Amendment

City of Chandler — Study Session (2026-04-20)

View PDF Meeting page

Extracted text (via pymupdf) 4133 characters
Page 1 of 3
                                                               
City Clerk Document No. 
City Council Meeting Date:
_______________
AMENDMENT TO CITY OF CHANDLER AGREEMENT
STREETLIGHT POLE REPLACEMENT
CITY OF CHANDLER AGREEMENT NO. TR3-968-4606
THIS AMENDMENT NO. 3 (Amendment No. 3) is made and entered into by and between the City of 
Chandler, an Arizona municipal corporation (City), and Paramount Assistant, LLC dba Paramount 
Streetlight, (Contractor), (City and Contractor may individually be referred to as Party and collectively 
referred to as Parties) and made __________________________, 2026 (Effective Date).
RECITALS
WHEREAS, the Parties entered into an agreement for streetlight pole replacement services (Agreement); 
and
WHEREAS, the term of the Agreement was May 1, 2023, through April 30, 2024, with the option of up to 
four one-year extensions; and
WHEREAS, the Parties wish to exercise the third option through this Amendment to extend the 
Agreement for one year.
AGREEMENT
NOW THEREFORE, the Parties agree as follows:
1.
The recitals are accurate and are incorporated and made a part of the Agreement by this 
reference.   
2.
Section III is amended to read as follows: The Agreement is extended for a one-year period May 
1, 2026, through April 30, 2027.
3. 
Section IV, Price is amended to read as follows: The City will pay the Contractor the per unit cost 
set forth in Revised Exhibit B of the original Agreement, attached to and made a part of this 
Amendment No. 3. Total payments made to the Contractor during the term of this Amendment 
No. 3 will not exceed $479,000.

Page 2 of 3 
4.
All other terms and conditions of the Agreement remain unchanged and in full force and effect.
If a conflict or ambiguity arises between this Amendment No. 3 and the Agreement, the terms
and conditions in this Amendment No. 3 prevail and control.
IN WITNESS WHEREOF, the Parties have entered into this Amendment on the Effective Date. 
FOR THE CITY
FOR THE CONTRACTOR
By: _________________________________________
By: _________________________________________
Its: __________Mayor_________________________
Its: _________________________________________
APPROVED AS TO FORM:
By: _________________________________________ 
City Attorney 
ATTEST: 
By: _________________________________________ 
City Clerk

Page 3 of 3 
 
EXHIBIT B 
REVISED PRICING 
Item
Description
Estimated 
Quantity 
Unit of 
Measure 
Unit Price
1
Install new pole and concrete foundation, 
remove/dispose of old pole and infrastructure.* 
 
 
a
30’ or 35’ SL-1 pole 
180 
Each 
$2,150 
b
30’ or 35’ SL-16 pole
11
Each
$2,075
c
30’ or 35’ SL-17 pole
5 
Each 
$2,075 
d
30’ SL-6 APS pole 
5 
Each 
$2,075 
e
38.6’ SL-8 APS pole
1
Each
$2,050
f
22.0’ Lantern Style Pole
5 
Each 
$2,050 
2
Install new pole on existing concrete foundation, 
remove/dispose of old pole.
 
 
a
30’ or 35’ SL-1 pole
5
Each
$740
b
30’ or 35’ SL-16 pole
3 
Each 
$740 
c
30’ or 35’ SL-17 pole
5 
Each 
$740 
d
30’ SL-6 APS pole 
 
2 
Each 
$740 
e
38.6’ SL-8 APS pole 
1 
Each 
$740 
f
22.0’ Lantern Style Pole
5 
Each 
$740 
3
Install new pole (Direct Burial) and PVC tube, 
remove/dispose of old pole. 
 
 
a
30’ or 35’ SL-1 pole 
5 
Each 
$620 
b
30’ or 35’ SL-16 pole
3 
Each 
$620 
c
30’ or 35’ SL-17 pole
5 
Each 
$620 
d
30’ SL-6 APS pole 
 
2 
Each 
$620 
e
38.6’ SL-8 APS pole 
1 
Each 
$620 
f
22.0’ Lantern Style Pole
2 
Each 
$620 
4
Remove and salvage pole. Remove existing 
foundation*.
15 
Each 
$1,900 
5
Supply & install 2.5 inch trenched conduit
250 
Feet
$10
6
Supply & install 2.5 inch bored conduit 
250 
Feet
$28
7
Supply & install 3.5 inch pull box 
50 
Each 
$275 
8
Spread Foundation per detail SL-20 
10 
Each 
$950 
9
Sonotubes
10 
Each 
$90
10 
Sawcutting 
50 
LF 
$75
11 
Skilled Electrical Worker, vehicle, and equipment 
hourly rate 
NA 
HR 
$95 
12 
Basic Labor Rate, vehicle, and equipment hourly 
rate
NA
HR
$75
* Includes disposal of concrete collar, if present.  For damaged concrete foundations, jackhammer one foot below finished 
grade and backfill.  Includes removal of existing signs and reinstalling on the new pole.