAL ASSEMBLY – effective 10/01/2025:  
Defined as an article, material, or supply that has been processed into a specific form and shape, or combined with other 
articles, materials, or supplies to create a product with different properties than the individual articles, materials, or 
supplies. **IF, however, an article, materials, or supply meets this definitation BUT Could also be classified as an iron ro 
steel product, excluded material, or other product category as specified by law or in 2 CFR part 184, that article, materials, 
or supply is not a manufactured product.  
 
FINAL RULE AND THE 55 PERCENT REQUIREMENT – effective 10/01/2026 
Through this rule, FHWA is establishing specific dates on which the Manufactured Products General Waiver will be 
terminated and is amending its Buy America regulation at 23 CFR 635.410 to establish standards regarding Buy America 
requirements that will apply to manufactured products on Federal aid projects.  These standards are substantially similar 
to those stablished by OMG that apply to manufactured products subject to “BABA”.  This means that to be considered 
“Produced in the United States”, and therefore Buy America-compliant, manufactured products must be manufactured in 
the United States (“final assembly requirement” and have greater than 55% of the manufactured products components by 
cost, be mined, produced, or manufactured in the United States. 
 
ON OR AFTER 10-01-2025 (AND BEFORE 10/01/2026) 
FHWA requirement that the final assembly requirement will become effective for Federal aid projects obligated on or after 
10-01-2025.  
 
ON OR AFTER 10/01/2026 
All manufactured products permanently incorporated into the project must both be manufactured in the United States and 
have the cost of the components of the manufactured product that are mined, produced, or manufactured in the United 
States be greater than 55percent of the total cost of all components of the manufactured product. 
 
Reference: 
Federal Highway Administration 
Federal Register / Buy America Requirements 
Title 23 U.S.C. 
OMB (Office of Management and Budgets) 
Surface Transportation Assistance Act of 1978 (1978 STAA) and Act of 1982 (1982 STAA) 
Public Law 95-599 (1978) 
Public Law 97-424 (1983) 
48 FR 1946 (Jan 17,1983) 
48 FR 63099 (Nov 25,1983) 
2 CFR Part 184 
NPRM (Notice of Proposed Rulemaking – a formal announcement by a U.S. Federal Agency) 
 
https://www.fhwa.dot.gov/construction/cqit/buyam.cfm 
https://www.federalregister.gov/documents/2025/01/14/2024-31350/buy-america-requirements-for-manufactured-products 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Federal Funded Contract Guide for Contractors – Rev 2023-04-10             pg 1 of 5 
                                                        
 
 
 
BUY AMERICA / BUILD AMERICA BUY AMERICA / MATERIAL CERTIFICATION 
REQUIREMENTS 
For City of Chandler Federal Funded Projects Per FHWA 
 
 
The City of Chandler will follow Buy America requirements and the Build America Buy America 
requirements. 
 
 
 
A. REGULATIONS 
1. FHWA - BUY AMERICA  AND THE NEW BUILD AMERICA, BUY AMERICA REGULATION EFFECTIVE 
NOVEMBER 1, 2022.  
https://www.transportation.gov/sites/dot.gov/files/docs/buy_america_provisions_side_by_side.pdf) 
 
Federal Highway Administration (FHWA) - 23 U.S.C. § 313 – Buy America; 23 C.F.R. § 635.410 
 
The Secretary of Transportation shall not obligate any funds unless steel, iron, and manufactured products used 
In such project are produced in the United States. 
 
2. MAG SPECIFICATION SECTION 106.2.1 
 
3. ADOT SPECIFICATION 106, 106.05 AND 106.15 
 
B. PROCEDURE FOR MATERIAL CERTIFICATION REQUIREMENTS – CITY OF CHANDLER 
 
1.  All material for a federal funded project must have a material certification. 
2.  All material delivered to jobsite must be accompanied by a material certification. 
3. Material Certifications must be submitted to the City of Chandler representative for review and approval and is not 
deemed accepted until City of Chandler representative approval. 
4. Buy America Material – All Iron and Steel products.  (See Item A above) 
5. Buy America Material Installation: All Buy America Iron and Steel Products MUST NOT be installed without 
Material Certification received and approval from City of Chandler.   
6. All non-Buy America Material Installation: All non-Buy America material, if installed without material certification 
receipt and approval is at the Prime Contractor's risk and WILL NOT BE PAID until approval of material 
certification for that material. 
 
C. MATERIAL CERTIFICATIONS – Every Material Certification must have the following– Items 1-11 
1. Project Name 
2. City Project Number 
3. Federal Project Number 
4. ADOT Number (previously known as Tracs Number) (if FHWA funded project) 
5. Supplier Information:  Name, Address, Telephone Number 
6. Description of the material supplied 
7. Quantity of material represented by the certificate 
8. Means of material identification, such as label, lot number, or marking 
9. A Statement that the material complies in all respects with the requirements of the cited specifications. 
Certificates shall state compliance with the cited specification, such as AASHTO M 320, ASTM C 494; or specific 
table or subsection of the Arizona Department of Transportation Standard Specifications or Special Provisions. 
Certificates may cite both, if applicable. 
10. Authorization Signature Statement: A statement that the individual signing has the legal authority to bind the 
manufacturer or the supplier of the material. 
11. The name, title, signature, and date of signature of the signing-responsible individual. 
12. Statement that that Federal Requirements for Buy America / BABA have been followed. 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Federal Funded Contract Guide for Contractors – Rev 2023-04-10             pg 2 of 5 
                                                        
ADOT SPECIFICATION – BUILD AMERICA BUY AMERICA (106CMATLS, 10-20-22) 
 
SECTION 106 CONTROL OF MATERIALS: of the Standard Specification is modified to add: 
 
106.17 Construction Materials 
 
A construction material, when used on a federal-aid construction project shall comply with the requirements of Build 
America Buy America (BABA) Act specific in Title IX, Subtitle A, Part 1, Sections 70901 and 70911-70918 of the 
Infrastructure Investment and Job Act (ILJA). 
 
A ‘construction material’ that is permanently incorporated on the project shall include an article, material, or supply that is 
or consists primarily of the following: 
 
- 
Non-ferrous metals; 
- 
Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used 
in fiber optic cables); 
- 
Glass (including optic glass); 
- 
Lumber; or 
- 
Drywall  
 
Items manufactured through a combination of either two or more materials listed above, or at least one of the materials list 
above and a material not listed shall be considered as a manufactured product, rather than as a construction material. 
 
Build America Buy America provisions specified for manufactured products in Section 70912(6)(B) of the ILJA, do not 
apply to federal-aid construction projects per FHQWA’s existing statutory requirement applicable to manufactured 
products.  A “manufactured product’ is considered to be an item that undergoes one or more manufacturing processes 
before the item can be used on a federal-aid construction project. 
 
Construction materials shall not include cement and cementitious materials; bituminous materials; aggregates such as 
stone, sand, or gravel; or aggregate binding agents or additives. 
 
All construction materials shall be produced in the United States. This means, all manufacturing processes to produce the 
construction materials shall occur in the United States.  All manufacturing processes for construction materials shall mean 
the final manufacturing process and the immediately preceding manufacturing stage for the construction material. 
 
The contractor shall furnish the Engineer with Certificate of Compliance, conforming to the requirements of Subsection 
106.05 of the ADOT specifications, which shall state that the construction materials incorporated in the project meet the 
requirements specified herein. 
 
Certificates of Compliance shall also certify that all manufacturing processes to produce construction materials occurred in 
the United States. 
 
Convict-produced materials are prohibited in accordance with the requirements of 23 CFR 635.417. 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Federal Funded Contract Guide for Contractors – Rev 2023-04-10             pg 3 of 5 
                                                        
 
ADDITIONAL INFORMATION FOR THE BUILD AMERICA, BUY AMERICA ACT 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Federal Funded Contract Guide for Contractors – Rev 2023-04-10 
  pg 4 of 5 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

12.0 
DBE EPRISE 
FOR CONTRACTS WITH NO DBE GOAL 
(RACE NEUTRAL) 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 1/12 
PROFESSIONAL SERVICES 
DBE PROVISIONS  
 (PROJECT SPECIFIC - CONTRACTS) 
FOR USE ON LPA/SUBRECIPIENT FEDERAL AID PROJECTS WITHOUT DBE GOALS 
*
NOTE:  REFER TO EDITING INSTRUCTIONS IN SECTIONS 13.0   *
(LPA PS EPRISE, 8/26/2016) 
DISADVANTAGED BUSINESS ENTERPRISES: 
1.0 
Policy: 
The Arizona Department of Transportation (hereinafter the Department) has established a 
Disadvantaged Business Enterprise (DBE) program in accordance with the regulations of the 
U.S. Department of Transportation (USDOT), 49 CFR Part 26.  The Department has received 
Federal financial assistance from the U.S. Department of Transportation and as a condition of 
receiving this assistance, the Department has signed an assurance that it will comply with 49 
CFR Part 26. 
It is the policy of the Department to ensure that DBEs, as defined in Part 26, have an equal 
opportunity to receive and participate in USDOT-assisted contracts.  It is also the policy of the 
Department: 
1. To ensure nondiscrimination in the award and administration of USDOT-assisted
contracts;
2. To create a level playing field on which DBEs can compete fairly for
USDOT-assisted contracts;
3. To ensure that the DBE program is narrowly tailored in accordance with applicable
law;
4. To ensure that only firms that fully meet 49 CFR Part 26 eligibility standards are
counted as DBEs;
5. To help remove barriers to the participation of DBEs in USDOT-assisted contracts;
6. To assist in the development of firms that can compete successfully in the market
place outside the DBE program; and
7. To promote the use of DBEs in all types of federally-assisted contracts and
procurement activities.
It is also the policy of the Department to facilitate and encourage participation of Small 
Business Concerns (SBCs), as defined in Subsection 3.0, in USDOT-assisted contracts.  The 
Department encourages consultants to take reasonable steps to eliminate obstacles to SBCs’ 
participation and to utilize SBCs in performing contracts. 
Local Public Agencies (LPA) and or Subrecipients of Federal financial assistance will 
administer and manage the contracts from advertising, consultant selection, negotiation, 
contract execution, processing payment reports and contract modifications, audits, DBE 
compliance (e.g., reporting and monitoring) through contract closeout. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 2/12 
2.0 
Assurances of Non-Discrimination: 
The consultant, subrecipient, or subconsultant shall not discriminate on the basis of race, 
color, sex or national origin in the performance of this contract.  The consultant shall carry out 
applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted 
contracts.  Failure by the consultant to carry out these requirements is a material breach of this 
contract, which may result in the termination of this contract or such other remedy as the the 
LPA/Subrecipient with the Department’s concurrence deems appropriate, which may include, 
but are not limited to: 
1. Withholding monthly progress payments;
2. Assessing sanctions;
3. Liquidated damages;
4. Disqualifying the consultant from submitting SOQs, or any other forms of proposals, as
non-responsible;
5. Cancellation, termination, or suspension of the Contract, in whole or in part.
The consultant, subrecipient, or subconsultant shall ensure that all subcontract agreements 
contain this non-discrimination assurance. 
3.0 
Definitions: 
(A) Commercially Useful Function (CUF): Commercially Useful Function is defined fully in
49 CFR 26.55, which definition is incorporated herein by reference.
(B) Disadvantaged Business Enterprise (DBE):  a for-profit small business concern which
meets both of the following requirements:
(1)
Is at least 51 percent owned by one or more socially and economically
disadvantaged individuals or, in the case of any publicly owned business, at least 51
percent of the stock is owned by one or more such individuals; and,
(2)
Whose management and daily business operations are controlled by one or more of
the socially and economically disadvantaged individuals who own it.
(C) NAICS Code: The North American Industry Classification System (NAICS) is the
standard used by Federal statistical agencies in classifying business establishments for
the purpose of collecting, analyzing, and publishing statistical data related to the U.S.
business economy.
(D) Non-DBE:  any firm that is not a DBE.
(E) Race-Conscious (RC): a measure or program focused specifically on assisting only
DBEs, including women-owned DBEs.
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 3/12 
(F)  Race-Neutral (RN): a measure or program used to assist all small businesses. For the 
purposes of this part, race-neutral includes gender-neutrality. 
 
(G) Small Business Concern (SBC): a business that meets all of the following conditions: 
 
 (1) 
Operates as a for-profit business registered to do business in Arizona; 
 
 (2) Operates a place of business primarily within the U.S., or makes a significant 
contribution to the U.S. economy through payment of taxes or use of American 
products, materials, or labor; 
 
 (3) 
Is independently owned and operated; 
 
 
 
(4) Is not dominant in its field on a national basis; and 
 
 
 
 
(5) Does not have annual gross receipts that exceed the Small Business 
Administration size standards average annual income criteria for its primary North 
American Industry Classification System (NAICS) code. 
 
 
 (I) Socially and Economically Disadvantaged Individuals:  any individual who is a 
citizen (or lawfully admitted permanent resident) of the United States and who is: 
 
 
 
(1) Any individual who is found to be a socially and economically disadvantaged 
individual on a case-by-case basis. 
 
 
 
(2) Any individual in the following groups, members of which are rebuttably presumed 
to be socially and economically disadvantaged: 
 
 
 
 
(i)  "Black Americans," which includes persons having origins in any of the Black 
racial groups of Africa; 
 
 
 
 
(ii)  "Hispanic Americans," which includes persons of Mexican, Puerto Rican, 
Cuban, Dominican, Central or South American, or other Spanish or 
Portuguese culture or origin, regardless of race; 
 
 
 
 
(iii)  "Native Americans," which includes persons who are enrolled members of 
federally or State recognized Indian tribe, Alaskan Natives or Native 
Hawaiians; 
 
 
 
 
(iv)  “Asian-Pacific Americans,” which includes persons whose origins are from 
Japan, China, Taiwan, Korea, Burma (Myanmar), Vietnam, Laos, Cambodia 
(Kampuchea), Thailand, Malaysia, Indonesia, the Philippines, Brunei, 
Samoa, Guam, the U.S. Trust Territories of the Pacific Islands (Republic of 
Palau), the Republic of the Northern Marianas Islands, Macao, Fiji, Tonga, 
Kiribati, Tuvalu, Nauru, Federated States of Micronesia, or Hong Kong; 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 4/12 
 
 
 
(v)  “Subcontinent Asian Americans,” which includes persons whose origins are 
from India, Pakistan, Bangladesh, Bhutan, the Maldives Islands, Nepal or Sri 
Lanka; 
 
 
 
 
(vi) 
"Women;" 
 
 
 
 
(vii) Any additional groups whose members are designated as socially and 
economically disadvantaged by the Small Business Administration (SBA), at 
such time as the SBA designation becomes effective. 
 
4.0 
 
Working with DBEs: 
 
The Department works with DBEs and assists them in their efforts to participate in the highway 
construction program.  All proposers should contact the Department’s Business Engagement 
and Compliance Office (BECO) by phone, through email, or at the address shown below, for 
assistance in their efforts to use DBEs in the highway construction industry.  BECO contact 
information is as follows: 
 
 
 
Arizona Department of Transportation 
 
 
Business Engagement and Compliance Office 
 
 
1801 W. Jefferson St, Suite 101, Mail Drop 154A 
 
 
Phoenix, AZ  85007 
 
 
Phone (602) 712-7761 
 
 
FAX    (602) 712-8429 
 
 
Email: ContractorCompliance@azdot.gov 
 
 
Website :  www.azdot.gov/bec 
 
4.01 
Mentor-Protège Program 
 
The Department has established a Mentor-Protégé program as an initiative to encourage and 
develop disadvantaged businesses in the highway construction industry.  The program 
encourages prime consultants to provide certain types of assistance to certified DBE 
subconsultants.  ADOT encourages consultants and certified DBE subconsultants to engage in a 
Mentor-Protégé agreement under certain conditions.  Such an agreement must be mutually 
beneficial to both parties and to ADOT in fulfilling requirements of 49 CFR Part 23.  For guidance 
regarding this program refer to the Mentor-Protégé Program Guidelines available on the BECO 
website.   
 
The Mentor-Protégé program is intended to increase legitimate DBE activities and is not 
intended to diminish nor circumvent existing DBE rules or regulations.   
 
5.0 
 
Applicability: 
 
The Department has established an overall annual goal for DBE participation on Federal-aid 
contracts.  The Department intends for the goal to be met with a combination of race conscious 
efforts and race neutral efforts.  Race conscious participation occurs when the consultant uses 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 5/12 
a percentage of DBEs, as defined herein, to meet the contract-specified goal.  Race neutral 
efforts are those that are, or can be, used to assist all small businesses or increase 
opportunities for all small businesses.  The regulation, 49 CFR 26, defines race neutral as 
when a DBE wins a prime contract through customary competitive procurement procedures or 
is awarded a subcontract on a prime contract that does not carry a DBE contract goal. 
 
The DBE provisions are applicable to all consultants including DBE consultants. 
 
6.0 
Certification and Registration: 
 
6.01 
DBE Certification: 
 
Certification as a DBE shall be predicated on: 
 
 
(1) The completion and execution of an application for certification as a "Disadvantaged 
Business Enterprise." 
 
 
(2) The submission of documents pertaining to the firm(s) as stated in the application(s), 
including but not limited to a statement of social disadvantage and a personal financial 
statement. 
 
 
(3) The submission of any additional information which the Department or the applicable 
Arizona Unified Certification (UCP) agency may require to determine the firm's eligibility to 
participate in the DBE program. 
 
 
(4) The information obtained during the on-site visits to the offices of the firm and to active 
job-sites. 
 
Applications for certification may be filed online with the Department or the applicable UCP 
agency at any time through the Arizona Unified Transportation Registration and Certification 
System (AZ UTRACS) website at http://www.azutracs.com. 
 
DBE firms and firms seeking DBE certification shall cooperate fully with requests for 
information relevant to the certification process.  Failure or refusal to provide such information 
is a ground for denial or removal of certification. 
 
ADOT is a member of the AZ Unified Certification Program (AZUCP).  Only DBE firms that are 
certified by the AZUCP are eligible for credit on ADOT projects.  A list of DBE firms certified by 
AZUCP is available on the internet at http://www.azutracs.com.  The list will indicate contact 
information and specialty for each DBE firm, and may be sorted in a variety of ways.  However, 
ADOT does not guarantee the accuracy and/or completeness of this information, nor does 
ADOT represent that any licenses or registrations are appropriate for the work to be done. 
 
The Department’s certification of a DBE is not a representation of qualifications and/or abilities 
nor does it mean that a DBE firm is guaranteed or entitled to receive or be awarded a contract.  
Being certified simply means that a firm has met the criteria for DBE certification as outlined in 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 6/12 
49 CFR Part 26.  The consultant bears all risks of ensuring that DBE firms selected by the 
consultant are able to perform the work. 
 
6.02 
 
SBC Registration: 
 
To comply with 49 CFR Part 26.39, ADOT’s DBE Program incorporates contracting 
requirements to facilitate participation by Small Business Concerns (SBCs) in federally 
assisted contracts. SBCs are for-profit businesses authorized to do businesses in Arizona that 
meet the Small Business Administration (SBA) size standards for average annual revenue 
criteria for its primary North American Industry Classification System (NAICS) code 
 
While the SBC component of the DBE program does not require utilization of goals on 
projects, ADOT and the LPA/Subrecipient strongly encourages consultants to utilize small 
businesses that are registered in AZ UTRACS on their contracts, in addition to DBEs meeting 
the certification requirement. The consultant may use the AZ UTRACS website to search for 
certified DBEs and registered SBCs that can be used on the contract.  However, SBCs that are 
not DBEs will not be counted toward the DBE participation. 
 
SBCs can register online at the AZ UTRACS website.  
 
The Department’s registration of SBCs is not a representation of qualifications and/or abilities 
nor does it mean that an SBC firm is guaranteed or entitled to receive or be awarded a contract.  
Being SBC registered simply means that a firm has met the criteria for SBC registration as 
outlined in 49 CFR Part 26.  The consultant bears all risks of ensuring that SBC firms selected 
by the consultant are able to perform the work. 
 
7.0 
 
DBE Financial Institutions: 
 
The Department thoroughly investigates the full extent of services offered by financial institutions 
owned and controlled by socially and economically disadvantaged individuals in its service area 
and makes reasonable efforts to use these institutions. The Department encourages prime 
consultants to use such institutions on USDOT assisted contracts.  However, use of DBE 
financial institutions will not be counted toward the DBE participation. 
 
The Department and the LPA/Subrecipient encourages prime consultants to research the 
Federal Reserve Board website at www.federalreserve.gov to identify minority-owned banks in 
Arizona derived from the Consolidated Reports of Condition and Income filed quarterly by banks 
(FFIEC 031 and 041) and from other information on the Board’s National Information Center 
database.  
 
8.0 
 
Time is of the Essence: 
 
TIME IS OF THE ESSENCE IN RESPECT TO THE DBE PROVISIONS 
 
9.0  
 
Computation of Time: 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 7/12 
In computing any period of time described in this DBE special provision, such as calendar 
days, the day from which the period begins to run is not counted, and when the last day of the 
period is a Saturday, Sunday, Federal or State holiday, the period extends to the next day that 
is not a Saturday, Sunday, Federal or State holiday. In circumstances where the 
LPA/Subrecipient Procurement Office is closed for all or part of the last day, the period extends 
to the next day on which the LPA / Subrecipient Procurement Office is open. 
 
10.0 
 
Consultant and Subconsultant Requirements:  
 
10.01  
General: 
 
The consultant shall establish a DBE program that will ensure nondiscrimination in the award 
and administration of contracts and subcontracts. 
 
Agreements between the proposer and a DBE in which the DBE promises not to provide 
subcontracting quotations to other proposers are prohibited. 
 
10.02  
DBE Liaison: 
 
The consultant shall designate a DBE Liaison responsible for the administration of the 
consultant’s DBE program.  The name of the designated DBE Liaison shall be included on the 
DBE Intended Participation Affidavit Summary.  
   
11.0 
 
DBE Goal: 
 
The Department has not established contract goals for DBE participation in this contract. 
Consultants are still encouraged to employ reasonable means to obtain DBE participation.  
Consultants must retain records in accordance with these DBE specifications.  The consultant 
is notified that this record keeping is important to the Department so that it can track DBE 
participation where only race neutral efforts are employed. 
 
12.0     Bidders/Proposers List and AZ UTRACS Registration Requirement: 
 
Under Title 49 CFR of the Code of Federal Regulations, Part 26.11, DOTs are required to collect 
certain information from all consultants and subconsultants who seek to work on federally-
assisted contracts in order to set overall and contract DBE goals. ADOT collects this information 
when firms register their companies on the Arizona Unified Transportation Registration and 
Certification System (AZ UTRACS) web portal at http://www.azutracs.com/ a centralized 
database for companies that seek to do business with ADOT. This information will be maintained 
as confidential to the extent allowed by federal and state law. 
 
Prime consultants and all subconsultants, including DBEs listed in the SOQ must be registered 
in AZ UTRACS.  Proposers may verify that their firm and each subconsultant is registered using 
the AZ UTRACS website.  
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 8/12 
Proposers may obtain additional information at the AZ UTRACS website or by contacting the 
LPA/Subrecipient. 
All proposers shall create a Bidders/Proposers list in the AZ UTRACS by selecting all firms, 
service providers, and vendors that expressed interest or submitted proposals or quotes for this 
contract. The Bidders/Proposers List form must be complete and must include the names for all 
subconsultants, service providers, and vendors that submitted proposals or quotes on this 
project regardless of the proposer’s intentions to use the those firms on the project.  
All proposers must complete and submit the Bidders/Proposers List online at AZ UTRACS prior 
to Cost Proposal submittal. A confirmation email will be generated by the system. This email 
confirmation shall be submitted with the Cost Proposal.   
FAILURE TO SUBMIT THE REQUIRED BIDDERS/PROPOSERS LIST CONFIRMATION 
EMAIL WITH THE COST PROPOSAL BY THE STATED TIME AND IN THE MANNER HEREIN 
SPECIFIED AND AS OUTLINED IN THE RFQ SHALL BE CAUSE FOR THE PROPOSER’S 
COST PROPOSAL TO BE REJECTED. 
13.0 
Payment Reporting: 
The consultant shall report on a monthly basis indicating the amounts paid to all subconsultants, 
of all tiers, working on the project.  Reporting shall be in accordance with Prompt Pay 
and Payment Reporting requirements. 
14.0 
Crediting DBE Participation: 
14.01 
General Requirements: 
To count toward DBE participation, the DBE firms must be certified at the time of Cost Proposal 
submission in each NAICS code applicable to the kind of work the firm will perform on the 
contract. NAICS for each DBE can be found on the AZ UTRACS website. General descriptions 
of all NAICS codes can be found at http://www.naics.com/search/.  
Credit towards the consultant’s DBE participation is given only after the DBE has been paid for 
the work performed. 
The entire amount of a contract that is performed by the DBE’s own forces, including the cost of 
supplies and materials purchased by the DBE for the work on the contract and equipment leased 
by the DBE will be credited toward DBE participation. Supplies and equipment the DBE 
subconsultant purchases or leases from the prime consultant or its affiliate will not be credited 
toward DBE participation. 
The consultant bears the responsibility to determine whether the DBE possesses the proper 
consultant’s license(s) to perform the work and, if DBE credit is requested, that the DBE 
subconsultant is certified for the requested type of work. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 9/12 
The Department’s certification is not a representation of a DBE’s qualifications and/or abilities.  
The consultant bears all risks that the DBE may not be able to perform its work for any reason. 
 
A DBE may participate as a prime consultant, subconsultant, or as a vendor of materials or 
supplies.  The dollar amount of work to be accomplished by DBEs, including partial amount of a 
lump sum or other similar item, shall be on the basis of subcontract, purchase order, hourly rate, 
rate per ton, etc., as agreed to between parties. 
 
DBE credit may be obtained only for specific work done for the project, supply of equipment 
specifically for physical work on the project, or supply of materials to be incorporated in the work.  
DBE credit will not be allowed for costs such as overhead items, capital expenditures (for 
example, purchase of equipment), and office items. 
 
The consultant may credit second-tier subcontracts issued to DBEs by non-DBE subconsultants.  
Any second-tier subcontract to a DBE must meet the requirements of a first-tier DBE 
subcontract. 
 
A prime consultant may credit the entire amount of that portion of a contract that is performed 
by the DBE’s own forces.  The cost of supplies and materials obtained by the DBE for the work 
of the contract can be included so long as that cost is reasonable.  Leased equipment may 
also be included.  No credit is permitted for supplies purchased or equipment leased from the 
prime consultant or its affiliate(s). 
 
When a DBE subcontracts a part of the work of its contract to another firm, the value of the 
subcontract may be credited towards the DBE participation only if the DBE’s subconsultant is 
itself a DBE and performs the work with its own forces.  Work that a DBE subcontracts to a 
non-DBE firm does not count toward a DBE participation. 
 
A prime consultant may credit the entire amount of fees or commissions charged by a DBE 
firm for providing a bona fide service, such as professional, technical, consulting, or 
managerial services, or for providing bonds or insurance specifically required for the 
performance of a USDOT-assisted contract, provided the fees are reasonable and not 
excessive as compared with fees customarily allowed for similar services. 
 
14.02  
Effect of Loss of DBE Eligibility: 
 
If a DBE is deemed ineligible (decertified) or suspended in accordance with 49 CFR 26.87 and 
26.88, the DBE may not be considered to count toward DBE participation on a new contract, but 
may be considered to count toward DBE participation under a subcontract that was executed 
before the DBE suspension or decertification is effective. 
 
When a DBE firm or a DBE prime consultant loses its DBE eligibility and a subcontract or 
contract has not been executed before a decertification notice is issued to the DBE firm by its 
certifying agency, the ineligible firm does not count toward DBE participation.  
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 10/12 
When a subcontract is executed with the DBE firm before the Department notified the firm of its 
ineligibility, the consultant may continue to use the firm on the contract and may continue to 
receive DBE participation credit for the firm’s work. 
14.03 
Notifying the Consultant of DBE Certification Status: 
Each DBE contract at any tier shall require any DBE subconsultant or supplier that is either 
decertified or certified during the term of the contract to immediately notify the consultant and 
all parties to the DBE contract in writing, with the date of decertification or certification. The 
consultant shall require that this provision be incorporated in any contract of any tier in which a 
DBE is a participant. 
14.04 
Police Officers: 
DBE credit will not be permitted for procuring DPS officers.  For projects on which officers from 
other agencies are supplied, DBE credit will be given only for the broker fees charged, and will 
not include amounts paid to the officers.  The broker fees must be reasonable. 
14.05 
Commercially Useful Function: 
A prime consultant can credit expenditures to a DBE subconsultant toward DBE participation 
only if the DBE performs a Commercially Useful Function (CUF). 
A DBE performs a CUF when it is responsible for execution of the work of a contract and 
carries out its responsibilities by actually performing, managing, and supervising the work 
involved.  To perform a commercially useful function, the DBE must also be responsible, with 
respect to materials and supplies on the contract, for negotiating price, determining quality and 
quantity, ordering the material, and installing (where applicable) and paying for the material 
itself that it uses on the project.  To determine whether a DBE is performing a commercially 
useful function, the LPA/Subrecipient will evaluate the amount of work subcontracted, industry 
practices, whether the amount the firm is to be paid under the contract is commensurate with 
the work it is actually performing and the DBE credit claimed for its performance of the work, 
and other relevant factors. 
A DBE will not be considered to perform a commercially useful function if its role is limited to 
that of an extra participant in a transaction, contract, or project through which funds are passed 
in order to obtain the appearance of DBE participation.  In determining whether a DBE is such 
an extra participant, the LPA/Subrecipient will examine similar transactions, particularly those 
in which DBEs do not participate. 
If a DBE does not perform or exercise responsibility for at least 30 percent of the total cost of 
its contract with its own work force, or if the DBE subcontracts a greater portion of the work of 
a contract than would be expected on the basis of normal industry practice for the type of work 
involved, LPA/Subrecipient will presume that the DBE is not performing a commercially useful 
function. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 11/12 
When a DBE is presumed not to be performing a commercially useful function as provided 
above, the DBE may present evidence to rebut this presumption.  The Department will 
determine if the firm is performing a CUF given the type of work involved and normal industry 
practices. 
The LPA/Subrecipient will notify the consultant, in writing, if it determines that the consultant’s 
DBE subconsultant is not performing a CUF.  The consultant will be notified within seven 
calendar days of the LPA/Subrecipient’s decision. 
Decisions on CUF may be appealed to the ADOT BECO.  The appeal must be in writing and 
personally delivered or sent by certified mail, return receipt requested, to the ADOT BECO.  
The appeal must be received by ADOT BECO no later than seven calendar days after the 
LPA/Subrecipient’s decision.  LPA/Subrecipient’s decision remains in place unless and until 
the ADOT BECO reverses or modifies LPA/Subrecipient’s decision. ADOT BECO will promptly 
consider any appeals under this subsection and notify the consultant of the ADOT BECO 
findings and decisions.  Decisions on CUF matters are not administratively appealable to 
USDOT. 
The LPA/Subrecipient may conduct project site visits on the contract to confirm that DBEs are 
performing a CUF. The consultant shall cooperate during the site visits and the 
LPA/Subrecipient staff will make every effort not to disrupt work on the project. 
15.0 
Required Provisions for DBE Subcontracts: 
All subcontracts of any tier, all supply contracts, and any other contracts in which a DBE is a 
participant shall include as a physical attachment, DBE Subconsultant Compliance Assurances 
available from the LPA/Subrecipient and all of the Uniform Terms and Conditions set forth in 
other sections of this contract. 
Consultants executing agreements with subconsultants, DBE or non-DBE, that materially 
modify federal regulation and state statutes such as, prompt payment and retention 
requirements, through subcontract terms and conditions will be found in breach of contract 
which may result in termination of the contract, or any other such remedy as the 
LPA/Subrecipient and ADOT deem appropriate as outlined in DBE Subsection 2.0. 
The LPA/Subrecipient reserves the right to conduct random reviews of DBE and non-DBE 
subcontract documentation to ensure compliance with federal requirements. 
The consultant shall ensure that all subcontracts or agreements with DBEs to supply labor or 
materials require that the subcontract and all lower tier subcontracts be performed in accordance 
with 49 CFR Part 26 provisions. 
The Consultant shall provide electronic copies of signed subcontract agreements for all DBE 
Subconsultants listed on the DBE Intended Participation Affidavit Summary by uploading them 
within 15 calendar days of an approved contract to the LPA DBE System.   
16.0 
Certification of Final DBE Payments: 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Professional Services DBE Special Provisions 08/26/2016 
LPA PS EPRISE - 12/12 
DBE participation on the contract is measured by actual payments made to the DBEs.  The 
consultant shall submit the “Certification of Final DBE Payments” form for each DBE firm 
working on the contract. This form shall be signed by the consultant and the relevant DBE, and 
submitted to the LPA/Subrecipient no later than 30 days after the DBE completes its work.  
The LPA/Subrecipient and ADOT will use this certification and other information available to 
determine applicable DBE credit allowed to date by the Prime Consultant and the extent to 
which the DBE firms were fully paid for that work. By the act of filing the forms, the consultant 
acknowledges that the information is supplied in order to justify the payment of state and 
federal funds to the consultant. 
The consultant will not be released from the obligations of the contract until the “Certification of 
Final DBE Payments” forms are received and deemed acceptable by the LPA/Subrecipient.  
17.0
False, Fraudulent, or Dishonest Conduct: 
In addition to any other remedies or actions, the Department will bring to the attention of the 
US Department of Transportation any appearance of false, fraudulent, or dishonest conduct in 
connection with the DBE program, so that USDOT can take steps such as referral to the 
Department of Justice for criminal prosecution, referral to the USDOT Inspector General for 
possible initiation of suspension and debarment proceedings against the offending parties or 
application of “Program Fraud and Civil Penalties” rules provided in 49 CFR Part 31. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

13.0 
DBE  
FORMS/DOCUMENTS 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

DBE DOCUMENTS AND INSTRUCTIONS/GUIDE 
 
Race Neutral – 0% Goal  
 
 
 
SUBMIT WITH SOQ: 
 
 
Bidders –Proposers List 
This is an ADOT On Line Submittal Process.   
 
Email Verification 
An Email Verification / Confirmation will be 
 
 
 
provided to you by the system after you submit. 
 
 
 
Save this email verification as a pdf document  
 
 
 
and submit with SOQ. 
 
 
 
  
 
----------------------------------------------------------------------------------------------------------------------------- -------- 
 
SUBMIT AT SCOPE & FEE FINALIZATION: 
 
No additional DBE Documents are required at this phase. 
 
*Important Note: At this phase, a packet of all DBE documentation is prepared and submitted to ADOT BECO by 
City of Chandler.  This DBE Packet must be approved by ADOT BECO prior to City of Chandler Council Date for 
approval of the contract. 
----------------------------------------------------------------------------------------------------------------------------- --------- 
 
DURING THE COURSE OF THE CONTRACT WORK, 
SUBMIT AS APPLICABLE 
 
 
 
 
 
 
DBE Form 3210PS – Final Payment 
This DBE Form is required for every DBE 
 
 
 
Subconsultant, whether or not listed as 
 
 
 
A committed goal DBE subconsultant or not, 
 
 
 
And, whether or not there is a DBE Goal. 
 
 
 
Important Note Regarding DBE Forms: 
DBE Forms provided by City of Chandler FOR THIS PROJECT MUST BE USED. 
Do not use forms found on ADOT Website. 
Do not use previously saved City of Chandler forms from a previous project. 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

BIDDERS PROPOSERS LIST
Caution: This email originated outside the organization. Do not click links or open attachments unless you recognize
the sender and know the content is safe.
From:
ADOT Business Engagement and Compliance Office
To:
CEI Marketing
Cc:
contractorcompliance@azdot.gov
Subject:
Bidders List for Consultant Engineering, Inc.
Date:
Monday, September 22, 2025 2:03:12 PM
You don't often get email from azutracs-support@azdot.gov. Learn why this is important
Consultant Engineering, Inc., AZUTRACS Number: 10192 has submitted a Bidder/Proposer list for T024301C-CM on
09/22/2025 at 2:02 PM MST (UTC - 07:00). 
Bidders/Proposers for this firm include:
Firm
Name
Address
Ethnicity
Gender
Age
of
Firm
Annual
Gross
Receipts
DBE
Status
NAICS
Codes
Epsilon Geotechnical & Material, LLC
13765
West Auto
Drive
Goodyear,
AZ 85338
Other
M
4-7
years
$500,000
to $1
million
Non-
DBE
541380
Mak Pro Services LLC
2036 N.
Gentry
Mesa, AZ
85213
Caucasian
F
10+
years
$500,000
to $1
million
DBE
541820
Quality Testing, LLC
175 S.
Hamilton
Place,
Bldg. 6,
Suite 114
Gilbert, AZ
85233
Hispanic
American
M
10+
years
$5 million
to $10
million
Non-
DBE
237310
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

14.0 
 
PAY REQUESTS 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Approved By:
Project Manager
Date
CIP Supervisor
Date
Revised: 4/14/23
Official City of Chandler Use Only
Authorized Signature
Date
Email PDF Signed Payment Application to: CapitalProjects.Payables@chandleraz.gov 
Or Submit to: City of Chandler, Capital Projects MS 407, PO Box 4008, Chandler, AZ 85244
PROFESSIONAL SERVICES AGREEMENT  
APPLICATION AND CERTIFICATION FOR
Budget Account #'s:
PO #:
 PAYMENT # _____  
Application is made for payment as shown below and on the 
attached Payment Schedule Summary Sheet in accordance with the 
Contract Documents.
Official City of Chandler
Use Only
Date Rec'd: _____________________
Record ID: ______________________
Date Recorded:_________________
Check if FINAL payment:
Consultant Information:
Name: _______________________________________________________   Invoice #:__________________________________ 
Remit to Address: _______________________________________________________________________________________________________________________ 
Contact Name: ___________________________________ Phone: __________________ Email Address: ___________________________________________
Project Name: ___________________________________________________________________________________________________________ 
Project No.: ____________________________ Federal/ADOT No. (if applicable): __________________________________________________ 
Pay Period Beginning: _______________  Ending: _______________  City Contact Name: ______________________________________ 
Total Time Elapsed: ___________%      
Contract Amendment Summary
No.  Date 
 Amount 
RED FIELDS AUTO CALCULATE 
Do not enter amount manually
Consultant's/Engineer's Certification
The undersigned certifies that the work covered by this Application for Payment has been completed in accordance with the Contract 
Documents; that all amounts have been paid for work which previous Certificates of Payment were issued and payments received from the Owner; 
and that the current payment requested as shown is current, accurate, and complete.  
1. Original Contract Price:
$__________________________________ 
2. Contract Amendments to Date:
$__________________________________
3. Adjusted Contract Price (Line 1 + 2):
$__________________________________
4. Total Amount Due to Date:
$__________________________________
(per attached Payment Schedule)
Work Completed to Date:__________%
5. Total Previous Certificates for Payment: $__________________________________
6. Federal Penalties if Applicable (per City):  $_________________________________
Deduct Penalties (-) or Credit Reimb (+)
7. Current Payment Due (Line 4 - 5 - or +6): $__________________________________
$
$
$
Calendar
Days
$
Notice to Proceed (NTP) Date:
Original Contract Duration:
Revised Contract Duration:
Contract Amendments:
Contract Expiration Date:
Contract Time Summary
(applicable milestones per contract)
Calendar Days
Calendar Days
Calendar Days
0.00
0.00
0.00
0.00
0
0
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

name
name
name
name
name
name
name
-
$            
-
$            
-
$            
-
$            
-
$                   
-
$           
-
$                  
Pay App 
#
Work Mo
Pay Mo
DBE Rpt 
Mo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
-
$            
-
$            
-
$            
-
$            
-
$                   
-
$           
-
$            
-
$            
-
$            
-
$            
-
$                   
-
$           
Project Numbers
SUBCONSULTANT INVOICES/PAYMENT SUMMARY DETAIL
Consultant
Project Name
PROFESSIONAL SERVICES PAY APP BACKUP - (REQUIRED)
Total To Date
Bal Remaining
Month
Subconsultants
DBE->  YES / NO
Contract Amt
Change Order(s):
Total Contract:
Lower Tier --> (x)
Lower Tier to:
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

15.0 
SUBCONSULTANT SUBCONTRACTS REQUIREMENTS 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Rev: 2023-08-11 
SUBCONSULTANTS – PROFESSIONAL SERVICES 
REQUIREMENTS AND SUBCONTRACTS 
 
1. Subconsultants will be required to be approved by the City.  Required forms will be provided. 
2. Subconsultants must have a current AZUTracs registration 5-digit number and current profile. 
https://utracs.azdot.gov/ 
3. Subconsultants must be registered/have a current/up to date profile in the DOORS reporting 
system for Payment Reporting, DBE Reporting, and Prompt Pay Reporting. (link is on the 
AZUTracs web page). 
4. Subconsultants (including lower tiers) will be required to report into the DOORs system on a 
monthly basis during the life of their subcontract. 
5. No Consultant/Subconsultant can work on a federal funded contract if they have been debarred 
and/or have unresolved federal tax liens.  
6. The “Joint Check” process – where a Prime pays a subconsultant’s lower tier or vendor is not 
allowed on FHWA Federal Funded Professional Services Contracts. 
7. DBE Subconsultants subcontract tasks must be applicable to their registered NAICS code(s). 
8. Subconsultants for QA/QC/IA Testing – must be on the ADOT Accredited Laboratories / ADOT 
Accredited Material Testing Laboratories List. 
https://azdot.gov/business/engineering-and-construction/materials/materials-quality-assurance/adot-accredited 
9. Subconsultants Invoices: Required to submit timely/monthly invoices to the Prime on a calendar 
monthly basis. The Prime Consultant’s monthly pay application to the City must include all work 
performed by subconsultants during the work period the pay application is being submitted for.   
10. No work can be started prior to the Prime’s Contract Notice to Proceed date. 
 
SUBCONTRACTS 
All Subcontracts: 
1. There are specific federal documents that must be included in all subcontracts.   
2. A set of these federal documents will be provided by the City.  There will be a required set of 
federal documents for a DBE Subconsultant Subcontract and a Non-DBE Subconsultant 
Subcontract. 
3. Subcontract tasks must be applicable to/related to the Prime’s Contract Task Detail with the City. 
4. DBE Subcontracts Task Detail must show breakdown pricing for each task item. 
5. Subcontract must show: Project Name, Project Numbers, and Names and addresses for both 
Prime and Subconsultant. 
 
 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

END OF FEDERAL DOCUMENTS SECTION 
 
Docusign Envelope ID: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433

Certificate Of Completion
Envelope Id: AD6DBDD7-32EE-4A52-B28C-8AF87BBBC433
Status: Sent
Subject: *COUNCIL 1/22/2026* ST2001.451 (FED-ADOT) LINDSAY RD IMPROVEMENTS - Consultant Engineering
EDMS Application:  PWU_CAPITAL_PROJECTS_CONTRACT_MANAGEMENT
Source Envelope: 
Document Pages: 114
Signatures: 2
Envelope Originator: 
Certificate Pages: 8
Initials: 0
Chandler CIP
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-07:00) Arizona
PO Box 4008
Chandler,   85244
chandlercip@chandleraz.gov
IP Address: 198.241.2.1    
Record Tracking
Status: Original
             12/10/2025 | 03:48 PM
Holder: Chandler CIP
             chandlercip@chandleraz.gov
Location: DocuSign
Security Appliance Status: Connected
Pool: StateLocal
Storage Appliance Status: Connected
Pool: City of Chandler
Location: Docusign
Signer Events
Signature
Timestamp
Brian Lizzet
blizzet@cei-az.com
Sr. Vice President
Security Level: Email, Account Authentication 
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 146.75.203.0
Signed using mobile
Sent: 12/10/2025 | 04:31 PM
Viewed: 12/10/2025 | 05:15 PM 
Signed: 12/10/2025 | 05:16 PM
Electronic Record and Signature Disclosure: 
      Accepted: 12/10/2025 | 05:15 PM
      ID: 2c8e4323-0c67-4c1e-a27c-6347513900a3
Daniel Haskins
daniel.haskins@chandleraz.gov
CIP City Engineer
Security Level: Email, Account Authentication 
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.241.2.1
Sent: 12/10/2025 | 05:16 PM
Resent: 12/11/2025 | 10:24 PM
Viewed: 12/12/2025 | 02:56 PM 
Signed: 12/12/2025 | 02:57 PM
Electronic Record and Signature Disclosure: 
      Accepted: 12/12/2025 | 02:56 PM
      ID: 6fe7a654-09c9-44e8-b8a9-a06b1f3070c1
Daniel L Brown
Daniel.Brown@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 7/1/2021 | 08:17 AM
      ID: 563d172a-e614-4b9b-b2a1-61a0afc8280a
Kevin Hartke
kevin.hartke@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 6/28/2021 | 11:17 AM
      ID: 2531f230-027c-41f7-9166-1189df6a8c8f

Signer Events
Signature
Timestamp
Dana DeLong
Dana.DeLong@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 6/28/2021 | 01:03 PM
      ID: e796186e-c533-4a41-978c-34d69e29778a
In Person Signer Events
Signature
Timestamp
Editor Delivery Events
Status
Timestamp
Michelle Reeder
michelle.reeder@chandleraz.gov
Procurement Senior Specialist
City of Chandler
Security Level: Email, Account Authentication 
(None)
Sent: 12/12/2025 | 02:57 PM
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509
Records Division
Signing Group: Records Division
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Not Offered via Docusign
Agent Delivery Events
Status
Timestamp
Intermediary Delivery Events
Status
Timestamp
Certified Delivery Events
Status
Timestamp
Carbon Copy Events
Status
Timestamp
Michelle Reeder
michelle.reeder@chandleraz.gov
Procurement Senior Specialist
City of Chandler
Security Level: Email, Account Authentication 
(None)
Sent: 12/10/2025 | 04:31 PM
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509
Ivan Magana
Ivan.Magana@chandleraz.gov
Owner
Security Level: Email, Account Authentication 
(None)
Sent: 12/10/2025 | 04:31 PM
Viewed: 12/10/2025 | 04:33 PM 
Electronic Record and Signature Disclosure: 
      Accepted: 8/15/2025 | 02:39 PM
      ID: 49375a20-0386-475c-8371-5719dce348c8
Brian Lizzet
blizzet@cei-az.com
Sr. Vice President
Security Level: Email, Account Authentication 
(None)
Sent: 12/10/2025 | 05:16 PM
Viewed: 12/10/2025 | 05:16 PM

Carbon Copy Events
Status
Timestamp
Electronic Record and Signature Disclosure: 
      Accepted: 12/10/2025 | 05:15 PM
      ID: 2c8e4323-0c67-4c1e-a27c-6347513900a3
Michelle Reeder
michelle.reeder@chandleraz.gov
Procurement Senior Specialist
City of Chandler
Security Level: Email, Account Authentication 
(None)
Sent: 12/10/2025 | 05:16 PM
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509
Ivan Magana
Ivan.Magana@chandleraz.gov
Owner
Security Level: Email, Account Authentication 
(None)
Sent: 12/12/2025 | 02:57 PM
Viewed: 12/15/2025 | 02:50 PM 
Electronic Record and Signature Disclosure: 
      Accepted: 8/15/2025 | 02:39 PM
      ID: 49375a20-0386-475c-8371-5719dce348c8
Michelle Reeder
michelle.reeder@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509
Michelle Reeder
michelle.reeder@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509
Bridgette Rhodehouse
Bridgette.Rhodehouse@chandleraz.gov
Jennifer Ekblad
jennifer.ekblad@chandleraz.gov
Dorothy Hernandez
dorothy.hernandez@chandleraz.gov
Vianka Enriquez
Vianka.Enriquez@chandleraz.gov
Signing Group: Records Division
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Not Offered via Docusign
Michelle Reeder
michelle.reeder@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 3/18/2025 | 10:55 AM
      ID: 1ac24ab2-9990-4da1-8fdc-64ed51bd8509

Carbon Copy Events
Status
Timestamp
Donna Rygiel
donna.rygiel@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 3/28/2025 | 11:23 AM
      ID: 40e41fec-eb0c-46d0-b3fc-d151223d8411
Ivan Magana
Ivan.Magana@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 8/15/2025 | 02:39 PM
      ID: 49375a20-0386-475c-8371-5719dce348c8
Melanie Sikes
Melanie.Sikes@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 8/1/2025 | 02:13 PM
      ID: 5d4b3f3a-63fb-4d78-bb91-862fc465e5d4
Jason Garcia
Jason.Garcia@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 12/9/2024 | 12:44 PM
      ID: 4b6e0811-8125-497b-9689-bec49d36fce3
Allan Zimmerman
Allan.Zimmerman@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 3/10/2022 | 07:58 AM
      ID: fa1c98a5-4381-4529-8f21-4c6629aed7b1
Janece Ray
Janece.Ray@chandleraz.gov
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Not Offered via Docusign
Brian Lizzet
blizzet@cei-az.com
Security Level: Email, Account Authentication 
(None)
Electronic Record and Signature Disclosure: 
      Accepted: 12/10/2025 | 05:15 PM
      ID: 2c8e4323-0c67-4c1e-a27c-6347513900a3
Witness Events
Signature
Timestamp
Notary Events
Signature
Timestamp
Envelope Summary Events
Status
Timestamps
Envelope Sent
Hashed/Encrypted
12/10/2025 | 04:31 PM
Payment Events
Status
Timestamps

Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE  
From time to time, City of Chandler (we, us or Company) may be required by law to provide to 
you certain written notices or disclosures. Described below are the terms and conditions for 
providing to you such notices and disclosures electronically through the DocuSign system. 
Please read the information below carefully and thoroughly, and if you can access this 
information electronically to your satisfaction and agree to this Electronic Record and Signature 
Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to 
use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign 
system. 
 
Getting paper copies  
At any time, you may request from us a paper copy of any record provided or made available 
electronically to you by us. You will have the ability to download and print documents we send 
to you through the DocuSign system during and immediately after the signing session and, if you 
elect to create a DocuSign account, you may access the documents for a limited period of time 
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to 
send you paper copies of any such documents from our office to you, you will be charged a 
$0.15 per-page fee. You may request delivery of such paper copies from us by following the 
procedure described below. 
 
Withdrawing your consent  
If you decide to receive notices and disclosures from us electronically, you may at any time 
change your mind and tell us that thereafter you want to receive required notices and disclosures 
only in paper format. How you must inform us of your decision to receive future notices and 
disclosure in paper format and withdraw your consent to receive notices and disclosures 
electronically is described below. 
 
Consequences of changing your mind  
If you elect to receive required notices and disclosures only in paper format, it will slow the 
speed at which we can complete certain steps in transactions with you and delivering services to 
you because we will need first to send the required notices or disclosures to you in paper format, 
and then wait until we receive back from you your acknowledgment of your receipt of such 
paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to 
receive required notices and consents electronically from us or to sign electronically documents 
from us. 
 
All notices and disclosures will be sent to you electronically  
Electronic Record and Signature Disclosure created on: 4/14/2021 | 08:43 AM
Parties agreed to: Brian Lizzet, Daniel Haskins, Daniel L Brown, Kevin Hartke, Dana DeLong, Michelle Reeder, Michelle Reeder, Ivan Magana, Brian Lizzet, Michelle R

Unless you tell us otherwise in accordance with the procedures described herein, we will provide 
electronically to you through the DocuSign system all required notices, disclosures, 
authorizations, acknowledgements, and other documents that are required to be provided or made 
available to you during the course of our relationship with you. To reduce the chance of you 
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required 
notices and disclosures to you by the same method and to the same address that you have given 
us. Thus, you can receive all the disclosures and notices electronically or in paper format through 
the paper mail delivery system. If you do not agree with this process, please let us know as 
described below. Please also see the paragraph immediately above that describes the 
consequences of your electing not to receive delivery of the notices and disclosures 
electronically from us. 
 
How to contact City of Chandler:  
You may contact us to let us know of your changes as to how we may contact you electronically, 
to request paper copies of certain information from us, and to withdraw your prior consent to 
receive notices and disclosures electronically as follows: 
To contact us by email send messages to: esignature@chandleraz.gov 
 
To advise City of Chandler of your new email address  
To let us know of a change in your email address where we should send notices and disclosures 
electronically to you, you must send an email message to us at esignature@chandleraz.gov and 
in the body of such request you must state: your previous email address, your new email 
address.  We do not require any other information from you to change your email address.  
If you created a DocuSign account, you may update it with your new email address through your 
account preferences.  
 
To request paper copies from City of Chandler  
To request delivery from us of paper copies of the notices and disclosures previously provided 
by us to you electronically, you must send us an email to esignature@chandleraz.gov and in the 
body of such request you must state your email address, full name, mailing address, and 
telephone number. We will bill you for any fees at that time, if any. 
 
To withdraw your consent with City of Chandler  
To inform us that you no longer wish to receive future notices and disclosures in electronic 
format you may:

i. decline to sign a document from within your signing session, and on the subsequent page, 
select the check-box indicating you wish to withdraw your consent, or you may; 
ii. send us an email to esignature@chandleraz.gov and in the body of such request you must state 
your email, full name, mailing address, and telephone number. We do not need any other 
information from you to withdraw consent..  The consequences of your withdrawing consent for 
online documents will be that transactions may take a longer time to process.. 
 
Required hardware and software  
The minimum system requirements for using the DocuSign system may change over time. The 
current system requirements are found here: https://support.docusign.com/guides/signer-guide-
signing-system-requirements.  
 
Acknowledging your access and consent to receive and sign documents electronically  
To confirm to us that you can access this information electronically, which will be similar to 
other electronic notices and disclosures that we will provide to you, please confirm that you have 
read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for 
your future reference and access; or (ii) that you are able to email this ERSD to an email address 
where you will be able to print on paper or save it for your future reference and access. Further, 
if you consent to receiving notices and disclosures exclusively in electronic format as described 
herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before 
clicking ‘CONTINUE’ within the DocuSign system. 
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm 
that: 
 
You can access and read this Electronic Record and Signature Disclosure; and 
 
You can print on paper this Electronic Record and Signature Disclosure, or save or send 
this Electronic Record and Disclosure to a location where you can print it, for future 
reference and access; and 
 
Until or unless you notify City of Chandler as described above, you consent to receive 
exclusively through electronic means all notices, disclosures, authorizations, 
acknowledgements, and other documents that are required to be provided or made 
available to you by City of Chandler during the course of your relationship with City of 
Chandler.