Contract

City of Chandler — Regular Meeting (2026-04-23)

View PDF Meeting page

Extracted text (via pymupdf) 14512 characters
Project Name: Pima Park Sidewalk Improvements
Project No.: PR2506.401
Rev. 1/20/2026
Page 1 
CITY OF CHANDLER 
JOB ORDER PROJECT AGREEMENT 
PIMA PARK SIDEWALK IMPROVEMENTS
Project No. PR2506.401 
Council Date:
This JOB ORDER PROJECT AGREEMENT (”Job Order”) is made this _____ day of ____________ 2026 
(“Effective Date”), by and between the City of Chandler, an Arizona municipal corporation, (“City”)
and Hunter Contracting Co., an Arizona corporation, (“JOC Contractor”) and is entered into 
pursuant to Job Order Master Agreement No. JOC2419.401 (“JOC Master Agreement”). City and 
JOC Contractor may be referred to individually as “Party” or collectively as “Parties”).
City and JOC Contractor, in consideration of the mutual covenants herein set forth, agree as
follows:
RECITALS
A. On or about February 13, 2024, the Parties entered into the JOC Master Agreement, which terms
and conditions are made a part of and incorporated into this Job Order Project Agreement by this
reference.
B. City proposes to engage JOC Contractor for construction services as more fully described in
Article 1 and Exhibit "A", which is attached to and made a part of this Job Order by this reference.
C. JOC Contractor is ready, willing, and able to provide the services described in Exhibit “A” for
the compensation and fees set forth and as described in Exhibit ”B”, which is attached to and
made a part of this Agreement by this reference.
ARTICLE 1.  DESCRIPTION OF WORK
The Parties enter into this Job Order Project Agreement for the Pima Park Sidewalk Improvements, 
Project Number PR2506.401  The scope of work consists of the removal of the existing concrete 
and asphalt pedestrian path, grading and placement of new aggregate base course, and 
construction of a new ADA-compliant concrete path, all as more particularly set forth in Exhibit 
“A” attached hereto and incorporated herein by reference.

Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page 2 
 
The JOC Contractor will not accept any change of scope, or change in Agreement provisions, unless 
issued in writing, as an Agreement, amendment or change order and signed by the authorized 
signatories for each party. 
 
Performance and Payment Bonds, as set forth in Exhibit “C” and Exhibit “D” respectively attached 
hereto and incorporated herein by reference, will be due prior to execution of each Job Order 
Project Agreement in the full amount of each Job Order. 
 
At project completion, JOC Contractor must complete Contractor's Affidavit Regarding Settlement 
of Claims and Certificate of Completion, as set forth in Exhibit “E” and Exhibit “F” respectively 
attached hereto and incorporated herein by reference. 
 
ARTICLE 2.  PROJECT PRICE 
City will pay JOC Contractor for completion of the Work in accordance with the JOC Master 
Agreement a fee not to exceed the Guaranteed Maximum Price of $1,342,571 Dollars determined 
and payable as set forth in JOC Master Agreement and Exhibit “B” attached hereto and made a 
part hereof by reference.  
 
ARTICLE 3.  AGREEMENT TIME & SCHEDULE 
JOC Contractor agrees to complete all Construction within 365 calendar days from the Notice to 
Proceed (NTP) Date.  
ARTICLE 4.  JOB ORDER CONTACTS 
The following parties serve in the capacity below for this Job Order Project. 
CITY: 
Construction Project Manager: Scott Riter
Phone:
480-782-3328
Email:
Scott.Riter@chandleraz.gov
JOC CONTRACTOR: 
Hunter Contracting Co. 
701 North Cooper Road, Gilbert AZ 85233
JOC Contractor Representative:  Michael Gonzales
Phone:
602-541-0671
Email:
michaelg@huntercontracting.com

Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page 3 
 
ARTICLE 5. FORCED LABOR OF ETHNIC UYGHURS PROHIBITED
By entering into this Agreement, Contractor certifies and agrees Contractor does not currently use 
and will not use for the term of this Agreement: (i) the forced labor of ethnic Uyghurs in the 
People's Republic of China; or (ii) any goods or services produced by the forced labor of ethnic 
Uyghurs in the People's Republic of China; or (iii) any contractors, subcontractors or suppliers that 
use the forced labor or any goods or services produced by the forced labor of ethnic Uyghurs in 
the People's Republic of China
 
 
 
 
 
 
SIGNATURE PAGE TO FOLLOW

Project Name: Pima Park Sidewalk Improvements 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page 4 
IN WITNESS WHEREOF, the Parties have executed this Job Order as of the Effective Date.
“CITY” 
CITY OF CHANDLER 
Mayor
RECOMMENDED BY:
Daniel Haskins, P.E. 
CIP City Engineer  
APPROVED AS TO FORM: 
City Attorney 
ATTEST: 
 City Clerk 
 Seal 
“JOC CONTRACTOR”
HUNTER CONTRACTING CO.
Signature 
 Date 
Print Name 
Title 
Signer Email Address

Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
 
Page A-1 
EXHIBIT A
SCOPE OF WORK

PR2506.401

Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
 
Page B-1 
 
EXHIBIT B
FEE SCHEDULE

EXHIBIT C 
 
Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page C-1 
PERFORMANCE BOND
ARIZONA STATUTORY PERFORMANCE BOND 
PURSUANT TO TITLES 28, 34, AND 41, ARIZONA REVISED STATUTES 
(Penalty of this bond must be 100% of the Agreement amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:___________________________________________________
 
(hereinafter "Principal"), and __________________________________________________________ (hereinafter "Surety"), a 
corporation organized and existing under the laws of the State of ______________ with its principal office in the City of 
_____________________________, holding a certificate of authority to transact surety business in Arizona issued by the 
Director of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto 
__________________________(hereinafter "Obligee") in the amount of ________________________________________________ 
(Dollars) ($___________), for the payment whereof, Principal and Surety bind themselves, and their heirs, administrators, 
executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated  
 
the ____________ day of _______________________, 20___ for construction of Pima Park Sidewalk Improvements 
PR2506.401, which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copies 
at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal faithfully performs and 
fulfills all the undertakings, covenants, terms, conditions and agreements of the Agreement during the original term of 
the Agreement and any extension of the Agreement, with or without notice of the Surety, and during the life of any 
guaranty required under the Agreement, and also performs and fulfills all the undertakings, covenants, terms, 
conditions, and agreements of all duly authorized modifications of the Agreement that may hereafter be made, notice 
of which modifications to the Surety being hereby waived, the above obligation is void.  Otherwise it remains in full force 
and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2, 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions of Title 34, 
Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length in this Agreement. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that 
may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
 
 
 
 
____________________________________ 
PRINCIPAL        
SEAL
___________________________________
AGENT OF RECORD 
 
 
 
By _________________________________ 
 
 
____________________________________ 
SURETY
SEAL

EXHIBIT D 
 
Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page D-1 
PAYMENT BOND 
ARIZONA STATUTORY PAYMENT BOND 
PURSUANT TO TITLES 28, 34, AND 41, OF THE ARIZONA REVISED STATUTES 
(Penalty of this Bond must be 100% of the Agreement amount) 
 
KNOW ALL MEN BY THESE PRESENTS THAT:________________________________________________  
 
(hereinafter "Principal"), as Principal, and _________________________________________(hereinafter "Surety"), a corporation 
organized and existing under the laws of the State of __________________   with its principal office in the City of 
__________________, holding a certificate of authority to transact surety business in Arizona issued by the Director of the 
Department of Insurance pursuant to Title 20, Chapter 2, Article 1, as Surety, are held and firmly bound unto 
________________________  (hereinafter "Obligee") in the amount of ________________________________________________ 
(Dollars) ($___________), for the payment whereof, the Principal and Surety bind themselves, and their heirs, 
administrators, executors, successors and assigns, jointly and severally, firmly by these presents. 
 
WHEREAS, the Principal has entered into a certain written Agreement with the Obligee, dated the _________ day of 
_______________________, 20___ for construction of Pima Park Sidewalk Improvements PR2506.401, 
which 
Amendment is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal promptly pays all moneys 
due to all persons supplying labor or materials to the Principal or the Principal's subcontractors in the prosecution of 
the work provided for in said Agreement, this obligation is void. Otherwise it remains in full force and effect. 
 
PROVIDED, HOWEVER that this bond is executed pursuant to the provisions of Title 34, Chapter 2, Article 2 
Arizona Revised Statutes, and all liabilities on this bond will be determined in accordance with the provisions, conditions 
and limitations of Title 34, Chapter 2, Article 2, Arizona Revised Statutes, to the same extent as if it were copied at length 
in this Agreement. 
 
The prevailing party in a suit on this bond may recover as part of the judgment reasonable attorney fees that 
may be fixed by a judge of the court. 
 
Witness our hands this ________________ day of ____________________, 20__. 
 
 
____________________________________ 
PRINCIPAL        
SEAL
___________________________________
AGENT OF RECORD
 
 
 
By _________________________________ 
 
 
____________________________________ 
SURETY
SEAL
___________________________________
AGENT ADDRESS

EXHIBIT E 
 
Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page E-1 
CONTRACTOR'S AFFIDAVIT REGARDING SETTLEMENT OF CLAIMS 
 
________________________, Arizona 
 
Date ____________________________ 
Project: 
Pima Park Sidewalk Improvements 
Project No.: PR2506.401 
 
To the City of Chandler, Arizona 
Gentlemen: 
This is to certify that all lawful claims for materials, rental of equipment and labor used in 
connection with the construction of the above project, whether by subcontractor or claimant in 
person, have been duly discharged. 
 
The undersigned, for the consideration of $________________________, as set out in the final pay 
estimate, as full and complete payment under the terms of the Agreement, hereby waives and 
relinquishes any and all further claims or right of lien under, in connection with, or as a result of 
the above described project.  The undersigned further agrees to indemnify and save harmless 
the City of Chandler against any and all liens, claims or liens, suits, actions, damages, charges 
and expenses whatsoever, which said City may suffer arising out of the failure of the 
undersigned to pay for all labor performances and materials furnished for the performance of 
said installation. 
 
Signed and dated at ________________, this _________ day of _______________ 20_____. 
 
 
__________________________________ 
                       CONTRACTOR 
 
By _______________________________ 
STATE OF ARIZONA  
) 
) SS 
COUNTY OF MARICOPA 
) 
 
The foregoing instrument was subscribed and sworn to before me this __________ day of 
__________________ 20 _________. 
___________________________________ 
 
 
 
 
 
Notary Public 
___________________________________ 
 
 
 
 
 
My Commission Expires

EXHIBIT F 
 
 
Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page F-1 
CERTIFICATE OF COMPLETION 
Project: 
Pima Park Sidewalk Improvements 
Project No.: PR2506.401 
 
(TO BE COMPLETED BY CONTRACTOR)
 
I HEREBY CERTIFY THAT ALL GOODS AND/OR SERVICES REQUIRED BY CITY OF CHANDLER PROJECT NO. Pima 
Park Sidewalk Improvements HAVE BEEN DELIVERED IN ACCORDANCE WITH THE AGREEMENT DOCUMENTS 
AND BID SPECIFICATIONS AND ALL ACTIVITIES REQUIRED BY THE CONTRACTOR UNDER THE AGREEMENT 
HAVE BEEN COMPLETED AS OF ____________________________. 
 
 
(Date) 
 
FIRM NAME: 
________________________________ 
 
PRINCIPAL: 
________________________________ 
         (Name) 
 
________________________________ 
      (Signature) 
 
________________________________ DATE: ___________________ 
          (Title) 
 
CERTIFIED BY ENGINEER/CONSULTANT (IF APPLICABLE): 
 
_________________________________ 
 
DATE: ____________________ 
      (Signature) 
 
_________________________________ 
 
        (Firm Name) 
  
PROJECT ACCEPTED BY USER DEPARTMENT 
 
_________________________________ 
 
DATE: ____________________ 
         (Signature) 
 
_________________________________ 
 
          (Dept. /Div.) 
 
_______________ Date of Final Walk-Through 
 
_______________ Date As-Built Received 
 
_______________ City As-Built Number

EXHIBIT G 
 
 
Project Name: Pima Park Sidewalk Improvements 
 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page G-1 
SUBCONTRACTOR DOCUMENTS WITH JOC CONTRACTOR 
 
Any subcontractor assumptions, clarifications, exclusions, terms & conditions, 
signature blocks, etc. included are strictly between the JOC Contractor and their 
subcontractors, and do not apply to the Agreement between the JOC Contractor and 
the City.

EXHIBIT H 
 
Project Name: Pima Park Sidewalk Improvements 
Project No.: PR2506.401 
Rev. 1/20/2026 
Page H-1 
 
BUILDERS RISK INSURANCE